Rab Pasar SP-5
Rab Pasar SP-5
( EE )
PROGRAM : -
PEKERJAAN : PERENCANAAN TEKNIS PEMBANGUNAN PASAR NOSAO
LOKASI : DISTRIK DEMBA-KABUPATEN WAROPEN
T/A : 2015
I PEKERJAAN PERSIAPAN
1 Pas. Bouwplank M' 98.80 84,787.00 8,376,955.60
2 Dokumentasi Proyek Ls 3.00 150,000.00 450,000.00
Sub Total 8,826,955.60
II PEKERJAAN TANAH DAN PASIR
1 Pekerjaan Galian Pondasi M3 33.16 41,126.00 1,363,869.76
2 Urugan kembali 1/4 Galian M3 8.29 19,706.00 163,378.50
3 Urugan Pasir Bawah Pondasi M3 393,417.00 0.00
4 Urugan Tanah Bawah Lantai M3 41.18 388,617.00 16,004,802.53
5 Urugan Pasir Bawah Lantai M3 17.16 393,417.00 6,751,035.72
Sub Total 24,283,086.52
III PEKERJAAN STRUKTUR DAN PASANGAN BATU
1 Pas. Batu Kosongan M3 1,102,892.00 0.00
2 Pasangan Pondasi Camp. 1 : 3 M3 18.05 1,776,642.00 32,064,834.82
3 Pekerjaan Beton Cyclope camp. 1 : 3 : 5 M3 6.16 1,647,224.00 10,146,899.84
4 Pekerjaan kolom gelagar kayu kls. I M' 2.00 6,907,356.00 13,813,330.53
6 Pekerjaan plat meja beton tebal 10 cm M3 4.00 7,619,099.00 30,476,396.00
7 Pekerjaan plat duduk beton tebal 10 cm M3 2.50 7,619,099.00 19,047,747.50
8 Cor lantai slab beton bertulang camp. 1 : 2 : 3 tebal 10 cm M3 33.70 4,298,134.00 144,864,308.34
9 Pas. Rolag Batu Tela Kaki Meja dan Tempat Duduk Camp. 1 : 3 M2 45.60 453,440.00 20,676,864.00
10 Pas. Batu Tela sisi depan meja M2 28.00 226,720.00 6,348,160.00
11 Pekerjaan Plesteran dinding Camp. 1 : 3 M2 147.20 80,167.00 11,800,582.40
12 Pekerjaan Acian Dinding M2 147.20 21,627.00 3,183,494.40
13 Pas. Rolag Batu Tela Penahan Tanah Bawah Lantai Camp. 1 : 3 M2 27.78 453,440.00 12,594,749.44
14 Pekerjaan Plesteran Dinding Rolag Camp. 1 : 3 M2 10.42 80,167.00 835,019.47
15 Pekerjaan Acian Dinding Rolag Lantai M2 10.42 21,627.00 225,266.83
16 Pekerjaan Saluran Air Hujan M' 86.80 200,552.90 17,407,991.72
Sub Total 323,485,645.28
IV PEKERJAAN KAYU DAN ATAP
1 Pekerjaan Kuda-Kuda Kayu Besi 5/10 M3 2.89 6,870,976.00 19,825,857.70
2 Pekerjaan Gording Kayu Kls II 5/10 M3 3.14 5,293,853.00 16,646,520.76
3 Pekerjaan Lesplank Papan Kayu Besi M2 22.65 172,442.97 3,905,833.29
4 Pekerjaan Pasang Atap BJLS 30 M2 403.82 101,330.00 40,919,080.60
5 Pas. Nok Seng Plat BJLS 30 M2 13.24 56,356.00 746,153.44
6 Pas. Balok dudukan jalusi ky. Kls. I 5/10 M3 0.60 7,658,302.00 4,594,981.20
7 Pekerjaan Top Gevel Papan ky. Kls. I + Rangka ky. Kls. II M2 15.60 196,636.00 3,067,521.60
8 Pas. Papan jalusi ky. Kls. I M2 21.10 355,467.00 7,500,353.70
Sub Total 97,206,302.29
V PEKERJAAN LANTAI DAN KERAMIK
1 Screed Lantai M2 343.20 135,188.00 46,396,521.60
2 Pekerjaan Acian Lantai M2 343.20 21,627.00 7,422,386.40
3 Pas. Keramik Meja uk. 30 x 30 M2 40.00 439,950.00 17,598,000.00
Sub Total 71,416,908.00
VIII PEKERJAAN PENGECATAN
2 Pengecatan Rangka Kayu M2 397.80 60,826.00 24,196,400.32
3 Pengecatan Top Gevel M2 15.60 60,826.00 948,885.60
4 Pengecatan Jalusi M2 42.20 60,826.00 2,566,857.20
5 Pengecatan Lesplank M2 22.65 60,826.00 1,377,708.90
Sub Total 29,089,852.02
IX PEKERJAAN INSTALASI LISTRIK
1 Pas. Sekring Khas 1 Group Titik 1.00 123,530.00 123,530.00
2 Pas. Lampu TL 40 Watt Titik 5.00 763,228.00 3,816,140.00
Sub Total 3,939,670.00
XI PEKERJAAN AKHIR
1 Pembersihan Sisa Proyek Ls 1.00 500,000.00 500,000.00
Sub Total 500,000.00
REKAPITULASI
I PEKERJAAN PERSIAPAN
1 Pembersihan lokasi M2 17,136.00 0.00
2 Pas. Bouwplank M' 11.00 84,787.00 932,657.00
3 Pembuatan Direksi Keet M2 1,965,041.00 0.00
4 Papan Nama Proyek Bh 1,095,353.00 0.00
5 Dokumentasi Proyek Ls 250,000.00 0.00
Sub Total 932,657.00
II PEKERJAAN TANAH DAN PASIR
1Pekerjaan Galian Pondasi M3 133.12 41,126.00 5,474,693.12
2Urugan kembali 1/4 Galian M3 33.28 19,706.00 655,815.68
3Urugan Pasir Bawah Pondasi M3 8.32 393,417.00 3,273,229.44
4Urugan Tanah Bawah Lantai M3 68.43 388,617.00 26,593,061.31
5Urugan Pasir Bawah Lantai M3 22.81 393,417.00 8,973,841.77
Sub Total 44,970,641.32
III PEKERJAAN STRUKTUR DAN PASANGAN BATU
1 Pas. Batu Kosongan M3 17.76 1,102,892.00 19,587,361.92
2 Pasangan Pondasi Camp. 1 : 3 M3 42.18 1,776,642.00 74,938,759.56
3 Pekerjaan sloef beton 15/20 camp. 1 : 2 : 3 M3 4.44 8,260,888.00 36,678,342.72
4 Pekerjaan kolom beton 10/10 M' 63.70 147,297.04 9,382,821.45
5 Pekerjaan Ringbalk praktis 10/20 M' 165.20 110,793.89 18,303,150.63
6 Cor lantai tanpa tulangan camp. 1 : 3 : 5 tebal 7 cm M3 16.38 1,903,122.00 31,173,138.36
7 Pas. Dinding Batu Tela Camp. 1 : 3 M2 408.39 226,720.00 92,590,180.80
8 Pekerjaan Plesteran dinding Camp. 1 : 3 M2 816.78 80,167.00 65,478,802.26
9 Pekerjaan Acian Dinding M2 816.78 21,627.00 17,664,501.06
10 Pas. Rolag Batu Tela Penahan Tanah Bawah Lantai Camp. 1 : 3 M2 22.54 453,440.00 10,220,537.60
11 Pekerjaan Plesteran Dinding Rolag Camp. 1 : 3 M2 9.66 80,167.00 774,413.22
12 Pekerjaan Acian Dinding Rolag Lantai M2 9.66 21,627.00 208,916.82
13 Pekerjaan Saluran Air Hujan M' 64.40 200,552.90 12,915,606.76
Sub Total 389,916,533.16
IV PEKERJAAN KAYU DAN ATAP
1 Pekerjaan Kuda-Kuda Kayu Besi 5/10 M3 2.36 6,870,976.00 16,193,516.24
2 Pekerjaan Gording Kayu Kls II 5/10 M3 1.84 5,293,853.00 9,746,512.76
3 Pekerjaan Lesplank Papan Kayu Besi M2 172,442.97 0.00
4 Pekerjaan Pasang Atap BJLS 30 M2 259.92 101,330.00 26,337,693.60
5 Pas. Nok Seng Plat BJLS 30 M2 8.66 56,356.00 488,268.38
7 Pekerjaan Plafond tripleks 3 mm+ Rangka ky. Kls. II M2 238.26 178,927.00 42,631,147.02
8 Pekerjaan Kusen Kayu Kls. I M3 0.43 8,257,696.00 3,550,809.28
Sub Total 98,947,947.28
V PEKERJAAN LANTAI DAN KERAMIK
1 Screed Lantai M2 234.00 135,188.00 31,633,992.00
2 Pekerjaan Acian Lantai M2 234.00 21,627.00 5,060,718.00
Sub Total 31,633,992.00
VI PEKERJAAN DAUN PINTU, JENDELA, DAN KACA
1 Pek. Daun Pintu Panil M2 66.00 644,324.00 42,525,384.00
Sub Total 42,525,384.00
VII PEKERJAAN KUNCI DAN PENGGANTUNG
1 Pas. Engsel Daun Pintu Bh 180.00 61,547.00 11,078,460.00
6 Pas. Kunci Slot Daun Pintu Bh 40.00 49,574.00 1,982,960.00
7 Pas. Kunci Tanam 2 Slag Biasa Bh 10.00 245,736.00 2,457,360.00
Sub Total 15,518,780.00
VIII PEKERJAAN PENGECATAN
1 Pengecatan Dinding Dalam dan Luar M2 816.78 23,705.00 19,361,769.90
2 Pengecatan Kusen M2 17.20 60,826.00 1,046,207.20
3 Pengecatan Pintu M2 132.00 60,826.00 8,029,032.00
4 Pengecatan Plafond M2 238.26 23,705.00 5,647,953.30
5 Pengecatan Lesplank M2 60,826.00 0.00
Sub Total 34,084,962.40
IX PEKERJAAN INSTALASI LISTRIK
1 Pas. Sekring Khas 2 Group Titik 10.00 123,530.00 1,235,300.00
3 Pas. Lampu TL 40 Watt Titik 10.00 763,228.00 7,632,280.00
4 Pas. Lampu XL 18 Watt Titik 10.00 721,153.00 7,211,530.00
5 Pas. Stop Kontak Titik 10.00 389,547.00 3,895,470.00
Sub Total 19,974,580.00
XI PEKERJAAN AKHIR
1 Pembersihan Sisa Proyek Ls 1.00 500,000.00 500,000.00
Sub Total 500,000.00
REKAPITULASI
A BANGUNAN UTAMA
I PEKERJAAN PERSIAPAN 932,657.00
II PEKERJAAN TANAH DAN PASIR 44,970,641.32
III PEKERJAAN STRUKTUR DAN PASANGAN BATU 389,916,533.16
IV PEKERJAAN KAYU DAN ATAP 98,947,947.28
V PEKERJAAN LANTAI DAN KERAMIK 31,633,992.00
VI PEKERJAAN DAUN PINTU, JENDELA, DAN KACA 42,525,384.00
VII PEKERJAAN KUNCI DAN PENGGANTUNG 15,518,780.00
VIII PEKERJAAN PENGECATAN 34,084,962.40
IX PEKERJAAN INSTALASI LISTRIK 19,974,580.00
XI PEKERJAAN AKHIR 500,000.00
Real Cost 679,005,477.16
10 Unit Kios 6,790,054,771.55
PPN 10 % 679,005,477.16
Total Cost 7,469,060,248.71
Dibulatkan 7,469,060,000.00
ENGGINEER ESTIMATE
( EE )
PROGRAM : -
PEKERJAAN : PERENCANAAN TEKNIS PEMBANGUNAN PASAR NOSAO
