Está en la página 1de 48

CUADRO DE CARGAS

C/U P.I. D.M. D.M. T F.P. I Id L SECCION ∆V CUMPLE


TABLERO CTO. DESCRIPCION CANT. F.D. TOTAL SIST. K' K" < 1.5% I.T.M. CONDUCTOR ALIMENTADOR TUBERIA
(W) (KW) (KW) (V) (CosФ) (A) (A) (m) (mm2) (V%)
(KW) (Vn)
C-1 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-2 ALUMBRADO L-1 DE 39.5W,220V 2.00 39.50 0.08 100% 0.08
ALUMBRADO L-2 DE 22W,220V 5.00 22.00 0.11 100% 0.11
C-3 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-4 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-5 ALUMBRADO L-2 DE 22W,220V 10.00 22.00 0.22 100% 0.22
C-6 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
STD-AA11 5.37 1Ф 220 0.85 28.69 35.86 1.00 2.00 38.90 16.00 1.18 SI 2x50 AMP. (2-1 x 16 + 1x16-T)mm2 N2XOH 50 mm ∅ PVC-SAP
C-7 GABINETE DE COMUNICACIONES 1.00 3350.00 3.35 50% 1.68
C-8 PANEL DE A.C.I. 1.00 500.00 0.50 100% 0.50
C-9 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25
C-10 TOMACORRIENTE 4.00 100.00 0.40 50% 0.20
C-11 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25
C-12 TOMACORRIENTE 4.00 100.00 0.40 50% 0.20
C-13 LUZ DE EMERGENCIA 7.00 50.00 0.35 0% 0.00
C-1 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-2 ALUMBRADO L-1 DE 39.5W,220V 2.00 39.50 0.08 100% 0.08
ALUMBRADO L-2 DE 22W,220V 7.00 22.00 0.15 100% 0.15
C-3 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-4 ALUMBRADO L-2 DE 22W,220V 10.00 22.00 0.22 100% 0.22
C-5 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
STD-AA12 4.74 1Ф 220 0.85 25.32 31.65 1.00 2.00 28.27 10.00 1.21 SI 2x40 AMP. (2-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-6 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25
C-7 PANEL DE A.C.I. 1.00 500.00 0.50 100% 0.50
C-8 GABINETE DE COMUNICACIONES 1.00 3350.00 3.35 50% 1.68
C-9 LUZ DE EMERGENCIA 7.00 50.00 0.35 0% 0.00
C-10 TOMACORRIENTE 4.00 100.00 0.40 50% 0.20
C-11 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25
C-1 ALUMBRADO L-1 DE 39.5W,220V 6.00 39.50 0.24 100% 0.24
ALUMBRADO L-2 DE 22W,220V 12.00 22.00 0.26 100% 0.26
STD-AA13 0.80 1Ф 220 0.85 4.28 5.35 1.00 2.00 8.12 6.00 0.10 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-2 TOMACORRIENTE 6.00 100.00 0.60 50% 0.30
C-3 LUZ DE EMERGENCIA 7.00 50.00 0.35 0% 0.00
C-1 ALUMBRADO L-2 DE 22W,220V 12.00 22.00 0.26 100% 0.26
STD-AA14 0.26 1Ф 220 0.85 1.39 1.74 1.00 2.00 46.90 6.00 0.18 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-2 LUZ DE EMERGENCIA 7.00 50.00 0.35 0% 0.00
C-1 ALUMBRADO L-1 DE 39.5W,220V 2.00 39.50 0.08 100% 0.08
STD-AA15 0.23 1Ф 220 0.85 1.23 1.54 1.00 2.00 56.94 6.00 0.20 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-2 TOMACORRIENTE 3.00 100.00 0.30 50% 0.15
C-1 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-2 ALUMBRADO L-1 DE 39.5W,220V 2.00 39.50 0.08 100% 0.08
ALUMBRADO L-2 DE 22W,220V 5.00 22.00 0.11 100% 0.11
C-3 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-4 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-5 ALUMBRADO L-2 DE 22W,220V 10.00 22.00 0.22 100% 0.22
STD-AA21 C-6 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47 4.87 1Ф 220 0.85 26.02 32.53 1.00 2.00 42.20 16.00 1.16 SI 2x50 AMP. (2-1 x 16 + 1x16-T)mm2 N2XOH 50 mm ∅ PVC-SAP
C-7 GABINETE DE COMUNICACIONES 1.00 3350.00 3.35 50% 1.68
C-8 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25
C-9 TOMACORRIENTE 4.00 100.00 0.40 50% 0.20
C-10 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25
C-11 TOMACORRIENTE 4.00 100.00 0.40 50% 0.20
C-12 LUZ DE EMERGENCIA 7.00 50.00 0.35 0% 0.00
C-1 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-2 ALUMBRADO L-1 DE 39.5W,220V 2.00 39.50 0.08 100% 0.08
ALUMBRADO L-2 DE 22W,220V 3.00 22.00 0.07 100% 0.07
C-3 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-4 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-5 ALUMBRADO L-2 DE 22W,220V 10.00 22.00 0.22 100% 0.22
STD-AA22 C-6 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47 4.83 1Ф 220 0.85 25.80 32.25 1.00 2.00 30.20 16.00 0.82 SI 2x50 AMP. (2-1 x 16 + 1x16-T)mm2 N2XOH 50 mm ∅ PVC-SAP
C-7 GABINETE DE COMUNICACIONES 1.00 3350.00 3.35 50% 1.68
C-8 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25
C-9 TOMACORRIENTE 4.00 100.00 0.40 50% 0.20
C-10 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25
C-11 TOMACORRIENTE 4.00 100.00 0.40 50% 0.20
C-12 LUZ DE EMERGENCIA 7.00 50.00 0.35 0% 0.00
C-1 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-2 ALUMBRADO L-1 DE 39.5W,220V 2.00 39.50 0.08 100% 0.08
C-2 ALUMBRADO L-2 DE 22W,220V 3.00 22.00 0.07 100% 0.07
C-3 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-4 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-5 ALUMBRADO L-2 DE 22W,220V 10.00 22.00 0.22 100% 0.22
STD-AA31 C-6 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47 4.83 1Ф 220 0.85 25.80 32.25 1.00 2.00 46.90 25.00 0.82 SI 2x63 AMP. (2-1 x 25 + 1x16-T)mm2 N2XOH 80 mm ∅ PVC-SAP
C-7 GABINETE DE COMUNICACIONES 1.00 3350.00 3.35 50% 1.68
C-8 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25
C-9 TOMACORRIENTE 4.00 100.00 0.40 50% 0.20
C-10 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25
C-11 TOMACORRIENTE 4.00 100.00 0.40 50% 0.20
C-12 LUZ DE EMERGENCIA 7.00 50.00 0.35 0% 0.00
C-1 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-2 ALUMBRADO L-1 DE 39.5W,220V 2.00 39.50 0.08 100% 0.08
ALUMBRADO L-2 DE 22W,220V 2.00 22.00 0.04 100% 0.04
STD-AA32 2.52 1Ф 220 0.85 13.45 16.81 1.00 2.00 28.10 6.00 1.06 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-3 GABINETE DE COMUNICACIONES 1.00 3350.00 3.35 50% 1.68
C-4 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25
C-5 LUZ DE EMERGENCIA 3.00 50.00 0.15 0% 0.00
C-1 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-2 ALUMBRADO L-2 DE 22W,220V 10.00 22.00 0.22 100% 0.22
STD-AA33 0.89 1Ф 220 0.85 4.76 5.95 1.00 2.00 44.70 6.00 0.60 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-3 TOMACORRIENTE 4.00 100.00 0.40 50% 0.20
STD-AA33 0.89 1Ф 220 0.85 4.76 5.95 1.00 2.00 44.70 6.00 0.60 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP

C-4 LUZ DE EMERGENCIA 3.00 50.00 0.15 0% 0.00


C-1 ALUMBRADO L-2 DE 22W,220V 2.00 22.00 0.04 100% 0.04
STD-AA41 C-2 TOMACORRIENTE 1.00 100.00 0.10 50% 0.05 3.09 3Ф 220 0.85 9.55 11.94 1.73 1.73 78.26 10.00 1.09 SI 3x40 AMP. (3-1 x 10 + 1x10-T)mm2 N2XOH 35 mm ∅ PVC-SAP
C-3 MOTOR ASCENSOR 1.00 6000.00 6.00 50% 3.00
D.M. CUMPLE
TABLERO CTO. DESCRIPCION CANT. P.I. D.M. TOTAL SIST. T F.P. I Id K' K" L SECCION ∆V < 1% I.T.M. CONDUCTOR ALIMENTADOR TUBERIA
(KW) (KW) (V) (CosФ) (A) (A) (m) (mm2) (V%)
(KW) (Vn)
C-1 STD-AA11 1.00 8.29 5.37
C-2 STD-AA12 1.00 7.46 4.74
C-3 STD-AA13 1.00 1.45 0.80
C-4 STD-AA14 1.00 0.61 0.26
C-5 STD-AA15 1.00 0.38 0.23
C-6 STD-AA21 1.00 7.79 4.87
TD-AA C-7 STD-AA22 1.00 7.75 4.83
32.80 3Ф 220 0.85 101.39 126.74 1.73 1.73 174.27 370.00 0.70 SI 3x600 AMP. 2x(3-1x185)mm2 N2XOH 2-105 mm ∅ PVC-SAP

C-8 STD-AA31 1.00 7.75 4.83


C-9 STD-AA32 1.00 4.59 2.52
C-10 STD-AA33 1.00 1.24 0.89
C-11 STD-AA41 1.00 6.14 3.09
C-12 ALUMBRADO L-6 DE 100W,220V 8.00 0.80 0.40
CUADRO DE CARGAS
D.M. CUMPLE
TABLERO CTO. DESCRIPCION CANT. C/U P.I. F.D. D.M. TOTAL SIST. T F.P. I Id K' K" L SECCION ∆V < 1.5% I.T.M. CONDUCTOR ALIMENTADOR TUBERIA
(W) (KW) (KW) (KW) (V) (CosФ) (A) (A) (m) (mm2) (V%) (Vn)
C-1 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-2 ALUMBRADO L-1 DE 39.5W,220V 2.00 39.50 0.08 100% 0.08
ALUMBRADO L-2 DE 22W,220V 9.00 22.00 0.20 100% 0.20
C-3 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-4 ALUMBRADO L-5 DE 32W,220V 10.00 32.00 0.32 100% 0.32
C-5 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
STD-AB11 4.89 1Ф 220 0.85 26.12 32.65 1.00 2.00 39.83 16.00 1.10 SI 2x50 AMP. (2-1 x 16 + 1x16-T)mm2 N2XOH 50 mm ∅ PVC-SAP
C-6 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25
C-7 GABINETE DE COMUNICACIONES 1.00 3350.00 3.35 50% 1.68
C-8 PANEL DE A.C.I. 1.00 500.00 0.50 100% 0.50
C-9 LUZ DE EMERGENCIA 7.00 50.00 0.35 0% 0.00
C-10 TOMACORRIENTE 4.00 100.00 0.40 50% 0.20
C-11 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25
C-1 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-2 ALUMBRADO L-1 DE 39.5W,220V 2.00 39.50 0.08 100% 0.08
ALUMBRADO L-2 DE 22W,220V 7.00 22.00 0.15 100% 0.15
C-3 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-4 ALUMBRADO L-2 DE 22W,220V 10.00 22.00 0.22 100% 0.22
C-5 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
STD-AB12 4.74 1Ф 220 0.85 25.32 31.65 1.00 2.00 28.17 10.00 1.21 SI 2x40 AMP. (2-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-6 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25
C-7 GABINETE DE COMUNICACIONES 1.00 3350.00 3.35 50% 1.68
C-8 PANEL DE A.C.I. 1.00 500.00 0.50 100% 0.50
C-9 LUZ DE EMERGENCIA 7.00 50.00 0.35 0% 0.00
C-10 TOMACORRIENTE 4.00 100.00 0.40 50% 0.20
C-11 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25
C-1 ALUMBRADO L-1 DE 39.5W,220V 6.00 39.50 0.24 100% 0.24
ALUMBRADO L-2 DE 22W,220V 12.00 22.00 0.26 100% 0.26
STD-AB13 0.80 1Ф 220 0.85 4.28 5.35 1.00 2.00 8.35 6.00 0.10 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-2 TOMACORRIENTE 6.00 100.00 0.60 50% 0.30
C-3 LUZ DE EMERGENCIA 7.00 50.00 0.35 0% 0.00
C-1 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
STD-AB14 0.47 1Ф 220 0.85 2.51 3.14 1.00 2.00 46.90 6.00 0.33 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-2 LUZ DE EMERGENCIA 7.00 50.00 0.35 0% 0.00
C-1 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-2 ALUMBRADO L-1 DE 39.5W,220V 2.00 39.50 0.08 100% 0.08
ALUMBRADO L-2 DE 22W,220V 5.00 22.00 0.11 100% 0.11
C-3 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-4 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-5 ALUMBRADO L-2 DE 22W,220V 10.00 22.00 0.22 100% 0.22
STD-AB21 C-6 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47 4.87 1Ф 220 0.85 26.02 32.53 1.00 2.00 42.40 16.00 1.17 SI 2x50 AMP. (2-1 x 16 + 1x16-T)mm2 N2XOH 50 mm ∅ PVC-SAP
C-7 TOMACORRIENTE 4.00 100.00 0.40 50% 0.20
C-8 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25
C-9 TOMACORRIENTE 4.00 100.00 0.40 50% 0.20
C-10 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25
C-11 GABINETE DE COMUNICACIONES 1.00 3350.00 3.35 50% 1.68
C-12 LUZ DE EMERGENCIA 7.00 50.00 0.35 0% 0.00
C-1 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-2 ALUMBRADO L-1 DE 39.5W,220V 2.00 39.50 0.08 100% 0.08
ALUMBRADO L-2 DE 22W,220V 3.00 22.00 0.07 100% 0.07
C-3 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-4 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-5 ALUMBRADO L-2 DE 22W,220V 10.00 22.00 0.22 100% 0.22
STD-AB22 C-6 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47 4.83 1Ф 220 0.85 25.80 32.25 1.00 2.00 30.20 16.00 0.82 SI 2x50 AMP. (2-1 x 16 + 1x16-T)mm2 N2XOH 50 mm ∅ PVC-SAP
C-7 TOMACORRIENTE 4.00 100.00 0.40 50% 0.20
C-8 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25
C-9 TOMACORRIENTE 4.00 100.00 0.40 50% 0.20
C-10 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25
C-11 GABINETE DE COMUNICACIONES 1.00 3350.00 3.35 50% 1.68
C-12 LUZ DE EMERGENCIA 7.00 50.00 0.35 0% 0.00
C-1 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-2 ALUMBRADO L-1 DE 39.5W,220V 2.00 39.50 0.08 100% 0.08
ALUMBRADO L-2 DE 22W,220V 2.00 22.00 0.04 100% 0.04
STD-AB31 2.52 1Ф 220 0.85 13.45 16.81 1.00 2.00 40.30 10.00 0.92 SI 2x40 AMP. (2-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-3 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25
C-4 GABINETE DE COMUNICACIONES 1.00 3350.00 3.35 50% 1.68
C-5 LUZ DE EMERGENCIA 2.00 50.00 0.10 0% 0.00
C-1 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-2 ALUMBRADO L-2 DE 22W,220V 9.00 22.00 0.20 100% 0.20
STD-AB32 0.87 1Ф 220 0.85 4.65 5.81 1.00 2.00 56.85 6.00 0.74 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-3 TOMACORRIENTE 4.00 100.00 0.40 50% 0.20
C-4 LUZ DE EMERGENCIA 3.00 50.00 0.15 0% 0.00
C-1 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-2 ALUMBRADO L-1 DE 39.5W,220V 2.00 39.50 0.08 100% 0.08
ALUMBRADO L-2 DE 22W,220V 2.00 22.00 0.04 100% 0.04
STD-AB33 2.52 1Ф 220 0.85 13.45 16.81 1.00 2.00 28.13 6.00 1.07 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-3 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25
C-4 GABINETE DE COMUNICACIONES 1.00 3350.00 3.35 50% 1.68
C-5 LUZ DE EMERGENCIA 2.00 50.00 0.10 0% 0.00
C-1 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-2 ALUMBRADO L-2 DE 22W,220V 9.00 22.00 0.20 100% 0.20
STD-AB34 0.87 1Ф 220 0.85 4.65 5.81 1.00 2.00 44.61 6.00 0.58 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-3 TOMACORRIENTE 4.00 100.00 0.40 50% 0.20
C-4 LUZ DE EMERGENCIA 3.00 50.00 0.15 0% 0.00
C-1 ALUMBRADO L-2 DE 22W,220V 2.00 22.00 0.04 100% 0.04
STD-AB41 C-2 TOMACORRIENTE 1.00 100.00 0.10 50% 0.05 3.09 3Ф 220 0.85 9.55 11.94 1.73 1.73 65.76 10.00 0.92 SI 3x40 AMP. (3-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-3 MOTOR ASCENSOR 1.00 6000.00 6.00 50% 3.00

D.M. CUMPLE
TABLERO CTO. DESCRIPCION CANT. P.I. D.M. TOTAL SIST. T F.P. I Id K' K" L SECCION ∆V < 1% I.T.M. CONDUCTOR ALIMENTADOR TUBERIA
(KW) (KW) (KW) (V) (CosФ) (A) (A) (m) (mm2) (V%) (Vn)
C-1 STD-AB11 1.00 7.61 4.89
C-2 STD-AB12 1.00 7.46 4.74
C-3 STD-AB13 1.00 1.45 0.80
C-4 STD-AB14 1.00 0.82 0.47
C-5 STD-AB21 1.00 7.79 4.87
C-6 STD-AB22 1.00 7.75 4.83
TD-AB C-7 STD-AB31 1.00 4.54 2.52
31.14 3Ф 220 0.85 96.26 120.33 1.73 1.73 133.77 240.00 0.78 SI 3x300 AMP. 3-1 x 240mm2 N2XOH 105 mm ∅ PVC-SAP
TD-AB 31.14 3Ф 220 0.85 96.26 120.33 1.73 1.73 133.77 240.00 0.78 SI 3x300 AMP. 3-1 x 240mm2 N2XOH 105 mm ∅ PVC-SAP

