CODIGO: OBN-681-2020
OBRA: CONSTRUCCION DE OBRAS CIVILES PARA LA INTERVENCION INTEGRAL DE BARRIO PASANKERI BAJO ZONA PASANKERI BAJO
1 GM-O-ADT-045 ADHESIVO PUENTE DE ADHERENCIA EPOXICO m2 0.60 121.72 73.03 1.44 175.28 1.44 175.28 0.00 0.00 1.44 175.28
2 GM-O-ALE-001 ALEROS (MALLA ALAMBRE TEJIDO + MADERA) m2 15.75 216.52 3,410.19 4.99 1,080.43 0.00 0.00 0.00 0.00 0.00 0.00
4 GM-O-ARB-006 AREA VERDE CON TEPE m2 16.72 40.37 674.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5 GM-O-ARC-028 PISO DE GRAVILLA E=5 CM m2 161.26 19.35 3,120.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8 GM-O-BAR-031 PROV Y COLOC DE BARANDA FG 2" y FG 1" m 21.00 465.22 9,769.62 29.22 13,593.73 0.00 0.00 0.00 0.00 0.00 0.00
9 GM-O-BAR-039 BARANDA METALICA TUBO 40 X 20 X 1.5 mm m 9.15 267.42 2,446.89 19.15 5,121.09 0.00 0.00 0.00 0.00 0.00 0.00
10 GM-O-BAT-101 PROVISION Y COLOCACION DE INODORO BLANCO Pza 8.00 403.92 3,231.36 8.00 3,231.36 0.00 0.00 0.00 0.00 0.00 0.00
11 GM-O-BOT-001 BOTAGUAS DE Hº Aº m 33.26 106.23 3,533.21 111.49 11,843.58 28.35 3,011.62 0.00 0.00 28.35 3,011.62
12 GM-O-BRD-002 BARNIZADO DE PUERTAS Y VENTANAS m2 47.74 64.92 3,099.28 49.63 3,221.98 0.00 0.00 0.00 0.00 0.00 0.00
13 GM-O-BRD-003 BARNIZADO DE LADRILLO VISTO m2 159.38 51.38 8,188.94 125.86 6,466.69 0.00 0.00 0.00 0.00 0.00 0.00
14 GM-O-CAJ-001 CAJA INTERCEPTORA PVC 2" E-40 6" x 30 cm Pza 9.00 150.29 1,352.61 2.00 300.58 0.00 0.00 2.00 300.58 2.00 300.58
16 GM-O-CAM-068 CAMARA DE INSPECCION HoCo H=1.21 M - 2.0 M Pza 6.00 2,495.20 14,971.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
18 GM-O-CAN-002 CANAL PLUVIAL (0.2 x 0.2) m 97.50 140.06 13,655.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
19 GM-O-CIE-001 CIELO FALSO - INCLUYE YESO MADERAMEN Y MALLA m2 17.10 197.15 3,371.27 17.10 3,371.27 0.00 0.00 17.10 3,371.27 17.10 3,371.27
20 GM-O-CIE-002 CIELO RASO SOBRE LOSA DE HORMIGON m2 39.40 117.23 4,618.86 62.37 7,311.64 0.00 0.00 39.40 4,618.86 39.40 4,618.86
23 GM-O-CRR-008 CORREAS METALICAS 80 x 40 x 15 x 2 mm m 126.35 125.99 15,918.84 586.14 73,847.78 586.14 73,847.78 0.00 0.00 586.14 73,847.78
Pag 1 de 12
VOLÚMENES AUTORIZADOS MODIFICACION VOLUMEN CERTIFICADO AVANCE
No CODIGO DESCRIPCION UNIDAD CANTIDAD MONTO CANTIDAD MONTO CANTIDAD MONTO CANTIDAD
CANTIDAD P.U. MONTO MONTO TOTAL
APROBADO APROBADO ANTERIOR ANTERIOR PRESENTE PRESENTE TOTAL
26 GM-O-DEM-002 DEMOLICION DE CONCRETO e = 8 - 12 cm m3 3.92 205.80 806.74 3.92 806.74 0.00 0.00 0.00 0.00 0.00 0.00
27 GM-O-DEM-010 DEMOLICION DE MURO DE LADRILLO m2 28.50 57.17 1,629.35 28.50 1,629.35 0.00 0.00 0.00 0.00 0.00 0.00
28 GM-O-DEM-015 DEMOLICION DE HORMIGON CICLOPEO m3 25.88 241.18 6,241.74 136.11 32,827.01 38.27 9,229.96 30.78 7,423.52 69.05 16,653.48
29 GM-O-DIN-001 DINTEL DE LADRILLO DE 6H ARMADO m 55.99 73.93 4,139.34 28.73 2,124.01 26.13 1,931.79 0.00 0.00 26.13 1,931.79
