LP A D LP LP A D LP LA INFORMACIÓN RELACIONADA A LAS BARDAS DE ESTE PROYECTO


7.00 7.00 DEBERA CONSULTARSE EN EL PLANO EJECUTIVO DE BARDAS DEL
0.075 4.40 2.525 0.075 4.40 2.525 FRACCIONAMIENTO.
LP LP LP LP
Barda Medianera h=1.20m. Barda h=1.20m.

h=1.20m.

h=1.20m.
LP 1' 2 5 LP

0.075
0.075
Barda
Patio Patio

Barda
N.P.
+0.38
N.S.P.
+6.157
0.15 0.15 N.S.P.

4.750

4.750
4.750

4.750
+5.957 N.S.L.A.
+5.755 N.S.L.A.

0.502
+5.655

0.100

0.165
Lavandería

0.165
N.B.
+0.40

0.100

0.2175
1'' Poliestireno
JUNTA CONSTRUCTIVA DE 1'' Lavandería Chaflán 10cm N.B.

Chaflán 10cm
(detalle)
N.B. A C D +0.42 GOTERON

+0.41

1.200
4 4 4.40 4 Chaflán 10cm 4
1.35 3.05

2.430

2.430

2.430
A

2.430
Recámara Recámara
1.350

5 5

1.0125
0.65
BAJANTE
Cocina N.P.T
N.S.L
+3.06

6.015
+3.06
SANITARIA

4 N.P.T

5.265
+2.8768

0.140
0.140
B B N.P.T

0.2175
+2.6932

0.23
GOTERON N.P.T GOTERON
N.F.T +2.5096
+0.49 VENTILA 2"Ø
N.P.T
N.S.L.E. Recámara +2.326
+3.06
Escalera N.P.T
+2.1424
0.75

3.450
N.P.T

1.200
Comedor

2.20
+1.9588
N.P.T
N.S.L.A. Pendiente 2.2 % N.S.L.A.

Chaflán 10cm
+1.7752
+5.755 +5.655 N.P.T

2.430
+1.5916

2.430
6.175

6.175
6.175

6.175
N.P.T

2.20
+1.408
Cocina

2.00
B Baño B N.P.T
+1.2242
Muro lateral
13 N.S.L.E. N.P.T (hasta altura
+1.0407
+3.06 N.P.T +1.9588)

0.1836
N.P.T

1.0125
12 N.F.T +0.8571
+0.31 VENTILA 3"Ø
PREPARACION
EXTRACTOR
11 3 EXTRACTOR
N.P.T
+0.6736 Muro lateral
(sólo si la escalera N.F.T

6.90
N.P.T +0.49 N.B.
se cuela con cimbra
N.B. +0.49 de madera) +0.41 N.P.
10 +0.34

16.00

16.00
16.00

16.00
+0.38

0.100
6.90

0.350
N.B.M.
9
N.F.T
Sala
N.S.L.E.
+3.06 2 N.C.
+0.00
+0.12

+0.49
8
Baja CORTE CORTE LONGITUDINAL
7 13 SUBE POLIDUCTO 1/2" DE AZOTEA
A-A' FACHADA A
2.420

VIENE POLIDUCTO DE 3/4" DE P.B.


ESC: 1:50
6 12 1.12
PREPARACION
EXTRACTOR
5 11
Colocar empastado
Sube

3.975
10 para dar pendiente

LP 5 4 3 1 1' LP

+5.957
9

N.S.P.
3.450
4 3 2 1
Recámara Chaflán 10cm
N.S.P. Chaflán 10cm
8
1 N.B.
1 7
1 +5.957 N.S.P.
+6.157
N.S.V.
1 N.S.P.
+6.157
+5.373

2.420
+0.34
6 N.S.L.E.

0.197
+3.06 N.S.L.A.
ACCESO +5.755

0.205
5

0.165

0.165
4 3

1 1'
0.075

1' A

2.53

2.53
1.05 3.40

5.075

5.075
5.075

5.075

4.45
Jardín Cochera Jardín Jardín Cochera Jardín
A B D'
N.S.L.

6.017
+3.06

5.365

0.14
0.14
GOTERON GOTERON
ARQ. PLANTA ARQUITECTÓNICA ALTA
02 FACHADA A ESC: 1:50

JUNTA CONSTRUCTIVA DE 1''

2.43

2.43
LP N.B.M
+0.14 LP LP LP

1.20
0.075 4.40 A 2.525 0.075 4.45 2.475
N.B. N.F.T.
7.00 7.00 N.P. +0.41 +0.49 N.B.
+0.34
+0.38

0.10
N.B.M. N.B.M.

0.35
+0.14 +0.12 N.C.
LP A D LP LP A D LP +0.00
ELEV ELEVACION IZQUIERDA
ARQ. PLANTA ARQUITECTÓNICA BAJA ARQ. PLANTA DE CONJUNTO 06 ESC: 1:50
01 FACHADA A ESC: 1:50 03 FACHADA A ESC: 1:50

LP A B D LP LP 1' 2 5 LP LP D C A LP LP A C D LP
N.S.P.
+6.157 N.S.P.
N.S.P. +6.157 N.S.P.
+5.957 +6.157
0.165 0.200

N.S.P.

0.200
0.502

N.S.L.A. +5.957 N.S.L.A.


0.202

0.502

N.S.L.A. +5.755 N.S.L.A. +5.762 N.S.L.A.

0.502

0.202
+5.655 N.S.L.A. +5.755 +5.652
N.S.V. +5.653
0.165

0.10

0.165

0.165
+5.373
0.165

0.165
1.40

0.165

0.165
0.10

GOTERON
GOTERON
1.20 0.60 1.20
GOTERON
GOTERON 0.60 GOTERON
GOTERON
Piña de 1'' Poliestireno

0.40

0.40
F
0.60

F
concreto (detalle)
F
F F

1.20

1.20
1.80

0.95
2.53

0.60
2.43

2.43
2.43

2.53

2.54
2.43

2.43
1.85
1.83
F
1.20

F 1.20 Baño Recámara

1.0125

1.0125
0.4125

N.S.L.
5.817
5.817

+3.06 N.S.L. N.S.L.


6.017

N.S.L. +3.06

5.767

5.767
+3.06

5.365
+3.06
0.14
0.14

5.195
0.14

5.095
0.14

0.14
0.14

0.14
0.14
GOTERON
0.95 1.20
GOTERON GOTERON
1.500 GOTERON 1.500
1.20

F
2.43

2.43

2.43
2.43
2.20

2.43

2.43

2.43

2.43
2.215

2.200
F F

BARDA MEDIANERA
1.0125

Cocina Comedor
1.20

1.20
N.F.T.
+0.49 N.B. N.F.T. N.B. N.F.T
N.F.T. +0.41 N.B. +0.41 N.F.T.
+0.49 N.P. +0.49 N.B.
+0.34 +0.34 N.B.
0.15

+0.49 N.P.
0.15

N.B.M. +0.38 +0.41 +0.37 (variable)

0.10
+0.38

0.10
+0.14 N.C. N.B.M. N.B.M.
0.35

+0.00 N.C. +0.12 +0.14


+0.00

ELEV ELEVACION PRINCIPAL ELEV ELEVACION DERECHA ELEV ELEVACION POSTERIOR CORTE CORTE TRANSVERSAL
04 FACHADA A ESC: 1:50 05 FACHADA A ESC: 1:50 07 ESC: 1:50 B-B' ESC: 1:50

FIRMAS SIMBOLOGÍA NOMENCLATURA REVISIONES TORRE LUNA


FRACCIONAMIENTO:
CAMBIO DE NIVEL N.B.M. NIVEL DE BANQUETA MUNICIPAL REVISIÓN FECHA OBSERVACIONES Y/O CAMBIOS
N.
+0.00 NIVEL N.P. NIVEL DE PATIO 01 12-MAYO-2020 REVISIÓN PROYECTO REV. 01 ÁGUILA REAL 63.001M2 112.000M2
ACCESO
ACCESO PRINCIPAL N.B. NIVEL DE BANQUETA PROTOTIPO: M2 CONSTRUCCIÓN: M2 TERRENO:
PLANTAS ARQUITECTONICAS PLANTA DE AZOTEA
A' CORTE N.F.T. NIVEL DE FIRME TERMINADO
ARQUITECTÓNICO ARQ ARQ01 DER 01 FACHADAS

CORTES FACHADA "A"


ARQ. ARQUITECTÓNICO N.S.L.E. NIVEL SUPERIOR DE LOSA DE ENTREPISO
DISCIPLINA CLAVE PLANO PASILLO No. PLANO DESCRIPCIÓN
INS. INSTALACIONES N.S.L.A. NIVEL SUPERIOR DE LOSA DE AZOTEA
EST. NOTA: ESTE PLANO Y SU CONTENIDO SON PROPIEDAD EXCLUSIVA DE CASAS
ESTRUCTURALES N.S.V. NIVEL SUPERIOR DE VOLADO JAVER, S.A. DE C.V., CONSIDERÁNDOSE ESTRICTAMENTE CONFIDENCIAL,
ARQ. JUAN CARLOS GALLEGOS DE LA ROSA ARQ. ERIK GABINO GONZALEZ BRIONES LIC. ERIKA GUADALUPE ESCOBEDO VILLA ARQ.JUAN CARLOS HERRERA HIDALGO ARQ. BERENICE MOCTEZUMA GONZALEZ LIC. CARLOS ESTEBAN MACIAS CASTILLO ING. FERNANDO PADILLA LORA
ACA. QUEDANDO POR LO TANTO ESTRICTAMENTE PROHIBIDA SU REPRODUCCIÓN
ACABADOS N.S.P. NIVEL SUPERIOR DE PRETIL
DIRECTOR UEN/PLAZA GERENTE DE DISEÑO JEFE DE COMPRAS JEFE DE COSTOS Y PRESUPUESTOS JEFE CONTROL ADMINISTRATIVO DE OBRA GERENTE COMERCIAL GERENTE DE CONSTRUCCIÓN TOTAL O PARCIAL SIN PREVIA AUTORIZACIÓN.
N.C. NIVEL DE CALLE
A NOTA:
LP A D LP LP A D LP LA INFORMACIÓN RELACIONADA A LAS BARDAS DE ESTE PROYECTO
7.00 DEBERA CONSULTARSE EN EL PLANO EJECUTIVO DE BARDAS DEL
7.00
0.075 4.40 2.525
0.075 4.40 2.525 FRACCIONAMIENTO.
LP LP LP LP
Barda Medianera h=1.20m. LP 1' 2 5 LP
h=1.20m.
Barda h=1.20m.

h=1.20m.
0.075
Barda
Patio

0.075
Patio

Barda
N.S.P.
N.P. +6.157
+0.38 N.S.P.
+5.957 N.S.L.A.
+5.755 N.S.L.A.

0.502
0.15
4.750

4.750
+5.655
0.15

4.750

4.750
0.100

0.165
0.165

0.100

0.2175
Lavandería N.B.
+0.40
1'' Poliestireno
GOTERON (detalle)
JUNTA CONSTRUCTIVA DE 1''
A C D Lavandería Chaflán 10cm N.B.

Chaflán 10cm

1.200
+0.42
N.B.
+0.41

4 4 4.40

2.430

2.430
4

2.430
4

2.430
1.35 3.05
Chaflán 10cm Recámara Recámara
A
1.350

1.0125
5 5 N.S.L

0.65
N.P.T +3.06

6.015
+3.06

Cocina N.P.T

5.265
+2.8768

0.140
0.140
BAJANTE
SANITARIA N.P.T

0.2175
+2.6932

0.23
GOTERON GOTERON
B B N.P.T
+2.5096
N.P.T
+2.326
N.F.T
+0.49 Escalera N.P.T
N.S.L.E.
+3.06
Recámara VENTILA 2"Ø
N.P.T
+2.1424
0.75

1.200
+1.9588
N.P.T

3.450
+1.7752
Comedor

2.20
N.P.T

2.430
+1.5916

2.430
N.P.T
N.S.L.A. Pendiente 2.2 % N.S.L.A.

2.20
Chaflán 10cm
+1.408
+5.755 +5.655
Cocina

2.00
N.P.T
6.175

6.175
+1.2242

6.175

6.175
Muro lateral
N.P.T
B Baño B +1.0407
(hasta altura
N.P.T +1.9588)

0.1836
N.P.T

1.0125
13 N.S.L.E. +0.8571
+3.06 N.P.T
Muro lateral
+0.6736 N.F.T
12 N.F.T (sólo si la escalera N.B.
N.P.T se cuela con cimbra +0.49
PREPARACION
EXTRACTOR
+0.31
3 VENTILA 3"Ø
N.B.
+0.34
+0.49 de madera) +0.41 N.P.

6.90
11 +0.38

0.100
EXTRACTOR

0.350
N.B.M.
10
16.00

16.00
N.C. +0.12

6.90

16.00

16.00
+0.00
9
N.F.T
Sala
N.S.L.E.
+3.06 2
8 +0.49
Baja
CORTE CORTE LONGITUDINAL
7 13

+5.957
N.S.P.
A-A' FACHADA B
2.420

6 12
SUBE POLIDUCTO 1/2" DE AZOTEA
VIENE POLIDUCTO DE 3/4" DE P.B. ESC: 1:50
PREPARACION
EXTRACTOR
1.12
5 11

3.975
Sube 10 Colocar empastado

9
para dar pendiente
LP 5 4 3 1 1' LP

3.450
Recámara Chaflán 10cm
4 3 2 1 8
Chaflán 10cm
1 N.B.
1 7 1
N.S.P.
+5.957 N.S.P.
+6.157 1 N.S.P.
+6.157

2.420
+0.34 N.S.V.
6 N.S.L.E. +5.373

0.197
+3.06 N.S.L.A.
ACCESO 5 +5.755

0.205
0.165

0.165
4 3

1 1'
0.075

1' 1.05 3.40 A

2.53

2.53
5.075

5.075

4.45

5.075

5.075
Jardín Cochera Jardín
A B D' Jardín Cochera Jardín
N.S.L.

6.017
+3.06

5.365

0.14
0.14
GOTERON GOTERON
ARQ. PLANTA ARQUITECTÓNICA ALTA
02 FACHADA B ESC: 1:50

JUNTA CONSTRUCTIVA DE 1''

2.43

2.43
LP N.B.M
+0.14 LP LP LP

1.20
0.075 4.40 A 2.525
0.075 4.45 2.475 N.B. N.F.T.
7.00 N.P. +0.41 +0.49 N.B.
7.00 +0.38 +0.34

0.10
N.B.M. N.B.M.

0.35
+0.14 +0.12 N.C.
LP A D LP LP A D LP
+0.00
ELEV ELEVACION IZQUIERDA
ARQ. PLANTA ARQUITECTÓNICA BAJA ARQ. PLANTA DE CONJUNTO 06 ESC: 1:50
01 ESC: 1:50 03 FACHADA B ESC: 1:50

LP A B D LP
LP 1' 2 5 LP LP D C A LP LP A C D LP
N.S.P.
+6.157 N.S.P. N.S.P.
N.S.P.
+6.157 +6.157
+5.957
0.165 0.200

N.S.P.

0.200
0.502

+5.957 N.S.L.A.
0.202

N.S.L.A. N.S.L.A. +5.762 N.S.L.A.

0.502
0.502

0.202
N.S.L.A. +5.755 N.S.L.A. +5.755 +5.652
N.S.V. +5.655 +5.653
0.165

0.165

0.165
0.10
+5.373

0.165
N.S.V.
2.60
0.165

0.165
+5.373

0.165
0.10

GOTERON
1.20 0.60 1.20
0.10

GOTERON GOTERON 0.60 GOTERON


GOTERON
GOTERON Piña de 1'' Poliestireno

0.40

0.40
F F
concreto (detalle)
F F F

1.20

1.20
1.80
2.53

0.60
2.43

1.80

2.53

2.54
2.43
2.43
2.43

2.43
1.85
1.83
F
Baño Recámara
1.20

F 1.20

1.0125

1.0125
0.4125

N.S.L.
5.817
5.817

+3.06 N.S.L.
N.S.L. N.S.L. +3.06

5.767

5.767
0.95
6.017

+3.06 +3.06
0.14

5.195
0.14

5.365

5.095
0.14

0.14
0.14

0.14
0.14
0.14

GOTERON
0.95 1.20
GOTERON GOTERON 1.500 GOTERON 1.500
1.20

F
2.43

2.43
2.20

2.43

2.43
2.43

2.43

2.43

2.43
2.215

2.200
F F

BARDA MEDIANERA
1.0125

Cocina Comedor

1.20
1.20

N.F.T.
+0.49 N.B. N.B. N.F.T
N.F.T. +0.41 N.B. N.F.T. N.F.T. +0.49 N.B.
+0.34 +0.49 +0.41 N.P. N.B. +0.49 N.P.
0.15

+0.34 +0.37 (variable)


0.15

N.B.M. +0.38 +0.41 +0.38

0.10
0.10
+0.14 N.C. N.B.M.
N.B.M.
0.35

+0.00 N.C. +0.12 +0.14


+0.00

ELEV ELEVACION PRINCIPAL ELEV ELEVACION DERECHA ELEV ELEVACION POSTERIOR CORTE CORTE TRANSVERSAL
04 FACHADA B ESC: 1:50 05 FACHADA B ESC: 1:50 07 ESC: 1:50 B-B' ESC: 1:50

FIRMAS SIMBOLOGÍA NOMENCLATURA REVISIONES TORRE LUNA


FRACCIONAMIENTO:
CAMBIO DE NIVEL N.B.M. NIVEL DE BANQUETA MUNICIPAL REVISIÓN FECHA OBSERVACIONES Y/O CAMBIOS
N.
+0.00 NIVEL N.P. NIVEL DE PATIO 01 12-MAYO-2020 REVISIÓN PROYECTO REV. 01 ÁGUILA REAL 63.001M2 112.000M2
ACCESO
ACCESO PRINCIPAL N.B. NIVEL DE BANQUETA PROTOTIPO: M2 CONSTRUCCIÓN: M2 TERRENO:
PLANTAS ARQUITECTONICAS PLANTA DE AZOTEA
A' CORTE N.F.T. NIVEL DE FIRME TERMINADO
ARQUITECTÓNICO ARQ ARQ01 DER 02 FACHADAS

