CRONOGRAMA VALORIZADO DE ADQUISICIÓN DE MATERIALES Y EQUIPOS

INSTALACION DEL SERVICIO DE ENERGIA ELECTRICA MEDIANTE SISTEMA CONVENCIONAL SUBSISTEMA DE DISTRIBUCION PRIMARIA 22.9 KV 3Ø DEL AA.HH. LAS DELICIAS, DISTRITO DE SECHURA, PROVINCIA DE SECHURA – PIURA

MESES
PARTIDAS UND CANT PRECIO SUBTOTAL
ENERO FEBRERO MARZO ABRIL MAYO
RED PRIMARIA
MATERIALES 49,924.84 1,300.73 27,132.11 17,707.51 3,784.49 0.00
CLAVOS PARA MADERA CON CABEZA DE 3" KG 1.00 7.00 7.00 100% 7.00
ABRAZADERA PARA RIOSTRA UND 1.00 42.00 42.00 100.00% 42.00
PIEDRA MEDIANA M3 2.05 140.00 286.86 30% 86.06 70% 200.80
HORMIGON M3 1.85 140.00 258.86 50% 129.43 50% 129.43
TIERRA VEGETAL CERNIDA M3 9.28 70.00 649.60 100% 649.60
AGUA PUESTA EN OBRA M3 2.90 15.00 43.50 2% 0.87 20.00% 8.70 50% 21.75 28% 12.18
CEMENTO PORTLAND TIPO I (42.5 kg) BOL 1.00 29.50 29.50 100% 29.50
CEMENTO TIPO MS BOL 6.45 29.50 190.28 100% 190.28
PERNO HEXAGONAL UND 10.00 28.50 285.00 100% 285.00
MADERA TORNILLO P2 70.00 8.50 595.00 100% 595.00
TRIPLAY DE 1.20x2.40mx6mm UND 4.00 48.00 192.00 100% 192.00
PINTURA ESMALTE GAL 0.65 90.00 58.50 100% 58.50
PINTURA DE TRAFICO FOSFORECENTE GAL 0.90 80.00 72.00 100% 72.00
PINTURA BITUMINOSA GAL 0.38 80.00 30.00 50% 15.00 50% 15.00
PINTURA ASFALTICA IMPERMEABILIZANTE KG 0.60 80.00 48.00 50% 24.00 50% 24.00
POSTE CAC 13/400/180/375 (Incluye Perilla y aditivo inhibidor de corrosión) UND 3.00 1700.40 5,101.20 50.00% 2,550.60 50% 2,550.60
MENSULA DE CAV DE 1.00/300 CARGA DE TRABAJO VERTICAL 150 Kg UND 3.00 112.80 338.40 100.00% 338.40
PALOMILLA SIMPLE DE C.A.V. Mp/1.50/300 UND 1.00 180.00 180.00 100% 180.00
MEDIA LOZA DE CAV 1.30/750 PARA SOPORTE DEL TRANSFORMADOR UND 1.00 364.80 364.80 100% 364.80
SOLADO DE CONCRETO F'C=140 KG/CM2 (E=0,15) UND 3.00 45.00 135.00 100% 135.00
MENSULA DE CAV DE 1.00/500 CARGA DE TRABAJO VERTICAL 150 Kg UND 4.00 112.80 451.20 100% 451.20
MENSULA DE CAV DE 1.20/500 CARGA DE TRABAJO VERTICAL 150 Kg UND 1.00 202.80 202.80 100% 202.80
MENSULA DE CAV DE 0.80/500 CARGA DE TRABAJO VERTICAL 150 Kg UND 1.00 102.00 102.00 100% 102.00
CRUCETA DE MADERA TRATADA DE 4" x 4" x 2.20m DE LONGITUD UND 1.00 250.00 250.00 100% 250.00
CONDUCTOR DE COBRE TIPO WP 10 mm2 M 3.00 6.00 18.00 50% 9.00 25% 4.50 25% 4.50
CONDUCTOR DE COBRE DESNUDO TEMPLE BLANDO DE 25 mm2 M 83.90 21.00 1,761.90 50% 880.94 25% 440.48 25% 440.48
CONDUCTOR DE COBRE DESNUDO TEMPLE DURO DE 35mm2 M 11.30 30.00 339.00 50% 169.50 25% 84.75 25% 84.75
BRAZO SOPORTE RIOSTRA DE PERFIL ANGULAR DE A°G° DE 3" X 3" X 6.35
UND 2.00 160.00 320.00 100% 320.00
mm. SECCIÓN, 1.50m DE LONGITUD
CONDUCTOR DE ALEACIÓN DE ALUMINIO AAAC, 35mm2 M 325.69 4.20 1,367.90 50% 683.94 25% 341.98 25% 341.98
CONDUCTOR DE AL SOLIDO PARA AMARRE DE 16 mm² M 11.00 1.80 19.80 50% 9.90 25% 4.95 25% 4.95
CABLE DE ENERGIA NYY - 1 kV DE TRIPLEX 3x1x25 mm2 M 6.00 90.00 540.00 50% 270.00 25% 135.00 25% 135.00
CABLE DE ENERGIA NYY - 1 kV DE UNIPOLAR 1x25 mm2 M 6.00 30.00 180.00 50% 90.00 25% 45.00 25% 45.00
TRANSFORMADOR 3Ø, 22.9 ± 2X2.5/0.40-0.23 kV de 75 kVA UND 1.00 15600.00 15,600.00 50% 7,800.00 50% 7,800.00
TABLERO DE DISTRIBUCIÓN TIPO TD2 3Ø 380/220 - 220 V, PARA SED DE 5 UND 1.00 9800.00 9,800.00 50% 4,900.00 50% 4,900.00
ELECTRODO DE COPPERWELD DE 16 mm Ø X 2400 mm LONG. UND 4.00 350.00 1,400.00 100% 1,400.00
CONECTOR DE BRONCE TIPO AB PARA ELECTRODO DE 16 mm UND 4.00 5.40 21.60 100% 21.60
CAJA DE CONCRETO REGISTRO, SEGÚN LAMINA DETALLE INCLUYE TAPA
UND 4.00 52.40 209.60 100%
DE CONCRETO PARA INSPECCION DE PUESTA TIERRA 209.60
BENTONITA SÓDICA (SACO DE 30 KG) UND 16.00 25.00 400.00 100% 400.00
AISLADOR POLIMERICO TIPO PIN DE 27 KV UND 9.00 250.00 2,250.00 100% 2,250.00
AISLADOR POLIMERICO TIPO SUSPENSION DE 27 KV UND 12.00 135.00 1,620.00 100% 1,620.00
ADAPTADOR TIPO LIRA DE A°G° DE 16mm Ø X 78mm DE LONG UND 12.00 12.50 150.00 100% 150.00
PERNO DOBLE ARMADO DE AºGº DE 16mm Øx 508 mm DE LONGITUD CON UND 10.00 15.00 150.00 100% 150.00
SECCIONADOR POLIMERICO TIPO CUT-OUT 27 KV,125 KV BIL - 100 Amp UND 3.00 720.00 2,160.00 100% 2,160.00
FUSIBLE TIPO EXPULSION SEGÚN REQUERIMIENTO, TIPO K UND 3.00 6.00 18.00 100% 18.00
TERMINAL DE PRESION CON OJAL DE 125 Amp. DE COBRE UND 6.00 6.00 36.00 100% 36.00
ESPIGA DE FºGº DE 16mmØ x 203mm LONG. PARA AISLADORES TIPO PIN UND 7.00 18.00 126.00 100% 126.00
GRAPA DE ANCLAJE TIPO PISTOLA DE ALUMINIO 35 mm2, 2 PERNOS UND 12.00 20.00 240.00 100% 240.00
TUBO PLASTICO DE PVC SAP, DE 19 mm ø x 2.5 m DE LONG. UND 4.00 12.00 48.00 100% 48.00
CONECTOR CUÑA TIPO MINI WEDGE, 35mm2 UND 12.00 21.60 259.20 100% 259.20
CINTA PLANA DE ARMAR M 18.00 1.80 32.40 100% 32.40
PERNO OJO DE AºGº 16 mmØ X 203 mm LONG., 152 mm MAQ. CON TUERCA UND 9.00 9.50 85.50 100% 85.50
ARANDELA CUADRADA CURVA DE A°G° 57 mm X 57 mm x 5 mm, 18 mm Ø DE UND 28.00 1.70 47.60 100% 47.60
PLANCHA DOBLADA DE COBRE TIPO "J" UND 26.00 9.00 234.00 100% 234.00
CONECTOR DE COBRE TIPO PERNO PARTIDO(SPLIT BOLT) UND 12.00 8.80 105.60 67% 70.75 33% 34.85
FLEJE DE ACERO INOXIDABLE DE 19mm,DE ANCHO DE ESPESOR 0.8mm. M 12.40 5.40 66.96 100% 66.96
HEBILLA PARA FLEJE DE ACERO DE 19mm. UND 13.00 1.44 18.72 100% 18.72
ARANDELA CUADRADA CURVA DE A°G° 57 mm X 57 mm x 5 mm, 18 mm Ø DE UND 22.00 1.70 37.40 100% 37.40
PERNO MAQUINADO DE A°G° DE 19mm X 508 mm LONG., 152 mm MAQ.
UND 1.00 23.40 23.40 100% 23.40
CON TUERCA Y CONTRATUERCA

