COSTO DIRECTO 2,006,928.05 S/. 100,345.67 S/. 401,382.69 S/. 602,088.65 S/. 501,728.36 S/. 401,382.69
GASTOS GENERALES (10.43%) 209,420.54 10.43% S/. 10,470.95 S/. 41,883.80 S/. 62,827.23 S/. 52,354.75 S/. 41,883.80
UTILIDAD (5.00%) 100,346.40 5.00% S/. 5,017.28 S/. 20,069.13 S/. 30,104.43 S/. 25,086.42 S/. 20,069.13
SUB-TOTAL 2,316,694.99 S/. 115,833.91 S/. 463,335.62 S/. 695,020.32 S/. 579,169.53 S/. 463,335.62
IMPUESTO IGV (18%) 417,005.10 S/. 20,850.10 S/. 83,400.41 S/. 125,103.66 S/. 104,250.52 S/. 83,400.41
PRESUPUESTO TOTAL 2,733,700.09 S/. 136,684.01 S/. 546,736.04 S/. 820,123.97 S/. 683,420.04 S/. 546,736.04
PORCENTAJE DE AVANCE MENSUAL 5.00% 20.00% 30.00% 25.00% 20.00%
PORCENTAJE ACUMULADO 5.00% 25.00% 55.00% 80.00% 100.00%
CALENDA
RIO DE
AVANCE
PROYECTO: "MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA COMUNIDAD DE COLPAMATARA, DISTRITO DE CHOTA, PROVINCIA DE CHOTA - CAJAMARCA"
DE OBRA
VALORIZ
ADO VALORIZACIÓN AL 31 DE MAYO
PRESUPUESTO SEGÚN CONTRATO ACUMULADO ANTERIOR VALORIZACIÓN ACTUAL VALORIZACIÓN ACUMULADA SALDO POR VALORIZAR
METRADO SUB TOTAL AVANCE METRADO SUB TOTAL AVANCE METRADO SUB TOTAL AVANCE METRADO SUB TOTAL AVANCE
Item Descripción Und. Metrado Precio (S/.) Parcial (S/.) S/. % S/. % S/. % S/. %
01 SISTEMA DE AGUA POTABLE - COLPAMATARA S/. 587,861.75
01.01 TRABAJOS PRELIMINARES S/. 3,320.56
01.01.01 CARTEL DE OBRA 3.60x2.40 und 1.00 S/. 745.70 S/. 745.70 0.00 0.00 0.00 1.00 745.70
01.01.02 ALMACEN PRELIMINAR Y CASETA DE SEGURIDAD m2 35.00 S/. 47.85 S/. 1,674.86 0.00 0.00 0.00 35.00 1,674.86
01.01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPO LIVIA glb 1.00 S/. 900.00 S/. 900.00 0.00 0.00 0.00 1.00 900.00
01.02 CAPTACIONES S/. 14,720.58
01.02.01 CAPTACION DE LADERA 1 S/. 5,007.13
01.02.01.01 TRABAJOS PRELIMINARES S/. 39.64
01.02.01.01.01 LIMPIEZA Y DEFORESTACION m2 15.84 S/. 1.58 S/. 25.09 0.00 0.00 0.00 15.84 25.09
01.02.01.01.02 TRAZO, NIVELES Y REPLANTEO m2 15.84 S/. 0.92 S/. 14.54 0.00 0.00 0.00 15.84 14.54
01.02.01.02 MOVIMIENTO DE TIERRAS S/. 209.90
01.02.01.02.01 EXCAVACION MANUAL DE TERRENO m3 3.96 S/. 27.51 S/. 108.95 0.00 0.00 0.00 3.96 108.95
01.02.01.02.02 REFINE Y NIVELACION DE TERRENO m2 2.00 S/. 2.75 S/. 5.51 0.00 0.00 0.00 2.00 5.51
01.02.01.02.03 RELLENO Y COMPACTACION CON MATERIAL PROP m3 0.16 S/. 15.75 S/. 2.52 0.00 0.00 0.00 0.00 0.00
01.02.01.02.04 MEJORAMIENTO DE BASE CON AFIRMADO E=0.10m m3 0.40 S/. 68.54 S/. 27.41 0.00 0.00 0.00 0.00 0.00
01.02.01.02.05 ELIMINACION DE MATERIAL EXCEDENTE (CARGU m3 4.76 S/. 13.76 S/. 65.50 0.00 0.00 0.00 4.76 65.50
01.02.01.03 MATERIAL GRANULAR PARA FILTRO S/. 125.85
01.02.01.03.01 FILTRO III (Arena fina) m3 0.70 S/. 97.39 S/. 68.18 0.00 0.00 0.00 0.00 0.00
01.02.01.03.02 FILTRO DE GRAVA FINA m3 0.36 S/. 97.08 S/. 34.95 0.00 0.00 0.00 0.00 0.00
01.02.01.03.03 FILTRO I (Grava gruesa de 3/4" - 3") m3 0.22 S/. 103.30 S/. 22.73 0.00 0.00 0.00 0.00 0.00
01.02.01.04 OBRAS DE CONCRETO SIMPLE S/. 438.27
01.02.01.04.01 CONCRETO f'c=175 kg/cm2 m3 0.18 S/. 287.70 S/. 51.79 0.00 0.00 0.00 0.00 0.00
01.02.01.04.02 CONCRETO f'c=100 kg/cm2 m3 0.40 S/. 178.07 S/. 71.23 0.00 0.00 0.00 0.00 0.00
01.02.01.04.03 VEREDA DE PIEDRA (D=4") MEZCLA C:H=1:8 m2 3.51 S/. 45.97 S/. 161.36 0.00 0.00 0.00 0.00 0.00
01.02.01.04.04 DADOS DE CONCRETO f'c=140 kg/cm2 m3 0.29 S/. 260.84 S/. 75.65 0.00 0.00 0.00 0.00 0.00
01.02.01.04.05 MEJORAMIENTO CON SOLADO F'C=140 KG/CM2 E=0m3 0.30 S/. 260.85 S/. 78.26 0.00 0.00 0.00 0.00 0.00
01.02.01.05 OBRAS DE CONCRETO ARMADO S/. 1,413.72
01.02.01.05.01 CONCRETO f'c=175 kg/cm2 CON ADITIVO IMPERME m3 1.05 S/. 313.97 S/. 329.67 0.00 0.00 0.00 0.00 0.00
01.02.01.05.02 ENCOFRADO Y DESENCOFRADO DE LOSA DE TEC m2 7.51 S/. 36.64 S/. 275.16 0.00 0.00 0.00 0.00 0.00
01.02.01.05.03 ENCOFRADO Y DESENCOFRADO DE MUROS m2 12.97 S/. 36.64 S/. 475.21 0.00 0.00 0.00 0.00 0.00
01.02.01.05.04 ACERO DE REFUERZO FY=4200 KG/CM2 kg 91.32 S/. 3.65 S/. 333.68 0.00 0.00 0.00 0.00 0.00
01.02.01.06 REVOQUES Y ENLUCIDOS S/. 277.14
01.02.01.06.01 TARRAJEO EN EXTERIORES (MORTERO C:A=1:5), E m2 7.24 S/. 13.24 S/. 95.85 0.00 0.00 0.00 0.00 0.00
01.02.01.06.02 TARRAJEO EN INTERIORES CON IMPERMEABILIZANm2 6.14 S/. 20.45 S/. 125.55 0.00 0.00 0.00 0.00 0.00
01.02.01.06.03 MORTERO 1:5 EN PENDIENTE DE FONDO m2 0.61 S/. 17.56 S/. 10.71 0.00 0.00 0.00 0.00 0.00
01.02.01.06.04 PINTURA LATEX EN EXTERIORES (DOS MANOS) m2 7.24 S/. 6.22 S/. 45.03 0.00 0.00 0.00 0.00 0.00
01.02.01.07 VÁLVULAS Y ACCESORIOS S/. 199.00
01.02.01.07.01 VALVULA COMPUERTA DE BRONCE DE 3/4" + ACC und 1.00 S/. 199.00 S/. 199.00 0.00 0.00 0.00 0.00 0.00
01.02.01.08 VARIOS S/. 2,303.62
01.02.01.08.01 SUM. E INST. TAPA SANITARIA METALICA DE 0.6 und 2.00 S/. 152.15 S/. 304.29 0.00 0.00 0.00 0.00 0.00
01.02.01.08.02 SUM. E INST. TAPA SANITARIA METALICA DE 0.4 und 2.00 S/. 150.41 S/. 300.82 0.00 0.00 0.00 0.00 0.00
01.02.01.08.03 CERCO PERIMETRICO CON MALLA OLIMPICA m 13.50 S/. 103.34 S/. 1,395.06 0.00 0.00 0.00 0.00 0.00
01.02.01.08.04 PUERTA EN CERCO PERIMETRICO und 1.00 S/. 303.45 S/. 303.45 0.00 0.00 0.00 0.00 0.00
01.02.02 CAPTACION DE LADERA 2 S/. 4,856.72
01.02.02.01 TRABAJOS PRELIMINARES S/. 39.64
01.02.02.01.01 LIMPIEZA Y DEFORESTACION m2 15.84 S/. 1.58 S/. 25.09 0.00 0.00 0.00 15.84 25.09
01.02.02.01.02 TRAZO, NIVELES Y REPLANTEO m2 15.84 S/. 0.92 S/. 14.54 0.00 0.00 0.00 15.84 14.54
01.02.02.02 MOVIMIENTO DE TIERRAS S/. 209.90
01.02.02.02.01 EXCAVACION MANUAL DE TERRENO m3 3.96 S/. 27.51 S/. 108.95 0.00 0.00 0.00 0.00
01.02.02.02.02 REFINE Y NIVELACION DE TERRENO m2 2.00 S/. 2.75 S/. 5.51 0.00 0.00 0.00 0.00
01.02.02.02.03 RELLENO Y COMPACTACION CON MATERIAL PROP m3 0.16 S/. 15.75 S/. 2.52 0.00 0.00 0.00 0.00
01.02.02.02.04 MEJORAMIENTO DE BASE CON AFIRMADO E=0.10m m3 0.40 S/. 68.54 S/. 27.41 0.00 0.00 0.00 0.00
01.02.02.02.05 ELIMINACION DE MATERIAL EXCEDENTE (CARGU m3 4.76 S/. 13.76 S/. 65.50 0.00 0.00 0.00 0.00
01.02.02.03 MATERIAL GRANULAR PARA FILTRO S/. 125.85
01.02.02.03.01 FILTRO III (Arena fina) m3 0.70 S/. 97.39 S/. 68.18 0.00 0.00 0.00 0.00
01.02.02.03.02 FILTRO DE GRAVA FINA m3 0.36 S/. 97.08 S/. 34.95 0.00 0.00 0.00 0.00
01.02.02.03.03 FILTRO I (Grava gruesa de 3/4" - 3") m3 0.22 S/. 103.30 S/. 22.73 0.00 0.00 0.00 0.00
01.02.02.04 OBRAS DE CONCRETO SIMPLE S/. 438.27
01.02.02.04.01 CONCRETO f'c=175 kg/cm2 m3 0.18 S/. 287.70 S/. 51.79 0.00 0.00 0.00 0.00
01.02.02.04.02 CONCRETO f'c=100 kg/cm2 m3 0.40 S/. 178.07 S/. 71.23 0.00 0.00 0.00 0.00
01.02.02.04.03 VEREDA DE PIEDRA (D=4") MEZCLA C:H=1:8 m2 3.51 S/. 45.97 S/. 161.36 0.00 0.00 0.00 0.00
01.02.02.04.04 DADOS DE CONCRETO f'c=140 kg/cm2 m3 0.29 S/. 260.84 S/. 75.65 0.00 0.00 0.00 0.00
01.02.02.04.05 MEJORAMIENTO CON SOLADO F'C=140 KG/CM2 E=0m3 0.30 S/. 260.85 S/. 78.26 0.00 0.00 0.00 0.00
01.02.02.05 OBRAS DE CONCRETO ARMADO S/. 1,413.72
01.02.02.05.01 CONCRETO f'c=175 kg/cm2 CON ADITIVO IMPERME m3 1.05 S/. 313.97 S/. 329.67 0.00 0.00 0.00 0.00
01.02.02.05.02 ENCOFRADO Y DESENCOFRADO DE LOSA DE TEC m2 7.51 S/. 36.64 S/. 275.16 0.00 0.00 0.00 0.00
01.02.02.05.03 ENCOFRADO Y DESENCOFRADO DE MUROS m2 12.97 S/. 36.64 S/. 475.21 0.00 0.00 0.00 0.00
01.02.02.05.04 ACERO DE REFUERZO FY=4200 KG/CM2 kg 91.32 S/. 3.65 S/. 333.68 0.00 0.00 0.00 0.00
01.02.02.06 REVOQUES Y ENLUCIDOS S/. 277.14
01.02.02.06.01 TARRAJEO EN EXTERIORES (MORTERO C:A=1:5), E m2 7.24 S/. 13.24 S/. 95.85 0.00 0.00 0.00 0.00
01.02.02.06.02 TARRAJEO EN INTERIORES CON IMPERMEABILIZANm2 6.14 S/. 20.45 S/. 125.55 0.00 0.00 0.00 0.00
01.02.02.06.03 MORTERO 1:5 EN PENDIENTE DE FONDO m2 0.61 S/. 17.56 S/. 10.71 0.00 0.00 0.00 0.00
CALENDA
RIO DE
AVANCE
PROYECTO: "MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA COMUNIDAD DE COLPAMATARA, DISTRITO DE CHOTA, PROVINCIA DE CHOTA - CAJAMARCA"
DE OBRA
VALORIZ
ADO VALORIZACIÓN AL 31 DE MAYO
01.02.02.06.04 PINTURA LATEXPRESUPUESTO SEGÚN
EN EXTERIORES (DOS CONTRATO
MANOS) m2 7.24 S/. 6.22 S/. 45.03 0.00 0.00 0.00 0.00
01.02.02.07 VÁLVULAS Y ACCESORIOS S/. 199.00
01.02.02.07.01 VALVULA COMPUERTA DE BRONCE DE 3/4" + ACC und 1.00 S/. 199.00 S/. 199.00 0.00 0.00 0.00 0.00
01.02.02.08 VARIOS S/. 2,153.21
01.02.02.08.01 SUM. E INST. TAPA SANITARIA METALICA DE 0.6 und 2.00 S/. 152.15 S/. 304.29 0.00 0.00 0.00 0.00
01.02.02.08.02 SUM. E INST. TAPA SANITARIA METALICA DE 0.4 und 1.00 S/. 150.41 S/. 150.41 0.00 0.00 0.00 0.00
01.02.02.08.03 CERCO PERIMETRICO CON MALLA OLIMPICA m 13.50 S/. 103.34 S/. 1,395.06 0.00 0.00 0.00 0.00
01.02.02.08.04 PUERTA EN CERCO PERIMETRICO und 1.00 S/. 303.45 S/. 303.45 0.00 0.00 0.00 0.00
01.02.03 CAPTACION DE LADERA 3 S/. 4,856.72
01.02.03.01 TRABAJOS PRELIMINARES S/. 39.64
01.02.03.01.01 LIMPIEZA Y DEFORESTACION m2 15.84 S/. 1.58 S/. 25.09 0.00 0.00 0.00 15.84 25.09
01.02.03.01.02 TRAZO, NIVELES Y REPLANTEO m2 15.84 S/. 0.92 S/. 14.54 0.00 0.00 0.00 15.84 14.54
01.02.03.02 MOVIMIENTO DE TIERRAS S/. 209.90
01.02.03.02.01 EXCAVACION MANUAL DE TERRENO m3 3.96 S/. 27.51 S/. 108.95 0.00 0.00 3.96 108.95
01.02.03.02.02 REFINE Y NIVELACION DE TERRENO m2 2.00 S/. 2.75 S/. 5.51 0.00 0.00 0.00 0.00
01.02.03.02.03 RELLENO Y COMPACTACION CON MATERIAL PROP m3 0.16 S/. 15.75 S/. 2.52 0.00 0.00 0.00 0.00
01.02.03.02.04 MEJORAMIENTO DE BASE CON AFIRMADO E=0.10m m3 0.40 S/. 68.54 S/. 27.41 0.00 0.00 0.00 0.00
01.02.03.02.05 ELIMINACION DE MATERIAL EXCEDENTE (CARGU m3 4.76 S/. 13.76 S/. 65.50 0.00 0.00 4.76 65.50
01.02.03.03 MATERIAL GRANULAR PARA FILTRO S/. 125.85
01.02.03.03.01 FILTRO III (Arena fina) m3 0.70 S/. 97.39 S/. 68.18 0.00 0.00 0.00 0.00
01.02.03.03.02 FILTRO DE GRAVA FINA m3 0.36 S/. 97.08 S/. 34.95 0.00 0.00 0.00 0.00
01.02.03.03.03 FILTRO I (Grava gruesa de 3/4" - 3") m3 0.22 S/. 103.30 S/. 22.73 0.00 0.00 0.00 0.00
01.02.03.04 OBRAS DE CONCRETO SIMPLE S/. 438.27
01.02.03.04.01 CONCRETO f'c=175 kg/cm2 m3 0.18 S/. 287.70 S/. 51.79 0.00 0.00 0.00 0.00
01.02.03.04.02 CONCRETO f'c=100 kg/cm2 m3 0.40 S/. 178.07 S/. 71.23 0.00 0.00 0.00 0.00
01.02.03.04.03 VEREDA DE PIEDRA (D=4") MEZCLA C:H=1:8 m2 3.51 S/. 45.97 S/. 161.36 0.00 0.00 0.00 0.00
01.02.03.04.04 DADOS DE CONCRETO f'c=140 kg/cm2 m3 0.29 S/. 260.84 S/. 75.65 0.00 0.00 0.00 0.00
01.02.03.04.05 MEJORAMIENTO CON SOLADO F'C=140 KG/CM2 E=0m3 0.30 S/. 260.85 S/. 78.26 0.00 0.00 0.00 0.00
01.02.03.05 OBRAS DE CONCRETO ARMADO S/. 1,413.72
01.02.03.05.01 CONCRETO f'c=175 kg/cm2 CON ADITIVO IMPERME m3 1.05 S/. 313.97 S/. 329.67 0.00 0.00 0.00 0.00
01.02.03.05.02 ENCOFRADO Y DESENCOFRADO DE LOSA DE TEC m2 7.51 S/. 36.64 S/. 275.16 0.00 0.00 0.00 0.00
01.02.03.05.03 ENCOFRADO Y DESENCOFRADO DE MUROS m2 12.97 S/. 36.64 S/. 475.21 0.00 0.00 0.00 0.00
01.02.03.05.04 ACERO DE REFUERZO FY=4200 KG/CM2 kg 91.32 S/. 3.65 S/. 333.68 0.00 0.00 0.00 0.00
01.02.03.06 REVOQUES Y ENLUCIDOS S/. 277.14
01.02.03.06.01 TARRAJEO EN EXTERIORES (MORTERO C:A=1:5), E m2 7.24 S/. 13.24 S/. 95.85 0.00 0.00 0.00 0.00
01.02.03.06.02 TARRAJEO EN INTERIORES CON IMPERMEABILIZANm2 6.14 S/. 20.45 S/. 125.55 0.00 0.00 0.00 0.00
01.02.03.06.03 MORTERO 1:5 EN PENDIENTE DE FONDO m2 0.61 S/. 17.56 S/. 10.71 0.00 0.00 0.00 0.00
01.02.03.06.04 PINTURA LATEX EN EXTERIORES (DOS MANOS) m2 7.24 S/. 6.22 S/. 45.03 0.00 0.00 0.00 0.00
01.02.03.07 VÁLVULAS Y ACCESORIOS S/. 199.00
01.02.03.07.01 VALVULA COMPUERTA DE BRONCE DE 3/4" + ACC und 1.00 S/. 199.00 S/. 199.00 0.00 0.00 0.00 0.00
01.02.03.08 VARIOS S/. 2,153.21
01.02.03.08.01 SUM. E INST. TAPA SANITARIA METALICA DE 0.6 und 2.00 S/. 152.15 S/. 304.29 0.00 0.00 0.00 0.00
01.02.03.08.02 SUM. E INST. TAPA SANITARIA METALICA DE 0.4 und 1.00 S/. 150.41 S/. 150.41 0.00 0.00 0.00 0.00
01.02.03.08.03 CERCO PERIMETRICO CON MALLA OLIMPICA m 13.50 S/. 103.34 S/. 1,395.06 0.00 0.00 0.00 0.00
01.02.03.08.04 PUERTA EN CERCO PERIMETRICO und 1.00 S/. 303.45 S/. 303.45 0.00 0.00 0.00 0.00
01.03 LINEAS DE CONDUCCION S/. 53,585.14
01.03.01 LINEA DE CONDUCCION 3/4" S/. 5,020.51
01.03.01.01 OBRAS PRELIMINARES S/. 90.38
01.03.01.01.01 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS m 156.90 S/. 0.58 S/. 90.38 0.00 0.00 0.00 156.90 90.38
01.03.01.02 MOVIMIENTO DE TIERRAS S/. 3,863.91
01.03.01.02.01 EXCAVACION MANUAL DE ZANJAS, A=0.60m x H m 159.90 S/. 10.49 S/. 1,676.56 0.00 0.00 0.00 0.00
01.03.01.02.02 REFINE Y NIVELACION DE ZANJAS m 156.90 S/. 2.20 S/. 344.56 0.00 0.00 0.00 0.00
01.03.01.02.03 CAMA DE APOYO E=0.10m, A=0.60m PARA TUBERIA m 156.90 S/. 2.34 S/. 367.15 0.00 0.00 0.00 0.00
01.03.01.02.04 RELLENO CON MATERIAL PROPIO ZARANDEADO E m 156.90 S/. 4.82 S/. 755.48 0.00 0.00 0.00 0.00
01.03.01.02.05 RELLENO Y COMPACTACION DE ZANJAS MANUAL Em 156.90 S/. 4.59 S/. 720.17 0.00 0.00 0.00 0.00
01.03.01.03 SUMINISTRO E INSTALACION DE TUBERIAS S/. 1,053.42
01.03.01.03.01 SUMINISTRO Y COLOCACION DE TUBERIA PVC SAP m 156.90 S/. 5.55 S/. 871.26 0.00 0.00 0.00 0.00
01.03.01.03.02 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERI m 156.90 S/. 1.16 S/. 182.16 0.00 0.00 0.00 0.00
01.03.01.04 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 12.80
01.03.01.04.01 SUMINISTRO Y COLOCACION DE CODO 3/4" x 45° und 3.00 S/. 4.27 S/. 12.80 0.00 0.00 0.00 0.00
01.03.02 LINEA DE CONDUCCION 1" S/. 14,264.09
01.03.02.01 OBRAS PRELIMINARES S/. 219.16
01.03.02.01.01 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS m 380.49 S/. 0.58 S/. 219.16 0.00 0.00 0.00 380.49 219.16
01.03.02.02 MOVIMIENTO DE TIERRAS S/. 9,293.85
01.03.02.02.01 EXCAVACION MANUAL DE ZANJAS, A=0.60m x H m 380.49 S/. 10.49 S/. 3,989.44 0.00 0.00 0.00 0.00
01.03.02.02.02 REFINE Y NIVELACION DE ZANJAS m 380.49 S/. 2.20 S/. 835.56 0.00 0.00 0.00 0.00
01.03.02.02.03 CAMA DE APOYO E=0.10m, A=0.60m PARA TUBERIA m 380.49 S/. 2.34 S/. 890.34 0.00 0.00 0.00 0.00
01.03.02.02.04 RELLENO CON MATERIAL PROPIO ZARANDEADO E m 380.49 S/. 4.81 S/. 1,832.06 0.00 0.00 0.00 0.00
01.03.02.02.05 RELLENO Y COMPACTACION DE ZANJAS MANUAL Em 380.49 S/. 4.59 S/. 1,746.45 0.00 0.00 0.00 0.00
01.03.02.03 SUMINISTRO E INSTALACION DE TUBERIAS S/. 4,729.10
01.03.02.03.01 SUMINISTRO Y COLOCACION DE TUBERIA PVC SAP m 380.49 S/. 11.27 S/. 4,287.36 0.00 0.00 0.00 0.00
01.03.02.03.02 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERI m 380.49 S/. 1.16 S/. 441.75 0.00 0.00 0.00 0.00
01.03.02.04 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 21.98
01.03.02.04.01 SUMINISTRO Y COLOCACION DE CODO 1" x 45° und 11.00 S/. 2.00 S/. 21.98 0.00 0.00 0.00 0.00
01.03.03 LINEA DE CONDUCCION 1 1/2" S/. 22,248.31
CALENDA
RIO DE
AVANCE
PROYECTO: "MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA COMUNIDAD DE COLPAMATARA, DISTRITO DE CHOTA, PROVINCIA DE CHOTA - CAJAMARCA"
DE OBRA
VALORIZ
ADO VALORIZACIÓN AL 31 DE MAYO
01.03.03.01 PRESUPUESTO
OBRAS PRELIMINARES SEGÚN CONTRATO S/. 399.65
01.03.03.01.01 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS m 693.84 S/. 0.58 S/. 399.65 0.00 0.00 0.00 693.84 399.65
01.03.03.02 MOVIMIENTO DE TIERRAS S/. 16,947.73
01.03.03.02.01 EXCAVACION MANUAL DE ZANJAS, A=0.60m x H m 693.84 S/. 10.49 S/. 7,274.92 0.00 0.00 0.00 0.00
01.03.03.02.02 REFINE Y NIVELACION DE ZANJAS m 693.84 S/. 2.20 S/. 1,523.67 0.00 0.00 0.00 0.00
01.03.03.02.03 CAMA DE APOYO E=0.10m, A=0.60m PARA TUBERIA m 693.84 S/. 2.34 S/. 1,623.58 0.00 0.00 0.00 0.00
01.03.03.02.04 RELLENO CON MATERIAL PROPIO ZARANDEADO E m 693.84 S/. 4.81 S/. 3,340.84 0.00 0.00 0.00 0.00
01.03.03.02.05 RELLENO Y COMPACTACION DE ZANJAS MANUAL Em 693.84 S/. 4.59 S/. 3,184.72 0.00 0.00 0.00 0.00
01.03.03.03 SUMINISTRO E INSTALACION DE TUBERIAS S/. 4,845.77
01.03.03.03.01 SUMINISTRO Y COLOCACION DE TUBERIA PVC SAP m
C 693.84 S/. 5.82 S/. 4,040.23 0.00 0.00 0.00 0.00
01.03.03.03.02 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERI m 693.84 S/. 1.16 S/. 805.55 0.00 0.00 0.00 0.00
01.03.03.04 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 55.15
01.03.03.04.01 SUMINISTRO Y COLOCACION DE CODO 1 1/2" x 45° und 16.00 S/. 3.45 S/. 55.15 0.00 0.00 0.00 0.00
01.03.04 CAMARAS DE REUNION S/. 3,343.83
01.03.04.01 TRABAJOS PRELIMINARES S/. 11.43
01.03.04.01.01 LIMPIEZA DEL TERRENO MANUAL m2 5.00 S/. 1.37 S/. 6.84 0.00 0.00 0.00 5.00 6.84
01.03.04.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 5.00 S/. 0.92 S/. 4.59 0.00 0.00 0.00 5.00 4.59
01.03.04.02 MOVIMIENTO DE TIERRAS S/. 96.43
01.03.04.02.01 EXCAVACION MANUAL DE TERRENO m3 2.50 S/. 27.51 S/. 68.79 0.00 0.00 0.00 0.00
01.03.04.02.02 REFINE Y NIVELACION INTERIOR DE TERRENO m2 5.00 S/. 2.09 S/. 10.44 0.00 0.00 0.00 0.00
01.03.04.02.03 ELIMINACION DE MATERIAL EXCEDENTE (CARGU m3 1.25 S/. 13.76 S/. 17.20 0.00 0.00 0.00 0.00
01.03.04.03 OBRAS DE CONCRETO SIMPLE S/. 37.07
01.03.04.03.01 CONCRETO f'c=140 kg/cm2 m3 0.05 S/. 264.42 S/. 13.22 0.00 0.00 0.00 0.00
01.03.04.03.02 EMPEDRADO D=4" ASENTADO MEZCLA C:H=1:8 m2 1.00 S/. 23.85 S/. 23.85 0.00 0.00 0.00 0.00
01.03.04.04 OBRAS DE CONCRETO ARMADO S/. 1,241.23
01.03.04.04.01 CONCRETO f'c=175 kg/cm2 m3 1.17 S/. 333.39 S/. 390.07 0.00 0.00 0.00 0.00
01.03.04.04.02 ACERO DE REFUERZO FY=4200 KG/CM2 kg 99.76 S/. 3.65 S/. 364.53 0.00 0.00 0.00 0.00
01.03.04.04.03 ENCOFRADO Y DESENCOFRADO m2 15.15 S/. 32.12 S/. 486.63 0.00 0.00 0.00 0.00
01.03.04.05 REVOQUES Y ENLUCIDOS S/. 374.60
01.03.04.05.01 TARRAJEO EN EXTERIORES (MORTERO C:A=1:5), E m2 9.39 S/. 13.24 S/. 124.32 0.00 0.00 0.00 0.00
01.03.04.05.02 TARRAJEO INTERIOR CON IMPERMEABILIZANTE (M m2 6.96 S/. 23.85 S/. 166.00 0.00 0.00 0.00 0.00
01.03.04.05.03 MORTERO 1:5 EN PENDIENTE DE FONDO m2 4.80 S/. 17.56 S/. 84.29 0.00 0.00 0.00 0.00
01.03.04.06 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS S/. 160.72
01.03.04.06.01 ACCESORIOS DE ENTRADA 3/4" und 1.00 S/. 15.82 S/. 15.82 0.00 0.00 0.00 0.00
01.03.04.06.02 ACCESORIOS DE ENTRADA 1" und 2.00 S/. 8.45 S/. 16.90 0.00 0.00 0.00 0.00
01.03.04.06.03 ACCESORIOS DE SALIDA 1 1/2" und 3.00 S/. 7.69 S/. 23.07 0.00 0.00 0.00 0.00
01.03.04.06.04 ACCESORIOS DE SALIDA 1" und 4.00 S/. 4.66 S/. 18.64 0.00 0.00 0.00 0.00
01.03.04.06.05 ACCESORIOS DE REBOSE Y LIMPIEZA 2" und 5.00 S/. 11.63 S/. 58.16 0.00 0.00 0.00 0.00
01.03.04.06.06 ACCESORIOS PARA VENTILACION 1" und 6.00 S/. 4.69 S/. 28.13 0.00 0.00 0.00 0.00
01.03.04.07 VARIOS S/. 1,422.36
01.03.04.07.01 PINTURA LATEX EN EXTERIORES (DOS MANOS) m2 9.39 S/. 6.22 S/. 58.39 0.00 0.00 0.00 0.00
01.03.04.07.02 TAPA SANITARIA METALICA DE 0.60x0.60x1/8" und 10.39 S/. 131.28 S/. 1,363.97 0.00 0.00 0.00 0.00
01.03.05 CAMARA ROMPE PRESION TIPO 6 (01 UNID) S/. 1,122.53
01.03.05.01 TRABAJOS PRELIMINARES S/. 3.20
01.03.05.01.01 LIMPIEZA DEL TERRENO MANUAL m2 1.40 S/. 1.37 S/. 1.92 0.00 0.00 0.00 1.40 1.92
01.03.05.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 1.40 S/. 0.92 S/. 1.29 0.00 0.00 0.00 1.40 1.29
01.03.05.02 MOVIMIENTO DE TIERRAS S/. 33.17
01.03.05.02.01 EXCAVACION MANUAL DE TERRENO m3 0.63 S/. 27.51 S/. 17.33 0.00 0.00 0.00 0.00
01.03.05.02.02 REFINE Y NIVELACION INTERIOR DE TERRENO m2 1.40 S/. 2.09 S/. 2.93 0.00 0.00 0.00 0.00
01.03.05.02.03 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 0.13 S/. 15.72 S/. 2.04 0.00 0.00 0.00 0.00
01.03.05.02.04 ELIMINACION DE MATERIAL EXCEDENTE (CARGU m3 0.79 S/. 13.76 S/. 10.87 0.00 0.00 0.00 0.00
01.03.05.03 OBRAS DE CONCRETO SIMPLE S/. 24.09
01.03.05.03.01 CONCRETO f'c=140 kg/cm2 m3 0.01 S/. 264.60 S/. 2.65 0.00 0.00 0.00 0.00
01.03.05.03.02 ENCOFRADO Y DESENCOFRADO m2 0.26 S/. 36.62 S/. 9.52 0.00 0.00 0.00 0.00
01.03.05.03.03 EMPEDRADO D=4" ASENTADO MEZCLA C:H=1:8 m2 0.50 S/. 23.85 S/. 11.93 0.00 0.00 0.00 0.00
01.03.05.04 OBRAS DE CONCRETO ARMADO S/. 621.00
01.03.05.04.01 CONCRETO f'c=175 kg/cm2 m3 0.59 S/. 333.40 S/. 196.70 0.00 0.00 0.00 0.00
01.03.05.04.02 ENCOFRADO Y DESENCOFRADO m2 9.85 S/. 32.12 S/. 316.40 0.00 0.00 0.00 0.00
01.03.05.04.03 ACERO DE REFUERZO FY=4200 KG/CM2 kg 29.53 S/. 3.65 S/. 107.90 0.00 0.00 0.00 0.00
01.03.05.05 REVOQUES Y ENLUCIDOS S/. 172.00
01.03.05.05.01 TARRAJEO EN EXTERIORES (MORTERO C:A=1:5), E m2 4.28 S/. 13.24 S/. 56.66 0.00 0.00 0.00 0.00
01.03.05.05.02 TARRAJEO INTERIOR CON IMPERMEABILIZANTE (M m2 3.72 S/. 23.85 S/. 88.72 0.00 0.00 0.00 0.00
01.03.05.05.03 PINTURA LATEX EN EXTERIORES (DOS MANOS) m2 4.28 S/. 6.22 S/. 26.61 0.00 0.00 0.00 0.00
01.03.05.06 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS S/. 98.56
01.03.05.06.01 SUMINISTRO E INSTALACION DE ACCESORIOS DE und 1.00 S/. 98.56 S/. 98.56 0.00 0.00 0.00 0.00
01.03.05.07 VARIOS S/. 170.50
01.03.05.07.01 TAPA SANITARIA METALICA DE 0.60x0.60x1/8" und 1.00 S/. 170.50 S/. 170.50 0.00 0.00 0.00 0.00
01.03.06 SEDIMENTADOR, FILTRO, CAMARA HUMEDA Y CAJA DE VALVULAS S/. 7,585.88
01.03.06.01 TRABAJOS PRELIMINARES S/. 30.56
01.03.06.01.01 LIMPIEZA DEL TERRENO MANUAL Y DESBROCE m2 13.37 S/. 1.37 S/. 18.29 0.00 0.00 0.00 13.37 18.29
01.03.06.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 13.37 S/. 0.92 S/. 12.28 0.00 0.00 0.00 13.37 12.28
01.03.06.02 MOVIMIENTO DE TIERRAS S/. 257.30
01.03.06.02.01 EXCAVACION MANUAL DE TERRENO NORMAL m3 5.77 S/. 27.51 S/. 158.75 0.00 0.00 0.00 0.00
01.03.06.02.02 RELLENO Y COMPACTACION CON MATERIAL PROP m3 0.50 S/. 15.73 S/. 7.87 0.00 0.00 0.00 0.00
01.03.06.02.03 ELIMINACION DE MATERIAL EXCEDENTE (CARGU m3 6.59 S/. 13.76 S/. 90.68 0.00 0.00 0.00 0.00
CALENDA
RIO DE
AVANCE
PROYECTO: "MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA COMUNIDAD DE COLPAMATARA, DISTRITO DE CHOTA, PROVINCIA DE CHOTA - CAJAMARCA"
DE OBRA
VALORIZ
ADO VALORIZACIÓN AL 31 DE MAYO
01.03.06.03 PRESUPUESTO
OBRAS DE CONCRETO SIMPLE SEGÚN CONTRATO S/. 242.75
01.03.06.03.01 CONCRETO PARA VERTEDERO f'c=175 kg/cm2 m3 0.24 S/. 262.09 S/. 62.90 0.00 0.00 0.00 0.00
01.03.06.03.02 EMPEDRADO D=4" ASENTADO MEZCLA C:H=1:8 m2 6.14 S/. 23.85 S/. 146.44 0.00 0.00 0.00 0.00
01.03.06.03.03 DADOS DE CONCRETO f'c=140 kg/cm2 m3 0.01 S/. 58.50 S/. 0.59 0.00 0.00 0.00 0.00
01.03.06.03.04 ENCOFRADO Y DESENCOFRADO DE VERTEDERO m2 1.48 S/. 22.18 S/. 32.82 0.00 0.00 0.00 0.00
01.03.06.04 OBRAS DE CONCRETO ARMADO S/. 2,949.34
01.03.06.04.01 CONCRETO EN ZAPATAS f'c=210 kg/cm2 m3 1.64 S/. 368.17 S/. 603.80 0.00 0.00 0.00 0.00
01.03.06.04.02 CONCRETO f'c= 210 kg/cm2 para Losa Superior m3 0.40 S/. 351.18 S/. 140.47 0.00 0.00 0.00 0.00
01.03.06.04.03 CONCRETO EN MUROS f'c=210 kg/cm2 m3 1.41 S/. 351.19 S/. 495.18 0.00 0.00 0.00 0.00
01.03.06.04.04 CONCRETO LOSA DE FONDO Y CIMENTACION f'c= 2m3 0.25 S/. 424.22 S/. 106.06 0.00 0.00 0.00 0.00
01.03.06.04.05 ENCOFRADO Y DESENCOFRADO DE LOSA DE TEC m2 4.70 S/. 40.56 S/. 190.65 0.00 0.00 0.00 0.00
01.03.06.04.06 ENCOFRADO Y DESENCOFRADO EN MUROS m2 23.39 S/. 41.86 S/. 979.08 0.00 0.00 0.00 0.00
01.03.06.04.07 ACERO DE REFUERZO FY=4200 KG/CM2 kg 118.80 S/. 3.65 S/. 434.10 0.00 0.00 0.00 0.00
01.03.06.05 REVOQUES, ENLUCIDOS Y MOLDURAS S/. 775.58
01.03.06.05.01 TARRAJEO EN SEDIMENTADOR m2 5.10 S/. 16.64 S/. 84.87 0.00 0.00 0.00 0.00
01.03.06.05.02 TARRAJEO EXTERIOR C:A 1:5 E=1.5cm m2 19.40 S/. 13.24 S/. 256.83 0.00 0.00 0.00 0.00
01.03.06.05.03 TARRAJEO INTERIOR CON IMPERMEABILIZANTE C:Am2 11.55 S/. 23.85 S/. 275.47 0.00 0.00 0.00 0.00
01.03.06.05.04 TARRAJEO EN PENDIENTE DE FONDO MORTERO 1: m2 2.15 S/. 17.56 S/. 37.76 0.00 0.00 0.00 0.00
01.03.06.05.05 PINTURA LATEX EN EXTERIORES (DOS MANOS) m2 19.40 S/. 6.22 S/. 120.65 0.00 0.00 0.00 0.00
01.03.06.06 MATERIAL PARA FILTROS S/. 87.59
01.03.06.06.01 FILTRO DE ANTRACITA m3 0.30 S/. 194.73 S/. 58.42 0.00 0.00 0.00 0.00
01.03.06.06.02 FILTRO DE GRAVA FINA m3 0.15 S/. 97.08 S/. 14.56 0.00 0.00 0.00 0.00
01.03.06.06.03 FILTRO DE ARENA FINA m3 0.15 S/. 97.38 S/. 14.61 0.00 0.00 0.00 0.00
01.03.06.07 VALVULAS Y ACCESORIOS S/. 166.94
01.03.06.07.01 VALVULA COMPUERTA DE BRONCE DE 1" + ACCES und 1.00 S/. 123.89 S/. 123.89 0.00 0.00 0.00 0.00
01.03.06.07.02 ACCESORIOS PARA CAMARA DE FILTROS und 16.00 S/. 2.69 S/. 43.06 0.00 0.00 0.00 0.00
01.03.06.08 TAPAS METÁLICAS S/. 673.58
01.03.06.08.01 SUM. E INST. TAPA SANITARIA METALICA DE 0.60x und 1.00 S/. 150.32 S/. 150.32 0.00 0.00 0.00 0.00
01.03.06.08.02 SUM. E INST. TAPA SANITARIA METALICA DE 0.60x0.und 1.00 S/. 152.15 S/. 152.15 0.00 0.00 0.00 0.00
01.03.06.08.03 SUM. E INST. TAPA SANITARIA METALICA DE 0.40x0.und 1.00 S/. 132.06 S/. 132.06 0.00 0.00 0.00 0.00
01.03.06.08.04 COMPUERTA DE FIERRO CON VOLANTE DE 0.25x0. und 1.00 S/. 239.06 S/. 239.06 0.00 0.00 0.00 0.00
01.03.06.09 CERCO PERIMETRICO S/. 2,402.24
01.03.06.09.01 CERCO PERIMETRICO CON MALLA OLIMPICA m 20.31 S/. 103.34 S/. 2,098.79 0.00 0.00 0.00 0.00
01.03.06.09.02 PUERTA EN CERCO PERIMETRICO und 1.00 S/. 303.45 S/. 303.45 0.00 0.00 0.00 0.00
01.04 RESERVORIOS S/. 26,964.42
01.04.01 RESERVORIO 21M3 S/. 24,447.20
01.04.01.01 TRABAJOS PRELIMINARES S/. 91.44
01.04.01.01.01 LIMPIEZA DEL TERRENO MANUAL Y DESBROCE m2 40.00 S/. 1.37 S/. 54.72 0.00 0.00 0.00 40.00 54.72
01.04.01.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 40.00 S/. 0.92 S/. 36.72 0.00 0.00 0.00 40.00 36.72
01.04.01.02 ESTRUCTURAS S/. 17,020.04
01.04.01.02.01 MOVIMIENTO DE TIERRAS S/. 3,041.37
01.04.01.02.01.01 EXCAVACION MANUAL DE TERRENO NORMAL m3 52.18 S/. 27.51 S/. 1,435.63 0.00 0.00 0.00 52.18 1,435.63
01.04.01.02.01.02 RELLENO Y COMPACTACION CON MATERIAL PROm3 3.14 S/. 15.72 S/. 49.37 0.00 0.00 0.00 0.00
