SUMINISTRO DE MATERIALES P. Unit P. Total P. Unit P. Total P. Unit P. Total P. Unit P. Total
01.00 POSTES Y CRUCETAS :
1.01 Poste CAC 14/400/2/180/375 u 1.00 S/ 1,130.00 S/ 1,130.00 S/ 1,130.00 S/ 1,130.00
1.02 Bastidor con riostra CAV DE 2.50 m u 3.00
1.03 Brazo riostra perfil tipo L DE 1.20 mts u 10.00
1.04 Caja de registro de Puesta a tierra u 4.00 S/ 160.00 S/ 640.00 S/ 160.00 S/ 640.00
1.05 Ductos de concreto de 4 vías u 5.00 S/ 150.00 S/ 750.00 S/ 150.00 S/ 750.00
8.00 OTROS
8.01 Tubo Fo.Go. 3" x 3m. u 1.00 S/ 86.00 S/ 86.00 S/ 86.00 S/ 86.00
8.02 Tubo Fo.Go.1.25" x 6m u 1.00 S/ 181.00 S/ 181.00 S/ 181.00 S/ 181.00
8.03 Cinta 3M No. 23 rollo 2.00 S/ 65.00 S/ 130.00 S/ 60.00 S/ 120.00 S/ 60.00 S/ 120.00
8.04 Cinta 3M No. 33 rollo 12.00 S/ 28.50 S/ 342.00 S/ 41.00 S/ 492.00 S/ 28.50 S/ 342.00
8.05 Cinta Band IT 3/4" x 1 mt u 8.00 S/ 4.50 S/ 36.00 S/ 5.80 S/ 46.40 S/ 4.50 S/ 36.00
8.06 Hebilla para cinta Band IT 3/4" u 12.00 S/ 1.20 S/ 14.40 S/ 4.50 S/ 54.00 S/ 1.20 S/ 14.40
TOTAL S/ 24,899.90