CORTES FACHADA "B"


ARQ. ARQUITECTÓNICO N.S.L.E. NIVEL SUPERIOR DE LOSA DE ENTREPISO
DISCIPLINA CLAVE PLANO PASILLO No. PLANO DESCRIPCIÓN
INS. INSTALACIONES N.S.L.A. NIVEL SUPERIOR DE LOSA DE AZOTEA
EST. NOTA: ESTE PLANO Y SU CONTENIDO SON PROPIEDAD EXCLUSIVA DE CASAS
ESTRUCTURALES N.S.V. NIVEL SUPERIOR DE VOLADO JAVER, S.A. DE C.V., CONSIDERÁNDOSE ESTRICTAMENTE CONFIDENCIAL,
ARQ. JUAN CARLOS GALLEGOS DE LA ROSA ARQ. ERIK GABINO GONZALEZ BRIONES LIC. ERIKA GUADALUPE ESCOBEDO VILLA ARQ.JUAN CARLOS HERRERA HIDALGO ARQ. BERENICE MOCTEZUMA GONZALEZ LIC. CARLOS ESTEBAN MACIAS CASTILLO ING. FERNANDO PADILLA LORA
ACA. QUEDANDO POR LO TANTO ESTRICTAMENTE PROHIBIDA SU REPRODUCCIÓN
ACABADOS N.S.P. NIVEL SUPERIOR DE PRETIL
DIRECTOR UEN/PLAZA GERENTE DE DISEÑO JEFE DE COMPRAS JEFE DE COSTOS Y PRESUPUESTOS JEFE CONTROL ADMINISTRATIVO DE OBRA GERENTE COMERCIAL GERENTE DE CONSTRUCCIÓN TOTAL O PARCIAL SIN PREVIA AUTORIZACIÓN.
N.C. NIVEL DE CALLE
A D
0.225
Muro de block de 15cm espesor.
Muro de block de 15cm espesor.
LP A D (Rellenar con concreto
f'c=150kg/cm2 donde se (Rellenar con concreto
aparezcan varillas) f'c=150kg/cm2 donde se
aparezcan varillas)

0.10
Baja Malla
4.40 vs. 3/8 @60cm. N.F.T Electrosoldada 6-6/4-4 vs. 3/8 @60cm. PLANTA
0.075 (ver detalle 1)
+0.49 hasta L.I (ver detalle 1)

2
N.F.T

0.33 ó 0.27
+0.31
4 VC-1
4

0.40
Malla
VAR. 3/8" @ 0.60m.

0.40
Silletas PM-90
Electrosoldada Silletas SU-20
6-6/4-4 L.S.
Silletas Desplante sobre
Poliestileno Negro [VC-1]
Silletas SU-20 Cal.600
[VC-2] SU-20 [VC-2a] plataforma segun

Anclaje en losa
0.1
especificaciones de 5

0.07 ó 0.13
la mecanica de
VC-1

0.16 suelos
0.1
VC-1

SECCIÓN 1-1
0.225
2 5
0.40

0.2 ELEVACION
0.1
0
MALLA ELECTROSOLDADA
0.40 0.40

VC-2a
6-6/4-4
DETALLE 1
1.03

6.175

6.175
Simbolo en planta:

VC-1
Anclaje en losa de 0.07m. en muro
"1" 1 interior, y anclaje de 0.13m. en
1 4
VC-2

muros perimetrales.
VC-2a
VC-2
1.30

Muro de block de 15cm


espesor. Muro de block de 15cm
(Rellenar con concreto espesor.
0.40

f'c=150kg/cm2 donde se (Rellenar con concreto


VC-2a
1 Ø 3/8"@ 20 cms. A.S. aparezcan varillas) f'c=150kg/cm2 donde se
aparezcan varillas)
DET DETALLES DE CIMENTACIÓN
AHOGADO EN FIRME PARA vs. 3/8 @60cm. Baja Malla Baja Malla 02
0.40

N.F.T ESC: S/E


VC-1

ARRANQE DE ESCALERA (ver detalle 1) Electrosoldada 6-6/4-4 Electrosoldada 6-6/4-4 vs. 3/8 @60cm.
hasta L.I +0.49 hasta L.I (ver detalle 1)
VC-1

0.16
VC-1
Silletas SU-20 Silletas PM-90
Malla Electrosoldada 6-6/4-4 L.S.
Silletas SU-20
1.00 1.00 1.00
DETALLE
1 1 [VC-1] Poliestileno Negro [VC-1]
Cal.600

0.25 0.50 0.50 0.50 0.25


Desplante sobre plataforma segun
LONGITUDINAL especificaciones de la mecanica de
"2"

suelos

0.075 4.40 SECCIÓN 2-2

1.00
4.48

LP A D CORTES CORTES DE CIMENTACIÓN


01 ESC: 1:25

armado con armex 15-30-4 grado 60

1.00
EST PLANTA DE CIMENTACIÓN

0.11
0.16
01 ESC: 1:50 ARMADO DE
LOSA DE ESCALERA:
PARRILLA DE
VRS. #3 @ 0.25m. 0.30 0.06

0.05
0.25 0.50 0.50 0.50 0.50 0.50 0.25
VC-1
DETALLE DE VC-1

ESTE HUECO SE RELLENARÁ CON


0.5
5 ARMADO DE AMARRE
A FIRME:
SILLETAS EN LOSA
VRS #3 @ 0.20m.
MATERIAL INERTE Y SE CERRARÁ
CON BLOCK No6 SÓLO SI LA ESCALERA armado con armex
SE CUELA CON CIMBRA DE MADERA 15-30-4 grado 60
MALLA DE ACERO
(VER PLANO DE CIMENTACION)
NOTAS GENERALES

0.095
LOSA DE CIMENTACION

0.025
ESPESOR 12cm Los planos estructurales se consideran como planos de ingeniería basica y los planos
arquitectónicos rigen en cuanto a cotas y niveles.
0.30 Todos los planos estructurales deberán sujetarse a estas especificaciones y las contenidas

0.30
en la memoria de cálculo.

0.11
El control de calidad de los materiales deberá efectuarse mediante los procedimientos
de prueba indicados en las NMX vigentes.
En caso de presentarse en obra condiciones diferentes a las reportadas por la mecánica
de suelos (utilizada en el diseño estructural) deberá informarse al departamento de
DET DETALLE DE SECCIÓN DE ARRANQUE DE ESCALERA 0.160.06 PROYECTOS para los ajustes correspondientes.
Acotaciones en metros.
03 ESC: S/E (excepto indicado).
15.00cm

Las cotas rigen al dibujo.


VC-2 LONGITUD DE DESARROLLO, TRASLAPE Y ANCLAJE
15.00cm ANCLAJE ESTRIBOS TRASLAPE ARMEX TRASLAPE MALLA
DETALLE DE VC-2 ELECTROSOLDADA
2.5 cm 8 cm PARA # 2
12 cm PARA # 3
K-1 Castillo de 15x15 cm
35cm

0
135

30cm
armado con armex
SIMBOLOGIA EN CIMENTACION 15-30-4 grado 60 5cm 5cm
30cm

ELECTROSOLDADA
ESPECIFICACIONES
A-A Varillas de Traslape NOTAS GRALES.
CIMENTACION
SE DEBERÁ COLOCAR MALLA POR 1.- El terreno de desplante de cimentación deberá ser tratado
NOTA 1: Debido a que el acabado final del
piso de los casas será la losa de cimentación (no
con pesticida contra termitas.
LECHO SUPERIOR Ó INFERIOR 2.- La losa de cimentación se aislará del terreno con polietileno
habrá nivelación con empastado), se deberá
garantizar una perfecta nivelación y rebosado
15.00cm

DONDE SE INDIQUE REFUERZO EN


20.00 cm

negro calibre 600.

0.30
en el colado de la losa.

0.11
LA PARTE BAJA DE LOS MUROS. NOTA 2: El curado del concreto deberà
ser por medio de membrana.
LOSA
II. CONCRETO / MORTERO
40.00cm
60 cm ESPECIFICACIONES
ESCALERILLA
0.160.06 f'c T.M.A. REV. RECUBR. ADITIVOS VIBRADO CURADO
ELEMENTO/FUNCION (Tamaño máximo
0.60

(kg/cm2) (cm) (cm)

K-3 Castillo de 15x20x40 cm SE COLOCARÁ EN TODO EL


del agregado)
(mm)

VC-2a
60 cm

Necesidades de
200 19 14 2
0.60

Losa de Cimentaciòn Mecánico Membrana


PERIMETRO DE LA LOSA, SE Avance

ARMARÁ CON VAR. 3/8" Y CON


DET DETALLES DE CASTILLOS
01 ESC: S/E 20.00 cm DETALLE 1 SEGÚN SE INDICA.
DETALLE DE VC-2a NOTA:
LOSA

UA Union de esquina conexion entre trabes LA INFORMACIÓN RELACIONADA A LAS BARDAS DE ESTE PROYECTO DEBERA
CONSULTARSE EN EL PLANO EJECUTIVO DE BARDAS DEL FRACCIONAMIENTO.

FIRMAS SIMBOLOGÍA NOMENCLATURA REVISIONES TORRE LUNA


FRACCIONAMIENTO:
CAMBIO DE NIVEL N.B.M. NIVEL DE BANQUETA MUNICIPAL REVISIÓN FECHA OBSERVACIONES Y/O CAMBIOS
N.
+0.00 NIVEL N.P. NIVEL DE PATIO 01 12-MAYO-2020 REVISIÓN PROYECTO REV. 01 ÁGUILA REAL 63.001M2 112.000M2
ACCESO
ACCESO PRINCIPAL N.B. NIVEL DE BANQUETA PROTOTIPO: M2 CONSTRUCCIÓN: M2 TERRENO:
PLANTAS DE CIMENTACIÓN
A' CORTE N.F.T. NIVEL DE FIRME TERMINADO ESTRUCTURAL EST EST-01 DER. 03 DETALLES DE CIMENTACIÓN
ARMADOS DE CASTILLOS Y CERRAMIENTOS
ARQ. ARQUITECTÓNICO N.S.L.E. NIVEL SUPERIOR DE LOSA DE ENTREPISO
DISCIPLINA CLAVE PLANO PASILLO No. PLANO DESCRIPCIÓN
INS. INSTALACIONES N.S.L.A. NIVEL SUPERIOR DE LOSA DE AZOTEA
EST. NOTA: ESTE PLANO Y SU CONTENIDO SON PROPIEDAD EXCLUSIVA DE CASAS
ESTRUCTURALES N.S.V. NIVEL SUPERIOR DE VOLADO JAVER, S.A. DE C.V., CONSIDERÁNDOSE ESTRICTAMENTE CONFIDENCIAL,
ARQ. JUAN CARLOS GALLEGOS DE LA ROSA ARQ. ERIK GABINO GONZALEZ BRIONES LIC. ERIKA GUADALUPE ESCOBEDO VILLA ARQ.JUAN CARLOS HERRERA HIDALGO ARQ. BERENICE MOCTEZUMA GONZALEZ LIC. CARLOS ESTEBAN MACIAS CASTILLO ING. FERNANDO PADILLA LORA
ACA. QUEDANDO POR LO TANTO ESTRICTAMENTE PROHIBIDA SU REPRODUCCIÓN
ACABADOS N.S.P. NIVEL SUPERIOR DE PRETIL
DIRECTOR UEN/PLAZA GERENTE DE DISEÑO JEFE DE COMPRAS JEFE DE COSTOS Y PRESUPUESTOS JEFE CONTROL ADMINISTRATIVO DE OBRA GERENTE COMERCIAL GERENTE DE CONSTRUCCIÓN TOTAL O PARCIAL SIN PREVIA AUTORIZACIÓN.
N.C. NIVEL DE CALLE
A
LP A D LP LP A D LP
7.00
7.00
0.075 4.40 2.525
0.075 4.40 2.525

A C D LP A B D LP D C A LP
LP LP LP LP PIÑA DE
Barda Medianera h=1.20m.

h=1.20m.
PIÑA DE K-4 CONCRETO
Barda Medianera h=1.20m.

h=1.20m.
N.S.P. N.S.P.
4.40 CONCRETO

0.075
Barda +6.157 +6.157
Patio

0.075
N.S.P. N.S.P.

0.200
Barda
1.35 3.05 Patio +5.957

0.165 0.200
+5.957
N.P. A N.S.L.A.

0.502
+0.38

0.202
0.202
3 PZA N.P. N.S.L.A. +5.755
3.20 +0.38 K-3 +5.653
K-3

0.165
h= 9 hiladas
CE-1
K-1 K-1

0.60 x 0.40
K-3 hc=2.212m K-3 N.S.V.
0.15

0.165
4.750

4.750
5 5 0.15
+5.373

4.750

4.750
1.40

0.65

A
BU 2+0.04m PZA CE-1 CE-1 CE-1 PIÑA DE

0.10
2+0.04m PZA 1.20 0.60

0.65
hc=0.8175m 0.30 LOSA DE AZOTEA GOTERON GOTERON

0.50
0.85 1.20 0.85 1.125 1.125 K-2 CONCRETO
CE-11.35

0.40
1.075 1.075

h= 5 hiladas
GOTERON
K-1 hc=2.222m K-3 PIÑA DE LOSA DE AZOTEA K-3 F
Lavandería BU

1.20 x 1.20
N.B.

0.15
K-6
+0.40
4 K-1 N.B. CONCRETO K-6

0.95
BU 1+0.20m PZA +0.40
F

1.20
hc=1.6275m
JUNTA CONSTRUCTIVA DE 1'' F K-1 K-1

0.95
2.30 1.51 0.545 0.60 0.60 K-2 K-3
1+0.19m PZA JUNTA CONSTRUCTIVA DE 1''

1.80
K-3

2.53
N.B. CE-1

2.53
0.60
Recámara

2.43
CE-1 +0.41 N.S.L.E.
N.B.

5+0.04m PZA
K-1 K-1 K-3 hc=2.20m K-3 K-1 +3.06
+0.41 K-2b

0.15
4 4 K-3

5+0.04m PZA

1.83
4

3.450
4

8+0.08m PZAS
2.20

3.30
Límite de Vivienda

2.05

2.05
3 PZAS 2 PZAS+0.20m PZA 1 PZA

2.20
F

h= 0.10 m
K-1

SARDINEL
1.20 1.00 1.51 0.40 BU

1.20

1.0125
F
h= 0 hiladas
0.15 K-3

1.075
K-3 1.20
BU
1.350

1.50 x 2.20

1.350

0.4125
N.S.L. LOSA DE ENTREPISO N.S.L.

A'

5.767
Baño

5.817
B B +3.06 +3.06
0.15

0.14

0.14
N.S.L.E.

0.14
+3.06 0.86

0.15
Cocina 1+ 0.20m PZA CE-1 K-3 GOTERON
CE-1 1.20 1.500
CE-1

6 + 0.31m PZA
K-1 0.95

1+0.05m PZA 1+0.19m PZA


GOTERON
2.725

2.725
LOSA DE ENTREPISO
BAJANTE
3 K-1

6.100
6 + 0.31m PZA

SANITARIA K-1

6.90
BAJANTE

0.60
K-3 K-1 hc=2.20m

1.05
SANITARIA
B B 0.44
0.15
0.76
1.89

0.955

1.20
2.20 4+0.34m PZA K-3 K-3 K-1

6.90

1.05
N.F.T

1.20
B B'
+0.49
0.90 0.15
N.S.L.E.
+3.06
K-1 K-2b 2 N.F.T
+0.49
F
K-1

6.325

0.45
Baja 1.94

2.43

2.43

2.43
4.25 K-3

2.215
K-1 K-3

2.20
CE-1
Comedor F

0.15
13

0.15
0.15 BU

Límite de Vivienda

Límite de Vivienda
K-1

1.05
0.90 12 hc=2.20m 0.30m K-1
0.15
0.15

PZA
K-1 K-1 K-1 PREPARACION
0.86 K-1 K-3
6.175

6.175

1.0125
EXTRACTOR
6.325

11
0.30 0.15
6.325

K-3

1.20
2 +0.10m PZA

6.175

6.175
hc=2.00m

3.975
CE-1

5+0.34m PZAS
10

3.825
0.76

13 N.F.T. N.F.T.
+0.49 N.B. N.B. +0.49 N.P.
9 N.F.T. +0.41 +0.41 +0.38

3.450
+0.34

0.10
12 N.F.T
Recámara

0.15

0.15
3.30
4 PZAS
1.600

9+0.20m PZA
+0.31 N.B.M.