01.04.01.02.01.03 RELLENO CON MATERIAL DE PRESTAMO (AFIRM m3 3.66 S/. 77.91 S/. 285.17 0.00 0.00 0.00 0.00
01.04.01.02.01.04 RELLENO CON MATERIAL DE PRESTAMO (GRAVA m3 3.32 S/. 77.91 S/. 258.67 0.00 0.00 0.00 0.00
01.04.01.02.01.05 NIVELACION INTERIOR Y APISONADO m2 36.60 S/. 4.62 S/. 168.98 0.00 0.00 0.00 36.60 168.98
01.04.01.02.01.06 ELIMINACION DE MATERIAL EXCEDENTE (CAR m3 61.30 S/. 13.76 S/. 843.55 0.00 0.00 0.00 61.30 843.55
01.04.01.02.02 OBRAS DE CONCRETO SIMPLE S/. 2,306.09
01.04.01.02.02.01 FALSA ZAPATA S/. 893.65
01.04.01.02.02.01 CONCRETO EN FALSA ZAPATA f'c=140 kg/cm2 m2 16.62 S/. 50.97 S/. 847.07 0.00 0.00 0.00 0.00
01.04.01.02.02.01 ENCOFRADO Y DESENCOFRADO EN FALSA ZA m2 1.45 S/. 32.12 S/. 46.58 0.00 0.00 0.00 0.00
01.04.01.02.02.02 DADOS PARA POSTES S/. 808.87
01.04.01.02.02.02 CONCRETO EN DADOS PARA POSTES f'c=140 kg m3 0.94 S/. 282.85 S/. 265.88 0.00 0.00 0.00 0.00
01.04.01.02.02.02 ENCOFRADO Y DESENCOFRADO m2 14.82 S/. 36.64 S/. 542.99 0.00 0.00 0.00 0.00
01.04.01.02.02.03 VEREDAS S/. 466.95
01.04.01.02.02.03 CONCRETO EN VEREDA f'c=140 kg/cm2 m3 0.87 S/. 257.95 S/. 224.42 0.00 0.00 0.00 0.00
01.04.01.02.02.03 ENCOFRADO Y DESENCOFRADO EN VEREDAS m2 3.50 S/. 33.42 S/. 116.96 0.00 0.00 0.00 0.00
01.04.01.02.02.03 BRUÑADO EN VEREDAS m 31.32 S/. 1.49 S/. 46.79 0.00 0.00 0.00 0.00
01.04.01.02.02.03 JUNTAS DE TECNOPOR DE 1" m2 1.30 S/. 6.55 S/. 8.51 0.00 0.00 0.00 0.00
01.04.01.02.02.03 SELLADO DE JUNTAS CON MASILLA DE POLIU m 15.90 S/. 4.42 S/. 70.26 0.00 0.00 0.00 0.00
01.04.01.02.02.04 ENROCADO PERIMETRAL S/. 945.50
01.04.01.02.02.04 CONCRETO EN CUNETA f'c=140 Kg/cm2+25% P Mm3 2.32 S/. 133.32 S/. 309.29 0.00 0.00 0.00 0.00
01.04.01.02.02.04 ENCOFRADO Y DESENCOFRADO EN CUNETA m2 16.45 S/. 36.64 S/. 602.71 0.00 0.00 0.00 0.00
01.04.01.02.02.04 JUNTAS DE TECNOPOR DE 1" m2 0.66 S/. 6.55 S/. 4.32 0.00 0.00 0.00 0.00
01.04.01.02.02.04 SELLADO DE JUNTAS CON MASILLA DE POLIU m 6.60 S/. 4.42 S/. 29.17 0.00 0.00 0.00 0.00
01.04.01.02.03 OBRAS DE CONCRETO ARMADO S/. 11,194.09
01.04.01.02.03.01 ZAPATA CORRIDA S/. 1,845.50
01.04.01.02.03.01 CONCRETO EN ZAPATA CORRIDA f'c=210 kg/cm2m3 2.87 S/. 351.19 S/. 1,007.91 0.00 0.00 0.00 0.00
01.04.01.02.03.01 ENCOFRADO Y DESENCOFRADO EN ZAPATA C m2 4.34 S/. 36.64 S/. 159.01 0.00 0.00 0.00 0.00
01.04.01.02.03.01 ACERO DE REFUERZO FY=4200 KG/CM2 kg 185.71 S/. 3.65 S/. 678.58 0.00 0.00 0.00 0.00
01.04.01.02.03.02 LOSA DE CIMENTACION S/. 1,581.79
01.04.01.02.03.02 CONCRETO EN LOSA DE CIMENTACION f'c=210 m3 1.46 S/. 340.88 S/. 497.68 0.00 0.00 0.00 0.00
01.04.01.02.03.02 ACERO DE REFUERZO FY=4200 KG/CM2 kg 296.69 S/. 3.65 S/. 1,084.10 0.00 0.00 0.00 0.00
01.04.01.02.03.03 MURO DE CUBA S/. 5,258.37
01.04.01.02.03.03 CONCRETO EN MURO DE CUBA f'c=210 kg/cm2 m3 4.28 S/. 353.97 S/. 1,514.99 0.00 0.00 0.00 0.00
CALENDA
RIO DE
AVANCE
PROYECTO: "MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA COMUNIDAD DE COLPAMATARA, DISTRITO DE CHOTA, PROVINCIA DE CHOTA - CAJAMARCA"
DE OBRA
VALORIZ
ADO VALORIZACIÓN AL 31 DE MAYO
01.04.01.02.03.03 PRESUPUESTO
ENCOFRADO SEGÚN
Y DESENCOFRADO CONTRATO
EN MURO DE m2 57.08 S/. 43.37 S/. 2,475.62 0.00 0.00 0.00 0.00
01.04.01.02.03.03 ACERO DE REFUERZO FY=4200 KG/CM2 kg 346.95 S/. 3.65 S/. 1,267.76 0.00 0.00 0.00 0.00
01.04.01.02.03.04 VIGA ANILLO SUPERIOR S/. 712.13
01.04.01.02.03.04 CONCRETO EN VIGA ANILLO SUPERIOR f'c=210 m3 0.50 S/. 354.85 S/. 177.43 0.00 0.00 0.00 0.00
01.04.01.02.03.04 ENCOFRADO Y DESENCOFRADO EN VIGA ANI m2 5.69 S/. 36.64 S/. 208.48 0.00 0.00 0.00 0.00
01.04.01.02.03.04 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 89.28 S/. 3.65 S/. 326.23 0.00 0.00 0.00 0.00
01.04.01.02.03.05 LOSA DE TECHO S/. 1,796.30
01.04.01.02.03.05 CONCRETO EN LOSA DE TECHO f'c=210 kg/cm2 m3 0.71 S/. 353.97 S/. 251.32 0.00 0.00 0.00 0.00
01.04.01.02.03.05 ENCOFRADO Y DESENCOFRADO DE LOSA DE m2 12.08 S/. 40.56 S/. 490.01 0.00 0.00 0.00 0.00
01.04.01.02.03.05 ACERO DE REFUERZO FY=4200 KG/CM2 kg 288.72 S/. 3.65 S/. 1,054.98 0.00 0.00 0.00 0.00
01.04.01.02.04 ESTRUCTURA METALICA S/. 478.49
01.04.01.02.04.01 ESCALERA METALICA INTERIOR TIPO GATO 1" und 1.00 S/. 201.29 S/. 201.29 0.00 0.00 0.00 0.00
01.04.01.02.04.02 ESCALERA METALICA EXTERIOR TIPO GATO F°G° und 1.00 S/. 125.06 S/. 125.06 0.00 0.00 0.00 0.00
01.04.01.02.04.03 TAPA METALICA PARA CISTERNA DE 0.60x0.60m x und 1.00 S/. 152.15 S/. 152.15 0.00 0.00 0.00 0.00
01.04.01.03 ARQUITECTURA S/. 2,255.10
01.04.01.03.01 REVOQUES, REVESTIMIENTOS Y MOLDURAS S/. 1,949.50
01.04.01.03.01.01 TARRAJEO EXTERIOR C:A 1:5 E=1.5cm m2 59.28 S/. 13.24 S/. 784.81 0.00 0.00 0.00 0.00
01.04.01.03.01.02 TARRAJEO INTERIOR CON IMPERMEABILIZANTE Cm2 38.80 S/. 23.85 S/. 925.38 0.00 0.00 0.00 0.00
01.04.01.03.01.03 TARRAJEO EN PENDIENTE DE FONDO MORTERO m2 11.34 S/. 17.56 S/. 199.12 0.00 0.00 0.00 0.00
01.04.01.03.01.04 OCHAVO SANITARIO MORTERO 1:5 m 11.94 S/. 3.37 S/. 40.19 0.00 0.00 0.00 0.00
01.04.01.03.02 PINTURA S/. 305.60
01.04.01.03.02.01 PINTURA LATEX EN EXTERIORES (DOS MANOS) m2 49.14 S/. 6.22 S/. 305.60 0.00 0.00 0.00 0.00
01.04.01.04 VARIOS S/. 5,080.62
01.04.01.04.01 SUM. E INST. DE SISTEMA DE CLORACION POR GOTund 1.00 S/. 1,141.69 S/. 1,141.69 0.00 0.00 0.00 0.00
01.04.01.04.02 VÁLVULA DE BRONCE 3" + ACCESORIOS DE LIMPI und 1.00 S/. 351.32 S/. 351.32 0.00 0.00 0.00 0.00
01.04.01.04.03 JUNTA WATER STOP NEOPRENE 6" m 12.41 S/. 17.78 S/. 220.70 0.00 0.00 0.00 0.00
01.04.01.04.04 JUNTA EPOXICA PARA UNION DE CONCRETO m2 1.86 S/. 40.65 S/. 75.60 0.00 0.00 0.00 0.00
01.04.01.04.05 SUM. E INST. DE ACCESORIOS DE VENTILACION und 1.00 S/. 41.95 S/. 41.95 0.00 0.00 0.00 0.00
01.04.01.04.06 CERCO PERIMETRICO CON MALLA OLIMPICA m 26.00 S/. 103.34 S/. 2,686.79 0.00 0.00 0.00 0.00
01.04.01.04.07 PUERTA EN CERCO PERIMETRICO und 1.00 S/. 303.45 S/. 303.45 0.00 0.00 0.00 0.00
01.04.01.04.08 PRUEBA HIDRAULICA DE ESTANQUEIDAD EN RES glb 1.00 S/. 259.12 S/. 259.12 0.00 0.00 0.00 0.00
01.04.02 CASETA DE VALVULAS S/. 2,517.23
01.04.02.01 ESTRUCTURAS S/. 1,434.33
01.04.02.01.01 MOVIMIENTO DE TIERRAS S/. 129.12
01.04.02.01.01.01 EXCAVACION MANUAL DE TERRENO NORMAL m3 2.88 S/. 27.51 S/. 79.24 0.00 0.00 0.00 2.88 79.24
01.04.02.01.01.02 RELLENO Y COMPACTACION CON MATERIAL PROm3 0.34 S/. 15.72 S/. 5.35 0.00 0.00 0.00 0.00
01.04.02.01.01.03 RELLENO CON GRAVA PARA FILTRO, TMAX 1/2" m3 0.01 S/. 91.80 S/. 0.92 0.00 0.00 0.00 0.00
01.04.02.01.01.04 ELIMINACION DE MATERIAL EXCEDENTE (CAR m3 3.17 S/. 13.76 S/. 43.62 0.00 0.00 0.00 3.17 43.62
01.04.02.01.02 OBRAS DE CONCRETO ARMADO S/. 1,305.21
01.04.02.01.02.01 CONCRETO f'c=175 kg/cm2 m3 1.28 S/. 341.32 S/. 436.89 0.00 0.00 0.00 0.00
01.04.02.01.02.02 ENCOFRADO Y DESENCOFRADO m2 15.64 S/. 32.12 S/. 502.37 0.00 0.00 0.00 0.00
01.04.02.01.02.03 ACERO DE REFUERZO FY=4200 KG/CM2 kg 100.15 S/. 3.65 S/. 365.95 0.00 0.00 0.00 0.00
01.04.02.02 ARQUITECTURA S/. 352.89
01.04.02.02.01 REVOQUES, ENLUCIDOS Y MOLDURAS S/. 352.89
01.04.02.02.01.01 TARRAJEO EN CARAS INTERIORES Y EXTERIORESm2 18.25 S/. 16.64 S/. 303.70 0.00 0.00 0.00 0.00
01.04.02.02.01.02 PINTURA LATEX EN EXTERIORES (DOS MANOS) m2 7.91 S/. 6.22 S/. 49.19 0.00 0.00 0.00 0.00
01.04.02.03 INSTALACIONES HIDRAULICAS S/. 577.86
01.04.02.03.01 VALVULAS Y ACCESORIOS S/. 577.86
01.04.02.03.01.01 VALVULA COMPUERTA DE BRONCE DE 3" + AC und 1.00 S/. 223.03 S/. 223.03 0.00 0.00 0.00 0.00
01.04.02.03.01.02 VALVULA COMPUERTA DE BRONCE DE 3" + ACC und 1.00 S/. 220.73 S/. 220.73 0.00 0.00 0.00 0.00
01.04.02.03.01.03 VALVULA COMPUERTA DE BRONCE DE 3" + AC und 1.00 S/. 134.10 S/. 134.10 0.00 0.00 0.00 0.00
01.04.02.04 VARIOS S/. 152.15
01.04.02.04.01 SUM. E INST. TAPA SANITARIA METALICA DE 0.60x0.und 1.00 S/. 152.15 S/. 152.15 0.00 0.00 0.00 0.00
01.05 RED DE DISTRIBUCION GENERAL S/. 381,894.50
01.05.01 TRABAJOS PRELIMINARES S/. 28,759.32
01.05.01.01 LIMPIEZA DEL TERRENO MANUAL y DEFORESTACIONm 17,180.00 S/. 0.92 S/. 15,771.24 0.00 0.00 0.00 17,180.00 15,771.24
01.05.01.02 TRAZO Y REPLANTEO PRELIMINAR (TUBERÍA ENTER m 17,180.00 S/. 0.76 S/. 12,988.08 0.00 0.00 0.00 17,180.00 12,988.08
01.05.02 MOVIMIENTO DE TIERRAS S/. 256,359.97
01.05.02.01 EXCAVACION MANUAL DE ZANJAS, A=0.40m x H=0 m 17,180.00 S/. 5.36 S/. 92,153.53 0.00 0.00 0.00 4,000.00 21,456.00
01.05.02.02 CAMA DE APOYO E=0.10m, A=0.40m PARA TUBERIA m 17,180.00 S/. 2.34 S/. 40,201.20 0.00 0.00 0.00 0.00
01.05.02.03 RELLENO CON MATERIAL PROPIO ZARANDEADO E=0m 17,180.00 S/. 3.55 S/. 60,920.28 0.00 0.00 0.00 0.00
01.05.02.04 RELLENO Y COMPACTACION DE ZANJAS MANUAL E=0m 17,180.00 S/. 3.67 S/. 63,084.96 0.00 0.00 0.00 0.00
01.05.03 TUBERIAS Y PRUEBA HIDRAULICA S/. 59,286.56
01.05.03.01 SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 7.5, DIA m 1,278.00 S/. 4.79 S/. 6,119.07 0.00 0.00 0.00 0.00
01.05.03.02 SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 10, DIA=m 2,638.00 S/. 2.53 S/. 6,671.50 0.00 0.00 0.00 0.00
01.05.03.03 SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 10, DIA=m 1,694.00 S/. 7.85 S/. 13,294.51 0.00 0.00 0.00 0.00
01.05.03.04 SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 10, DIA=m 3,693.00 S/. 2.26 S/. 8,342.49 0.00 0.00 0.00 0.00
01.05.03.05 SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 10, DIA=m 7,877.00 S/. 1.35 S/. 10,633.95 0.00 0.00 0.00 0.00
01.05.03.06 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA m 17,180.00 S/. 0.83 S/. 14,225.04 0.00 0.00 0.00 0.00
01.05.04 SUMINISTRO Y COLOCACION DE ACCESORIOS S/. 1,363.35
01.05.04.01 SUMINISTRO Y COLOCACION DE TEE PVC SAP DE 2" und 12.00 S/. 6.83 S/. 81.97 0.00 0.00 0.00 0.00
01.05.04.02 SUMINISTRO Y COLOCACION DE TEE PVC SAP DE 1 1/und 40.00 S/. 6.07 S/. 242.64 0.00 0.00 0.00 0.00
01.05.04.03 SUMINISTRO Y COLOCACION TEE PVC SAP DE 1" und 37.00 S/. 2.53 S/. 93.57 0.00 0.00 0.00 0.00
01.05.04.04 SUMINISTRO Y COLOCACION TEE PVC SAP DE 3/4" und 60.00 S/. 2.66 S/. 159.30 0.00 0.00 0.00 0.00
01.05.04.05 SUMINISTRO Y COLOCACION TEE PVC SAP DE 1/2" und 50.00 S/. 1.47 S/. 73.35 0.00 0.00 0.00 0.00
CALENDA
RIO DE
AVANCE
PROYECTO: "MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA COMUNIDAD DE COLPAMATARA, DISTRITO DE CHOTA, PROVINCIA DE CHOTA - CAJAMARCA"
DE OBRA
VALORIZ
ADO VALORIZACIÓN AL 31 DE MAYO
01.05.04.06 PRESUPUESTO
SUMINISTRO Y COLOCACION SEGÚN
DE CODO 2" x 45°CONTRATO
und 10.00 S/. 5.66 S/. 56.61 0.00 0.00 0.00 0.00
01.05.04.07 SUMINISTRO Y COLOCACION DE CODO 1 1/2" x 45° und 20.00 S/. 3.45 S/. 68.94 0.00 0.00 0.00 0.00
01.05.04.08 SUMINISTRO Y COLOCACION DE CODO 1" x 45° und 10.00 S/. 2.00 S/. 19.98 0.00 0.00 0.00 0.00
01.05.04.09 SUMINISTRO Y COLOCACION CODO PVC SAP DE 3/4"xund 11.00 S/. 2.41 S/. 26.53 0.00 0.00 0.00 0.00
01.05.04.10 SUMINISTRO Y COLOCACION CODO PVC SAP DE 1/2"xund 25.00 S/. 1.47 S/. 36.68 0.00 0.00 0.00 0.00
01.05.04.11 SUMINISTRO Y COLOCACION REDUCCION PVC SAP DE und 8.00 S/. 5.42 S/. 43.34 0.00 0.00 0.00 0.00
01.05.04.12 SUMINISTRO Y COLOCACION REDUCCION PVC SAP DE
und
1 31.00 S/. 4.36 S/. 135.04 0.00 0.00 0.00 0.00
01.05.04.13 SUMINISTRO Y COLOCACION REDUCCION PVC SAP DE
und 38.00 S/. 2.83 S/. 107.39 0.00 0.00 0.00 0.00
01.05.04.14 SUMINISTRO Y COLOCACION REDUCCION PVC SAP DE
und 68.00 S/. 2.15 S/. 146.27 0.00 0.00 0.00 0.00
01.05.04.15 SUMINISTRO Y COLOCACION REDUCCION PVC SAP DE
und 9.00 S/. 2.08 S/. 18.71 0.00 0.00 0.00 0.00
01.05.04.16 SUMINISTRO Y COLOCACION REDUCCION PVC SAP DE
und 3.00 S/. 5.42 S/. 16.25 0.00 0.00 0.00 0.00
01.05.04.17 SUMINISTRO Y COLOCACION REDUCCION PVC SAP DE
und 1.00 S/. 5.42 S/. 5.42 0.00 0.00 0.00 0.00
01.05.04.18 SUMINISTRO Y COLOCACION REDUCCION PVC SAP DE
und
1 5.00 S/. 3.93 S/. 19.67 0.00 0.00 0.00 0.00
01.05.04.19 SUMINISTRO Y COLOCACION REDUCCION PVC SAP DE
und 3.00 S/. 3.90 S/. 11.69 0.00 0.00 0.00 0.00
01.05.05 CAMARA ROMPE PRESION TIPO 7 (15 UNID) S/. 16,844.46
01.05.05.01 TRABAJOS PRELIMINARES S/. 48.01
01.05.05.01.01 LIMPIEZA DEL TERRENO MANUAL m2 21.00 S/. 1.37 S/. 28.73 0.00 0.00 0.00 21.00 28.73
01.05.05.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 21.00 S/. 0.92 S/. 19.28 0.00 0.00 0.00 21.00 19.28
01.05.05.02 MOVIMIENTO DE TIERRAS S/. 497.49
01.05.05.02.01 EXCAVACION MANUAL DE TERRENO m3 9.45 S/. 27.51 S/. 260.00 0.00 0.00 0.00 0.00
01.05.05.02.02 REFINE Y NIVELACION INTERIOR DE TERRENO m2 21.00 S/. 2.09 S/. 43.85 0.00 0.00 0.00 0.00
01.05.05.02.03 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 1.98 S/. 15.72 S/. 31.13 0.00 0.00 0.00 0.00
01.05.05.02.04 ELIMINACION DE MATERIAL EXCEDENTE (CARGU m3 11.81 S/. 13.76 S/. 162.51 0.00 0.00 0.00 0.00
01.05.05.03 OBRAS DE CONCRETO SIMPLE S/. 369.35
01.05.05.03.01 CONCRETO f'c=140 kg/cm2 m3 0.18 S/. 264.35 S/. 47.58 0.00 0.00 0.00 0.00
01.05.05.03.02 ENCOFRADO Y DESENCOFRADO m2 3.90 S/. 36.64 S/. 142.89 0.00 0.00 0.00 0.00
01.05.05.03.03 EMPEDRADO D=4" ASENTADO MEZCLA C:H=1:8 m2 7.50 S/. 23.85 S/. 178.88 0.00 0.00 0.00 0.00
01.05.05.04 OBRAS DE CONCRETO ARMADO S/. 9,312.98
01.05.05.04.01 CONCRETO f'c=175 kg/cm2 m3 8.85 S/. 333.40 S/. 2,950.55 0.00 0.00 0.00 0.00
01.05.05.04.02 ENCOFRADO Y DESENCOFRADO m2 147.68 S/. 32.12 S/. 4,743.63 0.00 0.00 0.00 0.00
01.05.05.04.03 ACERO DE REFUERZO FY=4200 KG/CM2 kg 443.02 S/. 3.65 S/. 1,618.79 0.00 0.00 0.00 0.00
01.05.05.05 REVOQUES Y ENLUCIDOS S/. 2,580.81
01.05.05.05.01 TARRAJEO EN EXTERIORES (MORTERO C:A=1:5), E m2 64.24 S/. 13.24 S/. 850.47 0.00 0.00 0.00 0.00
01.05.05.05.02 TARRAJEO INTERIOR CON IMPERMEABILIZANTE (M m2 55.80 S/. 23.85 S/. 1,330.83 0.00 0.00 0.00 0.00
01.05.05.05.03 PINTURA LATEX EN EXTERIORES (DOS MANOS) m2 64.24 S/. 6.22 S/. 399.51 0.00 0.00 0.00 0.00
01.05.05.06 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS S/. 1,478.39
01.05.05.06.01 SUMINISTRO E INSTALACION DE ACCESORIOS DE und 15.00 S/. 98.56 S/. 1,478.39 0.00 0.00 0.00 0.00
01.05.05.07 VARIOS S/. 2,557.44
01.05.05.07.01 TAPA SANITARIA METALICA DE 0.60x0.60x1/8" und 15.00 S/. 170.50 S/. 2,557.44 0.00 0.00 0.00 0.00
01.05.06 VALVULA DE CONTROL (19 UNID) S/. 8,030.81
01.05.06.01 TRABAJOS PRELIMINARES S/. 27.79
01.05.06.01.01 LIMPIEZA DEL TERRENO MANUAL m2 12.16 S/. 1.37 S/. 16.63 0.00 0.00 0.00 12.16 16.63
01.05.06.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 12.16 S/. 0.92 S/. 11.16 0.00 0.00 0.00 12.16 11.16
01.05.06.02 MOVIMIENTO DE TIERRAS S/. 386.20
01.05.06.02.01 EXCAVACION MANUAL DE TERRENO m3 7.30 S/. 27.51 S/. 200.84 0.00 0.00 0.00 0.00
01.05.06.02.02 REFINE Y NIVELACION INTERIOR DE TERRENO m2 12.16 S/. 2.09 S/. 25.39 0.00 0.00 0.00 0.00
01.05.06.02.03 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 3.19 S/. 15.72 S/. 50.16 0.00 0.00 0.00 0.00
01.05.06.02.04 ELIMINACION DE MATERIAL EXCEDENTE (CARGU m3 9.12 S/. 12.04 S/. 109.81 0.00 0.00 0.00 0.00
01.05.06.03 OBRAS DE CONCRETO SIMPLE S/. 2,615.34
01.05.06.03.01 CONCRETO f'c=140 kg/cm2 m3 3.06 S/. 264.33 S/. 808.85 0.00 0.00 0.00 0.00
01.05.06.03.02 ENCOFRADO Y DESENCOFRADO m2 56.24 S/. 32.12 S/. 1,806.49 0.00 0.00 0.00 0.00
01.05.06.04 REVOQUES Y ENLUCIDOS S/. 346.07
01.05.06.04.01 TARRAJEO INTERIOR C/MORTERO 1:5 x 1.5cm m2 18.24 S/. 16.64 S/. 303.53 0.00 0.00 0.00 0.00
01.05.06.04.02 PINTURA LATEX EN EXTERIORES (DOS MANOS) m2 6.84 S/. 6.22 S/. 42.53 0.00 0.00 0.00 0.00
01.05.06.05 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS S/. 1,792.17
01.05.06.05.01 SUMINISTRO E INSTALACION VÁLVULA TIPO GLO und 1.00 S/. 136.68 S/. 136.68 0.00 0.00 0.00 0.00
01.05.06.05.02 SUMINISTRO E INSTALACION VÁLVULA TIPO GLO und 3.00 S/. 115.07 S/. 345.22 0.00 0.00 0.00 0.00
01.05.06.05.03 SUMINISTRO E INSTALACION VALVULA TIPO GLO und 5.00 S/. 91.13 S/. 455.63 0.00 0.00 0.00 0.00
01.05.06.05.04 SUMINISTRO E INSTALACION VALVULA TIPO GLO und 10.00 S/. 85.46 S/. 854.64 0.00 0.00 0.00 0.00
01.05.06.06 VARIOS S/. 2,863.24
01.05.06.06.01 FILTRO DE GRAVA DIA. MAX. 1/2" m3 0.06 S/. 91.50 S/. 5.49 0.00 0.00 0.00 0.00
01.05.06.06.02 TAPA SANITARIA METALICA DE 0.40x0.40x1/8" und 19.00 S/. 150.41 S/. 2,857.75 0.00 0.00 0.00 0.00
01.05.07 VALVULA DE PURGA TIPO 1 (05 UNID) S/. 2,005.37
01.05.07.01 TRABAJOS PRELIMINARES S/. 7.31
01.05.07.01.01 LIMPIEZA DEL TERRENO MANUAL m2 3.20 S/. 1.37 S/. 4.37 0.00 0.00 0.00 3.20 4.37
01.05.07.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 3.20 S/. 0.92 S/. 2.93 0.00 0.00 0.00 3.20 2.93
01.05.07.02 MOVIMIENTO DE TIERRAS S/. 105.73
01.05.07.02.01 EXCAVACION MANUAL DE TERRENO m3 1.92 S/. 27.51 S/. 52.82 0.00 0.00 0.00 0.00
01.05.07.02.02 REFINE Y NIVELACION INTERIOR DE TERRENO m2 3.20 S/. 2.09 S/. 6.68 0.00 0.00 0.00 0.00
01.05.07.02.03 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 0.84 S/. 15.72 S/. 13.20 0.00 0.00 0.00 0.00
01.05.07.02.04 ELIMINACION DE MATERIAL EXCEDENTE (CARGU m3 2.40 S/. 13.76 S/. 33.03 0.00 0.00 0.00 0.00
01.05.07.03 OBRAS DE CONCRETO SIMPLE S/. 744.47
01.05.07.03.01 CONCRETO f'c=140 kg/cm2 m3 0.86 S/. 264.33 S/. 227.32 0.00 0.00 0.00 0.00
01.05.07.03.02 ENCOFRADO Y DESENCOFRADO m2 16.10 S/. 32.12 S/. 517.15 0.00 0.00 0.00 0.00
01.05.07.04 REVOQUES Y ENLUCIDOS S/. 91.07
CALENDA
RIO DE
AVANCE
PROYECTO: "MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA COMUNIDAD DE COLPAMATARA, DISTRITO DE CHOTA, PROVINCIA DE CHOTA - CAJAMARCA"
DE OBRA
VALORIZ
ADO VALORIZACIÓN AL 31 DE MAYO
01.05.07.04.01 PRESUPUESTO
TARRAJEO INTERIOR C/MORTERO SEGÚN CONTRATO
1:5 x 1.5cm m2 4.80 S/. 16.64 S/. 79.88 0.00 0.00 0.00 0.00
01.05.07.04.02 PINTURA LATEX EN EXTERIORES (DOS MANOS) m2 1.80 S/. 6.22 S/. 11.20 0.00 0.00 0.00 0.00
01.05.07.05 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 302.92
01.05.07.05.01 VALVULA COMPUERTA DE BRONCE DE 3/4" INC. und 4.00 S/. 63.23 S/. 252.90 0.00 0.00 0.00 0.00
01.05.07.05.02 VALVULA COMPUERTA DE BRONCE DE 1/2" INC. und 1.00 S/. 50.02 S/. 50.02 0.00 0.00 0.00 0.00
01.05.07.06 VARIOS S/. 753.87
01.05.07.06.01 FILTRO DE GRAVA DIA. MAX. 1/2" m3 0.02 S/. 91.35 S/. 1.83 0.00 0.00 0.00 0.00
01.05.07.06.02 TAPA SANITARIA METALICA DE 0.40x0.40x1/8" und 5.00 S/. 150.41 S/. 752.04 0.00 0.00 0.00 0.00
01.05.08 VALVULA DE AIRE TIPO I (01 UNID) S/. 600.34
01.05.08.01 TRABAJOS PRELIMINARES S/. 1.46
01.05.08.01.01 LIMPIEZA DEL TERRENO MANUAL m2 0.64 S/. 1.36 S/. 0.87 0.00 0.00 0.00 0.64 0.87
01.05.08.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 0.64 S/. 0.91 S/. 0.59 0.00 0.00 0.00 0.64 0.59
01.05.08.02 MOVIMIENTO DE TIERRAS S/. 21.07
01.05.08.02.01 EXCAVACION MANUAL DE TERRENO m3 0.38 S/. 27.52 S/. 10.46 0.00 0.00 0.00 0.00
01.05.08.02.02 REFINE Y NIVELACION INTERIOR DE TERRENO m2 0.64 S/. 2.08 S/. 1.33 0.00 0.00 0.00 0.00
01.05.08.02.03 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 0.17 S/. 15.72 S/. 2.67 0.00 0.00 0.00 0.00
01.05.08.02.04 ELIMINACION DE MATERIAL EXCEDENTE (CARGU m3 0.48 S/. 13.76 S/. 6.61 0.00 0.00 0.00 0.00
01.05.08.03 OBRAS DE CONCRETO SIMPLE S/. 137.37
01.05.08.03.01 CONCRETO f'c=140 kg/cm2 m3 0.16 S/. 264.32 S/. 42.29 0.00 0.00 0.00 0.00
01.05.08.03.02 ENCOFRADO Y DESENCOFRADO m2 2.96 S/. 32.12 S/. 95.08 0.00 0.00 0.00 0.00
01.05.08.04 REVOQUES Y ENLUCIDOS S/. 18.22
01.05.08.04.01 TARRAJEO INTERIOR Y EXTERIOR C/MORTERO 1:5 m2 0.96 S/. 16.64 S/. 15.98 0.00 0.00 0.00 0.00
01.05.08.04.02 PINTURA LATEX EN EXTERIORES (DOS MANOS) m2 0.36 S/. 6.23 S/. 2.24 0.00 0.00 0.00 0.00
01.05.08.05 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 270.90
01.05.08.05.01 SUMINISTRO Y COLOCACION VALVULA GLOBO BR und 5.00 S/. 54.18 S/. 270.90 0.00 0.00 0.00 0.00
01.05.08.06 VARIOS S/. 151.33
01.05.08.06.01 FILTRO DE GRAVA DIA. MAX. 1/2" m3 0.01 S/. 91.80 S/. 0.92 0.00 0.00 0.00 0.00
01.05.08.06.02 TAPA SANITARIA METALICA DE 0.40x0.40x1/8" und 1.00 S/. 150.41 S/. 150.41 0.00 0.00 0.00 0.00
01.05.09 PASE AEREO (L=6.0 m) S/. 2,112.58
01.05.09.01 TRABAJOS PRELIMINARES S/. 5.51
01.05.09.01.01 LIMPIEZA DEL TERRENO MANUAL m2 2.41 S/. 1.37 S/. 3.29 0.00 0.00 0.00 2.41 3.29
01.05.09.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 2.41 S/. 0.92 S/. 2.21 0.00 0.00 0.00 2.41 2.21
01.05.09.02 MOVIMIENTO DE TIERRAS S/. 84.47
01.05.09.02.01 EXCAVACION MANUAL DE TERRENO PARA CAMAR m3 1.66 S/. 27.52 S/. 45.68 0.00 0.00 0.00 0.00
01.05.09.02.02 EXCAVACION MANUAL DE TERRENO PARA ZAPATA m3 1.41 S/. 27.51 S/. 38.79 0.00 0.00 0.00 0.00
01.05.09.03 OBRAS DE CONCRETO SIMPLE S/. 246.51
01.05.09.03.01 CONCRETO EN CAMARAS DE ANCLAJE f'c=140 kg/ m3 1.02 S/. 241.68 S/. 246.51 0.00 0.00 0.00 0.00
01.05.09.04 OBRAS DE CONCRETO ARMADO S/. 668.44
01.05.09.04.01 CONCRETO EN ZAPATAS f'c=210 kg/cm2 m3 0.84 S/. 348.11 S/. 292.41 0.00 0.00 0.00 0.00
01.05.09.04.02 CONCRETO EN COLUMNAS f'c=210 kg/cm2 m3 0.28 S/. 366.01 S/. 102.48 0.00 0.00 0.00 0.00
01.05.09.04.03 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 4.05 S/. 32.12 S/. 130.09 0.00 0.00 0.00 0.00
01.05.09.04.04 ACERO DE REFUERZO FY=4200 KG/CM2 kg 39.26 S/. 3.65 S/. 143.46 0.00 0.00 0.00 0.00
01.05.09.05 TUBERIA, CABLE Y PENDOLAS S/. 1,107.66
01.05.09.05.01 TUBERIA DE F.G DE 3/4" m 6.00 S/. 51.46 S/. 308.77 0.00 0.00 0.00 0.00
01.05.09.05.02 CABLE DE ACERO 3/8" m 10.87 S/. 36.16 S/. 393.08 0.00 0.00 0.00 0.00
01.05.09.05.03 PENDOLAS DE 1/4" m 4.49 S/. 16.65 S/. 74.76 0.00 0.00 0.00 0.00
01.05.09.05.04 ACCESORIOS PARA EL TEMPLADOR DEL CABLE 3/8und 1.00 S/. 281.92 S/. 281.92 0.00 0.00 0.00 0.00
01.05.09.05.05 ACCESORIOS PARA TUBERIA DE 3/4" DE F.G und 1.00 S/. 49.12 S/. 49.12 0.00 0.00 0.00 0.00
01.05.10 PASE AEREO (L=40.0 m) S/. 6,531.74
01.05.10.01 TRABAJOS PRELIMINARES S/. 9.17
01.05.10.01.01 LIMPIEZA DEL TERRENO MANUAL m2 4.01 S/. 1.37 S/. 5.49 0.00 0.00 0.00 4.01 5.49
01.05.10.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 4.01 S/. 0.92 S/. 3.68 0.00 0.00 0.00 4.01 3.68
01.05.10.02 MOVIMIENTO DE TIERRAS S/. 157.64
01.05.10.02.01 EXCAVACION MANUAL DE TERRENO PARA CAMAR m3 4.32 S/. 27.51 S/. 118.85 0.00 0.00 0.00 0.00
01.05.10.02.02 EXCAVACION MANUAL DE TERRENO PARA ZAPATA m3 1.41 S/. 27.51 S/. 38.79 0.00 0.00 0.00 0.00
01.05.10.03 OBRAS DE CONCRETO SIMPLE S/. 696.03
01.05.10.03.01 CONCRETO EN CAMARAS DE ANCLAJE f'c=140 kg/ m3 2.88 S/. 241.68 S/. 696.03 0.00 0.00 0.00 0.00
01.05.10.04 OBRAS DE CONCRETO ARMADO S/. 1,110.85
01.05.10.04.01 CONCRETO EN ZAPATAS f'c=210 kg/cm2 m3 0.84 S/. 348.11 S/. 292.41 0.00 0.00 0.00 0.00
01.05.10.04.02 CONCRETO EN COLUMNAS f'c=210 kg/cm2 m3 0.65 S/. 366.01 S/. 237.91 0.00 0.00 0.00 0.00
01.05.10.04.03 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 9.53 S/. 32.12 S/. 306.12 0.00 0.00 0.00 0.00
01.05.10.04.04 ACERO DE REFUERZO FY=4200 KG/CM2 kg 75.10 S/. 3.65 S/. 274.42 0.00 0.00 0.00 0.00
01.05.10.05 TUBERIA, CABLE Y PENDOLAS S/. 4,558.04
01.05.10.05.01 TUBERIA DE F.G DE 3/4" m 40.00 S/. 51.46 S/. 2,058.48 0.00 0.00 0.00 0.00
01.05.10.05.02 CABLE DE ACERO 3/8" m 45.27 S/. 36.16 S/. 1,637.06 0.00 0.00 0.00 0.00
01.05.10.05.03 PENDOLAS DE 1/4" m 31.92 S/. 16.65 S/. 531.47 0.00 0.00 0.00 0.00
01.05.10.05.04 ACCESORIOS PARA EL TEMPLADOR DEL CABLE 3/8und 1.00 S/. 281.92 S/. 281.92 0.00 0.00 0.00 0.00
01.05.10.05.05 ACCESORIOS PARA TUBERIA DE 3/4" DE F.G und 1.00 S/. 49.12 S/. 49.12 0.00 0.00 0.00 0.00
01.06 CONEXIONES DOMICILIARIAS S/. 107,376.55
01.06.01 LAVADERO MULTIUSOS PARA VIVIENDAS (189 UNID) S/. 102,201.49
01.06.01.01 TRABAJOS PRELIMINARES S/. 469.86
01.06.01.01.01 LIMPIEZA DEL TERRENO MANUAL m2 205.54 S/. 1.37 S/. 281.18 0.00 0.00 0.00 102.77 140.59
01.06.01.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 205.54 S/. 0.92 S/. 188.69 0.00 0.00 0.00 102.77 94.34
01.06.01.02 MOVIMIENTO DE TIERRAS S/. 17,843.50
01.06.01.02.01 EXCAVACION MANUAL DE TERRENO m3 293.42 S/. 27.51 S/. 8,072.87 0.00 0.00 0.00 0.00
CALENDA
RIO DE
AVANCE
PROYECTO: "MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA COMUNIDAD DE COLPAMATARA, DISTRITO DE CHOTA, PROVINCIA DE CHOTA - CAJAMARCA"
DE OBRA
VALORIZ
ADO VALORIZACIÓN AL 31 DE MAYO
01.06.01.02.02 PRESUPUESTO
REFINE Y NIVELACION SEGÚN
INTERIOR DE CONTRATO
TERRENO m2 194.20 S/. 2.09 S/. 405.49 0.00 0.00 0.00 0.00
01.06.01.02.03 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 211.21 S/. 15.72 S/. 3,320.86 0.00 0.00 0.00 0.00
01.06.01.02.04 CAMA DE ARENA , E=0.05m m3 40.64 S/. 111.38 S/. 4,526.65 0.00 0.00 0.00 0.00
01.06.01.02.05 FILTRO DE GRAVA DIA. MAX. 1/2" m3 1.13 S/. 91.53 S/. 103.43 0.00 0.00 0.00 0.00
01.06.01.02.06 ELIMINACION DE MATERIAL EXCEDENTE (CARGU m3 102.77 S/. 13.76 S/. 1,414.22 0.00 0.00 0.00 0.00
01.06.01.03 OBRAS DE CONCRETO SIMPLE S/. 2,706.66
01.06.01.03.01 CIMIENTO CORRIDO - MEZCLA C:H 1:10 + 30% PG m3 17.96 S/. 150.70 S/. 2,706.66 0.00 0.00 0.00 0.00
01.06.01.04 OBRAS DE CONCRETO ARMADO S/. 25,295.76
01.06.01.04.01 CONCRETO f'c=175 kg/cm2 m3 27.31 S/. 333.40 S/. 9,105.05 0.00 0.00 0.00 0.00
01.06.01.04.02 ENCOFRADO Y DESENCOFRADO m2 379.89 S/. 32.12 S/. 12,202.44 0.00 0.00 0.00 0.00
01.06.01.04.03 ACERO DE REFUERZO FY=4200 KG/CM2 kg 1,091.48 S/. 3.65 S/. 3,988.27 0.00 0.00 0.00 0.00
01.06.01.05 MUROS Y TABIQUES S/. 20,789.07
01.06.01.05.01 MURO DE LADRILLO DE ARCILLA CORRIENTE MEZCm2 336.42 S/. 41.94 S/. 14,109.45 0.00 0.00 0.00 0.00
01.06.01.05.02 MURO DE LADRILLO DE ARCILLA CORRIENTE MEZCm2 136.08 S/. 49.09 S/. 6,679.62 0.00 0.00 0.00 0.00
01.06.01.06 REVOQUES, ENLUCIDOS Y MOLDURAS S/. 16,257.26
01.06.01.06.01 TARRAJEO EN MUROS, MORTERO C:A=1:5, E=1.5cmm2 976.94 S/. 16.64 S/. 16,257.26 0.00 0.00 0.00 0.00