LOKASI : DISTRIK DEMBA-KABUPATEN WAROPEN
T/A : 2015
I PEKERJAAN PERSIAPAN
1 Pas. Bouwplank M' 24.00 84,787.00 2,034,888.00
Sub Total 2,034,888.00
II PEKERJAAN TANAH DAN PASIR
1 Pekerjaan Galian Pondasi M3 10.56 41,126.00 434,290.56
2 Urugan kembali 1/4 Galian M3 2.64 19,706.00 52,023.84
3 Urugan Pasir Bawah Pondasi M3 0.66 393,417.00 259,655.22
4 Urugan Tanah Bawah Lantai M3 5.00 388,617.00 1,943,085.00
5 Urugan Pasir Bawah Lantai M3 1.25 393,417.00 491,771.25
Sub Total 3,180,825.87
III PEKERJAAN STRUKTUR DAN PASANGAN BATU
1 Pas. Batu Kosongan M3 1.98 1,102,892.00 2,183,726.16
2 Pasangan Pondasi Camp. 1 : 3 M3 4.70 1,776,642.00 8,354,659.01
3 Pekerjaan Sloof 15/20 M3 0.50 8,260,888.00 4,089,139.56
4 Pekerjaan kolom praktis 10/10 M' 36.00 147,297.04 5,302,693.44
5 Pekerjaan ringbalk praktis 10/15 M' 19.00 110,793.89 2,105,083.91
6 Cor lantai tanpa tulangan camp. 1 : 3 : 5 tebal 5 cm M3 1.25 1,903,122.00 2,378,902.50
7 Pas. Batu Tela Camp. 1 : 3 M2 52.59 226,720.00 11,923,204.80
8 Pekerjaan Plesteran dinding Camp. 1 : 3 M2 105.18 80,167.00 8,431,965.06
9 Pekerjaan acian dinding M2 105.18 21,627.00 2,274,727.86
10 Pas. Rolag Batu Tela Dinding Lantai Rabat Camp. 1 : 3 M2 6.00 453,440.00 2,720,640.00
11 Pekerjaan Saluran Air Hujan M' 20.00 200,552.90 4,011,058.00
Sub Total 53,775,800.30
IV PEKERJAAN KAYU DAN ATAP
1 Pekerjaan Kuda-Kuda Kayu Besi 5/10 M3 0.80 6,870,976.00 5,496,780.80
2 Pekerjaan Gording Kayu Kls II 5/10 M3 0.40 5,677,476.00 2,270,990.40
3 Pekerjaan Lesplank Papan Kayu Besi M2 6.00 62,607.00 375,642.00
4 Pekerjaan Pasang Atap BJLS 30 M2 35.68 101,330.00 3,615,454.40
5 Pas. Nok Seng Plat BJLS 30 M2 5.10 56,356.00 287,415.60
6 Pekerjaan Plafond tripleks 3 mm+ Rangka ky. Kls. II M2 25.00 178,927.00 4,473,175.00
7 Pekerjaan Kusen Kayu Kls. I M3 0.08 8,257,696.00 631,713.74
Sub Total 17,151,171.94
V PEKERJAAN LANTAI DAN KERAMIK
1 Ssreed Lantai M2 16.00 135,188.00 2,163,008.00
2 Acian Lantai M2 16.00 21,627.00 346,032.00
Sub Total 2,509,040.00
VI PEKERJAAN DAUN PINTU, JENDELA, DAN KACA
1 Pek. Daun Pintu Panil M2 2.94 644,324.00 1,894,312.56
2 Pas. Kaca mati 5 mm M2 0.56 417,540.00 233,822.40
Sub Total 2,128,134.96
VII PEKERJAAN KUNCI DAN PENGGANTUNG
1 Pas. Engsel Daun Pintu Bh 6.00 61,547.00 369,282.00
2 Pas. Kunci Slot Daun Pintu Bh 2.00 49,574.00 99,148.00
3 Pas. Kunci Tanam 2 Slag Biasa Bh 2.00 245,736.00 491,472.00
Sub Total 959,902.00
VIII PEKERJAAN PENGECATAN
1 Pengecatan Dinding Dalam dan Luar M2 105.18 23,705.00 2,493,291.90
2 Pengecatan Kusen M2 3.06 60,826.00 186,127.56
3 Pengecatan Pintu Panil M2 5.88 60,826.00 357,656.88
4 Pengecatan Plafond M2 25.00 23,705.00 592,625.00
5 Pengecatan Lesplank M2 6.00 60,826.00 364,956.00
Sub Total 3,994,657.34
IX PEKERJAAN INSTALASI LISTRIK
1 Pas. Sekring Khas 2 Group Titik 1.00 123,530.00 123,530.00
2 Pas. Lampu XL 18 Watt Titik 1.00 721,153.00 721,153.00
3 Pas. Lampu XL 8 Watt Titik 2.00 683,028.00 1,366,056.00
Sub Total 2,210,739.00
X PEKERJAAN SANITAIR
1 Pembuatan Septic Tank dan asesoris Ls 1.00 3,801,391.00 3,801,391.00
2 Pas. Bak Air Fiberglass Bh 2.00 1,290,242.00 2,580,484.00
3 Pas. Pipa 3" Pembuangan KM/WC M' 5.00 175,449.00 877,245.00
4 Pas. Pipa 4" Pembuangan Septic Tank M' 10.00 197,304.00 1,973,040.00
5 Pas. Kran air Titik 2.00 53,164.00 106,328.00
6 Pas. Pipa air bersih 1/2" M' 10.00 33,293.00 332,930.00
7 Pas. Floor Drain Bh 2.00 84,464.00 168,928.00
8 Pas. Closed Jongkok Bh 2.00 797,410.00 1,594,820.00
Sub Total 11,435,166.00
XI PEKERJAAN AKHIR
1 Pembersihan Sisa Proyek Ls 1.00 500,000.00 500,000.00
Sub Total 500,000.00
REKAPITULASI AKHIR
D. PAGAR KELILING
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6 = (4 x 5)
I PEKERJAAN PERSIAPAN
1 Pembersihan lokasi Ls 1.00 700,000.00 700,000.00
2 Pas. Bouwplank dan Pengukuran M' 1.00 1,000,000.00 1,000,000.00
Sub Total 1,700,000.00
II PEKERJAAN TANAH DAN PASIR
1 Pekerjaan Galian Pondasi M3 165.12 41,126.00 6,790,725.12
2 Urugan kembali Galian Pondasi M 3
41.28 19,706.00 813,463.68
3 Urugan Pasir Bawah Pondasi M 3
10.32 393,417.00 4,060,063.44
Sub Total 11,664,252.24
III PEKERJAAN STRUKTUR DAN PASANGAN BATU
1 Pas. Batu Kosongan M3 46.08 1,102,892.00 50,821,263.36
2 Pasangan Pondasi Camp. 1 : 3 M 3
109.44 1,776,642.00 194,435,700.48
3 Pekerjaan Sloof 15/20 M 3
11.52 8,260,888.00 95,165,429.76
4 Pekerjaan Kolom 30/30 M3 18.58 8,190,563.00 152,147,898.29
5 Pekerjaan balok tengah 10/20 M' 110,793.89 0.00
6 Pekerjaan Ringbalk 15/20 M' 11.52 8,260,888.00 95,165,429.76
7 Pas. Batu Tela Camp. 1 : 3 M2 393.80 226,720.00 89,282,336.00
8 Pekerjaan Plesteran dinding Camp. 1 : 3 M 2
787.60 80,167.00 63,139,529.20
9 Pek. Plesteran Penebalan Kolom Camp. 1 : 3 (sisi depan ) M2 61.44 80,167.00 4,925,460.48
10 Pekerjaan Les profilan dinding L = 5 cm M' 264.00 23,402.00 6,178,128.00
11 Pekerjaan Acian dinding M2 849.04 21,627.00 18,362,188.08
Sub Total 769,623,363.41
IV PEKERJAAN PENGECATAN
1 Pengecatan Dinding M2 849.04 23,705.00 20,126,493.20
Sub Total 20,126,493.20
V PEKERJAAN AKHIR
1 Pembersihan Sisa Proyek Ls 1.00 1,000,000.00 1,000,000.00
Sub Total 1,000,000.00
REKAPITULASI
E. PANGKALAN OJEK
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6 = (4 x 5)
I PEKERJAAN PERSIAPAN
1 Pas. Bouwplank M' 84,787.00 0.00
2 Dokumentasi Proyek Ls 250,000.00 0.00
Sub Total 0.00
II PEKERJAAN TANAH DAN PASIR
1 Pekerjaan Galian Pondasi M3 0.69 41,126.00 28,294.69
2 Urugan Tanah Bawah Lantai M 3
3.30 388,617.00 1,282,436.10
3 Urugan Pasir Bawah Lantai M3 1.38 393,417.00 540,948.38
Sub Total 1,851,679.16
III PEKERJAAN STRUKTUR DAN PASANGAN BATU
1 Pekerjaan Beton Cyclope camp. 1 : 3 : 5 M3 1.60 1,647,224.00 2,635,558.40
2 Pekerjaan kolom kayu kls. I M' 0.36 6,907,356.00 2,472,833.45
3 Pekerjaan plat duduk beton tebal 10 cm M3 0.39 7,619,099.00 2,971,448.61
4 Cor lantai tanpa tulangan camp. 1 : 3 : 5 tebal 7 cm M3 1.93 1,903,122.00 3,663,509.85
5 Pas. Batu Tela Kaki Meja dan Tempat Duduk Camp. 1 : 3 M2 2.25 226,720.00 510,120.00
6 Pekerjaan Plesteran dinding Camp. 1 : 3 M2 4.50 80,167.00 360,751.50
7 Pekerjaan Acian Dinding M2 4.50 21,627.00 97,321.50
8 Pas. Rolag Batu Tela Penahan Tanah Bawah Lantai Camp. 1 : 3 M 2
8.70 453,440.00 3,944,928.00
9 Pekerjaan Plesteran Dinding Rolag Camp. 1 : 3 M2 4.35 80,167.00 348,726.45
10 Pekerjaan Acian Dinding Rolag Lantai M2 4.35 21,627.00 94,077.45
Sub Total 17,099,275.21
IV PEKERJAAN KAYU DAN ATAP
1 Pekerjaan Kuda-Kuda Kayu Besi 5/10 M3 0.21 6,870,976.00 1,444,279.16
2 Pekerjaan Gording Kayu Kls II 5/10 M3 0.50 5,293,853.00 2,668,101.91
3 Pekerjaan Lesplank Papan Kayu Besi M2 8.00 172,442.97 1,379,543.77
4 Pekerjaan Pasang Atap BJLS 30 M2 60.48 101,330.00 6,128,438.40
5 Pas. Nok Seng Plat BJLS 30 M2 2.24 56,356.00 126,237.44
Sub Total 11,746,600.68
V PEKERJAAN LANTAI DAN KERAMIK
1 Screed Lantai M2 27.50 135,188.00 3,717,670.00
2 Acian Lantai M2 27.50 21,627.00 594,742.50
Sub Total 4,312,412.50
VIII PEKERJAAN PENGECATAN
1 Pengecatan Rangka Kayu M2 64.33 60,826.00 3,913,058.23
### Pengecatan Lesplank M2 8.00 60,826.00 486,608.00
Sub Total 4,399,666.23
IX PEKERJAAN INSTALASI LISTRIK
1 Pas. Sekring Khas 2 Group Titik 1.00 123,530.00 123,530.00
2 Pas. Lampu TL 40 Watt Titik 1.00 763,228.00 763,228.00
Sub Total 886,758.00
XI PEKERJAAN AKHIR
1 Pembersihan Sisa Proyek Ls 1.00 300,000.00 300,000.00
Sub Total 300,000.00
REKAPITULASI
A BANGUNAN UTAMA
I PEKERJAAN PERSIAPAN 0.00