C-8 STD-AB32 1.00 1.22 0.87


C-9 STD-AB33 1.00 4.54 2.52
C-10 STD-AB34 1.00 1.22 0.87
C-11 STD-AB41 1.00 6.14 3.09
C-12 ALUMBRADO L-6 DE 100W,220V 14.00 1.40 0.70
CUADRO DE CARGAS
C/U P.I. D.M. D.M. T F.P. I Id L SECCION ∆V CUMPLE
TABLERO CTO. DESCRIPCION CANT. (W) (KW) F.D. (KW) TOTAL SIST. (V) (CosФ) (A) (A) K' K" (m) (mm2) (V%) < 1.5% I.T.M. CONDUCTOR ALIMENTADOR TUBERIA
(KW) (Vn)
C-1 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-2 ALUMBRADO L-1 DE 39.5W,220V 2.00 39.50 0.08 100% 0.08
ALUMBRADO L-2 DE 22W,220V 9.00 22.00 0.20 100% 0.20
C-3 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-4 ALUMBRADO L-2 DE 22W,220V 10.00 22.00 0.22 100% 0.22
C-5 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
STD-AC11 4.79 1Ф 220 0.85 25.59 31.99 1.00 2.00 41.48 16.00 1.12 SI 2x50 AMP. (2-1 x 16 + 1x16-T)mm2 N2XOH 50 mm ∅ PVC-SAP
C-6 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25
C-7 PANEL DE A.C.I. 1.00 500.00 0.50 100% 0.50
C-8 GABINETE DE COMUNICACIONES 1.00 3350.00 3.35 50% 1.68
C-9 LUZ DE EMERGENCIA 7.00 50.00 0.35 0% 0.00
C-10 TOMACORRIENTE 4.00 100.00 0.40 50% 0.20
C-11 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25
C-1 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-2 ALUMBRADO L-1 DE 39.5W,220V 2.00 39.50 0.08 100% 0.08
ALUMBRADO L-2 DE 22W,220V 3.00 22.00 0.07 100% 0.07
C-3 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-4 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-5 ALUMBRADO L-2 DE 22W,220V 10.00 22.00 0.22 100% 0.22
C-6 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
STD-AC12 5.33 1Ф 220 0.85 28.48 35.60 1.00 2.00 27.34 16.00 0.82 SI 2x50 AMP. (2-1 x 16 + 1x16-T)mm2 N2XOH 50 mm ∅ PVC-SAP
C-7 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25
C-8 PANEL DE A.C.I. 1.00 500.00 0.50 100% 0.50
C-9 GABINETE DE COMUNICACIONES 1.00 3350.00 3.35 50% 1.68
C-10 LUZ DE EMERGENCIA 7.00 50.00 0.35 0% 0.00
C-11 TOMACORRIENTE 4.00 100.00 0.40 50% 0.20
C-12 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25
C-13 TOMACORRIENTE 4.00 100.00 0.40 50% 0.20
C-1 ALUMBRADO L-1 DE 39.5W,220V 6.00 39.50 0.24 100% 0.24
ALUMBRADO L-2 DE 22W,220V 12.00 22.00 0.26 100% 0.26
STD-AC13 0.80 1Ф 220 0.85 4.28 5.35 1.00 2.00 8.53 6.00 0.10 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-2 TOMACORRIENTE 6.00 100.00 0.60 50% 0.30
C-3 LUZ DE EMERGENCIA 7.00 50.00 0.35 0% 0.00
C-1 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
STD-AC14 0.47 1Ф 220 0.85 2.51 3.14 1.00 2.00 47.99 10.00 0.20 SI 2x40 AMP. (2-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-2 LUZ DE EMERGENCIA 7.00 50.00 0.35 0% 0.00
C-1 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-2 ALUMBRADO L-1 DE 39.5W,220V 2.00 39.50 0.08 100% 0.08
ALUMBRADO L-2 DE 22W,220V 5.00 22.00 0.11 100% 0.11
C-3 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-4 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-5 ALUMBRADO L-2 DE 22W,220V 10.00 22.00 0.22 100% 0.22
STD-AC21 C-6 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47 4.87 1Ф 220 0.85 26.02 32.53 1.00 2.00 43.40 16.00 1.19 SI 2x50 AMP. (2-1 x 16 + 1x16-T)mm2 N2XOH 50 mm ∅ PVC-SAP
C-7 TOMACORRIENTE 4.00 100.00 0.40 50% 0.20
C-8 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25
C-9 TOMACORRIENTE 4.00 100.00 0.40 50% 0.20
C-10 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25
C-11 GABINETE DE COMUNICACIONES 1.00 3350.00 3.35 50% 1.68
C-12 LUZ DE EMERGENCIA 7.00 50.00 0.35 0% 0.00
C-1 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-2 ALUMBRADO L-1 DE 39.5W,220V 2.00 39.50 0.08 100% 0.08
ALUMBRADO L-2 DE 22W,220V 3.00 22.00 0.07 100% 0.07
C-3 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-4 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-5 ALUMBRADO L-2 DE 22W,220V 10.00 22.00 0.22 100% 0.22
STD-AC22 C-6 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47 4.83 1Ф 220 0.85 25.80 32.25 1.00 2.00 30.66 16.00 0.84 SI 2x50 AMP. (2-1 x 16 + 1x16-T)mm2 N2XOH 50 mm ∅ PVC-SAP
C-7 TOMACORRIENTE 4.00 100.00 0.40 50% 0.20
C-8 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25
C-9 TOMACORRIENTE 4.00 100.00 0.40 50% 0.20
C-10 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25
C-11 GABINETE DE COMUNICACIONES 1.00 3350.00 3.35 50% 1.68
C-12 LUZ DE EMERGENCIA 7.00 50.00 0.35 0% 0.00
C-1 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-2 ALUMBRADO L-1 DE 39.5W,220V 2.00 39.50 0.08 100% 0.08
ALUMBRADO L-2 DE 22W,220V 2.00 22.00 0.04 100% 0.04
STD-AC31 2.52 1Ф 220 0.85 13.45 16.81 1.00 2.00 40.23 10.00 0.91 SI 2x40 AMP. (2-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-3 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25
C-4 GABINETE DE COMUNICACIONES 1.00 3350.00 3.35 50% 1.68
C-5 LUZ DE EMERGENCIA 3.00 50.00 0.15 0% 0.00
C-1 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-2 ALUMBRADO L-2 DE 22W,220V 9.00 22.00 0.20 100% 0.20
STD-AC32 0.87 1Ф 220 0.85 4.65 5.81 1.00 2.00 57.60 6.00 0.75 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-3 LUZ DE EMERGENCIA 3.00 50.00 0.15 0% 0.00
C-4 TOMACORRIENTE 4.00 100.00 0.40 50% 0.20
C-1 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-2 ALUMBRADO L-1 DE 39.5W,220V 2.00 39.50 0.08 100% 0.08
ALUMBRADO L-2 DE 22W,220V 3.00 22.00 0.07 100% 0.07
C-3 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-4 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-5 ALUMBRADO L-2 DE 22W,220V 10.00 22.00 0.22 100% 0.22
STD-AC33 C-6 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47 4.83 1Ф 220 0.85 25.80 32.25 1.00 2.00 34.69 16.00 0.95 SI 2x50 AMP. (2-1 x 16 + 1x16-T)mm2 N2XOH 50 mm ∅ PVC-SAP
C-7 TOMACORRIENTE 4.00 100.00 0.40 50% 0.20
C-8 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25
C-9 TOMACORRIENTE 4.00 100.00 0.40 50% 0.20
C-10 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25
C-11 GABINETE DE COMUNICACIONES 1.00 3350.00 3.35 50% 1.68
C-12 LUZ DE EMERGENCIA 7.00 50.00 0.35 0% 0.00
C-1 ALUMBRADO L-2 DE 22W,220V 2.00 22.00 0.04 100% 0.04
STD-AC41 C-2 TOMACORRIENTE 1.00 100.00 0.10 50% 0.05 3.09 3Ф 220 0.85 9.55 11.94 1.73 1.73 66.29 16.00 0.58 SI 3x50 AMP. (3-1 x 16 + 1x16-T)mm2 N2XOH 35 mm ∅ PVC-SAP
C-3 MOTOR ASCENSOR 1.00 6000.00 6.00 50% 3.00

P.I. D.M. D.M. T F.P. I Id L SECCION ∆V CUMPLE


TABLERO CTO. DESCRIPCION CANT. (KW) (KW) TOTAL SIST. (V) (CosФ) (A) (A) K' K" (m) (mm2) (V%) < 1% I.T.M. CONDUCTOR ALIMENTADOR TUBERIA
(KW) (Vn)
C-1 ALUMBRADO L-6 DE 100W,220V 1.00 7.51 4.79
C-2 STD-AC12 1.00 8.25 5.33
C-3 STD-AC13 1.00 1.45 0.80
C-4 STD-AC14 1.00 0.82 0.47
C-5 STD-AC21 1.00 7.79 4.87
TD-AC C-6 STD-AC22 1.00 7.75 4.83 32.92 3Ф 220 0.85 101.76 127.20 1.73 1.73 80.89 150.00 0.80 SI 3x200 AMP. 3-1 x 150mm2 N2XOH 105 mm ∅ PVC-SAP
C-7 STD-AC31 1.00 4.59 2.52
C-8 STD-AC32 1.00 1.22 0.87
TD-AC 32.92 3Ф 220 0.85 101.76 127.20 1.73 1.73 80.89 150.00 0.80 SI 3x200 AMP. 3-1 x 150mm2 N2XOH 105 mm ∅ PVC-SAP

C-9 STD-AC33 1.00 7.75 4.83


C-10 STD-AC41 1.00 6.14 3.09
C-11 ALUMBRADO L-6 DE 100W,220V 11.00 1.10 0.55
CUADRO DE CARGAS
D.M. CUMPLE
TABLERO CTO. DESCRIPCION CANT. C/U P.I. F.D. D.M. TOTAL SIST. T F.P. I Id K' K" L SECCION ∆V < 1.5% I.T.M. CONDUCTOR ALIMENTADOR TUBERIA
(W) (KW) (KW) (KW) (V) (CosФ) (A) (A) (m) (mm2) (V%) (Vn)
C-1 ALUMBRADO L-1 DE 39.5W,220V 10.00 39.50 0.40 100% 0.40
C-2 ALUMBRADO L-1 DE 39.5W,220V 8.00 39.50 0.32 100% 0.32
ALUMBRADO L-2 DE 22W,220V 1.00 22.00 0.02 100% 0.02
STD-T11 1.56 1Ф 220 0.85 8.34 10.43 1.00 2.00 25.97 6.00 0.61 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-3 ALUMBRADO L-2 DE 22W,220V 10.00 22.00 0.22 100% 0.22
C-3 TOMACORRIENTE 11.00 100.00 1.10 50% 0.55
C-4 TOMACORRIENTE 1.00 100.00 0.10 50% 0.05
C-1 ALUMBRADO L-1 DE 39.5W,220V 10.00 39.50 0.40 100% 0.40
C-2 ALUMBRADO L-1 DE 39.5W,220V 10.00 39.50 0.40 100% 0.40
C-3 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25
STD-T12 1.90 1Ф 220 0.85 10.16 12.70 1.00 2.00 45.14 10.00 0.78 SI 2x40 AMP. (2-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-4 TOMACORRIENTE 7.00 100.00 0.70 50% 0.35
C-5 PANEL DE A.C.I. 1.00 500.00 0.50 100% 0.50
C-6 LUZ DE EMERGENCIA 6.00 50.00 0.30 0% 0.00
C-1 ALUMBRADO L-2 DE 22W,220V 12.00 22.00 0.26 100% 0.26
STD-T13 0.26 1Ф 220 0.85 1.39 1.74 1.00 2.00 57.79 6.00 0.23 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-2 LUZ DE EMERGENCIA 7.00 50.00 0.35 0% 0.00
C-1 ALUMBRADO L-1 DE 39.5W,220V 10.00 39.50 0.40 100% 0.40
C-2 ALUMBRADO L-1 DE 39.5W,220V 9.00 39.50 0.36 100% 0.36
C-3 TOMACORRIENTE 1.00 100.00 0.10 50% 0.05
C-4 TOMACORRIENTE 8.00 100.00 0.80 50% 0.40
STD-T14 2.51 3Ф 220 0.85 7.76 9.70 1.73 1.73 30.73 6.00 0.58 SI 3x30 AMP. (3-1 x 6.0 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-5 TOMACORRIENTE 8.00 100.00 0.80 50% 0.40
C-6 TOMACORRIENTE 8.00 100.00 0.80 50% 0.40
C-7 PANEL DE A.C.I. 1.00 500.00 0.50 100% 0.50
C-8 LUZ DE EMERGENCIA 5.00 50.00 0.00 0% 0.00
C-1 ALUMBRADO L-1 DE 39.5W,220V 9.00 39.50 0.36 100% 0.36
C-2 ALUMBRADO L-1 DE 39.5W,220V 10.00 39.50 0.40 100% 0.40
C-3 ALUMBRADO L-2 DE 22W,220V 11.00 22.00 0.24 100% 0.24
STD-T15 C-4 TOMACORRIENTE 8.00 100.00 0.80 50% 0.40 2.05 3Ф 220 0.85 6.34 7.93 1.73 1.73 13.91 6.00 0.22 SI 3x30 AMP. (3-1 x 6.0 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-5 TOMACORRIENTE 1.00 100.00 0.10 50% 0.05
C-6 TOMACORRIENTE 12.00 100.00 1.20 50% 0.60
C-7 LUZ DE EMERGENCIA 4.00 50.00 0.20 0% 0.00
C-1 ALUMBRADO L-2 DE 22W,220V 13.00 22.00 0.29 100% 0.29
STD-T16 0.29 1Ф 220 0.85 1.55 1.94 1.00 2.00 11.10 6.00 0.05 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-2 LUZ DE EMERGENCIA 9.00 50.00 0.45 0% 0.00
C-1 ALUMBRADO L-1 DE 39.5W,220V 9.00 39.50 0.36 100% 0.36
C-2 ALUMBRADO L-1 DE 39.5W,220V 10.00 39.50 0.40 100% 0.40
C-3 ALUMBRADO L-2 DE 22W,220V 4.00 22.00 0.09 100% 0.09
C-4 TOMACORRIENTE 8.00 100.00 0.80 50% 0.40
STD-T17 C-5 TOMACORRIENTE 2.00 100.00 0.20 50% 0.10 2.25 3Ф 220 0.85 6.95 8.69 1.73 1.73 18.42 6.00 0.31 SI 3x30 AMP. (3-1 x 6.0 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-6 TOMACORRIENTE 1.00 100.00 0.10 50% 0.05
C-7 TOMACORRIENTE 6.00 100.00 0.60 50% 0.30
C-8 TOMACORRIENTE 1.00 100.00 0.10 50% 0.05
C-9 PANEL DE A.C.I. 1.00 500.00 0.50 100% 0.50
C-1 ALUMBRADO L-1 DE 39.5W,220V 10.00 39.50 0.40 100% 0.40
C-2 ALUMBRADO L-1 DE 39.5W,220V 9.00 39.50 0.36 100% 0.36
C-3 TOMACORRIENTE 4.00 100.00 0.40 50% 0.20
C-4 TOMACORRIENTE 1.00 100.00 0.10 50% 0.05
C-5 TOMACORRIENTE 3.00 100.00 0.30 50% 0.15
C-6 TOMACORRIENTE 3.00 100.00 0.30 50% 0.15
STD-T18 1.76 3Ф 220 0.85 5.44 6.80 1.73 1.73 39.84 6.00 0.53 SI 3x30 AMP. (3-1 x 6.0 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-7 TOMACORRIENTE 1.00 100.00 0.10 50% 0.05
C-8 TOMACORRIENTE 1.00 100.00 0.10 50% 0.05
C-9 TOMACORRIENTE 3.00 100.00 0.30 50% 0.15
C-10 TOMACORRIENTE 3.00 100.00 0.30 50% 0.15
C-11 TOMACORRIENTE 1.00 100.00 0.10 50% 0.05
C-12 LUZ DE EMERGENCIA 4.00 50.00 0.20 0% 0.00
C-1 ALUMBRADO L-1 DE 39.5W,220V 9.00 39.50 0.36 100% 0.36
C-2 ALUMBRADO L-1 DE 39.5W,220V 10.00 39.50 0.40 100% 0.40
C-3 ALUMBRADO L-2 DE 22W,220V 10.00 22.00 0.22 100% 0.22
STD-T21 1.88 1Ф 220 0.85 10.05 12.56 1.00 2.00 100.69 25.00 0.68 SI 2x63 AMP. (2-1 x 25 + 1x16-T)mm2 N2XOH 80 mm ∅ PVC-SAP
C-4 TOMACORRIENTE 1.00 100.00 0.10 50% 0.05
C-5 TOMACORRIENTE 10.00 100.00 1.00 50% 0.50
C-6 TOMACORRIENTE 7.00 100.00 0.70 50% 0.35
C-1 ALUMBRADO L-1 DE 39.5W,220V 10.00 39.50 0.40 100% 0.40
C-2 ALUMBRADO L-1 DE 39.5W,220V 9.00 39.50 0.36 100% 0.36
C-3 TOMACORRIENTE 10.00 100.00 1.00 50% 0.50
STD-T22 1.66 1Ф 220 0.85 8.88 11.10 1.00 2.00 81.59 16.00 0.77 SI 2x50 AMP. (2-1 x 16 + 1x16-T)mm2 N2XOH 50 mm ∅ PVC-SAP
C-4 TOMACORRIENTE 1.00 100.00 0.10 50% 0.05
C-5 TOMACORRIENTE 7.00 100.00 0.70 50% 0.35
C-6 LUZ DE EMERGENCIA 5.00 50.00 0.25 0% 0.00
C-1 ALUMBRADO L-1 DE 39.5W,220V 10.00 39.50 0.40 100% 0.40
C-2 ALUMBRADO L-1 DE 39.5W,220V 9.00 39.50 0.36 100% 0.36
C-3 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25
STD-T23 C-4 TOMACORRIENTE 1.00 100.00 0.10 50% 0.05 1.26 3Ф 220 0.85 3.89 4.86 1.73 1.73 69.21 6.00 0.66 SI 3x30 AMP. (3-1 x 6.0 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-5 TOMACORRIENTE 2.00 100.00 0.20 50% 0.10
C-6 TOMACORRIENTE 2.00 100.00 0.20 50% 0.10
C-7 LUZ DE EMERGENCIA 5.00 50.00 0.25 0% 0.00
C-1 ALUMBRADO L-1 DE 39.5W,220V 9.00 39.50 0.36 100% 0.36
C-2 ALUMBRADO L-1 DE 39.5W,220V 10.00 39.50 0.40 100% 0.40
C-3 ALUMBRADO L-2 DE 22W,220V 11.00 22.00 0.24 100% 0.24
C-4 TOMACORRIENTE 8.00 100.00 0.80 50% 0.40
STD-T24 2.15 3Ф 220 0.85 6.65 8.31 1.73 1.73 87.80 10.00 0.85 SI 3x40 AMP. (3-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-5 TOMACORRIENTE 6.00 100.00 0.60 50% 0.30
C-6 TOMACORRIENTE 4.00 100.00 0.40 50% 0.20
C-7 TOMACORRIENTE 1.00 100.00 0.10 50% 0.05
STD-T24 2.15 3Ф 220 0.85 6.65 8.31 1.73 1.73 87.80 10.00 0.85 SI 3x40 AMP. (3-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP

