ENGGINEER ESTIMATE

( EE )
PROGRAM : -
PEKERJAAN : PERENCANAAN TEKNIS PEMBANGUNAN PASAR NOSAO
LOKASI : DISTRIK DEMBA-KABUPATEN WAROPEN
T/A : 2015

A. BANGUNAN LOS PASAR


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6 = (4 x 5)

I PEKERJAAN PERSIAPAN
1 Pas. Bouwplank M' 98.80 84,787.00 8,376,955.60
2 Dokumentasi Proyek Ls 3.00 150,000.00 450,000.00
Sub Total 8,826,955.60
II PEKERJAAN TANAH DAN PASIR
1 Pekerjaan Galian Pondasi M3 33.16 41,126.00 1,363,869.76
2 Urugan kembali 1/4 Galian M3 8.29 19,706.00 163,378.50
3 Urugan Pasir Bawah Pondasi M3 393,417.00 0.00
4 Urugan Tanah Bawah Lantai M3 41.18 388,617.00 16,004,802.53
5 Urugan Pasir Bawah Lantai M3 17.16 393,417.00 6,751,035.72
Sub Total 24,283,086.52
III PEKERJAAN STRUKTUR DAN PASANGAN BATU
1 Pas. Batu Kosongan M3 1,102,892.00 0.00
2 Pasangan Pondasi Camp. 1 : 3 M3 18.05 1,776,642.00 32,064,834.82
3 Pekerjaan Beton Cyclope camp. 1 : 3 : 5 M3 6.16 1,647,224.00 10,146,899.84
4 Pekerjaan kolom gelagar kayu kls. I M' 2.00 6,907,356.00 13,813,330.53
6 Pekerjaan plat meja beton tebal 10 cm M3 4.00 7,619,099.00 30,476,396.00
7 Pekerjaan plat duduk beton tebal 10 cm M3 2.50 7,619,099.00 19,047,747.50
8 Cor lantai slab beton bertulang camp. 1 : 2 : 3 tebal 10 cm M3 33.70 4,298,134.00 144,864,308.34
9 Pas. Rolag Batu Tela Kaki Meja dan Tempat Duduk Camp. 1 : 3 M2 45.60 453,440.00 20,676,864.00
10 Pas. Batu Tela sisi depan meja M2 28.00 226,720.00 6,348,160.00
11 Pekerjaan Plesteran dinding Camp. 1 : 3 M2 147.20 80,167.00 11,800,582.40
12 Pekerjaan Acian Dinding M2 147.20 21,627.00 3,183,494.40
13 Pas. Rolag Batu Tela Penahan Tanah Bawah Lantai Camp. 1 : 3 M2 27.78 453,440.00 12,594,749.44
14 Pekerjaan Plesteran Dinding Rolag Camp. 1 : 3 M2 10.42 80,167.00 835,019.47
15 Pekerjaan Acian Dinding Rolag Lantai M2 10.42 21,627.00 225,266.83
16 Pekerjaan Saluran Air Hujan M' 86.80 200,552.90 17,407,991.72
Sub Total 323,485,645.28
IV PEKERJAAN KAYU DAN ATAP
1 Pekerjaan Kuda-Kuda Kayu Besi 5/10 M3 2.89 6,870,976.00 19,825,857.70
2 Pekerjaan Gording Kayu Kls II 5/10 M3 3.14 5,293,853.00 16,646,520.76
3 Pekerjaan Lesplank Papan Kayu Besi M2 22.65 172,442.97 3,905,833.29
4 Pekerjaan Pasang Atap BJLS 30 M2 403.82 101,330.00 40,919,080.60
5 Pas. Nok Seng Plat BJLS 30 M2 13.24 56,356.00 746,153.44
6 Pas. Balok dudukan jalusi ky. Kls. I 5/10 M3 0.60 7,658,302.00 4,594,981.20
7 Pekerjaan Top Gevel Papan ky. Kls. I + Rangka ky. Kls. II M2 15.60 196,636.00 3,067,521.60
8 Pas. Papan jalusi ky. Kls. I M2 21.10 355,467.00 7,500,353.70
Sub Total 97,206,302.29
V PEKERJAAN LANTAI DAN KERAMIK
1 Screed Lantai M2 343.20 135,188.00 46,396,521.60
2 Pekerjaan Acian Lantai M2 343.20 21,627.00 7,422,386.40
3 Pas. Keramik Meja uk. 30 x 30 M2 40.00 439,950.00 17,598,000.00
Sub Total 71,416,908.00
VIII PEKERJAAN PENGECATAN
2 Pengecatan Rangka Kayu M2 397.80 60,826.00 24,196,400.32
3 Pengecatan Top Gevel M2 15.60 60,826.00 948,885.60
4 Pengecatan Jalusi M2 42.20 60,826.00 2,566,857.20
5 Pengecatan Lesplank M2 22.65 60,826.00 1,377,708.90
Sub Total 29,089,852.02
IX PEKERJAAN INSTALASI LISTRIK
1 Pas. Sekring Khas 1 Group Titik 1.00 123,530.00 123,530.00
2 Pas. Lampu TL 40 Watt Titik 5.00 763,228.00 3,816,140.00
Sub Total 3,939,670.00
XI PEKERJAAN AKHIR
1 Pembersihan Sisa Proyek Ls 1.00 500,000.00 500,000.00
Sub Total 500,000.00
REKAPITULASI

I PEKERJAAN PERSIAPAN 8,826,955.60

II PEKERJAAN TANAH DAN PASIR 24,283,086.52

III PEKERJAAN STRUKTUR DAN PASANGAN BATU 323,485,645.28

IV PEKERJAAN KAYU DAN ATAP 97,206,302.29

V PEKERJAAN LANTAI DAN KERAMIK 71,416,908.00

VIII PEKERJAAN PENGECATAN 29,089,852.02

IX PEKERJAAN INSTALASI LISTRIK 3,939,670.00

XI PEKERJAAN AKHIR 500,000.00

Real Cost 558,748,419.71


4 Unit Los 2,234,993,678.85
PPN 10 % 223,499,367.89
Total Cost 2,458,493,046.74
Dibulatkan 2,458,493,000.00
ENGGINEER ESTIMATE
( EE )
PROGRAM : -
PEKERJAAN : PERENCANAAN TEKNIS PEMBANGUNAN PASAR NOSAO
LOKASI : DISTRIK DEMBA-KABUPATEN WAROPEN
T/A : 2015

B. BANGUNAN PETAK KIOS


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6 = (4 x 5)

I PEKERJAAN PERSIAPAN
1 Pembersihan lokasi M2 17,136.00 0.00
2 Pas. Bouwplank M' 11.00 84,787.00 932,657.00
3 Pembuatan Direksi Keet M2 1,965,041.00 0.00
4 Papan Nama Proyek Bh 1,095,353.00 0.00
5 Dokumentasi Proyek Ls 250,000.00 0.00
Sub Total 932,657.00
II PEKERJAAN TANAH DAN PASIR
1Pekerjaan Galian Pondasi M3 133.12 41,126.00 5,474,693.12
2Urugan kembali 1/4 Galian M3 33.28 19,706.00 655,815.68
3Urugan Pasir Bawah Pondasi M3 8.32 393,417.00 3,273,229.44
4Urugan Tanah Bawah Lantai M3 68.43 388,617.00 26,593,061.31
5Urugan Pasir Bawah Lantai M3 22.81 393,417.00 8,973,841.77
Sub Total 44,970,641.32
III PEKERJAAN STRUKTUR DAN PASANGAN BATU
1 Pas. Batu Kosongan M3 17.76 1,102,892.00 19,587,361.92
2 Pasangan Pondasi Camp. 1 : 3 M3 42.18 1,776,642.00 74,938,759.56
3 Pekerjaan sloef beton 15/20 camp. 1 : 2 : 3 M3 4.44 8,260,888.00 36,678,342.72
4 Pekerjaan kolom beton 10/10 M' 63.70 147,297.04 9,382,821.45
5 Pekerjaan Ringbalk praktis 10/20 M' 165.20 110,793.89 18,303,150.63
6 Cor lantai tanpa tulangan camp. 1 : 3 : 5 tebal 7 cm M3 16.38 1,903,122.00 31,173,138.36
7 Pas. Dinding Batu Tela Camp. 1 : 3 M2 408.39 226,720.00 92,590,180.80
8 Pekerjaan Plesteran dinding Camp. 1 : 3 M2 816.78 80,167.00 65,478,802.26
9 Pekerjaan Acian Dinding M2 816.78 21,627.00 17,664,501.06
10 Pas. Rolag Batu Tela Penahan Tanah Bawah Lantai Camp. 1 : 3 M2 22.54 453,440.00 10,220,537.60
11 Pekerjaan Plesteran Dinding Rolag Camp. 1 : 3 M2 9.66 80,167.00 774,413.22
12 Pekerjaan Acian Dinding Rolag Lantai M2 9.66 21,627.00 208,916.82
13 Pekerjaan Saluran Air Hujan M' 64.40 200,552.90 12,915,606.76
Sub Total 389,916,533.16
IV PEKERJAAN KAYU DAN ATAP
1 Pekerjaan Kuda-Kuda Kayu Besi 5/10 M3 2.36 6,870,976.00 16,193,516.24
2 Pekerjaan Gording Kayu Kls II 5/10 M3 1.84 5,293,853.00 9,746,512.76
3 Pekerjaan Lesplank Papan Kayu Besi M2 172,442.97 0.00
4 Pekerjaan Pasang Atap BJLS 30 M2 259.92 101,330.00 26,337,693.60
5 Pas. Nok Seng Plat BJLS 30 M2 8.66 56,356.00 488,268.38
7 Pekerjaan Plafond tripleks 3 mm+ Rangka ky. Kls. II M2 238.26 178,927.00 42,631,147.02
8 Pekerjaan Kusen Kayu Kls. I M3 0.43 8,257,696.00 3,550,809.28
Sub Total 98,947,947.28
V PEKERJAAN LANTAI DAN KERAMIK
1 Screed Lantai M2 234.00 135,188.00 31,633,992.00
2 Pekerjaan Acian Lantai M2 234.00 21,627.00 5,060,718.00
Sub Total 31,633,992.00
VI PEKERJAAN DAUN PINTU, JENDELA, DAN KACA
1 Pek. Daun Pintu Panil M2 66.00 644,324.00 42,525,384.00
Sub Total 42,525,384.00
VII PEKERJAAN KUNCI DAN PENGGANTUNG
1 Pas. Engsel Daun Pintu Bh 180.00 61,547.00 11,078,460.00
6 Pas. Kunci Slot Daun Pintu Bh 40.00 49,574.00 1,982,960.00
7 Pas. Kunci Tanam 2 Slag Biasa Bh 10.00 245,736.00 2,457,360.00
Sub Total 15,518,780.00
VIII PEKERJAAN PENGECATAN
1 Pengecatan Dinding Dalam dan Luar M2 816.78 23,705.00 19,361,769.90
2 Pengecatan Kusen M2 17.20 60,826.00 1,046,207.20
3 Pengecatan Pintu M2 132.00 60,826.00 8,029,032.00
4 Pengecatan Plafond M2 238.26 23,705.00 5,647,953.30
5 Pengecatan Lesplank M2 60,826.00 0.00
Sub Total 34,084,962.40
IX PEKERJAAN INSTALASI LISTRIK
1 Pas. Sekring Khas 2 Group Titik 10.00 123,530.00 1,235,300.00
3 Pas. Lampu TL 40 Watt Titik 10.00 763,228.00 7,632,280.00
4 Pas. Lampu XL 18 Watt Titik 10.00 721,153.00 7,211,530.00
5 Pas. Stop Kontak Titik 10.00 389,547.00 3,895,470.00
Sub Total 19,974,580.00
XI PEKERJAAN AKHIR
1 Pembersihan Sisa Proyek Ls 1.00 500,000.00 500,000.00
Sub Total 500,000.00
REKAPITULASI
A BANGUNAN UTAMA
I PEKERJAAN PERSIAPAN 932,657.00
II PEKERJAAN TANAH DAN PASIR 44,970,641.32
III PEKERJAAN STRUKTUR DAN PASANGAN BATU 389,916,533.16
IV PEKERJAAN KAYU DAN ATAP 98,947,947.28
V PEKERJAAN LANTAI DAN KERAMIK 31,633,992.00
VI PEKERJAAN DAUN PINTU, JENDELA, DAN KACA 42,525,384.00
VII PEKERJAAN KUNCI DAN PENGGANTUNG 15,518,780.00
VIII PEKERJAAN PENGECATAN 34,084,962.40
IX PEKERJAAN INSTALASI LISTRIK 19,974,580.00
XI PEKERJAAN AKHIR 500,000.00
Real Cost 679,005,477.16
10 Unit Kios 6,790,054,771.55
PPN 10 % 679,005,477.16
Total Cost 7,469,060,248.71
Dibulatkan 7,469,060,000.00
ENGGINEER ESTIMATE
( EE )
PROGRAM : -
PEKERJAAN : PERENCANAAN TEKNIS PEMBANGUNAN PASAR NOSAO
LOKASI : DISTRIK DEMBA-KABUPATEN WAROPEN
T/A : 2015

C. FASILITAS TOILET UMUM


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6 = (4 x 5)

I PEKERJAAN PERSIAPAN
1 Pas. Bouwplank M' 24.00 84,787.00 2,034,888.00
Sub Total 2,034,888.00
II PEKERJAAN TANAH DAN PASIR
1 Pekerjaan Galian Pondasi M3 10.56 41,126.00 434,290.56
2 Urugan kembali 1/4 Galian M3 2.64 19,706.00 52,023.84
3 Urugan Pasir Bawah Pondasi M3 0.66 393,417.00 259,655.22
4 Urugan Tanah Bawah Lantai M3 5.00 388,617.00 1,943,085.00
5 Urugan Pasir Bawah Lantai M3 1.25 393,417.00 491,771.25
Sub Total 3,180,825.87
III PEKERJAAN STRUKTUR DAN PASANGAN BATU
1 Pas. Batu Kosongan M3 1.98 1,102,892.00 2,183,726.16
2 Pasangan Pondasi Camp. 1 : 3 M3 4.70 1,776,642.00 8,354,659.01
3 Pekerjaan Sloof 15/20 M3 0.50 8,260,888.00 4,089,139.56
4 Pekerjaan kolom praktis 10/10 M' 36.00 147,297.04 5,302,693.44
5 Pekerjaan ringbalk praktis 10/15 M' 19.00 110,793.89 2,105,083.91
6 Cor lantai tanpa tulangan camp. 1 : 3 : 5 tebal 5 cm M3 1.25 1,903,122.00 2,378,902.50
7 Pas. Batu Tela Camp. 1 : 3 M2 52.59 226,720.00 11,923,204.80
8 Pekerjaan Plesteran dinding Camp. 1 : 3 M2 105.18 80,167.00 8,431,965.06
9 Pekerjaan acian dinding M2 105.18 21,627.00 2,274,727.86
10 Pas. Rolag Batu Tela Dinding Lantai Rabat Camp. 1 : 3 M2 6.00 453,440.00 2,720,640.00
11 Pekerjaan Saluran Air Hujan M' 20.00 200,552.90 4,011,058.00
Sub Total 53,775,800.30
IV PEKERJAAN KAYU DAN ATAP
1 Pekerjaan Kuda-Kuda Kayu Besi 5/10 M3 0.80 6,870,976.00 5,496,780.80
2 Pekerjaan Gording Kayu Kls II 5/10 M3 0.40 5,677,476.00 2,270,990.40
3 Pekerjaan Lesplank Papan Kayu Besi M2 6.00 62,607.00 375,642.00
4 Pekerjaan Pasang Atap BJLS 30 M2 35.68 101,330.00 3,615,454.40
5 Pas. Nok Seng Plat BJLS 30 M2 5.10 56,356.00 287,415.60
6 Pekerjaan Plafond tripleks 3 mm+ Rangka ky. Kls. II M2 25.00 178,927.00 4,473,175.00
7 Pekerjaan Kusen Kayu Kls. I M3 0.08 8,257,696.00 631,713.74
Sub Total 17,151,171.94
V PEKERJAAN LANTAI DAN KERAMIK
1 Ssreed Lantai M2 16.00 135,188.00 2,163,008.00
2 Acian Lantai M2 16.00 21,627.00 346,032.00
Sub Total 2,509,040.00
VI PEKERJAAN DAUN PINTU, JENDELA, DAN KACA
1 Pek. Daun Pintu Panil M2 2.94 644,324.00 1,894,312.56
2 Pas. Kaca mati 5 mm M2 0.56 417,540.00 233,822.40
Sub Total 2,128,134.96
VII PEKERJAAN KUNCI DAN PENGGANTUNG
1 Pas. Engsel Daun Pintu Bh 6.00 61,547.00 369,282.00
2 Pas. Kunci Slot Daun Pintu Bh 2.00 49,574.00 99,148.00
3 Pas. Kunci Tanam 2 Slag Biasa Bh 2.00 245,736.00 491,472.00
Sub Total 959,902.00
VIII PEKERJAAN PENGECATAN
1 Pengecatan Dinding Dalam dan Luar M2 105.18 23,705.00 2,493,291.90
2 Pengecatan Kusen M2 3.06 60,826.00 186,127.56
3 Pengecatan Pintu Panil M2 5.88 60,826.00 357,656.88
4 Pengecatan Plafond M2 25.00 23,705.00 592,625.00
5 Pengecatan Lesplank M2 6.00 60,826.00 364,956.00
Sub Total 3,994,657.34
IX PEKERJAAN INSTALASI LISTRIK
1 Pas. Sekring Khas 2 Group Titik 1.00 123,530.00 123,530.00
2 Pas. Lampu XL 18 Watt Titik 1.00 721,153.00 721,153.00
3 Pas. Lampu XL 8 Watt Titik 2.00 683,028.00 1,366,056.00
Sub Total 2,210,739.00
X PEKERJAAN SANITAIR
1 Pembuatan Septic Tank dan asesoris Ls 1.00 3,801,391.00 3,801,391.00
2 Pas. Bak Air Fiberglass Bh 2.00 1,290,242.00 2,580,484.00
3 Pas. Pipa 3" Pembuangan KM/WC M' 5.00 175,449.00 877,245.00
4 Pas. Pipa 4" Pembuangan Septic Tank M' 10.00 197,304.00 1,973,040.00
5 Pas. Kran air Titik 2.00 53,164.00 106,328.00
6 Pas. Pipa air bersih 1/2" M' 10.00 33,293.00 332,930.00
7 Pas. Floor Drain Bh 2.00 84,464.00 168,928.00
8 Pas. Closed Jongkok Bh 2.00 797,410.00 1,594,820.00
Sub Total 11,435,166.00
XI PEKERJAAN AKHIR
1 Pembersihan Sisa Proyek Ls 1.00 500,000.00 500,000.00
Sub Total 500,000.00
REKAPITULASI AKHIR

I. PEKERJAAN PENDAHULUAN 2,034,888.00


II. PEKERJAAN TANAH DAN GALIAN 3,180,825.87
III. PEKERJAAN STRUKTUR DAN PASANGAN BATU 53,775,800.30
IV. PEKERJAAN KAYU DAN ATAP 17,151,171.94
V. PEKERJAAN LANTAI DAN KERAMIK 2,509,040.00
VI. PEKERJAAN DAUN PINTU, JENDELA, DAN KACA 2,128,134.96
VII. PEKERJAAN KUNCI DAN PENGGANTUNG 959,902.00
VIII. PEKERJAAN PENGECATAN 3,994,657.34
IX. PEKERJAAN INSTALASI LISTRIK 2,210,739.00
X. PEKERJAAN SANITAIR 11,435,166.00
XI. PEKERJAAN AKHIR 500,000.00
Real Cost 99,880,325.41
2 Unit Toilet Umum 199,760,650.82
PPN 10 % 19,976,065.08
Total Cost 219,736,715.90
Dibulatkan 219,736,000.00
ENGGINEER ESTIMATE
( EE )
PROGRAM : -
PEKERJAAN : PERENCANAAN TEKNIS PEMBANGUNAN PASAR NOSAO
LOKASI : DISTRIK DEMBA-KABUPATEN WAROPEN
T/A : 2015

D. PAGAR KELILING
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6 = (4 x 5)

I PEKERJAAN PERSIAPAN
1 Pembersihan lokasi Ls 1.00 700,000.00 700,000.00
2 Pas. Bouwplank dan Pengukuran M' 1.00 1,000,000.00 1,000,000.00
Sub Total 1,700,000.00
II PEKERJAAN TANAH DAN PASIR
1 Pekerjaan Galian Pondasi M3 165.12 41,126.00 6,790,725.12
2 Urugan kembali Galian Pondasi M 3
41.28 19,706.00 813,463.68
3 Urugan Pasir Bawah Pondasi M 3
10.32 393,417.00 4,060,063.44
Sub Total 11,664,252.24
III PEKERJAAN STRUKTUR DAN PASANGAN BATU
1 Pas. Batu Kosongan M3 46.08 1,102,892.00 50,821,263.36
2 Pasangan Pondasi Camp. 1 : 3 M 3
109.44 1,776,642.00 194,435,700.48
3 Pekerjaan Sloof 15/20 M 3
11.52 8,260,888.00 95,165,429.76
4 Pekerjaan Kolom 30/30 M3 18.58 8,190,563.00 152,147,898.29
5 Pekerjaan balok tengah 10/20 M' 110,793.89 0.00
6 Pekerjaan Ringbalk 15/20 M' 11.52 8,260,888.00 95,165,429.76
7 Pas. Batu Tela Camp. 1 : 3 M2 393.80 226,720.00 89,282,336.00
8 Pekerjaan Plesteran dinding Camp. 1 : 3 M 2
787.60 80,167.00 63,139,529.20
9 Pek. Plesteran Penebalan Kolom Camp. 1 : 3 (sisi depan ) M2 61.44 80,167.00 4,925,460.48
10 Pekerjaan Les profilan dinding L = 5 cm M' 264.00 23,402.00 6,178,128.00
11 Pekerjaan Acian dinding M2 849.04 21,627.00 18,362,188.08
Sub Total 769,623,363.41
IV PEKERJAAN PENGECATAN
1 Pengecatan Dinding M2 849.04 23,705.00 20,126,493.20
Sub Total 20,126,493.20
V PEKERJAAN AKHIR
1 Pembersihan Sisa Proyek Ls 1.00 1,000,000.00 1,000,000.00
Sub Total 1,000,000.00
REKAPITULASI

I PEKERJAAN PERSIAPAN 1,700,000.00

II PEKERJAAN TANAH DAN PASIR 11,664,252.24

III PEKERJAAN STRUKTUR DAN PASANGAN BATU 769,623,363.41

IV PEKERJAAN PENGECATAN 20,126,493.20

V PEKERJAAN AKHIR 1,000,000.00

Real Cost 804,114,108.85


PPN 10 % 80,411,410.88
Total Cost 884,525,519.73
Dibulatkan 884,525,000.00
ENGGINEER ESTIMATE
( EE )
PROGRAM : -
PEKERJAAN : PERENCANAAN TEKNIS PEMBANGUNAN PASAR NOSAO
LOKASI : DISTRIK DEMBA-KABUPATEN WAROPEN
T/A : 2015

E. PANGKALAN OJEK
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6 = (4 x 5)

I PEKERJAAN PERSIAPAN
1 Pas. Bouwplank M' 84,787.00 0.00
2 Dokumentasi Proyek Ls 250,000.00 0.00
Sub Total 0.00
II PEKERJAAN TANAH DAN PASIR
1 Pekerjaan Galian Pondasi M3 0.69 41,126.00 28,294.69
2 Urugan Tanah Bawah Lantai M 3
3.30 388,617.00 1,282,436.10
3 Urugan Pasir Bawah Lantai M3 1.38 393,417.00 540,948.38
Sub Total 1,851,679.16
III PEKERJAAN STRUKTUR DAN PASANGAN BATU
1 Pekerjaan Beton Cyclope camp. 1 : 3 : 5 M3 1.60 1,647,224.00 2,635,558.40
2 Pekerjaan kolom kayu kls. I M' 0.36 6,907,356.00 2,472,833.45
3 Pekerjaan plat duduk beton tebal 10 cm M3 0.39 7,619,099.00 2,971,448.61
4 Cor lantai tanpa tulangan camp. 1 : 3 : 5 tebal 7 cm M3 1.93 1,903,122.00 3,663,509.85
5 Pas. Batu Tela Kaki Meja dan Tempat Duduk Camp. 1 : 3 M2 2.25 226,720.00 510,120.00
6 Pekerjaan Plesteran dinding Camp. 1 : 3 M2 4.50 80,167.00 360,751.50
7 Pekerjaan Acian Dinding M2 4.50 21,627.00 97,321.50
8 Pas. Rolag Batu Tela Penahan Tanah Bawah Lantai Camp. 1 : 3 M 2
8.70 453,440.00 3,944,928.00
9 Pekerjaan Plesteran Dinding Rolag Camp. 1 : 3 M2 4.35 80,167.00 348,726.45
10 Pekerjaan Acian Dinding Rolag Lantai M2 4.35 21,627.00 94,077.45
Sub Total 17,099,275.21
IV PEKERJAAN KAYU DAN ATAP
1 Pekerjaan Kuda-Kuda Kayu Besi 5/10 M3 0.21 6,870,976.00 1,444,279.16
2 Pekerjaan Gording Kayu Kls II 5/10 M3 0.50 5,293,853.00 2,668,101.91
3 Pekerjaan Lesplank Papan Kayu Besi M2 8.00 172,442.97 1,379,543.77
4 Pekerjaan Pasang Atap BJLS 30 M2 60.48 101,330.00 6,128,438.40
5 Pas. Nok Seng Plat BJLS 30 M2 2.24 56,356.00 126,237.44
Sub Total 11,746,600.68
V PEKERJAAN LANTAI DAN KERAMIK
1 Screed Lantai M2 27.50 135,188.00 3,717,670.00
2 Acian Lantai M2 27.50 21,627.00 594,742.50
Sub Total 4,312,412.50
VIII PEKERJAAN PENGECATAN
1 Pengecatan Rangka Kayu M2 64.33 60,826.00 3,913,058.23
### Pengecatan Lesplank M2 8.00 60,826.00 486,608.00
Sub Total 4,399,666.23
IX PEKERJAAN INSTALASI LISTRIK
1 Pas. Sekring Khas 2 Group Titik 1.00 123,530.00 123,530.00
2 Pas. Lampu TL 40 Watt Titik 1.00 763,228.00 763,228.00
Sub Total 886,758.00
XI PEKERJAAN AKHIR
1 Pembersihan Sisa Proyek Ls 1.00 300,000.00 300,000.00
Sub Total 300,000.00

REKAPITULASI
A BANGUNAN UTAMA
I PEKERJAAN PERSIAPAN 0.00
II PEKERJAAN TANAH DAN PASIR 1,851,679.16
III PEKERJAAN STRUKTUR DAN PASANGAN BATU 17,099,275.21
IV PEKERJAAN KAYU DAN ATAP 11,746,600.68
V PEKERJAAN LANTAI DAN KERAMIK 4,312,412.50
VIII PEKERJAAN PENGECATAN 4,399,666.23
IX PEKERJAAN INSTALASI LISTRIK 886,758.00
XI PEKERJAAN AKHIR 300,000.00
Real Cost 40,596,391.78
2 Unit 81,192,783.56
PPN 10 % 8,119,278.36
Total Cost 89,312,061.91
Dibulatkan 89,312,000.00
ENGGINEER ESTIMATE
( EE )
PROGRAM : -
PEKERJAAN : PERENCANAAN TEKNIS PEMBANGUNAN PASAR NOSAO
LOKASI : DISTRIK DEMBA-KABUPATEN WAROPEN
T/A : 2015

6. POS SECURITY

NO. ITEM PEKERJAAN VOLUME HARGA SATUAN TOTAL HARGA

I PEKERJAAN PENDAHULUAN
Pas. Bouwplank 30.00 m' 84,787.00 2,543,610.00
Sub Total 2,543,610.00
II PEKERJAAN TANAH DAN PASIR
Pekerjaan Galian Pondasi 14.00 m3 41,126.00 575,764.00
Urugan kembali 1/4 Galian 3.50 m3 19,706.00 68,971.00
Urugan Pasir Bawah Pondasi 0.70 m3 393,417.00 275,391.90
Urugan Tanah Bawah Lantai 5.20 m3 388,617.00 2,020,808.40
Urugan Pasir Bawah Lantai 1.30 m3 393,417.00 511,442.10
Sub Total 3,452,377.40
III PEKERJAAN PASANGAN, BATU DAN BETON
Pas. Batu Kosongan 2.10 m3 1,102,892.00 2,316,073.20
Pasangan Pondasi Camp. 1 : 3 4.99 m3 1,776,642.00 8,861,001.98
Pekerjaan Sloof 15/20 0.53 m3 8,260,888.00 4,336,966.20
Pekerjaan kolom 20/20 0.45 m3 9,491,202.00 4,228,330.49
Pekerjaan ringbalk 10/20 17.50 m3 110,793.89 1,938,893.08
Pekerjaan dinding batu tela camp. 1 : 3 37.50 m2 226,720.00 8,502,000.00
Pekerjaan plesteran camp. 1 : 3 75.00 m2 80,167.00 6,012,525.00
Pekerjaan kolom praktis 10/10 1.00 m' 147,297.04 147,297.04
Cor balok 10/20 6.50 m' 110,793.89 720,160.29
Pekerjaan acian dinding 75.00 m2 21,627.00 1,622,025.00
Pasangan Rolag batu tela camp. 1 : 3 6.30 m3 226,720.00 1,428,336.00
Pekerjaan Saluran Air Hujan 26.00 m' 0.00
Sub Total 40,113,608.27
IV PEKERJAAN ATAP DAN PLAFOND
Pekerjaan Kuda-Kuda Kayu Besi 5/10 1.10 m3 6,870,976.00 7,558,073.60
Pekerjaan Gording Kayu Kls II 5/10 0.98 m3 5,677,476.00 5,563,926.48
Pekerjaan Lesplank Papan Kayu Besi 6.40 m2 62,607.00 400,684.80
Pasang Atap Seng BJLS 30 60.20 m2 101,330.00 6,100,066.00
Pasang Nok seng plat BJLS 30 8.13 m2 56,356.00 458,061.57
Pekerjaan Plafond 3 mm+ Rangka ky. Kls. II 16.00 m2 178,927.00 2,862,832.00
Sub Total 22,943,644.45
V PEKERJAAN LANTAI
Cor lantai kerja dan Lantai Rabat 1.82 m3 1,903,122.00 3,463,682.04
Screed lantai 26.00 m2 135,188.00 3,514,888.00
Acian lantai 26.00 m2 21,627.00 562,302.00
Sub Total 7,540,872.04
ENGGINEER ESTIMATE
( EE )
PROGRAM : -
PEKERJAAN : PERENCANAAN TEKNIS PEMBANGUNAN PASAR NOSAO
LOKASI : DISTRIK DEMBA-KABUPATEN WAROPEN
T/A : 2015

6. POS SECURITY

VI PEKERJAAN KUSEN, DAUN PINTU, JENDELA, DAN KACA


Pekerjaan Kusen Kayu besi 0.10 m3 8,257,696.00 825,769.60
Pek. Daun Pintu Panil 1.68 m2 644,324.00 1,082,464.32
Pas. Daun Jendela Panil Kaca 1.43 m2 837,779.00 1,198,023.97
Sub Total 3,106,257.89
VII PEKERJAAN KUNCI DAN PENGGANTUNG
Pas. Engsel Daun Pintu 3.00 Bh 61,547.00 184,641.00
Pas. Kunci Tanam 2 Slag 1.00 Bh 245,736.00 245,736.00
Pas. Engsel Daun Jendela Panil 4.00 Bh 32,776.00 131,104.00
Pas. Handle Jendela 2.00 Bh 35,977.00 71,954.00
Pas. Hak Angin 4.00 Bh 82,727.00 330,908.00
Pas. Grendel Jendela 4.00 Bh 49,574.00 198,296.00
Sub Total 1,162,639.00
VIII PEKERJAAN PENGECATAN
Pengecatan Dinding Interior 75.00 m2 23,705.00 1,777,875.00
Pengecatan Kusen 4.00 m2 60,826.00 243,304.00
Pengecatan Pintu Panil 3.36 m2 60,826.00 204,375.36
Pengecatan Daun Jendela Panil 0.57 m2 60,826.00 34,792.47
Pengecatan Plafond 16.00 m2 23,705.00 379,280.00
Pengecatan Lesplank 6.40 m2 60,826.00 389,286.40
Sub Total 3,028,913.23
IX PEKERJAAN INSTALASI LISTRIK
Pas. Sekring Khas 1 Group 1.00 bh 123,530.00 123,530.00
Pas. Lampu XL 18 Watt 2.00 titik 721,153.00 1,442,306.00
Pas. Stop Kontak 1.00 titik 389,547.00 389,547.00
Sub Total 1,955,383.00
X PEKERJAAN AKHIR
Pembersihan akhir sisa proyek 1.00 Ls 300,000.00 300,000.00
Sub Total 300,000.00

REKAPITULASI BIAYA FISIK

I PEKERJAAN PENDAHULUAN 2,543,610.00


II PEKERJAAN TANAH DAN PASIR 3,452,377.40
III PEKERJAAN PASANGAN, BATU DAN BETON 40,113,608.27
IV PEKERJAAN ATAP DAN PLAFOND 22,943,644.45
V PEKERJAAN LANTAI 7,540,872.04
VI PEKERJAAN KUSEN, DAUN PINTU, JENDELA, DAN KACA 3,106,257.89
VII PEKERJAAN KUNCI DAN PENGGANTUNG 1,162,639.00
ENGGINEER ESTIMATE
( EE )
PROGRAM : -
PEKERJAAN : PERENCANAAN TEKNIS PEMBANGUNAN PASAR NOSAO
LOKASI : DISTRIK DEMBA-KABUPATEN WAROPEN
T/A : 2015

6. POS SECURITY

VIII PEKERJAAN PENGECATAN 3,028,913.23


IX PEKERJAAN INSTALASI LISTRIK 1,955,383.00
X PEKERJAAN AKHIR 300,000.00

REAL COAST 86,147,305.28

PPN 10 % 8,614,730.53
Total Cost 94,762,035.80
Dibulatkan 94,762,000.00
ENGGINER ESTIMATE
( EE )
PROGRAM : -
PEKERJAAN : PERENCANAAN TEKNIS PEMBANGUNAN PASAR NOSAO
LOKASI : DISTRIK DEMBA-KABUPATEN WAROPEN
T/A : 2015

F. LANDSCAPING
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME
( Rp ) ( Rp )

A. PEKERJAAN PERSIAPAN
1 Pembuatan Papan Nama Proyek 1.00 bh 0.00
3 Pembersihan Lokasi Proyek 1.00 Ls 30,000,000.00 30,000,000.00
5 Dokumentasi Proyek 0.00
Sub Total 30,000,000.00
B. PEKERJAAN PENATAAN HALAMAN
1 Urugan Tanah Peninggian Halaman 2,000.00 m3 388,617.00 777,234,000.00
2 Pas. Paving Blok 3,986.00 m2 265,036.00 1,056,433,496.00
3 Cor Kerb Camp. 1 : 3 : 5 23.71 m3 1,903,122.00 45,114,458.57
4 Urugan Pasir Bawah Lantai Cor 89.58 m3 393,417.00 35,240,327.78
5 Cor Lantai Sisi Dalam Area Pasar Camp. 1 : 3 : 5 1,324.00 m2 210,182.00 278,280,968.00
6 Pas. Saluran Air hujan Camp. 1 : 3 396.00 m' 200,552.90 79,418,948.40
Sub Total 2,271,722,198.75

REKAPITULASI

I PEKERJAAN PERSIAPAN 30,000,000.00

II PEKERJAAN PENATAAN HALAMAN 2,271,722,198.75

Real Cost 2,301,722,198.75


PPN 10 % 230,172,219.87
Total Cost 2,531,894,418.62
Dibulatkan 2,531,894,000.00
REKAPITULASI

A PEKERJAAN LANDSCAPE 2,531,894,000.00

B PEKERJAAN PEMBANGUNAN LOS PASAR 2,458,493,000.00

C PEKERJAAN PEMBANGUNAN KIOS PASAR 7,469,060,000.00

D PEKERJAAN PEMBANGUNAN TOILET UMUM 219,736,000.00

E PEKERJAAAN PAGAR KELILING 884,525,000.00

F PEKERJAAN PEMBANGUNAN PANGKALAN OJEK 89,312,000.00

G PEKERJAAN PEMBANGUNAN POS RETRIBUSI 94,762,000.00

TOTAL COST 13,747,782,000.00


BIAYA PERENCANAAN 549,911,000.00
BIAYA PENGAWASAN 412,433,000.00
GRAND TOTAL 14,710,126,000.00

TERBILANG :

Waropen, Mei 2015

DISETUJUI : DISUSUN OLEH :


KEPALA DINAS PERINDUSTRIAN, PERDAGANGAN, DAN CV. ASCOM KONSULTAN
UKM
KABUPATEN WAROPEN

………………………………………….. …………………………………..
NIP. …………………………….. Ka. Perwakilan

MENGETAHUI :
KEPALA DINAS PEKERJAAN UMUM DAN PERUMAHAN
KABUPATEN WAROPEN

Ir. EBEN SAUR SINAGA, M. MT.


