PARTIDAS DE ESTRUCTURAS - RESUMEN DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

Item Descripcion Unidad TOTAL


01 OBRAS PROVISIONALES
01.01 ALMACEN, OFICINAS, CASETA DE GUARDIANIA Y COMEDOR glb 1.00
01.02 CARTEL DE OBRA 3.60 x 5.40 und 1.00
01.03 SERVICIOS HIGIENICOS glb 2.00
01.04 AGUA PARA LA OBRA glb 1.00
01.05 ENERGIA ELECTRICA PARA LA OBRA glb 1.00
01.06 CERCO PROVISIONAL DE OBRA m 1.00
02 TRABAJOS PRELIMINARES
02.01 TRANSPORTE DE EQUIPO Y MAQUINARIAS glb 1.00
02.02 DEMOLICION Y ELIMINACION DE ESTRUCTURAS EXISTENTES glb 1.00
02.03 TRAZO Y REPLANTEO PRELIMINAR m2 14,225.00
02.04 TRAZO Y REPLANTEO DURANTE LA OBRA glb 14,225.00
03 SEGURIDAD Y SALUD
03.01 ELABORACION IMPLEMENTACION Y ADMINISTRACION DEL
PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO glb 1.00
03.02 IMPLEMENTOS DE SEGURIDAD Y SEÑALIZACION glb 1.00
03.03 CAPACITACION EN SEGURIDAD Y SALUD glb 1.00
04 MOVIMIENTO DE TIERRAS
04.01 EXCAVACION MASIVA m3 19,711.50
04.02 EXACAVACION DE ZANJAS Y ZAPATAS m3 816.02
04.03 RELLENO COMPACTADO C/EQUIPO MAT/PRESTAMO m3 4,035.11
04.04 RELLENO COMPACTADO C/EQUIPO MAT/PROPIO m3 564.63
04.05 NIVELACION INTERIOR Y APISONADO m2 5,922.15
04.06 ELIM INACION DE MATERIAL EXCEDENTE C/MAQUINARIA m3 22,957.33
05 OBRAS DE CONCRETO SIMPLE
05.01 SUBCIMIENTOS Y SOLADOS
05.01.01 SOLADO DE CONCRETO E= 4" MEZCLA C:H 1:1O m2 5,026.37
05.02 CIMIENTOS
05.02.01 CIMIENTO CORRIDOS 1:10 + 30% P.G m3 68.83
05.03 SOBRECIMIENTOS
05.03.01 SOBRECIMIENTO CONCRETO C:H 1:8 +25% P.M m3 105.32
05.03.02 SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO m2 522.28
05.04 FALSO PISO
05.04.01 FALSO PISO C:H 1:8 E = 10 cm m2 5,922.15
06 OBRAS DE CONCRETO ARMADO
06.01 ZAPATAS
06.01.01 CONCRETO EN ZAPATAS F`C = 210 KG/CM2 m3 504.48
06.01.02 ACERO DE REFUERZO Fy=4200 kg/cm2 kg 38,867.61
06.02 VIGAS DE CIMENTACION
06.02.01 VIGAS DE CIMENTACION CONCRETO F`C = 210 KG/CM2 m3 119.75
06.02.02 VIGAS DE CIMENTACION ENCOFRADO Y DESENCOFRADO m2 399.17
06.02.03 ACERO DE REFUERZO Fy=4200 kg/cm2 kg 12,665.58
06.03 PLACAS
06.03.01 PLACAS CONCRETO F`C = 210 KG/CM2 m3 1,955.77
06.03.02 PLACAS ENCOFRADO Y DESENCOFRADO m2 16,307.15
06.03.03 ACERO DE REFUERZO Fy=4200 kg/cm2 kg 259,528.89
06.04 MUROS DE CONTENCION
06.04.01 MUROS DE CONTENCION CONCRETO F`C = 210 KG/CM2 m3 243.00
06.04.02 MUROS DE CONTENCION ENCOFRADO Y DESENCOFRADO m2 623.91
06.04.03 ACERO DE REFUERZO Fy=4200 kg/cm2 kg 19,439.80
06.05 COLUMNAS
06.05.01 COLUMNAS CONCRETO F`C = 210 KG/CM2 m3 1,029.86
06.05.02 COLUMNAS ENCOFRADO Y DESENCOFRADO m2 14,457.44
06.05.03 ACERO DE REFUERZO Fy=4200 kg/cm2 kg 174,352.38
06.06 VIGAS
06.06.01 VIGAS CONCRETO F`C = 210 KG/CM2 m3 1,277.39
06.06.02 VIGAS ENCOFRADO Y DESENCOFRADO m2 7,659.77
06.06.03 ACERO DE REFUERZO Fy=4200 kg/cm2 kg 194,360.42
06.07 LOSAS MACIZAS
06.07.01 LOSAS MACIZAS CONCRETO F`C = 210 KG/CM2 m3 291.15
06.07.02 LOSAS MACIZAS ENCOFRADO Y DESENCOFRADO m2 1,193.34
06.07.03 ACERO DE REFUERZO Fy=4200 kg/cm2 kg 12,653.30
06.08 LOSAS ALIGERADAS EN UN SENTIDO
06.08.01 LOSAS ALIGERADA CONCRETO F`C = 210 KG/CM2 m3 127.13
PARTIDAS DE ESTRUCTURAS - RESUMEN DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

