Documentos de Académico
Documentos de Profesional
Documentos de Cultura
90
9.40 C6 C6
3.025 1.00 5.23
0.98
1.20
C2 C2 C2
5 CC - 3 VC - 2 CC - 3 VC - 2 5 C6
2.60
2.60
2.60
Ø 1/2" @ 0.15
Ø 1/2" @ 0.15
Ø 1/2" @ 0.15
Z-9 Z-8 Z-7
CC - 1
5.60
VC - 1
VC - 1
VC - 1
NFP= + 0.05 NFP= + 0.05
Z-4 0.35
H=0.50 0.40
0.50
NFZ = - 1.50 SECCION
NFSZ= - 1.60 Z-5 Z-6
H=0.50 H=0.50
2 Ø 1/2"
3.10
NFZ = - 1.50
3.10
2.60
NFZ = - 1.50
1º, 2º, y 3° Nivel 2 Ø 1/2"
Ø 1/2" @ 0.15
Ø 1/2" @ 0.15
C1
11.950
CC - 1
2 ø 3/8", 2 @ .O5 , 6 @ .10, rto. @ 2 ø 3/8", 2 @ .O5 , 6 @ .10, rto. @ 2 ø 3/8", 2 @ .O5 , 6 @ .10, rto. @
0.90
Ø 1/2" @ 0.15
ESTRIBOS @ .20 en ambos sentidos. @ .20 en ambos sentidos. @ .20 en ambos sentidos.
12.90
Ø 1/2" @ 0.15 Ø 1/2" @ 0.15 ANCLAJE ZAPATA ZAPATA ZAPATA
VC - 2
VC - 2
3.775
NFP= + 0.05
3.55
ESTACIONAMIENTO
1.40 2.50 NFP= + 0.05 2.00
NPT= ± 0.00
Ø 1/2" @ 0.15
Z-3
Ø 1/2" @ 0.15
NFZ = - 1.50
NFSZ= - 1.60 C2 ESCALA: 1/20
3
C3 VC - 2 VC - 2 C2
3
A
0.15
BASE DE ESCALERA
TIPO
NIVEL
C4 C5 C6
2.13
1.50
Ø 1/2" @ 0.15
Ø 1/2" @ 0.15
4.00
4.00
VC - 2
NFP= + 0.10
Cisterna
2.93
2.00
cap.: 8.70 m3
0.15 0.15
CC - 2
3.45
0.50 0.25
Z-1 Z-2
VC - 2
Ø 1/2" @ 0.15
C2 ø 1/4", 2 @ .O5 , 4 @ .10, rto. @ ø 1/4", 2 @ .O5 , 5 @ .10, rto. @ ø 1/4", 2 @ .O5 , 4 @ .10, rto. @
0.55
1.00
1.00
0.95
ESTRIBOS
0.83
CC - 7
3.025 0.925
2.58
2.125
CC - 5
NFP= - 0.05
PROYECTO :
C6 CC - 5
C6
CC - 5
C6 C4 C4
CC - 8
C4 C5
EDIFICIO DE OFICINAS Y VIVIENDA
PROPIETARIO:
LAMINA:
Y
E-08
3.53 3.38 0.3 1.45 1.86 1.24
Junta de
Dilatación
Junta de
Dilatación
NPT = + 0.10 0.20 NPT = + 0.10 0.20 N.V. = + 0.15 NPT= + 0.10 0.20 NPT = + 0.15 0.20
NPT= ± 0.00 NPT = ± 0.00 NPT = ± 0.00 0.20 NPT = ± 0.00
0.05 0.05 0.05 0.05
Falso Piso 0.10 Falso Piso 0.10 Falso Piso 0.10 Falso Piso 0.10 0.05
0.35 Falso Piso Falso Piso 0.10
0.25 Sobrecimiento 0.25 0.25
concreto ciclopeo Sobrecimiento 0.20
concreto ciclopeo Sobrecimiento
dosif. 1:8 + 25% P.M. concreto ciclopeo Sobrecimiento
dosif. 1:8 + 25% P.M.
