Está en la página 1de 6

UBICACIÓN:

MONTO CONTRATADO SIN IGV: -214.30%

PLAZO DE EJECUCION DE OBRA:


FECHA DE PRESUPUESTO BASE:

% DE % DE
METRADO COSTO % DE AVANCE METRADO COSTO % DE AVANCE METRADO COSTO % DE AVANCE METRADO COSTO METRADO COSTO % DE AVANCE METRADO COSTO % DE AVANCE METRADO COSTO % DE AVANCE METRADO COSTO % DE AVANCE METRADO COSTO
AVANCE AVANCE
1 OPERARIO hh 27,889.919 S/ 24.22 S/ 675,493.83 351.41 8,511.22 1.26% 1,963.45 47,554.77 7.04% 4,679.93 113,347.86 16.78% 6,517.87 157,862.91 23.37% 4,248.54 102,899.76 15.23% 1,830.09 44,324.76 6.56% 1,300.79 31,505.20 4.66% 6,997.83 169,487.35 25.09%

2 OFICIAL hh 13,465.529 S/ 19.12 S/ 257,460.92 201.98 3,861.91 1.50% 2,794.10 53,423.14 20.75% 3,059.37 58,495.12 22.72% 2,427.83 46,420.20 18.03% 1,897.29 36,276.24 14.09% 1,720.59 32,897.62 12.78% 675.97 12,924.54 5.02% 636.28 12,165.61 4.73% 52.12 996.53 0.39%

3 PEON hh 24,147.042 S/ 17.28 S/ 417,260.88 876.54 15,146.57 3.63% 3,747.09 64,749.80 15.52% 5,334.08 92,172.93 22.09% 4,822.16 83,327.00 19.97% 2,854.18 49,320.24 11.82% 3,168.09 54,744.63 13.12% 1,487.46 25,703.27 6.16% 982.29 16,973.96 4.07% 875.14 15,122.49 3.62%

4 MANO DE OBRA PROTECCION INDIVIDUAL glb 1.000 S/ 2,500.00 S/ 2,500.00 0.04 100.00 4.00% 0.13 323.00 12.92% 0.13 312.50 12.50% 0.13 323.00 12.92% 0.13 312.50 12.50% 0.13 323.00 12.92% 0.13 323.00 12.92% 0.13 312.50 12.50% 0.07 170.50 6.82%
MANO DE OBRA - CAPACITACION EN
5 glb 8.000 S/ 500.00 S/ 4,000.00 0.32 160.00 4.00% 1.03 516.80 12.92% 1.00 500.00 12.50% 1.03 516.80 12.92% 1.00 500.00 12.50% 1.03 516.80 12.92% 1.03 516.80 12.92% 1.00 500.00 12.50% 0.55 272.80 6.82%
SEGURIDAD
6 TOPOGRAFO hh 159.421 S/ 25.06 S/ 3,995.10 11.11 278.46 6.97% 20.17 505.38 12.65% 19.51 489.00 12.24% 20.17 505.38 12.65% 19.51 489.00 12.24% 20.17 505.38 12.65% 20.17 505.38 12.65% 18.91 473.82 11.86% 9.71 243.30 6.09%

7 OPERADOR DE EQUIPO LIVIANO hh 1,105.768 S/ 19.38 S/ 21,429.79 222.81 4,318.10 20.15% 300.88 5,831.05 27.21% 352.74 6,836.10 31.90% 138.55 2,685.15 12.53% 90.78 1,759.39 8.21%
CHARLAS DE CAPACITACION EN SEGURIDAD
8 glb 8.000 S/ 500.00 S/ 4,000.00 4.27 2,133.20 53.33% 3.73 1,866.80 46.67%
AL PERSONAL
9 CLAVOS DE 2" A 4" kg 19.500 S/ 5.51 S/ 107.45 19.50 107.45 100.00%

10 CODO DE A°G° Ø 1 1/2" x 90° pza 9.780 S/ 10.59 S/ 103.57 9.78 103.57 100.00%

11 CODO DE A°G° Ø 1" x 90° pza 62.500 S/ 4.58 S/ 286.25 62.50 286.25 100.00%

12 CODO DE A°G° Ø 3/4" x 90° pza 10.700 S/ 5.00 S/ 53.50 10.70 53.50 100.00%

13 ARENA FINA m3 181.294 S/ 28.00 S/ 5,076.22 25.15 704.07 13.87% 87.76 2,457.40 48.41% 42.10 1,178.70 23.22% 26.29 736.05 14.50% 0.00 0.00 0.00%

14 ALAMBRE NEGRO N° 16 kg 4,929.166 S/ 6.41 S/ 31,595.95 1,263.35 8,098.04 25.63% 2,609.99 16,730.06 52.95% 449.54 2,881.55 9.12% 545.66 3,497.67 11.07% 60.63 388.63 1.23% 0.00 0.00 0.00%

15 ALAMBRE NEGRO N° 8 kg 1,858.616 S/ 6.41 S/ 11,913.73 342.17 2,193.32 18.41% 867.04 5,557.76 46.65% 465.40 2,983.20 25.04% 159.84 1,024.58 8.60% 24.16 154.88 1.30%

16 ANGULO F°Gº 2"x2"x1/16 m 1,023.840 S/ 4.66 S/ 4,771.09 1,023.84 4,771.09 100.00%

17 ANGULO F°Gº 2"x2"x3/16 m 2,218.320 S/ 5.08 S/ 11,269.07 2,218.32 11,269.07 100.00%


ACERO CORRUGADO fy = 4200 kg/cm2
18 kg 86,146.673 S/ 4.10 S/ 353,201.36 32,945.94 135,078.36 38.24% 53,200.73 218,123.00 61.76%
GRADO 60
CLAVOS CON CABEZA P/CONSTRUCCION
19 kg 1,116.053 S/ 5.51 S/ 6,149.45 33.70 185.71 3.02% 170.64 940.25 15.29% 325.89 1,795.64 29.20% 348.21 1,918.63 31.20% 167.97 925.49 15.05% 26.56 146.36 2.38% 13.62 75.02 1.22% 29.46 162.35 2.64%
PROMEDIO
20 ABRAZADERA DE 1" pza 5.000 S/ 5.00 S/ 25.00 5.00 25.00 100.00%

21 ABRAZADERA DE 1 1/2" pza 5.000 S/ 5.85 S/ 29.25 5.00 29.25 100.00%

22 PIEDRA GRANDE DE 8" m3 13.182 S/ 48.00 S/ 632.74 13.18 632.74 100.00%

23 ARENA GRUESA m3 951.754 S/ 30.00 S/ 28,552.62 716.67 21,500.12 75.30% 82.71 2,481.22 8.69% 152.38 4,571.27 16.01% 0.00 0.00 0.00%

24 BARRENOS 3' x 7/8" pza 34.186 S/ 389.83 S/ 13,326.88 34.19 13,326.88 100.00%

25 MATERIAL DE PRESTAMO TIPO A1-a(0) IP=0 m3 147.504 S/ 31.36 S/ 4,625.73 147.50 4,625.73 100.00%

26 TUBO PVC DESAGUE SAL 4" x 3m pza 102.331 S/ 30.83 S/ 3,154.87 57.83 1,782.82 56.51% 16.00 493.42 15.64% 28.50 878.63 27.85%