NIP. 19670115 199403 1 013
ANALISA SATUAN PEKERJAAN BETON
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)

PEKERJAAN BETON
SNI 1.0000 m3 Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr
6.13 336.0000 kg PC @ Rp. 2,856.25 959,700.00
0.5400 m 3
Pasir beton @ Rp. 766,000.00 413,640.00
0.8100 m3 Kerikil beton @ Rp. 787,000.00 637,470.00
0.2750 org Tukang batu @ Rp. 137,088.00 37,699.20
0.0275 org Kepala tukang batu @ Rp. 154,224.00 4,241.16
1.6500 org Pekerja @ Rp. 85,680.00 141,372.00
0.0825 org Mandor @ Rp. 171,360.00 14,137.20
JUMLAH 197,449.56 2,010,810.00 2,208,259.56
DIBULATKAN 197,449.00 2,010,810.00 2,208,259.00

SNI 1.0000 m3 Membuat beton tumbuk, 1 Pc : 3 Ps : 5 Kr


6.1 218.0000 kg PC @ Rp. 2,856.25 622,662.50
0.5200 m3 Pasir beton @ Rp. 766,000.00 398,320.00
0.8700 m 3
Kerikil beton @ Rp. 787,000.00 684,690.00
0.2750 org Tukang batu @ Rp. 137,088.00 37,699.20
0.0275 org Kepala tukang batu @ Rp. 154,224.00 4,241.16
1.6500 org Pekerja @ Rp. 85,680.00 141,372.00
0.0825 org Mandor @ Rp. 171,360.00 14,137.20
JUMLAH 197,449.56 1,705,672.50 1,903,122.06
DIBULATKAN 197,449.00 1,705,672.00 1,903,122.00

1.0000 m2 Membuat lantai beton tanpa tulangan, 1 Pc : 3 Ps : 6 Kr tebal 7 cm dan finishing plester
18.2000 kg PC @ Rp. 2,856.25 51,983.75
0.0440 m3 Pasir pasang @ Rp. 333,200.00 14,660.80
0.0700 m 3
Kerikil beton @ Rp. 787,000.00 55,090.00
0.1350 org Tukang batu @ Rp. 137,088.00 18,506.88
0.0135 org Kepala tukang batu @ Rp. 154,224.00 2,082.02
0.7200 org Pekerja @ Rp. 85,680.00 61,689.60
0.0360 org Mandor @ Rp. 171,360.00 6,168.96
JUMLAH 88,447.46 121,734.55 210,182.01
DIBULATKAN 88,447.00 121,734.00 210,182.00

AK 1.0000 m3 Beton cyclope 1pc:3ps:5kr


0.7000 m 3
Batu kali @ Rp. 900,000.00 630,000.00
61.2500 kg PC @ Rp. 2,856.25 174,945.31
0.4000 m3 Pasir pasang @ Rp. 333,200.00 133,280.00
0.6500 m 3
Kerikil beton @ Rp. 787,000.00 511,550.00
0.2750 org Tukang batu @ Rp. 137,088.00 37,699.20
0.0275 org Kep. Tk. Batu @ Rp. 154,224.00 4,241.16
1.6500 org Pekerja @ Rp. 85,680.00 141,372.00
0.0825 org Mandor @ Rp. 171,360.00 14,137.20
JUMLAH 197,449.56 1,449,775.31 1,647,224.87
DIBULATKAN 197,449.00 1,449,775.00 1,647,224.00

SNI 1.0000 m3 Membuat beton bertulang, 1 Pc : 1,5 Ps : 2,5 Kr


6.16 400.0000 kg PC @ Rp. 2,856.25 1,142,500.00
0.4800 m 3
Pasir beton @ Rp. 766,000.00 367,680.00
0.8000 m3 Kerikil beton @ Rp. 787,000.00 629,600.00
0.2750 org Tukang batu @ Rp. 137,088.00 37,699.20
0.0275 org Kepala tukang batu @ Rp. 154,224.00 4,241.16
1.6500 org Pekerja @ Rp. 85,680.00 141,372.00
0.0825 org Mandor @ Rp. 171,360.00 14,137.20
JUMLAH 197,449.56 2,139,780.00 2,337,229.56
DIBULATKAN 197,449.00 2,139,780.00 2,337,229.00

SNI 1.0000 m3 Membuat beton dengan mutu K 175


6.36 326.0000 kg PC @ Rp. 2,856.25 931,137.50
0.5428 m 3
Pasir beton @ Rp. 766,000.00 415,784.80
0.7622 m 3
Kerikil beton @ Rp. 787,000.00 599,851.40
0.2750 org Tukang batu @ Rp. 137,088.00 37,699.20
0.0275 org Kepala tukang batu @ Rp. 154,224.00 4,241.16
1.6500 org Pekerja @ Rp. 85,680.00 141,372.00
0.0825 org Mandor @ Rp. 171,360.00 14,137.20
JUMLAH 197,449.56 1,946,773.70 2,144,223.26
DIBULATKAN 197,449.00 1,946,773.00 2,144,223.00

SNI 1.0000 m3 Membuat beton dengan mutu K 200


6.36 352.0000 kg PC @ Rp. 2,856.25 1,005,400.00
0.5221 m 3
Pasir beton @ Rp. 766,000.00 399,928.60
0.7637 m3 Kerikil beton @ Rp. 787,000.00 601,031.90
0.2750 org Tukang batu @ Rp. 137,088.00 37,699.20
0.0275 org Kepala tukang batu @ Rp. 154,224.00 4,241.16
1.6500 org Pekerja @ Rp. 85,680.00 141,372.00
0.0825 org Mandor @ Rp. 171,360.00 14,137.20
JUMLAH 197,449.56 2,006,360.50 2,203,810.06
DIBULATKAN 197,449.00 2,006,360.00 2,203,810.00

SNI 1.0000 m3 Membuat beton dengan mutu K 225


6.35 388.0000 kg PC @ Rp. 2,856.25 1,108,225.00
0.6500 m3 Pasir beton @ Rp. 766,000.00 497,900.00
0.6500 m 3
Kerikil beton @ Rp. 787,000.00 511,550.00
0.2750 org Tukang batu @ Rp. 137,088.00 37,699.20
0.0275 org Kepala tukang batu @ Rp. 154,224.00 4,241.16
1.6500 org Pekerja @ Rp. 85,680.00 141,372.00
0.0825 org Mandor @ Rp. 171,360.00 14,137.20
JUMLAH 197,449.56 2,117,675.00 2,315,124.56
DIBULATKAN 197,449.00 2,117,675.00 2,315,124.00

SNI 1.0000 m3 Membuat beton dengan mutu K 250


6.36 384.0000 kg PC @ Rp. 2,856.25 1,096,800.00
0.4943 m 3
Pasir beton @ Rp. 900,000.00 444,870.00
0.7696 m 3
Kerikil beton @ Rp. 895,000.00 688,792.00
0.2750 org Tukang batu @ Rp. 137,088.00 37,699.20
0.0275 org Kepala tukang batu @ Rp. 154,224.00 4,241.16
1.6500 org Pekerja @ Rp. 85,680.00 141,372.00
0.0825 org Mandor @ Rp. 171,360.00 14,137.20
JUMLAH 197,449.56 2,230,462.00 2,427,911.56
DIBULATKAN 197,449.00 2,230,462.00 2,427,911.00

SNI 1.0000 m3 Membuat beton dengan mutu K 275


6.36 406.0000 kg PC @ Rp. 2,856.25 1,159,637.50
0.4886 m 3
Pasir beton @ Rp. 1,012,500.00 494,707.50
0.7600 m3 Kerikil beton @ Rp. 787,000.00 598,120.00
0.2750 org Tukang batu @ Rp. 137,088.00 37,699.20
0.0275 org Kepala tukang batu @ Rp. 154,224.00 4,241.16
1.6500 org Pekerja @ Rp. 85,680.00 141,372.00
0.0825 org Mandor @ Rp. 171,360.00 14,137.20
JUMLAH 197,449.56 2,252,465.00 2,449,914.56
DIBULATKAN 197,449.00 2,252,465.00 2,449,914.00
1.0000 m3 Membuat beton dengan mutu K 300
413.0000 kg PC @ Rp. 2,856.25 1,179,631.25
0.4864 m 3
Pasir beton @ Rp. 1,012,500.00 492,480.00
0.7563 m 3
Kerikil beton @ Rp. 787,000.00 595,208.10
0.2750 org Tukang batu @ Rp. 137,088.00 37,699.20
0.0275 org Kepala tukang batu @ Rp. 154,224.00 4,241.16
1.6500 org Pekerja @ Rp. 85,680.00 141,372.00
0.0825 org Mandor @ Rp. 171,360.00 14,137.20
JUMLAH 197,449.56 2,267,319.35 2,464,768.91
DIBULATKAN 197,449.00 2,267,319.00 2,464,768.00

SNI 1.0000 kg Pembesian dengan besi polos


6.25 1.0500 kg Besi beton polos @ Rp. 24,400.00 25,620.00
0.0150 kg Kawat beton @ Rp. 34,563.00 518.45
0.0070 org Tukang besi @ Rp. 137,088.00 959.62
0.0007 org Kepala tukang besi @ Rp. 154,224.00 107.96
0.0070 org Pekerja @ Rp. 85,680.00 599.76
0.0004 org Mandor @ Rp. 171,360.00 59.98
JUMLAH 1,727.31 26,138.45 27,865.75
DIBULATKAN 1,727.00 26,138.00 27,865.00

SNI 1.0000 kg Pembesian dengan besi ulir


6.25 1.0500 kg Besi beton ulir @ Rp. 24,197.00 25,406.85
0.0150 kg Kawat beton @ Rp. 34,563.00 518.45
0.0070 org Tukang besi @ Rp. 137,088.00 959.62
0.0007 org Kepala tukang besi @ Rp. 154,224.00 107.96
0.0070 org Pekerja @ Rp. 85,680.00 599.76
0.0004 org Mandor @ Rp. 171,360.00 59.98
JUMLAH 1,727.31 25,925.30 27,652.60
DIBULATKAN 1,727.00 25,925.00 27,652.00

F.8 1.0000 m2 Cetakan beton / begisting memakai papan


0.0170 m 3
Usuk ky. Kls. II @ Rp. 3,135,000.00 53,295.00
0.0240 m3 Papan cetakan @ Rp. 3,135,000.00 75,240.00
0.4000 kg Paku @ Rp. 27,325.00 10,930.00
0.5000 org Tukang kayu @ Rp. 137,088.00 68,544.00
0.0500 org Kep. Tk. Kayu @ Rp. 154,224.00 7,711.20
0.2000 org Pekerja @ Rp. 85,680.00 17,136.00
0.0100 org Mandor @ Rp. 171,360.00 1,713.60
JUMLAH 95,104.80 139,465.00 234,569.80
DIBULATKAN 95,104.00 139,465.00 234,569.00

F.8 1.0000 m2 Cetakan beton / begisting memakai multiplek


0.0170 m3 Usuk ky. Kls. II @ Rp. 3,135,000.00 53,295.00
0.3470 lbr Multiplek @ Rp. 335,940.00 116,571.18
0.4000 kg Paku @ Rp. 27,325.00 10,930.00
0.5000 org Tukang kayu @ Rp. 137,088.00 68,544.00
0.0500 org Kep. Tk. Kayu @ Rp. 154,224.00 7,711.20
0.2000 org Pekerja @ Rp. 85,680.00 17,136.00
0.0100 org Mandor @ Rp. 171,360.00 1,713.60
JUMLAH 95,104.80 180,796.18 275,900.98
DIBULATKAN 95,104.00 180,796.00 275,900.00

F.V 1.0000 m3 Membongkar cetakan


4.0000 org Pekerja @ Rp. 85,680.00 342,720.00
JUMLAH 342,720.00 342,720.00
DIBULATKAN 342,720.00 342,720.00

Sup Stutwerk untuk 1 m3 beton, tinggi 3 - 4 m ( memakai dolken )


muko2 0.7000 m3 Perancah/dolken @ Rp. 1,895,000.00 1,326,500.00
hal 10.5000 org Tukang kayu @ Rp. 137,088.00 1,439,424.00
332 1.0500 org Kep. Tk. Kayu @ Rp. 154,224.00 161,935.20
3.5000 org Pekerja @ Rp. 85,680.00 299,880.00
0.1750 org Mandor @ Rp. 171,360.00 29,988.00
JUMLAH 1,931,227.20 1,326,500.00 3,257,727.20
DIBULATKAN 1,931,227.00 1,326,500.00 3,257,727.00

Stutwerk untuk 1 m3 beton, tinggi 3 - 4 m ( memakai scafolding )


32.0000 unit Scafolding @ Rp. 75,000.00 2,400,000.00
3.5000 org Tukang kayu @ Rp. 137,088.00 479,808.00
0.3500 org Kep. Tk. Kayu @ Rp. 154,224.00 53,978.40
2.2000 org Pekerja @ Rp. 85,680.00 188,496.00
0.1200 org Mandor @ Rp. 171,360.00 20,563.20
JUMLAH 742,845.60 2,400,000.00 3,142,845.60
DIBULATKAN 742,845.00 2,400,000.00 3,142,845.00

1.0000 m3 Kolom praktis beton bertulang (10x10 cm) camp. 1 : 2 : 3


1.0000 m3 Beton Camp. 1 : 2 : 3 @ Rp. 2,208,259.00 2,208,259.00
281.0000 kg Besi Beton @ Rp. 27,865.00 7,830,065.00
20.0000 m2 Papan Bekisting @ Rp. 234,569.00 4,691,380.00
JUMLAH 14,729,704.00
DIBULATKAN 14,729,704.00
1.0000 m' Kolom praktis beton bertulang (10x10 cm) camp. 1 : 2 : 3 147,297.04

1.0000 m3 Ring balok beton bertulang (10x20 cm)


1.0000 m3 Beton Camp. 1 : 2 : 3 @ Rp. 2,208,259.00 2,208,259.00
150.0000 kg Besi Beton @ Rp. 27,865.00 4,179,750.00
20.0000 m2 Papan Bekisting @ Rp. 234,569.00 4,691,380.00
JUMLAH 11,079,389.00
DIBULATKAN 11,079,389.00
1.0000 m' Ringbalk praktis beton bertulang (10x15 cm) camp. 1 : 2 : 3 110,793.89

1.0000 m3 Balok praktis beton bertulang (10x30 cm)


1.0000 m3 Beton K175 @ Rp. 2,144,223.00 2,144,223.00
150.0000 kg Besi Beton @ Rp. 27,865.00 4,179,750.00
20.0000 m2 Papan Bekisting @ Rp. 234,569.00 4,691,380.00
JUMLAH 11,015,353.00
DIBULATKAN 11,015,353.00
1.0000 m' Ringbalk praktis beton bertulang (10x30 cm) K175 110,153.53

1.0000 m3 Kolom Beton Bertulang K200 uk. 40x40 cm pembesian 145 kg


1.0000 m3 Beton K200 @ Rp. 2,203,810.00 2,203,810.00
145.0000 kg Besi Beton @ Rp. 27,865.00 4,040,425.00
10.0000 m2 Papan Bekisting @ Rp. 234,569.00 2,345,690.00
JUMLAH 8,589,925.00
DIBULATKAN 8,589,925.00

1.0000 m3 Kolom Beton Bertulang K200 uk. 15x30 cm pembesian 110 kg


1.0000 m3 Beton K175 @ Rp. 2,144,223.00 2,144,223.00
110.0000 kg Besi Beton @ Rp. 27,865.00 3,065,150.00
16.6000 m2 Papan Bekisting @ Rp. 234,569.00 3,893,845.40
JUMLAH 9,103,218.40
DIBULATKAN 9,103,218.00

1.0000 m3 Kolom Beton Bertulang K200 uk. 25x25 cm pembesian 80 kg


1.0000 m3 Beton camp. 1 : 2 : 3 @ Rp. 2,208,259.00 2,208,259.00
80.0000 kg Besi Beton @ Rp. 27,865.00 2,229,200.00
16.0000 m2 Papan Bekisting @ Rp. 234,569.00 3,753,104.00
JUMLAH 8,190,563.00
DIBULATKAN 8,190,563.00
1.0000 m3 Kolom Beton Bertulang K200 uk. 20x25 cm pembesian 110 kg
1.0000 m3 Beton K200 @ Rp. 2,203,810.00 2,203,810.00
110.0000 kg Besi Beton @ Rp. 27,865.00 3,065,150.00
18.0000 m2 Papan Bekisting @ Rp. 234,569.00 4,222,242.00
JUMLAH 9,491,202.00
DIBULATKAN 9,491,202.00

1.0000 m3 Pondasi Poer Beton Bertulang K200 pembesian 175 kg


1.0000 m3 Beton K200 @ Rp. 2,203,810.00 2,203,810.00
175.0000 kg Besi Beton @ Rp. 27,865.00 4,876,375.00
3.3300 m2 Papan Bekisting @ Rp. 234,569.00 781,114.77
JUMLAH 7,861,299.77
DIBULATKAN 7,861,299.00

1.0000 m3 Soof Beton Bertulang K200 uk. 25x40 cm pembesian 120 kg


1.0000 m3 Beton K200 @ Rp. 2,203,810.00 2,203,810.00
120.0000 kg Besi Beton @ Rp. 27,865.00 3,343,800.00
8.0000 m2 Papan Bekisting @ Rp. 234,569.00 1,876,552.00
JUMLAH 7,424,162.00
DIBULATKAN 7,424,162.00

1.0000 m3 Soof Beton Bertulang K200 uk. 20x30 cm pembesian 120 kg


1.0000 m3 Beton K200 @ Rp. 2,203,810.00 2,203,810.00
120.0000 kg Besi Beton @ Rp. 27,865.00 3,343,800.00
10.0000 m2 Papan Bekisting @ Rp. 234,569.00 2,345,690.00
JUMLAH 7,893,300.00
DIBULATKAN 7,893,300.00

1.0000 m3 Soof Beton Bertulang camp. 1 : 2 : 3 uk. 15x20 cm pembesian 105 kg


1.0000 m3 Beton camp. 1 : 2 : 3 @ Rp. 2,208,259.00 2,208,259.00
105.0000 kg Besi Beton @ Rp. 27,865.00 2,925,825.00
13.3300 m2 Papan Bekisting @ Rp. 234,569.00 3,126,804.77
JUMLAH 8,260,888.77
DIBULATKAN 8,260,888.00

1.0000 m3 Balok Beton Bertulang K200 uk. 25x50 cm pembesian 145 kg


1.0000 m3 Beton K200 @ Rp. 2,203,810.00 2,203,810.00
145.0000 kg Besi Beton @ Rp. 27,865.00 4,040,425.00
10.0000 m2 Papan Bekisting @ Rp. 234,569.00 2,345,690.00
JUMLAH 8,589,925.00
DIBULATKAN 8,589,925.00

1.0000 m3 Ring Balok Beton Bertulang K200 uk. 15x30 cm pembesian 145 kg
1.0000 m3 Beton K200 @ Rp. 2,203,810.00 2,203,810.00
145.0000 kg Besi Beton @ Rp. 27,865.00 4,040,425.00
13.3300 m2 Papan Bekisting @ Rp. 234,569.00 3,126,804.77
JUMLAH 9,371,039.77
DIBULATKAN 9,371,039.00

1.0000 m3 Dak Beton Bertulang camp. 1 : 2 : 3 tebal 10 cm pembesian 110 kg


1.0000 m3 Beton camp. 1 : 2 : 3 @ Rp. 2,208,259.00 2,208,259.00
110.0000 kg Besi Beton @ Rp. 27,865.00 3,065,150.00
10.0000 m2 Papan Bekisting @ Rp. 234,569.00 2,345,690.00
JUMLAH 7,619,099.00
DIBULATKAN 7,619,099.00

1.0000 m3 Lantai Slab Beton Bertulang camp. 1 : 2 : 3 tebal 10 cm pembesian 75 kg


1.0000 m3 Beton camp. 1 : 2 : 3 @ Rp. 2,208,259.00 2,208,259.00
75.0000 kg Besi Beton @ Rp. 27,865.00 2,089,875.00
m2 Papan Bekisting @ Rp. 234,569.00 0.00
JUMLAH 4,298,134.00
DIBULATKAN 4,298,134.00
ANALISA SATUAN PEKERJAAN
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)

PEKERJAAN RANGKA BAJA


SNI 1.0000 kg Pasang rangka atap baja
1.1000 kg Besi baja @ Rp. 9,960.37 10,956.40
0.0050 kg Elektroda @ Rp. 60,000.00 300.00
0.0600 org @ Rp. 137,088.00 8,225.28
0.0060 org @ Rp. 154,224.00 925.34
0.0600 org @ Rp. 85,680.00 5,140.80
0.0030 org @ Rp. 171,360.00 514.08
JUMLAH 14,805.50 11,256.40 26,061.91
DIBULATKAN 14,805.00 11,256.00 26,061.00

SNI 1.0000 m3 Pasang Gording baja


6.1 1.1000 kg Gording baja @ Rp. 9,960.37 10,956.40
0.0050 kg Elektroda @ Rp. 60,000.00 300.00
0.0600 org Tukang besi @ Rp. 137,088.00 8,225.28
0.0060 org Kepala tukang besi @ Rp. 154,224.00 925.34
0.0600 org Pekerja @ Rp. 85,680.00 5,140.80
0.0030 org Mandor @ Rp. 171,360.00 514.08
JUMLAH 14,805.50 11,256.40 26,061.91
DIBULATKAN 14,805.00 11,256.00 26,061.00

1.0000 M2 Atap Superdeks


0.8700 Lbr Superdeks @ Rp. 231,000.00 200,970.00
0.0250 kg Paku Ardeks @ Rp. 45,475.00 1,136.88
0.2000 org Tukang @ Rp. 137,088.00 27,417.60
0.0200 org Kepala Tukang @ Rp. 154,224.00 3,084.48
0.1000 org Pekerja @ Rp. 85,680.00 8,568.00
0.0050 org Mandor @ Rp. 171,360.00 856.80
JUMLAH 39,926.88 202,106.88 242,033.76
DIBULATKAN 39,926.00 202,106.00 242,033.00
ANALISA SATUAN PEKERJAAN PENDAHULUAN DAN TANAH
No. Macam Pekerjaan Upah Bahan
(1) (2) (3) (4)

PEKERJAAN PERSIAPAN

SNI 1.0000 m1 Pengukuran dan pemasangan bouwplank untuk gedung dan saluran
6.4 0.0120 m3 Kayu kls. II @ Rp. 3,135,000.00 37,620.00
03-2835-2002 0.0200 kg Paku reng @ Rp. 27,325.00 546.50
0.0070 m3 Papan kayu kls. II @ Rp. 3,135,000.00 21,945.00
0.1000 org Tukang kayu @ Rp. 137,088.00 13,708.80
0.0100 org Kepala tukang kayu @ Rp. 154,224.00 1,542.24
0.1000 org Pekerja @ Rp. 85,680.00 8,568.00
0.0050 org Mandor @ Rp. 171,360.00 856.80
JUMLAH 24,675.84 60,111.50
DIBULATKAN 24,675.00 60,111.00

SNI 1.0000 m2 Membersihkan lapangan dan perataan


6.8 0.1000 org Pekerja @ Rp. 85,680.00 8,568.00
03-2835-2002 0.0500 org Mandor @ Rp. 171,360.00 8,568.00
JUMLAH 17,136.00
DIBULATKAN 17,136.00

A4 1.0000 bh Membuat Papan Nama Proyek 80x120 cm


0.0350 m3 Kayu meranti @ Rp. 3,135,000.00 109,725.00
1.4000 m1
Seng plat lebar 90 cm @ Rp. 100,200.00 140,280.00
0.6000 kg Paku @ Rp. 27,325.00 16,395.00
1.5000 kg Cat kayu @ Rp. 62,025.00 93,037.50
16.8000 kg PC @ Rp. 2,856.25 47,985.00
0.0270 m3
Pasir beton @ Rp. 1,012,500.00 27,337.50
0.0405 m3 Kerikil beton @ Rp. 787,000.00 31,873.50
0.0175 org Tukang batu @ Rp. 137,088.00 2,399.04
1.0000 org Tukang kayu @ Rp. 137,088.00 137,088.00
1.0000 org Tukang cat @ Rp. 137,088.00 137,088.00
2.1000 org Pekerja @ Rp. 85,680.00 179,928.00
1.0050 org Mandor @ Rp. 171,360.00 172,216.80
JUMLAH 628,719.84 466,633.50
DIBULATKAN 628,719.00 466,633.00

SNI 1.0000 m2 Pembuatan jalan sementara, tebal 25 cm


6.16 0.2750 m3 Batu belah @ Rp. 1,183,875.00 325,565.63
0.0300 m3
Kerikil @ Rp. 1,270,500.00 38,115.00
0.0500 m3 Pasir @ Rp. 333,200.00 16,660.00
1.0000 org Pekerja @ Rp. 85,680.00 85,680.00
0.1000 org Mandor @ Rp. 171,360.00 17,136.00
JUMLAH 102,816.00 380,340.63
DIBULATKAN 102,816.00 380,340.00

SNI 1.0000 m2 Pembuatan kantor sementara, dengan lantai plesteran


6.5 1.2500 btg Dolken kayu Ø 8 - 10/400 cm @ Rp. 59,218.75 74,023.44
03-2835-2002 0.1800 m3 Kayu kls. II @ Rp. 3,135,000.00 564,300.00
0.8500 kg Paku biasa @ Rp. 27,325.00 23,226.25
1.1000 kg Baja strip @ Rp. 133,000.00 146,300.00
35.0000 kg PC @ Rp. 2,856.25 99,968.75
0.1500 m3 Pasir pasang @ Rp. 333,200.00 49,980.00
0.1000 m3 Pasir beton @ Rp. 766,000.00 76,600.00
No. Macam Pekerjaan Upah Bahan
(1) (2) (3) (4)
0.1500 m3 Kerikil beton @ Rp. 787,000.00 118,050.00
10.0000 bh Batu tela @ Rp. 5,800.00 58,000.00
0.2500 lbr Seng plat 3" x 6 " @ Rp. 100,200.00 25,050.00
2.0000 bh Jendela nako @ Rp. 18,562.00 37,124.00
0.0800 m2 Kaca polos @ Rp. 357,500.00 28,600.00
0.1500 bh Kunci tanam @ Rp. 123,750.00 18,562.50
0.0600 lbr Plywood 4 mm @ Rp. 129,954.00 7,797.24
2.0000 org Tukang kayu @ Rp. 137,088.00 274,176.00
1.0000 org Tukang batu @ Rp. 137,088.00 137,088.00
0.3000 org Kepala tukang @ Rp. 154,224.00 46,267.20
2.0000 org Pekerja @ Rp. 85,680.00 171,360.00
0.0500 org Mandor @ Rp. 171,360.00 8,568.00
JUMLAH 637,459.20 1,327,582.18
DIBULATKAN 637,459.00 1,327,582.00

SNI 1.0000 m1 Pembuatan pagar sementara dari seng gelombang tinggi 2 meter
6.2 1.2500 btg Dolken kayu Ø 8 - 10/400 cm @ Rp. 59,218.75 74,023.44
03-2835-2002 2.5000 kg PC @ Rp. 2,856.25 7,140.63
1.2000 lbr Seng gelombang 2"-5" BJLS 24 @ Rp. 84,450.00 101,340.00
0.0050 m3 Pasir beton @ Rp. 1,012,500.00 5,062.50
0.0090 m3 Kerikil beton @ Rp. 787,000.00 7,083.00
0.0250 m3
Kaso 5/7 kayu meranti @ Rp. 3,135,000.00 78,375.00
0.0600 kg Paku biasa 2" - 5" @ Rp. 27,325.00 1,639.50
0.4000 kg Meni besi @ Rp. 49,650.00 19,860.00
0.2000 org Tukang kayu @ Rp. 137,088.00 27,417.60
0.0200 org Kepala tukang kayu @ Rp. 154,224.00 3,084.48
0.4000 org Pekerja @ Rp. 85,680.00 34,272.00
0.0200 org Mandor @ Rp. 171,360.00 3,427.20
JUMLAH 68,201.28 294,524.06
DIBULATKAN 68,201.00 294,524.00

PEKERJAAN TANAH
SNI 1.0000 m3 Galian tanah biasa sedalam sampai 1 meter
6.1 0.4000 org Pekerja @ Rp. 85,680.00 34,272.00
0.0400 org Mandor @ Rp. 171,360.00 6,854.40
JUMLAH 41,126.40
DIBULATKAN 41,126.00

SNI 1.0000 m3 Galian tanah biasa sedalam 1 - 2 meter


6.2 0.5260 org Pekerja @ Rp. 85,680.00 45,067.68
0.0526 org Mandor @ Rp. 171,360.00 9,013.54
JUMLAH 54,081.22
DIBULATKAN 54,081.00

SNI 1.0000 m3 Galian tanah biasa sedalam 2 - 3 meter


6.3 0.7350 org Pekerja @ Rp. 85,680.00 62,974.80
0.0735 org Mandor @ Rp. 171,360.00 12,594.96
JUMLAH 75,569.76
DIBULATKAN 75,569.00

SNI 1.0000 m3 Galian tanah keras sedalam sampai 1 meter


6.4 0.6250 org Pekerja @ Rp. 85,680.00 53,550.00
0.0620 org Mandor @ Rp. 171,360.00 10,624.32
JUMLAH 64,174.32
DIBULATKAN 64,174.00
No. Macam Pekerjaan Upah Bahan
(1) (2) (3) (4)
SNI 1.0000 m3 Galian tanah cadas sedalam sampai 1 meter
6.5 1.2500 org Pekerja @ Rp. 85,680.00 107,100.00
0.1250 org Mandor @ Rp. 171,360.00 21,420.00
JUMLAH 128,520.00
DIBULATKAN 128,520.00

SNI 1.0000 m3 Galian tanah lumpur sedalam 1 meter


6.6 0.8230 org Pekerja @ Rp. 85,680.00 70,514.64
0.0830 org Mandor @ Rp. 171,360.00 14,222.88
JUMLAH 84,737.52
DIBULATKAN 84,737.00

A6 1.0000 m3 Mengangkut tanah sejauh 30 meter


0.3300 org Pekerja @ Rp. 85,680.00 28,274.40
0.0100 org Mandor @ Rp. 171,360.00 1,713.60
JUMLAH 29,988.00
DIBULATKAN 29,988.00

SNI 1.0000 m3 Pembuangan tanah sejauh 150 meter


6.8 0.5160 org Pekerja @ Rp. 85,680.00 44,210.88
0.0500 org Mandor @ Rp. 171,360.00 8,568.00
JUMLAH 52,778.88
DIBULATKAN 52,778.00

A14 1.0000 m3 Membuang tanah dengan menghampar


0.2500 org Pekerja @ Rp. 85,680.00 21,420.00
0.0100 org Mandor @ Rp. 171,360.00 1,713.60
JUMLAH 23,133.60
DIBULATKAN 23,133.00

SNI 1.0000 m3 Urug kembali bekas galian


6.9 0.1920 org Pekerja @ Rp. 85,680.00 16,450.56
0.0190 org Mandor @ Rp. 171,360.00 3,255.84
JUMLAH 19,706.40
DIBULATKAN 19,706.00

1.0000 m2 Meratakan tanah ditumbuk halus


0.2500 org Pekerja @ Rp. 85,680.00 21,420.00
0.0100 org Mandor @ Rp. 171,360.00 1,713.60
JUMLAH 23,133.60
DIBULATKAN 23,133.00

A18 1.0000 m3 Urug pasir


1.2000 m3 Pasir urug @ Rp. 305,000.00 366,000.00
0.3000 org Pekerja @ Rp. 85,680.00 25,704.00
0.0100 org Mandor @ Rp. 171,360.00 1,713.60
JUMLAH 27,417.60 366,000.00
DIBULATKAN 27,417.00 366,000.00

MOD 1.0000 m3 Urug tanah mendatangkan


A18 1.2000 m3 Tanah urug @ Rp. 301,000.00 361,200.00
0.3000 org Pekerja @ Rp. 85,680.00 25,704.00
0.0100 org Mandor @ Rp. 171,360.00 1,713.60
JUMLAH 27,417.60 361,200.00
DIBULATKAN 27,417.00 361,200.00
No. Macam Pekerjaan Upah Bahan
(1) (2) (3) (4)
SNI 1.0000 m3 Urugan sirtu
6.15 1.2000 m3 Sirtu @ Rp. 305,000.00 366,000.00
0.2500 org Pekerja @ Rp. 85,680.00 21,420.00
0.0250 org Mandor @ Rp. 171,360.00 4,284.00
JUMLAH 25,704.00 366,000.00
DIBULATKAN 25,704.00 366,000.00
H
Jumlah
(5)

84,787.34
84,787.00

17,136.00
17,136.00

1,095,353.34
1,095,353.00

483,156.63
483,156.00
Jumlah
(5)

1,965,041.38
1,965,041.00

362,725.34
362,725.00

41,126.40
41,126.00

54,081.22
54,081.00

75,569.76
75,569.00

64,174.32
64,174.00
Jumlah
(5)

128,520.00
128,520.00

84,737.52
84,737.00

29,988.00
29,988.00

52,778.88
52,778.00

23,133.60
23,133.00

19,706.40
19,706.00

23,133.60
23,133.00

393,417.60
393,417.00

388,617.60
388,617.00
Jumlah
(5)

391,704.00
391,704.00
ANALISA SATUAN PEKERJAAN BATU DAN PASANGAN
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)

PEKERJAAN PASANGAN

SNI 1.0000 m3 Pasangan pondasi batu kosong


6.14 1.2000 m3 Batu belah 15/20 cm @ Rp. 732,000.00 878,400.00
03-2836-2002 0.3000 m3 Pasir urug @ Rp. 305,000.00 91,500.00
0.3900 org Tukang batu @ Rp. 137,088.00 53,464.32
0.0390 org Kepala tukang batu @ Rp. 154,224.00 6,014.74
0.7800 org Pekerja @ Rp. 85,680.00 66,830.40
0.0390 org Mandor @ Rp. 171,360.00 6,683.04
JUMLAH 132,992.50 969,900.00 1,102,892.50
DIBULATKAN 132,992.00 969,900.00 1,102,892.00

SNI 1.0000 m3 Pasangan pondasi 1 Pc : 3 Ps


6.5 1.1000 m3 Batu belah 15/20 cm @ Rp. 732,000.00 805,200.00
03-2836-2002 202.0000 kg PC @ Rp. 2,856.25 576,962.50
0.4850 m3 Pasir pasang @ Rp. 333,200.00 161,602.00
0.6000 org Tukang batu @ Rp. 137,088.00 82,252.80
0.0600 org Kepala tukang batu @ Rp. 154,224.00 9,253.44
1.5000 org Pekerja @ Rp. 85,680.00 128,520.00
0.0750 org Mandor @ Rp. 171,360.00 12,852.00
JUMLAH 232,878.24 1,543,764.50 1,776,642.74
DIBULATKAN 232,878.00 1,543,764.00 1,776,642.00

SNI 1.0000 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps


6.11 70.0000 bh Bata merah 5 x 11 x 22 cm @ Rp. 4,640.00 324,800.00
03-2837-2002 11.5000 kg PC @ Rp. 2,856.25 32,846.88
0.0430 m3 Pasir pasang @ Rp. 333,200.00 14,327.60
0.1000 org Tukang batu @ Rp. 137,088.00 13,708.80
0.0100 org Kepala tukang batu @ Rp. 154,224.00 1,542.24
0.3200 org Pekerja @ Rp. 85,680.00 27,417.60
0.0150 org Mandor @ Rp. 171,360.00 2,570.40
JUMLAH 45,239.04 371,974.48 417,213.52
DIBULATKAN 45,239.00 371,974.00 417,213.00

1.0000 m2 Pasangan batu Tela, 1 Pc : 3 Ps


20.0000 bh Batu Tela @ Rp. 5,800.00 116,000.00
12.6400 kg PC @ Rp. 2,856.25 36,103.00
0.0280 m3 Pasir pasang @ Rp. 333,200.00 9,329.60
0.1500 org Tukang batu @ Rp. 137,088.00 20,563.20
0.0150 org Kepala tukang batu @ Rp. 154,224.00 2,313.36
0.4500 org Pekerja @ Rp. 85,680.00 38,556.00
0.0225 org Mandor @ Rp. 171,360.00 3,855.60
JUMLAH 65,288.16 161,432.60 226,720.76
DIBULATKAN 65,288.00 161,432.00 226,720.00
1.0000 m2 Pasangan Rolag batu Tela, 1 Pc : 3 Ps 453,440.00

SNI 1.0000 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 4 Ps


6.4 140.0000 bh Bata merah 5 x 11 x 22 cm @ Rp. 4,640.00 649,600.00
03-2837-2002 26.4500 kg PC @ Rp. 2,856.25 75,547.81
0.0980 m3
Pasir pasang @ Rp. 333,200.00 32,653.60
0.2000 org Tukang batu @ Rp. 137,088.00 27,417.60
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
0.0200 org Kepala tukang batu @ Rp. 154,224.00 3,084.48
0.6500 org Pekerja @ Rp. 85,680.00 55,692.00
0.0300 org Mandor @ Rp. 171,360.00 5,140.80
JUMLAH 91,334.88 757,801.41 849,136.29
DIBULATKAN 91,334.00 757,801.00 849,136.00

G.50.q 1.0000 m2 Plesteran batu kali 1pc:4ps


6.5110 kg PC @ Rp. 2,856.25 18,597.04
0.0209 m3 Pasir pasang @ Rp. 333,200.00 6,963.88
0.2000 org Tukang batu @ Rp. 137,088.00 27,417.60
0.0200 org Kep. Tk. Batu @ Rp. 154,224.00 3,084.48
0.4000 org Pekerja @ Rp. 85,680.00 34,272.00
0.0200 org Mandor @ Rp. 171,360.00 3,427.20
JUMLAH 68,201.28 25,560.92 93,762.20
DIBULATKAN 68,201.00 25,560.00 93,762.00

SNI 1.0000 m2 Plesteran 1 Pc : 4 Ps, tebal 15 mm


6.4 5.2000 kg PC @ Rp. 2,856.25 14,852.50
03-2837-2002 0.0200 m3 Pasir pasang @ Rp. 333,200.00 6,664.00
0.1500 org Tukang batu @ Rp. 137,088.00 20,563.20
0.0150 org Kepala tukang batu @ Rp. 154,224.00 2,313.36
0.2000 org Pekerja @ Rp. 85,680.00 17,136.00
0.0100 org Mandor @ Rp. 171,360.00 1,713.60
JUMLAH 41,726.16 21,516.50 63,242.66
DIBULATKAN 41,726.00 21,516.00 63,242.00

SNI 1.0000 m2 Plesteran dinding 1 Pc : 3 Ps, tebal 15 mm


6.30 7.7760 kg PC @ Rp. 2,856.25 22,210.20
03-2837-2002 0.0230 m3 Pasir pasang @ Rp. 333,200.00 7,663.60
0.1500 org Tukang batu @ Rp. 137,088.00 20,563.20
0.0150 org Kepala tukang batu @ Rp. 154,224.00 2,313.36
0.3000 org Pekerja @ Rp. 85,680.00 25,704.00
0.0100 org Mandor @ Rp. 171,360.00 1,713.60
JUMLAH 50,294.16 29,873.80 80,167.96
DIBULATKAN 50,294.00 29,873.00 80,167.00

SNI 1.0000 m2 Screed lantai 1 Pc : 3 Ps, tebal 30 mm


6.30 15.5520 kg PC @ Rp. 2,856.25 44,420.40
03-2837-2002 0.0460 m3
Pasir pasang @ Rp. 333,200.00 15,327.20
0.2250 org Tukang batu @ Rp. 137,088.00 30,844.80
0.0225 org Kepala tukang batu @ Rp. 154,224.00 3,470.04
0.4500 org Pekerja @ Rp. 85,680.00 38,556.00
0.0150 org Mandor @ Rp. 171,360.00 2,570.40
JUMLAH 75,441.24 59,747.60 135,188.84
DIBULATKAN 75,441.00 59,747.00 135,188.00

SNI 1.0000 m1 Les profil dinding L = 5 cm 1 Pc : 2 Ps ( untuk gedung )


6.31 0.8000 kg PC @ Rp. 2,856.25 2,285.00
03-2837-2002 0.0030 m3 Pasir pasang @ Rp. 333,200.00 999.60
0.0600 org Tukang batu @ Rp. 137,088.00 8,225.28
0.0060 org Kepala tukang batu @ Rp. 154,224.00 925.34
0.1200 org Pekerja @ Rp. 85,680.00 10,281.60
0.0040 org Mandor @ Rp. 171,360.00 685.44
JUMLAH 20,117.66 3,284.60 23,402.26
DIBULATKAN 20,117.00 3,284.00 23,402.00

SNI 1.0000 m2 Plesteran siar adukan 1 Pc : 2 Ps


No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
6.35 4.3200 kg PC @ Rp. 2,856.25 12,339.00
03-2837-2002 0.0160 m3 Pasir pasang @ Rp. 333,200.00 5,331.20
0.0700 org Tukang batu @ Rp. 137,088.00 9,596.16
0.0070 org Kepala tukang batu @ Rp. 154,224.00 1,079.57
0.1500 org Pekerja @ Rp. 85,680.00 12,852.00
0.0080 org Mandor @ Rp. 171,360.00 1,370.88
JUMLAH 24,898.61 17,670.20 42,568.81
DIBULATKAN 24,898.00 17,670.00 42,568.00