Item Descripcion Unidad TOTAL


06.08.02 LOSAS ALIGERADA ENCOFRADO Y DESENCOFRADO m2 2,688.33
06.08.03 ACERO DE REFUERZO Fy=4200 kg/cm2 kg 6,910.33
06.08.04 LOSA ALIGERADA LADRILLO HUECO 15 x 30 x 30 cm. und 12,350
06.09 LOSAS ALIGERADAS EN DOS SENTIDOS
06.09.01 LOSAS ALIGERADA CONCRETO F`C = 210 KG/CM2 m3 2,062.56
06.09.02 LOSAS ALIGERADA ENCOFRADO Y DESENCOFRADO m2 13,850.13
06.09.03 ACERO DE REFUERZO Fy=4200 kg/cm2 kg 144,509.48
06.09.04 LOSA ALIGERADA LADRILLO HUECO 20 x 30 x 30 cm. und 72,826
06.10 ESCALERAS
06.10.01 ESCALERAS CONCRETO F`C = 210 KG/CM2 m3 232.48
06.10.02 ESCALERAS ENCOFRADO Y DESENCOFRADO m2 939.46
06.10.03 ACERO DE REFUERZO Fy=4200 kg/cm2 kg 13,638.97
06.11 CISTERNA
06.11.01 CISTERNA CONCRETO F`C = 210 KG/CM2 m3 129.76
06.11.02 CISTERNA ENCOFRADO Y DESENCOFRADO m2 673.40
06.11.03 ACERO DE REFUERZO Fy=4200 kg/cm2 kg 7,602.33
06.12 TANQUE DE PETROLEO
06.12.01 TANQUE DE PETROLEO CONCRETO F`C = 210 KG/CM2 m3 18.57
06.12.02 TANQUE DE PETROLEO ENCOFRADO Y DESENCOFRADO m2 124.23
06.12.03 ACERO DE REFUERZO Fy=4200 kg/cm2 kg 1,575.00
06.13 TANQUE DE GAS LICUADO
06.13.01 TANQUE DE GAS LICUADO CONCRETO F`C = 210 KG/CM2 m3 33.93
06.13.02 TANQUE DE GAS LICUADO ENCOFRADO Y DESENCOFRADO m2 185.26
06.13.03 ACERO DE REFUERZO Fy=4200 kg/cm2 kg 2,654.49
06.14 RAMPAS
06.14.01 RAMPAS CONCRETO F`C = 210 KG/CM2 m3 73.10
06.14.02 RAMPAS ENCOFRADO Y DESENCOFRADO m2 532.00
06.14.03 ACERO DE REFUERZO Fy=4200 kg/cm2 kg 4,767.16
06.15 CERCO PERIMETRICO
06.15.01 MOVIMIENTO DE TIERRAS
06.15.01.01 EXACAVACION DE ZANJAS Y ZAPATAS m3 155.68
06.15.01.02 RELLENO COMPACTADO C/EQUIPO MAT/PROPIO m3 12.16
06.15.01.03 ELIM INACION DE MATERIAL EXCEDENTE C/MAQUINARIA m3 143.52
06.15.02 OBRAS DE CONCRETO SIMPLE
06.15.02.01 CIMIENTO CORRIDOS 1:10 + 30% P.G m3 136.22
06.15.02.02 SOBRECIMIENTO CONCRETO C:H 1:8 +25% P.M m3 37.58
06.15.02.03 SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO m2 501.00
06.15.03 OBRAS DE CONCRETO ARMADO
06.15.03.01 COLUMNAS CONCRETO F`C = 210 KG/CM2 m3 19.24
06.15.03.02 COLUMNAS ENCOFRADO Y DESENCOFRADO m2 769.50
06.15.03.03 ACERO DE REFUERZO Fy=4200 kg/cm2 kg 3,468.30
06.15.04 MUROS Y TABIQUES DE ALBAÑILERIA
06.15.04.01 MURO DE LADRILLO KK DE ARCILLA DE SOGA C/M 1:5 X 1.5 CM m2 352.26
06.15.05 REVOQUES, ENLUCIDOS Y MOLDURAS
06.15.05.01 TARRAJEO FROTACHADO DE MUROS EXTERIORES 1:4 , e = 1.5 cm m2 1,395.24
06.15.05.02 TARRAJEO DE COLUMNAS Y PLACAS m2 769.50
06.15.06 PINTURA
06.15.06.01 PINTURA LATEX DOS MANOS EN EXTERIORES m2 2009.22
06.15.07 CARPINTERÍA METÁLICA Y HERRERIA
06.15.07.01 PUERTAS TIPO Pf-04 ( 4.57 X 3.00 ) und 5.00
06.15.07.02 PUERTAS TIPO Pf-05 ( 2.00 X 3.00 ) und 2.00
06.15.07.03 PUERTAS TIPO Pf-06 (4.50 X 3.00 ) und 1.00
06.15.07.04 PUERTAS TIPO Pf-06 (6.15 X 3.00 ) und 1.00
06.15.07.05 PUERTAS TIPO Pf-07 (1.40 X 3.00 ) und 2.00
06.15.07.06 PUERTAS TIPO Pf-07 (1.20 X 3.00 ) und 1.00
06.15.08 MURO METALICO DE CERCO
06.15.08.01 MURO METALICO DE CERCO PERIMETRICO ml 317.90
06.16 LOSAS DE PISO
06.16.01 LOSAS DE PISO CONCRETO F`C = 210 KG/CM2 m3 2,304.59
06.16.02 ACERO DE REFUERZO Fy=4200 kg/cm2 kg 168,512.00
07 ESTRUCTURAS METALICAS Y COBERTURA
07.01 TECHO METALICO
07.01.01 TECHO METALICO INCL. COBERTURA m2 440.00
08. MUROS Y TABIQUES DE ALBAÑILERIA
PARTIDAS DE ESTRUCTURAS - RESUMEN DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

Item Descripcion Unidad TOTAL


08.01 MURO DE LADRILLO KK DE ARCILLA DE CABEZA C/M 1:5 X 1.5 CM m2 1,748.86
08.02 MURO DE LADRILLO KK DE ARCILLA DE SOGA C/M 1:5 X 1.5 CM m2 27,085.86
08.03 ALAMBRE #8 REFUERZO HORIZONTAL kg 7,200.00
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 01. OBRAS PROVISIONALES

VOLUMEN
N° Dimensiones
Descripción
Part. Und. Nro Vec. Longitud Ancho Altura Parcial Total

01.01 ALMACEN, OFICINAS, CASETA DE GUARDIANIA Y COMEDOR

Glob 1 1.00

TOTALES Glob 1.00

VOLUMEN
N° Dimensiones
Descripción
Part. Und. Nro Vec. Longitud Ancho Altura Parcial Total

01.02 CARTEL DE OBRA 3.60 x 5.40

Und. 1 1.00

TOTALES Glob 1.00

VOLUMEN
N° Dimensiones
Descripción
Part. Und. Nro Vec. Longitud Ancho Altura Parcial Total

01.03 SERVICIOS HIGIENICOS


Glob 2 2.00

TOTALES Glob 2.00

VOLUMEN
N° Dimensiones
Descripción
Part. Und. Nro Vec. Longitud Ancho Altura Parcial Total

01.04 AGUA PARA LA OBRA


Glob 1 1.00

TOTALES Glob 1.00

VOLUMEN
N° Dimensiones
Descripción
Part. Und. Nro Vec. Longitud Ancho Altura Parcial Total

01.05 ENERGIA ELECTRICA PARA LA OBRA


Glob 1 1.00

TOTALES Glob 1.00

VOLUMEN
N° Dimensiones
Descripción
Part. Und. Nro Vec. Longitud Ancho Altura Parcial Total

01.06 CERCO PROVISIONAL DE OBRA


ml 1 1.00

TOTALES Glob 1.00

PARTIDA : 02. TRABAJOS PRELIMINARES

VOLUMEN
N° Dimensiones
Descripción
Part. Und. Nro Vec. Longitud Ancho Altura Parcial Total

02.01 TRANSPORTE DE EQUIPO Y MAQUINARIAS


Glob 1 1.00

TOTALES Glob 1.00


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 01. OBRAS PROVISIONALES

VOLUMEN
N° Dimensiones
Descripción
Part. Und. Nro Vec. Longitud Ancho Altura Parcial Total

02.02 DEMOLICION Y ELIMINACION DE ESTRUCTURAS EXISTENTES

Glob 1 1.00 1.00


1.00

TOTALES Glob 1.00

VOLUMEN
N° Dimensiones
Descripción
Part. Und. Nro Vec. Longitud Ancho Altura Parcial Total

02.03 TRAZO Y REPLANTEO PRELIMINAR

Area
AREA DEL TERRENO m2 1 14225.00 1.00 14225.00
14,225.00

TOTALES M2 14,225.00

VOLUMEN
N° Dimensiones
Descripción
Part. Und. Nro Vec. Longitud Ancho Altura Parcial Total