C-8 TOMACORRIENTE 4.00 100.00 0.40 50% 0.20


C-1 ALUMBRADO L-1 DE 39.5W,220V 9.00 39.50 0.36 100% 0.36
C-2 ALUMBRADO L-1 DE 39.5W,220V 10.00 39.50 0.40 100% 0.40
STD-T25 C-3 ALUMBRADO L-2 DE 22W,220V 4.00 22.00 0.09 100% 0.09 1.30 1Ф 220 0.85 6.95 8.69 1.00 2.00 102.13 16.00 0.75 SI 2x50 AMP. (2-1 x 16 + 1x16-T)mm2 N2XOH 50 mm ∅ PVC-SAP
C-4 TOMACORRIENTE 8.00 100.00 0.80 50% 0.40
C-5 TOMACORRIENTE 1.00 100.00 0.10 50% 0.05
C-1 ALUMBRADO L-1 DE 39.5W,220V 10.00 39.50 0.40 100% 0.40
C-2 ALUMBRADO L-1 DE 39.5W,220V 9.00 39.50 0.36 100% 0.36
STD-T26 C-3 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25 1.06 1Ф 220 0.85 5.67 7.09 1.00 2.00 112.28 16.00 0.67 SI 2x50 AMP. (2-1 x 16 + 1x16-T)mm2 N2XOH 50 mm ∅ PVC-SAP
C-4 TOMACORRIENTE 1.00 100.00 0.10 50% 0.05
C-5 LUZ DE EMERGENCIA 4.00 50.00 0.20 0% 0.00
C-1 ALUMBRADO L-1 DE 39.5W,220V 10.00 39.50 0.40 100% 0.40
C-2 ALUMBRADO L-1 DE 39.5W,220V 10.00 39.50 0.40 100% 0.40
C-3 ALUMBRADO L-2 DE 22W,220V 10.00 22.00 0.22 100% 0.22
STD-T31 1.97 3Ф 220 0.85 6.09 7.61 1.73 1.73 105.95 10.00 0.94 SI 3x40 AMP. (3-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-4 TOMACORRIENTE 10.00 100.00 1.00 50% 0.50
C-5 TOMACORRIENTE 1.00 100.00 0.10 50% 0.05
C-6 TOMACORRIENTE 8.00 100.00 0.80 50% 0.40
C-1 ALUMBRADO L-1 DE 39.5W,220V 10.00 39.50 0.40 100% 0.40
C-2 ALUMBRADO L-1 DE 39.5W,220V 10.00 39.50 0.40 100% 0.40
C-3 TOMACORRIENTE 10.00 100.00 1.00 50% 0.50
STD-T32 1.75 1Ф 220 0.85 9.36 11.70 1.00 2.00 84.85 25.00 0.54 SI 2x63 AMP. (2-1 x 25 + 1x16-T)mm2 N2XOH 80 mm ∅ PVC-SAP
C-4 TOMACORRIENTE 1.00 100.00 0.10 50% 0.05
C-5 TOMACORRIENTE 8.00 100.00 0.80 50% 0.40
C-6 LUZ DE EMERGENCIA 5.00 50.00 0.25 0% 0.00
C-1 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
STD-T33 C-2 TOMACORRIENTE 4.00 100.00 0.40 50% 0.20 0.72 1Ф 220 0.85 3.85 4.81 1.00 2.00 65.20 6.00 0.71 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-3 TOMACORRIENTE 1.00 100.00 0.10 50% 0.05
C-1 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-2 TOMACORRIENTE 4.00 100.00 0.40 50% 0.20
STD-T34 0.72 1Ф 220 0.85 3.85 4.81 1.00 2.00 75.35 10.00 0.49 SI 2x40 AMP. (2-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-3 TOMACORRIENTE 1.00 100.00 0.10 50% 0.05
C-4 LUZ DE EMERGENCIA 7.00 50.00 0.35 0% 0.00
C-1 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
STD-T35 C-2 TOMACORRIENTE 4.00 100.00 0.40 50% 0.20 0.72 1Ф 220 0.85 3.85 4.81 1.00 2.00 84.09 6.00 0.91 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-3 TOMACORRIENTE 1.00 100.00 0.10 50% 0.05
C-1 ALUMBRADO L-2 DE 22W,220V 11.00 22.00 0.24 100% 0.24
C-2 ALUMBRADO L-1 DE 39.5W,220V 13.00 39.50 0.51 100% 0.51
STD-T36 C-3 TOMACORRIENTE 6.00 100.00 0.60 50% 0.30 3.03 1Ф 220 0.85 16.18 20.23 1.00 2.00 91.90 25.00 1.01 SI 2x63 AMP. (2-1 x 25 + 1x16-T)mm2 N2XOH 80 mm ∅ PVC-SAP
C-4 GABINETE DE COMUNICACIONES 1.00 3350.00 3.35 50% 1.68
C-5 TOMACORRIENTE 6.00 100.00 0.60 50% 0.30
C-1 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-2 TOMACORRIENTE 4.00 100.00 0.40 50% 0.20
STD-T37 0.72 1Ф 220 0.85 3.85 4.81 1.00 2.00 107.90 10.00 0.70 SI 2x40 AMP. (2-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-3 TOMACORRIENTE 1.00 100.00 0.10 50% 0.05
C-4 LUZ DE EMERGENCIA 1.00 50.00 0.05 0% 0.00
C-1 ALUMBRADO L-2 DE 22W,220V 2.00 22.00 0.04 100% 0.04
STD-T41 C-2 TOMACORRIENTE 1.00 100.00 0.10 50% 0.05 3.09 3Ф 220 0.85 9.55 11.94 1.73 1.73 73.65 10.00 1.03 SI 3x40 AMP. (3-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-3 MOTOR ASCENSOR 1.00 6000.00 6.00 50% 3.00

D.M. CUMPLE
TABLERO CTO. DESCRIPCION CANT. P.I. D.M. TOTAL SIST. T F.P. I Id K' K" L SECCION ∆V < 1% I.T.M. CONDUCTOR ALIMENTADOR TUBERIA
(KW) (KW) (KW) (V) (CosФ) (A) (A) (m) (mm2) (V%) (Vn)
C-1 STD-T11 1.00 2.16 1.56
C-2 STD-T12 1.00 2.80 1.90
C-3 STD-T13 1.00 0.61 0.26
C-4 STD-T14 1.00 3.76 2.51
C-5 STD-T15 1.00 3.30 2.05
C-6 STD-T16 1.00 0.74 0.29
C-7 STD-T17 1.00 3.15 2.25
C-8 STD-T18 1.00 2.96 1.76
C-9 STD-T21 1.00 2.78 1.88
C-10 STD-T22 1.00 2.81 1.66
C-11 STD-T23 1.00 2.01 1.26
C-12 STD-T24 1.00 3.30 2.15
TD-TALL C-13 STD-T25 1.00 1.75 1.30
41.93 3Ф 220 0.85 129.62 162.03 1.73 1.73 223.45 900.00 0.47 SI 3x1200 AMP. 3x(3-1x300)mm2 N2XOH 9-80 mm ∅ PVC-SAP

C-14 STD-T26 1.00 1.56 1.06


C-15 STD-T31 1.00 2.92 1.97
C-16 STD-T32 1.00 2.95 1.75
C-17 STD-T33 1.00 0.97 0.72
C-18 STD-T34 1.00 1.32 0.72
C-19 STD-T35 1.00 0.97 0.72
C-20 STD-T36 1.00 5.30 3.03
C-21 STD-T37 1.00 1.02 0.72
C-22 TGE-01 1.00 12.00 7.20
C-23 STD-T41 1.00 6.14 3.09
C-24 ALUMBRADO L-7 DE 32W,220V 8.00 0.26 0.13
CUADRO DE CARGAS
D.M. CUMPLE
TABLERO CTO. DESCRIPCION CANT. C/U P.I. F.D. D.M. TOTAL SIST. T F.P. I Id K' K" L SECCION ∆V < 1.5% I.T.M. CONDUCTOR ALIMENTADOR TUBERIA
(W) (KW) (KW) (KW) (V) (CosФ) (A) (A) (m) (mm2) (V%) (Vn)
C-1 ALUMBRADO L-2 DE 22W,220V 10.00 22.00 0.22 100% 0.22
C-2 ALUMBRADO L-1 DE 39.5W,220V 8.00 39.50 0.32 100% 0.32
STD-ADM11 C-3 TOMACORRIENTE 9.00 100.00 0.90 50% 0.45 1.49 1Ф 220 0.85 7.97 9.96 1.00 2.00 9.78 6.00 0.22 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-4 PANEL DE A.C.I. 1.00 500.00 0.50 100% 0.50
C-5 LUZ DE EMERGENCIA 5.00 50.00 0.25 0% 0.00
C-1 ALUMBRADO L-1 DE 39.5W,220V 9.00 39.50 0.36 100% 0.36
STD-ADM12 C-2 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25 0.94 1Ф 220 0.85 5.03 6.29 1.00 2.00 21.39 6.00 0.30 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-3 SSTD-ADM12 1.00 0.68 0.33
C-1 ALUMBRADO L-1 DE 39.5W,220V 2.00 39.50 0.08 100% 0.08
SSTD-ADM12 C-2 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25 0.33 1Ф 220 0.85 1.76 2.20 1.00 2.00 5.40 6.00 0.03 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-3 LUZ DE EMERGENCIA 2.00 50.00 0.10 0% 0.00
C-1 ALUMBRADO L-1 DE 39.5W,220V 11.00 39.50 0.43 100% 0.43
C-2 ALUMBRADO L-1 DE 39.5W,220V 8.00 39.50 0.32 100% 0.32
STD-ADM13 C-3 TOMACORRIENTE 6.00 100.00 0.60 50% 0.30 1.30 1Ф 220 0.85 6.95 8.69 1.00 2.00 31.02 6.00 0.61 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-4 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25
C-5 LUZ DE EMERGENCIA 2.00 50.00 0.10 0% 0.00
C-1 ALUMBRADO L-2 DE 22W,220V 6.00 22.00 0.13 100% 0.13
C-2 ALUMBRADO L-1 DE 39.5W,220V 10.00 39.50 0.40 100% 0.40
STD-ADM14 C-3 TOMACORRIENTE 9.00 100.00 0.90 50% 0.45 1.48 1Ф 220 0.85 7.91 9.89 1.00 2.00 20.68 6.00 0.46 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-4 PANEL DE A.C.I. 1.00 500.00 0.50 100% 0.50
C-5 LUZ DE EMERGENCIA 5.00 50.00 0.25 0% 0.00
C-1 ALUMBRADO L-2 DE 22W,220V 20.00 22.00 0.44 100% 0.44
STD-ADM15 C-2 LUZ DE EMERGENCIA 12.00 50.00 0.60 0% 0.00 0.76 1Ф 220 0.85 4.06 5.08 1.00 2.00 7.99 6.00 0.09 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-3 ALUMBRADO L-7 DE 32W,220V 10.00 32.00 0.32 100% 0.32
C-1 ALUMBRADO L-1 DE 39.5W,220V 8.00 39.50 0.32 100% 0.32
ALUMBRADO L-2 DE 22W,220V 3.00 22.00 0.07 100% 0.07
C-2 ALUMBRADO L-1 DE 39.5W,220V 10.00 39.50 0.40 100% 0.40
STD-ADM21 C-3 TOMACORRIENTE 6.00 100.00 0.60 50% 0.30 3.12 1Ф 220 0.85 16.66 20.83 1.00 2.00 11.49 6.00 0.54 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-4 TOMACORRIENTE 7.00 100.00 0.70 50% 0.35
C-5 GABINETE DE COMUNICACIONES 1.00 3350.00 3.35 50% 1.68
C-6 LUZ DE EMERGENCIA 4.00 50.00 0.20 0% 0.00
C-1 ALUMBRADO L-1 DE 39.5W,220V 8.00 39.50 0.32 100% 0.32
ALUMBRADO L-2 DE 22W,220V 1.00 22.00 0.02 100% 0.02
STD-ADM22 0.69 1Ф 220 0.85 3.69 4.61 1.00 2.00 25.62 6.00 0.27 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-2 TOMACORRIENTE 7.00 100.00 0.70 50% 0.35
C-3 LUZ DE EMERGENCIA 1.00 50.00 0.05 0% 0.00
C-1 ALUMBRADO L-1 DE 39.5W,220V 10.00 39.50 0.40 100% 0.40
ALUMBRADO L-2 DE 22W,220V 1.00 22.00 0.02 100% 0.02
STD-ADM23 0.72 1Ф 220 0.85 3.85 4.81 1.00 2.00 38.86 6.00 0.42 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-2 TOMACORRIENTE 6.00 100.00 0.60 50% 0.30
C-3 LUZ DE EMERGENCIA 1.00 50.00 0.05 0% 0.00
C-1 ALUMBRADO L-1 DE 39.5W,220V 8.00 39.50 0.32 100% 0.32
ALUMBRADO L-2 DE 22W,220V 5.00 22.00 0.11 100% 0.11
C-2 ALUMBRADO L-1 DE 39.5W,220V 10.00 39.50 0.40 100% 0.40
STD-ADM24 1.63 1Ф 220 0.85 8.72 10.90 1.00 2.00 24.77 6.00 0.61 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-3 TOMACORRIENTE 9.00 100.00 0.90 50% 0.45
C-4 TOMACORRIENTE 7.00 100.00 0.70 50% 0.35
C-5 LUZ DE EMERGENCIA 5.00 50.00 0.25 0% 0.00
C-1 ALUMBRADO L-1 DE 39.5W,220V 3.00 39.50 0.12 100% 0.12
ALUMBRADO L-2 DE 22W,220V 9.00 22.00 0.20 100% 0.20
STD-ADM31 0.52 1Ф 220 0.85 2.78 3.48 1.00 2.00 17.94 6.00 0.14 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-2 TOMACORRIENTE 4.00 100.00 0.40 50% 0.20
C-3 LUZ DE EMERGENCIA 5.00 50.00 0.25 0% 0.00
C-1 ALUMBRADO L-1 DE 39.5W,220V 9.00 39.50 0.36 100% 0.36
C-2 ALUMBRADO L-1 DE 39.5W,220V 9.00 39.50 0.36 100% 0.36
C-3 TOMACORRIENTE 3.00 100.00 0.30 50% 0.15
STD-ADM32 1.17 1Ф 220 0.85 6.26 7.83 1.00 2.00 30.98 6.00 0.55 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-4 TOMACORRIENTE 2.00 100.00 0.20 50% 0.10
C-5 TOMACORRIENTE 4.00 100.00 0.40 50% 0.20
C-6 LUZ DE EMERGENCIA 1.00 50.00 0.05 0% 0.00
C-1 ALUMBRADO L-1 DE 39.5W,220V 7.00 39.50 0.28 100% 0.28
ALUMBRADO L-2 DE 22W,220V 4.00 22.00 0.09 100% 0.09
C-2 ALUMBRADO L-1 DE 39.5W,220V 7.00 39.50 0.28 100% 0.28
ALUMBRADO L-2 DE 22W,220V 3.00 22.00 0.07 100% 0.07
STD-ADM33 1.42 1Ф 220 0.85 7.59 9.49 1.00 2.00 28.84 6.00 0.62 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-3 TOMACORRIENTE 1.00 100.00 0.10 50% 0.05
C-4 TOMACORRIENTE 8.00 100.00 0.80 50% 0.40
C-5 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25
C-6 LUZ DE EMERGENCIA 5.00 50.00 0.25 0% 0.00
C-1 ALUMBRADO L-2 DE 22W,220V 4.00 22.00 0.09 100% 0.09
C-2 ALUMBRADO L-1 DE 39.5W,220V 10.00 39.50 0.40 100% 0.40
STD-ADM41 0.94 1Ф 220 0.85 5.03 6.29 1.00 2.00 18.66 6.00 0.26 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-3 TOMACORRIENTE 9.00 100.00 0.90 50% 0.45
C-4 LUZ DE EMERGENCIA 4.00 50.00 0.20 0% 0.00
C-1 ALUMBRADO L-1 DE 39.5W,220V 7.00 39.50 0.28 100% 0.28
ALUMBRADO L-2 DE 22W,220V 5.00 22.00 0.11 100% 0.11
STD-ADM42 C-2 ALUMBRADO L-1 DE 39.5W,220V 7.00 39.50 0.28 100% 0.28 1.02 1Ф 220 0.85 5.45 6.81 1.00 2.00 32.65 6.00 0.50 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-3 TOMACORRIENTE 7.00 100.00 0.70 50% 0.35
C-4 LUZ DE EMERGENCIA 2.00 50.00 0.10 0% 0.00
C-1 ALUMBRADO L-1 DE 39.5W,220V 4.00 39.50 0.16 100% 0.16
C-2 ALUMBRADO L-1 DE 39.5W,220V 10.00 39.50 0.40 100% 0.40
C-3 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25
STD-ADM43 1.21 1Ф 220 0.85 6.47 8.09 1.00 2.00 45.34 6.00 0.83 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-4 TOMACORRIENTE 7.00 100.00 0.70 50% 0.35
C-5 TOMACORRIENTE 1.00 100.00 0.10 50% 0.05
C-6 LUZ DE EMERGENCIA 2.00 50.00 0.10 0% 0.00
C-1 ALUMBRADO L-2 DE 22W,220V 5.00 22.00 0.11 100% 0.11
C-2 ALUMBRADO L-1 DE 39.5W,220V 10.00 39.50 0.40 100% 0.40
STD-ADM44 0.96 1Ф 220 0.85 5.13 6.41 1.00 2.00 32.89 6.00 0.48 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-3 TOMACORRIENTE 9.00 100.00 0.90 50% 0.45
C-4 LUZ DE EMERGENCIA 4.00 50.00 0.20 0% 0.00
C-1 ALUMBRADO L-2 DE 22W,220V 2.00 22.00 0.04 100% 0.04
STD-ADM51 C-2 TOMACORRIENTE 1.00 100.00 0.10 50% 0.05 3.09 3Ф 220 0.85 9.55 11.94 1.73 1.73 27.97 10.00 0.39 SI 3x40 AMP. (3-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-3 MOTOR ASCENSOR 1.00 6000.00 6.00 50% 3.00

D.M. CUMPLE
TABLERO CTO. DESCRIPCION CANT. P.I. D.M. TOTAL SIST. T F.P. I Id K' K" L SECCION ∆V < 1% I.T.M. CONDUCTOR ALIMENTADOR TUBERIA
(KW) (KW) (KW) (V) (CosФ) (A) (A) (m) (mm2) (V%) (Vn)
C-1 STD-ADM11 1.00 2.19 1.49
C-2 STD-ADM12 1.00 1.54 0.94
C-3 STD-ADM13 1.00 1.95 1.30
C-4 STD-ADM14 1.00 2.18 1.48
C-5 STD-ADM15 1.00 1.36 0.76
C-6 STD-ADM21 1.00 5.64 3.12
C-7 STD-ADM22 1.00 1.09 0.69
C-8 STD-ADM23 1.00 1.07 0.72
TD-ADM C-9 STD-ADM24 1.00 2.68 1.63 22.46 3Ф 220 0.85 69.41 86.76 1.73 1.73 190.03 300.00 0.64 SI 3x400 AMP. 3-1 x 300mm2 N2XOH 3-80 mm ∅ PVC-SAP
C-10 STD-ADM31 1.00 0.97 0.52
C-11 STD-ADM32 1.00 1.67 1.17
C-12 STD-ADM33 1.00 2.37 1.42
C-13 STD-ADM41 1.00 1.59 0.94
C-14 STD-ADM42 1.00 1.47 1.02
TD-ADM 22.46 3Ф 220 0.85 69.41 86.76 1.73 1.73 190.03 300.00 0.64 SI 3x400 AMP. 3-1 x 300mm2 N2XOH 3-80 mm ∅ PVC-SAP

C-15 STD-ADM43 1.00 1.96 1.21


C-16 STD-ADM44 1.00 1.61 0.96
C-17 STD-ADM51 1.00 6.14 3.09
CUADRO DE CARGAS
D.M. CUMPLE
TABLERO CTO. DESCRIPCION CANT. C/U P.I. F.D. D.M. TOTAL SIST. T F.P. I Id K' K" L SECCION ∆V < 1.5% I.T.M. CONDUCTOR ALIMENTADOR TUBERIA
(W) (KW) (KW) (KW) (V) (CosФ) (A) (A) (m) (mm2) (V%) (Vn)
C-1 TOMACORRIENTE ESTABILIZADO 10.00 100.00 1.00 60% 0.60
TE-T33 C-2 TOMACORRIENTE ESTABILIZADO 10.00 100.00 1.00 60% 0.60 1.80 3Ф 220 0.85 5.56 6.95 1.73 1.73 26.14 10.00 0.21 SI 3x40 AMP. (3-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-3 TOMACORRIENTE ESTABILIZADO 10.00 100.00 1.00 60% 0.60
C-1 TOMACORRIENTE ESTABILIZADO 10.00 100.00 1.00 60% 0.60
TE-T34 C-2 TOMACORRIENTE ESTABILIZADO 10.00 100.00 1.00 60% 0.60 1.80 3Ф 220 0.85 5.56 6.95 1.73 1.73 16.89 10.00 0.14 SI 3x40 AMP. (3-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-3 TOMACORRIENTE ESTABILIZADO 10.00 100.00 1.00 60% 0.60
C-1 TOMACORRIENTE ESTABILIZADO 10.00 100.00 1.00 60% 0.60
TE-T35 C-2 TOMACORRIENTE ESTABILIZADO 10.00 100.00 1.00 60% 0.60 1.80 3Ф 220 0.85 5.56 6.95 1.73 1.73 9.79 10.00 0.08 SI 3x40 AMP. (3-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-3 TOMACORRIENTE ESTABILIZADO 10.00 100.00 1.00 60% 0.60
C-1 TOMACORRIENTE ESTABILIZADO 10.00 100.00 1.00 60% 0.60
TE-T37 C-2 TOMACORRIENTE ESTABILIZADO 10.00 100.00 1.00 60% 0.60 1.80 3Ф 220 0.85 5.56 6.95 1.73 1.73 26.77 10.00 0.22 SI 3x40 AMP. (3-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-3 TOMACORRIENTE ESTABILIZADO 10.00 100.00 1.00 60% 0.60

