Documentos de Académico
Documentos de Profesional
Documentos de Cultura
CRISTOBAL COLON
CONTENIDO: DESCRIPCION DEL PROYECTO
CALCULISTA: Ing. Ivan Puentes VERSION: A
CONTACTO coordinacion@ip-ingenieros.com TEL: 3123854991
DESCRIPCION
Conexiones previstas:
Requerimientos particulares:
DIAS DE RESERVA 1
CALCULO VOLUMEN TQ AGUA RED CONTRA INCENDIOS SEGUN NORMAS NFPA Y NSR-10
PERDIDAS EN LA RED
PERDIDAD ∑ PERDIDAS
PERDIDAD PERDIDAS PRESION
TRAMO DIAMETRO AREA GASTO VELOCIDAD FACTOR DE F LONGITUD POR
POF ACC MEDIDOR ∆ ALTURA FINAL
U.H. MATERIAL FRICCION
Inicial Final Pulgadas m2 l/seg m/seg f semilla f calculado metros Metros Metros metros metros metros metros
SAN 1 3 1/2" 0.000216424 0.98 4.53 0.02 0.020041 PVC 4.5 5.67693472 5.22476 0.000 10.902 3.5 34.40
1 2 4 1" 0.000637044 1.11 1.74 0.02 0.02196 PVC 14 1.66741285 0.7723 0.000 2.440 36.84
2 3 12 2" 0.002339681 1.78 0.76 0.02 0.022887 PVC 4.7 0.05805234 0.147277 0.000 0.205 37.05
3 4 40 2" 0.002339681 2.98 1.28 0.02 0.020114 PVC 0.8 0.02445701 0.414774 0.000 0.439 37.49
4 5 63 2" 0.002339681 3.63 1.55 0.02 0.019205 PVC 1.5 0.06471028 0.613018 0.000 0.678 3.5 41.66
5 6 63 2" 0.002339681 3.63 1.55 0.02 0.019205 PVC 3.5 0.15099064 0.613018 0.000 0.764 3.5 45.93
6 7 119 2" 0.002339681 4.77 2.04 0.02 0.01804 PVC 3.5 0.24508144 1.05928 0.000 1.304 47.23
7 8 119 2" 0.002339681 4.77 2.04 0.02 0.01804 PVC 1.5 0.1050349 1.05928 0.000 1.164 48.40
8 9 147 3" 0.005079461 5.22 1.03 0.02 0.019265 PVC 0.5 0.00645692 0.269532 0.000 0.276 48.67
9 10 161 3" 0.005079461 5.43 1.07 0.02 0.019089 PVC 3.5 0.04842819 0.291466 0.000 0.340 49.01
10 11 165 3" 0.005079461 5.49 1.08 0.02 0.019041 PVC 2.5 0.03524196 0.297683 0.000 0.333 49.35
11 12 175 3" 0.005079461 5.63 1.11 0.02 0.018929 PVC 40.5 0.5970048 0.313134 0.000 0.910 50.26
12 13 198 3" 0.005079461 5.94 1.17 0.02 0.018696 PVC 1 0.01619087 0.348217 0.000 0.364 50.62
13 14 239 3" 0.005079461 6.44 1.27 0.02 0.01835 PVC 1.5 0.02802465 0.409393 0.000 0.437 51.06
14 15 257 3" 0.005079461 6.64 1.31 0.02 0.01822 PVC 23 0.45414215 0.435773 0.000 0.890 51.95
15 16 286 3" 0.005079461 6.95 1.37 0.02 0.01803 PVC 12 0.25705726 0.477741 0.000 0.735 52.68
16 BOMBAS 315 3" 0.005079461 7.25 1.43 0.02 0.017861 PVC 12 0.27670641 0.519117 0.000 0.796 53.48
A B 96 2" 0.002339681 4.35 1.86 0.02 0.022023 ACERO 6 0.42640542 0.88063 0.000 0.077 1 1.08
PERDIDAS EN LA PRESION
SUCCION 1.08 m.c.a. ATMOSFERICA 9.14 m.c.a.
TEMPERATURA DEL
ALTURA DE SUCCION
2.00 m.c.a. FLUIDO 26 °C
CAUDAL A
PRESION DE VAPOR
FRACCIONAR 7.25 lps 0.34 m.c.a.
FRACCIONAMIENTO TIEMPO DE
DEL CAUDAL 60% REGULACION 1.20 minutos
NUMERO DE
BOMBAS 2 UNIDADES
PERDIDAS EN LA RED
PERDIDAD PERDIDAD ∑ PERDIDAS PRESION
TRAMO DIAMETRO DEMANDA AREA VELOCIDAD FACTOR DE F LONGITUD
POR FRICCION POF ACC
∆ ALTURA FINAL
MATERIAL
Inicial Final Pulgadas l/seg m2 m/seg f semilla f calculado metros Metros Metros metros metros metros
1 2 4" 6.30 0.008400373 0.75 0.02 0.021389 ACERO 3.5 0.020751444 0.14333589 0.164 3.5 49.39
2 3 4" 6.30 0.008400373 0.75 0.02 0.021389 ACERO 3.5 0.020751444 0.14333589 0.164 3.5 53.06
3 4 4" 6.30 0.008400373 0.75 0.02 0.019541 PVC 4.9 0.026541638 0.14333589 0.170 3.5 56.73
4 5 4" 6.30 0.008400373 0.75 0.02 0.019541 PVC 46 0.249166398 0.14333589 0.393 57.12
5 BOMBAS 4" 6.30 0.008400373 0.75 0.02 0.019541 PVC 26 0.140833182 0.14333589 0.284 57.40
PERDIDAS EN LA SUCCION
PERDIDAD PERDIDAD ∑ PERDIDAS PRESION
TRAMO DIAMETRO DEMANDA AREA VELOCIDAD FACTOR DE F LONGITUD
POR FRICCION POF ACC
∆ ALTURA FINAL
MATERIAL
Inicial Final Pulgadas l/seg m2 m/seg f semilla f calculado metros Metros Metros metros metros metros
A B 4" 6.30 0.008400373 0.75 0.02 0.021389 ACERO 3 0.017786952 0.14333589 0.161 1 1.16
PERDIDAS EN LA PRESION
SUCCION 1.16 m.c.a. ATMOSFERICA 9.14 m.c.a.
TEMPERATURA DEL
ALTURA DE SUCCION
2.00 m.c.a. FLUIDO 26 °C
CAUDAL A
PRESION DE VAPOR
FRACCIONAR 6.30 lps 0.34 m.c.a.
FRACCIONAMIENTO
DEL CAUDAL 100%