VARILLA DE ARMAR PREFORMADA SIMPLE PARA CNDUCTOR DE 35 mm2 UND 6.00 7.80 46.80 100% 46.80
MATERIALES (VARIOS) %MO 207.86 100% 207.86
MATERIALES (VARIOS) %MO 13.28 100% 13.28
MATERIALES (VARIOS) %MO 51.45 100% 51.45
MATERIALES (VARIOS) ESTACA, YESO, PINTURA %MO 5.37 100% 5.37
SUB TOTAL MATERIALES RED PRIMARIA 49,924.84 1,300.73 27,132.11 17,707.51 3,784.49 0.00
% AVANCE PARCIAL 2.61% 54.35% 35.47% 7.58% 0.00%
% AVANCE ACUMULADO 2.61% 56.95% 92.42% 100.00% 100.00%

MESES
PARTIDAS UND CANT PRECIO SUBTOTAL
ENERO FEBRERO MARZO ABRIL MAYO
RED PRIMARIA
EQUIPOS 4,934.09 72.90 1,549.60 3,271.86 33.12 6.62
POLEAS HM 2.56 9.00 23.04 100% 23.04
TEODOLITO HM 0.33 50.00 16.50 100% 16.50
TIRFOR DE TN HM 7.68 35.00 268.80 100% 268.80
HERRAMIENTAS MANUALES %MO 331.15 10% 33.12 10% 33.12 68% 225.18 10% 33.12 2% 6.62
RADIO WALKIE TALKIE HE 11.12 15.00 166.80 10% 16.68 90% 150.12
CAMION PLATAFORMA HM 0.50 45.00 22.50 100% 22.50
CAMIONETA PICK UP DOBLE CABINA 4 X 4 HM 12.26 150.00 1,839.00 15% 275.85 85% 1,563.15
CAMION GRUA DE 6 TN HM 11.20 180.00 2,016.02 50% 1,008.01 50% 1,008.01
COMPUTADORA HM 0.22 20.00 4.40 100% 4.40
PLOTER HM 0.22 10.00 2.20 100% 2.20
MEZCLADORA DE TROMPO 9 P3 (8 HP) HM 3.00 20.00 60.00 100% 60.00
ESCALERA DE ALUMINIO EMBONABLE HM 26.24 7.00 183.68 100% 183.68
SUB TOTAL EQUIPOS RED PRIMARIA 4,934.09 72.90 1,549.60 3,271.86 33.12 6.62
% AVANCE PARCIAL 1.48% 31.41% 66.31% 0.67% 0.13%
% AVANCE ACUMULADO 1.48% 32.88% 99.19% 99.87% 100.00%