II PEKERJAAN TANAH DAN PASIR 1,851,679.16
III PEKERJAAN STRUKTUR DAN PASANGAN BATU 17,099,275.21
IV PEKERJAAN KAYU DAN ATAP 11,746,600.68
V PEKERJAAN LANTAI DAN KERAMIK 4,312,412.50
VIII PEKERJAAN PENGECATAN 4,399,666.23
IX PEKERJAAN INSTALASI LISTRIK 886,758.00
XI PEKERJAAN AKHIR 300,000.00
Real Cost 40,596,391.78
2 Unit 81,192,783.56
PPN 10 % 8,119,278.36
Total Cost 89,312,061.91
Dibulatkan 89,312,000.00
ENGGINEER ESTIMATE
( EE )
PROGRAM : -
PEKERJAAN : PERENCANAAN TEKNIS PEMBANGUNAN PASAR NOSAO
LOKASI : DISTRIK DEMBA-KABUPATEN WAROPEN
T/A : 2015
6. POS SECURITY
I PEKERJAAN PENDAHULUAN
Pas. Bouwplank 30.00 m' 84,787.00 2,543,610.00
Sub Total 2,543,610.00
II PEKERJAAN TANAH DAN PASIR
Pekerjaan Galian Pondasi 14.00 m3 41,126.00 575,764.00
Urugan kembali 1/4 Galian 3.50 m3 19,706.00 68,971.00
Urugan Pasir Bawah Pondasi 0.70 m3 393,417.00 275,391.90
Urugan Tanah Bawah Lantai 5.20 m3 388,617.00 2,020,808.40
Urugan Pasir Bawah Lantai 1.30 m3 393,417.00 511,442.10
Sub Total 3,452,377.40
III PEKERJAAN PASANGAN, BATU DAN BETON
Pas. Batu Kosongan 2.10 m3 1,102,892.00 2,316,073.20
Pasangan Pondasi Camp. 1 : 3 4.99 m3 1,776,642.00 8,861,001.98
Pekerjaan Sloof 15/20 0.53 m3 8,260,888.00 4,336,966.20
Pekerjaan kolom 20/20 0.45 m3 9,491,202.00 4,228,330.49
Pekerjaan ringbalk 10/20 17.50 m3 110,793.89 1,938,893.08
Pekerjaan dinding batu tela camp. 1 : 3 37.50 m2 226,720.00 8,502,000.00
Pekerjaan plesteran camp. 1 : 3 75.00 m2 80,167.00 6,012,525.00
Pekerjaan kolom praktis 10/10 1.00 m' 147,297.04 147,297.04
Cor balok 10/20 6.50 m' 110,793.89 720,160.29
Pekerjaan acian dinding 75.00 m2 21,627.00 1,622,025.00
Pasangan Rolag batu tela camp. 1 : 3 6.30 m3 226,720.00 1,428,336.00
Pekerjaan Saluran Air Hujan 26.00 m' 0.00
Sub Total 40,113,608.27
IV PEKERJAAN ATAP DAN PLAFOND
Pekerjaan Kuda-Kuda Kayu Besi 5/10 1.10 m3 6,870,976.00 7,558,073.60
Pekerjaan Gording Kayu Kls II 5/10 0.98 m3 5,677,476.00 5,563,926.48
Pekerjaan Lesplank Papan Kayu Besi 6.40 m2 62,607.00 400,684.80
Pasang Atap Seng BJLS 30 60.20 m2 101,330.00 6,100,066.00
Pasang Nok seng plat BJLS 30 8.13 m2 56,356.00 458,061.57
Pekerjaan Plafond 3 mm+ Rangka ky. Kls. II 16.00 m2 178,927.00 2,862,832.00
Sub Total 22,943,644.45
V PEKERJAAN LANTAI
Cor lantai kerja dan Lantai Rabat 1.82 m3 1,903,122.00 3,463,682.04
Screed lantai 26.00 m2 135,188.00 3,514,888.00
Acian lantai 26.00 m2 21,627.00 562,302.00
Sub Total 7,540,872.04
ENGGINEER ESTIMATE
( EE )
PROGRAM : -
PEKERJAAN : PERENCANAAN TEKNIS PEMBANGUNAN PASAR NOSAO
LOKASI : DISTRIK DEMBA-KABUPATEN WAROPEN
T/A : 2015
6. POS SECURITY
6. POS SECURITY
PPN 10 % 8,614,730.53
Total Cost 94,762,035.80
Dibulatkan 94,762,000.00
ENGGINER ESTIMATE
( EE )
PROGRAM : -
PEKERJAAN : PERENCANAAN TEKNIS PEMBANGUNAN PASAR NOSAO
LOKASI : DISTRIK DEMBA-KABUPATEN WAROPEN
T/A : 2015
F. LANDSCAPING
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME
( Rp ) ( Rp )
A. PEKERJAAN PERSIAPAN
1 Pembuatan Papan Nama Proyek 1.00 bh 0.00
3 Pembersihan Lokasi Proyek 1.00 Ls 30,000,000.00 30,000,000.00
5 Dokumentasi Proyek 0.00
Sub Total 30,000,000.00
B. PEKERJAAN PENATAAN HALAMAN
1 Urugan Tanah Peninggian Halaman 2,000.00 m3 388,617.00 777,234,000.00
2 Pas. Paving Blok 3,986.00 m2 265,036.00 1,056,433,496.00
3 Cor Kerb Camp. 1 : 3 : 5 23.71 m3 1,903,122.00 45,114,458.57
4 Urugan Pasir Bawah Lantai Cor 89.58 m3 393,417.00 35,240,327.78
5 Cor Lantai Sisi Dalam Area Pasar Camp. 1 : 3 : 5 1,324.00 m2 210,182.00 278,280,968.00
6 Pas. Saluran Air hujan Camp. 1 : 3 396.00 m' 200,552.90 79,418,948.40
Sub Total 2,271,722,198.75
REKAPITULASI
TERBILANG :
………………………………………….. …………………………………..
NIP. …………………………….. Ka. Perwakilan
MENGETAHUI :
KEPALA DINAS PEKERJAAN UMUM DAN PERUMAHAN
KABUPATEN WAROPEN
PEKERJAAN BETON
SNI 1.0000 m3 Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr
6.13 336.0000 kg PC @ Rp. 2,856.25 959,700.00
0.5400 m 3
Pasir beton @ Rp. 766,000.00 413,640.00
0.8100 m3 Kerikil beton @ Rp. 787,000.00 637,470.00
0.2750 org Tukang batu @ Rp. 137,088.00 37,699.20
0.0275 org Kepala tukang batu @ Rp. 154,224.00 4,241.16
1.6500 org Pekerja @ Rp. 85,680.00 141,372.00
0.0825 org Mandor @ Rp. 171,360.00 14,137.20
JUMLAH 197,449.56 2,010,810.00 2,208,259.56
DIBULATKAN 197,449.00 2,010,810.00 2,208,259.00
1.0000 m2 Membuat lantai beton tanpa tulangan, 1 Pc : 3 Ps : 6 Kr tebal 7 cm dan finishing plester
18.2000 kg PC @ Rp. 2,856.25 51,983.75
0.0440 m3 Pasir pasang @ Rp. 333,200.00 14,660.80
0.0700 m 3
Kerikil beton @ Rp. 787,000.00 55,090.00
0.1350 org Tukang batu @ Rp. 137,088.00 18,506.88
0.0135 org Kepala tukang batu @ Rp. 154,224.00 2,082.02
0.7200 org Pekerja @ Rp. 85,680.00 61,689.60
0.0360 org Mandor @ Rp. 171,360.00 6,168.96
JUMLAH 88,447.46 121,734.55 210,182.01
DIBULATKAN 88,447.00 121,734.00 210,182.00
1.0000 m3 Ring Balok Beton Bertulang K200 uk. 15x30 cm pembesian 145 kg
1.0000 m3 Beton K200 @ Rp. 2,203,810.00 2,203,810.00
145.0000 kg Besi Beton @ Rp. 27,865.00 4,040,425.00
13.3300 m2 Papan Bekisting @ Rp. 234,569.00 3,126,804.77
JUMLAH 9,371,039.77
DIBULATKAN 9,371,039.00
PEKERJAAN PERSIAPAN
SNI 1.0000 m1 Pengukuran dan pemasangan bouwplank untuk gedung dan saluran
6.4 0.0120 m3 Kayu kls. II @ Rp. 3,135,000.00 37,620.00
03-2835-2002 0.0200 kg Paku reng @ Rp. 27,325.00 546.50
0.0070 m3 Papan kayu kls. II @ Rp. 3,135,000.00 21,945.00
0.1000 org Tukang kayu @ Rp. 137,088.00 13,708.80
0.0100 org Kepala tukang kayu @ Rp. 154,224.00 1,542.24
0.1000 org Pekerja @ Rp. 85,680.00 8,568.00
0.0050 org Mandor @ Rp. 171,360.00 856.80
JUMLAH 24,675.84 60,111.50
DIBULATKAN 24,675.00 60,111.00
SNI 1.0000 m1 Pembuatan pagar sementara dari seng gelombang tinggi 2 meter
6.2 1.2500 btg Dolken kayu Ø 8 - 10/400 cm @ Rp. 59,218.75 74,023.44
03-2835-2002 2.5000 kg PC @ Rp. 2,856.25 7,140.63
1.2000 lbr Seng gelombang 2"-5" BJLS 24 @ Rp. 84,450.00 101,340.00
0.0050 m3 Pasir beton @ Rp. 1,012,500.00 5,062.50
0.0090 m3 Kerikil beton @ Rp. 787,000.00 7,083.00
0.0250 m3
Kaso 5/7 kayu meranti @ Rp. 3,135,000.00 78,375.00
0.0600 kg Paku biasa 2" - 5" @ Rp. 27,325.00 1,639.50
0.4000 kg Meni besi @ Rp. 49,650.00 19,860.00
0.2000 org Tukang kayu @ Rp. 137,088.00 27,417.60
0.0200 org Kepala tukang kayu @ Rp. 154,224.00 3,084.48
0.4000 org Pekerja @ Rp. 85,680.00 34,272.00
0.0200 org Mandor @ Rp. 171,360.00 3,427.20
JUMLAH 68,201.28 294,524.06
DIBULATKAN 68,201.00 294,524.00
PEKERJAAN TANAH
SNI 1.0000 m3 Galian tanah biasa sedalam sampai 1 meter
6.1 0.4000 org Pekerja @ Rp. 85,680.00 34,272.00
0.0400 org Mandor @ Rp. 171,360.00 6,854.40
JUMLAH 41,126.40
DIBULATKAN 41,126.00
84,787.34
84,787.00
17,136.00
17,136.00
1,095,353.34
1,095,353.00
483,156.63
483,156.00
Jumlah
(5)
1,965,041.38
1,965,041.00
362,725.34
362,725.00
41,126.40
41,126.00
54,081.22
54,081.00
75,569.76
75,569.00
64,174.32
64,174.00
Jumlah
(5)
128,520.00
128,520.00
84,737.52
84,737.00
29,988.00
29,988.00
52,778.88
52,778.00
23,133.60
23,133.00
19,706.40
19,706.00
23,133.60
23,133.00
393,417.60
393,417.00
388,617.60
388,617.00
Jumlah
(5)
391,704.00
391,704.00
ANALISA SATUAN PEKERJAAN BATU DAN PASANGAN
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
PEKERJAAN PASANGAN
10.0000 m' Selokan pas. Batu tela camp. 1 : 3 uk. 25x25 cm diplester camp. 1 : 3
111.0000 Bh Batu tela @ Rp. 5,800.00 643,800.00
0.2100 m3
Pasir @ Rp. 333,200.00 69,972.00
44.8000 kg Semen PC @ Rp. 2,856.25 127,960.00
8.5000 m2 Plesteran @ Rp. 80,167.00 681,419.50