27 TUBO PVC DESAGUE SAL 3" x 3m pza 4.865 S/ 30.25 S/ 147.17 4.87 147.17 100.00%

28 TUBO PVC DESAGUE SAL 6" pza 5.635 S/ 151.69 S/ 854.77 5.63 854.77 100.00%

29 TUBO PVC DESAGUE SAL 2" x 3m pza 91.551 S/ 14.15 S/ 1,295.44 47.19 667.80 51.55% 44.36 627.64 48.45% 0.00 0.00 0.00%

30 CURVA PVC-SAP 50mm und 2.415 S/ 16.02 S/ 38.69 2.42 38.69 100.00%

31 CURVA PVC-SAP 35mm und 62.126 S/ 9.24 S/ 574.05 1.40 12.97 2.26% 60.72 561.08 97.74%

32 CURVA PVC-SAP 25mm und 37.200 S/ 3.31 S/ 123.13 32.20 106.58 86.56% 5.00 16.55 13.44%
ADAPTADOR UNION PRESION.ROSCA PVC
33 pza 2.000 S/ 3.31 S/ 6.62 2.00 6.62 100.00%
SAP 1"
ADAPTADOR UNION PRESION.ROSCA PVC
34 pza 14.000 S/ 0.85 S/ 11.90 14.00 11.90 100.00%
SAP 1/2"
ADAPTADOR UNION PRESION.ROSCA PVC
35 pza 20.000 S/ 2.46 S/ 49.20 20.00 49.20 100.00%
SAP 3/4"
ADAPTADOR UNION PRESION.ROSCA PVC
36 pza 17.000 S/ 9.24 S/ 157.08 17.00 157.08 100.00%
SAP 2 1/2"
37 TAPON PVC SAL DESAGUE 4" pza 8.000 S/ 11.78 S/ 94.24 8.00 94.24 100.00%

38 TAPON PVC SAL DESAGUE 2" pza 12.920 S/ 5.00 S/ 64.60 12.92 64.60 100.00%

39 TEE SANITARIA SIMPLE PVC SAL DE 4" und 16.000 S/ 19.66 S/ 314.56 16.00 314.56 100.00%

40 YEE SIMPLE PVC 4"X4" und 7.000 S/ 16.02 S/ 112.14 7.00 112.14 100.00%

41 YEE SIMPLE PVC 2"X2" und 1.000 S/ 4.15 S/ 4.15 1.00 4.15 100.00%
CONECTOR DE POLICARBONATO HCP,
42 und 124.342 S/ 93.14 S/ 11,581.23 124.34 11,581.23 100.00%
L=5.80m
43 PIEDRA CHANCADA 1/2" m3 710.008 S/ 60.00 S/ 42,600.49 107.07 6,424.15 15.08% 437.86 26,271.72 61.67% 56.37 3,382.48 7.94% 108.70 6,522.14 15.31%

44 OVER SELECCIONADO T.M. 2"-4" m3 97.260 S/ 45.00 S/ 4,376.70 97.26 4,376.70 100.00%

45 OVER SELECCIONADO T.M. 4"-8" m3 151.975 S/ 48.00 S/ 7,294.80 151.98 7,294.80 100.00%

46 OVER SELECCIONADO T.M. 2"-3" m3 830.472 S/ 42.37 S/ 35,187.10 830.47 35,187.10 100.00%

47 OVER SELECCIONADO T.M. 1"-2" m3 927.732 S/ 42.37 S/ 39,308.00 927.73 39,308.00 100.00%

48 PIEDRA MEDIANA DE 2" m3 2.708 S/ 42.37 S/ 114.74 2.71 114.74 100.00%

49 HORMIGON m3 176.069 S/ 38.14 S/ 6,715.26 176.07 6,715.26 100.00%

50 AFIRMADO m3 116.935 S/ 38.14 S/ 4,459.90 116.93 4,459.90 100.00%

51 INODORO DE LOZA VITRIFICADA und 3.000 S/ 191.69 S/ 575.07 3.00 575.07 100.00%
INODORO SUSPENDIDO DE LOZA
52 und 1.000 S/ 744.92 S/ 744.92 1.00 744.92 100.00%
VITRIFICADA
53 LAVATORIO INCL. ACCESORIOS und 8.000 S/ 99.92 S/ 799.36 4.27 426.30 53.33% 3.73 373.06 46.67%

54 EQUIPO DE DESINFECCION Y/O FUMIGACION mes 8.000 S/ 84.66 S/ 677.28 4.27 361.19 53.33% 3.73 316.09 46.67%

55 URINARIO LOSA BLANCA C/ACCESORIOS und 1.000 S/ 156.44 S/ 156.44 1.00 156.44 100.00%
SEÑAL DE EXTINTOR PORTATIL PQS
56 und 1.000 S/ 17.37 S/ 17.37 1.00 17.37 100.00%
(ADHESIVO 0.2X0.30 M.)
SEÑAL DE EXTINTOR CO2 (ADHESIVO
57 und 10.000 S/ 17.37 S/ 173.70 10.00 173.70 100.00%
0.2X0.30 M.)
SEÑAL DE BOTIQUIN (AUTOADHESIVO
58 und 8.000 S/ 7.54 S/ 60.32
0.20x0.30m)

W
CRONOGRAMA DE ADQUISICION DE MATERIALES
"REHABILITACIÓN EN EL LOCAL ESCOLAR 0313, CÓDIGO LOCAL 033821, EN EL P.J. MIRAFLORES ALTO, DISTRITO DE CHIMBOTE, PROVINCIA DE SANTA, DEPARTAMENTO DE ANCASH"
UBICACIÓN: CHIMBOTE, SANTA - ANCASH
MONTO CONTRATADO SIN IGV: S/. 6,079,175.38 -214.30%

PLAZO DE EJECUCION DE OBRA: 240 DIAS CALENDARIOS


FECHA DE PRESUPUESTO BASE: Abr-22
DEL DEL DEL DEL DEL DEL DEL DEL DEL
13 de Febrero de 2023 1 de Marzo de 2023 1 de Abril de 2023 1 de Mayo de 2023 1 de Junio de 2023 1 de Julio de 2023 1 de Agosto de 2023 1 de Setiembre de 2023 1 de Octubre de 2023
AL AL AL AL AL AL AL AL AL
RECURSOS UND CANTIDAD PRECIO (S/.) SUB TOTAL (S/.)
28 de Febrero de 2023 31 de Marzo de 2023 30 de Abril de 2023 31 de Mayo de 2023 30 de Junio de 2023 31 de Julio de 2023 31 de Agosto de 2023 30 de Setiembre de 2023 10 de Octubre de 2023
% DE % DE
METRADO COSTO % DE AVANCE METRADO COSTO % DE AVANCE METRADO COSTO % DE AVANCE METRADO COSTO METRADO COSTO % DE AVANCE METRADO COSTO % DE AVANCE METRADO COSTO % DE AVANCE METRADO COSTO % DE AVANCE METRADO COSTO
AVANCE AVANCE
TABLERO GABINETE METAL BARRA COBRE
80 und 6.000 S/ 364.23 S/ 2,185.38 6.00 2,185.38 100.00%
26 POLOS 3ø
TOMACORRIENTE BIPOLAR DOBLE C/P A
81 pza 59.000 S/ 16.10 S/ 949.90 59.00 949.90 100.00%
TIERRA
82 INTERRUPTOR TERMOMAGNETICO DE 3x50A und 1.000 S/ 66.86 S/ 66.86 1.00 66.86 100.00%