SNI 1.0000 m2 Plesteran Ciprat, 1 Pc : 2 Ps


6.34 4.3200 kg PC @ Rp. 2,856.25 12,339.00
0.0160 m3 Pasir pasang @ Rp. 333,200.00 5,331.20
0.1000 org Tukang batu @ Rp. 137,088.00 13,708.80
0.0100 org Kepala tukang batu @ Rp. 154,224.00 1,542.24
0.2500 org Pekerja @ Rp. 85,680.00 21,420.00
0.0150 org Mandor @ Rp. 171,360.00 2,570.40
JUMLAH 39,241.44 17,670.20 56,911.64
DIBULATKAN 39,241.00 17,670.00 56,911.00

Analisa ZAZ 1.0000 m2 Acian dinding bata


3.5000 kg PC @ Rp. 2,856.25 9,996.88
0.0330 org Tukang batu @ Rp. 137,088.00 4,523.90
0.0033 org Kep. Tk. Batu @ Rp. 154,224.00 508.94
0.0700 org Pekerja @ Rp. 85,680.00 5,997.60
0.0035 org Mandor @ Rp. 171,360.00 599.76
JUMLAH 11,630.20 9,996.88 21,627.08
DIBULATKAN 11,630.00 9,996.00 21,627.00

SNI 1.0000 m2 Pasang dinding batu hias tempel


6.74 1.0500 m2 Batu tempel hitam @ Rp. 350,000.00 367,500.00
11.7500 kg PC @ Rp. 2,856.25 33,560.94
0.0350 m3
Pasir pasang @ Rp. 333,200.00 11,662.00
0.3500 org Tukang batu @ Rp. 137,088.00 47,980.80
0.0350 org Kepala tukang batu @ Rp. 154,224.00 5,397.84
0.6500 org Pekerja @ Rp. 85,680.00 55,692.00
0.0300 org Mandor @ Rp. 171,360.00 5,140.80
JUMLAH 114,211.44 412,722.94 526,934.38
DIBULATKAN 114,211.00 412,722.00 526,934.00

1.0000 m' Pasang kanstin uk. 15x25x40


2.5000 bh Kanstin @ Rp. 36,857.14 92,142.86
0.1500 kg Semen PC @ Rp. 2,856.25 428.44
0.0500 m3 Pasir pasang @ Rp. 333,200.00 16,660.00
0.1000 org Tukang batu @ Rp. 137,088.00 13,708.80
0.0500 org Kep. Tk. Batu @ Rp. 154,224.00 7,711.20
0.0500 org Pekerja @ Rp. 85,680.00 4,284.00
0.0250 org Mandor @ Rp. 171,360.00 4,284.00
JUMLAH 29,988.00 109,231.29 139,219.29
DIBULATKAN 29,988.00 109,231.00 139,219.00

1.0000 m2 Pasang paving blok uk. 10x20x7


50.0000 bh paving blok @ Rp. 4,300.00 215,000.00
0.0500 m3 Pasir urug @ Rp. 305,000.00 15,250.00
0.1600 org Tukang batu @ Rp. 137,088.00 21,934.08
0.0500 org Kep. Tk. Batu @ Rp. 154,224.00 7,711.20
0.0100 org Pekerja @ Rp. 85,680.00 856.80
0.0250 org Mandor @ Rp. 171,360.00 4,284.00
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
JUMLAH 34,786.08 230,250.00 265,036.08
DIBULATKAN 34,786.00 230,250.00 265,036.00

1.0000 m2 Pasangan keramik 20 x 20 campuran 1 PC : 3 PP


1.1000 m2 Keramik 20 x 20 @ Rp. 272,975.00 300,272.50
14.1500 kg Semen PC @ Rp. 2,856.25 40,415.94
0.0390 m3 Pasir pasang @ Rp. 333,200.00 12,994.80
0.2000 kg Semen nat (tile grout) @ Rp. 18,150.00 3,630.00
0.3500 org Tukang batu @ Rp. 137,088.00 47,980.80
0.0350 org Kep. Tk. Batu @ Rp. 154,224.00 5,397.84
0.3500 org Pekerja @ Rp. 85,680.00 29,988.00
0.0350 org Mandor @ Rp. 171,360.00 5,997.60
JUMLAH 89,364.24 357,313.24 446,677.48
DIBULATKAN 89,364.00 357,313.00 446,677.00

1.0000 m2 Pasangan keramik 20 x 25 campuran 1 PC : 3 PP


1.1000 m2 Keramik 20 x 25 @ Rp. 317,700.00 349,470.00
14.1500 kg Semen PC @ Rp. 2,856.25 40,415.94
0.0390 m3 Pasir pasang @ Rp. 333,200.00 12,994.80
0.2000 kg Semen nat (tile grout) @ Rp. 18,150.00 3,630.00
0.3500 org Tukang batu @ Rp. 137,088.00 47,980.80
0.0350 org Kep. Tk. Batu @ Rp. 154,224.00 5,397.84
0.3500 org Pekerja @ Rp. 85,680.00 29,988.00
0.0350 org Mandor @ Rp. 171,360.00 5,997.60
JUMLAH 89,364.24 406,510.74 495,874.98
DIBULATKAN 89,364.00 406,510.00 495,874.00

1.0000 m2 Pasangan keramik 30 x 30 campuran 1 PC : 3 PP


1.1000 m2 Keramik 30 x 30 @ Rp. 266,860.00 293,546.00
14.1500 kg Semen PC @ Rp. 2,856.25 40,415.94
0.0390 m3
Pasir pasang @ Rp. 333,200.00 12,994.80
0.2000 kg Semen nat (tile grout) @ Rp. 18,150.00 3,630.00
0.3500 org Tukang batu @ Rp. 137,088.00 47,980.80
0.0350 org Kep. Tk. Batu @ Rp. 154,224.00 5,397.84
0.3500 org Pekerja @ Rp. 85,680.00 29,988.00
0.0350 org Mandor @ Rp. 171,360.00 5,997.60
JUMLAH 89,364.24 350,586.74 439,950.98
DIBULATKAN 89,364.00 350,586.00 439,950.00

1.0000 m2 Pasangan keramik 40 x 40 campuran 1 PC : 3 PP


1.1000 m2 Keramik 40 x 40 @ Rp. 285,768.00 314,344.80
14.1500 kg Semen PC @ Rp. 2,856.25 40,415.94
0.0390 m3 Pasir pasang @ Rp. 333,200.00 12,994.80
0.2000 kg Semen nat (tile grout) @ Rp. 18,150.00 3,630.00
0.3500 org Tukang batu @ Rp. 137,088.00 47,980.80
0.0350 org Kep. Tk. Batu @ Rp. 154,224.00 5,397.84
0.3500 org Pekerja @ Rp. 85,680.00 29,988.00
0.0350 org Mandor @ Rp. 171,360.00 5,997.60
JUMLAH 89,364.24 371,385.54 460,749.78
DIBULATKAN 89,364.00 371,385.00 460,749.00

10.0000 m' Selokan pas. Batu tela camp. 1 : 3 uk. 25x25 cm diplester camp. 1 : 3
111.0000 Bh Batu tela @ Rp. 5,800.00 643,800.00
0.2100 m3
Pasir @ Rp. 333,200.00 69,972.00
44.8000 kg Semen PC @ Rp. 2,856.25 127,960.00
8.5000 m2 Plesteran @ Rp. 80,167.00 681,419.50
1.1250 org Tukang batu @ Rp. 137,088.00 154,224.00
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
0.1900 org Kep. Tk. Batu @ Rp. 154,224.00 29,302.56
3.1500 org Pekerja @ Rp. 85,680.00 269,892.00
0.1690 org Mandor @ Rp. 171,360.00 28,959.84
JUMLAH 482,378.40 1,523,151.50 2,005,529.90
DIBULATKAN 482,378.00 1,523,151.00 2,005,529.00
1.0000 m' Selokan pas. Batu tela camp. 1 : 3 uk. 25x25 cm diplester camp. 1 : 3 200,552.90
ANALISA SATUAN PEKERJAAN SANITAIR
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)

PEKERJAAN SANITASI
SNI 1.0000 bh Memasang kloset duduk/monoblock
1.0000 bh Kloset duduk / monoblock @ Rp. 1,455,300.00 1,455,300.00
6.1 6% x Harga kloset (Perlengkapan) @ Rp. 1,455,300.00 87,318.00
1.1000 org Tukang batu @ Rp. 137,088.00 150,796.80
0.0010 org Kepala tukang batu @ Rp. 154,224.00 154.22
3.3000 org Pekerja @ Rp. 85,680.00 282,744.00
0.1600 org Mandor @ Rp. 171,360.00 27,417.60
JUMLAH 461,112.62 1,542,618.00 2,003,730.62
DIBULATKAN 461,112.00 1,542,618.00 2,003,730.00

SNI 1.0000 bh Memasang kloset jongkok porselen


1.0000 bh Kloset jongkok porselen @ Rp. 226,875.00 226,875.00
6.2 6.0000 kg PC @ Rp. 2,856.25 17,137.50
0.0100 m3 Pasir pasang @ Rp. 333,200.00 3,332.00
1.5000 org Tukang batu @ Rp. 137,088.00 205,632.00
1.5000 org Kepala tukang batu @ Rp. 154,224.00 231,336.00
1.0000 org Pekerja @ Rp. 85,680.00 85,680.00
0.1600 org Mandor @ Rp. 171,360.00 27,417.60
JUMLAH 550,065.60 247,344.50 797,410.10
DIBULATKAN 550,065.00 247,344.00 797,410.00

SNI 1.0000 bh Memasang urinoir


1.0000 bh Urinoir @ Rp. 1,629,477.00 1,629,477.00
6.4 30% x Harga urinoir (Perlengkapan) @ Rp. 1,629,477.00 488,843.10
6.0000 kg PC @ Rp. 2,856.25 17,137.50
0.0100 m3 Pasir pasang @ Rp. 333,200.00 3,332.00
1.0000 org Tukang batu @ Rp. 137,088.00 137,088.00
0.1000 org Kepala tukang batu @ Rp. 154,224.00 15,422.40
1.0000 org Pekerja @ Rp. 85,680.00 85,680.00
0.1000 org Mandor @ Rp. 171,360.00 17,136.00
JUMLAH 255,326.40 2,138,789.60 2,394,116.00
DIBULATKAN 255,326.00 2,138,789.00 2,394,116.00

SNI 1.0000 bh Memasang wastafel


1.0000 bh Wastafel @ Rp. 2,000,000.00 2,000,000.00
6.5 12% x Harga wastafel (Perlengkapan) @ Rp. 2,000,000.00 240,000.00
6.0000 kg PC @ Rp. 2,856.25 17,137.50
0.0100 m3 Pasir pasang @ Rp. 333,200.00 3,332.00
1.4500 org Tukang batu @ Rp. 137,088.00 198,777.60
0.1500 org Kepala tukang batu @ Rp. 154,224.00 23,133.60
1.2000 org Pekerja @ Rp. 85,680.00 102,816.00
0.1000 org Mandor @ Rp. 171,360.00 17,136.00
JUMLAH 341,863.20 2,260,469.50 2,602,332.70
DIBULATKAN 341,863.00 2,260,469.00 2,602,332.00

SNI 1.0000 bh Memasang bak mandi fiberglass volume 0,30 m3


1.0000 bh Bak fiberglass @ Rp. 562,500.00 562,500.00
6.7 18% x Harga bak(Perlengkapan) @ Rp. 562,500.00 101,250.00
2.7000 org Tukang batu @ Rp. 137,088.00 370,137.60
0.5400 org Kepala tukang batu @ Rp. 154,224.00 83,280.96
1.8000 org Pekerja @ Rp. 85,680.00 154,224.00
Analisa Gedung - 39
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
0.1100 org Mandor @ Rp. 171,360.00 18,849.60
JUMLAH 626,492.16 663,750.00 1,290,242.16
DIBULATKAN 626,492.00 663,750.00 1,290,242.00

SNI 1.0000 bh Memasang bak fiberglass volume 1 m3 air


1.0000 bh Bak fiberglass @ Rp. 906,250.00 906,250.00
6.11 12% x Harga bak (Perlengkapan) @ Rp. 906,250.00 108,750.00
4.5000 org Tukang batu @ Rp. 137,088.00 616,896.00
0.9000 org Kepala tukang batu @ Rp. 154,224.00 138,801.60
3.0000 org Pekerja @ Rp. 85,680.00 257,040.00
0.9000 org Mandor @ Rp. 171,360.00 154,224.00
JUMLAH 1,166,961.60 1,015,000.00 2,181,961.60
DIBULATKAN 1,166,961.00 1,015,000.00 2,181,961.00

SNI 1.0000 m1 Memasang pipa galvanis diameter 1/2"


1.2000 m1 Pipa galvanis @ Rp. 39,420.00 47,304.00
6.19 35% x Harga pipa (Perlengkapan) @ Rp. 39,420.00 13,797.00
0.0900 org Tukang batu @ Rp. 137,088.00 12,337.92
0.0090 org Kepala tukang batu @ Rp. 154,224.00 1,388.02
0.0540 org Pekerja @ Rp. 85,680.00 4,626.72
0.0270 org Mandor @ Rp. 171,360.00 4,626.72
JUMLAH 22,979.38 61,101.00 84,080.38
DIBULATKAN 22,979.00 61,101.00 84,080.00

SNI 1.0000 m1 Memasang pipa galvanis diameter 3/4"


1.2000 m1 Pipa galvanis @ Rp. 59,512.00 71,414.40
6.20 35% x Harga pipa (Perlengkapan) @ Rp. 59,512.00 20,829.20
0.0900 org Tukang batu @ Rp. 137,088.00 12,337.92
0.0090 org Kepala tukang batu @ Rp. 154,224.00 1,388.02
0.0540 org Pekerja @ Rp. 85,680.00 4,626.72
0.0270 org Mandor @ Rp. 171,360.00 4,626.72
JUMLAH 22,979.38 92,243.60 115,222.98
DIBULATKAN 22,979.00 92,243.00 115,222.00

SNI 1.0000 m1 Memasang pipa galvanis diameter 1"


1.2000 m1 Pipa galvanis @ Rp. 73,990.00 88,788.00
6.21 35% x Harga pipa (Perlengkapan) @ Rp. 73,990.00 25,896.50
0.0900 org Tukang batu @ Rp. 137,088.00 12,337.92
0.0090 org Kepala tukang batu @ Rp. 154,224.00 1,388.02
0.0540 org Pekerja @ Rp. 85,680.00 4,626.72
0.0270 org Mandor @ Rp. 171,360.00 4,626.72
JUMLAH 22,979.38 114,684.50 137,663.88
DIBULATKAN 22,979.00 114,684.00 137,663.00

SNI 1.0000 m1 Memasang pipa galvanis diameter 1 1/2"


1.2000 m1 Pipa galvanis @ Rp. 88,311.00 105,973.20
6.22 35% x Harga pipa (Perlengkapan) @ Rp. 88,311.00 30,908.85
0.1800 org Tukang batu @ Rp. 137,088.00 24,675.84
0.0180 org Kepala tukang batu @ Rp. 154,224.00 2,776.03
0.1080 org Pekerja @ Rp. 85,680.00 9,253.44
0.0054 org Mandor @ Rp. 171,360.00 925.34
JUMLAH 37,630.66 136,882.05 174,512.71
DIBULATKAN 37,630.00 136,882.00 174,512.00

SNI 1.0000 m1 Memasang pipa PVC tipe AW diameter 1/2"

Analisa Gedung - 40
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
1.2000 m1 Pipa PVC @ Rp. 13,387.00 16,064.40
6.25 35% x Harga pipa (Perlengkapan) @ Rp. 13,387.00 4,685.45
0.0600 org Tukang batu @ Rp. 137,088.00 8,225.28
0.0060 org Kepala tukang batu @ Rp. 154,224.00 925.34
0.0360 org Pekerja @ Rp. 85,680.00 3,084.48
0.0018 org Mandor @ Rp. 171,360.00 308.45
JUMLAH 12,543.55 20,749.85 33,293.40
DIBULATKAN 12,543.00 20,749.00 33,293.00

SNI 1.0000 m1 Memasang pipa PVC tipe AW diameter 3/4"


1.2000 m1 Pipa PVC @ Rp. 15,300.00 18,360.00
6.26 35% x Harga pipa (Perlengkapan) @ Rp. 15,300.00 5,355.00
0.0600 org Tukang batu @ Rp. 137,088.00 8,225.28
0.0060 org Kepala tukang batu @ Rp. 154,224.00 925.34
0.0360 org Pekerja @ Rp. 85,680.00 3,084.48
0.0018 org Mandor @ Rp. 171,360.00 308.45
JUMLAH 12,543.55 23,715.00 36,258.55
DIBULATKAN 12,543.00 23,715.00 36,258.00

SNI 1.0000 m1 Memasang pipa PVC tipe AW diameter 1"


1.2000 m1 Pipa PVC @ Rp. 20,700.00 24,840.00
6.27 35% x Harga pipa (Perlengkapan) @ Rp. 20,700.00 7,245.00
0.0600 org Tukang batu @ Rp. 137,088.00 8,225.28
0.0060 org Kepala tukang batu @ Rp. 154,224.00 925.34
0.0360 org Pekerja @ Rp. 85,680.00 3,084.48
0.0018 org Mandor @ Rp. 171,360.00 308.45
JUMLAH 12,543.55 32,085.00 44,628.55
DIBULATKAN 12,543.00 32,085.00 44,628.00

SNI 1.0000 m1 Memasang pipa PVC tipe AW diameter 1 1/2"


1.2000 m1 Pipa PVC @ Rp. 31,500.00 37,800.00
6.28 35% x Harga pipa (Perlengkapan) @ Rp. 31,500.00 11,025.00
0.0600 org Tukang batu @ Rp. 137,088.00 8,225.28
0.0060 org Kepala tukang batu @ Rp. 154,224.00 925.34
0.0360 org Pekerja @ Rp. 85,680.00 3,084.48
0.0018 org Mandor @ Rp. 171,360.00 308.45
JUMLAH 12,543.55 48,825.00 61,368.55
DIBULATKAN 12,543.00 48,825.00 61,368.00

SNI 1.0000 m1 Memasang pipa PVC tipe AW diameter 2"


1.2000 m1 Pipa PVC @ Rp. 45,000.00 54,000.00
6.29 35% x Harga pipa (Perlengkapan) @ Rp. 45,000.00 15,750.00
0.0900 org Tukang batu @ Rp. 137,088.00 12,337.92
0.0090 org Kepala tukang batu @ Rp. 154,224.00 1,388.02
0.0544 org Pekerja @ Rp. 85,680.00 4,660.99
0.0027 org Mandor @ Rp. 171,360.00 462.67
JUMLAH 18,849.60 69,750.00 88,599.60
DIBULATKAN 18,849.00 69,750.00 88,599.00

SNI 1.0000 m1 Memasang pipa PVC tipe AW diameter 2 1/2"


1.2000 m1 Pipa PVC @ Rp. 66,600.00 79,920.00
6.30 35% x Harga pipa (Perlengkapan) @ Rp. 66,600.00 23,310.00
0.0600 org Tukang batu @ Rp. 137,088.00 8,225.28
0.0060 org Kepala tukang batu @ Rp. 154,224.00 925.34
0.0360 org Pekerja @ Rp. 85,680.00 3,084.48

Analisa Gedung - 41
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
0.0018 org Mandor @ Rp. 171,360.00 308.45
JUMLAH 12,543.55 103,230.00 115,773.55
DIBULATKAN 12,543.00 103,230.00 115,773.00

SNI 1.0000 m1 Memasang pipa PVC tipe AW diameter 3"


1.2000 m1 Pipa PVC @ Rp. 90,900.00 109,080.00
6.31 35% x Harga pipa (Perlengkapan) @ Rp. 90,900.00 31,815.00
0.1350 org Tukang batu @ Rp. 137,088.00 18,506.88
0.0135 org Kepala tukang batu @ Rp. 154,224.00 2,082.02
0.0810 org Pekerja @ Rp. 85,680.00 6,940.08
0.0410 org Mandor @ Rp. 171,360.00 7,025.76
JUMLAH 34,554.74 140,895.00 175,449.74
DIBULATKAN 34,554.00 140,895.00 175,449.00

SNI 1.0000 m1 Memasang pipa PVC tipe AW diameter 4"


1.2000 m1 Pipa PVC @ Rp. 105,000.00 126,000.00
6.32 35% x Harga pipa (Perlengkapan) @ Rp. 105,000.00 36,750.00
0.1350 org Tukang batu @ Rp. 137,088.00 18,506.88
0.0135 org Kepala tukang batu @ Rp. 154,224.00 2,082.02
0.0810 org Pekerja @ Rp. 85,680.00 6,940.08
0.0410 org Mandor @ Rp. 171,360.00 7,025.76
JUMLAH 34,554.74 162,750.00 197,304.74
DIBULATKAN 34,554.00 162,750.00 197,304.00

SNI 1.0000 bh Memasang bak cuci piring stainless steel


1.0000 bh Bak cuci stainless steel @ Rp. 680,625.00 680,625.00
6.33 1.0000 set Water drain + asesories @ Rp. 88,968.00 88,968.00
0.3000 org Tukang batu @ Rp. 137,088.00 41,126.40
0.0300 org Kepala tukang batu @ Rp. 154,224.00 4,626.72
0.0300 org Pekerja @ Rp. 85,680.00 2,570.40
0.0015 org Mandor @ Rp. 171,360.00 257.04
JUMLAH 48,580.56 769,593.00 818,173.56
DIBULATKAN 48,580.00 769,593.00 818,173.00

SNI 1.0000 bh Memasang kran diameter 3/4" atau 1/2"


1.0000 bh Kran air @ Rp. 35,856.00 35,856.00
6.35 0.0250 bh Seal tape @ Rp. 13,750.00 343.75
0.1000 org Tukang batu @ Rp. 137,088.00 13,708.80
0.0100 org Kepala tukang batu @ Rp. 154,224.00 1,542.24
0.0100 org Pekerja @ Rp. 85,680.00 856.80
0.0050 org Mandor @ Rp. 171,360.00 856.80
JUMLAH 16,964.64 36,199.75 53,164.39
DIBULATKAN 16,964.00 36,199.00 53,164.00

SNI 1.0000 bh Memasang floor drain


1.0000 bh Floor drain @ Rp. 67,500.00 67,500.00
6.35 0.1000 org Tukang batu @ Rp. 137,088.00 13,708.80
0.0100 org Kepala tukang batu @ Rp. 154,224.00 1,542.24
0.0100 org Pekerja @ Rp. 85,680.00 856.80
0.0050 org Mandor @ Rp. 171,360.00 856.80
JUMLAH 16,964.64 67,500.00 84,464.64
DIBULATKAN 16,964.00 67,500.00 84,464.00

1.0000 UNIT SEPTIC TANK DAN RESAPAN UK. 1.5x1x1.5 M


2.2500 M3 Galian Tanah @ Rp. 54,081.00 121,682.25
9.0000 M2 Pas. Batu Tela @ Rp. 226,720.00 2,040,480.00
Analisa Gedung - 42
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
10.5000 M2 Plesteran Camp. 1 : 3 @ Rp. 80,167.00 841,753.50
16.7320 Kg Pembesian @ Rp. 27,865.00 466,237.18
0.1500 M3 Cor Beton Camp. 1 : 2 : 3 @ Rp. 2,208,259.00 331,238.85
JUMLAH 3,801,391.78
DIBULATKAN 3,801,391.00

Analisa Gedung - 43
ANALISA SATUAN PEKERJAAN PENGECATAN
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)

PEKERJAAN CAT-CATAN

SNI 1.0000 m2 Pengecatan bidang kayu lama


6.7 0.1500 kg Plamir @ Rp. 41,334.00 6,200.10
0.1700 kg Cat dasar @ Rp. 62,025.00 10,544.25
0.1700 kg Cat penutup @ Rp. 62,025.00 10,544.25
0.0750 org Tukang cat @ Rp. 137,088.00 10,281.60
0.0075 org Kepala tukang cat @ Rp. 154,224.00 1,156.68
0.0700 org Pekerja @ Rp. 85,680.00 5,997.60
0.0025 org Mandor @ Rp. 171,360.00 428.40
JUMLAH 17,864.28 27,288.60 45,152.88
DIBULATKAN 17,864.00 27,288.00 45,152.00

SNI 1.0000 m2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup
6.8 0.2000 kg Cat meni @ Rp. 41,334.00 8,266.80
0.1500 kg Plamir @ Rp. 41,334.00 6,200.10
0.1700 kg Cat dasar @ Rp. 62,025.00 10,544.25
0.2600 kg Cat penutup @ Rp. 62,025.00 16,126.50
0.0900 org Tukang cat @ Rp. 137,088.00 12,337.92
0.0060 org Kepala tukang cat @ Rp. 154,224.00 925.34
0.0700 org Pekerja @ Rp. 85,680.00 5,997.60
0.0025 org Mandor @ Rp. 171,360.00 428.40
JUMLAH 19,689.26 41,137.65 60,826.91
DIBULATKAN 19,689.00 41,137.00 60,826.00

SNI 1.0000 m2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 3 lapis cat penutup
6.9 0.2000 kg Cat meni @ Rp. 41,334.00 8,266.80
0.1500 kg Plamir @ Rp. 41,334.00 6,200.10
0.1700 kg Cat dasar @ Rp. 62,025.00 10,544.25
0.3500 kg Cat penutup @ Rp. 62,025.00 21,708.75
0.1050 org Tukang cat @ Rp. 137,088.00 14,394.24
0.0040 org Kepala tukang cat @ Rp. 154,224.00 616.90
0.0700 org Pekerja @ Rp. 85,680.00 5,997.60
0.0025 org Mandor @ Rp. 171,360.00 428.40
JUMLAH 21,437.14 46,719.90 68,157.04
DIBULATKAN 21,437.00 46,719.00 68,157.00

SNI 1.0000 m2 Pelaburan bidang kayu dengan politur


6.11 0.1500 ltr Politur @ Rp. 58,650.00 8,797.50
0.3720 ltr Politur jadi @ Rp. 58,650.00 21,817.80
2.0000 lbr Amplas @ Rp. 9,400.00 18,800.00
0.0600 org Tukang cat @ Rp. 137,088.00 8,225.28
0.0160 org Kepala tukang cat @ Rp. 154,224.00 2,467.58
0.0025 org Mandor @ Rp. 171,360.00 428.40
JUMLAH 11,121.26 49,415.30 60,536.56
DIBULATKAN 11,121.00 49,415.00 60,536.00

SNI 1.0000 m2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
6.14 0.1000 kg Plamir tembok @ Rp. 40,355.00 4,035.50
0.1000 kg Cat dasar @ Rp. 22,000.00 2,200.00
0.2600 kg Cat penutup 2 x @ Rp. 22,000.00 5,720.00
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
0.0630 org Tukang cat @ Rp. 137,088.00 8,636.54
0.0063 org Kepala tukang cat @ Rp. 154,224.00 971.61
0.0200 org Pekerja @ Rp. 85,680.00 1,713.60
0.0025 org Mandor @ Rp. 171,360.00 428.40
JUMLAH 11,750.16 11,955.50 23,705.66
DIBULATKAN 11,750.00 11,955.00 23,705.00

SNI 1.0000 m2 Pengecatan tembok tidak terlindung dari panas dan hujan
6.14 0.1000 kg Cat alkali resisting primer @ Rp. 41,205.00 4,120.50
0.3600 kg Cat ICI Weathershield @ Rp. 82,410.00 29,667.60
0.0630 org Tukang cat @ Rp. 137,088.00 8,636.54
0.0063 org Kepala tukang cat @ Rp. 154,224.00 971.61
0.0200 org Pekerja @ Rp. 85,680.00 1,713.60
0.0025 org Mandor @ Rp. 171,360.00 428.40
JUMLAH 11,750.16 33,788.10 45,538.26
DIBULATKAN 11,750.00 33,788.00 45,538.00
ANALISA SATUAN PEKERJAAN KAYU
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)

PEKERJAAN RANGKA ATAP

SNI 1.000 m3 Membuat kuda-kuda kayu kelas I


6.28 1.100 m3 Kayu kls. I @ Rp. 4,220,000.00 4,642,000.00
03-3434-2002 0.800 kg Paku biasa 2" - 5" @ Rp. 27,325.00 21,860.00
12.000 OH Tukang kayu @ Rp. 137,088.00 1,645,056.00
1.200 OH Kepala tukang kayu @ Rp. 154,224.00 185,068.80
4.000 OH Pekerja @ Rp. 85,680.00 342,720.00
0.200 OH Mandor @ Rp. 171,360.00 34,272.00
JUMLAH 2,207,116.80 4,663,860.00 6,870,976.80
DIBULATKAN 2,207,116.00 4,663,860.00 6,870,976.00

SNI 1.000 m3 Pasang kuda-kuda kayu lama


03-3434-2002 0.800 kg Paku biasa 2" - 5" @ Rp. 27,325.00 21,860.00
12.000 OH Tukang kayu @ Rp. 137,088.00 1,645,056.00
1.200 OH Kepala tukang kayu @ Rp. 154,224.00 185,068.80
4.000 OH Pekerja @ Rp. 85,680.00 342,720.00
0.200 OH Mandor @ Rp. 171,360.00 34,272.00
JUMLAH 2,207,116.80 21,860.00 2,228,976.80
DIBULATKAN 2,207,116.00 21,860.00 2,228,976.00

SNI 1.000 m3 Pasang Nook,Goording dan Jurai kayu kelas II


1.100 m3 Kayu kls. II @ Rp. 3,135,000.00 3,448,500.00
0.800 kg Paku biasa 2" - 5" @ Rp. 27,325.00 21,860.00
12.000 OH Tukang kayu @ Rp. 137,088.00 1,645,056.00
1.200 OH Kepala tukang kayu @ Rp. 154,224.00 185,068.80
4.000 OH Pekerja @ Rp. 85,680.00 342,720.00
0.200 OH Mandor @ Rp. 171,360.00 34,272.00
JUMLAH 2,207,116.80 3,470,360.00 5,677,476.80
DIBULATKAN 2,207,116.00 3,470,360.00 5,677,476.00

SNI 1.000 m3 Pasang Goording Lama


0.800 kg Paku biasa 2" - 5" @ Rp. 27,325.00 21,860.00
12.000 OH Tukang kayu @ Rp. 137,088.00 1,645,056.00
1.200 OH Kepala tukang kayu @ Rp. 154,224.00 185,068.80
4.000 OH Pekerja @ Rp. 85,680.00 342,720.00
0.200 OH Mandor @ Rp. 171,360.00 34,272.00
JUMLAH ( BELUM PPN ) 2,207,116.80 21,860.00 2,228,976.80
DIBULATKAN 2,207,116.00 21,860.00 2,228,976.00

F.16 1.000 m2 Pasang usuk 5/5, reng 3/5 lama


0.150 kg Paku usuk @ Rp. 27,325.00 4,098.75
0.100 kg Paku reng @ Rp. 27,325.00 2,732.50
0.100 OH Tukang kayu @ Rp. 137,088.00 13,708.80
0.010 OH Kep. Tk. Kayu @ Rp. 154,224.00 1,542.24
0.100 OH Pekerja @ Rp. 85,680.00 8,568.00
0.003 OH Mandor @ Rp. 171,360.00 428.40
JUMLAH ( BELUM PPN ) 24,247.44 6,831.25 31,078.69
DIBULATKAN 24,247.00 6,831.00 31,078.00

F.16 1.000 m2 Pasang usuk 5/5, reng 3/5 kayu jati


2.200 m1 Usuk kayu jati 5/5 @ Rp. 70,000.00 154,000.00
5.000 m 1
Reng jati 3/5 @ Rp. 12,000.00 60,000.00
0.150 kg Paku usuk @ Rp. 27,325.00 4,098.75
0.100 kg Paku reng @ Rp. 27,325.00 2,732.50
0.100 OH Tukang kayu @ Rp. 137,088.00 13,708.80
0.010 OH Kep. Tk. Kayu @ Rp. 154,224.00 1,542.24
0.100 OH Pekerja @ Rp. 85,680.00 8,568.00
0.003 OH Mandor @ Rp. 171,360.00 428.40
JUMLAH ( BELUM PPN ) 24,247.44 220,831.25 245,078.69
DIBULATKAN 24,247.00 220,831.00 245,078.00

F.16 1.000 m2 Pasang usuk 5/7, reng 3/4 kayu jati


2.200 m1 Usuk kayu jati 5/7 @ Rp. 70,000.00 154,000.00
4.000 m1 Reng jati 3/4 @ Rp. 24,000.00 96,000.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 OH Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 OH Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 OH Pekerja @ Rp. 20,000.00 2,000.00
0.003 OH Mandor @ Rp. 32,500.00 81.25
JUMLAH 5,406.25 252,000.00 257,406.25
DIBULATKAN 5,406.00 252,000.00 257,406.00

1.000 m3 Pasang Gelagar dan balok skor


1.100 m3 Kayu Kls I @ Rp. 4,220,000.00 4,642,000.00
15.000 OH Tukang kayu @ Rp. 137,088.00 2,056,320.00
1.500 OH Kep. Tk. Kayu @ Rp. 154,224.00 231,336.00
5.000 OH Pekerja @ Rp. 85,680.00 428,400.00
0.250 OH Mandor @ Rp. 171,360.00 42,840.00
JUMLAH 2,764,302.00 4,894,000.00 7,658,302.00
DIBULATKAN 2,764,302.00 4,894,000.00 7,658,302.00

SNI 1.000 m3 Pasang Kolom Kayu Kelas I


1.100 m3 Kayu kls. I @ Rp. 4,220,000.00 4,642,000.00
0.250 kg Paku biasa 2" - 5" @ Rp. 27,325.00 6,831.25
12.000 OH Tukang kayu @ Rp. 137,088.00 1,645,056.00
1.200 OH Kepala tukang kayu @ Rp. 154,224.00 185,068.80
4.000 OH Pekerja @ Rp. 85,680.00 342,720.00
0.500 OH Mandor @ Rp. 171,360.00 85,680.00
JUMLAH 2,258,524.80 4,648,831.25 6,907,356.05
DIBULATKAN 2,258,524.00 4,648,831.00 6,907,356.00

1.000 m2 Pasang Dinding Papan Kayu Kls. I 2/20


0.022 m3 Kayu kls. I @ Rp. 4,220,000.00 92,840.00
0.200 kg Paku biasa 2" - 5" @ Rp. 27,325.00 5,465.00
0.013 m3 Balok Kayu kls. II 5/10 @ Rp. 3,135,000.00 40,755.00
0.080 OH Tukang kayu @ Rp. 137,088.00 10,967.04
0.080 OH Kepala tukang kayu @ Rp. 154,224.00 12,337.92
0.200 OH Pekerja @ Rp. 85,680.00 17,136.00
0.100 OH Mandor @ Rp. 171,360.00 17,136.00
JUMLAH 57,576.96 139,060.00 196,636.96
DIBULATKAN 57,576.00 139,060.00 196,636.00

PEKERJAAN PINTU DAN JENDELA


SNI 1.000 m3 Membuat kusen pintu / jendela kayu kelas I
6.1 1.100 m3 Kayu kls. I @ Rp. 4,220,000.00 4,642,000.00
03-3434-2002 20.000 OH Tukang kayu @ Rp. 137,088.00 2,741,760.00
2.000 OH Kepala tukang kayu @ Rp. 154,224.00 308,448.00
6.000 OH Pekerja @ Rp. 85,680.00 514,080.00
0.300 OH Mandor @ Rp. 171,360.00 51,408.00
JUMLAH 3,615,696.00 4,642,000.00 8,257,696.00
DIBULATKAN 3,615,696.00 4,642,000.00 8,257,696.00

SNI 1.000 m2 Pasang pintu teakwood rangkap, rangka kayu kelas II


6.19 0.020 m3 Papan kayu kls. II @ Rp. 3,135,000.00 61,446.00
03-3434-2002 0.030 kg Paku biasa 1/2" - 1" @ Rp. 27,325.00 819.75
0.300 kg Lem kayu @ Rp. 125,000.00 37,500.00
1.000 lbr Teakwood 4' x 8' x 4 mm @ Rp. 129,954.00 129,954.00
2.000 OH Tukang kayu @ Rp. 137,088.00 274,176.00
0.200 OH Kepala tukang kayu @ Rp. 154,224.00 30,844.80
0.600 OH Pekerja @ Rp. 85,680.00 51,408.00
0.030 OH Mandor @ Rp. 171,360.00 5,140.80
JUMLAH 361,569.60 229,719.75 591,289.35
DIBULATKAN 361,569.00 229,719.00 591,289.00

1.000 m2 Pasang pintu teakwood rangkap lapis seng plat BJLS 30, rangka kayu kelas II
0.020 m3 Papan kayu kls. II @ Rp. 3,135,000.00 61,446.00
0.030 kg Paku biasa 1/2" - 1" @ Rp. 27,325.00 819.75
0.300 kg Lem kayu @ Rp. 125,000.00 37,500.00
1.000 lbr Teakwood 4' x 8' x 4 mm @ Rp. 129,954.00 129,954.00
1.000 lbr Seng Plat BJLS 30 @ Rp. 100,200.00 100,200.00
2.000 OH Tukang kayu @ Rp. 137,088.00 274,176.00
0.200 OH Kepala tukang kayu @ Rp. 154,224.00 30,844.80
0.600 OH Pekerja @ Rp. 85,680.00 51,408.00
0.030 OH Mandor @ Rp. 171,360.00 5,140.80
JUMLAH 361,569.60 329,919.75 691,489.35
DIBULATKAN 361,569.00 329,919.00 691,489.00

SNI 1.000 m2 Mengerjakan daun pintu / jendela panil kayu Kls I


6.7 0.040 m3 Kayu Kls I @ Rp. 4,220,000.00 168,800.00
03-3434-2002 2.500 OH Tukang kayu @ Rp. 137,088.00 342,720.00
0.250 OH Kepala tukang kayu @ Rp. 154,224.00 38,556.00
1.000 OH Pekerja @ Rp. 85,680.00 85,680.00
0.050 OH Mandor @ Rp. 171,360.00 8,568.00
JUMLAH 475,524.00 168,800.00 644,324.00
DIBULATKAN 475,524.00 168,800.00 644,324.00

SNI 1.000 m2 Pasang pintu dan jendela jalusi kayu kelas I


6.12 0.064 m3 Kayu Kls I @ Rp. 4,220,000.00 270,080.00
03-3434-2002 3.000 OH Tukang kayu @ Rp. 137,088.00 411,264.00
0.300 OH Kepala tukang kayu @ Rp. 154,224.00 46,267.20
1.000 OH Pekerja @ Rp. 85,680.00 85,680.00
0.300 OH Mandor @ Rp. 171,360.00 51,408.00
JUMLAH 594,619.20 270,080.00 864,699.20
DIBULATKAN 594,619.00 270,080.00 864,699.00

1.000 m2 Mengerjakan daun pintu / jendela panil kaca 5 mm


0.025 m3 Kayu Kls I @ Rp. 4,220,000.00 105,500.00
0.800 m2 Kaca 5 mm Bening @ Rp. 357,500.00 286,000.00
3.000 OH Tukang kayu @ Rp. 137,088.00 411,264.00
0.300 OH Kepala tukang kayu @ Rp. 154,224.00 46,267.20
1.000 OH Pekerja @ Rp. 85,680.00 85,680.00
0.050 OH Mandor @ Rp. 171,360.00 8,568.00
JUMLAH 551,779.20 286,000.00 837,779.20
DIBULATKAN 551,779.00 286,000.00 837,779.00