36 GM-O-ELC-155 PROV. E INST. DE TUBOS PARA INST. ELECTRICA PVC 2" m 8.74 15.52 135.64 39.39 611.33 0.00 0.00 0.00 0.00 0.00 0.00
41 GM-O-ELC-272 PROVISION E INSTALACION CAJA OCTOGONAL PVC Pza 51.00 24.85 1,267.35 51.00 1,267.35 21.00 521.85 0.00 0.00 21.00 521.85
42 GM-O-ELC-273 PROVISION E INSTALACION CAJA RECTAGULAR PVC Pza 55.00 6.87 377.85 55.00 377.85 10.00 68.70 0.00 0.00 10.00 68.70
Pag 2 de 12
VOLÚMENES AUTORIZADOS MODIFICACION VOLUMEN CERTIFICADO AVANCE
No CODIGO DESCRIPCION UNIDAD CANTIDAD MONTO CANTIDAD MONTO CANTIDAD MONTO CANTIDAD
CANTIDAD P.U. MONTO MONTO TOTAL
APROBADO APROBADO ANTERIOR ANTERIOR PRESENTE PRESENTE TOTAL
47 GM-O-ENL-004 ENLUCIDO DE CEMENTO MORT 1:3 e = 0.5 cm m2 40.76 42.68 1,739.64 332.32 14,183.42 0.00 0.00 0.00 0.00 0.00 0.00
51 GM-O-HOR-001 HORMIGON POBRE m3 3.02 621.24 1,876.14 20.56 12,772.69 12.49 7,759.28 0.00 0.00 12.49 7,759.28
52 GM-O-FEE-001 ACERO DE REFUERZO kg 5,067.90 14.70 74,498.13 10,050.67 147,744.85 6,800.12 99,961.77 0.00 0.00 6,800.12 99,961.77
53 GM-O-HOR-020 Hº Sº PARA LOSA LLENA - H21 m3 2.53 1,973.55 4,993.08 2.11 4,164.19 2.11 4,164.19 0.00 0.00 2.11 4,164.19
55 GM-O-HOR-068 HORMIGON SIMPLE P/COLUMNA - H21 m3 7.30 2,093.50 15,282.55 17.26 36,133.81 11.59 24,263.67 0.00 0.00 11.59 24,263.67
56 GM-O-HOR-069 HORMIGON SIMPLE P/ESCALERA - H21 m3 1.17 2,040.09 2,386.91 4.21 8,588.78 2.66 5,426.64 0.00 0.00 2.66 5,426.64
57 GM-O-HOR-070 HORMIGON SIMPLE P/VIGAS - H21 m3 26.52 2,067.05 54,818.17 21.53 44,503.59 21.24 43,904.15 0.00 0.00 21.24 43,904.15
58 GM-O-HOR-071 HORMIGON SIMPLE P/ZAPATAS - H21 m3 9.32 1,543.92 14,389.33 60.04 92,696.96 34.32 52,987.33 0.00 0.00 34.32 52,987.33
59 GM-O-HOR-107 HORMIGON SIMPLE PARA VIGA DE FUNDACION m3 21.75 1,584.71 34,467.44 7.88 12,487.51 7.87 12,471.67 0.00 0.00 7.87 12,471.67
62 GM-O-IMP-020 IMPERMEABILIZACION SOBRECIMIENTOS m2 135.76 33.09 4,492.30 18.44 610.18 17.37 574.77 0.00 0.00 17.37 574.77
64 GM-O-JGO-036 PROVISION Y COLOCADO EQUIPO TWIST TRIPLE Pza 1.00 3,067.89 3,067.89 1.00 3,067.89 0.00 0.00 0.00 0.00 0.00 0.00
67 GM-O-JGO-040 PROVISION Y COLOCADO DE APARATO TWIST LATERAL Pza 1.00 4,201.65 4,201.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
70 GM-O-LIM-012 LIMPIEZA Y RETIRO DE ESCOMBROS m3 79.35 72.14 5,724.31 147.76 10,659.41 0.00 0.00 0.00 0.00 0.00 0.00
Pag 3 de 12
VOLÚMENES AUTORIZADOS MODIFICACION VOLUMEN CERTIFICADO AVANCE
No CODIGO DESCRIPCION UNIDAD CANTIDAD MONTO CANTIDAD MONTO CANTIDAD MONTO CANTIDAD
CANTIDAD P.U. MONTO MONTO TOTAL
APROBADO APROBADO ANTERIOR ANTERIOR PRESENTE PRESENTE TOTAL
75 GM-O-LUM-085 PROV E INST DE TUBOS PARA INST ELECTRICA PVC 3/4" m 216.38 6.37 1,378.34 141.40 900.72 0.00 0.00 0.00 0.00 0.00 0.00
76 GM-O-LUM-086 PROV E INST DE LUMINARIA APLIQUE TIPO TORTUGA Pza 1.00 164.76 164.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
80 GM-O-LUM-143 PROV E INST DE CONMUTADOR SIMPLE P/3LINEAS Pza 1.00 78.57 78.57 1.00 78.57 0.00 0.00 0.00 0.00 0.00 0.00