01.06.01.07 CONEXION DOMICILIARIA, INC. VALVULAS Y ACCESORIOS S/. 15,138.90
01.06.01.07.01 SUMINISTRO Y COLOCACION DE VALVULAS Y AC und 189.00 S/. 80.10 S/. 15,138.90 0.00 0.00 0.00 0.00
01.06.01.08 VARIOS S/. 3,700.48
01.06.01.08.01 PINTURA OCRE COLOR ROJO EN PILETA m2 721.34 S/. 5.13 S/. 3,700.48 0.00 0.00 0.00 0.00
01.06.02 LAVADERO MULTIUSOS PARA INSTITUCIONES Y PUESTO DE SALUD (09 UND) S/. 5,175.06
01.06.02.01 TRABAJOS PRELIMINARES S/. 22.64
01.06.02.01.01 LIMPIEZA DEL TERRENO MANUAL m2 3.30 S/. 4.10 S/. 13.55 0.00 0.00 0.00 1.65 6.77
01.06.02.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 3.30 S/. 2.75 S/. 9.09 0.00 0.00 0.00 1.65 4.55
01.06.02.02 MOVIMIENTO DE TIERRAS S/. 863.95
01.06.02.02.01 EXCAVACION MANUAL DE TERRENO m3 4.81 S/. 82.60 S/. 397.29 0.00 0.00 0.00 0.00
01.06.02.02.02 REFINE Y NIVELACION INTERIOR DE TERRENO m2 4.25 S/. 6.26 S/. 26.60 0.00 0.00 0.00 0.00
01.06.02.02.03 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 3.03 S/. 47.17 S/. 142.92 0.00 0.00 0.00 0.00
01.06.02.02.04 CAMA DE ARENA , E=0.05m m3 0.60 S/. 334.16 S/. 200.49 0.00 0.00 0.00 0.00
01.06.02.02.05 RELLENO CON PIEDRA CHACADA m3 0.02 S/. 229.05 S/. 4.58 0.00 0.00 0.00 0.00
01.06.02.02.06 ELIMINACION DE MATERIAL EXCEDENTE (CARGU m3 2.23 S/. 41.28 S/. 92.06 0.00 0.00 0.00 0.00
01.06.02.03 OBRAS DE CONCRETO SIMPLE S/. 143.17
01.06.02.03.01 CIMIENTO CORRIDO - MEZCLA C:H 1:10 + 30% PG m3 0.32 S/. 447.41 S/. 143.17 0.00 0.00 0.00 0.00
01.06.02.04 OBRAS DE CONCRETO ARMADO S/. 1,594.42
01.06.02.04.01 CONCRETO f'c=175 kg/cm2 m3 0.73 S/. 1,004.76 S/. 733.47 0.00 0.00 0.00 0.00
01.06.02.04.02 ENCOFRADO Y DESENCOFRADO m2 7.77 S/. 96.36 S/. 748.74 0.00 0.00 0.00 0.00
01.06.02.04.03 ACERO DE REFUERZO FY=4200 KG/CM2 kg 10.24 S/. 10.96 S/. 112.21 0.00 0.00 0.00 0.00
01.06.02.05 MUROS Y TABIQUES S/. 879.49
01.06.02.05.01 MURO DE LADRILLO DE ARCILLA CORRIENTE MEZCm2 4.88 S/. 125.91 S/. 614.42 0.00 0.00 0.00 0.00
01.06.02.05.02 MURO DE LADRILLO DE ARCILLA CORRIENTE MEZCm2 1.80 S/. 147.26 S/. 265.07 0.00 0.00 0.00 0.00
01.06.02.06 REVOQUES, ENLUCIDOS Y MOLDURAS S/. 553.92
01.06.02.06.01 TARRAJEO EN MUROS, MORTERO C:A=1:5, E=1.5cmm2 13.95 S/. 39.71 S/. 553.92 0.00 0.00 0.00 0.00
01.06.02.07 CONEXION DOMICILIARIA, INC. VALVULAS Y ACCESORIOS S/. 720.90
01.06.02.07.01 SUMINISTRO Y COLOCACION DE VALVULAS Y AC und 3.00 S/. 240.30 S/. 720.90 0.00 0.00 0.00 0.00
01.06.02.08 VARIOS S/. 396.58
01.06.02.08.01 PINTURA OCRE COLOR ROJO EN PILETA m2 8.34 S/. 15.38 S/. 128.30 0.00 0.00 0.00 0.00
01.06.02.08.02 ASAS DE TORNILLOS EN "U" und 9.00 S/. 29.81 S/. 268.27 0.00 0.00 0.00 0.00
02 UNIDAD BASICA DE SANEAMIENTO S/. 1,310,341.79
02.01 ARRASTRE HIDRAULICO S/. 1,310,341.79
02.01.01 MÓDULO DE SERVICIOS HIGIÉNICOS TIPO 1 PARA VIVIENDAS (196 UNID) S/. 988,912.44
02.01.01.01 ESTRUCTURAS - ARQUITECTURA S/. 727,691.45
02.01.01.01.01 TRABAJOS PRELIMINARES S/. 2,942.09
02.01.01.01.01.01 LIMPIEZA DEL TERRENO MANUAL m2 1,287.00 S/. 1.37 S/. 1,760.63 0.00 0.00 0.00 1,287.00 1,760.63
02.01.01.01.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 1,287.00 S/. 0.92 S/. 1,181.47 0.00 0.00 0.00 1,287.00 1,181.47
02.01.01.01.02 MOVIMIENTO DE TIERRAS S/. 28,600.04
02.01.01.01.02.01 EXCAVACION MANUAL DE TERRENO m3 555.89 S/. 27.51 S/. 15,294.20 0.00 0.00 0.00 173.72 4,779.56
02.01.01.01.02.02 RELLENO Y COMPACTACION CON MATERIAL PROm3 49.23 S/. 15.72 S/. 774.05 0.00 0.00 0.00 0.00
02.01.01.01.02.03 MEJORAMIENTO DE BASE CON AFIRMADO E=0.10 m3 55.68 S/. 68.54 S/. 3,816.53 0.00 0.00 0.00 0.00
02.01.01.01.02.04 ELIMINACION DE MATERIAL EXCEDENTE (CAR m3 633.33 S/. 13.76 S/. 8,715.26 0.00 0.00 0.00 96.94 1,333.99
02.01.01.01.03 OBRAS DE CONCRETO SIMPLE S/. 137,446.53
02.01.01.01.03.01 CIMIENTO CORRIDO - MEZCLA C:H 1:8 + 30% P.M m3 278.39 S/. 215.30 S/. 59,936.81 0.00 0.00 0.00 2.90 624.36
02.01.01.01.03.02 SOBRECIMIENTO - MEZCLA C:H 1:8 + 25% PM m3 84.20 S/. 231.65 S/. 19,505.02 0.00 0.00 0.00 0.88 203.85
02.01.01.01.03.03 SOBRECIMIENTO - ENCOFRADO Y DESENCOFRA m2 1,136.03 S/. 32.12 S/. 36,490.42 0.00 0.00 0.00 11.84 380.31
02.01.01.01.03.04 CONCRETO EN FALSO PISO MEZCLA C:H 1:8, E=4"m2 567.27 S/. 37.93 S/. 21,514.28 0.00 0.00 0.00 0.00
02.01.01.01.04 OBRAS DE CONCRETO ARMADO S/. 123,531.72
02.01.01.01.04.01 COLUMNAS S/. 76,335.79
02.01.01.01.04.01 COLUMNAS - CONCRETO F’C=175 KG/CM2 m3 45.80 S/. 333.40 S/. 15,269.54 0.00 0.00 0.00 0.00
02.01.01.01.04.01 COLUMNAS - ENCOFRADO Y DESENCOFRADO m2 683.69 S/. 36.64 S/. 25,049.72 0.00 0.00 0.00 0.00
02.01.01.01.04.01 COLUMNAS ACERO kg 8,892.97 S/. 4.05 S/. 36,016.53 0.00 0.00 0.00 1,361.17 5,512.74
02.01.01.01.04.02 VIGAS S/. 47,195.94
02.01.01.01.04.02 VIGAS - CONCRETO F’C=175 KG/CM2 m3 34.04 S/. 333.40 S/. 11,348.80 0.00 0.00 0.00 0.00
02.01.01.01.04.02 VIGAS - ENCOFRADO Y DESENCOFRADO m2 340.36 S/. 36.64 S/. 12,470.45 0.00 0.00 0.00 0.00
02.01.01.01.04.02 VIGAS ACERO kg 5,772.02 S/. 4.05 S/. 23,376.68 0.00 0.00 0.00 0.00
02.01.01.01.05 ESTRUCTURA DE MADERA S/. 32,963.44
02.01.01.01.05.01 CORREAS DE MADERA EUCALIPTO 2"x2"x3.00m pza 792.00 S/. 13.12 S/. 10,392.62 0.00 0.00 0.00 0.00
CALENDA
RIO DE
AVANCE
PROYECTO: "MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA COMUNIDAD DE COLPAMATARA, DISTRITO DE CHOTA, PROVINCIA DE CHOTA - CAJAMARCA"
DE OBRA
VALORIZ
ADO VALORIZACIÓN AL 31 DE MAYO
02.01.01.01.05.02 CORREAS DE PRESUPUESTO SEGÚN
MADERA EUCALIPTO CONTRATO
2"x3"x2.75 m und 396.00 S/. 22.48 S/. 8,902.87 0.00 0.00 0.00 0.00
02.01.01.01.05.03 VIGUETA DE MADERA EUCALIPTO DE 4"x3"x2.75m pza 396.00 S/. 34.52 S/. 13,667.94 0.00 0.00 0.00 0.00
02.01.01.01.06 COBERTURA S/. 38,808.59
02.01.01.01.06.01 COBERTURA CON PLANCHA ZINCADA ONDULADAm2 1,633.50 S/. 23.76 S/. 38,808.59 0.00 0.00 0.00 0.00
02.01.01.01.07 MUROS Y TABIQUES S/. 120,902.33
02.01.01.01.07.01 MURO DE LADRILLO DE ARCILLA CORRIENTE ME m2 2,799.32 S/. 41.94 S/. 117,403.48 0.00 0.00 0.00 14.28 598.90
02.01.01.01.07.02 MURO DE LADRILLO DE ARCILLA CORRIENTE ME m2 71.28 S/. 49.09 S/. 3,498.85 0.00 0.00 0.00 0.00
02.01.01.01.08 REVOQUES Y REVESTIMIENTOS S/. 97,961.45
02.01.01.01.08.01 TARRAJEO EN MUROS MORTERO C:A=1:5, E=1.5c m2 7,399.46 S/. 13.24 S/. 97,961.45 0.00 0.00 0.00 0.00
02.01.01.01.09 PISOS Y PAVIMENTOS S/. 64,331.43
02.01.01.01.09.01 CONFORMACION DE BASE GRANURAL H=0.10m, m2 1,404.81 S/. 11.20 S/. 15,728.26 0.00 0.00 0.00 0.00
02.01.01.01.09.02 PISO DE CEMENTO PULIDO DE COLOR m2 709.83 S/. 39.42 S/. 27,981.50 0.00 0.00 0.00 0.00
02.01.01.01.09.03 VEREDA DE CONCRETO f'c=140 kg/cm2, FROT m2 415.80 S/. 41.38 S/. 17,206.63 0.00 0.00 0.00 0.00
02.01.01.01.09.04 ENCOFRADO Y DESENCOFRADO EN VEREDAS m2 66.33 S/. 32.12 S/. 2,130.59 0.00 0.00 0.00 0.00
02.01.01.01.09.05 BRUÑAS DE 1 X 1 cm m 1,049.40 S/. 1.22 S/. 1,284.46 0.00 0.00 0.00 0.00
02.01.01.01.10 CARPINTERIA DE MADERA S/. 33,285.98
02.01.01.01.10.01 PUERTA E=37.5mm C/CALAMINA LISA 0.22MM, und 198.00 S/. 137.16 S/. 27,157.68 0.00 0.00 0.00 0.00
02.01.01.01.10.02 VENTANA DE MADERA C/MALLA MOSQUITERO und 198.00 S/. 30.95 S/. 6,128.30 0.00 0.00 0.00 0.00
02.01.01.01.11 PINTURAS S/. 46,917.84
02.01.01.01.11.01 PINTURA EN MUROS m2 7,339.46 S/. 6.22 S/. 45,644.10 0.00 0.00 0.00 0.00
02.01.01.01.11.02 PINTURA EN PUERTA DE CALAMINA m2 225.72 S/. 5.64 S/. 1,273.73 0.00 0.00 0.00 0.00
02.01.01.02 INSTALACIONES SANITARIAS S/. 261,221.00
02.01.01.02.01 TRABAJOS PRELIMINARES S/. 5,861.01
02.01.01.02.01.01 LIMPIEZA DEL TERRENO MANUAL m2 2,574.00 S/. 1.37 S/. 3,521.23 0.00 0.00 0.00 0.00
02.01.01.02.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 2,574.00 S/. 0.91 S/. 2,339.78 0.00 0.00 0.00 0.00
02.01.01.02.02 MOVIMIENTO DE TIERRAS S/. 37,666.23
02.01.01.02.02.01 EXCAVACION DE ZANJA PARA COLOCACION DE m3 792.00 S/. 22.01 S/. 17,427.96 0.00 0.00 0.00 0.00
02.01.01.02.02.02 EXCAVACION DE ZANJA PARA COLOCACION DE m3 148.50 S/. 22.00 S/. 3,267.74 0.00 0.00 0.00 0.00
02.01.01.02.02.03 CAMA DE APOYO PARA TUBERIA e=0.05m m2 2,574.00 S/. 1.53 S/. 3,929.68 0.00 0.00 0.00 0.00
02.01.01.02.02.04 RELLENO Y COMPACTACION CON MATERIAL PROm3 752.40 S/. 15.72 S/. 11,829.99 0.00 0.00 0.00 0.00
02.01.01.02.02.05 RELLENO CON MATERIAL PROPIO ZARANDEADO m3 59.40 S/. 20.39 S/. 1,210.87 0.00 0.00 0.00 0.00
02.01.01.02.03 INSTALACION AGUA FRIA S/. 35,934.03
02.01.01.02.03.01 SALIDA DE AGUA FRIA CON TUBERIA PVC SAP 1/2pto 594.00 S/. 24.26 S/. 14,407.47 0.00 0.00 0.00 0.00
02.01.01.02.03.02 RED DE DISTRIBUCION TUBERIA PVC SAP 1/2" m 2,178.00 S/. 1.17 S/. 2,548.26 0.00 0.00 0.00 0.00
02.01.01.02.03.03 VALVULA DE PASO TIPO ESFERICA DE 1/2" pza 198.00 S/. 68.51 S/. 13,564.59 0.00 0.00 0.00 0.00
02.01.01.02.03.04 ACCESORIOS PVC AGUA glb 198.00 S/. 27.34 S/. 5,413.72 0.00 0.00 0.00 0.00
02.01.01.02.04 INSTALACION DE DESAGÜE S/. 86,289.08
02.01.01.02.04.01 SALIDA DE DESAGÜE DIA=2" pto 396.00 S/. 34.67 S/. 13,728.53 0.00 0.00 0.00 0.00
02.01.01.02.04.02 SALIDA DE VENTILACION DIA=2" pto 198.00 S/. 44.91 S/. 8,892.18 0.00 0.00 0.00 0.00
02.01.01.02.04.03 TUBERIA PVC SAL 2" m 3,049.20 S/. 5.99 S/. 18,249.46 0.00 0.00 0.00 0.00
02.01.01.02.04.04 TUBERIA PVC SAL 4" m 2,019.60 S/. 8.40 S/. 16,958.58 0.00 0.00 0.00 0.00
02.01.01.02.04.05 SUMIDERO DE BRONCE CROMADO 2" und 198.00 S/. 12.49 S/. 2,473.42 0.00 0.00 0.00 0.00
02.01.01.02.04.06 REGISTRO DE BRONCE CROMADO 4" und 198.00 S/. 14.76 S/. 2,922.48 0.00 0.00 0.00 0.00
02.01.01.02.04.07 SUMIDERO DE BRONCE CROMADO 2" und 396.00 S/. 6.37 S/. 2,523.31 0.00 0.00 0.00 0.00
02.01.01.02.04.08 ACCESORIOS PVC DESAGÜE glb 198.00 S/. 103.74 S/. 20,541.11 0.00 0.00 0.00 0.00
02.01.01.02.05 APARATOS SANITARIOS S/. 75,426.71
02.01.01.02.05.01 LAVATORIO BLANCO +ACCESORIOS und 198.00 S/. 143.04 S/. 28,321.33 0.00 0.00 0.00 0.00
02.01.01.02.05.02 INODORO TANQUE BAJO ADULTO + ACCESORIOSund 198.00 S/. 179.96 S/. 35,631.09 0.00 0.00 0.00 0.00
02.01.01.02.05.03 DUCHA + ACCESORIOS und 198.00 S/. 57.95 S/. 11,474.30 0.00 0.00 0.00 0.00
02.01.01.02.06 CAJAS DE INSPECCION Y/O REGISTRO S/. 20,043.94
02.01.01.02.06.01 CAJAS DE REGISTRO DE DESAGUE 12" x 24" und 198.00 S/. 101.23 S/. 20,043.94 0.00 0.00 0.00 0.00
02.01.02 INSTALACION DE TANQUE BIODIGESTOR 600 LTS S/. 321,429.34
02.01.02.01 TRABAJOS PRELIMINARES S/. 1,252.57
02.01.02.01.01 LIMPIEZA DEL TERRENO MANUAL m2 550.09 S/. 1.37 S/. 752.53 0.00 0.00 0.00 2.80 3.83
02.01.02.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 550.09 S/. 0.91 S/. 500.03 0.00 0.00 0.00 2.80 2.55
02.01.02.02 MOVIMIENTO DE TIERRAS S/. 20,930.71
02.01.02.02.01 EXCAVACION DE TERRENO PARA TANQUE BIODIG m3 467.78 S/. 27.51 S/. 12,870.03 0.00 0.00 0.00 2.39 65.76
02.01.02.02.02 NIVELACION Y APISONADO INTERIOR MANUAL m2 214.19 S/. 1.56 S/. 333.50 0.00 0.00 0.00 0.00
02.01.02.02.03 RELLENO Y COMPACTACION CON MATERIAL PROP m3 215.94 S/. 15.72 S/. 3,395.22 0.00 0.00 0.00 0.00
02.01.02.02.04 ELIMINACION DE MATERIAL EXCEDENTE (CARGU m3 314.80 S/. 13.76 S/. 4,331.96 0.00 0.00 0.00 1.61 22.16
02.01.02.03 PLANTILLA DE FONDO S/. 5,948.37
02.01.02.03.01 BASE DE CONCRETO MEZCLA C:H=1:10, E=10cm m2 153.45 S/. 28.86 S/. 4,429.03 0.00 0.00 0.00 0.00
02.01.02.03.02 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 415.80 S/. 3.65 S/. 1,519.34 0.00 0.00 0.00 0.00
02.01.02.04 CAJA DE REGISTRO DE LODOS (0.60m X 0.60m) S/. 58,942.23
02.01.02.04.01 CONCRETO f'c=175 kg/cm2 m3 41.58 S/. 333.40 S/. 13,862.62 0.00 0.00 0.00 0.00
CALENDA
RIO DE
AVANCE
PROYECTO: "MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA COMUNIDAD DE COLPAMATARA, DISTRITO DE CHOTA, PROVINCIA DE CHOTA - CAJAMARCA"
DE OBRA
VALORIZ
ADO VALORIZACIÓN AL 31 DE MAYO
02.01.02.04.02 ENCOFRADO Y PRESUPUESTO
DESENCOFRADO SEGÚN CONTRATO
m2 356.40 S/. 32.12 S/. 11,447.93 0.00 0.00 0.00 0.00
02.01.02.04.03 TAPA SANITARIA METALICA DE 0.60x0.60x1/8" und 198.00 S/. 169.86 S/. 33,631.69 0.00 0.00 0.00 0.00
02.01.02.05 TANQUE BIODIGESTOR S/. 200,540.93
02.01.02.05.01 INSTALACION DE TANQUE BIODIGESTOR 600 LITROund 198.00 S/. 1,012.83 S/. 200,540.93 0.00 0.00 0.00 0.00
02.01.02.06 ZANJAS DE INFILTRACION S/. 33,814.54
02.01.02.06.01 EXCAVACION MANUAL EN ZANJAS DE INFILTRACIO m3 498.96 S/. 22.01 S/. 10,979.62 0.00 0.00 0.00 0.00
02.01.02.06.02 FILTRO DE GRAVA m3 249.48 S/. 91.53 S/. 22,834.92 0.00 0.00 0.00 0.00
03 FLETE S/. 35,178.80
03.01 FLETE TERRESTRE glb 1.00 S/. 14,761.37 S/. 14,761.37 0.00 0.00 0.00 0.03 369.03
03.02 FLETE RURAL glb 1.00 S/. 20,417.44 S/. 20,417.44 0.00 0.00 0.00 0.01 204.17
04 MITIGACION DE RIEGOS Y EVALUACION AMBIENTAL S/. 22,082.51
04.01 MITIGACION DEL IMPACTO AMBIENTAL glb 1.00 S/. 22,082.51 S/. 22,082.51 0.00 0.00 0.00 0.01 220.83
05 CAPACITACION, EDUCACION SANITARIA Y PMA S/. 50,654.34
05.01 CAPACITACION Y EDUCACION SANITARIA glb 1.00 S/. 43,065.00 S/. 43,065.00 0.00 0.00 0.00 0.00
05.02 PLAN DE MONITOREO ARQUEOLOGICO glb 1.00 S/. 7,589.34 S/. 7,589.34 0.00 0.00 0.00 0.02 113.84
Item Descripción Und. Metrado Precio (S/.) Parcial (S/.) S/. % S/. % S/. % S/. %
01 SISTEMA DE AGUA POTABLE - COLPAMATARA S/. 654,095.87
01.01 TRABAJOS PRELIMINARES S/. 3,689.51
01.01.01 CARTEL DE OBRA 3.60x2.40 und 1.00 S/. 828.56 S/. 828.56 0.00 0.00 0.00 1.00 828.56
01.01.02 ALMACEN PRELIMINAR Y CASETA DE SEGURIDAD m2 35.00 S/. 53.17 S/. 1,860.95 0.00 0.00 0.00 35.00 1,860.95
01.01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPO LIVIA glb 1.00 S/. 1,000.00 S/. 1,000.00 0.00 0.00 0.00 1.00 1,000.00
01.02 CAPTACIONES S/. 16,356.20
01.02.01 CAPTACION DE LADERA 1 S/. 5,563.48
01.02.01.01 TRABAJOS PRELIMINARES S/. 44.04
01.02.01.01.01 LIMPIEZA Y DEFORESTACION m2 15.84 S/. 1.76 S/. 27.88 0.00 0.00 0.00 15.84 27.88
01.02.01.01.02 TRAZO, NIVELES Y REPLANTEO m2 15.84 S/. 1.02 S/. 16.16 0.00 0.00 0.00 15.84 16.16
01.02.01.02 MOVIMIENTO DE TIERRAS S/. 233.22
01.02.01.02.01 EXCAVACION MANUAL DE TERRENO m3 3.96 S/. 30.57 S/. 121.06 0.00 0.00 0.00 3.96 121.06
01.02.01.02.02 REFINE Y NIVELACION DE TERRENO m2 2.00 S/. 3.06 S/. 6.12 0.00 0.00 0.00 2.00 6.12
01.02.01.02.03 RELLENO Y COMPACTACION CON MATERIAL PROP m3 0.16 S/. 17.50 S/. 2.80 0.00 0.00 0.00 0.00 0.00
01.02.01.02.04 MEJORAMIENTO DE BASE CON AFIRMADO E=0.10m m3 0.40 S/. 76.15 S/. 30.46 0.00 0.00 0.00 0.00 0.00
01.02.01.02.05 ELIMINACION DE MATERIAL EXCEDENTE (CARGU m3 4.76 S/. 15.29 S/. 72.78 0.00 0.00 0.00 4.76 72.78
01.02.01.03 MATERIAL GRANULAR PARA FILTRO S/. 139.83
01.02.01.03.01 FILTRO III (Arena fina) m3 0.70 S/. 108.21 S/. 75.75 0.00 0.00 0.00 0.00 0.00
01.02.01.03.02 FILTRO DE GRAVA FINA m3 0.36 S/. 107.86 S/. 38.83 0.00 0.00 0.00 0.00 0.00
01.02.01.03.03 FILTRO I (Grava gruesa de 3/4" - 3") m3 0.22 S/. 114.77 S/. 25.25 0.00 0.00 0.00 0.00 0.00
01.02.01.04 OBRAS DE CONCRETO SIMPLE S/. 486.97
01.02.01.04.01 CONCRETO f'c=175 kg/cm2 m3 0.18 S/. 319.67 S/. 57.54 0.00 0.00 0.00 0.00 0.00
01.02.01.04.02 CONCRETO f'c=100 kg/cm2 m3 0.40 S/. 197.85 S/. 79.14 0.00 0.00 0.00 0.00 0.00
01.02.01.04.03 VEREDA DE PIEDRA (D=4") MEZCLA C:H=1:8 m2 3.51 S/. 51.08 S/. 179.29 0.00 0.00 0.00 0.00 0.00
01.02.01.04.04 DADOS DE CONCRETO f'c=140 kg/cm2 m3 0.29 S/. 289.83 S/. 84.05 0.00 0.00 0.00 0.00 0.00
01.02.01.04.05 MEJORAMIENTO CON SOLADO F'C=140 KG/CM2 E=0m3 0.30 S/. 289.83 S/. 86.95 0.00 0.00 0.00 0.00 0.00
01.02.01.05 OBRAS DE CONCRETO ARMADO S/. 1,570.80
01.02.01.05.01 CONCRETO f'c=175 kg/cm2 CON ADITIVO IMPERME m3 1.05 S/. 348.86 S/. 366.30 0.00 0.00 0.00 0.00 0.00
01.02.01.05.02 ENCOFRADO Y DESENCOFRADO DE LOSA DE TEC m2 7.51 S/. 40.71 S/. 305.73 0.00 0.00 0.00 0.00 0.00
01.02.01.05.03 ENCOFRADO Y DESENCOFRADO DE MUROS m2 12.97 S/. 40.71 S/. 528.01 0.00 0.00 0.00 0.00 0.00
01.02.01.05.04 ACERO DE REFUERZO FY=4200 KG/CM2 kg 91.32 S/. 4.06 S/. 370.76 0.00 0.00 0.00 0.00 0.00
01.02.01.06 REVOQUES Y ENLUCIDOS S/. 307.93
01.02.01.06.01 TARRAJEO EN EXTERIORES (MORTERO C:A=1:5), E m2 7.24 S/. 14.71 S/. 106.50 0.00 0.00 0.00 0.00 0.00
01.02.01.06.02 TARRAJEO EN INTERIORES CON IMPERMEABILIZANm2 6.14 S/. 22.72 S/. 139.50 0.00 0.00 0.00 0.00 0.00
01.02.01.06.03 MORTERO 1:5 EN PENDIENTE DE FONDO m2 0.61 S/. 19.51 S/. 11.90 0.00 0.00 0.00 0.00 0.00
01.02.01.06.04 PINTURA LATEX EN EXTERIORES (DOS MANOS) m2 7.24 S/. 6.91 S/. 50.03 0.00 0.00 0.00 0.00 0.00
01.02.01.07 VÁLVULAS Y ACCESORIOS S/. 221.11
01.02.01.07.01 VALVULA COMPUERTA DE BRONCE DE 3/4" + ACC und 1.00 S/. 221.11 S/. 221.11 0.00 0.00 0.00 0.00 0.00
01.02.01.08 VARIOS S/. 2,559.58
01.02.01.08.01 SUM. E INST. TAPA SANITARIA METALICA DE 0.6 und 2.00 S/. 169.05 S/. 338.10 0.00 0.00 0.00 0.00 0.00
01.02.01.08.02 SUM. E INST. TAPA SANITARIA METALICA DE 0.4 und 2.00 S/. 167.12 S/. 334.24 0.00 0.00 0.00 0.00 0.00
01.02.01.08.03 CERCO PERIMETRICO CON MALLA OLIMPICA m 13.50 S/. 114.82 S/. 1,550.07 0.00 0.00 0.00 0.00 0.00
01.02.01.08.04 PUERTA EN CERCO PERIMETRICO und 1.00 S/. 337.17 S/. 337.17 0.00 0.00 0.00 0.00 0.00
01.02.02 CAPTACION DE LADERA 2 S/. 5,396.36
01.02.02.01 TRABAJOS PRELIMINARES S/. 44.04
01.02.02.01.01 LIMPIEZA Y DEFORESTACION m2 15.84 S/. 1.76 S/. 27.88 0.00 0.00 0.00 15.84 27.88
01.02.02.01.02 TRAZO, NIVELES Y REPLANTEO m2 15.84 S/. 1.02 S/. 16.16 0.00 0.00 0.00 15.84 16.16
01.02.02.02 MOVIMIENTO DE TIERRAS S/. 233.22
01.02.02.02.01 EXCAVACION MANUAL DE TERRENO m3 3.96 S/. 30.57 S/. 121.06 0.00 0.00 0.00 0.00
01.02.02.02.02 REFINE Y NIVELACION DE TERRENO m2 2.00 S/. 3.06 S/. 6.12 0.00 0.00 0.00 0.00
01.02.02.02.03 RELLENO Y COMPACTACION CON MATERIAL PROP m3 0.16 S/. 17.50 S/. 2.80 0.00 0.00 0.00 0.00
01.02.02.02.04 MEJORAMIENTO DE BASE CON AFIRMADO E=0.10m m3 0.40 S/. 76.15 S/. 30.46 0.00 0.00 0.00 0.00
01.02.02.02.05 ELIMINACION DE MATERIAL EXCEDENTE (CARGU m3 4.76 S/. 15.29 S/. 72.78 0.00 0.00 0.00 0.00
01.02.02.03 MATERIAL GRANULAR PARA FILTRO S/. 139.83
01.02.02.03.01 FILTRO III (Arena fina) m3 0.70 S/. 108.21 S/. 75.75 0.00 0.00 0.00 0.00
01.02.02.03.02 FILTRO DE GRAVA FINA m3 0.36 S/. 107.86 S/. 38.83 0.00 0.00 0.00 0.00
01.02.02.03.03 FILTRO I (Grava gruesa de 3/4" - 3") m3 0.22 S/. 114.77 S/. 25.25 0.00 0.00 0.00 0.00
01.02.02.04 OBRAS DE CONCRETO SIMPLE S/. 486.97
01.02.02.04.01 CONCRETO f'c=175 kg/cm2 m3 0.18 S/. 319.67 S/. 57.54 0.00 0.00 0.00 0.00
01.02.02.04.02 CONCRETO f'c=100 kg/cm2 m3 0.40 S/. 197.85 S/. 79.14 0.00 0.00 0.00 0.00
01.02.02.04.03 VEREDA DE PIEDRA (D=4") MEZCLA C:H=1:8 m2 3.51 S/. 51.08 S/. 179.29 0.00 0.00 0.00 0.00
01.02.02.04.04 DADOS DE CONCRETO f'c=140 kg/cm2 m3 0.29 S/. 289.83 S/. 84.05 0.00 0.00 0.00 0.00
01.02.02.04.05 MEJORAMIENTO CON SOLADO F'C=140 KG/CM2 E=0m3 0.30 S/. 289.83 S/. 86.95 0.00 0.00 0.00 0.00
01.02.02.05 OBRAS DE CONCRETO ARMADO S/. 1,570.80
01.02.02.05.01 CONCRETO f'c=175 kg/cm2 CON ADITIVO IMPERME m3 1.05 S/. 348.86 S/. 366.30 0.00 0.00 0.00 0.00
01.02.02.05.02 ENCOFRADO Y DESENCOFRADO DE LOSA DE TEC m2 7.51 S/. 40.71 S/. 305.73 0.00 0.00 0.00 0.00
01.02.02.05.03 ENCOFRADO Y DESENCOFRADO DE MUROS m2 12.97 S/. 40.71 S/. 528.01 0.00 0.00 0.00 0.00
01.02.02.05.04 ACERO DE REFUERZO FY=4200 KG/CM2 kg 91.32 S/. 4.06 S/. 370.76 0.00 0.00 0.00 0.00
01.02.02.06 REVOQUES Y ENLUCIDOS S/. 307.93
01.02.02.06.01 TARRAJEO EN EXTERIORES (MORTERO C:A=1:5), E m2 7.24 S/. 14.71 S/. 106.50 0.00 0.00 0.00 0.00
01.02.02.06.02 TARRAJEO EN INTERIORES CON IMPERMEABILIZANm2 6.14 S/. 22.72 S/. 139.50 0.00 0.00 0.00 0.00
01.02.02.06.03 MORTERO 1:5 EN PENDIENTE DE FONDO m2 0.61 S/. 19.51 S/. 11.90 0.00 0.00 0.00 0.00
CALENDA
RIO DE
AVANCE
PROYECTO: "MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA COMUNIDAD DE COLPAMATARA, DISTRITO DE CHOTA, PROVINCIA DE CHOTA - CAJAMARCA"
DE OBRA
VALORIZ
ADO VALORIZACIÓN AL 31 DE MAYO
01.02.02.06.04 PINTURA LATEXPRESUPUESTO SEGÚN
EN EXTERIORES (DOS CONTRATO
MANOS) m2 7.24 S/. 6.91 S/. 50.03 0.00 0.00 0.00 0.00
01.02.02.07 VÁLVULAS Y ACCESORIOS S/. 221.11
01.02.02.07.01 VALVULA COMPUERTA DE BRONCE DE 3/4" + ACC und 1.00 S/. 221.11 S/. 221.11 0.00 0.00 0.00 0.00
01.02.02.08 VARIOS S/. 2,392.46
01.02.02.08.01 SUM. E INST. TAPA SANITARIA METALICA DE 0.6 und 2.00 S/. 169.05 S/. 338.10 0.00 0.00 0.00 0.00
01.02.02.08.02 SUM. E INST. TAPA SANITARIA METALICA DE 0.4 und 1.00 S/. 167.12 S/. 167.12 0.00 0.00 0.00 0.00
01.02.02.08.03 CERCO PERIMETRICO CON MALLA OLIMPICA m 13.50 S/. 114.82 S/. 1,550.07 0.00 0.00 0.00 0.00
01.02.02.08.04 PUERTA EN CERCO PERIMETRICO und 1.00 S/. 337.17 S/. 337.17 0.00 0.00 0.00 0.00
01.02.03 CAPTACION DE LADERA 3 S/. 5,396.36
01.02.03.01 TRABAJOS PRELIMINARES S/. 44.04
01.02.03.01.01 LIMPIEZA Y DEFORESTACION m2 15.84 S/. 1.76 S/. 27.88 0.00 0.00 0.00 15.84 27.88
01.02.03.01.02 TRAZO, NIVELES Y REPLANTEO m2 15.84 S/. 1.02 S/. 16.16 0.00 0.00 0.00 15.84 16.16
01.02.03.02 MOVIMIENTO DE TIERRAS S/. 233.22
01.02.03.02.01 EXCAVACION MANUAL DE TERRENO m3 3.96 S/. 30.57 S/. 121.06 0.00 0.00 3.96 121.06
01.02.03.02.02 REFINE Y NIVELACION DE TERRENO m2 2.00 S/. 3.06 S/. 6.12 0.00 0.00 0.00 0.00
01.02.03.02.03 RELLENO Y COMPACTACION CON MATERIAL PROP m3 0.16 S/. 17.50 S/. 2.80 0.00 0.00 0.00 0.00
01.02.03.02.04 MEJORAMIENTO DE BASE CON AFIRMADO E=0.10m m3 0.40 S/. 76.15 S/. 30.46 0.00 0.00 0.00 0.00
01.02.03.02.05 ELIMINACION DE MATERIAL EXCEDENTE (CARGU m3 4.76 S/. 15.29 S/. 72.78 0.00 0.00 4.76 72.78
01.02.03.03 MATERIAL GRANULAR PARA FILTRO S/. 139.83
01.02.03.03.01 FILTRO III (Arena fina) m3 0.70 S/. 108.21 S/. 75.75 0.00 0.00 0.00 0.00
01.02.03.03.02 FILTRO DE GRAVA FINA m3 0.36 S/. 107.86 S/. 38.83 0.00 0.00 0.00 0.00
01.02.03.03.03 FILTRO I (Grava gruesa de 3/4" - 3") m3 0.22 S/. 114.77 S/. 25.25 0.00 0.00 0.00 0.00
01.02.03.04 OBRAS DE CONCRETO SIMPLE S/. 486.97
01.02.03.04.01 CONCRETO f'c=175 kg/cm2 m3 0.18 S/. 319.67 S/. 57.54 0.00 0.00 0.00 0.00
01.02.03.04.02 CONCRETO f'c=100 kg/cm2 m3 0.40 S/. 197.85 S/. 79.14 0.00 0.00 0.00 0.00
01.02.03.04.03 VEREDA DE PIEDRA (D=4") MEZCLA C:H=1:8 m2 3.51 S/. 51.08 S/. 179.29 0.00 0.00 0.00 0.00
01.02.03.04.04 DADOS DE CONCRETO f'c=140 kg/cm2 m3 0.29 S/. 289.83 S/. 84.05 0.00 0.00 0.00 0.00
01.02.03.04.05 MEJORAMIENTO CON SOLADO F'C=140 KG/CM2 E=0m3 0.30 S/. 289.83 S/. 86.95 0.00 0.00 0.00 0.00
01.02.03.05 OBRAS DE CONCRETO ARMADO S/. 1,570.80
01.02.03.05.01 CONCRETO f'c=175 kg/cm2 CON ADITIVO IMPERME m3 1.05 S/. 348.86 S/. 366.30 0.00 0.00 0.00 0.00
01.02.03.05.02 ENCOFRADO Y DESENCOFRADO DE LOSA DE TEC m2 7.51 S/. 40.71 S/. 305.73 0.00 0.00 0.00 0.00
01.02.03.05.03 ENCOFRADO Y DESENCOFRADO DE MUROS m2 12.97 S/. 40.71 S/. 528.01 0.00 0.00 0.00 0.00
01.02.03.05.04 ACERO DE REFUERZO FY=4200 KG/CM2 kg 91.32 S/. 4.06 S/. 370.76 0.00 0.00 0.00 0.00
01.02.03.06 REVOQUES Y ENLUCIDOS S/. 307.93
01.02.03.06.01 TARRAJEO EN EXTERIORES (MORTERO C:A=1:5), E m2 7.24 S/. 14.71 S/. 106.50 0.00 0.00 0.00 0.00
01.02.03.06.02 TARRAJEO EN INTERIORES CON IMPERMEABILIZANm2 6.14 S/. 22.72 S/. 139.50 0.00 0.00 0.00 0.00
01.02.03.06.03 MORTERO 1:5 EN PENDIENTE DE FONDO m2 0.61 S/. 19.51 S/. 11.90 0.00 0.00 0.00 0.00
01.02.03.06.04 PINTURA LATEX EN EXTERIORES (DOS MANOS) m2 7.24 S/. 6.91 S/. 50.03 0.00 0.00 0.00 0.00
01.02.03.07 VÁLVULAS Y ACCESORIOS S/. 221.11
01.02.03.07.01 VALVULA COMPUERTA DE BRONCE DE 3/4" + ACC und 1.00 S/. 221.11 S/. 221.11 0.00 0.00 0.00 0.00
01.02.03.08 VARIOS S/. 2,392.46
01.02.03.08.01 SUM. E INST. TAPA SANITARIA METALICA DE 0.6 und 2.00 S/. 169.05 S/. 338.10 0.00 0.00 0.00 0.00
01.02.03.08.02 SUM. E INST. TAPA SANITARIA METALICA DE 0.4 und 1.00 S/. 167.12 S/. 167.12 0.00 0.00 0.00 0.00
01.02.03.08.03 CERCO PERIMETRICO CON MALLA OLIMPICA m 13.50 S/. 114.82 S/. 1,550.07 0.00 0.00 0.00 0.00
01.02.03.08.04 PUERTA EN CERCO PERIMETRICO und 1.00 S/. 337.17 S/. 337.17 0.00 0.00 0.00 0.00
01.03 LINEAS DE CONDUCCION S/. 59,539.04
01.03.01 LINEA DE CONDUCCION 3/4" S/. 5,578.34
01.03.01.01 OBRAS PRELIMINARES S/. 100.42
01.03.01.01.01 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS m 156.90 S/. 0.64 S/. 100.42 0.00 0.00 0.00 156.90 100.42
01.03.01.02 MOVIMIENTO DE TIERRAS S/. 4,293.23
01.03.01.02.01 EXCAVACION MANUAL DE ZANJAS, A=0.60m x H m 159.90 S/. 11.65 S/. 1,862.84 0.00 0.00 0.00 0.00
01.03.01.02.02 REFINE Y NIVELACION DE ZANJAS m 156.90 S/. 2.44 S/. 382.84 0.00 0.00 0.00 0.00
01.03.01.02.03 CAMA DE APOYO E=0.10m, A=0.60m PARA TUBERIA m 156.90 S/. 2.60 S/. 407.94 0.00 0.00 0.00 0.00
01.03.01.02.04 RELLENO CON MATERIAL PROPIO ZARANDEADO E m 156.90 S/. 5.35 S/. 839.42 0.00 0.00 0.00 0.00
01.03.01.02.05 RELLENO Y COMPACTACION DE ZANJAS MANUAL Em 156.90 S/. 5.10 S/. 800.19 0.00 0.00 0.00 0.00
01.03.01.03 SUMINISTRO E INSTALACION DE TUBERIAS S/. 1,170.47
01.03.01.03.01 SUMINISTRO Y COLOCACION DE TUBERIA PVC SAP m 156.90 S/. 6.17 S/. 968.07 0.00 0.00 0.00 0.00
01.03.01.03.02 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERI m 156.90 S/. 1.29 S/. 202.40 0.00 0.00 0.00 0.00
01.03.01.04 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 14.22
01.03.01.04.01 SUMINISTRO Y COLOCACION DE CODO 3/4" x 45° und 3.00 S/. 4.74 S/. 14.22 0.00 0.00 0.00 0.00
01.03.02 LINEA DE CONDUCCION 1" S/. 15,848.99
01.03.02.01 OBRAS PRELIMINARES S/. 243.51
01.03.02.01.01 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS m 380.49 S/. 0.64 S/. 243.51 0.00 0.00 0.00 380.49 243.51
01.03.02.02 MOVIMIENTO DE TIERRAS S/. 10,326.50
01.03.02.02.01 EXCAVACION MANUAL DE ZANJAS, A=0.60m x H m 380.49 S/. 11.65 S/. 4,432.71 0.00 0.00 0.00 0.00
