Está en la página 1de 1

INICIO ENTUBADO

DESAGÜE PASEO
PRINCIPIO
+0.48%

PCV: 0+047.95
+0.73% -2.95 -0.74%
% +2.95%

PCV: 47.95

47.720
-0.11% +0.73% -3.43 -0.74%

0+000.00
%
% +3.43

FCV: 0+067.95
-0.14% +0.73% -3. +0.28% +0.28% -0.68% -0.68%
% -0.73% -0.68%
52 % +3.37

48.12
48.05

48.12
-3.08 03%

0+296.29
48.05
0+416.29

0+286.97
48.140
0+406.97
48.140

% +5.
0+401.63
0+421.78

0+411.63

48.250
48.16

48.250

48.250
0+306.61

0+277.65

0+108.94

48.301
48.286

48.342
48.24

48.24
48.23
+0.%

FCV: 48.50
48.390
0+121.89

0+095.29
0+101.43
0+176.29

0+166.97

48.390
0+291.63

48.800
48.383

0+088.27
0+185.61

0+157.65
48.35
0+171.68

0+074.95
0+073.85
CALLE 303
CALLE
CALLE 307

305

301 a 307 ==> 1 caño de 1000mm

1
47.99 47.99

0
Existente

LE 3
CAL
TAP.
48.02

1.40

.B
BR 48.09 48.09 48.20 48.20
48.43 48.43

.M
48.41 48.47 48.51 48.57 48.28

C.G
BR 48.32
48.02

4.45

4.45
48.02

5.40

5.40

5.40

FF.C
48.22
7.20

7.20

7.20
TAP. TAP. 48.48
BR BR 48.23

4.70
BR 1.05
1.25 TAP. 0.90
CR. 0.90
BR TAP. 0.90

48.14 48.05 48.05 48.14 48.25 48.12 48.12 48.25 48.39 48.24 48.24 48.39 48.28 48.25

48.35
48.16

48.23

48.40
48.80 48.80 47.95 47.72

48.29

48.40

48.29
48.26 48.26 48.37 48.37 48.51 48.51

48.14 48.14 48.39 48.39 48.28


48.25 48.25 48.50 48.80 48.80 47.95 47.72
48.29
48.23

48.12 48.12 48.30


A CONSTRUIR
48.27 48.63 48.32 48.49 48.68 48.58

También podría gustarte