82 GM-O-LUM-282 PROV E INST DE TUBOS PARA INST ELECTRICA PVC 5/8" m 136.26 5.75 783.50 136.26 783.50 98.02 563.62 0.00 0.00 98.02 563.62
83 GM-O-LUM-287 PROV E INST DE TERMOMAGNETICO BIPOLAR DE 16A Pza 5.00 106.87 534.35 5.00 534.35 2.00 213.74 0.00 0.00 2.00 213.74
84 GM-O-LUM-289 PROV E INST DE TERMOMAGNETICO BIPOLAR DE 32A Pza 2.00 128.72 257.44 2.00 257.44 0.00 0.00 0.00 0.00 0.00 0.00
89 GM-O-LUM-535 INSTALACION DEL SISTEMA DE PUESTA A TIERRA Pza 1.00 2,105.30 2,105.30 1.00 2,105.30 0.00 0.00 0.00 0.00 0.00 0.00
90 GM-O-LUM-581 PROVISION Y COLOCACION DE INTERRUPTOR SIMPLE Pza 19.00 31.14 591.66 19.00 591.66 0.00 0.00 0.00 0.00 0.00 0.00
Pag 4 de 12
VOLÚMENES AUTORIZADOS MODIFICACION VOLUMEN CERTIFICADO AVANCE
No CODIGO DESCRIPCION UNIDAD CANTIDAD MONTO CANTIDAD MONTO CANTIDAD MONTO CANTIDAD
CANTIDAD P.U. MONTO MONTO TOTAL
APROBADO APROBADO ANTERIOR ANTERIOR PRESENTE PRESENTE TOTAL
96 GM-O-MET-002 MASTIL METALICO PARA IZA DE BANDERA H = 4 m Pza 3.00 623.79 1,871.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
97 GM-O-MET-007 BANCAS METALICAS CON ESPALDAR Pza 8.00 1,035.45 8,283.60 4.00 4,141.80 0.00 0.00 0.00 0.00 0.00 0.00
98 GM-O-MET-020 BASURERO METALICO Pza 8.00 842.01 6,736.08 3.00 2,526.03 0.00 0.00 0.00 0.00 0.00 0.00
99 GM-O-MET-025 COLUMPIO MAYORES DE 3 ASIENTOS Pza 1.00 2,866.70 2,866.70 1.00 2,866.70 0.00 0.00 0.00 0.00 0.00 0.00
102 GM-O-MUR-004 MURO DE LADRILLO 6H e = 0.12 m DOSIF 1:5 m2 412.67 131.25 54,162.94 431.74 56,665.88 412.67 54,162.94 0.00 0.00 412.67 54,162.94
103 GM-O-MUR-007 MURO DE LADRILLO GAMBOTE 18H e = 12 cm DOSIF 1:5 m2 12.11 197.91 2,396.69 12.11 2,396.69 12.11 2,396.69 0.00 0.00 12.11 2,396.69
104 GM-O-MUR-015 MURO DE LADRILLO GAMBOTE VISTO e = 24 cm m2 107.20 351.81 37,714.03 107.20 37,714.03 92.28 32,465.03 14.91 5,245.49 107.19 37,710.52
105 GM-O-NIV-001 NIVELACION TERRENO (MANUAL) m3 237.39 68.60 16,284.95 33.52 2,299.47 31.59 2,167.07 0.00 0.00 31.59 2,167.07
106 GM-O-PIC-005 PICADO DE REVOQUE S/ LADRILLO m2 6.96 11.43 79.55 215.58 2,464.08 0.00 0.00 0.00 0.00 0.00 0.00
109 GM-O-PIN-015 PINTADO DE LINEAS CANCHA BALONCESTO Pza 1.00 685.81 685.81 1.00 685.81 0.00 0.00 0.00 0.00 0.00 0.00
110 GM-O-PIN-016 PINTADO DE LINEAS CANCHA FUTBOL DE SALON Pza 1.00 669.13 669.13 1.00 669.13 0.00 0.00 0.00 0.00 0.00 0.00
111 GM-O-PIN-017 PINTADO DE LINEAS CANCHA VOLIBOL Pza 1.00 317.55 317.55 1.00 317.55 0.00 0.00 0.00 0.00 0.00 0.00
112 GM-O-PIN-022 PINTADO DE MURAL m2 29.74 58.94 1,752.88 55.76 3,286.49 0.00 0.00 0.00 0.00 0.00 0.00
113 GM-O-PIN-024 PINTURA AL OLEO MATE m2 4.20 54.72 229.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
117 GM-O-PIS-024 CONTRAPISO DE CEMENTO S/ LOSA m2 12.63 116.98 1,477.46 12.63 1,477.46 0.00 0.00 0.00 0.00 0.00 0.00
119 GM-O-PUE-009 PUERTA METALICA CON MALLA OLIMPICA m2 4.20 737.31 3,096.70 8.00 5,898.48 0.00 0.00 0.00 0.00 0.00 0.00
