ACTIVIDAD VOLUMENES EXCAVACIÓN DE SUBRASANTE
ABCSISAS COTAS RASANTE EXISTENTE COTAS TOMADAS NIVEL DE SUBRASANTE DIFERENCIA DE COTAS
BVI EJE BVD BVI EJE BVD BVI EJE BVD

TRAMO 1
K0+000 2953.2322 2953.248 2953.178 2952.9822 2952.962 2952.8282 0.25 0.29 0.35

K0+010 2953.6902 2953.615 2953.672 2953.3902 2953.3292 2953.4222 0.30 0.29 0.25

K0+020 2954.0052 2954.009 2953.982 2953.7052 2953.7232 2953.6322 0.30 0.29 0.35

K0+030 2954.5042 2954.495 2954.587 2954.2042 2954.3092 2954.2372 0.30 0.19 0.35

K0+040 2955.4412 2955.386 2955.314 2955.2412 2955.1002 2954.9642 0.20 0.29 0.35

K0+050 2957.0402 2957.049 2956.9 2956.7402 2956.7632 2956.5502 0.30 0.29 0.35

K0+055 2958.4612 2958.575 2958.7 2958.1612 2958.2892 2958.3502 0.30 0.29 0.35

TRAMO 2
K0+000 2999.75 2999.67 2999.712 2999.45 2999.484 2999.362 0.30 0.19 0.35

K0+010 3000.75 3000.7 3000.65 3000.45 3000.414 3000.3 0.30 0.29 0.35

K0+020 3001.7502 3001.827 3001.84 3001.4502 3001.5412 3001.5302 0.30 0.29 0.31

K0+030 3002.0792 3002.25 3002.183 3001.7792 3001.964 3001.833 0.30 0.29 0.35
K0+040 3003.752 3003.824 3003.102 3003.488 3003.538 3002.7522 0.26 0.29 0.35

K0+050 3004.75 3004.79 3004.87 3004.45 3004.504 3004.52 0.30 0.29 0.35

K0+060 3005.88 3005.85 3005.772 3005.58 3005.564 3005.422 0.30 0.29 0.35

K0+070 3006.124 3006.148 3006.132 3005.824 3005.862 3005.782 0.30 0.29 0.35
ESTRUCTURA DE
ANCHO (m) 0.30
0 C.R
0.3 S.B.G
0.00 AFIRM

PROMEDIO ANCHO VIA (M) AREA AREA LONGITUD (m) VOLUMEN VOLUMEN
ESPESOR TRANSVERSAL(m2) PROMEDIO(m2) (m3) ACUMULADO (m3)

TRAMO 1
0.30 5 5 1.48
1.44 10 14.35 14.35
0.28 5 5 1.39
1.48 10 14.77 29.12
0.31 5 5 1.56
1.48 10 14.77 43.89
0.28 5 5 1.39
1.39 10 13.93 57.82
0.28 5 5 1.39
1.48 10 14.77 72.59
0.31 5 5 1.56 0.2
1.56 5 7.80 80.39
0.31 5 5 1.56 0.2

TRAMO 2
0.28 5 5 1.39 0.2
1.48 10 14.77 95.15
0.31 5 5 1.56 0.2
1.53 10 15.27 110.42
0.30 5 5 1.49 0.2
1.53 10 15.27 125.69
0.31 5 5 1.56 0.2
1.53 10 15.30 140.99
0.30 5 5 1.50 0.2
1.53 10 15.30 156.29
0.31 5 5 1.56 0.4
1.56 10 15.60 171.89
0.31 5 5 1.56 0.4
1.56 10.00 15.60 187.49
0.31 5.00 5 1.56
VOLUMEN TOTAL EXCAVADO M3 187.49