01.03.02.02.02 REFINE Y NIVELACION DE ZANJAS m 380.49 S/. 2.44 S/. 928.40 0.00 0.00 0.00 0.00
01.03.02.02.03 CAMA DE APOYO E=0.10m, A=0.60m PARA TUBERIA m 380.49 S/. 2.60 S/. 989.27 0.00 0.00 0.00 0.00
01.03.02.02.04 RELLENO CON MATERIAL PROPIO ZARANDEADO E m 380.49 S/. 5.35 S/. 2,035.62 0.00 0.00 0.00 0.00
01.03.02.02.05 RELLENO Y COMPACTACION DE ZANJAS MANUAL Em 380.49 S/. 5.10 S/. 1,940.50 0.00 0.00 0.00 0.00
01.03.02.03 SUMINISTRO E INSTALACION DE TUBERIAS S/. 5,254.56
01.03.02.03.01 SUMINISTRO Y COLOCACION DE TUBERIA PVC SAP m 380.49 S/. 12.52 S/. 4,763.73 0.00 0.00 0.00 0.00
01.03.02.03.02 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERI m 380.49 S/. 1.29 S/. 490.83 0.00 0.00 0.00 0.00
01.03.02.04 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 24.42
01.03.02.04.01 SUMINISTRO Y COLOCACION DE CODO 1" x 45° und 11.00 S/. 2.22 S/. 24.42 0.00 0.00 0.00 0.00
01.03.03 LINEA DE CONDUCCION 1 1/2" S/. 24,720.34
CALENDA
RIO DE
AVANCE
PROYECTO: "MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA COMUNIDAD DE COLPAMATARA, DISTRITO DE CHOTA, PROVINCIA DE CHOTA - CAJAMARCA"
DE OBRA
VALORIZ
ADO VALORIZACIÓN AL 31 DE MAYO
01.03.03.01 PRESUPUESTO
OBRAS PRELIMINARES SEGÚN CONTRATO S/. 444.06
01.03.03.01.01 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS m 693.84 S/. 0.64 S/. 444.06 0.00 0.00 0.00 693.84 444.06
01.03.03.02 MOVIMIENTO DE TIERRAS S/. 18,830.81
01.03.03.02.01 EXCAVACION MANUAL DE ZANJAS, A=0.60m x H m 693.84 S/. 11.65 S/. 8,083.24 0.00 0.00 0.00 0.00
01.03.03.02.02 REFINE Y NIVELACION DE ZANJAS m 693.84 S/. 2.44 S/. 1,692.97 0.00 0.00 0.00 0.00
01.03.03.02.03 CAMA DE APOYO E=0.10m, A=0.60m PARA TUBERIA m 693.84 S/. 2.60 S/. 1,803.98 0.00 0.00 0.00 0.00
01.03.03.02.04 RELLENO CON MATERIAL PROPIO ZARANDEADO E m 693.84 S/. 5.35 S/. 3,712.04 0.00 0.00 0.00 0.00
01.03.03.02.05 RELLENO Y COMPACTACION DE ZANJAS MANUAL Em 693.84 S/. 5.10 S/. 3,538.58 0.00 0.00 0.00 0.00
01.03.03.03 SUMINISTRO E INSTALACION DE TUBERIAS S/. 5,384.19
01.03.03.03.01 SUMINISTRO Y COLOCACION DE TUBERIA PVC SAP m
C 693.84 S/. 6.47 S/. 4,489.14 0.00 0.00 0.00 0.00
01.03.03.03.02 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERI m 693.84 S/. 1.29 S/. 895.05 0.00 0.00 0.00 0.00
01.03.03.04 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 61.28
01.03.03.04.01 SUMINISTRO Y COLOCACION DE CODO 1 1/2" x 45° und 16.00 S/. 3.83 S/. 61.28 0.00 0.00 0.00 0.00
01.03.04 CAMARAS DE REUNION S/. 3,715.37
01.03.04.01 TRABAJOS PRELIMINARES S/. 12.70
01.03.04.01.01 LIMPIEZA DEL TERRENO MANUAL m2 5.00 S/. 1.52 S/. 7.60 0.00 0.00 0.00 5.00 7.60
01.03.04.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 5.00 S/. 1.02 S/. 5.10 0.00 0.00 0.00 5.00 5.10
01.03.04.02 MOVIMIENTO DE TIERRAS S/. 107.14
01.03.04.02.01 EXCAVACION MANUAL DE TERRENO m3 2.50 S/. 30.57 S/. 76.43 0.00 0.00 0.00 0.00
01.03.04.02.02 REFINE Y NIVELACION INTERIOR DE TERRENO m2 5.00 S/. 2.32 S/. 11.60 0.00 0.00 0.00 0.00
01.03.04.02.03 ELIMINACION DE MATERIAL EXCEDENTE (CARGU m3 1.25 S/. 15.29 S/. 19.11 0.00 0.00 0.00 0.00
01.03.04.03 OBRAS DE CONCRETO SIMPLE S/. 41.19
01.03.04.03.01 CONCRETO f'c=140 kg/cm2 m3 0.05 S/. 293.80 S/. 14.69 0.00 0.00 0.00 0.00
01.03.04.03.02 EMPEDRADO D=4" ASENTADO MEZCLA C:H=1:8 m2 1.00 S/. 26.50 S/. 26.50 0.00 0.00 0.00 0.00
01.03.04.04 OBRAS DE CONCRETO ARMADO S/. 1,379.14
01.03.04.04.01 CONCRETO f'c=175 kg/cm2 m3 1.17 S/. 370.44 S/. 433.41 0.00 0.00 0.00 0.00
01.03.04.04.02 ACERO DE REFUERZO FY=4200 KG/CM2 kg 99.76 S/. 4.06 S/. 405.03 0.00 0.00 0.00 0.00
01.03.04.04.03 ENCOFRADO Y DESENCOFRADO m2 15.15 S/. 35.69 S/. 540.70 0.00 0.00 0.00 0.00
01.03.04.05 REVOQUES Y ENLUCIDOS S/. 416.22
01.03.04.05.01 TARRAJEO EN EXTERIORES (MORTERO C:A=1:5), E m2 9.39 S/. 14.71 S/. 138.13 0.00 0.00 0.00 0.00
01.03.04.05.02 TARRAJEO INTERIOR CON IMPERMEABILIZANTE (M m2 6.96 S/. 26.50 S/. 184.44 0.00 0.00 0.00 0.00
01.03.04.05.03 MORTERO 1:5 EN PENDIENTE DE FONDO m2 4.80 S/. 19.51 S/. 93.65 0.00 0.00 0.00 0.00
01.03.04.06 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS S/. 178.58
01.03.04.06.01 ACCESORIOS DE ENTRADA 3/4" und 1.00 S/. 17.58 S/. 17.58 0.00 0.00 0.00 0.00
01.03.04.06.02 ACCESORIOS DE ENTRADA 1" und 2.00 S/. 9.39 S/. 18.78 0.00 0.00 0.00 0.00
01.03.04.06.03 ACCESORIOS DE SALIDA 1 1/2" und 3.00 S/. 8.54 S/. 25.63 0.00 0.00 0.00 0.00
01.03.04.06.04 ACCESORIOS DE SALIDA 1" und 4.00 S/. 5.18 S/. 20.71 0.00 0.00 0.00 0.00
01.03.04.06.05 ACCESORIOS DE REBOSE Y LIMPIEZA 2" und 5.00 S/. 12.92 S/. 64.62 0.00 0.00 0.00 0.00
01.03.04.06.06 ACCESORIOS PARA VENTILACION 1" und 6.00 S/. 5.21 S/. 31.26 0.00 0.00 0.00 0.00
01.03.04.07 VARIOS S/. 1,580.40
01.03.04.07.01 PINTURA LATEX EN EXTERIORES (DOS MANOS) m2 9.39 S/. 6.91 S/. 64.88 0.00 0.00 0.00 0.00
01.03.04.07.02 TAPA SANITARIA METALICA DE 0.60x0.60x1/8" und 10.39 S/. 145.86 S/. 1,515.52 0.00 0.00 0.00 0.00
01.03.05 CAMARA ROMPE PRESION TIPO 6 (01 UNID) S/. 1,247.25
01.03.05.01 TRABAJOS PRELIMINARES S/. 3.56
01.03.05.01.01 LIMPIEZA DEL TERRENO MANUAL m2 1.40 S/. 1.52 S/. 2.13 0.00 0.00 0.00 1.40 2.13
01.03.05.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 1.40 S/. 1.02 S/. 1.43 0.00 0.00 0.00 1.40 1.43
01.03.05.02 MOVIMIENTO DE TIERRAS S/. 36.86
01.03.05.02.01 EXCAVACION MANUAL DE TERRENO m3 0.63 S/. 30.57 S/. 19.26 0.00 0.00 0.00 0.00
01.03.05.02.02 REFINE Y NIVELACION INTERIOR DE TERRENO m2 1.40 S/. 2.32 S/. 3.25 0.00 0.00 0.00 0.00
01.03.05.02.03 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 0.13 S/. 17.46 S/. 2.27 0.00 0.00 0.00 0.00
01.03.05.02.04 ELIMINACION DE MATERIAL EXCEDENTE (CARGU m3 0.79 S/. 15.29 S/. 12.08 0.00 0.00 0.00 0.00
01.03.05.03 OBRAS DE CONCRETO SIMPLE S/. 26.77
01.03.05.03.01 CONCRETO f'c=140 kg/cm2 m3 0.01 S/. 294.00 S/. 2.94 0.00 0.00 0.00 0.00
01.03.05.03.02 ENCOFRADO Y DESENCOFRADO m2 0.26 S/. 40.69 S/. 10.58 0.00 0.00 0.00 0.00
01.03.05.03.03 EMPEDRADO D=4" ASENTADO MEZCLA C:H=1:8 m2 0.50 S/. 26.50 S/. 13.25 0.00 0.00 0.00 0.00
01.03.05.04 OBRAS DE CONCRETO ARMADO S/. 690.00
01.03.05.04.01 CONCRETO f'c=175 kg/cm2 m3 0.59 S/. 370.44 S/. 218.56 0.00 0.00 0.00 0.00
01.03.05.04.02 ENCOFRADO Y DESENCOFRADO m2 9.85 S/. 35.69 S/. 351.55 0.00 0.00 0.00 0.00
01.03.05.04.03 ACERO DE REFUERZO FY=4200 KG/CM2 kg 29.53 S/. 4.06 S/. 119.89 0.00 0.00 0.00 0.00
01.03.05.05 REVOQUES Y ENLUCIDOS S/. 191.11
01.03.05.05.01 TARRAJEO EN EXTERIORES (MORTERO C:A=1:5), E m2 4.28 S/. 14.71 S/. 62.96 0.00 0.00 0.00 0.00
01.03.05.05.02 TARRAJEO INTERIOR CON IMPERMEABILIZANTE (M m2 3.72 S/. 26.50 S/. 98.58 0.00 0.00 0.00 0.00
01.03.05.05.03 PINTURA LATEX EN EXTERIORES (DOS MANOS) m2 4.28 S/. 6.91 S/. 29.57 0.00 0.00 0.00 0.00
01.03.05.06 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS S/. 109.51
01.03.05.06.01 SUMINISTRO E INSTALACION DE ACCESORIOS DE und 1.00 S/. 109.51 S/. 109.51 0.00 0.00 0.00 0.00
01.03.05.07 VARIOS S/. 189.44
01.03.05.07.01 TAPA SANITARIA METALICA DE 0.60x0.60x1/8" und 1.00 S/. 189.44 S/. 189.44 0.00 0.00 0.00 0.00
01.03.06 SEDIMENTADOR, FILTRO, CAMARA HUMEDA Y CAJA DE VALVULAS S/. 8,428.75
01.03.06.01 TRABAJOS PRELIMINARES S/. 33.96
01.03.06.01.01 LIMPIEZA DEL TERRENO MANUAL Y DESBROCE m2 13.37 S/. 1.52 S/. 20.32 0.00 0.00 0.00 13.37 20.32
01.03.06.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 13.37 S/. 1.02 S/. 13.64 0.00 0.00 0.00 13.37 13.64
01.03.06.02 MOVIMIENTO DE TIERRAS S/. 285.89
01.03.06.02.01 EXCAVACION MANUAL DE TERRENO NORMAL m3 5.77 S/. 30.57 S/. 176.39 0.00 0.00 0.00 0.00
01.03.06.02.02 RELLENO Y COMPACTACION CON MATERIAL PROP m3 0.50 S/. 17.48 S/. 8.74 0.00 0.00 0.00 0.00
01.03.06.02.03 ELIMINACION DE MATERIAL EXCEDENTE (CARGU m3 6.59 S/. 15.29 S/. 100.76 0.00 0.00 0.00 0.00
CALENDA
RIO DE
AVANCE
PROYECTO: "MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA COMUNIDAD DE COLPAMATARA, DISTRITO DE CHOTA, PROVINCIA DE CHOTA - CAJAMARCA"
DE OBRA
VALORIZ
ADO VALORIZACIÓN AL 31 DE MAYO
01.03.06.03 PRESUPUESTO
OBRAS DE CONCRETO SIMPLE SEGÚN CONTRATO S/. 269.72
01.03.06.03.01 CONCRETO PARA VERTEDERO f'c=175 kg/cm2 m3 0.24 S/. 291.21 S/. 69.89 0.00 0.00 0.00 0.00
01.03.06.03.02 EMPEDRADO D=4" ASENTADO MEZCLA C:H=1:8 m2 6.14 S/. 26.50 S/. 162.71 0.00 0.00 0.00 0.00
01.03.06.03.03 DADOS DE CONCRETO f'c=140 kg/cm2 m3 0.01 S/. 65.00 S/. 0.65 0.00 0.00 0.00 0.00
01.03.06.03.04 ENCOFRADO Y DESENCOFRADO DE VERTEDERO m2 1.48 S/. 24.64 S/. 36.47 0.00 0.00 0.00 0.00
01.03.06.04 OBRAS DE CONCRETO ARMADO S/. 3,277.04
01.03.06.04.01 CONCRETO EN ZAPATAS f'c=210 kg/cm2 m3 1.64 S/. 409.08 S/. 670.89 0.00 0.00 0.00 0.00
01.03.06.04.02 CONCRETO f'c= 210 kg/cm2 para Losa Superior m3 0.40 S/. 390.20 S/. 156.08 0.00 0.00 0.00 0.00
01.03.06.04.03 CONCRETO EN MUROS f'c=210 kg/cm2 m3 1.41 S/. 390.21 S/. 550.20 0.00 0.00 0.00 0.00
01.03.06.04.04 CONCRETO LOSA DE FONDO Y CIMENTACION f'c= 2m3 0.25 S/. 471.36 S/. 117.84 0.00 0.00 0.00 0.00
01.03.06.04.05 ENCOFRADO Y DESENCOFRADO DE LOSA DE TEC m2 4.70 S/. 45.07 S/. 211.83 0.00 0.00 0.00 0.00
01.03.06.04.06 ENCOFRADO Y DESENCOFRADO EN MUROS m2 23.39 S/. 46.51 S/. 1,087.87 0.00 0.00 0.00 0.00
01.03.06.04.07 ACERO DE REFUERZO FY=4200 KG/CM2 kg 118.80 S/. 4.06 S/. 482.33 0.00 0.00 0.00 0.00
01.03.06.05 REVOQUES, ENLUCIDOS Y MOLDURAS S/. 861.75
01.03.06.05.01 TARRAJEO EN SEDIMENTADOR m2 5.10 S/. 18.49 S/. 94.30 0.00 0.00 0.00 0.00
01.03.06.05.02 TARRAJEO EXTERIOR C:A 1:5 E=1.5cm m2 19.40 S/. 14.71 S/. 285.37 0.00 0.00 0.00 0.00
01.03.06.05.03 TARRAJEO INTERIOR CON IMPERMEABILIZANTE C:Am2 11.55 S/. 26.50 S/. 306.08 0.00 0.00 0.00 0.00
01.03.06.05.04 TARRAJEO EN PENDIENTE DE FONDO MORTERO 1: m2 2.15 S/. 19.51 S/. 41.95 0.00 0.00 0.00 0.00
01.03.06.05.05 PINTURA LATEX EN EXTERIORES (DOS MANOS) m2 19.40 S/. 6.91 S/. 134.05 0.00 0.00 0.00 0.00
01.03.06.06 MATERIAL PARA FILTROS S/. 97.32
01.03.06.06.01 FILTRO DE ANTRACITA m3 0.30 S/. 216.37 S/. 64.91 0.00 0.00 0.00 0.00
01.03.06.06.02 FILTRO DE GRAVA FINA m3 0.15 S/. 107.87 S/. 16.18 0.00 0.00 0.00 0.00
01.03.06.06.03 FILTRO DE ARENA FINA m3 0.15 S/. 108.20 S/. 16.23 0.00 0.00 0.00 0.00
01.03.06.07 VALVULAS Y ACCESORIOS S/. 185.49
01.03.06.07.01 VALVULA COMPUERTA DE BRONCE DE 1" + ACCES und 1.00 S/. 137.65 S/. 137.65 0.00 0.00 0.00 0.00
01.03.06.07.02 ACCESORIOS PARA CAMARA DE FILTROS und 16.00 S/. 2.99 S/. 47.84 0.00 0.00 0.00 0.00
01.03.06.08 TAPAS METÁLICAS S/. 748.42
01.03.06.08.01 SUM. E INST. TAPA SANITARIA METALICA DE 0.60x und 1.00 S/. 167.02 S/. 167.02 0.00 0.00 0.00 0.00
01.03.06.08.02 SUM. E INST. TAPA SANITARIA METALICA DE 0.60x0.und 1.00 S/. 169.05 S/. 169.05 0.00 0.00 0.00 0.00
01.03.06.08.03 SUM. E INST. TAPA SANITARIA METALICA DE 0.40x0.und 1.00 S/. 146.73 S/. 146.73 0.00 0.00 0.00 0.00
01.03.06.08.04 COMPUERTA DE FIERRO CON VOLANTE DE 0.25x0. und 1.00 S/. 265.62 S/. 265.62 0.00 0.00 0.00 0.00
01.03.06.09 CERCO PERIMETRICO S/. 2,669.16
01.03.06.09.01 CERCO PERIMETRICO CON MALLA OLIMPICA m 20.31 S/. 114.82 S/. 2,331.99 0.00 0.00 0.00 0.00
01.03.06.09.02 PUERTA EN CERCO PERIMETRICO und 1.00 S/. 337.17 S/. 337.17 0.00 0.00 0.00 0.00
01.04 RESERVORIOS S/. 30,859.21
01.04.01 RESERVORIO 21M3 S/. 28,062.29
01.04.01.01 TRABAJOS PRELIMINARES S/. 101.60
01.04.01.01.01 LIMPIEZA DEL TERRENO MANUAL Y DESBROCE m2 40.00 S/. 1.52 S/. 60.80 0.00 0.00 0.00 40.00 60.80
01.04.01.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 40.00 S/. 1.02 S/. 40.80 0.00 0.00 0.00 40.00 40.80
01.04.01.02 ESTRUCTURAS S/. 19,809.89
01.04.01.02.01 MOVIMIENTO DE TIERRAS S/. 3,379.30
01.04.01.02.01.01 EXCAVACION MANUAL DE TERRENO NORMAL m3 52.18 S/. 30.57 S/. 1,595.14 0.00 0.00 0.00 52.18 1,595.14
01.04.01.02.01.02 RELLENO Y COMPACTACION CON MATERIAL PROm3 3.14 S/. 17.47 S/. 54.86 0.00 0.00 0.00 0.00
01.04.01.02.01.03 RELLENO CON MATERIAL DE PRESTAMO (AFIRM m3 3.66 S/. 86.57 S/. 316.85 0.00 0.00 0.00 0.00
01.04.01.02.01.04 RELLENO CON MATERIAL DE PRESTAMO (GRAVA m3 3.32 S/. 86.57 S/. 287.41 0.00 0.00 0.00 0.00
01.04.01.02.01.05 NIVELACION INTERIOR Y APISONADO m2 36.60 S/. 5.13 S/. 187.76 0.00 0.00 0.00 36.60 187.76
01.04.01.02.01.06 ELIMINACION DE MATERIAL EXCEDENTE (CAR m3 61.30 S/. 15.29 S/. 937.28 0.00 0.00 0.00 61.30 937.28
01.04.01.02.02 OBRAS DE CONCRETO SIMPLE S/. 3,461.06
01.04.01.02.02.01 FALSA ZAPATA S/. 992.94
01.04.01.02.02.01 CONCRETO EN FALSA ZAPATA f'c=140 kg/cm2 m2 16.62 S/. 56.63 S/. 941.19 0.00 0.00 0.00 0.00
01.04.01.02.02.01 ENCOFRADO Y DESENCOFRADO EN FALSA ZA m2 1.45 S/. 35.69 S/. 51.75 0.00 0.00 0.00 0.00
01.04.01.02.02.02 DADOS PARA POSTES S/. 898.74
01.04.01.02.02.02 CONCRETO EN DADOS PARA POSTES f'c=140 kg m3 0.94 S/. 314.28 S/. 295.42 0.00 0.00 0.00 0.00
01.04.01.02.02.02 ENCOFRADO Y DESENCOFRADO m2 14.82 S/. 40.71 S/. 603.32 0.00 0.00 0.00 0.00
01.04.01.02.02.03 VEREDAS S/. 518.83
01.04.01.02.02.03 CONCRETO EN VEREDA f'c=140 kg/cm2 m3 0.87 S/. 286.61 S/. 249.35 0.00 0.00 0.00 0.00
01.04.01.02.02.03 ENCOFRADO Y DESENCOFRADO EN VEREDAS m2 3.50 S/. 37.13 S/. 129.96 0.00 0.00 0.00 0.00
01.04.01.02.02.03 BRUÑADO EN VEREDAS m 31.32 S/. 1.66 S/. 51.99 0.00 0.00 0.00 0.00
01.04.01.02.02.03 JUNTAS DE TECNOPOR DE 1" m2 1.30 S/. 7.28 S/. 9.46 0.00 0.00 0.00 0.00
01.04.01.02.02.03 SELLADO DE JUNTAS CON MASILLA DE POLIU m 15.90 S/. 4.91 S/. 78.07 0.00 0.00 0.00 0.00
01.04.01.02.02.04 ENROCADO PERIMETRAL S/. 1,050.55
01.04.01.02.02.04 CONCRETO EN CUNETA f'c=140 Kg/cm2+25% P Mm3 2.32 S/. 148.13 S/. 343.66 0.00 0.00 0.00 0.00
01.04.01.02.02.04 ENCOFRADO Y DESENCOFRADO EN CUNETA m2 16.45 S/. 40.71 S/. 669.68 0.00 0.00 0.00 0.00
01.04.01.02.02.04 JUNTAS DE TECNOPOR DE 1" m2 0.66 S/. 7.27 S/. 4.80 0.00 0.00 0.00 0.00
01.04.01.02.02.04 SELLADO DE JUNTAS CON MASILLA DE POLIU m 6.60 S/. 4.91 S/. 32.41 0.00 0.00 0.00 0.00
01.04.01.02.03 OBRAS DE CONCRETO ARMADO S/. 12,437.88
01.04.01.02.03.01 ZAPATA CORRIDA S/. 2,050.56
01.04.01.02.03.01 CONCRETO EN ZAPATA CORRIDA f'c=210 kg/cm2m3 2.87 S/. 390.21 S/. 1,119.90 0.00 0.00 0.00 0.00
01.04.01.02.03.01 ENCOFRADO Y DESENCOFRADO EN ZAPATA C m2 4.34 S/. 40.71 S/. 176.68 0.00 0.00 0.00 0.00
01.04.01.02.03.01 ACERO DE REFUERZO FY=4200 KG/CM2 kg 185.71 S/. 4.06 S/. 753.98 0.00 0.00 0.00 0.00
01.04.01.02.03.02 LOSA DE CIMENTACION S/. 1,757.54
01.04.01.02.03.02 CONCRETO EN LOSA DE CIMENTACION f'c=210 m3 1.46 S/. 378.75 S/. 552.98 0.00 0.00 0.00 0.00
01.04.01.02.03.02 ACERO DE REFUERZO FY=4200 KG/CM2 kg 296.69 S/. 4.06 S/. 1,204.56 0.00 0.00 0.00 0.00
01.04.01.02.03.03 MURO DE CUBA S/. 5,842.63
01.04.01.02.03.03 CONCRETO EN MURO DE CUBA f'c=210 kg/cm2 m3 4.28 S/. 393.30 S/. 1,683.32 0.00 0.00 0.00 0.00
CALENDA
RIO DE
AVANCE
PROYECTO: "MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA COMUNIDAD DE COLPAMATARA, DISTRITO DE CHOTA, PROVINCIA DE CHOTA - CAJAMARCA"
DE OBRA
VALORIZ
ADO VALORIZACIÓN AL 31 DE MAYO
01.04.01.02.03.03 PRESUPUESTO
ENCOFRADO SEGÚN
Y DESENCOFRADO CONTRATO
EN MURO DE m2 57.08 S/. 48.19 S/. 2,750.69 0.00 0.00 0.00 0.00
01.04.01.02.03.03 ACERO DE REFUERZO FY=4200 KG/CM2 kg 346.95 S/. 4.06 S/. 1,408.62 0.00 0.00 0.00 0.00
01.04.01.02.03.04 VIGA ANILLO SUPERIOR S/. 791.26
01.04.01.02.03.04 CONCRETO EN VIGA ANILLO SUPERIOR f'c=210 m3 0.50 S/. 394.28 S/. 197.14 0.00 0.00 0.00 0.00
01.04.01.02.03.04 ENCOFRADO Y DESENCOFRADO EN VIGA ANI m2 5.69 S/. 40.71 S/. 231.64 0.00 0.00 0.00 0.00
01.04.01.02.03.04 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 89.28 S/. 4.06 S/. 362.48 0.00 0.00 0.00 0.00
01.04.01.02.03.05 LOSA DE TECHO S/. 1,995.89
01.04.01.02.03.05 CONCRETO EN LOSA DE TECHO f'c=210 kg/cm2 m3 0.71 S/. 393.30 S/. 279.24 0.00 0.00 0.00 0.00
01.04.01.02.03.05 ENCOFRADO Y DESENCOFRADO DE LOSA DE m2 12.08 S/. 45.07 S/. 544.45 0.00 0.00 0.00 0.00
01.04.01.02.03.05 ACERO DE REFUERZO FY=4200 KG/CM2 kg 288.72 S/. 4.06 S/. 1,172.20 0.00 0.00 0.00 0.00
01.04.01.02.04 ESTRUCTURA METALICA S/. 531.65
01.04.01.02.04.01 ESCALERA METALICA INTERIOR TIPO GATO 1" und 1.00 S/. 223.65 S/. 223.65 0.00 0.00 0.00 0.00
01.04.01.02.04.02 ESCALERA METALICA EXTERIOR TIPO GATO F°G° und 1.00 S/. 138.95 S/. 138.95 0.00 0.00 0.00 0.00
01.04.01.02.04.03 TAPA METALICA PARA CISTERNA DE 0.60x0.60m x und 1.00 S/. 169.05 S/. 169.05 0.00 0.00 0.00 0.00
01.04.01.03 ARQUITECTURA S/. 2,505.67
01.04.01.03.01 REVOQUES, REVESTIMIENTOS Y MOLDURAS S/. 2,166.11
01.04.01.03.01.01 TARRAJEO EXTERIOR C:A 1:5 E=1.5cm m2 59.28 S/. 14.71 S/. 872.01 0.00 0.00 0.00 0.00
01.04.01.03.01.02 TARRAJEO INTERIOR CON IMPERMEABILIZANTE Cm2 38.80 S/. 26.50 S/. 1,028.20 0.00 0.00 0.00 0.00
01.04.01.03.01.03 TARRAJEO EN PENDIENTE DE FONDO MORTERO m2 11.34 S/. 19.51 S/. 221.24 0.00 0.00 0.00 0.00
01.04.01.03.01.04 OCHAVO SANITARIO MORTERO 1:5 m 11.94 S/. 3.74 S/. 44.66 0.00 0.00 0.00 0.00
01.04.01.03.02 PINTURA S/. 339.56
01.04.01.03.02.01 PINTURA LATEX EN EXTERIORES (DOS MANOS) m2 49.14 S/. 6.91 S/. 339.56 0.00 0.00 0.00 0.00
01.04.01.04 VARIOS S/. 5,645.13
01.04.01.04.01 SUM. E INST. DE SISTEMA DE CLORACION POR GOTund 1.00 S/. 1,268.54 S/. 1,268.54 0.00 0.00 0.00 0.00
01.04.01.04.02 VÁLVULA DE BRONCE 3" + ACCESORIOS DE LIMPI und 1.00 S/. 390.36 S/. 390.36 0.00 0.00 0.00 0.00
01.04.01.04.03 JUNTA WATER STOP NEOPRENE 6" m 12.41 S/. 19.76 S/. 245.22 0.00 0.00 0.00 0.00
01.04.01.04.04 JUNTA EPOXICA PARA UNION DE CONCRETO m2 1.86 S/. 45.16 S/. 84.00 0.00 0.00 0.00 0.00
01.04.01.04.05 SUM. E INST. DE ACCESORIOS DE VENTILACION und 1.00 S/. 46.61 S/. 46.61 0.00 0.00 0.00 0.00
01.04.01.04.06 CERCO PERIMETRICO CON MALLA OLIMPICA m 26.00 S/. 114.82 S/. 2,985.32 0.00 0.00 0.00 0.00
01.04.01.04.07 PUERTA EN CERCO PERIMETRICO und 1.00 S/. 337.17 S/. 337.17 0.00 0.00 0.00 0.00
01.04.01.04.08 PRUEBA HIDRAULICA DE ESTANQUEIDAD EN RES glb 1.00 S/. 287.91 S/. 287.91 0.00 0.00 0.00 0.00
01.04.02 CASETA DE VALVULAS S/. 2,796.92
01.04.02.01 ESTRUCTURAS S/. 1,593.70
01.04.02.01.01 MOVIMIENTO DE TIERRAS S/. 143.47
01.04.02.01.01.01 EXCAVACION MANUAL DE TERRENO NORMAL m3 2.88 S/. 30.57 S/. 88.04 0.00 0.00 0.00 2.88 88.04
01.04.02.01.01.02 RELLENO Y COMPACTACION CON MATERIAL PROm3 0.34 S/. 17.47 S/. 5.94 0.00 0.00 0.00 0.00
01.04.02.01.01.03 RELLENO CON GRAVA PARA FILTRO, TMAX 1/2" m3 0.01 S/. 102.00 S/. 1.02 0.00 0.00 0.00 0.00
01.04.02.01.01.04 ELIMINACION DE MATERIAL EXCEDENTE (CAR m3 3.17 S/. 15.29 S/. 48.47 0.00 0.00 0.00 3.17 48.47
01.04.02.01.02 OBRAS DE CONCRETO ARMADO S/. 1,450.23
01.04.02.01.02.01 CONCRETO f'c=175 kg/cm2 m3 1.28 S/. 379.24 S/. 485.43 0.00 0.00 0.00 0.00
01.04.02.01.02.02 ENCOFRADO Y DESENCOFRADO m2 15.64 S/. 35.69 S/. 558.19 0.00 0.00 0.00 0.00
01.04.02.01.02.03 ACERO DE REFUERZO FY=4200 KG/CM2 kg 100.15 S/. 4.06 S/. 406.61 0.00 0.00 0.00 0.00
01.04.02.02 ARQUITECTURA S/. 392.10
01.04.02.02.01 REVOQUES, ENLUCIDOS Y MOLDURAS S/. 392.10
01.04.02.02.01.01 TARRAJEO EN CARAS INTERIORES Y EXTERIORESm2 18.25 S/. 18.49 S/. 337.44 0.00 0.00 0.00 0.00
01.04.02.02.01.02 PINTURA LATEX EN EXTERIORES (DOS MANOS) m2 7.91 S/. 6.91 S/. 54.66 0.00 0.00 0.00 0.00
01.04.02.03 INSTALACIONES HIDRAULICAS S/. 642.07
01.04.02.03.01 VALVULAS Y ACCESORIOS S/. 642.07
01.04.02.03.01.01 VALVULA COMPUERTA DE BRONCE DE 3" + AC und 1.00 S/. 247.81 S/. 247.81 0.00 0.00 0.00 0.00
01.04.02.03.01.02 VALVULA COMPUERTA DE BRONCE DE 3" + ACC und 1.00 S/. 245.26 S/. 245.26 0.00 0.00 0.00 0.00
01.04.02.03.01.03 VALVULA COMPUERTA DE BRONCE DE 3" + AC und 1.00 S/. 149.00 S/. 149.00 0.00 0.00 0.00 0.00
01.04.02.04 VARIOS S/. 169.05
01.04.02.04.01 SUM. E INST. TAPA SANITARIA METALICA DE 0.60x0.und 1.00 S/. 169.05 S/. 169.05 0.00 0.00 0.00 0.00
01.05 RED DE DISTRIBUCION GENERAL S/. 424,344.63
01.05.01 TRABAJOS PRELIMINARES S/. 31,954.80
01.05.01.01 LIMPIEZA DEL TERRENO MANUAL y DEFORESTACIONm 17,180.00 S/. 1.02 S/. 17,523.60 0.00 0.00 0.00 17,180.00 17,523.60
01.05.01.02 TRAZO Y REPLANTEO PRELIMINAR (TUBERÍA ENTER m 17,180.00 S/. 0.84 S/. 14,431.20 0.00 0.00 0.00 17,180.00 14,431.20
01.05.02 MOVIMIENTO DE TIERRAS S/. 284,844.40
01.05.02.01 EXCAVACION MANUAL DE ZANJAS, A=0.40m x H=0 m 17,180.00 S/. 5.96 S/. 102,392.80 0.00 0.00 0.00 4,000.00 23,840.00
01.05.02.02 CAMA DE APOYO E=0.10m, A=0.40m PARA TUBERIA m 17,180.00 S/. 2.60 S/. 44,668.00 0.00 0.00 0.00 0.00
01.05.02.03 RELLENO CON MATERIAL PROPIO ZARANDEADO E=0m 17,180.00 S/. 3.94 S/. 67,689.20 0.00 0.00 0.00 0.00
01.05.02.04 RELLENO Y COMPACTACION DE ZANJAS MANUAL E=0m 17,180.00 S/. 4.08 S/. 70,094.40 0.00 0.00 0.00 0.00
01.05.03 TUBERIAS Y PRUEBA HIDRAULICA S/. 65,873.95
01.05.03.01 SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 7.5, DIA m 1,278.00 S/. 5.32 S/. 6,798.96 0.00 0.00 0.00 0.00
01.05.03.02 SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 10, DIA=m 2,638.00 S/. 2.81 S/. 7,412.78 0.00 0.00 0.00 0.00
01.05.03.03 SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 10, DIA=m 1,694.00 S/. 8.72 S/. 14,771.68 0.00 0.00 0.00 0.00
01.05.03.04 SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 10, DIA=m 3,693.00 S/. 2.51 S/. 9,269.43 0.00 0.00 0.00 0.00
01.05.03.05 SUM. Y COLOC. DE TUBERIA PVC SAP CLASE 10, DIA=m 7,877.00 S/. 1.50 S/. 11,815.50 0.00 0.00 0.00 0.00
01.05.03.06 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA m 17,180.00 S/. 0.92 S/. 15,805.60 0.00 0.00 0.00 0.00
01.05.04 SUMINISTRO Y COLOCACION DE ACCESORIOS S/. 1,514.83
01.05.04.01 SUMINISTRO Y COLOCACION DE TEE PVC SAP DE 2" und 12.00 S/. 7.59 S/. 91.08 0.00 0.00 0.00 0.00
01.05.04.02 SUMINISTRO Y COLOCACION DE TEE PVC SAP DE 1 1/und 40.00 S/. 6.74 S/. 269.60 0.00 0.00 0.00 0.00
01.05.04.03 SUMINISTRO Y COLOCACION TEE PVC SAP DE 1" und 37.00 S/. 2.81 S/. 103.97 0.00 0.00 0.00 0.00
01.05.04.04 SUMINISTRO Y COLOCACION TEE PVC SAP DE 3/4" und 60.00 S/. 2.95 S/. 177.00 0.00 0.00 0.00 0.00
01.05.04.05 SUMINISTRO Y COLOCACION TEE PVC SAP DE 1/2" und 50.00 S/. 1.63 S/. 81.50 0.00 0.00 0.00 0.00
CALENDA
RIO DE
AVANCE
PROYECTO: "MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA COMUNIDAD DE COLPAMATARA, DISTRITO DE CHOTA, PROVINCIA DE CHOTA - CAJAMARCA"
DE OBRA
VALORIZ
ADO VALORIZACIÓN AL 31 DE MAYO
01.05.04.06 PRESUPUESTO
SUMINISTRO Y COLOCACION SEGÚN
DE CODO 2" x 45°CONTRATO
und 10.00 S/. 6.29 S/. 62.90 0.00 0.00 0.00 0.00
01.05.04.07 SUMINISTRO Y COLOCACION DE CODO 1 1/2" x 45° und 20.00 S/. 3.83 S/. 76.60 0.00 0.00 0.00 0.00
01.05.04.08 SUMINISTRO Y COLOCACION DE CODO 1" x 45° und 10.00 S/. 2.22 S/. 22.20 0.00 0.00 0.00 0.00
01.05.04.09 SUMINISTRO Y COLOCACION CODO PVC SAP DE 3/4"xund 11.00 S/. 2.68 S/. 29.48 0.00 0.00 0.00 0.00
01.05.04.10 SUMINISTRO Y COLOCACION CODO PVC SAP DE 1/2"xund 25.00 S/. 1.63 S/. 40.75 0.00 0.00 0.00 0.00
01.05.04.11 SUMINISTRO Y COLOCACION REDUCCION PVC SAP DE und 8.00 S/. 6.02 S/. 48.16 0.00 0.00 0.00 0.00
01.05.04.12 SUMINISTRO Y COLOCACION REDUCCION PVC SAP DE
und
1 31.00 S/. 4.84 S/. 150.04 0.00 0.00 0.00 0.00
01.05.04.13 SUMINISTRO Y COLOCACION REDUCCION PVC SAP DE
und 38.00 S/. 3.14 S/. 119.32 0.00 0.00 0.00 0.00
01.05.04.14 SUMINISTRO Y COLOCACION REDUCCION PVC SAP DE
und 68.00 S/. 2.39 S/. 162.52 0.00 0.00 0.00 0.00
01.05.04.15 SUMINISTRO Y COLOCACION REDUCCION PVC SAP DE
und 9.00 S/. 2.31 S/. 20.79 0.00 0.00 0.00 0.00
01.05.04.16 SUMINISTRO Y COLOCACION REDUCCION PVC SAP DE
und 3.00 S/. 6.02 S/. 18.06 0.00 0.00 0.00 0.00
01.05.04.17 SUMINISTRO Y COLOCACION REDUCCION PVC SAP DE
und 1.00 S/. 6.02 S/. 6.02 0.00 0.00 0.00 0.00
01.05.04.18 SUMINISTRO Y COLOCACION REDUCCION PVC SAP DE
und
1 5.00 S/. 4.37 S/. 21.85 0.00 0.00 0.00 0.00
01.05.04.19 SUMINISTRO Y COLOCACION REDUCCION PVC SAP DE
und 3.00 S/. 4.33 S/. 12.99 0.00 0.00 0.00 0.00
01.05.05 CAMARA ROMPE PRESION TIPO 7 (15 UNID) S/. 18,716.07
01.05.05.01 TRABAJOS PRELIMINARES S/. 53.34
01.05.05.01.01 LIMPIEZA DEL TERRENO MANUAL m2 21.00 S/. 1.52 S/. 31.92 0.00 0.00 0.00 21.00 31.92
01.05.05.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 21.00 S/. 1.02 S/. 21.42 0.00 0.00 0.00 21.00 21.42
01.05.05.02 MOVIMIENTO DE TIERRAS S/. 552.77
01.05.05.02.01 EXCAVACION MANUAL DE TERRENO m3 9.45 S/. 30.57 S/. 288.89 0.00 0.00 0.00 0.00
01.05.05.02.02 REFINE Y NIVELACION INTERIOR DE TERRENO m2 21.00 S/. 2.32 S/. 48.72 0.00 0.00 0.00 0.00
01.05.05.02.03 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 1.98 S/. 17.47 S/. 34.59 0.00 0.00 0.00 0.00
01.05.05.02.04 ELIMINACION DE MATERIAL EXCEDENTE (CARGU m3 11.81 S/. 15.29 S/. 180.57 0.00 0.00 0.00 0.00
01.05.05.03 OBRAS DE CONCRETO SIMPLE S/. 410.39
01.05.05.03.01 CONCRETO f'c=140 kg/cm2 m3 0.18 S/. 293.72 S/. 52.87 0.00 0.00 0.00 0.00
01.05.05.03.02 ENCOFRADO Y DESENCOFRADO m2 3.90 S/. 40.71 S/. 158.77 0.00 0.00 0.00 0.00
01.05.05.03.03 EMPEDRADO D=4" ASENTADO MEZCLA C:H=1:8 m2 7.50 S/. 26.50 S/. 198.75 0.00 0.00 0.00 0.00
01.05.05.04 OBRAS DE CONCRETO ARMADO S/. 10,347.75
01.05.05.04.01 CONCRETO f'c=175 kg/cm2 m3 8.85 S/. 370.44 S/. 3,278.39 0.00 0.00 0.00 0.00
01.05.05.04.02 ENCOFRADO Y DESENCOFRADO m2 147.68 S/. 35.69 S/. 5,270.70 0.00 0.00 0.00 0.00
01.05.05.04.03 ACERO DE REFUERZO FY=4200 KG/CM2 kg 443.02 S/. 4.06 S/. 1,798.66 0.00 0.00 0.00 0.00
01.05.05.05 REVOQUES Y ENLUCIDOS S/. 2,867.57
01.05.05.05.01 TARRAJEO EN EXTERIORES (MORTERO C:A=1:5), E m2 64.24 S/. 14.71 S/. 944.97 0.00 0.00 0.00 0.00
01.05.05.05.02 TARRAJEO INTERIOR CON IMPERMEABILIZANTE (M m2 55.80 S/. 26.50 S/. 1,478.70 0.00 0.00 0.00 0.00