SUBTOTAL RED PRIMARIA 54,858.93 1,373.63 28,681.71 20,979.37 3,817.61 6.62


% AVANCE PARCIAL 2.50% 52.28% 38.24% 6.96% 0.01%
% AVANCE ACUMULADO 2.50% 54.79% 93.03% 99.99% 100.00%
MESES
PARTIDAS UND CANT PRECIO SUBTOTAL
ENERO FEBRERO MARZO ABRIL MAYO
RED SECUNDARIA
MATERIALES 152,942.71 954.21 43,755.30 36,150.73 72,026.38 56.09
PIEDRA MEDIANA M3 17.12 140.00 2,396.66 100% 2,396.66
HORMIGÓN M3 16.90 140.00 2,365.86 25% 591.47 75% 1,774.40
TIERRA VEGETAL CERNIDA M3 30.00 70.00 2,100.00 100% 2,100.00
AGUA PUESTA EN OBRA M3 19.90 15.00 298.50 10% 29.85 40% 119.40 30% 89.55 20% 59.70
CEMENTO TIPO MS BOL 92.45 29.50 2,727.28 8% 218.18 92% 2,509.10
PINTURA ESMALTE GAL 2.15 90.00 193.50 100% 193.50
PINTURA DE TRAFICO FOSFORESCENTE GAL 12.90 80.00 1,032.00 100% 1,032.00
PINTURA BITUMINOSA GAL 5.38 80.00 430.00 50% 215.00 50% 215.00
PINTURA IMPERMEABILIZANTE GAL 4.30 80.00 344.00 50% 172.00 50% 172.00
POSTE C.A.C. 9/200/2/120/255 (Incluye Perilla y aditivo inhibidor de corrosión) UND 29.00 668.40 19,383.60 50% 9,691.80 50% 9,691.80
POSTE C.A.C. 9/300/2/120/255 (Incluye Perilla y aditivo inhibidor de corrosión) UND 14.00 736.80 10,315.20 50% 5,157.60 50% 5,157.60
BLOQUE DE CONCRETO ARMADO 0.40x0.40x0.15 m UND 14.00 52.40 733.60 100% 733.60
SOLADO DE CONCRETO F'C=140 KG/CM2 (E=0,15 M) UND 44.00 45.00 1,980.00 100% 1,980.00
POSTE C.A.C. 8/200/2/120/255 (Incluye Perilla y aditivo inhibidor de corrosión) UND 1.00 544.80 544.80 100% 544.80
MANTA ABIERTA TERMOCONTRAIBLE SELADO DE EXTREMO DE CABLE UND 22.60 165.00 3,729.00 53% 1,976.37 47% 1,752.63
CAPUCHON TERMOCOTRAIBLE SELLADO EN EXTREMO DE CABLE UND 30.00 7.80 234.00 100% 234.00
CINTA SELLANTE MASTIC TERMORESISTENTE UND 10.20 140.00 1,428.00 49% 699.72 51% 728.28
CORREA PLASTICA DE AMARRE DE 2x7.6x340mm DE LONGITUD COLOR NEG UND 416.00 2.00 832.00 100% 832.00
CABLE AUTOPORTANTE DE ALUMINIO TIPO CAAI 3x25 + 1x16 + NA25 mm2 M 1256.27 14.40 18,090.29 50% 9,045.15 25% 4,522.57 25% 4,522.57
CONDUCTOR DE AMARRE TPO TW DE 4mm2 M 30.00 3.80 114.00 100% 114.00
CONDUCTOR DE COBRE TIPO WP 10mm2 M 36.00 6.00 216.00 100% 216.00
CONDUCTOR DE COBRE DESNUDO TEMPLE BLANDO DE 25 mm2 M 110.00 21.00 2,310.00 100% 2,310.00
CABLE TIPO NLT 2x2,5 mm2 M 167.00 6.50 1,085.50 100% 1,085.50
LUMINARIA LED DE 50W, 230 V - 60 Hz UND 93.00 550.00 51,150.00 15% 7,416.75 86% 43,733.25
AISLADOR DE PORCELANA TIPO CARRETE CLASE 54-2 UND 30.00 8.50 255.00 100% 255.00
GRAPA DE ANCLAJE TIPO CUÑA PARA CONDUCTOR AL 25 - 35 mm2 UND 30.00 14.20 426.00 100% 426.00

CONECTOR BIMETÁLICO CUÑA SEGÚN REQUERIMIENTO UND 194.00 11.40 2,211.60 46% 1,017.34 54%
1,194.26
CAJA DE DERIVACIÓN MONOFÁSICA MONOPOLAR DE 4 SALIDAS TIPO CASE UND 45.00 70.00 3,150.00 100% 3,150.00
AISLADOR DE PORCELANA TIPO TRACCIÓN, CLASE ANSI 54-1 (RETENIDA BT UND 14.00 7.50 105.00 100% 105.00
CONECTOR BIMETALICO CUÑA, 25mm2 10.00 11.40 114.00 100% 114.00