1.000 m2 Mengerjakan Jalusi Kayu Kls. I


0.022 m3 Kayu Kls I @ Rp. 4,220,000.00 92,840.00
0.200 kg Paku Campur @ Rp. 27,325.00 5,465.00
2.000 OH Tukang kayu @ Rp. 137,088.00 274,176.00
0.200 OH Kepala tukang kayu @ Rp. 154,224.00 30,844.80
0.500 OH Pekerja @ Rp. 85,680.00 42,840.00
0.025 OH Mandor @ Rp. 85,680.00 2,142.00
JUMLAH 350,002.80 5,465.00 355,467.80
DIBULATKAN 350,002.00 5,465.00 355,467.00

PEKERJAAN PLAFOND
SNI 1.000 m2 Pasang rangka langit-langit (1,00 x 1,00) m, kayu lama
03-3434-2002 0.100 kg Paku biasa 2" - 5" @ Rp. 8,000.00 800.00
0.250 OH Tukang kayu @ Rp. 30,000.00 7,500.00
0.025 OH Kepala tukang kayu @ Rp. 32,500.00 812.50
0.150 OH Pekerja @ Rp. 20,000.00 3,000.00
0.008 OH Mandor @ Rp. 32,500.00 243.75
JUMLAH ( BELUM PPN ) 11,556.25 800.00 12,356.25
JASA 10 % 1,155.63 80.00 1,235.63
JUMLAH 12,711.88 880.00 13,591.88
DIBULATKAN 12,711.00 880.00 13,591.00

SNI 1.000 m2 Pasang rangka langit-langit (1,00 x 1,00) m, kayu kelas II


6.39 0.012 m3 Kayu kls. II @ Rp. 4,750,000.00 57,000.00
03-3434-2002 0.100 kg Paku biasa 2" - 5" @ Rp. 8,000.00 800.00
0.250 OH Tukang kayu @ Rp. 30,000.00 7,500.00
0.025 OH Kepala tukang kayu @ Rp. 32,500.00 812.50
0.150 OH Pekerja @ Rp. 20,000.00 3,000.00
0.008 OH Mandor @ Rp. 32,500.00 243.75
JUMLAH 11,556.25 57,800.00 69,356.25
DIBULATKAN 11,556.00 57,800.00 69,356.00

1.000 m2 Pasang rangka langit-langit (60 x 120) m, kayu kelas II


0.013 m3 Kayu kls. II @ Rp. 3,135,000.00 40,755.00
0.120 kg Paku @ Rp. 27,325.00 3,279.00
0.270 OH Tukang kayu @ Rp. 137,088.00 37,013.76
0.027 OH Kepala tukang kayu @ Rp. 154,224.00 4,164.05
0.170 OH Pekerja @ Rp. 85,680.00 14,565.60
0.009 OH Mandor @ Rp. 171,360.00 1,456.56
JUMLAH 57,199.97 44,034.00 101,233.97
DIBULATKAN 57,199.00 44,034.00 101,233.00

1.000 m2 Langit-langit tripleks t; 4 mm, rangka 60 x 120 kayu kls. II


0.336 Lbr Tripleks 3 mm @ Rp. 95,590.00 32,118.24
0.017 M3 Kayu Matoa @ Rp. 3,135,000.00 53,295.00
0.200 Kg Paku @ Rp. 27,325.00 5,465.00
0.020 Kg Paku Tripleks @ Rp. 32,770.00 655.40
0.400 OH Tukang kayu @ Rp. 137,088.00 54,835.20
0.040 OH Kepala tukang kayu @ Rp. 154,224.00 6,168.96
0.280 OH Pekerja @ Rp. 85,680.00 23,990.40
0.014 OH Mandor @ Rp. 171,360.00 2,399.04
JUMLAH 87,393.60 91,533.64 178,927.24
DIBULATKAN 87,393.00 91,533.00 178,927.00

6.13 1.000 m2 Langit2 gypsum t; 9 mm, rangka 60 x 120 kayu kamper


0.013 m3 Kayu kamper @ Rp. 4,750,000.00 61,750.00
0.360 lbr Gypsum board 9 mm @ Rp. 42,000.00 15,120.00
0.050 roll Kasa gypsum @ Rp. 10,000.00 500.00
0.450 kg Tepung gypsum @ Rp. 3,500.00 1,575.00
0.003 kg Alkasit @ Rp. 300,000.00 900.00
0.050 kg Paku gypsum @ Rp. 20,000.00 1,000.00
0.120 kg Paku usuk @ Rp. 8,000.00 960.00
0.370 OH Tukang kayu @ Rp. 30,000.00 11,100.00
0.037 OH Kepala tukang kayu @ Rp. 32,500.00 1,202.50
0.240 OH Pekerja @ Rp. 20,000.00 4,800.00
0.012 OH Mandor @ Rp. 32,500.00 390.00
JUMLAH ( BELUM PPN ) 17,492.50 81,805.00 99,297.50
JASA 10 % 1,749.25 8,180.50 9,929.75
JUMLAH 19,241.75 89,985.50 109,227.25
DIBULATKAN 19,241.00 89,985.00 109,227.00

1.000 m2 Langit-langit gypsum board tebal 9 mm, rangka hollow


4.500 m1 Rangka hollow 4x4 cm @ Rp. 9,500.00 42,750.00
0.360 lbr Gypsum board 9 mm @ Rp. 42,000.00 15,120.00
0.050 roll Kasa gypsum @ Rp. 10,000.00 500.00
0.450 kg Tepung gypsum @ Rp. 3,500.00 1,575.00
0.003 kg Alkasit @ Rp. 300,000.00 900.00
0.150 kg Paku skrup @ Rp. 10,000.00 1,500.00
5.000 m1 Kawat penggantung @ Rp. 500.00 2,500.00
0.370 OH Tukang kayu @ Rp. 30,000.00 11,100.00
0.037 OH Kepala tukang kayu @ Rp. 32,500.00 1,202.50
0.240 OH Pekerja @ Rp. 20,000.00 4,800.00
0.012 OH Mandor @ Rp. 32,500.00 390.00
JUMLAH ( BELUM PPN ) 17,492.50 64,845.00 82,337.50
JASA 10 % 1,749.25 6,484.50 8,233.75
JUMLAH 19,241.75 71,329.50 90,571.25
DIBULATKAN 19,241.00 71,329.00 90,571.00

6.13 1.000 m2 Langit2 kalsiboard t; 3.5 mm, rangka 60 x 120 ky kamper


0.013 m3 Kayu kamper @ Rp. 4,750,000.00 61,750.00
0.360 lbr Kalsiboard 3.5 mm @ Rp. 46,200.00 16,632.00
0.050 roll Kasa gypsum @ Rp. 10,000.00 500.00
0.450 kg Tepung gypsum @ Rp. 3,500.00 1,575.00
0.003 kg Alkasit @ Rp. 300,000.00 900.00
0.050 kg Paku gypsum @ Rp. 20,000.00 1,000.00
0.120 kg Paku usuk @ Rp. 8,000.00 960.00
0.370 OH Tukang kayu @ Rp. 30,000.00 11,100.00
0.037 OH Kepala tukang kayu @ Rp. 32,500.00 1,202.50
0.240 OH Pekerja @ Rp. 20,000.00 4,800.00
0.012 OH Mandor @ Rp. 32,500.00 390.00
JUMLAH ( BELUM PPN ) 17,492.50 83,317.00 100,809.50
JASA 10 % 1,749.25 8,331.70 10,080.95
JUMLAH 19,241.75 91,648.70 110,890.45
DIBULATKAN 19,241.00 91,648.00 110,890.00

1.000 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka hollow


4.500 m1 Rangka hollow 4x4 cm @ Rp. 9,500.00 42,750.00
0.360 lbr Kalsiboard 3.5 mm @ Rp. 46,200.00 16,632.00
0.050 roll Kasa gypsum @ Rp. 10,000.00 500.00
0.450 kg Tepung gypsum @ Rp. 3,500.00 1,575.00
0.003 kg Alkasit @ Rp. 300,000.00 900.00
0.150 kg Paku skrup @ Rp. 10,000.00 1,500.00
5.000 m1 Kawat penggantung @ Rp. 500.00 2,500.00
0.370 OH Tukang kayu @ Rp. 30,000.00 11,100.00
0.037 OH Kepala tukang kayu @ Rp. 32,500.00 1,202.50
0.240 OH Pekerja @ Rp. 20,000.00 4,800.00
0.012 OH Mandor @ Rp. 32,500.00 390.00
JUMLAH ( BELUM PPN ) 17,492.50 66,357.00 83,849.50
JASA 10 % 1,749.25 6,635.70 8,384.95
JUMLAH 19,241.75 72,992.70 92,234.45
DIBULATKAN 19,241.00 72,992.00 92,234.00

1.000 m1 Pasang list profil cornees gypsum lebar sampai 5 cm


1.100 m1 List profil cornees gypsum @ Rp. 4,000.00 4,400.00
0.700 kg Tepung gypsum @ Rp. 3,500.00 2,450.00
0.004 kg Alkasit @ Rp. 300,000.00 1,050.00
0.038 OH Tukang kayu @ Rp. 30,000.00 1,125.00
0.004 OH Kepala tukang kayu @ Rp. 32,500.00 120.25
0.113 OH Pekerja @ Rp. 20,000.00 2,250.00
0.007 OH Mandor @ Rp. 32,500.00 211.25
JUMLAH ( BELUM PPN ) 3,706.50 7,900.00 11,606.50
JASA 10 % 370.65 790.00 1,160.65
JUMLAH 4,077.15 8,690.00 12,767.15
DIBULATKAN 4,077.00 8,690.00 12,767.00

1.000 m1 Pasang list profil cornees gypsum lebar 5 - 10 cm


1.100 m1 List profil cornees gypsum @ Rp. 8,000.00 8,800.00
0.875 kg Tepung gypsum @ Rp. 3,500.00 3,062.50
0.004 kg Alkasit @ Rp. 300,000.00 1,320.00
0.038 OH Tukang kayu @ Rp. 30,000.00 1,125.00
0.004 OH Kepala tukang kayu @ Rp. 32,500.00 120.25
0.113 OH Pekerja @ Rp. 20,000.00 2,250.00
0.007 OH Mandor @ Rp. 32,500.00 211.25
JUMLAH ( BELUM PPN ) 3,706.50 13,182.50 16,889.00
JASA 10 % 370.65 1,318.25 1,688.90
JUMLAH 4,077.15 14,500.75 18,577.90
DIBULATKAN 4,077.00 14,500.00 18,577.00

1.000 m1 Pasang list profil cornees gypsum lebar lebih dari 10 cm


1.100 m1 List profil cornees gypsum @ Rp. 15,000.00 16,500.00
1.050 kg Tepung gypsum @ Rp. 3,500.00 3,675.00
0.005 kg Alkasit @ Rp. 300,000.00 1,590.00
0.040 OH Tukang kayu @ Rp. 30,000.00 1,200.00
0.004 OH Kepala tukang kayu @ Rp. 32,500.00 130.00
0.113 OH Pekerja @ Rp. 20,000.00 2,250.00
0.007 OH Mandor @ Rp. 32,500.00 211.25
JUMLAH ( BELUM PPN ) 3,791.25 21,765.00 25,556.25
JASA 10 % 379.13 2,176.50 2,555.63
JUMLAH 4,170.38 23,941.50 28,111.88
DIBULATKAN 4,170.00 23,941.00 28,111.00

SNI 1.000 m1 List langit-langit kayu profil


6.19 1.100 m1 List kayu profil @ Rp. 14,300.00 15,730.00
03-2838-2002 0.010 kg Paku @ Rp. 27,325.00 273.25
0.050 OH Tukang kayu @ Rp. 137,088.00 6,854.40
0.005 OH Kepala tukang kayu @ Rp. 154,224.00 771.12
0.050 OH Pekerja @ Rp. 85,680.00 4,284.00
0.003 OH Mandor @ Rp. 171,360.00 514.08
JUMLAH 12,423.60 16,003.25 28,426.85
DIBULATKAN 12,423.00 16,003.00 28,426.00

PEKERJAAN LISPLANK
SNI 1.000 m1 Pasang lisplank ukuran 2 x (2 x 20) cm, kayu kelas I
0.009 m3 Kayu kls. I papan @ Rp. 4,220,000.00 36,292.00
03-3434-2002 0.060 kg Paku biasa 2" - 5" @ Rp. 27,325.00 1,639.50
0.100 OH Tukang kayu @ Rp. 137,088.00 13,708.80
0.010 OH Kepala tukang kayu @ Rp. 154,224.00 1,542.24
0.100 OH Pekerja @ Rp. 85,680.00 8,568.00
0.005 OH Mandor @ Rp. 171,360.00 856.80
JUMLAH ( BELUM PPN ) 24,675.84 37,931.50 62,607.34
DIBULATKAN 24,675.00 37,931.00 62,607.00

AK 1.000 m2 Membuat listplank asbes plat ram kayu kamper


0.025 m3 Ram kayu kamper @ Rp. 4,750,000.00 118,750.00
1.000 m 2
Asbes plat @ Rp. 10,000.00 10,000.00
0.300 kg Paku reng @ Rp. 8,000.00 2,400.00
1.800 OH Tukang kayu @ Rp. 30,000.00 54,000.00
0.180 OH Kep. Tk. Kayu @ Rp. 32,500.00 5,850.00
0.600 OH Pekerja @ Rp. 20,000.00 12,000.00
0.030 OH Mandor @ Rp. 32,500.00 975.00
JUMLAH ( BELUM PPN ) 72,825.00 131,150.00 203,975.00
JASA 10 % 7,282.50 13,115.00 20,397.50
JUMLAH 80,107.50 144,265.00 224,372.50
DIBULATKAN 80,107.00 144,265.00 224,372.00

PEKERJAAN TALANG
SNI 1.000 m1 Pasang talang datar, seng BJLS 30, papan kayu kelas II
6.18 0.500 lbr Seng plat 3' x 6' BJLS 30 @ Rp. 100,200.00 50,100.00
0.015 kg Paku biasa 1/2" - 1" @ Rp. 27,325.00 409.88
0.010 m3 Kayu kls. II papan @ Rp. 3,135,000.00 30,096.00
0.400 OH Tukang kayu @ Rp. 137,088.00 54,835.20
0.025 OH Kepala tukang kayu @ Rp. 154,224.00 3,855.60
0.150 OH Pekerja @ Rp. 85,680.00 12,852.00
0.001 OH Mandor @ Rp. 171,360.00 214.20
JUMLAH ( BELUM PPN ) 71,757.00 80,605.88 152,362.88
DIBULATKAN 71,757.00 80,605.00 152,362.00

SNI 1.000 m1 Pasang talang miring, seng BJLS 28, papan kayu kamper
6.19 0.500 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00 22,000.00
0.015 kg Paku biasa 1/2" - 1" @ Rp. 8,000.00 120.00
0.019 m 3
Kayu kamper papan @ Rp. 5,500,000.00 104,500.00
0.250 kg Flincoat @ Rp. 35,000.00 8,750.00
0.400 OH Tukang kayu @ Rp. 30,000.00 12,000.00
0.025 OH Kepala tukang kayu @ Rp. 32,500.00 812.50
0.040 OH Pekerja @ Rp. 20,000.00 800.00
0.001 OH Mandor @ Rp. 32,500.00 40.63
JUMLAH ( BELUM PPN ) 13,653.13 135,370.00 149,023.13
JASA 10 % 1,365.31 13,537.00 14,902.31
JUMLAH 15,018.44 148,907.00 163,925.44
DIBULATKAN 15,018.00 148,907.00 163,925.00

H.18 10.000 m1 Pasang talang torong


10.000 m1 Seng BJLS 0,30 ( 60 cm ) @ Rp. 20,000.00 200,000.00
225.000 bh Paku sumbat @ Rp. 400.00 90,000.00
3.750 OH Tukang besi @ Rp. 25,000.00 93,750.00
0.375 OH Kep. Tk. Besi @ Rp. 27,000.00 10,125.00
2.250 OH Pekerja @ Rp. 20,000.00 45,000.00
0.110 OH Mandor @ Rp. 32,500.00 3,575.00
JUMLAH ( BELUM PPN ) 152,450.00 290,000.00 442,450.00

TIAP 1M1 ( BELUM PPN ) 15,245.00 29,000.00 44,245.00


JASA 10 % 1,524.50 2,900.00 4,424.50
JUMLAH 16,769.50 31,900.00 48,669.50
DIBULATKAN 16,769.00 31,900.00 48,669.00

SNI 1.000 m1 Pasang talang ½ lingkaran D - 10 cm, seng BJLS 28


6.20 0.300 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00 13,200.00
0.100 kg Paku biasa 1/2" - 1" @ Rp. 8,000.00 800.00
0.019 m3 Kayu bengkirai papan @ Rp. 6,000,000.00 114,000.00
0.500 kg Besi strip @ Rp. 8,800.00 4,400.00
0.250 OH Tukang kayu @ Rp. 30,000.00 7,500.00
0.025 OH Kepala tukang kayu @ Rp. 32,500.00 812.50
0.150 OH Pekerja @ Rp. 20,000.00 3,000.00
0.001 OH Mandor @ Rp. 32,500.00 40.63
JUMLAH ( BELUM PPN ) 11,353.13 132,400.00 143,753.13
JASA 10 % 1,135.31 13,240.00 14,375.31
JUMLAH 12,488.44 145,640.00 158,128.44
DIBULATKAN 12,488.00 145,640.00 158,128.00

SNI 1.000 m2 Pasang dinding pemisah teakwood rangkap, rangka kayu kamper
03-3434-2002 0.020 m3 Kayu kamper balok @ Rp. 4,750,000.00 92,625.00
6.56 0.007 m3 Kayu kamper papan @ Rp. 5,500,000.00 38,500.00
0.100 kg Paku biasa 2" - 5" @ Rp. 8,000.00 800.00
0.560 kg Lem kayu @ Rp. 11,000.00 6,160.00
1.000 lbr Teakwood 4' x 8' x 4 mm @ Rp. 69,500.00
0.450 OH Tukang kayu @ Rp. 30,000.00 13,500.00
0.045 OH Kepala tukang kayu @ Rp. 32,500.00 1,462.50
0.150 OH Pekerja @ Rp. 20,000.00 3,000.00
0.075 OH Mandor @ Rp. 32,500.00 2,437.50
JUMLAH ( BELUM PPN ) 20,400.00 138,085.00 158,485.00
JASA 10 % 2,040.00 13,808.50 15,848.50
JUMLAH 22,440.00 151,893.50 174,333.50
DIBULATKAN 22,440.00 151,893.00 174,333.00

SNI 1.000 m2 Pas. dinding pemisah plywoodwood rangkap, rangka ky kamper


03-3434-2002 0.020 m3 Kayu kamper balok @ Rp. 4,750,000.00 92,625.00
6.57 0.007 m3 Kayu kamper papan @ Rp. 5,500,000.00 38,500.00
0.100 kg Paku biasa 2" - 5" @ Rp. 8,000.00 800.00
0.560 kg Lem kayu @ Rp. 11,000.00 6,160.00
1.000 lbr Plywood 4' x 8' x 4 mm @ Rp. 41,250.00 41,250.00
0.600 OH Tukang kayu @ Rp. 30,000.00 18,000.00
0.060 OH Kepala tukang kayu @ Rp. 32,500.00 1,950.00
0.200 OH Pekerja @ Rp. 20,000.00 4,000.00
0.010 OH Mandor @ Rp. 32,500.00 325.00
JUMLAH ( BELUM PPN ) 24,275.00 179,335.00 203,610.00
JASA 10 % 2,427.50 17,933.50 20,361.00
JUMLAH 26,702.50 197,268.50 223,971.00
DIBULATKAN 26,702.00 197,268.00 223,971.00

SNI 1.000 m2 Pasang plywood tebal 4 mm, untuk dinding


03-3434-2002 0.400 lbr Plywood 4' x 8' x 4 mm @ Rp. 41,250.00 16,500.00
6.59 0.050 kg Paku biasa 2" - 5" @ Rp. 8,000.00 400.00
0.075 OH Tukang kayu @ Rp. 30,000.00 2,250.00
0.008 OH Kepala tukang kayu @ Rp. 32,500.00 243.75
0.025 OH Pekerja @ Rp. 20,000.00 500.00
0.001 OH Mandor @ Rp. 32,500.00 42.25
JUMLAH ( BELUM PPN ) 3,036.00 16,900.00 19,936.00
JASA 10 % 303.60 1,690.00 1,993.60
JUMLAH 3,339.60 18,590.00 21,929.60
DIBULATKAN 3,339.00 18,590.00 21,929.00

PEKERJAAN ATAP
1.000 m2 Pasang genteng lama
0.100 OH Tukang batu @ Rp. 27,500.00 2,750.00
0.010 OH Kep. Tk. Batu @ Rp. 30,000.00 300.00
0.200 OH Pekerja @ Rp. 20,000.00 4,000.00
0.010 OH Mandor @ Rp. 32,500.00 325.00
JUMLAH ( BELUM PPN ) 7,375.00 0.00 7,375.00
JASA 10 % 737.50 0.00 737.50
JUMLAH 8,112.50 0.00 8,112.50
DIBULATKAN 8,112.00 0.00 8,112.00

H.2 1.000 m2 Pasang genteng paris


25.000 bh Genteng paris @ Rp. 600.00 15,000.00
0.100 OH Tukang batu @ Rp. 27,500.00 2,750.00
0.010 OH Kep. Tk. Batu @ Rp. 30,000.00 300.00
0.200 OH Pekerja @ Rp. 20,000.00 4,000.00
0.010 OH Mandor @ Rp. 32,500.00 325.00
JUMLAH ( BELUM PPN ) 7,375.00 15,000.00 22,375.00
JASA 10 % 737.50 1,500.00 2,237.50
JUMLAH 8,112.50 16,500.00 24,612.50
DIBULATKAN 8,112.00 16,500.00 24,612.00

H.2A 1.000 m2 Pasang genteng paris untuk rumah tingkat


25.000 bh Genteng paris @ Rp. 600.00 15,000.00
0.100 OH Tukang batu @ Rp. 27,500.00 2,750.00
0.010 OH Kep. Tk. Batu @ Rp. 30,000.00 300.00
0.300 OH Pekerja @ Rp. 20,000.00 6,000.00
0.015 OH Mandor @ Rp. 32,500.00 487.50
JUMLAH ( BELUM PPN ) 9,537.50 15,000.00 24,537.50
JASA 10 % 953.75 1,500.00 2,453.75
JUMLAH 10,491.25 16,500.00 26,991.25
DIBULATKAN 10,491.00 16,500.00 26,991.00

H.2A 1.000 m2 Pasang genteng beton besar Natural ( isi 9 / m2 )


9.000 bh Genteng beton natural @ Rp. 2,750.00 24,750.00
0.100 OH Tukang batu @ Rp. 27,500.00 2,750.00
0.010 OH Kep. Tk. Batu @ Rp. 30,000.00 300.00
0.200 OH Pekerja @ Rp. 20,000.00 4,000.00
0.010 OH Mandor @ Rp. 32,500.00 325.00
JUMLAH ( BELUM PPN ) 7,375.00 24,750.00 32,125.00
JASA 10 % 737.50 2,475.00 3,212.50
JUMLAH 8,112.50 27,225.00 35,337.50
DIBULATKAN 8,112.00 27,225.00 35,337.00

H.2A 1.000 m2 Pas. genteng beton besar Natural ( isi 9 / m2 ) untuk r. tingkat
9.000 bh Genteng beton natural @ Rp. 2,750.00 24,750.00
0.100 OH Tukang batu @ Rp. 27,500.00 2,750.00
0.010 OH Kep. Tk. Batu @ Rp. 30,000.00 300.00
0.300 OH Pekerja @ Rp. 20,000.00 6,000.00
0.015 OH Mandor @ Rp. 32,500.00 487.50
JUMLAH ( BELUM PPN ) 9,537.50 24,750.00 34,287.50
JASA 10 % 953.75 2,475.00 3,428.75
JUMLAH 10,491.25 27,225.00 37,716.25
DIBULATKAN 10,491.00 27,225.00 37,716.00

H.2A 1.000 m2 Pasang genteng beton besar Warna ( isi 9 / m2 )


9.000 bh Genteng beton Warna @ Rp. 4,420.00 39,780.00
0.100 OH Tukang batu @ Rp. 27,500.00 2,750.00
0.010 OH Kep. Tk. Batu @ Rp. 30,000.00 300.00
0.200 OH Pekerja @ Rp. 20,000.00 4,000.00
0.010 OH Mandor @ Rp. 32,500.00 325.00
JUMLAH ( BELUM PPN ) 7,375.00 39,780.00 47,155.00
JASA 10 % 737.50 3,978.00 4,715.50
JUMLAH 8,112.50 43,758.00 51,870.50
DIBULATKAN 8,112.00 43,758.00 51,870.00

H.2A 1.000 m2 Pas. genteng beton besar Warna ( isi 9 / m2 ) untuk r. tingkat
9.000 bh Genteng beton Warna @ Rp. 4,420.00 39,780.00
0.100 OH Tukang batu @ Rp. 27,500.00 2,750.00
0.010 OH Kep. Tk. Batu @ Rp. 30,000.00 300.00
0.300 OH Pekerja @ Rp. 20,000.00 6,000.00
0.015 OH Mandor @ Rp. 32,500.00 487.50
JUMLAH ( BELUM PPN ) 9,537.50 39,780.00 49,317.50
JASA 10 % 953.75 3,978.00 4,931.75
JUMLAH 10,491.25 43,758.00 54,249.25
DIBULATKAN 10,491.00 43,758.00 54,249.00

H.6 1.000 m1 Pasang bubungan genteng paris


5.000 bh Bubungan genteng paris @ Rp. 1,650.00 8,250.00
0.015 m3 Kapur pasang @ Rp. 72,500.00 1,102.00
0.015 m 3
Pasir pasang @ Rp. 76,000.00 1,155.20
1.524 kg PC @ Rp. 764.00 1,164.34
0.200 OH Tukang batu @ Rp. 27,500.00 5,500.00
0.020 OH Kep. Tk. Batu @ Rp. 30,000.00 600.00
0.400 OH Pekerja @ Rp. 20,000.00 8,000.00
0.020 OH Mandor @ Rp. 32,500.00 650.00
JUMLAH ( BELUM PPN ) 14,750.00 11,671.54 26,421.54
JASA 10 % 1,475.00 1,167.15 2,642.15
JUMLAH 16,225.00 12,838.69 29,063.69
DIBULATKAN 16,225.00 12,838.00 29,063.00

H.6 1.000 m1 Pasang bubungan genteng beton Natural


5.000 bh Bubungan genteng beton natural @ Rp. 2,460.00 12,300.00
0.015 m 3
Kapur pasang @ Rp. 72,500.00 1,102.00
0.015 m3 Pasir pasang @ Rp. 76,000.00 1,155.20
1.524 kg PC @ Rp. 764.00 1,164.34
0.200 OH Tukang batu @ Rp. 27,500.00 5,500.00
0.020 OH Kep. Tk. Batu @ Rp. 30,000.00 600.00
0.400 OH Pekerja @ Rp. 20,000.00 8,000.00
0.020 OH Mandor @ Rp. 32,500.00 650.00
JUMLAH ( BELUM PPN ) 14,750.00 15,721.54 30,471.54
JASA 10 % 1,475.00 1,572.15 3,047.15
JUMLAH 16,225.00 17,293.69 33,518.69
DIBULATKAN 16,225.00 17,293.00 33,518.00

H.6 1.000 m1 Pasang bubungan genteng beton Warna


4.000 bh Bubungan genteng beton warna @ Rp. 4,260.00 17,040.00
0.015 m 3
Kapur pasang @ Rp. 72,500.00 1,102.00
0.015 m3 Pasir pasang @ Rp. 76,000.00 1,155.20
1.524 kg PC @ Rp. 764.00 1,164.34
0.200 OH Tukang batu @ Rp. 27,500.00 5,500.00
0.020 OH Kep. Tk. Batu @ Rp. 30,000.00 600.00
0.400 OH Pekerja @ Rp. 20,000.00 8,000.00
0.020 OH Mandor @ Rp. 32,500.00 650.00
JUMLAH ( BELUM PPN ) 14,750.00 20,461.54 35,211.54
JASA 10 % 1,475.00 2,046.15 3,521.15
JUMLAH 16,225.00 22,507.69 38,732.69
DIBULATKAN 16,225.00 22,507.00 38,732.00

1.000 m2 Pasang atap asbes gelombang (2,5 x 0,92 m) x 5 mm


SNI 0.500 lbr Asbes gelombang @ Rp. 62,960.00 31,480.00
6.8 0.120 kg Paku pancing 60 x 230 @ Rp. 9,350.00 1,122.00
03-3436-2002 0.075 OH Tukang kayu @ Rp. 30,000.00 2,250.00
0.008 OH Kepala tukang kayu @ Rp. 32,500.00 260.00
0.140 OH Pekerja @ Rp. 20,000.00 2,800.00
0.008 OH Mandor @ Rp. 32,500.00 260.00
JUMLAH ( BELUM PPN ) 5,570.00 32,602.00 38,172.00
JASA 10 % 557.00 3,260.20 3,817.20
JUMLAH 6,127.00 35,862.20 41,989.20
DIBULATKAN 6,127.00 35,862.00 41,989.00

SNI 1.000 m2 Pasang atap asbes gelombang (2,00 x 0,92 m) x 5 mm


6.10 0.600 lbr Asbes gelombang @ Rp. 50,330.00 30,198.00
03-3436-2002 0.120 kg Paku pancing 60 x 230 @ Rp. 9,350.00 1,122.00
0.070 OH Tukang kayu @ Rp. 30,000.00 2,100.00
0.007 OH Kepala tukang kayu @ Rp. 32,500.00 227.50
0.140 OH Pekerja @ Rp. 20,000.00 2,800.00
0.007 OH Mandor @ Rp. 32,500.00 227.50
JUMLAH ( BELUM PPN ) 5,355.00 31,320.00 36,675.00
JASA 10 % 535.50 3,132.00 3,667.50
JUMLAH 5,890.50 34,452.00 40,342.50
DIBULATKAN 5,890.00 34,452.00 40,342.00

SNI 1.000 m2 Pasang atap asbes gelombang (1,80 x 0,92 m) x 5 mm


6.11 0.750 lbr Asbes gelombang @ Rp. 45,290.00 33,967.50
03-3436-2002 0.120 kg Paku pancing 60 x 230 @ Rp. 9,350.00 1,122.00
0.070 OH Tukang kayu @ Rp. 30,000.00 2,100.00
0.007 OH Kepala tukang kayu @ Rp. 32,500.00 227.50
0.140 OH Pekerja @ Rp. 20,000.00 2,800.00
0.007 OH Mandor @ Rp. 32,500.00 227.50
JUMLAH ( BELUM PPN ) 5,355.00 35,089.50 40,444.50
JASA 10 % 535.50 3,508.95 4,044.45
JUMLAH 5,890.50 38,598.45 44,488.95
DIBULATKAN 5,890.00 38,598.00 44,488.00
SNI 1.000 m2 Pasang atap asbes gelombang (300 x 1,05 m) x 4 mm
6.12 0.350 lbr Asbes gelombang @ Rp. 71,350.00 24,972.50
03-3436-2002 0.120 kg Paku pancing 60 x 230 @ Rp. 9,350.00 1,122.00
0.070 OH Tukang kayu @ Rp. 30,000.00 2,100.00
0.007 OH Kepala tukang kayu @ Rp. 32,500.00 227.50
0.140 OH Pekerja @ Rp. 20,000.00 2,800.00
0.007 OH Mandor @ Rp. 32,500.00 227.50
JUMLAH ( BELUM PPN ) 5,355.00 26,094.50 31,449.50
JASA 10 % 535.50 2,609.45 3,144.95
JUMLAH 5,890.50 28,703.95 34,594.45
DIBULATKAN 5,890.00 28,703.00 34,594.00

SNI 1.000 m2 Pasang atap asbes gelombang (2,40 x 1,05 m) x 4 mm


6.14 0.440 lbr Asbes gelombang @ Rp. 61,000.00 26,840.00
03-3436-2002 0.120 kg Paku pancing 60 x 230 @ Rp. 9,350.00 1,122.00
0.067 OH Tukang kayu @ Rp. 30,000.00 2,010.00
0.007 OH Kepala tukang kayu @ Rp. 32,500.00 227.50
0.140 OH Pekerja @ Rp. 20,000.00 2,800.00
0.007 OH Mandor @ Rp. 32,500.00 227.50
JUMLAH ( BELUM PPN ) 5,265.00 27,962.00 33,227.00
JASA 10 % 526.50 2,796.20 3,322.70
JUMLAH 5,791.50 30,758.20 36,549.70
DIBULATKAN 5,791.00 30,758.00 36,549.00

SNI 1.000 m2 Pasang atap asbes gelombang (2,10 x 1,05 m) x 4 mm


6.15 0.510 lbr Asbes gelombang @ Rp. 57,500.00 29,325.00
03-3436-2002 0.120 kg Paku pancing 60 x 230 @ Rp. 9,350.00 1,122.00
0.067 OH Tukang kayu @ Rp. 30,000.00 2,010.00
0.007 OH Kepala tukang kayu @ Rp. 32,500.00 227.50
0.140 OH Pekerja @ Rp. 20,000.00 2,800.00
0.007 OH Mandor @ Rp. 32,500.00 227.50
JUMLAH ( BELUM PPN ) 5,265.00 30,447.00 35,712.00
JASA 10 % 526.50 3,044.70 3,571.20
JUMLAH 5,791.50 33,491.70 39,283.20
DIBULATKAN 5,791.00 33,491.00 39,283.00

SNI 1.000 m2 Pasang atap asbes gelombang (1,50 x 1,05 m) x 4 mm


6.16 0.800 lbr Asbes gelombang @ Rp. 35,950.00 28,760.00
03-3436-2002 0.120 kg Paku pancing 60 x 230 @ Rp. 9,350.00 1,122.00
0.067 OH Tukang kayu @ Rp. 30,000.00 2,010.00
0.007 OH Kepala tukang kayu @ Rp. 32,500.00 227.50
0.140 OH Pekerja @ Rp. 20,000.00 2,800.00
0.007 OH Mandor @ Rp. 32,500.00 227.50
JUMLAH ( BELUM PPN ) 5,265.00 29,882.00 35,147.00
JASA 10 % 526.50 2,988.20 3,514.70
JUMLAH 5,791.50 32,870.20 38,661.70
DIBULATKAN 5,791.00 32,870.00 38,661.00

SNI 1.000 m2 Pasang atap asbes gelombang (3,00 x 1,08 m) x 6 mm


6.17 0.370 lbr Asbes gelombang @ Rp. 112,830.00 41,747.10
03-3436-2002 0.120 kg Paku pancing 60 x 230 @ Rp. 9,350.00 1,122.00
0.067 OH Tukang kayu @ Rp. 30,000.00 2,010.00
0.007 OH Kepala tukang kayu @ Rp. 32,500.00 227.50
0.140 OH Pekerja @ Rp. 20,000.00 2,800.00
0.007 OH Mandor @ Rp. 32,500.00 227.50
JUMLAH ( BELUM PPN ) 5,265.00 42,869.10 48,134.10
JASA 10 % 526.50 4,286.91 4,813.41
JUMLAH 5,791.50 47,156.01 52,947.51
DIBULATKAN 5,791.00 47,156.00 52,947.00

SNI 1.000 m2 Pasang atap sbes gelombang (2,40 x 1,08 m) x 6 mm


6.19 0.460 lbr Asbes gelombang @ Rp. 90,265.00 41,521.90
03-3436-2002 0.120 kg Paku pancing 60 x 230 @ Rp. 9,350.00 1,122.00
0.067 OH Tukang kayu @ Rp. 30,000.00 2,010.00
0.007 OH Kepala tukang kayu @ Rp. 32,500.00 227.50
0.140 OH Pekerja @ Rp. 20,000.00 2,800.00
0.007 OH Mandor @ Rp. 32,500.00 227.50
JUMLAH ( BELUM PPN ) 5,265.00 42,643.90 47,908.90
JASA 10 % 526.50 4,264.39 4,790.89
JUMLAH 5,791.50 46,908.29 52,699.79
DIBULATKAN 5,791.00 46,908.00 52,699.00

SNI 1.000 m2 Pasang atap asbes gelombang (2,10 x 1,08 m) x 6 mm


6.20 0.490 lbr Asbes gelombang @ Rp. 78,980.00 38,700.20
03-3436-2002 0.120 kg Paku pancing 60 x 230 @ Rp. 9,350.00 1,122.00
0.067 OH Tukang kayu @ Rp. 30,000.00 2,010.00
0.007 OH Kepala tukang kayu @ Rp. 32,500.00 227.50
0.140 OH Pekerja @ Rp. 20,000.00 2,800.00
0.007 OH Mandor @ Rp. 32,500.00 227.50
JUMLAH ( BELUM PPN ) 5,265.00 39,822.20 45,087.20
JASA 10 % 526.50 3,982.22 4,508.72
JUMLAH 5,791.50 43,804.42 49,595.92
DIBULATKAN 5,791.00 43,804.00 49,595.00

SNI 1.000 m2 Pasang atap Superdek 6 kaki


6.21 0.870 Lbr Superdeks @ Rp. 138,600.00 120,582.00
03-3436-2002 0.025 Kg Paku Ardeks @ Rp. 45,475.00 1,136.88
0.067 OH Tukang kayu @ Rp. 137,088.00 9,184.90
0.007 OH Kepala tukang kayu @ Rp. 154,224.00 1,079.57
0.140 OH Pekerja @ Rp. 85,680.00 11,995.20
0.007 OH Mandor @ Rp. 171,360.00 1,199.52
JUMLAH 23,459.18 121,718.88 145,178.06
DIBULATKAN 23,459.00 121,718.00 145,178.00
SNI 1.000 m2 Pasang atap Seng gelombang BJLS 30
6.21 0.870 Lbr Seng gelombang BJLS 30 @ Rp. 88,200.00 76,734.00
03-3436-2002 0.025 Kg Paku seng @ Rp. 45,475.00 1,136.88
0.067 OH Tukang kayu @ Rp. 137,088.00 9,184.90
0.007 OH Kepala tukang kayu @ Rp. 154,224.00 1,079.57
0.140 OH Pekerja @ Rp. 85,680.00 11,995.20
0.007 OH Mandor @ Rp. 171,360.00 1,199.52
JUMLAH 23,459.18 77,870.88 101,330.06
DIBULATKAN 23,459.00 77,870.00 101,330.00

SNI 1.000 m1 Pasang nok Seng plat BJLS 30


6.22 0.380 Lbr Seng Plat BJLS 30 @ Rp. 41,800.00 15,884.00
03-3436-2002 0.004 M3 Kayu Matoa @ Rp. 3,135,000.00 12,540.00
0.020 Kg Paku Seng @ Rp. 45,475.00 909.50
0.125 OH Tukang kayu @ Rp. 137,088.00 17,136.00
0.013 OH Kepala tukang kayu @ Rp. 154,224.00 2,004.91
0.084 OH Pekerja @ Rp. 85,680.00 7,197.12
0.004 OH Mandor @ Rp. 171,360.00 685.44
JUMLAH 27,023.47 29,333.50 56,356.97
DIBULATKAN 27,023.00 29,333.00 56,356.00