120 GM-O-PUE-026 PROV Y COLOC DE PUERTA DE CEDRO m2 47.74 882.89 42,149.17 49.63 43,817.83 0.00 0.00 0.00 0.00 0.00 0.00
Pag 5 de 12
VOLÚMENES AUTORIZADOS MODIFICACION VOLUMEN CERTIFICADO AVANCE
No CODIGO DESCRIPCION UNIDAD CANTIDAD MONTO CANTIDAD MONTO CANTIDAD MONTO CANTIDAD
CANTIDAD P.U. MONTO MONTO TOTAL
APROBADO APROBADO ANTERIOR ANTERIOR PRESENTE PRESENTE TOTAL
124 GM-O-PVB-370 LOSA ALIVIANADA H= 20 cm CON VIGUETA PRETENSADA m2 123.93 285.57 35,390.69 122.68 35,033.73 122.68 35,033.73 0.00 0.00 122.68 35,033.73
125 GM-O-QIN-002 PROV Y COLOC DE CHAPA EXTERIOR Pza 6.00 298.64 1,791.84 5.00 1,493.20 0.00 0.00 0.00 0.00 0.00 0.00
126 GM-O-QIN-003 PROV Y COLOC DE CHAPA INTERIOR Pza 17.00 325.93 5,540.81 22.00 7,170.46 0.00 0.00 0.00 0.00 0.00 0.00
127 GM-O-QIN-005 PROV Y COLOC DE PICAPORTES DE 3" Pza 20.00 45.94 918.80 20.00 918.80 0.00 0.00 0.00 0.00 0.00 0.00
128 GM-O-REJ-007 REJAS METALICAS PARA VENTANA m2 71.41 381.49 27,242.20 73.47 28,028.07 0.00 0.00 0.00 0.00 0.00 0.00
129 GM-O-REL-004 RELLENO Y COMPACTADO CON TIERRA CERNIDA m3 13.24 138.37 1,832.02 10.31 1,426.59 0.00 0.00 0.00 0.00 0.00 0.00
130 GM-O-REL-014 CAMA DE ASIENTO PARA TUBERIA m3 4.40 99.53 437.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
141 GM-O-SUM-015 SUMIDERO TIPO R I Pza 3.00 971.95 2,915.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
142 GM-O-TUB-065 PROV Y TENDIDO DE TUBERIA PVC 2" C-9 m 14.98 24.40 365.51 40.22 981.37 0.00 0.00 40.22 981.37 40.22 981.37
143 GM-O-TUB-081 PROV Y TENDIDO DE TUBERIA PVC 4" C-9 m 41.33 66.30 2,740.18 121.86 8,079.32 0.00 0.00 20.20 1,339.26 20.20 1,339.26
144 GM-O-TUB-090 PROV Y TENDIDO DE TUBERIA PVC 3" C-9 m 5.29 51.98 274.97 0.96 49.90 0.00 0.00 0.96 49.90 0.96 49.90
Pag 6 de 12
VOLÚMENES AUTORIZADOS MODIFICACION VOLUMEN CERTIFICADO AVANCE
No CODIGO DESCRIPCION UNIDAD CANTIDAD MONTO CANTIDAD MONTO CANTIDAD MONTO CANTIDAD
CANTIDAD P.U. MONTO MONTO TOTAL
APROBADO APROBADO ANTERIOR ANTERIOR PRESENTE PRESENTE TOTAL
147 GM-O-TUB-104 PROV Y TENDIDO DE TUBERIA PVC 1/2" E-40 m 27.17 8.52 231.49 46.74 398.22 0.00 0.00 46.74 398.22 46.74 398.22
148 GM-O-TUB-105 PROV Y TENDIDO DE TUBERIA PVC 3/4" E-40 m 9.00 11.54 103.86 76.24 879.81 0.00 0.00 76.24 879.81 76.24 879.81
149 GM-O-TUB-106 PROVISION Y TENDIDO DE TUBERIA PVC 1" E-40 m 8.23 17.48 143.86 12.71 222.17 0.00 0.00 12.71 222.17 12.71 222.17
150 GM-O-TUB-111 PROV Y TENDIDO DE TUBERIA PVC 2" E-40 m 0.59 36.81 21.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
151 GM-O-TUB-115 PROV Y COLOC DE YEE DE PVC 4" SDR 35 Pza 6.00 312.42 1,874.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
152 GM-O-TUB-112 TENDIDO Y PROV DE TUBERIA DE PVC DE 4" SDR 35 m 3.15 40.59 127.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
153 GM-O-TUB-119 PROV Y TENDIDO DE TUBERIA PVC 1 1/2" E-40 m 21.85 26.03 568.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
154 GM-O-TUB-136 PROV Y COLOC LLAVE DE PASO DE 1" Pza 12.00 127.14 1,525.68 1.00 127.14 0.00 0.00 1.00 127.14 1.00 127.14