1.05
PREPARACION N.F.T
0.15

8 +0.14

2.775
EXTRACTOR +0.31
K-1 N.C.

6+0.21m PZA
11 PREPARACION
1 + 0.29 m PZA

2.63
EXTRACTOR +0.00
0.30 7
10
16.00

16.00

2.420
7 + 0.33 m PZA
0.69

16.00

16.00
6 N.S.L.E.
ELEV ELEVACIÓN FRONTAL ELEV ELEVACIÓN POSTERIOR

h= 12 hiladas
9 +3.06
2 +0.10m PZA Sala
3.150

Muro deN.F.T

0.60 x 1.20
block No. 6
5 K-1 ESC: 1:50 ESC: 1:50
0.15

8 +0.49 N.F.T

h= 5 hiladas
K-1 K-1 Altura = 1.50m +0.49

1.05
2 PZAS
1.20 x 1.20
1+ 0.10m

0.80
0.50

3.20

CE-1
2.420

0.075 0.60 0.225 1.000 1.20 1.050

2.420
2.82
PZA

6
7 + 0.07 m PZA

CE-1 3 PZA
4 hc=1.20m 3 CE-1
2+0.19m PZA hc=2.212m K-5 2+0.10m PZAK-5
0.38
1
h= 5 hiladas

0.10
5

0.225
1'
1.20 x 1.20

1.43 K-2 K-3

0.05
Sube K-2
0.90

3 PZAS 1.05 K-3 BU


LP 1' 2 5

0.075
0.15
hc=0.8175m K-1 K-2b
LP

1.05
0.075
0.90 0.40 0.960 0.64 1.20 3.250
0.15
4
2 +0.10m PZA
3 2
1 PZA
1
CE-1
hc=2.20m 1+0.23m PZA
CE-1
hc=2.212m
1' 1.05 3.40 A
0.10
0.05 PIÑA DE
K-1 CONCRETO
1 1

AL NIVEL SUPERIOR
N.S.P.
4.45 1 Límite de Vivienda 1

DE LA VENTANA
+6.157
0.30

N.B. K-1 K-3 K-3 K-3 BU K-1 K-3 K-3

0.30
+0.34 hc=0.8175m
N.B.
+0.34 N.S.L.A.
LOSA DE AZOTEA

0.502
1.60
ACCESO
0.96 1.80
A B D' 0.85 0.85 ACCESO 1.125 1.125
N.S.L.A.
+5.655
+5.755

0.10
0.30

0.165

0.165
1.18
CE-1 GOTERON

DES DESPLANTE DE MUROS

0.40
GOTERON

02 PLANTA ALTA ESC: 1:50

0.60

0.40
K-6
MALLA POLIFLEX REFORZADO 0.40 M, APLICADA K-1

8+0.38m PZA

0.880
DESPUÉS DE ESTUCO, CON IMPERMEABILIZANTE 0.95
ACRÍLICO 5 AÑOS MARCA PROTEXA COLOR K-2b

2.43
2.43
0.60 SUBE POLIDUCTO 1/2" DE AZOTEA 0.60 BLANCO COMO ADHESIVO
5.075

5.075

VIENE POLIDUCTO DE 3/4" DE P.B.


K-2b

5.075

5.075
5.00

1.12
Jardín Cochera Jardín

0.880
0.15 Colocar empastado Jardín Cochera Jardín
para dar pendiente
N.S.L.
1+0.20m PZA

0.15

6.017
LOSA DE ENTREPISO +3.06

+5.957
0.90 3.25

N.S.P.

5.365
0.60

Chaflán 10cm

0.14
0.14
N.S.P. Chaflán 10cm

1 +5.957 N.S.P.
GOTERON GOTERON

0.880
+6.157
K-3 2+0.09m PZA N.S.V.

0.40
K-4 8+0.04m PZA +5.373 K-3
1.05 3.13 0.075
0.15 0.15
0.075 4.45 K-1 K-1

0.880
7.00

2.43

2.43
LP N.B.M
LP LP A D 1.70

BARDA MEDIANERA
+0.14
LP N.B.M
+0.14 LP K-1

1.20
0.075 4.40 A 2.525 N.F.T. N.B.
0.075 4.40 2.525 N.B.
+0.49 +0.41 N.P.
7.00 +0.34
+0.38
DES DESPLANTE DE MUROS 7.00

0.10
N.B.M. N.B.M.

0.35
+0.12 +0.14
02 PRETIL N.C.

0.20
MALLA POLIFLEX REFORZADO 0.20 M, APLICADA
LP A D LP ESC: 1:50
LP A D LP
+0.00

ELEV ELEVACIÓN LATERAL DERECHA DESPUÉS DE ESTUCO, CON IMPERMEABILIZANTE


ACRÍLICO 5 AÑOS MARCA PROTEXA COLOR
ESC: 1:50 BLANCO COMO ADHESIVO
DES DESPLANTE DE MUROS Banqueta de concreto

01 PLANTA BAJA ESC: 1:50 Cocina 8cm. de espesor,


f'c= 100 Kg/cm²
Comedor Pasillo
N.F.T Patio acabado escobillado N.F.T
+0.49 N.B. N.B. +0.49 N.B. NIV NIVELES DE BANQUETA
+0.41 +0.39 +0.398 (variable)
01 1 1'
0.95 0.30
ESC: 1:50
LP 5 4 3 LP
0.08

N.S.P.
PIÑA DE PIÑA DE +6.157
20.00cm

CONCRETO CONCRETO

0.197
N.S.L.A.
LOSA DE AZOTEA

0.40
+5.755
DET DETALLES DE CAMBIOS DE NIVEL

0.205
0.165

0.165
15.00cm 02 ESC: S/E K-3
N.S.L. N.S.L. K-1

AMARRE CON LOSA


CE-1 Cerramiento de 15x20 cm CASTILLOS +3.06 +3.06 K-1 K-1

0.30
14 14
0.14

14

0.1839
MALLA POLIFLEX REFORZADO 0.40 M, APLICADA
13 K-1
0.2175

13 13

0.1835 0.1835 0.1835 0.1835 0.1835


DESPUÉS DE ESTUCO, CON IMPERMEABILIZANTE
GOTERON
K-1

2.53

2.53
12 12 ACRÍLICO 5 AÑOS MARCA PROTEXA COLOR
N.F.T

0.1835 0.1835 0.1835 0.1835 0.1835


12
+0.31 BLANCO COMO ADHESIVO
11 11 PREPARACION
RACION
EXTRACTOR
RACTOR
Escalera 0.28 11 K-1
22.00cm

15.00cm

10 10
0.1835

LAS VARILLAS DENTRO


0.75 Preparación
15.00cm

AHOGAR EN MEZCLA
9
1.200

9 10
extractor
0.1835

DEL MURO
8

0.40
8
9 N.S.L. LOSA DE ENTREPISO

6.017
4 Ø 3/8 @ 25 cms.
15.00cm 40.00cm 7 +3.06
15.00cm 7
2.43

N.F.T

5.365
0.90 8 +0.49

0.14
0.14
6 6 K-1 K-1
0.42 0.48
2.00

K-1 Castillo de 15x15 cm K-2 Castillo de 15x22 cm K-3 Castillo de 15x20x40 cm 5 5 7


GOTERON GOTERON

0.48 0.42

2.420
1.468

4 4
0.46 6 K-1 Bajante
0.1836

4 Ø 3/8 @ 25 cms.
1.0125

3 4 Ø 3/8 @ 25 cms. 3 Sanitaria K-1 K-1 K-1


0.1835 0.1835

4 Ø 3/8 @ 25 cms.
2 N.S.F. 2 5 JUNTA CONSTRUCTIVA DE 1''
0.1835

1 +0.49
1 1.35
Sube AMARRE CON FIRME 2.42
0.1835

2.43

2.43
4 Ø 3/8 @ 25 cms.
22.00cm
20.00cm

15.00cm

AMARRE CON FIRME


4 3 2 1
K-1

1.20
15.00cm
nota: 1
1.- Cuando la escalera se cuele con cimbra
15.00cm 10.00cm de madera, este hueco deberá rellenarse N.B. K-1 K-3 N.B. N.F.T.
con material inerte y deberá confinarse con N.P. +0.41 +0.49 N.B.
block de concreto (ver desplante de muros). +0.38 +0.34

0.10
K-4 Castillo de 15x22 cm 2.- Cuando la escalera se cuele con cimbra
metálica, este hueco quedará expuesto: N.B.M.
K-5 Castillo de 10x15 cm N.B.M.

0.35
K-2b Castillo de 15x20 cm sin relleno ni muro de block. A +0.14 +0.12 N.C.

0.20
MALLA POLIFLEX REFORZADO 0.20 M, APLICADA +0.00

DET ARMADOS ESTRUCTURALES DET DETALLES DE ESCALERA DESPUÉS DE ESTUCO, CON IMPERMEABILIZANTE
ACRÍLICO 5 AÑOS MARCA PROTEXA COLOR ELEV ELEVACIÓN LATERAL IZQUIERDA
01 ESC: S/E 03 ESC: S/E
BLANCO COMO ADHESIVO
ESC: 1:50

FIRMAS SIMBOLOGÍA NOMENCLATURA REVISIONES TORRE LUNA


FRACCIONAMIENTO:
CAMBIO DE NIVEL N.B.M. NIVEL DE BANQUETA MUNICIPAL REVISIÓN FECHA OBSERVACIONES Y/O CAMBIOS
N.
+0.00 NIVEL N.P. NIVEL DE PATIO 01 12-MAYO-2020 REVISIÓN PROYECTO REV. 01 ÁGUILA REAL 63.001M2 112.000M2
ACCESO
ACCESO PRINCIPAL N.B. NIVEL DE BANQUETA PROTOTIPO: M2 CONSTRUCCIÓN: M2 TERRENO:
PLANTA DE DESPLANTE DE MUROS

ESTRUCTURAL
NIVELES DE BANQUETAS
A' CORTE N.F.T. NIVEL DE FIRME TERMINADO DETALLES DE CASTILLOS Y CERRAMIENTOS
EST EST-03 DER 05 ELEVACIONES CONSTRUCTIVAS
DETALLE DE ESCALERA
ARQ. ARQUITECTÓNICO N.S.L.E. NIVEL SUPERIOR DE LOSA DE ENTREPISO
DISCIPLINA CLAVE PLANO PASILLO No. PLANO DESCRIPCIÓN
INS. INSTALACIONES N.S.L.A. NIVEL SUPERIOR DE LOSA DE AZOTEA
EST. NOTA: ESTE PLANO Y SU CONTENIDO SON PROPIEDAD EXCLUSIVA DE CASAS
ESTRUCTURALES N.S.V. NIVEL SUPERIOR DE VOLADO JAVER, S.A. DE C.V., CONSIDERÁNDOSE ESTRICTAMENTE CONFIDENCIAL,
ARQ. JUAN CARLOS GALLEGOS DE LA ROSA ARQ. ERIK GABINO GONZALEZ BRIONES LIC. ERIKA GUADALUPE ESCOBEDO VILLA ARQ.JUAN CARLOS HERRERA HIDALGO ARQ. BERENICE MOCTEZUMA GONZALEZ LIC. CARLOS ESTEBAN MACIAS CASTILLO ING. FERNANDO PADILLA LORA
ACA. QUEDANDO POR LO TANTO ESTRICTAMENTE PROHIBIDA SU REPRODUCCIÓN
ACABADOS N.S.P. NIVEL SUPERIOR DE PRETIL
DIRECTOR UEN/PLAZA GERENTE DE DISEÑO JEFE DE COMPRAS JEFE DE COSTOS Y PRESUPUESTOS JEFE CONTROL ADMINISTRATIVO DE OBRA GERENTE COMERCIAL GERENTE DE CONSTRUCCIÓN TOTAL O PARCIAL SIN PREVIA AUTORIZACIÓN.
N.C. NIVEL DE CALLE
SEPARACIÓN DE
BOVEDILLAS NORTE
A C D 14 14 14 20
MACIZO DE 4.40 CAPA DE
LP A CONCRETO D 1.35 3.05
20 4
15 20 COMPRESIÓN
T-3 ARMEX 15-15-4 ARMEX 15-20-4 ARMEX 15-20-4
0.075 5 5 +2Ø1/4" G-60 10 ESPESOR DE

N-1
+2Ø1/4" G-60 +2Ø1/4" G-60

T-2

0.65
D BOVEDILLA LOCALIZACION
+1Ø5/16" G-60
4 4 4 3 T-1 T-2
110 1 110
AR CR D T-3 CIMBRA
A C 1 D
4Ø1/4" G-60

3.450
DETALLES DE VIGAS

2.20
EST
110 1 110
1 PLANTA ESQUEMATICA
A C D 04 SIN ESCALA LECHO SUPERIOR

2.875
2 bastones MACIZO DE
64.5
5/16+1 de
110 1 110 2 bastones
5/16 +1 de
A C 1 D CONCRETO
VARILLAS 32" 5
N-1 NOTAS:
1/4 G60 3 1
1/4 G60 A C D @30cm

6.90
110 1 110
INDICA INICIO DE DESPIECE DE ALIGERANTES
2 DALA DE BORDE

6.90
B C 1 D 2
2 # 3 CON
6.175

6.175
14 1' N.S.P. 1' N.S.P. Traslape, Diam. de doblez (D,DE)
75 2 75
4 E # 2 @ 20 CM +6.157 y Longitudes de Ganchos (A,B,C)
B C D +6.157
2 bastones VIGUETA No.
Diámetro Longitud de Traslape
75
2 75 2 bastones 4 de pulg. A B C de doblez Lecho Superior Otras Varillas
1
4 G60
B C D BOVEDILLA DE Var. f'c f'c f'c f'c f'c f'c f'c f'c

3.975
1 D DE 150
4 G60
MURO 200 250 300 150 200 250 300
4 CEMENTO - ARENA 2.5 5/16 6.5 9.6 7.9 4.8 3.2 37 37 37 37 30 30 30 30

3.450
75
2 75 B C D 3 3/8 6.5 11.4 9.5 5.7 3.8 44 44 44 44 32 32 32 32
MACIZO DE CORTE MURO - BOVEDILLA 4 1/2 6.5 15.2 12.7 7.6 5.1 50 50 50 50 42 42 42 42
CONCRETO B C 4 D BOVEDILLA DE 10 CM 5 5/8 6.5 19.0 15.9 9.5 6.4 73 73 73 73 54 53 53 53
75 2 75
T-1

0.05 m DE 6 3/4 7.6 22.9 19.0 11.4 11.4 108 94 88 88 77 67 63 63


K-2b K-2b

0.40
ENTREPISO

0.40
1.550

ANCHO B C 4 D 8 1 10.2 30.6 25.4 15.3 15.3 190 165 148 135 138 118 106 96
10 1 ¼ 12.7 38.1 31.8 25.4 25.4 297 257 230 210 212 184 165 150

0.80
75 2 75
BR CR 4 DR VARILLAS 5 32" BOVEDILLA DE NOTAS:
1 1 1 1' @30cm CEMENTO - ARENA *NO SE PODRA TRASLAPAR MAS DE UN 50% DE UN MISMO PUNTO.
*SE DEBERA AUMENTAR LA LONGITUD DE TRASLAPE EN PAQUETES DE

1.40
1.050

0.075
3 VARILLAS EN UN 20% Y EN PAQUETES DE 4 VARILLAS EN UN 33%.
0.075 4.40 .EXTENDER 1' 1.05 3.40 4 K-5 *EL REFUERZO EN COLUMAS SOLO SE PODRA TRASLAPAR EN LA MITAD
DEL ENTREPISO.
4.48 PARRILLA DE 4.45 14 10
VS 5/32
Detalles de Dobleces del Acero de Refuerzo
LP A D HASTA BORDE A B D'
DE AMBOS 66

0.40
Losa de vigueta y bovedilla de
cemento-arena Concreto fc=200 kg/cm2 MACIZO DE VOLADOS
Losa de vigueta y bovedilla de Poliestileno
CORTE DE LOSA K-5 D B D

de 14 cm de espesor, vigueta 10-64 (ver CONCRETO Concreto fc=200 kg/cm2 de 16.5 cm de BOVEDILLA DE 10 CM DE
detalles de armado), bovedilla de 10 cm y 4 0.075 m DE Gancho 180° Gancho 90° Estribo
espesor, vigueta 10-64 (ver detalles de
cm de patin de compresion, reforzada con ANCHO armado), bovedilla de 12.5 cm y 4 cm de patin ENTREPISO
parrilla vs 5/32 @ 30cm de compresion, reforzada con malla 66-1010
RECUBRIMIENTOS
50 EN LOSAS...................r =2.0cms. EN DADOS...................r =5.0cms.
EST LOSA DE ENTREPISO EST LOSA DE AZOTEA K-2b EN TRABES.................r =3.0cms.
EN COLUMNAS............r =4.0cms.
EN RAMPAS.................r =2.0cms.
EN CASTILLOS, CERRAMIENTOS,
01 ESC: 1:50 02 Y DALAS......................r =2.0cms.
ESC: 1:50 EN ZAPATAS................r =5.0cms.

0.80
EN CONTRATRABES......r =5.0cms. EN MUROS DE
CONTENCION................r =3.0cms.
DALA DE BORDE

0.40
N.S.L. N.S.L.
N-1 2 # 3 CON 16.5
E # 2 @ 20 CM +3.06 K-2b +3.06
MODIFICACIONES / REVISIONES
VIGUETA No. CONCEPTO FECHA APROBO
MURO BOVEDILLA DE
POLIESTIRENO
CORTE MURO - BOVEDILLA
DET DETALLE CASTILLO COMBINADO DET DETALLE CASTILLO COMBINADO
AZOTEA 06 FACHADA A 07 FACHADA B
SIN ESCALA SIN ESCALA
VIGUETA 1 (AZOTEA) VIGUETA 1 (ENTREPISO) VIGUETA 2 (ENTREPISO)
MALLA BOVEDILLA DE
6X6-10/10 46.5 POLIESTIRENO
NOTAS GENERALES:
- ACOTACIONES EN METROS
4 - DETALLES EN CMS
16.5 12.5 5 - LAS COTAS RIGEN AL DIBUJO
5 A C D
2.5 CONSULTARSE CON LA DIRECCIÓN DE OBRA
4.40
41.5 1.35 3.05 A

COORD. EJECUTIVA:
53.5 5
K-1 K-3 K-3 K-1
5 Gabinete de Estudios y Consultorias ING. MANUEL JEZZINI
COLABORADORES:

0.65
CORTE DE LOSA 4
K-1 K-3
K-1
manueljezzini@gmail.com
VIGUETA 4 (AZOTEA) PLACA DE POLIESTIRENO DE 1"
VIGUETA 3 (AZOTEA) AZOTEA DE ESPESOR ENTRE MURO Y GeyCo Tel. 83 46 21 60
N.S.L.E.
+3.06
Recámara LOSA DE AZOTEA, PARA EVITAR
CONTACTO ENTRE ESTOS DOS GEOHIDROLOGIA Y CONSTRUCCION

3.450
2.20
ELEMENTOS.