D.M. CUMPLE
TABLERO CTO. DESCRIPCION CANT. P.I. D.M. TOTAL SIST. T F.P. I Id K' K" L SECCION ∆V < 1.5% I.T.M. CONDUCTOR ALIMENTADOR TUBERIA
(KW) (KW) (KW) (V) (CosФ) (A) (A) (m) (mm2) (V%) (Vn)
C-1 TE-T33 1.00 3.00 1.80
C-2 TE-T34 1.00 3.00 1.80
TGE-01 C-3 TE-T35 1.00 3.00 1.80
7.20 3Ф 220 0.85 22.26 27.83 1.73 1.73 98.04 120.00 0.27 SI 3x180 AMP. 3-1 x 120mm2 N2XOH 80 mm ∅ PVC-SAP

C-4 TE-T37 1.00 3.00 1.80


CUADRO DE CARGAS
D.M. CUMPLE
TABLERO CTO. DESCRIPCION CANT. C/U P.I. F.D. D.M. TOTAL SIST. T F.P. I Id K' K" L SECCION ∆V < 1.5% I.T.M. CONDUCTOR ALIMENTADOR TUBERIA
(W) (KW) (KW) (KW) (V) (CosФ) (A) (A) (m) (mm2) (V%) (Vn)
C-1 ALUMBRADO L-1 DE 39.5W,220V 2.00 39.50 0.08 100% 0.08
ALUMBRADO L-2 DE 22W,220V 2.00 22.00 0.04 100% 0.04
C-2 TOMACORRIENTE 4.00 100.00 0.40 100% 0.40
TD-VIV 1.27 1Ф 220 0.85 6.79 8.49 1.00 2.00 38.00 10.00 0.44 SI 2x40 AMP. 2-1 x 10mm2 N2XOH 25 mm ∅ PVC-SAP
C-3 TD-VIV 1.00 0.38 0.23
C-4 ALUMBRADO L-5 DE 32W,220V 10.00 32.00 0.32 100% 0.32
C-5 ALUMBRADO L-6 DE 100W,220V 2.00 100.00 0.20 100% 0.20
C-1 ALUMBRADO L-1 DE 39.5W,220V 2.00 39.50 0.08 100% 0.08
STD-VIV01 0.23 1Ф 220 0.85 1.23 1.54 1.00 2.00 20.42 6.00 0.07 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-2 TOMACORRIENTE 3.00 100.00 0.30 50% 0.15
CUADRO DE CARGAS
D.M. CUMPLE
TABLERO CTO. DESCRIPCION CANT. C/U P.I. F.D. D.M. TOTAL SIST. T F.P. I Id K' K" L SECCION ∆V < 1.5% I.T.M. CONDUCTOR ALIMENTADOR TUBERIA
(W) (KW) (KW) (KW) (V) (CosФ) (A) (A) (m) (mm2) (V%) (Vn)
C-1 ALUMBRADO L-1 DE 39.5W,220V 4.00 39.50 0.16 100% 0.16
C-2 ALUMBRADO L-2 DE 22W,220V 8.00 22.00 0.18 100% 0.18
STD-PISC01 0.44 1Ф 220 0.85 2.35 2.94 1.00 2.00 18.38 6.00 0.12 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-3 TOMACORRIENTE 2.00 100.00 0.20 50% 0.10
C-4 LUZ DE EMERGENCIA 6.00 50.00 0.30 0% 0.00
C-1 BOMBAS DE CALOR DE 23KW 1.00 23000.00 23.00 50% 11.50
C-2 BOMBAS DE CALOR DE 23KW 1.00 23000.00 23.00 50% 11.50
C-3 BOMBAS DE CALOR DE 23KW 1.00 23000.00 23.00 50% 11.50
C-4 ELECTROBOMBA 6HP 1.00 4476.00 4.48 50% 2.24
STD-PISC02 41.97 3Ф 220 0.85 129.73 162.16 1.73 1.73 9.95 120.00 0.16 SI 3x180 AMP. 3-1 x 120mm2 N2XOH 80 mm ∅ PVC-SAP
C-5 ELECTROBOMBA 6HP 1.00 4476.00 4.48 50% 2.24
C-6 ELECTROBOMBA 6HP 1.00 4476.00 4.48 50% 2.24
C-7 BOMBA SUMIDERO ACI 1HP 1.00 746.00 0.75 50% 0.38
C-8 BOMBA SUMIDERO ACI 1HP 1.00 746.00 0.75 50% 0.38
C-1 ALUMBRADO L-2 DE 22W,220V 11.00 22.00 0.24 100% 0.24
C-2 ALUMBRADO L-2 DE 22W,220V 8.00 22.00 0.18 100% 0.18
STD-PISC11 C-3 ALUMBRADO L-3 DE 32W,220V 6.00 32.00 0.19 100% 0.19 0.81 1Ф 220 0.85 4.33 5.41 1.00 2.00 14.65 6.00 0.18 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-4 TOMACORRIENTE 4.00 100.00 0.40 50% 0.20
C-5 LUZ DE EMERGENCIA 3.00 50.00 0.15 0% 0.00
C-1 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
C-2 ALUMBRADO L-2 DE 22W,220V 1.00 22.00 0.02 100% 0.02
ALUMBRADO L-4 DE 70W,220V 6.00 70.00 0.42 100% 0.42
STD-PISC21 1.21 1Ф 220 0.85 6.47 8.09 1.00 2.00 9.88 6.00 0.18 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-3 TOMACORRIENTE 3.00 100.00 0.30 50% 0.15
C-4 TOMACORRIENTE 3.00 100.00 0.30 50% 0.15
C-5 LUZ DE EMERGENCIA 5.00 50.00 0.25 0% 0.00

P.I. D.M. D.M. T F.P. I Id L SECCION ∆V CUMPLE


TABLERO CTO. DESCRIPCION CANT. (KW) (KW) TOTAL SIST. (V) (CosФ) (A) (A) K' K" (m) (mm2) (V%) < 1% I.T.M. CONDUCTOR ALIMENTADOR TUBERIA
(KW) (Vn)
C-1 STD-PISC01 1.00 1.04 0.81
C-2 STD-PISC02 1.00 83.94 41.97
TD-PISC C-3 STD-PISC11 1.00 1.56 1.12 45.95 3Ф 220 0.85 142.04 177.55 1.73 1.73 176.59 370.00 0.99 SI 3x600 AMP. 2x(3-1x185)mm2 N2XOH 2-105 mm ∅ PVC-SAP
C-4 STD-PISC21 1.00 2.36 1.70
C-7 ALUMBRADO L-7 DE 32W,220V 22.00 0.70 0.35
CUADRO DE CARGAS
D.M. CUMPLE
TABLERO CTO. DESCRIPCION CANT. C/U P.I. F.D. D.M. TOTAL SIST. T F.P. I Id K' K" L SECCION ∆V < 1.5% I.T.M. CONDUCTOR ALIMENTADOR TUBERIA
(W) (KW) (KW) (KW) (V) (CosФ) (A) (A) (m) (mm2) (V%) (Vn)
C-1 ALUMBRADO L-1 DE 39.5W,220V 1.00 39.50 0.04 100% 0.04
ALUMBRADO L-2 DE 22W,220V 13.00 22.00 0.29 100% 0.29
C-2 ALUMBRADO L-2 DE 22W,220V 10.00 22.00 0.22 100% 0.22
C-3 GABINETE DE COMUNICACIONES 1.00 3350.00 3.35 50% 1.68
STD-AUD11 2.68 1Ф 220 0.85 14.30 17.88 1.00 2.00 11.59 6.00 0.47 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-4 TOMACORRIENTE 9.00 100.00 0.90 50% 0.45
C-5 LUZ DE EMERGENCIA 14.00 50.00 0.70 0% 0.00
C-6 TOMACORRIENTE 100.00 0.00 50% 0.00
C-7 LUZ DE EMERGENCIA 50.00 0.00 0% 0.00
C-1 ALUMBRADO L-1 DE 39.5W,220V 4.00 39.50 0.16 100% 0.16
ALUMBRADO L-2 DE 22W,220V 12.00 22.00 0.26 100% 0.26
STD-AUD12 C-2 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25 1.37 1Ф 220 0.85 7.33 9.16 1.00 2.00 37.82 6.00 0.78 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-3 LUZ DE EMERGENCIA 5.00 50.00 0.25 0% 0.00
C-4 ALUMBRADO L-6 DE 100W,220V 7.00 100.00 0.70 100% 0.70
C-1 ALUMBRADO L-4 DE 70W,220V 3.00 70.00 0.21 100% 0.21
C-2 ALUMBRADO L-5 DE 32W,220V 10.00 32.00 0.32 100% 0.32
STD-AUD13 C-3 TOMACORRIENTE 3.00 100.00 0.30 50% 0.15 0.88 1Ф 220 0.85 4.71 5.89 1.00 2.00 31.97 6.00 0.42 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-4 TOMACORRIENTE 4.00 100.00 0.40 50% 0.20
C-5 LUZ DE EMERGENCIA 2.00 50.00 0.10 0% 0.00
C-1 ALUMBRADO L-5 DE 32W,220V 30.00 32.00 0.96 100% 0.96
C-2 ALUMBRADO L-5 DE 32W,220V 38.00 32.00 1.22 100% 1.22
C-3 ALUMBRADO L-5 DE 32W,220V 32.00 32.00 1.02 100% 1.02
C-4 ALUMBRADO L-5 DE 32W,220V 38.00 32.00 1.22 100% 1.22
C-5 ALUMBRADO L-5 DE 32W,220V 30.00 32.00 0.96 100% 0.96
STD-AUD14 6.31 1Ф 220 0.85 33.74 42.18 1.00 2.00 12.10 6.00 1.15 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-6 ALUMBRADO L-2 DE 22W,220V 12.00 22.00 0.26 100% 0.26
C-7 ALUMBRADO L-2 DE 22W,220V 12.00 22.00 0.26 100% 0.26
C-8 ALUMBRADO L-2 DE 22W,220V 12.00 22.00 0.26 100% 0.26
C-9 TOMACORRIENTE 3.00 100.00 0.30 50% 0.15
C-10 LUZ DE EMERGENCIA 4.00 50.00 0.20 0% 0.00
C-1 ALUMBRADO L-1 DE 39.5W,220V 2.00 39.50 0.08 100% 0.08
STD-AUD15 0.38 1Ф 220 0.85 2.03 2.54 1.00 2.00 22.63 6.00 0.13 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-2 TOMACORRIENTE 3.00 200.00 0.60 50% 0.30
C-1 ALUMBRADO L-1 DE 39.5W,220V 1.00 39.50 0.04 100% 0.04
ALUMBRADO L-2 DE 22W,220V 10.00 22.00 0.22 100% 0.22
STD-AUD31 C-2 TOMACORRIENTE 3.00 100.00 0.30 50% 0.15 0.91 1Ф 220 0.85 4.87 6.09 1.00 2.00 19.12 6.00 0.26 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-3 PANEL DE A.C.I. 1.00 500.00 0.50 100% 0.50
C-4 LUZ DE EMERGENCIA 6.00 50.00 0.30 0% 0.00
C-1 ALUMBRADO L-2 DE 22W,220V 20.00 22.00 0.44 100% 0.44
C-2 ALUMBRADO L-2 DE 22W,220V 16.00 22.00 0.35 100% 0.35
C-3 ALUMBRADO L-2 DE 22W,220V 19.00 22.00 0.42 100% 0.42
C-4 ALUMBRADO L-2 DE 22W,220V 16.00 22.00 0.35 100% 0.35
STD-AUD32 C-5 ALUMBRADO L-2 DE 22W,220V 20.00 22.00 0.44 100% 0.44 4.04 1Ф 220 0.85 21.60 27.00 1.00 2.00 19.81 6.00 1.21 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-6 ALUMBRADO L-2 DE 22W,220V 16.00 22.00 0.35 100% 0.35
C-7 ALUMBRADO L-5 DE 32W,220V 24.00 32.00 0.77 100% 0.77
C-8 ALUMBRADO L-5 DE 32W,220V 24.00 32.00 0.77 100% 0.77
C-9 TOMACORRIENTE 3.00 100.00 0.30 50% 0.15

P.I. D.M. D.M. T F.P. I Id L SECCION ∆V CUMPLE


TABLERO CTO. DESCRIPCION CANT. (KW) (KW) TOTAL SIST. (V) (CosФ) (A) (A) K' K" (m) (mm2) (V%) < 1% I.T.M. CONDUCTOR ALIMENTADOR TUBERIA
(KW) (Vn)
C-1 STD-AUD11 1.00 5.50 2.68
C-2 STD-AUD12 1.00 1.87 1.37
C-3 STD-AUD13 1.00 1.33 0.88
C-4 STD-AUD14 1.00 6.66 6.31
TD-AUD C-5 STD-AUD15 1.00 0.68 0.38
16.76 3Ф 220 0.85 51.80 64.75 1.73 1.73 242.50 240.00 0.77 SI 3x300 AMP. 3-1 x 240mm2 N2XOH 105 mm ∅ PVC-SAP

C-6 STD-AUD31 1.00 1.36 0.91


C-7 STD-AUD32 1.00 4.19 4.04
C-8 ALUMBRADO L-7 DE 32W,220V 12.00 0.38 0.19
CUADRO DE CARGAS
D.M. CUMPLE
TABLERO CTO. DESCRIPCION CANT. C/U P.I. F.D. D.M. TOTAL SIST. T F.P. I Id K' K" L SECCION ∆V < 1.5% I.T.M. CONDUCTOR ALIMENTADOR TUBERIA
(W) (KW) (KW) (KW) (V) (CosФ) (A) (A) (m) (mm2) (V%) (Vn)
C-1 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
ALUMBRADO L-2 DE 22W,220V 1.00 22.00 0.02 100% 0.02
C-2 ALUMBRADO L-1 DE 39.5W,220V 6.00 39.50 0.24 100% 0.24
ALUMBRADO L-2 DE 22W,220V 2.00 22.00 0.04 100% 0.04
C-3 ALUMBRADO L-2 DE 22W,220V 7.00 22.00 0.15 100% 0.15
STD-CAF11 C-4 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25 3.80 1Ф 220 0.85 20.29 25.36 1.00 2.00 10.11 6.00 0.58 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-5 TOMACORRIENTE 4.00 100.00 0.40 50% 0.20
C-6 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25
C-7 PANEL DE A.C.I. 1.00 500.00 0.50 100% 0.50
C-8 GABINETE DE COMUNICACIONES 1.00 3350.00 3.35 50% 1.68
C-9 LUZ DE EMERGENCIA 7.00 50.00 0.35 0% 0.00
C-1 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47
ALUMBRADO L-2 DE 22W,220V 1.00 22.00 0.02 100% 0.02
C-2 ALUMBRADO L-1 DE 39.5W,220V 6.00 39.50 0.24 100% 0.24
ALUMBRADO L-2 DE 22W,220V 2.00 22.00 0.04 100% 0.04
STD-CAF21 C-3 ALUMBRADO L-2 DE 22W,220V 7.00 22.00 0.15 100% 0.15 1.62 1Ф 220 0.85 8.66 10.83 1.00 2.00 14.25 6.00 0.35 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-4 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25
C-5 TOMACORRIENTE 4.00 100.00 0.40 50% 0.20
C-6 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25
C-7 LUZ DE EMERGENCIA 10.00 50.00 0.50 0% 0.00
C-1 ALUMBRADO L-1 DE 39.5W,220V 12.00 39.50 0.47 100% 0.47 1.13
ALUMBRADO L-2 DE 22W,220V 3.00 22.00 0.07 100% 0.07
C-2 ALUMBRADO L-2 DE 22W,220V 2.00 22.00 0.04 100% 0.04
STD-CAF31 C-3 ALUMBRADO L-2 DE 22W,220V 7.00 22.00 0.15 100% 0.15 1Ф 220 0.85 6.04 7.55 1.00 2.00 18.07 6.00 0.31 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-4 TOMACORRIENTE 5.00 100.00 0.50 50% 0.25
C-5 TOMACORRIENTE 3.00 100.00 0.30 50% 0.15
C-6 LUZ DE EMERGENCIA 8.00 50.00 0.40 0% 0.00 0.00
C-1 ALUMBRADO L-1 DE 39.5W,220V 3.00 39.50 0.12 100% 0.12
STD-CAF32 0.42 1Ф 220 0.85 2.25 2.81 1.00 2.00 27.71 6.00 0.18 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-2 TOMACORRIENTE 6.00 100.00 0.60 50% 0.30
C-1 ALUMBRADO L-1 DE 39.5W,220V 1.00 39.50 0.04 100% 0.04
STD-CAF33 0.14 1Ф 220 0.85 0.75 0.94 1.00 2.00 20.11 6.00 0.04 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-2 TOMACORRIENTE 2.00 100.00 0.20 50% 0.10
C-1 ALUMBRADO L-1 DE 39.5W,220V 1.00 39.50 0.04 100% 0.04
STD-CAF34 0.14 1Ф 220 0.85 0.75 0.94 1.00 2.00 37.08 6.00 0.08 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-2 TOMACORRIENTE 2.00 100.00 0.20 50% 0.10

P.I. D.M. D.M. T F.P. I Id L SECCION ∆V CUMPLE


TABLERO CTO. DESCRIPCION CANT. (KW) (KW) TOTAL SIST. (V) (CosФ) (A) (A) K' K" (m) (mm2) (V%) < 1% I.T.M. CONDUCTOR ALIMENTADOR TUBERIA
(KW) (Vn)
C-1 STD-CAF11 1.00 6.52 3.80
C-2 STD-CAF21 1.00 2.82 1.62
C-3 STD-CAF31 1.00 1.93 1.13
C-4 STD-CAF32 1.00 0.72 0.42
TD-CAF C-5 STD-CAF33 1.00 0.24 0.14 8.01 3Ф 220 0.85 24.74 30.93 1.73 1.73 217.10 120.00 0.65 SI 3x180 AMP. 3-1 x 120mm2 N2XOH 80 mm ∅ PVC-SAP
C-6 STD-CAF34 1.00 0.24 0.14
C-7 ALUMBRADO L-6 DE 100W,220V 4.00 0.40 0.20
C-8 ALUMBRADO L-4 DE 70W,220V 8.00 0.56 0.28
C-9 ALUMBRADO L-4 DE 70W,220V 8.00 0.56 0.28
CUADRO DE CARGAS
D.M. CUMPLE
TABLERO CTO. DESCRIPCION CANT. C/U P.I. F.D. D.M. TOTAL SIST. T F.P. I Id K' K" L SECCION ∆V < 1.5% I.T.M. CONDUCTOR ALIMENTADOR TUBERIA
(W) (KW) (KW) (KW) (V) (CosФ) (A) (A) (m) (mm2) (V%) (Vn)
C-1 ALUMBRADO L-2 DE 22W,220V 11.00 22.00 0.24 100% 0.24
STD-EST01 C-2 TOMACORRIENTE 2.00 100.00 0.20 50% 0.10 0.34 1Ф 220 0.85 1.82 2.28 1.00 2.00 59.80 6.00 0.31 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-3 LUZ DE EMERGENCIA 2.00 50.00 0.10 0% 0.00
C-1 ALUMBRADO L-2 DE 22W,220V 9.00 22.00 0.20 100% 0.20
C-2 TOMACORRIENTE 2.00 100.00 0.20 50% 0.10
C-3 LUZ DE EMERGENCIA 3.00 50.00 0.15 0% 0.00
STD-EST02 1.33 1Ф 220 0.85 7.11 8.89 1.00 2.00 17.89 6.00 0.36 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-4 ALUMBRADO L-6 DE 100W,220V 8.00 100.00 0.80 100% 0.80
C-5 ALUMBRADO L-1 DE 39.5W,220V 2.00 39.50 0.08 100% 0.08
C-6 TOMACORRIENTE 3.00 100.00 0.30 50% 0.15
C-1 ALUMBRADO L-1 DE 39.5W,220V 9.00 39.50 0.36 100% 0.36
C-2 TOMACORRIENTE 1.00 100.00 0.10 50% 0.05
STD-EST03 0.92 1Ф 220 0.85 4.92 6.15 1.00 2.00 58.91 6.00 0.82 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-3 LUZ DE EMERGENCIA 6.00 50.00 0.30 0% 0.00
C-4 ALUMBRADO L-5 DE 32W,220V 16.00 32.00 0.51 100% 0.51
C-1 ALUMBRADO L-1 DE 39.5W,220V 9.00 39.50 0.36 100% 0.36
C-2 TOMACORRIENTE 1.00 100.00 0.10 50% 0.05
STD-EST04 0.92 1Ф 220 0.85 4.92 6.15 1.00 2.00 133.63 10.00 1.11 SI 2x40 AMP. (2-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-3 LUZ DE EMERGENCIA 6.00 50.00 0.30 0% 0.00
C-4 ALUMBRADO L-5 DE 32W,220V 16.00 32.00 0.51 100% 0.51
C-1 ALUMBRADO L-2 DE 22W,220V 9.00 22.00 0.20 100% 0.20
C-2 TOMACORRIENTE 2.00 100.00 0.20 50% 0.10
STD-EST05 C-3 LUZ DE EMERGENCIA 3.00 50.00 0.15 0% 0.00 1.53 1Ф 220 0.85 8.18 10.23 1.00 2.00 169.86 25.00 0.94 SI 2x63 AMP. (2-1 x 25 + 1x16-T)mm2 N2XOH 80 mm ∅ PVC-SAP
C-4 ALUMBRADO L-6 DE 100W,220V 10.00 100.00 1.00 100% 1.00
C-5 SSTD-EST05 0.38 0.23
C-1 ALUMBRADO L-1 DE 39.5W,220V 2.00 39.50 0.08 100% 0.08
SSTD-EST05 0.23 1Ф 220 0.85 1.23 1.54 1.00 2.00 63.11 6.00 0.22 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-2 TOMACORRIENTE 3.00 100.00 0.30 50% 0.15