02.04 TRAZO Y REPLANTEO DURANTE LA OBRA

Area
AREA DEL TERRENO Glob 1 14225.00 1.00 14225.00
14,225.00

TOTALES Glob 14,225.00


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

PARTIDA : 04.00.00 MOVIMIENTO DE TIERRAS


VOLUMEN
N° Descripción Dimensiones
Part. Und. Nro Vec. Area Ancho Altura Parcial Total

04.01 EXCAVACION MASIVA


SOTANO
HASTA EL NIVEL - 3.30 EN SOTANO m3 1 3,895.25 3.30 12,854.33
HASTA EL NIVEL - 1.00 - TALUD EN SOTANO m3 1 89.00 1.00 89.00
HASTA EL NIVEL - 1.50 - TALUD EN JARDIN
AREA DE EMERGENCIA m3 1 136.00 1.50 204.00
HASTA EL NIVEL - 1.50 ( PROM.) EN RAMPAS m3 1 72.00 1.50 108.00 13,255.33
PARA LOSAS DE CIMENTACION
SECTOR A Area
Losa de Piso y vigas de cim + Excav. Relleno m3 1 383.20 1.60 613.12 613.12
SECTOR B
Losa de Piso y vigas de cim + Excav. Relleno m3 1 930.42 1.60 1488.67 1,488.67
SECTOR C-1
Losa de Piso y vigas de cim + Excav. Relleno m3 1 389.20 1.60 622.72 622.72
SECTOR C-2
Losa de Piso y vigas de cim + Excav. Relleno m3 1 878.05 1.60 1404.88 1,404.88
SECTOR C-3
Losa de Piso y vigas de cim + Relleno m3 1 533.86 1.60 854.18 854.18
SECTOR F
Losa de Piso y vigas de cim + Relleno m3 1 920.38 1.60 1472.61 1,472.61

TOTALES M3 19,711.50

VOLUMEN
N° Descripción Dimensiones
Part. Und. Nro Vec. Longitud Ancho Altura Parcial Total

04.02 EXACAVACION DE ZANJAS Y ZAPATAS


SECTOR C-1
Para Zapatas
Z1 m3 1 9.60 3.20 1.2 15.00
Z2 m3 1 29.70 3.20 1.2 35.10
m3 1 1.20 0.55 1.2 3.95
Z-4 m3 1 2.80 2.40 1.2 7.40
Z-5 m3 1 3.30 2.88 1.2 8.38
Z-6 m3 1 3.25 2.80 1.2 8.25
Z-7 m3 2 2.50 2.15 1.2 7.85
Z-8 m3 1 3.55 3.05 1.2 8.80
Z-12 m3 1 9.44 2.40 1.2 14.04
Z- s/n m3 2 9.40 2.00 1.2 14.60
m3 1 6.82 4.95 1.2 13.97
Para Cimientos
Ejes Verticales
Entre ejes 13 y 14 m3 1 14.40 0.50 1.20 17.10
Eje 15 m3 1 12.70 0.50 1.20 15.40
Eje 17 m3 1 9.20 0.50 1.20 11.90
Ejes Horizontales
Entre ejes 12-14 y Q-U m3 3 5.30 0.50 1.20 10.00
m3 3 3.85 0.50 1.20 8.55 200.29
SECTOR C-3
Para Zapatas
Z-9 m3 2 3.60 3.10 1.2 9.90
Z-10 m3 3 3.80 3.30 1.2 11.30
Z-11 m3 2 3.65 3.30 1.2 10.15
Z-12 m3 1 7.60 2.50 1.2 12.30
Para Cimientos
Ejes Horizontales m3 1 3.40 0.50 1.20 6.10
m3 1 7.50 0.50 1.20 10.20
m3 2 3.30 0.50 1.20 7.00
m3 1 12.80 0.50 1.20 15.50
m3 1 2.75 0.50 1.20 5.45
m3 1 6.30 0.50 1.20 9.00
m3 1 5.00 0.50 1.20 7.70
m3 1 3.90 0.50 1.20 6.60
m3 1 7.20 0.50 1.20 9.90
m3 2 3.35 0.50 1.20 7.05
Ejes Verticales m3 1 2.80 0.50 1.20 5.50
m3 2 1.55 0.50 1.20 5.25

Página 6 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

PARTIDA : 04.00.00 MOVIMIENTO DE TIERRAS


m3 2 0.85 0.50 1.20 4.55
m3 1 2.10 0.50 1.20 4.80
m3 1 3.40 0.50 1.20 6.10
m3 1 1.40 0.50 1.20 4.10
m3 1 5.80 0.50 1.20 8.50
m3 1 1.75 0.50 1.20 4.45
m3 1 1.15 0.50 1.20 3.85
m3 1 6.20 0.50 1.20 8.90
m3 2 3.55 0.50 1.20 7.25 191.40
SECTOR D
Para Zapatas
Z-1 m3 1 0.90 0.75 1.2 0.81
Z-2 m3 2 1.00 0.75 1.2 1.80
Z-3 m3 1 1.75 0.75 1.2 1.58
Z-4 m3 3 1.10 0.75 1.2 2.97
Z-5 m3 2 1.40 1.30 1.2 4.37
Z-6 m3 1 1.00 0.70 1.2 0.84
Z-7 m3 1 0.90 0.70 1.2 0.76
Para Cimientos
Corte 6 m3 1 2.35 0.45 1.2 1.27
m3 1 6.25 0.45 1.2 3.38
Corte 7 m3 2 2.80 0.40 1.2 2.69
Corte 8 m3 1 6.15 0.40 1.2 2.95 23.40
SECTOR E
Para Zapatas
Z-13 m3 4 2.20 2.00 1.2 21.12
Z-14 m3 3 2.35 2.10 1.2 17.77
m3 1 21.05 2.45 1.2 61.89
m3 1 9.00 8.40 1.2 90.72
Z-18 m3 1 3.55 2.10 1.2 8.95
Z-19 m3 1 8.95 2.10 1.2 22.55
Z-S/N m3 1 2.55 2.55 1.2 7.80
Para Cimientos
Ejes Horizontales
Eje L m3 1 4.65 0.50 1.2 2.79
Entre ejes L y M m3 1 13.55 0.50 1.2 8.13
Eje M m3 1 7.10 0.50 1.2 4.26
Entre ejes M y N m3 1 19.00 0.50 1.2 11.40
Eje N m3 1 14.40 0.50 1.2 8.64
Ejes Verticales m3
Eje 21 m3 1 2.60 0.50 1.2 1.56
Entre ejes 21 y 22 m3 1 5.30 0.50 1.2 3.18
Eje 23 m3 1 1.60 0.50 1.2 0.96
Entre ejes 23 y 24 m3 1 6.35 0.50 1.2 3.81
Eje 24 m3 1 9.25 0.50 1.2 5.55
Entre ejes 25 y 26 m3 1 6.00 0.50 1.2 3.60
Eje 26 m3 1 5.35 0.50 1.2 3.21
Entre ejes 26 y 27 m3 1 1.80 0.50 1.2 1.08
Eje 28 m3 1 1.13 0.50 1.2 0.68 289.64
SECTOR F
Para Zapatas
Z-16 m3 2 2.00 2.00 1.2 9.60
Z-17 m3 1 2.75 2.75 1.2 9.08
Z-19 m3 1 5.90 1.95 1.2 13.81
Para Cimientos
Ejes Horizontales
Entre ejes I y J m3 1 15.42 0.50 1.2 9.25
Eje J m3 1 19.85 0.50 1.2 11.91
Entre ejes J y K m3 1 37.65 0.50 1.2 22.59
Eje K m3 1 4.65 0.50 1.2 2.79
Ejes Verticales
Eje 20 m3 1 3.10 0.50 1.2 1.86
Entre ejes 21 y 24 m3 1 15.60 0.50 1.2 9.36
Eje 24 m3 1 8.00 0.50 1.2 4.80
Entre ejes 24 y 25 m3 1 8.70 0.50 1.2 5.22
Entre ejes 25 y 26 m3 1 8.50 0.50 1.2 5.10
Eje 26 m3 1 7.52 0.50 1.2 4.51
Entre ejes 27 y 28 m3 1 2.35 0.50 1.2 1.41 111.29