B Baño B
EST DETALLES DE VIGUETAS N.S.L.E.

03
+3.06
K-3 PROYECTO:
AGUILA REAL CLAVE DEL
K-1
SIN ESCALA CERRAMIENTO O 3

6.90
K-3 K-1
DALA A NIVEL DE CERRAMIENTO O CASTILLO PLANO

6.90
LOSA DALA A NIVEL DE N.S.L.E.
+3.06
K-1 K-2b 2
2#3 LOSA 2#3 Baja
CERRAMIENTO K-1 K-3

ES-02
13

CE-1
0.10
PREPARACION
EXTRACTOR
12 K-1
PLANO:
Armado de vigas
11
+ 2VS 3/8

3.975
10

CANTIDADES DE OBRA 23 23
9

3.450
Recámara PLACA DE POLIESTIRENO DE 1"
8
DE ESPESOR ENTRE MURO Y
2#3
0.10

CONCRETO MALLA 2#3 7


BOVEDILLA BOVEDILLA POLIESTIRENO VIGUETAS VARILLAS 5 32" 23 LOSA DE AZOTEA, PARA EVITAR

2.420
BASTONES Ø 5/16" G-60 BASTONES Ø 1/4" G-60
ÁREA 23
6 N.S.L.E.
+3.06
CONTACTO ENTRE ESTOS DOS FIRMA:
LOSA EN OBRA CEMENTO - ARENA DE 6 M 6X6-10/10 5 K-1
ELEMENTOS.
(M²) TIPO CANTIDAD DIMENSIONES (CM) TIPO CANTIDAD LONGITUD (M) (PIEZAS)
(M³) (PIEZAS) (M²) CANTIDAD LONGITUD CANTIDAD LONGITUD
16 110 16 110 ESTRIBOS VENTANA
- - - 1 4 4.35 (0) 1
4 3
K-5 K-5
VS 1/4@20cm K-2 K-3 1'
- - - 2 6 3.29 (0) 18 75 CASTILLO K-2 K-3
K-1 K-2b

0.075
ENTREPISO 28.01 1.54 178 - - - - - - 28 - 1' 1.05 3.40 A
- - ELEVACIÓN ELEVACIÓN 4.45
- - - - - -
- - - - - - DETALLES DE UNIÓN DE A B D'
A 5 12.5 X 53.3 X 50 3 1 3.00 (0) CASTILLOS A DALAS O FECHA: ESCALA GRAFICA:
B 7 12.5 X 53.3 X 60 1 5 4.35 (0) DETALLE DE VOLADO
AZOTEA 31.29 1.72 - - 32 - - - - CERRAMIENTOS
C 12 12.5 X 53.3 X 75 4 6 4.40 (0) SOBRE VENTANA EN DET POLIESTIRENO SOBRE MUROS NO CARGADORES JUNIO/2020
D 13 12.5 X 53.3 X 300 - - - FACHADA PRINCIPAL 05 ESC: 1:75

FIRMAS SIMBOLOGÍA NOMENCLATURA REVISIONES TORRE LUNA


FRACCIONAMIENTO:
CAMBIO DE NIVEL N.B.M. NIVEL DE BANQUETA MUNICIPAL REVISIÓN FECHA OBSERVACIONES Y/O CAMBIOS
N.
+0.00 NIVEL N.P. NIVEL DE PATIO 01 12-MAYO-2020 REVISIÓN PROYECTO REV. 01 ÁGUILA REAL 63.001M2 112.000M2
ACCESO
ACCESO PRINCIPAL N.B. NIVEL DE BANQUETA PROTOTIPO: M2 CONSTRUCCIÓN: M2 TERRENO:
LOSAS
A' CORTE N.F.T. NIVEL DE FIRME TERMINADO ESTRUCTURAL 2 EST EST-02 DER 04 DETALLES
ARQ. ARQUITECTÓNICO N.S.L.E. NIVEL SUPERIOR DE LOSA DE ENTREPISO
DISCIPLINA CLAVE PLANO PASILLO No. PLANO DESCRIPCIÓN
INS. INSTALACIONES N.S.L.A. NIVEL SUPERIOR DE LOSA DE AZOTEA
EST. NOTA: ESTE PLANO Y SU CONTENIDO SON PROPIEDAD EXCLUSIVA DE CASAS
ESTRUCTURALES N.S.V. NIVEL SUPERIOR DE VOLADO JAVER, S.A. DE C.V., CONSIDERÁNDOSE ESTRICTAMENTE CONFIDENCIAL,
ARQ. JUAN CARLOS GALLEGOS DE LA ROSA ARQ. ERIK GABINO GONZALEZ BRIONES LIC. ERIKA GUADALUPE ESCOBEDO VILLA ARQ.JUAN CARLOS HERRERA HIDALGO ARQ. BERENICE MOCTEZUMA GONZALEZ LIC. CARLOS ESTEBAN MACIAS CASTILLO ING. FERNANDO PADILLA LORA
ACA. QUEDANDO POR LO TANTO ESTRICTAMENTE PROHIBIDA SU REPRODUCCIÓN
ACABADOS N.S.P. NIVEL SUPERIOR DE PRETIL
DIRECTOR UEN/PLAZA GERENTE DE DISEÑO JEFE DE COMPRAS JEFE DE COSTOS Y PRESUPUESTOS JEFE CONTROL ADMINISTRATIVO DE OBRA GERENTE COMERCIAL GERENTE DE CONSTRUCCIÓN TOTAL O PARCIAL SIN PREVIA AUTORIZACIÓN.
N.C. NIVEL DE CALLE
A A A
LP A D LP LP A D LP LP A D LP
CODO PIPA

CPVC 1/2" DIÁM. L=1.00 m


7.00 7.00 7.00
MURO
0.075 4.40 2.525 0.075 4.40 2.525 0.075 4.40 2.525 REGADERA

DETALLE DE SALIDA ELEMENTO ALTURA

AF
1.00
HIDRÁULICA
LP LP LP LP LAVABO 0.60m
TEE CODO 90˚

Ø 1/2"
AF
CODO 90˚

Barda Medianera h=1.20m. Barda Medianera h=1.20m. Barda Medianera h=1.20m. WC 0.20m

h=1.20m.
CONECTOR CPVC ROSCA

h=1.20m.

CPVC 1/2" DIÁM. L=1.07 m


h=1.20m.

AF
EXTERIOR DE 1/2"
Ø 1/2"

2.00

CPVC 1/2" DIÁM. L=1.07 m

AF
MANERALES 1.00m

0.075
0.075
0.075

Barda
Barda
Barda

AC
Patio Patio Patio LLAVES EMPOTRAR
1/2" DIÁMETRO h=1.00m
CODO CPVC 90°
CEBOLLETAS 2.00m

AC
N.P. N.P. N.P.

1.00
+0.38 +0.38 +0.38 CODO 90˚

AF
FREGADERO 0.60m

AC
N.F.T.

1/2" DIÁM.

AF
TAPÓN CACHUCHA

AC
0.11 GALV. DE 1/2" LAVABO
AF, AC, h=0.60m
CODO 90˚
L=
LAVADERO 1.10m

AC
0.2
0.15 0.15

AF
0.15

4.750

4.750
4.750

4.750
0m
4.750

4.750
REGISTRO PARA DESCARGA 2"Ø CONECTOR ROSCA
LLAVE ESTOPERA

1/2" DIÁM.
EXT. 1/2" CODO 90˚
BANQUETA DE TALLADOR m
TUBO DE CPVC DE 1/2 SANITARIO 75

AC
Fo.Vo. DE 4"Ø h=0.50m L= 0.3

AF
(Lavadero)
AF, AC, 1/2"Ø
(VER DETALLE) AF, h=0.20m
CODO 90˚L
0 .22
5m
L=
AC 5 m
BOILER 1.50m
0.20 =0 7

AF
0.65 .42 0.5

AF
h=0.95m 0.35 0.50 CODO 90˚ 5m L=

AC
AF LLAVE DE

AF
L=1.08 m
L=0.67m

L=0.27m.

L=1.08 m
0.60m

L=0.67m
m .
25 DIÁM

AC

AC

AF
Lavandería N.B.
+0.40
Lavandería N.B.
+0.40
Lavandería N.B.
+0.40
LLAVE DE CONTROL
0.9
L= 1/2
VC
CP AF
"
TEE JARDÍN
CODO 90˚ 9m
L=
0.2 TEE 1.3
L=0.20m. 25 AC L= LLAVE DE PASO
SUBE AF, AC, A P.A m
m M. TEE
(Boiler)
ISOMÉTRICO .28

PVC 4"Ø
JUNTA CONSTRUCTIVA
AF, AC,DE 1'' (Lavadora) JUNTA CONSTRUCTIVA DE 1'' JUNTA CONSTRUCTIVA DE 1'' CODO 90˚ L= L=
0
2"
D IÁ

0.80
0.2
1/2"Ø DESCARGA 2"Ø 0.25 25
m AC VC 1/ BOILER
AF, AC, 1/2"Ø L=
0.4 CP AF, AC, h=1.50m
h=1.25m LAVADORA 25
h=0.95m
DETALLE DE REGADERA
CONECTOR ROSCA
N.B. N.B. N.B. m

1.20
0.35 h=0.80m EXT. 1/2"
0.15 +0.41 +0.41 +0.41
0.20 0.37 0.20 0.48 0.20 0.20 0.35
K-1

CPVC 1/2" DIÁM. L=1.47 m


K-1 K-1 K-3 K-3 K-1 K-1 K-1 K-3 K-3 K-1 K-1 K-3 K-3 K-1

AF
CODO 90˚ LAVADERO NOTA:
4 4 4 4

0.29
0.15
AF, AC, h=0.95m

AC
CPVC 1/2" DIÁM. L=1.47 m
F C F C C F C G CONECTOR ROSCA
35

28
LAVADORA ELEMENTOS INTERNOS TOMADOS DESDE N.F.T.
0.175

EXT. 1/2"
0.
0.325

0.
0.325

VENTILA 2"Ø
AF, AC, h=0.95m
AF AF AF CONECTOR ROSCA
ELEMENTOS EXTERNOS TOMADOS DESDE N.B.

GAS
AC

0.225 0.57 0.88 DESCARGA 2"Ø CODO 90˚ EXT. 1/2"

39
AC AC AC 0.29 h=0.50m

0.
CODO 90˚

AF
FREGADERO
0.20 1/2" Ø AF, AC, h=0.60m

AC
Ø
0.40

1.350
0.57

1.350
1.350

0.48 LLAVE DE CONTROL

PVC 4"Ø
AF

h=1.50m

2"
h= 0.60m

1.36
AC

PV
0.72

GAS

CPVC 1/2" DIÁM. L=1.07 m


CODO 90˚
NOMENCLATURA

AF
13
CODO 90˚

1.
1.20

CPVC 1/2" DIÁM. L=1.07 m


AF

AC
AF

AC
h=0.60m

L=0.42 m
LLEGA TUBERIA CODO 90˚
AC

(Fregadero) PVC 3"Ø


TUBERÍA AGUA FRIA

GAS
DE P.A. F

AC
AF, AC, 1/2"Ø
Cocina Cocina Cocina DE CPVC DE 1/2 " DIÁM.

AF
0.75
AF

BAJANTE BAJANTE BAJANTE G L= 0 TEE

AC
CODO 90˚ .20

CPVC 1/2" DIÁM. L=1.07 m


LAVABO

AC
0.36
SANITARIA SANITARIA m
SANITARIA
MCA. AMANCO
AC

AF, AC, h=0.60m LLAVE DE CONTROL 5m CODO 90˚


7
CONECTOR ROSCA 0.1
2.55

GAS
m
L= AF
2.92

B B B1/2" Ø B
5
B B EXT. 1/2" .32

0.

AC
0
L=

L=0.65 m
TEE

74

L=0.65 m
CODO 90˚
AF

AC
h=0.60m VÁLVULA DE 0m . C TUBERÍA AGUA CALIENTE

AF
2.7 IÁM
AC

N.F.T N.F.T CUADRO

AC
N.F.T L= TEE AF L=
0.5
1/2
"D CODO 90˚
+0.49 +0.49 +0.49 7m
AF.175 m DE CPVC DE 1/2 " DIÁM.

GAS
LO INSTALA C.A.D.M
CODO 90˚ VC
CP L =0

L=0.65 m
L=
0 5m
MCA. AMANCO

AC
5m AC0.32
AF

AC .57 m

AC

AF
L=0.65 m
CODO 90˚ 2.5 TEE
CUADRO MEDIDOR 1/2" L= L= CODO 90˚

LONG.
0.18 m
AC

MEDIDOR AF
FIERRO GALVANIZADO

LONG.
0.18 m
(Lavabo) CODO 90º CODO 90˚ L=
0.8 m
SUBE A NIVEL 25

GAS
LLAVE DE JARDÍN 8m CODO 90˚
AF, AC, 1/2"Ø
Comedor Comedor Comedor CODO 90˚ TEE =0
.3

M
L=
GENERAL DE FIRME AF, h=0.60m L
AC
CODO 90˚ 0
AC.48m m
MEDIDOR
AF

h=0.60m LLAVE DE PASO CONECTOR ROSCA CODO 90˚ L= TEE AF 75


0.2 m 0.1
VENTILA 2"Ø CONECTOR ROSCA EXT. 1/2" EXT. 1/2"
L= 25
0.2
15 CODO 90˚
L=
1.5 L= AF CODO 90˚
AC

0.4 m 8m
DESCARGA 2"Ø L= m

PVC 4"Ø
25
h=0.50m m 15 m
CODO 90˚ 0.4 TEE 5
LO INSTALA EL PROPIETARIO AC .32
K-1 K-1 K-1 = L=

GAS

AF
L
K-1 K-1 K-1 K-1 K-1 K-1 m 0.4 CODO 90˚
L=
0

6.175

6.175
6.175

6.175
AF= 1.53
CODO 90˚
6.175

6.175
5 0m
0.20 0.21

L=0.40 m
AF

L
BOILER

0.24
LLAVE ESTOPERA

L=0.70 m
TEE
AC

LO INSTALA URBANIZACIÓN

AF
F CODO 90º CODO 90˚
SANITARIO CODO 90˚

L=0.25m.
TAPÓN CACHUCHA GALVANIZADO 1/2" AF, h=0.20m

GAS
C 13 13 13 AF

AF
L=
AF

0.5
CONECTOR ROSCA EXT. 1/2" 5m 0m
TUBO CPVC 1.5
L=

0.25
CODO 90º 1/2" DIÁM.
12 N.F.T 12 N.F.T 12 N.F.T CODO 90˚

AF

LONG.
TEE

0.17 m
+0.31 +0.31 +0.31
PREPARACION PREPARACION PREPARACION N.B.M.
ISO ISOMETRIA HIDRAULICA

GAS

4.81
TOMA DOMICILIARIA 1/2"

L=0.40 m
EXTRACTOR EXTRACTOR EXTRACTOR AF CODO 90˚
AF

11 K-1 h=1.65m 11 K-1 11 K-1

AF
AF
m
5.18
1.34

10 COLADERA 10 0.45 DESCARGA 4"Ø


10 " DIÁ
M. L= 01 SIN ESC

16.00

16.00
C 1/2

16.00

16.00
16.00

16.00

AF
0.09 CPV

GAS
AF

0.25
9 9 9
Sala Sala Sala

0.30
0.20
CODO 90° C.P.V.C.
N.F.T N.F.T N.F.T
+0.49 +0.49 +0.49

GAS
8 8 8
AF

K-1 AF F K-1 K-1 K-1 K-1 K-1

L.P.

SALIDA HIDRÁULICA
7 7 7

2.420
2.420
2.420

K-1
AF

GAS
6 6 6

5 5 5
1.55

AF

GAS
Sube Sube Sube TERRENO
AF

L. P.
GAS
Llega tubería Pie Derecho
4 3 2 1 4 3 2 1 4 3 2 1 de red general agua h=25cm 0.10 0.10 N.S.L
K-1 K-1 K-1 Descarga

1 1 1 1

0.20
0.10 0.10 Drenaje Sanitario +3.06
F
agua h=25cm (hacia casa) L.P. 0.30
K-1 K-3 K-1 K-3 K-3 K-3 K-1 K-1 K-3 K-3 K-3 K-1

0.38
K-3 K-1

0.56
K-3

0.10
N.B.
AF
N.B. N.B. SALIDA HIDRÁULICA
TUBERÍA DE CPVC
(Llave de Jardín) +0.34 +0.34 +0.34

0.08
DRENAJE
AF

Pie Derecho h= 50cm


AF, 1/2"Ø 0.15 agua h=25cm
h=0.60m AF
SUBE A NIVEL Pie Derecho
agua h=25cm (casa) Baño SALIDA HIDRÁULICA

0.12
0.50 0.50 TUBERÍA DE CPVC
DE FIRME

0.28
ACCESO REGISTRO DE BANQUETA ACCESO ACCESO (casa)

GA
DE 4"Ø, YEE DE 4"
N.B.

GAS
R R
N.S.L.

0.60
AF

0.50
AF Y CODO DE 45º 4" BANQUETA BANQUETA N.S.L.

0.25
+0.00 +3.06

0.25
+3.06

0.20
K-1 K-1

G
AF

AS
Acometida

SALIDA HIDRÁULICA
GAS
Cablevision
AF

AF
Acometida

G
AS
Telefono SALIDA SANITARIA
AF

GAS
AF

DETALLE ISLETA AGUA Y DRENAJE,

G
A
TELEFONO Y CABLEVISION VISTA LATERAL

S
AF
VISTA LATERAL
PVC 4"Ø

DETALLE DE LAVABO
AF

GAS

G
A
DETALLE DE RETRETE
AF

S
AF
G
A
S
DET DETALLE DE ISLETA AGUA Y DRENAJE, TELEFONO Y CABLEVISIÓN
DET DETALLES DE BAÑO

5.075

5.075
5.075

5.075
01
5.075

5.075
AF

8.