01.05.05.05.03 PINTURA LATEX EN EXTERIORES (DOS MANOS) m2 64.24 S/. 6.91 S/. 443.90 0.00 0.00 0.00 0.00
01.05.05.06 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS S/. 1,642.65
01.05.05.06.01 SUMINISTRO E INSTALACION DE ACCESORIOS DE und 15.00 S/. 109.51 S/. 1,642.65 0.00 0.00 0.00 0.00
01.05.05.07 VARIOS S/. 2,841.60
01.05.05.07.01 TAPA SANITARIA METALICA DE 0.60x0.60x1/8" und 15.00 S/. 189.44 S/. 2,841.60 0.00 0.00 0.00 0.00
01.05.06 VALVULA DE CONTROL (19 UNID) S/. 8,940.55
01.05.06.01 TRABAJOS PRELIMINARES S/. 30.88
01.05.06.01.01 LIMPIEZA DEL TERRENO MANUAL m2 12.16 S/. 1.52 S/. 18.48 0.00 0.00 0.00 12.16 18.48
01.05.06.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 12.16 S/. 1.02 S/. 12.40 0.00 0.00 0.00 12.16 12.40
01.05.06.02 MOVIMIENTO DE TIERRAS S/. 446.54
01.05.06.02.01 EXCAVACION MANUAL DE TERRENO m3 7.30 S/. 30.57 S/. 223.16 0.00 0.00 0.00 0.00
01.05.06.02.02 REFINE Y NIVELACION INTERIOR DE TERRENO m2 12.16 S/. 2.32 S/. 28.21 0.00 0.00 0.00 0.00
01.05.06.02.03 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 3.19 S/. 17.47 S/. 55.73 0.00 0.00 0.00 0.00
01.05.06.02.04 ELIMINACION DE MATERIAL EXCEDENTE (CARGU m3 9.12 S/. 15.29 S/. 139.44 0.00 0.00 0.00 0.00
01.05.06.03 OBRAS DE CONCRETO SIMPLE S/. 2,905.93
01.05.06.03.01 CONCRETO f'c=140 kg/cm2 m3 3.06 S/. 293.70 S/. 898.72 0.00 0.00 0.00 0.00
01.05.06.03.02 ENCOFRADO Y DESENCOFRADO m2 56.24 S/. 35.69 S/. 2,007.21 0.00 0.00 0.00 0.00
01.05.06.04 REVOQUES Y ENLUCIDOS S/. 384.52
01.05.06.04.01 TARRAJEO INTERIOR C/MORTERO 1:5 x 1.5cm m2 18.24 S/. 18.49 S/. 337.26 0.00 0.00 0.00 0.00
01.05.06.04.02 PINTURA LATEX EN EXTERIORES (DOS MANOS) m2 6.84 S/. 6.91 S/. 47.26 0.00 0.00 0.00 0.00
01.05.06.05 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS S/. 1,991.30
01.05.06.05.01 SUMINISTRO E INSTALACION VÁLVULA TIPO GLO und 1.00 S/. 151.87 S/. 151.87 0.00 0.00 0.00 0.00
01.05.06.05.02 SUMINISTRO E INSTALACION VÁLVULA TIPO GLO und 3.00 S/. 127.86 S/. 383.58 0.00 0.00 0.00 0.00
01.05.06.05.03 SUMINISTRO E INSTALACION VALVULA TIPO GLO und 5.00 S/. 101.25 S/. 506.25 0.00 0.00 0.00 0.00
01.05.06.05.04 SUMINISTRO E INSTALACION VALVULA TIPO GLO und 10.00 S/. 94.96 S/. 949.60 0.00 0.00 0.00 0.00
01.05.06.06 VARIOS S/. 3,181.38
01.05.06.06.01 FILTRO DE GRAVA DIA. MAX. 1/2" m3 0.06 S/. 101.67 S/. 6.10 0.00 0.00 0.00 0.00
01.05.06.06.02 TAPA SANITARIA METALICA DE 0.40x0.40x1/8" und 19.00 S/. 167.12 S/. 3,175.28 0.00 0.00 0.00 0.00
01.05.07 VALVULA DE PURGA TIPO 1 (05 UNID) S/. 2,228.19
01.05.07.01 TRABAJOS PRELIMINARES S/. 8.12
01.05.07.01.01 LIMPIEZA DEL TERRENO MANUAL m2 3.20 S/. 1.52 S/. 4.86 0.00 0.00 0.00 3.20 4.86
01.05.07.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 3.20 S/. 1.02 S/. 3.26 0.00 0.00 0.00 3.20 3.26
01.05.07.02 MOVIMIENTO DE TIERRAS S/. 117.48
01.05.07.02.01 EXCAVACION MANUAL DE TERRENO m3 1.92 S/. 30.57 S/. 58.69 0.00 0.00 0.00 0.00
01.05.07.02.02 REFINE Y NIVELACION INTERIOR DE TERRENO m2 3.20 S/. 2.32 S/. 7.42 0.00 0.00 0.00 0.00
01.05.07.02.03 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 0.84 S/. 17.46 S/. 14.67 0.00 0.00 0.00 0.00
01.05.07.02.04 ELIMINACION DE MATERIAL EXCEDENTE (CARGU m3 2.40 S/. 15.29 S/. 36.70 0.00 0.00 0.00 0.00
01.05.07.03 OBRAS DE CONCRETO SIMPLE S/. 827.19
01.05.07.03.01 CONCRETO f'c=140 kg/cm2 m3 0.86 S/. 293.70 S/. 252.58 0.00 0.00 0.00 0.00
01.05.07.03.02 ENCOFRADO Y DESENCOFRADO m2 16.10 S/. 35.69 S/. 574.61 0.00 0.00 0.00 0.00
01.05.07.04 REVOQUES Y ENLUCIDOS S/. 101.19
CALENDA
RIO DE
AVANCE
PROYECTO: "MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA COMUNIDAD DE COLPAMATARA, DISTRITO DE CHOTA, PROVINCIA DE CHOTA - CAJAMARCA"
DE OBRA
VALORIZ
ADO VALORIZACIÓN AL 31 DE MAYO
01.05.07.04.01 PRESUPUESTO
TARRAJEO INTERIOR C/MORTERO SEGÚN CONTRATO
1:5 x 1.5cm m2 4.80 S/. 18.49 S/. 88.75 0.00 0.00 0.00 0.00
01.05.07.04.02 PINTURA LATEX EN EXTERIORES (DOS MANOS) m2 1.80 S/. 6.91 S/. 12.44 0.00 0.00 0.00 0.00
01.05.07.05 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 336.58
01.05.07.05.01 VALVULA COMPUERTA DE BRONCE DE 3/4" INC. und 4.00 S/. 70.25 S/. 281.00 0.00 0.00 0.00 0.00
01.05.07.05.02 VALVULA COMPUERTA DE BRONCE DE 1/2" INC. und 1.00 S/. 55.58 S/. 55.58 0.00 0.00 0.00 0.00
01.05.07.06 VARIOS S/. 837.63
01.05.07.06.01 FILTRO DE GRAVA DIA. MAX. 1/2" m3 0.02 S/. 101.50 S/. 2.03 0.00 0.00 0.00 0.00
01.05.07.06.02 TAPA SANITARIA METALICA DE 0.40x0.40x1/8" und 5.00 S/. 167.12 S/. 835.60 0.00 0.00 0.00 0.00
01.05.08 VALVULA DE AIRE TIPO I (01 UNID) S/. 667.04
01.05.08.01 TRABAJOS PRELIMINARES S/. 1.62
01.05.08.01.01 LIMPIEZA DEL TERRENO MANUAL m2 0.64 S/. 1.52 S/. 0.97 0.00 0.00 0.00 0.64 0.97
01.05.08.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 0.64 S/. 1.02 S/. 0.65 0.00 0.00 0.00 0.64 0.65
01.05.08.02 MOVIMIENTO DE TIERRAS S/. 23.41
01.05.08.02.01 EXCAVACION MANUAL DE TERRENO m3 0.38 S/. 30.58 S/. 11.62 0.00 0.00 0.00 0.00
01.05.08.02.02 REFINE Y NIVELACION INTERIOR DE TERRENO m2 0.64 S/. 2.31 S/. 1.48 0.00 0.00 0.00 0.00
01.05.08.02.03 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 0.17 S/. 17.47 S/. 2.97 0.00 0.00 0.00 0.00
01.05.08.02.04 ELIMINACION DE MATERIAL EXCEDENTE (CARGU m3 0.48 S/. 15.29 S/. 7.34 0.00 0.00 0.00 0.00
01.05.08.03 OBRAS DE CONCRETO SIMPLE S/. 152.63
01.05.08.03.01 CONCRETO f'c=140 kg/cm2 m3 0.16 S/. 293.69 S/. 46.99 0.00 0.00 0.00 0.00
01.05.08.03.02 ENCOFRADO Y DESENCOFRADO m2 2.96 S/. 35.69 S/. 105.64 0.00 0.00 0.00 0.00
01.05.08.04 REVOQUES Y ENLUCIDOS S/. 20.24
01.05.08.04.01 TARRAJEO INTERIOR Y EXTERIOR C/MORTERO 1:5 m2 0.96 S/. 18.49 S/. 17.75 0.00 0.00 0.00 0.00
01.05.08.04.02 PINTURA LATEX EN EXTERIORES (DOS MANOS) m2 0.36 S/. 6.92 S/. 2.49 0.00 0.00 0.00 0.00
01.05.08.05 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 301.00
01.05.08.05.01 SUMINISTRO Y COLOCACION VALVULA GLOBO BR und 5.00 S/. 60.20 S/. 301.00 0.00 0.00 0.00 0.00
01.05.08.06 VARIOS S/. 168.14
01.05.08.06.01 FILTRO DE GRAVA DIA. MAX. 1/2" m3 0.01 S/. 102.00 S/. 1.02 0.00 0.00 0.00 0.00
01.05.08.06.02 TAPA SANITARIA METALICA DE 0.40x0.40x1/8" und 1.00 S/. 167.12 S/. 167.12 0.00 0.00 0.00 0.00
01.05.09 PASE AEREO (L=6.0 m) S/. 2,347.31
01.05.09.01 TRABAJOS PRELIMINARES S/. 6.12
01.05.09.01.01 LIMPIEZA DEL TERRENO MANUAL m2 2.41 S/. 1.52 S/. 3.66 0.00 0.00 0.00 2.41 3.66
01.05.09.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 2.41 S/. 1.02 S/. 2.46 0.00 0.00 0.00 2.41 2.46
01.05.09.02 MOVIMIENTO DE TIERRAS S/. 93.85
01.05.09.02.01 EXCAVACION MANUAL DE TERRENO PARA CAMAR m3 1.66 S/. 30.57 S/. 50.75 0.00 0.00 0.00 0.00
01.05.09.02.02 EXCAVACION MANUAL DE TERRENO PARA ZAPATA m3 1.41 S/. 30.57 S/. 43.10 0.00 0.00 0.00 0.00
01.05.09.03 OBRAS DE CONCRETO SIMPLE S/. 273.90
01.05.09.03.01 CONCRETO EN CAMARAS DE ANCLAJE f'c=140 kg/ m3 1.02 S/. 268.53 S/. 273.90 0.00 0.00 0.00 0.00
01.05.09.04 OBRAS DE CONCRETO ARMADO S/. 742.71
01.05.09.04.01 CONCRETO EN ZAPATAS f'c=210 kg/cm2 m3 0.84 S/. 386.79 S/. 324.90 0.00 0.00 0.00 0.00
01.05.09.04.02 CONCRETO EN COLUMNAS f'c=210 kg/cm2 m3 0.28 S/. 406.68 S/. 113.87 0.00 0.00 0.00 0.00
01.05.09.04.03 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 4.05 S/. 35.69 S/. 144.54 0.00 0.00 0.00 0.00
01.05.09.04.04 ACERO DE REFUERZO FY=4200 KG/CM2 kg 39.26 S/. 4.06 S/. 159.40 0.00 0.00 0.00 0.00
01.05.09.05 TUBERIA, CABLE Y PENDOLAS S/. 1,230.73
01.05.09.05.01 TUBERIA DE F.G DE 3/4" m 6.00 S/. 57.18 S/. 343.08 0.00 0.00 0.00 0.00
01.05.09.05.02 CABLE DE ACERO 3/8" m 10.87 S/. 40.18 S/. 436.76 0.00 0.00 0.00 0.00
01.05.09.05.03 PENDOLAS DE 1/4" m 4.49 S/. 18.50 S/. 83.07 0.00 0.00 0.00 0.00
01.05.09.05.04 ACCESORIOS PARA EL TEMPLADOR DEL CABLE 3/8und 1.00 S/. 313.24 S/. 313.24 0.00 0.00 0.00 0.00
01.05.09.05.05 ACCESORIOS PARA TUBERIA DE 3/4" DE F.G und 1.00 S/. 54.58 S/. 54.58 0.00 0.00 0.00 0.00
01.05.10 PASE AEREO (L=40.0 m) S/. 7,257.49
01.05.10.01 TRABAJOS PRELIMINARES S/. 10.19
01.05.10.01.01 LIMPIEZA DEL TERRENO MANUAL m2 4.01 S/. 1.52 S/. 6.10 0.00 0.00 0.00 4.01 6.10
01.05.10.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 4.01 S/. 1.02 S/. 4.09 0.00 0.00 0.00 4.01 4.09
01.05.10.02 MOVIMIENTO DE TIERRAS S/. 175.16
01.05.10.02.01 EXCAVACION MANUAL DE TERRENO PARA CAMAR m3 4.32 S/. 30.57 S/. 132.06 0.00 0.00 0.00 0.00
01.05.10.02.02 EXCAVACION MANUAL DE TERRENO PARA ZAPATA m3 1.41 S/. 30.57 S/. 43.10 0.00 0.00 0.00 0.00
01.05.10.03 OBRAS DE CONCRETO SIMPLE S/. 773.37
01.05.10.03.01 CONCRETO EN CAMARAS DE ANCLAJE f'c=140 kg/ m3 2.88 S/. 268.53 S/. 773.37 0.00 0.00 0.00 0.00
01.05.10.04 OBRAS DE CONCRETO ARMADO S/. 1,234.28
01.05.10.04.01 CONCRETO EN ZAPATAS f'c=210 kg/cm2 m3 0.84 S/. 386.79 S/. 324.90 0.00 0.00 0.00 0.00
01.05.10.04.02 CONCRETO EN COLUMNAS f'c=210 kg/cm2 m3 0.65 S/. 406.68 S/. 264.34 0.00 0.00 0.00 0.00
01.05.10.04.03 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 9.53 S/. 35.69 S/. 340.13 0.00 0.00 0.00 0.00
01.05.10.04.04 ACERO DE REFUERZO FY=4200 KG/CM2 kg 75.10 S/. 4.06 S/. 304.91 0.00 0.00 0.00 0.00
01.05.10.05 TUBERIA, CABLE Y PENDOLAS S/. 5,064.49
01.05.10.05.01 TUBERIA DE F.G DE 3/4" m 40.00 S/. 57.18 S/. 2,287.20 0.00 0.00 0.00 0.00
01.05.10.05.02 CABLE DE ACERO 3/8" m 45.27 S/. 40.18 S/. 1,818.95 0.00 0.00 0.00 0.00
01.05.10.05.03 PENDOLAS DE 1/4" m 31.92 S/. 18.50 S/. 590.52 0.00 0.00 0.00 0.00
01.05.10.05.04 ACCESORIOS PARA EL TEMPLADOR DEL CABLE 3/8und 1.00 S/. 313.24 S/. 313.24 0.00 0.00 0.00 0.00
01.05.10.05.05 ACCESORIOS PARA TUBERIA DE 3/4" DE F.G und 1.00 S/. 54.58 S/. 54.58 0.00 0.00 0.00 0.00
01.06 CONEXIONES DOMICILIARIAS S/. 119,307.28
01.06.01 LAVADERO MULTIUSOS PARA VIVIENDAS (189 UNID) S/. 113,557.21
01.06.01.01 TRABAJOS PRELIMINARES S/. 522.07
01.06.01.01.01 LIMPIEZA DEL TERRENO MANUAL m2 205.54 S/. 1.52 S/. 312.42 0.00 0.00 0.00 102.77 156.21
01.06.01.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 205.54 S/. 1.02 S/. 209.65 0.00 0.00 0.00 102.77 104.83
01.06.01.02 MOVIMIENTO DE TIERRAS S/. 19,826.11
01.06.01.02.01 EXCAVACION MANUAL DE TERRENO m3 293.42 S/. 30.57 S/. 8,969.85 0.00 0.00 0.00 0.00
CALENDA
RIO DE
AVANCE
PROYECTO: "MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA COMUNIDAD DE COLPAMATARA, DISTRITO DE CHOTA, PROVINCIA DE CHOTA - CAJAMARCA"
DE OBRA
VALORIZ
ADO VALORIZACIÓN AL 31 DE MAYO
01.06.01.02.02 PRESUPUESTO
REFINE Y NIVELACION SEGÚN
INTERIOR DE CONTRATO
TERRENO m2 194.20 S/. 2.32 S/. 450.54 0.00 0.00 0.00 0.00
01.06.01.02.03 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 211.21 S/. 17.47 S/. 3,689.84 0.00 0.00 0.00 0.00
01.06.01.02.04 CAMA DE ARENA , E=0.05m m3 40.64 S/. 123.76 S/. 5,029.61 0.00 0.00 0.00 0.00
01.06.01.02.05 FILTRO DE GRAVA DIA. MAX. 1/2" m3 1.13 S/. 101.70 S/. 114.92 0.00 0.00 0.00 0.00
01.06.01.02.06 ELIMINACION DE MATERIAL EXCEDENTE (CARGU m3 102.77 S/. 15.29 S/. 1,571.35 0.00 0.00 0.00 0.00
01.06.01.03 OBRAS DE CONCRETO SIMPLE S/. 3,007.40
01.06.01.03.01 CIMIENTO CORRIDO - MEZCLA C:H 1:10 + 30% PG m3 17.96 S/. 167.45 S/. 3,007.40 0.00 0.00 0.00 0.00
01.06.01.04 OBRAS DE CONCRETO ARMADO S/. 28,106.40
01.06.01.04.01 CONCRETO f'c=175 kg/cm2 m3 27.31 S/. 370.44 S/. 10,116.72 0.00 0.00 0.00 0.00
01.06.01.04.02 ENCOFRADO Y DESENCOFRADO m2 379.89 S/. 35.69 S/. 13,558.27 0.00 0.00 0.00 0.00
01.06.01.04.03 ACERO DE REFUERZO FY=4200 KG/CM2 kg 1,091.48 S/. 4.06 S/. 4,431.41 0.00 0.00 0.00 0.00
01.06.01.05 MUROS Y TABIQUES S/. 23,098.97
01.06.01.05.01 MURO DE LADRILLO DE ARCILLA CORRIENTE MEZCm2 336.42 S/. 46.60 S/. 15,677.17 0.00 0.00 0.00 0.00
01.06.01.05.02 MURO DE LADRILLO DE ARCILLA CORRIENTE MEZCm2 136.08 S/. 54.54 S/. 7,421.80 0.00 0.00 0.00 0.00
01.06.01.06 REVOQUES, ENLUCIDOS Y MOLDURAS S/. 18,063.62
01.06.01.06.01 TARRAJEO EN MUROS, MORTERO C:A=1:5, E=1.5cmm2 976.94 S/. 18.49 S/. 18,063.62 0.00 0.00 0.00 0.00
01.06.01.07 CONEXION DOMICILIARIA, INC. VALVULAS Y ACCESORIOS S/. 16,821.00
01.06.01.07.01 SUMINISTRO Y COLOCACION DE VALVULAS Y AC und 189.00 S/. 89.00 S/. 16,821.00 0.00 0.00 0.00 0.00
01.06.01.08 VARIOS S/. 4,111.64
01.06.01.08.01 PINTURA OCRE COLOR ROJO EN PILETA m2 721.34 S/. 5.70 S/. 4,111.64 0.00 0.00 0.00 0.00
01.06.02 LAVADERO MULTIUSOS PARA INSTITUCIONES Y PUESTO DE SALUD (09 UND) S/. 5,750.07
01.06.02.01 TRABAJOS PRELIMINARES S/. 25.15
01.06.02.01.01 LIMPIEZA DEL TERRENO MANUAL m2 3.30 S/. 4.56 S/. 15.05 0.00 0.00 0.00 1.65 7.53
01.06.02.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 3.30 S/. 3.06 S/. 10.10 0.00 0.00 0.00 1.65 5.05
01.06.02.02 MOVIMIENTO DE TIERRAS S/. 959.94
01.06.02.02.01 EXCAVACION MANUAL DE TERRENO m3 4.81 S/. 91.77 S/. 441.43 0.00 0.00 0.00 0.00
01.06.02.02.02 REFINE Y NIVELACION INTERIOR DE TERRENO m2 4.25 S/. 6.96 S/. 29.56 0.00 0.00 0.00 0.00
01.06.02.02.03 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 3.03 S/. 52.41 S/. 158.80 0.00 0.00 0.00 0.00
01.06.02.02.04 CAMA DE ARENA , E=0.05m m3 0.60 S/. 371.28 S/. 222.77 0.00 0.00 0.00 0.00
01.06.02.02.05 RELLENO CON PIEDRA CHACADA m3 0.02 S/. 254.50 S/. 5.09 0.00 0.00 0.00 0.00
01.06.02.02.06 ELIMINACION DE MATERIAL EXCEDENTE (CARGU m3 2.23 S/. 45.87 S/. 102.29 0.00 0.00 0.00 0.00
01.06.02.03 OBRAS DE CONCRETO SIMPLE S/. 159.08
01.06.02.03.01 CIMIENTO CORRIDO - MEZCLA C:H 1:10 + 30% PG m3 0.32 S/. 497.13 S/. 159.08 0.00 0.00 0.00 0.00
01.06.02.04 OBRAS DE CONCRETO ARMADO S/. 1,771.58
01.06.02.04.01 CONCRETO f'c=175 kg/cm2 m3 0.73 S/. 1,116.40 S/. 814.97 0.00 0.00 0.00 0.00
01.06.02.04.02 ENCOFRADO Y DESENCOFRADO m2 7.77 S/. 107.07 S/. 831.93 0.00 0.00 0.00 0.00
01.06.02.04.03 ACERO DE REFUERZO FY=4200 KG/CM2 kg 10.24 S/. 12.18 S/. 124.68 0.00 0.00 0.00 0.00
01.06.02.05 MUROS Y TABIQUES S/. 977.21
01.06.02.05.01 MURO DE LADRILLO DE ARCILLA CORRIENTE MEZCm2 4.88 S/. 139.90 S/. 682.69 0.00 0.00 0.00 0.00
01.06.02.05.02 MURO DE LADRILLO DE ARCILLA CORRIENTE MEZCm2 1.80 S/. 163.62 S/. 294.52 0.00 0.00 0.00 0.00
01.06.02.06 REVOQUES, ENLUCIDOS Y MOLDURAS S/. 615.47
01.06.02.06.01 TARRAJEO EN MUROS, MORTERO C:A=1:5, E=1.5cmm2 13.95 S/. 44.12 S/. 615.47 0.00 0.00 0.00 0.00
01.06.02.07 CONEXION DOMICILIARIA, INC. VALVULAS Y ACCESORIOS S/. 801.00
01.06.02.07.01 SUMINISTRO Y COLOCACION DE VALVULAS Y AC und 3.00 S/. 267.00 S/. 801.00 0.00 0.00 0.00 0.00
01.06.02.08 VARIOS S/. 440.64
01.06.02.08.01 PINTURA OCRE COLOR ROJO EN PILETA m2 8.34 S/. 17.09 S/. 142.56 0.00 0.00 0.00 0.00
01.06.02.08.02 ASAS DE TORNILLOS EN "U" und 9.00 S/. 33.12 S/. 298.08 0.00 0.00 0.00 0.00
02 UNIDAD BASICA DE SANEAMIENTO S/. 1,464,351.60
02.01 ARRASTRE HIDRAULICO S/. 1,464,351.60
02.01.01 MÓDULO DE SERVICIOS HIGIÉNICOS TIPO 1 PARA VIVIENDAS (196 UNID) S/. 1,107,207.94
02.01.01.01 ESTRUCTURAS - ARQUITECTURA S/. 816,978.64
02.01.01.01.01 TRABAJOS PRELIMINARES S/. 3,268.98
02.01.01.01.01.01 LIMPIEZA DEL TERRENO MANUAL m2 1,287.00 S/. 1.52 S/. 1,956.24 0.00 0.00 0.00 1,287.00 1,956.24
02.01.01.01.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 1,287.00 S/. 1.02 S/. 1,312.74 0.00 0.00 0.00 1,287.00 1,312.74
02.01.01.01.02 MOVIMIENTO DE TIERRAS S/. 31,777.82
02.01.01.01.02.01 EXCAVACION MANUAL DE TERRENO m3 555.89 S/. 30.57 S/. 16,993.56 0.00 0.00 0.00 173.72 5,310.62
02.01.01.01.02.02 RELLENO Y COMPACTACION CON MATERIAL PROm3 49.23 S/. 17.47 S/. 860.05 0.00 0.00 0.00 0.00
02.01.01.01.02.03 MEJORAMIENTO DE BASE CON AFIRMADO E=0.10 m3 55.68 S/. 76.16 S/. 4,240.59 0.00 0.00 0.00 0.00
02.01.01.01.02.04 ELIMINACION DE MATERIAL EXCEDENTE (CAR m3 633.33 S/. 15.29 S/. 9,683.62 0.00 0.00 0.00 96.94 1,482.21
02.01.01.01.03 OBRAS DE CONCRETO SIMPLE S/. 152,718.37
02.01.01.01.03.01 CIMIENTO CORRIDO - MEZCLA C:H 1:8 + 30% P.M m3 278.39 S/. 239.22 S/. 66,596.46 0.00 0.00 0.00 2.90 693.74
02.01.01.01.03.02 SOBRECIMIENTO - MEZCLA C:H 1:8 + 25% PM m3 84.20 S/. 257.39 S/. 21,672.24 0.00 0.00 0.00 0.88 226.50
02.01.01.01.03.03 SOBRECIMIENTO - ENCOFRADO Y DESENCOFRA m2 1,136.03 S/. 35.69 S/. 40,544.91 0.00 0.00 0.00 11.84 422.57
02.01.01.01.03.04 CONCRETO EN FALSO PISO MEZCLA C:H 1:8, E=4"m2 567.27 S/. 42.14 S/. 23,904.76 0.00 0.00 0.00 0.00
02.01.01.01.04 OBRAS DE CONCRETO ARMADO S/. 137,257.47
02.01.01.01.04.01 COLUMNAS S/. 84,817.54
02.01.01.01.04.01 COLUMNAS - CONCRETO F’C=175 KG/CM2 m3 45.80 S/. 370.44 S/. 16,966.15 0.00 0.00 0.00 0.00
02.01.01.01.04.01 COLUMNAS - ENCOFRADO Y DESENCOFRADO m2 683.69 S/. 40.71 S/. 27,833.02 0.00 0.00 0.00 0.00
02.01.01.01.04.01 COLUMNAS ACERO kg 8,892.97 S/. 4.50 S/. 40,018.37 0.00 0.00 0.00 1,361.17 6,125.27
02.01.01.01.04.02 VIGAS S/. 52,439.93
02.01.01.01.04.02 VIGAS - CONCRETO F’C=175 KG/CM2 m3 34.04 S/. 370.44 S/. 12,609.78 0.00 0.00 0.00 0.00
02.01.01.01.04.02 VIGAS - ENCOFRADO Y DESENCOFRADO m2 340.36 S/. 40.71 S/. 13,856.06 0.00 0.00 0.00 0.00
02.01.01.01.04.02 VIGAS ACERO kg 5,772.02 S/. 4.50 S/. 25,974.09 0.00 0.00 0.00 0.00
02.01.01.01.05 ESTRUCTURA DE MADERA S/. 36,626.04
02.01.01.01.05.01 CORREAS DE MADERA EUCALIPTO 2"x2"x3.00m pza 792.00 S/. 14.58 S/. 11,547.36 0.00 0.00 0.00 0.00
CALENDA
RIO DE
AVANCE
PROYECTO: "MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA COMUNIDAD DE COLPAMATARA, DISTRITO DE CHOTA, PROVINCIA DE CHOTA - CAJAMARCA"
DE OBRA
VALORIZ
ADO VALORIZACIÓN AL 31 DE MAYO
02.01.01.01.05.02 CORREAS DE PRESUPUESTO SEGÚN
MADERA EUCALIPTO CONTRATO
2"x3"x2.75 m und 396.00 S/. 24.98 S/. 9,892.08 0.00 0.00 0.00 0.00
02.01.01.01.05.03 VIGUETA DE MADERA EUCALIPTO DE 4"x3"x2.75m pza 396.00 S/. 38.35 S/. 15,186.60 0.00 0.00 0.00 0.00
02.01.01.01.06 COBERTURA S/. 51,553.26
02.01.01.01.06.01 COBERTURA CON PLANCHA ZINCADA ONDULADAm2 1,633.50 S/. 31.56 S/. 51,553.26 0.00 0.00 0.00 0.00
02.01.01.01.07 MUROS Y TABIQUES S/. 134,335.92
02.01.01.01.07.01 MURO DE LADRILLO DE ARCILLA CORRIENTE ME m2 2,799.32 S/. 46.60 S/. 130,448.31 0.00 0.00 0.00 14.28 665.45
02.01.01.01.07.02 MURO DE LADRILLO DE ARCILLA CORRIENTE ME m2 71.28 S/. 54.54 S/. 3,887.61 0.00 0.00 0.00 0.00
02.01.01.01.08 REVOQUES Y REVESTIMIENTOS S/. 108,846.06
02.01.01.01.08.01 TARRAJEO EN MUROS MORTERO C:A=1:5, E=1.5c m2 7,399.46 S/. 14.71 S/. 108,846.06 0.00 0.00 0.00 0.00
02.01.01.01.09 PISOS Y PAVIMENTOS S/. 71,479.37
02.01.01.01.09.01 CONFORMACION DE BASE GRANURAL H=0.10m, m2 1,404.81 S/. 12.44 S/. 17,475.84 0.00 0.00 0.00 0.00
02.01.01.01.09.02 PISO DE CEMENTO PULIDO DE COLOR m2 709.83 S/. 43.80 S/. 31,090.55 0.00 0.00 0.00 0.00
02.01.01.01.09.03 VEREDA DE CONCRETO f'c=140 kg/cm2, FROT m2 415.80 S/. 45.98 S/. 19,118.48 0.00 0.00 0.00 0.00
02.01.01.01.09.04 ENCOFRADO Y DESENCOFRADO EN VEREDAS m2 66.33 S/. 35.69 S/. 2,367.32 0.00 0.00 0.00 0.00
02.01.01.01.09.05 BRUÑAS DE 1 X 1 cm m 1,049.40 S/. 1.36 S/. 1,427.18 0.00 0.00 0.00 0.00
02.01.01.01.10 CARPINTERIA DE MADERA S/. 36,984.42
02.01.01.01.10.01 PUERTA E=37.5mm C/CALAMINA LISA 0.22MM, und 198.00 S/. 152.40 S/. 30,175.20 0.00 0.00 0.00 0.00
02.01.01.01.10.02 VENTANA DE MADERA C/MALLA MOSQUITERO und 198.00 S/. 34.39 S/. 6,809.22 0.00 0.00 0.00 0.00
02.01.01.01.11 PINTURAS S/. 52,130.93
02.01.01.01.11.01 PINTURA EN MUROS m2 7,339.46 S/. 6.91 S/. 50,715.67 0.00 0.00 0.00 0.00
02.01.01.01.11.02 PINTURA EN PUERTA DE CALAMINA m2 225.72 S/. 6.27 S/. 1,415.26 0.00 0.00 0.00 0.00
02.01.01.02 INSTALACIONES SANITARIAS S/. 290,229.30
02.01.01.02.01 TRABAJOS PRELIMINARES S/. 6,512.23
02.01.01.02.01.01 LIMPIEZA DEL TERRENO MANUAL m2 2,574.00 S/. 1.52 S/. 3,912.48 0.00 0.00 0.00 0.00
02.01.01.02.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 2,574.00 S/. 1.01 S/. 2,599.75 0.00 0.00 0.00 0.00
02.01.01.02.02 MOVIMIENTO DE TIERRAS S/. 41,835.12
02.01.01.02.02.01 EXCAVACION DE ZANJA PARA COLOCACION DE m3 792.00 S/. 24.45 S/. 19,364.40 0.00 0.00 0.00 0.00
02.01.01.02.02.02 EXCAVACION DE ZANJA PARA COLOCACION DE m3 148.50 S/. 24.45 S/. 3,630.82 0.00 0.00 0.00 0.00
02.01.01.02.02.03 CAMA DE APOYO PARA TUBERIA e=0.05m m2 2,574.00 S/. 1.69 S/. 4,350.06 0.00 0.00 0.00 0.00
02.01.01.02.02.04 RELLENO Y COMPACTACION CON MATERIAL PROm3 752.40 S/. 17.47 S/. 13,144.43 0.00 0.00 0.00 0.00
02.01.01.02.02.05 RELLENO CON MATERIAL PROPIO ZARANDEADO m3 59.40 S/. 22.65 S/. 1,345.41 0.00 0.00 0.00 0.00
02.01.01.02.03 INSTALACION AGUA FRIA S/. 39,926.70
02.01.01.02.03.01 SALIDA DE AGUA FRIA CON TUBERIA PVC SAP 1/2pto 594.00 S/. 26.95 S/. 16,008.30 0.00 0.00 0.00 0.00
02.01.01.02.03.02 RED DE DISTRIBUCION TUBERIA PVC SAP 1/2" m 2,178.00 S/. 1.30 S/. 2,831.40 0.00 0.00 0.00 0.00
02.01.01.02.03.03 VALVULA DE PASO TIPO ESFERICA DE 1/2" pza 198.00 S/. 76.12 S/. 15,071.76 0.00 0.00 0.00 0.00
02.01.01.02.03.04 ACCESORIOS PVC AGUA glb 198.00 S/. 30.38 S/. 6,015.24 0.00 0.00 0.00 0.00
02.01.01.02.04 INSTALACION DE DESAGÜE S/. 95,876.75
02.01.01.02.04.01 SALIDA DE DESAGÜE DIA=2" pto 396.00 S/. 38.52 S/. 15,253.92 0.00 0.00 0.00 0.00
02.01.01.02.04.02 SALIDA DE VENTILACION DIA=2" pto 198.00 S/. 49.90 S/. 9,880.20 0.00 0.00 0.00 0.00
02.01.01.02.04.03 TUBERIA PVC SAL 2" m 3,049.20 S/. 6.65 S/. 20,277.18 0.00 0.00 0.00 0.00
02.01.01.02.04.04 TUBERIA PVC SAL 4" m 2,019.60 S/. 9.33 S/. 18,842.87 0.00 0.00 0.00 0.00
02.01.01.02.04.05 SUMIDERO DE BRONCE CROMADO 2" und 198.00 S/. 13.88 S/. 2,748.24 0.00 0.00 0.00 0.00
02.01.01.02.04.06 REGISTRO DE BRONCE CROMADO 4" und 198.00 S/. 16.40 S/. 3,247.20 0.00 0.00 0.00 0.00
02.01.01.02.04.07 SUMIDERO DE BRONCE CROMADO 2" und 396.00 S/. 7.08 S/. 2,803.68 0.00 0.00 0.00 0.00
02.01.01.02.04.08 ACCESORIOS PVC DESAGÜE glb 198.00 S/. 115.27 S/. 22,823.46 0.00 0.00 0.00 0.00
02.01.01.02.05 APARATOS SANITARIOS S/. 83,807.46
02.01.01.02.05.01 LAVATORIO BLANCO +ACCESORIOS und 198.00 S/. 158.93 S/. 31,468.14 0.00 0.00 0.00 0.00
02.01.01.02.05.02 INODORO TANQUE BAJO ADULTO + ACCESORIOSund 198.00 S/. 199.95 S/. 39,590.10 0.00 0.00 0.00 0.00
02.01.01.02.05.03 DUCHA + ACCESORIOS und 198.00 S/. 64.39 S/. 12,749.22 0.00 0.00 0.00 0.00
02.01.01.02.06 CAJAS DE INSPECCION Y/O REGISTRO S/. 22,271.04
02.01.01.02.06.01 CAJAS DE REGISTRO DE DESAGUE 12" x 24" und 198.00 S/. 112.48 S/. 22,271.04 0.00 0.00 0.00 0.00
02.01.02 INSTALACION DE TANQUE BIODIGESTOR 600 LTS S/. 357,143.66
02.01.02.01 TRABAJOS PRELIMINARES S/. 1,391.73
02.01.02.01.01 LIMPIEZA DEL TERRENO MANUAL m2 550.09 S/. 1.52 S/. 836.14 0.00 0.00 0.00 2.80 4.26
02.01.02.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 550.09 S/. 1.01 S/. 555.59 0.00 0.00 0.00 2.80 2.83
02.01.02.02 MOVIMIENTO DE TIERRAS S/. 23,256.34
02.01.02.02.01 EXCAVACION DE TERRENO PARA TANQUE BIODIG m3 467.78 S/. 30.57 S/. 14,300.03 0.00 0.00 0.00 2.39 73.06
02.01.02.02.02 NIVELACION Y APISONADO INTERIOR MANUAL m2 214.19 S/. 1.73 S/. 370.55 0.00 0.00 0.00 0.00
02.01.02.02.03 RELLENO Y COMPACTACION CON MATERIAL PROP m3 215.94 S/. 17.47 S/. 3,772.47 0.00 0.00 0.00 0.00
02.01.02.02.04 ELIMINACION DE MATERIAL EXCEDENTE (CARGU m3 314.80 S/. 15.29 S/. 4,813.29 0.00 0.00 0.00 1.61 24.62
02.01.02.03 PLANTILLA DE FONDO S/. 6,609.29
02.01.02.03.01 BASE DE CONCRETO MEZCLA C:H=1:10, E=10cm m2 153.45 S/. 32.07 S/. 4,921.14 0.00 0.00 0.00 0.00
02.01.02.03.02 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 415.80 S/. 4.06 S/. 1,688.15 0.00 0.00 0.00 0.00
02.01.02.04 CAJA DE REGISTRO DE LODOS (0.60m X 0.60m) S/. 65,491.36
02.01.02.04.01 CONCRETO f'c=175 kg/cm2 m3 41.58 S/. 370.44 S/. 15,402.90 0.00 0.00 0.00 0.00
CALENDA
RIO DE
AVANCE
PROYECTO: "MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA COMUNIDAD DE COLPAMATARA, DISTRITO DE CHOTA, PROVINCIA DE CHOTA - CAJAMARCA"
DE OBRA
VALORIZ
ADO VALORIZACIÓN AL 31 DE MAYO
02.01.02.04.02 ENCOFRADO Y PRESUPUESTO
DESENCOFRADO SEGÚN CONTRATO
m2 356.40 S/. 35.69 S/. 12,719.92 0.00 0.00 0.00 0.00
02.01.02.04.03 TAPA SANITARIA METALICA DE 0.60x0.60x1/8" und 198.00 S/. 188.73 S/. 37,368.54 0.00 0.00 0.00 0.00
02.01.02.05 TANQUE BIODIGESTOR S/. 222,823.26
02.01.02.05.01 INSTALACION DE TANQUE BIODIGESTOR 600 LITROund 198.00 S/. 1,125.37 S/. 222,823.26 0.00 0.00 0.00 0.00
02.01.02.06 ZANJAS DE INFILTRACION S/. 37,571.69
02.01.02.06.01 EXCAVACION MANUAL EN ZANJAS DE INFILTRACIO m3 498.96 S/. 24.45 S/. 12,199.57 0.00 0.00 0.00 0.00
02.01.02.06.02 FILTRO DE GRAVA m3 249.48 S/. 101.70 S/. 25,372.12 0.00 0.00 0.00 0.00
03 FLETE S/. 39,087.57
03.01 FLETE TERRESTRE glb 1.00 S/. 16,401.52 S/. 16,401.52 0.00 0.00 0.00 0.03 410.04
03.02 FLETE RURAL glb 1.00 S/. 22,686.05 S/. 22,686.05 0.00 0.00 0.00 0.01 226.86
04 MITIGACION DE RIEGOS Y EVALUACION AMBIENTAL S/. 24,535.00
04.01 MITIGACION DEL IMPACTO AMBIENTAL glb 1.00 S/. 24,535.00 S/. 24,535.00 0.00 0.00 0.00 0.01 245.35
05 CAPACITACION, EDUCACION SANITARIA Y PMA S/. 47,850.00
05.01 CAPACITACION Y EDUCACION SANITARIA glb 1.00 S/. 47,850.00 S/. 47,850.00 0.00 0.00 0.00 0.00
Me dirijo a usted para remitirle la presente la Valorizacion N°01 de la obra de la referencia,correspondiente a los metrados realmente
ejecutados al 31 de Mayo, por el contratista CONSORCIO COLPAMATARA y que ha sido elaborada conjuntamente con el Residente de
Obra,de acuerdo al articulo 166 del Reglamento de la Ley de Contrataciones del Estado,para su revision y cancelacion por lo que se
presenta un original y dos copias para su tramite correspondiente.
B. REAJUSTE (S)
Sistema de Agua Potable y Saneamiento #REF!
#REF!
DEDUCCION(S)
Que no corresponde por Adelanto en Efectivo S/. -
C. AMORTIZACIONES
D. RETENCIONES
En Efectivo : ( VN - D ) #REF!
En I.G.V. ( 18 % VN ) #REF!
