MES 1
2.00%
MONTO MENSUAL S/40,000.00
A. AMORTIGUCION DEL ADELANTO DIRECTO MENSUAL S/4,000.00
B. AMORTIGUACION DEL ADELANTO DE MATERIALES (2 S/8,000.00
SALDO S/28,000.00
SEGUNDA PRACTICA – RESIDENTE DE OBRAS PUBLICAS
NOMBRE: CARINNE LEYDY KARI ROMAN
CODIGO:201700723D

SOLUCION PREGU
S/2,000,000.00 SOLES
10 MESES NOTA: ADELANTO DIRECTO:
2 DE ENERO NOTA:ADELANTO MATERIALES:
7 DE ENERO

20 DE ENERO

MES 2 MES 3 MES 4 MES 5 MES 6


5.00% 8.00% 10.00% 12.00% 15.00%
S/100,000.00 S/160,000.00 S/200,000.00 S/240,000.00 S/300,000.00
S/10,000.00 S/16,000.00 S/20,000.00 S/24,000.00 S/30,000.00
S/20,000.00 S/32,000.00 S/40,000.00 S/48,000.00 S/60,000.00
S/70,000.00 S/112,000.00 S/140,000.00 S/168,000.00 S/210,000.00
PUBLICAS

SOLUCION PREGUNTA 4:

CTO: 10% 200000


ERIALES: 20% 400000
MES 7 MES 8 MES 9 MES 10 TOTALES
16.00% 18.00% 12.00% 2.00% 100.00%
S/320,000.00 S/360,000.00 S/240,000.00 S/40,000.00 S/2,000,000.00
S/32,000.00 S/36,000.00 S/24,000.00 S/4,000.00 S/200,000.00
S/64,000.00 S/72,000.00 S/48,000.00 S/8,000.00 S/400,000.00
S/224,000.00 S/252,000.00 S/168,000.00 S/28,000.00 S/1,400,000.00
APELLIDOS Y NOMBRES KARI ROMAN
CODIGO 201
A.- DETERMINE EL VALOR REFERENCIAL DE LICITACION DE LICITACION OBRA
COSTO DIRECTO S/1,786,891.78
GASTOS GENERALES 10% S/178,689.18
UTILIDAD 10% S/178,689.18
SUB TOTAL PRESUPUESTO S/2,144,270.14
I.G.V. 18% S/385,968.62
VALOR REFERENCIAL S/2,530,238.76

B.- DETERMINE LOS PORCENTAJE DE AVANCE DEL MES DE ABRIL (TERCER MES)

ITEM PARTIDA
1 PREPARACION DE PLATAFORMA CON MAQUINARIA (EXPLANACIONES)
2 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO
3 SISTEMA DE DRENAJE
4 SUMINISTRO E INSTALACION DE GRAS SINTETICO
5 SARDINELES DE CONCRETO E=0.15m y H=0.30m
6 SEÑALIZACION Y CAPACITACION

C.- ELABORE LA HOJA DE VALORIZACION AL MES DE ABRIL DEL 2020 (TERCER MES)

ITEM PARTIDA
1 PREPARACION DE PLATAFORMA CON MAQUINARIA (EXPLANACIONES)
2 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO
3 SISTEMA DE DRENAJE
4 SUMINISTRO E INSTALACION DE GRAS SINTETICO
5 SARDINELES DE CONCRETO E=0.15m y H=0.30m
6 SEÑALIZACION Y CAPACITACION

ITEM PARTIDA
1 PREPARACION DE PLATAFORMA CON MAQUINARIA (EXPLANACIONES)
2 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO
3 SISTEMA DE DRENAJE
4 SUMINISTRO E INSTALACION DE GRAS SINTETICO
5 SARDINELES DE CONCRETO E=0.15m y H=0.30m
6 SEÑALIZACION Y CAPACITACION

D.- DETERMINE EL COEFICIENTE DEL FACTOR DE RELACION.