GAS
0 1 ESC: 1:50
5.18

AF G
A
S
02

4.57
4.80

Jardín Cochera Jardín Jardín Cochera Jardín Jardín Cochera Jardín ESC: S/E
AF

AF G

GAS
AS CODO
90º 2"
VENTILA 2"
AF

na
GA
S
AF

D
DESPIECE DE MATERIAL CPVC TOTAL

Toma alter
ES

GAS
AF C
A GA CODO
RG S
A
90º 2"
VENTILA 2"
SIMBOLOGÍA
TO AF
A
LT GA TUBO CPVC - FGG - TUBOS FLEXIBLES DE 1/2" 43.05 m
AF

ER

PVC 2" L=2.70mts


M
A N
Profundidad de intalación S Profundidad de intalación

GAS
AL A h=0.40 h=0.40
TE GA CODO TUBERÍA PVC 4" Ø
RN
A
AF S 90º 3" CODO DE 90° CPVC DE 1/2" 41 PZAS
VENTILA 3"
AF

GA
S
AF

GAS
GA
S
COLADERA EN DESCARGA 4"
TUBERÍA PVC 3" Ø TEE DE CPVC DE 1/2 15 PZAS
AF REGADERA CODO 90º 4"
GA
AF

CODO PIPA CON OREJA CPVC DE 1/2" HEMBRA (R. INT.) 1 PZA

GAS
GA CODO 45° 2" PVC 4"
AF S CODO 90° 2"
PV
C
L=0.15 mts
2"
CODO 45° 2" L=0 CODO
GA
0.50 0.50 S 0.28 .22
mts
45º 2" DESCARGA 2"
TEE 2" VENTILA
TUBERÍA PVC 2" Ø
AF

GAS
ADAPTADOR MACHO DE CPVC DE 1/2" (R. EXT.) 16 PZAS

L=0.27
H=0.50 mts AHOGADA 2"
AF Pie Derecho Pie Derecho 0.30 mts
YEE DOBLE PVC 2"

0.16
Gas h=70cm Gas h=70cm 4-2-2" L=0.13 mts
DESCARGA 2"Ø

LP N.B.M
LP N.B.M
LP (casa) N.B.M (casa)
LP CODO 90º 4" L=0.22m LAVADORA
h=0.80m
0.10

+0.14 +0.14 +0.14 LLAVE DE CONTROL ANGULAR, MCA. RUGO, MOD. 25E 6 PZAS

L=0.40 mts
0.10

Medidor Medidor
M M Gas Gas
PVC 4"
L=0.13 mts CODO 90º 2"
AL COLECTOR GENERAL CODO

PVC 2" L=5.23mts


REDUCCION
4"- 3" 45º 2"
AL COLECTOR GENERAL DESCARGA 2"Ø
TALLADOR CODO 90º 2"
LLAVE DE PASO 2 PZAS

L=0.80 mts
DESCARGA 2"

A A

PVC 3" L=3.60mts


h=0.50m

0.075 4.40 A 2.525 0.075 4.40 2.525 0.075 4.40 2.525 TEE 2"

L=0.55 mts
CONECTOR H=0.50 mts
REGISTRO
L= 1 1/4" A 2"
BANQUETA 0.2
9 90º 2"
CODO 90º 4"

7.00 7.00 7.00 LLAVE ESTOPERA, MCA. RUGO, MOD. 66-B 2 PZA

BAJA DE PLANTA ALTA


DESAGUE DE 1/2" CODO 90º 2"

PVC 3" L=2.95 mts


CODO 90º 2"

L=0.55 mts.

39m
CODO

35m

L=0.
45º 4"

L=0.
CODO
CODO 45º 2"

LP A D LP LP A D LP LP A D LP CODO .2 0m
45º 4" YEE 2" L=0
PV
C
4"
45º 2"
PVC 2" DESPIECE DE MATERIAL GALVANIZADO TOTAL
COLADERA
L= L=0.28mts ts CODO 90º 2"
9m

mts
1.2
0m 0.2
L=

1.18
PV
C
TUBO GALVANIZADO DE 1/2" 0.40 m

2" L=
YEE 4-2" 4"
L=
0.7
6m

PVC
ts

PV
C
4"
L= PREPARACIÓN
TAPÓN CACHUCHA GALV. DE 1/2" 16 PZAS
YEE 4"-2" 0.5
4m EXTRACTOR
REDUCCION t s REDUCCION
4"- 3" 4"- 3" H=1.65 mts

INST INSTALACION SANITARIA INST INSTALACION DE GAS NIPLE DE 1/2" x 4" (TEMPORAL, EN SALIDA DE REGADERA) 1 PZA
INST INSTALACION HIDRAULICA BOILER CODO 90º 4"
PVC 4" L=0.60 mts

YEE 4" DESCARGA 2" CODO 90º 4"


TEE 2"
A=1.50 m
01 PLANTA BAJA ESC: 1:50 03 PLANTA BAJA ESC: 1:50 05 PLANTA BAJA ESC: 1:50 H=0.50 mts
PV
C
4"
6 L=
1.7 DESPIECE DE MATERIALES DRENAJE SANITARIO TOTAL
4 mt
s

L=0.60 mts
5 2 TUBO PVC 4" 13.14m.
8 ISO ISOMETRIA SANITARIA YEE 4"-2"
PV
DESCARGA 4"
TEE 4"
TUBO PVC 3" 6.55 m.
A C D
PVC 2" L=0.60 mts
L= C 4

A C D 02
0.4 "
0m
GAS

CODO 90º 2"


SIN ESC
t s
PV
COLADERA EN
L= C 4
0.2 " TUBO PVC 2" 16.32 m.
0m
1/2 BAÑO s t
REGISTRO
CODO 90° 2" YEE 4"-2" BANQUETA CODO PVC 90° DE 4" 4 PZAS.
SIMBOLOGÍA CODO 45° 2"

4.40 4.40 CODO 45° 2"


GAS
L=1.55 m

PVC 2" L=0.20 mts PV


C
4" CODO PVC 45° DE 4" 3 PZAS.
G TUBERÍA GAS TUBERÍA INSTALACIÓN DE GAS L=
1.6

1.35 3.05 A 1.35 3.05 A No. ELEMENTO CANTIDAD


0m
ts
CODO 45° 4" REDUCCIÓN PVC 4"-3" 2 PZAS.
BOILER
GAS

TUB. PE-AL-PE DE 1/2", CIFUNSA Y/O SIMILAR


0m 1 GAS NEGRA (14248GC) 16.365 m.
YEE DOBLE PVC DE 4" CON SALIDAS DE 2" 1 PZA.
3.9
L= ESTUFA
K-1 K-3 K-3 K-1 K-1 K-3 K-3 K-1 A=0.60 m
2 TUBERÍA GALVANIZADA 1/2" (P/ACOMETIDA) 0.70 m.
NOTAS: 4 PZAS.
5 5 5 5 YEE PVC DE 4" CON SALIDA DE 2"
YEE 4"
L=
LLEGA TUBERIA GA 1.3 1.- AL REALIZAR LA INSTALACIÓN UTILIZAR LA HERRAMIENTA
DE P.B.
S 6m
5 CONEXIONES INSTALACIÓN DE GAS YEE PVC DE 4" 2 PZAS.
APROPIADA
0.65

0.65

AF, AC, 1/2"Ø GA 6 No. ELEMENTO CANTIDAD


S 2 2.- TENER PRECAUCIÓN AL MANIPULAR LA TUBERÍA, NO
0.15 0.20 TEE PVC DE 4" 1 PZA.
8 ARASTRÁNDOLA NI RODÁNDOLA 1 CODO 90 GALVANIZADO 1/2 " 1 PZA.
K-1 K-3 K-1 K-3 GA
S
3.- TODAS LAS TERMINALES DE LA TUBERÍA SE DEBERÁN 1
CODO PVC 90° DE 2" 10 PZAS.
4 F C K-1
4 K-1 GA
S
AVELLANAR CON UN AVELLANADOR ANTES DE COLOCAR LAS
2 CODO G. 2 " x 90° CHM BRONCE (45049CHM) 3 PZAS.
PV
GAS
L=0.65 m
0.375

CONEXIONES 3 COPLE RECTO C x C 90º CHM BRONCE (11248GC) 1 PZA. C


0.225 4 4"
L= CODO PVC 45° DE 2" 9 PZAS.
0.575

4.9
0.40

4.- PARA REALIZAR LOS DOBLECES SE DEBERÁ UTILIZAR UN 4 TEE RECTA C x C x C DE 21 " (11591GC) 1 PZA. 2m
AC

ts
0.25 DOBLADOR DE TUBO 1 PZA.
F GA
YEE PVC DE 2"
AF, AC, 1/2"Ø
S
m GA 5 NIPLE GALVANIZADO 1/2" x 4" 2 PZAS.
h=1.00m 25 S 5.- EL CORTE DE LA TUBERÍA SE DEBERÁ REALIZAR CON TIJERAS
(Cebolleta) C AC N.S.L.E. Recámara N.S.L.E. Recámara L=
0.3 CORTATUBO 6 TAPON CACHUCHA GALVANIZADO 2" 2 PZAS. TEE PVC DE 2" 3 PZAS.
1.20
AF

h=2.00m +3.06 COLADERA EN


REGADERA +3.06 GA
S 6.- TODAS LAS PUNTAS O TERMINALES SERÁN DE GALVANIZADO
0.61

7 TAPON MANCHO DE 1/2" 1 PZA.


0.15 7.- PINTAR CON SPRAY DE COLOR AMARILLO TODAS LAS PUNTAS REGISTRO PARA BANQUETA DE Fo.Vo. DE 4" CON TAPA 2 PZAS.
AC
0.925

3.450

GA
3.450

0.30 S ÚNICAMENTE DURANTE CONSTRUCCIÓN 8 ADAPTADOR MACHO C x RM 1/2" (12248GC) 2 PZAS.


2.20

2.20

AL
CO
LE
COLADERA CON TAPA 2 PZAS.
AF

BAJA GA 8.- TODAS LAS ALTURAS DE LAS SALIDAS DE LAS TUBERÍAS SE 9 CODO DE 3/4" 1 PZA.
CTO
RG
(WC) EN
27

S E RA
PVC 3"Ø CONSIDERAN A PARTIR DE N.P.T. L
0.

AF, 1/2"Ø
1.39

CODO PVC 90° DE 3" 1 PZA.


AC

L= 10 TAPON CACHUCHA GALVANIZADO 3/4" 1 PZA.


h=0.20m GA 4.8 9.- POR CUANTIFICACIÓN EN OBRA, CONSIDERAR DESNIVELES EN
DESCARGA 4"Ø S 1m
ISOMÉTRICOS EN LAS LONGITUDES ESPECIFICADAS 11 REDUCCION DE 3/4" A 1/2" 1 PZA.
AF

0.

F
22

GA
0.56
0.28

Salida doble de PVC


B Baño B B Baño B
S
CONEXIÓN
AC

F
GA
S
A MEDIDOR de 1 21" con trampa flexible
0.16 0.20

N.S.L.E. VENTILA 2"Ø 40 N.S.L.E.


+3.06 DESCARGA 2"Ø 0. 9
+3.06 GA 10
0.29

C h=0.50m
0.16

S
0.425 K-3 K-3
K-1 K-1
3 (Lavabo)
3 NIPLE GALV. 1/2"x4"
CODO G. DE 1/2" GA
S
0.72
6.90

6.90

AF, AC, 1/2"Ø


K-3 K-1 K-3 K-1 GA SUBE A NIVEL Profundidad de instalación

L=0.70 m
GAS
h=0.60m S
DE FIRME h=0.40 0.35
ADAPTADOR MACHO
Descarga
6.90

6.90

0.20
N.S.L.E.
+3.06
K-1 K-2b 2 N.S.L.E.
+3.06
K-1 K-2b 2
TAPON CACHUCHA

TUB. PE-AL-PE GAS


GAS
11 Trampa
flexible
de 2" a paño
de Muro
2
Baja Baja GAS
GAS
G

L= 0.37 m L= 7.95 m GAS


A

GAS GAS
S

GAS GAS GAS


GAS GAS
K-1 K-3 K-1 K-3
GAS GAS GAS GAS

0.90
13 13 3

0.50
N.F.T.
N.B.

INST INSTALACION SANITARIA


DET DETALLE DE SALIDA DE GAS ISO ISOMETRIA DE GAS DET DETALLE DE DESCARGA EN TALLADOR
INST INSTALACION HIDRAULICA 04
04 PLANTA ALTA ESC: 1:50 ESC: S/E 03 SIN ESC 03
02 PLANTA ALTA ESC: 1:50 ESC: 1:20

FIRMAS SIMBOLOGÍA NOMENCLATURA REVISIONES TORRE LUNA


FRACCIONAMIENTO:
CAMBIO DE NIVEL N.B.M. NIVEL DE BANQUETA MUNICIPAL REVISIÓN FECHA OBSERVACIONES Y/O CAMBIOS
N.
+0.00 NIVEL N.P. NIVEL DE PATIO 01 12-MAYO-2020 REVISIÓN PROYECTO REV. 01 ÁGUILA REAL 63.001M2 112.000M2
ACCESO
ACCESO PRINCIPAL N.B. NIVEL DE BANQUETA PROTOTIPO: M2 CONSTRUCCIÓN: M2 TERRENO:
PLANTAS DE INSTALACIONES HIDRAULOICAS
PLANTA DE INSTALACIONES SANITARIAS
A' CORTE N.F.T. NIVEL DE FIRME TERMINADO
INSTALACIONES INST INST- 01 DER. 06
PLANTAS DE INSTALACIONES DE GAS
ISOMETRIAS, HIDRAULICA, SANITARIA Y GAS
DETALLES DE INSTALACIONES
ARQ. ARQUITECTÓNICO N.S.L.E. NIVEL SUPERIOR DE LOSA DE ENTREPISO
DISCIPLINA CLAVE PLANO PASILLO No. PLANO DESCRIPCIÓN
INS. INSTALACIONES N.S.L.A. NIVEL SUPERIOR DE LOSA DE AZOTEA
EST. NOTA: ESTE PLANO Y SU CONTENIDO SON PROPIEDAD EXCLUSIVA DE CASAS
ESTRUCTURALES N.S.V. NIVEL SUPERIOR DE VOLADO JAVER, S.A. DE C.V., CONSIDERÁNDOSE ESTRICTAMENTE CONFIDENCIAL,
ARQ. JUAN CARLOS GALLEGOS DE LA ROSA ARQ. ERIK GABINO GONZALEZ BRIONES LIC. ERIKA GUADALUPE ESCOBEDO VILLA ARQ.JUAN CARLOS HERRERA HIDALGO ARQ. BERENICE MOCTEZUMA GONZALEZ LIC. CARLOS ESTEBAN MACIAS CASTILLO ING. FERNANDO PADILLA LORA
ACA. QUEDANDO POR LO TANTO ESTRICTAMENTE PROHIBIDA SU REPRODUCCIÓN
ACABADOS N.S.P. NIVEL SUPERIOR DE PRETIL
DIRECTOR UEN/PLAZA GERENTE DE DISEÑO JEFE DE COMPRAS JEFE DE COSTOS Y PRESUPUESTOS JEFE CONTROL ADMINISTRATIVO DE OBRA GERENTE COMERCIAL GERENTE DE CONSTRUCCIÓN TOTAL O PARCIAL SIN PREVIA AUTORIZACIÓN.
N.C. NIVEL DE CALLE
A
LP A D LP A SIMBOLOGIA
Código de colores para cableado LP A D LP
Fase 1 Negro
7.00 T-16 Cédula de Cableado
Fase 2 Rojo 1F#12 T-16 = diámetro de tubo, F = Fase, N = Neutro, T = Tierra, R =

0.075 4.40 2.525 Fase 3 Azul 7.00 1N#12


1R#12
Retorno, #12 = indica calibre AWG, Se utilizará cable de marca
"CONDUCCASA" tipo CCA THW/THHW Cobre-Aluminio 600V
Neutro Blanco o gris claro 1T#12
0.075 4.40 2.525 PVC 90°C ROHS en los calibres indicados.
Tierra Verde Conduit por plafón o muro
LP LP Los retornos deberán ser del mismo color de fase
Electrico
Se utilizará tubo conduit de polietileno rígido o

Barda Medianera h=1.20m. LP LP flexible

h=1.20m.
Barda Medianera h=1.20m. Conduit por piso

h=1.20m.
0.075
Barda
Se utilizará tubo conduit de polietileno rígido o
Patio Electrico
flexible

0.075
Barda
Patio
N.P.
+0.38 A C D N.P. A C D Conduit vertical
Conecta nivel inferior e inmediato superior/inferior.
+0.38 Electrico
Se utilizará tubo conduit de polietileno rígido o
0.15
4.750

4.750
flexible
4.40 4.40
0.15 Medidor

4.750

4.750
1.35 3.05 A 1.35 3.05 A
Medidor a dos fases proporcionado por CFE,
colocado en base circular de 5 mordazas o
terminales.
Lavandería N.B.
+0.40
Tablero de Control
Lavandería N.B.

