ARQUITECTURA
LADRILLO-MURO DE SOGA M2 80.80 42.00
ARENA GRUESA 0.05
CEMENTO 0.35
ESTRUCTURAS
HORMIGON 17.8875
PISO HORMIGON 29.19 1.25
ZAPATAS 10.96
ARENA GRUESA M3 0.5
CONFITILLO M3 0.8
CEMENTO UND 9.7
ALAMBRE KG 0.35
CLAVOS KG 0.31
SOBRECIMIENTO 5.60
ARENA GRUESA M3 0.5
CONFITILLO M3 0.8
CEMENTO UND 9.7
ALAMBRE KG 0.26
CLAVOS KG 0.20
COLUMNAS 6.23
ARENA GRUESA M3 0.5
CONFITILLO M3 0.8
CEMENTO UND 9.7
ALAMBRE KG 0.35
CLAVOS KG 0.31
VIGAS 7.13
ARENA GRUESA M3 0.5
CONFITILLO M3 0.8
CEMENTO UND 9.7
ALAMBRE KG 0.21
CLAVOS KG 0.24
SOLADO 49.95
HORMIGON M3 0.132
CEMENTO UND 0.36
S/.382.17
1.50 40.00 60.03
11.67 27.60 322.14
S/.51,878.50
50 894.375 S/.894.38
36.49 50.00 1824.375 S/.1,824.38
S/.3,222.11
16.22 50.00 810.84
9.39456 65.00 610.65
65.24 27.60 1800.62
S/.3,974.53
5.48 55.00 301.40
8.768 65.00 569.92
106.31 27.60 2934.21
12.00 6.50 78.00
14.00 6.50 91.00
S/.483.64
0.43 55.00 23.38
0.68 65.00 44.20
8.25 27.60 227.56
15.00 6.50 97.50
14.00 6.50 91.00
S/.2,132.93
2.80 55.00 154.00
4.48 65.00 291.20
54.32 27.60 1499.23
15 6.50 97.50
14 6.50 91.00
S/.2,315.41 S/.11,543.88
3.12 55.00 171.33
4.98 65.00 323.96
60.43 27.60 1667.90
12.42 6.50 80.73
11.00 6.50 71.50
S/.2,595.08 S/.14,755.92
3.57 55.00 196.08
5.70 65.00 370.76
69.16 27.60 1908.84
8.57 6.50 55.71
9.80 6.50 63.70
S/.1,568.34
2.15 55.00 118.15
3.44 65.00 223.41
41.67 27.60 1150.19
5.89 6.50 38.30
5.89 6.50 38.30
S/.825.97
6.59 50.00 329.67
17.98 27.60 496.30
S/.1,867.83
10.43 50.00 521.25
48.79 27.60 1346.58
S/.1,432.94
269.88 5.00 1349.41 241.38
12.85 6.50 83.53 49.2
41.6
S/.9,228.46
1738.10 5.00 8690.48
82.77 6.50 537.98
S/.8,920.00
1680 5.00 8400.00
80.00 6.50 520.00
4.23728814
FLETE TERRESTRE I.E I.S
S/.3,000.00 S/.10,927.00 S/.12,585.00 S/.132,058.12
S/.1,650.73
S/.26,411.62
S/.158,469.75
S/.1,886.54
DECRIPCION UND CANTIDAD
PISCINA 8.75
ARENA GRUESA M3
CONFITILLO M3
CEMENTO UND
ALAMBRE KG
CLAVOS KG
SOLADO
SOLADO 15.40 M2
HORMIGON M3
CEMENTO UND
S/.254.65
0.132 2.03 50.00 101.64
0.36 5.54 27.60 153.01
50 155 155
6.5 195 195
5 2550 2550
TOTAL 6335.83