P.I. D.M. D.M. T F.P. I Id L SECCION ∆V CUMPLE


TABLERO CTO. DESCRIPCION CANT. (KW) (KW) TOTAL SIST. (V) (CosФ) (A) (A) K' K" (m) (mm2) (V%) < 1% I.T.M. CONDUCTOR ALIMENTADOR TUBERIA
(KW) (Vn)
C-1 STD-EST01 1.00 0.54 0.34
C-2 STD-EST02 1.00 1.73 1.33
C-3 STD-EST03 1.00 1.27 0.92
C-4 STD-EST04 1.00 1.27 0.92
TD-EST C-5 STD-EST05 1.00 1.93 1.53 5.97 3Ф 220 0.85 18.46 23.08 1.73 1.73 196.65 70.00 0.76 SI 3x120 AMP. 3-1 x 70 mm2 N2XOH 80 mm ∅ PVC-SAP
C-6 ALUMBRADO L-2 DE 22W,220V 11.00 0.24 0.19
C-7 TOMACORRIENTE 2.00 0.40 0.24
C-8 LUZ DE EMERGENCIA 3.00 0.15 0.15
C-9 ALUMBRADO L-6 DE 100W,220V 7.00 0.70 0.35
CUADRO DE CARGAS
D.M. CUMPLE
TABLERO CTO. DESCRIPCION CANT. C/U P.I. F.D. D.M. TOTAL SIST. T F.P. I Id K' K" L SECCION ∆V < 1.5% I.T.M. CONDUCTOR ALIMENTADOR TUBERIA
(W) (KW) (KW) (KW) (V) (CosФ) (A) (A) (m) (mm2) (V%) (Vn)
C-1 ALUMBRADO L-1 DE 39.5W,220V 39.50 0.00 100% 0.00
C-2 TOMACORRIENTE 100.00 0.00 50% 0.00
C-3 ELECTROBOMBA 10HP 1.00 7460.00 7.46 50% 3.73
TD-CIST C-4 ELECTROBOMBA 10HP 1.00 7460.00 7.46 50% 3.73 17.90 3Ф 220 0.85 55.33 69.16 1.73 1.73 185.20 120.00 1.25 SI 3x180 AMP. 3-1 x 120mm2 N2XOH 80 mm ∅ PVC-SAP
C-5 ELECTROBOMBA 10HP 1.00 7460.00 7.46 50% 3.73
C-6 ELECTROBOMBA 9HP 1.00 6714.00 6.71 50% 3.36
C-7 ELECTROBOMBA 9HP 1.00 6714.00 6.71 50% 3.36
CUADRO DE CARGAS
D.M. CUMPLE
TABLERO CTO. DESCRIPCION CANT. C/U P.I. F.D. D.M. TOTAL SIST. T F.P. I Id K' K" L SECCION ∆V < 1.5% I.T.M. CONDUCTOR ALIMENTADOR TUBERIA
(W) (KW) (KW) (KW) (V) (CosФ) (A) (A) (m) (mm2) (V%) (Vn)
C-1 ALUMBRADO L-1 DE 39.5W,220V 2.00 39.50 0.08 100% 0.00
C-2 TOMACORRIENTE 3.00 100.00 0.30 50% 0.15
C-3 MOTOR A.C.I. DE 100HP 1.00 74600.00 74.60 30% 22.38
TD-INCD C-4 MOTOR JOKEY DE 4.5HP 1.00 3357.00 3.36 50% 1.68
24.96 3Ф 220 0.85 77.15 96.44 1.73 1.73 94.23 95.00 1.12 SI 3x150 AMP. 3-1 x 95mm2 N2XOH 80 mm ∅ PVC-SAP

C-5 BOMBA SUMIDERO ACI 1HP 1.00 746.00 0.75 50% 0.38
C-6 BOMBA SUMIDERO ACI 1HP 1.00 746.00 0.75 50% 0.38
CUADRO DE CARGAS
D.M. CUMPLE
TABLERO CTO. DESCRIPCION CANT. C/U P.I. F.D. D.M. TOTAL SIST. T F.P. I Id K' K" L SECCION ∆V < 1.5% I.T.M. CONDUCTOR ALIMENTADOR TUBERIA
(W) (KW) (KW) (KW) (V) (CosФ) (A) (A) (m) (mm2) (V%) (Vn)
C-1 ALUMBRADO L-1 DE 39.5W,220V 7.00 39.50 0.28 100% 0.28
TD-SSEE C-2 TOMACORRIENTE 9.00 100.00 0.90 50% 0.45 0.73 1Ф 220 0.85 3.90 4.88 1.00 2.00 4.26 6.00 0.05 SI 2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP
C-3 LUZ DE EMERGENCIA 3.00 50.00 0.15 0% 0.00
CUADRO DE CARGAS GENERALES
P.I. D.M. T F.P. I Id L SECCION ∆V CUMPLE
TABLERO
(KW) (KW) SIST. (V) (CosФ) (A) (A) K' K'' (m) (mm2) (V%) < 1% I.T.M. CONDUCTOR ALIMENTADOR TUBERIA
(Vn)

TD-AA 54.25 32.80 3Ф 220 0.85 101.39 126.74 1.73 1.73 174.27 370.00 0.70 SI 3x600 AMP. 2x(3-1x185)mm2 N2XOH 2-105 mm ∅ PVC-SAP

TD-AB 51.94 31.14 3Ф 220 0.85 96.26 120.33 1.73 1.73 133.77 240.00 0.78 SI 3x300 AMP. 3-1 x 240mm2 N2XOH 105 mm ∅ PVC-SAP

TD-AC 54.37 32.92 3Ф 220 0.85 101.76 127.2 1.73 1.73 80.89 150.00 0.80 SI 3x200 AMP. 3-1 x 150mm2 N2XOH 105 mm ∅ PVC-SAP

TD-VIV 1.42 1.27 1Ф 220 0.85 6.79 8.49 1 2 38.25 10.00 0.44 SI 2x40 AMP. 2-1 x 10mm2 N2XOH 25 mm ∅ PVC-SAP

TD-TALL 67.54 41.93 3Ф 220 0.85 129.62 162.03 1.73 1.73 223.45 900.00 0.47 SI 3x1200 AMP. 3x(3-1x300)mm2 N2XOH 9-80 mm ∅ PVC-SAP

TD-AUD 21.97 16.76 3Ф 220 0.85 51.8 64.75 1.73 1.73 242.50 240.00 0.77 SI 3x300 AMP. 3-1 x 240mm2 N2XOH 105 mm ∅ PVC-SAP

TD-CAF 13.99 8.01 3Ф 220 0.85 24.74 30.93 1.73 1.73 217.10 120.00 0.65 SI 3x180 AMP. 3-1 x 120mm2 N2XOH 80 mm ∅ PVC-SAP

TD-PISC 89.60 45.95 3Ф 220 0.85 142.04 177.55 1.73 1.73 176.59 370.00 0.99 SI 3x600 AMP. 2x(3-1x185)mm2 N2XOH 2-105 mm ∅ PVC-SAP

TD-ADM 37.48 22.46 3Ф 220 0.85 69.41 86.76 1.73 1.73 190.03 300.00 0.64 SI 3x400 AMP. 3-1 x 300mm2 N2XOH 3-80 mm ∅ PVC-SAP

TD-EST 8.23 5.97 3Ф 220 0.85 18.46 23.08 1.73 1.73 196.65 70.00 0.76 SI 3x120 AMP. 3-1 x 70 mm2 N2XOH 80 mm ∅ PVC-SAP

TD-CIST 35.80 17.90 3Ф 220 0.85 55.33 69.16 1.73 1.73 185.20 120.00 1.25 SI 3x180 AMP. 3-1 x 120mm2 N2XOH 80 mm ∅ PVC-SAP

TD-INCD 79.84 24.96 3Ф 220 0.85 77.15 96.44 1.73 1.73 94.23 95.00 1.12 SI 3x150 AMP. 3-1 x 95mm2 N2XOH 80 mm ∅ PVC-SAP

TD-SSEE 1.33 0.73 1Ф 220 0.85 3.9 4.88 1 2 16.07 50.00 0.02 SI 2x100 AMP. (2-1 x 50 + 1x16-T)mm2 N2XOH 80 mm ∅ PVC-SAP

P.I. D.M. T F.P. I Id L SECCION ∆V CUMPLE


TABLERO
(KW) (KW) SIST. (V) (CosФ) (A) (A) K' K'' (m) (mm2) (V%) < 0.5% I.T.M. CONDUCTOR ALIMENTADOR TUBERIA
(Vn)

TAA 517.77 282.79 3Ф 220 0.85 874.14 1092.68 1.73 1.73 9.44 1200 0.1 SI 3x1500 AMP. 4x(3-1x300)mm2 N2XOH 12-80 mm ∅ PVC-SAP

TG 517.77 282.79 3Ф 220 0.85 874.14 1092.68 1.73 1.73 9.56 1200 0.1 SI 3x1500 AMP. 4x(3-1x300)mm2 N2XOH 12-80 mm ∅ PVC-SAP

RESUMEN
POTENCIA INSTALADA (KW) 517.77
DEMANDA MAXIMA A CONTRATAR (90 282.79
DIMENSIONAMIENTO DE TRANSFORMADOR PARA SUBESTACION

Sistema : 1Ф
Configuracion : Y
Voltaje nominal : 220 V
factor de potencia : 0.85
frecuencia : 60 Hz
Relacion de transf. : 22.9 / 0.22 KV

DEMANDA MAXIMA DE LOS SUB TABLEROS GENERALES


P.I. D.M.
ITEM DESCRIPCION CANTIDAD
(KW) (KW)
1.00 TABLERO STG-1 1 54.25 32.80
2.00 TABLERO STG-2 1 #NAME? #NAME?
3.00 TABLERO STG-3 1 #NAME? #NAME?
4.00 TABLERO STG-4 1 #NAME? #NAME?
5.00 TABLERO STG-5 1 #NAME? #NAME?
6.00 TABLERO STG-6 1 #NAME? #NAME?
TOTAL D.M. #NAME? #NAME?

DEMANDA MAXIMA DE LOS SUB TABLEROS GENERALES


P.I. D.M.
ITEM DESCRIPCION CANTIDAD
(KW) (KW)
1.00 TABLERO TG 1 517.77 282.79
TOTAL D.M. 517.766 282.7936

POTENCIA INSTALADA TOTAL (KW) : 517.77


DEMANDA MAXIMA TOTAL (KW) : 282.79

CAPACIDA TOTAL DEL TRANS. +20% (KW) : 339.35


CAPACIDA TOTAL DEL TRANS. EN KVA : 399.24

SELECCIÓN DEL TRANSFORMADOR (KVA) : 75.00 1Ф 60 Hz


DIMENSIONAMIENTO DEL GRUPO ELECTROGENO

Sistema : 3Ф
Voltaje nominal : 380 V
factor de potencia : 0.85
frecuencia : 60 Hz
RPM de funcionamiento : 3600
ITM Principal : 3x600 A

P.I. D.M.
ITEM DESCRIPCION CANTIDAD
(KW) (KW)
1.00 TABLERO TGE 1 #REF! #REF!
TOTAL #REF! #REF!

POTENCIA INSTALADA TOTAL (KW) : #REF!

DEMANDA MAXIMA TOTAL (KW) : #REF!

CAPACIDA TOTAL DEL G.E. +10% (KW) : #REF!

CAPACIDA TOTAL DEL TRANS. EN (KVA) : #REF!

SELECCIÓN DEL GRUPO ELECTROGENO (KVA) : 25.00 3Ф 60 Hz


9 14 17

CONTRACTUAL (DIAGRAMA UNIFILAR)


D.M.
Id LONG
TABLERO TOTAL ITM CONDUCTOR TUBERIA
(A) (m)
(KW)

STD-AA11 5.37 35.86 38.90 2x30A 2-1x10mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AA12 4.74 31.65 28.27 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AA13 0.80 5.35 8.12 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AA14 0.26 1.74 46.90 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AA15 0.23 1.54 56.94 2x25A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AA21 4.87 32.53 42.20 2x30A 2-1x10mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AA22 4.83 32.25 30.20 2x30A 2-1x10mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AA31 4.83 32.25 46.90 2x30A 2-1x10mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AA32 2.52 16.81 28.10 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AA33 0.89 5.95 44.70 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AA41 3.09 11.94 78.26 3x40A 3-1x10mm2 N2XOH+1-1x10mm2 CPT(T) 35mm PVC-SAP ∅
TD-AA 32.80 126.74 174.27 3x100A 3-1x70mm2 N2XOH 80mm PVC-SAP ∅

STD-AB11 4.89 32.65 39.83 2x30A 2-1x10mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AB12 4.74 31.65 28.17 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AB13 0.80 5.35 8.35 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AB14 0.47 3.14 46.90 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AB21 4.87 32.53 42.40 2x30A 2-1x10mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AB22 4.83 32.25 30.20 2x30A 2-1x10mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AB31 2.52 16.81 40.30 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AB32 0.87 5.81 56.85 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AB33 2.52 16.81 28.13 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AB34 0.87 5.81 44.61 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AB41 3.09 11.94 65.76 3x40A 3-1x10mm2 N2XOH+1-1x10mm2 CPT(T) 35mm PVC-SAP ∅
TD-AB 31.14 120.33 133.77 3x100A 3-1x50mm2 N2XOH 80mm PVC-SAP ∅

STD-AC11 4.79 31.99 41.48 2x30A 2-1x10mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AC12 5.33 35.60 27.34 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AC13 0.80 5.35 8.53 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AC14 0.47 3.14 47.99 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AC21 4.87 32.53 43.40 2x30A 2-1x10mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AC22 4.83 32.25 30.66 2x30A 2-1x10mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AC31 2.52 16.81 40.23 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AC32 0.87 5.81 57.60 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AC33 4.83 32.25 34.69 2x30A 2-1x10mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AC41 3.09 11.94 66.29 3x40A 3-1x10mm2 N2XOH+1-1x10mm2 CPT(T) 35mm PVC-SAP ∅
TD-AC 32.92 127.20 80.89 3x100A 3-1x35mm2 N2XOH 55mm PVC-SAP ∅

STD-T11 1.56 10.43 25.97 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-T12 1.90 12.70 45.14 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-T13 0.26 1.74 57.79 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-T14 2.51 9.70 30.73 3x30A 3-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-T15 2.05 7.93 13.91 3x30A 3-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-T16 0.29 1.94 11.10 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-T17 2.25 8.69 18.42 3x30A 3-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-T18 1.76 6.80 39.84 3x30A 3-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-T21 1.88 12.56 100.69 2x30A 2-1x16mm2 N2XOH+1-1x10mm2 CPT(T) 35mm PVC-SAP ∅
STD-T22 1.66 11.10 81.59 2x30A 2-1x10mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-T23 1.26 4.86 69.21 3x30A 3-1x10mm2 N2XOH+1-1x10mm2 CPT(T) 35mm PVC-SAP ∅
STD-T24 2.15 8.31 87.80 3x30A 3-1x16mm2 N2XOH+1-1x10mm2 CPT(T) 35mm PVC-SAP ∅
STD-T25 1.30 8.69 102.13 2x30A 2-1x10mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-T26 1.06 7.09 112.28 2x30A 2-1x16mm2 N2XOH+1-1x10mm2 CPT(T) 35mm PVC-SAP ∅
STD-T31 1.97 7.61 105.95 3x30A 3-1x10mm2 N2XOH+1-1x10mm2 CPT(T) 35mm PVC-SAP ∅
STD-T32 1.75 11.70 84.85 2x30A 2-1x16mm2 N2XOH+1-1x10mm2 CPT(T) 35mm PVC-SAP ∅
STD-T33 0.72 4.81 65.20 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-T34 0.72 4.81 75.35 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-T35 0.72 4.81 84.09 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-T36 3.03 20.23 91.90 2x30A 2-1x10mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-T37 0.72 4.81 107.90 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-T41 3.09 11.94 73.65 3x40A 3-1x16mm2 N2XOH+1-1x10mm2 CPT(T) 35mm PVC-SAP ∅
TD-TALL 41.93 162.03 223.45 3x150-250A 2(3-1x120mm2 N2XOH) 105mm PVC-SAP ∅

STD-ADM11 1.49 9.96 9.78 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-ADM12 0.94 6.29 21.39 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
SSTD-ADM12 0.33 2.20 5.40 2x25A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-ADM13 1.30 8.69 31.02 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-ADM14 1.48 9.89 20.68 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-ADM15 0.76 5.08 7.99 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-ADM21 3.12 20.83 11.49 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-ADM22 0.69 4.61 25.62 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-ADM23 0.72 4.81 38.86 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-ADM24 1.63 10.90 24.77 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-ADM31 0.52 3.48 17.94 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-ADM32 1.17 7.83 30.98 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-ADM33 1.42 9.49 28.84 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-ADM41 0.94 6.29 18.66 3x40A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-ADM42 1.02 6.81 32.65 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-ADM43 1.21 8.09 45.34 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-ADM44 0.96 6.41 32.89 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-ADM51 3.09 11.94 27.97 3x40A 3-1x10mm2 N2XOH+1-1x10mm2 CPT(T) 35mm PVC-SAP ∅
TD-ADM 22.46 86.76 190.03 3x100A 3-1x50mm2 N2XOH 80mm PVC-SAP ∅

TE-T33 1.80 6.95 26.14 3x30A 3-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
TE-T34 1.80 6.95 16.89 3x30A 3-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
TE-T35 1.80 6.95 9.79 3x30A 3-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
TE-T37 1.80 6.95 26.77 3x30A 3-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
TGE-01 7.20 27.83 98.04 3x60A 3-1x50mm2 N2XOH+1-1x10mm2 CPT(T) 75mm PVC-SAP ∅