JUNTA CONSTRUCTIVA DE 1'' 5 T-16 T-16


5 +0.40
5 5
Centro de Carga de 6P 100 A Modelo QO612L100F,
Marca "Square D", con interruptores

0.65
C-01
C-03 1.60 termomagnéticos tipo QO o QOB en los amperajes

0.33

0.65
1F#12 1F#12
ICFT e N.B. 1N#12
1T#12
h=0.60 1N#12
1T#12
JUNTA CONSTRUCTIVA DE 1'' C-01
C-03
h=0.60 indicados en el diagrama unifilar.
C-06 +0.41 0.45
L h=1.20
ICFT e N.B. 1.45 1.45 Interruptor General
4 4 4
C-06 +0.41

1.10
L h=1.20
4 Centro de Carga 2P 125 A tipo NQO2, con

1.20
2X30

1.35
T-16
1F#12
1N#12
1T#12
C-03
h=1.20
h=1.20
d,e,f
T-16
1F#12
3R#12 4 C-03 h=1.20
4
Interruptor termomagnético de 2X30A

h=0.60 h=1.20

0.50
C-02
1.350

T-16 T-16 C-03 d,e,f h=0.60


Tierra Física

0.59
C-03
M h=1.20
C-03
1F#12 1F#12 h=0.40
N.S.L.E. Recámara 0.85

1.02
1N#12
1T#12 1N#12 C-03
C-02 N.S.L.E. Recámara C-03
Electrodo cubierto de cobre con espesor de 5 8" y 3.00

1.350
2R#12 +3.06 h=0.60
T-16 C-01 h=0.40 +3.06 h=0.60
T-16
1F#12 1F#12
A CC por piso
1T#12
T-16 l M h=1.20
C-03 C-01 mts de longitud con conector mecánico, enterrado
1N#12

3.450
1N#12 1F#12 l hasta 2.44 mts. o como se requiera según el nivel de

0.58

3.450
1T#12 1T#12

2.20
1N#12

1.58

2.20
1.60
Estufa Campana 1T#12 roca del subsuelo.

0.60
C-01
C-03 k h=1.20 C-01
h=1.80
Cocina T-16
l T-16 Estufa Campana k h=1.20 Acometida Eléctrica
C-03 T-16 1F#12 l
BAJANTE h=0.80
1F#12 1N#12 1N#12 C-03 Acometida eléctrica subterranea en 2 Fases 3 Hilos,
SANITARIA T-16
1F#12
1N#12
1N#12
1R#12
1R#12
1T#12
1R#12

BAJANTE C-03
h=0.80
h=1.80
Cocina 0.60
1.45 suministrada por CFE

B 1T#12
T-16 C-01 1T#12 C-01
B B h=2.20 T-16
Baño B SANITARIA 1.08
Baño

0.50
1F#12
1N#12 f d
C-01 1N#12
B h=2.20
B Apagador de 2 Vías

1.07
2R#12 C-01 a

3.42
1T#12 C-01
h=1.20
C-03 N.F.T T-16
1F#12
j N.S.L.E.
+3.06 T-16 B f
C-01
d
B j N.S.L.E. 0.40 (a) apagador de control
+0.49

0.28
1N#12 C-05 h=1.20
T-16
1F#12
h=1.20
+3.06 altura de colocación
A CC por piso h=1.20 j,k 1N#12 C-05 h=1.20
1T#12 1F#12 1T#12 C-03 N.F.T 1.45 h=1.20 j,k

0.60
3

2.69
1N#12 +0.49
R C-02 T-16
1T#12
3 a Apagador de 3 Vías

6.90
h=1.20 T-16

6.90
T-16 1F#12
1N#12 1F#12 0.40 (a) apagador de control

0.53
1F#12
1N#12
1T#12
1T#12
Comedor 1N#12
1T#12 R C-02
h=1.20
0.20 0.14 altura de colocación

0.70
Sube a Contacto
Comedor

6.90
C-01 1.10
Contacto

6.90
C-01
en Baño
Viene de Baño PB h i
T-16
h=1.20 h=1.20 1F#12
i
N.S.L.E.
+3.06 2 0.25 h=1.20 h=1.20 N.S.L.E.
2 01 (Con tapa para exterior)
C-01 Circuito al que pertenece.
6.175

6.175
1N#12
T-16 ICFT
T-16 1R#12 h i i +3.06 0.40
1F#12 1F#12 1T#12
1N#12
g C-05 1N#12
Baja Baja Altura de colocación.

6.175

6.175
h=1.20 1T#12
1T#12 T-16
T-16 h=2.20 ICFT

0.24
1F#12 g C-05
1N#12 1N#12
13C-01 2R#12 13 h=1.20
h=2.20
1T#12
c h=2.20
13 Contacto con tapa
C-01
01
12 N.F.T A CC por piso C-02
12 13C-01 C-01 Circuito al que pertenece.
h=0.40 h=1.20 12
+0.31 h=2.20 c h=1.20 0.40

0.64
PREPARACION C-03
T-16 PREPARACION T-16 m C-01
EXTRACTOR T-16 N.F.T C-02 PREPARACION C-03
11 1N#12 g,n EXTRACTOR
11 1N#12 h=0.60 12 h=0.40
m Altura de colocación.
1R#12 2R#12 1F#12 +0.31 EXTRACTOR 0.22 h=0.60
n 1T#12 1T#12 1N#12 PREPARACION 11
C-01 1T#12 T-16 EXTRACTOR

0.20
T-16 g,n

3.975
1N#12 11
10 h=1.20 T-21 1N#12 10 Contacto ICFT

3.975
16.00

16.00
1R#12
T-21 1R#12 n
C-01
10 ICFT 01
1T#12 Contacto con interrupcion de corriente por falla a

0.65
Sube 10 h=1.20 0.40

16.00

16.00
h=0.60 h tierra
9 9 Viene de PB
Sala h

3.450
C-01 9
h a Rec. Recámara

3.450
h=2.20 C-01 C-01 Circuito al que pertenece.
N.F.T T-16
1F#12 9 h=0.60 1.45 h=2.20
Recámara

2.04
C-01 Altura de colocación.
8 C-02
+0.49 1N#12 8 Sala 8

0.20
1T#12 h 1.75
h=0.60 a T-16 N.F.T Equipo a proteger o indicación de ICFT
T-16 1F#12 +0.49 C-01
C-01 8

2.10
7 1F#12 7 T-21 1N#12 C-02 C-01 Salida de Centro
1N#12 1T#12 a 7
2.420

m h=0.60

2.420
1T#12 m

2.420
(a) Apagador de control
6 Sube a 6 T-16
C-03 N.S.L.E. 7
N.S.L.E. a C-01 Circuito al que pertenece
6

2.420
T-16 3R#12 +3.06 T-16
Luminaria "h" T-16 h=1.40 C-03
h=1.40 +3.06
1F#12 1F#12 01

1.75
1F#12 T-16 6

0.20
1N#12 Sube a 1N#12
5 3R#12 1N#12 1T#12 h=0.60 5 1T#12
1R#12 T-16 5
1F#12 Azotea h=1.40
A CC por 0.20 0.20 h=1.40 Salida Arbotante
Sube

1.50
a

1.35
T-16 1N#12
1T#12
T-21 T-16 5 1.05 h=0.60
3R#12
Baja a 1F#12 plafón y muro (a) Apagador de control

0.20
T-16 h=0.60 1N#12 h=0.60 2.10
1F#12 C-02 Sube a Contacto apagador 1T#12 C-03
Sube h=0.60 Altura de colocación

0.80
1N#12 C-03
h=1.20
h 1T#12 en Recámara "h"
T-16 h=0.60 01 C-01 Circuito al que pertenece
h=1.20 1F#12 T-16 Viene de C-02

0.35
a,b,c 1N#12 0.65

0.15
Centro de Carga

0.35
4 3 2 1 4 3 1T#12
1F#12
1N#12 CC h=1.20
4
1 1
h=0.60 h 3 Extractor de Pared
b
Modelo QOD6, Marca "Square D"
1 C-03 1T#12

1' 4 3 2 1
h=1.20
a,b,c
1
h=0.60
C-03

1' a (a) Apagador de control


N.B.
+0.34
C-01
h=2.20
ICFT
C-02
0.40
1 N.B.
b
C-02
1 C-01
C-01 Circuito al que pertenece
Marca Sugerida "Estevez" de 4" Ø

0.075
C-01

0.075
+0.34 h=2.20 0.40
ACCESO
1' 1.05 3.40 A
ACCESO 0.30 0.30
ICFT

1.40
1' 1.05 3.40 A Notas al proyecto eléctrico
4.45 4.45 1. A LA REPRESENTACIÓN GRAFICA (PLANO)
1.1. Las distancias horizontales indicadas son medidas desde el paño del muro al centro de
caja. Las alturas indicadas en plano son desde nivel de piso terminado a centro de caja,
RIGE la cota indicada en plano. no se permite la toma de medidas directa al plano
T-21
A B D' A B D' impreso o digital.
1.2. Todas las ubicaciones indicadas deberán ajustarse en obra, previo consentimiento del
área de proyectos; por presencia de elementros estructurales, interferencia con
cualquier otra instalación no eléctrica o muebles fijos.
2. MATERIALES
2.1. Se Utilizará tubería conduit de polietileno lisa o corrugada, deberá cumlir con lo indicado
en el artículo 364 de la NOM-001-SEDE-2012. Si fuera necesario alguna conducción
A Registro subterraneo INST DESPLANTE DE ILUMINACION Y CONTACTOS por exteriores, deberá ser realizada con tubería de PVC Rígido tipo pesado.
INST CABLEADO DE ILUMINACIÓN Y CONTACTOS
5.075

5.075

2.2. Todo el calbeado será de marca "CONDUCASA" tipo CCA THW/THHW Cobre-Aluminio
TCI
04 PLANTA ALTA ESC: 1:50 600V PVC 90°C ROHS en los calibres indicados

5.075

5.075
02 PLANTA ALTA ESC: 1:50 2.3. Todas las marcas comerciales señaladas en este documento, exceptuando el
Jardín Cochera Jardín
T-27
cableado, pueden ser cambiadas siempre y cuando se conserven las características
1F#8
electromecánicas del elemento a sustituir.
1N#8
1T#10 Jardín Cochera Jardín 2.4. Todos los contactos con interrupcion de corriente por falla a tierra pueden ser
sustituidos por contactos normales al utilizar un interruptor termomagnéticodel tipo
QO-GFI.
2.5. La marca y modelo de luminarias y accesorios será seleccionada por el departamento
de proyectos

NOTAS LLAVE: 3. CONSTRUCCIÓN

TIERRA FISICA PARA MEDIDOR (UNA POR MEDIDOR): ALTURAS PARA APAGADORES 4 Detalle de Cableado en Acometida de 2 Fases 3.1. Es posible migrar de un sistema de 2 Fases a 1 Fase, bastará con cambiarse el
interruptor termomagnético indicado 2X30A por uno de 1X50A y conectar en el centro
de carga la "Fase A" a la "Fase B" con el mismo calibre de alimentador.
F2
CABLE CCA THW-LS CAL. 10 AWG COLOR VERDE PLANTA BAJA 3.2. Nunca se deberá utilizar un ducto con cables eléctricos para llevar líneas telefónicas,
Interruptor General F1 N 2 1. Alimentación de energía con cable en calibre y datos, video o cualquier otro flujo eléctrico o electrónico.
EN TUBO CONDUIT PVC DE 1/2" DIAM., VIENE DE 3.3. La separación entre conductos electricos y otros conductos con flujo electrónico deberá
Tablero QOD2
GENERAL 1.20 m material aprobado por CFE.
Interruptor Termomagnético 2X30 LA BASE SOCKET DE MEDICIÓN HASTA EL 3 ser de 30 cm como mínimo.
2. Cable tipo bimetálico THW calibre indicado en 3.4. Se permite por facilidad en la construcción o de instalación de cableado incrementar en
CONECTOR MECÁNICO. PLANTA ALTA
Tierra Física T-27 2X30
planos una medida el diametro nominal del conduit, es decir de 16mm a 21mm, o de 21mm
1T#10
3. Tubo conduit de pared gruesa de 32 mm (1 a 27mm, etc. en aquellos tramos donde existan mas de 6 cables y se experimente
Varilla tipo "Copperweld" de 5 8"
de 3.00 mts. con conector mecánico. T-27 CONECTOR MECÁNICO 5/8" (UNO POR VARILLA) GENERAL 1.20 m 2 8 alguna dificultad para introducir el cableado.
1F#8 2X30
1/4") de diametro.
LP N.B.M
+0.14 Medidor de Energía
1N#8
1T#8
LP VARILLA COPPERWELD DE 5/8" DIAM.X 2.44MTS. LARGO ALTURAS PARA LUMINARIAS DE PARED 2 2 4. Base enchufe de 4 terminales, 100 amperes
3.5. Todos los empalmes y conexiones deberán realizarze con medios mecánicos o
soldados, no se permite el uso de entorchados.

LP LP
2 Fases Suministrado por CFE 3.6. Todas las cajas para cotactos, apagadores y timres serán de tipo chalupa, para salidas
N.B.M
PARA ATERRIZAR MEDIDOR ELECTRICO. +0.14 con quinta terminal.
Acometida CFE
USAR UNA VARILLA POR MEDIDOR *. PLANTA BAJA 5 5. Reduccion de 32 mm (1 1/4") a 12,7 mm (1/2")
a luminaria registro cuadrado con tapa (4"X4").

0.075 4.40 A 2.525 2F-3H


PASILLO Y COCHERA 2.20 m 6. Tubo conduit pared delgada de 12,7 mm (1/2") Especificado con material de
* La colocación de la varilla se apegará a los requerimientos 6 N
7.00 observados por la norma NOM-001-SEDE 2012 INSTALACIONES 0.075 4.40 A 2.525 F2
de diametro
PLANTA ALTA F1 F2
F1 7. Alambre o cable tipo bimetálico THW calibre
ELECTRICAS (UTILIZACION): 1
"El electrodo se debe instalar de manera que al menos una ESCALERA 2.20 m a partir 7.00 N indicado en planos conectado a Varilla de
del escalon 9
LP A D LP longitud de 2.44m esté en contacto con la tierra. Se debe
enterrar a una profundidad mínima de 2.44m a menos que, BAÑO 2.00 m 2 8.
Tierra
Caja para Interruptor termomagnetico de 2
cuando se encuentre roca en la parte baja, el electrodo se
debe enterrar en un ángulo oblicuo no mayor de 45 grados ALTURAS PARA CONTACTOS LP A D LP polos 230 volts, 100 amperes, a prueba de
7 agua. (NEMA 3R)
respecto a la vertical o, cuando se encuentre en fondo rocoso
en un ángulo de más de 45 grados, se debe permitir que el PLANTA BAJA INST DESPLANTE DE ILUMINACIÓN Y CONTACTOS
INST CABLEADO DE ILUMINACIÓN Y CONTACTOS electrodo se entierre en una zanja de por lo menos 75 cms. de
profundidad. SALA 0.40 m ó 0.60m
01 PLANTA BAJA ESC: 1:50 03 PLANTA BAJA ESC: 1:50
COMEDOR 0.40 m
COCINA 1.20 m
1.80 m
NOTAS GENERALES:
2".
CAMPANA Diagrama Unifilar TUBO CONDUIT
ESTUFA 0.80 m 0.040 0.040 0.265
a) SE PRETENDE QUE LAS TRAYECTORIAS DE CONDUIT ELECTRICO f) LAS CAJAS EN SALIDAS DE CIELO SERAN DE 4" X 4", MEDIDA MEDIDA
n) EN LA INSTALACIÓN DE T.V. Y TELEFONO SOLO SE DEJARÁ EL Acometida CFE

0.04
SALGAN DEL CENTRO DE CARGA Y SIGAN UNA TRAYECTORIA POR REFRIGERADOR 1.20 m MM PULGADAS
OCTOGONALES CON ROSETA CERAMICA. POLIDUCTO GUIADO PARA FACILITAR POSTERIORMENTE LA Tierra Física 0.200

0.040
LA LOSA DE TECHO LLEGANDO A LAS SALIDAS DE CIELO, DE AHI SE 2F 3H 220V
g) LOS ACCESORIOS SERAN DE LA MARCA "SIMON" MODELO INSTALACIÓN DEL CABLE RG6. CAMPANA DE TIMBRE 1.80 m Varilla tipo "Copperweld" de 3.00 mts 16 1/2
DISTRIBUIRAN A OTRAS SALIDAS DE CIELO O BAJARAN POR MURO A
"SERIE 23" COLOR BLANCO. o) EN CADA SALIDA DE CIELO SE AGREGARÁN LÁMPARAS de longitud y conector mecáncio. ARO DE ALTA
CONTACTOS Y CONTINUANDO POR MURO O PISO A OTROS LAVANDERIA SEGURIDAD PARA 21 3/4 SECCIÓN
CONTACTOS DE LA MISMA AREA O DEL MISMO CIRCUITO. h) TODOS LOS CONTACTOS IRÁN EN POSICIÓN HORIZONTAL, TODOS FLUORESCENTES COMPACTAS AHORRADORAS QUE CUMPLAN CON BASE DE ENCHUFE DE PARA

0.52
LOS APAGADORES EN POSICIÓN VERTICAL Y EL CENTRO DE LA NOM-017-ENER/SCFI-2008, Y A PARTIR DE DICIEMBRE 2011 SE LAVADORA Y SECADORA 0.80 m Medidor ACERO 27 1 MEDIDORES
b) LAS TRAYECTORIAS CONDUIT ELECTRICAS SON REPRESENTATIVAS Y

0.070

0.520

0.070
EN OBRA SE DETERMINARA LA MAS CONVENIENTE. EL INICIO DEL CARGA EN POSICIÓN VERTICAL. APLICARÁ LA NOM-028-ENER-2010, LA CERTIFICACIÓN LA DEBERÁ CENTRO DE CARGA 1.60 m proporcionado por CFE 2F-3H 35 1 1/4
220V INTERRUPTOR INTERRUPTOR
CIRCUITO ESTA REPRESENTADO CON UNA FLECHA CURVA E INDICA i) DURANTE LA OBRA TODAS LAS TUBERIAS DEBERAN ESTAR GUIADAS DE PROPORCIONAR EL PROVEEDOR. INTERRUPTOR

p) USAR CONDUCTOR COPPERLITE CCA THW 600V 90° C EN DIFERENTES PATIO Y COCHERA 0.40 m Base de 5 terminales
GENERAL GENERAL
GENERAL 41 1 1/2
QUE VA AL CENTRO DE CARGA. SIEMPRE EN LO POSIBLE POR LOSA CON CABLE ACERADO.
DE TECHO Y EN LA DISTANCIA MAS CORTA. CALIBRES, MARCA CONDUCCASA O SIMILAR. 53 2