(maximo 3") dosif. 1:8 + 25% P.M. concreto ciclopeo concreto ciclopeo
(maximo 3")
1.10 dosif. 1:8 + 25% P.M. 0.90
1.00 (maximo 3") 1.00 dosif. 1:8 + 25% P.M. 1.00
Cimiento (maximo 3") (maximo 3")
concreto ciclopeo Cimiento 0.55
0.70 0.70 Cimiento 0.70 0.70
dosif. 1:10 + 30% P.G. concreto ciclopeo Cimiento Cimiento
(maximo 8") dosif. 1:10 + 30% P.G. concreto ciclopeo concreto ciclopeo
concreto ciclopeo
(maximo 8") dosif. 1:10 + 30% P.G. dosif. 1:10 + 30% P.G.
NFCC= - 1.00 dosif. 1:10 + 30% P.G. NFCC= - 1.00
(maximo 8") (maximo 8")
(maximo 8")
CC - 1 CC - 3 CC - 3 CC - 4 CC - 5
0.15 0.15
ESPECIFICACIONES TECNICAS
0.15
TIPO DE CIMENTACIÓN:
A) Cimiento Corrido : B) Cimiento Cuadrado : 0.60 0.60 0.60
C = 0.05 kg/cm² C = 0.00 kg/cm²
F.S. = 3.00 F.S. = 3.00
Df = 1.00 m.
B = 0.70 m.
Df = 1.50 m.
B = 1.60 m. CC - 6 CC - 7 CC - 8
= 2.03 gr/cm³ = 2.03 gr/cm³
qad = 1.31 kg/cm² qad = 2.09 kg/cm²
CLASIFICACIÓN DE SUELOS (SUCS):
-TIPO DE SUELO FLEXIBLE , CLASIFICACION S2 Y PERIODO DE VIBRACION DE 0.12 SEG. PROYECTO :
4.- SOBRECARGAS :
-S/C = 100Kg/m2
YY : EDIFICIO DE OFICINAS Y VIVIENDA
5.- CONSIDERACIONES SISMORESISTENTES : PROPIETARIO:
LAMINA:
E-09
- Sistema Estructural :
XX : Aporticado
YY : Aporticado
PLANO: ESCALA: UBICACION:
- Parámetros de Fuerza Sísmica :
Z=0.45 , U=1.0 , S=1.05 , Tp=0.9 seg.,Tn=0.6 seg. , Rx=6.0, Ry=6.0
ESTRUCTURAS
XX : (PLANO DE ALIGERADO - OFICINAS y DETALLES ESTRUCTURALES) 1:50
- Junta de Separación Sísmica 0.025m.(VER PLAN DE ESTRUCTURAS)
FECHA: PROFESIONAL RESPONSABLE: APOYO TÉCNICO:
DETALLE ESTRUCTURAL TÍPICO DE CONEXIÓN DETALLE ESTRUCTURAL DETALLE ESTRUCTURAL
ZAPATA - VIGA DE CIMENTACIÓN DE VIGA DE CIMENTACIÓN DE VIGA DE CIMENTACIÓN
ESC: 1/20
(VC - 1) (VC - 2)
ESC: 1/20 ESC: 1/20
1.00
1.00 1.00
Viga de Cimentación 1 - 2
concreto f'c: 210 kg/cm2 0.25
dosif. 1:2:2
1.60 0.25
Endientado de
mamposteria
2 Ø8 @ 3 hiladas 2 Ø8 @ 3 hiladas
Endientado de
mamposteria
2 Ø8 @ 3 hiladas 2 Ø8 @ 3 hiladas
SOBRECIMIENTO
CIMIENTO CORRIDO
PROYECTO :
SOBRECIMIENTO
EDIFICIO DE OFICINAS Y VIVIENDA
PROPIETARIO:
LAMINA:
