PORVENIR_CREACION DEL SERVICIO DE EDUCACION INICIAL ESCOLARIZADA EN LA I.E. N°2255 EN EL BARRIO 6B DEL SECTOR
OBRA: ALTO PORVENIR - DISTRITO EL PORVENIR - PROVINCIA DE TRUJILLO - REGION LA LIBERTAD PROVINCIA DE TRUJILLO, REGIÓN LA
LIBERTAD”
D
ITEM DESCRIPCIÓN # VECES TOTAL
UN
LARGO ANCHO ALTURA TOTAL
OE.2 ESTRUCTURAS
2.1. MOVIMIENTO DE TIERRAS
2.1.1.1 NIVELACION m2 390.34
Módulo "1" m2 1.00 Area cad= 195.17 195.17
Módulo "2" m2 1.00 Area cad= 195.17 195.17
2.1.1.2 NIVELADO APISONADO m2 390.34
modulo "1" y modulo "2" m2 1.00 390.34
2.1.2 EXCAVACIONES
2.1.2.2 EXCAVACION PARA CIMIENTOS CORRIDOS 23.97
EN CERCO PERIMETRICO
FRONTAL -
CORTE 2-2 m3 1.00 Area= 9.14 1.15 10.51
CORTE 3-3 m3 1.00 Area= 4.06 1.05 4.26
CORTE 3´-3´ m3 1.00 Area= 3.28 1.02 3.35
zapata 1 m3 1.00 Area= 1.27 1.52 1.93
zapata 2 m3 1.00 Area= 2.58 1.52 3.92
1 de 4
METRADO DE ESTRUCTURAS
PORVENIR_CREACION DEL SERVICIO DE EDUCACION INICIAL ESCOLARIZADA EN LA I.E. N°2255 EN EL BARRIO 6B DEL SECTOR
OBRA: ALTO PORVENIR - DISTRITO EL PORVENIR - PROVINCIA DE TRUJILLO - REGION LA LIBERTAD PROVINCIA DE TRUJILLO, REGIÓN LA
LIBERTAD”
D
ITEM DESCRIPCIÓN # VECES TOTAL
UN
LARGO ANCHO ALTURA TOTAL
INGRESO
Z-1 m3 1.00 1.30 1.30 0.50 0.85
Z-2 m3 1.00 2.65 1.10 0.50 1.46
2 de 4
METRADO DE ESTRUCTURAS
PORVENIR_CREACION DEL SERVICIO DE EDUCACION INICIAL ESCOLARIZADA EN LA I.E. N°2255 EN EL BARRIO 6B DEL SECTOR
OBRA: ALTO PORVENIR - DISTRITO EL PORVENIR - PROVINCIA DE TRUJILLO - REGION LA LIBERTAD PROVINCIA DE TRUJILLO, REGIÓN LA
LIBERTAD”
D
ITEM DESCRIPCIÓN # VECES TOTAL
UN
LARGO ANCHO ALTURA TOTAL
POSTERIOR m3 1.00 28.26 0.13 0.30 1.10
m3 1.00 9.49 0.13 0.30 0.37
m3 1.00 3.77 0.13 0.30 0.15
m3 1.00 18.86 0.13 0.35 0.86
IZQUIERDA m3 1.00 27.09 0.13 0.35 1.23
CERCO PERIMETRICO
FRONTAL
Base m3 1.00 9.27 1.60 0.50 7.42
Pantalla m3 1.00 9.27 0.25 1.70 3.94
Base m3 1.00 10.16 2.15 0.50 10.92
Pantalla m3 1.00 10.16 0.25 2.10 5.33
Base m3 1.00 17.65 2.50 0.50 22.06
Pantalla m3 1.00 17.65 0.25 2.60 11.47
DERECHA
Base m3 1.00 17.75 1.40 0.50 12.43
Pantalla m3 1.00 17.75 0.25 1.30 5.77
Base m3 1.00 2.73 2.50 0.50 3.41
Pantalla m3 1.00 2.73 0.25 2.60 1.77
POSTERIOR
Base m3 1.00 28.26 1.55 0.50 21.90
Pantalla m3 1.00 28.26 0.25 2.30 16.25
Base m3 1.00 9.49 2.25 0.50 10.68
Pantalla m3 1.00 9.49 0.25 3.10 7.35
Base m3 1.00 3.77 2.25 0.50 4.24
Pantalla m3 1.00 3.77 0.25 4.00 3.77
Base m3 1.00 18.86 1.15 0.50 10.84
Pantalla m3 1.00 18.86 0.25 2.10 9.90
IZQUIERDA
Base m3 1.00 30.67 1.40 0.50 21.47
Pantalla m3 1.00 30.67 0.25 1.60 12.27
CERCO PERIMETRICO
FRONTAL
Pantalla m2 2.00 9.27 1.70 31.52
Pantalla m2 2.00 10.16 2.10 42.67
Pantalla m2 2.00 17.65 2.60 91.78
DERECHA
Pantalla m2 2.00 17.75 1.30 46.15
3 de 4
METRADO DE ESTRUCTURAS
PORVENIR_CREACION DEL SERVICIO DE EDUCACION INICIAL ESCOLARIZADA EN LA I.E. N°2255 EN EL BARRIO 6B DEL SECTOR
OBRA: ALTO PORVENIR - DISTRITO EL PORVENIR - PROVINCIA DE TRUJILLO - REGION LA LIBERTAD PROVINCIA DE TRUJILLO, REGIÓN LA
LIBERTAD”
D
ITEM DESCRIPCIÓN # VECES TOTAL
UN
LARGO ANCHO ALTURA TOTAL
2.3.7 COLUMNAS
2.3.7.1 CONCRETO f'c=210 kg/cm2, COLUMNAS 13.24
CERCO PERIMETRICO
C-1 m3 78.00 0.25 0.25 2.45 11.94
C-2 m3 2.00 Area= 0.08 2.45 0.40
C-3 m3 2.00 Area= 0.15 2.45 0.74
C-4 m3 1.00 0.25 0.25 2.45 0.15
2.3.8 VIGAS
2.3.8.1 CONCRETO f'c=210 kg/cm2, EN VIGAS m3 8.43
CERCO PERIMETRICO
m3 1.00 27.03 0.25 0.25 1.69
m3 1.00 24.07 0.25 0.25 1.50
m3 1.00 54.39 0.25 0.25 3.40
m3 1.00 29.46 0.25 0.25 1.84