TD-VIV 1.27 8.49 38.00 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-VIV01 0.23 1.54 20.42 2x25A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅

STD-PISC01 0.44 2.94 18.38 2x30A 2-1x10mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-PISC02 41.97 162.16 9.95 3x300A 3-1x95mm2 N2XOH+1-1x25mm2 CPT(T) 80mm PVC-SAP ∅
STD-PISC11 0.81 5.41 14.65 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-PISC21 1.21 8.09 9.88 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
TD-PISC 45.95 177.55 176.59 3x250-350A 3-1x185mm2 N2XOH 105mm PVC-SAP ∅

STD-AUD11 2.68 17.88 11.59 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AUD12 1.37 9.16 37.82 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AUD13 0.88 5.89 31.97 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AUD14 6.31 42.18 12.10 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AUD15 0.38 2.54 22.63 2x25A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AUD31 0.91 6.09 19.12 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AUD32 4.04 27.00 19.81 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
TD-AUD 16.76 64.75 242.50 3x40A 3-1x25mm2 N2XOH 35mm PVC-SAP ∅

STD-CAF11 3.80 25.36 10.11 2x40A 2-1x10mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-CAF21 1.62 10.83 14.25 2x40A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-CAF31 1.13 7.55 18.07 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-CAF32 0.42 2.81 27.71 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-CAF33 0.14 0.94 20.11 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-CAF34 0.14 0.94 37.08 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
TD-CAF 8.01 30.93 217.10 3x60A 3-1x50mm2 N2XOH 80mm PVC-SAP ∅

STD-EST01 0.34 2.28 59.80 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-EST02 1.33 8.89 17.89 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-EST03 0.92 6.15 58.91 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-EST04 0.92 6.15 133.63 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-EST05 1.53 10.23 169.86 2x30A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
SSTD-EST05 0.23 1.54 63.11 2x25A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
TD-EST 5.97 23.08 196.65 3x30A 3-1x10mm2 N2XOH 35mm PVC-SAP ∅

TD-CIST 17.90 69.16 185.20 3x125A 3-1x50mm2 N2XOH 80mm PVC-SAP ∅

TD-INCD 24.96 96.44 94.23 3x200A 3-1x50mm2 N2XOH 80mm PVC-SAP ∅

TD-SSEE 0.73 4.88 4.26 2x25A 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅

TG 282.79 1092.68 9.56 3x1000-1200A 2(3-1x300mm2) N2XOH 200mm PVC-SAP ∅


TTA 282.79 1092.68 9.44 3x1000-1200A 2(3-1x300mm2) N2XOH 200mm PVC-SAP ∅
21 22 23

REPLANTEO CONCLUSION 2

ITM CONDUCTOR TUBERIA ITM CONDUCTOR

2x50 AMP. (2-1 x 16 + 1x16-T)mm2 N2XOH 50 mm ∅ PVC-SAP C 2x50 AMP. (2-1 x 16 + 1x16-T)mm2 N2XOH
2x40 AMP. (2-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP C 2x40 AMP. (2-1 x 10 + 1x10-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x25A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
2x50 AMP. (2-1 x 16 + 1x16-T)mm2 N2XOH 50 mm ∅ PVC-SAP C 2x50 AMP. (2-1 x 16 + 1x16-T)mm2 N2XOH
2x50 AMP. (2-1 x 16 + 1x16-T)mm2 N2XOH 50 mm ∅ PVC-SAP C 2x50 AMP. (2-1 x 16 + 1x16-T)mm2 N2XOH
2x63 AMP. (2-1 x 25 + 1x16-T)mm2 N2XOH 80 mm ∅ PVC-SAP C 2x63 AMP. (2-1 x 25 + 1x16-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
3x40 AMP. (3-1 x 10 + 1x10-T)mm2 N2XOH 35 mm ∅ PVC-SAP 3x40A (3-1 x 10 + 1x10-T)mm2 N2XOH
3x600 AMP. 2x(3-1x185)mm2 N2XOH 2-105 mm ∅ PVC-SAP C 3x600 AMP. 2x(3-1x185)mm2 N2XOH

2x50 AMP. (2-1 x 16 + 1x16-T)mm2 N2XOH 50 mm ∅ PVC-SAP C 2x50 AMP. (2-1 x 16 + 1x16-T)mm2 N2XOH
2x40 AMP. (2-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP C 2x40 AMP. (2-1 x 10 + 1x10-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
2x50 AMP. (2-1 x 16 + 1x16-T)mm2 N2XOH 50 mm ∅ PVC-SAP C 2x50 AMP. (2-1 x 16 + 1x16-T)mm2 N2XOH
2x50 AMP. (2-1 x 16 + 1x16-T)mm2 N2XOH 50 mm ∅ PVC-SAP C 2x50 AMP. (2-1 x 16 + 1x16-T)mm2 N2XOH
2x40 AMP. (2-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP C 2x40 AMP. (2-1 x 10 + 1x10-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
3x40 AMP. (3-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP 3x40A (3-1 x 10 + 1x10-T)mm2 N2XOH
3x300 AMP. 3-1 x 240mm2 N2XOH 105 mm ∅ PVC-SAP C 3x300 AMP. 3-1 x 240mm2 N2XOH

2x50 AMP. (2-1 x 16 + 1x16-T)mm2 N2XOH 50 mm ∅ PVC-SAP C 2x50 AMP. (2-1 x 16 + 1x16-T)mm2 N2XOH
2x50 AMP. (2-1 x 16 + 1x16-T)mm2 N2XOH 50 mm ∅ PVC-SAP C 2x50 AMP. (2-1 x 16 + 1x16-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
2x40 AMP. (2-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP C 2x40 AMP. (2-1 x 10 + 1x10-T)mm2 N2XOH
2x50 AMP. (2-1 x 16 + 1x16-T)mm2 N2XOH 50 mm ∅ PVC-SAP C 2x50 AMP. (2-1 x 16 + 1x16-T)mm2 N2XOH
2x50 AMP. (2-1 x 16 + 1x16-T)mm2 N2XOH 50 mm ∅ PVC-SAP C 2x50 AMP. (2-1 x 16 + 1x16-T)mm2 N2XOH
2x40 AMP. (2-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP C 2x40 AMP. (2-1 x 10 + 1x10-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
2x50 AMP. (2-1 x 16 + 1x16-T)mm2 N2XOH 50 mm ∅ PVC-SAP C 2x50 AMP. (2-1 x 16 + 1x16-T)mm2 N2XOH
3x50 AMP. (3-1 x 16 + 1x16-T)mm2 N2XOH 35 mm ∅ PVC-SAP C 3x50 AMP. (3-1 x 16 + 1x16-T)mm2 N2XOH
3x200 AMP. 3-1 x 150mm2 N2XOH 105 mm ∅ PVC-SAP C 3x200 AMP. 3-1 x 150mm2 N2XOH

2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
2x40 AMP. (2-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP C 2x40 AMP. (2-1 x 10 + 1x10-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
3x30 AMP. (3-1 x 6.0 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP 3x30A (3-1 x 6.0 + 1x10-T)mm2 N2XOH
3x30 AMP. (3-1 x 6.0 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP 3x30A (3-1 x 6.0 + 1x10-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
3x30 AMP. (3-1 x 6.0 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP 3x30A (3-1 x 6.0 + 1x10-T)mm2 N2XOH
3x30 AMP. (3-1 x 6.0 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP 3x30A (3-1 x 6.0 + 1x10-T)mm2 N2XOH
2x63 AMP. (2-1 x 25 + 1x16-T)mm2 N2XOH 80 mm ∅ PVC-SAP C 2x63 AMP. (2-1 x 25 + 1x16-T)mm2 N2XOH
2x50 AMP. (2-1 x 16 + 1x16-T)mm2 N2XOH 50 mm ∅ PVC-SAP C 2x50 AMP. (2-1 x 16 + 1x16-T)mm2 N2XOH
3x30 AMP. (3-1 x 6.0 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP 3x30A (3-1 x 10 + 1x10-T)mm2 N2XOH
3x40 AMP. (3-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP 3x30A (3-1 x 16 + 1x16-T)mm2 N2XOH
2x50 AMP. (2-1 x 16 + 1x16-T)mm2 N2XOH 50 mm ∅ PVC-SAP C 2x50 AMP. (2-1 x 16 + 1x16-T)mm2 N2XOH
2x50 AMP. (2-1 x 16 + 1x16-T)mm2 N2XOH 50 mm ∅ PVC-SAP 2x30A (2-1 x 16 + 1x16-T)mm2 N2XOH
3x40 AMP. (3-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP 3x30A (3-1 x 10 + 1x10-T)mm2 N2XOH
2x63 AMP. (2-1 x 25 + 1x16-T)mm2 N2XOH 80 mm ∅ PVC-SAP C 2x63 AMP. (2-1 x 25 + 1x16-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
2x40 AMP. (2-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP C 2x40 AMP. (2-1 x 10 + 1x10-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
2x63 AMP. (2-1 x 25 + 1x16-T)mm2 N2XOH 80 mm ∅ PVC-SAP C 2x63 AMP. (2-1 x 25 + 1x16-T)mm2 N2XOH
2x40 AMP. (2-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP C 2x40 AMP. (2-1 x 10 + 1x10-T)mm2 N2XOH
3x40 AMP. (3-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP 3x40A (3-1 x 16 + 1x16-T)mm2 N2XOH
3x1200 AMP. 3x(3-1x300)mm2 N2XOH 9-80 mm ∅ PVC-SAP C 3x1200 AMP. 3x(3-1x300)mm2 N2XOH

2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x25A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 3x40A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
3x40 AMP. (3-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP 3x40A (3-1 x 10 + 1x10-T)mm2 N2XOH
3x400 AMP. 3-1 x 300mm2 N2XOH 3-80 mm ∅ PVC-SAP C 3x400 AMP. 3-1 x 300mm2 N2XOH

3x40 AMP. (3-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP C 3x40 AMP. (3-1 x 10 + 1x10-T)mm2 N2XOH
3x40 AMP. (3-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP C 3x40 AMP. (3-1 x 10 + 1x10-T)mm2 N2XOH
3x40 AMP. (3-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP C 3x40 AMP. (3-1 x 10 + 1x10-T)mm2 N2XOH
3x40 AMP. (3-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP C 3x40 AMP. (3-1 x 10 + 1x10-T)mm2 N2XOH
3x180 AMP. 3-1 x 120mm2 N2XOH 80 mm ∅ PVC-SAP C 3x180 AMP. (3-1 x 120 + 1x16-T)mm2 N2XOH

2x40 AMP. 2-1 x 10mm2 N2XOH 25 mm ∅ PVC-SAP C 2x40 AMP. 2-1 x 10mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x25A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH

2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 10 + 1x10-T)mm2 N2XOH
3x180 AMP. 3-1 x 120mm2 N2XOH 80 mm ∅ PVC-SAP C 3x180 AMP. (3-1 x 120 + 1x16-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
3x600 AMP. 2x(3-1x185)mm2 N2XOH 2-105 mm ∅ PVC-SAP C 3x600 AMP. 2x(3-1x185)mm2 N2XOH

2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x25A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
3x300 AMP. 3-1 x 240mm2 N2XOH 105 mm ∅ PVC-SAP C 3x300 AMP. 3-1 x 240mm2 N2XOH

2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x40A (2-1 x 10 + 1x10-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x40A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
3x180 AMP. 3-1 x 120mm2 N2XOH 80 mm ∅ PVC-SAP C 3x180 AMP. 3-1 x 120mm2 N2XOH

2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x30A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
2x40 AMP. (2-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP C 2x40 AMP. (2-1 x 10 + 1x10-T)mm2 N2XOH
2x63 AMP. (2-1 x 25 + 1x16-T)mm2 N2XOH 80 mm ∅ PVC-SAP C 2x63 AMP. (2-1 x 25 + 1x16-T)mm2 N2XOH
2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x25A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH
3x120 AMP. 3-1 x 70 mm2 N2XOH 80 mm ∅ PVC-SAP C 3x120 AMP. 3-1 x 70 mm2 N2XOH

3x180 AMP. 3-1 x 120mm2 N2XOH 80 mm ∅ PVC-SAP C 3x180 AMP. 3-1 x 120mm2 N2XOH

3x150 AMP. 3-1 x 95mm2 N2XOH 80 mm ∅ PVC-SAP C 3x150 AMP. 3-1 x 95mm2 N2XOH

2x30 AMP. (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH 25 mm ∅ PVC-SAP 2x25A (2-1 x 6.0 + 1x10.0-T)mm2 N2XOH

3x1500 AMP. 4x(3-1x300)mm2 N2XOH 12-80 mm ∅ PVC-SAP C 3x1500 AMP. 4x(3-1x300)mm2 N2XOH
3x1500 AMP. 4x(3-1x300)mm2 N2XOH 12-80 mm ∅ PVC-SAP C 3x1500 AMP. 4x(3-1x300)mm2 N2XOH
CLUSION 2

TUBERIA

50 mm ∅ PVC-SAP
25 mm ∅ PVC-SAP
25mm PVC-SAP ∅
25mm PVC-SAP ∅
25mm PVC-SAP ∅
50 mm ∅ PVC-SAP
50 mm ∅ PVC-SAP
80 mm ∅ PVC-SAP
25mm PVC-SAP ∅
25mm PVC-SAP ∅
35mm PVC-SAP ∅
2-105 mm ∅ PVC-SAP

50 mm ∅ PVC-SAP
25 mm ∅ PVC-SAP
25mm PVC-SAP ∅
25mm PVC-SAP ∅
50 mm ∅ PVC-SAP
50 mm ∅ PVC-SAP
25 mm ∅ PVC-SAP
25mm PVC-SAP ∅
25mm PVC-SAP ∅
25mm PVC-SAP ∅
35mm PVC-SAP ∅
105 mm ∅ PVC-SAP

50 mm ∅ PVC-SAP
50 mm ∅ PVC-SAP
25mm PVC-SAP ∅
25 mm ∅ PVC-SAP
50 mm ∅ PVC-SAP
50 mm ∅ PVC-SAP
25 mm ∅ PVC-SAP
25mm PVC-SAP ∅
50 mm ∅ PVC-SAP
35 mm ∅ PVC-SAP
105 mm ∅ PVC-SAP

25mm PVC-SAP ∅
25 mm ∅ PVC-SAP
25mm PVC-SAP ∅
25mm PVC-SAP ∅
25mm PVC-SAP ∅
25mm PVC-SAP ∅
25mm PVC-SAP ∅
25mm PVC-SAP ∅
80 mm ∅ PVC-SAP
50 mm ∅ PVC-SAP
35mm PVC-SAP ∅
35mm PVC-SAP ∅
50 mm ∅ PVC-SAP
35mm PVC-SAP ∅
35mm PVC-SAP ∅
80 mm ∅ PVC-SAP
25mm PVC-SAP ∅
25 mm ∅ PVC-SAP
25mm PVC-SAP ∅
80 mm ∅ PVC-SAP
25 mm ∅ PVC-SAP
35mm PVC-SAP ∅
9-80 mm ∅ PVC-SAP

25mm PVC-SAP ∅
25mm PVC-SAP ∅
25mm PVC-SAP ∅
25mm PVC-SAP ∅
25mm PVC-SAP ∅
25mm PVC-SAP ∅
25mm PVC-SAP ∅
25mm PVC-SAP ∅
25mm PVC-SAP ∅
25mm PVC-SAP ∅
25mm PVC-SAP ∅
25mm PVC-SAP ∅
25mm PVC-SAP ∅
25mm PVC-SAP ∅
25mm PVC-SAP ∅
25mm PVC-SAP ∅
25mm PVC-SAP ∅
35mm PVC-SAP ∅
3-80 mm ∅ PVC-SAP

25 mm ∅ PVC-SAP
25 mm ∅ PVC-SAP
25 mm ∅ PVC-SAP
25 mm ∅ PVC-SAP
80 mm ∅ PVC-SAP

25 mm ∅ PVC-SAP
25mm PVC-SAP ∅

25mm PVC-SAP ∅
80 mm ∅ PVC-SAP
25mm PVC-SAP ∅
25mm PVC-SAP ∅
2-105 mm ∅ PVC-SAP

25mm PVC-SAP ∅
25mm PVC-SAP ∅
25mm PVC-SAP ∅
25mm PVC-SAP ∅
25mm PVC-SAP ∅
25mm PVC-SAP ∅
25mm PVC-SAP ∅
105 mm ∅ PVC-SAP

25mm PVC-SAP ∅
25mm PVC-SAP ∅
25mm PVC-SAP ∅
25mm PVC-SAP ∅
25mm PVC-SAP ∅
25mm PVC-SAP ∅
80 mm ∅ PVC-SAP

25mm PVC-SAP ∅
25mm PVC-SAP ∅
25mm PVC-SAP ∅
25 mm ∅ PVC-SAP
80 mm ∅ PVC-SAP
25mm PVC-SAP ∅
80 mm ∅ PVC-SAP