0.015

0.185
j) LOS CONTACTOS EXTERIORES LLEVARAN PROTECTOR. PLANTA ALTA
c) LAS CAJAS PARA CONTACTOS Y APAGADORES SERAN q) USAR CONDUCTOR COLOR BLANCO PARA EL NEUTRO, VERDE PARA

0.185

0.185
DE 4" x 2" CON ESPACIOS DE 1/2". k) EL POLIDUCTO PARA T.V. Y/O TELÉFONO SERA DE 3/4" (19mm). LA TIERRA FISICA, NEGRO Y ROJO EN FASES, Y AZUL EN LOS RETORNOS RECAMARAS 0.60 m Interruptor
d) LA CANALIZACIÓN EN TODA DE LA VIVIENDA SERÁ EN POLIDUCTO ESTA CANALIZACIÓN DEBERA COLOCARSE PREFERENTEMENTE POR RETORNOS. 2X30 General

0.035

0.035
ESTANCIA 0.40 m POLIDUCTO POLIDUCTO
COLOR NARANJA. PISO O LOSA DE ENTREPISO. r) SE DEBERAN MARCAR DE MANERA ADECUADA LOS CONTACTOS

1.800
Centro de Carga NQO2 1F3H CORRUGADO 1" CORRUGADO 1"
EN LA ALIMENTACION PRINCIPAL DESDE EL INTERRUPTOR EN 220V. BAÑO 1.20 m

1.800
l) TODAS LAS ALTURAS SON CONSIDERADAS DESDE N.P.T. INTERIOR. 60A 230V con interruptor
CAJA DE CONEXIONES
TERMOMAGNETICO EN MURETE DE MEDICION HASTA EL TABLERO S) LOS EMPALMES Y DERIVACIONES DEBERAN SER POR MEDIO DE

0.61
LA TUBERIA POLIDUCTO DEBERA ENCONTRARSE A UNA m) LAS CAJAS EN SALIDAS DE T.V. Y TELEFONO SERÁN NOTA: LAS ALTURAS ESTAN MARCADAS A Termomagnético 2X30A ANCHO 26 CM X CAJA DE CONEXIONES 0.375 MEDIDOR TIPO SECCIÓN DE CAJA
CONECTORES APROPIADOS, MECANICO O SOLDABLE. ALTURA 57.5 CM X ANCHO 26 CM X
PROFUNDIDAD DE 50 CM Y CUBIERTA CON UNA CAPA DE 5CM DE DE 4" X 4" CON UNA TAPA REDUCCIÓN METÁLICA DE 4" X 4" A 4" X NO ENTORCHADOS, (USO DE CHUPON)
NIVEL SUPERIOR DE FIRME EN PLANTA BAJA Y Tierra Física FONDO 18.5 CM COMO
MÍNIMO
ALTURA 57.5 CM X
FONDO 18.5 CM COMO
0.290 ENCHUFE DE CONEXIÓN

ESPESOR DE CONCRETO. 2". A NIVEL SUPERIOR DE LOSA DE ENTREPISO EN Conectada en Varilla de Estructura MÍNIMO ARO DE ALTA
Centro de Carga

0.200
0.185
SEGURIDAD PARA

0.255
o Llevada a tierrra física instalada
e) PLANTA ALTA. BASE DE ENCHUFE DE
fuera de vivienda Centro de Carga de 6P 100 A ACERO
Modelo QOD6, Marca "Square D"

0.015
DESBALANCEO
CIRCUITO

6 Polos 100A de 1F-3H

0.015
DESCRIPCIÓN
2
R L M ENTRE FASES
FACTOR DE FACTOR DE FACTOR DE
VOLTAJE DEMANDA INTENSIDAD
INTENSIDAD
LONGITUD
DEL
CALIBRES
FASE Y
SECCION
TRANSVER.
CAÍDA DE INTERRUPTOR
TENSIÓN TERMO- CALIBRES
230/110V. BANQUETA
0.390
ICFT 0.00% TEMP. AGRUP. CORREGIDA

0.445
CIRCUITO TIERRA POLIDUCTO
NIVEL DE
NEUTRO CONDUCTOR MÁX 3% MAGNÉTICO Fase B SECCIÓN DE
CORRUGADO 1/2"
EMPOTRAMIENTO
UBICACIÓN DEL CIRCUITO 75W 75W 180W 180W 575W 550W 1,200W 30W A B (BAJANTE A TIERRA)
MURETE VISTA

0.430

0.430
EMPOTRAMIENTO
Fase A
A1 ILUMINACIÓN GENERAL 8 5 1 1,005 127.5 V 1.000 1.000 0.800 8.76 A 10.95 A 15.00 m 12 AWG 2.83 mm2 1.92 % 1 x 15 A 12 AWG

0.050
A2 CONTACTOS PB 1 4 1 1 1,475 127.5 V 1.000 1.000 0.800 12.85 A 16.07 A 12.00 m 12 AWG 3.31 mm2 1.92 % 1 x 20 A 12 AWG
DE PLANTA

0.100
1X15 1X20 1X20 1X20 1X20 1X20 0.260
0.330
A3 CONTACTOS PB 2 3 1 1 1,920 127.5 V 1.000 1.000 0.800 16.73 A 20.92 A 12.00 m 12 AWG 3.31 mm2 2.50 % 1 x 20 A 12 AWG Iluminación General

Contactos Cocina
0.390 0.255

Contactos P.A.
Contactos P.B.
A4
Circuito 01

Circuito 02

Circuito 03

Circuito 04
CONTACTOS PA 7 1,260 127.5 V 1.000 1.000 0.800 10.98 A 13.73 A 15.00 m 12 AWG 3.31 mm2 2.05 % 1 x 20 A 12 AWG

Contactos Lavadora
Circuito 06
Circuito Baños
Circuito 05
A5 CIRCUITO BAÑOS 2 360 127.5 V 1.000 1.000 0.800 3.14 A 3.92 A 12.00 m 12 AWG 3.31 mm2 0.47 % 1 x 20 A 12 AWG MURETE VISTA MURETE VISTA MURETE VISTA MURETE REGISTRO
A6 CIRCUITO LAVADORA 1 550 127.5 V 1.000 1.000 0.800 4.79 A 5.99 A 12.00 m 12 AWG 3.31 mm2 0.72 % 1 x 20 A 12 AWG FRONTAL POSTERIOR LATERAL ELECTRICO: ISOMETRIA
TOTAL INSTALADO 8 5 14 4 1 1 1 1
ALIMENTADOR PRINCIPAL TOTALES 3,285 3,285 6,570 0.647 1.000 1.000 18.52 A 23.15 A 10.00 m 8 AWG 8.37 mm2 0.57 % 2 x 30 A 10 AWG
EL DISEÑO DEL MURETE PUEDE VARIAR

FIRMAS SIMBOLOGÍA NOMENCLATURA REVISIONES TORRE LUNA


FRACCIONAMIENTO:
CAMBIO DE NIVEL N.B.M. NIVEL DE BANQUETA MUNICIPAL REVISIÓN FECHA OBSERVACIONES Y/O CAMBIOS
N.
+0.00 NIVEL N.P. NIVEL DE PATIO 01 12-MAYO-2020 REVISIÓN PROYECTO REV. 01 ÁGUILA REAL 63.001M2 112.000M2
ACCESO
ACCESO PRINCIPAL N.B. NIVEL DE BANQUETA PROTOTIPO: M2 CONSTRUCCIÓN: M2 TERRENO:
PLANTAS DE INST. CABLEADO ELÉCTRICO
A' CORTE N.F.T. NIVEL DE FIRME TERMINADO INSTALACIONES INST INST-02 DER 07 PLANTA DE DESPLANTE DE INSTALACIONES
TABLAS DE ESPECIFICACIONES
ARQ. ARQUITECTÓNICO N.S.L.E. NIVEL SUPERIOR DE LOSA DE ENTREPISO
DISCIPLINA CLAVE PLANO PASILLO No. PLANO DESCRIPCIÓN
INS. INSTALACIONES N.S.L.A. NIVEL SUPERIOR DE LOSA DE AZOTEA
EST. NOTA: ESTE PLANO Y SU CONTENIDO SON PROPIEDAD EXCLUSIVA DE CASAS
ESTRUCTURALES N.S.V. NIVEL SUPERIOR DE VOLADO JAVER, S.A. DE C.V., CONSIDERÁNDOSE ESTRICTAMENTE CONFIDENCIAL,
ARQ. JUAN CARLOS GALLEGOS DE LA ROSA ARQ. ERIK GABINO GONZALEZ BRIONES LIC. ERIKA GUADALUPE ESCOBEDO VILLA ARQ.JUAN CARLOS HERRERA HIDALGO ARQ. BERENICE MOCTEZUMA GONZALEZ LIC. CARLOS ESTEBAN MACIAS CASTILLO ING. FERNANDO PADILLA LORA
ACA. QUEDANDO POR LO TANTO ESTRICTAMENTE PROHIBIDA SU REPRODUCCIÓN
ACABADOS N.S.P. NIVEL SUPERIOR DE PRETIL
DIRECTOR UEN/PLAZA GERENTE DE DISEÑO JEFE DE COMPRAS JEFE DE COSTOS Y PRESUPUESTOS JEFE CONTROL ADMINISTRATIVO DE OBRA GERENTE COMERCIAL GERENTE DE CONSTRUCCIÓN TOTAL O PARCIAL SIN PREVIA AUTORIZACIÓN.
N.C. NIVEL DE CALLE
A
LP A D LP ESPECIFICACIONES DE ACABADOS LP A
A
D LP A C D
7.00 CIELOS 4.40
7.00
0.075 4.40 2.525 1 LOSA DE VIGUETA Y BOVEDILLA, ARAMADA SEGÚN CÁLCULO 1.35 3.05 A
0.075 4.40 2.525

h= 1.8225 del N.S.L.E.


APLANADO DIRECTO EN CIELOS EXTERIORES A BASE DE "BEXEL" Y/O SIMILAR, DE 4 mm. DE
2 K-1 V-1 K-1

v = 0.60 x 0.40
K-3 K-3
LP 3
LP A C D
ESPESOR PROMEDIO.
LP LP 5 5
Barda Medianera h=1.20m.

h=1.20m.

h= 1.0125 del N.S.L.E.


APLICACIÓN EN CIELOS INTERIORES CAPA DE YESO ; ACABADO FINAL

0.65
Barda Medianera h=1.20m.

h=1.20m.
3

v = 1.20 x 1.20
TIROL BLANCO, MARCA CREST O SIMILAR.

0.075
Barda Patio

0.075
4.40 K-1 K-3

Barda
PINTURA VINIL-ACRÍLICA MARCA SHERWIN WILLIAMS O SIMILAR, SEGUN PLANO DE Patio
N.P.
+0.38 1.35 3.05 A
4
SEMBRADO DE COLORES A DOS MANOS N.P.
4 K-1
10 PINTURA VINIL-ACRÍLICA MARCA SHERWIN WILLIAMS O SIMILAR, SEGUN PLANO DE
+0.38 V-3
7 5
SEMBRADO DE COLORES A UNA MANO.
0.15 K-3 2
4.750

4.750
K-1 K-3 K-1
0.15 Recámara

4.750

4.750
N.S.L.E.
5 2
5 MUROS +3.06

0.65

3.450
10

10
2
7

2.20
1.20
7 BLOCK DE CONCRETO DE 0.40 x 0.20 x 0.10 m. (BLOCK No. 4), ASENTADO CON MORTERO
Lavandería N.B.
2 6 1
+0.40 K-1 K-3 CEMENTO-ARENA PROP. 1:5 Lavandería N.B.

JUNTA CONSTRUCTIVA DE 1''


4 2
K-1
2
BLOCK DE CONCRETO DE 0.40 x 0.20 x 0.15 m. (BLOCK No. 6), ASENTADO CON MORTERO
+0.40
3

7 1 CEMENTO-ARENA PROP. 1:5 JUNTA CONSTRUCTIVA DE 1''


10 2 10 5 B Baño B
7 5 7 N.B. 8 PV-1

0.90

0.90
+0.41 BLOCK DE CONCRETO DE 0.40 x 0.20 x 0.15 m. (BLOCK No. 6) EMBOQUILLADO. N.B.
K-1 2 K-1 K-3 K-3 2 K-1 3 Recámara N.S.L.E.
N.S.L.E.
CONSIDERAR ZARPEO, AFINE Y FILETES EXCLUSIVAMENTE EN CERRAMIENTOS Y K-1 K-1 K-3 K-3 K-1
+0.41 +3.06 P-2
4

8
2

2
5

5
4 6
+3.06 3
CASTILLOS. CUANDO SE TRATE DE BARDA "CABECERA" EL ACABADO EXTERIOR Y EL 4 4 K-1 P-3
K-3
2 3 M-2

3.450
1.82
2 3 1 ACABADO INTERIOR SERAN EMBOQUILLADOS, ALTURA INDICADA.

2.20

10

6.90
1

2
7
K-3 K-1

v = 2.20 x 1.50
h= 0.00 del N.F.T
5 6 3 M-3

6
2
8
1.350

3 BLOCK DE CONCRETO DE 0.40 x 0.20 x 0.20 m. (BLOCK No. 8), ASENTADO CON
4

1.350
2
6
6
2
MORTERO CEMENTO-ARENA PROP. 1:5

6.90
2
6
B Baño B APLANADO DIRECTO EN MUROS INTERIORES PARA RECIBIR LAMBRÍN DE AZULEJO, A BASE
N.S.L.E.
+3.06
K-1 K-2b 2
2
5
8
1.82

5
DE ZARPEO CEMENTO-ARENA PROP. 1:4, HECHO EN OBRA Baja

0.60

8
5
2
N.S.L.E.
Cocina +3.06
3 APLANADO DIRECTO EN MUROS INTERIORES CON UNA CAPA BASE DE YESO, ACABADO 13 K-1 K-3
BAJANTE
K-1
K-3 Cocina P-2
SANITARIA
1 1 3 6 FINAL APLANADO RAYADO VERTICAL MCA. ''BEXEL'' CON UNA BASE DE SELLADOR Y
MEZCLA CON GRANO.
BAJANTE
SANITARIA 12 K-1

6.90
B B 2 K-3 K-1 6 B B
PREPARACION
M-2

2
6
6
3 APLANADO DIRECTO EN MUROS EXTERIORES A BASE DE ESTUCO, MARCA "BEXEL" Y/O
EXTRACTOR
11
N.F.T 6 1 2 7

6.90

3.975
+0.49 SIMILAR, DE 4 mm. DE ESPESOR PROMEDIO, SOBRE MURO DE BLOCK. N.F.T 10

3
N.S.L.E.
+3.06
6 K-1 2
K-2b 2 LAMBRIN DE AZULEJO DE 0.25 x 0.40m, MODELO "AMUR", COLOR HUESO, MARCA
+0.49

3.450
Baja 3 1 "LAMOSA", ASENTADO CON ADHESIVO CERAMICO 5000 MCA. "CREST" Y JUNTEADO CON Recámara
10

2
6
6
2
7
2

6 Comedor K-1 2
K-3 6 CEMENTO BLANCO. 8
10
Comedor
6
2

2
7

13
8 ALTURAS
2

10

2
2

6
7
2
12
COCINA: h=0.90m (a parte inferior de azulejo) 7
K-1 K-1 K-1 K-1

2.420
6.175

6.175
PREPARACION LAVABO EN BAÑO: h=0.80m (a parte inferior de azulejo) K-1 K-1 K-1

6.175

6.175
6 N.S.L.E.

h= 0.4125 del N.S.L.E.


