REGISTRO DE LLENAR POZO

POZO: POZO:MARIANN 54H MARIANN 54H FECHA: 25-Jul-18

PROFUNDIDAD : 7954 HORA: 13:00 PM HRS

DISPLACEME
OD(in) ID(in) ft/TUBO NT(BBL/FT) TOTAL(BBL)
SUPERVISOR : R. MEJIA

3½" EUE 3,5" 2.992 31.24 0.0037 60.00 PESO EUE 9,3 LPP
CASING 9 5/8" 47 LPP

BLS
BLS FINAL
INICIAL VOL.
DEL VOL. DIFERENCI DIFERENCIA
JUNTA DEL LLENADO OBSERVACIONES
TANQUE TEORICO A ACUMULADA
TANQUE BLS
VIAJE
VIAJE
20 120.00 117.70 2.30 2.30 32.00
40 117.70 115.40 2.30 4.60 32.00 DESPLAZAMIENTO
60 115.40 113.10 2.30 6.90 32.00 CON FLUIDO DE 8.4 LPG
80 113.10 110.80 2.30 9.20 32.00 C/D 20 TUBOS
100 110.80 108.50 2.30 11.50 32.00 LLENADO
120 108.50 106.20 2.30 13.80 32.00 DE POZO
140 106.20 103.90 2.30 16.10 32.00 SACA COMPLETACION
160 103.90 101.60 2.30 18.40 32.00 DE FONDO BOMBEO
180 101.60 99.30 2.30 20.70 32.00 HIDRAULICO
200 99.30 97.00 2.30 23.00 32.00
220 97.00 94.70 2.30 25.30 32.00
240 97.00 92.40 2.30 27.60 32.00
260 94.70 92.40 2.30 29.90 32.00
0.00 -2.30 2.30 32.20 32.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00
0.00 0.00

SACANDO BHA BOMBEO HIDRAULICO EN 3-1/2" TUBERIA EUE


SUPERVISOR : R. MEJIA RIG MANAGER : SR. XIAO MING
32.20

16.10
REGISTRO DE LLENAR POZO

POZO: POZO: KUPI 05 PAD :KUPI E FECHA: 2-Jul-18

PROFUNDIDAD : 11648 HORA: 22: HRS

DISPLACEME
OD(in) ID(in) ft/TUBO NT(BBL/FT) TOTAL(BBL)
SUPERVISOR : RICHAR MEJIA

3½" EUE 3,5" 2.992 30.5 0.0032 37.00 PESO EUE 9,3 LPP
CASING 7" 29 LPP

BLS
BLS FINAL
INICIAL VOL.
DEL VOL. DIFERENCI DIFERENCIA
JUNTA DEL LLENADO OBSERVACIONES
TANQUE TEORICO A ACUMULADA
TANQUE BLS
VIAJE
VIAJE
20 280.00 278.05 1.95 1.95 30.36
40 278.05 276.10 1.95 3.90 30.36 EL DESPLAZAMIENTO
60 276.10 274.15 1.95 5.85 30.36 CON FLUIDO DE 8.4 LPG
80 274.15 272.20 1.95 7.80 30.36 C/D 10 TUBOS
100 272.20 270.25 1.95 9.75 30.36 LLENADO
120 270.25 268.30 1.95 11.70 30.36 DE POZO
140 268.30 266.35 1.95 13.65 30.36
160 266.35 264.40 1.95 15.60 30.36
180 264.40 262.45 1.95 17.55 30.36
200 264.40 262.45 1.95 19.50 30.36
220 264.40 262.45 1.95 21.45 30.36
240 264.40 262.45 1.95 23.40 30.36
260 264.40 262.45 1.95 25.35 30.36
280 264.40 262.45 1.95 27.30 30.36
300 264.40 262.45 1.95 29.25 30.36
320 264.40 262.45 1.95 31.20 30.36
340 264.40 262.45 1.95 33.15 30.36
360 264.40 262.45 1.95 35.10 30.36
370 264.40 262.45 1.95 37.05 30.36
262.45 260.50 0.00 37.05 30.36
262.45 262.45 0.00 37.05 30.36
262.45 262.45 0.00 37.05 30.36

SACANDO EQUIPO BES EN TUBERIA 3-1/2" EUE QUEBRANDO UNO X UNO A LOS CABALLETES
SUPERVISOR : SR. RICHAR MEJIA RIG MANAGER : SR. XIAO MING
31.20