83 INTERRUPTOR TERMOMAGNETICO DE 3x80A und 1.000 S/ 69.80 S/ 69.80 1.00 69.80 100.00%
INTERRUPTOR TERMOMAGNETICO DE 2x16A-
84 und 18.000 S/ 52.75 S/ 949.50 18.00 949.50 100.00%
10KA RIEL DIN
85 INTERRUPTOR TERMOMAGNETICO DE 2x20A und 1.000 S/ 52.75 S/ 52.75 1.00 52.75 100.00%
INTERRUPTOR TERMOMAGNETICO DE 3x30A
86 und 6.000 S/ 67.80 S/ 406.80 6.00 406.80 100.00%
10KA RIEL DIN
INTERRUPTOR TERMOMAGNETICO DE 2x20A-
87 und 13.000 S/ 52.75 S/ 685.75 13.00 685.75 100.00%
3KA RIEL DIN
INTERRUPTOR TERMOMAGNETICO DE 3x50A-
88 und 6.000 S/ 66.86 S/ 401.16 6.00 401.16 100.00%
10KA RIEL DIN
89 CAMPANA DE BRECHA DE AIRE Ø4" und 1.000 S/ 5.85 S/ 5.85 1.00 5.85 100.00%
CAMPANILLA DE TIMBRE E=8" CON TRANF
90 und 1.000 S/ 50.76 S/ 50.76 1.00 50.76 100.00%
220/12V
91 UNION UNIVERSAL DE Ø1" und 6.000 S/ 12.71 S/ 76.26 6.00 76.26 100.00%

92 UNION UNIVERSAL DE Ø3/4" und 2.000 S/ 10.17 S/ 20.34 2.00 20.34 100.00%

93 SISTEMA DE MALLA ANTIAFIDA glb 1.000 S/ 200.00 S/ 200.00 1.00 200.00 100.00%

94 SISTEMA DE ENTIBADO glb 1.000 S/ 400.00 S/ 400.00 1.00 400.00 100.00%

95 SISTEMA DE EXTRACCION DE AIRE glb 1.000 S/ 600.00 S/ 600.00 1.00 600.00 100.00%
SISTEMA DE BLOQUEO (TARJETA Y
96 glb 1.000 S/ 200.00 S/ 200.00 1.00 200.00 100.00%
CANDADO)
CAJA OCTOGONAL GALVANIZADA LIVIANA
97 und 232.000 S/ 4.15 S/ 962.80 232.00 962.80 100.00%
100X55MM
CAJA RECTANGULAR GALVANIZADA LIVIANA
98 und 130.000 S/ 5.85 S/ 760.50 130.00 760.50 100.00%
DE 4" X 2 1/8"
99 TAPA DE ACERO INOX. DE 1 1/2" und 1.900 S/ 30.00 S/ 57.00 1.90 57.00 100.00%

100 TAPA DE REGISTRO pza 1.120 S/ 120.00 S/ 134.40 1.12 134.40 100.00%

101 PUENTE DE ADHERENCIA gal 4.837 S/ 100.76 S/ 487.38 4.84 487.38 100.00%

102 PLAN DE CIERRE DE OBRA glb 1.000 S/ 1,000.00 S/ 1,000.00 0.53 533.30 53.33% 0.47 466.70 46.67%
LLAVE DE URINARIO TEMPORIZADA
103 und 1.000 S/ 88.90 S/ 88.90 1.00 88.90 100.00%
CROMADO
104 INTERRUPTOR DIFERENCIAL 2x20A, 30mA und 1.000 S/ 163.47 S/ 163.47 0.53 87.18 53.33% 0.47 76.29 46.67%
INTERRUPTOR DIFERENCIAL 2x25A - 30mA
105 und 31.000 S/ 114.41 S/ 3,546.71 31.00 3,546.71 100.00%
SENSIBILIDAD
INTERRUPTOR DIFERENCIAL 2x30A - 30mA
106 und 1.000 S/ 114.41 S/ 114.41 1.00 114.41 100.00%
SENSIBILIDAD
107 SENSOR DE NIVEL DE AGUA TIPO FLOTANTE und 2.000 S/ 70.25 S/ 140.50 2.00 140.50 100.00%

108 CONTACTOR DE 2X16A und 6.000 S/ 70.40 S/ 422.40 6.00 422.40 100.00%
CONTACTOR CON BOBINA DE 24V,
109 und 3.000 S/ 70.40 S/ 211.20 3.00 211.20 100.00%
100W,RIEL DIN
110 CONTACTOR AUXILIAR NA, 24 V, RIEL DIN und 1.000 S/ 72.00 S/ 72.00 1.00 72.00 100.00%

111 SELECTOR MANUAL und 1.000 S/ 30.89 S/ 30.89 1.00 30.89 100.00%

112 GUARDAMOTOR BIPOLAR RIEL DIN und 1.000 S/ 130.29 S/ 130.29 1.00 130.29 100.00%

113 PILOTO DE SEÑALIZACION glb 1.000 S/ 15.63 S/ 15.63 1.00 15.63 100.00%

114 ASFALTO LIQUIDO RC-250 gal 221.739 S/ 10.45 S/ 2,317.17 221.74 2,317.17 100.00%

115 FRAGUA kg 41.399 S/ 7.20 S/ 298.07 41.40 298.07 100.00%

116 CODO PVC SAL 4" X 90° und 32.000 S/ 8.22 S/ 263.04 32.00 263.04 100.00%

117 UNION UNIVERSAL CON ROSCA PVC SAP 1" pza 2.000 S/ 10.08 S/ 20.16 2.00 20.16 100.00%
UNION UNIVERSAL CON ROSCA PVC SAP
118 pza 14.000 S/ 2.97 S/ 41.58 14.00 41.58 100.00%
1/2"
UNION UNIVERSAL CON ROSCA PVC SAP
119 pza 20.000 S/ 6.69 S/ 133.80 20.00 133.80 100.00%
3/4"
120 LADRILLO PASTELERO 24 X 24 X 3 cm und 13,789.550 S/ 1.35 S/ 18,615.89 13,789.55 18,615.89 100.00%

121 GRASS SINTETICO m2 250.425 S/ 49.15 S/ 12,308.39 250.43 12,308.39 100.00%


LADRILLO DE ARCILLA PARA TECHO
122 und 6,259.050 S/ 2.58 S/ 16,148.35 6,259.05 16,148.35 100.00%
15X30X30
LADRILLO ARCILLA KING KONG 18 HUECOS
123 und 55,299.000 S/ 0.97 S/ 53,640.03 55,299.00 53,640.03 100.00%
(TIPO IV) 9x12.5x23cm
124 CABLE ELÉCTRICO NHX-90 2-1x2.5mm2 m 999.900 S/ 2.15 S/ 2,149.79 999.90 2,149.79 100.00%
CABLE ELÉCTRICO NHX 90 1x2.5mm2 (T)
125 m 1,266.093 S/ 2.15 S/ 2,722.10 766.11 1,647.14 60.51% 499.98 1,074.96 39.49%
VERDE CON FRANJA AMARILLO
CABLE ELÉCTRICO NHX 90 1x4mm2 (T)
126 m 1,320.346 S/ 3.01 S/ 3,974.24 360.85 1,086.16 27.33% 959.50 2,888.08 72.67%
VERDE CON FRANJA AMARILLO
127 CABLE ELÉCTRICO NHX-90 2-1x4mm2 m 1,025.150 S/ 3.01 S/ 3,085.70 1,025.15 3,085.70 100.00%

128 CABLE ELÉCTRICO N2XOH 3-1 x 10 mm2 m 567.588 S/ 7.46 S/ 4,234.21 567.59 4,234.21 100.00%
CABLE ELÉCTRICO N2XOH 1 x 10 mm2 (T)
129 m 141.897 S/ 7.46 S/ 1,058.55 141.90 1,058.55 100.00%
AMARILLO
130 CABLE ELÉCTRICO N2XOH 3-1x6mm2 m 196.896 S/ 4.36 S/ 858.47 196.90 858.47 100.00%
CABLE ELÉCTRICO N2XOH 1x6mm2(T)
131 m 200.142 S/ 4.36 S/ 872.62 200.14 872.62 100.00%
AMARILLO
132 CABLE ELÉCTRICO N2XOH 1x6mm2 m 301.833 S/ 4.36 S/ 1,315.99 301.83 1,315.99 100.00%