ATENTAMENTE
CONTROL GENERAL DE VALORIZACIONES
PROYECTO
OBRA: "CREACIÓN DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN EL CASERÍO EL PARAÍSO, DISTRITO DE CHUGUR, PROVINCIA DE HUALGAYOC - REGIÓN CAJAMARCA"
PROCESO ADJUDICACIÓN SIMPLIFICADA N° 004-2021-MDCH/CS – PRIMERA CONVOCATORIA PLAZO DE EJECUCION : 90 dias calendarios
CONTRATANTE MUNICIPALIDAD DISTRITAL DE CHUGUR VALOR REFERENCIAL : S/. 1,140,403.83
UBICACIÓN CASERÍO PARAISO, DISTRITO DE CHUGUR- PROVINCIA DE HUALGAYOC-CAJAMARCA MONTO OFERTADO : S/. 1,026,363.45
CONTRATISTA CONSORCIO JESAN Garantia.F.C.: 10.00%VR : S/. 102,636.35
MODALIDAD
A PRECIOS UNITARIOS CARTA FIANZA Nº RETENCION DEL 10%
EJECUCION
601,217.13 601,217.13 0.00 0.00 0.00 0.00 0.00 0.00 509,506.04 91,711.09 601,217.13
1 Ubicación
Departamento : CAJAMARCA
Provincia : HUALGAYOC
Distrito : CHUGUR
Localidad : PARAISO
Area Geografica : 1
2 Obra : "CREACIÓN DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN
EL CASERÍO EL PARAÍSO, DISTRITO DE CHUGUR, PROVINCIA DE
HUALGAYOC - REGIÓN CAJAMARCA"
3 Contratista :
CONSORCIO JESAN
02.01.01.04.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 272.37 7.48 2,037.33 272.37 2,037.33 100.0% - 0.00 0.0% 272.37 2,037.33 100.0% 0.00 0.00 0.00%
02.01.01.05 REVOQUES, ENLUCIDOS Y MOLDURAS
m2
02.01.01.05.01 TARRAJEO CON IMPERMEABILIZANTE MEZCLA 1:2; E=2.0 CM 19.06 30.01 571.99 - 0.00 0.0% 19.06 571.99 100.0% 19.06 571.99 100.0% 0.00 0.00 0.00%
02.01.01.05.02 TARRAJEO INT. Y EXT. MEZC. 1:4 E=1.5 CM m2 40.42 24.65 996.35 - 0.00 0.0% 40.42 996.35 100.0% 40.42 996.35 100.0% 0.00 0.00 0.00%
02.01.01.06 FILTROS
m3
02.01.01.06.01 FILTRO DE GRAVA GRUESA TAMAÑO MAXIMO 3/4"-1", e= 0.15 m 2.60 207.46 539.40 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 2.60 539.40 100.00%
02.01.01.06.02 FILTRO DE GRAVA TAMAÑO MAXIMO 2", e= 0.15 m m3 0.74 199.81 147.86 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 0.74 147.86 100.00%
02.01.01.07 CARPINTERIA METALICA
SUMINISTRO E INSTALACION DE TAPA METALICA DE und
02.01.01.07.01 0.60X0.60m, E=1/8" INC. LLAVE MAESTRA
2.00 143.28 286.56 - 0.00 0.0% 2.00 286.56 100.0% 2.00 286.56 100.0% 0.00 0.00 0.00%
02.01.01.10 VARIOS
02.01.01.10.01 SUMINISTRO Y COLOCACION DE JUNTA ELASTOMERICA m 2.40 10.91 26.18 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 2.40 26.18 100.00%
m2
02.01.01.10.02 SUMINISTRO Y COLOCACION DE GEOMEMBRANA HDPE 1" . 7.15 13.98 99.96 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 7.15 99.96 100.00%
02.01.01.11.04.02 SUMINISTRO Y COLOCACION DE ALAMBRE DE PUAS m 252.48 1.46 368.62 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 252.48 368.62 100.00%
02.01.01.11.04.03 SUMINISTRO Y COLOCACION DE PUERTA und 2.00 496.32 992.64 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 2.00 992.64 100.00%
02.02 LINEA DE CONDUCCION
02.02.01 LINEA DE CONDUCCION L=87.90 m
02.02.01.01 TRABAJOS PRELIMINARES
02.02.01.01.01 LIMPIEZA DE TERRENO MANUAL m 87.90 0.67 58.89 87.90 58.89 100.0% - 0.00 0.0% 87.90 58.89 100.0% 0.00 0.00 0.0%
02.02.01.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS m 87.90 0.59 51.86 87.90 51.86 100.0% - 0.00 0.0% 87.90 51.86 100.0% 0.00 0.00 0.00%
02.02.01.02 MOVIMIENTO DE TIERRAS
EXCAVACION EN TERRENO NORMAL DE 0.40 x 0.60 m P/TUB. m
02.02.01.02.01 AGUA
79.10 10.98 868.52 79.10 868.52 100.0% - 0.00 0.0% 79.10 868.52 100.0% 0.00 0.00 0.00%
m
02.02.01.02.03 REFINE Y NIVELACION DE FONDOS PARA ZANJA P/TUB. AGUA 87.90 1.82 159.98 87.90 159.98 100.0% - 0.00 0.0% 87.90 159.98 100.0% 0.00 0.00 0.00%
02.02.01.02.07 ELIMINACION DE MATERIAL EXCEDENTE DP=30m m3 4.10 16.86 69.13 4.10 69.13 100.0% - 0.00 0.0% 4.10 69.13 100.0% 0.00 0.00 0.01%
02.02.01.03 SUMINISTRO E INSTALACION DE TUBERIAS
m
02.02.01.03.01 SUMINISTRO E INST. DE TUBERIA PVC NTP 399.002 DN 1" C-10 87.90 5.06 444.77 87.90 444.77 100.0% - 0.00 0.0% 87.90 444.77 100.0% 0.00 0.00 0.00%
02.02.01.03.02 PRUEBA HIDRAULICA P/TUB. m 87.90 1.02 89.66 87.90 89.66 100.0% - 0.00 0.0% 87.90 89.66 100.0% 0.00 0.00 0.00%
02.02.02 CAMARA DE REUNION
02.02.02.01 CAMARA DE REUNION (1 UND)
02.02.02.01.01 TRABAJOS PRELIMINARES
02.02.02.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 6.15 0.67 4.12 6.15 4.12 100.0% - 0.00 0.0% 6.15 4.12 100.0% 0.00 0.00 -0.01%
02.02.02.01.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 6.15 1.19 7.32 6.15 7.32 100.0% - 0.00 0.0% 6.15 7.32 100.0% 0.00 0.00 0.02%
02.02.02.01.02 MOVIMIENTO DE TIERRAS
02.02.02.01.02.01 EXCAVACION EN TERRENO NORMAL m3 3.87 38.54 149.15 3.87 149.15 100.0% - 0.00 0.00% 3.87 149.15 100.0% 0.00 0.00 0.00%
02.02.02.01.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 2.58 25.96 66.98 2.58 66.98 100.0% - 0.00 0.00% 2.58 66.98 100.0% 0.00 0.00 0.00%
02.02.02.01.02.03 ELIMINACION DE MATERIAL EXCEDENTE DP=30 M m3 1.55 16.86 26.13 1.55 26.13 100.0% - 0.00 0.0% 1.55 26.13 100.0% 0.00 0.00 0.0%
02.02.02.01.03 OBRAS DE CONCRETO SIMPLE
02.02.02.01.03.01 CONCRETO F'C=100 kg/cm2, e=4", S/MEZCLADORA m2 0.36 44.03 15.85 0.36 15.85 100.0% - 0.00 0.0% 0.36 15.85 100.0% 0.00 0.00 0.0%
02.02.02.01.03.02 CONCRETO f'c=140 kg/cm2 + 30% PM, S/MEZCLADORA m3 0.05 440.60 22.03 0.05 22.03 100.0% - 0.00 0.0% 0.05 22.03 100.0% 0.00 0.00 0.00%
02.02.02.01.03.03 CONCRETO f'c=140 kg/cm2, S/MEZCLADORA m3 0.01 493.90 4.94 0.01 4.94 100.0% - 0.00 0.0% 0.01 4.94 100.0% 0.00 0.00 0.02%
02.02.02.01.04 OBRAS DE CONCRETO ARMADO
02.02.02.01.04.01 CONCRETO F'C=175 kg/cm2 S/MEZCLADORA m3 0.53 497.13 263.48 0.53 263.48 100.0% - 0.00 0.0% 0.53 263.48 100.0% 0.00 0.00 0.00%
02.02.02.01.04.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 33.26 7.48 248.78 33.26 248.78 100.0% - 0.00 0.0% 33.26 248.78 100.0% 0.00 0.00 0.00%
02.02.02.01.05 REVOQUES, ENLUCIDOS Y MOLDURAS
m2
02.02.02.01.05.01 TARRAJEO CON IMPERMEABILIZANTE MEZCLA 1:2, E=2.0 CM 2.52 30.01 75.63 - 0.00 0.0% 2.52 75.63 100.0% 2.52 75.63 100.0% 0.00 0.00 0.01%
02.02.02.01.05.02 TARRAJEO INT. Y EXT. MEZC. 1:4, E=1.5 cm m2 3.78 24.65 93.18 - 0.00 0.0% 3.78 93.18 100.0% 3.78 93.18 100.0% 0.00 0.00 0.00%
02.02.02.01.06 ACCESORIOS
SUMINISTRO E INSTALACION DE ACCESORIOS DE ENTRADA 1 und
02.02.02.01.06.01 DE 1" ( CAPTACION 01)
1.00 92.13 92.13 - 0.00 0.0% 1.00 92.13 100.0% 1.00 92.13 100.0% 0.00 0.00 0.00%
02.02.02.01.08 PINTURA
02.02.02.01.08.01 PINTURA C/ESMALTE 02 MANOS (Exterior) m2 3.78 15.28 57.76 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 3.78 57.76 100.00%
02.03 RESERVORIOS
02.03.01 RESERVORIO APOYADO V=10m3 (01 UND)
02.03.01.01 TRABAJOS PRELIMINARES
02.03.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 27.52 0.67 18.44 27.52 18.44 100.0% - 0.00 0.0% 27.52 18.44 100.0% 0.00 0.00 0.01%
02.03.01.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 27.52 1.19 32.75 27.52 32.75 100.0% - 0.00 0.0% 27.52 32.75 100.0% 0.00 0.00 0.00%
02.03.01.02 ESTRUCTURAS
02.03.01.02.01 MOVIMIENTO DE TIERRAS
02.03.01.02.01.01 EXCAVACIÓN EN TERRENO NORMAL m3 13.72 38.54 528.77 13.72 528.77 100.0% - 0.00 0.0% 13.72 528.77 100.0% 0.00 0.00 0.00%
02.03.01.02.01.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 5.48 25.96 142.26 5.48 142.26 100.0% - 0.00 0.0% 5.48 142.26 100.0% 0.00 0.00 0.00%
02.03.01.02.01.03 NIVELACIÓN INTERIOR Y APISONADO m2 32.72 6.68 218.57 32.72 218.57 100.0% - 0.00 0.0% 32.72 218.57 100.0% 0.00 0.00 0.00%
02.03.01.02.01.04 ELIMINACION DE MATERIAL EXCEDENTE DP=30m. m3 10.29 16.86 173.49 - 0.00 0.0% 10.29 173.49 100.0% 10.29 173.49 100.0% 0.00 0.00 0.00%
02.03.01.02.02 OBRAS DE CONCRETO SIMPLE
02.03.01.02.02.01 SOLADO
02.03.01.02.02.01.01CONCRETO f'c = 100 Kg/cm2, S/MEZCLADORA m3 1.84 44.03 81.02 1.84 81.02 100.0% - 0.00 0.0% 1.84 81.02 100.0% 0.00 0.00 0.01%
02.03.01.02.02.01.02ENCOFRADO Y DESENCOFRADO EN SOLADO m2 0.88 36.84 32.42 0.88 32.42 100.0% - 0.00 0.0% 0.88 32.42 100.0% 0.00 0.00 0.00%
02.03.01.02.02.02 VEREDAS
02.03.01.02.02.02.01CONCRETO f'c=140 kg/cm2, S/MEZCLADORA m3 1.69 493.90 834.69 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 1.69 834.69 100.00%
02.03.01.02.02.02.02ENCOFRADO Y DESENCOFRADO EN VEREDA m2 4.48 45.54 204.02 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 4.48 204.02 100.00%
02.03.01.02.02.03 DADO DE CONCRETO EN REBOSE
02.03.01.02.02.03.01CONCRETO f'c=140 kg/cm2,S/MEZCLADORA m3 0.05 493.90 24.70 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 0.05 24.70 100.00%
02.03.01.02.02.03.02CONCRETO f'c=140 kg/cm2 + 30 PM, S/MEZCLADORA m3 0.05 440.60 22.03 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 0.05 22.03 100.00%
02.03.01.02.02.03.03ENCOFRADO Y DESENCOFRADO EN DADO DE REBOSE m2 0.56 35.61 19.94 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 0.56 19.94 100.00%
02.03.01.02.03 OBRAS DE CONCRETO ARMADO
02.03.01.02.03.01 ZAPATA CORRIDA
02.03.01.02.03.01.01CONCRETO f'c=210 kg/cm2 S/MEZCLADORA m3 2.27 526.80 1,195.84 2.27 1,195.84 100.0% - 0.00 0.0% 2.27 1,195.84 100.0% 0.00 0.00 0.00%
02.03.01.02.03.01.02ENCOFRADO Y DESENCOFRADO EN ZAPATA CORRIDA m2 6.84 37.28 255.00 6.84 255.00 100.0% - 0.00 0.0% 6.84 255.00 100.0% 0.00 0.00 0.00%
02.03.01.02.03.01.03ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 211.66 7.44 1,574.75 211.66 1,574.75 100.0% - 0.00 0.0% 211.66 1,574.75 100.0% 0.00 0.00 0.00%
02.03.01.02.03.03.03ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 (M.C) kg 428.93 7.48 3,208.40 428.93 3,208.40 100.0% - 0.00 0.0% 428.93 3,208.40 100.0% 0.00 0.00 0.00%
02.03.01.02.03.04 LOSA DE TECHO
02.03.01.02.03.04.01CONCRETO f´c=210 Kg/cm2 S/MEZCLADORA (L.T) m3 1.89 526.80 995.65 1.89 995.65 100.0% - 0.00 0.0% 1.89 995.65 100.0% 0.00 0.00 0.00%
02.03.01.02.03.04.02ENCOFRADO Y DESENCOFRADO LOSA DE TECHO (L.T) m2 12.56 36.24 455.17 12.56 455.17 100.0% - 0.00 0.0% 12.56 455.17 100.0% 0.00 0.00 0.00%
02.03.01.02.03.04.03ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 (L.T) kg 109.31 7.48 817.64 109.31 817.64 100.0% - 0.00 0.0% 109.31 817.64 100.0% 0.00 0.00 0.00%
02.03.01.02.04 ESTRUCTURA METÁLICA
02.03.01.02.04.01 ESCALERA METÁLICA INTERIOR TIPO GATO F°G° 5/8" und 1.00 306.89 306.89 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 1.00 306.89 100.00%
02.03.01.02.04.02 ESCALERA METALICA EXTERIOR TIPO GATO FºGº 5/8" und 1.00 306.89 306.89 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 1.00 306.89 100.00%
SUMINISTRO E INSTALACION DE TAPAS METALICAS DE 0.60 X und
02.03.01.02.04.03 0.60 M E=1/8" INC. LLAVE MAESTRA
1.00 160.14 160.14 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 1.00 160.14 100.00%
02.03.01.03 ARQUITECTURA
02.03.01.03.01 REVOQUES Y ENLUCIDOS
02.03.01.03.01.01 TARRAJEO INT. Y EXT. MEZC. 1:4 E=1.5 cm m2 57.62 24.65 1,420.33 - 0.00 0.0% 57.62 1,420.33 100.0% 57.62 1,420.33 100.0% 0.00 0.00 0.00%
02.03.01.03.01.02 TARRAJEO C/IMPERMEAB. MEZCLA 1:2, E=2 CM m2 28.92 31.30 905.20 - 0.00 0.0% 28.92 905.20 100.0% 28.92 905.20 100.0% 0.00 0.00 0.00%
02.03.01.03.01.03 TARRAJEO EN PENDIENTE DE FONDO MORTERO 1:4 m2 9.00 58.00 522.00 - 0.00 0.0% 9.00 522.00 100.0% 9.00 522.00 100.0% 0.00 0.00 0.00%
02.03.01.03.01.04 OCHAVO SANITARIO MORTERO 1:4 m 3.00 28.39 85.17 - 0.00 0.0% 3.00 85.17 100.0% 3.00 85.17 100.0% 0.00 0.00 0.00%
02.03.01.03.02 PINTURA
02.03.01.03.02.01 PINTURA C/ESMALTE 02 MANOS (Exterior) m2 37.70 15.28 576.06 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 37.70 576.06 100.00%
02.03.01.04 CASETA DE CLORACION
02.03.01.04.01 CONCRETO ARMADO
02.03.01.04.01.01 CONCRETO F'C 210 (CASETA DE CLORACIÓN) m3 0.44 526.80 231.79 0.44 231.79 100.0% - 0.00 0.0% 0.44 231.79 100.0% 0.00 0.00 0.00%
m2
02.03.01.04.01.02 ENCOFRADO Y DESENCOFRADO (CASETA DE CLORACIÓN) 8.02 37.04 297.06 8.02 297.06 100.0% - 0.00 0.0% 8.02 297.06 100.0% 0.00 0.00 0.00%
02.03.01.04.01.03 ACERO DE REFUERZO (CASETA DE CLORACIÓN) Kg 33.38 7.48 249.68 33.38 249.68 100.0% - 0.00 0.0% 33.38 249.68 100.0% 0.00 0.00 0.00%
02.03.01.04.02 REVOQUES Y ENLUCIDOS
TARRAJEO INT. Y EXT. MEZC. 1:4 E=1.5 cm (CASETA DE m2
02.03.01.04.02.01 CLORACIÓN)
8.53 24.65 210.26 - 0.00 0.0% 8.53 210.26 100.0% 8.53 210.26 100.0% 0.00 0.00 0.00%
02.03.01.05 VARIOS
02.03.01.05.01 JUNTA WATER STOP NEOPRENE 6" m 13.60 62.15 845.24 13.60 845.24 100.0% - 0.00 0.0% 13.60 845.24 100.0% 0.00 0.00 0.00%
02.03.01.05.02 SUMINISTRO Y COLOCACION DE JUNTA ELASTOMERICA m 13.60 10.91 148.38 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 13.60 148.38 100.00%
02.03.01.05.03 SUMINISTRO E INST. DE ACCESORIOS DE VENTILACION und 1.00 133.35 133.35 - 0.00 0.0% 1.00 133.35 100.0% 1.00 133.35 100.0% 0.00 0.00 0.00%
PRUEBA HIDRAULICA Y DESINFECCIÓN DE ESTANQUEIDAD glb
02.03.01.05.04 EN RESERVORIO
1.00 251.49 251.49 - 0.00 0.0% 1.00 251.49 100.0% 1.00 251.49 100.0% 0.00 0.00 0.00%
und
02.03.01.06.03.01.02SUMINISTRO E INST. DE ACCESORIOS DE SALIDA - RAP 01 1.00 243.63 243.63 - 0.00 0.0% - 0.00 0.0% 0.00 0.00 0.0% 1.00 243.63 100.00%
und
02.03.01.06.03.01.03SUMINISTRO E INST. DE ACCESORIOS DE BY PASS - RAP 01 1.00 242.00 242.00 - 0.00 0.0% - 0.00 0.0% 0.00 0.00 0.0% 1.00 242.00 100.00%
und
02.03.01.06.03.01.04SUMINISTRO E INST. DE ACCESORIOS DE LIMPIA Y REBOSE 1.00 592.43 592.43 - 0.00 0.0% - 0.00 0.0% 0.00 0.00 0.0% 1.00 592.43 100.00%
02.04.01.02.10 ELIMINACION DE MATERIAL EXCEDENTE DP=30m m3 227.50 16.86 3,835.65 68.25 1,150.70 30.0% 147.88 2,493.17 65.0% 216.13 3,643.87 95.0% 11.38 191.78 5.00%
02.04.01.03 SUMINISTRO E INSTALACION DE TUBERIAS
SUMINISTRO E INST. DE TUBERIA PVC NTP 399.002 DN 1 1/4"
02.04.01.03.01 C-10 m 622.80 5.62 3,500.14 622.80 3,500.14 100.0% - 0.00 0.0% 622.80 3,500.14 100.0% 0.00 0.00 0.00%
SUMINISTRO E INSTALACION DE TUBERIA PVC NTP ITINTEC m
02.04.01.03.02 399.002 DN Ø 1'' C-10
904.30 5.06 4,575.76 904.30 4,575.76 100.0% - 0.00 0.0% 904.30 4,575.76 100.0% 0.00 0.00 0.00%
02.04.01.03.04 PRUEBA HIDRAULICA P/TUB m 4,932.30 1.02 5,030.95 2,687.10 2,740.84 54.5% 2,000.00 2,040.00 40.5% 4,687.10 4,780.84 95.0% 245.20 250.11 4.97%
02.04.01.04 SUMINISTRO E INSTALACION DE ACCESORIOS
SUMINISTRO E INSTALACION DE ACCESORIOS EN RED DE glb
02.04.01.04.01 DISTRIBUCION PVC
1.00 199.00 199.00 0.30 59.70 30.0% 0.60 119.40 60.0% 0.90 179.10 90.0% 0.10 19.90 10.00%
02.04.02.01.09 PINTURA
02.04.02.01.09.01 PINTURA C/ESMALTE 02 MANOS (Exterior) m2 11.52 15.28 176.03 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 11.52 176.03 100.00%
02.04.03 CAMARA ROMPE PRESION TIPO VII
02.04.03.01 CAMARA ROMPE PRESION TIPO VII - (12 UND)
02.04.03.01.01 TRABAJOS PRELIMINARES
02.04.03.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 47.76 0.67 32.00 47.76 32.00 100.0% - 0.00 0.0% 47.76 32.00 100.0% 0.00 0.00 0.00%
02.04.03.01.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 47.76 1.19 56.83 47.76 56.83 100.0% - 0.00 0.0% 47.76 56.83 100.0% 0.00 0.00 -0.01%
02.04.03.01.02 MOVIMIENTO DE TIERRAS
02.04.03.01.02.01 EXCAVACION EN TERRENO NORMAL m3 63.09 38.54 2,431.49 63.09 2,431.49 100.0% - 0.00 0.0% 63.09 2,431.49 100.0% 0.00 0.00 0.00%
02.04.03.01.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 32.32 25.96 839.03 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 32.32 839.03 100.00%
02.04.03.01.02.03 ELIMINACION DE MATERIAL EXCEDENTE DP= 30 M m3 36.93 16.86 622.64 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 36.93 622.64 100.00%
02.04.03.01.03 OBRAS DE CONCRETO SIMPLE
02.04.03.01.03.01 CONCRETO f'c=100 kg/cm2, e= 4", S/MEZCLADORA m2 24.12 44.03 1,062.00 24.12 1,062.00 100.0% - 0.00 0.0% 24.12 1,062.00 100.0% 0.00 0.00 0.00%
02.04.03.01.03.02 CONCRETO f'c=140 kg/cm2, S/MEZCLADORA m3 0.14 493.90 69.15 0.14 69.15 100.0% - 0.00 0.0% 0.14 69.15 100.0% 0.00 0.00 0.01%
02.04.03.01.03.03 ENCOFRADO Y DESENCOFRADO EN DADO DE REBOSE m2 2.88 35.61 102.56 2.88 102.56 100.0% - 0.00 0.0% 2.88 102.56 100.0% 0.00 0.00 0.00%
02.04.03.01.03.04 CONCRETO f'c=140 kg/cm2 + 30% PM, S/MEZCLADORA m3 0.60 579.93 347.96 0.60 347.96 100.0% - 0.00 0.0% 0.60 347.96 100.0% 0.00 0.00 0.00%
02.04.03.01.04 OBRAS DE CONCRETO ARMADO
02.04.03.01.04.01 CONCRETO F'C=175 KG/CM2, S/MEZCLADORA m3 12.68 493.19 6,253.65 11.41 5,628.28 90.0% 1.27 625.36 10.0% 12.68 6,253.65 100.0% 0.00 0.00 0.00%
02.04.03.01.04.02 ENCOFRADO Y DESENCOFRADO EN CAMARA ROMPE PRESION m2 132.48 36.24 4,801.08 119.23 4,320.97 90.0% 13.25 480.11 10.0% 132.48 4,801.08 100.0% 0.00 0.00 0.00%
02.04.03.01.04.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 902.23 7.48 6,748.68 902.23 6,748.68 100.0% - 0.00 0.0% 902.23 6,748.68 100.0% 0.00 0.00 0.00%
02.04.03.01.05 REVOQUES, ENLUCIDOS Y MOLDURAS
02.04.03.01.05.01 TARRAJEO C/IMPERMEAB. MEZCLA 1:2, E=2 CM m2 48.48 31.30 1,517.42 - 0.00 0.0% 48.48 1,517.42 100.0% 48.48 1,517.42 100.0% 0.00 0.00 0.00%
02.04.03.01.05.02 TARRAJEO INT. Y EXT., MEZCLA 1:4 , E=1.5 CM m2 86.28 24.65 2,126.80 - 0.00 0.0% 86.28 2,126.80 100.0% 86.28 2,126.80 100.0% 0.00 0.00 0.00%
02.04.03.01.06 PINTURA
02.04.03.01.06.01 PINTURA C/ESMALTE 02 MANOS (Exterior) m2 74.40 15.28 1,136.83 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 74.40 1,136.83 100.00%
02.04.03.01.07 CARPINTERIA METALICA
SUMINISTRO E INSTALACION DE TAPAS METALICAS DE und
02.04.03.01.07.01 0.60X0.60m, E=1/8" INC. LLAVE MAESTRA
12.00 143.28 1,719.36 - 0.00 0.0% 10.00 1,432.80 83.3% 10.00 1,432.80 83.3% 2.00 286.56 16.67%
SUMINISTRO E INSTALACION DE TAPAS METALICAS DE
02.04.03.01.07.02 0.40X0.50m, E=1/8" INC. LLAVE MAESTRA und 12.00 129.54 1,554.48 - 0.00 0.0% 10.00 1,295.40 83.3% 10.00 1,295.40 83.3% 2.00 259.08 16.67%
02.04.03.01.08 VALVULAS Y ACCESORIOS
SUMINISTRO E INSTALACION DE ACCESORIOS DE ENTRADA
02.04.03.01.08.01 3/4'' Y SALIDAE3/4'' und 11.00 163.29 1,796.19 - 0.00 0.0% 11.00 1,796.19 100.0% 11.00 1,796.19 100.0% 0.00 0.00 0.00%
SUMINISTRO INSTALACION DE ACCESORIOS DE ENTRADA 1''
02.04.03.01.08.02 Y SALIDA 1'' und 1.00 205.67 205.67 - 0.00 0.0% 1.00 205.67 100.0% 1.00 205.67 100.0% 0.00 0.00 0.00%
SUMINISTRO E INSTALACION DE ACCESORIOS DE LIMPIA Y und
02.04.03.01.08.03 REBOSE, 2"
12.00 160.54 1,926.48 - 0.00 0.0% 12.00 1,926.48 100.0% 12.00 1,926.48 100.0% 0.00 0.00 0.00%
kg
02.04.04.02.04.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 63.33 7.48 473.71 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 63.33 473.71 100.00%
02.06.01.06.03 TARRAJEO MEZC. 1:4, E=1.5CM m2 46.28 24.09 1,114.89 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 46.28 1,114.89 100.00%
02.06.01.07 SUMINISTRO E INST. DE ACCESORIOS - LAVADERO
SUMINISTRO E INST. DE ACCESORIOS EN LAVADERO
02.06.01.07.01 INTRADOMICILIARIO und 20.00 154.98 3,099.60 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 20.00 3,099.60 100.00%
02.07 FLETE
02.07.01 FLETE TERRESTRE
02.07.01.01 FLETE TERRESTRE SISTEMA DE AGUA POTABLE glb 1.00 7,000.00 7,000.00 0.80 5,600.00 80.0% 0.20 1,400.00 20.0% 1.00 7,000.00 100.0% 0.00 0.00 0.00%
02.07.02 FLETE RURAL
02.07.03 FLETE RURAL SISTEMA DE AGUA POTABLE glb 1.00 18,500.00 18,500.00 0.80 14,800.00 80.0% 0.10 1,850.00 10.0% 0.90 16,650.00 90.0% 0.10 1,850.00 10.00%
ADECUADA INFRAESTUCTURA DE DISPOSICION SANITARIA
03 DE EXCRETAS
03.01 UBS ARRASTRE HIDRAULICO
03.01.01 UBS ARRASTRE HIDRAULICO-VIVIENDAS (20 UBS)
03.01.01.01 ESTRUCTURAS
03.01.01.01.01 OBRAS PRELIMINARES
03.01.01.01.01.01 LIMPIEZA Y DESBROCE DE TERRENO MANUAL m2 136.00 0.67 91.12 136.00 91.12 100.0% - 0.00 0.0% 136.00 91.12 100.0% 0.00 0.00 0.00%
03.01.01.01.01.02 TRAZO, NIVELACION Y REPLANTEO m2 136.00 1.19 161.84 136.00 161.84 100.0% - 0.00 0.0% 136.00 161.84 100.0% 0.00 0.00 0.00%
03.01.01.01.02 MOVIMIENTO DE TIERRAS
03.01.01.01.02.01 EXCAVACION EN TERRENO NORMAL m3 38.13 38.54 1,469.53 38.13 1,469.53 100.0% - 0.00 0.0% 38.13 1,469.53 100.0% 0.00 0.00 0.00%
03.01.01.01.02.02 EXCAVACION EN TERRENO SEMIROCOSO m3 6.35 53.95 342.58 6.35 342.58 100.0% - 0.00 0.0% 6.35 342.58 100.0% 0.00 0.00 0.00%
03.01.01.01.02.03 REFINE Y NIVELACION DE FONDOS m2 54.72 4.09 223.80 54.72 223.80 100.0% - 0.00 0.0% 54.72 223.80 100.0% 0.00 0.00 0.00%
RELLENO COMPACTADO CON MATERIAL PROPIO m3
03.01.01.01.02.04 SELECCIONADO 5.02 25.96 130.32 5.02 130.32 100.0% - 0.00 0.0% 5.02 130.32 100.0% 0.00 0.00 0.00%
03.01.01.01.02.05 ELIMINACION DE MATERIAL EXCEDENTE DP=30 M m3 70.23 16.86 1,184.08 70.23 1,184.08 100.0% - 0.00 0.0% 70.23 1,184.08 100.0% 0.00 0.00 0.00%
03.01.01.01.03 OBRAS DE CONCRETO SIMPLE
03.01.01.01.03.01 CIMIENTOS
03.01.01.01.03.01.01CONCRETO CICLOPEO MEZCLA C:H 1:10 + 30% P.G m3 27.36 402.68 11,017.32 27.36 11,017.32 100.0% - 0.00 0.0% 27.36 11,017.32 100.0% 0.00 0.00 0.00%
03.01.01.01.03.02 SOBRECIMIENTOS
03.01.01.01.03.02.01CONCRETO SIMPLE MEZCLA 1:8 +25% P.M m3 5.62 445.57 2,504.10 5.62 2,504.10 100.0% - 0.00 0.0% 5.62 2,504.10 100.0% 0.00 0.00 0.00%
03.01.01.01.03.02.02ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTO m2 91.04 36.84 3,353.91 91.04 3,353.91 100.0% - 0.00 0.0% 91.04 3,353.91 100.0% 0.00 0.00 0.00%
03.01.01.01.03.03 SARDINEL PARA DUCHA
03.01.01.01.03.03.01CONCRETO F'C=140 KG/CM2, S/MEZCLADORA m3 0.56 493.90 276.58 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 0.56 276.58 100.00%
03.01.01.01.03.03.02ENCOFRADO Y DESENCOFRADO EN SARDINEL m2 14.48 36.64 530.55 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 14.48 530.55 100.00%
03.01.01.01.03.04 VEREDAS
03.01.01.01.03.04.01CONCRETO F'C=140 KG/CM2, E=4", S/MEZCLADORA m2 42.72 55.85 2,385.91 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 42.72 2,385.91 100.00%
03.01.01.01.03.04.02JUNTAS ELASTOMERICA, E=1/2". m 35.60 11.54 410.82 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 35.60 410.82 100.00%
03.01.01.01.03.04.03BRUÑAS PARA VEREDA E=1CM m 72.60 10.25 744.15 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 72.60 744.15 100.00%
03.01.01.01.03.05 PISOS
m2
03.01.01.01.03.05.01CONCRETO F'C=140 KG/CM2, ACABADO FROTACHADO, E=10CM 34.09 58.57 1,996.65 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 34.09 1,996.65 100.00%
03.01.01.02.03.02 TARRAJEO DE COLUMNETAS, FROTACHADO, C:A= 1:4, 1.5cm m2 55.95 28.82 1,612.48 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 55.95 1,612.48 100.00%
03.01.01.02.03.03 TARRAJEO DE VIGUETAS, C:A=1:4, e=1.5cm. m2 41.10 28.82 1,184.50 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 41.10 1,184.50 100.00%
VESTIDURAS DE DERRAMES MEZCLA C:A 1:4, e=1.5cm., ANCHO m
03.01.01.02.03.04 = 0.15m
150.00 20.02 3,003.00 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 150.00 3,003.00 100.00%
03.01.01.02.03.05 PARED DUCHA CERAMICO 0.30 x 0.30 m m2 62.28 42.04 2,618.25 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 62.28 2,618.25 100.00%
03.01.01.02.04 CONTRAZOCALOS
CONTRAZOCALO DE CEMENTO Y PULIDO CON MORTERO,
03.01.01.02.04.01 C:A=1:4, e=1.5cm m2 90.22 35.75 3,225.37 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 90.22 3,225.37 100.00%
03.01.01.02.05 PINTURA
03.01.01.02.05.01 PINTURA ESMALTE ( Columnas y vigas) m2 97.05 14.69 1,425.66 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 97.05 1,425.66 100.00%
03.01.01.02.05.02 PINTURA ESMALTE (Contrazocalos) m2 90.22 16.40 1,479.61 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 90.22 1,479.61 100.00%
03.01.01.02.06 COBERTURAS
COBERTURA CON CALAMINA GALVANIZADA DE
03.01.01.02.06.01 1.80X0.83X0.30 mm m2 215.60 24.44 5,269.26 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 215.60 5,269.26 100.00%
03.01.01.02.06.02 VIGA DE MADERA TORNILLO 2"X3" p2 229.66 17.49 4,016.75 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 229.66 4,016.75 100.00%
03.01.01.02.06.03 CORREA DE MADERA TORNILLO 2"X2" p2 336.83 11.77 3,964.49 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 336.83 3,964.49 100.00%
03.01.01.02.06.04 ACCESORIO DE FIJACIÓN und 120.00 29.10 3,492.00 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 120.00 3,492.00 100.00%
03.01.01.02.07 CARPINTERIA DE MADERA
PUERTA DE MADERA TORNILLO DE UBS INCLUYE CON
03.01.01.02.07.01 MARCO DE und 20.00 500.77 10,015.40 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 20.00 10,015.40 100.00%
PUERTA DE MADERA DE 2"X 1 1/2"
CAJA DE VALVULA EN PARED CON TRIPLAY DE
03.01.01.02.07.02 4mm, CON MARCO DE 35X20cm und 40.00 19.10 764.00 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 40.00 764.00 100.00%
VENTANA CON MARCO DE MADERA DE 1"X1 "/C MALLA und
03.01.01.02.07.03 MOSQUETERO
20.00 39.03 780.60 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 20.00 780.60 100.00%
03.01.01.04.06.02.02ENCOFRADO Y DESENCOFRADO EN VIGA CIRCULAR m2 31.91 37.13 1,184.82 - 0.00 0.0% 9.57 355.45 30.0% 9.57 355.45 30.0% 22.34 829.37 70.00%
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 (VIGA kg
03.01.01.04.06.02.03CIRCULAR) 304.17 7.48 2,275.19 - 0.00 0.0% 91.25 682.56 30.0% 91.25 682.56 30.0% 212.92 1,592.63 70.00%
03.01.01.04.06.02.04CONCRETO F'C=175 KG/CM2,S/MEZCLADORA (LOSA DE TECHO) m3 4.18 497.13 2,078.00 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 4.18 2,078.00 100.00%
03.01.01.04.06.02.05ENCOFRADO Y DESENCOFRADO EN LOSA DE TECHO m2 26.33 36.64 964.73 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 26.33 964.73 100.00%
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 (LOSA DE kg
03.01.01.04.06.02.06TECHO) 335.87 7.48 2,512.31 - 0.00 0.0% 0.00 0.0% 0.00 0.00 0.0% 335.87 2,512.31 100.00%
04.02 EQUIPOS DE PROTECCION PERSONAL (EPP) glb 1.00 1,768.91 1,768.91 0.90 1,592.02 90.0% - 0.00 0.0% 0.90 1,592.02 90.0% 0.10 176.89 10.00%
04.03 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 1.00 8,504.30 8,504.30 0.50 4,252.15 50.0% - 0.00 0.0% 0.50 4,252.15 50.0% 0.50 4,252.15 50.00%
RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN glb
04.04 SEGURIDAD Y SALUD EN OBRA
1.00 1,483.70 1,483.70 0.50 741.85 50.0% - 0.00 0.0% 0.50 741.85 50.0% 0.50 741.85 50.00%
05 MITIGACION AMBIENTAL
PROGRAMA DE MANEJO DE RESIDUOS SOLIDOS Y
05.01 LIQUIDOS
IMPLEMENTACION DE CILINDROS PROVISIONALES PARA und
05.01.01 ALMACENAR RESIDUOS
3.00 240.00 720.00 1.00 240.00 33.3% 1.00 240.00 33.3% 2.00 480.00 66.7% 1.00 240.00 33.33%
CONSTRUCCION DE MICRORELLENO SANITARIOS DE 3.0 X 3.0
05.01.02 X 1.0 M und 1.00 665.24 665.24 1.00 665.24 100.0% - 0.00 0.0% 1.00 665.24 100.0% 0.00 0.00 0.00%
MATERIALES PARA CHARLAS DE MANEJO DE RESIDUOS und
05.01.03 SOLIDOS.
2.00 199.20 398.40 - 0.00 0.0% - 0.00 0.0% 0.00 0.00 0.0% 2.00 398.40 100.00%
und
05.03.04 EQUIPO CONTRAINCENDIO (EXTINTORES 12 KG) 1.00 149.90 149.90 1.00 149.90 100.0% - 0.00 0.0% 1.00 149.90 100.0% 0.00 0.00 0.00%
06.02.02 PRUEBAS RAPIDAS PARA DETECTAR COVID-19 kit 35.00 127.14 4,449.90 15.00 1,907.10 42.9% 10.00 1,271.40 28.6% 25.00 3,178.50 71.4% 10.00 1,271.40 28.57%
glb
EQUIPAMIENTO, IMPLEMENTOS E INSUMOS PARA LA
06.02.03 PREVENCION DEL COVID-19
1.00 14,854.69 14,854.69 0.30 4,456.41 30.0% 0.20 2,970.94 20.0% 0.50 7,427.35 50.0% 0.50 7,427.35 50.00%
06.02.04 SEÑALIZACION Y CAPACITACION glb 1.00 1,550.83 1,550.83 0.30 465.25 30.0% - 0.00 0.0% 0.30 465.25 30.0% 0.70 1,085.58 70.00%
07 EDUCACION SANITARIA AMBIENTAL Y AOM
07.01 COSTO DE PERSONAL PARA DESARROLLAR LA CAPACITACION glb 1.00 10,500.00 10,500.00 - 0.00 0.0% - 0.00 0.0% 0.00 0.00 0.0% 1.00 10,500.00 100.00%
07.02 PLAN DE GESTIÓN DEL SERVICIO glb 1.00 1,519.60 1,519.60 - 0.00 0.0% - 0.00 0.0% 0.00 0.00 0.0% 1.00 1,519.60 100.00%
07.03 PLAN DE EDUCACIÓN SANITARIA AMBIENTAL glb 1.00 3,500.00 3,500.00 - 0.00 0.0% - 0.00 0.0% 0.00 0.00 0.0% 1.00 3,500.00 100.00%
08 GESTION DE RIESGOS
GESTION DE RIEGOS EN LA PLANIFICACION DE
08.01 glb 1.00 5,000.00 5,000.00 - 0.00 0.0% - 0.00 0.0% 0.00 0.00 0.0% 1.00 5,000.00 100.00%
EJECUCION DE OBRA
COSTO DIRECTO 772,037.98 292,716.53 37.91% 159,523.32 20.66% 452,239.85 58.6% 319,798.13 41.42%
GASTOS GENERALES 10.66279% 10.66% 82,320.79 31,211.75 17,009.64 48,221.39 34,099.40
UTILIDAD 2.00% 2.00% 15,440.76 5,854.33 3,190.47 9,044.80 6,395.96
MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO BASICO EN EL CASERIO DE LA LUCMA SAN RAFAEL, DISTRITO DE
PROYECTO:
BAMBAMARCA, PROVINCIA DE HUALGAYOC - CAJAMARCA
MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO BASICO EN EL CASERIO DE LA LUCMA SAN RAFAEL, DISTRITO DE
PROYECTO:
BAMBAMARCA, PROVINCIA DE HUALGAYOC - CAJAMARCA
MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO BASICO EN EL CASERIO DE LA LUCMA SAN RAFAEL, DISTRITO DE
PROYECTO:
BAMBAMARCA, PROVINCIA DE HUALGAYOC - CAJAMARCA
MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO BASICO EN EL CASERIO DE LA LUCMA SAN RAFAEL, DISTRITO DE
PROYECTO:
BAMBAMARCA, PROVINCIA DE HUALGAYOC - CAJAMARCA
MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO BASICO EN EL CASERIO DE LA LUCMA SAN RAFAEL, DISTRITO DE
PROYECTO:
BAMBAMARCA, PROVINCIA DE HUALGAYOC - CAJAMARCA
MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO BASICO EN EL CASERIO DE LA LUCMA SAN RAFAEL, DISTRITO DE
PROYECTO:
BAMBAMARCA, PROVINCIA DE HUALGAYOC - CAJAMARCA
MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO BASICO EN EL CASERIO DE LA LUCMA SAN RAFAEL, DISTRITO DE
PROYECTO:
BAMBAMARCA, PROVINCIA DE HUALGAYOC - CAJAMARCA
MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO BASICO EN EL CASERIO DE LA LUCMA SAN RAFAEL, DISTRITO DE
PROYECTO:
BAMBAMARCA, PROVINCIA DE HUALGAYOC - CAJAMARCA
MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO BASICO EN EL CASERIO DE LA LUCMA SAN RAFAEL, DISTRITO DE
PROYECTO:
BAMBAMARCA, PROVINCIA DE HUALGAYOC - CAJAMARCA
MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO BASICO EN EL CASERIO DE LA LUCMA SAN RAFAEL, DISTRITO DE
PROYECTO:
BAMBAMARCA, PROVINCIA DE HUALGAYOC - CAJAMARCA
MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO BASICO EN EL CASERIO DE LA LUCMA SAN RAFAEL, DISTRITO DE
PROYECTO:
BAMBAMARCA, PROVINCIA DE HUALGAYOC - CAJAMARCA
COSTO DIRECTO 2,229,920.06 S/. 44,598.40 S/. 245,291.21 S/. 557,480.01 S/. 639,243.75 S/. 505,448.54 S/. 237,858.14
GASTOS GENERALES (1.99%) 44,406.45 1.99% S/. 888.13 S/. 4,884.71 S/. 11,101.62 S/. 12,729.85 S/. 10,065.46 S/. 4,736.69
UTILIDAD (1.9%) 42,368.48 1.90% S/. 847.37 S/. 4,660.53 S/. 10,592.12 S/. 12,145.63 S/. 9,603.52 S/. 4,519.30
SUB-TOTAL 2,316,694.99 S/. 46,333.90 S/. 254,836.45 S/. 579,173.75 S/. 664,119.24 S/. 525,117.53 S/. 247,114.13
IMPUESTO IGV (18%) 417,005.10 S/. 8,340.10 S/. 45,870.56 S/. 104,251.27 S/. 119,541.46 S/. 94,521.16 S/. 44,480.54
PRESUPUESTO DE AVANCE MENSUAL 2,733,700.09 S/. 54,674.00 S/. 300,707.01 S/. 683,425.02 S/. 783,660.70 S/. 619,638.68 S/. 291,594.68
PRESUPUESTO DE AVANCE ACUMULADO S/. 54,674.00 S/. 355,381.01 S/. 1,038,806.04 S/. 1,822,466.74 S/. 2,442,105.42 S/. 2,733,700.09
PORCENTAJE DE AVANCE MENSUAL 2.00% 11.00% 25.00% 28.67% 22.67% 10.67%
PORCENTAJE DE AVANCE ACUMULADO 2.00% 13.00% 38.00% 66.67% 89.33% 100.00%
PROYECTO: “CREACIÓN DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN EL CASERÍO EL PAR
Lugar: CASERÍO EL PARAÍSO DEL DISTRITO DE CHUGUR – PROVINCIA DE HUALGAYOC – DEPARTAMENTO DE CAJA
02.03.01.06.02 ARQUITECTURA
02.03.01.06.02.01 REVOQUES, ENLUCIDOS Y MOLDURAS
02.03.01.06.02.01.01 TARRAJEO INT. Y EXT. MEZC. 1:4 E= 1.5cm m2
02.03.01.06.02.02 PINTURA
02.03.01.06.02.02.01 PINTURA C/ESMALTE 02 MANOS. ( Exterior ) m2
02.03.01.06.03 INSTALACIONES HIDRÁULICAS
02.03.01.06.03.01 VALVULAS Y ACCESORIOS
02.03.01.06.03.01.01 SUMINISTRO E INST. DE ACCESORIOS DE ENTRADA - RAP 01 und
02.03.01.06.03.01.02 SUMINISTRO E INST. DE ACCESORIOS DE SALIDA - RAP 01 und
02.03.01.06.03.01.03 SUMINISTRO E INST. DE ACCESORIOS DE BY PASS - RAP 01 und
02.03.01.06.03.01.04 SUMINISTRO E INST. DE ACCESORIOS DE LIMPIA Y REBOSE und
02.03.01.06.04 CARPINTERIA METALICA
SUMINISTRO E INSTALACION DE TAPAS METALICAS DE 0.60 X 0.60 M E=1/8" INC. LLAVE
02.03.01.06.04.01 und
MAESTRA.