ELECTRODO DE COPPERWELD DE 16 mm Ø X 2400 mm LONG. UND 10.00 350.00 3,500.00 100% 3,500.00

CONECTOR DE BRONCE TIPO AB PARA ELECTRODO DE 16 mm UND 10.00 5.40 54.00 100% 54.00
CAJA DE CONCRETO REGISTRO, SEGÚN LAMINA DETALLE INCLUYE TAPA
UND 10.00 52.40 524.00 100% 524.00
DE CONCRETO PARA INSPECCION DE PUESTA TIERRA
BENTONITA SÓDICA (SACO DE 30 KG) UND 40.00 25.00 1,000.00 100% 1,000.00
TUBO PLASTICO DE PVC SAP, DE 25 mm ø x 2.5 m DE LONG. UND 10.00 14.40 144.00 100% 144.00

VARILLA DE ANCLAJE DE ACERO, DE 16 mm Ø X 1 800 mm DE LONGITUD


UND 14.00 35.90 502.60 100% 502.60
PROVISTO DE OJAL-GUARDACABO EN UN EXTREMO, TUERCA Y CONT

PERNO MAQUINADO DE A°G° DE 16mmØ X 254 mm LONG., 152 mm MAQ.


UND 30.00 8.50 255.00 100% 255.00
CON TUERCA Y CONTRATUERCA Y ARANDELA REDONDA
PERNO OJO DE AºGº 16 mmØ X 203 mm LONG., 152 mm MAQ. CON TUERCA
UND 14.00 9.50 133.00 100% 133.00
Y CONTRATUERCA
PERNO OJO DE AºGº 16 mmØ X 356mm LONG., 152 mm MAQ. CON TUERCA
UND 4.00 18.50 74.00 100% 74.00
Y CONTRATUERCA
TUERCA OJO AºGº PARA PERNO DE 16 mmØ UND 2.00 11.40 22.80 100% 22.80
ARANDELA REDONDA DE AºGº DE 18 mm Ø X 3 mm DE ESPESOR UND 30.00 1.60 48.00 100% 48.00
PORTALINEA UNIPOLAR CLEVIS DE FºGº UND 78.00 8.50 663.00 100% 663.00
HEBILLA PARA FLEJE DE ACERO DE 19mm. UND 78.00 1.50 117.00 100% 117.00
FLEJE DE ACERO INOXIDABLE DE 19mm, DE ANCHO DE ESPESOR 0.8 mm UND 46.80 5.40 252.72 100% 252.72
PERNO ANGULAR CON OJAL GUARDACABO 16 mm Ø X 203 mmLONG.,
UND 14.00 10.50 147.00 100% 147.00
152mm MAQ. CON TUERCA Y CONTRATUERCA
CABLE DE ACERO TIPO SIEMENS MARTIN DE 10 mm Ø M 127.00 5.16 655.32 100% 655.32
MORDAZA PREFORMADA DE ACERO PARA CABLE DE 10 mm Ø UND 56.00 7.80 436.80 100% 436.80
ARANDELA DE ANCLAJE DE ACERO DE 102 X 102 X 5 mm CON AGUJERO CE UND 14.00 5.76 80.64 100% 80.64

SOPORTE DE CONTRAPUNTA DE 150mm Ø X 1.0m LONG. CON


UND 13.00 85.00 1,105.00 100% 1,105.00
ABRAZADERA PARTIDA EN UN EXTREMO

CANALETA GUARDACABLE DE F°G° DE 2400 mm DE LONGITUD CON


UND 14.00 36.00 504.00 100% 504.00
PERNO Y TUERCA EN UN EXTREMO
ALAMBRE DE AoGo N°12 PARA ENTORCHADO M 16.80 96.00 1,612.80 100% 1,612.80
PASTORAL DE A° G° EN CALIENTE DE 38 mm Ø DE 1,50 m DE AVANCE
UND 47.00 120.00 5,640.00 100% 5,640.00
HORIZONTAL Y V=1,10 m, 15°
ABRAZADERA SIMPLE DE F° G° DE 38 mm X 5,0 mm X 121 mm Ø (POSTE DE B. UND 88.00 35.00 3,080.00 100% 3,080.00
ABRAZADERA SIMPLE DE F° G° DE 38 mm X 5,0 mm X 232 mm Ø (POSTE DE M UND 4.00 38.00 152.00 100% 152.00
EXTENSOR PARA PASTORAL EN SE INCLUYE ABRAZADERAS PARA POSTE
UND 1.00 220.00 220.00 100% 220.00
DE MT
ARANDELA CUADRADA CURVA DE A°G° 57 mm X 57 mm X 5 mm, 18 mm DE
UND 94.00 1.70 159.80 100% 159.80
AGUJERO
MATERIALES (VARIOS) %MO 1,121.85 5% 56.09 20% 224.37 60% 673.11 10% 112.19 5% 56.09
MATERIALES (VARIOS) %MO 200.79 20% 40.16 80% 160.63
MATERIALES (VARIOS) %MO 182.58 20% 36.52 80% 146.06
MATERIALES VARIOS (ESTACA, YESO, PINTURA) %MO 58.62 100% 58.62
SUB TOTAL MATERIALES RED SECUNDARIA 152,942.71 954.21 43,755.30 36,150.73 72,026.38 56.09
% AVANCE PARCIAL 0.62% 28.61% 23.64% 47.09% 0.04%
% AVANCE ACUMULADO 0.62% 29.23% 52.87% 99.96% 100.00%