133 CABLE ELÉCTRICO NHX-90 1x4mm2 m 721.686 S/ 3.01 S/ 2,172.27 721.68 2,172.27 100.00%

134 CABLE ELÉCTRICO NHX-90 1x2.5mm2 m 1,532.286 S/ 2.15 S/ 3,294.41


CRONOGRAMA DE ADQUISICION DE MATERIALES
"REHABILITACIÓN EN EL LOCAL ESCOLAR 0313, CÓDIGO LOCAL 033821, EN EL P.J. MIRAFLORES ALTO, DISTRITO DE CHIMBOTE, PROVINCIA DE SANTA, DEPARTAMENTO DE ANCASH"
UBICACIÓN: CHIMBOTE, SANTA - ANCASH
MONTO CONTRATADO SIN IGV: S/. 6,079,175.38 -214.30%

PLAZO DE EJECUCION DE OBRA: 240 DIAS CALENDARIOS


FECHA DE PRESUPUESTO BASE: Abr-22
DEL DEL DEL DEL DEL DEL DEL DEL DEL
13 de Febrero de 2023 1 de Marzo de 2023 1 de Abril de 2023 1 de Mayo de 2023 1 de Junio de 2023 1 de Julio de 2023 1 de Agosto de 2023 1 de Setiembre de 2023 1 de Octubre de 2023
AL AL AL AL AL AL AL AL AL
RECURSOS UND CANTIDAD PRECIO (S/.) SUB TOTAL (S/.)
28 de Febrero de 2023 31 de Marzo de 2023 30 de Abril de 2023 31 de Mayo de 2023 30 de Junio de 2023 31 de Julio de 2023 31 de Agosto de 2023 30 de Setiembre de 2023 10 de Octubre de 2023
% DE % DE
METRADO COSTO % DE AVANCE METRADO COSTO % DE AVANCE METRADO COSTO % DE AVANCE METRADO COSTO METRADO COSTO % DE AVANCE METRADO COSTO % DE AVANCE METRADO COSTO % DE AVANCE METRADO COSTO % DE AVANCE METRADO COSTO
AVANCE AVANCE
159 HIPOCLORITO DE SODIO AL 5% l 400.000 S/ 2.94 S/ 1,176.00 400.00 1,176.00 100.00%
HINCADO CON MARTILLO HINCA PILOTES,
160 und 133.000 S/ 2,820.00 S/ 375,060.00 44.00 124,077.64 33.08% 54.45 153,559.82 40.94% 34.55 97,422.53 25.98%
DE ACUERDO A CAPACIDAD REQUERIDA
161 SOLDADURA CELLOCORD 1/8" kg 292.604 S/ 14.32 S/ 4,190.08 2.60 37.29 0.89% 290.00 4,152.79 99.11%

162 ACCESORIOS DIVERSOS pza 7.000 S/ 42.37 S/ 296.59 7.00 296.59 100.00%

163 LIQUIDO LIMPIAVIDRIOS gal 21.077 S/ 16.86 S/ 355.36 1.00 16.84 4.74% 20.08 338.52 95.26%
ADITIVO ADHESIVO EPOXICO PARA
164 bal 0.130 S/ 68.22 S/ 8.87 0.13 8.87 100.00%
ANCLAJE
165 EMPASTE bls 191.965 S/ 32.12 S/ 6,165.92 191.97 6,165.92 100.00%

166 ADITIVO PLASTIFICANTE gal 7.505 S/ 29.58 S/ 222.00 3.07 90.66 40.84% 4.44 131.34 59.16%

167 ALARMAS AUDIBLES C/PULSADOR und 7.000 S/ 338.14 S/ 2,366.98 3.73 1,262.31 53.33% 3.27 1,104.67 46.67%
PANEL DE ALARMA CONTRA INCENDIOS FA-
168 und 5.000 S/ 1,101.69 S/ 5,508.45 5.00 5,508.45 100.00%
106R(6 ZONAS)
169 ALARMAS CONTRA INCENDIO und 5.000 S/ 127.03 S/ 635.15 5.00 635.15 100.00%

170 PEGAMENTO DE CERAMICO (25 Kg) bls 26.606 S/ 36.10 S/ 960.46 26.61 960.46 100.00%

171 PEGAMENTO PARA PVC FORDUIT gal 2.875 S/ 160.59 S/ 461.63 2.87 461.63 100.00%

172 SOLDADURA CELLOCORD P 3/16" kg 0.374 S/ 15.17 S/ 5.68 0.37 5.68 100.00%

173 VARILLA DE FIERRO CORRUGADO 1/2" var 1.673 S/ 35.69 S/ 59.72 1.67 59.72 100.00%

174 VARILLA DE FIERRO CORRUGADO 3/8" var 34.128 S/ 19.90 S/ 679.15 34.13 679.15 100.00%

175 CINTA TEFLON pza 1.800 S/ 2.46 S/ 4.43 1.80 4.43 100.00%
CINTA AISLANTE ELECTRICA ASA PLAST 19 X
176 rll 18.400 S/ 9.28 S/ 170.75 18.40 170.75 100.00%
10 m.
177 ZOCALO DE ALUMINIO m 246.576 S/ 16.56 S/ 4,083.30 246.58 4,083.30 100.00%
TRAJE DE BATA DE AISLAMIENTO
178 DESECHABLE DE MICROFIBRA NO TEJIDA A und 8.000 S/ 25.34 S/ 202.72 4.27 108.11 53.33% 3.73 94.61 46.67%
PRUEBA DE AGUA
179 SELLO DE AGUA und 7.000 S/ 8.47 S/ 59.29 7.00 59.29 100.00%

180 MADERA NACIONAL P/ENCOFRADO p2 31,169.081 S/ 5.93 S/ 184,832.65 24,517.60 145,389.36 78.66% 6,651.48 39,443.29 21.34%

181 MADERA TORNILLO p2 1,106.253 S/ 5.85 S/ 6,471.58 1,106.25 6,471.58 100.00%

182 MADERA TORNILLO CEPILLADA p2 3.780 S/ 8.00 S/ 30.24 3.78 30.24 100.00%
MADERA TORNILLO SELECCIONADA Y
183 p2 4,239.970 S/ 6.36 S/ 26,966.21 5.51 35.06 0.13% 4,234.46 26,931.15 99.87%
PREPARADA
184 MDF 5.5 mm 1.52 X 2.44 pln 16.052 S/ 110.90 S/ 1,780.13 16.05 1,780.13 100.00%

185 TABLERO DE MELAMINE E=18MM pza 3.744 S/ 211.78 S/ 792.90 3.74 792.90 100.00%

186 REMACHE pza 37.440 S/ 2.50 S/ 93.60 37.44 93.60 100.00%

187 LISTELO 0.10m x 0.40m pza 436.288 S/ 14.32 S/ 6,247.64 436.29 6,247.64 100.00%
MOVILIZACION Y DESMOVILIZACION DE
188 glb 1.000 S/ 45,500.00 S/ 45,500.00 1.00 45,500.00 100.00%
EQUIPOS DE PILOTAJE
189 PLANCHA LAF Gº E=1/8" und 1.810 S/ 340.03 S/ 615.32 1.81 615.32 100.00%