156 GM-O-VID-008 PROV Y COLOC DE VIDRIO TEMPLADO (10 mm) m2 4.32 640.26 2,765.92 4.32 2,765.92 0.00 0.00 0.00 0.00 0.00 0.00
158 GM-O-ZOC-002 ZOCALO DE CEMENTO - ARENA m2 25.40 98.70 2,506.98 25.40 2,506.98 0.00 0.00 0.00 0.00 0.00 0.00
159 GM-O-ZOC-003 ZOCALO DE CERAMICA m 166.88 31.72 5,293.43 191.25 6,066.45 0.00 0.00 0.00 0.00 0.00 0.00
160 GM-O-AGR-003 PROV. Y COLOC. DE GRAVA DE D = 3/4 " m3 51.84 189.73 9,835.60 63.31 12,011.81 0.00 0.00 16.90 3,206.44 16.90 3,206.44
161 GM-O-AMB-019 MEDICION GASES DE COMBUSTION Pto 10.00 463.04 4,630.40 10.00 4,630.40 3.00 1,389.12 1.00 463.04 4.00 1,852.16
162 GM-O-AMB-021 MEDICION DE PARTICULAS SUSPENDIDAS Pto 6.00 663.21 3,979.26 6.00 3,979.26 6.00 3,979.26 0.00 0.00 6.00 3,979.26
163 GM-O-AMB-022 MEDICION ACUSTICA Pto 21.00 467.27 9,812.67 21.00 9,812.67 14.00 6,541.78 2.00 934.54 16.00 7,476.32
165 GM-O-ARC-028 PISO DE GRAVILLA E=5 CM m2 78.24 19.35 1,513.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
167 GM-O-BAR-027 PROV Y COLOC DE BARANDA FG 2" m 305.60 393.53 120,262.77 122.92 48,372.71 0.00 0.00 0.00 0.00 0.00 0.00
168 GM-O-CAM-068 CAMARA DE INSPECCION HoCo H=1.21 M - 2.0 M Pza 1.00 2,495.20 2,495.20 20.00 49,904.00 12.00 29,942.40 7.00 17,466.40 19.00 47,408.80
171 GM-O-DEM-015 DEMOLICION DE HORMIGON CICLOPEO m3 3.39 241.18 817.60 73.26 17,668.85 45.79 11,043.64 19.84 4,785.01 65.63 15,828.65
172 GM-O-ELT-003 ENLOSETADO LOSETA ONDULADA (10 cm) m2 346.10 177.18 61,322.00 1,042.61 184,729.64 0.00 0.00 0.00 0.00 0.00 0.00
173 GM-O-ENL-004 ENLUCIDO DE CEMENTO MORT 1:3 e = 0.5 cm m2 1,153.80 42.68 49,244.18 340.59 14,536.38 239.71 10,230.81 0.00 0.00 239.71 10,230.81
174 GM-O-ENS-003 ENSAYO - CORTE DIRECTO PARA SUELOS Ensayo 4.00 508.29 2,033.16 7.00 3,558.03 5.00 2,541.45 2.00 1,016.58 7.00 3,558.03
Pag 7 de 12
VOLÚMENES AUTORIZADOS MODIFICACION VOLUMEN CERTIFICADO AVANCE
No CODIGO DESCRIPCION UNIDAD CANTIDAD MONTO CANTIDAD MONTO CANTIDAD MONTO CANTIDAD
CANTIDAD P.U. MONTO MONTO TOTAL
APROBADO APROBADO ANTERIOR ANTERIOR PRESENTE PRESENTE TOTAL
176 GM-O-ENT-001 ENTIBADO Y APUNTALADO m2 119.86 135.34 16,221.85 58.00 7,849.72 16.50 2,233.11 0.00 0.00 16.50 2,233.11
181 GM-O-EXC-011 EXCAVACION DE 4 - 6 M S/ AGOTAMIENTO m3 179.95 182.93 32,918.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
182 GM-O-FEE-001 ACERO DE REFUERZO kg 6,179.20 14.70 90,834.24 4,158.80 61,134.36 1,515.81 22,282.41 1,290.70 18,973.29 2,806.51 41,255.70
183 GM-O-HOR-001 HORMIGON POBRE m3 10.56 621.24 6,560.29 6.91 4,292.77 3.19 1,981.76 0.61 378.96 3.80 2,360.72
184 GM-O-HOR-067 HORMIGON SIMPLE P/MUROS m3 69.12 1,603.11 110,806.96 49.37 79,145.54 21.38 34,274.49 0.00 0.00 21.38 34,274.49
185 GM-O-HOR-071 HORMIGON SIMPLE P/ZAPATAS - H21 m3 55.36 1,543.92 85,471.41 3.99 6,160.24 0.00 0.00 3.99 6,160.24 3.99 6,160.24
190 GM-O-LET-006 LETREROS DE SEÑALIZACION Pza 5.00 268.45 1,342.25 5.00 1,342.25 0.00 0.00 5.00 1,342.25 5.00 1,342.25