MESES
PARTIDAS UND CANT PRECIO SUBTOTAL
ENERO FEBRERO MARZO ABRIL MAYO
RED SECUNDARIA
EQUIPOS 23,417.08 1,338.03 8,404.01 13,265.85 368.27 40.92
POLEAS HM 6.1500 9.00 55.35 100% 55.35
TEODOLITO HM 3.6000 50.00 180.00 100% 180.00
TIRFOR DE 3TN HM 43.5200 35.00 1,523.20 100% 1,523.20
HERRAMIENTAS MANUALES %MO 2,045.93 10% 204.59 35% 716.08 35% 716.08 18% 368.27 2% 40.92
RADIO WALKIE TALKIE HE 48.9600 15.00 734.40 10% 73.44 90% 660.96
CAMIONETA PICK UP DOBLE CABINA 4 X 4 HM 25.9251 150.00 3,888.77 100% 3,888.77
CAMION GRUA DE 6 TN HM 71.6681 180.00 12,900.26 15% 1,935.04 85% 10,965.22
COMPUTADORA HM 2.0000 20.00 40.00 85% 34.00 15% 6.00
PLOTER HM 2.0000 10.00 20.00 100% 20.00
MEZCLADORA DE TROMPO 9 P3 (8 HP) HM 43.0000 20.00 860.00 100% 860.00
ESCALERA DE ALUMINIO EMBONABLE HM 167.02 7.00 1,169.17 100% 1,169.17
100% 0.00
SUB TOTAL EQUIPOS RED SECUNDARIA 23,417.08 1,338.03 8,404.01 13,265.85 368.27 40.92
% AVANCE PARCIAL 5.71% 35.89% 56.65% 1.57% 0.17%
% AVANCE ACUMULADO 5.71% 41.60% 98.25% 99.83% 100.00%

SUBTOTAL RED SECUNDARIA 176,359.79 2,292.24 52,159.32 49,416.58 72,394.65 97.01


% AVANCE PARCIAL 1.30% 29.58% 28.02% 41.05% 0.06%
% AVANCE ACUMULADO 1.30% 30.88% 58.90% 99.94% 100.00%
MESES
PARTIDAS UND CANT PRECIO SUBTOTAL
ENERO FEBRERO MARZO ABRIL MAYO
CONEXIONES DOMICILIARIAS
MATERIALES 44,625.82 0.00 0.00 44,394.33 114.59 116.90
CURVA PVC SAP DE 1"x90° UND 155.00 2.98 461.90 100% 461.90
PIEDRA MEDIANA M3 7.75 140.00 1,085.00 100% 1,085.00
HORMIGÓN M3 7.75 140.00 1,085.00 100% 1,085.00
AGUA PUESTA EN OBRA M3 6.05 15.00 90.68 100% 90.68
CEMENTO TIPO MS BOL 46.50 29.50 1,371.75 100% 1,371.75
MURETE DE 0.30x0.25x1.00 m UND 155.00 160.00 24,800.00 100% 24,800.00
TUBO MASTIL DE F°G° 35 MM Ø x 6.4M C/ ARMELLA TIRAFON UND 155.00 100.00 15,500.00 100% 15,500.00
MATERIALES (VARIOS) %MO 231.49 49.5% 114.59 50.5% 116.90
SUB TOTAL MATERIALES CONEXIONES DOMICILIARIAS 44,625.82 0.00 0.00 44,394.33 114.59 116.90
% AVANCE PARCIAL 0.00% 0.00% 99.48% 0.26% 0.26%
% AVANCE ACUMULADO 0.00% 0.00% 99.48% 99.74% 100.00%

MESES
PARTIDAS UND CANT PRECIO SUBTOTAL
ENERO FEBRERO MARZO ABRIL MAYO
CONEXIONES DOMICILIARIAS
EQUIPOS 747.08 0.00 0.00 0.00 369.81 377.28
HERRAMIENTAS MANUALES %MO 413.23 49.50% 204.55 50.50% 208.68
ESCALERA DE ALUMINIO EMBONABLE HM 47.69 7.00 333.85 49.50% 165.26 50.50% 168.60

SUB TOTAL EQUIPOS CONEXIONES DOMICILIARIAS 747.08 0.00 0.00 0.00 369.81 377.28
% AVANCE PARCIAL 0.00% 0.00% 0.00% 49.50% 50.50%
% AVANCE ACUMULADO 0.00% 0.00% 0.00% 49.50% 100.00%