TOTALES M3 816.02

VOLUMEN
Descripción

Página 7 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

PARTIDA : 04.00.00 MOVIMIENTO DE TIERRAS


N° Descripción Dimensiones
Part. Und. Nro Vec. Area Ancho Altura Parcial Total

04.03 RELLENO COMPACTADO C/EQUIPO MAT/PRESTAMO


PARA LOSAS DE PISO
SECTOR A Area
Losa de Piso y vigas de cimentacion m3 1 383.20 1.00 383.20 383.20
SECTOR B Area
Losa de Piso y vigas de cimentacion m3 1 930.42 1.00 930.42 930.42
SECTOR C-1
Losa de Piso y vigas de cimentacion m3 1 389.20 1.00 389.20 389.20
SECTOR C-2
Losa de Piso y vigas de cimentacion m3 1 878.05 1.00 878.05 878.05
SECTOR C-3
Losa de Piso y vigas de cimentacion m3 1 533.86 1.00 533.86 533.86
SECTOR F
Losa de Piso y vigas de cimentacion m3 1 920.38 1.00 920.38 920.38

TOTALES M3 4,035.11

VOLUMEN
N° Descripción Dimensiones
Part. Und. Nro Vec. Area Ancho Altura Parcial Total

04.04 RELLENO COMPACTADO C/EQUIPO MAT/PROPIO


SECTOR C-1
Para Zapatas
Z1 m3 1 9.60 3.20 0.6 14.40
Z2 m3 1 29.70 3.20 0.6 34.50
m3 1 1.20 0.55 0.6 3.35
Z-4 m3 1 2.80 2.40 0.6 6.80
Z-5 m3 1 3.30 2.88 0.6 7.78
Z-6 m3 1 3.25 2.80 0.6 7.65
Z-7 m3 2 2.50 2.15 0.6 7.25
Z-8 m3 1 3.55 3.05 0.6 8.20
Z-12 m3 1 9.44 2.40 0.6 13.44
Z- s/n m3 2 9.40 2.00 0.6 14.00
m3 1 6.82 4.95 0.6 13.37
Para Cimientos
Ejes Verticales
Entre ejes 13 y 14 m3 1 14.40 0.50 0.6 16.50
Eje 15 m3 1 12.70 0.50 0.6 14.80
Eje 17 m3 1 9.20 0.50 0.6 11.30
Ejes Horizontales
Entre ejes 12-14 y Q-U m3 3 5.30 0.50 0.50 9.30
m3 3 3.85 0.50 0.50 7.85 190.49
SECTOR C-3
Para Zapatas
Z-9 m3 2 3.60 3.10 0.6 9.30
Z-10 m3 3 3.80 3.30 0.6 10.70
Z-11 m3 2 3.65 3.30 0.6 9.55
Z-12 m3 1 7.60 2.50 0.6 11.70
Para Cimientos
Ejes Horizontales m3 1 3.40 0.50 0.50 5.40
m3 1 7.50 0.50 0.50 9.50
m3 2 3.30 0.50 0.50 6.30
m3 1 12.80 0.50 0.50 14.80
m3 1 2.75 0.50 0.50 4.75
m3 1 6.30 0.50 0.50 8.30
m3 1 5.00 0.50 0.50 7.00
m3 1 3.90 0.50 0.50 5.90
m3 1 7.20 0.50 0.50 9.20
m3 2 3.35 0.50 0.50 6.35
Ejes Verticales m3 1 2.80 0.50 0.50 4.80
m3 2 1.55 0.50 0.50 4.55
m3 2 0.85 0.50 0.50 3.85
m3 1 2.10 0.50 0.50 4.10
m3 1 3.40 0.50 0.50 5.40
m3 1 1.40 0.50 0.50 3.40
m3 1 5.80 0.50 0.50 7.80
m3 1 1.75 0.50 0.50 3.75
m3 1 1.15 0.50 0.50 3.15

Página 8 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

PARTIDA : 04.00.00 MOVIMIENTO DE TIERRAS


m3 1 6.20 0.50 0.50 8.20
m3 2 3.55 0.50 0.50 6.55 174.30
SECTOR D
Para Zapatas
Z-1 m3 1 0.90 0.75 0.6 0.41
Z-2 m3 2 1.00 0.75 0.6 0.90
Z-3 m3 1 1.75 0.75 0.6 0.79
Z-4 m3 3 1.10 0.75 0.6 1.49
Z-5 m3 2 1.40 1.30 0.6 2.18
Z-6 m3 1 1.00 0.70 0.6 0.42
Z-7 m3 1 0.90 0.70 0.6 0.38
Para Cimientos
Corte 6 m3 1 2.35 0.45 0.50 0.53
m3 1 6.25 0.45 0.50 1.41
Corte 7 m3 2 2.80 0.40 0.50 1.12
Corte 8 m3 1 6.15 0.40 0.50 1.23 10.84
SECTOR E
Para Zapatas
Z-13 m3 4 2.20 2.00 0.6 10.56
Z-14 m3 3 2.35 2.10 0.6 8.88
m3 1 21.05 2.45 0.6 30.94
m3 1 9.00 8.40 0.6 45.36
Z-18 m3 1 3.55 2.10 0.6 4.47
Z-19 m3 1 8.95 2.10 0.6 11.28
Z-S/N m3 1 2.55 2.55 0.6 3.90
Para Cimientos
Ejes Horizontales
Eje L m3 1 4.65 0.50 0.50 1.16
Entre ejes L y M m3 1 13.55 0.50 0.50 3.39
Eje M m3 1 7.10 0.50 0.50 1.78
Entre ejes M y N m3 1 19.00 0.50 0.50 4.75
Eje N m3 1 14.40 0.50 0.50 3.60
Ejes Verticales m3
Eje 21 m3 1 2.60 0.50 0.50 0.65
Entre ejes 21 y 22 m3 1 5.30 0.50 0.50 1.33
Eje 23 m3 1 1.60 0.50 0.50 0.40
Entre ejes 23 y 24 m3 1 6.35 0.50 0.50 1.59
Eje 24 m3 1 9.25 0.50 0.50 2.31
Entre ejes 25 y 26 m3 1 6.00 0.50 0.50 1.50
Eje 26 m3 1 5.35 0.50 0.50 1.34
Entre ejes 26 y 27 m3 1 1.80 0.50 0.50 0.45
Eje 28 m3 1 1.13 0.50 0.50 0.28 139.92
SECTOR F
Para Zapatas
Z-16 m3 2 2.00 2.00 0.6 4.80
Z-17 m3 1 2.75 2.75 0.6 4.54
Z-19 m3 1 5.90 1.95 0.6 6.90
Para Cimientos
Ejes Horizontales
Entre ejes I y J m3 1 15.42 0.50 0.50 3.86
Eje J m3 1 19.85 0.50 0.50 4.96
Entre ejes J y K m3 1 37.65 0.50 0.50 9.41
Eje K m3 1 4.65 0.50 0.50 1.16
Ejes Verticales
Eje 20 m3 1 3.10 0.50 0.50 0.78
Entre ejes 21 y 24 m3 1 15.60 0.50 0.50 3.90
Eje 24 m3 1 8.00 0.50 0.50 2.00
Entre ejes 24 y 25 m3 1 8.70 0.50 0.50 2.18
Entre ejes 25 y 26 m3 1 8.50 0.50 0.50 2.13
Eje 26 m3 1 7.52 0.50 0.50 1.88
Entre ejes 27 y 28 m3 1 2.35 0.50 0.50 0.59 49.08