190 BISAGRA DE ACERO ALUMINIZADO DE 4"x2" und 36.000 S/ 21.95 S/ 790.20 36.00 790.20 100.00%

191 LIJA #80 (Pliego 30cm x 30cm) und 1,220.648 S/ 2.12 S/ 2,587.77 1,220.65 2,587.77 100.00%

192 LIJA und 20.920 S/ 2.12 S/ 44.35 20.92 44.35 100.00%

193 LIJA PARA MADERA und 357.112 S/ 2.46 S/ 878.50 357.11 878.50 100.00%

194 LIJA PARA AGUA und 550.060 S/ 2.12 S/ 1,166.13 12.98 27.52 2.36% 537.08 1,138.61 97.64%

195 CILINDRO VACIO und 2.000 S/ 76.27 S/ 152.54 1.07 81.35 53.33% 0.93 71.19 46.67%

196 CERA LIQUIDA NEUTRO gal 15.152 S/ 37.71 S/ 571.39 0.99 37.25 6.52% 14.16 534.14 93.48%

197 AMBIENTADOR ANTIBACTERIAL PARA PISOS gal 142.521 S/ 30.42 S/ 4,335.49 0.98 29.91 0.69% 141.54 4,305.58 99.31%
AGUA TRANSPORTADA EN CISTERNA A
198 m3 522.240 S/ 10.00 S/ 5,222.40 25.96 259.55 4.97% 221.59 2,215.86 42.43% 143.88 1,438.77 27.55% 71.29 712.86 13.65% 59.54 595.35 11.40%
OBRA
199 HIPOCLORITO DE CALCIO AL 70% kg 1.442 S/ 21.80 S/ 31.44 1.44 31.44 100.00%

200 SOLUCION DE ALCOHOL ETILICO AL 70% l 400.000 S/ 9.75 S/ 3,900.00 213.32 2,079.87 53.33% 186.68 1,820.13 46.67%

201 RACK DE SERVIDOR-DATA(INCLUYE MODEM) und 1.000 S/ 1,200.00 S/ 1,200.00 1.00 1,200.00 100.00%
GIGANTOGRAFIA DE LONA A COLOR
202 und 1.000 S/ 600.00 S/ 600.00 0.53 319.98 53.33% 0.47 280.02 46.67%
3.60x2.40 M
INSTALACIONES ELECTRICAS
203 glb 1.000 S/ 2,000.00 S/ 2,000.00 0.53 1,066.60 53.33% 0.47 933.40 46.67%
PROVISIONALES
INSTRUCTIVO PARA EL MOVIMIENTO DE
204 MAQUINARIA, TRANSPORTE DE MATERIALES glb 1.000 S/ 500.00 S/ 500.00 0.53 266.65 53.33% 0.47 233.35 46.67%
Y EQUIPOS (INC PREVENCIONISTA)
MANEJO DE MATERIAL PARTICULADO
205 glb 1.000 S/ 500.00 S/ 500.00 0.53 266.65 53.33% 0.47 233.35 46.67%
DURANTE LA OBRA
MANEJO DE RESIDUOS SOLIDOS DURANTE
206 mes 8.000 S/ 150.00 S/ 1,200.00 4.27 639.96 53.33% 3.73 560.04 46.67%
LA CONSTRUCCION
207 PRUEBAS DE COMUNICACIONES Y ACI und 1.000 S/ 900.00 S/ 900.00 1.00 900.00 100.00%

208 GUANTES DE CUERO par 40.000 S/ 15.17 S/ 606.80 21.33 323.61 53.33% 18.67 283.19 46.67%

209 CHALECOS REFLECTANTE und 40.000 S/ 18.56 S/ 742.40 21.33 395.92 53.33% 18.67 346.48 46.67%

210 JABON COMUN und 240.000 S/ 2.71 S/ 650.40 127.99 346.86 53.33% 112.01 303.54 46.67%

211 TERMOMETRO INFRAROJO mes 8.000 S/ 117.80 S/ 942.40 4.27 502.58 53.33% 3.73 439.82 46.67%

212 PRUEBA RAPIDA COVID-2019 und 160.000 S/ 67.80 S/ 10,848.00 85.33 5,785.24 53.33% 74.67 5,062.76 46.67%

213 MASCARILLA N95 und 3,200.000 S/ 8.45 S/ 27,040.00 1,706.56 14,420.43 53.33% 1,493.44 12,619.57 46.67%

214 MALLA DE PLASTICO PARA SEGURIDAD rll 15.000 S/ 59.24 S/ 888.60 8.00 473.89 53.33%
CRONOGRAMA DE ADQUISICION DE MATERIALES
"REHABILITACIÓN EN EL LOCAL ESCOLAR 0313, CÓDIGO LOCAL 033821, EN EL P.J. MIRAFLORES ALTO, DISTRITO DE CHIMBOTE, PROVINCIA DE SANTA, DEPARTAMENTO DE ANCASH"
UBICACIÓN: CHIMBOTE, SANTA - ANCASH
MONTO CONTRATADO SIN IGV: S/. 6,079,175.38 -214.30%

PLAZO DE EJECUCION DE OBRA: 240 DIAS CALENDARIOS


FECHA DE PRESUPUESTO BASE: Abr-22
DEL DEL DEL DEL DEL DEL DEL DEL DEL
13 de Febrero de 2023 1 de Marzo de 2023 1 de Abril de 2023 1 de Mayo de 2023 1 de Junio de 2023 1 de Julio de 2023 1 de Agosto de 2023 1 de Setiembre de 2023 1 de Octubre de 2023
AL AL AL AL AL AL AL AL AL
RECURSOS UND CANTIDAD PRECIO (S/.) SUB TOTAL (S/.)
28 de Febrero de 2023 31 de Marzo de 2023 30 de Abril de 2023 31 de Mayo de 2023 30 de Junio de 2023 31 de Julio de 2023 31 de Agosto de 2023 30 de Setiembre de 2023 10 de Octubre de 2023
% DE % DE
METRADO COSTO % DE AVANCE METRADO COSTO % DE AVANCE METRADO COSTO % DE AVANCE METRADO COSTO METRADO COSTO % DE AVANCE METRADO COSTO % DE AVANCE METRADO COSTO % DE AVANCE METRADO COSTO % DE AVANCE METRADO COSTO
AVANCE AVANCE
238 JG-01 JUEGO INFANTIL DE SUBE Y BAJA und 2.000 S/ 4,000.00 S/ 8,000.00 2.00 8,000.00 100.00%

239 JG-03 JUEGO INFANTIL DE TOBOGAN und 2.000 S/ 4,000.00 S/ 8,000.00 2.00 8,000.00 100.00%

240 JG-02 JUEGO INFANTIL DE COLUMPIO und 4.000 S/ 4,500.00 S/ 18,000.00 4.00 18,000.00 100.00%

KIT DE INSTALACIÓN PARA INODORO


241 BLANCO (INC. TUBO DE ABASTO, ANILLO DE und 16.000 S/ 74.49 S/ 1,191.84 16.00 1,191.84 100.00%
CERA Y PERNOS DE ANCLAJE)
LAVATORIO OVALIN LOSA BLANCA
242 und 12.000 S/ 148.14 S/ 1,777.68 12.00 1,777.68 100.00%
C/ACCESORIOS
243 TAPA PARA ABERTURA EN LOSA und 5.000 S/ 50.00 S/ 250.00 2.67 133.33 53.33% 2.33 116.68 46.67%

244 TAPA ABS DE PLASTICO PARA VALVULAS pza 17.000 S/ 50.76 S/ 862.92 17.00 862.92 100.00%

245 CARTELA METALICA 120x75x9mm ASTM A36 und 104.000 S/ 3.39 S/ 352.56 104.00 352.56 100.00%

246 TEE DE AºGº 1" pza 7.250 S/ 10.93 S/ 79.24 7.25 79.24 100.00%

247 TEE DE AºGº 3/4" pza 2.350 S/ 4.83 S/ 11.35 2.35 11.35 100.00%

248 PLATINA LAC G° 1 1/2" x 3/16" m 8.960 S/ 8.47 S/ 75.89 8.96 75.89 100.00%
BARRA ROSCADA DE 16mm x 370mm ASTM
249 und 52.000 S/ 35.00 S/ 1,820.00 52.00 1,820.00 100.00%
A325
250 BARRA REDONDA LISA 1/2" x 6 m pza 41.546 S/ 38.14 S/ 1,584.56 41.55 1,584.56 100.00%