SUBTOTAL CONEXIONES DOMICILIARIAS 45,372.90 0.00 0.00 44,394.33 484.39 494.18


% AVANCE PARCIAL 0.00% 0.00% 97.84% 1.07% 1.09%
% AVANCE ACUMULADO 0.00% 0.00% 97.84% 98.91% 100.00%
MESES
PARTIDAS UND CANT PRECIO SUBTOTAL
ENERO FEBRERO MARZO ABRIL MAYO
PLAN COVID - 19
MATERIALES Y EQUIPOS 13,952.93 797.31 3,720.78 4,119.41 3,986.56 1,328.87
AGUA POTABLE PARA HIGIENE M3 10.00 15.00 150.00 5.7% 8.57 26.7% 40.00 29.5% 44.29 28.6% 42.85 9.5% 14.29
PEDILUVIO DESINFECTANTE DE CALZADO UND 1.00 110.17 110.17 5.7% 6.30 26.7% 29.38 29.5% 32.53 28.6% 31.47 9.5% 10.49
PROYECTOR MULTIMEDIA UND 0.20 2966.11 593.22 5.7% 33.90 26.7% 158.19 29.5% 175.14 28.6% 169.49 9.5% 56.50
GUANTES INDUSTRIAL NEOPRENO 450 T8 PAR 10.00 20.00 200.00 5.7% 11.43 26.7% 53.33 29.5% 59.05 28.6% 57.14 9.5% 19.05
RESPIRADOR REUTILIZABLE S950 + FILTROS P3 UND 0.20 296.61 59.32 5.7% 3.39 26.7% 15.82 29.5% 17.51 28.6% 16.95 9.5% 5.65
MOCHILA FUMIGADORA C/PULVERIZADOR MANUAL UND 0.83 186.44 153.81 5.7% 8.79 26.7% 41.02 29.5% 45.41 28.6% 43.94 9.5% 14.65
HIPOCLORITO DE SODIO L 2.50 5.94 14.85 5.7% 0.85 26.7% 3.96 29.5% 4.38 28.6% 4.24 9.5% 1.42
ALCOHOL EN GEL L 21.50 11.00 236.50 5.7% 13.51 26.7% 63.07 29.5% 69.82 28.6% 67.57 9.5% 22.53
TRAPEADOR INDUSTRIAL L 5.00 20.00 100.00 5.7% 5.71 26.7% 26.67 29.5% 29.52 28.6% 28.57 9.5% 9.53
BOLSA ROJA DE 20X30 PQT 225.00 0.85 191.25 5.7% 10.93 26.7% 51.00 29.5% 56.46 28.6% 54.64 9.5% 18.22
ALCOHOL 96° L 6.50 11.00 71.50 5.7% 4.09 26.7% 19.07 29.5% 21.11 28.6% 20.42 9.5% 6.81
GAFAS DE PROTECCION UND 5.00 10.17 50.85 5.7% 2.91 26.7% 13.56 29.5% 15.01 28.6% 14.53 9.5% 4.84
DETERGENTE KG 5.00 7.63 38.15 5.7% 2.18 26.7% 10.17 29.5% 11.26 28.6% 10.91 9.5% 3.63
ESCOBA CON MANGO PVC UND 2.50 12.00 30.00 5.7% 1.71 26.7% 8.00 29.5% 8.86 28.6% 8.57 9.5% 2.86
BALDE DE 16 LT UND 2.50 4.24 10.60 5.7% 0.61 26.7% 2.83 29.5% 3.13 28.6% 3.02 9.5% 1.01
TRAJE DE PROTECCION BIOLOGICA UND 5.00 67.80 339.00 5.7% 19.37 26.7% 90.40 29.5% 100.09 28.6% 96.85 9.5% 32.29
FICHA DE SINTOMATOLOGIA COVID-19 UND 46.00 0.43 19.78 5.7% 1.13 26.7% 5.27 29.5% 5.84 28.6% 5.66 9.5% 1.88
APLICACION DE PRUEBA SEROLOGICAS UND 46.00 80.00 3,680.00 5.7% 210.28 26.7% 981.33 29.5% 1,086.48 28.6% 1,051.43 9.5% 350.48
FICHA DE INVESTIGACION CLINICO EPIDEMIOLOGICA DE COVID-19 UND 46.00 0.43 19.78 5.7% 1.13 26.7% 5.27 29.5% 5.84 28.6% 5.66 9.5% 1.88
MASCARILLA QUIRURGICA UND 2525.00 1.00 2,525.00 5.7% 144.28 26.7% 673.33 29.5% 745.48 28.6% 721.43 9.5% 240.48
JABON LIQUIDO L 27.00 9.00 243.00 5.7% 13.89 26.7% 64.80 29.5% 71.74 28.6% 69.43 9.5% 23.14
CARTEL DE SEÑALIZACION DE LAADO DE MANOS UND 2.50 30.00 75.00 5.7% 4.29 26.7% 20.00 29.5% 22.14 28.6% 21.43 9.5% 7.14
TACHOS DE DESECHOS COVID-19 COLOR ROJO UND 2.50 15.00 37.50 5.7% 2.14 26.7% 10.00 29.5% 11.07 28.6% 10.72 9.5% 3.57
PAPEL TOALLA X 200 M UND 50.00 5.00 250.00 5.7% 14.29 26.7% 66.67 29.5% 73.81 28.6% 71.42 9.5% 23.81
LAVAMANOS PORTATIL UND 1.25 300.00 375.00 5.7% 21.43 26.7% 100.00 29.5% 110.71 28.6% 107.15 9.5% 35.71
AFICHES INFORMATIVOS UND 25.00 10.17 254.25 5.7% 14.53 26.7% 67.80 29.5% 75.06 28.6% 72.65 9.5% 24.21
TERMOMETRO DIGITAL INFRAROJO UND 1.00 260.00 260.00 5.7% 14.86 26.7% 69.33 29.5% 76.76 28.6% 74.29 9.5% 24.76
BOTIQUIN CON MEDICAMENTOS BASICOS UND 1.00 450.00 450.00 5.7% 25.71 26.7% 120.00 29.5% 132.86 28.6% 128.57 9.5% 42.86
TENSIOMETRO DIGITAL UND 1.00 240.00 240.00 5.7% 13.71 26.7% 64.00 29.5% 70.86 28.6% 68.57 9.5% 22.86
BAJA LENGUA UND 20.00 2.00 40.00 5.7% 2.29 26.7% 10.67 29.5% 11.81 28.6% 11.42 9.5% 3.81
BATA DESCARTABLE UND 1.00 20.00 20.00 5.7% 1.14 26.7% 5.33 29.5% 5.90 28.6% 5.72 9.5% 1.91
GUANTES PARA PROTECCION BIOLOGICA PAR 5.00 12.00 60.00 5.7% 3.43 26.7% 16.00 29.5% 17.71 28.6% 17.15 9.5% 5.71
BOTAS PARA PROTECCION BIOLOGICA PAR 2.50 40.00 100.00 5.7% 5.71 26.7% 26.67 29.5% 29.52 28.6% 28.58 9.5% 9.52
TRAJE PARA PROTECCION BIOLOGICA UND 2.50 60.00 150.00 5.7% 8.57 26.7% 40.00 29.5% 44.29 28.6% 42.85 9.5% 14.29
MASCARILLA QUIRURGICA MES 2500.00 1.00 2,500.00 5.7% 142.85 26.7% 666.67 29.5% 738.10 28.6% 714.28 9.5% 238.10
SEÑALIZACION DE AFORO UND 10.00 12.72 127.20 5.7% 7.27 26.7% 33.92 29.5% 37.55 28.6% 36.35 9.5% 12.11
SEÑALIZACION DE DISTANCIAMIENTO SOCIAL UND 10.00 12.72 127.20 5.7% 7.27 26.7% 33.92 29.5% 37.55 28.6% 36.35 9.5% 12.11
COMPUTADORA HM 2.50 20.00 50.00 5.7% 2.86 26.7% 13.33 29.5% 14.76 28.6% 14.29 9.5% 4.76
SUBTOTAL PLAN COVID 19 13,952.93 797.31 3,720.78 4,119.41 3,986.56 1,328.87
% AVANCE PARCIAL 5.71% 26.67% 29.52% 28.57% 9.52%
% AVANCE ACUMULADO 5.71% 32.38% 61.90% 90.48% 100.00%

