CALENDARIO DE MATERIALES

PROYECTO: CREACION DEL SERVICIO DE ALCANTARILLADO PLUVIAL EN LA AV. RICARDO PALMA SECTOR PAMPA DEL CARMEN DEL DISTRITO DE CHANCHAMAYO - PROVINCIA DE
CHANCHAMAYO - DEPARTAMENTO JUNIN
SUBPRESUPUESTO: OBRAS DE ARTE
CLIENTE: MUNICIPALIDAD PROVINCIAL DE CHANCHAMAYO
UBICACION: CALLE CALLAO N°245 - LA MERCED
FECHA BASE: 16-08-2022
MONEDA: SOLES

Item Insumo Unidad Cantidad PU Parcial 01-11-2022


1 PEON HH 226.96 17.58 3,989.94 3,989.94
2 TOPOGRAFO HH 1.34 24.65 33.15 33.15
3 OPERARIO HH 72.66 24.65 1,791.08 1,791.08
4 OFICIAL HH 7.16 19.46 139.37 139.37
5 CLAVOS 3" KG 9.38 7.50 70.33 70.33
6 YESO BOLSA 25 KG BLS 0.76 15.00 11.33 11.33
7 MADERA PARA ENCOFRADO P2 287.00 5.50 1,578.49 1,578.49
8 WINCHA DE 50M UND 0.05 38.65 2.04 2.04
9 ALAMBRE NEGRO N° 8 KG 22.05 7.50 165.41 165.41
10 POSTES DE MADERA, Ø=4", L=2.50 M UND 19.80 16.95 335.61 335.61
11 MANTA ARPILLERA DE ANCHO 2.00 M. ML 61.80 3.39 209.50 209.50
12 GASOLINA 90 OCTANOS GAL 5.56 24.10 133.96 133.96
13 PETROLEO GAL 5.24 18.20 95.38 95.38
14 ACEITE MOTOR GASOLINERO MULTIGRADO GAL 0.12 50.00 5.84 5.84
15 CEMENTO PORTLAND TIPO I (42.5KG) BLS 128.72 27.50 3,539.81 3,539.81
16 HORMIGON M3 3.59 35.00 125.57 125.57
17 ALAMBRE NEGRO N° 16 KG 21.25 7.50 159.35 159.35
18 ACERO CORRUGADO F´Y = 4200 KG/CM2 GRADO 60 KG 446.18 4.70 2,097.03 2,097.03
19 CLAVO PARA MADERA C/C 3" KG 12.04 7.50 90.31 90.31
20 ARENA GRUESA M3 7.53 38.00 286.26 286.26
21 PIEDRA CHANCADA DE 3/4" M3 8.99 50.00 449.67 449.67
22 AGUA M3 2.53 5.00 12.67 12.67
23 ARENA FINA M3 0.67 75.00 50.49 50.49
24 ASFALTO RC-250 GAL 1.02 18.00 18.36 18.36
25 LEÑA KG 5.10 3.00 15.30 15.30
26 MITIGACION DE IMPACTO AMBIENTAL GLB 1.00 2,000.00 2,000.00 2,000.00
27 HERRAMIENTAS MANUALES %MO 0.00 0.00 255.66 255.66
28 MIRA TOPOGRAFICA HM 1.34 6.00 8.07 8.07
29 JALON HM 2.69 6.00 16.14 16.14
30 ESTACION TOTAL HM 1.34 18.00 24.21 24.21
31 NIVEL TOPOGRAFICO HM 1.34 10.00 13.45 13.45
32 PRISMAS HM 2.69 6.00 16.14 16.14
33 PLANCHA COMPACTADORA 7 HP HM 11.12 29.10 323.64 323.64
34 VOLQUETE 6X4 330HP 15M3 HM 0.98 110.00 107.92 107.92
35 CARGADOR SOBRE LLANTAS 160-195 HP 3.5 YD3 HM 0.49 170.00 83.65 83.65
36 MEZCLADORA DE CONCRETO DE 9 -11P3 HM 9.96 25.00 249.11 249.11
37 VIBRADOR DE CONCRETO 4 HP 1.50" HM 6.08 7.00 42.54 42.54
38 LOCAL PARA ALMACEN Y OFICINA MES 1.00 500.00 500.00 500.00
39 PLAN DE SALUD Y SEGURIDAD EN EL TRABAJO GLB 1.00 1,500.00 1,500.00 1,500.00