251 CANAL DE ALUMINIO m 246.576 S/ 3.67 S/ 904.93 246.57 904.93 100.00%


PLANCHA DE POLICARBONATO ALVEOLAR
252 pln 124.342 S/ 381.36 S/ 47,419.14 124.34 47,419.14 100.00%
E=8mm, 1.05x5.80m
253 PERFIL L DE 1"x1"x1/8" pza 1.872 S/ 5.85 S/ 10.95 1.87 10.95 100.00%

254 SOPORTE DE CANALETA und 46.400 S/ 8.50 S/ 394.40 46.40 394.40 100.00%
PARANTES DE MADERA H=1.20 M C/BASE DE
255 und 60.000 S/ 25.42 S/ 1,525.20 32.00 813.39 53.33% 28.00 711.81 46.67%
CONCRETO 0.25x0.25 M
PARASOL PREFABRICADO EMPERNADO
256 C/MARCO DE 2" S/DISEÑO INC. ACCESORIOS m2 89.500 S/ 101.69 S/ 9,101.26 89.50 9,101.26 100.00%
DE FIJACION
257 VALVULA ESFERICA DE BRONCE 1" pza 2.000 S/ 60.93 S/ 121.86 2.00 121.86 100.00%
VALVULA FLOTADORA DE BRONCE DE 1"
258 und 1.000 S/ 167.71 S/ 167.71 1.00 167.71 100.00%
INCLUYE BOYA
MEDIDOR DN 15MM INC/ANCLAJE Y ACC
259 und 1.000 S/ 220.34 S/ 220.34 1.00 220.34 100.00%
PARA INSTALACION
ABRAZADERA 2 CUERPOS TERMOPLASTICA
260 und 1.000 S/ 24.49 S/ 24.49 1.00 24.49 100.00%
PVC 110/15MM - Inc. Acc.
261 VALVULA COMPUERTA 3" pza 1.000 S/ 300.85 S/ 300.85 1.00 300.85 100.00%

262 PINTURA ESMALTE SINTETICO gal 13.923 S/ 44.07 S/ 613.60 7.43 327.23 53.33% 6.50 286.37 46.67%

263 PINTURA OLEO MATE gal 189.200 S/ 44.92 S/ 8,498.88 189.20 8,498.88 100.00%

264 PINTURA MATE PARA MADERA gal 12.053 S/ 44.92 S/ 541.41 12.05 541.41 100.00%

265 PINTURA AL DUCO gal 12.053 S/ 43.22 S/ 520.92 12.05 520.92 100.00%

266 PINTURA ESMALTE EPOXICA gal 31.300 S/ 114.32 S/ 3,578.23 1.04 118.80 3.32% 30.26 3,459.43 96.68%

267 PINTURA ANTICORROSIVA EPOXICA gal 31.300 S/ 114.32 S/ 3,578.23 1.04 118.80 3.32% 30.26 3,459.43 96.68%

268 PRESERVANTE DE MADERA l 54.786 S/ 14.83 S/ 812.47 54.79 812.47 100.00%

269 SOLDADURA P/ACERO INOX. kg 0.238 S/ 13.47 S/ 3.20 0.24 3.20 100.00%
PLACA DE ANCLAJE 400x400x16mm ASTM
270 und 13.000 S/ 93.88 S/ 1,220.44 13.00 1,220.44 100.00%
A36
CALAMINA GALVANIZADA ZINC 24CANALES
271 pl 11.220 S/ 27.03 S/ 303.28 5.98 161.74 53.33% 5.24 141.54 46.67%
1.83 X 1.085 m X 0.6 mm
PUERTA METALICA PRELAGLE SEGUN
272 m2 12.600 S/ 650.00 S/ 8,190.00 12.60 8,190.00 100.00%
DISEÑO
PAPELERA DE PLÁSTICO CON TAPA Y
273 und 16.000 S/ 30.42 S/ 486.72 16.00 486.72 100.00%
VENTANA BATIBLE
CABINA DE LAVADO DE MANOS INCL.
274 mes 8.000 S/ 300.00 S/ 2,400.00 4.27 1,279.92 53.33% 3.73 1,120.08 46.67%
SUMINISTRO E INST.
275 PIZARRA DE ACERO VITRIFICADO O SIMILAR und 7.000 S/ 364.41 S/ 2,550.87 7.00 2,550.87 100.00%

276 DETECTOR DE HUMO und 40.000 S/ 50.00 S/ 2,000.00 40.00 2,000.00 100.00%

277 CRUCETAS DE 2mm cto 77.749 S/ 5.07 S/ 394.19 77.75 394.19 100.00%

278 TIRAFONES DE 1/4" x 2" und 37.440 S/ 1.65 S/ 61.78 37.44 61.78 100.00%

279 TAPON, ABRAZADERA Y ACCESORIOS glb 6.643 S/ 8.47 S/ 56.27 6.64 56.27 100.00%

280 CASCO DE PROTECCIÓN und 25.000 S/ 11.78 S/ 294.50 13.33 157.06 53.33% 11.67 137.44 46.67%

281 LENTES DE PROTECCIÓN und 40.000 S/ 12.63 S/ 505.20 21.33 269.42 53.33% 18.67 235.78 46.67%

282 TAPONES AUDITIVOS par 40.000 S/ 2.97 S/ 118.80 21.33 63.36 53.33% 18.67 55.44 46.67%

283 ARNES DE SEGURIDAD PECTORAL und 10.000 S/ 169.41 S/ 1,694.10 5.33 903.46 53.33% 4.67 790.64 46.67%

284 PROTECTOR FACIAL und 64.000 S/ 12.71 S/ 813.44 34.13 433.81 53.33% 29.87 379.63 46.67%

285 CORTAVIENTOS und 40.000 S/ 10.08 S/ 403.20 21.33 215.03 53.33% 18.67 188.17 46.67%

286 BOTINES DE CUERO par 40.000 S/ 59.24 S/ 2,369.60 21.33 1,263.71 53.33% 18.67 1,105.89 46.67%

287 LINEA DE VIDA und 10.000 S/ 55.08 S/ 550.80 5.33 293.74 53.33% 4.67 257.06 46.67%

288 RESPIRADOR CONTRA POLVO und 40.000 S/ 27.88 S/ 1,115.20 21.33 594.74 53.33% 18.67 520.46 46.67%

289 BOTIQUIN COMPLETO und 2.000 S/ 350.00 S/ 700.00 1.07 373.31 53.33% 0.93 326.69 46.67%

290 BARANDA RIGIDA m 80.000 S/ 20.00 S/ 1,600.00 42.66 853.28 53.33% 37.34 746.72 46.67%

291 CONO DE SEGUIRDAD und 15.000 S/ 25.34 S/ 380.10 8.00 202.71 53.33% 7.00 177.39 46.67%

292 SUMIDERO DE BRONCE CROMADO 2" pza 21.000 S/ 26.19 S/ 549.99 21.00 549.99 100.00%

293 C

W
W

W
CRONOGRAMA DE ADQUISICION DE MATERIALES
"REHABILITACIÓN EN EL LOCAL ESCOLAR 0313, CÓDIGO LOCAL 033821, EN EL P.J. MIRAFLORES ALTO, DISTRITO DE CHIMBOTE, PROVINCIA DE SANTA, DEPARTAMENTO DE ANCASH"
UBICACIÓN: CHIMBOTE, SANTA - ANCASH
MONTO CONTRATADO SIN IGV: S/. 6,079,175.38 -214.30%