TOTALES M3 564.63

VOLUMEN
N° Descripción Dimensiones
Part. Coeficiente Nro Vec. Volumen Altura Parcial Total

04.05 NIVELACION INTERIOR Y APISONADO

IDEM FALSO PISOS M2 1 5,922.15 5922.15

Página 9 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

PARTIDA : 04.00.00 MOVIMIENTO DE TIERRAS

TOTALES M2 5,922.15

VOLUMEN
N° Descripción Dimensiones
Part. Coef. Esp. Nro Vec. Volumen Altura Parcial Total

04.06 ELIM INACION DE MATERIAL EXCEDENTE C/MAQUINARIA

VOLUMEN EXCAVACION MANUAL M3 1 816.02 816.02


VOLUMEN EXCAVACION MAQUINA M3 1 19,711.50 19,711.50
MENOS VOLUMEN DE RELLENO PROPIO M3 -1 564.63 -564.63
Sub Total 19,962.90
VOLUMEN DE ESPONJAMIENTO M3 15% 2,994.43 22,957.33

TOTALES M3 22,957.33

Página 10 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

PARTIDA : 05.00.00 OBRAS DE CONCRETO SIMPLE

CONCRETO ENCOFRADO
N° Descripción Dimensiones Dimensiones

Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Longitud Ancho Altura Parcial

05.01.01 SOLADO DE CONCRETO E= 4" MEZCLA C:H 1:1O


SECTOR A
PARA LOSAS DE CIMENTACION Area
ENTRE EJES 2-9 Y P-P1 1 351.80 351.80
PARA VIGAS DE CIMENTACION
EJE P 1 24.34 0.30 7.30
EJE P1 1 24.30 0.30 7.29
EJE 2 1 14.85 0.30 4.46
EJE 9 1 16.70 0.30 5.01
SECTOR B

PARA LOSAS DE CIMENTACION Area


ENTRE EJES 2-9 Y E1-E6 1 875.75 875.75

PARA VIGAS DE CIMENTACION


EJE 2 1 32.10 0.30 9.63

EJE 3 1 3.40 0.30 1.02


EJE 6 1 2.10 0.30 0.63
EJE 8 1 1.90 0.30 0.57
EJE 9 1 13.15 0.30 3.95
EJE 9 1 13.95 0.30 4.19
EJE 9 1 7.15 0.30 2.15
EJE 9 1 7.25 0.30 2.18
EJE E1 1 4.30 0.30 1.29
EJE F 1 6.90 0.30 2.07
EJE E3 1 10.25 0.30 3.08
EJES H-I-E5 3 3.15 0.30 2.84
EJE E-6 1 27.20 0.30 8.16
SECTOR C-1
PARA LOSAS DE CIMENTACION Area
ENTRE EJES 10-12 Y O-U 1 367.20 367.20

PARA VIGAS DE CIMENTACION


EJE O 1 14.25 0.30 4.28

EJE U 1 14.25 0.30 4.28


EJE 10 1 27.80 0.30 8.34

EJE 12 1 27.80 0.30 8.34


PARA ZAPATAS
Z1 1 9.60 3.20 30.72
Z2 1 29.70 3.20 95.04
1 1.20 0.55 0.66
Z-4 1 2.80 2.40 6.72
Z-5 1 3.30 2.88 9.50
Z-6 1 3.25 2.80 9.10
Z-7 2 2.50 2.15 10.75
Z-8 1 3.55 3.05 10.83

Z-12 1 9.44 2.40 22.66


Z- s/n 2 9.40 2.00 37.60

1 6.82 4.95 33.76


SECTOR C-2

PARA LOSAS DE CIMENTACION Area


ENTRE EJES 10-12 Y D-Ñ 1 817.44 817.44
PARA VIGAS DE CIMENTACION
EJE D 1 14.25 0.30 4.28
EJE Ñ 1 21.10 0.30 6.33
EJE M 1 7.25 0.30 2.18
EJE 10 1 55.25 0.30 16.58
EJE 12 1 42.25 0.30 12.68
EJE 14 1 13.35 0.30 4.01

SECTOR C-3

Página 11 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

PARTIDA : 05.00.00 OBRAS DE CONCRETO SIMPLE

PARA LOSAS DE CIMENTACION Area


ENTRE EJES 13-19 Y C-I 1 508.00 508.00

PARA VIGAS DE CIMENTACION


EJE C 1 3.75 0.30 1.13

EJE D 1 23.85 0.30 7.16


EJE 13 1 17.65 0.30 5.30
EJE 18 1 6.75 0.30 2.03
PARA ZAPATAS
Z-9 2 3.60 3.10 22.32
Z-10 3 3.80 3.30 37.62
Z-11 2 3.65 3.30 24.09
Z-12 1 7.60 2.50 19.00
SECTOR D
PARA CISTERNAS

ENTRE EJES 17-20 y R-T1 1 12.05 7.10 85.56


ENTRE EJES 23-24 y R-T1 1 12.05 5.25 63.26

EN EJE+C79 T1 ENTRE EJES 20 y 22 1 6.33 0.45 2.85


PARA ZAPATAS

Z-1 1 0.90 0.75 0.68


Z-2 2 1.00 0.75 1.50
Z-3 1 1.75 0.75 1.31
Z-4 3 1.10 0.75 2.48
Z-5 2 1.40 1.30 3.64
Z-6 1 1.00 0.70 0.70
Z-7 1 0.90 0.70 0.63
SECTOR E
PARA ZAPATAS
Z-13 4 2.20 2.00 17.60
Z-14 3 2.35 2.10 14.81
1 21.05 2.45 51.57
1 9.00 8.40 75.60
Z-18 1 3.55 2.10 7.46
Z-19 1 8.95 2.10 18.80