80 mm ∅ PVC-SAP

80 mm ∅ PVC-SAP

25mm PVC-SAP ∅

12-80 mm ∅ PVC-SAP
12-80 mm ∅ PVC-SAP
LONG
TABLERO LONGITUD DE TABLERO A TABLERO CONDUCTOR TUBERIA
(ml)
AULAS "A"
STD-AA11 TD-AA hacia STD-AA11 38.9 (2-1 x 16 + 1x16-T)mm2 NH-80 50 mm ∅ PVC-SAP
STD-AA12 TD-AA hacia STD-AA12 28.27 (2-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP
STD-AA13 TD-AA hacia STD-AA13 8.12 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AA14 TD-AA hacia STD-AA14 46.9 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AA15 TD-AA hacia STD-AA15 56.94 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AA21 TD-AA hacia STD-AA21 42.2 (2-1 x 16 + 1x16-T)mm2 N2XOH 50 mm ∅ PVC-SAP
STD-AA22 TD-AA hacia STD-AA22 30.2 (2-1 x 16 + 1x16-T)mm2 N2XOH 50 mm ∅ PVC-SAP
STD-AA31 TD-AA hacia STD-AA31 46.9 (2-1 x 25 + 1x16-T)mm2 N2XOH 80 mm ∅ PVC-SAP
STD-AA32 TD-AA hacia STD-AA32 28.1 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AA33 TD-AA hacia STD-AA33 44.7 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AA41 TD-AA hacia STD-AA41 78.26 3-1x10mm2 N2XOH+1-1x10mm2 CPT(T) 35mm PVC-SAP ∅
TD-AA TG hacia TD-AA 174.27 2x(3-1x185 + 1x25-T)mm2 N2XOH 2-105 mm ∅ PVC-SAP
AULAS "B"
STD-AB11 TD-AB hacia STD-AB11 39.83 (2-1 x 16 + 1x16-T)mm2 N2XOH 50 mm ∅ PVC-SAP
STD-AB12 TD-AB hacia STD-AB12 28.17 (2-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP
STD-AB13 TD-AB hacia STD-AB13 8.35 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AB14 TD-AB hacia STD-AB14 46.9 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AB21 TD-AB hacia STD-AB21 42.4 (2-1 x 16 + 1x16-T)mm2 N2XOH 50 mm ∅ PVC-SAP
STD-AB22 TD-AB hacia STD-AB22 30.2 (2-1 x 16 + 1x16-T)mm2 N2XOH 50 mm ∅ PVC-SAP
STD-AB31 TD-AB hacia STD-AB31 40.3 (2-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP
STD-AB32 TD-AB hacia STD-AB32 56.85 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AB33 TD-AB hacia STD-AB33 28.13 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AB34 TD-AB hacia STD-AB34 44.61 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AB41 TD-AB hacia STD-AB41 65.76 3-1x10mm2 N2XOH+1-1x10mm2 CPT(T) 35mm PVC-SAP ∅
TD-AB TG hacia TD-AB 133.77 (3-1 x 240 + 1x25-T)mm2 N2XOH 105 mm ∅ PVC-SAP
AULAS "C"
STD-AC11 TD-AC hacia STD-AC11 41.48 (2-1 x 16 + 1x16-T)mm2 N2XOH 50 mm ∅ PVC-SAP
STD-AC12 TD-AC hacia STD-AC12 27.34 (2-1 x 16 + 1x16-T)mm2 N2XOH 50 mm ∅ PVC-SAP
STD-AC13 TD-AC hacia STD-AC13 8.53 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AC14 TD-AC hacia STD-AC14 47.99 (2-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP
STD-AC21 TD-AC hacia STD-AC21 43.4 (2-1 x 16 + 1x16-T)mm2 N2XOH 50 mm ∅ PVC-SAP
STD-AC22 TD-AC hacia STD-AC22 30.66 (2-1 x 16 + 1x16-T)mm2 N2XOH 50 mm ∅ PVC-SAP
STD-AC31 TD-AC hacia STD-AC31 40.23 (2-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP
STD-AC32 TD-AC hacia STD-AC32 57.6 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AC33 TD-AC hacia STD-AC33 34.69 (2-1 x 16 + 1x16-T)mm2 N2XOH 50 mm ∅ PVC-SAP
STD-AC41 TD-AC hacia STD-AC41 66.29 (3-1 x 16 + 1x16-T)mm2 N2XOH 35 mm ∅ PVC-SAP
TD-AC TG hacia TD-AC 80.89 (3-1 x 150 + 1x25-T)mm2 N2XOH 105 mm ∅ PVC-SAP
TALLERES
STD-T11 TD-TALL hacia STD-T11 25.97 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-T12 TD-TALL hacia STD-T12 45.14 (2-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP
STD-T13 TD-TALL hacia STD-T13 57.79 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-T14 TD-TALL hacia STD-T14 30.73 3-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-T15 TD-TALL hacia STD-T15 13.91 3-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-T16 TD-TALL hacia STD-T16 11.1 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-T17 TD-TALL hacia STD-T17 18.42 3-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-T18 TD-TALL hacia STD-T18 39.84 3-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-T21 TD-TALL hacia STD-T21 100.69 (2-1 x 25 + 1x16-T)mm2 N2XOH 80 mm ∅ PVC-SAP
STD-T22 TD-TALL hacia STD-T22 81.59 (2-1 x 16 + 1x16-T)mm2 N2XOH 50 mm ∅ PVC-SAP
STD-T23 TD-TALL hacia STD-T23 69.21 3-1x10mm2 N2XOH+1-1x10mm2 CPT(T) 35mm PVC-SAP ∅
STD-T24 TD-TALL hacia STD-T24 87.8 3-1x16mm2 N2XOH+1-1x10mm2 CPT(T) 35mm PVC-SAP ∅
STD-T25 TD-TALL hacia STD-T25 102.13 (2-1 x 16 + 1x16-T)mm2 N2XOH 50 mm ∅ PVC-SAP
STD-T26 TD-TALL hacia STD-T26 112.28 2-1x16mm2 N2XOH+1-1x10mm2 CPT(T) 35mm PVC-SAP ∅
STD-T31 TD-TALL hacia STD-T31 105.95 3-1x10mm2 N2XOH+1-1x10mm2 CPT(T) 35mm PVC-SAP ∅
STD-T32 TD-TALL hacia STD-T32 84.85 (2-1 x 25 + 1x16-T)mm2 N2XOH 80 mm ∅ PVC-SAP
STD-T33 TD-TALL hacia STD-T33 65.2 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-T34 TD-TALL hacia STD-T34 75.35 (2-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP
STD-T35 TD-TALL hacia STD-T35 84.09 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-T36 TD-TALL hacia STD-T36 91.9 (2-1 x 25 + 1x16-T)mm2 N2XOH 80 mm ∅ PVC-SAP
STD-T37 TD-TALL hacia STD-T37 107.9 (2-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP
STD-T41 TD-TALL hacia STD-T41 73.65 3-1x16mm2 N2XOH+1-1x10mm2 CPT(T) 35mm PVC-SAP ∅
TD-TALL TG hacia TD-TALL 223.45 3x(3-1x300 + 1x25-T)mm2 N2XOH 9-80 mm ∅ PVC-SAP
ADMINISTRACION
STD-ADM11 TD-ADM hacia STD-ADM11 9.78 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-ADM12 TD-ADM hacia STD-ADM12 21.39 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
SSTD-ADM12 STD-ADM12 hacia SSTD-ADM12 5.4 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-ADM13 TD-ADM hacia STD-ADM13 31.02 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-ADM14 TD-ADM hacia STD-ADM14 20.68 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-ADM15 TD-ADM hacia STD-ADM15 7.99 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-ADM21 TD-ADM hacia STD-ADM21 11.49 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-ADM22 TD-ADM hacia STD-ADM22 25.62 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-ADM23 TD-ADM hacia STD-ADM23 38.86 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-ADM24 TD-ADM hacia STD-ADM24 24.77 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-ADM31 TD-ADM hacia STD-ADM31 17.94 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-ADM32 TD-ADM hacia STD-ADM32 30.98 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-ADM33 TD-ADM hacia STD-ADM33 28.84 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-ADM41 TD-ADM hacia STD-ADM41 18.66 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-ADM42 TD-ADM hacia STD-ADM42 32.65 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-ADM43 TD-ADM hacia STD-ADM43 45.34 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-ADM44 TD-ADM hacia STD-ADM44 32.89 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-ADM51 TD-ADM hacia STD-ADM51 27.97 3-1x10mm2 N2XOH+1-1x10mm2 CPT(T) 35mm PVC-SAP ∅
TD-ADM TG hacia TD-ADM 190.03 (3-1 x 300 + 1x25-T)mm2 N2XOH 3-80 mm ∅ PVC-SAP
ESTABILIZADO
TE-T33 TGE-01 hacia TE-T33 26.14 (3-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP
TE-T34 TGE-01 hacia TE-T34 16.89 (3-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP
TE-T35 TGE-01 hacia TE-T35 9.79 (3-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP
TE-T37 TGE-01 hacia TE-T37 26.77 (3-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP
TGE-01 TD-TALL hacia TGE-01 98.04 (3-1 x 120 + 1x16-T)mm2 N2XOH 80 mm ∅ PVC-SAP
VIVIENDAS
TD-VIV TG hacia TD-VIV 38 (2-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP
STD-VIV01 TD-VIV hacia STD-VIV01 20.42 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅

PISCINA
STD-PISC01 TD-PISC hacia STD-PISC01 18.38 2-1x10mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-PISC02 TD-PISC hacia STD-PISC02 9.95 (3-1 x 120 + 1x16-T)mm2 N2XOH 80 mm ∅ PVC-SAP
STD-PISC11 TD-PISC hacia STD-PISC11 14.65 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-PISC21 TD-PISC hacia STD-PISC21 9.88 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
TD-PISC TG hacia TD-PISC 176.59 2x(3-1x185 + 1x25-T)mm2 N2XOH 2-105 mm ∅ PVC-SAP
AUDITORIO
STD-AUD11 TD-AUD hacia STD-AUD11 11.59 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AUD12 TD-AUD hacia STD-AUD12 37.82 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AUD13 TD-AUD hacia STD-AUD13 31.97 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AUD14 TD-AUD hacia STD-AUD14 12.1 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AUD15 TD-AUD hacia STD-AUD15 22.63 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AUD31 TD-AUD hacia STD-AUD31 19.12 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-AUD32 TD-AUD hacia STD-AUD32 19.81 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
TD-AUD TG hacia TD-AUD 242.5 (3-1 x 240 + 1x25-T)mm2 N2XOH 105 mm ∅ PVC-SAP
CAFETIN
STD-CAF11 TD-CAF hacia STD-CAF11 10.11 2-1x10mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-CAF21 TD-CAF hacia STD-CAF21 14.25 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-CAF31 TD-CAF hacia STD-CAF31 18.07 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-CAF32 TD-CAF hacia STD-CAF32 27.71 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-CAF33 TD-CAF hacia STD-CAF33 20.11 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-CAF34 TD-CAF hacia STD-CAF34 37.08 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
TD-CAF TG hacia TD-CAF 217.1 (3-1 x 120 + 1x16-T)mm2 N2XOH 80 mm ∅ PVC-SAP
ESTADIO
STD-EST01 TD-EST hacia STD-EST01 59.8 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-EST02 TD-EST hacia STD-EST02 17.89 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-EST03 TD-EST hacia STD-EST03 58.91 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
STD-EST04 TD-EST hacia STD-EST04 133.63 (2-1 x 10 + 1x10-T)mm2 N2XOH 25 mm ∅ PVC-SAP
STD-EST05 TD-EST hacia STD-EST05 169.86 (2-1 x 25 + 1x16-T)mm2 N2XOH 80 mm ∅ PVC-SAP
SSTD-EST05 STD-EST05 hacia SSTD-EST05 63.11 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
TD-EST TG hacia TD-EST 196.65 (3-1 x 70 + 1x16-T)mm2 N2XOH 80 mm ∅ PVC-SAP
CISTERNA
TD-CIST TG hacia TD-CIST 185.2 (3-1 x 120 + 1x16-T)mm2 N2XOH 80 mm ∅ PVC-SAP
CONTRA INCENDIO
TD-INCD TG hacia TD-INCD 94.23 (3-1 x 95 + 1x16-T)mm2 N2XOH 80 mm ∅ PVC-SAP
SUBESTACION
TD-SSEE TG hacia TD-SSEE 4.26 2-1x6mm2 N2XOH+1-1x10mm2 CPT(T) 25mm PVC-SAP ∅
GENERALES
TG Subestacion hacia TG 9.56 4x(3-1x300 + 1x25-T)mm2 N2XOH 12-80 mm ∅ PVC-SAP
TTA Subestacion hacia TTA 9.44 4x(3-1x300 + 1x25-T)mm2 N2XOH 12-80 mm ∅ PVC-SAP
CALCULO DE ALIMENTADORES DE TABLERO TG
Factores DATOS TABLEROS
Factor de Co Factor de Int Modo Instala#F Tensión (V) Alimentador
1.1 1.25 Ducto 3F 220 TG
1.1 1.25 Ducto 3F 220 TG
1.1 1.25 Ducto 3F 220 TG
1.1 1.25 Ducto 3F 220 TG
1.1 1.25 Ducto 3F 220 TG
1.1 1.25 Ducto 3F 220 TG
1.1 1.25 Ducto 3F 220 TG
1.1 1.25 Ducto 3F 220 TG
1.1 1.25 Ducto 3F 220 TG
1.1 1.25 Ducto 3F 220 TG
1.1 1.25 Ducto 3F 220 TG
1.1 1.25 Ducto 3F 220 TG

1.25 1.25 Ducto 1F 220 TD-AA


1.25 1.25 Ducto 1F 220 TD-AA
1.25 1.25 Ducto 1F 220 TD-AA
1.25 1.25 Ducto 1F 220 TD-AA
1.25 1.25 Ducto 1F 220 TD-AA
1.25 1.25 Ducto 1F 220 TD-AA
1.25 1.25 Ducto 1F 220 TD-AA
1.25 1.25 Ducto 1F 220 TD-AA
1.25 1.25 Ducto 1F 220 TD-AA
1.25 1.25 Ducto 1F 220 TD-AA
1.25 1.25 Ducto 1F 220 TD-AB
1.25 1.25 Ducto 1F 220 TD-AB
1.25 1.25 Ducto 1F 220 TD-AB
1.25 1.25 Ducto 1F 220 TD-AB
1.25 1.25 Ducto 1F 220 TD-AB
1.25 1.25 Ducto 1F 220 TD-AB
1.25 1.25 Ducto 1F 220 TD-AB
1.25 1.25 Ducto 1F 220 TD-AB
1.25 1.25 Ducto 1F 220 TD-AB
1.25 1.25 Ducto 1F 220 TD-AB
1.25 1.25 Ducto 1F 220 TD-AB
1.25 1.25 Ducto 1F 220 TD-AC
1.25 1.25 Ducto 1F 220 TD-AC
1.25 1.25 Ducto 1F 220 TD-AC
1.25 1.25 Ducto 1F 220 TD-AC
1.25 1.25 Ducto 1F 220 TD-AC
1.25 1.25 Ducto 1F 220 TD-AC
1.25 1.25 Ducto 1F 220 TD-AC
1.25 1.25 Ducto 1F 220 TD-AC
1.25 1.25 Ducto 1F 220 TD-AC
1.25 1.25 Ducto 1F 220 TD-AC
1.25 1.25 Ducto 1F 220 TD-TALL
1.25 1.25 Ducto 1F 220 TD-TALL
1.25 1.25 Ducto 1F 220 TD-TALL
1.25 1.25 Ducto 1F 220 TD-TALL
1.25 1.25 Ducto 1F 220 TD-TALL
1.25 1.25 Ducto 1F 220 TD-TALL
1.25 1.25 Ducto 1F 220 TD-TALL
1.25 1.25 Ducto 1F 220 TD-TALL
1.25 1.25 Ducto 1F 220 TD-TALL
1.25 1.25 Ducto 1F 220 TD-TALL
1.25 1.25 Ducto 1F 220 TD-TALL
1.25 1.25 Ducto 1F 220 TD-TALL
1.25 1.25 Ducto 1F 220 TD-TALL
1.25 1.25 Ducto 1F 220 TD-TALL
1.25 1.25 Ducto 1F 220 TD-TALL
1.25 1.25 Ducto 1F 220 TD-TALL
1.25 1.25 Ducto 1F 220 TD-TALL
1.25 1.25 Ducto 1F 220 TD-TALL
1.25 1.25 Ducto 1F 220 TD-TALL
1.25 1.25 Ducto 1F 220 TD-TALL
1.25 1.25 Ducto 1F 220 TD-TALL
1.25 1.25 Ducto 1F 220 TD-TALL
1.25 1.25 Ducto 1F 220 TD-PISC
1.25 1.25 Ducto 1F 220 TD-PISC
1.25 1.25 Ducto 1F 220 TD-PISC
1.25 1.25 Ducto 1F 220 TD-PISC
1.25 1.25 Ducto 1F 220 TD-PISC
1.25 1.25 Ducto 1F 220 TD-PISC
1.25 1.25 Ducto 1F 220 TD-PISC
1.25 1.25 Ducto 1F 220 TD-AUD
1.25 1.25 Ducto 1F 220 TD-AUD
1.25 1.25 Ducto 1F 220 TD-AUD
1.25 1.25 Ducto 1F 220 TD-AUD
1.25 1.25 Ducto 1F 220 TD-AUD
1.25 1.25 Ducto 1F 220 TD-AUD
1.25 1.25 Ducto 1F 220 TD-EST
1.25 1.25 Ducto 1F 220 TD-EST
1.25 1.25 Ducto 1F 220 TD-EST
1.25 1.25 Ducto 1F 220 TD-EST
1.25 1.25 Ducto 1F 220 TD-EST
1.25 1.25 Ducto 1F 220 TD-ADM
1.25 1.25 Ducto 1F 220 TD-ADM
1.25 1.25 Ducto 1F 220 TD-ADM
1.25 1.25 Ducto 1F 220 TD-ADM
1.25 1.25 Ducto 1F 220 TD-ADM
1.25 1.25 Ducto 1F 220 TD-ADM
1.25 1.25 Ducto 1F 220 TD-ADM
1.25 1.25 Ducto 1F 220 TD-ADM
1.25 1.25 Ducto 1F 220 TD-ADM
1.25 1.25 Ducto 1F 220 TD-ADM
1.25 1.25 Ducto 1F 220 TD-ADM
1.25 1.25 Ducto 1F 220 TD-ADM
1.25 1.25 Ducto 1F 220 TD-ADM
1.25 1.25 Ducto 1F 220 TD-ADM
1.25 1.25 Ducto 1F 220 TD-ADM
1.25 1.25 Ducto 1F 220 TD-ADM
1.25 1.25 Ducto 1F 220 TD-ADM
1.25 1.25 Ducto 1F 220 TD-CAF
1.25 1.25 Ducto 1F 220 TD-CAF
1.25 1.25 Ducto 1F 220 TD-CAF
1.25 1.25 Ducto 1F 220 TD-CAF
1.25 1.25 Ducto 1F 220 TD-CAF
1.25 1.25 Ducto 1F 220 TD-CAF
1.25 1.25 Ducto 1F 220 TD-VIV
1.25 1.25 Ducto 1F 220 TD-AUD
1.25 1.25 Ducto 1F 220 TD-AA
1.25 1.25 Ducto 1F 220 STD-EST15
1.25 1.25 Ducto 1F 220 STD-EST12
ALCULO DE ALIMENTADORES DE TABLERO TGN
F.P 0.9 DISEÑO POR CAPACIDAD DE CONDUCCIÓN
Tablero M.D. (Kw) In (A) I diseño (A) Factor de corrTipo de CondSección del C
TD-AA 21.77 63.4793705 69.8273076 0.7 N2XOH 70
TD-AB 22.4 65.3163941 71.8480335 0.7 N2XOH 50
TD-AC 24.52 71.4981242 78.6479367 0.7 N2XOH 35
TD-TALL 78.8 229.773743 252.751118 0.7 N2XOH 2(3 - 1 x 185)
TD-ADM 56.62365 165.109493 181.620442 0.7 N2XOH 185
TD-AUD 13.4074 39.0947778 43.0042556 0.7 N2XOH 25
TD-CAF 8.19005 23.8814524 26.2695976 0.7 N2XOH 25
TD-PISC 19.62477 57.2240719 62.9464791 0.7 N2XOH 185
TD-EST 6.2326 18.1737035 19.9910738 0.7 N2XOH 25
TD-VIV 1.8425 5.372565 5.90982151 0.7 N2XOH 6
TD-LOSA 1.35 3.93647911 4.33012702 0.7 N2XOH 6
TD-CIST 33.8822 98.7974611 108.677207 0.7 N2XOH 150