ITEM DESCRIPCION

1 PREPARACION DE PLATAFORMA CON MAQUINARIA (EXPLANACIONES)


2 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO
3 SISTEMA DE DRENAJE
4 SUMINISTRO E INSTALACION DE GRAS SINTETICO
5 SARDINELES DE CONCRETO E=0.15m y H=0.30m
6 SEÑALIZACION Y CAPACITACION

COSTO DIRECTO
GASTOS GENERALES 10%
UTILIDAD 10%
D.1.- SUB TOTAL PRESUPUESTO
I.G.V. 18%
TOTAL

MONTO TOTAL S/2,530,238.76


MONTO USADO AL MES DE ABRIL S/836,427.14
MONTO A USAR EL MES DE ABRIL S/862,316.71
SALDO DEL MONTO TOTAL S/831,494.91

D.1.- DETERMINE EL COEFICIENTE DEL FACTOR DE RELACION


MONTO REFERENCIAL S/2,530,238.76
MONTO OFERTADO S/1,985,795.65

FACTOR DE RELACION 0.78483 HASTA EL 5TO DECIMAL

DETERMINE LAS AMORTIZACIONES DE LOS ADELANTOS DE MATERIALES DE LOS 4 MESES, S


E.-
CONSIDERANDO QUE EL ADELANTO DE MATERIALES SE AMORTIZARA DE MANERA PRORRAT
FEBRERO MARZO
COSTO DIRECTO S/1,786,891.78 S/220,471.05 S/370,226.08
GASTOS GENERALES 10% S/178,689.18 S/22,047.10 S/37,022.61
UTILIDAD 10% S/178,689.18 S/22,047.10 S/37,022.61
SUB TOTAL PRESUPUESTO S/2,144,270.14 S/264,565.26 S/444,271.30
I.G.V. 18% S/385,968.62 S/47,621.75 S/79,968.83
TOTAL S/2,530,238.76 S/312,187.00 S/524,240.14
ADELANTO DIRECTO (10%) S/253,023.88 S/31,218.70 S/52,424.01
ADELANTO DE MATERIALES MAX. 20% S/506,047.75 S/62,437.40 S/104,848.03

DETERMINE EL MONTO A PAGAR AL CONTRATISTA EN CADA UNO DE LOS MESES DE EJECUCION, SI, LOS
UTILIDAD 10%, SOLICITUD DEL ADELANTO ES EL MAXIMO DE A CUERDO A REGLAMENTO DE LA LEY DE C
G.- ACUERDO A REGLAMENTO DE LEY DE CONCTRATACIONES, ASUMIENDO QUE EL ADELANTO DE MATERIA
EJECUSION

FEBRERO MARZO
COSTO DIRECTO S/1,786,891.78 S/220,471.05 S/370,226.08
GASTOS GENERALES VARIABLES 5% S/89,344.59 S/11,023.55 S/18,511.30
GASTOS GENERALES FIJOS 10% S/178,689.18 S/22,047.10 S/37,022.61
UTILIDAD 10% S/178,689.18 S/22,047.10 S/37,022.61
SUB TOTAL PRESUPUESTO S/2,233,614.73 S/275,588.81 S/462,782.61
I.G.V. 18% S/402,050.65 S/49,605.99 S/83,300.87
TOTAL S/2,635,665.38 S/325,194.80 S/546,083.47
ADELANTO DRECTO MAXIMO (10%) S/263,566.54 S/32,519.48 S/54,608.35
ADELANTO MATERIALES MAXIMO (20%) S/527,133.08 S/65,038.96 S/109,216.69
MONTO A PAGAR AL C. S/1,844,965.77 S/227,636.36 S/382,258.43
KARI ROMAN CARINNE LEYDY
201700723D
SOLUCIÓN PREGUNTA 5:

% PRIMER MES FEBRERO % SEGUNDO MES MARZO % TERCER MES ABRIL % CUARTO MES MAYO
40 20 20 20
30 30 30 10
20 40 30 10
0 20 40 40
10 20 30 40
10 20 30 40

UNIDAD METRADO P.U S/ SUB TOTAL % PRIMER MES FEBRERO % SEGUNDO MES MARZ
M2 6985.24 S/65.85 S/459,978.05 40 20
M3 2894.21 S/37.49 S/108,503.93 30 30
ML 2684.59 S/3.72 S/9,986.67 20 40
M2 6500 S/182.94 S/1,189,110.00 0 20
ML 385.64 S/49.61 S/19,131.60 10 20
MES 4 S/45.38 S/181.52 10 20

UNIDAD METRADO P.U S/ SUB TOTAL PRIMER MES FEBRERO SEGUNDO MES MARZO
M2 6985.24 S/65.85 S/459,978.05 S/183,991.22 S/91,995.61
M3 2894.21 S/37.49 S/108,503.93 S/32,551.18 S/32,551.18
ML 2684.59 S/3.72 S/9,986.67 S/1,997.33 S/3,994.67
M2 6500 S/182.94 S/1,189,110.00 S/0.00 S/237,822.00
ML 385.64 S/49.61 S/19,131.60 S/1,913.16 S/3,826.32
MES 4 S/45.38 S/181.52 S/18.15 S/36.30