E-10
L L
0.15 0.15
0.23
0.23
Ø 1/2" @ .15
NPT. + 11.175
NPT. + 8.025
ø 3/8" @ 0.25 NPT. + 4.875
2.30 2.30
2.00 2.00 2.30
2.30 NPT. + 1.725 29
2ro. TRAMO
0.15 9no. TRAMO
0.60 S/C: 400 Kg/m2 7mo. TRAMO 0.12 (Típ.)
28 S/C: 400 Kg/m2
0.1
0.30 0.60 ø 3/8" @ .20 PASO = 0.30m 5to. TRAMO ø 3/8" @ 0.25 3( PASO = 0.25m
Típ
27 NPT. +1.725 14 .
2 Ø 1/2" CONTRAPASO = 0.175m 3ro. TRAMO )
CONTRAPASO = 0.175m
0.15
26 13
ø 3/8"@ 0.20 ø 3/8" @ 0.25
25 ø 3/8" @ 0.20 12
2 Ø 1/2"
0.15
ø 3/8" @ 0.25
24 0.15 11 NPT. + 1.20
ø 1/2" @ .10 0.15
23
ø 3/8" @ 0.20
ø 3/8"@ 0.20
0.25 (Tip.)
22
0.15 0.15
NPT. + 12.75
21 NPT. + 9.60
0.30 ø 3/8" @ 0.20
NPT. + 6.45
7
0.0
0.20
19 2
S/C: 400 Kg/m2 9no. TRAMO
0.20 0.20
7mo. TRAMO
PASO = 0.30m 18 Losa Aligerada 1
5to. TRAMO
CONTRAPASO = 0.175m 3ro. TRAMO NPT= + 0.15
17
ø 3/8" @ 0.20 V-P-1
ø 1/2" @ .20 ø 1/2" @ .20 15
Falso Piso 0.15
ø 3/8" @ 0.20
doble malla doble malla
0.23 ø 3/8" @ 0.25
0.15 0.15 15
ø 3/8" @ 0.20
14 0.80
0.20
13 ø 1/2" @ 0.10
0.15
NPT. + 11.175
NPT. + 8.025 12
ø 3/8" @ 0.25 NPT. + 4.875 1.30 0.75 0.50
2.95
ø 3/8" @ .20 ø 3/8" @ .20
1.30 2.40
ø 3/8" @ .20
doble malla
NIVEL A. = - 2.50 0.20 0.20
NF. - 2.40 PROYECTO :
0.40
0.20
0.40
EDIFICIO DE OFICINAS Y VIVIENDA
NCF = - 2.90 PROPIETARIO:
0.15 LAMINA:
E-11
PLANO: ESCALA: UBICACION:
0.15 0.15 ESTRUCTURAS
(PLANO DE ALIGERADO - OFICINAS y DETALLES ESTRUCTURALES) 1:50
0.30 0.20 1.43 0.20 0.30
FECHA: PROFESIONAL RESPONSABLE: APOYO TÉCNICO:
2.43
A B C D
9.40
V-B
0.90 V-A 1.20 1.60 V-A 1.20
V-A
1 Ø 3/8" 2 Ø 1/2" 1 Ø 1/2"
V-A
1.05
1.00
1.35
1 Ø 3/8" 1 Ø 1/2"
V-B
0.50 1 Ø 1/2" 0.65 0.80 1 Ø 1/2" 0.65
C2 C2 C2 C3 C2
5 V - P - 1 ( 0.25 x 0.40 ) V - P - 1 ( 0.25 x 0.40 ) V-A 5
3 V-A
V-A
0.90 1.20 1.60 1.60
1 Ø 1/2"
1 Ø 3/8" 2 Ø 1/2" 2 Ø 1/2"
1 Ø 1/2"
1 Ø 3/8" 1 Ø 1/2"
1 Ø 1/2"
V-A
1 Ø 1/2"
V-B
0.50 0.65 0.80 0.80
3.75
V - P - 1 ( 0.25 x 0.50 )
V - P - 1 ( 0.25 x 0.50 )
V - P - 1 ( 0.25 x 0.50 )
5.5
5.60
V - C ( 0.35 x 0.20 ) V-C
V - C ( 0.35 x 0.20 )
C3
1.60 1.60 V-A
1 Ø 1/2" + 1 Ø 3/8" 2 Ø 1/2"
1
C3
1 Ø 1/2"
3.08 0.875
1 Ø 1/2"
V-A
V-A
0.80 0.80
C2 C2 B C
4 V - P - 1 ( 0.25 x 0.40 ) A
V - P - 1 ( 0.25 x 0.40 ) V-A 3'
C1
11.950
12.90
1 Ø 3/8" 2 Ø 1/2" 2 Ø 1/2" ESC.: 1 / 50
1 Ø 3/8" 1 Ø 1/2" ALIGERADO H= 0.20 cm.