13.65
REGISTRO DE LLENAR POZO

POZO: POZO: KUPI 05 PAD :KUPI E 5 FECHA: 5-Jul-18

PROFUNDIDAD : 12300 HORA: 03:00 AM HRS

DISPLACEME
OD(in) ID(in) ft/TUBO NT(BBL/FT) TOTAL(BBL)
SUPERVISOR : R. VILLAFUERTE

3½" DP 3,5" 2.764 31.67 0.0051 63.00 PESO EUE13,30 LPP


CASING 7" 29 LPP

BLS
BLS FINAL
INICIAL VOL.
DEL VOL. DIFERENCI DIFERENCIA
JUNTA DEL LLENADO OBSERVACIONES
TANQUE TEORICO A ACUMULADA
TANQUE BLS
VIAJE
VIAJE
20 200.00 196.80 3.20 1.95 63.00
40 196.80 193.60 3.20 5.15 63.00 EL DESPLAZAMIENTO
60 193.60 190.40 3.20 8.35 63.00 CON FLUIDO DE 8.4 LPG
80 190.40 187.20 3.20 11.55 63.00 C/D 20 TUBOS
100 187.20 184.00 3.20 14.75 63.00 LLENADO
120 184.00 180.80 3.20 17.95 63.00 DE POZO
140 180.80 177.60 3.20 21.15 63.00 PUNTA LIBRE DP
160 177.60 174.40 3.20 24.35 63.00
180 174.40 171.20 3.20 27.55 63.00
200 171.20 168.00 3.20 30.75 63.00
220 168.00 164.80 3.20 33.95 63.00
240 164.80 161.60 3.20 37.15 63.00
260 161.60 158.40 3.20 40.35 63.00
280 158.40 155.20 3.20 43.55 63.00
300 155.20 152.00 3.20 46.75 63.00
320 152.00 148.80 3.20 49.95 63.00
340 148.80 145.60 3.20 53.15 63.00
360 145.60 142.40 3.20 56.35 63.00
370 142.40 139.20 3.20 59.55 63.00
375 139.20 136.00 3.20 62.75 63.00
0.00 0.00
0.00 0.00 0.00

SACANDO TUBERIA DRIL PIPE EN PARADAS A LA TORRE LLENANDOEL POZO CADA 20 TUBOS
SUPERVISOR : R. VILLAFUERTE RIG MANAGER : SR. XIAO MING
51.20

22.40
REGISTRO DE LLENAR POZO

POZO: POZO:MARIANN 5&8 MARIANN 77 FECHA: 12-Oct-21

PROFUNDIDAD : 7977 FT HORA: 16:30 PM HRS

DISPLACEME
OD(in) ID(in) ft/TUBO NT(BBL/FT) TOTAL(BBL)
SUPERVISOR : R. MEJIA

3½" D/P 9.30 2.992 30.55 0.0087 10.00 PESO EUE 9,3 LPP
CASING 7" 26 LPP

BLS
BLS FINAL
INICIAL VOL.
DEL VOL. DIFERENCI DIFERENCIA
JUNTA DEL LLENADO OBSERVACIONES
TANQUE TEORICO A ACUMULADA
TANQUE BLS
VIAJE
VIAJE
20 100.00 98.00 2.00 2.00 4.00 32.00
40 98.00 96.00 2.00 4.00 4.00 32.00 DESPLAZAMIENTO
60 96.00 94.00 2.00 6.00 4.00 32.00 CON FLUIDO DE 8.4 LPG
80 94.00 92.00 2.00 8.00 4.00 32.00 C/D 20 TUBOS
100 92.00 90.00 2.00 10.00 4.00 32.00 LLENADO
120 90.00 88.00 2.00 12.00 4.00 32.00 DE POZO
140 88.00 86.00 2.00 14.00 4.00 32.00 SACANDO EQUIPO
160 86.00 84.00 2.00 16.00 4.00 32.00 BES HALLIBURTON
180 101.60 99.30 2.00 18.00 4.00 32.00 DE 7" A 7977,46 FT
200 99.30 97.00 2.00 20.00 4.00 32.00
220 97.00 94.70 2.00 22.00 4.00 32.00
240 94.70 92.40 2.00 24.00 4.00 32.00
255 92.40 90.40 2.00 26.00 4.00 32.00

SACANDO BHA DE LIMPIEZA DE CIA HILONG


SUPERVISOR : LLERY GALARZA, R. MEJIA RIG MANAGER : YANG JUN
26.00