Z-S/N 1 2.55 2.55 6.50


SECTOR F

PARA LOSAS DE CIMENTACION Area


ENTRE EJES 13-19 Y C-I 1 920.83 920.83

PARA VIGAS DE CIMENTACION


EJE D 1 30.90 0.30 9.27
EJE G 1 3.60 0.30 1.08
EJE 27 1 13.60 0.30 4.08
EJE 28 1 13.30 0.30 3.99
PARA ZAPATAS
| Z-16 2 2.00 2.00 8.00
Z-17 1 2.75 2.75 7.56
Z-19 1 5.90 1.95 11.51
PARA MUROS DE CONTENCION

SECTOR C-1
Muros M5 1 21.15 1.50 31.73

SECTOR C-3
Muros M1 1 60.20 1.50 90.30

SECTOR F
Muros M1 1 50.00 1.50 75.00
TANQUE DE PETROLEO 1 5.00 3.25 16.25
TANQUE DE GAS LICUADO 1 7.60 6.40 48.64

M2 5026.37

CONCRETO ENCOFRADO
N° Descripción Dimensiones Dimensiones

Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Longitud Ancho Altura Parcial

Página 12 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

PARTIDA : 05.00.00 OBRAS DE CONCRETO SIMPLE

05.02.01 CIMIENTO CORRIDOS 1:10 + 30% P.G


SECTOR C-1

Ejes Verticales
Entre ejes 13 y 14 1 14.40 0.50 0.60 4.32

Eje 15 1 12.70 0.50 0.60 3.81


Eje 17 1 9.20 0.50 0.60 2.76
Ejes Horizontales
Entre ejes 12-14 y Q-U 3 5.30 0.50 0.60 4.77
3 3.85 0.50 0.60 3.47
SECTOR C-3
Entre ejes 15-17 y J-N
Ejes Horizontales 1 3.40 0.50 0.60 1.02
1 7.50 0.50 0.60 2.25
2 3.30 0.50 0.60 1.98

1 12.80 0.50 0.60 3.84


1 2.75 0.50 0.60 0.83

1 6.30 0.50 0.60 1.89


1 5.00 0.50 0.60 1.50

1 3.90 0.50 0.60 1.17


1 7.20 0.50 0.60 2.16
2 3.35 0.50 0.60 2.01
Ejes Verticales 1 2.80 0.50 0.60 0.84
2 1.55 0.50 0.60 0.93
2 0.85 0.50 0.60 0.51
1 2.10 0.50 0.60 0.63
1 3.40 0.50 0.60 1.02
1 1.40 0.50 0.60 0.42
1 5.80 0.50 0.60 1.74
1 1.75 0.50 0.60 0.53
1 1.15 0.50 0.60 0.35
1 6.20 0.50 0.60 1.86
2 3.55 0.50 0.60 2.13
SECTOR D

Corte 6 1 2.35 0.45 0.60 0.63


1 6.25 0.45 0.60 1.69

Corte 7 2 2.80 0.40 0.60 1.34


Corte 8 1 6.15 0.40 0.60 1.48

SECTOR E
Ejes Horizontales
Eje L 1 4.65 0.50 0.60 1.40
Entre ejes L y M 1 13.55 0.50 0.60 4.07
Eje M 1 7.10 0.50 0.60 2.13
Entre ejes M y N 1 19.00 0.50 0.60 5.70
Eje N 1 14.40 0.50 0.60 4.32
Ejes Verticales
Eje 21 1 2.60 0.50 0.60 0.78
Entre ejes 21 y 22 1 5.30 0.50 0.60 1.59

Eje 23 1 1.60 0.50 0.60 0.48


Entre ejes 23 y 24 1 6.35 0.50 0.60 1.91

Eje 24 1 9.25 0.50 0.60 2.78


Entre ejes 25 y 26 1 6.00 0.50 0.60 1.80

Eje 26 1 5.35 0.50 0.60 1.61


Entre ejes 26 y 27 1 1.80 0.50 0.60 0.54
Eje 28 1 1.13 0.50 0.60 0.34
SECTOR F
Ejes Horizontales
Entre ejes I y J 1 15.42 0.50 0.60 4.63
Eje J 1 19.85 0.50 0.60 5.96
Entre ejes J y K 1 37.65 0.50 0.60 11.30
Eje K 1 4.65 0.50 0.60 1.40

Ejes Verticales

Página 13 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

PARTIDA : 05.00.00 OBRAS DE CONCRETO SIMPLE

Eje 20 1 3.10 0.50 0.60 0.93


Entre ejes 21 y 24 1 15.60 0.50 0.60 4.68

Eje 24 1 8.00 0.50 0.60 2.40


Entre ejes 24 y 25 1 8.70 0.50 0.60 2.61

Entre ejes 25 y 26 1 8.50 0.50 0.60 2.55


Eje 26 1 7.52 0.50 0.60 2.26
Entre ejes 27 y 28 1 2.35 0.50 0.60 0.71

M3 68.83 M2 0

CONCRETO ENCOFRADO
N° Descripción Dimensiones Dimensiones
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Longitud Ancho Altura Parcial
05.03.01 SOBRECIMIENTO CONCRETO C:H 1:8 +25% P.M

05.03.02 SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO


SECTOR A

Eje P 1 17.80 0.40 0.45 3.20 1 17.80 2 0.45 16.02


Eje P1 1 17.90 0.40 0.45 3.22 1 17.90 2 0.45 16.11

Eje 2 1 10.00 0.25 0.45 1.13 1 10.00 2 0.45 9


Eje 9 1 10.00 0.25 0.45 1.13 1 10.00 2 0.45 9
Entre ejes 2d y 9 1 17.00 0.25 0.45 1.91 1 17.00 2 0.45 15.3
1 33.65 0.15 0.45 2.27 1 33.65 2 0.45 30.285
SECTOR B
Eje 2 1 19.90 0.15 0.45 1.34 1 19.90 2 0.45 17.91
Eje 3 1 7.70 0.25 0.45 0.87 1 7.70 2 0.45 6.93
1 15.75 0.15 0.45 1.06 1 15.75 2 0.45 14.175
Entre elea 2 y 3 1 4.25 0.15 0.45 0.29 1 4.25 2 0.45 3.825
Eje 4 1 17.00 0.15 0.45 1.15 1 17.00 2 0.45 15.3
Entre ejes 4 y 5 1 1.10 0.15 0.45 0.07 1 1.10 2 0.45 0.99
Eje 5 1 27.65 0.15 0.45 1.87 1 27.65 2 0.45 24.885
Eje 6 1 27.85 0.15 0.45 1.88 1 27.85 2 0.45 25.065
Entre ejes 6 y 7 1 1.10 0.15 0.45 0.07 1 1.10 2 0.45 0.99
Eje 7 1 14.55 0.15 0.45 0.98 1 14.55 2 0.45 13.095