191 GM-O-LET-052 LETRERO IDENTIFICATIVO DE OBRA 3X2 BANNER Pza 2.00 1,074.96 2,149.92 2.00 2,149.92 0.00 0.00 0.00 0.00 0.00 0.00
192 GM-O-LET-081 LETRERO DE OBRA DE 2X1 M (TIPO BANNER) Pza 2.00 592.02 1,184.04 2.00 1,184.04 2.00 1,184.04 0.00 0.00 2.00 1,184.04
193 GM-O-LIM-002 LIMPIEZA Y DESHIERBE m2 78.24 1.90 148.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
194 GM-O-LIM-012 LIMPIEZA Y RETIRO DE ESCOMBROS m3 670.17 72.14 48,346.06 1,116.65 80,555.13 58.90 4,249.05 0.00 0.00 58.90 4,249.05
195 GM-O-MET-007 BANCAS METALICAS CON ESPALDAR Pza 23.00 1,035.45 23,815.35 11.00 11,389.95 0.00 0.00 0.00 0.00 0.00 0.00
196 GM-O-MET-020 BASURERO METALICO Pza 18.00 842.01 15,156.18 5.00 4,210.05 0.00 0.00 0.00 0.00 0.00 0.00
197 GM-O-MET-025 COLUMPIO MAYORES DE 3 ASIENTOS Pza 2.00 2,866.70 5,733.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
198 GM-O-MET-044 SUBE Y BAJA CON RESORTE Pza 1.00 3,867.82 3,867.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
199 GM-O-NIV-001 NIVELACION TERRENO (MANUAL) m3 211.77 68.60 14,527.42 149.98 10,288.63 11.87 814.28 0.00 0.00 11.87 814.28
200 GM-O-NIV-010 PERFILADO Y NIVELADO DE PLATAFORMA m2 346.10 41.62 14,404.68 1,030.24 42,878.59 0.00 0.00 0.00 0.00 0.00 0.00
201 GM-O-PIN-009 PINTURA SOBRE HORMIGON VISTO EXTERIOR m2 1,429.44 47.80 68,327.23 1,354.18 64,729.80 0.00 0.00 0.00 0.00 0.00 0.00
Pag 8 de 12
VOLÚMENES AUTORIZADOS MODIFICACION VOLUMEN CERTIFICADO AVANCE
No CODIGO DESCRIPCION UNIDAD CANTIDAD MONTO CANTIDAD MONTO CANTIDAD MONTO CANTIDAD
CANTIDAD P.U. MONTO MONTO TOTAL
APROBADO APROBADO ANTERIOR ANTERIOR PRESENTE PRESENTE TOTAL
202 GM-O-PIN-029 PINTURA AL OLEO m2 144.66 57.51 8,319.40 145.13 8,346.43 0.00 0.00 0.00 0.00 0.00 0.00
206 GM-O-REL-004 RELLENO Y COMPACTADO CON TIERRA CERNIDA m3 0.14 138.37 19.37 160.41 22,195.93 101.21 14,004.43 37.23 5,151.52 138.44 19,155.95
208 GM-O-REL-014 CAMA DE ASIENTO PARA TUBERIA m3 0.07 99.53 6.97 36.68 3,650.76 22.50 2,239.43 8.93 888.80 31.43 3,128.23
212 GM-O-REP-006 REPLANTEO DE VIAS Y GRADERIAS m 482.00 14.83 7,148.06 504.16 7,476.69 149.79 2,221.38 53.13 787.92 202.92 3,009.30
213 GM-O-REP-008 REPLANTEO Y TRAZADO DE TUBERIAS m 1.20 4.12 4.94 660.19 2,719.98 428.66 1,766.08 163.91 675.31 592.57 2,441.39
215 GM-O-SUM-015 SUMIDERO TIPO R I Pza 1.00 971.95 971.95 16.00 15,551.20 0.00 0.00 0.00 0.00 0.00 0.00
ITEMS ADICIONALES CM - 1
220 GM-O-CAM-024 CAMARA DE INSPECCION Hº Cº H = 2.01 m - 3.0 m Pza 0.00 3,275.14 0.00 1.00 3,275.14 1.00 3,275.14 0.00 0.00 1.00 3,275.14
223 GM-O-DEM-004 DEMOLICION DE CORDON DE ACERA m 0.00 16.01 0.00 61.98 992.30 0.00 0.00 61.98 992.30 61.98 992.30
224 GM-O-EMP-005 DESEMPIEDRE m2 0.00 6.86 0.00 263.83 1,809.87 0.00 0.00 263.83 1,809.87 263.83 1,809.87
225 GM-O-CAM-012 ELEVACION DE CAMARAS DOSIF 1:3:4 m3 0.00 1,009.33 0.00 0.50 504.67 0.00 0.00 0.00 0.00 0.00 0.00
Pag 9 de 12
