Está en la página 1de 1

HACIA CAJA DE REJISTRO

TUBERIA DE 4"
S= 1.5 %
0.45
CAJA DE REGISTRO CAJA DE REGISTRO CAJA DE REGISTRO CAJA DE REGISTRO CAJA DE REGISTRO
DE CONCRETO 24" X 24": DE CONCRETO 24" X 24": DE CONCRETO 24" X 24": DE CONCRETO 24" X 24": DE CONCRETO 24" X 24":
N.T. 0.00 M. N.T. 0.00 M. N.T. 0.00 M. N.T. 0.00 M. N.T. 0.00 M.
NF= -0.60 M. NF= -0.73 M. NF= -0.86 M. NF= -0.73 M. NF= -0.60 M.

S= 1.5 % S= 1.5 %
TUBERIA PVC SAL DE 4" TUBERIA PVC SAL DE 4"
L= 8.60M L= 8.60M

LINEA DE DEMARCACION DE LA CANCHA LINEA DE DEMARCACION DE LA CANCHA


2.00

S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 %
L= 3.70M L= 4.45M L= 4.45M L= 4.45M L= 4.45M L= 4.45M L= 4.45M L= 4.45M L= 4.45M L= 3.70M

5.79 6.96 6.96 6.96 6.96 6.96 6.96 6.96 6.96 5.79
DEMARCACION DE CANCHA

DEMARCACION DE CANCHA
PIEDRA CUARTA @0.25%

4.04

S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 %
L= 3.70M L= 4.45M L= 4.45M L= 4.45M L= 4.45M L= 4.45M L= 4.45M L= 4.45M L= 4.45M L= 3.70M N.P.T=0+0.00
4.90

TUBERIA DE 3" CRIBADA


TUBERIA DE 3" CRIBADA

TUBERIA DE 3" CRIBADA

TUBERIA DE 3" CRIBADA

TUBERIA DE 3" CRIBADA


EJE DE CAMBIO DE PENDIENTE

EJE DE CAMBIO DE PENDIENTE

EJE DE CAMBIO DE PENDIENTE

EJE DE CAMBIO DE PENDIENTE


CONCRETO:1.2.3
F'C: 210 KG/CM2

L= 30.00M
L= 30.00M

L= 30.00M

L= 30.00M

L= 30.00M
S= 1.5 %
S= 1.5 %

S= 1.5 %

S= 1.5 %

S= 1.5 %
1.00

0.50

0.45

S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 %
1.25
L= 3.70M L= 4.45M L= 4.45M L= 4.45M L= 4.45M L= 4.45M L= 4.45M L= 4.45M L= 4.45M L= 3.70M
DEMARCACION DE CANCHA

DEMARCACION DE CANCHA
0.45
0.51

0.50

5.79 6.96 6.96 6.96 6.96 6.96 6.96 6.96 6.96 5.79

S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 %
L= 3.70M L= 4.45M L= 4.45M L= 4.45M L= 4.45M L= 4.45M L= 4.45M L= 4.45M L= 4.45M L= 3.70M

DETALLE DE MURO DE RETENCION


LINEA DE DEMARCACION DE LA CANCHA LINEA DE DEMARCACION DE LA CANCHA
CON MAMPOSTERIA DE PIEDRA
ESC : 1 / 50

SARDINEL PERDIDO PARA EVACUACION DE AGUAS PLUVIALES

71.94

COBERTURA:
POLICARBONATO MACIZO E= 8 MM
TRANSPARENTE INC/ ACCESORIOS
DE FIJACION

TRANSVERSAL: CORREAS:
TUBO F° G° Ø 2 1/2" TUBO F° G° Ø 1 1/2"

DETALLE DE PASAMANO
TUBO 2" GALVANIZAADO
PARANTE:
TUBO F° G° Ø 2 1/2"

2.68

BANCA DE MADERA:
MADERA AGUANO 2" X 10" X 10'
DETALLE DE PASAMANO 2.51
TUBO 2" GALVANIZAADO 0.40
1.00
0.40

0.40
DADO DE CONCRETO:
F'C: 175 KG/CM2
0.20 0.40

0.20 0.40
3.58
0.40

DETALLE DE PASAMANO
TUBO 2" GALVANIZAADO
0.20 1.00 SECCION TRANVERSAL
ESC : 1 / 25
0.20 0.40
PIEDRA CUARTA @0.25%

0.20 0.40 2.98

0.20 0.40
DETALLE DE PASAMANO
TUBO 2" GALVANIZAADO
0.20 CONCRETO:1.2 0.40
F'C: 175 KG/CM2
0.95 0.20 0.40

0.20 0.40

0.20 0.40

0.40
1.50 MAXIMO

2.51
AREA DE ESQUINA
6.58

LINEA DE BANDA
1.00

0.10

AREA DE DETALLES DE ESCALINATAS 0.10

ESC : 1 / 50
AREA DE ESQUINA,
BANDEROLA Y
SEÑALIZACIÓN
ESC : 1 / 50

También podría gustarte