Eje 8 1 25.45 0.15 0.45 1.72 1 25.45 2 0.45 22.905


Entre ejes 8 y 9 1 4.40 0.15 0.45 0.30 1 4.40 2 0.45 3.96

Eje 9 1 31.90 0.15 0.45 2.15 1 31.90 2 0.45 28.71


Eje E1 1 4.15 0.15 0.45 0.28 1 4.15 2 0.45 3.735

Eje E2 1 5.30 0.15 0.45 0.36 1 5.30 2 0.45 4.77


Eje E3 1 9.00 0.15 0.45 0.61 1 9.00 2 0.45 8.1
Entre ejes E3 y G 1 6.00 0.15 0.45 0.41 1 6.00 2 0.45 5.4
Eje G 1 12.30 0.15 0.45 0.83 1 12.30 2 0.45 11.07
Eje H 1 21.30 0.15 0.45 1.44 1 21.30 2 0.45 19.17
Entre ejes H y I 1 24.30 0.15 0.45 1.64 1 24.30 2 0.45 21.87
Entre ejes I y J 1 34.95 0.15 0.45 2.36 1 34.95 2 0.45 31.455
Entre ejes J y K 1 32.20 0.15 0.45 2.17 1 32.20 2 0.45 28.98
SECTOR C-1
EJE O 1 9.00 0.15 0.45 0.61 1 9.00 2 0.45 8.1

EJE O-Q 1 17.50 0.15 0.45 1.18 1 17.50 2 0.45 15.75


EJE Q 1 14.40 0.15 0.45 0.97 1 14.40 2 0.45 12.96

EJE Q-R 1 14.20 0.15 0.45 0.96 1 14.20 2 0.45 12.78


EJE R 1 1.80 0.15 0.45 0.12 1 1.80 2 0.45 1.62

EJE R-S 1 24.60 0.15 0.45 1.66 1 24.60 2 0.45 22.14


EJE S 1 16.00 0.15 0.45 1.08 1 16.00 2 0.45 14.4
EJE S-U 1 19.90 0.15 0.45 1.34 1 19.90 2 0.45 17.91
EJE U 1 23.20 0.15 0.45 1.57 1 23.20 2 0.45 20.88
EJE 10 1 13.50 0.15 0.45 0.91 1 13.50 2 0.45 12.15
ENTRE EJES 10-11 1 11.00 0.15 0.45 0.74 1 11.00 2 0.45 9.9
EJE 11 1 17.00 0.15 0.45 1.15 1 17.00 2 0.45 15.3
ENTRE EJES 11-12 1 39.65 0.15 0.45 2.68 1 39.65 2 0.45 35.685
EJE 12 1 17.00 0.15 0.45 1.15 1 17.00 2 0.45 15.3

ENTRE EJES 12-14 1 6.00 0.15 0.45 0.41 1 6.00 2 0.45 5.4

Página 14 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

PARTIDA : 05.00.00 OBRAS DE CONCRETO SIMPLE

EJE 14 1 3.50 0.15 0.45 0.24 1 3.50 2 0.45 3.15


ENTRE EJES 14-16 1 17.00 0.15 0.45 1.15 1 17.00 2 0.45 15.3

EJE 16 1 19.00 0.15 0.45 1.28 1 19.00 2 0.45 17.1


ENTRE EJES 16-17 1 10.00 0.15 0.45 0.68 1 10.00 2 0.45 9

EJE 17 1 15.50 0.15 0.45 1.05 1 15.50 2 0.45 13.95


SECTOR C-2
EJE D 1 12.70 0.15 0.45 0.86 1 12.70 2 0.45 11.43
EJE G 1 3.45 0.15 0.45 0.23 1 3.45 2 0.45 3.105
ENTRE EJES H-I 1 13.50 0.15 0.45 0.91 1 13.50 2 0.45 12.15
EJE I 1 12.00 0.15 0.45 0.81 1 12.00 2 0.45 10.8
EJE 10 1 11.70 0.15 0.45 0.79 1 11.70 2 0.45 10.53
EJE 11 1 6.45 0.15 0.45 0.44 1 6.45 2 0.45 5.805
ENTRE EJES 10-11 1 10.90 0.15 0.45 0.74 1 10.90 2 0.45 9.81
EJE 12 1 19.30 0.15 0.45 1.30 1 19.30 2 0.45 17.37

ENTRE EJES 12-14 1 4.50 0.15 0.45 0.30 1 4.50 2 0.45 4.05
EJE 14 1 12.90 0.15 0.45 0.87 1 12.90 2 0.45 11.61

SECTOR C-3
EJE D 1 6.30 0.15 0.45 0.43 1 6.30 2 0.45 5.67

EJE G 1 21.00 0.15 0.45 1.42 1 21.00 2 0.45 18.9


ENTRE EJES G-H 1 15.00 0.15 0.45 1.01 1 15.00 2 0.45 13.5
EJE H 1 21.00 0.15 0.45 1.42 1 21.00 2 0.45 18.9
ENTRE EJES H-I 1 21.00 0.15 0.45 1.42 1 21.00 2 0.45 18.9
EJE 15 1 15.00 0.15 0.45 1.01 1 15.00 2 0.45 13.5
EJE 16 1 12.00 0.15 0.45 0.81 1 12.00 2 0.45 10.8
EJE 17 1 12.00 0.15 0.45 0.81 1 12.00 2 0.45 10.8
EJE 18 1 6.00 0.15 0.45 0.41 1 6.00 2 0.45 5.4
EJE 19 1 12.90 0.15 0.45 0.87 1 12.90 2 0.45 11.61
EJE 20 1 7.00 0.15 0.45 0.47 1 7.00 2 0.45 6.3
SECTOR D
CORTE 5 1 6.70 0.25 0.20 0.34 1 6.70 2 0.20 2.68
CORTE 6 1 2.80 0.25 0.70 0.49 1 2.80 2 0.70 3.92
1 6.70 0.25 0.70 1.17 1 6.70 2 0.70 9.38
CORTE 7 2 3.45 0.15 0.70 0.72 2 3.45 2 0.70 9.66

CORTE 8 1 4.35 0.25 0.70 0.76 1 4.35 2 0.70 6.09


SECTOR E

Ejes Horizontales
Eje L 1 5.75 0.15 0.80 0.69 1 5.75 2 0.80 9.2

Entre ejes L y M 1 9.25 0.15 0.80 1.11 1 9.25 2 0.80 14.8


Eje M 1 5.00 0.15 0.80 0.60 1 5.00 2 0.80 8
Entre ejes M y N 1 19.35 0.15 0.80 2.32 1 19.35 2 0.80 30.96
Eje N 1 15.45 0.15 0.80 1.85 1 15.45 2 0.80 24.72
Ejes Verticales
Eje 21 1 3.10 0.15 0.80 0.37 1 3.10 2 0.80 4.96
Entre ejes 21 y 22 1 5.95 0.15 0.80 0.71 1 5.95 2 0.80 9.52
Eje 23 1 1.55 0.15 0.80 0.19 1 1.55 2 0.80 2.48
Entre ejes 23 y 24 1 5.85 0.15 0.80 0.70 1 5.85 2 0.80 9.36
Eje 24 1 12.45 0.15 0.80 1.49 1 12.45 2 0.80 19.92