PRESUPUESTO VALORIZACION ANTERIOR


UNIDAD
METRADO P. UNIT. PARCIAL METRADO MONTO %

M2 6985.24 S/65.85 S/459,978.05 4191.144 S/275,986.83 60


M3 2894.21 S/37.49 S/108,503.93 1736.526 S/65,102.36 60
ML 2684.59 S/3.72 S/9,986.67 1610.754 S/5,992.00 60
M2 6500 S/182.94 S/1,189,110.00 1300 S/237,822.00 20
ML 385.64 S/49.61 S/19,131.60 115.692 S/5,739.48 30
MES 4 S/45.38 S/181.52 1.2 S/54.46 30

S/1,786,891.78 S/590,697.13
S/178,689.18 S/59,069.71
S/178,689.18 S/59,069.71
S/2,144,270.14 S/708,836.56
S/385,968.62 S/127,590.58
S/2,530,238.76 S/836,427.14

OS 4 MESES, SI EL ADELANTO DE MATERIALES SOLICITADO ES EL MAXIMO PERMITIDO,


ERA PRORRATEADA EN LOS CUATRO MESES DE EJECUSION
ABRIL MAYO
S/370,226.08 S/608,980.73
S/37,022.61 S/60,898.07
S/37,022.61 S/60,898.07
S/444,271.30 S/730,776.88
S/79,968.83 S/131,539.84
S/524,240.14 S/862,316.71
S/52,424.01 S/86,231.67
S/104,848.03 S/172,463.34

ECUCION, SI, LOS GASTOS GENERALES FIJOS ES EL 10%, GASTOS GENERALES VARIABLES 5%,
DE LA LEY DE CONCTRATACIONES, SOLICITUD DEL ADELANTO DE MATERIALES ES EL MAXIMO DE
NTO DE MATERIALES SE AMORTIZARA DE MANERA PRORRATEADA EN LOS CUATRO MESES DE

ABRIL MAYO
S/370,226.08 S/608,980.73
S/18,511.30 S/30,449.04
S/37,022.61 S/60,898.07
S/37,022.61 S/60,898.07
S/462,782.61 S/761,225.91
S/83,300.87 S/137,020.66
S/546,083.47 S/898,246.58
S/54,608.35 S/89,824.66
S/109,216.69 S/179,649.32
S/382,258.43 S/628,772.60
5:

% CUARTO MES MAYO


20
10
10
40
40
40

SEGUNDO MES MARZO % TERCER MES ABRIL % CUARTO MES MAYO


20 20 20
30 30 10
40 30 10
20 40 40
20 30 40
20 30 40

EGUNDO MES MARZO TERCER MES ABRIL CUARTO MES MAYO


S/91,995.61 S/91,995.61 S/91,995.61
S/32,551.18 S/32,551.18 S/10,850.39
S/3,994.67 S/2,996.00 S/998.67
S/237,822.00 S/475,644.00 S/475,644.00
S/3,826.32 S/5,739.48 S/7,652.64
S/36.30 S/54.46 S/72.61

VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO POR VALORIZAR

METRADO MONTO % METRADO MONTO % METRADO MONTO

1397.048 S/91,995.61 20 5588.192 S/367,982.44 80 1397.048 S/91,995.61


868.263 S/32,551.18 30 2604.789 S/97,653.54 90 289.421 S/10,850.39
805.377 S/2,996.00 30 2416.131 S/8,988.01 90 268.459 S/998.67
2600 S/475,644.00 40 3900 S/713,466.00 60 2600 S/475,644.00
115.692 S/5,739.48 30 231.384 S/11,478.96 60 154.256 S/7,652.64
1.2 S/54.46 30 2.4 S/108.91 60 1.6 S/72.61

S/608,980.73 S/1,199,677.86 S/587,213.92


S/60,898.07 S/119,967.79 S/58,721.39
S/60,898.07 S/119,967.79 S/58,721.39
S/730,776.88 S/1,439,613.43 S/704,656.70
S/131,539.84 S/259,130.42 S/126,838.21
S/862,316.71 S/1,698,743.85 S/831,494.91
VALORIZAR

20
10
10
40
40
40