PLAZO DE EJECUCION DE OBRA: 240 DIAS CALENDARIOS


FECHA DE PRESUPUESTO BASE: Abr-22
DEL DEL DEL DEL DEL DEL DEL DEL DEL
13 de Febrero de 2023 1 de Marzo de 2023 1 de Abril de 2023 1 de Mayo de 2023 1 de Junio de 2023 1 de Julio de 2023 1 de Agosto de 2023 1 de Setiembre de 2023 1 de Octubre de 2023
AL AL AL AL AL AL AL AL AL
RECURSOS UND CANTIDAD PRECIO (S/.) SUB TOTAL (S/.)
28 de Febrero de 2023 31 de Marzo de 2023 30 de Abril de 2023 31 de Mayo de 2023 30 de Junio de 2023 31 de Julio de 2023 31 de Agosto de 2023 30 de Setiembre de 2023 10 de Octubre de 2023
% DE % DE
METRADO COSTO % DE AVANCE METRADO COSTO % DE AVANCE METRADO COSTO % DE AVANCE METRADO COSTO METRADO COSTO % DE AVANCE METRADO COSTO % DE AVANCE METRADO COSTO % DE AVANCE METRADO COSTO % DE AVANCE METRADO COSTO
AVANCE AVANCE
315 TARUGO DE PVC und 37.440 S/ 0.50 S/ 18.72 37.44 18.72 100.00%

316 CURVA EMT CONDUIT 25MM und 21.560 S/ 5.00 S/ 107.80 21.56 107.80 100.00%

317 CODO PVC SAP P/AGUA C-10 SP 1" x 90° pza 7.000 S/ 4.41 S/ 30.87 7.00 30.87 100.00%

318 CODO PVC SAP P/AGUA C-10 SP 1/2" x 90° pza 171.000 S/ 1.44 S/ 246.24 171.00 246.24 100.00%

319 CODO PVC SAP P/AGUA C-10 SP 3/4" x 90° pza 51.000 S/ 2.63 S/ 134.13 51.00 134.13 100.00%

320 TEE PVC SAP P/AGUA C-10 SP 1" pza 33.704 S/ 7.54 S/ 254.13 33.70 254.13 100.00%

321 TEE PVC SAP P/AGUA C-10 SP 1/2" pza 82.000 S/ 2.20 S/ 180.40 82.00 180.40 100.00%

322 TEE PVC SAP P/AGUA C-10 SP 3/4" pza 19.000 S/ 3.56 S/ 67.64 19.00 67.64 100.00%

323 TEE PVC SAP P/AGUA C-10 SP 1 1/2" pza 6.000 S/ 15.17 S/ 91.02 6.00 91.02 100.00%

324 TUBERIA EMT CONDUIT 25MM de 3M m 50.306 S/ 9.10 S/ 457.78 50.31 457.78 100.00%

325 NIPLE PVC SAP C/ROSCA 1" pza 1.000 S/ 2.46 S/ 2.46 1.00 2.46 100.00%

326 NIPLE PVC SAP C/ROSCA 1/2" x 3/4" pza 14.000 S/ 1.61 S/ 22.54 14.00 22.54 100.00%

327 NIPLE PVC SAP C/ROSCA 3/4" x 1 1/4" pza 20.000 S/ 1.61 S/ 32.20 20.00 32.20 100.00%
LLAVE CORPORATION TERMOPLASTICA
328 und 1.000 S/ 11.78 S/ 11.78 1.00 11.78 100.00%
DN15mm - INC. ACC.
329 EMPALME DE RED PUBLICA glb 1.000 S/ 3,000.00 S/ 3,000.00 1.00 3,000.00 100.00%
EMPALME DE RED PUBLICA EXISTENTE DE
330 glb 1.000 S/ 3,500.00 S/ 3,500.00 1.00 3,500.00 100.00%
DESAGUE
331 CODO PVC SAL 2" X 90° pza 92.060 S/ 2.03 S/ 186.88 92.06 186.88 100.00%

332 CODO PVC SAL 3" X 90° pza 2.000 S/ 8.39 S/ 16.78 2.00 16.78 100.00%

333 CODO PVC SAL 2" X 45° pza 71.000 S/ 1.78 S/ 126.38 71.00 126.38 100.00%

334 CODO PVC SAL 4" X 45° pza 21.000 S/ 6.86 S/ 144.06 21.00 144.06 100.00%

335 TEE PVC SAL 2" X 2" pza 51.000 S/ 6.69 S/ 341.19 51.00 341.19 100.00%

336 TEE PVC SAL 3" pza 2.000 S/ 15.17 S/ 30.34 2.00 30.34 100.00%

337 TEE SANITARIA SIMPLE PVC SAL 4" X 2" pza 12.920 S/ 8.90 S/ 114.99 12.92 114.99 100.00%

338 YEE PVC SAL DESAGUE 4" a 2" pza 77.220 S/ 9.66 S/ 745.95 77.22 745.95 100.00%

339 YEE PVC SAL DESAGUE 4" pza 16.000 S/ 16.02 S/ 256.32 16.00 256.32 100.00%

340 YEE PVC SAL DESAGUE 2" pza 12.920 S/ 4.15 S/ 53.62 12.92 53.62 100.00%

341 REDUCCION PVC DE 1" a 3/4" pza 1.000 S/ 5.00 S/ 5.00 1.00 5.00 100.00%

342 REDUCCION PVC DESAGUE 4" a 3" pza 1.000 S/ 9.84 S/ 9.84 1.00 9.84 100.00%

343 REDUCCION PVC DESAGUE 4" a 2" pza 22.000 S/ 6.69 S/ 147.18 22.00 147.18 100.00%

344 SOMBRERO DE VENTILACION PVC SAL 2" pza 18.000 S/ 7.54 S/ 135.72 18.00 135.72 100.00%

345 SOMBRERO DE VENTILACION PVC SAL 3" pza 1.000 S/ 10.60 S/ 10.60 1.00 10.60 100.00%

346 ABRAZADERA PVC DESAGUE Ø3" pza 6.000 S/ 7.54 S/ 45.24 6.00 45.24 100.00%

347 TRAMPA P PVC DESAGUE SAL 2" pza 26.220 S/ 10.93 S/ 286.58 26.22 286.58 100.00%

348 TUBERIA PVC ELECTRICO SAP 25mm X 3m. und 1,239.500 S/ 4.21 S/ 5,218.30 1,239.50 5,218.30 100.00%

349 TUBO PVC ELECTRICO SAP 50mm x 3m pza 42.259 S/ 27.26 S/ 1,151.98 42.26 1,151.98 100.00%

350 TUBO PVC ELECTRICO SAP 35mm x 3m pza 16.408 S/ 18.80 S/ 308.47 16.41 308.47 100.00%

351 TUBO PVC ELECTRICO SAP 25mm x 3m pza 385.662 S/ 10.08 S/ 3,887.47 375.67 3,786.78 97.41% 9.99 100.69 2.59% 0.00 0.00 0.00%
TUBERIA PVC SAP PARA INSTALACIONES
352 m 15.000 S/ 2.97 S/ 44.55 15.00 44.55 100.00%
ELECTRICAS DE 3/4" x3m
353 TUBO PVC ELECTRICO SEL 20mm x 3m pza 180.000 S/ 7.55 S/ 1,359.00 180.00 1,359.00 100.00%

354 TUBERIA PVC ELECTRICO SAP 35mm X 3m. und 106.260 S/ 18.80 S/ 1,997.69 106.26 1,997.69 100.00%
CURVA PVC SAP PESADO PARA
355 und 795.000 S/ 3.31 S/ 2,631.45 795.00 2,631.45 100.00%
INSTALACIONES ELECTRICAS DE 25mm
356 UNION PVC SAP 25 mm pza 102.000 S/ 1.61 S/ 164.22 52.00 83.72 50.98% 50.00 80.50 49.02%