CUADRO RESUMEN DEL CRONOGRAMA DE ADQUISICIONES DE MATERIALES Y EQUIPOS DEL PROYECTO


MESES
PARTIDAS UND CANT PRECIO SUBTOTAL
ENERO FEBRERO MARZO ABRIL MAYO
RED PRIMARIA 54,858.93 1,373.63 28,681.71 20,979.37 3,817.61 6.62
RED SECUNDARIA 176,359.79 2,292.24 52,159.32 49,416.58 72,394.65 97.01
CONEXIONES DOMICILIARIAS 45,372.90 0.00 0.00 44,394.33 484.39 494.18
PLAN COVID-19 13,952.93 797.31 3,720.78 4,119.41 3,986.56 1,328.87
COSTO DIRECTO 290,544.55 4,463.17 84,561.80 118,909.69 80,683.21 1,926.68
% AVANCE PARCIAL 1.54% 29.10% 40.93% 27.77% 0.66%
% AVANCE ACUMULADO 1.54% 30.64% 71.57% 99.34% 100.00%
MANO DE OBRA MESES
UND CANT PRECIO PARCIAL ENERO FEBRERO MARZO ABRIL MAYO
RED PRIMARIA
OPERARIO HH 75.67 24.23 1,833.48 2% 36.67 15% 275.02 80% 1,466.78 2% 36.67 1% 18.33
OFICIAL HH 85.38 19.13 1,633.33 2% 32.67 15% 245.00 80% 1,306.66 2% 32.67 1% 16.33
PEON HH 185.96 17.29 3,215.25 2% 64.31 15% 482.29 80% 2,572.20 2% 64.31 1% 32.15
PRUEBAS Y PUESTA EN SERVICIO GLB 1.00 2,000.00 2,000.00 0% 0.00 0% 0.00 0% 0.00 0% 0.00 100% 2,000.00
TRANSPORTE GLB 1.00 2,853.02 2,853.02 0% 0.00 50% 1,426.51 50% 1,426.51 0% 0.00 0% 0.00
ELABORACION DE EXPEDIENTE TECNICO FINAL DE OBRA GLB 1.00 3,500.00 3,500.00 0% 0.00 0% 0.00 0% 0.00 0% 0.00 100% 3,500.00
PAGO POR CORTE DE ENERGIA ENOSA GLB 1.00 3,800.00 3,800.00 0% 0.00 0% 0.00 0% 0.00 0% 0.00 100% 3,800.00
OPERARIO TOPOGRAFO HH 0.88 27.42 24.13 100% 24.13 0% 0.00 0% 0.00 0% 0.00 0% 0.00
AYUDANTE DE TOPOGRAFIA HH 0.88 20.12 17.71 100% 17.71 0% 0.00 0% 0.00 0% 0.00 0% 0.00
TECNICO DIBUJANTE AUTOCAD HH 0.88 27.42 24.13 100% 24.13 0% 0.00 0% 0.00 0% 0.00 0% 0.00
ESPECIALISTA EN INGENIERIA EN REDES PRIMARIAS Y/O SECUNDARIAS HH 1.76 40.00 70.40 100% 70.40 0% 0.00 0% 0.00 0% 0.00 0% 0.00
SUBTOTAL MANO DE OBRA RED PRIMARIA 18,971.45 270.01 2,428.82 6,772.16 133.64 9,366.82
% AVANCE PARCIAL 1.42% 12.80% 35.70% 0.70% 49.37%
% AVANCE ACUMULADO 1.42% 14.23% 49.92% 50.63% 100.00%