VOLÚMENES AUTORIZADOS MODIFICACION VOLUMEN CERTIFICADO AVANCE
No CODIGO DESCRIPCION UNIDAD CANTIDAD MONTO CANTIDAD MONTO CANTIDAD MONTO CANTIDAD
CANTIDAD P.U. MONTO MONTO TOTAL
APROBADO APROBADO ANTERIOR ANTERIOR PRESENTE PRESENTE TOTAL
226 GM-O-EMP-006 EMPIEDRE DE CALZADA S/ PROV m2 0.00 32.49 0.00 179.00 5,815.71 0.00 0.00 0.00 0.00 0.00 0.00
227 GM-O-TER-002 ESTRUCTURA EN SUELO REFORZADO 1 x 1 x 4 m3 0.00 1,181.57 0.00 48.00 56,715.36 0.00 0.00 48.00 56,715.36 48.00 56,715.36
228 GM-O-HOR-004 Hº Cº CON 30% DE PIEDRA DESPLAZADORA DOSIF 1:3:4 m3 0.00 817.46 0.00 17.24 14,093.01 0.00 0.00 0.00 0.00 0.00 0.00
229 GM-O-HOR-106 HORMIGON SIMPLE H-18 INCLUYE COLOCADO m3 0.00 1,967.22 0.00 0.16 314.76 0.00 0.00 0.00 0.00 0.00 0.00
230 GM-O-IMP-062 IMPERMEABILIZACION MURO DE CONTENCION m2 0.00 77.00 0.00 97.18 7,482.86 54.05 4,161.85 0.00 0.00 54.05 4,161.85
232 GM-O-PIC-003 PICADO DE PISOS DE CEMENTO m2 0.00 36.59 0.00 39.24 1,435.79 0.00 0.00 39.24 1,435.79 39.24 1,435.79
233 GM-O-PIN-002 PINTURA AL OLEO SOBRE MUROS m2 0.00 33.36 0.00 61.00 2,034.96 0.00 0.00 0.00 0.00 0.00 0.00
234 GM-O-ARB-036 PLANTADO DE ESPECIE ARBUSTO FLORAL Pza 0.00 6.22 0.00 163.00 1,013.86 0.00 0.00 0.00 0.00 0.00 0.00
237 GM-O-IMP-017 PROV Y COLOC DE MEMBRANA GEOTEXTIL MT 200 m2 0.00 26.87 0.00 423.00 11,366.01 102.00 2,740.74 68.00 1,827.16 170.00 4,567.90
239 GM-O-HDR-001 PRUEBA HIDRAULICA ALCANTARILLADO 6" m 0.00 8.18 0.00 248.28 2,030.93 0.00 0.00 163.91 1,340.78 163.91 1,340.78
240 GM-O-HDR-002 PRUEBA HIDRAULICA ALCANTARILLADO 8" m 0.00 12.58 0.00 431.66 5,430.28 406.04 5,107.98 0.00 0.00 406.04 5,107.98
241 GM-O-REV-009 REVOQUE e = 3 cm CON ENLUCIDO m2 0.00 135.11 0.00 16.97 2,292.82 0.00 0.00 0.00 0.00 0.00 0.00
242 GM-O-REV-060 REVOQUE MORTERO 1:3 e=1.5 cm CON ENLUCIDO m2 0.00 91.30 0.00 51.59 4,710.17 0.00 0.00 32.39 2,957.21 32.39 2,957.21
243 GM-O-SUM-017 SUMIDERO TIPO RIII Pza 0.00 2,677.53 0.00 2.00 5,355.06 0.00 0.00 0.00 0.00 0.00 0.00
244 GM-O-CAM-019 CAMARA DE REGISTRO 25 x 25 cm Pza 0.00 309.03 0.00 8.00 2,472.24 0.00 0.00 0.00 0.00 0.00 0.00
245 GM-O-CBS-005 CONFORMACION CAPA SUB BASE m3 0.00 27.24 0.00 317.63 8,652.24 0.00 0.00 0.00 0.00 0.00 0.00
246 GM-O-IMP-062 IMPERMEABILIZACION MURO DE CONTENCION m2 0.00 77.00 0.00 64.28 4,949.56 34.10 2,625.70 0.00 0.00 34.10 2,625.70
Pag 10 de 12
VOLÚMENES AUTORIZADOS MODIFICACION VOLUMEN CERTIFICADO AVANCE
No CODIGO DESCRIPCION UNIDAD CANTIDAD MONTO CANTIDAD MONTO CANTIDAD MONTO CANTIDAD
CANTIDAD P.U. MONTO MONTO TOTAL
APROBADO APROBADO ANTERIOR ANTERIOR PRESENTE PRESENTE TOTAL
254 GM-O-ACC-046 PROV Y COLOC DE YEE DE REDUCCION PVC C-9 4"x4"x2" Pza 0.00 54.92 0.00 4.00 219.68 0.00 0.00 4.00 219.68 4.00 219.68
255 GM-O-TUB-074 PROV Y COLOC LLAVE DE PASO DE 1/2" Pza 0.00 105.39 0.00 6.00 632.34 0.00 0.00 6.00 632.34 6.00 632.34
256 GM-O-TUB-137 PROV Y COLOC LLAVE DE PASO DE 3/4" Pza 0.00 106.40 0.00 3.00 319.20 0.00 0.00 3.00 319.20 3.00 319.20