EXTRACTOR
11 REGADERA EN BAÑO: h= 2.30m ( a parte superior de azulejo) +3.06
1
P-4
0.60

ESTA LINEA INDICA :

h= 2.57 del N.F.T


5 K-1
8
5
2

3.975
13 10 COLOCACIÓN DE LAMBRIN DE AZULEJO

v = 0.60 x 1.20

v = 1.20 x 1.20
3 7 13
12 N.F.T 9 9
PINTURA VINIL-ACRÍLICA MARCA SHERWIN WILLIAMS O SIMILAR, SEGUN PLANO DE M-4

3.450
+0.31 12 N.F.T
PREPARACION
EXTRACTOR Recámara SEMBRADO DE COLORES A DOS MANOS
PREPARACION +0.31
K-1
6
2

11 8 EXTRACTOR
3 PINTURA VINIL-ACRÍLICA MARCA SHERWIN WILLIAMS O SIMILAR, SEGUN PLANO DE K-1

6
6

6
2
1

2
6
2

2
7
9
11
10 SEMBRADO DE COLORES A UNA MANO. 4 3
10 7 K-5 K-5
1
16.00

16.00
1 3 10
1'

16.00

16.00
6
2

2.420
6
9
Sala 6 N.S.L.E.
+3.06
PISOS 9
K-2
F-1 K-3
K-2 K-3
2 N.F.T Sala V-3 K-1 K-2b

0.075
+0.49 N.F.T
K-1
8
K-1
5 K-1 8 +0.49
7
2
1 1 1
LOSA DE CIMENTACIÓN O LOSA DE CONCRETO, ARMADA SEGÚN CÁLCULO,
TERMINADO SEMI-PULIDO.
K-1 K-1 1' 1.05 3.40 A

6
1
7
2.420

2.420
6 3 6
6 6 2 ESCALERA DE CONCRETO, ARMADA SEGÚN CÁLCULO. 4.45
8 6

h= 1.0125 del N.F.T


5 4 2 3
2 K-5 1 K-5

v = 1.20 x 1.20
Sube 1 1'
3 LOSA DE VIGUETA Y BOVEDILLA, ARMADA SEGÚN CÁLCULO, TERMINADO SEMI-PULIDO. 5
A B D'
K-2 2 K-3 K-2 2 K-3 2 4 Sube
6 6 7 K-1 K-2b P-1
7 7

0.075
9 9 9 EMPASTADO PARA RECIBIR PISO CERÁMICO A BASE DE CEMENTO-ARENA PROP. 1:5
K-1
4 23 2 1 2
1' 1.05 3.40 A 5 HECHO EN OBRA. 4
M-1
ACA PUERTAS Y VENTANAS
1 1 1 K-1
3 2 1

1
N.B.
+0.34
2 K-1 7 K-3
7
1 K-3 2 K-3
7
K-1 4.45 6
PISO CERÁMICO ANTIDERRAPANTE DE 0.20x0.20m. MODELO "DINAMOS", COLOR BEIGE,
MCA. "PORCELANITE" , Y/O SIMILAR, ASENTADO CON CEMENTO ADHESIVO PARA PISO, N.B. K-1 K-3 K-3 K-3 V-1 K-1 04 PLANTA ALTA ESC: 1:50
9 2 9
+0.34
4 MARCA "CREST", Y/O SIMILAR, CON BOQUILLA COLOR ARENA MCA CREST
ACCESO
A B D' 7
BANQUETA DE CONCRETO DE 0.08 m. DE ESPESOR, F´C= 100Kg/cm², ACABADO
ESCOBILLADO.
ACCESO
TABLA DE VENTANAS
8 ACABADO DE CONCRETO APARENTE SOBRE ESCALERA, ARMADA SEGÚN CÁLCULO.
TIPO ANCHO ALTO DESCRIPCIÓN CANT.
ACA ACABADOS ESPECIFICACIONES GENERALES VENTANA CORREDIZA DE ALUMINIO BLANCO, LÍNEA BÁSICA, CON
02 PLANTA ALTA ESC: 1:50 *Llevará ZOCLO VINILICO color "Cafe" de 0.07m. marca VINYLASA, y/o similar.
(Ver plano de Puertas y Ventanas)
V-1 1.20 1.20 PERFIL DE 1.5" CON VIDRIO TRANSPARENTE DE 3mm MARCA CUPRUM
(O SIMILAR). INCLUYE MOSQUITERO DE FIBRA DE VIDRIO.
2
* IMPERMEABILIZACION EN CHAROLA DE REGADERA, APLICAFACIL ACRILICO 5A MCA. PROTEXA CUB. 19 LT
* CEMENTO BLANCO, MARCA PROTEXA VENTANA CORREDIZA DE ALUMINIO BLANCO, LÍNEA BÁSICA, CON
* MALLA DE POLIFLEX REFORZADO, MARCA PROTEXA, EN UNIÓN DE MUROS LATERALES CON FIRME, ENTREPISO Y AZOTEA V-2 0.60 0.40 PERFIL DE 1.5" CON CRISTAL TAPIZ DE 3mm, MARCA CUPRUM (O 1
(Ver plano de Elevaciones constructivas) SIMILAR) INCLUYE MOSQUITERO DE FIBRA DE VIDRIO.
5.075

5.075

5.075

5.075
* IMPERMEABILIZACION EN SUPERFICIE DE AZOTEA MEDIANTE ROLLO PREFABRICADO ASFÁLTICO DIABLO ROJO, SBS/APP 3.5
MM 5 AÑOS. CON BASE DE IMPRIMIDOR ASFÁLTICO EMULTEX TP Y SELLADOR PLASTICEM, MARCA PROTEXA VENTANA COMBINADA DE ALUMINIO BLANCO, LÍNEA BÁSICA, CON
7
Jardín Cochera Jardín TODOS LOS FILETES DE PUERTAS Y VENTANAS SERAN HECHOS CON YESO.
Jardín Cochera Jardín V-3 1.20 1.80 PERFIL DE 1.5" , CON FIJO EN LA PARTE INFERIOR DE 1.20 X 0.60 Y
CORREDIZOS EN LA PARTE SUPERIOR DE 1.20 X 1.20, CON VIDRIO
1
TRANSPARENTE DE 3mm. INCLUYE MOSQUITERO DE FIBRA DE VIDRIO.
A SIMBOLOGÍA FIJO DE ALUMINIO BLANCO, LÍNEA BÁSICA, CON PERFIL DE 1.5" CON
F-1 0.60 1.20 VIDRIO TRANSPARENTE DE 3mm MARCA CUPRUM (O SIMILAR). 1

ACABADO ACABADO
INICIAL ACABADO INICIAL PUERTA CORREDIZA DE ALUMINIO BLANCO, LÍNEA BÁSICA, CON PERFIL
PREPARACIÓN INICIAL
EXTRACTOR 4"
0.25 ACABADO ACABADO ACABADO PV-1 1.50 2.20 DE 2" CON VIDRIO TRANSPARENTE DE 3mm MARCA CUPRUM (O 1
INTERMEDIO INTERMEDIO INTERMEDIO SIMILAR). INCLUYE MOSQUITERO DE FIBRA DE VIDRIO.

ACABADO ACABADO ACABADO


1/2 pieza de FINAL FINAL FINAL
*LOS MARCOS SERAN PRE-ENSAMBLADOS, GALVANIZADOS, CON PINTURA HORNEADA, COLOR BLANCO.
G

azulejo
*TODAS LAS VENTANAS IRAN A CENTRO DE MURO
PREPARACION
EXTRACTOR
N.F.T
JABONERA
CHICA
CEPILLERO PISOS MUROS CIELOS *APLICACIÓN DE SILICON DE ALTA RESISTENCIA TRANSPARENTE EN JUNTA (INTERIOR Y
+0.31 0.25 0.25
0.125 EXTERIOR) ENTRE PERFIL DE VENTANA Y ACABADO DE MURO
0.72 *LOS FIJOS PARA LAS VENTANAS DE ESTE PROYECTO ESTARÁN UBICADOS DEL MISMO LADO QUE EL PASILLO DE SERVICIO DE LA
CASA, ES DECIR, PARA CASAS CON PASILLO DERECHO, LOS FIJOS DE LAS VENTANAS ESTARÁN DEL LADO DERECHO Y PARA CASAS

0.40

2.00
LP N.B.M
+0.14 LP ESPECIFICACIONES DE MUEBLES Y LP N.B.M
LP
CON PASILLO IZQUIERDO, LOS FIJOS DE LAS VENTANAS ESTARÁN DEL LADO IZQUIERDO (VIENDO LAS VENTANAS POR FUERA).

1.65
+0.14
SALIDA HIDRÁULICA
AC AF

ACCESORIOS HIDRAÚLICOS Y
TUBERÍA DE CPVC
DESCARGA DE
N.F.T
TABLA DE PUERTAS

1.00
0.075 4.40 A 2.525
LAVABO 2" Ø
+0.49
A
N.F.T
0.075 4.40 2.525

0.60
+0.31
SANITARIOS
0.50
7.00 7.00
0.20

MEZCLADORA PARA EMPOTRAR PARA REGADERA, CIERRE A COMPRESIÓN, MOD. 32-I,


TIPO ANCHO ALTO DESCRIPCIÓN CANT.
DETALLE AZULEJO Y LAMBRÍN MCA. "RUGO" O SIMIAR, COLOR CROMO.
LP A D LP PASILLO DERECHO 1/2 BAÑO
SALIDA SANITARIA

REGADERA ITALIA 1/2 BRAZO METALICO Y CHAPETON, MOD. 44-IBE, MCA. "RUGO" O
LP A D LP
PUERTA DE ACCESO PPAL. DE ACERO MIXTA COLOR BLANCO, MCA.
WINDOOR O SIMILAR, APLICANDO PINTURA ESMALTE MCA. BEREL
VISTA G SIMILAR, COLOR CROMO. P-1 0.90 2.13 CALIDAD BERALKID (O SIMILAR) A DOS MANOS SOBRE CANTO. INC. 1
ACA ACABADOS SELLADO DE MADERA; COMBO DE CERRADURA CILINDRICA ENTRADA
BOLA ALUMINIO CON CERROJO DE SEGUIRDAD DOBLE CILINDRO MCA.
-LAVABO MODELO JAZMÍN, COLOR BLANCO, MARCA "CATO" O SIMILAR.
01 PLANTA BAJA ESC: 1:50 -MEZCLADORA PARA LAVABO DE 4" CUBIERTA DE LATON, MODELO 24T, MARCA
FANAL.
PUERTA HDF, MCA. WINDOOR O SIMILAR, APLICANDO PINTURA ESMALTE
"RUGO" O SIMILAR.
-ALIMENTADOR PARA WC MOD. 67ME, MARCA "RUGO" O SIMILAR. ACA PUERTAS Y VENTANAS P-2 0.80 2.13
MCA. BEREL CALIDAD BERALKID ( O SIMILAR) A DOS MANOS SOBRE
CANTO. INC. SELLADO DE MADERA, CON CERRADURA CILINDRICA 2
A A C 4 4 -LAVABO MODELO JAZMÍN, COLOR BLANCO, MARCA "CATO" O SIMILAR.
03 PLANTA BAJA ESC: 1:50 ENTRADA BOLA ALUMINIO , MARCA "FANAL"

PUERTA HDF, MCA. WINDOOR O SIMILAR, APLICANDO PINTURA ESMALTE


MEZCLADORA PARA LAVABO DE 4" CUBIERTA DE LATON, MODELO 24T, MARCA "RUGO" MCA. BEREL CALIDAD BERALKID (O SIMILAR) A DOS MANOS SOBRE
1.20
0.95 P-3 0.70 2.13 CANTO. INC. SELLADO DE MADERA, CON CERRADURA CILINDRICA DE 1
0.20
ARRANQUE O SIMILAR.
ALIMENTADOR PARA LAVABO MOD. 25ME, MARCA "RUGO" O SIMILAR. 0.85 0.70 BAÑO BOLA ALUMINIO, MARCA "FANAL" O SIMILAR.
4 DE PISO 0.70
4

C
CESPOL PARA LAVABO , MOD. 29RF, MARCA "RUGO" O SIMILAR.

0.20

0.20
0.20

1.82 PUERTA HDF, MCA. WINDOOR O SIMILAR, APLICANDO PINTURA ESMALTE

0.20
MCA. BEREL CALIDAD BERALKID (O SIMILAR) A DOS MANOS SOBRE

0.20
1.93

1.20
P-4 0.65 1

1.20
LAVADERO PREFABRICADO DE CONCRETO DE 0.55 x 0.60 m. F F CANTO. INC. SELLADO DE MADERA, CON CERRADURA CILINDRICA DE
0.90

Contacto Campana 1.10 BAÑO BOLA ALUMINIO, MARCA "FANAL" O SIMILAR.

1.80
h= 1.80m
1/2 pieza de
azulejo AZULEJO SEGÚN
1/2 pieza de azulejo
TABLA DE ACABADOS
0.10
1.82

B
TABLA DE MARCOS
1.82 1.82

2.16
0.40
D 0.20 0.20

2.00
2.16
0.15 0.18

2.16
Contacto doble Contacto doble
1.00
0.25
A

h= 1.20 m GFCI h= 0.80 m ARRANQUE

0.60
1.20
E

DE AZULEJO
0.50

F
C

0.50

ARRANQUE Apagador Triple


0.250

0.25

DE AZULEJO h= 1.20 m
LP A C D V-1 TIPO ANCHO ALTO DESCRIPCIÓN CANT.
Cocina
1.23

Contacto Estufa 0.40

F h= 0.80 m
AC AF
1.20

1.20

1.20

GAS
1.20 MARCO PRE-ENSAMBLADOS, GALVANIZADOS, CON PINTURA
0.90

0.26 1.10
PLACA DE POLIESTIRENO DE 1" DE M-1 0.95 2.16 HORNEADA, COLOR BLANCO. 1
0.90

N.P.T.

0.30
N.P.T.
V-3

0.30
0.80

N.P.T.

0.30
Baño N.S.L.A. N.P.T.

0.30
DESCARGA DE ESPESOR ENTRE MURO Y LOSA DE
0.60

+5.772
0.60

N.S.L.A.
0.50

3 TARJA 2" Ø
AZOTEA, PARA EVITAR CONTACTO
PLACA DE POLIESTIRENO DE 1" DE
+5.662
M-1
ESPESOR ENTRE MURO Y LOSA DE
AZOTEA, PARA EVITAR CONTACTO

ENTRE ESTOS DOS ELEMENTOS. M-2 M-4


0.165

ENTRE ESTOS DOS ELEMENTOS.

1 PIEZA M-3 2.16


MARCO PRE-ENSAMBLADOS, GALVANIZADOS, CON PINTURA

0.165
M-2 0.85 HORNEADA, COLOR BLANCO. 2
0.60 2 PIEZAS 1 PIEZA 1 PIEZA
VISTA A

0.40
DETALLE AZULEJO Y LAMBRÍN DETALLE AZULEJO Y LAMBRÍN VISTA B PIÑA DE
CONCRETO
1.20
F
0.025

PASILLO DERECHO COCINA PASILLO DERECHO BAÑO MARCO PRE-ENSAMBLADOS, GALVANIZADOS, CON PINTURA
0.40

F M-3 0.75 2.16 HORNEADA, COLOR BLANCO. 1


4 3 PIÑA DE 0.60
3 4 A C C A CONCRETO
F V-2

1.20
0.025

2.20
AZULEJO SEGÚN
TABLA DE ACABADOS
F MARCO PRE-ENSAMBLADOS, GALVANIZADOS, CON PINTURA
M-4 0.70 2.00 HORNEADA, COLOR BLANCO. 1
2.54
0.165

2.43
0.40

1.85

2.13
ARRANQUE

2.13

2.13
ARRANQUE ARRANQUE
0.31

AZULEJO SEGÚN ARRANQUE 0.90 DE AZULEJO

1.93
DE AZULEJO DE AZULEJO DE AZULEJO
0.40 TABLA DE 0.40
0.40 LOSA DE
ACABADOS
Baño Recámara CONCRETO
0.25
0.25

1.20
0.25

F
0.40

1.0125
F 0.25

0.
N.S.L.

02
5
Contacto Doble GFCI +3.06

02

5
AZULEJO SEGÚN h= 1.20 m 0.75 0.75

0.
JABONERA TABLA DE
CEPILLERO
CHICA

0.14
ACABADOS
0.14
1.00

0.125
0.25 0.25 JABONERA 0.20 0.20 0.10 1.50
GRANDE
0.60 APLANADO A
2.22

1.500
PV-1
2.22

AC AF Apagador Doble 0.90 0.80 0.70 0.65 ZARPEO Y AFINE


2.00
2.00

0.40

2.00
1.80

h= 1.20 m
F-1 CEMENTO - ARENA
1.82

0.40 P-1 P-2 P-3 P-4


AC AF
1 PIEZA 2 PIEZAS 1 PIEZA 1 PIEZA
DESCARGA DE
1.00

0.80

0.035 0.025
DET DETALLE DE VENTANAS
0.80

LAVABO 2" Ø
0.60

DET DETALLE DE PUERTAS


0.60
0.50

AF

DET VISTAS INTEIRORES DET DETALLE DE PLACA DE POLIESTIRENO EN MUROS INTERIORES 03


0.20

02 ESC. 1:50
ESC. 1:50 DET GOTERON
01 ESC. 1:50 04 ESC. 1:50 05
VISTA C VISTA D VISTA E VISTA F ESC. 1:10

FIRMAS SIMBOLOGÍA NOMENCLATURA REVISIONES TORRE LUNA


FRACCIONAMIENTO:
CAMBIO DE NIVEL N.B.M. NIVEL DE BANQUETA MUNICIPAL REVISIÓN FECHA OBSERVACIONES Y/O CAMBIOS
N.
+0.00 NIVEL N.P. NIVEL DE PATIO 01 12-MAYO-2020 REVISIÓN PROYECTO REV. 01 ÁGUILA REAL 63.001M2 112.000M2
ACCESO
ACCESO PRINCIPAL N.B. NIVEL DE BANQUETA PROTOTIPO: M2 CONSTRUCCIÓN: M2 TERRENO:
PLANTAS DE ACABADOS

A' CORTE N.F.T. NIVEL DE FIRME TERMINADO


ACABADOS ACA ACA- 01 DER 08
VISTAS INTERIORES
DETALLES PUERTAS, VENTAS Y MARCOS
TABLAS DE ESPECIFICACIONES
ARQ. ARQUITECTÓNICO N.S.L.E. NIVEL SUPERIOR DE LOSA DE ENTREPISO
DISCIPLINA CLAVE PLANO PASILLO No. PLANO DESCRIPCIÓN
INS. INSTALACIONES N.S.L.A. NIVEL SUPERIOR DE LOSA DE AZOTEA
EST. NOTA: ESTE PLANO Y SU CONTENIDO SON PROPIEDAD EXCLUSIVA DE CASAS
ESTRUCTURALES N.S.V. NIVEL SUPERIOR DE VOLADO JAVER, S.A. DE C.V., CONSIDERÁNDOSE ESTRICTAMENTE CONFIDENCIAL,
ARQ. JUAN CARLOS GALLEGOS DE LA ROSA ARQ. ERIK GABINO GONZALEZ BRIONES LIC. ERIKA GUADALUPE ESCOBEDO VILLA ARQ.JUAN CARLOS HERRERA HIDALGO ARQ. BERENICE MOCTEZUMA GONZALEZ LIC. CARLOS ESTEBAN MACIAS CASTILLO ING. FERNANDO PADILLA LORA
ACA. QUEDANDO POR LO TANTO ESTRICTAMENTE PROHIBIDA SU REPRODUCCIÓN
ACABADOS N.S.P. NIVEL SUPERIOR DE PRETIL
DIRECTOR UEN/PLAZA GERENTE DE DISEÑO JEFE DE COMPRAS JEFE DE COSTOS Y PRESUPUESTOS JEFE CONTROL ADMINISTRATIVO DE OBRA GERENTE COMERCIAL GERENTE DE CONSTRUCCIÓN TOTAL O PARCIAL SIN PREVIA AUTORIZACIÓN.
N.C. NIVEL DE CALLE