MANO DE OBRA MESES


UND CANT PRECIO PARCIAL ENERO FEBRERO MARZO ABRIL MAYO
RED SECUNDARIA - - - - -
OPERARIO HH 537.77 24.23 13,030.26 6% 781.82 7% 912.12 82% 10,684.81 0% 0.00 5% 651.51
OFICIAL HH 331.43 19.13 6,340.16 6% 380.41 7% 443.81 82% 5,198.93 0% 0.00 5% 317.01
PEON HH 1,280.59 17.29 22,141.46 6% 1,328.49 7% 1,549.90 82% 18,156.00 0% 0.00 5% 1,107.07
PRUEBAS Y PUESTA EN SERVICIO GLB 1.00 2,000.00 2,000.00 0% 0.00 0% 0.00 0% 0.00 0% 0.00 100% 2,000.00
EXPEDIENTE TECNICO CONFORME A OBRA GLB 1.00 3,500.00 3,500.00 0% 0.00 0% 0.00 0% 0.00 0% 0.00 100% 3,500.00
TRANSPORTE GLB 1.00 6,977.46 6,977.46 0% 0.00 50% 3,488.73 50% 3,488.73 0% 0.00 0% 0.00
OPERARIO TOPOGRAFO HH 9.60 27.42 263.23 100% 263.23 0% 0.00 0% 0.00 0% 0.00 0% 0.00
AYUDANTE DE TOPOGRAFIA HH 9.60 20.12 193.15 100% 193.15 0% 0.00 0% 0.00 0% 0.00 0% 0.00
TECNICO DIBUJANTE AUTOCAD HH 8.00 27.42 219.36 100% 219.36 0% 0.00 0% 0.00 0% 0.00 0% 0.00
ESPECIALISTA EN INGENIERIA EN REDES PRIMARIAS Y/O SECUNDARIAS HH 17.60 40.00 704.00 100% 704.00 0% 0.00 0% 0.00 0% 0.00 0% 0.00
SUBTOTAL MANO DE OBRA RED SECUNDARIA 55,369.08 3,870.45 6,394.56 37,528.47 0.00 7,575.59
% AVANCE PARCIAL 6.99% 11.55% 67.78% 0.00% 13.68%
% AVANCE ACUMULADO 6.99% 18.54% 86.32% 86.32% 100.00%

MANO DE OBRA MESES


UND CANT PRECIO PARCIAL ENERO FEBRERO MARZO ABRIL MAYO
PLAN COVID-19 - - - - -
PROFESIONAL DE LA SALUD DEL SERVICIO DE SEGURIDAD Y SALUD EN EL
ser 2.50 2,000.00 5,000.00 6% 280.43 12% 584.82 50% 3,428.85 9% 224.00 10% 481.89
TRABAJO
SUBTOTAL MANO DE OBRA PLAN COVID 5,000.00 280.43 584.82 3,428.85 224.00 481.89
% AVANCE PARCIAL 5.61% 11.70% 68.58% 4.48% 9.64%
% AVANCE ACUMULADO 5.61% 17.31% 85.88% 90.36% 100.00%

MANO DE OBRA MESES


UND CANT PRECIO PARCIAL ENERO FEBRERO MARZO ABRIL MAYO
CONEXIONES DOMICILIARIAS - - - - -
OPERARIO HH 99.36 24.23 2,407.37 0% 0.00 0% 0.00 0% 0.00 17% 409.25 83% 1,998.12
OFICIAL HH 95.39 19.13 1,824.75 0% 0.00 0% 0.00 0% 0.00 17% 310.21 83% 1,514.54
PEON HH 233.17 17.29 4,031.45 0% 0.00 0% 0.00 0% 0.00 17% 685.35 83% 3,346.10
TRANSPORTE GLB 1.00 2,418.00 2,418.00 0% 0.00 0% 0.00 0% 0.00 17% 411.06 83% 2,006.94
PAGO POR DERECHO A CONEXIÓN DOMICILIARIA GLB 155.00 326.00 50,530.00 0% 0.00 0% 0.00 0% 0.00 17% 8,590.10 83% 41,939.90
SUBTOTAL MANO DE OBRA conexiones domiciliarias 61,211.57 0.00 0.00 0.00 10,405.97 50,805.60
% AVANCE PARCIAL 0.00% 0.00% 0.00% 17.00% 83.00%
% AVANCE ACUMULADO 0.00% 0.00% 0.00% 17.00% 100.00%

CUADRO RESUMEN DEL CRONOGRAMA DE MANO DE OBRA


MESES
PARTIDAS UND CANT PRECIO SUBTOTAL
ENERO FEBRERO MARZO ABRIL MAYO
RED PRIMARIA 18,971.45 270.01 2,428.82 6,772.16 133.64 9,366.82
RED SECUNDARIA 55,369.08 3,870.45 6,394.56 37,528.47 0.00 7,575.59
CONEXIONES DOMICILIARIAS 61,211.57 0.00 0.00 0.00 10,405.97 50,805.60
PLAN COVID-19 5,000.00 280.43 584.82 3,428.85 224.00 481.89
COSTO DIRECTO 140,552.10 4,420.90 9,408.20 47,729.48 10,763.61 68,229.91
% AVANCE PARCIAL 3.15% 6.69% 33.96% 7.66% 48.54%
% AVANCE ACUMULADO 3.15% 9.84% 43.80% 51.46% 100.00%
RESUMEN DEL CRONOGRAMA DE MANO DE OBRA-MATERIALES Y EQUIPOS
MESES
PARTIDAS UND CANT PRECIO SUBTOTAL
ENERO FEBRERO MARZO ABRIL MAYO
RED PRIMARIA 73,830.38 1,643.64 31,110.52 27,751.53 3,951.25 9,373.44
RED SECUNDARIA 231,728.87 6,162.69 58,553.88 86,945.05 72,394.65 7,672.60
CONEXIONES DOMICILIARIAS 106,584.47 0.00 0.00 44,394.33 10,890.36 51,299.78
PLAN COVID-19 18,952.93 1,077.74 4,305.60 7,548.26 4,210.56 1,810.76
SUBCONTRATO DE PLAN COVID-19 3,800.87 3,800.87
COSTO DIRECTO 434,897.52 8,884.07 93,970.01 166,639.17 95,247.68 70,156.59
% AVANCE PARCIAL 2.04% 21.61% 38.32% 21.90% 16.13%
% AVANCE ACUMULADO 2.04% 23.65% 61.97% 83.87% 100.00%
###