1.1250 org Tukang batu @ Rp. 137,088.00 154,224.00
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
0.1900 org Kep. Tk. Batu @ Rp. 154,224.00 29,302.56
3.1500 org Pekerja @ Rp. 85,680.00 269,892.00
0.1690 org Mandor @ Rp. 171,360.00 28,959.84
JUMLAH 482,378.40 1,523,151.50 2,005,529.90
DIBULATKAN 482,378.00 1,523,151.00 2,005,529.00
1.0000 m' Selokan pas. Batu tela camp. 1 : 3 uk. 25x25 cm diplester camp. 1 : 3 200,552.90
ANALISA SATUAN PEKERJAAN SANITAIR
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
PEKERJAAN SANITASI
SNI 1.0000 bh Memasang kloset duduk/monoblock
1.0000 bh Kloset duduk / monoblock @ Rp. 1,455,300.00 1,455,300.00
6.1 6% x Harga kloset (Perlengkapan) @ Rp. 1,455,300.00 87,318.00
1.1000 org Tukang batu @ Rp. 137,088.00 150,796.80
0.0010 org Kepala tukang batu @ Rp. 154,224.00 154.22
3.3000 org Pekerja @ Rp. 85,680.00 282,744.00
0.1600 org Mandor @ Rp. 171,360.00 27,417.60
JUMLAH 461,112.62 1,542,618.00 2,003,730.62
DIBULATKAN 461,112.00 1,542,618.00 2,003,730.00
Analisa Gedung - 40
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
1.2000 m1 Pipa PVC @ Rp. 13,387.00 16,064.40
6.25 35% x Harga pipa (Perlengkapan) @ Rp. 13,387.00 4,685.45
0.0600 org Tukang batu @ Rp. 137,088.00 8,225.28
0.0060 org Kepala tukang batu @ Rp. 154,224.00 925.34
0.0360 org Pekerja @ Rp. 85,680.00 3,084.48
0.0018 org Mandor @ Rp. 171,360.00 308.45
JUMLAH 12,543.55 20,749.85 33,293.40
DIBULATKAN 12,543.00 20,749.00 33,293.00
Analisa Gedung - 41
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
0.0018 org Mandor @ Rp. 171,360.00 308.45
JUMLAH 12,543.55 103,230.00 115,773.55
DIBULATKAN 12,543.00 103,230.00 115,773.00
Analisa Gedung - 43
ANALISA SATUAN PEKERJAAN PENGECATAN
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
PEKERJAAN CAT-CATAN
SNI 1.0000 m2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup
6.8 0.2000 kg Cat meni @ Rp. 41,334.00 8,266.80
0.1500 kg Plamir @ Rp. 41,334.00 6,200.10
0.1700 kg Cat dasar @ Rp. 62,025.00 10,544.25
0.2600 kg Cat penutup @ Rp. 62,025.00 16,126.50
0.0900 org Tukang cat @ Rp. 137,088.00 12,337.92
0.0060 org Kepala tukang cat @ Rp. 154,224.00 925.34
0.0700 org Pekerja @ Rp. 85,680.00 5,997.60
0.0025 org Mandor @ Rp. 171,360.00 428.40
JUMLAH 19,689.26 41,137.65 60,826.91
DIBULATKAN 19,689.00 41,137.00 60,826.00
SNI 1.0000 m2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 3 lapis cat penutup
6.9 0.2000 kg Cat meni @ Rp. 41,334.00 8,266.80
0.1500 kg Plamir @ Rp. 41,334.00 6,200.10
0.1700 kg Cat dasar @ Rp. 62,025.00 10,544.25
0.3500 kg Cat penutup @ Rp. 62,025.00 21,708.75
0.1050 org Tukang cat @ Rp. 137,088.00 14,394.24
0.0040 org Kepala tukang cat @ Rp. 154,224.00 616.90
0.0700 org Pekerja @ Rp. 85,680.00 5,997.60
0.0025 org Mandor @ Rp. 171,360.00 428.40
JUMLAH 21,437.14 46,719.90 68,157.04
DIBULATKAN 21,437.00 46,719.00 68,157.00
SNI 1.0000 m2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
6.14 0.1000 kg Plamir tembok @ Rp. 40,355.00 4,035.50
0.1000 kg Cat dasar @ Rp. 22,000.00 2,200.00
0.2600 kg Cat penutup 2 x @ Rp. 22,000.00 5,720.00
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
0.0630 org Tukang cat @ Rp. 137,088.00 8,636.54
0.0063 org Kepala tukang cat @ Rp. 154,224.00 971.61
0.0200 org Pekerja @ Rp. 85,680.00 1,713.60
0.0025 org Mandor @ Rp. 171,360.00 428.40
JUMLAH 11,750.16 11,955.50 23,705.66
DIBULATKAN 11,750.00 11,955.00 23,705.00
SNI 1.0000 m2 Pengecatan tembok tidak terlindung dari panas dan hujan
6.14 0.1000 kg Cat alkali resisting primer @ Rp. 41,205.00 4,120.50
0.3600 kg Cat ICI Weathershield @ Rp. 82,410.00 29,667.60
0.0630 org Tukang cat @ Rp. 137,088.00 8,636.54
0.0063 org Kepala tukang cat @ Rp. 154,224.00 971.61
0.0200 org Pekerja @ Rp. 85,680.00 1,713.60
0.0025 org Mandor @ Rp. 171,360.00 428.40
JUMLAH 11,750.16 33,788.10 45,538.26
DIBULATKAN 11,750.00 33,788.00 45,538.00
ANALISA SATUAN PEKERJAAN KAYU
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
1.000 m2 Pasang pintu teakwood rangkap lapis seng plat BJLS 30, rangka kayu kelas II
0.020 m3 Papan kayu kls. II @ Rp. 3,135,000.00 61,446.00
0.030 kg Paku biasa 1/2" - 1" @ Rp. 27,325.00 819.75
0.300 kg Lem kayu @ Rp. 125,000.00 37,500.00
1.000 lbr Teakwood 4' x 8' x 4 mm @ Rp. 129,954.00 129,954.00
1.000 lbr Seng Plat BJLS 30 @ Rp. 100,200.00 100,200.00
2.000 OH Tukang kayu @ Rp. 137,088.00 274,176.00
0.200 OH Kepala tukang kayu @ Rp. 154,224.00 30,844.80
0.600 OH Pekerja @ Rp. 85,680.00 51,408.00
0.030 OH Mandor @ Rp. 171,360.00 5,140.80
JUMLAH 361,569.60 329,919.75 691,489.35
DIBULATKAN 361,569.00 329,919.00 691,489.00
PEKERJAAN PLAFOND
SNI 1.000 m2 Pasang rangka langit-langit (1,00 x 1,00) m, kayu lama
03-3434-2002 0.100 kg Paku biasa 2" - 5" @ Rp. 8,000.00 800.00
0.250 OH Tukang kayu @ Rp. 30,000.00 7,500.00
0.025 OH Kepala tukang kayu @ Rp. 32,500.00 812.50
0.150 OH Pekerja @ Rp. 20,000.00 3,000.00
0.008 OH Mandor @ Rp. 32,500.00 243.75
JUMLAH ( BELUM PPN ) 11,556.25 800.00 12,356.25
JASA 10 % 1,155.63 80.00 1,235.63
JUMLAH 12,711.88 880.00 13,591.88
DIBULATKAN 12,711.00 880.00 13,591.00
PEKERJAAN LISPLANK
SNI 1.000 m1 Pasang lisplank ukuran 2 x (2 x 20) cm, kayu kelas I
0.009 m3 Kayu kls. I papan @ Rp. 4,220,000.00 36,292.00
03-3434-2002 0.060 kg Paku biasa 2" - 5" @ Rp. 27,325.00 1,639.50
0.100 OH Tukang kayu @ Rp. 137,088.00 13,708.80
0.010 OH Kepala tukang kayu @ Rp. 154,224.00 1,542.24
0.100 OH Pekerja @ Rp. 85,680.00 8,568.00
0.005 OH Mandor @ Rp. 171,360.00 856.80
JUMLAH ( BELUM PPN ) 24,675.84 37,931.50 62,607.34
DIBULATKAN 24,675.00 37,931.00 62,607.00
PEKERJAAN TALANG
SNI 1.000 m1 Pasang talang datar, seng BJLS 30, papan kayu kelas II
6.18 0.500 lbr Seng plat 3' x 6' BJLS 30 @ Rp. 100,200.00 50,100.00
0.015 kg Paku biasa 1/2" - 1" @ Rp. 27,325.00 409.88
0.010 m3 Kayu kls. II papan @ Rp. 3,135,000.00 30,096.00
0.400 OH Tukang kayu @ Rp. 137,088.00 54,835.20
0.025 OH Kepala tukang kayu @ Rp. 154,224.00 3,855.60
0.150 OH Pekerja @ Rp. 85,680.00 12,852.00
0.001 OH Mandor @ Rp. 171,360.00 214.20
JUMLAH ( BELUM PPN ) 71,757.00 80,605.88 152,362.88
DIBULATKAN 71,757.00 80,605.00 152,362.00
SNI 1.000 m1 Pasang talang miring, seng BJLS 28, papan kayu kamper
6.19 0.500 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00 22,000.00
0.015 kg Paku biasa 1/2" - 1" @ Rp. 8,000.00 120.00
0.019 m 3
Kayu kamper papan @ Rp. 5,500,000.00 104,500.00
0.250 kg Flincoat @ Rp. 35,000.00 8,750.00
0.400 OH Tukang kayu @ Rp. 30,000.00 12,000.00
0.025 OH Kepala tukang kayu @ Rp. 32,500.00 812.50
0.040 OH Pekerja @ Rp. 20,000.00 800.00
0.001 OH Mandor @ Rp. 32,500.00 40.63
JUMLAH ( BELUM PPN ) 13,653.13 135,370.00 149,023.13
JASA 10 % 1,365.31 13,537.00 14,902.31
JUMLAH 15,018.44 148,907.00 163,925.44
DIBULATKAN 15,018.00 148,907.00 163,925.00
SNI 1.000 m2 Pasang dinding pemisah teakwood rangkap, rangka kayu kamper
03-3434-2002 0.020 m3 Kayu kamper balok @ Rp. 4,750,000.00 92,625.00
6.56 0.007 m3 Kayu kamper papan @ Rp. 5,500,000.00 38,500.00
0.100 kg Paku biasa 2" - 5" @ Rp. 8,000.00 800.00
0.560 kg Lem kayu @ Rp. 11,000.00 6,160.00
1.000 lbr Teakwood 4' x 8' x 4 mm @ Rp. 69,500.00
0.450 OH Tukang kayu @ Rp. 30,000.00 13,500.00
0.045 OH Kepala tukang kayu @ Rp. 32,500.00 1,462.50
0.150 OH Pekerja @ Rp. 20,000.00 3,000.00
0.075 OH Mandor @ Rp. 32,500.00 2,437.50
JUMLAH ( BELUM PPN ) 20,400.00 138,085.00 158,485.00
JASA 10 % 2,040.00 13,808.50 15,848.50