257 GM-O-ACC-030 PROV Y COLOCADO DE CODO 90° PVC C-9 D=4" Pza 0.00 717.60 0.00 28.00 20,092.80 4.00 2,870.40 4.00 2,870.40 8.00 5,740.80
258 GM-O-ACC-058 PROV Y COLOCADO DE CODO PVC 1" E-40 Pza 0.00 14.67 0.00 3.00 44.01 0.00 0.00 3.00 44.01 3.00 44.01
259 GM-O-LUM-597 PROV. E INST. PANEL 30X120cm LED 48 W. 3920 LUMEN Pza 0.00 361.65 0.00 35.00 12,657.75 0.00 0.00 0.00 0.00 0.00 0.00
261 GM-O-ACC-052 PROV. Y COLOC TEE PVC 1/2" Pza 0.00 17.90 0.00 16.00 286.40 0.00 0.00 16.00 286.40 16.00 286.40
262 GM-O-ACC-190 PROVISION Y COLOCACION CODO 90º PVC 1/2" E-40 Pza 0.00 13.96 0.00 35.00 488.60 0.00 0.00 35.00 488.60 35.00 488.60
263 GM-O-ACC-189 PROVISION Y COLOCACION CODO 90º PVC 3/4" E-40 Pza 0.00 16.07 0.00 13.00 208.91 0.00 0.00 13.00 208.91 13.00 208.91
264 GM-O-ACC-043 PROVISION Y COLOCACION DE TEE 1" PVC Pza 0.00 16.55 0.00 2.00 33.10 0.00 0.00 2.00 33.10 2.00 33.10
267 GM-O-ACC-194 PROVISION Y COLOCACION TEE PVC 3/4" E-40 Pza 0.00 13.18 0.00 5.00 65.90 0.00 0.00 5.00 65.90 5.00 65.90
268 GM-O-BAT-106 PROVISION Y COLOCADO TANQUE DE AGUA DE 1200 LT Pza 0.00 1,617.77 0.00 1.00 1,617.77 0.00 0.00 0.00 0.00 0.00 0.00
269 GM-O-TAP-028 TAPA CIRCULAR DE Hº Aº D = 70 cm. e =10 cm H21 Pza 0.00 187.19 0.00 6.00 1,123.14 0.00 0.00 0.00 0.00 0.00 0.00
271 GM-O-HOR-068 HORMIGON SIMPLE P/COLUMNA - H21 m3 0.00 2,093.50 0.00 0.86 1,800.41 0.00 0.00 0.86 1,800.41 0.86 1,800.41
272 GM-O-HOR-070 HORMIGON SIMPLE P/VIGAS - H21 m3 0.00 2,067.05 0.00 9.14 18,892.84 0.00 0.00 9.14 18,892.84 9.14 18,892.84
273 GM-O-HOR-107 HORMIGON SIMPLE PARA VIGA DE FUNDACION m3 0.00 1,584.71 0.00 5.76 9,127.93 0.00 0.00 2.40 3,803.30 2.40 3,803.30
274 GM-O-PIS-024 CONTRAPISO DE CEMENTO S/ LOSA m2 0.00 116.98 0.00 95.00 11,113.10 0.00 0.00 95.00 11,113.10 95.00 11,113.10
275 GM-O-PVB-370 LOSA ALIVIANADA H= 20 cm CON VIGUETA PRETENSADA m2 0.00 285.57 0.00 80.67 23,036.93 0.00 0.00 80.67 23,036.93 80.67 23,036.93
277 GM-O-PIN-009 PINTURA SOBRE HORMIGON VISTO EXTERIOR m2 0.00 47.80 0.00 465.97 22,273.37 0.00 0.00 0.00 0.00 0.00 0.00
Pag 11 de 12
VOLÚMENES AUTORIZADOS MODIFICACION VOLUMEN CERTIFICADO AVANCE
No CODIGO DESCRIPCION UNIDAD CANTIDAD MONTO CANTIDAD MONTO CANTIDAD MONTO CANTIDAD
CANTIDAD P.U. MONTO MONTO TOTAL
APROBADO APROBADO ANTERIOR ANTERIOR PRESENTE PRESENTE TOTAL
281 GM-O-HOR-067 HORMIGON SIMPLE P/MUROS m3 0.00 1,603.11 0.00 25.42 40,751.06 13.49 21,625.95 0.00 0.00 13.49 21,625.95
ITEMS ADICIONALES CM - 2
283 GM-O-REV-018 REVOQUE DE CEMENTO e = 3 cm MORT 1:5 m2 0.00 123.54 0.00 14.58 1,801.21 0.00 0.00 0.00 0.00 0.00 0.00
287 GM-O-JGO-040 PROVISION Y COLOCADO DE APARATO TWIST LATERAL Pza 0.00 4,201.65 0.00 2.00 8,403.30 0.00 0.00 0.00 0.00 0.00 0.00
289 GM-O-TER-014 SUELO CEMENTO m3 0.00 205.46 0.00 75.60 15,532.78 0.00 0.00 0.00 0.00 0.00 0.00
CONSTRUCTORA LYON & LESANCH S.R.L. Ing. Daniel Alejandro Rios Oliver Ing. WILLIAM GANEM URGEL
Pag 12 de 12