CRONOGRAMA VALORIZADO

OBRA CONSTRUCCION COLEGION KALBERMATER, DISTRITO POTONI-AZANGARO-PUNO


FECHA DE INICIO DE OBRA

DIAS EJECUCION PRESUPUESTAL AÑO 2013


PARTIDAS
N° DURAC MONTO MES 01 MES 02 MES 03
ESTRUCTURAS
S/. 4906.91 4906.91
1.00 OBRAS PRELIMINARES P 8
E
S/. 239.58 239.58
2.00 TRABAJOS PRELIMINARES P 6
E
S/. 2756.94 2756.94
3.00 MOVIMIENTO DE TIERRAS P 15
E
S/. 4901.33 4901.33
4.00 CONCRETO SIMPLE P 30
E
S/. 22832.89 7534.8537 7534.8537 7763.18
5.00 CONCRETO ARMADO P 45
E
S/. 880.00 880.00
6.00 PRUEBAS DE CALIDAD P 15
E
ARQUITECTURA
S/. 9619.46 3174.4218 3174.4218 3270.62
7.00 MUROS Y TABIQUES P 45
E
S/. 3995.07 1318.37 1318.37 1358.32
8.00 REVOQUES ENLUCIDOS Y MOLDURAS P 45
E
S/. 3866.21 1933.11 1933.11
9.00 CIELORRASOS P 30
E
S/. 23729.15 11864.58 11864.58
10.00 COBERTURAS P 30
E
S/. 15205.53 7602.77 7602.77
11.00 PISOS Y PAVIMENTOS P 30
E
S/. 1343.84 1343.84
12.00 ZOCALOS Y CONTRAZOCALOS P 15
E
S/. 11726.93 11726.93
13.00 CARPINTERIA DE MADERA P 15
E
S/. 236.18 236.18
14.00 CERRAJERIA P 15
E
S/. 3662.45 1831.23 1831.23
15.00 PINTURA 30
E
S/. 3903.36 3903.36
16.00 VIDRIOS, CRISTALES Y SIMILARES P 15
E
S/. 7950.00 7950.00
17.00 EQUIPAMIENTO Y MOBIILARIO P 15
E
S/. 1740.00 1740.00
18.00 PIZARRA P 15
E
S/. 3077.80 3077.80
19.00 VARIOS P 15
E
S/. 16299.30 16299.30
20.00 EVACUACION DE AGUAS PLUVIALES P 15
E
INSTALACIONES ELECTRICAS
S/. 2156.36 1078.18 1078.18
CENTROS, TOMACORRIENTES,
21.00 P 30
INTERRUPTORES
E
S/. 120.28 120.28
22.00 TABLEROS P 15
E
S/. 374.40 374.40
23.00 POZO A TIERRA P 15
E
S/. 1252.80 626.40 626.40
24.00 TUBERIA P 30
E
S/. 1041.44 1041.44
25.00 ARTEFACTOS P 15
E
147818.21
TOTAL QUINCENAL 12804.76 10709.28 10709.28 12352.17 27134.62 74108.10
TOTAL MENSUAL 23514.04 23061.45 101242.73

AVANCE PROGRAMADO 15.91% 15.60% 68.49%


MENSUAL (%) EJECUCION
AVANCE PROGRAMADO 15.91% 31.51% 100.00%
ACUMULADO (%) EJECUCION