JUMLAH 22,440.00 151,893.50 174,333.50
DIBULATKAN 22,440.00 151,893.00 174,333.00
PEKERJAAN ATAP
1.000 m2 Pasang genteng lama
0.100 OH Tukang batu @ Rp. 27,500.00 2,750.00
0.010 OH Kep. Tk. Batu @ Rp. 30,000.00 300.00
0.200 OH Pekerja @ Rp. 20,000.00 4,000.00
0.010 OH Mandor @ Rp. 32,500.00 325.00
JUMLAH ( BELUM PPN ) 7,375.00 0.00 7,375.00
JASA 10 % 737.50 0.00 737.50
JUMLAH 8,112.50 0.00 8,112.50
DIBULATKAN 8,112.00 0.00 8,112.00
H.2A 1.000 m2 Pas. genteng beton besar Natural ( isi 9 / m2 ) untuk r. tingkat
9.000 bh Genteng beton natural @ Rp. 2,750.00 24,750.00
0.100 OH Tukang batu @ Rp. 27,500.00 2,750.00
0.010 OH Kep. Tk. Batu @ Rp. 30,000.00 300.00
0.300 OH Pekerja @ Rp. 20,000.00 6,000.00
0.015 OH Mandor @ Rp. 32,500.00 487.50
JUMLAH ( BELUM PPN ) 9,537.50 24,750.00 34,287.50
JASA 10 % 953.75 2,475.00 3,428.75
JUMLAH 10,491.25 27,225.00 37,716.25
DIBULATKAN 10,491.00 27,225.00 37,716.00
H.2A 1.000 m2 Pas. genteng beton besar Warna ( isi 9 / m2 ) untuk r. tingkat
9.000 bh Genteng beton Warna @ Rp. 4,420.00 39,780.00
0.100 OH Tukang batu @ Rp. 27,500.00 2,750.00
0.010 OH Kep. Tk. Batu @ Rp. 30,000.00 300.00
0.300 OH Pekerja @ Rp. 20,000.00 6,000.00
0.015 OH Mandor @ Rp. 32,500.00 487.50
JUMLAH ( BELUM PPN ) 9,537.50 39,780.00 49,317.50
JASA 10 % 953.75 3,978.00 4,931.75
JUMLAH 10,491.25 43,758.00 54,249.25
DIBULATKAN 10,491.00 43,758.00 54,249.00
SNI 1.000 m2 Pasang atap genteng metal zinc alume type prima roof
03-3436-2002 1.020 m2 Genteng metal @ Rp. 95,400.00 97,308.00
6.32 0.200 kg Paku anti karat @ Rp. 20,000.00 4,000.00
0.100 OH Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 OH Kepala tukang kayu @ Rp. 32,500.00 325.00
0.200 OH Pekerja @ Rp. 20,000.00 4,000.00
0.001 OH Mandor @ Rp. 32,500.00 32.50
JUMLAH ( BELUM PPN ) 7,357.50 101,308.00 108,665.50
JASA 10 % 735.75 10,130.80 10,866.55
JUMLAH 8,093.25 111,438.80 119,532.05
DIBULATKAN 8,093.00 111,438.00 119,532.00
123,530.40
123,530.00
683,028.00
683,028.00
721,153.00
721,153.00
763,228.00
763,228.00
389,547.04
(5)
389,547.00
387,110.04
387,110.00
390,235.04
390,235.00
DINAS PEKERJAAN UMUM ANALISA HARGA SATUAN KODE
SUB DINAS BINA MARGA MEMBUAT PARIT K110
KABUPATEN WAROPEN (MENGGUNAKAN BURUH)
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH ; TANGGAL :
PAPUA WAROPEN ( 10 ) CV. MADYA Consultant MEI. 2007
PROSES : ANGGAPAN :
1. Gali parit dengan tenaga manusia 1. Menggunakan tenaga manusia ( 100 m/hari)
2. Membuang sisa galian menggunaka 2. Dimensi parit : lebar bawah : 0,5 m
truk bak terbuka lebar atas : 1.3 m
kedalaman : 0,6 m ( vol: 0,54 m3 )
3. 25 % hasil galian dibuang setempat
4. Sisa galian dibuang sejauh 2 km
5. Menggali dan membuang dihitung 1, 5 m3/org-hari
6. umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat
PEKERJA 3,769,920
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)
MATERIAL 475,200
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
PEKERJA 3,512,880
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)
MATERIAL 43,610,360
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
P Truk bak terbuka 3,5 t/115 HP 1 1 E221 6.00 280,001 1,680,008
E
R
A
L
A
T
A
N
PERALATAN 1,680,008
TOTAL 48,803,249
PEKERJA 4,284,000.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit) (Rp.) (Rp.)
MATERIAL 633,600.00
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
P
E
R
A
L
A
T
A
N
PERALATAN 0.00
TOTAL 4,917,600.00
PEKERJA 2,741,760.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)
MATERIAL 396,000.00
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
P
E
R
A
L
A
T
A
N
N PERALATAN 0.00
TOTAL 3,137,760.00
PEKERJA 1,388,016.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)
MATERIAL 43,972,800.00
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
PEKERJA 1,645,056.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)
MATERIAL 106,678,248.44
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
MATERIAL 84,935,286.05
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
PEKERJA 8,396,640.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)
MATERIAL 138,345,000.00
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
P
E Mesin gilas 3RD 6-8 ton 1 1 E080 13.00 102,969.45 1,338,602.81
R
A
L
A
T
A
N
PERALATAN 1,338,602.81
TOTAL 148,080,242.81
|::
DINAS PEKERJAAN UMUM ANALISA HARGA SATUAN KODE
SUB DINAS BINA MARGA LAPIS PONDASI ATAS MENGGUNAKAN KARANG DARI SERUI K522
KABUPATEN PANGKEP (MENGGUNAKAN ALAT)
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH ; TANGGAL :
SUL-SEL PANGKEP CV. MADYA Consultant
PROSES : ANGGAPAN :
1. Kerikil tersaring ditimbun disepanjang 1. Menggunakan alat berat (150 m3/hari)
jalan oleh pemasok 2. Material ditimbun disepanjang jalan oleh pemasok
2. Grader menghampar agregat 3. Dikirim kerikil galian/sungai tersaring yang murah
3. Jalan disiram air dengan truk air 4. Dihampar dan dipadatkan sampai tebal padat 10 cm
4. Pemadatan dengan mesin gilas 6-8 ton 5. Dihampar dan dipadatkan 1000 m2/hari; koefisien pemadatan = 1,25
6. Gradasi Macadam 75 mm dan agregat halus semua harus melalui saringan 9,5 mm
sesuai rev. spek umum B.M 1989-Buku 3
PEKERJA 1,559,376.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)
MATERIAL 156,412,700.00
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
PEKERJA 21,231,504.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOLUME SATUAN Rp. (Rp.) (Rp.)
MATERIAL 234,180,340.72
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
|::
DINAS PEKERJAAN UMUM ANALISA HARGA SATUAN KODE
SUB DINAS BINA MARGA PENGHAMPARAN LAPIS PERMUKAAN ASPAL BETON LASTON (4 cm) K 6 4 1
KABUPATEN PANGKEP (MENGGUNAKAN ALAT)
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH ; TANGGAL :
SUL-SEL ( 73 ) PANGKEP ( 10 ) CV. MADYA Consultant
PROSES ANGGAPAN :
PEKERJA 4,026,960
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)
MATERIAL 136,487,904
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
Pengisian
1. material sampai kebin spreader 1. Menggunakan alat berat 1500m2/hari
oleh pemasok 2. Hot Rolled Sheet (LATASTON) dikirim kelokasi pakerjaan oleh pemasok dari AMP
Material
2. dihampar dgn mesin spreader, 3. Tebal padat rata-rata 3 cm
dipadatkan dengan mesin gilas roda 4. BJ LATASTON padat 2,2 ton/m3
baja dan mesin gilas pneumatic 5. Sesuai Spek.B.M.No. 12/PT/B/1983 (tabel 3,3) rev.spek. Umum B.M.
roda karet
Hamparkan
3 lapis tack/pangikat aspal
cutback @ 0,5 m/m2
PEKERJA 3,255,840
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)
MATERIAL 175,591,674
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
PEKERJA 1,610,784.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)
MATERIAL 1,431,100.00
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
P
E
R
A
L
A
T
A
N
PERALATAN
TOTAL 3,041,884.00
VOLUME : 20.00 SATUAN : m2 HARGA SATUAN Rp. 152,094.20 Per M2
PEKERJA 685,440.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)
MATERIAL 5,529,600.00
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
P
E
R
A
L
A
T
A
N
PERALATAN
TOTAL 6,215,040.00
PEKERJA 7,865,424.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)
MATERIAL 49,790,908.01
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
PEKERJA 1,730,736.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)
MATERIAL 5,417,393.75
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
PEKERJA 2,638,944.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOLUME SATUAN Rp. (Rp.) (Rp.)