SNI 1.000 m1 Pasang nok stel gelombang 1,05 m


6.23 2.100 lbr Nok stel gelombang @ Rp. 29,000.00 60,900.00
03-3436-2002 6.000 bh Paku sekrup 3,5" @ Rp. 750.00 4,500.00
0.125 OH Tukang kayu @ Rp. 30,000.00 3,750.00
0.013 OH Kepala tukang kayu @ Rp. 32,500.00 422.50
0.084 OH Pekerja @ Rp. 20,000.00 1,680.00
0.004 OH Mandor @ Rp. 32,500.00 130.00
JUMLAH ( BELUM PPN ) 5,982.50 65,400.00 71,382.50
JASA 10 % 598.25 6,540.00 7,138.25
JUMLAH 6,580.75 71,940.00 78,520.75
DIBULATKAN 6,580.00 71,940.00 78,520.00

SNI 1.000 m1 Pasang nok stel gelombang 1,08 m


6.24 2.050 lbr Nok stel gelombang @ Rp. 29,000.00 59,450.00
03-3436-2002 6.000 bh Paku sekrup 3,5" @ Rp. 750.00 4,500.00
0.125 OH Tukang kayu @ Rp. 30,000.00 3,750.00
0.013 OH Kepala tukang kayu @ Rp. 32,500.00 422.50
0.084 OH Pekerja @ Rp. 20,000.00 1,680.00
0.004 OH Mandor @ Rp. 32,500.00 130.00
JUMLAH ( BELUM PPN ) 5,982.50 63,950.00 69,932.50
JASA 10 % 598.25 6,395.00 6,993.25
JUMLAH 6,580.75 70,345.00 76,925.75
DIBULATKAN 6,580.00 70,345.00 76,925.00

SNI 1.000 m2 Pasang atap genteng metal zinc alume type prima roof
03-3436-2002 1.020 m2 Genteng metal @ Rp. 95,400.00 97,308.00
6.32 0.200 kg Paku anti karat @ Rp. 20,000.00 4,000.00
0.100 OH Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 OH Kepala tukang kayu @ Rp. 32,500.00 325.00
0.200 OH Pekerja @ Rp. 20,000.00 4,000.00
0.001 OH Mandor @ Rp. 32,500.00 32.50
JUMLAH ( BELUM PPN ) 7,357.50 101,308.00 108,665.50
JASA 10 % 735.75 10,130.80 10,866.55
JUMLAH 8,093.25 111,438.80 119,532.05
DIBULATKAN 8,093.00 111,438.00 119,532.00

Mod. SNI 1.000 m2 Pasang atap metal gelombanmg


03-3436-2002 1.020 m2 Atap metal gelombang t 3,5 mm @ Rp. 60,000.00 61,200.00
6.32 4.000 bh Paku/skrup atap anti karat @ Rp. 1,200.00 4,800.00
0.100 OH Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 OH Kepala tukang kayu @ Rp. 32,500.00 325.00
0.200 OH Pekerja @ Rp. 20,000.00 4,000.00
0.001 OH Mandor @ Rp. 32,500.00 32.50
JUMLAH ( BELUM PPN ) 7,357.50 66,000.00 73,357.50
JASA 10 % 735.75 6,600.00 7,335.75
JUMLAH 8,093.25 72,600.00 80,693.25
DIBULATKAN 8,093.00 72,600.00 80,693.00

SNI 1.000 m2 Pasang alumunium foil / sisalation


03-3436-2002 1.050 m2 Sisalation / alumunium foil @ Rp. 25,000.00 26,250.00
6.42 0.050 OH Tukang kayu @ Rp. 30,000.00 1,500.00
0.005 OH Kepala tukang kayu @ Rp. 32,500.00 162.50
0.150 OH Pekerja @ Rp. 20,000.00 3,000.00
0.008 OH Mandor @ Rp. 32,500.00 260.00
JUMLAH ( BELUM PPN ) 4,922.50 26,250.00 31,172.50
JASA 10 % 492.25 2,625.00 3,117.25
JUMLAH 5,414.75 28,875.00 34,289.75
DIBULATKAN 5,414.00 28,875.00 34,289.00

Empiris 1.000 m2 Pasang atap polikarbonat


1.050 m2 Plykarbhonat @ Rp. 225,000.00 236,250.00
7.000 kg Besi rangka @ Rp. 8,800.00 61,600.00
9.000 bh Paku sekrup @ Rp. 1,200.00 10,800.00
0.500 OH Tukang besi @ Rp. 25,000.00 12,500.00
0.050 OH Kepala tukang besi @ Rp. 27,000.00 1,350.00
0.500 OH Pekerja @ Rp. 20,000.00 10,000.00
0.003 OH Mandor @ Rp. 32,500.00 81.25
JUMLAH ( BELUM PPN ) 23,931.25 308,650.00 332,581.25
JASA 10 % 2,393.13 30,865.00 33,258.13
JUMLAH 26,324.38 339,515.00 365,839.38
DIBULATKAN 26,324.00 339,515.00 365,839.00

PEKERJAAN BESI DAN ALUMUNIUM


3 1.000 M Pengelasan Single ( las listrik )
3.000 kg Kawat las @ Rp. 6,500.00 19,500.00
1.000 hari Peralatan las @ Rp. 75,000.00 75,000.00
0.500 OH Tukang las @ Rp. 27,500.00 13,750.00
0.050 OH Kepala tukang las @ Rp. 29,000.00 1,450.00
1.000 OH Pekerja @ Rp. 27,500.00 27,500.00
1.000 OH Mandor @ Rp. 32,500.00 32,500.00
JUMLAH ( BELUM PPN ) 75,200.00 94,500.00 169,700.00
JASA 10 % 7,520.00 9,450.00 16,970.00
JUMLAH 82,720.00 103,950.00 186,670.00
DIBULATKAN 82,720.00 103,950.00 186,670.00

SNI 1.000 kg Pasang rangka atap baja


1.100 kg Baja profil IWF @ Rp. 8,800.00 9,680.00
6.1 0.080 kg Meni besi @ Rp. 22,500.00 1,800.00
0.006 OH Tukang besi @ Rp. 25,000.00 150.00
0.006 OH Kepala tukang besi @ Rp. 27,000.00 162.00
0.060 OH Pekerja @ Rp. 20,000.00 1,200.00
0.000 OH Mandor @ Rp. 32,500.00 9.75
JUMLAH ( BELUM PPN ) 1,521.75 11,480.00 13,001.75
JASA 10 % 152.18 1,148.00 1,300.18
JUMLAH 1,673.93 12,628.00 14,301.93
DIBULATKAN 1,673.00 12,628.00 14,301.00

SNI 1.000 m2 Pasang pintu besi baja


1.000 m2 Pintu besi baja @ Rp. 750,000.00 750,000.00
6.2 0.650 OH Tukang besi konstruksi @ Rp. 25,000.00 16,250.00
0.065 OH Kepala tukang besi @ Rp. 27,000.00 1,755.00
0.650 OH Pekerja @ Rp. 20,000.00 13,000.00
0.032 OH Mandor @ Rp. 32,500.00 1,040.00
JUMLAH ( BELUM PPN ) 32,045.00 750,000.00 782,045.00
JASA 10 % 3,204.50 75,000.00 78,204.50
JUMLAH 35,249.50 825,000.00 860,249.50
DIBULATKAN 35,249.00 825,000.00 860,249.00

SNI 1.000 m2 Pasang pintu gulung besi


1.000 m2 Pintu gulung besi @ Rp. 250,000.00 250,000.00
6.5 1.200 OH Tukang besi konstruksi @ Rp. 25,000.00 30,000.00
0.120 OH Kepala tukang besi @ Rp. 27,000.00 3,240.00
1.200 OH Pekerja @ Rp. 20,000.00 24,000.00
0.006 OH Mandor @ Rp. 32,500.00 195.00
JUMLAH ( BELUM PPN ) 57,435.00 250,000.00 307,435.00
JASA 10 % 5,743.50 25,000.00 30,743.50
JUMLAH 63,178.50 275,000.00 338,178.50
DIBULATKAN 63,178.00 275,000.00 338,178.00

SNI 1.000 m2 Pasang pintu lipat


1.000 m2 Pintu lipat @ Rp. 500,000.00 500,000.00
6.6 1.050 OH Tukang besi konstruksi @ Rp. 25,000.00 26,250.00
0.105 OH Kepala tukang besi @ Rp. 27,000.00 2,835.00
1.050 OH Pekerja @ Rp. 20,000.00 21,000.00
0.005 OH Mandor @ Rp. 32,500.00 169.00
JUMLAH ( BELUM PPN ) 50,254.00 500,000.00 550,254.00
JASA 10 % 5,025.40 50,000.00 55,025.40
JUMLAH 55,279.40 550,000.00 605,279.40
DIBULATKAN 55,279.00 550,000.00 605,279.00

SNI 1.000 m2 Pasang Rolling door


1.000 m2 Roll door @ Rp. 200,000.00 200,000.00
6.8 1.500 OH Tukang besi konstruksi @ Rp. 25,000.00 37,500.00
0.105 OH Kepala tukang besi @ Rp. 27,000.00 2,835.00
1.050 OH Pekerja @ Rp. 20,000.00 21,000.00
0.005 OH Mandor @ Rp. 32,500.00 169.00
JUMLAH ( BELUM PPN ) 61,504.00 200,000.00 261,504.00
JASA 10 % 6,150.40 20,000.00 26,150.40
JUMLAH 67,654.40 220,000.00 287,654.40
DIBULATKAN 67,654.00 220,000.00 287,654.00

SNI 1.000 m2 Pasang pintu alumunium


1.000 m2 Pintu alumunium @ Rp. 400,000.00 400,000.00
6.9 1.050 OH Tukang besi konstruksi @ Rp. 137,088.00 143,942.40
0.105 OH Kepala tukang besi @ Rp. 154,224.00 16,193.52
1.050 OH Pekerja @ Rp. 85,680.00 89,964.00
0.005 OH Mandor @ Rp. 171,360.00 891.07
JUMLAH ( BELUM PPN ) 250,990.99 400,000.00 650,990.99
JASA 10 % 25,099.10 40,000.00 65,099.10
JUMLAH 276,090.09 440,000.00 716,090.09
DIBULATKAN 276,090.00 440,000.00 716,090.00

SNI 1.000 m2 Pasang teralis besi


11.500 m1 Baja strip 2 x 3 @ Rp. 0.00
6.12 1.200 OH Tukang las @ Rp. 137,088.00 164,505.60
0.012 OH Kepala tukang las @ Rp. 154,224.00 1,850.69
1.200 OH Pekerja @ Rp. 85,680.00 102,816.00
0.001 OH Mandor @ Rp. 171,360.00 102.82
JUMLAH ( BELUM PPN ) 269,275.10 0.00 269,275.10
DIBULATKAN 269,275.00 0.00 269,275.00

SNI 1.000 m2 Pasang kawat harmonika


1.100 m2 Kawat harmonika @ Rp. 25,000.00 27,500.00
6.13 0.020 kg Paku biasa 1/2" - 1" @ Rp. 10,000.00 200.00
0.002 m 3
Kayu kamper papan @ Rp. 5,500,000.00 9,900.00
0.100 OH Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 OH Kepala tukang kayu @ Rp. 32,500.00 325.00
0.100 OH Pekerja @ Rp. 20,000.00 2,000.00
0.001 OH Mandor @ Rp. 32,500.00 16.25
JUMLAH ( BELUM PPN ) 5,341.25 37,600.00 42,941.25
JASA 10 % 534.13 3,760.00 4,294.13
JUMLAH 5,875.38 41,360.00 47,235.38
DIBULATKAN 5,875.00 41,360.00 47,235.00

SNI 1.000 m2 Pasang kawat nyamuk


1.100 m2 Kawat nyamuk @ Rp. 8,250.00 9,075.00
6.14 0.020 kg Paku biasa 1/2" - 1" @ Rp. 10,000.00 200.00
0.002 m3 Kayu kamper papan @ Rp. 5,500,000.00 9,900.00
0.100 OH Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 OH Kepala tukang kayu @ Rp. 32,500.00 325.00
0.100 OH Pekerja @ Rp. 20,000.00 2,000.00
0.001 OH Mandor @ Rp. 32,500.00 16.25
JUMLAH ( BELUM PPN ) 5,341.25 19,175.00 24,516.25
JASA 10 % 534.13 1,917.50 2,451.63
JUMLAH 5,875.38 21,092.50 26,967.88
DIBULATKAN 5,875.00 21,092.00 26,967.00

SNI 1.000 m2 Pasang kawat kassa


1.100 m2 Kawat kassa @ Rp. 10,000.00 11,000.00
6.15 0.020 kg Paku biasa 1/2" - 1" @ Rp. 10,000.00 200.00
0.002 m3 Kayu kamper papan @ Rp. 5,500,000.00 9,900.00
0.100 OH Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 OH Kepala tukang kayu @ Rp. 32,500.00 325.00
0.100 OH Pekerja @ Rp. 20,000.00 2,000.00
0.001 OH Mandor @ Rp. 32,500.00 16.25
JUMLAH ( BELUM PPN ) 5,341.25 21,100.00 26,441.25
JASA 10 % 534.13 2,110.00 2,644.13
JUMLAH 5,875.38 23,210.00 29,085.38
DIBULATKAN 5,875.00 23,210.00 29,085.00

SNI 1.000 set Pasang jendela louver lengkap teralis


1.100 set jendela louver lengkap teralis @ Rp. 391,680.00 430,848.00
6.17 0.020 kg Paku skrup @ Rp. 20,725.00 414.50
0.025 m2 Besi strip @ Rp. 114,000.00 2,850.00
0.200 OH Tukang kayu @ Rp. 137,088.00 27,417.60
0.020 OH Kepala tukang kayu @ Rp. 154,224.00 3,084.48
0.200 OH Pekerja @ Rp. 85,680.00 17,136.00
0.001 OH Mandor @ Rp. 171,360.00 171.36
JUMLAH ( BELUM PPN ) 47,809.44 434,112.50 481,921.94
DIBULATKAN 47,809.00 434,112.00 481,921.00

PEKERJAAN KUNCI DAN KACA

6.1 1.000 bh Pasang kunci tanam antik


1.000 bh Kunci tanam antik @ Rp. 275,000.00 275,000.00
0.600 OH Tukang kayu @ Rp. 137,088.00 82,252.80
0.060 OH Kepala tukang kayu @ Rp. 154,224.00 9,253.44
0.060 OH Pekerja @ Rp. 85,680.00 5,140.80
0.003 OH Mandor @ Rp. 171,360.00 514.08
JUMLAH 97,161.12 275,000.00 372,161.12
DIBULATKAN 97,161.00 275,000.00 372,161.00

6.2 1.000 bh Pasang kunci tanam biasa


1.000 bh Kunci tanam biasa @ Rp. 173,937.00 173,937.00
0.500 OH Tukang kayu @ Rp. 137,088.00 68,544.00
0.010 OH Kepala tukang kayu @ Rp. 154,224.00 1,542.24
0.010 OH Pekerja @ Rp. 85,680.00 856.80
0.005 OH Mandor @ Rp. 171,360.00 856.80
JUMLAH 71,799.84 173,937.00 245,736.84
DIBULATKAN 71,799.00 173,937.00 245,736.00

6.3 1.000 bh Pasang kunci tanam kamar mandi


1.000 bh Kunci tanam kamar mandi @ Rp. 50,000.00 50,000.00
0.500 OH Tukang kayu @ Rp. 30,000.00 15,000.00
0.005 OH Kepala tukang kayu @ Rp. 32,500.00 162.50
0.005 OH Pekerja @ Rp. 20,000.00 100.00
0.003 OH Mandor @ Rp. 32,500.00 81.25
JUMLAH #REF! #REF! #REF!
DIBULATKAN #REF! #REF! #REF!

6.4 1.000 bh Pasang kunci tanam silinder


1.000 bh Kunci silinder @ Rp. 75,000.00 75,000.00
0.500 OH Tukang kayu @ Rp. 30,000.00 15,000.00
0.005 OH Kepala tukang kayu @ Rp. 32,500.00 162.50
0.005 OH Pekerja @ Rp. 20,000.00 100.00
0.000 OH Mandor @ Rp. 32,500.00 8.13
JUMLAH #REF! #REF! #REF!
DIBULATKAN #REF! #REF! #REF!

6.5 1.000 bh Pasang engsel pintu


1.000 bh Engsel pintu @ Rp. 37,257.00 37,257.00
0.150 OH Tukang kayu @ Rp. 137,088.00 20,563.20
0.015 OH Kepala tukang kayu @ Rp. 154,224.00 2,313.36
0.015 OH Pekerja @ Rp. 85,680.00 1,285.20
0.001 OH Mandor @ Rp. 171,360.00 128.52
JUMLAH 24,290.28 37,257.00 61,547.28
DIBULATKAN 24,290.00 37,257.00 61,547.00

6.6 1.000 bh Pasang engsel jendela kupu-kupu


1.000 bh Engsel jendela @ Rp. 15,812.00 15,812.00
0.100 OH Tukang kayu @ Rp. 137,088.00 13,708.80
0.010 OH Kepala tukang kayu @ Rp. 154,224.00 1,542.24
0.010 OH Pekerja @ Rp. 85,680.00 856.80
0.005 OH Mandor @ Rp. 171,360.00 856.80
JUMLAH 16,964.64 15,812.00 32,776.64
DIBULATKAN 16,964.00 15,812.00 32,776.00

6.7 1.000 bh Pasang engsel angin


1.000 bh Engsel angin @ Rp. 14,231.00 14,231.00
0.200 OH Tukang kayu @ Rp. 137,088.00 27,417.60
0.020 OH Kepala tukang kayu @ Rp. 154,224.00 3,084.48
0.020 OH Pekerja @ Rp. 85,680.00 1,713.60
0.010 OH Mandor @ Rp. 171,360.00 1,713.60
JUMLAH 33,929.28 14,231.00 48,160.28
DIBULATKAN 33,929.00 14,231.00 48,160.00

6.9 1.000 bh Pasang kait angin


1.000 bh Kait angin @ Rp. 58,437.00 58,437.00
0.150 OH Tukang kayu @ Rp. 137,088.00 20,563.20
0.015 OH Kepala tukang kayu @ Rp. 154,224.00 2,313.36
0.015 OH Pekerja @ Rp. 85,680.00 1,285.20
0.001 OH Mandor @ Rp. 171,360.00 128.52
JUMLAH 24,290.28 58,437.00 82,727.28
DIBULATKAN 24,290.00 58,437.00 82,727.00

1.000 bh Pasang Tarikan jendela


1.000 bh Tarikan jendela @ Rp. 11,687.00 11,687.00
0.150 OH Tukang kayu @ Rp. 137,088.00 20,563.20
0.015 OH Kepala tukang kayu @ Rp. 154,224.00 2,313.36
0.015 OH Pekerja @ Rp. 85,680.00 1,285.20
0.001 OH Mandor @ Rp. 171,360.00 128.52
JUMLAH 24,290.28 11,687.00 35,977.28
DIBULATKAN 24,290.00 11,687.00 35,977.00

6.10 1.000 bh Pasang door closer


1.000 bh Door closer @ Rp. 150,000.00 150,000.00
0.500 OH Tukang kayu @ Rp. 30,000.00 15,000.00
0.050 OH Kepala tukang kayu @ Rp. 32,500.00 1,625.00
0.050 OH Pekerja @ Rp. 20,000.00 1,000.00
0.003 OH Mandor @ Rp. 32,500.00 81.25
JUMLAH #REF! #REF! #REF!
DIBULATKAN #REF! #REF! #REF!

6.11 1.000 bh Pasang kunci selot


1.000 bh Kunci selot @ Rp. 17,187.00 17,187.00
0.200 OH Tukang kayu @ Rp. 137,088.00 27,417.60
0.020 OH Kepala tukang kayu @ Rp. 154,224.00 3,084.48
0.020 OH Pekerja @ Rp. 85,680.00 1,713.60
0.001 OH Mandor @ Rp. 171,360.00 171.36
JUMLAH 32,387.04 17,187.00 49,574.04
DIBULATKAN 32,387.00 17,187.00 49,574.00

6.12 1.000 bh Pasang pegangan pintu / door holder


1.000 bh Door holder @ Rp. 15,000.00 15,000.00
0.500 OH Tukang kayu @ Rp. 30,000.00 15,000.00
0.050 OH Kepala tukang kayu @ Rp. 32,500.00 1,625.00
0.050 OH Pekerja @ Rp. 20,000.00 1,000.00
0.003 OH Mandor @ Rp. 32,500.00 81.25
JUMLAH #REF! #REF! #REF!
DIBULATKAN #REF! #REF! #REF!

6.13 1.000 bh Pasang door stop


1.000 bh Door stop @ Rp. 15,000.00 15,000.00
0.100 OH Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 OH Kepala tukang kayu @ Rp. 32,500.00 325.00
0.010 OH Pekerja @ Rp. 20,000.00 200.00
0.001 OH Mandor @ Rp. 32,500.00 16.25
JUMLAH #REF! #REF! #REF!
DIBULATKAN #REF! #REF! #REF!

6.14 1.000 bh Pasang rel pintu dorong


1.000 bh Rel pintu dorong @ Rp. 200,000.00 200,000.00
0.600 OH Tukang kayu @ Rp. 30,000.00 18,000.00
0.060 OH Kepala tukang kayu @ Rp. 32,500.00 1,950.00
0.060 OH Pekerja @ Rp. 20,000.00 1,200.00
0.003 OH Mandor @ Rp. 32,500.00 97.50
JUMLAH #REF! #REF! #REF!
DIBULATKAN #REF! #REF! #REF!
6.16 1.000 m2 Pasang kaca, tebal 3 mm
1.100 m2 Kaca polos @ Rp. 341,000.00 375,100.00
0.150 OH Tukang kayu @ Rp. 137,088.00 20,563.20
0.015 OH Kepala tukang kayu @ Rp. 154,224.00 2,313.36
0.015 OH Pekerja @ Rp. 85,680.00 1,285.20
0.001 OH Mandor @ Rp. 171,360.00 128.52
JUMLAH 24,290.28 375,100.00 399,390.28
DIBULATKAN 24,290.00 375,100.00 399,390.00

6.17 1.000 m2 Pasang kaca, tebal 5 mm


1.100 m2 Kaca polos @ Rp. 357,500.00 393,250.00
0.150 OH Tukang kayu @ Rp. 137,088.00 20,563.20
0.015 OH Kepala tukang kayu @ Rp. 154,224.00 2,313.36
0.015 OH Pekerja @ Rp. 85,680.00 1,285.20
0.001 OH Mandor @ Rp. 171,360.00 128.52
JUMLAH 24,290.28 393,250.00 417,540.28
DIBULATKAN 24,290.00 393,250.00 417,540.00

6.20 1.000 m2 Pasang kaca cermin, tebal 5 mm


1.100 m2 Kaca cermin @ Rp. 120,000.00 132,000.00
0.150 OH Tukang kayu @ Rp. 30,000.00 4,500.00
0.015 OH Kepala tukang kayu @ Rp. 32,500.00 487.50
0.015 OH Pekerja @ Rp. 20,000.00 300.00
0.001 OH Mandor @ Rp. 32,500.00 24.38
JUMLAH #REF! #REF! #REF!
DIBULATKAN #REF! #REF! #REF!

6.24 1.000 m2 Pasang kaca patri, tebal 5 mm


1.100 m2 Kaca patri @ Rp. 300,000.00 330,000.00
0.150 OH Tukang kayu @ Rp. 30,000.00 4,500.00
0.015 OH Kepala tukang kayu @ Rp. 32,500.00 487.50
0.015 OH Pekerja @ Rp. 20,000.00 300.00
0.001 OH Mandor @ Rp. 32,500.00 24.38
JUMLAH #REF! #REF! #REF!
DIBULATKAN #REF! #REF! #REF!

6.17 1.000 m1 Pasang kusen alumunium


1.100 m1 Kusen alumunium @ Rp. 55,000.00 60,500.00
0.150 x Harga kusen (Perlengkapan) @ Rp. 55,000.00 8,250.00
0.150 oh Tukang alumunium @ Rp. 25,000.00 3,750.00
0.015 oh Kepala tukang @ Rp. 27,000.00 405.00
0.015 oh Pekerja @ Rp. 20,000.00 300.00
0.001 oh Mandor @ Rp. 32,500.00 24.38
JUMLAH #REF! 68,750.00 #REF!
DIBULATKAN #REF! 68,750.00 #REF!
ANJALISA PEKERJAAN LISTRIK
No. Macam Pekerjaan Upah Bahan
(1) (2) (3) (4)

23. 1.0000 bh Pasang MCB Ampere + box tutup panel ukuran 30 x 30


1.0000 bh MCB 10 Ampere + box @ Rp. 103,824.00 103,824.00
0.0500 org Tukang listrik @ Rp. 137,088.00 6,854.40
0.1000 org Pekerja @ Rp. 85,680.00 8,568.00
0.0250 org Mandor @ Rp. 171,360.00 4,284.00
JUMLAH 19,706.40 103,824.00
DIBULATKAN 19,706.00 103,824.00

1.0000 TITIK PASANG LAMPU XL 8 WATT


1.0000 Bh Fitting 27,500.00 27,500.00
1.0000 Bh Lampu Pijar XL-8 Watt 55,000.00 55,000.00
10.0000 M1 Kabel NYY 3x2½ 26,235.00 262,350.00
10.0000 M1 Pipa Paralon instalasi 5/8" 5,859.00 58,590.00
1.0000 Bh Saklar 27,500.00 27,500.00
4.0000 Bh Isolator 13,750.00 55,000.00
1.0000 H/O Tukang Listrik 137,088.00 137,088.00
1.0000 TTK Instalasi 60,000.00 60,000.00
JUMLAH 545,940.00 137,088.00
DIBULATKAN 545,940.00 137,088.00

1.0000 TITIK PASANG LAMPU XL 18 WATT


1.0000 Bh Fitting 27,500.00 27,500.00
1.0000 Bh Lampu Pijar XL 18 Watt 89,375.00 89,375.00
10.0000 M1 Kabel NYY 3x2½ 26,235.00 262,350.00
10.0000 M1 Pipa Paralon instalasi 5/8" 5,859.00 58,590.00
1.0000 Bh Saklar 31,250.00 31,250.00
4.0000 Bh Isolator 13,750.00 55,000.00
1.0000 H/O Tukang Listrik 137,088.00 137,088.00
1.0000 TTK Instalasi 60,000.00 60,000.00
JUMLAH 584,065.00 137,088.00
DIBULATKAN 584,065.00 137,088.00

1.0000 TITIK PASANG LAMPU TL 40 WATT


1.0000 Bh Lampu Pijar TL 40 Watt 158,950.00 158,950.00
10.0000 M1 Kabel NYY 3x2½ 26,235.00 262,350.00
10.0000 M1 Pipa Paralon instalasi 5/8" 5,859.00 58,590.00
1.0000 Bh Saklar 31,250.00 31,250.00
4.0000 Bh Isolator 13,750.00 55,000.00
1.0000 H/O Tukang Listrik 137,088.00 137,088.00
1.0000 TTK Instalasi 60,000.00 60,000.00
JUMLAH 626,140.00 137,088.00
DIBULATKAN 626,140.00 137,088.00

1.0000 TITIK PASANG STOP KONTAK


1.0000 Bh Stop Kontak 33,687.00 33,687.00
5.0000 M1 Kabel NYY 2x2½ 21,900.00 109,500.00
3.0000 M1 Pipa Paralon instalasi 5/8" 5,859.00 17,577.00
4.0000 Bh Isolator 13,750.00 55,000.00
0.8300 H/O Tukang Listrik 137,088.00 113,783.04
1.0000 TTK Instalasi 60,000.00 60,000.00
JUMLAH 275,764.00 113,783.04
(1) (2) (3) (4)
DIBULATKAN 275,764.00 113,783.00

1.0000 TITIK PASANG SAKLAR TUNGGAL


1.0000 Bh Saklar Tunggal 31,250.00 31,250.00
5.0000 M1 Kabel NYY 2x2½ 21,900.00 109,500.00
3.0000 M1 Pipa Paralon instalasi 5/8" 5,859.00 17,577.00
4.0000 Bh Isolator 13,750.00 55,000.00
0.8300 H/O Tukang Listrik 137,088.00 113,783.04
1.0000 TTK Instalasi 60,000.00 60,000.00
JUMLAH 273,327.00 113,783.04
DIBULATKAN 273,327.00 113,783.00

1.0000 TITIK PASANG SAKLAR GANDA


1.0000 Bh Saklar Ganda 34,375.00 34,375.00
5.0000 M1 Kabel NYY 2x2½ 21,900.00 109,500.00
3.0000 M1 Pipa Paralon instalasi 5/8" 5,859.00 17,577.00
4.0000 Bh Isolator 13,750.00 55,000.00
0.8300 H/O Tukang Listrik 137,088.00 113,783.04
1.0000 TTK Instalasi 60,000.00 60,000.00
JUMLAH 276,452.00 113,783.04
DIBULATKAN 276,452.00 113,783.00
Jumlah
(5)

123,530.40
123,530.00

683,028.00
683,028.00

721,153.00
721,153.00

763,228.00
763,228.00

389,547.04
(5)
389,547.00

387,110.04
387,110.00

390,235.04
390,235.00
DINAS PEKERJAAN UMUM ANALISA HARGA SATUAN KODE
SUB DINAS BINA MARGA MEMBUAT PARIT K110
KABUPATEN WAROPEN (MENGGUNAKAN BURUH)
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH ; TANGGAL :
PAPUA WAROPEN ( 10 ) CV. MADYA Consultant MEI. 2007
PROSES : ANGGAPAN :
1. Gali parit dengan tenaga manusia 1. Menggunakan tenaga manusia ( 100 m/hari)
2. Membuang sisa galian menggunaka 2. Dimensi parit : lebar bawah : 0,5 m
truk bak terbuka lebar atas : 1.3 m
kedalaman : 0,6 m ( vol: 0,54 m3 )
3. 25 % hasil galian dibuang setempat
4. Sisa galian dibuang sejauh 2 km
5. Menggali dan membuang dihitung 1, 5 m3/org-hari
6. umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat

PEKERJA VOL HARI KODE TOTAL.VOL UPAH BIAYA SUB TOTAL


(org.hari) (Rp./org/hyari) (Rp.) (Rp.)

P Mandor 1 1 L061 1.00 171,360 171,360


E Supir terampil 1 1 L091 2.00 137,088 274,176
K Pembantu supir 1 1 L099 2.00 119,952 239,904
E Buruh tak terampil 36 1 L101 36.00 85,680 3,084,480
R
J
A

PEKERJA 3,769,920
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)

M Alat bantu (set @ 3 alat ) Set M170 1.44 330,000 475,200


A
T
E
R
I
A
L

MATERIAL 475,200
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)

P Truk bak terbuka 3,5 t/115 HP 1 1 E221 12.00 280,001 3,360,017


E
R
A
L
A
T
A
N
PERALATAN 3,360,017
TOTAL 7,605,137

VOLUME : 54.0 SATUAN : M3 HARGA SATUAN Rp. 140,835.87 Per M3

DINAS PEKERJAAN UMUM ANALISA HARGA SATUAN KODE


SUB DINAS BINA MARGA MEMBUAT PASANGAN BATU PADA PARIT K112
KABUPATEN WAROPEN (MENGGUNAKAN BURUH)
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH ; TANGGAL :
PAPUA WAROPEN ( 10 ) CV. MADYA Consultant MEI. 2007
PROSES : ANGGAPAN :
1. Galian tambahan (0,4 m3/m) 1. Parit yang ada Vol. 0,54 m3/meter
2. Buat dasar pas.batu 2. Ukuran parit bag.dalam tebal rata-2 dinding = 20 cm,tebal dasar = 25 cm ,
3. Buat dinding Pas.Batu pada parit lebar dasar = 0,5 m, lebar atas = 0,9 m, kedalaman = 0,6 m
perbatasan dgn jalan untuk menduk 3. 50 % sisa galian dibuang dengan truk bak terbuka sejauh 1 km
perkerasan jalan dimana perlu 4. 50 % sisa galian dibuang dengan disekitar lokasi
4. Urug kembali dan buang sisa 5. Bahan - bahan dikirim ke tempat pekerjaan oleh pemasok
galian 6. Hasil produksi 60 m / hari

PEKERJA VOL HARI KODE TOTAL.VOL UPAH BIAYA SUB TOTAL


(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1 1 L061 1.00 171,360 171,360


E Supir terampil 1 1 L091 1.00 137,088 137,088
K Pembantu supir 1 1 L099 1.00 119,952 119,952
E Buruh tak terampil 36 1 L101 36.00 85,680 3,084,480
R
J
A

PEKERJA 3,512,880
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)

M Alat bantu (set @ 3 alat ) Set M170 1.44 330,000.00 475,200.00


A Konstruksi Pas.batu m3 K705 30.00 1,437,838.67 43,135,160.14
T
E
R
I
A
L

MATERIAL 43,610,360
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
P Truk bak terbuka 3,5 t/115 HP 1 1 E221 6.00 280,001 1,680,008
E
R
A
L
A
T
A
N
PERALATAN 1,680,008
TOTAL 48,803,249

VOLUME : 60.0 SATUAN : M HARGA SATUAN Rp. 813,387.48 Per M

DINAS PEKERJAAN UMUM ANALISA HARGA SATUAN KODE


SUB DINAS BINA MARGA PENGUPASAN DAN PEMBERSIHAN SEMAK PADA DAMIJA K210
KABUPATEN PANGKEP (MENGGUNAKAN BURUH)
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH ; TANGGAL :
SUL-SEL PANGKEP CV. MADYA Consultant
PROSES : ANGGAPAN :
1.Mengupas dan membuang semak dgn 1. Menggunakan tenaga manusia ( 1200 m2/hari)
tenaga manusia pd DAMIJA 2. Tidak ada pohon besar pada DAMIJA (hanya semak)
2. Lebar pengupasan & Pembersihan = 3. DAMIJA 12 m
DAMIJA minus lebar badan jalan 4. Pembersihan DAMIJA 100 m per hari
5. Bakar sampah di lokasi pekerjaan
6. Hasil kerja 25 m2/org-hari
7. Umur alat bantu rata-rata 1 bulan/org/set @ 3 alat

PEKERJA VOL HARI KODE TOTAL.VOL UPAH BIAYA SUB TOTAL


(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1 1 L061 1.00 171,360 171,360.00


E Buruh tak terampil 48 1 L101 48.00 85,680 4,112,640.00
K
E
R
J
A

PEKERJA 4,284,000.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit) (Rp.) (Rp.)

M Alat bantu (set @ 3 alat) set M170 1.92 330,000 633,600.00


A
T
E
R
I
A
L

MATERIAL 633,600.00
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)

P
E
R
A
L
A
T
A
N
PERALATAN 0.00
TOTAL 4,917,600.00

VOLUME : 1,200.00 SATUAN : M2 HARGA SATUAN Rp. 4,098.00 Per M2

DINAS PEKERJAAN UMUM ANALISA HARGA SATUAN KODE


SUB DINAS BINA MARGA GALIAN TANAH UNTUK KONSTRUKSI K224
KABUPATEN PANGKEP (MENGGUNAKAN BURUH)
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH ; TANGGAL :
SUL-SEL PANGKEP CV. MADYA Consultant
PROSES : ANGGAPAN :

1. Digali dengan tenaga manusia 1. Menggunakan tenaga manusia (40 m3/hari)


2. Membuang tanah galian sejauh 30 m dari 2. Kapasitas kerja per orang 1,3 m3/hari
lubang galian 3. Kedalaman rata-rata galian s/d 3 m
4. Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat

PEKERJA VOL HARI KODE TOTAL.VOL UPAH BIAYA SUB TOTAL


(org.hari) (Rp./org/hyari) (Rp.) (Rp.)
P Mandor 1 1 L061 1 171,360.00 171,360.00
E Buruh tak terampil 30 1 L101 30 85,680.00 2,570,400.00
K
E
R
J
A
A

PEKERJA 2,741,760.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)

M Alat bantu (set @ 3 alat) set M170 1.20 330,000 396,000.00


A
T
E
R
I
A
L
L

MATERIAL 396,000.00
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)

P
E
R
A
L
A
T
A
N
N PERALATAN 0.00
TOTAL 3,137,760.00

VOLUME : 40.00 SATUAN : M3 HARGA SATUAN Rp. 78,444.00 Per M3

DINAS PEKERJAAN UMUM ANALISA HARGA SATUAN KODE


SUB DINAS BINA MARGA PENIMBUNAN BADAN JALAN K311
KABUPATEN PANGKEP (MENGGUNAKAN ALAT)
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH ; TANGGAL :
SUL-SEL PANGKEP CV. MADYA Consultant
PROSES : ANGGAPAN :
1. Material dihampar maksimun tebal setiap 1. Menggunakan alat berat (120 m3/hari)
lapis 20 cm 2. Material pilihan yang termurah untuk timbunan dikirim kelokasi pekerjaan
2. Setiap lapis dipadatkan minimun 4 kali sejauh 10 km oleh pemasok
lintasan dengan mesin gilas roda karet 3. Harga material timbunan tegantung harga dilokasi pekerjaan

PEKERJA VOL HARI KODE TOTAL.VOL UPAH BIAYA SUB TOTAL


(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1 1 L061 1.00 171,360.00 171,360.00


E Operator terampil 2 1 L081 2.00 171,360.00 342,720.00
K Pembantu operator 2 1 L083 2.00 137,088.00 274,176.00
E Supir terampil 1 1 L091 1.00 137,088.00 137,088.00
R Pembantu supir 1 1 L099 1.00 119,952.00 119,952.00
J Buruh tak terampil 4 1 L101 4.00 85,680.00 342,720.00
A

PEKERJA 1,388,016.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)

M Timbunan pilihan m3 M050 144.00 305,000.00 43,920,000.00


A Alat bantu (set @ 3 alat) set M170 0.16 330,000.00 52,800.00
T
E
R
I
A
L

MATERIAL 43,972,800.00
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)

P Motor grader 100HP 1 1 E010 5.00 300,737.30 1,503,686.49


E Mesin gilas roda karet 8-15 ton 1 1 E084 5.00 325,798.47 1,628,992.36
R Truk tangki air 115HP 1 1 E182 5.00 287,059.72 1,435,298.59
A
L
A
T
A
N
PERALATAN 4,567,977.45
TOTAL 49,928,793.45

VOLUME : 120.00 SATUAN : M3 HARGA SATUAN Rp. 416,073.28 Per M3

DINAS PEKERJAAN UMUM ANALISA HARGA SATUAN KODE


SUB DINAS BINA MARGA PEMBENTUKAN BAHU JALAN KERAS K411
KABUPATEN PANGKEP (MENGGUNAKAN ALAT)
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH ; TANGGAL :
SUL-SEL PANGKEP CV. MADYA Consultant
PROSES : ANGGAPAN :
1. Material LPB yang yang baik dan sesuai 1. Menggunakan alat berat (200 m3/hari, pemadatan 2.000 m bahu jalan/hari
ditimbun sepanjang bahu jalan oleh 2. 10 cm timbunan padat dibutuhkan untuk 1 m lebar bahu jalan
pemasok 3. Material LPB yang termurah dikirim kelokasi pekerjaan oleh pemasok
2. Tenaga terampil mengatur penimbunan 4. Pemasok menimbun material LPB disepanjang bahu jalan
3. Material disebar dengan grader 5. Material disebar dengan grader
4. Pemadatan dengan mesin gilas bergetar 6. 200 m3 dihampar dan dipadatkan perhari
yang kesil 7. Koefisien pemadatan = 1,2

PEKERJA VOL HARI KODE TOTAL.VOL UPAH BIAYA SUB TOTAL


(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1 1 L061 1.00 171,360.00 171,360.00


E Operator terampil 3 1 L081 3.00 171,360.00 514,080.00
K Pembantu operator 3 1 L083 3.00 137,088.00 411,264.00
E Buruh tak terampil 4 1 L101 4.00 85,680.00 342,720.00
R Buruh terampil 2 1 L106 2.00 102,816.00 205,632.00
J
A

PEKERJA 1,645,056.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)

M Kerikil sungai tidak disaring m3 K012 240.00 444,272.70 106,625,448.44


A Alat bantu (set @ 3 alat) set M170 0.16 330,000.00 52,800.00
T
E
R
I
A
L

MATERIAL 106,678,248.44
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)

P Motor grader 100HP 1 1 E010 5.00 300,737.30 1,503,686.49


E Mesin gilas bergetar 2 1 E087 10.00 70,313.71 703,137.13
R
A
L
A
T
A
N
PERALATAN 2,206,823.62
TOTAL 110,530,128.06

VOLUME : 200.00 SATUAN : M3 HARGA SATUAN Rp. 552,650.64 Per M3

DINAS PEKERJAAN UMUM ANALISA HARGA SATUAN KODE


SUB DINAS BINA MARGA LAPIS PONDASI BAWAH KELAS C SIRTU K514
KABUPATEN PANGKEP (MENGGUNAKAN ALAT)
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH ; TANGGAL :
SUL-SEL PANGKEP CV. MADYA Consultant
PROSES : ANGGAPAN :
1. Sirtu ditimbun disepanjang jalan oleh 1. Menggunakan alat berat (150 m3/hari)
pemasok 2. Material ditimbun disepanjang jalan oleh pemasok
2. Greder membnetuk ulang permukaan 3. dikirim kerikil galian/sungai tidak disaring yang termurah
lama jalan 4. 6 % sirtu dengan ukuran lebih dipisah pada saat penghamparan dengan greder
3. Gader menghampaaaar sirtu dan ukuran 5. Lapis pondasi bawah dipadatkan sampai tebal pada 15 cm
yang lebih dipisah 6. Dihampar dan dipadatkan 1.000 m2/hari
4. Jalan disiram air dengan truk air 7. Keofisien kompaksi -1,2
5. Pemadatan dengan mesin gilas 6-8 ton
sampai 100 MDD

PEKERJA VOL HARI KODE TOTAL.VOL UPAH BIAYA SUB TOTAL


(org.hari) (Rp./org/hyari) (Rp.) (Rp.)

