Está en la página 1de 1

N

A B
D ORIENTACION:
C

25.16 LOCALIZACION:
6.00
19.16

1.20 17.16
1.20

S-02
1 Z-1 19.16 Z-1
1.20 0.40

D-02 Ø 8 3/4
E3/8 @20 C
.40
15.00 13.40 14.60 COLUMNA C-1
F´C=250 KG/CM2
SIMBOLOGÍA Y NOTAS:

Z-2 Z-3
2 18.48
1.20 0.40 1.20 Ø3/8 @ 20 CM
0.40 8 Ø 3/4
0.40 0.80
Ø 8 3/4
E3/8 @20 CM
15.00 13.80 14.60
0.40 0.40
0.70
Ø 1/2 @10 CM

Ø1/2 @ 10 CM
1.20 0.10
Z-2 Z-3 0.80 0.20
18.48
3 1.20 0.40
D-03
1.20
Ø1/2 @ 10 CM

ZAPATA Z-1
ZAPATA Z-1
F´C=250 KG/CM2 F'C=250 KG/CM2
15.00 13.80 14.60

83.21

S-01
1.20
Z-2 Z-3
18.48 S-01
4 1.20 0.40
0.40 0.40 0.40 0.40
D-04 Ø3/8 @ 20 CM
0.40 8 Ø 3/4
Ø 8 3/4
E3/8 @20 CM 0.40

Ø1/2 @ 10 CM
15.00 13.80 14.60 1.20 0.40 0.70
0.10 Ø 1/2 @10 CM
0.40 0.20
Ø1/2 @ 10 CM

5 1.20 0.40
Z-2
18.48 Z-3
ZAPATA Z-2 1.20
F´C=250 KG/CM2 ZAPATA Z-2
F´C=250 KG/CM2
15.00
1.20
0.80 0.40 0.40 Ø3/8 @ 20 CM IDRev ChID Nombre del Cambio Fecha

21.61 22.81
0.40 Ø 8 3/4 8 Ø 3/4
Z-2 Z-1 E3/8 @20 CM 0.40
0.70
Ø1/2 @ 10 CM

6 18.48

0.40 1.20 0.10 Ø 1/2 @10 CM


8.21 0.20
0.40 NAVE TALLER
Z-1
Ø1/2 @ 10 CM 1.20
7 1.20
0.40
ZAPATA Z-3 ZAPATA Z-3 EMPRESA PROYECTISTA:
S-02

F'C=250KG/CM2 F'C=250KG/CM2 SENSUNT


D.R.O. NO. DE REGISTRO NO. DE REVISION

-1. PLANTA DE CIMENTACION 1:200 DIRECCION:


AMATLAN,VERACRUZ.

FECHA: 07/02/2023
COTAS:
CLIENTE: METROS
TRABAL
ESCALA:
1:200,
1:20, 1:15
GRUPO: CLAVE:
Arquitectónicos
PLANO:

Plantas A-01