MATERIAL 79,200.00
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
PEKERJA 6,408,864.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)
MATERIAL 109,905,600.00
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
Bulldozer 2 1 E001 9.00 438,927.80 3,950,350.20
P Wheel Loader 115HP 1 1 E052 6.00 345,141.14 2,070,846.85
E Dump Truk 5 ton/145HP 18 1 E212 108.00 348,171.40 37,602,511.61
R
A
L
A
T
A
N
PERALATAN 43,623,708.66
TOTAL 159,938,172.66
PEKERJA 2,673,216.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)
MATERIAL 24,479,200.00
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
Bulldozer 110 HP 1 1 E001 2.00 438,927.80 877,855.60
P Mesin Penyaring 80 HP 1 1 E040 6 176,142.74 1,056,856.46
E Wheel Loader 115HP 1 1 E052 5.00 345,141.14 1,725,705.71
R Dump Truk 5 ton/145HP 4 1 E212 24.00 348,171.40 8,356,113.69
A
L
A
T
A
N
PERALATAN 12,016,531.46
TOTAL 39,168,947.46
PEKERJA 3,272,976.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)
MATERIAL 63,026,000.00
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
PEKERJA 2,947,392
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)
MATERIAL 145,405,970
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
VOLUME : 100.0 SATUAN : ton HARGA SATUAN Rp. 1,642,435.69 Per ton
PEKERJA 6,768,720.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)
MATERIAL 19,092,000.00
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
PEKERJA 2,673,216.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)
###
A + B = Rp. 438,927.80
###
|::
DINAS PU KODE
KAB. WAROPEN ANALISA BIAYA PERALATAN E 010
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA WAROPEN CV. MADYA Consultant MEI. 2007
### 2. Lain-lain :
### Asuransi 3 % thn + PPN 10 % = 0.033 x Harga alat / Jam/Thn
###
### = 0.033 x 404,550,000.00 / 1,500.00 = Rp. 8,900.10
Sub Total = Rp. 58,619.02
A + B = Rp. 300,737.30
###
|::
DINAS PU KODE
KAB. WAROPEN ANALISA BIAYA PERALATAN E 0 20
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA WAROPEN CV. MADYA Consultant MEI. 2007
### 2. Lain-lain :
### Asuransi 3 % thn + PPN 10 % = 0.033 x Harga alat / Jam/Thn
A + B = Rp. 246,541.08
###
|::
DINAS PU KODE
KAB. WAROPEN ANALISA BIAYA PERALATAN E 031
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007
A + B = Rp. 460,494.47
###
|::
DINAS PU KODE
KAB. WAROPEN ANALISA BIAYA PERALATAN E 040
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007
###
|::
DINAS PU KODE
KAB. WAROPEN ANALISA BIAYA PERALATAN E 052
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007
###
###
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A + B = Rp. 345,141.14
###
|::
DINAS PU KODE
KAB. WAROPEN ANALISA BIAYA PERALATAN E 080
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007
###
###
### TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A + B = Rp. 102,969.45
###
|::
DINAS PU KODE
KAB. WAROPEN ANALISA BIAYA PERALATAN E 084
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH T TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007
###
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A + B = Rp. 325,798.47
###
|::
DINAS PU KODE
KAB. WAROPEN ANALISA BIAYA PERALATAN E 087
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007
###
###
###
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A + B = Rp. 70,313.71
###
###
DINAS PU KODE
KAB. WAROPEN ANALISA BIAYA PERALATAN E 088
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH T TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007
A + B = Rp. 11,181.83
###
###
|::
DINAS PU KODE
KAB. WAROPEN ANALISA BIAYA PERALATAN E 089
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH T TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007
###
###
###
### TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
###
###
A + B = Rp. 11,438.66
###
###
DINAS PU KODE
KAB. WAROPEN ANALISA BIAYA PERALATAN E 152
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007
###
###
###
### TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
###
A + B = Rp. 173,874.31
###
###
DINAS PU KODE
KAB. PANGKEP ANALISA BIAYA PERALATAN E 153
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH T TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007
A + B = Rp. 64,468.38
###
DINAS PU KODE
KAB. PANGKEP ANALISA BIAYA PERALATAN E 182
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007
A + B = Rp. 287,059.72
###
DINAS PU KODE
KAB. PANGKEP ANALISA BIAYA PERALATAN E 212
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH T TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007
###
###
### TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A + B = Rp. 348,171.40
###
###
DINAS PU KODE
KAB. PANGKEP ANALISA BIAYA PERALATAN E 221
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007
Jenis Alat : FLAT BAD TRUCK 3:5 T TENAGA = 115 HP
Harga : Rp. 138,600,000.00
Umur Kerja 6 tahun (A) 0.24668
Jam Kerja/Hr 5 Jam FAKTOR ( CRF ) : 0.24668
hari kerja/Thn 300 HK pada 12.50%
1500 Jam/Tahun (W)
###
A + B = Rp. 280,001.40
###
|::
DINAS PU KODE
KAB. PANGKEP ANALISA BIAYA PERALATAN E 251
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007
###
###
### TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
###
A + B = Rp. 14,082.39
###
###
|::
DINAS PU KODE
KAB. PANGKEP ANALISA BIAYA PERALATAN E 253
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007
###
###
###
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A + B = Rp. 52,919.89
###
###
|::
DINAS PU KODE
KAB. PANGKEP ANALISA BIAYA PERALATAN E 301
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007
A + B = Rp. 87,752.21
###
###
|::
DINAS PU KODE
KAB. PANGKEP ANALISA BIAYA PERALATAN E 341
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007
###
###
### TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
###
A + B = Rp. 20,531.80
###
###
|::
DINAS PU KODE
KAB. PANGKEP ANALISA BIAYA PERALATAN E 081
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007
###
###
### TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A + B = Rp. 196,628.07
###
###
|::
DINAS PU KODE
KAB. PANGKEP ANALISA BIAYA PERALATAN E 155
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007
2. Lain-lain :
Asuransi 3 % thn + PPN 10 % = 0.033 x Harga alat / Jam/Thn
A + B = Rp. 1,161,677.63
|::
DINAS PU KODE
KAB. PANGKEP ANALISA BIAYA PERALATAN E 157
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007
2. Lain-lain :
Asuransi 3 % thn + PPN 10 % = 0.033 x Harga alat / Jam/Thn
BACHTIAR HASYM, ST
Ka. Perwakilan
DAFTAR HARGA BAHAN DAN UPAH KERJA
TAHUN ANGGARAN 2007
K. 9
DINAS PEKERJAAN UMUM PROPINSI : SULAWESI SELATAN
SUB DINAS BINA MARGA KABUPATEN : PANGKEP
BACHTIAR HASYM, ST
Ka. Perwakilan
DAFTAR HARGA SATUAN PEKERJAAN
TAHUN ANGGARAN 2003
I. PRODUKSI DAN PENGADAAN BAHAN - BAHAN
1 PENGADAAN KERIKIL SUNGAI (TIDAK DISARING) ALAT m3 K 012 444,272.70
2 PENGADAAN KERIKIL SUNGAI (TIDAK DISARING) BURUH M3 K 013 571,012.70
3 PENGADAAN KERIKIL GALIAN (TERSARING) ALAT M3 K 014 1,303,237.92
4 PENGADAAN KERIKIL SUNGAI TERSARING ALAT M3 K 016 652,815.79
5 PRODUKSI BATU PECAH TERSARING ALAT M3 K 017 1,324,096.17
6 PRODUKSI BATU PECAH TERSARING ALAT M3 K 018 1,222,191.35
7 LAPIS TIPIS ASPAL PASIR (LATASIR) ALAT Ton K 020 1,921,338.36
8 LAPIS TIPIS ASPAL DAN AGREGAT HALUS (LATASAG) BURUH Ton K 024 1,667,408.26
9 ASPAL BETON UNTUK LAPIS PONDASI ATAS (LASTON ATAS) ALAT Ton K 026 1,571,336.22
10 LAPIS TIPIS ASPAL BETON (LATASTON) ALAT Ton K 035 1,666,715.06
11 ASPAL BETON (LASTON) PRODUKSI DAN SUPLAI ALAT Ton K 040 1,642,435.69
12 BATU KARANG DARI SERUI ALAT M3 K 017 862,000.00
13 BATU KARANG LAUT ALAT M3 K 018 515,000.00
II. DRAINASE
12 MEMBUAT PARIT BURUH M3 K 110 140,835.87
13 MEMBUAT PASANGAN BATU PADA PARIT BURUH M K 112 813,387.48
14 KONSTRUKSI PASANGAN BATU BURUH M3 K 705 1,437,838.67