P Mandor 1 1 L061 1.00 171,360.00 171,360.00


E Operator terampil 2 1 L081 2.00 171,360.00 342,720.00
K Pembantu operator 2 1 L083 2.00 137,088.00 274,176.00
E Supir terampil 1 1 L091 1.00 137,088.00 137,088.00
R Pembantu supir 1 1 L099 1.00 119,952.00 119,952.00
J Buruh tak terampil 6 1 L101 6.00 85,680.00 514,080.00
A
PEKERJA 1,559,376.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)

M Kerikil sungai tidak tersaring m3 K.012 191.00 444,272.70 84,856,086.05


A Alat bantu (set @ 3 alat) set M170 0.24 330,000.00 79,200.00
T
E
R
I
A
L

MATERIAL 84,935,286.05
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)

P Motor grader 100HP 1 1 E010 5.00 300,737.30 1,503,686.49


E Mesin gilas 3RD 6-8 ton 1 1 E080 5.00 102,969.45 514,847.24
R Truk tangki air 115HP 1 1 E182 5.00 287,059.72 1,435,298.59
A
L
A
T
A
N
PERALATAN 3,453,832.32
TOTAL 89,948,494.37

VOLUME : 150.00 SATUAN : M3 HARGA SATUAN Rp. 599,656.63 Per M3

DINAS PEKERJAAN UMUM ANALISA HARGA SATUAN KODE


SUB DINAS BINA MARGA LAPIS PONDASI BAWAH (LPB) - TELFORD K516
KABUPATEN PANGKEP (MENGGUNAKAN BURUH )
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH ; TANGGAL :
SUL-SEL PANGKEP CV. MADYA Consultant
PROSES : ANGGAPAN :
1. Material disiapkan dilokasi Pekerjaan. 1. Menggunakan tenaga manusia 400 m2 per hari.
2. Material - material dikirim ketempat pekerjaan oleh leveransir.
2. Menghampar pasir tebal 10 - 15 cm 3. Batu sudah dipecah.
4. Tanah dasar sudah disiapkan.
3. Batu pecah berukuran besar ( 10-15 cm 5. Dipadatkan samapi tebal 20 cm.
disusun berdiri.
4. Batu pecah yang lebih kecil mengisi
rongga diatasnya sehingga rata dan
dipadatkan dengan mesin gilas.

PEKERJA VOL HARI KODE TOTAL.VOL UPAH BIAYA SUB TOTAL


(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 3 1 L061 3.00 171,360.00 514,080.00


E Operator terampil 1 1 L081 1.00 171,360.00 171,360.00
K Buruh tak terampil 90 1 L101 90.00 85,680.00 7,711,200.00
E
R
J
A

PEKERJA 8,396,640.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)

M Batu Belah 15/20 m3 M.20 80.00 1,183,875.00 94,710,000.00


A Batu Pecah 5/7 set M.22 20.00 1,212,750.00 24,255,000.00
T Pasir Urug set M.40 60.00 301,000.00 18,060,000.00
E Alat bantu (set @ 3 alat) set M170 4.00 330,000.00 1,320,000.00
R
I
A
L

MATERIAL 138,345,000.00
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)

P
E Mesin gilas 3RD 6-8 ton 1 1 E080 13.00 102,969.45 1,338,602.81
R
A
L
A
T
A
N
PERALATAN 1,338,602.81
TOTAL 148,080,242.81

VOLUME : 400.00 SATUAN : M2 HARGA SATUAN Rp. 370,200.61 Per M2

|::
DINAS PEKERJAAN UMUM ANALISA HARGA SATUAN KODE
SUB DINAS BINA MARGA LAPIS PONDASI ATAS MENGGUNAKAN KARANG DARI SERUI K522
KABUPATEN PANGKEP (MENGGUNAKAN ALAT)
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH ; TANGGAL :
SUL-SEL PANGKEP CV. MADYA Consultant
PROSES : ANGGAPAN :
1. Kerikil tersaring ditimbun disepanjang 1. Menggunakan alat berat (150 m3/hari)
jalan oleh pemasok 2. Material ditimbun disepanjang jalan oleh pemasok
2. Grader menghampar agregat 3. Dikirim kerikil galian/sungai tersaring yang murah
3. Jalan disiram air dengan truk air 4. Dihampar dan dipadatkan sampai tebal padat 10 cm
4. Pemadatan dengan mesin gilas 6-8 ton 5. Dihampar dan dipadatkan 1000 m2/hari; koefisien pemadatan = 1,25
6. Gradasi Macadam 75 mm dan agregat halus semua harus melalui saringan 9,5 mm
sesuai rev. spek umum B.M 1989-Buku 3

PEKERJA VOL HARI KODE TOTAL.VOL UPAH BIAYA SUB TOTAL


(org.hari) (Rp./org/hyari) (Rp.) (Rp.)

P Mandor 1 1 L061 1.00 171,360.00 171,360.00


E Operator terampil 2 1 L081 2.00 171,360.00 342,720.00
K Pembantu operator 2 1 L083 2.00 137,088.00 274,176.00
E Supir terampil 1 1 L091 1.00 137,088.00 137,088.00
R Pembantu supir 1 1 L099 1.00 119,952.00 119,952.00
J Buruh tak terampil 6 1 L101 6.00 85,680.00 514,080.00
A

PEKERJA 1,559,376.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)

M Karang Dari Serui m3 K016 75.00 862,000.00 64,650,000.00


A Alat bantu (set @ 3 alat) set M170 0.24 330,000.00 79,200.00
T Karang Dari Serui m3 K017 103.00 862,000.00 88,786,000.00
E Timbunan Pilihan m3 M50 9.50 305,000.00 2,897,500.00
R
I
A
L

MATERIAL 156,412,700.00
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)

P Motor grader 100HP 1 1 E010 5.00 300,737.30 1,503,686.49


E Mesin gilas 3RD 6-8 ton 1 1 E080 5.00 102,969.45 514,847.24
R Truk tangki air 115HP 1 1 E182 5.00 287,059.72 1,435,298.59
A
L
A
T
A
N
PERALATAN 3,453,832.32
TOTAL 161,425,908.32

VOLUME : 150.00 SATUAN : M3 HARGA SATUAN Rp. 1,076,172.72 Per M3

DINAS PEKERJAAN UMUM ANALISA HARGA SATUAN KODE


SUB DINAS BINA MARGA LAPIS PENETRASI MAKADAM (LAPEN) K618
KABUPATEN PANGKEP (MENGGUNAKAN BURUH )
PROPINSI : KABUPATEN : KODE DISIAPKAN OLEH ; TANGGAL :
SUL-SEL PANGKEP CV. MADYA Consultant
PROSES : ANGGAPAN :
1. Semprotkan aspal tack coat 0,5 l/m2 1. Menggunakan tenaga buruh
2. Hamparkan agregat kasar 20 m2/m3 2. Agregat pecah tersaring dikirim kelokasi pekerjaan oleh pemasok
3. Digilas & dipadatkan dengan mesin 3. Digunakan agregat pecah tersaring yang termurah (agregat kasar <50 mm, agregat
gilas roda baja 6-8ton pengunci <25 mm, agregat penutup <12,5 mm)
4. Semprotkan aspal binder 3,7 l/m2 4. Agregat dimuat ulang ke truk dengan tenaga manusia dan dihampar dengan mesin
5. Hamparkan agr pengunci 64 m2/m3 penghampar agregat
6. Hamparkan lapis seal dengan 12,5 mm 5. Tebal padat perkerasan 5 cm
ship 80 m2/m3 & cutback 1,25 l/m2 6. PenMac sesuai rev.spek.umum B.M Maret'89-buku 3

PEKERJA VOL HARI KODE TOTAL.VOL UPAH BIAYA SUB TOTAL


(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 2 3 L061 6.00 171,360.00 1,028,160.00


E Operator terampil 2 3 L081 6.00 171,360.00 1,028,160.00
K Pembantu operator 2 3 L083 6.00 137,088.00 822,528.00
E Supir terampil 1 3 L091 3.00 137,088.00 411,264.00
R Pembantu supir 1 3 L099 3.00 119,952.00 359,856.00
J Buruh tak terampil 66 3 L101 198.00 85,680.00 16,964,640.00
A Buruh terampil 2 3 L106 6.00 102,816.00 616,896.00

PEKERJA 21,231,504.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOLUME SATUAN Rp. (Rp.) (Rp.)

M Batu pecah 3 - 5 cm m3 M023 56.00 1,241,625.00 69,531,000.00


A Batu pecah 2 - 3 cm m3 M024 31.11 1,270,500.00 39,525,255.00
T Batupecah 1 - 2 cm m3 M025 15.55 1,339,800.00 20,833,890.00
E P a s i r ayak untuk beton m3 M041 3.50 1,012,500.00 3,543,750.00
R Aspal kg M061 7,980.00 11,613.00 92,671,740.00
I Minyak bakar lt M065 450.00 11,959.79 5,381,905.72
A Alat bantu (set @ 3 alat) set M170 8.16 330,000.00 2,692,800.00
L

MATERIAL 234,180,340.72
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)

P Mesin gilas 3 roda 6-8 ton 1 3 E080 15.00 102,969.45 1,544,541.71


E Mesin penyemprot aspal 1000 ltr 1 3 E152 15.00 173,874.31 2,608,114.60
R Truk bak terbuka 3,5 ton/115HP 1 3 E221 15.00 280,001.40 4,200,020.94
A
L
A
T
A
N
PERALATAN 8,352,677.25
TOTAL 263,764,521.97

VOLUME : 1,400.00 SATUAN : M2 HARGA SATUAN Rp. 188,403.23 Per M2

|::
DINAS PEKERJAAN UMUM ANALISA HARGA SATUAN KODE
SUB DINAS BINA MARGA PENGHAMPARAN LAPIS PERMUKAAN ASPAL BETON LASTON (4 cm) K 6 4 1
KABUPATEN PANGKEP (MENGGUNAKAN ALAT)
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH ; TANGGAL :
SUL-SEL ( 73 ) PANGKEP ( 10 ) CV. MADYA Consultant
PROSES ANGGAPAN :

1. Pengisian material samapai bin dari 1. Menggunakan alat berata


spreader oleh pemasok 2. Hotmix Aspal beton dikirim sampai kespreader oleh pemasok dari AMP
2. Material dihamparkan dengan sprea 3. Berat jenis padat 2,25/m3. Tebal padat 4 cm
dan dipadatkan dengan mesin gilas 4. Dihampar dan dipadatkan 900 m2/hari
roda baja dan mesin gilas pneumatic 5. Lapis tack/pengikat aspal cutback dihampar @ 0,5 l/m2
roda karet 6. Sesuai Spek.B.M.No.12/PT/B/1983 (tabel 3,3) dan rev. Umum B.M. Maret
1989 - buku 3

PEKERJA VOL HARI KODE TOTAL.VOL UPAH BIAYA SUB TOTAL


(org.hari) (Rp./org/hyari) (Rp.) (Rp.)

P Mandor 1 1 L061 1.00 171,360 171,360


E Operator terampil 5 1 L081 5.00 171,360 856,800
K Pembantu operator 5 1 L083 5.00 137,088 685,440
E Buruh tak terampil 15 1 L101 15.00 85,680 1,285,200
R Buruh terampil 10 1 L106 10.00 102,816 1,028,160
J
A

PEKERJA 4,026,960
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)

M Aspal beton (laston) Tonne K040 80.00 1,642,436 131,394,855


A Pasir ayak untuk beton m3 M041 0.72 1,012,500 729,000
T Aspal kg M061 288.00 11,613 3,344,544
E Minyak bakar lt M065 72.00 11,960 861,105
R Alat bantu (set @ 3 alat) set M170 0.48 330,000 158,400
I
A
L

MATERIAL 136,487,904
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)

P Mesin gilas 3 roda 6 - 8 ton 1 1 E080 5.00 102,969.45 514,847.24


E Mesin gilas tanden 6-10 ton 1 1 E081 5.00 196,628.07 983,140.36
R Mesin Gilas roda karet 8-15 ton 1 1 E084 5.00 325,798.47 1,628,992.36
A Mesin penyemprot aspal 1000Ltr 1 1 E153 3.00 64,468.38 193,405.15
L Mesin penghampar 1820mm/30HP 1 1 E157 5.00 240,637.07 1,203,185.34
A Compressor 210m3/jam 1 1 E301 4.00 87,752.21 351,008.84
T
A
N
PERALATAN 4,874,579
TOTAL 145,389,444

VOLUME : 900 SATUAN : M2 HARGA SATUAN Rp. 161,543.83 Per M2

DINAS PEKERJAAN UMUM ANALISA HARGA SATUAN KODE


SUB DINAS BINA MARGA PENGHAMPARAN LAPIS TIPIS ASPAL BETON ( 3 cm ) K636
KABUPATEN PANGKEP LATASTON (MENGGUNAKAN ALAT)
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH ; TANGGAL :
SUL-SEL ( 73 ) PANGKEP ( 10 ) CV. MADYA Consultant
PROSES ANGGAPAN :

Pengisian
1. material sampai kebin spreader 1. Menggunakan alat berat 1500m2/hari
oleh pemasok 2. Hot Rolled Sheet (LATASTON) dikirim kelokasi pakerjaan oleh pemasok dari AMP
Material
2. dihampar dgn mesin spreader, 3. Tebal padat rata-rata 3 cm
dipadatkan dengan mesin gilas roda 4. BJ LATASTON padat 2,2 ton/m3
baja dan mesin gilas pneumatic 5. Sesuai Spek.B.M.No. 12/PT/B/1983 (tabel 3,3) rev.spek. Umum B.M.
roda karet
Hamparkan
3 lapis tack/pangikat aspal
cutback @ 0,5 m/m2

PEKERJA VOL HARI KODE TOTAL.VOL UPAH BIAYA SUB TOTAL


(org.hari) (Rp./org/hyari) (Rp.) (Rp.)

P Mandor 1 1 L061 1.00 171,360.00 171,360.00


E Operator terampil 4 1 L081 4.00 171,360.00 685,440.00
K Pembantu operator 4 1 L083 4.00 137,088.00 548,352.00
E Buruh tak terampil 12 1 L101 12.00 85,680.00 1,028,160.00
R Buruh terampil 8 1 L106 8.00 102,816.00 822,528.00
J
A

PEKERJA 3,255,840
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)

M H.R.S. (LATASTON) tonne K035 100.00 1,666,715.06 166,671,505.80


A Aspal kg M061 600.00 11,613.00 6,967,800.00
T Minyak bakar lt M065 150.00 11,959.79 1,793,968.57
E Alat bantu (set @ 3 alat) set M170 0.48 330,000.00 158,400.00
R
I
A
L

MATERIAL 175,591,674
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)

P Mesin gilas tandem 6-10 ton 1 1 E081 5.00 196,628.07 983,140.36


E Mesin gilas roda karet 8-15 ton 1 1 E084 5.00 325,798.47 1,628,992.36
R Mesin penyemprot aspal 1000 liter 1 1 E154 5.00 64,468.38 322,341.92
A Mesin penghampar 1820mm/30 Hp 1 1 E157 5.00 240,637.07 1,203,185.34
L Compressor 210m3/jam 1 1 E301 4.00 87,752.21 351,008.84
A
T
A
N
PERALATAN 4,488,669
TOTAL 183,336,183

VOLUME : 1,500 SATUAN : M2 HARGA SATUAN Rp. 122,224.12 Per M2

DINAS PEKERJAAN UMUM ANALISA HARGA SATUAN KODE


SUB DINAS BINA MARGA ACUAN UNTUK BETON STRUKTUR K710
KABUPATEN PANGKEP ( MENGGUNAKAN BURUH )
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH ; TANGGAL :
SUL-SEL PANGKEP CV. MADYA Consultant
PROSES : ANGGAPAN :
1. Pengadaan bahan pemasok 1. Kelompok tukang kayu memasang 20 m2 dalam 1 hari kerja
2. Kelompok tukang kayu memotong dan 2. 1/3 material dapat dipakai kembali
acuan 3. Pengadaan bahan oleh pemasok
;3. Kelompok tukang kayu membongkar 4. Untuk 1m3 beton dipakai 20 lembar plywood '(120 Cm x 240 Cm x 1,75 Cm)
'acuan setelah beton cukup kuat 5. Kelompok tukang kayu membongkar acuan
4. Kelompok tukang kayumembersihkan
acuan

PEKERJA VOL HARI KODE TOTAL.VOL UPAH BIAYA SUB TOTAL


(org.hari) (Rp./org/hyari) (Rp.) (Rp.)

P Kepala tukang 1 1 L073 1.00 154,224.00 154,224.00


E Tukang 4 1 L079 4.00 137,088.00 548,352.00
K Buruh tak terampil 7 1 L101 7.00 85,680.00 599,760.00
E Buruh terampil 3 1 L106 3.00 102,816.00 308,448.00
R
J
A

PEKERJA 1,610,784.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)

M Paku jembatan Kg M166 4.00 27,325.00 109,300.00


A Kayu acuan m3 M180 0.60 1,895,000 1,137,000.00
T Alat bantu 'set @ 3 alat set M170 0.56 330,000.00 184,800.00
E
R
I
A
L

MATERIAL 1,431,100.00
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)

P
E
R
A
L
A
T
A
N
PERALATAN
TOTAL 3,041,884.00
VOLUME : 20.00 SATUAN : m2 HARGA SATUAN Rp. 152,094.20 Per M2

DINAS PEKERJAAN UMUM ANALISA HARGA SATUAN KODE


SUB DINAS BINA MARGA MEMOTONG MEMBENGKOK DAN MEMASANG TULANGAN BESI K715
KABUPATEN PANGKEP BETON (MENGGUNAKAN BURUH)
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH ; TANGGAL :
SUL-SEL PANGKEP CV. MADYA Consultant
PROSES : ANGGAPAN :
1. Batang besi beton dipotong sesuai ukuran 1. 200 kg tulangan jadi disiapkan dalam 1 hari
panjang yang diperlukan 2. Besi tulangan dikirim ketempat pekerjaan oeh pemasok
2. Batang dan beugel besi beton dibengkok 3. Penyusutan akibat pematokan 10% dan dipakai kawat dll dianggap 1%
sesuai yang diperlukan 4. Membengkok dan memasang batang besi beton dilaksanakan dengan tangan
3. Perakitan tulangan besi beton dan diikat 5. Panjang dan diameter besi tulangan yang biasa dipakai gorong-gorong dll
dengan kawat baja 6. 0,8 Orang-hari memotong 200 kg batang besi beton
7. 1,0 Orang hari memasang & mengikat 200 Kg tulangan besi betong
8. 1,2 Orang/hari memasang dan mengikat 200 kg tulangan besi beton
9. Umur alat bantu rata-rata i bulan/Orang/set @ alat

PEKERJA VOL HARI KODE TOTAL.VOL UPAH BIAYA SUB TOTAL


(org.hari) (Rp./org/hyari) (Rp.) (Rp.)

P Mandor 1 1 L061 1.00 171,360.00 171,360.00


E Kepala tukang 1 1 L073 1.00 154,224.00 154,224.00
K Buruh tak terampil 3 1 L101 3.00 85,680.00 257,040.00
E Buruh terampil 1 1 L106 1.00 102,816.00 102,816.00
R
J
A

PEKERJA 685,440.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)

M Tulangan besi beton Kg M167 225.00 24,400.00 5,490,000.00


A Alat bantu (set @ 3 alat) set M170 0.12 330,000.00 39,600.00
T
E
R
I
A
L

MATERIAL 5,529,600.00
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)

P
E
R
A
L
A
T
A
N
PERALATAN
TOTAL 6,215,040.00

VOLUME : 200.00 SATUAN : Kg HARGA SATUAN Rp. 31,075.20 Per Kg

DINAS PEKERJAAN UMUM ANALISA HARGA SATUAN KODE


SUB DINAS BINA MARGA BETON STRUKTUR KLAS K225 K725
KABUPATEN PANGKEP (MENGGUNAKAN ALAT PENGADUK BETON 250 LTR)
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH ; TANGGAL :
SUL-SEL PANGKEP CV. MADYA Consultant
PROSES : ANGGAPAN :
1. Pemasok mengirim material 1. Bahan-bahan dasar dikirim kelokasi pekerjaan oleh pemasok
2. Acuan dan tulangan besi beton dipasang 2. Dipakai agregat pecah dan tersaring yang termurah
3. Beton diaduk dilokasi 3. Dicor 11,0 m3/hari dengan 48 adukan/6 jam/hari
4. Beton dicor dan digetar sampai padat 4. Adukan 1 Pc:2Ps:3Kr (yaitu) 1:5); semen : 350 kg/m3; air:160 kg/m3; 2.487 kg/m3
5. Anggap tiap adukan membutuhkan : 2,0 zak (55,6 l.lepas) semen portland; 111 liter
pasir; 166,7 liter kerikil dan 36,6 liter air
6. Tidak termasuk acuan dan tulangan besi beton yang sudah dipasang
7. Beton bertulang dipakai untuk pilar, gorong-gorong, dinding penahan dll
8. Sesuai Peraturan Beton Bertulang Indonesia (PBI N.I 2)

PEKERJA VOL HARI KODE TOTAL.VOL UPAH BIAYA SUB TOTAL


(org.hari) (Rp./org/hyari) (Rp.) (Rp.)

P Mandor 1 3 L061 3.00 171,360.00 514,080.00


E Buruh tak terampil 25 3 L101 75.00 85,680.00 6,426,000.00
K Buruh terampil 3 3 L106 9.00 102,816.00 925,344.00
E
R
J
A

PEKERJA 7,865,424.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)

M Pasir ayak untuk beton m3 M041 16.00 1,012,500.00 16,200,000.00


A Semen 1 zak M080 288.00 2,856.25 822,600.00
T Alat bantu (set @ 3 alat) set M170 3.00 330,000.00 990,000.00
E Batu sungai pecah tersaring m3 K017 24.00 1,324,096.17 31,778,308.01
R
I
A
L

MATERIAL 49,790,908.01
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)

P Alat penggetar beton 4Hpir 2 3 E089 36.00 11,438.66 411,791.78


E Pengaduk beton 250 ltr/10HP 1 3 E251 18.00 14,082.39 253,483.10
R Pompa air (0 50 mm) 30 m3/jam 1 3 E341 6.00 20,531.80 123,190.82
A
L
A
T
A
N
PERALATAN 788,465.70
TOTAL 58,444,797.71

VOLUME : 33.00 SATUAN : M3 HARGA SATUAN Rp. 1,771,054.48 Per M3

DINAS PEKERJAAN UMUM ANALISA HARGA SATUAN KODE


SUB DINAS BINA MARGA KONSTRUKSI PASANGAN BATU K705
KABUPATEN PANGKEP (MENGGUNAKAN BURUH)
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH ; TANGGAL :
SUL-SEL PANGKEP CV. MADYA Consultant
PROSES : ANGGAPAN :
1. Material ditimbun dilokasi pekerjaan oleh 1. Dilakukan untuk pekerjaan gorong-gorong, jembatan, dinding penahan tanah dan
pemasok lainnya yang menggunakan konstruksi pasangan batu
2. Pekerja membawa batu pecahketempat 2. Material-material dikirim ketempat pekerjaan oleh pemasok
tukang batu bekerja 3. Tidak termasuk galian/timbunan
3. Tukang batu memasang batu pecah 4. Biaya alat bantu tambahan sudah termasuk biaya kira-kira ekivalen dari bambu
dengan adukan pasir semen lubang drainase

PEKERJA VOL HARI KODE TOTAL.VOL UPAH BIAYA SUB TOTAL


(org.hari) (Rp./org/hyari) (Rp.) (Rp.)

P Kepala Tukang 1 1 L073 1.00 154,224.00 154,224.00


E Tukang 4 1 L079 4.00 137,088.00 548,352.00
K Buruh tak terampil 12 1 L101 12.00 85,680.00 1,028,160.00
E
R
J
A

PEKERJA 1,730,736.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)

M Batu quarry m3 M010 5.00 770,000.00 3,850,000.00


A Pasir ayak untuk beton m3 M041 1.25 1,012,500.00 1,265,625.00
T Semen 1 zak M080 19.00 2,856.25 54,268.75
E Alat bantu ( set @ 3 alat ) set M170 0.75 330,000.00 247,500.00
R
I
A
L

MATERIAL 5,417,393.75
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)

P Pompa air (50 mm) 30 m3/jam 1 1 E341 2.00 20,531.80 41,063.61


E
R
A
L
A
T
A
N
PERALATAN 41,063.61
TOTAL 7,189,193.36

VOLUME : 5.00 SATUAN : M3 HARGA SATUAN Rp. 1,437,838.67 Per M3

DINAS PEKERJAAN UMUM ANALISA HARGA SATUAN KODE


SUB DINAS BINA MARGA GALIAN TANAH DAN PEMBUANGAN K 321
KABUPATEN PANGKEP ( MENGGUNAKAN ALAT)
PROPINSI : KABUPATEN : KODE DISIAPKAN OLEH ; TANGGAL :
SUL-SEL PANGKEP CV. MADYA Consultant
PROSES : ANGGAPAN :
1. Digali dengan buldozer 1. Menggunakan alat berat ( 200 m3 /hari)
2. Permukaan tanah dibentuk dan di - 2. 20 % dibuang di lokasi tampa diangkut dengan truk.
ratakan dengan grader 3. 80 % dibuang dan diangkut dengan truk.
3. Dimuat ke truk dengan loader 4. Jarak 1 rip pp < 2 Km
4. Membuang tanah menggunakan 5. 2,5 rip pp /jam/truk.
Dump truk.
PEKERJA VOL HARI KODE TOTAL.VOL UPAH BIAYA SUB TOTAL
(org.hari) (Rp./org/hyari) (Rp.) (Rp.)

P Mandor 1 1 L061 1 171,360.00 171,360.00


E Operator terampil 3 1 L081 3 171,360.00 514,080.00
K Pembantu operator 3 1 L083 3 137,088.00 411,264.00
E Supir terampil 4 1 L091 4 137,088.00 548,352.00
R Pembantu supir 4 1 L099 4 119,952.00 479,808.00
J Buruh tak terampil 6 1 L101 6 85,680.00 514,080.00
A

PEKERJA 2,638,944.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOLUME SATUAN Rp. (Rp.) (Rp.)

M Alat bantu (set @ 3 alat) set M170 0.24 330,000.00 79,200.00


A
T
E
R
I
A
L

MATERIAL 79,200.00
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)

P Bulduser 110 HP 1 1 E001 5.00 438,927.80 2,194,639.00


E Motor greder 100 Hp 1 1 E010 5.00 300,737.30 1,503,686.49
R Wheel Loader 115 Hp 1 1 E052 5.00 345,141.14 1,725,705.71
A Dump truk 5 ton/145 Hp 4 1 E212 20.00 348,171.40 6,963,428.08
L
A
T
A
N
PERALATAN 12,387,459.27
TOTAL 15,105,603.27

VOLUME : 200.00 SATUAN : m3 HARGA SATUAN Rp. 75,528.02 Per km

DINAS PEKERJAAN UMUM ANALISA HARGA SATUAN KODE


SUB DINAS BINA MARGA PENGADAAN KERIKIL SUNGAI (TIDAK DISARING) K012
KABUPATEN PANGKEP (MENGGUNAKAN ALAT)
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH ; TANGGAL :
SUL-SEL PANGKEP CV. MADYA Consultant
PROSES : ANGGAPAN :
1. Bulduzer membuat timbunan kerikil 1. Menggunakan alat berat (360 m3/hari)
ditepi sungai 2. Kapasitas wheel loader 60 m3/jam
2. Wheel loader memuati dumptruk dari 3. Wheel loader memuati 18 truk/jam (6 jam kerja/hari)
timbunan 4. Sumber material tersedia bebas/dengan ganti rugi royalti yang berlaku
3. Dumptruk mengangkut kerikil sungai 5. Pengadaan/penimbunan material 1 trip/jam/truk, 10 km dari sumber
tidak disaring ke lokasi pekerjaan/ 6. Volume yang diukur berdasarkan 5 ton lepas/truk (BJ = 1,6)
penimbunan 7. Umur alat bantu rata-rata 1 bulan/set @ 3 alat
PEKERJA VOL HARI KODE TOTAL.VOL UPAH BIAYA SUB TOTAL
(org.hari) (Rp./org/hyari) (Rp.) (Rp.)

P Mandor 1 1 L061 1.00 171,360.00 171,360.00


E Operator terampil 3 1 L081 3.00 171,360.00 514,080.00
K Pembantu operator 3 1 L083 3.00 137,088.00 411,264.00
E Supir terampil 18 1 L091 18.00 137,088.00 2,467,584.00
R Pembantu supir 18 1 L099 18.00 119,952.00 2,159,136.00
J Buruh tak terampil 8 1 L101 8.00 85,680.00 685,440.00
A 0.00

PEKERJA 6,408,864.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)

M Sirtu - Royalti m3 M042 360.00 305,000.00 109,800,000.00


A Alat bantu (set @ 3 alat) set M170 0.32 330,000.00 105,600.00
T
E
R
I
A
L

MATERIAL 109,905,600.00
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
Bulldozer 2 1 E001 9.00 438,927.80 3,950,350.20
P Wheel Loader 115HP 1 1 E052 6.00 345,141.14 2,070,846.85
E Dump Truk 5 ton/145HP 18 1 E212 108.00 348,171.40 37,602,511.61
R
A
L
A
T
A
N
PERALATAN 43,623,708.66
TOTAL 159,938,172.66

VOLUME : 360.00 SATUAN : m3 HARGA SATUAN Rp. 444,272.70 Per m3

DINAS PEKERJAAN UMUM ANALISA HARGA SATUAN KODE


SUB DINAS BINA MARGA PENGADAAN KERIKIL SUNGAI TERSARING K016
KABUPATEN PANGKEP (MENGGUNAKAN ALAT)
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH ; TANGGAL :
SUL-SEL PANGKEP CV. MADYA Consultant
PROSES : ANGGAPAN :
1. Buldozer menimbun stok di sungai untuk 1. Menggunakan alat berat (60 m3/hari)
loader 2. Loader memuati bergantian diantara truk pengangkut dan truk pengisi tempat
2. Dumptruk memuat dan mengangkut saringan disungai
Kerikil sungai ketempat saringan 3. Sumber material tersedia bebas/dengan ganti rugi royalti yang berlaku
3. Kerikil disaring sesuai ukuran 4. Volume yang diukur berdasarkan 5 ton lepas/truk (BJ=1,6
4. Loader memuati dumptruk 5. Suplai kelokasi jarak 10 km dari sumber; 1 trip/jam/truk (dengan 3 truk)
5. Dumptruk mengangkut kerikil sungai 6. Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat
yang disaring ke lokasi pekerjaan/ 7. Kapasitas saringan rata-rata 20 ton/jam, dengan ditambah bagian halus 20 %
penimbunan dengan dibuang oversize 25 %

PEKERJA VOL HARI KODE TOTAL.VOL UPAH BIAYA SUB TOTAL


(org.hari) (Rp./org/hyari) (Rp.) (Rp.)

P Mandor ### 1.00 L061 1.00 171,360.00 171,360.00


E operator terampil ### 1.00 L081 3.00 171,360.00 514,080.00
K Pembantu Operator ### 1.00 L083 3.00 137,088.00 411,264.00
E Supir Terampil ### 1.00 L091 4.00 137,088.00 548,352.00
R Pembantu Sopir ### 1.00 L099 4.00 119,952.00 479,808.00
J Buruh Tak terampil ### 1.00 L101 4.00 85,680.00 342,720.00
A Buruh Terampil ### 1.00 L106 2.00 102,816.00 205,632.00

PEKERJA 2,673,216.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)

M Sirtu royalti M3 M042 80.00 305,000.00 24,400,000.00


A Alat bantu ( set @ 3 alat) Set M170 0.24 330,000.00 79,200.00
T
E
R
I
A
L

MATERIAL 24,479,200.00
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
Bulldozer 110 HP 1 1 E001 2.00 438,927.80 877,855.60
P Mesin Penyaring 80 HP 1 1 E040 6 176,142.74 1,056,856.46
E Wheel Loader 115HP 1 1 E052 5.00 345,141.14 1,725,705.71
R Dump Truk 5 ton/145HP 4 1 E212 24.00 348,171.40 8,356,113.69
A
L
A
T
A
N
PERALATAN 12,016,531.46
TOTAL 39,168,947.46

VOLUME : 60.00 SATUAN : M3 HARGA SATUAN Rp. 652,815.79 Per M3

DINAS PEKERJAAN UMUM ANALISA HARGA SATUAN KODE


SUB DINAS BINA MARGA PRODUKSI BATU PECAH TERSARING K017
KABUPATEN PANGKEP MEMPERGUNAKAN BATU SUNGAI (MENGGUNAKAN ALAT)
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH ; TANGGAL :
SUL-SEL PANGKEP CV. MADYA Consultant
PROSES : ANGGAPAN :
1. Buldozer membuat timbinan disungai 1. Menggunakan alat berat (60 M3/hari), material diolah tiga kali
untuk loader 2. Batu diambil darisungai dan diangkut kesaringan pertama (30 ton/jam)
2. Loader memuat ke dump truk yang 3. Ex saringan 1 : oversize 25 % (7,5 t/j kepemecah 1 & 75%(22,5 t/j) ke saringan 2
membongkar ke saringan 1 4. Ex saringan 2 : 7,5 t/j ke pemecah 1, 7,5 t/j ke pemecah 2 & 7,5 t/j terbuang
3. Batu oversize ke pemecah 1 5. Ex Pemecah 1 : 7,5 t/j ke pemecah 2 & 7,5 t/j untuk dikirim
4. Hasil ( pemecah batu dicampur ulang 6. Ex Pemecah 2 : 15 t/j untuk dikirim
dengan hasil saringan untuk pemecah2 7. Volume yang diukur berdasarkan 5 ton lepas/truk (BJ = 1,6)
5. Dumptruk angkut batu pecah tersaring 8. Jarak kirim dari sumber bahan ke lokasi pekerjaan 10 Km 1 trip/jam/truk
9. Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat

PEKERJA VOL HARI KODE TOTAL.VOL UPAH BIAYA SUB TOTAL


(org.hari) (Rp./org/hyari) (Rp.) (Rp.)

P Mandor 1 1 L061 1.00 171,360.00 171,360.00


E operator terampil 4 1 L081 4.00 171,360.00 685,440.00
K Pembantu Operator 4 1 L83 4.00 137,088.00 548,352.00
E Supir Terampil 4 1 L091 4.00 137,088.00 548,352.00
R Pembantu Sopir 4 1 L099 4.00 119,952.00 479,808.00
J Buruh Tak terampil 5 1 L101 5.00 85,680.00 428,400.00
A Buruh Terampil 4 1 L106 4.00 102,816.00 411,264.00

PEKERJA 3,272,976.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)

M Kerikil sungai - royalti M3 M012 80.00 787,000.00 62,960,000.00


A Alat bantu ( set @ 3 alat) Set M170 0.20 330,000.00 66,000.00
T
E
R
I
A
L

MATERIAL 63,026,000.00
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)

P Buldozer 110HP 1 1 E001 2.00 438,927.80 877,855.60


E Pemecah Batu 30 t/j 185HP 1 1 E031 4.00 460,494.47 1,841,977.89
R Wheel Loader 115HP 1 1 E052 6.00 345,141.14 2,070,846.85
A Dump Truk 5 t/145HP 4 1 E212 24.00 348,171.40 8,356,113.69
L
A
T
A
N
PERALATAN 13,146,794.03
TOTAL 79,445,770.03

VOLUME : 60.00 SATUAN : M3 HARGA SATUAN Rp. 1,324,096.17 Per M3

DINAS PEKERJAAN UMUM ANALISA HARGA SATUAN KODE


SUB DINAS BINA MARGA ASPAL BETON (LASTON) PRODUKSI DAN SUPLAI K040
KABUPATEN PANGKEP (MENGGUNAKAN ALAT)
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH ; TANGGAL :
SUL-SEL ( 73 ) PANGKEP ( 10 ) CV. MADYA Consultant
PROSES ANGGAPAN :

1. Semua material dikirim pemasok 1. Memakai alat betar (100 ton/hari)


2. Loader menjaga bin tetap penuh 2. Agregat pecah tersaring disuplai termurah
3. Produksi AMP 20 Ton/jam (5 jam/hari 3. AMP didirikan didekat penimbunan material
4. Dumptruk Dimuati dan ditutup terpal 4. Aspal dipanaskan lebih dahulu agar aspal sudah siap saat dimulai
untuk mempertahankan suhu 5. Produksi dimuat kedalam dumptruk 5 ton dan dikirim kepenghampar aspal
5. Dumptruk membongkar langsung ke 6. Biaya produksi termasuk pengangkutan s/d 10 km dari AMP
dalam mesin penghampar aspal 7. Umur alat bantu rata-rata 1 bulan /orang/set @ 3 alat
8. Spek.B.M.No.13/PT/B/1983(Mix V) dan revisi Spesifikasi Umum Maret-Buku 3

PEKERJA VOL HARI KODE TOTAL.VOL UPAH BIAYA SUB TOTAL


(org.hari) (Rp./org/hyari) (Rp.) (Rp.)