02.03.01.07 CERCO PERIMETRICO
02.03.01.07.01 TRABAJOS PRELIMINARES
02.03.01.07.01.01 TRAZO Y REPLANTEO PRELIMINAR m2
02.03.01.07.02 MOVIMIENTO DE TIERRAS
02.03.01.07.02.01 EXCAVACION EN TERRENO NORMAL m3
02.03.01.07.02.02 ELIMINACION DE MATERIAL EXCEDENTE DP=30M m3
02.03.01.07.03 OBRAS DE CONCRETO SIMPLE
02.03.01.07.03.01 CONCRETO F'C=140 KG/CM2 + 30% PM, S/MEZCLADORA m3
02.03.01.07.04 VARIOS
02.03.01.07.04.01 SUMINISTRO Y COLOCACION DE POSTES DE MADERA TRATADA und
02.03.01.07.04.02 SUMINISTRO Y COLOCACION DE ALAMBRE DE PUAS m
02.03.01.07.04.03 SUMINISTRO Y COLOCACION DE PUERTA und
02.04 REDES DE DISTRIBUCION
02.04.01 REDES DE DISTRIBUCION L= 4932.30M
02.04.01.01 TRABAJOS PRELIMINARES
02.04.01.01.01 LIMPIEZA DE TERRENO MANUAL m
02.04.01.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS m
02.04.01.02 MOVIMIENTO DE TIERRAS
02.04.01.02.01 EXCAVACION EN TERRENO NORMAL DE 0.40 x 0.60 m P/TUB. AGUA m
EXCAVACION EN TERRENO NORMAL DE 0.50 x 1.10 m P/TUB. AGUA (Cruce en via
02.04.01.02.02 m
carrozable)
02.04.01.02.03 EXCAVACION EN TERRENO SEMIROCOSO DE 0.40 x 0.60 m P/TUB. AGUA m
EXCAVACION EN TERRENO SEMIROCOSO DE 0.50 x 1.10 m P/TUB. AGUA (Cruce en via
02.04.01.02.04 m
carrozable)
02.04.01.02.05 REFINE Y NIVELACION DE FONDOS PARA ZANJA P/TUB. AGUA m
02.04.01.02.06 CAMA DE APOYO C/MAT. PROP. ZARANDEADO PARA TUBERIA DE AGUA e=0.10 m m
PRIMER RELLENO COMPACTADO DE ZANJA CON MAT. PROPIO ZARANDEADO e=0.30
02.04.01.02.07 m
m
02.04.01.02.08 SEGUNDO RELLENO CON MATERIAL PROPIO COMPACTADO e=0.20 m m
02.04.01.02.09 SEGUNDO RELLENO CON MATERIAL PROPIO COMPACTADO e=0.70 m m
02.04.01.02.10 ELIMINACION DE MATERIAL EXCEDENTE DP=30m m3
02.04.01.03 SUMINISTRO E INSTALACION DE TUBERIAS
02.04.01.03.01 SUMINISTRO E INST. DE TUBERIA PVC NTP 399.002 DN 1 1/4" C-10 m
02.04.01.03.02 SUMINISTRO E INSTALACION DE TUBERIA PVC NTP ITINTEC 399.002 DN Ø 1'' C-10 m
02.04.01.03.03 SUMINISTRO E INSTALACION DE TUBERIA PVC NTP ITINTEC 399.002 DN Ø 3/4'' C-10 m
02.04.01.03.04 PRUEBA HIDRAULICA P/TUB m
02.04.01.04 SUMINISTRO E INSTALACION DE ACCESORIOS
02.04.01.04.01 SUMINISTRO E INSTALACION DE ACCESORIOS EN RED DE DISTRIBUCION PVC glb
02.04.02 PASES AEREOS
02.04.02.01 PASE AEREO N° 01 (L=18.50.m)
02.04.02.01.01 TRABAJOS PRELIMINARES
02.04.02.01.01.01 LIMPIEZA DE TERRENO MANUAL m2
02.04.02.01.01.02 TRAZO Y REPLANTEO PRELIMINAR m2
02.04.02.01.02 MOVIMIENTO DE TIERRAS
02.04.02.01.02.01 EXCAVACION EN TERRENO NORMAL m3
02.04.02.01.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3
02.04.02.01.02.03 ELIMINACION DE MATERIAL EXCEDENTE DP=30 M m3
02.04.02.01.03 OBRAS DE CONCRETO SIMPLE
02.04.02.01.03.01 CONCRETO F'C=100 kg/cm2, e=4", S/MEZCLADORA m2
02.04.02.01.03.02 CONCRETO f'c=175 kg/cm2, S/MEZCLADORA m3
02.04.02.01.04 OBRAS DE CONCRETO ARMADO
02.04.02.01.04.01 CONCRETO F'C=210 kg/cm2 S/MEZCLADORA m3
02.04.02.01.04.02 ENCOFRADO Y DESENCOFRADO EN COLUMNA m2
02.04.02.01.04.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 Kg
02.04.02.01.05 REVOQUES, ENLUCIDOS Y MOLDURAS
02.04.02.01.05.01 TARRAJEO INT. Y EXT. MEZC. 1:4, E=1.5 cm m2
02.04.02.01.06 ESTRUCTURAS DE ACERO
02.04.02.01.06.01 SUMINISTRO E INSTALACION DE CABLE PRINCIPAL TIPO BOA 6 X 19 DE 1/2" m
02.04.02.01.06.02 SUMINISTRO E INSTALACION DE PENDOLAS DE ACERO 1/4" TIPO BOA 6X9 m
02.04.02.01.07 SUMINISTRO E INSTALACION DE TUBERIAS
02.04.02.01.07.01 SUMINISTRO E INST. DE TUBERIA HDPE 3/4" m
02.04.02.01.07.02 SUMINISTRO E INST. DE TUBERIA PVC NTP 399.002 DN 1 1/2" C-10 m
02.04.02.01.08 SUMINISTRO E INSTALACION DE ACCESORIOS
02.04.02.01.08.01 SUMINISTRO E INSTALACION DE ACCESORIOS DE PASE AEREO glb
02.04.02.01.09 PINTURA
02.04.02.01.09.01 PINTURA C/ESMALTE 02 MANOS (Exterior) m2
02.04.03 CAMARA ROMPE PRESION TIPO VII
02.04.03.01 CAMARA ROMPE PRESION TIPO VII - (12 UND)
02.04.03.01.01 TRABAJOS PRELIMINARES
02.04.03.01.01.01 LIMPIEZA DE TERRENO MANUAL m2
02.04.03.01.01.02 TRAZO Y REPLANTEO PRELIMINAR m2
02.04.03.01.02 MOVIMIENTO DE TIERRAS
02.04.03.01.02.01 EXCAVACION EN TERRENO NORMAL m3
02.04.03.01.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3
02.04.03.01.02.03 ELIMINACION DE MATERIAL EXCEDENTE DP= 30 M m3
02.04.03.01.03 OBRAS DE CONCRETO SIMPLE
02.04.03.01.03.01 CONCRETO f'c=100 kg/cm2, e= 4", S/MEZCLADORA m2
02.04.03.01.03.02 CONCRETO f'c=140 kg/cm2, S/MEZCLADORA m3
02.04.03.01.03.03 ENCOFRADO Y DESENCOFRADO EN DADO DE REBOSE m2
02.04.03.01.03.04 CONCRETO f'c=140 kg/cm2 + 30% PM, S/MEZCLADORA m3
02.04.03.01.04 OBRAS DE CONCRETO ARMADO
02.04.03.01.04.01 CONCRETO F'C=175 KG/CM2, S/MEZCLADORA m3
02.04.03.01.04.02 ENCOFRADO Y DESENCOFRADO EN CAMARA ROMPE PRESION m2
02.04.03.01.04.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg
02.04.03.01.05 REVOQUES, ENLUCIDOS Y MOLDURAS
02.04.03.01.05.01 TARRAJEO C/IMPERMEAB. MEZCLA 1:2, E=2 CM m2
02.04.03.01.05.02 TARRAJEO INT. Y EXT., MEZCLA 1:4 , E=1.5 CM m2
02.04.03.01.06 PINTURA
02.04.03.01.06.01 PINTURA C/ESMALTE 02 MANOS (Exterior) m2
02.04.03.01.07 CARPINTERIA METALICA
02.04.04.01.08 PINTURA
02.04.04.01.08.01 PINTURA C/ESMALTE 02 MANOS (Exterior) m2
02.04.04.01.09 SUMINISTRO E INST. DE ACCESORIOS - VALVULA CONTROL
02.04.04.01.09.01 SUMINISTRO E INST. DE ACCESORIOS EN VALVULA DE CONTROL 3/4" und
02.04.04.01.09.02 SUMINISTRO E INST. DE ACCESORIOS EN VALVULA DE CONTROL 1 1/4" und
02.04.04.02 VALVULA DE AIRE (3 UNID)
02.04.04.02.01 TRABAJOS PRELIMINARES
02.04.04.02.01.01 LIMPIEZA DE TERRENO MANUAL m2
02.04.04.02.01.02 TRAZO Y REPLANTEO PRELIMINAR m2
02.04.04.02.02 MOVIMIENTO DE TIERRAS
02.04.04.02.02.01 EXCAVACION EN TERRENO NORMAL m3
02.04.04.02.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3
02.04.04.02.02.03 ELIMINACION DE MATERIAL EXCEDENTE DP=30m m3
02.04.04.02.03 OBRA DE CONCRETO SIMPLE
02.04.04.02.03.01 CONCRETO f'c=100 kg/cm2, e= 4", S/MEZCLADORA m2
02.04.04.02.03.02 CONCRETO FC=140 KG/CM2, S/MEZCLADORA m3
02.04.04.02.04 OBRAS DE CONCRETO ARMADO
02.04.04.02.04.01 CONCRETO F'C=175 KG/CM2, S/MEZCLADORA m3
02.04.04.02.04.02 ENCOFRADO Y DESENCOFRADO EN CAJA DE VALVULAS m2
02.04.04.02.04.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg
02.04.04.02.05 REVOQUES Y ENLUCIDOS
02.04.04.02.05.01 TARRAJEO INT. Y EXT. MEZC. 1:4 E=1.5 cm m2
02.04.04.02.06 FILTROS
02.04.04.02.06.01 FILTRO DE GRAVA m3
02.04.04.02.07 CARPINTERIA METALICA
02.04.04.02.07.01 SUMINISTRO E INST. DE TAPA METALICA DE 0.60 X 0.60 m E=1/8" INC. LLAVE MAESTRA Und
02.04.04.02.08 PINTURA
02.04.04.02.08.01 PINTURA C/ESMALTE 02 MANOS (Exterior) m2
02.04.04.02.09 SUMINISTRO E INST. DE ACCESORIOS - VALVULA DE AIRE
02.04.04.02.09.01 SUMINISTRO E INST. DE ACCESORIOS EN VALVULA DE AIRE 1 1/4" und
02.04.04.02.09.02 SUMINISTRO E INST. DE ACCESORIOS EN VALVULA DE AIRE 1" und
02.04.04.02.09.03 SUMINISTRO E INST. DE ACCESORIOS EN VALVULA DE AIRE 3/4" und
02.04.04.03 VALVULA DE PURGA (6 UNID)
02.04.04.03.01 TRABAJOS PRELIMINARES
02.04.04.03.01.01 LIMPIEZA DE TERRENO MANUAL m2
02.04.04.03.01.02 TRAZO Y REPLANTEO PRELIMINAR m2
02.04.04.03.02 MOVIMIENTO DE TIERRAS
02.04.04.03.02.01 EXCAVACION EN TERRENO NORMAL m3
02.04.04.03.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3
02.04.04.03.02.03 ELIMINACION DE MATERIAL EXCEDENTE DP=30m m3
02.04.04.03.03 OBRAS DE CONCRETO SIMPLE
02.04.04.03.03.01 CONCRETO f'c=100 kg/cm2, e= 4", S/MEZCLADORA m2
02.04.04.03.03.02 CONCRETO FC=140 KG/CM2, S/MEZCLADORA m3
02.04.04.03.03.03 CONCRETO f'c=140 kg/cm2 + 30% PM, S/MEZCLADORA m3
02.04.04.03.04 OBRAS DE CONCRETO ARMADO
02.04.04.03.04.01 CONCRETO F'C=175 KG/CM2, S/MEZCLADORA m3
02.04.04.03.04.02 ENCOFRADO Y DESENCOFRADO EN CAJA DE VALVULAS m2
02.04.04.03.04.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg
02.04.04.03.05 REVOQUES Y ENLUCIDOS
02.04.04.03.05.01 TARRAJEO INT. Y EXT. MEZC. 1:4 E=1.5 cm m2
02.04.04.03.06 FILTROS
02.04.04.03.06.01 FILTRO DE GRAVA m3
02.04.04.03.07 CARPINTERIA METALICA
02.04.04.03.07.01 SUMINISTRO E INST. DE TAPA METALICA DE 0.60 X 0.60 m E=1/8" INC. LLAVE MAESTRA Und
02.04.04.03.08 PINTURA
02.04.04.03.08.01 PINTURA C/ESMALTE 02 MANOS (Exterior) m2
02.04.04.03.09 SUMINISTRO E INST. DE ACCESORIOS - VALVULA DE PURGA
02.04.04.03.09.01 SUMINISTRO E INST. DE ACCESORIOS EN VALVULA DE PURGA 3/4" und
02.04.04.03.09.02 SUMINISTRO E INST. DE ACCESORIOS EN VALVULA DE PURGA 1" und
02.05 CONEXIONES DOMICILIARIAS
02.05.01 CONEXIONES DOMICILIARIAS (20 UNID)
02.05.01.01 TRABAJOS PRELIMINARES
02.05.01.01.01 LIMPIEZA DE TERRENO MANUAL m
02.05.01.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS m
02.05.01.02 MOVIMIENTO DE TIERRAS
02.05.01.02.01 EXCAVACION MANUAL DE ZANJA EN TERRENO NORMAL DE 0.40X0.50 m P/TUB. AGUA m
02.05.01.02.03 REFINE Y NIVELACION DE FONDO PARA ZANJA DE 0.40 x 0.50 m P/TUB. AGUA m
02.05.01.02.04 CAMA DE APOYO PARA TUBERIA DE AGUA E=0.10M (ZANJA DE 0.40 x 0.50 m) m
02.05.01.02.05 PRIMER RELLENO COMPACTADO DE ZANJA CON MAT. PROPIO ZARANDEADO e=0.30 M m
02.05.01.02.06 SEGUNDO RELLENO CON MATERIAL PROPIO COMPACTADO E=0.10M m
02.05.01.02.07 ELIMINACION DE MATERIAL EXCEDENTE DP=30m m3
02.05.01.03 SUMINISTRO E INSTALACION DE TUBERIAS
02.05.01.03.01 SUMINISTRO E INSTALACION DE TUBERIA PVC NTP ITINTEC 399.002 DN Ø 1/2'' C-10 m
02.05.01.04 SUMINISTRO E INST. DE ACCESORIOS - CONEXIONES DOMICILIARIAS
02.05.01.04.01 SUMINISTRO E INST. DE ACCESORIOS EN CONEXIONES DOMICILIARIAS (Para Ø 3/4") und
02.05.01.04.02 SUMINISTRO E INST. DE ACCESORIOS EN CONEXIONES DOMICILIARIAS (Para Ø 1 1/4") und
02.05.01.04.03 SUMINISTRO E INST. DE CAJA DE CONCRETO 0.50 X 0.30 M INC. ACCESORIOS und
02.06 LAVADEROS DOMICILIARIOS
02.06.01 LAVADERO DOMICILIARIOS (20Und)
02.06.01.01 TRABAJOS PRELIMINARES
02.06.01.01.01 LIMPIEZA DE TERRENO MANUAL m2
02.06.01.01.02 TRAZO Y REPLANTEO PRELIMINAR m2
02.06.01.02 MOVIMIENTO DE TIERRAS
02.06.01.02.01 EXCAVACIÓN EN TERRENO NORMAL m3
02.06.01.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3
02.06.01.02.03 ELIMINACION DE MATERIAL EXCEDENTE DP=30m m3
02.06.01.03 OBRAS DE CONCRETO SIMPLE
02.06.01.03.01 CONCRETO CICLOPEO 1:10 + 20% PM m3
02.06.01.04 ALBAÑILERIA
02.06.01.04.01 MURO DE LADRILLO KK DE ARCILLA DE SOGA, MEZCLA C:A 1:4 m2
02.06.01.05 OBRAS DE CONCRETO ARMADO
02.06.01.05.01 CONCRETO F'C = 175 KG/CM2 S/MEZCLADORA m3
02.06.01.05.02 ENCOFRADO Y DESENCOFRADO EN LAVADERO m2
02.06.01.05.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg
02.06.01.06 REVOQUES Y ENLUCIDOS
02.06.01.06.01 TARRAJEO PULIDO MEZC. 1:4, E=1.5CM m2
02.06.01.06.02 TARRAJEO PULIDO IMPERMEABILIZADO MEZC. 1:4, E= 1.5CM m2
02.06.01.06.03 TARRAJEO MEZC. 1:4, E=1.5CM m2
02.06.01.07 SUMINISTRO E INST. DE ACCESORIOS - LAVADERO
02.06.01.07.01 SUMINISTRO E INST. DE ACCESORIOS EN LAVADERO INTRADOMICILIARIO und
02.07 FLETE
02.07.01 FLETE TERRESTRE
02.07.01.01 FLETE TERRESTRE SISTEMA DE AGUA POTABLE glb
02.07.02 FLETE RURAL
02.07.03 FLETE RURAL SISTEMA DE AGUA POTABLE glb
03 ADECUADA INFRAESTUCTURA DE DISPOSICION SANITARIA DE EXCRETAS
03.01 UBS ARRASTRE HIDRAULICO
03.01.01 UBS ARRASTRE HIDRAULICO-VIVIENDAS (20 UBS)
03.01.01.01 ESTRUCTURAS
03.01.01.01.01 OBRAS PRELIMINARES
03.01.01.01.01.01 LIMPIEZA Y DESBROCE DE TERRENO MANUAL m2
03.01.01.01.01.02 TRAZO, NIVELACION Y REPLANTEO m2
03.01.01.01.02 MOVIMIENTO DE TIERRAS
03.01.01.01.02.01 EXCAVACION EN TERRENO NORMAL m3
03.01.01.01.02.02 EXCAVACION EN TERRENO SEMIROCOSO m3
03.01.01.01.02.03 REFINE Y NIVELACION DE FONDOS m2
03.01.01.01.02.04 RELLENO COMPACTADO CON MATERIAL PROPIO SELECCIONADO m3
03.01.01.01.02.05 ELIMINACION DE MATERIAL EXCEDENTE DP=30 M m3
03.01.01.01.03 OBRAS DE CONCRETO SIMPLE
03.01.01.01.03.01 CIMIENTOS
03.01.01.01.03.01.01 CONCRETO CICLOPEO MEZCLA C:H 1:10 + 30% P.G m3
03.01.01.01.03.02 SOBRECIMIENTOS
03.01.01.01.03.02.01 CONCRETO SIMPLE MEZCLA 1:8 +25% P.M m3
03.01.01.01.03.02.02 ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTO m2
03.01.01.01.03.03 SARDINEL PARA DUCHA
03.01.01.01.03.03.01 CONCRETO F'C=140 KG/CM2, S/MEZCLADORA m3
03.01.01.01.03.03.02 ENCOFRADO Y DESENCOFRADO EN SARDINEL m2
03.01.01.01.03.04 VEREDAS
03.01.01.01.03.04.01 CONCRETO F'C=140 KG/CM2, E=4", S/MEZCLADORA m2
03.01.01.01.03.04.02 JUNTAS ELASTOMERICA, E=1/2". m
03.01.01.01.03.04.03 BRUÑAS PARA VEREDA E=1CM m
03.01.01.01.03.05 PISOS
03.01.01.01.03.05.01 CONCRETO F'C=140 KG/CM2, ACABADO FROTACHADO, E=10CM m2
03.01.01.01.04 OBRAS DE CONCRETO ARMADO
03.01.01.01.04.01 COLUMNETAS
03.01.01.01.04.01.01 CONCRETO F'c=175 kg/cm2, S/MEZCLADORA m3
03.01.01.01.04.01.02 ENCOFRADO Y DESENCOFRADO EN COLUMNETA m2
03.01.01.01.04.01.03 ACERO CORRUGADO f'y=4200 kg/cm2 GRADO 60 kg
03.01.01.01.04.02 VIGUETAS
03.01.01.01.04.02.01 CONCRETO F'c=175 kg/cm2, S/MEZCLADORA m3
03.01.01.01.04.02.02 ENCOFRADO Y DESENCOFRADO EN VIGA m2
03.01.01.01.04.02.03 ACERO CORRUGADO f'y=4200 kg/cm2 GRADO 60 kg
03.01.01.02 ARQUITECTURA
03.01.01.02.01 MURO Y TABIQUE DE ALBAÑILERIA
03.01.01.02.01.01 MURO DE SOGA 18 huecos de 23x12.5x9cm, CEMENTO-ARENA 1:5, junta 1.5cm m2
03.01.01.02.02 PISOS
03.01.01.02.02.01 PISO CERAMICO 0.30 x 0.30 m m2
03.01.01.02.03 REVOQUES Y ENLUCIDOS
TARRAJEO DE MUROS INTERIORES, ACABADO PULIDO IMPERMEABILIZADO C:A= 1:4,
03.01.01.02.03.01 m2
e=1.5cm
03.01.01.02.03.02 TARRAJEO DE COLUMNETAS, FROTACHADO, C:A= 1:4, 1.5cm m2
03.01.01.02.03.03 TARRAJEO DE VIGUETAS, C:A=1:4, e=1.5cm. m2
03.01.01.02.03.04 VESTIDURAS DE DERRAMES MEZCLA C:A 1:4, e=1.5cm., ANCHO = 0.15m m
03.01.01.02.03.05 PARED DUCHA CERAMICO 0.30 x 0.30 m m2
03.01.01.02.04 CONTRAZOCALOS
03.01.01.02.04.01 CONTRAZOCALO DE CEMENTO Y PULIDO CON MORTERO, C:A=1:4, e=1.5cm m2
03.01.01.02.05 PINTURA
03.01.01.02.05.01 PINTURA ESMALTE ( Columnas y vigas) m2
03.01.01.02.05.02 PINTURA ESMALTE (Contrazocalos) m2
03.01.01.02.06 COBERTURAS
03.01.01.02.06.01 COBERTURA CON CALAMINA GALVANIZADA DE 1.80X0.83X0.30 mm m2
03.01.01.02.06.02 VIGA DE MADERA TORNILLO 2"X3" p2
03.01.01.02.06.03 CORREA DE MADERA TORNILLO 2"X2" p2
03.01.01.02.06.04 ACCESORIO DE FIJACIÓN und
03.01.01.02.07 CARPINTERIA DE MADERA
03.01.01.02.07.03 VENTANA CON MARCO DE MADERA DE 1"X1 "/C MALLA MOSQUETERO und
03.01.01.02.08 APARATOS Y ACCESORIOS SANITARIOS
03.01.01.04.05 BIODIGESTOR
03.01.01.04.05.01 MOVIMIENTO DE TIERRAS
03.01.01.04.05.01.01 EXCAVACION EN TERRENO NORMAL m3
03.01.01.04.05.01.02 EXCAVACION EN TERRENO SEMIROCOSO m3
03.01.01.04.05.01.03 REFINE Y NIVELACION DE FONDOS m2
03.01.01.04.05.01.04 RELLENO COMPACTADO CON MATERIAL PROPIO SELECCIONADO m3
03.01.01.04.05.01.05 ELIMINACION DE MATERIAL EXCEDENTE DP=30 M m3
03.01.01.04.05.02 OBRAS DE CONCRETO SIMPLE
03.01.01.04.05.02.01 CONCRETO F'c=100 kg/cm2, e= 4", S/MEZCLADORA m2
03.01.01.04.05.03 SUMINISTRO E INSTALACION DE BIODIGESTOR
03.01.01.04.05.03.01 SUMINISTRO E INST. DE BIODIGESTOR Y ACCESORIOS (700 L) und
03.01.01.04.05.04 VARIOS
03.01.01.04.05.04.01 REPELLADO DE Cº, E=0.03m, C:A=1:3 CON MALLA EXAGONAL 3/4" m2
03.01.01.04.06 POZO DE PERCOLACION
03.01.01.04.06.01 MOVIMIENTO DE TIERRAS
03.01.01.04.06.01.01 EXCAVACION EN TERRENO NORMAL m3
03.01.01.04.06.01.02 EXCAVACION EN TERRENO SEMIROCOSO m3
03.01.01.04.06.01.03 REFINE Y NIVELACION DE FONDOS m2
03.01.01.04.06.01.04 ELIMINACION DE MATERIAL EXCEDENTE DP=30 M m3
03.01.01.04.06.02 OBRAS DE CONCRETO ARMADO
03.01.01.04.06.02.01 CONCRETO F'C=175 KG/CM2, S/MEZCLADORA (VIGA CIRCULAR) m3
03.01.01.04.06.02.02 ENCOFRADO Y DESENCOFRADO EN VIGA CIRCULAR m2
03.01.01.04.06.02.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 (VIGA CIRCULAR) kg
03.01.01.04.06.02.04 CONCRETO F'C=175 KG/CM2,S/MEZCLADORA (LOSA DE TECHO) m3
03.01.01.04.06.02.05 ENCOFRADO Y DESENCOFRADO EN LOSA DE TECHO m2
03.01.01.04.06.02.06 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 (LOSA DE TECHO) kg
03.01.01.04.06.03 TAPA DE CONCRETO
03.01.01.04.06.03.01 TAPA DE CONCRETO 60 X 60 X 5 CM und
03.01.01.04.06.04 ALBAÑILERIA
03.01.01.04.06.04.01 MURO DE CABEZA LADRILLO KING-KONG CON CEMENTO - ARENA m2
03.01.01.04.06.05 SISTEMA DE DRENAJE
03.01.01.04.06.05.01 SUMINISTRO E INST. GRAVA DE 2" m3
03.01.01.04.06.05.02 SUMINISTRO E INST. GRAVA DE 1" m3
03.02 FLETE
03.02.01 FLETE TERRESTRE
03.02.01.01 FLETE TERRESTRE SISTEMA DE SANEAMIENTO glb
03.02.02 FLETE RURAL
03.02.02.01 FLETE RURAL SISTEMA DE SANEAMIENTO glb
04 SEGURIDAD Y SALUD
ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y
04.01 glb
SALUD EN EL TRABAJO
04.02 EQUIPOS DE PROTECCION PERSONAL (EPP) glb
04.03 SEÑALIZACION TEMPORAL DE SEGURIDAD glb
RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD EN
04.04 glb
OBRA
05 MITIGACION AMBIENTAL
05.01 PROGRAMA DE MANEJO DE RESIDUOS SOLIDOS Y LIQUIDOS
05.01.01 IMPLEMENTACION DE CILINDROS PROVISIONALES PARA ALMACENAR RESIDUOS und
05.01.02 CONSTRUCCION DE MICRORELLENO SANITARIOS DE 3.0 X 3.0 X 1.0 M und
05.01.03 MATERIALES PARA CHARLAS DE MANEJO DE RESIDUOS SOLIDOS. und
05.02 PROGRAMA DE MITIGACION AMBIENTAL
05.02.01 ELABORACION DE BAÑOS TEMPORALES (UBS HOYO SECO) und
05.02.02 TRASLADO DE RESIDUOS SOLIDOS und
05.02.03 HUMEDECIMIENTO DE TERRENO Y AGREGADOS PARA EVITAR GENERAR POLVO m
05.02.04 REPOSICION DE COBERTURA VEGETAL m2
05.02.05 MATERIALES PARA CHARLA DE INTRODUCCION AL MEDIO AMBIENTE und
05.03 PROGRAMA DE CONTINGENCIA
05.03.01 SEÑALIZACION DE AREAS m
05.03.02 LETREROS INFORMATIVOS glb
05.03.03 EQUIPO DE PRIMEROS AUXILIOS (BOTIQUIN) und
05.03.04 EQUIPO CONTRAINCENDIO (EXTINTORES 12 KG) und
05.04 ETAPA DE CIERRE DE EJECUCION DE OBRA
05.04.01 ELIMINACION DE RESIDUOS EN GENERAL glb
05.04.02 CLAUSURA DE LETRINAS PROVISIONALES und
05.04.03 CLAUSURA DE MICRORELLENO und
06 SEGURIDAD EN OBRA E IMPLEMENTACION DE PROTOCOLO COVID-19
06.01 SEGURIDAD EN OBRAS
06.01.01 PROTECCIÓN DE CABEZA, VISTA Y OÍDOS glb
06.01.02 PROTECCION PARA EXTREMIDADES glb
06.01.03 ROPA DE TRABAJO glb
06.01.04 PROTECCIÓN PARA TRABAJO EN ALTURA glb
06.01.05 PROTECCIÓN PARA SEÑALIZACIÓN glb
06.02 PLAN PARA LA VIGILANCIA, PREVENCION Y CONTROL DE COVID-19.
06.02.01 RESPONSABLES DE SEGURIDAD DE SALUD DE LOS TRABAJADORES glb
06.02.02 PRUEBAS RAPIDAS PARA DETECTAR COVID-19 kit
06.02.03 EQUIPAMIENTO, IMPLEMENTOS E INSUMOS PARA LA PREVENCION DEL COVID-19 glb
06.02.04 SEÑALIZACION Y CAPACITACION glb
07 EDUCACION SANITARIA AMBIENTAL Y AOM
07.01 COSTO DE PERSONAL PARA DESARROLLAR LA CAPACITACION glb
07.02 PLAN DE GESTIÓN DEL SERVICIO glb
07.03 PLAN DE EDUCACIÓN SANITARIA AMBIENTAL glb
08 GESTION DE RIESGOS
08.01 GESTION DE RIEGOS EN LA PLANIFICACION DE EJECUCION DE OBRA glb
Costo Directo
Gastos Generales
Utilidad
Sub-Total
Total Final
DO EN EL CASERÍO EL PARAÍSO DEL DISTRITO DE CHUGUR – PROVINCIA DE HUALGAYOC – DEPARTAMENTO DE CAJAMARCA”
– DEPARTAMENTO DE CAJAMARCA
P. Unit. Parcial Mes 1 Mes 2 Mes 3
Metrado
S/. S/. Parcial % Parcial % Parcial %
2,810.69 2,810.69 100.00% - 0.00% - 0.00%
1,210.69 1,210.69 100.00% - 0.00% - 0.00%
1.00 1,210.69 1,210.69 1,210.69 100.00% 0.00% 0.00%
1,600.00 1,600.00 100.00% - 0.00% - 0.00%
1.00 1,600.00 1,600.00 1,600.00 100.00% 0.00% 0.00%
344,488.46 26,841.09 7.79% 117,522.98 34.12% 114,368.21 33.20%
18,058.64 1,705.84 9.45% 7,086.43 39.24% 496.54 2.75%
18,058.64 1,705.84 9.45% 7,086.43 39.24% 496.54 2.75%
32.19 32.19 100.00% - 0.00% - 0.00%
28.21 0.67 18.90 18.90 100.00% 0.00% 0.00%
11.17 1.19 13.29 13.29 100.00% 0.00% 0.00%
2,253.32 1,198.60 53.19% - 0.00% 210.54 9.34%
28.97 38.54 1,116.50 1,116.50 100.00% 0.00% 0.00%
8.11 25.96 210.54 0.00% 0.00% 210.54 100.00%
12.29 6.68 82.10 82.10 100.00% 0.00% 0.00%
50.07 16.86 844.18 0.00% 0.00% 0.00%
613.27 348.91 56.89% 264.36 43.11% - 0.00%
7.70 44.03 339.03 339.03 100.00% 0.00% 0.00%
0.02 493.90 9.88 9.88 100.00% 0.00% 0.00%
0.60 440.60 264.36 0.00% 264.36 100.00% 0.00%
6,822.07 - 0.00% 6,822.07 100.00% - 0.00%
6.34 526.80 3,339.91 0.00% 3,339.91 100.00% 0.00%
39.39 36.68 1,444.83 0.00% 1,444.83 100.00% 0.00%
272.37 7.48 2,037.33 0.00% 2,037.33 100.00% 0.00%
1,568.34 - 0.00% - 0.00% 286.00 18.24%
19.06 30.01 571.99 0.00% 0.00% 286.00 50.00%
40.42 24.65 996.35 0.00% 0.00% 0.00%
687.26 - 0.00% - 0.00% - 0.00%
2.60 207.46 539.40 0.00% 0.00% 0.00%
0.74 199.81 147.86 0.00% 0.00% 0.00%
545.64 - 0.00% - 0.00% - 0.00%
1.00
DE CAJAMARCA”
Mes 4
Parcial
- 0.00%
- 0.00%
0.00%
- 0.00%
0.00%
85,756.18 24.89%
8,769.83 48.56%
8,769.83 48.56%
- 0.00%
0.00%
0.00%
844.18 37.46%
0.00%
0.00%
0.00%
844.18 100.00%
- 0.00%
0.00%
0.00%
0.00%
- 0.00%
0.00%
0.00%
0.00%
1,282.34 81.76%
285.99 50.00%
996.35 100.00%
687.26 100.00%
539.40 100.00%
147.86 100.00%
545.64 100.00%
286.56 100.00%
259.08 100.00%
362.90 100.00%
362.90 100.00%
554.64 100.00%
255.44 100.00%
299.20 100.00%
- 0.00%
0.00%
0.00%
4,492.87 100.00%
46.54 100.00%
46.54 100.00%
93.91 100.00%
45.86 100.00%
48.05 100.00%
616.84 100.00%
616.84 100.00%
3,735.58 100.00%
2,374.32 100.00%
368.62 100.00%
992.64 100.00%
- 0.00%
- 0.00%
- 0.00%
0.00%
0.00%
- 0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
- 0.00%
0.00%
0.00%
- 0.00%
- 0.00%
- 0.00%
0.00%
0.00%
- 0.00%
0.00%
0.00%
0.00%
- 0.00%
0.00%
0.00%
0.00%
- 0.00%
0.00%
0.00%
0.00%
- 0.00%
0.00%
0.00%
- 0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
- 0.00%
0.00%
- 0.00%
0.00%
7,312.84 22.68%
7,312.84 22.68%
- 0.00%
0.00%
0.00%
2,175.11 11.52%
315.75 29.70%
0.00%
142.26 100.00%
0.00%
173.49 100.00%
1,085.44 89.06%
- 0.00%
0.00%
0.00%
1,038.71 100.00%
834.69 100.00%
204.02 100.00%
46.73 70.09%
24.70 100.00%
22.03 100.00%
0.00%
- 0.00%
- 0.00%
0.00%
0.00%
0.00%
- 0.00%
0.00%
0.00%
- 0.00%
0.00%
0.00%
0.00%
- 0.00%
0.00%
0.00%
0.00%
773.92 100.00%
306.89 100.00%
306.89 100.00%
160.14 100.00%
3,153.68 89.88%
2,577.62 87.89%
1,065.25 75.00%
905.20 100.00%
522.00 100.00%
85.17 100.00%
576.06 100.00%
576.06 100.00%
249.68 13.39%
249.68 32.07%
0.00%
0.00%
249.68 100.00%
- 0.00%
0.00%
- 0.00%
0.00%
0.00%
399.87 29.01%
0.00%
148.38 100.00%
0.00%
251.49 100.00%
1,078.06 34.24%
- 0.00%
- 0.00%
0.00%
0.00%
0.00%
0.00%
- 0.00%
0.00%
- 0.00%
0.00%
0.00%
0.00%
- 0.00%
- 0.00%
0.00%
- 0.00%
0.00%
1,078.06 70.86%
1,078.06 70.86%
0.00%
243.63 100.00%
242.00 100.00%
592.43 100.00%
- 0.00%
0.00%
256.44 7.54%
- 0.00%
0.00%
256.44 34.43%
0.00%
256.44 100.00%
- 0.00%
0.00%
- 0.00%
0.00%
0.00%
0.00%
52,866.38 22.91%
48,320.57 29.00%
- 0.00%
0.00%
0.00%
48,121.57 35.94%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
30,826.88 100.00%
13,122.08 100.00%
336.96 100.00%
3,835.65 100.00%
- 0.00%
0.00%
0.00%
0.00%
0.00%
199.00 100.00%
199.00 100.00%
1,648.28 21.08%
1,648.28 21.08%
- 0.00%
0.00%
0.00%
- 0.00%
0.00%
0.00%
0.00%
- 0.00%
0.00%
0.00%
- 0.00%
0.00%
0.00%
0.00%
- 0.00%
0.00%
- 0.00%
0.00%
0.00%
- 0.00%
0.00%
0.00%
1,472.25 100.00%
1,472.25 100.00%
176.03 100.00%
176.03 100.00%
2,897.53 8.08%
2,897.53 8.08%
- 0.00%
0.00%
0.00%
622.64 15.99%
0.00%
0.00%
622.64 100.00%
- 0.00%
0.00%
0.00%
0.00%
0.00%
- 0.00%
0.00%
0.00%
0.00%
1,138.06 31.23%
1,138.06 75.00%
0.00%
1,136.83 100.00%
1,136.83 100.00%
- 0.00%
0.00%
0.00%
- 0.00%
0.00%
0.00%
0.00%
0.00%
- 0.00%
- 0.00%
- 0.00%
0.00%
0.00%
- 0.00%
0.00%
0.00%
0.00%
- 0.00%
0.00%
0.00%
- 0.00%
0.00%
0.00%
0.00%
- 0.00%
0.00%
- 0.00%
0.00%
- 0.00%
0.00%
- 0.00%
0.00%
- 0.00%
0.00%
0.00%
- 0.00%
- 0.00%
0.00%
0.00%
- 0.00%
0.00%
0.00%
0.00%
- 0.00%
0.00%
0.00%
- 0.00%
0.00%
0.00%
0.00%
- 0.00%
0.00%
- 0.00%
0.00%
- 0.00%
0.00%
- 0.00%
0.00%
- 0.00%
0.00%
0.00%
0.00%
- 0.00%
- 0.00%
0.00%
0.00%
- 0.00%
0.00%
0.00%
0.00%
- 0.00%
0.00%
0.00%
0.00%
- 0.00%
0.00%
0.00%
0.00%
- 0.00%
0.00%
- 0.00%
0.00%
- 0.00%
0.00%
- 0.00%
0.00%
- 0.00%
0.00%
0.00%
- 0.00%
- 0.00%
- 0.00%
0.00%
0.00%
- 0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
- 0.00%
0.00%
- 0.00%
0.00%
0.00%
0.00%
11,571.84 94.24%
11,571.84 94.24%
- 0.00%
0.00%
0.00%
968.66 76.88%
291.36 50.00%
373.82 100.00%
303.48 100.00%
- 0.00%
0.00%
1,735.18 100.00%
1,735.18 100.00%
3,595.16 100.00%
725.81 100.00%
1,751.84 100.00%
1,117.51 100.00%
2,173.24 100.00%
633.51 100.00%
424.84 100.00%
1,114.89 100.00%
3,099.60 100.00%
3,099.60 100.00%
5,235.29 20.53%
1,317.64 18.82%
1,317.64 18.82%
3,917.65 21.18%
3,917.65 21.18%
82,097.11 25.73%
69,297.13 27.16%
69,297.13 27.16%
- 0.00%
- 0.00%
0.00%
0.00%
- 0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
- 0.00%
- 0.00%
0.00%
- 0.00%
0.00%
0.00%
- 0.00%
0.00%
0.00%
- 0.00%
0.00%
0.00%
0.00%
- 0.00%
0.00%
- 0.00%
- 0.00%
0.00%
0.00%
0.00%
- 0.00%
0.00%
0.00%
0.00%
33,089.01 43.15%
- 0.00%
0.00%
535.63 30.00%
535.63 30.00%
322.50 3.01%
0.00%
322.50 20.00%
0.00%
0.00%
0.00%
3,225.37 100.00%
3,225.37 100.00%
1,479.61 50.93%
0.00%
1,479.61 100.00%
16,742.50 100.00%
5,269.26 100.00%
4,016.75 100.00%
3,964.49 100.00%
3,492.00 100.00%
1,544.60 13.36%
0.00%
764.00 100.00%
780.60 100.00%
9,238.80 100.00%
3,740.00 100.00%
2,668.00 100.00%
2,830.80 100.00%
- 0.00%
- 0.00%
0.00%
0.00%
0.00%
- 0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
- 0.00%
0.00%
- 0.00%
0.00%
0.00%
0.00%
36,208.12 34.78%
- 0.00%
0.00%
0.00%
955.45 14.62%
155.45 4.30%
0.00%
0.00%
0.00%
0.00%
0.00%
155.45 100.00%
800.00 27.44%
0.00%
0.00%
800.00 100.00%
359.29 30.42%
359.29 30.42%
0.00%
0.00%
0.00%
359.29 100.00%
11,693.97 85.42%
1,385.42 44.44%
5,299.20 100.00%
5,009.35 95.00%
11,703.85 34.23%
969.47 33.02%
0.00%
0.00%
0.00%
575.79 100.00%
393.68 100.00%
- 0.00%
0.00%
6,636.20 25.00%
6,636.20 25.00%
4,098.18 100.00%
4,098.18 100.00%
11,495.56 23.99%
2,158.25 32.13%
0.00%
0.00%
0.00%
2,158.25 100.00%
- 0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
3,501.80 100.00%
3,501.80 100.00%
- 0.00%
0.00%
5,835.51 100.00%
734.57 100.00%
5,100.94 100.00%
12,799.98 20.00%
6,023.52 18.82%
6,023.52 18.82%
6,776.46 21.18%
6,776.46 21.18%
856.11 6.92%
0.00%
0.00%
728.94 8.57%
127.17 8.57%
4,467.54 23.95%
- 0.00%
0.00%
0.00%
0.00%
3,076.81 24.84%
0.00%
0.00%
0.00%
2,479.21 100.00%
597.60 100.00%
- 0.00%
0.00%
0.00%
0.00%
0.00%
1,390.73 100.00%
728.33 100.00%
558.56 100.00%
103.84 100.00%
10,439.84 19.30%
3,742.97 21.11%
686.65 21.11%
1,068.44 21.11%
1,722.05 21.11%
124.85 21.11%
140.98 21.11%
6,696.87 18.42%
1,743.75 11.25%
1,056.85 23.75%
3,527.99 23.75%
368.28 23.75%
15,519.60 100.00%
10,500.00 100.00%
1,519.60 100.00%
3,500.00 100.00%
1,055.56 21.11%
1,055.56 21.11%
200,191.94
21,346.05
4,003.84
225,541.83
40,597.53
266,139.36 25.93%
100.00%
ADJUDICACION SIMPLIFICADA N° 004-2021-MDCH/CAS-PRIMERA CONVOCATORIA.
ADJUDICACION
PROYECTO "CREACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN EL CASERIO EL PARAISO, DISTRITO DE CHUGUR,
PROVINCIA DE HUALGAYOC-REGION CAJAMARCA"
ENTIDAD MUNICIPALIDAD DISTRITAL DE CHUGUR
UBICACIÓN CASERIO EL PARAISO
CONTRATISTA CONSORCIO JESAN
SUPERVISION ING. ELMER DIAZ TELLO
VALOR REFERENCIAL : S/. 1,140,403.83
MONTO DE OFERTA : S/. 1,026,363.45
MONTO DE OFERTA (SIN IGV) : S/. 869,799.53
100.0% 100.00%
80.0%
61.38%
SITUACIÓN ACTUAL DE LA 65.91%
OBRA 60.0%
ATRASADA
PORCENTAJE
37.91%
-4.53% 40.0%
37.91%
20.0%
0.00% 16.12%
LEYENDA 16.12%
CURVA PROG.
0.0% 0.00%
Inicio 01/10/21 Oct-21 Nov-21 Dec-21 Jan-22
CURVA REAL
-20.0%
-4.53%
MESES
Inicio
MESES oct-21 nov-21 dic-21 ene-22
01/10/21
100.0% 100.00%
90.0%
89.33%
80.0%
#REF! 50.0%
40.0%
38.00%
LEYENDA 30.0%
Inicio
MESES may-17 jun-17 jul-17 ago-17 sep-17 oct-17
20/05/17
750,000
700,000
650,000 676,431.69
601,217.13
600,000
AVANCE MENSUAL ACUMULADO (S/.)
550,000
500,000
450,000
400,000 389,143.48
389,143.49
350,000
300,000
Col umn I
200,000 165,496.73
150,000 165,496.73
100,000
50,000
0.00
0
0.00
Oct-21 Oct-21 Nov-21 Dec-21
1,350,000
1,300,000 1261016.95
1,250,000
1,200,000
1,150,000 1072526.77
1,100,000
1,050,000
AVANCE MENSUAL ACUMULADO (S/.)
1,000,000
SITUACIÓN ACTUAL DE LA 950,000
858411.35
OBRA 900,000
850,000
ADELANTADA EN 3.82 % 800,000
750,000
700,000
#REF! 650,000
600,000
609336.33
550,000
500,000
450,000
LEYENDA 400,000
350,000
373683.54
PROGRAMADO
300,000
CURVA PROG. 250,000
EJECUTADO
282090.97
200,000
150,000
CURVA REAL 100,000
0
50,000
0
Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 14/01/18
Inicio
MESES mar-18 abr-17 may-17 jun-17 jul-18
15/03/18
700,000.00
616,241.52
600,000.00 547,572.38
SITUACIÓN DE LA OBRA
MONTO 500,000.00
MONTO PARCIAL
ADELANTADA 400,000.00
323,070.41
#REF!
300,000.00
223,194.24
200,000.00
89,421.44
100,000.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00
Inicio 01/10/21 44500 44530 44559 Err:509 Err:509
MESES
Row 53 Row 54
0 1 2 3
COSTO DIRECTO 2,006,928.05 S/. 100,346.40 S/. 401,385.61 S/. 602,078.41 S/. 501,732.01 S/. 401,385.61
GASTOS GENERALES (10.43%) 209,420.54 S/. 10,471.03 S/. 41,884.11 S/. 62,826.16 S/. 52,355.14 S/. 41,884.11
UTILIDAD (5.00%) 100,346.40 S/. 5,017.32 S/. 20,069.28 S/. 30,103.92 S/. 25,086.60 S/. 20,069.28
SUB-TOTAL 2,316,694.99 S/. 115,834.75 S/. 463,339.00 S/. 695,008.50 S/. 579,173.75 S/. 463,339.00
IMPUESTO IGV (18%) 417,005.10 S/. 20,850.25 S/. 83,401.02 S/. 125,101.53 S/. 104,251.27 S/. 83,401.02
PRESUPUESTO TOTAL 2,733,700.09 S/. 136,685.00 S/. 546,740.02 S/. 820,110.03 S/. 683,425.02 S/. 546,740.02
PORCENTAJE DE AVANCE MENSUAL 5.00% 20.00% 30.00% 25.00% 20.00%
PORCENTAJE DE AVANCE ACUMULADO 5.00% 25.00% 55.00% 80.00% 100.00%
CALENDARIO DE AVANCE DE OBRA VALORIZADO FECHADO - VIGENTE
COSTO DIRECTO 2,006,928.05 S/. 40,138.56 S/. 220,762.09 S/. 501,732.01 S/. 575,319.38 S/. 454,903.69 S/. 214,072.33
GASTOS GENERALES (10.43%) 209,420.54 S/. 4,188.41 S/. 23,036.26 S/. 52,355.14 S/. 60,033.89 S/. 47,468.66 S/. 22,338.19
UTILIDAD (5.00%) 100,346.40 S/. 2,006.93 S/. 11,038.10 S/. 25,086.60 S/. 28,765.97 S/. 22,745.18 S/. 10,703.62
SUB-TOTAL 2,316,694.99 S/. 46,333.90 S/. 254,836.45 S/. 579,173.75 S/. 664,119.24 S/. 525,117.53 S/. 247,114.13
IMPUESTO IGV (18%) 417,005.10 S/. 8,340.10 S/. 45,870.56 S/. 104,251.27 S/. 119,541.46 S/. 94,521.15 S/. 44,480.54
PRESUPUESTO DE AVANCE MENSUAL 2,733,700.09 S/. 54,674.00 S/. 300,707.01 S/. 683,425.02 S/. 783,660.70 S/. 619,638.68 S/. 291,594.68
PRSEUPUESTO DE AVANCE ACUMULADO S/. 54,674.00 S/. 355,381.01 S/. 1,038,806.04 S/. 1,822,466.74 S/. 2,442,105.42 S/. 2,733,700.09
PORCENTAJE DE AVANCE MENSUAL 2.00% 11.00% 25.00% 28.67% 22.67% 10.67%
PORCENTAJE DE AVANCE ACUMULADO 2.00% 13.00% 38.00% 66.67% 89.33% 100.00%
CALENDARIO DE AVANCE DE OBRA VALORIZADO
I 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.206 0.206 100.00% 434.89 444.52 0.21056
1.839 1.000
COEFICIENTE DE REAJUSTE K1 1.0029115
VALORIZACION Nº 01
Del 20 al 31 de Mayo - 2017
MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN LA COMUNIDAD DE
PROYECTO:
COLPAMATARA, DISTRITO DE CHOTA, PROVINCIA DE CHOTA - CAJAMARCA
ENTIDAD: MUNICIPALIDAD PROVINCIAL DE CHOTA
COMUNIDAD: COLPAMATARA
DISTRITO: CHOTA
PROVINCIA: CHOTA PLAZO DE EJECUCIÓN: 150 DIAS CALENDARIO
DEPARTAMENTCAJAMARCA FECHA DE INICIO: 20 DE MAYO 2017
VALOR REFER3,037,444.54 FECHA DE TERMINO: 16 DE OCTUBRE 2017
VALOR CONTR2,733,700.09 FECHA PRESUPUESTO BASE: 30 DE NOVIEMBRE DEL 2016
CONTRATISTACONSORCIO COLPAMATARA
SUPERVISOR:CONSORCIO B y Q
CÁLCULO DE REAJUSTE
FORMULA Nº 01: ESTRUCTURAS
Monto Mensual Monto Acumulado Mes Reajuste
Val K
Real Programado Real Programado Reajuste Real Programado Reconocido
20/15/2017 #REF! 54,674.00 #REF! 54,674.00 Apr-17 1.0029 #REF! 159.18 #REF!