15 KONSTRUKSI PASANGAN BATU BURUH M3 K 115 302,396.77
III. PEMBERSIHAN LAPANGAN DAN PEKERJAAN TANAH
16 PENGUPASAN DAN PEMBERSIHAN SEMAK PADA DAMIJA BURUH m2 K 210 4,098.00
17 PENGUPASAN DAN PEMBERSIHAN SEMAK PADA DAMIJA ALAT m2 K 211 1,196.75
18 GALIAN TANAH UNTUK KONSTRUKSI BURUH M3 K 224 78,444.00
19 PENGURUGAN KEMBALI DAN DIPADATKAN BURUH M3 K 225 890,149.92
20 PENIMBUNAN BADAN JALAN ALAT M3 K 311 416,073.28
21 GALIAN TANAH & PEMBUANGAN ALAT M3 K 321 75,528.02
IV.BAHU JALAN DAN SALURAN TEPI JALAN
22 PEMBENTUKAN BAHU JALAN KERAS BURUH M3 K 410 807,934.83
23 PEMBENTUKAN BAHU JALAN KERAS ALAT M3 K 411 552,650.64
24 PEMBERSIHAN SEMAK DAN LAIN-LAIN PADA BAHU JALAN BURUH m2 K 422 1,762.24
25 MEMBERSIHKAN PARIT BURUH M1 K 424 14,090.27
26 MEMETONG BAHU JALAN TINGGI BURUH M3 K 420 224,057.25
27 MEMOTONG BAHU JALAN TINGGI ALAT M3 K 420 93,301.35
28 CERUCUK KAYU DIRAWA BURUH M K 232 105,947.21
29 PEKERJAAN BRONJONG PENAHAN BURUH M3 K 815 1,456,439.36
V. PEMBUATAN LPB DAN LPA
30 LAPIS PONDASI BAWAH KELAS C SIRTU ALAT M3 K 514 599,656.63
31 LAPIS PONDASI BAWAH KLS A AGREGAT PECAH TERSARING BURUH M3 K 511 1,286,528.48
32 LAPIS PONDASI ATAS MENGGUNAKAN KARANG DARI SERUI ALAT M3 K 522 1,076,172.72
33 LAPIS PONDASI BAWAH (LPB) - TELFORD BURUH M2 K 516 370,200.61
VI. PELAPISAN PERMUKAAN PERKERASAN
34 LABURAN ASPAL PASIR BURAS ALAT M2 K 612 19,382.13
35 LABURAN ASPAL SATU LAPIS ( BURTU 1) BURUH M2 K 615 59,277.05
36 LABURAN ASPAL LAPIS KEDUA ( BURTU 2) ALAT M2 K 616 31,783.70
37 LABURAN ASPAL DUA LAPIS ( BURDA ) ALAT M2 K 617 91,060.74
38 LAPIS PENETRASI MAKADAM (LAPEN) BURUH M2 K 618 188,403.23
39 PENGHAMPARAN LAPIS TIPIS ASPAL PASIR 20 MM (LATASIR) ALAT M2 K 621 82,496.56
40 PENGHAMPARAN LAPIS TIPIS ASPAL PASIR 20 MM (LATASIR) BURUH M2 K 638 82,933.32
41 PENGHAMPARAN LAPIS PERMUKAAN ASPAL BETON LASTON ( 5 cm ) ALAT M2 K 641 199,413.13
PENGHAMPARAN LAPIS PERMUKAAN ASPAL BETON LASTON ( 5 cm ) ALAT M2 K 641 161,543.83
42 PENGHAMPARAN LAPIS TIPIS ASPAL BETON ( 3 cm ) ALAT M2 K 636 122,224.12
VII. BETON STRUKTUR
37 ACUAN UNTUK BETON STRUKTUR BURUH M2 K 710 152,094.20
38 BETON STRUKTUR KLAS K225 ALAT M3 K 725 1,771,054.48
39 MEMOTONG MEMBENGKOK DAN MEMASANG TULANGAN BESI BURUH M3 K 715 31,075.20
40 BETON NON STRUKTUR/RABAT BURUH M3 K 719 1,778,041.81
VIII. PEMELIHARAAN JALAN
41 PERATAAN DAN PEMADATAN JALAN TANAH ALAT KM K 850 3,274,598.76
42 PEMBENTUKAN DAN PERATAAN BAHU JALAN ALAT M3 K 855 475,802.90
43 PERATAAN KEMBALI JALAN KERIKIL ALAT KM K 860 1,476,570.86
44 PERBAIKAN AMBELAS JALAN KERIKIL BURUH M2 K 870 740,125.63
45 PENGKERIKILAN ULANG JALAN KERIKIL PADAT 50 MM ALAT KM K 877 82,609.90
46 PERBAIKAN AMBLES JALAN ASPAL BURUH M2 K 885 743,833.73
47 PERBAIKAN LUBANG JALAN ASPAL BURUH M2 K 880 273,863.18
48 BIAYA PEMELIHARAAN RUTIN TAHUNAN JALAN ASPAL (KRLL I ) BURUH KM K 803 35,149,967.67
49 BIAYA PEMELIHARAAN RUTIN TAHUNAN JALAN ASPAL ( KRLL 2 ) BURUH KM K 884 48,350,696.88
50 BIAYA PEMELIHARAAN RUTIN TAHUNAN JALAN ASPAL (KRLL 3 ) BURUH KM K 885 61,991,462.63
Disusun Oleh :
CV. MADYA Consultant
BACHTIAR HASYM, ST
Ka. Perwakilan
3
DAFTAR HARGA BAHAN BANGUNAN DAN UPAH KABUPATEN WAROPEN
1687
1.25 A. DAFTAR HARGA UPAH ###
UPAH TENAGA
NO. TENAGA KERJA KERJA (Rp. /
HARI)
1 Mandor Rp 171,360.00
2 Mekanik Rp 154,224.00
3 Mekanik Pembantu Rp 137,088.00
4 Kepala Tukang Rp 154,224.00
5 Tukang Rp 137,088.00
6 Operator Terampil Rp 171,360.00
7 Operator Kurang Terampil Rp 154,224.00
8 Pembantu Opearator Rp 137,088.00
9 Sopir Truck Rp 137,088.00
10 Sopir Pribadi Rp 119,952.00
11 Pembantu Sopir Rp 119,952.00
12 Buruh Tak Terampil Rp 85,680.00
13 Buruh Kurang Terampil Rp 94,248.00
14 Buruh Terampil Rp 102,816.00
BAHAN DASAR
1 Batu
Batu Gunung/Karang Laut M3 Rp 770,000.00
Batu Karang dari Serui M3
Rp 895,000.00
Batu Kali dari Botawa M3
Rp 732,000.00
Batu Kali dari Serui M3
Rp 900,000.00
2 Koral/Kerikil
Koral/Kerikil laut sudah diayak dari Waren/Urfas M3 Rp 535,000.00
Koral/Kerikil Sungai dari Botawa M3
Rp 787,000.00
3 Pasir
Pasir Beton dari Botawa M3 Rp 766,000.00
Pasir Pasang Laut M3
Rp 333,200.00
Pasir Batu (Sirtu) dari Waren/Urfas M3
Rp 305,000.00
Pasir Urug/Timbunan M3 Rp 305,000.00
4 Tanah Urug/Timbunan M3 Rp 301,000.00
5 Batu Merah Bh Rp 4,640.00
6 Batu Tela Bh Rp 5,800.00
7 Conblok Bh Rp 23,415.00
8 Kanstin 15x20x40 bh Rp 36,857.14
9 Paving Block 10x20 Tebal 7 cm Bh Rp 4,300.00
10 Paving Block Segi enam Tebal 7 cm Bh Rp 7,500.00
11 Batu tempel hitam M2 Rp 350,000.00
12 Semen
Semen 1 Zak = 40 Kg kg Rp 2,856.25
Semen Putih/Warna Kg Rp 18,150.00
BAHAN KAYU
1 Balok/Papan Kayu Besi (Klas I) M3 Rp 4,220,000.00
2 Balok/Papan Kayu Matoa (Klas II) M3 Rp 3,135,000.00
3 Balok/Papan Kayu Tinang (Klas III) M3 Rp 2,535,000.00
4 Kayu Bakar M3 Rp 675,000.00
5 Kayu Perancah M 3
Rp 1,895,000.00
BAHAN LANTAI
1 Tegel Mozaik 30 x 30 CM M2 Rp 266,860.00
2 Tegel Keramik
Putih 11 x 11 CM Bh Rp 3,200.00
Warna 11 x 11 CM Bh Rp 3,840.00
Putih 10 x 20 CM Bh Rp 3,520.00
Warna 10 x 20 CM Bh Rp 4,000.00
Putih 15 x 15 CM Bh Rp 6,066.00
Warna 15 x 15 CM Bh Rp 7,169.00
Putih 20 x 20 CM M2 Rp 272,975.00
Warna 20 x 20 CM M2 Rp 310,200.00
Putih 20 x 25 CM M 2
Rp 266,860.00
Warna 20 x 25 CM M 2
Rp 317,700.00
Putih 30 x 30 CM M 2
Rp 266,860.00
Warna 30 x 30 CM M 2
Rp 317,691.00
Putih 40 x 40 CM M 2
Rp 285,768.00
Warna 40 x 40 CM M 2
Rp 299,376.00
BAHAN BESI
1 Besi Beton
Besi Beton Polos Kg Rp 24,400.00
Besi Beton Ulir Kg Rp 24,197.00
2 Paku
Paku Colour Tiles/Metal Roof kg Rp 62,727.00
Paku Eternit kg Rp 40,493.00
Paku Seng Kg Rp 45,475.00
Paku Campur Kg Rp 27,325.00
Paku Ardeks Kg Rp 45,475.00
Paku Beton Kg Rp 61,601.00
Paku Jembatan Kg Rp 44,771.00
Paku Skrup Dos Rp 20,725.00
Paku Tripleks Kg Rp 32,770.00
3 Kawat
Kawat Ikat / Beton Kg Rp 34,563.00
BAHAN PIPA
2 Pipa Paralon PVC
Pipa Paralon Ø 1/4" M1 Rp 9,843.00
Pipa PVC Ø 1/2" M 1
Rp 13,387.00
Pipa PVC Ø 3/4" M 1
Rp 15,300.00
Pipa PVC Ø 1" M 1
Rp 20,700.00
Pipa PVC Ø 1½" M 1
Rp 31,500.00
Pipa PVC Ø 2" M1 Rp 45,000.00
Pipa PVC Ø 2½" M1 Rp 66,600.00
Pipa PVC Ø 3" M1 Rp 90,900.00
Pipa PVC Ø 4" M 1
Rp 105,000.00
Pipa PVC Ø 5" M 1
Rp 137,300.00
Pipa PVC Ø 6" M 1
Rp 192,500.00
Pipa PVC Ø 8" M 1
Rp 328,500.00
Pipa PVC Ø 10" M 1
Rp 499,500.00
3 Jenis Batang D u/Sal. Pembuangan Air
Ø 1/2" - 4 m M1 Rp 9,090.00
Ø 3/4" - 4 m M 1
Rp 12,120.00
Ø 1" - 4 m M 1
Rp 18,558.75
Ø 1½" - 4 m M 1
Rp 19,316.25
Ø 2" - 4 m M 1
Rp 23,482.50
Ø 2½" - 4 m M 1
Rp 31,587.75
Ø 3" - 4 m M 1
Rp 41,662.50
Ø 4" - 4 m M1 Rp 66,660.00
Ø 5" - 4 m Btg Rp 101,883.75
Ø 6" - 4 m Btg Rp 137,865.00
Ø 10" - 4 m Btg Rp 396,930.00
4 Jenis Batang C u/Instalasi Listrik
Ø 5/8" - 4 m M1 Rp 5,859.00
Ø 3/4" - 4 m M 1
Rp 15,750.00
Ø 1" - 4 m M 1
Rp 18,000.00
Ø 1½" - 4 m Btg Rp 23,437.00
5 Sock Lurus, Sock Drat Dalam, Sok Drat Luar, Knie & Bh Rp 42,281.00
Teste PVC
6 Lem PVC Tube Rp 15,125.00
7 Alat Bantu Set Rp 330,000.00
8 Gate Valve GIP f 1" Bh Rp 294,400.00
9 Gate Valve GIP f 2" Bh Rp 404,050.00
10 Gate Valve GIP f 3" Bh Rp 759,862.00
11 Gate Valve GIP f 4" Bh Rp 996,906.00
12 Gate Valve GIP f 6" Bh Rp 1,176,593.00
13 Gate Valve GIP f 8" Bh Rp 1,356,281.00
14 Seal Type Bh Rp 13,750.00
BAHAN LANGIT-LANGIT
1 Eternit 100 X 100 Lbr Rp 85,921.00
2 Tripleks
122x244x0,3 cm Lbr Rp 95,590.00
122x244x0,4 cm Lbr Rp 129,954.00
122x244x0,6 cm Lbr Rp 226,050.00
122x244x0,9 cm Lbr Rp 335,940.00
3 Tripleks melamin 122x244x0,3 cm Lbr Rp 115,610.00
4 Acoustic 40x60 Lbr Rp 44,625.00
5 Teakwood
122x244x0,3 cm Lbr Rp 162,140.00
80x244x0,3 cm Lbr Rp 121,605.00
6 Hard Board 122x244 cm Lbr Rp 221,100.00
7 Asbes Plat Harflek 200x100x0,3 cm Lbr Rp 112,500.00
8 Plywood Lbr Rp 152,278.00
9 Formika Lbr Rp 310,500.00
10 Kayu List Plafond M1 Rp 14,300.00
BAHAN ATAP
1 Genteng
Beton Bh Rp 26,538.00
Keramik Bh Rp 13,500.00
Asbes Lbr Rp 32,500.00