P Mandor 1 1 L061 1 171,360 171,360


E Operator terampil 3 1 L081 3 171,360 514,080
K Pembantu operator 3 1 L083 3 137,088 411,264
E Supir terampil 4 1 L091 4 137,088 548,352
R Pembantu supir 4 1 L099 4 119,952 479,808
J Buruh tak terampil 6 1 L101 6 85,680 514,080
A Buruh terampil 3 1 L106 3 102,816 308,448

PEKERJA 2,947,392
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)

M Pasir ayak untuk beton m3 M041 27.00 1,012,500.00 27,337,500.00


A Aspal kg M061 7,000.00 11,613.00 81,291,000.00
T Semen Zak M080 100.00 2,856.25 285,625.00
E Alat bantu (set @ 3 alat) set M170 0.24 330,000.00 79,200.00
R Batu sungai pecah tersaring m3 K017 27.50 1,324,096.17 36,412,644.60
I
A
L

MATERIAL 145,405,970
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)

P Whel loader 115 Hp 1 1 E052 5 345,141.14 1,725,706


E Mesin penyampur aspal (AMP) 1 1 E155 5 1,161,677.63 5,808,388
R Dump truk 4 1 E212 24 348,171.40 8,356,114
A
L
A
T
A
N
PERALATAN 15,890,208
TOTAL 164,243,569

VOLUME : 100.0 SATUAN : ton HARGA SATUAN Rp. 1,642,435.69 Per ton

DINAS PEKERJAAN UMUM ANALISA HARGA SATUAN KODE


SUB DINAS BINA MARGA PENGADAAN KERIKIL SUNGAI (TIDAK DISARING) K013
KABUPATEN PANGKEP (MENGGUNAKAN BURUH)
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH ; TANGGAL :
SUL-SEL PANGKEP CV. MADYA Consultant
PROSES : ANGGAPAN :
1. Menggali kerikil sungai dan memuat ke 1. Menggunakan tenaga manusia (60 m3/hari) dalam dua kelompok
truk dengan tenaga manusia di sungai 2. Sumber material tersedia bebas/dengan ganti rugi royalti yang berlaku
2. Truk mengangkut kerikil sungai ke lokasi 3. Muatan 5 truk perjam 93 m3/orang/hari)
pekerjaan/penimbunan 4. Waktu muat 12 menit/10 orang/truk; waktu bongkar 5 menit/5 orang/truk
3. Membongkar muatan truk dengan tenaga 5. Dua tim @ 5 orang membongkar truk
manusia 6. Jarak angkut 10 km, 72 menit per trip, 5 trip/hari/truk
7. Volume yang diukur berdasarkan 3,5 ton lepas/truk (BJ=1,6)
8. Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat

PEKERJA VOL HARI KODE TOTAL.VOL UPAH BIAYA SUB TOTAL


(org.hari) (Rp./org/hyari) (Rp.) (Rp.)

P Mandor 2 1 L061 2.00 171,360.00 342,720.00


E Supir terampil 5 1 L091 5.00 137,088.00 685,440.00
K Pembantu supir 5 1 L099 5.00 119,952.00 599,760.00
E Buruh tak terampil 60 1 L101 60.00 85,680.00 5,140,800.00
R
J
A

PEKERJA 6,768,720.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)

M Sirtu - Royalti m3 MR42 60.00 305,000.00 18,300,000.00


A Alat bantu (set @ 3 alat) set M170 2.40 330,000.00 792,000.00
T
E
R
I
A

MATERIAL 19,092,000.00
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)

P Truk bak terbuka 3,5 ton/115HP 5 1 E221 30.00 280,001.40 8,400,041.89


E
R
A
L
A
T
A
N
PERALATAN 8,400,041.89
TOTAL 34,260,761.89

VOLUME : 60.00 SATUAN : m3 HARGA SATUAN Rp. 571,012.70 Per m3

DINAS PEKERJAAN UMUM ANALISA HARGA SATUAN KODE


SUB DINAS BINA MARGA PENGADAAN KERIKIL GALIAN (TERSARING) K014
KABUPATEN PANGKEP (MENGGUNAKAN ALAT)
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH ; TANGGAL :
SUL-SEL PANGKEP CV. MADYA Consultant
PROSES : ANGGAPAN :
1. Bulduzer menggususr lapis penutup 1. Menggunakan alat berat (360 m3/hari)
dan menimbun stock untuk loader 2. 50 cm penutup dibuang untuk mendapatkan kerikil
2. Dumptruk mengangkut kerikil galian 3. Jumlah lapis penutup 1 m3 per 8 m3 kerikil galian
ketempat saringan 4. Sumber material tersedia bebas/dengan ganti rugi royalti yang berlaku
3. Kerikil disaring untuk ukuran 5. Kapasitas penyaringan 20 t/j, dengan surplus 25 %
4. Loader memuati dum truk 6. Pengadaan/penimbunan material 1 trip/jam/truk, 10 km dari sumber
5. Dum truk mengangkut kerikil galian 7. Tiga truk mengangkut kelokasi dan 1 truk mensuplai tempat saringan
yang disaring ke lokasi pekerjaan/ 8. Volume yang diukur berdasarkan 5 ton lepas/truk (BJ = 1,6)
penimbunan 9. Umur alat bantu rata-rata 1 bulan/set @ 3 alat

PEKERJA VOL HARI KODE TOTAL.VOL UPAH BIAYA SUB TOTAL


(org.hari) (Rp./org/hyari) (Rp.) (Rp.)

P Mandor 1 1 L061 1.00 171,360 171,360.00


E Operator terampil 3 1 L081 3.00 171,360 514,080.00
K Pembantu operator 3 1 L083 3.00 137,088 411,264.00
E Supir terampil 4 1 L091 4.00 137,088 548,352.00
R Pembantu supir 4 1 L099 4.00 119,952 479,808.00
J Buruh tak terampil 4 1 L101 4.00 85,680 342,720.00
A Buruh Terampil 2 1 L106 2.00 102,816 205,632.00

PEKERJA 2,673,216.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)

M Kerikil galian - Royalti m3 MR11 80.00 787,000.00 62,960,000.00


A Alat bantu (set @ 3 alat) set M170 0.32 330,000.00 105,600.00
T
E
R
I
A
### DINAS PU KODE
KAB. WAROPEN ANALISA BIAYA PERALATAN E 001
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA WAROPEN CV. MADYA Consultant MEI. 2007

Jenis Alat : BULDUZER TENAGA = 110 HP


Harga : Rp. 751,050,000.00
Umur Kerja 8 tahun (A) 0.205
Jam Kerja/Hr 4 Jam FAKTOR ( CRF ) : 0.205
hari kerja/Thn 300 HK pada 12.50%
1200 Jam/Tahun (W)

A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : (Rp/jAM)

1. Depresiasi : 0,9 % x Harga Alat x (CRF) x 1


Jam/Thn

### 0.90 x 751,050,000.00 x 0.20500 = Rp. 115,473.94


### 1,200.00
###
### 2. Lain-lain :
Asuransi 3 % thn + PPN 10 % = 0.033 x Harga alat / Jam/Thn

= 0.033 x 751,050,000.00 / 1,200.00 = Rp. 20,653.88

Sub Total = Rp. 136,127.81


###
B. BIAYA OPERASI ( OPERATION COSTS ) : (Rp/Jam)

Kebutuhan bahan bakar dan pelumas tiap HP :


### Diesel = 0.150 liter/HP/jam
Bensin = 0.167 liter/HP/jam
Pelumas = 0.006 liter/HP/jam

Harga : Solar/Minyak Diesel = Rp. 12589 /liter


Bensin = Rp. 10511 /liter
Pelumas = Rp. 39092 /liter

Bahan bakar = Rp. 207,715.04


Pelumas = Rp. 25,800.58
Perbaikan & Spareparts = Rp. 69,284.36
Sub Total = Rp. 302,799.99

###

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A + B = Rp. 438,927.80

###

|::
DINAS PU KODE
KAB. WAROPEN ANALISA BIAYA PERALATAN E 010
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA WAROPEN CV. MADYA Consultant MEI. 2007

Jenis Alat :MOTOR GRADER TENAGA = 100 HP


Harga :Rp. 404,550,000.00 0.20483
Umur Kerja 8 tahun (A) FAKTOR ( CRF ) : 0.20483
Jam Kerja/Hr 5 Jam pada 12.50%
hari kerja/Thn 300 HK
1500 Jam/Tahun (W)
A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : (Rp/jAM)

1. Depresiasi : 0,9 % x Harga Alat x (CRF) x 1


Jam/Thn
0.90 x 404,550,000.00 x 0.20483 = Rp. 49,718.92
1,500.00

### 2. Lain-lain :
### Asuransi 3 % thn + PPN 10 % = 0.033 x Harga alat / Jam/Thn
###
### = 0.033 x 404,550,000.00 / 1,500.00 = Rp. 8,900.10
Sub Total = Rp. 58,619.02

B. BIAYA OPERASI ( OPERATION COSTS ) : (Rp/Jam)

### Kebutuhan bahan bakar dan pelumas tiap HP :


Diesel = 0.150 liter/HP/jam
Bensin = 0.167 liter/HP/jam
Pelumas = 0.006 liter/HP/jam
###
### Harga : Solar/Minyak Diesel = Rp. 12589 /liter
Bensin = Rp. 10511 /liter
Pelumas = Rp. 39092 /liter

Bahan bakar = Rp. 188,831.86


Pelumas = Rp. 23,455.07
Perbaikan & Spareparts = Rp. 29,831.35
Sub Total = Rp.
= Rp. 242,118.28

### TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A + B = Rp. 300,737.30

###

|::
DINAS PU KODE
KAB. WAROPEN ANALISA BIAYA PERALATAN E 0 20
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA WAROPEN CV. MADYA Consultant MEI. 2007

Jenis Alat : EXCAVATOR 90 HP TENAGA = 90 HP


Harga : Rp. 253,764,750.00 0.20483
Umur Kerja 8 tahun (A) FAKTOR ( CRF ) : 0.20483
Jam Kerja/Hr 5 Jam pada 12.50%
hari kerja/Thn 300 HK
1500 Jam/Tahun (W)
A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : (Rp/jAM)

1. Depresiasi : 0,9 % x Harga Alat x (CRF) x 1


Jam/Thn
0.90 x 253,764,750.00 x 0.20483 = Rp. 31,187.51
1,500.00

### 2. Lain-lain :
### Asuransi 3 % thn + PPN 10 % = 0.033 x Harga alat / Jam/Thn

= 0.033 x 253,764,750.00 / 1,500 = Rp. 5,582.82


Sub Total = Rp. 36,770.34

B. BIAYA OPERASI ( OPERATION COSTS ) : (Rp/Jam)

Kebutuhan bahan bakar dan pelumas tiap HP :


Diesel = 0.150 liter/HP/jam
Bensin = 0.167 liter/HP/jam
Pelumas = 0.006 liter/HP/jam
###
Harga : Solar/Minyak Diesel = Rp. 12589 /liter
Bensin = Rp. 10511 /liter
Pelumas = Rp. 39092 /liter

Bahan bakar = Rp. 169,948.67


Pelumas = Rp. 21,109.57
Perbaikan & Spareparts = Rp. 18,712.51
Sub Total = Rp.
= Rp. 209,770.75

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A + B = Rp. 246,541.08

###

|::
DINAS PU KODE
KAB. WAROPEN ANALISA BIAYA PERALATAN E 031
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007

Jenis Alat : CRUSHER TENAGA = 185 HP


Harga : Rp. 346,800,000.00
Umur Kerja 10 tahun (A) 0.18062
Jam Kerja/Hr 5 Jam FAKTOR ( CRF ) : 0.18062
hari kerja/Thn 300 HK pada 12.50%
1500 Jam/Tahun (W)

A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : (Rp/jAM)


1. Depresiasi : 0,9 % x Harga Alat x (CRF) x 1
Jam/Thn
0.90 x 346,800,000.00 x 0.18062 = Rp. 37,583.78
1,500.00
###
### 2. Lain-lain :
Asuransi 3 % thn + PPN 10 % = 0.033 x Harga alat / Jam/Thn

= 0.033 x 346,800,000.00 / 1,500.00 = Rp. 7,629.60

Sub Total = Rp. 45,213.38

B. BIAYA OPERASI ( OPERATION COSTS ) : (Rp/Jam)


###
Kebutuhan bahan bakar dan pelumas tiap HP :
Diesel = 0.150 liter/HP/jam
Bensin = 0.167 liter/HP/jam
### Pelumas = 0.006 liter/HP/jam

Harga : Solar/Minyak Diesel = Rp. 12589 /liter


Bensin = Rp. 10511 /liter
Pelumas = Rp. 39092 /liter

Bahan bakar = Rp. 349,338.94


Pelumas = Rp. 43,391.89
Perbaikan & Spareparts = Rp. 22,550.27
Sub Total = Rp. 415,281.09

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A + B = Rp. 460,494.47

###

|::
DINAS PU KODE
KAB. WAROPEN ANALISA BIAYA PERALATAN E 040
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007

Jenis Alat : CREENING PLANT TENAGA = 80 HP


Harga : Rp. 28,875,000.00
Umur Kerja 8 tahun (A) 0.20483
Jam Kerja/Hr 5 Jam FAKTOR ( CRF ) : 0.20483
hari kerja/Thn 300 HK pada 0.125
1500 Jam/Tahun (W)

A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : (Rp/jAM)

1. Depresiasi : 0,9 % x Harga Alat x (CRF) x 1


Jam/Thn
0.90 x 28,875,000.00 x 0.20483 = Rp. 3,548.72
1,500.00
### 2. Lain-lain :
### Asuransi 3 % thn + PPN 10 % = 0.033 x Harga alat / Jam/Thn
###
### = 0.033 x 28,875,000.00 / 1,500.00 = Rp. 635.25
###
### Sub Total = Rp. 4,183.97

B. BIAYA OPERASI ( OPERATION COSTS ) : (Rp/Jam)

### Kebutuhan bahan bakar dan pelumas tiap HP :


Diesel = 0.150 liter/HP/jam
Bensin = 0.167 liter/HP/jam
Pelumas = 0.006 liter/HP/jam
###
### Harga : Solar/Minyak Diesel = Rp. 12589 /liter
Bensin = Rp. 10511 /liter
Pelumas = Rp. 39092 /liter

Bahan bakar = Rp. 151,065.49


Pelumas = Rp. 18,764.06
Perbaikan & Spareparts = Rp. 2,129.23
Sub Total = Rp. 171,958.78

### TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :


###
###
A + B = Rp. 176,142.74

###

|::
DINAS PU KODE
KAB. WAROPEN ANALISA BIAYA PERALATAN E 052
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007

Jenis Alat : WHELL LOADER TENAGA = 115 HP


Harga : Rp. 462,000,000.00
Umur Kerja 8 tahun (A) 0.20483
Jam Kerja/Hr 5 Jam FAKTOR ( CRF ) : 0.20483
hari kerja/Thn 300 HK pada 0.125
1500 Jam/Tahun (W)

A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : (Rp/jAM)

1. Depresiasi : 0,9 % x Harga Alat x (CRF) x 1


Jam/Thn
0.90 x 462,000,000.00 x 0.20483 = Rp. 56,779.48
### 1,500.00
###
### 2. Lain-lain :
### Asuransi 3 % thn + PPN 10 % = 0.033 x Harga alat / Jam/Thn
###
= 0.033 x 462,000,000.00 / 1,500.00 = Rp. 10,164.00
Sub Total = Rp. 66,943.48

### B. BIAYA OPERASI ( OPERATION COSTS ) : (Rp/Jam)

Kebutuhan bahan bakar dan pelumas tiap HP :


Diesel = 0.150 liter/HP/jam
### Bensin = 0.167 liter/HP/jam
### Pelumas = 0.006 liter/HP/jam

Harga : Solar/Minyak Diesel = Rp. 12589 /liter


Bensin = Rp. 10511 /liter
Pelumas = Rp. 39092 /liter

Bahan bakar = Rp. 217,156.64


Pelumas = Rp. 26,973.34
Perbaikan & Spareparts = Rp. 34,067.69
Sub Total = Rp. 278,197.66

###
###
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A + B = Rp. 345,141.14

###

|::
DINAS PU KODE
KAB. WAROPEN ANALISA BIAYA PERALATAN E 080
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007

Jenis Alat : ROLLER STELL WALL TENAGA = 40 HP


Harga : Rp. 92,400,000.00
Umur Kerja 10 tahun (A) 0.18062
Jam Kerja/Hr 5 Jam FAKTOR ( CRF ) : 0.18062
hari kerja/Thn 300 HK pada 12.50%
1500 Jam/Tahun (W)

A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : (Rp/jAM)

1. Depresiasi : 0,9 % x Harga Alat x (CRF) x 1


Jam/Thn
0.90 x 92,400,000.00 x 0.18062 = Rp. 10,013.67
### 1,500.00
###
### 2. Lain-lain :
### Asuransi 3 % thn + PPN 10 % = 0.033 x Harga alat / Jam/Thn
###
### = 0.033 x 92,400,000.00 / 1,500.00 = Rp. 2,032.80

Sub Total = Rp. 12,046.47

### B. BIAYA OPERASI ( OPERATION COSTS ) : (Rp/Jam)


Kebutuhan bahan bakar dan pelumas tiap HP :
Diesel = 0.150 liter/HP/jam
### Bensin = 0.167 liter/HP/jam
### Pelumas = 0.006 liter/HP/jam

Harga : Solar/Minyak Diesel = Rp. 12589 /liter


Bensin = Rp. 10511 /liter
Pelumas = Rp. 39092 /liter

Bahan bakar = Rp. 75,532.74


Pelumas = Rp. 9,382.03
Perbaikan & Spareparts = Rp. 6,008.20
Sub Total = Rp. 90,922.98

###
###
### TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A + B = Rp. 102,969.45

###

|::
DINAS PU KODE
KAB. WAROPEN ANALISA BIAYA PERALATAN E 084
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH T TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007

Jenis Alat : MESIN GILAS BAN KARET TENAGA = 95 HP


Harga : Rp. 635,250,000.00
Umur Kerja 10 tahun (A) 0.18062
Jam Kerja/Hr 5 Jam FAKTOR ( CRF ) : 0.18062
hari kerja/Thn 300 HK oada 0.125
1500 Jam/Tahun (W)

A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : (Rp/jAM)

1. Depresiasi : 0,9 % x Harga Alat x (CRF) x 1


Jam/Thn
0.90 x 635,250,000.00 x 0.18062 = Rp. 68,843.99
### 1,500.00
###
### 2. Lain-lain :
Asuransi 3 % thn + PPN 10 % = 0.033 x Harga alat / Jam/Thn

= 0.033 x 635,250,000.00 / 1,500.00 = Rp. 13,975.50

Sub Total = Rp. 82,819.49

### B. BIAYA OPERASI ( OPERATION COSTS ) : (Rp/Jam)

Kebutuhan bahan bakar dan pelumas tiap HP :


Diesel = 0.150 liter/HP/jam
### Bensin = 0.167 liter/HP/jam
### Pelumas = 0.006 liter/HP/jam
###
### Harga : Solar/Minyak Diesel = Rp. 12589 /liter
### Bensin = Rp. 10511 /liter
Pelumas = Rp. 39092 /liter

Bahan bakar = Rp. 179,390.26


Pelumas = Rp. 22,282.32
### Perbaikan & Spareparts = Rp. 41,306.40
Sub Total = Rp. 242,978.98

###
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A + B = Rp. 325,798.47

###

|::
DINAS PU KODE
KAB. WAROPEN ANALISA BIAYA PERALATAN E 087
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007

Jenis Alat : ROLLER VEBRO TENAGA = 12 HP


Harga : Rp. 138,600,000.00
Umur Kerja 6 tahun (A) 0.24668
Jam Kerja/Hr 4 Jam FAKTOR ( CRF ) : 0.24668
hari kerja/Thn 300 HK pada 12.50%
1200 Jam/Tahun (W)

A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : (Rp/jAM)

1. Depresiasi : 0,9 % x Harga Alat x (CRF) x 1


Jam/Thn
### 0.90 x 138,600,000.00 x 0.24668 = Rp. 25,642.36
### 1,200.00
###
### 2. Lain-lain :
### Asuransi 3 % thn + PPN 10 % = 0.033 x Harga alat / Jam/Thn
###
= 0.033 x 138,600,000.00 / 1,200.00 = Rp. 3,811.50

Sub Total = Rp. 29,453.86


###
B. BIAYA OPERASI ( OPERATION COSTS ) : (Rp/Jam)

Kebutuhan bahan bakar dan pelumas tiap HP :


### Diesel = 0.150 liter/HP/jam
### Bensin = 0.167 liter/HP/jam
### Pelumas = 0.006 liter/HP/jam
###
Harga : Solar/Minyak Diesel = Rp. 12589 /liter
Bensin = Rp. 10511 /liter
Pelumas = Rp. 39092 /liter
Bahan bakar = Rp. 22,659.82
### Pelumas = Rp. 2,814.61
Perbaikan & Spareparts = Rp. 15,385.42
Sub Total = Rp. 40,859.85

###
###
###
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A + B = Rp. 70,313.71

###

###

DINAS PU KODE
KAB. WAROPEN ANALISA BIAYA PERALATAN E 088
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH T TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007

Jenis Alat : TANPER VEBRATOR PLAT TENAGA = 4 HP


Harga : Rp. 5,197,500.00
Umur Kerja 6 tahun (A) 0.24668
Jam Kerja/Hr 2.5 Jam FAKTOR ( CRF ) : 0.24668
hari kerja/Thn 300 HK pada 12.50%
750 Jam/Tahun (W)

A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : (Rp/jAM)

1. Depresiasi : 0,9 % x Harga Alat x (CRF) x 1


Jam/Thn
0.90 x 5,197,500.00 x 0.24668 = Rp. 1,538.54
### 750.00
###
### 2. Lain-lain :
### Asuransi 3 % thn + PPN 10 % = 0.033 x Harga alat / Jam/Thn
###
### = 0.033 x 5,197,500.00 / 750.00 = Rp. 228.69
###
Sub Total = Rp. 1,767.23

### B. BIAYA OPERASI ( OPERATION COSTS ) : (Rp/Jam)

Kebutuhan bahan bakar dan pelumas tiap HP :


Diesel = 0.150 liter/HP/jam
### Bensin = 0.167 liter/HP/jam
### Pelumas = 0.006 liter/HP/jam
###
### Harga : Solar/Minyak Diesel = Rp. 12589 /liter
### Bensin = Rp. 10511 /liter
### Pelumas = Rp. 39092 /liter
###

Bahan bakar = Rp. 7,553.27


Pelumas = Rp. 938.20
### Perbaikan & Spareparts = Rp. 923.13
Sub Total = Rp. 9,414.60
###
###
### TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A + B = Rp. 11,181.83

###

###

|::
DINAS PU KODE
KAB. WAROPEN ANALISA BIAYA PERALATAN E 089
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH T TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007

Jenis Alat : ALAT PENGGETAR BETON TENAGA = 4 HP


Harga : Rp. 4,042,500.00
Umur Kerja 5 tahun (A) 0.28085
Jam Kerja/Hr 2 Jam FAKTOR ( CRF ) : 0.28085
hari kerja/Thn 300 HK pada 0.125
600 Jam/Tahun (W)

A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : (Rp/jAM)

1. Depresiasi : 0,9 % x Harga Alat x (CRF) x 1


Jam/Thn
### 0.90 x 4,042,500.00 x 0.28085 = Rp. 1,703.03
### 600.00
###
### 2. Lain-lain :
### Asuransi 3 % thn + PPN 10 % = 0.033 x Harga alat / Jam/Thn

= 0.033 x 4,042,500.00 / 600.00 = Rp. 222.34

Sub Total = Rp. 1,925.37


###
B. BIAYA OPERASI ( OPERATION COSTS ) : (Rp/Jam)

Kebutuhan bahan bakar dan pelumas tiap HP :


### Diesel = 0.150 liter/HP/jam
### Bensin = 0.167 liter/HP/jam
### Pelumas = 0.006 liter/HP/jam
###
### Harga : Solar/Minyak Diesel = Rp. 12589 /liter
Bensin = Rp. 10511 /liter
Pelumas = Rp. 39092 /liter

Bahan bakar = Rp. 7,553.27


### Pelumas = Rp. 938.20
Perbaikan & Spareparts = Rp. 1,021.82
Sub Total = Rp. 9,513.29

###
###
###
### TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
###
###
A + B = Rp. 11,438.66

###

###

DINAS PU KODE
KAB. WAROPEN ANALISA BIAYA PERALATAN E 152
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007

Jenis Alat : PEMANAS ASPAL/SPRAYER TENAGA = 68 HP


Harga : Rp. 91,245,000.00
Umur Kerja 6 tahun (A) 0.24668
Jam Kerja/Hr 4 Jam FAKTOR ( CRF ) : 0.24668
hari kerja/Thn 300 HK pada 12.50%
1200 Jam/Tahun (W)

A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : (Rp/jAM)

1. Depresiasi : 0,9 % x Harga Alat x (CRF) x 1


Jam/Thn
### 0.90 x 91,245,000.00 x 0.24668 = Rp. 16,881.22
### 1,200.00
###
### 2. Lain-lain :
### Asuransi 3 % thn + PPN 10 % = 0.033 x Harga alat / Jam/Thn

= 0.033 x 91,245,000.00 / 1,200.00 = Rp. 2,509.24

Sub Total = Rp. 19,390.46


###
B. BIAYA OPERASI ( OPERATION COSTS ) : (Rp/Jam)

Kebutuhan bahan bakar dan pelumas tiap HP :


### Diesel = 0.150 liter/HP/jam
### Bensin = 0.167 liter/HP/jam
### Pelumas = 0.006 liter/HP/jam
###
Harga : Solar/Minyak Diesel = Rp. 12589 /liter
Bensin = Rp. 10511 /liter
Pelumas = Rp. 39092 /liter

Bahan bakar = Rp. 128,405.66


### Pelumas = Rp. 15,949.45
Perbaikan & Spareparts = Rp. 10,128.73
Sub Total = Rp. 154,483.85

###
###
###
### TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
###

A + B = Rp. 173,874.31

###
###

DINAS PU KODE
KAB. PANGKEP ANALISA BIAYA PERALATAN E 153
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH T TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007

Jenis Alat : SPRYER TENAGA = 25 HP


Harga : Rp. 35,227,500.00
Umur Kerja 6 tahun (A) 0.24668
Jam Kerja/Hr 4 Jam FAKTOR ( CRF ) : 0.24668
hari kerja/Thn 300 HK pada 12.50%
1200 Jam/Tahun (W)

A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : (Rp/jAM)

1. Depresiasi : 0,9 % x Harga Alat x (CRF) x 1


Jam/Thn
0.90 x 35,227,500.00 x 0.24668 = Rp. 6,517.43
1,200.00
###
### 2. Lain-lain :
### Asuransi 3 % thn + PPN 10 % = 0.033 x Harga alat / Jam/Thn
###
= 0.033 x 35,227,500.00 / 1,200.00 = Rp. 968.76

Sub Total = Rp. 7,486.19

B. BIAYA OPERASI ( OPERATION COSTS ) : (Rp/Jam)


###
Kebutuhan bahan bakar dan pelumas tiap HP :
Diesel = 0.150 liter/HP/jam
Bensin = 0.167 liter/HP/jam
### Pelumas = 0.006 liter/HP/jam
###
### Harga : Solar/Minyak Diesel = Rp. 12589 /liter
Bensin = Rp. 10511 /liter
Pelumas = Rp. 39092 /liter

Bahan bakar = Rp. 47,207.96


Pelumas = Rp. 5,863.77
Perbaikan & Spareparts = Rp. 3,910.46
### Sub Total = Rp. 56,982.19

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A + B = Rp. 64,468.38

###
DINAS PU KODE
KAB. PANGKEP ANALISA BIAYA PERALATAN E 182
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007

Jenis Alat : TRUK AIR TENAGA = 115 HP


Harga : Rp. 98,175,000.00
Umur Kerja 8 tahun (A) 0.20483
Jam Kerja/Hr 2.5 Jam FAKTOR ( CRF ) : 0.20483
hari kerja/Thn 300 HK pada 12.50%
750 Jam/Tahun (W)

A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : (Rp/jAM)

1. Depresiasi : 0,9 % x Harga Alat x (CRF) x 1


Jam/Thn
0.90 x 98,175,000.00 x 0.20483 = Rp. 24,131.28
### 750.00
###
### 2. Lain-lain :
### Asuransi 3 % thn + PPN 10 % = 0.033 x Harga alat / Jam/Thn

= 0.033 x 98,175,000.00 / 750.00 = Rp. 4,319.70

Sub Total = Rp. 28,450.98

### B. BIAYA OPERASI ( OPERATION COSTS ) : (Rp/Jam)

Kebutuhan bahan bakar dan pelumas tiap HP :


Diesel = 0.150 liter/HP/jam
### Bensin = 0.167 liter/HP/jam
### Pelumas = 0.006 liter/HP/jam

Harga : Solar/Minyak Diesel = Rp. 12589 /liter


Bensin = Rp. 10511 /liter
Pelumas = Rp. 39092 /liter

Bahan bakar = Rp. 217,156.64


Pelumas = Rp. 26,973.34
### Perbaikan & Spareparts = Rp. 14,478.77
Sub Total = Rp. 258,608.74

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A + B = Rp. 287,059.72

###

DINAS PU KODE
KAB. PANGKEP ANALISA BIAYA PERALATAN E 212
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH T TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007

Jenis Alat : DUMP TRUCK 5 T TENAGA = 145 HP


Harga : Rp. 155,925,000.00
Umur Kerja 6 tahun (A) 0.24668
Jam Kerja/Hr 5 Jam FAKTOR ( CRF ) : 0.24668
hari kerja/Thn 300 HK pada 12.50%
1500 Jam/Tahun (W)

A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : (Rp/jAM)

1. Depresiasi : 0,9 % x Harga Alat x (CRF) x 1


Jam/Thn
0.90 x 155,925,000.00 x 0.24668 = Rp. 23,078.13
### 1,500.00
###
### 2. Lain-lain :
Asuransi 3 % thn + PPN 10 % = 0.033 x Harga alat / Jam/Thn

= 0.033 x 155,925,000.00 / 1,500.00 = Rp. 3,430.35

Sub Total = Rp. 26,508.48

### B. BIAYA OPERASI ( OPERATION COSTS ) : (Rp/Jam)

Kebutuhan bahan bakar dan pelumas tiap HP :


Diesel = 0.150 liter/HP/jam
### Bensin = 0.167 liter/HP/jam
### Pelumas = 0.006 liter/HP/jam
###
### Harga : Solar/Minyak Diesel = Rp. 12589 /liter
Bensin = Rp. 10511 /liter
Pelumas = Rp. 39092 /liter

Bahan bakar = Rp. 273,806.19


Pelumas = Rp. 34,009.86
### Perbaikan & Spareparts = Rp. 13,846.88
Sub Total = Rp. 321,662.93

###
###
### TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A + B = Rp. 348,171.40

###

###

DINAS PU KODE
KAB. PANGKEP ANALISA BIAYA PERALATAN E 221
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007
Jenis Alat : FLAT BAD TRUCK 3:5 T TENAGA = 115 HP
Harga : Rp. 138,600,000.00
Umur Kerja 6 tahun (A) 0.24668
Jam Kerja/Hr 5 Jam FAKTOR ( CRF ) : 0.24668
hari kerja/Thn 300 HK pada 12.50%
1500 Jam/Tahun (W)

A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : (Rp/jAM)

1. Depresiasi : 0,9 % x Harga Alat x (CRF) x 1


Jam/Thn
### 0.90 x 138,600,000.00 x 0.24668 = Rp. 20,513.89
### 1,500.00
###
2. Lain-lain :
Asuransi 3 % thn + PPN 10 % = 0.033 x Harga alat / Jam/Thn

= 0.033 x 138,600,000.00 / 1,500.00 = Rp. 3,049.20

Sub Total = Rp. 23,563.09


###
B. BIAYA OPERASI ( OPERATION COSTS ) : (Rp/Jam)

Kebutuhan bahan bakar dan pelumas tiap HP :


### Diesel = 0.150 liter/HP/jam
### Bensin = 0.167 liter/HP/jam
### Pelumas = 0.006 liter/HP/jam
###
Harga : Solar/Minyak Diesel = Rp. 12589 /liter
Bensin = Rp. 10511 /liter
Pelumas = Rp. 39092 /liter

Bahan bakar = Rp. 217,156.64


### Pelumas = Rp. 26,973.34
Perbaikan & Spareparts = Rp. 12,308.33
Sub Total = Rp. 256,438.31

###

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A + B = Rp. 280,001.40

###

|::
DINAS PU KODE
KAB. PANGKEP ANALISA BIAYA PERALATAN E 251
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007

Jenis Alat : CANC MIXER TENAGA = 6 HP


Harga : Rp. 5,197,500.00
Umur Kerja 6 tahun (A) 0.24668
Jam Kerja/Hr 5 Jam FAKTOR ( CRF ) : 0.24668
hari kerja/Thn 300 HK pada 12.50%
1500 Jam/Tahun (W)

A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : (Rp/jAM)

1. Depresiasi : 0,9 % x Harga Alat x (CRF) x 1


Jam/Thn
0.90 x 5,197,500.00 x 0.24668 = Rp. 769.27
### 1,500.00
###
### 2. Lain-lain :
### Asuransi 3 % thn + PPN 10 % = 0.033 x Harga alat / Jam/Thn
###
### = 0.033 x 5,197,500.00 / 1,500.00 = Rp. 114.35

Sub Total = Rp. 883.62

### B. BIAYA OPERASI ( OPERATION COSTS ) : (Rp/Jam)

Kebutuhan bahan bakar dan pelumas tiap HP :


Diesel = 0.150 liter/HP/jam
### Bensin = 0.167 liter/HP/jam
Pelumas = 0.006 liter/HP/jam

Harga : Solar/Minyak Diesel = Rp. 12589 /liter


Bensin = Rp. 10511 /liter
Pelumas = Rp. 39092 /liter

Bahan bakar = Rp. 11,329.91


Pelumas = Rp. 1,407.30
Perbaikan & Spareparts = Rp. 461.56
Sub Total = Rp. 13,198.78

###
###
### TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
###

A + B = Rp. 14,082.39

###

###

|::
DINAS PU KODE
KAB. PANGKEP ANALISA BIAYA PERALATAN E 253
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007

Jenis Alat : ALAT PENGADUK BETON TENAGA = 20 HP


Harga : Rp. 40,425,000.00
Umur Kerja 6 tahun (A) 0.24668
Jam Kerja/Hr 5 Jam FAKTOR ( CRF ) : 0.24668
hari kerja/Thn 300 HK pada 12.50%
1500 Jam/Tahun (W)

A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : (Rp/jAM)

1. Depresiasi : 0,9 % x Harga Alat x (CRF) x 1


Jam/Thn
0.90 x 40,425,000.00 x 0.24668 = Rp. 5,983.22
### 1,500.00
###
### 2. Lain-lain :
### Asuransi 3 % thn + PPN 10 % = 0.033 x Harga alat / Jam/Thn
###
### = 0.033 x 40,425,000.00 / 1,500.00 = Rp. 889.35

Sub Total = Rp. 6,872.57

### B. BIAYA OPERASI ( OPERATION COSTS ) : (Rp/Jam)

Kebutuhan bahan bakar dan pelumas tiap HP :


Diesel = 0.150 liter/HP/jam
### Bensin = 0.167 liter/HP/jam
### Pelumas = 0.006 liter/HP/jam

Harga : Solar/Minyak Diesel = Rp. 12589 /liter


Bensin = Rp. 10511 /liter
Pelumas = Rp. 39092 /liter

Bahan bakar = Rp. 37,766.37


Pelumas = Rp. 4,691.01
### Perbaikan & Spareparts = Rp. 3,589.93
Sub Total = Rp. 46,047.32

###
###
###
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A + B = Rp. 52,919.89

###

###

|::
DINAS PU KODE
KAB. PANGKEP ANALISA BIAYA PERALATAN E 301
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007

Jenis Alat : COMPRESSOR TENAGA = 35 HP


Harga : Rp. 51,975,000.00
Umur Kerja 6 tahun (A) 0.24668
Jam Kerja/Hr 5 Jam FAKTOR ( CRF ) : 0.24668
hari kerja/Thn 300 HK pada 12.50%
1500 Jam/Tahun (W)

A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : (Rp/jAM)

1. Depresiasi : 0,9 % x Harga Alat x (CRF) x 1


Jam/Thn
### 0.90 x 51,975,000.00 x 0.24668 = Rp. 7,692.71
### 1,500.00
###
### 2. Lain-lain :
### Asuransi 3 % thn + PPN 10 % = 0.033 x Harga alat / Jam/Thn
###
### = 0.033 x 51,975,000.00 / 1,500.00 = Rp. 1,143.45

Sub Total = Rp. 8,836.16


###
B. BIAYA OPERASI ( OPERATION COSTS ) : (Rp/Jam)

Kebutuhan bahan bakar dan pelumas tiap HP :


### Diesel = 0.150 liter/HP/jam
### Bensin = 0.167 liter/HP/jam
Pelumas = 0.006 liter/HP/jam

Harga : Solar/Minyak Diesel = Rp. 12589 /liter


Bensin = Rp. 10511 /liter
Pelumas = Rp. 39092 /liter

Bahan bakar = Rp. 66,091.15


### Pelumas = Rp. 8,209.28
Perbaikan & Spareparts = Rp. 4,615.63
Sub Total = Rp. 78,916.05
###
###
###
###
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A + B = Rp. 87,752.21

###

###

|::
DINAS PU KODE
KAB. PANGKEP ANALISA BIAYA PERALATAN E 341
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007

Jenis Alat : WATER PUMP DIA 5 CM TENAGA = 8 HP


Harga : Rp. 5,197,500.00
Umur Kerja 4 tahun (A) 0.33271
Jam Kerja/Hr 2.5 Jam FAKTOR ( CRF ) : 0.33271
hari kerja/Thn 300 HK pada 12.50%
750 Jam/Tahun (W)

A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : (Rp/jAM)

1. Depresiasi : 0,9 % x Harga Alat x (CRF) x 1


Jam/Thn
0.90 x 5,197,500.00 x 0.33271 = Rp. 2,075.10
### 750.00
###
### 2. Lain-lain :
### Asuransi 3 % thn + PPN 10 % = 0.033 x Harga alat / Jam/Thn
###
### = 0.033 x 5,197,500.00 / 750.00 = Rp. 228.69
###
Sub Total = Rp. 2,303.79
### B. BIAYA OPERASI ( OPERATION COSTS ) : (Rp/Jam)

Kebutuhan bahan bakar dan pelumas tiap HP :


Diesel = 0.150 liter/HP/jam
### Bensin = 0.167 liter/HP/jam
### Pelumas = 0.006 liter/HP/jam

Harga : Solar/Minyak Diesel = Rp. 12589 /liter


Bensin = Rp. 10511 /liter
Pelumas = Rp. 39092 /liter

Bahan bakar = Rp. 15,106.55


Pelumas = Rp. 1,876.41
### Perbaikan & Spareparts = Rp. 1,245.06
Sub Total = Rp. 18,228.01

###
###
### TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
###

A + B = Rp. 20,531.80

###

###

|::
DINAS PU KODE
KAB. PANGKEP ANALISA BIAYA PERALATAN E 081
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007

Jenis Alat : TANDEM ROLLER TENAGA = 40 HP


Harga : Rp. 571,725,000.00
Umur Kerja 10 tahun (A) 0.18062
Jam Kerja/Hr 5 Jam FAKTOR ( CRF ) : 0.18062
hari kerja/Thn 300 HK pada 12.50%
1500 Jam/Tahun (W)