357 CAJA EMT CONDUIT TIPO T, 25MM und 17.248 S/ 20.00 S/ 344.95 17.25 344.95 100.00%
CONEXION A CAJA PVC SAP PARA INST
358 und 658.000 S/ 1.61 S/ 1,059.38 552.00 888.71 83.89% 106.00 170.67 16.11%
ELECTRICAS DE 25mm
359 HOJA DE SIERRA und 20.920 S/ 5.85 S/ 122.38 20.92 122.38 100.00%

360 VALVULA CHECK DE BRONCE DE 1" und 2.000 S/ 95.68 S/ 191.36 2.00 191.36 100.00%

361 VALVULA DE PIE CON CANASTILLA DE 1" u 2.000 S/ 74.49 S/ 148.98 2.00 148.98 100.00%
REGISTRO ROSCADO DE BRONCE
362 pza 28.000 S/ 57.54 S/ 1,611.12 28.00 1,611.12 100.00%
CROMADO 4"
REGISTRO ROSCADO DE BRONCE
363 pza 1.000 S/ 26.19 S/ 26.19 1.00 26.19 100.00%
CROMADO 2"
364 LLAVE DE PASO TERMOPLASTICA DN15mm und 2.000 S/ 17.71 S/ 35.42 2.00 35.42 100.00%
VALVULA COMPUERTA PESADA DE BRONCE
365 pza 1.000 S/ 42.29 S/ 42.29 1.00 42.29 100.00%
Ø 1"
VALVULA COMPUERTA PESADA DE BRONCE
366 pza 1.000 S/ 35.51 S/ 35.51 1.00 35.51 100.00%
Ø 3/4"
VALVULA COMPUERTA PESADA DE BRONCE
367 pza 7.000 S/ 32.97 S/ 230.79 7.00 230.79 100.00%
DE 250 LB. 1/2"
VALVULA COMPUERTA PESADA DE BRONCE
368 pza 10.000 S/ 54.15 S/ 541.50 10.00 541.50 100.00%
DE 250 LB. 3/4"
369 VIDRIO TEMPLADO INCOLORO e=6mm. m2 236.422 S/ 133.05 S/ 31,455.88
CRONOGRAMA DE ADQUISICION DE MATERIALES
"REHABILITACIÓN EN EL LOCAL ESCOLAR 0313, CÓDIGO LOCAL 033821, EN EL P.J. MIRAFLORES ALTO, DISTRITO DE CHIMBOTE, PROVINCIA DE SANTA, DEPARTAMENTO DE ANCASH"
UBICACIÓN: CHIMBOTE, SANTA - ANCASH
MONTO CONTRATADO SIN IGV: S/. 6,079,175.38 -214.30%

PLAZO DE EJECUCION DE OBRA: 240 DIAS CALENDARIOS


FECHA DE PRESUPUESTO BASE: Abr-22
DEL DEL DEL DEL DEL DEL DEL DEL DEL
13 de Febrero de 2023 1 de Marzo de 2023 1 de Abril de 2023 1 de Mayo de 2023 1 de Junio de 2023 1 de Julio de 2023 1 de Agosto de 2023 1 de Setiembre de 2023 1 de Octubre de 2023
AL AL AL AL AL AL AL AL AL
RECURSOS UND CANTIDAD PRECIO (S/.) SUB TOTAL (S/.)
28 de Febrero de 2023 31 de Marzo de 2023 30 de Abril de 2023 31 de Mayo de 2023 30 de Junio de 2023 31 de Julio de 2023 31 de Agosto de 2023 30 de Setiembre de 2023 10 de Octubre de 2023
% DE % DE
METRADO COSTO % DE AVANCE METRADO COSTO % DE AVANCE METRADO COSTO % DE AVANCE METRADO COSTO METRADO COSTO % DE AVANCE METRADO COSTO % DE AVANCE METRADO COSTO % DE AVANCE METRADO COSTO % DE AVANCE METRADO COSTO
AVANCE AVANCE
MOVILIZ. Y DESMOV. DE
395 glb 1.000 S/ 300.00 S/ 300.00 0.53 159.99 53.33% 0.47 140.01 46.67%
RETROEXCAVADORA
EXTINTOR CONTRAINCENDIO C/POLVO
396 und 3.000 S/ 101.61 S/ 304.83 1.07 108.40 35.56% 0.93 94.83 31.11% 1.00 101.60 33.33%
QUIMICO SECO 6 KG
397 EXTINTOR CO2 6 KG. und 10.000 S/ 110.08 S/ 1,100.80 10.00 1,100.80 100.00%

398 TUBERIA DE SUCCIÓN A°G° Ø 1 1/2" m 6.069 S/ 21.19 S/ 128.60 6.07 128.60 100.00%

399 TUBERIA DE IMPULSION A°G° Ø 1" m 11.025 S/ 10.79 S/ 118.96 11.03 118.96 100.00%

400 TUBERIA DE LIMPIA A°G° Ø 3/4" m 2.468 S/ 9.18 S/ 22.65 2.47 22.65 100.00%

401 HERRAMIENTAS MANUALES %mo S/ - S/ 48,449.85 1,458.56 3.01% 3,381.58 6.98% 8,129.88 16.78% 15,373.14 31.73% 11,322.73 23.37% 7,146.35 14.75% 1,637.60 3.38%

COSTO DIRECTO SIN IGV (S/.) S/ 3,971,590.40 S/ 110,944.44 S/ 597,035.22 S/ 882,087.22 735,528.23 S/ 396,134.67 S/ 501,556.87 S/ 480,189.87 S/ 248,589.95 S/ 19,523.92

GASTOS GENERALES 10.00% S/ 397,159.04 S/ 11,094.44 S/ 59,703.52 S/ 88,208.72 73,552.82 S/ 39,613.47 S/ 50,155.69 S/ 48,018.99 S/ 24,859.00 S/ 1,952.39

UTILIDADES 2.52% S/ 100,156.55 S/ 2,797.82 S/ 15,056.18 S/ 22,244.69 18,548.73 S/ 9,989.82 S/ 12,648.39 S/ 12,109.55 S/ 6,269.00 S/ 492.36

SUB TOTAL S/ 4,468,905.99 S/ 124,836.71 S/ 671,794.92 S/ 992,540.63 827,629.79 S/ 445,737.96 S/ 564,360.94 S/ 540,318.41 S/ 279,717.95 S/ 21,968.67

FACTOR DE RELACION 1.00 S/ 4,468,905.99 S/ 124,836.71 S/ 671,794.92 S/ 992,540.63 827,629.79 S/ 445,737.96 S/ 564,360.94 S/ 540,318.41 S/ 279,717.95 S/ 21,968.67

IMPUESTO GENERAL A LAS VENTAS 18.00% S/ 804,403.08 S/ 22,470.61 S/ 120,923.09 S/ 178,657.31 148,973.36 S/ 80,232.83 S/ 101,584.97 S/ 97,257.31 S/ 50,349.23 S/ 3,954.36

TOTAL DE MATERIALES PRESUPUESTADO S/ 5,273,309.07 S/ 147,307.32 S/ 792,718.00 S/ 1,171,197.94 976,603.15 S/ 525,970.80 S/ 665,945.91 S/ 637,575.72 S/ 330,067.18 S/ 25,923.04

AVANCE MENSUAL (%) S/ - 2.79% 15.03% 22.21% 0.19 9.97% 12.63% 12.09% 6.26% 0.49%

AVANCE ACUMULADO (%) 2.79% 17.83% 40.04% 0.59 68.53% 81.16% 93.25% 99.51% 100.00%