Harfles (115x85x0,5 cm) Lbr Rp 62,500.00
2 Asbes Gelombang Kaki/Lbr Rp 100,000.00
3 Sirap Ikat/M2 Rp 100,000.00
4 Seng Gelombang
BWG 34" BJLS 0,20 mm Lbr Rp 72,450.00
BWG 32" BJLS 0,30 mm Lbr Rp 88,200.00
BWG 28" BJLS 0,35 mm Lbr Rp 105,875.00
5 Seng Plat
BJLS 0,30 mm Lbr Rp 100,200.00
BJLS 0,20 mm Lbr Rp 84,450.00
6 Seng Super Dek
180x70 cm - 10 kaki Lbr Rp 231,000.00
180x70 cm - 8 kaki Lbr Rp 184,800.00
180x70 cm - 7 kaki Lbr Rp 161,700.00
180x70 cm - 6 kaki Lbr Rp 138,600.00
7 Seng Aluminium Gelombang
SWG 32" 0,27 mm Lbr Rp 85,470.00
SWG 32" 0,31 mm Lbr Rp 120,393.00
SWG 32" 0,38 mm Lbr Rp 127,050.00
8 Seng Plastik (Fiber) Kaki/Lbr Rp 138,600.00
9 Atap Plastik Gelombang Besar Lbr Rp 130,812.00
10 Atap Plastik Gelombang Kecil Lbr Rp 104,144.00
11 Ardek Gelombang Lbr Rp 110,975.00
12 Seng Galvanis Lbr Rp 113,437.00
13 Fiber Semen (Harlek)
Super 240x108 x0,6 cm Lbr Rp 137,500.00
Super 180x108 x0,6 cm Lbr Rp 94,600.00
Ekonomi 240x92x0,5 cm Lbr Rp 103,400.00
Ekonomi 180x92x0,4 cm Lbr Rp 91,300.00
Mini 240x105x0,4 cm Lbr Rp 88,000.00
Mini 180x92x0,5 cm Lbr Rp 81,400.00
Super 240x105 x0,4 cm Lbr Rp 103,400.00
Super 180x105 x0,4 cm Lbr Rp 92,400.00
14 Atap Harflex 30 x 110 x0.5 cm Lbr Rp 138,512.00
15 Atap Utomo Colour Tiles 7 Genteng Bh Rp 115,615.00
16 Nok/Bubungan
Genteng Beton Bh Rp 24,964.00
Genteng Asbes Bh Rp 30,800.00
Genteng Keramik Bh Rp 9,900.00
Alm. SWG 28" - 180 cm Lbr Rp 99,000.00
Alm. SWG 28" - 105 cm Lbr Rp 78,100.00
17 Nok Harflex 30 x 118 x0.5 cm Bh Rp 63,442.00
18 Nok Utomo Colour Tiles 7 genteng Bh Rp 95,403.00
19 Nok Steel Gelombang
Super - 180 cm Bh Rp 66,000.00
Mini - 105 cm Bh Rp 44,000.00
Ekonomi - 95 cm Bh Rp 34,100.00
20 Nok Steel Rata
Super - 108 cm Bh Rp 55,000.00
Mini - 105 cm Bh Rp 44,000.00
Ekonomi - 95 cm Bh Rp 41,800.00
21 Nok ½ Lingkaran Bh Rp 79,200.00
22 Karet Pelapis Genteng Roll Rp 340,000.00
23 Talang Paralon f 4" M1 Rp 93,008.00
24 Talang Paralon f 12" M 1
Rp 126,774.00
BAHAN PENGGANTUNG
1 Kunci Tanam
Union 1 x slaag Bh Rp 240,625.00
Union 2 x slaag Bh Rp 275,000.00
Yalle 1 x Slaag Bh Rp 137,500.00
Yalle 2 x Slaag Bh Rp 173,937.00
Kuda Terbang 1 x Slaag Bh Rp 103,125.00
Kuda Terbang 2 x Slaag Bh Rp 123,750.00
2 Kunci Gembok No. 30 Bh Rp 47,565.00
3 Penggantung
Hak / Kait Angin Biasa Bh Rp 14,437.00
Hak / Kait Angin Kancing Bh Rp 58,437.00
Grendel Pintu Bh Rp 34,375.00
Grendel Jendela Bh Rp 17,187.00
Engsel Pintu Ring Nylon Bh Rp 37,257.00
Engsel H Pintu Bh Rp 26,616.00
Engsel Jendela Bh Rp 15,812.00
Engsel H Jendela Bh Rp 14,231.00
Engsel Almari Bh Rp 12,856.00
Tarikan Jendela Bh Rp 11,687.00
Expagnolet Bh Rp 75,625.00
BAHAN SANITAIR
1 Kloset Duduk INA Bh Rp 1,455,300.00
2 Kloset Jongkok Teraso Bh Rp 226,875.00
3 Wasthafel INA Set Rp 2,000,000.00
4 Wasthafel + Cermin INA Set Rp 2,500,000.00
5 Wasthafel Logam 1 Lubang Set Rp 680,625.00
6 Wasthafel Logam 2 Lubang Set Rp 983,125.00
7 Urinoir Porselin Bh Rp 1,629,477.00
8 Bak Air Viber Glass 200-300 ltr Bh Rp 562,500.00
9 Bak Air Viber Glass 300-500 ltr Bh Rp 656,250.00
10 Bak Air Viber Glass 750 ltr Bh Rp 906,250.00
11 Reservoir Viber Glass 650 ltr Bh Rp 1,925,000.00
12 Reservoir Viber Glass 1.100 ltr Bh Rp 2,812,500.00
13 Floor Drain dari Besi Bh Rp 67,500.00
14 Kran Air 1/2" Bh Rp 35,856.00
15 Kran Air 3/4" Bh Rp 39,468.00
16 Kran Air Aluminium Besar Bh Rp 65,868.00
17 Kran Air Wastafel Bh Rp 88,968.00
18 Penyambungan Air PDAM Ls Rp 907,500.00
BAHAN FINISHING/CAT
1 Cat Tembok Kg Rp 22,000.00
2 Cat Alkali resisting primer Kg Rp 41,205.00
3 Cat ICI Weathershield Kg Rp 82,410.00
4 Cat Kilat Kg Rp 62,025.00
5 Cat Besi Kg Rp 62,025.00
6 Cat Aluminium Kg Rp 127,516.00
7 Cat Atap/AGA Kg Rp 286,000.00
8 Meni Kayu Kg Rp 41,334.00
9 Meni Besi Kg Rp 49,650.00
10 Dempul Kayu Kg Rp 41,334.00
11 Dempul Besi Kg Rp 70,656.00
12 Plamur Besi Kg Rp 51,750.00
13 Plamur Tembok Kg Rp 40,355.00
14 Politur Kg Rp 58,650.00
15 Teak Oil Kg Rp 48,055.00
16 Minyak Cat Kg Rp 37,485.00
17 Residu Kg Rp 33,637.00
18 Dempul Kg Rp 38,053.00
19 Kertas Amplas Lbr Rp 9,400.00
BAHAN LISTRIK
1 Kabel Listrik
Type NYK
1½ mm M1 Rp 8,250.00
2½ mm M1 Rp 9,750.00
Type NYY
2 X 1½ mm M1 Rp 15,000.00
2 X 2½ mm M1 Rp 21,900.00
3 X 2½ mm M1 Rp 26,235.00
2 X 4 mm M1 Rp 30,000.00
2 Lampu TL
1 x 10 w Set Rp 63,690.00
1 x 20 w Set Rp 82,500.00
2 x 20 w Set Rp 135,575.00
1 x 40 w Set Rp 121,500.00
2 x 40 w Set Rp 158,950.00
10 Watt Bh Rp 18,750.00
20 Watt Bh Rp 26,250.00
40 Watt Bh Rp 30,000.00
3 Lampu Pijar
25 w Bh Rp 13,750.00
40 w Bh Rp 16,500.00
60 w Bh Rp 22,000.00
100 w Bh Rp 20,625.00
4 Lampu Mercuri Lengkap 250 watt Set Rp 2,567,250.00
5 Saklar
Tunggal Putih Bh Rp 31,250.00
Tunggal Hitam Bh Rp 26,875.00
Ganda Putih Bh Rp 34,375.00
Ganda Hitam Bh Rp 30,625.00
6 Stop Kontak
Putih Bh Rp 33,687.00
Hitam Bh Rp 29,562.00
7 Zekring Kast
1 Group Bh Rp 93,012.00
2 Group Bh Rp 103,824.00
3 Group Bh Rp 130,032.00
8 Fitting Tempel Kotak Bulat Putih Bh Rp 27,500.00
9 Fitting Biasa Bh Rp 17,187.00
10 Lampu XL 18 wattt Bh Rp 89,375.00
11 Lampu Sorot 500 watt Bh Rp 515,625.00
12 Lampu XL 8 wattt Bh Rp 55,000.00
13 Isolator Bh Rp 13,750.00
14 Instalasi Ttk Rp 60,000.00
15 Klem Kabel Dos Rp 24,062.00
16 Penyambungan Listrik PLTD Ls Rp 1,718,750.00
PROYEK : PEMBANGUNAN GEDUNG PUSAT PELAYANAN AKADEMIK
UNIVERSITAS NEGERI MAKASSAR TAHAP III
LOKASI : JL. A.P. PETTARANI, GUNUNGSARI BARU, RAPPOCINI, MAKASAR
3 Besi
3.1 Besi beton kg 8,575.00
3.2 Wire mesh M8 m2 59,413.58
3.3 Besi beton ulir kg 8,575.00
3.4 Besi Hollow 40x40 kg 17,150.00
3.5 Besi plat sandaran 10x100 kg 17,150.00
3.6 Besi railing sandaran 10x50 kg 17,150.00
4 Kawat
4.1 Bendrat kg 12,740.00
4.2 Anyam m2 6,125.00
5 Keramik
5.1 Keramik 40x40 dos 112,500.00
5.2 Keramik 30x30 dos 100,000.00
5.3 Keramik 20x20 dos 100,000.00
5.4 Keramik 20x25 dos 92,500.00
5.5 Keramik step nossing 10x30 bj 8,000.00
6 Marmer
6.1 Marmer Pangkep 60x60 dinding m2 325,000.00
6.2 Marmer Pangkep 60x60 lantai m2 325,000.00
7 Paku
7.1 Paku kg 14,976.91
8 Pasir
8.1 Pasir beton m3 104,187.20
8.2 Pasir pasang m3 104,187.20
8.3 pasir urug m3 78,140.40
8.4 Sirtu m3 110,698.90
9 Semen
9.1 Semen PC kg 1,237.22
9.2 Semen hardener kg 2,604.68
9.3 Semen nat ( tile grout ) kg 19,535.10
10 Batako
10.1 Batako bj 3,255.85
10.2 Batako roster bj 3,907.02
11 Batu
11.1 Batu kali m3 117,210.60
11.2 Batu pecah 2-3 cm m3 123,722.30
12 Kayu
12.1 Balok klas I m3 2,344,212.00
12.2 Papan klas I m3 2,409,329.00
12.3 Balok klas II m3 2,213,978.00
12.4 Papan klas II m3 2,279,095.00
12.5 Balok klas III m3 1,953,510.00
12.6 Papan klas III m3 2,018,627.00
12.7 Kayu begisting m3 1,953,510.00
12.8 Multipleks 9 mm lbr 240,932.90
13 Cat
13.1 Cat besi kg 2,205.00
13.2 Cat Zincromate m2 -
14 Bahan khusus
14.1 Curing compound ltr 240,932.90
14.2 Minyak begisting ltr 240,932.90
14.3 Spacer ( untuk begisting dinding ) bh 240,932.90
14.4 Skimcoat kg 240,932.90
14.5 Waterproofing membran m2 110,698.90
14.6 Screed m2 45,581.90
14.7 Mortar utama kg 1,627.93
15 Bata
15.1 Bata merah bj 520.94
15.2 Bata ringan hebel m3 1,126,524.10
15.3 Bata tempel UNM m2
16 Granite
16.1 Granite tile 60x60 m2 211,250.00
16.2 Granite tile 40x40 m2 186,250.00
16.3 Granite tile 30x30 m2 187,500.00
19 Baja
19.1 Baja WF kg 11,147.50
19.2 Baja gording kg 9,555.00
19.3 Elektroda kg 30,625.00
PROYEK : PEMBANGUNAN GEDUNG PUSAT PELAYANAN AKADEMIK
UNIVERSITAS NEGERI MAKASSAR TAHAP III
LOKASI : JL. A.P. PETTARANI, GUNUNGSARI BARU, RAPPOCINI, MAKASAR
I Tenaga Kerja
Mandor org/ hr 98,000.00
Kepala Tukang Batu org/ hr 85,750.00
Kepala Tukang Kayu org/ hr 85,750.00
Kepala Tukang Besi org/ hr 85,750.00
Kepala Tukang Las org/ hr 85,750.00
Tukang Batu org/ hr 67,375.00
Tukang Kayu org/ hr 67,375.00
Tukang Besi org/ hr 67,375.00
Tukang Las org/ hr 67,375.00
Pekerja org/ hr 49,000.00