A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : (Rp/jAM)

1. Depresiasi : 0,9 % x Harga Alat x (CRF) x 1


Jam/Thn
0.90 x 571,725,000.00 x 0.18062 = Rp. 61,959.59
### 1,500.00
###
### 2. Lain-lain :
### Asuransi 3 % thn + PPN 10 % = 0.033 x Harga alat / Jam/Thn
###
### = 0.033 x 571,725,000.00 / 1,500.00 = Rp. 12,577.95
###
Sub Total = Rp. 74,537.54

### B. BIAYA OPERASI ( OPERATION COSTS ) : (Rp/Jam)

Kebutuhan bahan bakar dan pelumas tiap HP :


Diesel = 0.150 liter/HP/jam
### Bensin = 0.167 liter/HP/jam
### Pelumas = 0.006 liter/HP/jam
###
### Harga : Solar/Minyak Diesel = Rp. 12589 /liter
### Bensin = Rp. 10511 /liter
Pelumas = Rp. 39092 /liter

Bahan bakar = Rp. 75,532.74


Pelumas = Rp. 9,382.03
### Perbaikan & Spareparts = Rp. 37,175.76
Sub Total = Rp. 122,090.53

###
###
### TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A + B = Rp. 196,628.07

###

###

|::
DINAS PU KODE
KAB. PANGKEP ANALISA BIAYA PERALATAN E 155
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007

Jenis Alat : ASPAL MIXING PLANT TENAGA = 215 HP


Harga : Rp. 2,887,500,000.00
Umur Kerja 10 tahun (A) 0.18062
Jam Kerja/Hr 4 Jam FAKTOR ( CRF ) : 0.18062
hari kerja/Thn 300 HK pada 12.50%
1200 Jam/Tahun (W)

A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : (Rp/jAM)

1. Depresiasi : 0,9 % x Harga Alat x (CRF) x 1


Jam/Thn
0.90 x 2,887,500,000.00 x 0.18062 = Rp. 391,159.05
1,200.00

2. Lain-lain :
Asuransi 3 % thn + PPN 10 % = 0.033 x Harga alat / Jam/Thn

= 0.033 x 2,887,500,000.00 / 1,200.00 = Rp. 79,406.25

Sub Total = Rp. 470,565.30

B. BIAYA OPERASI ( OPERATION COSTS ) : (Rp/Jam)

Kebutuhan bahan bakar dan pelumas tiap HP :


Diesel = 0.150 liter/HP/jam
Bensin = 0.167 liter/HP/jam
Pelumas = 0.006 liter/HP/jam

Harga : Solar/Minyak Diesel = Rp. 12589 /liter


Bensin = Rp. 10511 /liter
Pelumas = Rp. 39092 /liter

Bahan bakar = Rp. 405,988.49


Pelumas = Rp. 50,428.41
Perbaikan & Spareparts = Rp. 234,695.43
Sub Total = Rp. 691,112.33

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A + B = Rp. 1,161,677.63

|::
DINAS PU KODE
KAB. PANGKEP ANALISA BIAYA PERALATAN E 157
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007

Jenis Alat : ASPAL FINISHER TENAGA = 30 HP


Harga : Rp. 600,600,000.00
Umur Kerja 7 tahun (A) 0.22260
Jam Kerja/Hr 4 Jam FAKTOR ( CRF ) : 0.22260
hari kerja/Thn 300 HK pada 12.50%
1200 Jam/Tahun (W)

A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : (Rp/jAM)

1. Depresiasi : 0,9 % x Harga Alat x (CRF) x 1


Jam/Thn
0.90 x 600,600,000.00 x 0.22260 = Rp. 100,271.56
1,200.00

2. Lain-lain :
Asuransi 3 % thn + PPN 10 % = 0.033 x Harga alat / Jam/Thn

= 0.033 x 600,600,000.00 / 1,200.00 = Rp. 16,516.50

Sub Total = Rp. 116,788.06

B. BIAYA OPERASI ( OPERATION COSTS ) : (Rp/Jam)

Kebutuhan bahan bakar dan pelumas tiap HP :


Diesel = 0.150 liter/HP/jam
Bensin = 0.167 liter/HP/jam
Pelumas = 0.006 liter/HP/jam

Harga : Solar/Minyak Diesel = Rp. 12589 /liter


Bensin = Rp. 10511 /liter
Pelumas = Rp. 39092 /liter

Bahan bakar = Rp. 56,649.56


Pelumas = Rp. 7,036.52
Perbaikan & Spareparts = Rp. 60,162.93
Sub Total = Rp. 123,849.01
A + B = Rp. 240,637.07
DAFTAR BIAYA PERALATAN
TAHUN ANGARAN 2007
URAIAN UNIT INSTALASI KODE U.KERJA WAKTU OPERASI/TAHUN/JAM HARGA TOTAL BIAYA
No.
DAN ALAT BERAT ALAT (TAHUN) JAM/HR J/THN JAM/THN ALAT SEWA (Rp./JAM)
1 Bluduzer 110 HP E001 8 4 300 1200 751,050,000.00 438,927.80
2 Motor Grader 100 HP E010 8 5 300 1500 404,550,000.00 300,737.30
3 Excavator 90 HP E020 8 5 300 1500 253,764,750.00 246,541.08
4 Crusher 185 HP E031 10 5 300 1500 346,800,000.00 460,494.47
5 Creening Plant 80 HP E040 8 5 300 1500 28,875,000.00 176,142.74
6 Whell Loader 115 HP E052 8 5 300 1500 462,000,000.00 345,141.14
7 Roller steel Wheel 6-8 HP E080 10 5 300 1500 92,400,000.00 102,969.45
8 Mesin Gilas Roda Karet 8-15 HP E084 10 5 300 1500 635,250,000.00 325,798.47
9 Roller Vebro 12 HP E087 6 4 300 1200 138,600,000.00 70,313.71
10 Tanper Vebrator Plat 4 HP E088 6 2.5 300 750 5,197,500.00 11,181.83
11 Alat Penggetar Beton 4 HP E089 5 2 300 600 4,042,500.00 11,438.66
12 Pemanas Aspal/spreyer 68 HP E152 6 4 300 1200 91,245,000.00 173,874.31
13 Spayer 25 HP E153 6 4 300 1200 35,227,500.00 64,468.38
14 Truk Air 115 HP E182 8 2.5 300 750 98,175,000.00 287,059.72
15 Dump Truck 5 ton 5 T/145 HP E212 6 5 300 1500 155,925,000.00 348,171.40
16 Flat Bed Truck 3,5 ton 3,5T/115 HP E221 6 5 300 1500 138,600,000.00 280,001.40
17 Canc mixer 125 m3/6HP E251 6 5 300 1500 5,197,500.00 14,082.39
18 Canc Mixer 0,5 M3/10 HP E253 6 5 300 1500 40,425,000.00 52,919.89
19 Compressor 210 m3/HR E301 6 5 300 1500 51,975,000.00 87,752.21
20 Water Pump Dia 5 cm 30 m3/HR E341 4 2.5 300 750 5,197,500.00 20,531.80
21 Roller Tandem 6 - 10 T E081 10 5 300 1500 571,725,000.00 196,628.07
22 Aspal Mixing Plant (AMP) 30 T/HR E155 10 4 300 1200 2,887,500,000.00 1,161,677.63
23 Asphal Fhiniser 50 HP E157 7 4 300 1200 600,600,000.00 240,637.07

Botawa, Mei 2007


Disusun Oleh :
CV. MADYA Consultant

BACHTIAR HASYM, ST
Ka. Perwakilan
DAFTAR HARGA BAHAN DAN UPAH KERJA
TAHUN ANGGARAN 2007
K. 9
DINAS PEKERJAAN UMUM PROPINSI : SULAWESI SELATAN
SUB DINAS BINA MARGA KABUPATEN : PANGKEP

NO. PEKERJAAN KODE U P A H ( Rp. / H A R I ) KETERANGAN


1 Mandor Lapangan L061 171,360.00
2 Mekanik L071 154,224.00
3 Mekanik Pembantu L072 137,088.00
4 Kepala Tukang L073 154,224.00
5 Tukang L079 137,088.00
6 operator Terlatih L081 171,360.00
7 Operator Kurang Terlatih L082 154,224.00
8 Pembantu Operator L083 137,088.00
9 Supir material / Truck L091 137,088.00
10 Supir Personil L092 119,952.00
11 Pembantu Supir / Kenek L099 119,952.00
12 Buruh Lapangan tak Terlatih L101 85,680.00
13 Buruh Lapangan Agak terlatih L103 94,248.00
14 Buruh Lapangan terlatih L106 102,816.00
NO. BAHAN / MATERIAL KODE SATUAN HARGA / SATUAN
1 Batu gunung M010 m3 770,000
2 kerikil royalti MR12 m3 787,000
3 Kerikil M012 m3 535,000
4 Batu pecah 10 - 15 cm M-020 m3 1,183,875
5 Batu pecah 7 - 10 cm M-021 m3 1,183,875
6 Batu pecah 5 - 7 cm M022 m3 1,212,750
7 Batu pecah 3 - 5 cm M023 m3 1,241,625
8 Batu pecah 2 - 3 cm M024 m3 1,270,500
9 Batu pecah 1 - 2 cm M025 m3 1,339,800
10 Batu pecah 0.5 - 1 cm M026 m3 1,543,080
11 Timbunan Biasa (Tanah) M040 m3 301,000
12 Pasir ayak untuk beton M041 m3 1,012,500
13 Sirtu (tak ayak) MR42 m3 305,000
14 Timbunan pilihan M050 m3 305,000
15 Aspal bitumen M061 kg 11,613
16 Minyak tanah M065 lt 11,960
17 Kayu bakar M070 m3 675,000
18 Semen P.C M080 kg 2,856
19 Paku M166 kg 27,325
20 Baja tulangan beton M167 kg 24,400
21 Kawat baja (bindsiaal) M168 kg 34,563
22 Alat-alat bantu M170 set 330,000
23 Kayu untuk perancah M180 m3 1,895,000
24 Kayu Ulin M180 m3 4,220,000
25 Minyak diesel / solor M183 lt 12,589
26 Minyak diesel / solor(AMP) M183 lt 12,589
27 Bensin premiun M184 lt 10,511
28 Minyak pelumas M185 lt 39,092

Botawa, Mei 2007


Disusun Oleh :
CV. MADYA Consultant

BACHTIAR HASYM, ST
Ka. Perwakilan
DAFTAR HARGA SATUAN PEKERJAAN
TAHUN ANGGARAN 2003
I. PRODUKSI DAN PENGADAAN BAHAN - BAHAN
1 PENGADAAN KERIKIL SUNGAI (TIDAK DISARING) ALAT m3 K 012 444,272.70
2 PENGADAAN KERIKIL SUNGAI (TIDAK DISARING) BURUH M3 K 013 571,012.70
3 PENGADAAN KERIKIL GALIAN (TERSARING) ALAT M3 K 014 1,303,237.92
4 PENGADAAN KERIKIL SUNGAI TERSARING ALAT M3 K 016 652,815.79
5 PRODUKSI BATU PECAH TERSARING ALAT M3 K 017 1,324,096.17
6 PRODUKSI BATU PECAH TERSARING ALAT M3 K 018 1,222,191.35
7 LAPIS TIPIS ASPAL PASIR (LATASIR) ALAT Ton K 020 1,921,338.36
8 LAPIS TIPIS ASPAL DAN AGREGAT HALUS (LATASAG) BURUH Ton K 024 1,667,408.26
9 ASPAL BETON UNTUK LAPIS PONDASI ATAS (LASTON ATAS) ALAT Ton K 026 1,571,336.22
10 LAPIS TIPIS ASPAL BETON (LATASTON) ALAT Ton K 035 1,666,715.06
11 ASPAL BETON (LASTON) PRODUKSI DAN SUPLAI ALAT Ton K 040 1,642,435.69
12 BATU KARANG DARI SERUI ALAT M3 K 017 862,000.00
13 BATU KARANG LAUT ALAT M3 K 018 515,000.00

II. DRAINASE
12 MEMBUAT PARIT BURUH M3 K 110 140,835.87
13 MEMBUAT PASANGAN BATU PADA PARIT BURUH M K 112 813,387.48
14 KONSTRUKSI PASANGAN BATU BURUH M3 K 705 1,437,838.67
15 KONSTRUKSI PASANGAN BATU BURUH M3 K 115 302,396.77
III. PEMBERSIHAN LAPANGAN DAN PEKERJAAN TANAH
16 PENGUPASAN DAN PEMBERSIHAN SEMAK PADA DAMIJA BURUH m2 K 210 4,098.00
17 PENGUPASAN DAN PEMBERSIHAN SEMAK PADA DAMIJA ALAT m2 K 211 1,196.75
18 GALIAN TANAH UNTUK KONSTRUKSI BURUH M3 K 224 78,444.00
19 PENGURUGAN KEMBALI DAN DIPADATKAN BURUH M3 K 225 890,149.92
20 PENIMBUNAN BADAN JALAN ALAT M3 K 311 416,073.28
21 GALIAN TANAH & PEMBUANGAN ALAT M3 K 321 75,528.02
IV.BAHU JALAN DAN SALURAN TEPI JALAN
22 PEMBENTUKAN BAHU JALAN KERAS BURUH M3 K 410 807,934.83
23 PEMBENTUKAN BAHU JALAN KERAS ALAT M3 K 411 552,650.64
24 PEMBERSIHAN SEMAK DAN LAIN-LAIN PADA BAHU JALAN BURUH m2 K 422 1,762.24
25 MEMBERSIHKAN PARIT BURUH M1 K 424 14,090.27
26 MEMETONG BAHU JALAN TINGGI BURUH M3 K 420 224,057.25
27 MEMOTONG BAHU JALAN TINGGI ALAT M3 K 420 93,301.35
28 CERUCUK KAYU DIRAWA BURUH M K 232 105,947.21
29 PEKERJAAN BRONJONG PENAHAN BURUH M3 K 815 1,456,439.36
V. PEMBUATAN LPB DAN LPA
30 LAPIS PONDASI BAWAH KELAS C SIRTU ALAT M3 K 514 599,656.63
31 LAPIS PONDASI BAWAH KLS A AGREGAT PECAH TERSARING BURUH M3 K 511 1,286,528.48
32 LAPIS PONDASI ATAS MENGGUNAKAN KARANG DARI SERUI ALAT M3 K 522 1,076,172.72
33 LAPIS PONDASI BAWAH (LPB) - TELFORD BURUH M2 K 516 370,200.61
VI. PELAPISAN PERMUKAAN PERKERASAN
34 LABURAN ASPAL PASIR BURAS ALAT M2 K 612 19,382.13
35 LABURAN ASPAL SATU LAPIS ( BURTU 1) BURUH M2 K 615 59,277.05
36 LABURAN ASPAL LAPIS KEDUA ( BURTU 2) ALAT M2 K 616 31,783.70
37 LABURAN ASPAL DUA LAPIS ( BURDA ) ALAT M2 K 617 91,060.74
38 LAPIS PENETRASI MAKADAM (LAPEN) BURUH M2 K 618 188,403.23
39 PENGHAMPARAN LAPIS TIPIS ASPAL PASIR 20 MM (LATASIR) ALAT M2 K 621 82,496.56
40 PENGHAMPARAN LAPIS TIPIS ASPAL PASIR 20 MM (LATASIR) BURUH M2 K 638 82,933.32
41 PENGHAMPARAN LAPIS PERMUKAAN ASPAL BETON LASTON ( 5 cm ) ALAT M2 K 641 199,413.13
PENGHAMPARAN LAPIS PERMUKAAN ASPAL BETON LASTON ( 5 cm ) ALAT M2 K 641 161,543.83
42 PENGHAMPARAN LAPIS TIPIS ASPAL BETON ( 3 cm ) ALAT M2 K 636 122,224.12
VII. BETON STRUKTUR
37 ACUAN UNTUK BETON STRUKTUR BURUH M2 K 710 152,094.20
38 BETON STRUKTUR KLAS K225 ALAT M3 K 725 1,771,054.48
39 MEMOTONG MEMBENGKOK DAN MEMASANG TULANGAN BESI BURUH M3 K 715 31,075.20
40 BETON NON STRUKTUR/RABAT BURUH M3 K 719 1,778,041.81
VIII. PEMELIHARAAN JALAN
41 PERATAAN DAN PEMADATAN JALAN TANAH ALAT KM K 850 3,274,598.76
42 PEMBENTUKAN DAN PERATAAN BAHU JALAN ALAT M3 K 855 475,802.90
43 PERATAAN KEMBALI JALAN KERIKIL ALAT KM K 860 1,476,570.86
44 PERBAIKAN AMBELAS JALAN KERIKIL BURUH M2 K 870 740,125.63
45 PENGKERIKILAN ULANG JALAN KERIKIL PADAT 50 MM ALAT KM K 877 82,609.90
46 PERBAIKAN AMBLES JALAN ASPAL BURUH M2 K 885 743,833.73
47 PERBAIKAN LUBANG JALAN ASPAL BURUH M2 K 880 273,863.18
48 BIAYA PEMELIHARAAN RUTIN TAHUNAN JALAN ASPAL (KRLL I ) BURUH KM K 803 35,149,967.67
49 BIAYA PEMELIHARAAN RUTIN TAHUNAN JALAN ASPAL ( KRLL 2 ) BURUH KM K 884 48,350,696.88
50 BIAYA PEMELIHARAAN RUTIN TAHUNAN JALAN ASPAL (KRLL 3 ) BURUH KM K 885 61,991,462.63

Botawa, Mei 2007

Disusun Oleh :
CV. MADYA Consultant

BACHTIAR HASYM, ST
Ka. Perwakilan
3
DAFTAR HARGA BAHAN BANGUNAN DAN UPAH KABUPATEN WAROPEN
1687
1.25 A. DAFTAR HARGA UPAH ###
UPAH TENAGA
NO. TENAGA KERJA KERJA (Rp. /
HARI)
1 Mandor Rp 171,360.00
2 Mekanik Rp 154,224.00
3 Mekanik Pembantu Rp 137,088.00
4 Kepala Tukang Rp 154,224.00
5 Tukang Rp 137,088.00
6 Operator Terampil Rp 171,360.00
7 Operator Kurang Terampil Rp 154,224.00
8 Pembantu Opearator Rp 137,088.00
9 Sopir Truck Rp 137,088.00
10 Sopir Pribadi Rp 119,952.00
11 Pembantu Sopir Rp 119,952.00
12 Buruh Tak Terampil Rp 85,680.00
13 Buruh Kurang Terampil Rp 94,248.00
14 Buruh Terampil Rp 102,816.00

B. DAFTAR HARGA BAHAN BANGUNAN

Wilayah "A" Urfas


NO JENIS BAHAN BANGUNAN
s/d Waropen Bawah

BAHAN DASAR
1 Batu
Batu Gunung/Karang Laut M3 Rp 770,000.00
Batu Karang dari Serui M3
Rp 895,000.00
Batu Kali dari Botawa M3
Rp 732,000.00
Batu Kali dari Serui M3
Rp 900,000.00
2 Koral/Kerikil
Koral/Kerikil laut sudah diayak dari Waren/Urfas M3 Rp 535,000.00
Koral/Kerikil Sungai dari Botawa M3
Rp 787,000.00
3 Pasir
Pasir Beton dari Botawa M3 Rp 766,000.00
Pasir Pasang Laut M3
Rp 333,200.00
Pasir Batu (Sirtu) dari Waren/Urfas M3
Rp 305,000.00
Pasir Urug/Timbunan M3 Rp 305,000.00
4 Tanah Urug/Timbunan M3 Rp 301,000.00
5 Batu Merah Bh Rp 4,640.00
6 Batu Tela Bh Rp 5,800.00
7 Conblok Bh Rp 23,415.00
8 Kanstin 15x20x40 bh Rp 36,857.14
9 Paving Block 10x20 Tebal 7 cm Bh Rp 4,300.00
10 Paving Block Segi enam Tebal 7 cm Bh Rp 7,500.00
11 Batu tempel hitam M2 Rp 350,000.00
12 Semen
Semen 1 Zak = 40 Kg kg Rp 2,856.25
Semen Putih/Warna Kg Rp 18,150.00

BAHAN KAYU
1 Balok/Papan Kayu Besi (Klas I) M3 Rp 4,220,000.00
2 Balok/Papan Kayu Matoa (Klas II) M3 Rp 3,135,000.00
3 Balok/Papan Kayu Tinang (Klas III) M3 Rp 2,535,000.00
4 Kayu Bakar M3 Rp 675,000.00
5 Kayu Perancah M 3
Rp 1,895,000.00

BAHAN LANTAI
1 Tegel Mozaik 30 x 30 CM M2 Rp 266,860.00
2 Tegel Keramik
Putih 11 x 11 CM Bh Rp 3,200.00
Warna 11 x 11 CM Bh Rp 3,840.00
Putih 10 x 20 CM Bh Rp 3,520.00
Warna 10 x 20 CM Bh Rp 4,000.00
Putih 15 x 15 CM Bh Rp 6,066.00
Warna 15 x 15 CM Bh Rp 7,169.00
Putih 20 x 20 CM M2 Rp 272,975.00
Warna 20 x 20 CM M2 Rp 310,200.00
Putih 20 x 25 CM M 2
Rp 266,860.00
Warna 20 x 25 CM M 2
Rp 317,700.00
Putih 30 x 30 CM M 2
Rp 266,860.00
Warna 30 x 30 CM M 2
Rp 317,691.00
Putih 40 x 40 CM M 2
Rp 285,768.00
Warna 40 x 40 CM M 2
Rp 299,376.00

BAHAN BESI
1 Besi Beton
Besi Beton Polos Kg Rp 24,400.00
Besi Beton Ulir Kg Rp 24,197.00
2 Paku
Paku Colour Tiles/Metal Roof kg Rp 62,727.00
Paku Eternit kg Rp 40,493.00
Paku Seng Kg Rp 45,475.00
Paku Campur Kg Rp 27,325.00
Paku Ardeks Kg Rp 45,475.00
Paku Beton Kg Rp 61,601.00
Paku Jembatan Kg Rp 44,771.00
Paku Skrup Dos Rp 20,725.00
Paku Tripleks Kg Rp 32,770.00
3 Kawat
Kawat Ikat / Beton Kg Rp 34,563.00

BAHAN PIPA
2 Pipa Paralon PVC
Pipa Paralon Ø 1/4" M1 Rp 9,843.00
Pipa PVC Ø 1/2" M 1
Rp 13,387.00
Pipa PVC Ø 3/4" M 1
Rp 15,300.00
Pipa PVC Ø 1" M 1
Rp 20,700.00
Pipa PVC Ø 1½" M 1
Rp 31,500.00
Pipa PVC Ø 2" M1 Rp 45,000.00
Pipa PVC Ø 2½" M1 Rp 66,600.00
Pipa PVC Ø 3" M1 Rp 90,900.00
Pipa PVC Ø 4" M 1
Rp 105,000.00
Pipa PVC Ø 5" M 1
Rp 137,300.00
Pipa PVC Ø 6" M 1
Rp 192,500.00
Pipa PVC Ø 8" M 1
Rp 328,500.00
Pipa PVC Ø 10" M 1
Rp 499,500.00
3 Jenis Batang D u/Sal. Pembuangan Air
Ø 1/2" - 4 m M1 Rp 9,090.00
Ø 3/4" - 4 m M 1
Rp 12,120.00
Ø 1" - 4 m M 1
Rp 18,558.75
Ø 1½" - 4 m M 1
Rp 19,316.25
Ø 2" - 4 m M 1
Rp 23,482.50
Ø 2½" - 4 m M 1
Rp 31,587.75
Ø 3" - 4 m M 1
Rp 41,662.50
Ø 4" - 4 m M1 Rp 66,660.00
Ø 5" - 4 m Btg Rp 101,883.75
Ø 6" - 4 m Btg Rp 137,865.00
Ø 10" - 4 m Btg Rp 396,930.00
4 Jenis Batang C u/Instalasi Listrik
Ø 5/8" - 4 m M1 Rp 5,859.00
Ø 3/4" - 4 m M 1
Rp 15,750.00
Ø 1" - 4 m M 1
Rp 18,000.00
Ø 1½" - 4 m Btg Rp 23,437.00
5 Sock Lurus, Sock Drat Dalam, Sok Drat Luar, Knie & Bh Rp 42,281.00
Teste PVC
6 Lem PVC Tube Rp 15,125.00
7 Alat Bantu Set Rp 330,000.00
8 Gate Valve GIP f 1" Bh Rp 294,400.00
9 Gate Valve GIP f 2" Bh Rp 404,050.00
10 Gate Valve GIP f 3" Bh Rp 759,862.00
11 Gate Valve GIP f 4" Bh Rp 996,906.00
12 Gate Valve GIP f 6" Bh Rp 1,176,593.00
13 Gate Valve GIP f 8" Bh Rp 1,356,281.00
14 Seal Type Bh Rp 13,750.00

BAHAN LANGIT-LANGIT
1 Eternit 100 X 100 Lbr Rp 85,921.00
2 Tripleks
122x244x0,3 cm Lbr Rp 95,590.00
122x244x0,4 cm Lbr Rp 129,954.00
122x244x0,6 cm Lbr Rp 226,050.00
122x244x0,9 cm Lbr Rp 335,940.00
3 Tripleks melamin 122x244x0,3 cm Lbr Rp 115,610.00
4 Acoustic 40x60 Lbr Rp 44,625.00
5 Teakwood
122x244x0,3 cm Lbr Rp 162,140.00
80x244x0,3 cm Lbr Rp 121,605.00
6 Hard Board 122x244 cm Lbr Rp 221,100.00
7 Asbes Plat Harflek 200x100x0,3 cm Lbr Rp 112,500.00
8 Plywood Lbr Rp 152,278.00
9 Formika Lbr Rp 310,500.00
10 Kayu List Plafond M1 Rp 14,300.00

BAHAN ATAP
1 Genteng
Beton Bh Rp 26,538.00
Keramik Bh Rp 13,500.00
Asbes Lbr Rp 32,500.00
Harfles (115x85x0,5 cm) Lbr Rp 62,500.00
2 Asbes Gelombang Kaki/Lbr Rp 100,000.00
3 Sirap Ikat/M2 Rp 100,000.00
4 Seng Gelombang
BWG 34" BJLS 0,20 mm Lbr Rp 72,450.00
BWG 32" BJLS 0,30 mm Lbr Rp 88,200.00
BWG 28" BJLS 0,35 mm Lbr Rp 105,875.00
5 Seng Plat
BJLS 0,30 mm Lbr Rp 100,200.00
BJLS 0,20 mm Lbr Rp 84,450.00
6 Seng Super Dek
180x70 cm - 10 kaki Lbr Rp 231,000.00
180x70 cm - 8 kaki Lbr Rp 184,800.00
180x70 cm - 7 kaki Lbr Rp 161,700.00
180x70 cm - 6 kaki Lbr Rp 138,600.00
7 Seng Aluminium Gelombang
SWG 32" 0,27 mm Lbr Rp 85,470.00
SWG 32" 0,31 mm Lbr Rp 120,393.00
SWG 32" 0,38 mm Lbr Rp 127,050.00
8 Seng Plastik (Fiber) Kaki/Lbr Rp 138,600.00
9 Atap Plastik Gelombang Besar Lbr Rp 130,812.00
10 Atap Plastik Gelombang Kecil Lbr Rp 104,144.00
11 Ardek Gelombang Lbr Rp 110,975.00
12 Seng Galvanis Lbr Rp 113,437.00
13 Fiber Semen (Harlek)
Super 240x108 x0,6 cm Lbr Rp 137,500.00
Super 180x108 x0,6 cm Lbr Rp 94,600.00
Ekonomi 240x92x0,5 cm Lbr Rp 103,400.00
Ekonomi 180x92x0,4 cm Lbr Rp 91,300.00
Mini 240x105x0,4 cm Lbr Rp 88,000.00
Mini 180x92x0,5 cm Lbr Rp 81,400.00
Super 240x105 x0,4 cm Lbr Rp 103,400.00
Super 180x105 x0,4 cm Lbr Rp 92,400.00
14 Atap Harflex 30 x 110 x0.5 cm Lbr Rp 138,512.00
15 Atap Utomo Colour Tiles 7 Genteng Bh Rp 115,615.00
16 Nok/Bubungan
Genteng Beton Bh Rp 24,964.00
Genteng Asbes Bh Rp 30,800.00
Genteng Keramik Bh Rp 9,900.00
Alm. SWG 28" - 180 cm Lbr Rp 99,000.00
Alm. SWG 28" - 105 cm Lbr Rp 78,100.00
17 Nok Harflex 30 x 118 x0.5 cm Bh Rp 63,442.00
18 Nok Utomo Colour Tiles 7 genteng Bh Rp 95,403.00
19 Nok Steel Gelombang
Super - 180 cm Bh Rp 66,000.00
Mini - 105 cm Bh Rp 44,000.00
Ekonomi - 95 cm Bh Rp 34,100.00
20 Nok Steel Rata
Super - 108 cm Bh Rp 55,000.00
Mini - 105 cm Bh Rp 44,000.00
Ekonomi - 95 cm Bh Rp 41,800.00
21 Nok ½ Lingkaran Bh Rp 79,200.00
22 Karet Pelapis Genteng Roll Rp 340,000.00
23 Talang Paralon f 4" M1 Rp 93,008.00
24 Talang Paralon f 12" M 1
Rp 126,774.00

BAHAN PENGGANTUNG
1 Kunci Tanam
Union 1 x slaag Bh Rp 240,625.00
Union 2 x slaag Bh Rp 275,000.00
Yalle 1 x Slaag Bh Rp 137,500.00
Yalle 2 x Slaag Bh Rp 173,937.00
Kuda Terbang 1 x Slaag Bh Rp 103,125.00
Kuda Terbang 2 x Slaag Bh Rp 123,750.00
2 Kunci Gembok No. 30 Bh Rp 47,565.00
3 Penggantung
Hak / Kait Angin Biasa Bh Rp 14,437.00
Hak / Kait Angin Kancing Bh Rp 58,437.00
Grendel Pintu Bh Rp 34,375.00
Grendel Jendela Bh Rp 17,187.00
Engsel Pintu Ring Nylon Bh Rp 37,257.00
Engsel H Pintu Bh Rp 26,616.00
Engsel Jendela Bh Rp 15,812.00
Engsel H Jendela Bh Rp 14,231.00
Engsel Almari Bh Rp 12,856.00
Tarikan Jendela Bh Rp 11,687.00
Expagnolet Bh Rp 75,625.00

BAHAN SANITAIR
1 Kloset Duduk INA Bh Rp 1,455,300.00
2 Kloset Jongkok Teraso Bh Rp 226,875.00
3 Wasthafel INA Set Rp 2,000,000.00
4 Wasthafel + Cermin INA Set Rp 2,500,000.00
5 Wasthafel Logam 1 Lubang Set Rp 680,625.00
6 Wasthafel Logam 2 Lubang Set Rp 983,125.00
7 Urinoir Porselin Bh Rp 1,629,477.00
8 Bak Air Viber Glass 200-300 ltr Bh Rp 562,500.00
9 Bak Air Viber Glass 300-500 ltr Bh Rp 656,250.00
10 Bak Air Viber Glass 750 ltr Bh Rp 906,250.00
11 Reservoir Viber Glass 650 ltr Bh Rp 1,925,000.00
12 Reservoir Viber Glass 1.100 ltr Bh Rp 2,812,500.00
13 Floor Drain dari Besi Bh Rp 67,500.00
14 Kran Air 1/2" Bh Rp 35,856.00
15 Kran Air 3/4" Bh Rp 39,468.00
16 Kran Air Aluminium Besar Bh Rp 65,868.00
17 Kran Air Wastafel Bh Rp 88,968.00
18 Penyambungan Air PDAM Ls Rp 907,500.00

BAHAN FINISHING/CAT
1 Cat Tembok Kg Rp 22,000.00
2 Cat Alkali resisting primer Kg Rp 41,205.00
3 Cat ICI Weathershield Kg Rp 82,410.00
4 Cat Kilat Kg Rp 62,025.00
5 Cat Besi Kg Rp 62,025.00
6 Cat Aluminium Kg Rp 127,516.00
7 Cat Atap/AGA Kg Rp 286,000.00
8 Meni Kayu Kg Rp 41,334.00
9 Meni Besi Kg Rp 49,650.00
10 Dempul Kayu Kg Rp 41,334.00
11 Dempul Besi Kg Rp 70,656.00
12 Plamur Besi Kg Rp 51,750.00
13 Plamur Tembok Kg Rp 40,355.00
14 Politur Kg Rp 58,650.00
15 Teak Oil Kg Rp 48,055.00
16 Minyak Cat Kg Rp 37,485.00
17 Residu Kg Rp 33,637.00
18 Dempul Kg Rp 38,053.00
19 Kertas Amplas Lbr Rp 9,400.00

BAHAN LISTRIK
1 Kabel Listrik
Type NYK
1½ mm M1 Rp 8,250.00
2½ mm M1 Rp 9,750.00
Type NYY
2 X 1½ mm M1 Rp 15,000.00
2 X 2½ mm M1 Rp 21,900.00
3 X 2½ mm M1 Rp 26,235.00
2 X 4 mm M1 Rp 30,000.00
2 Lampu TL
1 x 10 w Set Rp 63,690.00
1 x 20 w Set Rp 82,500.00
2 x 20 w Set Rp 135,575.00
1 x 40 w Set Rp 121,500.00
2 x 40 w Set Rp 158,950.00
10 Watt Bh Rp 18,750.00
20 Watt Bh Rp 26,250.00
40 Watt Bh Rp 30,000.00
3 Lampu Pijar
25 w Bh Rp 13,750.00
40 w Bh Rp 16,500.00
60 w Bh Rp 22,000.00
100 w Bh Rp 20,625.00
4 Lampu Mercuri Lengkap 250 watt Set Rp 2,567,250.00
5 Saklar
Tunggal Putih Bh Rp 31,250.00
Tunggal Hitam Bh Rp 26,875.00
Ganda Putih Bh Rp 34,375.00
Ganda Hitam Bh Rp 30,625.00
6 Stop Kontak
Putih Bh Rp 33,687.00
Hitam Bh Rp 29,562.00
7 Zekring Kast
1 Group Bh Rp 93,012.00
2 Group Bh Rp 103,824.00
3 Group Bh Rp 130,032.00
8 Fitting Tempel Kotak Bulat Putih Bh Rp 27,500.00
9 Fitting Biasa Bh Rp 17,187.00
10 Lampu XL 18 wattt Bh Rp 89,375.00
11 Lampu Sorot 500 watt Bh Rp 515,625.00
12 Lampu XL 8 wattt Bh Rp 55,000.00
13 Isolator Bh Rp 13,750.00
14 Instalasi Ttk Rp 60,000.00
15 Klem Kabel Dos Rp 24,062.00
16 Penyambungan Listrik PLTD Ls Rp 1,718,750.00
PROYEK : PEMBANGUNAN GEDUNG PUSAT PELAYANAN AKADEMIK
UNIVERSITAS NEGERI MAKASSAR TAHAP III
LOKASI : JL. A.P. PETTARANI, GUNUNGSARI BARU, RAPPOCINI, MAKASAR

RENCANA ANGGARAN BIAYA

NO URAIAN PEKERJAAN Satuan Harga

1 Air ltr 625.00


2 Beton
2.1 Beton readymix K 300 m3 784,000.00
2.2 Beton readymix K 350 m3 826,000.00

3 Besi
3.1 Besi beton kg 8,575.00
3.2 Wire mesh M8 m2 59,413.58
3.3 Besi beton ulir kg 8,575.00
3.4 Besi Hollow 40x40 kg 17,150.00
3.5 Besi plat sandaran 10x100 kg 17,150.00
3.6 Besi railing sandaran 10x50 kg 17,150.00

4 Kawat
4.1 Bendrat kg 12,740.00
4.2 Anyam m2 6,125.00

5 Keramik
5.1 Keramik 40x40 dos 112,500.00
5.2 Keramik 30x30 dos 100,000.00
5.3 Keramik 20x20 dos 100,000.00
5.4 Keramik 20x25 dos 92,500.00
5.5 Keramik step nossing 10x30 bj 8,000.00

6 Marmer
6.1 Marmer Pangkep 60x60 dinding m2 325,000.00
6.2 Marmer Pangkep 60x60 lantai m2 325,000.00

7 Paku
7.1 Paku kg 14,976.91

8 Pasir
8.1 Pasir beton m3 104,187.20
8.2 Pasir pasang m3 104,187.20
8.3 pasir urug m3 78,140.40
8.4 Sirtu m3 110,698.90

9 Semen
9.1 Semen PC kg 1,237.22
9.2 Semen hardener kg 2,604.68
9.3 Semen nat ( tile grout ) kg 19,535.10

10 Batako
10.1 Batako bj 3,255.85
10.2 Batako roster bj 3,907.02

11 Batu
11.1 Batu kali m3 117,210.60
11.2 Batu pecah 2-3 cm m3 123,722.30

12 Kayu
12.1 Balok klas I m3 2,344,212.00
12.2 Papan klas I m3 2,409,329.00
12.3 Balok klas II m3 2,213,978.00
12.4 Papan klas II m3 2,279,095.00
12.5 Balok klas III m3 1,953,510.00
12.6 Papan klas III m3 2,018,627.00
12.7 Kayu begisting m3 1,953,510.00
12.8 Multipleks 9 mm lbr 240,932.90

13 Cat
13.1 Cat besi kg 2,205.00
13.2 Cat Zincromate m2 -

14 Bahan khusus
14.1 Curing compound ltr 240,932.90
14.2 Minyak begisting ltr 240,932.90
14.3 Spacer ( untuk begisting dinding ) bh 240,932.90
14.4 Skimcoat kg 240,932.90
14.5 Waterproofing membran m2 110,698.90
14.6 Screed m2 45,581.90
14.7 Mortar utama kg 1,627.93

15 Bata
15.1 Bata merah bj 520.94
15.2 Bata ringan hebel m3 1,126,524.10
15.3 Bata tempel UNM m2

16 Granite
16.1 Granite tile 60x60 m2 211,250.00
16.2 Granite tile 40x40 m2 186,250.00
16.3 Granite tile 30x30 m2 187,500.00

19 Baja
19.1 Baja WF kg 11,147.50
19.2 Baja gording kg 9,555.00
19.3 Elektroda kg 30,625.00
PROYEK : PEMBANGUNAN GEDUNG PUSAT PELAYANAN AKADEMIK
UNIVERSITAS NEGERI MAKASSAR TAHAP III
LOKASI : JL. A.P. PETTARANI, GUNUNGSARI BARU, RAPPOCINI, MAKASAR

UPAH TENAGA KERJA

NO Uraian Tenaga Kerja Satuan Harga

I Tenaga Kerja
Mandor org/ hr 98,000.00
Kepala Tukang Batu org/ hr 85,750.00
Kepala Tukang Kayu org/ hr 85,750.00
Kepala Tukang Besi org/ hr 85,750.00
Kepala Tukang Las org/ hr 85,750.00
Tukang Batu org/ hr 67,375.00
Tukang Kayu org/ hr 67,375.00
Tukang Besi org/ hr 67,375.00
Tukang Las org/ hr 67,375.00
Pekerja org/ hr 49,000.00

También podría gustarte