1 Ø 1/2" SOBRECARGAS: 250 kg/m2
1 Ø 1/2"
V - P - 1 ( 0.25 x 0.50 )
V - P - 1 ( 0.25 x 0.50 )
V - P - 1 ( 0.25 x 0.50 )
3.65
3.55
V-A
V - C ( 0.35 x 0.20 )
DETALLE DE REFUERZO POR PASO
DE TUBERÍAS DE INSTALACIONES
Escala: 1/25
C3 C2
3 V - P - 1 ( 0.25 x 0.40 ) V - P - 1 ( 0.25 x 0.40 ) C2V - A
3
Planta
V - P - 1 ( 0.25 x 0.40 )
1.60 1.20
2.93
0.20
Tubería
1 Ø 1/2" A
V-P-1
V-P-1
0.80 0.80
3.75
CAJA DE ESCALERAS
V-B
A
4 Ø 8 mm
Ø 6 mm @ .20
2 V - P - 1 ( 0.25 x 0.40 )
1'
C2 C2
0.55
0.95
0.83
C3
V - P - 1 ( 0.25 x 0.40 ) V-A V-A
1 C3 1
Viguetas
3.05 0.95 2.975
1 Ø 1/2"
1 Ø 1/2"
1 Ø 1/2"
1 Ø 1/2"
2.58
V-B
V-B
V-B
PROYECTO :
A B C
EDIFICIO DE OFICINAS Y VIVIENDA
PROPIETARIO:
LAMINA:
E-12
V-A V-A
PLANO: ESCALA: UBICACION:
ESC.: 1 / 50 ESTRUCTURAS
1.60 1.86 1.24
ALIGERADO H= 0.20 cm. (PLANO DE ALIGERADO - OFICINAS y DETALLES ESTRUCTURALES) 1:50
SOBRECARGAS: 250 kg/m2 FECHA: PROFESIONAL RESPONSABLE: APOYO TÉCNICO:
DETALLE TIPICO DE ALIGERADO
ESC: 1/10
CUADRO DE COLUMNAS f'c: 210 Kg/cm2
ESCALA: 1/20
TEMPERATURA (Ø1/4" c .25)
0.05
NIVEL TIPO C1 C2 C3
0.20
0.15
0.40 0.40
0.40 0.35
0.50
SECCION
2 Ø 1/2"
1º, 2º, y 3° Nivel 2 Ø 1/2"
2 ø 3/8", 2 @ .O5 , 6 @ .10, rto. @ 2 ø 3/8", 2 @ .O5 , 6 @ .10, rto. @ 2 ø 3/8", 2 @ .O5 , 6 @ .10, rto. @
ESTRIBOS @ .20 en ambos sentidos. @ .20 en ambos sentidos. @ .20 en ambos sentidos. ESPECIFICACIONES TECNICAS
2.- TABIQUERÍA :
- Se usara ladrillo pandereta del tipo maquinado que descansaran sobre elementos estructurales.
- Se usara ladrillo ceramico tipo k.k. de 18 huecos maquinado en muros.
- f'm = 65 kg/cm² (mín.)
- f'b = 145 kg/cm²
- v'm = 8.1 kg/cm²
0.15 0.15 - Mortero Cemento : Arena 1 : 4
0.25 - Espesor de Junta 1.5 cm.
0.25
TIPO DE CIMENTACIÓN:
Ø 4 ø 1/2" 4 ø 1/2" 4 ø 3/8" -TIPO DE SUELO FLEXIBLE , CLASIFICACION S2 Y PERIODO DE VIBRACION DE 0.12 SEG.
4.- SOBRECARGAS :
-S/C = 100Kg/m2
YY :
E-13
8 Ø 5/8" + 2 Ø 1/2" : R @ 0.20 C/E : R @ 0.20 C/E