STD-AA11 6.47 18.8659406 23.5824258 1 N2XOH 10


STD-AA12 5.14 14.9877797 18.7347246 0.7 N2XOH 6
STD-AA13 0.48 1.39963702 1.74954627 0.7 N2XOH 6
STD-AA14 0.09 0.26243194 0.32803993 0.7 N2XOH 6
STD-AA21 5.71 16.6498487 20.8123108 0.7 N2XOH 10
STD-AA22 5.66 16.5040531 20.6300664 0.7 N2XOH 10
STD-AA31 5.66 16.5040531 20.6300664 0.7 N2XOH 10
STD-AA32 1.5 4.37386568 5.46733209 0.7 N2XOH 6
STD-AA33 1.47 4.28638836 5.35798545 0.7 N2XOH 6
STD-AA41 6.12 17.845372 22.3067149 0.7 N2XOH 10
STD-AB11 5.19 15.1335752 18.916969 0.7 N2XOH 6
STD-AB12 5.14 14.9877797 18.7347246 0.7 N2XOH 6
STD-AB13 0.44 1.2830006 1.60375075 0.7 N2XOH 6
STD-AB14 0.16 0.46654567 0.58318209 0.7 N2XOH 6
STD-AB21 6.27 18.2827585 22.8534482 0.7 N2XOH 10
STD-AB22 6.23 18.1661221 22.7076526 0.7 N2XOH 10
STD-AB31 1.57 4.57797941 5.72247426 0.7 N2XOH 6
STD-AB32 1.64 4.78209314 5.97761642 0.7 N2XOH 6
STD-AB33 1.65 4.81125224 6.0140653 0.7 N2XOH 6
STD-AB34 1.64 4.78209314 5.97761642 0.7 N2XOH 6
STD-AA41 6.14 17.9036902 22.3796127 0.7 N2XOH 10
STD-AC11 4.29 12.5092558 15.6365698 1 N2XOH 6
STD-AC12 5.23 15.2502117 19.0627646 0.7 N2XOH 10
STD-AC13 0.44 1.2830006 1.60375075 0.7 N2XOH 6
STD-AC14 0.16 0.46654567 0.58318209 0.7 N2XOH 6
STD-AC21 5.07 14.783666 18.4795825 0.7 N2XOH 6
STD-AC22 5.03 14.6670296 18.333787 0.7 N2XOH 6
STD-AC31 1.37 3.99479732 4.99349665 0.7 N2XOH 6
STD-AC32 1.34 3.90732 4.88415 0.7 N2XOH 6
STD-AC33 5.03 14.6670296 18.333787 0.7 N2XOH 6
STD-AC41 6.14 17.9036902 22.3796127 0.7 N2XOH 10
STD-T11 2.65 7.72716269 9.65895337 0.7 N2XOH 6
STD-T12 5.03 14.6670296 18.333787 0.7 N2XOH 10
STD-T13 0.43 1.25384149 1.56730187 1 N2XOH 6
STD-T14 7.07 20.6154869 25.7693586 0.7 N2XOH 10
STD-T15 6.99 20.382214 25.4777676 0.7 N2XOH 6
STD-T16 0.41 1.19552328 1.49440411 0.7 N2XOH 6
STD-T17 9.94 28.9841499 36.2301873 0.7 N2XOH 6
STD-T18 22 64.1500299 80.1875374 0.7 N2XOH 16
STD-T21 3.27 9.53502717 11.918784 0.7 N2XOH 6
STD-T22 3.17 9.24343613 11.5542952 0.7 N2XOH 6
STD-T23 9.12 26.5931033 33.2413791 0.7 N2XOH 10
STD-T24 7.39 21.5485782 26.9357228 0.7 N2XOH 6
STD-T25 2.24 6.53163941 8.16454926 0.7 N2XOH 6
STD-T26 2.95 8.60193583 10.7524198 0.7 N2XOH 6
STD-T31 4.91 14.3171203 17.8964004 1 N2XOH 6
STD-T32 4.51 13.1507561 16.4384452 0.7 N2XOH 10
STD-T33 13.18 38.4316997 48.0396247 0.7 N2XOH 16
STD-T34 13.39 39.0440409 48.8050512 0.7 N2XOH 6
STD-T35 13.18 38.4316997 48.0396247 0.7 N2XOH 6
STD-T36 3.96 11.5470054 14.4337567 0.7 N2XOH 6
STD-T37 13.2 38.4900179 48.1125224 0.7 N2XOH 10
STD-T41 0.12 0.34990925 0.43738657 0.7 N2XOH 6
STD-PISC01 0.86 2.50768299 3.13460373 0.7 N2XOH 6
STD-PISC02 0 0 0 0.7 N2XOH 10
STD-PISC02 5.52 16.0958257 20.1197821 0.7 N2XOH 10
STD-PISC03 0 0 0 0.7 N2XOH 10
STD-PISC04 0 0 0 1 N2XOH 10
STD-PISC11 0.96 2.79927403 3.49909254 0.7 N2XOH 6
STD-PISC21 2.84 8.28118568 10.3514821 0.7 N2XOH 6
STD-AUD11 1.06 3.09086508 3.86358135 0.7 N2XOH 6
STD-AUD12 0.73 2.12861463 2.66076829 0.7 N2XOH 6
STD-AUD13 0.74 2.15777373 2.69721717 0.7 N2XOH 6
STD-AUD14 2.42 7.05650329 8.82062911 0.7 N2XOH 6
STD-AUD31 0.63 1.83702358 2.29627948 0.7 N2XOH 6
STD-AUD32 0.37 1.07888687 1.34860858 0.7 N2XOH 10
STD-EST01 0.69 2.01197821 2.51497276 0.7 N2XOH 6
STD-EST02 0.47 1.37047791 1.71309739 0.7 N2XOH 6
STD-EST03 0.64 1.86618269 2.33272836 0.7 N2XOH 6
STD-EST04 0.64 1.86618269 2.33272836 1 N2XOH 6
STD-EST05 0.47 1.37047791 1.71309739 0.7 N2XOH 6
STD-ADM11 8.47 24.6977615 30.8722019 0.7 N2XOH 10
STD-ADM12 2.53 7.37725344 9.2215668 0.7 N2XOH 6
SSTD-ADM12 1.69 4.92788866 6.15986083 0.7 N2XOH 6
STD-ADM13 3.99 11.6344827 14.5431034 0.7 N2XOH 6
STD-ADM14 1.38 4.02395642 5.02994553 0.7 N2XOH 6
STD-ADM15 2.84 8.28118568 10.3514821 0.7 N2XOH 6
STD-ADM21 5.51 16.0666666 20.0833332 0.7 N2XOH 6
STD-ADM22 2.6 7.58136717 9.47670896 0.7 N2XOH 6
STD-ADM23 2.48 7.23145792 9.0393224 0.7 N2XOH 6
STD-ADM24 4.25 12.3926194 15.4907743 0.7 N2XOH 6
STD-ADM31 1.04 3.03254687 3.79068359 1 N2XOH 6
STD-ADM32 3.23 9.41839075 11.7729884 0.7 N2XOH 6
STD-ADM33 4.21 12.275983 15.3449787 0.7 N2XOH 6
STD-ADM41 2.36 6.88154866 8.60193583 0.7 N2XOH 6
STD-ADM42 2.22 6.4733212 8.0916515 0.7 N2XOH 6
STD-ADM43 3.02 8.80604956 11.007562 0.7 N2XOH 6
STD-ADM44 2.67 7.7854809 9.73185113 0.7 N2XOH 6
STD-CAF11 1.97 5.74434359 7.18042948 0.7 N2XOH 10
STD-CAF21 2.89 8.4269812 10.5337265 0.7 N2XOH 10
STD-CAF31 1.38 4.02395642 5.02994553 0.7 N2XOH 10
STD-CAF32 0.36 1.04972776 1.3121597 0.7 N2XOH 6
STD-CAF33 0.12 0.34990925 0.43738657 0.7 N2XOH 6
STD-CAF34 0.12 0.34990925 0.43738657 1 N2XOH 6
STD-VIV11 0.55 1.60375075 2.00468843 0.7 N2XOH 6
STD-AUD15 0.55 1.60375075 2.00468843 0.7 N2XOH 6
STD-AA13 0.55 1.60375075 2.00468843 0.7 N2XOH 6
SSTD-EST15 0.55 1.60375075 2.00468843 0.7 N2XOH 6
SSTD-EST12 0.55 1.60375075 2.00468843 0.7 N2XOH 6
DISEÑO POR CAÍDA DE TENSIÓN
I Max ConducI Max corregiLong. FCT %DV adm. DV Max. AdmDV Sec. Calc. %V%
275 192.5 156 0.0006088 1.79 3.938 NO 1.79
230 161 90 0.00084661 1.49 3.278 NO 1.49
195 136.5 53 0.00112406 1 2.2 NO 1.37
720 504 179.9 0.0001357 1 2.2 NO 1.45
450 315 156.7 0.00027141 1 2.2 NO
160 112 192.5 0.00152957 1 2.2 NO
160 112 117.7 0.00152957 1 2.2 NO
450 315 149.3 0.00027141 1 2.2 NO
160 112 187.8 0.00152957 1 2.2 NO
68 47.6 51.5 0.00622264 1.5 3.3 1.89389667
68 47.6 84.5 0.00622264 1.5 3.3 2.27683748
410 287 157.1 0.00032004 1.5 3.3 NO

95 95 32 0.0037303 1 2.2 NO
68 47.6 29.3 0.00622264 1 2.2 NO
68 47.6 9.2 0.00622264 1 2.2 0.10015853
68 47.6 47.2 0.00622264 1 2.2 0.09634815
95 66.5 36 0.0037303 1 2.2 NO
95 66.5 34 0.0037303 1 2.2 NO
95 66.5 37.9 0.0037303 1 2.2 NO
68 47.6 26.9 0.00622264 1 2.2 0.91517136
68 47.6 44.7 0.00622264 1 2.2 1.49033445
95 66.5 58 0.0037303 1.5 3.3 NO
68 47.6 30.2 0.00622264 1.5 3.3 NO
68 47.6 29.3 0.00622264 1.5 3.3 NO
68 47.6 9.2 0.00622264 1 2.2 0.09181199
68 47.6 47.2 0.00622264 1 2.2 0.1712856
95 66.5 34.9 0.0037303 1 2.2 NO
95 66.5 34 0.0037303 1.5 3.3 2.88001669
68 47.6 26.9 0.00622264 1.5 3.3 0.95787936
68 47.6 44.7 0.00622264 1.5 3.3 1.66268605
68 47.6 26.9 0.00622264 2.5 5.5 1.0066885
68 47.6 57 0.00622264 3.5 7.7 2.12020369
95 66.5 68 0.0037303 4.5 9.9 5.67682262
68 68 30.2 0.00622264 1 2.2 NO
95 66.5 29.3 0.0037303 1 2.2 2.08351845
68 47.6 9.2 0.00622264 1 2.2 0.09181199
68 47.6 47.2 0.00622264 1 2.2 0.1712856
68 47.6 36 0.00622264 1 2.2 NO
68 47.6 32.5 0.00622264 1 2.2 NO
68 47.6 26.9 0.00622264 1 2.2 0.83585651
68 47.6 44.7 0.00622264 1 2.2 1.35853616
68 47.6 37.9 0.00622264 1 2.2 NO
95 66.5 58 0.0037303 1.5 3.3 NO
68 47.6 19.8 0.00622264 1.5 3.3 1.19006298
95 66.5 41 0.0037303 1.5 3.3 2.80401209
68 68 56 0.00622264 1 2.2 0.54615431
95 66.5 58 0.0037303 1 2.2 NO
68 47.6 13.8 0.00622264 1 2.2 2.18783792
68 47.6 1 0.00622264 1 2.2 0.00929914
68 47.6 11 0.00622264 1 2.2 NO
125 87.5 32 0.00237209 1 2.2 NO
68 47.6 23.8 0.00622264 1 2.2 1.76515803
68 47.6 45 0.00622264 1 2.2 NO
95 66.5 62 0.0037303 1 2.2 NO
68 47.6 17.8 0.00622264 1.5 3.3 2.98348132
68 47.6 15 0.00622264 1.5 3.3 0.76207578
68 47.6 36 0.00622264 1.5 3.3 2.40870381
68 68 27.8 0.00622264 1 2.2 NO
95 66.5 49 0.0037303 1 2.2 NO
125 87.5 66 0.00237209 1 2.2 NO
68 NO 21.8 0.00622264 1 2.2 NO
68 NO 19 0.00622264 1 2.2 NO
68 47.6 40 0.00622264 1 2.2 NO
95 66.5 31.8 0.0037303 1 2.2 NO
68 47.6 56 0.00622264 1 2.2 0.15241516
68 47.6 1 0.00622264 1 2.2 0.01950551
95 66.5 5.6 0.0037303 1.5 3.3 0
95 66.5 6.6 0.0037303 1.5 3.3 0.49534873
95 66.5 7.6 0.0037303 1.5 3.3 0
95 95 8.6 0.0037303 1 2.2 0
68 47.6 23 0.00622264 1 2.2 0.50079266
68 47.6 16 0.00622264 1 2.2 1.03061677
68 47.6 7.4 0.00622264 1 2.2 0.17790841
68 47.6 23.3 0.00622264 1 2.2 0.38577818
68 47.6 40.3 0.00622264 1 2.2 0.67638762
68 47.6 6.9 0.00622264 1 2.2 0.37872445
68 47.6 28 0.00622264 1 2.2 0.40008978
95 66.5 17 0.0037303 1 2.2 0.08552216
68 47.6 85.2 0.00622264 1.5 3.3 1.33336045
68 47.6 46.6 0.00622264 1.5 3.3 0.49675547
68 47.6 1 0.00622264 1.5 3.3 0.01451573
68 68 84.1 0.00622264 1 2.2 1.22077282
68 47.6 118.7 0.00622264 1 2.2 1.26534065
95 66.5 25.6 0.0037303 1 2.2 NO
68 47.6 31.6 0.00622264 1 2.2 1.81328674
68 47.6 5.5 0.00622264 1 2.2 0.21081829
68 47.6 21.8 0.00622264 1 2.2 1.97282368
68 47.6 9.8 0.00622264 1 2.2 0.3067355
68 47.6 7.7 0.00622264 1 2.2 0.49598432
68 47.6 18.4 0.00622264 1 2.2 NO
68 47.6 42.2 0.00622264 1.5 3.3 2.48854032
68 47.6 33.6 0.00622264 1.5 3.3 1.88994794
68 47.6 12 0.00622264 1.5 3.3 1.15672217
68 68 24.2 0.00622264 1 2.2 0.57083105
68 47.6 45.4 0.00622264 1 2.2 NO
68 47.6 15 0.00622264 1 2.2 1.43229421
68 47.6 24.4 0.00622264 1 2.2 1.30605273
68 47.6 48.6 0.00622264 1 2.2 NO
68 47.6 44.2 0.00622264 1 2.2 NO
68 47.6 18 0.00622264 1 2.2 1.09004054
95 66.5 12 0.0037303 1 2.2 0.32142194
95 66.5 8 0.0037303 1 2.2 0.31435174
95 66.5 15 0.0037303 1.5 3.3 0.28144814
68 47.6 14.2 0.00622264 1.5 3.3 0.11594439
68 47.6 10.4 0.00622264 1.5 3.3 0.02830567
68 68 20.4 0.00622264 1 2.2 0.05552266
68 47.6 24.4 0.00622264 1 2.2 0.3043767
68 47.6 58.1 0.00622264 1 2.2 0.72476582
68 47.6 49.3 0.00622264 1 2.2 0.61499062
68 47.6 11.5 0.00622264 1 2.2 0.14345623
68 47.6 71.2 0.00622264 1 2.2 0.88818118
ALIMENTADOR
FORMACIÓN DEL CONDUCTOR Tubería Ømm
3 - 1 x 70 mm2 N2XOH 80
3 - 1 x 50 mm2 N2XOH 80
3 - 1 x 35 mm2 N2XOH 50
2(3-1x185)mm2 N2XOH 2(100)
3-1x180mm2 N2XOH 100
3-1x25mm2 N2XOH 35
3-1x25mm2 N2XOH 35
3-1x185mm2 N2XOH 100
3-1x25mm2 N2XOH 35
2-1x6mm2 N2XOH 25
3-1x6mm2 N2XOH 25
3-1x150mm2 N2XOH 80

1 x 10 mm² N2XOH(F) +1 x 10 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25


1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 10 mm² N2XOH(F) +1 x 10 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 10 mm² N2XOH(F) +1 x 10 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 10 mm² N2XOH(F) +1 x 10 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 10 mm² N2XOH(F) +1 x 10 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 10 mm² N2XOH(F) +1 x 10 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 10 mm² N2XOH(F) +1 x 10 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 10 mm² N2XOH(F) +1 x 10 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 10 mm² N2XOH(F) +1 x 10 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 10 mm² N2XOH(F) +1 x 10 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 10 mm² N2XOH(F) +1 x 10 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 10 mm² N2XOH(F) +1 x 10 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 16 mm² N2XOH(F) +1 x 16 mm² N2XOH (N)+1x16mm² N2XOH (T) 35
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 10 mm² N2XOH(F) +1 x 10 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 10 mm² N2XOH(F) +1 x 10 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 16 mm² N2XOH(F) +1 x 16 mm² N2XOH (N)+1x16mm² N2XOH (T) 35
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 10 mm² N2XOH(F) +1 x 10 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 10 mm² N2XOH(F) +1 x 10 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 10 mm² N2XOH(F) +1 x 10 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 10 mm² N2XOH(F) +1 x 10 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 10 mm² N2XOH(F) +1 x 10 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 10 mm² N2XOH(F) +1 x 10 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 10 mm² N2XOH(F) +1 x 10 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 10 mm² N2XOH(F) +1 x 10 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 10 mm² N2XOH(F) +1 x 10 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 10 mm² N2XOH(F) +1 x 10 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
1 x 6 mm² N2XOH(F) +1 x 6 mm² N2XOH (N)+1x10 mm² N2XOH (T) 25
FASES TENSION
1F 220
3F 380
3F+N 380

PROTECCIÓN
Proteccion ITM Icc (kA)
3x100 20 79.3492131
3x100 20 81.6454926
3x100 20 89.3726553
3x250 20 287.217179
3x100 20 206.386866
3x100 20 48.8684722
3x100 20 29.8518155
3x100 20 71.5300899
3x100 20 22.7171293
3x100 20 6.71570626
3x100 20 4.92059889
3x100 20 123.496826

2x25 25 70 23.5824258
2x20 20 50 18.7347246
2x25 25 50 1.74954627
2x20 20 50 0.32803993
2x25 25 50 20.8123108
2x25 25 50 20.6300664
2x25 25 50 20.6300664
2x20 20 50 5.46733209
2x20 20 50 5.35798545
2x32 32 50 22.3067149
2x25 25 50 18.916969
2x25 25 25 18.7347246
2x20 20 50 1.60375075
2x20 20 50 0.58318209
2x25 25 50 22.8534482
2x32 32 50 22.7076526
2x25 25 50 5.72247426
2x25 25 25 5.97761642
2x25 25 26 6.0140653
2x25 25 27 5.97761642
2x32 32 28 22.3796127
2x20 20 70 15.6365698
2x20 20 50 19.0627646
2x25 25 50 1.60375075
2x20 20 50 0.58318209
2x20 20 50 18.4795825
2x20 20 50 18.333787
2x20 20 50 4.99349665
2x20 20 50 4.88415
2x20 20 50 18.333787
2x32 32 50 22.3796127
2x25 25 50 9.65895337
2x25 25 25 18.333787
2x20 20 70 1.56730187
2x32 32 50 25.7693586
2x40 40 50 25.4777676
2x20 20 50 1.49440411
2x40 40 50 36.2301873
2x20 20 50 80.1875374
2x20 20 50 11.918784
2x20 20 50 11.5542952
2x40 40 50 33.2413791
2x40 40 50 26.9357228
2x25 25 50 8.16454926
2x25 25 25 10.7524198
2x20 20 70 17.8964004
2x20 20 50 16.4384452
2x63 63 50 48.0396247
2x50 50 50 48.8050512
2x50 50 50 48.0396247
2x20 20 50 14.4337567
2x50 50 50 48.1125224
2x20 20 50 0.43738657
2x20 20 50 3.13460373
2x25 25 50 0
2x32 32 50 20.1197821
2x25 25 25 0
2x20 20 70 0
2x20 20 50 3.49909254
2x25 25 50 10.3514821
2x20 20 50 3.86358135
2x20 20 50 2.66076829
2x20 20 50 2.69721717
2x20 20 50 8.82062911
2x20 20 50 2.29627948
2x20 20 50 1.34860858
2x25 25 50 2.51497276
2x25 25 50 1.71309739
2x25 25 25 2.33272836
2x20 20 70 2.33272836
2x20 20 50 1.71309739
2x40 40 50 30.8722019
2x20 20 50 9.2215668
2x20 20 50 6.15986083
2x20 20 50 14.5431034
2x20 20 50 5.02994553
2x20 20 50 10.3514821
2x25 25 50 20.0833332
2x25 25 50 9.47670896
2x25 25 50 9.0393224
2x25 25 25 15.4907743
2x20 20 70 3.79068359
2x20 20 50 11.7729884
2x25 25 50 15.3449787
2x20 20 50 8.60193583
2x20 20 50 8.0916515
2x20 20 50 11.007562
2x20 20 50 9.73185113
2x20 20 50 7.18042948
2x20 20 50 10.5337265
2x25 25 50 5.02994553
2x25 25 50 1.3121597
2x25 25 25 0.43738657
2x20 20 70 0.43738657
2x20 20 50 2.00468843
2x25 25 50 2.00468843
2x20 20 50 2.00468843
2x20 20 50 2.00468843
2x20 20 50 2.00468843