AVANCE ACUMULADO EN SOLES (S/) Y PORCENTAJE (%) CUADRO COMPARATIVO FISICO Y FINANCIERO EJECUTADO
700000 70.000%
500000 50.000%
S/. 389,143.49
400000 40.000%
37.91%
300000 30.000%
S/. 165,496.73
200000 20.000%
0 0.000%
0.00 0.000%
Oct-21 Nov-21 Dec-21
2.0.0 DESCUENTOS
02.01.01.08 PINTURA
02.01.01.08.0 PINTURA C/ESMALTE 02 MANOS (Exterior) m2 23.75 - - 0.00% 23.75 100.00%
02.01.01.09 SUMINISTRO Y COLOCACION DE ACCESORIOS
SUMINISTRO Y COLOCACION DE ACCESORIOS DE SALIDA EN und
02.01.01.09.0 CAPTACION Ds=1" 2.00 2.00 2.00 100.00% 0.00 0.00%
02.01.01.10 VARIOS
02.01.01.10.0 SUMINISTRO Y COLOCACION DE JUNTA ELASTOMERICA m 2.40 - - 0.00% 2.40 100.00%
02.01.01.10.0 SUMINISTRO Y COLOCACION DE GEOMEMBRANA HDPE 1" . m2 7.15 - - 0.00% 7.15 100.00%
02.01.01.11 CERCO PERIMETRICO
02.01.01.11.0 TRABAJOS PRELIMINARES
02.01.01.11.0 TRAZO Y REPLANTEO PRELIMINAR m2 39.11 - - 0.00% 39.11 100.00%
02.01.01.11.0 MOVIMIENTO DE TIERRAS
02.01.01.11.0 EXCAVACION EN TERRENO NORMAL m3 1.19 - - 0.00% 1.19 100.00%
02.01.01.11.0 ELIMINACION DE MATERIAL EXCEDENTE DP=30M m3 2.85 - - 0.00% 2.85 100.00%
02.01.01.11.0 OBRAS DE CONCRETO SIMPLE
02.01.01.11.0 CONCRETO F'C=140 KG/CM2 + 30% PM, S/MEZCLADORA m3 1.40 - - 0.00% 1.40 100.00%
02.01.01.11.0 VARIOS-CERCO PERIMETRICO
02.01.01.11.0 SUMINISTRO Y COLOCACION DE POSTES DE MADERA TRATADA und 24.00 - - 0.00% 24.00 100.00%
02.01.01.11.0 SUMINISTRO Y COLOCACION DE ALAMBRE DE PUAS m 252.48 - - 0.00% 252.48 100.00%
02.02.01.02.0 REFINE Y NIVELACION DE FONDOS PARA ZANJA P/TUB. AGUA m 87.90 - 87.90 100.00% 0.00 0.00%
CAMA DE APOYO C/MAT. PROP. ZARANDEADO PARA TUBERIA DE AGUA m
02.02.01.02.0 e=0.10 m 87.90 - 87.90 100.00% 0.00 0.00%
m
02.02.01.02.0 SEGUNDO RELLENO CON MATERIAL PROPIO COMPACTADO e=0.20 m 87.90 - 87.90 100.00% 0.00 0.00%
02.02.01.02.0 ELIMINACION DE MATERIAL EXCEDENTE DP=30m m3 4.10 - 4.10 100.00% 0.00 0.00%
02.02.01.03 SUMINISTRO E INSTALACION DE TUBERIAS
02.02.01.03.0 SUMINISTRO E INST. DE TUBERIA PVC NTP 399.002 DN 1" C-10 m 87.90 - 87.90 0.00 0.00%
02.02.01.03.0 PRUEBA HIDRAULICA P/TUB. m 87.90 - 87.90 0.00 0.00%
02.02.02 CAMARA DE REUNION
02.02.02.01 CAMARA DE REUNION (1 UND)
02.02.02.01.0 TRABAJOS PRELIMINARES
02.02.02.01.0 LIMPIEZA DE TERRENO MANUAL m2 6.15 - 6.15 100.00% 0.00 0.00%
02.02.02.01.0 TRAZO Y REPLANTEO PRELIMINAR m2 6.15 - 6.15 100.00% 0.00 0.00%
02.02.02.01.0 MOVIMIENTO DE TIERRAS
02.02.02.01.0 EXCAVACION EN TERRENO NORMAL m3 3.87 - 3.87 100.00% 0.00 0.00%
02.02.02.01.0 RELLENO COMPACTADO CON MATERIAL PROPIO m3 2.58 - 2.58 100.00% 0.00 0.00%
02.02.02.01.0 ELIMINACION DE MATERIAL EXCEDENTE DP=30 M m3 1.55 - 1.55 100.00% 0.00 0.00%
02.02.02.01.0 OBRAS DE CONCRETO SIMPLE
02.02.02.01.0 CONCRETO F'C=100 kg/cm2, e=4", S/MEZCLADORA m2 0.36 - 0.36 100.00% 0.00 0.00%
02.02.02.01.0 CONCRETO f'c=140 kg/cm2 + 30% PM, S/MEZCLADORA m3 0.05 - 0.05 100.00% 0.00 0.00%
02.02.02.01.0 CONCRETO f'c=140 kg/cm2, S/MEZCLADORA m3 0.01 - 0.01 100.00% 0.00 0.00%
02.02.02.01.0 OBRAS DE CONCRETO ARMADO
02.02.02.01.0 CONCRETO F'C=175 kg/cm2 S/MEZCLADORA m3 0.53 - 0.53 100.00% 0.00 0.00%
02.02.02.01.0 ENCOFRADO Y DESENCOFRADO EN CAMARA DE REUNION m2 5.94 - 5.94 100.00% 0.00 0.00%
02.02.02.01.0 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 33.26 - 33.26 100.00% 0.00 0.00%
02.02.02.01.0 REVOQUES, ENLUCIDOS Y MOLDURAS
02.02.02.01.0 TARRAJEO CON IMPERMEABILIZANTE MEZCLA 1:2, E=2.0 CM m2 2.52 2.52 2.52 100.00% 0.00 0.00%
02.02.02.01.0 TARRAJEO INT. Y EXT. MEZC. 1:4, E=1.5 cm m2 3.78 3.78 3.78 100.00% 0.00 0.00%
02.02.02.01.0 ACCESORIOS
SUMINISTRO E INSTALACION DE ACCESORIOS DE ENTRADA 1 DE 1" und
02.02.02.01.0 ( CAPTACION 01) 1.00 1.00 1.00 100.00% 0.00 0.00%
02.02.02.01.0 SUMINISTRO E INSTALACION DE ACCESORIOS DE SALIDA DE 1" und 1.00 1.00 1.00 100.00% 0.00 0.00%
SUMINISTRO E INSTALACION DE ACCESORIOS DE LIMPIA Y REBOSE DE und
02.02.02.01.0 2" 1.00 1.00 1.00 100.00% 0.00 0.00%
und
02.02.02.01.0 SUMINISTRO E INSTALACION DE ACCESORIOS DE VENTILACION DE 2" 1.00 1.00 1.00 100.00% 0.00 0.00%
02.02.02.01.0 PINTURA - -
02.02.02.01.0 PINTURA C/ESMALTE 02 MANOS (Exterior) m2 3.78 - - 0.00% 3.78 100.00%
02.03 RESERVORIOS
02.03.01.03 ARQUITECTURA
02.03.01.03.0 REVOQUES Y ENLUCIDOS
02.03.01.03.0 TARRAJEO INT. Y EXT. MEZC. 1:4 E=1.5 cm m2 57.62 57.62 57.62 100.00% 0.00 0.00%
02.03.01.03.0 TARRAJEO C/IMPERMEAB. MEZCLA 1:2, E=2 CM m2 28.92 28.92 28.92 100.00% 0.00 0.00%
02.03.01.03.0 TARRAJEO EN PENDIENTE DE FONDO MORTERO 1:4 m2 9.00 9.00 9.00 100.00% 0.00 0.00%
02.03.01.03.0 OCHAVO SANITARIO MORTERO 1:4 m 3.00 3.00 3.00 100.00% 0.00 0.00%
02.03.01.03.0 PINTURA
02.03.01.03.0 PINTURA C/ESMALTE 02 MANOS (Exterior) m2 37.70 - - 0.00% 37.70 100.00%
02.03.01.04 CASETA DE CLORACION
02.03.01.04.0 CONCRETO ARMADO
02.03.01.04.0 CONCRETO F'C 210 (CASETA DE CLORACIÓN) m3 0.44 - 0.44 100.00% 0.00 0.00%
02.03.01.04.0 ENCOFRADO Y DESENCOFRADO (CASETA DE CLORACIÓN) m2 8.02 - 8.02 100.00% 0.00 0.00%
02.03.01.04.0 ACERO DE REFUERZO (CASETA DE CLORACIÓN) Kg 33.38 - 33.38 100.00% 0.00 0.00%
02.03.01.04.0 REVOQUES Y ENLUCIDOS
m
02.04.01.02.0 EXCAVACION EN TERRENO SEMIROCOSO DE 0.40 x 0.60 m P/TUB. AGUA 189.60 189.60 189.60 100.00% 0.00 0.00%
02.04.01.02.0 REFINE Y NIVELACION DE FONDOS PARA ZANJA P/TUB. AGUA m 4,932.30 851.35 4,684.39 94.97% 247.91 5.03%
CAMA DE APOYO C/MAT. PROP. ZARANDEADO PARA TUBERIA DE AGUA m
02.04.01.02.0 e=0.10 m 4,932.30 2,000.00 4,687.10 95.03% 245.20 4.97%
m
02.04.01.02.0 SEGUNDO RELLENO CON MATERIAL PROPIO COMPACTADO e=0.20 m 4,896.30 3,310.00 4,653.55 95.04% 242.75 4.96%
m
02.04.01.02.0 SEGUNDO RELLENO CON MATERIAL PROPIO COMPACTADO e=0.70 m 36.00 - - 0.00% 36.00 100.00%
02.04.01.02.1 ELIMINACION DE MATERIAL EXCEDENTE DP=30m m3 227.50 147.88 216.13 95.00% 11.38 5.00%
02.04.01.03 SUMINISTRO E INSTALACION DE TUBERIAS
02.04.01.03.0 SUMINISTRO E INST. DE TUBERIA PVC NTP 399.002 DN 1 1/4" C-10 m 622.80 - 622.80 100.00% 0.00 0.00%
SUMINISTRO E INSTALACION DE TUBERIA PVC NTP ITINTEC 399.002 DN m
02.04.01.03.0 Ø 1'' C-10 904.30 - 904.30 100.00% 0.00 0.00%
und
02.04.03.01.0 SUMINISTRO E INSTALACION DE ACCESORIOS DE LIMPIA Y REBOSE, 2" 12.00 12.00 12.00 100.00% 0.00 0.00%
02.04.03.01.0 SUMINISTRO E INSTALACION DE ACCESORIOS DE VENTILACION und 12.00 12.00 12.00 100.00% 0.00 0.00%
02.04.04 SUMINISTRO E INSTALACION DE VALVULAS
02.04.04.01 VALVULA DE CONTROL (9 UNID)
02.04.04.01.0 TRABAJOS PRELIMINARES
02.04.04.01.0 LIMPIEZA DE TERRENO MANUAL m2 9.00 2.70 2.70 30.00% 6.30 70.00%
02.04.04.01.0 TRAZO Y REPLANTEO PRELIMINAR m2 9.00 2.70 2.70 30.00% 6.30 70.00%
02.04.04.01.0 MOVIMIENTO DE TIERRAS
02.04.04.01.0 EXCAVACION EN TERRENO NORMAL m3 15.25 4.58 4.58 30.00% 10.68 70.00%
02.04.04.01.0 RELLENO COMPACTADO CON MATERIAL PROPIO m3 11.79 - - 0.00% 11.79 100.00%
02.04.04.01.0 ELIMINACION DE MATERIAL EXCEDENTE DP=30m m3 38.88 - - 0.00% 38.88 100.00%
02.04.04.01.0 OBRAS DE CONCRETO SIMPLE
02.04.04.01.0 CONCRETO f'c=100 kg/cm2, e= 4", S/MEZCLADORA m2 5.76 1.73 1.73 30.00% 4.03 70.00%
02.04.04.01.0 CONCRETO FC=140 KG/CM2, S/MEZCLADORA m3 0.02 0.01 0.01 30.00% 0.01 70.00%
02.04.04.01.0 OBRAS DE CONCRETO ARMADO
02.04.04.01.0 CONCRETO F'C=175 KG/CM2, S/MEZCLADORA m3 2.18 0.65 0.65 30.00% 1.53 70.00%
02.04.04.01.0 ENCOFRADO Y DESENCOFRADO EN CAJA DE VALVULAS m2 35.28 10.58 10.58 30.00% 24.70 70.00%
02.04.04.01.0 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 194.04 58.21 58.21 30.00% 135.83 70.00%
02.04.04.01.0 REVOQUES Y ENLUCIDOS
02.04.04.01.0 TARRAJEO INT. Y EXT. MEZC. 1:4 E=1.5 cm m2 40.52 12.16 12.16 30.00% 28.36 70.00%
02.04.04.01.0 FILTROS
02.04.04.01.0 FILTRO DE GRAVA m3 0.16 - - 0.00% 0.16 100.00%
02.04.04.01.0 CARPINTERIA METALICA
02.04.04.01.0 PINTURA
02.04.04.01.0 PINTURA C/ESMALTE 02 MANOS (Exterior) m2 11.52 - - 0.00% 11.52 100.00%
02.04.04.01.0 SUMINISTRO E INST. DE ACCESORIOS - VALVULA CONTROL
und
02.04.04.01.0 SUMINISTRO E INST. DE ACCESORIOS EN VALVULA DE CONTROL 3/4" 8.00 4.00 4.00 50.00% 4.00 50.00%
und
02.04.04.01.0 SUMINISTRO E INST. DE ACCESORIOS EN VALVULA DE CONTROL 1 1/4" 1.00 1.00 1.00 100.00% 0.00 0.00%
02.04.04.02.0 PINTURA
02.04.04.02.0 PINTURA C/ESMALTE 02 MANOS (Exterior) m2 3.84 - - 0.00% 3.84 100.00%
02.04.04.02.0 SUMINISTRO E INST. DE ACCESORIOS - VALVULA DE AIRE
02.04.04.02.0 SUMINISTRO E INST. DE ACCESORIOS EN VALVULA DE AIRE 1 1/4" und 1.00 - - 0.00% 1.00 100.00%
02.04.04.02.0 SUMINISTRO E INST. DE ACCESORIOS EN VALVULA DE AIRE 1" und 1.00 - - 0.00% 1.00 100.00%
02.04.04.02.0 SUMINISTRO E INST. DE ACCESORIOS EN VALVULA DE AIRE 3/4" und 1.00 - - 0.00% 1.00 100.00%
02.04.04.03 VALVULA DE PURGA (6 UNID)
02.04.04.03.0 TRABAJOS PRELIMINARES
02.04.04.03.0 LIMPIEZA DE TERRENO MANUAL m2 32.85 9.86 9.86 30.00% 23.00 70.00%
02.04.04.03.0 TRAZO Y REPLANTEO PRELIMINAR m2 32.85 9.86 9.86 30.00% 23.00 70.00%
02.04.04.03.0 MOVIMIENTO DE TIERRAS
02.04.04.03.0 EXCAVACION EN TERRENO NORMAL m3 21.42 6.43 6.43 30.00% 14.99 70.00%
02.04.04.03.0 RELLENO COMPACTADO CON MATERIAL PROPIO m3 17.45 - - 0.00% 17.45 100.00%
02.04.04.03.0 ELIMINACION DE MATERIAL EXCEDENTE DP=30m m3 29.79 - - 0.00% 29.79 100.00%
02.04.04.03.0 OBRAS DE CONCRETO SIMPLE
02.04.04.03.0 CONCRETO f'c=100 kg/cm2, e= 4", S/MEZCLADORA m2 3.36 1.01 1.01 30.00% 2.35 70.00%
02.04.04.03.0 CONCRETO FC=140 KG/CM2, S/MEZCLADORA m3 0.22 0.07 0.07 30.00% 0.15 70.00%
02.04.04.03.0 CONCRETO f'c=140 kg/cm2 + 30% PM, S/MEZCLADORA m3 0.30 0.09 0.09 30.00% 0.21 70.00%
02.04.04.03.0 OBRAS DE CONCRETO ARMADO
02.04.04.03.0 CONCRETO F'C=175 KG/CM2, S/MEZCLADORA m3 1.67 0.50 0.50 30.00% 1.17 70.00%
02.04.04.03.0 ENCOFRADO Y DESENCOFRADO EN CAJA DE VALVULAS m2 28.80 8.64 8.64 30.00% 20.16 70.00%
02.04.04.03.0 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 144.16 43.25 43.25 30.00% 100.91 70.00%
02.04.04.03.0 REVOQUES Y ENLUCIDOS
02.04.04.03.0 TARRAJEO INT. Y EXT. MEZC. 1:4 E=1.5 cm m2 32.34 - - 0.00% 32.34 100.00%
02.04.04.03.0 FILTROS
02.04.04.03.0 PINTURA
02.04.04.03.0 PINTURA C/ESMALTE 02 MANOS (Exterior) m2 7.68 - - 0.00% 7.68 100.00%
02.04.04.03.0 SUMINISTRO E INST. DE ACCESORIOS - VALVULA DE PURGA
02.04.04.03.0 SUMINISTRO E INST. DE ACCESORIOS EN VALVULA DE PURGA 3/4" und 1.00 - - 0.00% 1.00 100.00%
02.04.04.03.0 SUMINISTRO E INST. DE ACCESORIOS EN VALVULA DE PURGA 1" und 5.00 - - 0.00% 5.00 100.00%
02.05 CONEXIONES DOMICILIARIAS
02.05.01 CONEXIONES DOMICILIARIAS (20 UNID)
02.05.01.01 TRABAJOS PRELIMINARES
02.05.01.01.0 LIMPIEZA DE TERRENO MANUAL m 462.00 462.00 462.00 100.00% 0.00 0.00%
02.05.01.01.0 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS m 462.00 462.00 462.00 100.00% 0.00 0.00%
02.05.01.02 MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJA EN TERRENO NORMAL DE 0.40X0.50 m m
02.05.01.02.0 P/TUB. AGUA 436.10 348.88 348.88 80.00% 87.22 20.00%
m
02.05.01.02.0 SEGUNDO RELLENO CON MATERIAL PROPIO COMPACTADO E=0.10M 462.00 369.60 369.60 80.00% 92.40 20.00%
02.05.01.02.0 ELIMINACION DE MATERIAL EXCEDENTE DP=30m m3 18.48 14.78 14.78 80.00% 3.70 20.00%
02.05.01.03 SUMINISTRO E INSTALACION DE TUBERIAS
SUMINISTRO E INSTALACION DE TUBERIA PVC NTP ITINTEC 399.002 DN m
02.05.01.03.0 Ø 1/2'' C-10 462.00 369.60 369.60 80.00% 92.40 20.00%
02.07 FLETE
02.07.01 FLETE TERRESTRE
02.07.01.01 FLETE TERRESTRE SISTEMA DE AGUA POTABLE glb 1.00 0.20 1.00 100.00% 0.00 0.00%
02.07.02 FLETE RURAL
02.07.03 FLETE RURAL SISTEMA DE AGUA POTABLE glb 1.00 0.10 0.90 90.00% 0.10 10.00%
ADECUADA INFRAESTUCTURA DE DISPOSICION SANITARIA DE
03 EXCRETAS
03.01 UBS ARRASTRE HIDRAULICO
03.01.01 UBS ARRASTRE HIDRAULICO-VIVIENDAS (20 UBS)
03.01.01.01 ESTRUCTURAS
03.01.01.01.0 OBRAS PRELIMINARES
03.01.01.01.0 LIMPIEZA Y DESBROCE DE TERRENO MANUAL m2 136.00 - 136.00 100.00% 0.00 0.00%
03.01.01.01.0 TRAZO, NIVELACION Y REPLANTEO m2 136.00 - 136.00 100.00% 0.00 0.00%
03.01.01.01.0 MOVIMIENTO DE TIERRAS
03.01.01.01.0 EXCAVACION EN TERRENO NORMAL m3 38.13 - 38.13 100.00% 0.00 0.00%
03.01.01.01.0 EXCAVACION EN TERRENO SEMIROCOSO m3 6.35 - 6.35 100.00% 0.00 0.00%
03.01.01.01.0 REFINE Y NIVELACION DE FONDOS m2 54.72 - 54.72 100.00% 0.00 0.00%
03.01.01.01.0 RELLENO COMPACTADO CON MATERIAL PROPIO SELECCIONADO m3 5.02 - 5.02 100.00% 0.00 0.00%
03.01.01.01.0 ELIMINACION DE MATERIAL EXCEDENTE DP=30 M m3 70.23 - 70.23 100.00% 0.00 0.00%
03.01.01.01.0 OBRAS DE CONCRETO SIMPLE
03.01.01.01.0 CIMIENTOS
03.01.01.01.0 CONCRETO CICLOPEO MEZCLA C:H 1:10 + 30% P.G m3 27.36 - 27.36 100.00% 0.00 0.00%
03.01.01.01.0 SOBRECIMIENTOS
03.01.01.01.0 CONCRETO SIMPLE MEZCLA 1:8 +25% P.M m3 5.62 - 5.62 100.00% 0.00 0.00%
03.01.01.01.0 ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTO m2 91.04 - 91.04 100.00% 0.00 0.00%
03.01.01.01.0 SARDINEL PARA DUCHA
03.01.01.01.0 CONCRETO F'C=140 KG/CM2, S/MEZCLADORA m3 0.56 - - 0.00% 0.56 100.00%
03.01.01.01.0 ENCOFRADO Y DESENCOFRADO EN SARDINEL m2 14.48 - - 0.00% 14.48 100.00%
03.01.01.01.0 VEREDAS
03.01.01.01.0 CONCRETO F'C=140 KG/CM2, E=4", S/MEZCLADORA m2 42.72 - - 0.00% 42.72 100.00%
03.01.01.01.0 JUNTAS ELASTOMERICA, E=1/2". m 35.60 - - 0.00% 35.60 100.00%
03.01.01.01.0 BRUÑAS PARA VEREDA E=1CM m 72.60 - - 0.00% 72.60 100.00%
03.01.01.01.0 PISOS
03.01.01.01.0 CONCRETO F'C=140 KG/CM2, ACABADO FROTACHADO, E=10CM m2 34.09 - - 0.00% 34.09 100.00%
03.01.01.01.0 OBRAS DE CONCRETO ARMADO
03.01.01.01.0 COLUMNETAS
03.01.01.01.0 CONCRETO F'c=175 kg/cm2, S/MEZCLADORA m3 3.09 1.55 1.55 50.00% 1.55 50.00%
03.01.01.01.0 ENCOFRADO Y DESENCOFRADO EN COLUMNETA m2 62.40 31.20 31.20 50.00% 31.20 50.00%
03.01.01.01.0 ACERO CORRUGADO f'y=4200 kg/cm2 GRADO 60 kg 1,209.86 - 1,209.86 100.00% 0.00 0.00%
03.01.01.01.0 VIGUETAS
03.01.01.01.0 CONCRETO F'c=175 kg/cm2, S/MEZCLADORA m3 2.80 0.28 0.28 10.00% 2.52 90.00%
03.01.01.01.0 ENCOFRADO Y DESENCOFRADO EN VIGA m2 41.10 4.11 4.11 10.00% 36.99 90.00%
03.01.01.01.0 ACERO CORRUGADO f'y=4200 kg/cm2 GRADO 60 kg 540.67 270.34 540.67 100.00% 0.00 0.00%
03.01.01.02 ARQUITECTURA
03.01.01.02.0 MURO Y TABIQUE DE ALBAÑILERIA
MURO DE SOGA 18 huecos de 23x12.5x9cm, CEMENTO-ARENA 1:5, junta m2
03.01.01.02.0 1.5cm 240.43 216.39 216.39 90.00% 24.04 10.00%
03.01.01.02.0 PISOS
03.01.01.02.0 PISO CERAMICO 0.30 x 0.30 m m2 42.47 - - 0.00% 42.47 100.00%
03.01.01.02.0 REVOQUES Y ENLUCIDOS
03.01.01.02.0 TARRAJEO DE COLUMNETAS, FROTACHADO, C:A= 1:4, 1.5cm m2 55.95 - - 0.00% 55.95 100.00%
03.01.01.02.0 TARRAJEO DE VIGUETAS, C:A=1:4, e=1.5cm. m2 41.10 - - 0.00% 41.10 100.00%
m
03.01.01.02.0 VESTIDURAS DE DERRAMES MEZCLA C:A 1:4, e=1.5cm., ANCHO = 0.15m 150.00 - - 0.00% 150.00 100.00%
03.01.01.02.0 PARED DUCHA CERAMICO 0.30 x 0.30 m m2 62.28 - - 0.00% 62.28 100.00%
03.01.01.02.0 CONTRAZOCALOS
CONTRAZOCALO DE CEMENTO Y PULIDO CON MORTERO, C:A=1:4, m2
03.01.01.02.0 e=1.5cm 90.22 - - 0.00% 90.22 100.00%
03.01.01.02.0 PINTURA
03.01.01.02.0 PINTURA ESMALTE ( Columnas y vigas) m2 97.05 - - 0.00% 97.05 100.00%
03.01.01.02.0 PINTURA ESMALTE (Contrazocalos) m2 90.22 - - 0.00% 90.22 100.00%
03.01.01.02.0 COBERTURAS
03.01.01.02.0 COBERTURA CON CALAMINA GALVANIZADA DE 1.80X0.83X0.30 mm m2 215.60 - - 0.00% 215.60 100.00%
03.01.01.02.0 VIGA DE MADERA TORNILLO 2"X3" p2 229.66 - - 0.00% 229.66 100.00%
03.01.01.02.0 CORREA DE MADERA TORNILLO 2"X2" p2 336.83 - - 0.00% 336.83 100.00%
03.01.01.02.0 ACCESORIO DE FIJACIÓN und 120.00 - - 0.00% 120.00 100.00%
03.01.01.02.0 CARPINTERIA DE MADERA
PUERTA DE MADERA TORNILLO DE UBS INCLUYE CON MARCO DE und
03.01.01.02.0 MADERA DE 2"X 1 1/2" 20.00 - - 0.00% 20.00 100.00%
und
03.01.01.02.0 VENTANA CON MARCO DE MADERA DE 1"X1 "/C MALLA MOSQUETERO 20.00 - - 0.00% 20.00 100.00%
03.01.01.04.0 RELLENO COMPACTADO CON MATERIAL PROPIO SELECCIONADO m3 28.32 - - 0.00% 28.32 100.00%
03.01.01.04.0 ELIMINACION DE MATERIAL EXCEDENTE DP=30 m m3 9.22 - - 0.00% 9.22 100.00%
03.01.01.04.0 SUMINISTRO E INSTALACION DE TUBERIAS
03.01.01.04.0 SUMINISTRO E INST. TUBERIA PVC SAL DE Ø 2" m 190.00 - - 0.00% 190.00 100.00%
03.01.01.04.0 SUMINISTRO E INST. TUBERIA PVC SAL DE Ø 4" m 46.00 - - 0.00% 46.00 100.00%
03.01.01.04.0 SUMINISTRO E INST. ACCESORIOS DE PVC SAL DE Ø 2" A 4" und 20.00 - - 0.00% 20.00 100.00%
03.01.01.04.0 CAJA DE INSPECCION
03.01.01.04.0 MOVIMIENTO DE TIERRAS
03.01.01.04.0 EXCAVACION EN TERRENO NORMAL m3 15.36 - - 0.00% 15.36 100.00%
03.01.01.04.0 EXCAVACION EN TERRENO SEMIROCOSO m3 2.40 - - 0.00% 2.40 100.00%
03.01.01.04.0 REFINE Y NIVELACION DE FONDOS m2 23.95 - - 0.00% 23.95 100.00%
03.01.01.04.0 ELIMINACION DE MATERIAL EXCEDENTE DP=30 M m3 21.31 - - 0.00% 21.31 100.00%
03.01.01.04.0 CAJA DE REGISTRO
CAJA DE REGISTRO DE DESAGUE 0.25 x 0.50 m, INCLUYE MARCO Y TAPA
03.01.01.04.0 DE CONCRETO und 20.00 - - 0.00% 20.00 100.00%
CAJA DE TRAMPA DE NATAS Y SOLIDOS 0.30 x 0.60 m, INCLUYE MARCO und
03.01.01.04.0 Y TAPA DE CONCRETO 20.00 - - 0.00% 20.00 100.00%
03.01.01.04.0 BIODIGESTOR
03.01.01.04.0 MOVIMIENTO DE TIERRAS
03.01.01.04.0 EXCAVACION EN TERRENO NORMAL m3 41.64 20.82 33.31 80.00% 8.33 20.00%
03.01.01.04.0 EXCAVACION EN TERRENO SEMIROCOSO m3 5.55 - - 0.00% 5.55 100.00%
03.01.01.04.0 REFINE Y NIVELACION DE FONDOS m2 13.88 11.10 11.10 80.00% 2.78 20.00%
03.01.01.04.0 RELLENO COMPACTADO CON MATERIAL PROPIO SELECCIONADO m3 22.18 17.74 17.74 80.00% 4.44 20.00%
03.01.01.04.0 ELIMINACION DE MATERIAL EXCEDENTE DP=30 M m3 23.35 18.68 18.68 80.00% 4.67 20.00%
03.01.01.04.0 OBRAS DE CONCRETO SIMPLE
03.01.01.04.0 CONCRETO F'c=100 kg/cm2, e= 4", S/MEZCLADORA m2 13.88 11.10 11.10 80.00% 2.78 20.00%
03.01.01.04.0 SUMINISTRO E INSTALACION DE BIODIGESTOR
03.01.01.04.0 SUMINISTRO E INST. DE BIODIGESTOR Y ACCESORIOS (700 L) und 20.00 8.00 8.00 40.00% 12.00 60.00%
03.01.01.04.0 VARIOS
03.01.01.04.0 REPELLADO DE Cº, E=0.03m, C:A=1:3 CON MALLA EXAGONAL 3/4" m2 170.90 136.72 136.72 80.00% 34.18 20.00%
03.01.01.04.0 POZO DE PERCOLACION
03.01.01.04.0 MOVIMIENTO DE TIERRAS
03.01.01.04.0 EXCAVACION EN TERRENO NORMAL m3 90.79 36.32 36.32 40.00% 54.47 60.00%
03.01.01.04.0 EXCAVACION EN TERRENO SEMIROCOSO m3 15.89 - - 0.00% 15.89 100.00%
03.01.01.04.0 REFINE Y NIVELACION DE FONDOS m2 45.39 0.00% 45.39 100.00%
03.01.01.04.0 ELIMINACION DE MATERIAL EXCEDENTE DP=30 M m3 128.01 - - 0.00% 128.01 100.00%
03.01.01.04.0 OBRAS DE CONCRETO ARMADO
m3
03.01.01.04.0 CONCRETO F'C=175 KG/CM2, S/MEZCLADORA (VIGA CIRCULAR) 3.67 1.10 1.10 30.00% 2.57 70.00%
03.01.01.04.0 ENCOFRADO Y DESENCOFRADO EN VIGA CIRCULAR m2 31.91 9.57 9.57 30.00% 22.34 70.00%
03.01.01.04.0 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 (VIGA CIRCULAR) kg 304.17 0.00% 304.17 100.00%
03.01.01.04.0 CONCRETO F'C=175 KG/CM2,S/MEZCLADORA (LOSA DE TECHO) m3 4.18 - - 0.00% 4.18 100.00%
m2
03.01.01.04.0 ENCOFRADO Y DESENCOFRADO EN LOSA DE TECHO 26.33 0.00% 26.33 100.00%
03.01.01.04.0 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 (LOSA DE TECHO) kg 335.87 0.00% 335.87 100.00%
03.01.01.04.0 TAPA DE CONCRETO
03.01.01.04.0 TAPA DE CONCRETO 60 X 60 X 5 CM und 20.00 - - 0.00% 20.00 100.00%
03.01.01.04.0 ALBAÑILERIA
03.01.01.04.0 MURO DE CABEZA LADRILLO KING-KONG CON CEMENTO - ARENA m2 202.63 40.53 40.53 20.00% 162.10 80.00%
03.01.01.04.0 SISTEMA DE DRENAJE
04.02 EQUIPOS DE PROTECCION PERSONAL (EPP) glb 1.00 - 0.90 90.00% 0.10 10.00%
04.03 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 1.00 - 0.50 50.00% 0.50 50.00%
RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y glb
04.04 SALUD EN OBRA
1.00 - 0.50 50.00% 0.50 50.00%
05 MITIGACION AMBIENTAL
05.01 PROGRAMA DE MANEJO DE RESIDUOS SOLIDOS Y LIQUIDOS
IMPLEMENTACION DE CILINDROS PROVISIONALES PARA ALMACENAR und
05.01.01 RESIDUOS
3.00 1.00 2.00 66.67% 1.00 33.33%
und
05.01.02 CONSTRUCCION DE MICRORELLENO SANITARIOS DE 3.0 X 3.0 X 1.0 M 1.00 - 1.00 100.00% 0.00 0.00%
05.01.03 MATERIALES PARA CHARLAS DE MANEJO DE RESIDUOS SOLIDOS. und 2.00 - - 0.00% 2.00 100.00%
05.02 PROGRAMA DE MITIGACION AMBIENTAL
05.02.01 ELABORACION DE BAÑOS TEMPORALES (UBS HOYO SECO) und 2.00 1.00 1.00 50.00% 1.00 50.00%
05.02.02 TRASLADO DE RESIDUOS SOLIDOS und 40.00 5.00 20.00 50.00% 20.00 50.00%
HUMEDECIMIENTO DE TERRENO Y AGREGADOS PARA EVITAR m
05.02.03 GENERAR POLVO
7,002.00 - 1,400.40 20.00% 5,601.60 80.00%
06.02.01 RESPONSABLES DE SEGURIDAD DE SALUD DE LOS TRABAJADORES glb 1.00 0.30 0.00% 1.00 100.00%
06.02.02 PRUEBAS RAPIDAS PARA DETECTAR COVID-19 kit 35.00 10.00 25.00 71.43% 10.00 28.57%
EQUIPAMIENTO, IMPLEMENTOS E INSUMOS PARA LA PREVENCION DEL glb
06.02.03 COVID-19
1.00 0.20 0.50 50.00% 0.50 50.00%
02.01 CAPTACIÓN
02.01.01 CAPTACION DE LADERA -"EL PARAISO " (02 UND)
02.01.01.05 REVOQUES, ENLUCIDOS Y MOLDURAS
02.01.01.05.01 TARRAJEO CON IMPERMEABILIZANTE MEZCLA 1:2; E=2.0 CM m2 19.06
02.01.01.05.02 TARRAJEO INT. Y EXT. MEZC. 1:4 E=1.5 CM m2 40.42
02.01.01.07 CARPINTERIA METALICA
SUMINISTRO E INSTALACION DE TAPA METALICA DE 0.60X0.60m, E=1/8" und
02.01.01.07.01 INC. LLAVE MAESTRA
2.00
und
02.02.02.01.06.0 SUMINISTRO E INSTALACION DE ACCESORIOS DE VENTILACION DE 2" 1.00
02.03 RESERVORIOS
02.03.01 RESERVORIO APOYADO V=10m3 (01 UND)
02.03.01.02 ESTRUCTURAS
02.03.01.02.01 MOVIMIENTO DE TIERRAS
02.03.01.02.01.0 ELIMINACION DE MATERIAL EXCEDENTE DP=30m. m3 10.29
02.03.01.02.02 OBRAS DE CONCRETO SIMPLE
02.03.01.03 ARQUITECTURA
02.03.01.03.01 REVOQUES Y ENLUCIDOS
02.03.01.03.01.0 TARRAJEO INT. Y EXT. MEZC. 1:4 E=1.5 cm m2 57.62
02.03.01.03.01.0 TARRAJEO C/IMPERMEAB. MEZCLA 1:2, E=2 CM m2 28.92
02.03.01.03.01.0 TARRAJEO EN PENDIENTE DE FONDO MORTERO 1:4 m2 9.00
02.03.01.03.01.0 OCHAVO SANITARIO MORTERO 1:4 m 3.00
02.03.01.04 CASETA DE CLORACION
02.03.01.04.02 REVOQUES Y ENLUCIDOS
m2
02.03.01.04.02.0 TARRAJEO INT. Y EXT. MEZC. 1:4 E=1.5 cm (CASETA DE CLORACIÓN) 8.53
02.03.01.05 VARIOS
02.03.01.05.03 SUMINISTRO E INST. DE ACCESORIOS DE VENTILACION und 1.00
PRUEBA HIDRAULICA Y DESINFECCIÓN DE ESTANQUEIDAD EN glb
02.03.01.05.04 RESERVORIO 1.00
m
02.04.01.02.03 EXCAVACION EN TERRENO SEMIROCOSO DE 0.40 x 0.60 m P/TUB. AGUA 189.60
m
02.04.01.02.08 SEGUNDO RELLENO CON MATERIAL PROPIO COMPACTADO e=0.20 m 3,310.00
m
02.04.01.02.09 SEGUNDO RELLENO CON MATERIAL PROPIO COMPACTADO e=0.70 m -
und
02.04.03.01.08.0 SUMINISTRO E INSTALACION DE ACCESORIOS DE LIMPIA Y REBOSE, 2" 12.00
und
02.04.04.01.09.0 SUMINISTRO E INST. DE ACCESORIOS EN VALVULA DE CONTROL 1 1/4" 1.00
m
02.05.01.02.06 SEGUNDO RELLENO CON MATERIAL PROPIO COMPACTADO E=0.10M 369.60
05 MITIGACION AMBIENTAL
05.01 PROGRAMA DE MANEJO DE RESIDUOS SOLIDOS Y LIQUIDOS
IMPLEMENTACION DE CILINDROS PROVISIONALES PARA ALMACENAR und
05.01.01 RESIDUOS
1.00
02.01.01.08 PINTURA
02.01.01.08.0 PINTURA C/ESMALTE 02 MANOS (Exterior) m2 -
02.01.01.09 SUMINISTRO Y COLOCACION DE ACCESORIOS
SUMINISTRO Y COLOCACION DE ACCESORIOS DE SALIDA EN und
02.01.01.09.0 CAPTACION Ds=1" 2.00
02.01.01.10 VARIOS
02.01.01.10.0 SUMINISTRO Y COLOCACION DE JUNTA ELASTOMERICA m -
02.01.01.10.0 SUMINISTRO Y COLOCACION DE GEOMEMBRANA HDPE 1" . m2 -
02.01.01.11 CERCO PERIMETRICO
02.01.01.11.0 TRABAJOS PRELIMINARES
02.01.01.11.0 TRAZO Y REPLANTEO PRELIMINAR m2 -
02.01.01.11.0 MOVIMIENTO DE TIERRAS
02.01.01.11.0 EXCAVACION EN TERRENO NORMAL m3 -
02.01.01.11.0 ELIMINACION DE MATERIAL EXCEDENTE DP=30M m3 -
02.01.01.11.0 OBRAS DE CONCRETO SIMPLE
02.01.01.11.0 CONCRETO F'C=140 KG/CM2 + 30% PM, S/MEZCLADORA m3 -
02.01.01.11.0 VARIOS-CERCO PERIMETRICO
02.01.01.11.0 SUMINISTRO Y COLOCACION DE POSTES DE MADERA TRATADA und -
02.01.01.11.0 SUMINISTRO Y COLOCACION DE ALAMBRE DE PUAS m -
02.01.01.11.0 SUMINISTRO Y COLOCACION DE PUERTA und -
02.02 LINEA DE CONDUCCION
02.02.01 LINEA DE CONDUCCION L=87.90 m
02.02.01.01 TRABAJOS PRELIMINARES
02.02.01.01.0 LIMPIEZA DE TERRENO MANUAL m -
02.02.01.01.0 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS m -
02.02.01.02 MOVIMIENTO DE TIERRAS
02.02.01.02.0 EXCAVACION EN TERRENO NORMAL DE 0.40 x 0.60 m P/TUB. AGUA m -
m
02.02.01.02.0 SEGUNDO RELLENO CON MATERIAL PROPIO COMPACTADO e=0.20 m -
und
02.02.02.01.0 SUMINISTRO E INSTALACION DE ACCESORIOS DE VENTILACION DE 2" 1.00
02.02.02.01.0 PINTURA -
02.02.02.01.0 PINTURA C/ESMALTE 02 MANOS (Exterior) m2 -
02.03 RESERVORIOS
02.03.01 RESERVORIO APOYADO V=10m3 (01 UND)
02.03.01.01 TRABAJOS PRELIMINARES
02.03.01.01.0 LIMPIEZA DE TERRENO MANUAL m2 -
02.03.01.01.0 TRAZO Y REPLANTEO PRELIMINAR m2 -
02.03.01.02 ESTRUCTURAS
02.03.01.02.0 MOVIMIENTO DE TIERRAS
02.03.01.02.0 EXCAVACIÓN EN TERRENO NORMAL m3 -
02.03.01.02.0 RELLENO COMPACTADO CON MATERIAL PROPIO m3 -
02.03.01.02.0 NIVELACIÓN INTERIOR Y APISONADO m2 -
02.03.01.02.0 ELIMINACION DE MATERIAL EXCEDENTE DP=30m. m3 10.29
02.03.01.02.0 OBRAS DE CONCRETO SIMPLE
02.03.01.02.0 SOLADO
02.03.01.02.0 CONCRETO f'c = 100 Kg/cm2, S/MEZCLADORA m3 -
02.03.01.02.0 ENCOFRADO Y DESENCOFRADO EN SOLADO m2 -
02.03.01.02.0 VEREDAS
02.03.01.02.0 CONCRETO f'c=140 kg/cm2, S/MEZCLADORA m3 -
02.03.01.02.0 ENCOFRADO Y DESENCOFRADO EN VEREDA m2 -
02.03.01.03 ARQUITECTURA
02.03.01.03.0 REVOQUES Y ENLUCIDOS
02.03.01.03.0 TARRAJEO INT. Y EXT. MEZC. 1:4 E=1.5 cm m2 57.62
02.03.01.03.0 TARRAJEO C/IMPERMEAB. MEZCLA 1:2, E=2 CM m2 28.92
02.03.01.03.0 TARRAJEO EN PENDIENTE DE FONDO MORTERO 1:4 m2 9.00
02.03.01.03.0 OCHAVO SANITARIO MORTERO 1:4 m 3.00
02.03.01.03.0 PINTURA
02.03.01.03.0 PINTURA C/ESMALTE 02 MANOS (Exterior) m2 -
02.03.01.04 CASETA DE CLORACION
02.03.01.04.0 CONCRETO ARMADO
02.03.01.04.0 CONCRETO F'C 210 (CASETA DE CLORACIÓN) m3 -
02.03.01.04.0 ENCOFRADO Y DESENCOFRADO (CASETA DE CLORACIÓN) m2 -
02.03.01.04.0 ACERO DE REFUERZO (CASETA DE CLORACIÓN) Kg -
02.03.01.04.0 REVOQUES Y ENLUCIDOS
m2
02.03.01.04.0 TARRAJEO INT. Y EXT. MEZC. 1:4 E=1.5 cm (CASETA DE CLORACIÓN) 8.53
m
02.04.01.02.0 EXCAVACION EN TERRENO SEMIROCOSO DE 0.40 x 0.60 m P/TUB. AGUA 189.60
m
02.04.01.02.0 SEGUNDO RELLENO CON MATERIAL PROPIO COMPACTADO e=0.20 m 3,310.00
m
02.04.01.02.0 SEGUNDO RELLENO CON MATERIAL PROPIO COMPACTADO e=0.70 m -
und
02.04.03.01.0 SUMINISTRO E INSTALACION DE ACCESORIOS DE LIMPIA Y REBOSE, 2" 12.00
02.04.04.01.0 PINTURA
02.04.04.01.0 PINTURA C/ESMALTE 02 MANOS (Exterior) m2 -
02.04.04.01.0 SUMINISTRO E INST. DE ACCESORIOS - VALVULA CONTROL
und
02.04.04.01.0 SUMINISTRO E INST. DE ACCESORIOS EN VALVULA DE CONTROL 3/4" 4.00
und
02.04.04.01.0 SUMINISTRO E INST. DE ACCESORIOS EN VALVULA DE CONTROL 1 1/4" 1.00
02.04.04.02.0 PINTURA
02.04.04.02.0 PINTURA C/ESMALTE 02 MANOS (Exterior) m2 -
02.04.04.02.0 SUMINISTRO E INST. DE ACCESORIOS - VALVULA DE AIRE
02.04.04.02.0 SUMINISTRO E INST. DE ACCESORIOS EN VALVULA DE AIRE 1 1/4" und -
02.04.04.02.0 SUMINISTRO E INST. DE ACCESORIOS EN VALVULA DE AIRE 1" und -
02.04.04.02.0 SUMINISTRO E INST. DE ACCESORIOS EN VALVULA DE AIRE 3/4" und -
02.04.04.03 VALVULA DE PURGA (6 UNID)
02.04.04.03.0 TRABAJOS PRELIMINARES
02.04.04.03.0 LIMPIEZA DE TERRENO MANUAL m2 9.86
02.04.04.03.0 TRAZO Y REPLANTEO PRELIMINAR m2 9.86
02.04.04.03.0 MOVIMIENTO DE TIERRAS
02.04.04.03.0 EXCAVACION EN TERRENO NORMAL m3 6.43
02.04.04.03.0 RELLENO COMPACTADO CON MATERIAL PROPIO m3 -
02.04.04.03.0 ELIMINACION DE MATERIAL EXCEDENTE DP=30m m3 -
02.04.04.03.0 OBRAS DE CONCRETO SIMPLE
02.04.04.03.0 CONCRETO f'c=100 kg/cm2, e= 4", S/MEZCLADORA m2 1.01
02.04.04.03.0 CONCRETO FC=140 KG/CM2, S/MEZCLADORA m3 0.07
02.04.04.03.0 CONCRETO f'c=140 kg/cm2 + 30% PM, S/MEZCLADORA m3 0.09
02.04.04.03.0 OBRAS DE CONCRETO ARMADO
02.04.04.03.0 CONCRETO F'C=175 KG/CM2, S/MEZCLADORA m3 0.50
02.04.04.03.0 ENCOFRADO Y DESENCOFRADO EN CAJA DE VALVULAS m2 8.64
02.04.04.03.0 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 43.25
02.04.04.03.0 PINTURA
02.04.04.03.0 PINTURA C/ESMALTE 02 MANOS (Exterior) m2 -
02.04.04.03.0 SUMINISTRO E INST. DE ACCESORIOS - VALVULA DE PURGA
02.04.04.03.0 SUMINISTRO E INST. DE ACCESORIOS EN VALVULA DE PURGA 3/4" und -
02.04.04.03.0 SUMINISTRO E INST. DE ACCESORIOS EN VALVULA DE PURGA 1" und -
02.05 CONEXIONES DOMICILIARIAS
02.05.01 CONEXIONES DOMICILIARIAS (20 UNID)
02.05.01.01 TRABAJOS PRELIMINARES
02.05.01.01.0 LIMPIEZA DE TERRENO MANUAL m 462.00
02.05.01.01.0 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS m 462.00
02.05.01.02 MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJA EN TERRENO NORMAL DE 0.40X0.50 m m
02.05.01.02.0 P/TUB. AGUA 348.88
m
02.05.01.02.0 SEGUNDO RELLENO CON MATERIAL PROPIO COMPACTADO E=0.10M 369.60
02.07 FLETE
03.01.01.02.0 PISOS
03.01.01.02.0 PISO CERAMICO 0.30 x 0.30 m m2 -
03.01.01.02.0 REVOQUES Y ENLUCIDOS
TARRAJEO DE MUROS INTERIORES, ACABADO PULIDO m2
03.01.01.02.0 IMPERMEABILIZADO C:A= 1:4, e=1.5cm -
03.01.01.02.0 PINTURA
03.01.01.02.0 PINTURA ESMALTE ( Columnas y vigas) m2 -
03.01.01.02.0 PINTURA ESMALTE (Contrazocalos) m2 -
03.01.01.02.0 COBERTURAS
03.01.01.02.0 COBERTURA CON CALAMINA GALVANIZADA DE 1.80X0.83X0.30 mm m2 -
03.01.01.02.0 VIGA DE MADERA TORNILLO 2"X3" p2 -
und
03.01.01.02.0 VENTANA CON MARCO DE MADERA DE 1"X1 "/C MALLA MOSQUETERO -
03.01.01.04.0 BIODIGESTOR
05 MITIGACION AMBIENTAL
05.01 PROGRAMA DE MANEJO DE RESIDUOS SOLIDOS Y LIQUIDOS
IMPLEMENTACION DE CILINDROS PROVISIONALES PARA ALMACENAR und
05.01.01 RESIDUOS
1.00
und
05.01.02 CONSTRUCCION DE MICRORELLENO SANITARIOS DE 3.0 X 3.0 X 1.0 M -