Entre ejes 25 y 26 1 3.70 0.15 0.80 0.44 1 3.70 2 0.80 5.92


Eje 26 1 5.40 0.15 0.80 0.65 1 5.40 2 0.80 8.64

Entre ejes 26 y 27 1 3.35 0.15 0.80 0.40 1 3.35 2 0.80 5.36


Eje 28 1 2.95 0.15 0.80 0.35 1 2.95 2 0.80 4.72

SECTOR F
EJE C 1 15.65 0.15 0.45 1.06 1 15.65 2 0.45 14.085
EJE D 1 14.05 0.15 0.45 0.95 1 14.05 2 0.45 12.645
ENTRE EJES D-C 1 30.15 0.15 0.45 2.04 1 30.15 2 0.45 27.135
EJE G 1 9.80 0.15 0.45 0.66 1 9.80 2 0.45 8.82
EJE H 1 25.85 0.15 0.45 1.74 1 25.85 2 0.45 23.265
ENTRE EJES G-H 1 14.00 0.15 0.45 0.95 1 14.00 2 0.45 12.6
ENTRE EJES H-I 1 6.00 0.15 0.45 0.41 1 6.00 2 0.45 5.4

ENTRE EJES J-I 1 6.60 0.15 0.45 0.45 1 6.60 2 0.45 5.94

Página 15 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

PARTIDA : 05.00.00 OBRAS DE CONCRETO SIMPLE

ENTRE EJES K-J 1 23.40 0.15 0.45 1.58 1 23.40 2 0.45 21.06
EJE 20 1 13.10 0.15 0.45 0.88 1 13.10 2 0.45 11.79

ENTRE EJES 20-23 1 35.60 0.15 0.45 2.40 1 35.60 2 0.45 32.04
EJE 23 1 35.00 0.15 0.45 2.36 1 35.00 2 0.45 31.5

ENTRE EJES 23 -24 1 23.00 0.15 0.45 1.55 1 23.00 2 0.45 20.7
EJE 24 1 10.00 0.15 0.45 0.68 1 10.00 2 0.45 9
ENTRE EJES 24 -25 1 13.00 0.15 0.45 0.88 1 13.00 2 0.45 11.7
EJE 25 1 28.00 0.15 0.45 1.89 1 28.00 2 0.45 25.2
ENTRE EJES 25 -26 1 6.00 0.15 0.45 0.41 1 6.00 2 0.45 5.4
EJE 26 1 9.00 0.15 0.45 0.61 1 9.00 2 0.45 8.1
ENTRE EJES 26 -27 1 6.00 0.15 0.45 0.41 1 6.00 2 0.45 5.4
EJE 27 1 15.10 0.15 0.45 1.02 1 15.10 2 0.45 13.59
ENTRE EJES I-K y 20 27
Ejes Horizontales

Entre ejes I y J 1 13.40 0.15 0.80 1.61 1 13.40 2 0.80 21.44


Eje J 1 22.80 0.15 0.80 2.74 1 22.80 2 0.80 36.48

Entre ejes J y K 1 28.75 0.15 0.80 3.45 1 28.75 2 0.80 46


Eje K 1 4.39 0.15 0.80 0.53 1 4.39 2 0.80 7.024

Ejes Verticales 0 0.00 2 0.00 0


Eje 20 1 3.10 0.15 0.80 0.37 1 3.10 2 0.80 4.96
Entre ejes 21 y 24 1 19.98 0.15 0.80 2.40 1 19.98 2 0.80 31.968
Eje 24 1 10.55 0.15 0.80 1.27 1 10.55 2 0.80 16.88
Entre ejes 24 y 25 1 7.35 0.15 0.80 0.88 1 7.35 2 0.80 11.76
Entre ejes 25 y 26 1 10.10 0.15 0.80 1.21 1 10.10 2 0.80 16.16
Eje 26 1 10.85 0.15 0.80 1.30 1 10.85 2 0.80 17.36
Entre ejes 27 y 28 1 4.30 0.15 0.80 0.52 1 4.30 2 0.80 6.88

M3 105.32 M2 522.28

CONCRETO ENCOFRADO
N° Descripción Dimensiones Dimensiones
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Longitud Ancho Altura Parcial
05.04.01 FALSO PISO C:H 1:8 E = 10 cm

IDEM METRADO DE ARQUITECTURA 1 5922.15

M2 5922.15

Página 16 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL

perimet Elemento
06.01.01 CONCRETO EN ZAPATAS F`C = 210 KG/CM2
06.01.02 ACERO DE REFUERZO Fy=4200 kg/cm2
SECTOR C-1
Z1 1 9.60 3.20 0.90 27.65 Superior 1" 65 3.20 1 208.00

Superior 1" 23 9.60 1 220.80


Inferior 3/4" 78 3.20 1 249.60
Inferior 3/4" 27 9.60 1 259.20

Z2 1 29.70 3.20 0.95 90.29 Superior 1" 133 3.20 1 425.60


1 1.20 0.55 0.95 0.63 Superior 1" 23 29.70 1 683.10
Inferior 1" 133 3.20 1 425.60
Inferior 1" 16 29.70 1 475.20
Superior 1" 7 0.55 1 3.85

Superior 1" 5 1.20 1 6.00


Inferior 1" 7 0.55 1 3.85
Inferior 1" 4 1.20 1 4.80

Z-4 1 2.80 2.40 0.70 4.70 Superior 3/4" 15 2.40 1 36.00


Superior 3/4" 13 2.80 1 36.40
Inferior 3/4" 15 2.40 1 36.00

Inferior 3/4" 17 2.80 1 47.60


Z-5 1 3.30 2.88 0.95 9.03 Superior 3/4" 23 2.88 1 66.24
Superior 3/4" 21 3.30 1 69.30

Inferior 3/4" 28 2.88 1 80.64


Inferior 3/4" 21 3.30 1 69.30
Z-6 1 3.25 2.80 0.90 8.19 Superior 3/4" 20 2.80 1 56.00
Superior 3/4" 20 3.25 1 65.00

Inferior 3/4" 20 2.80 1 56.00


Inferior 1" 15 3.25 1 48.75
Z-7 2 2.50 2.15 0.70 7.53 Superior 3/4" 14 2.15 2 60.20

Superior 3/4" 12 2.50 2 60.00


Inferior 3/4" 14 2.15 2 60.20
Inferior 3/4" 13 2.50 2 65.00
Z-8 1 3.55 3.05 1.00 10.83 Superior 3/4" 25 3.05 1 76.25
Superior 3/4" 22 3.55 1 78.10
Inferior 3/4" 25 3.05 1 76.25
Inferior 1" 18 3.55 1 63.90
Z-12 1 9.44 2.40 0.90 20.39 Superior 3/4" 49 2.40 1 117.60

Superior 3/4" 17 9.44 1 160.48


Inferior 3/4" 49 2.40 1 117.60
Inferior 3/4" 13 9.44 1 122.72

Z- s/n 2 9.40 2.00 0.80 30.08 Superior 1" 64 2.00 2 256.00


1 6.82 4.95 0.80 27.01 Superior 1" 15 9.40 2 282.00
Inferior 3/4" 77 2.00 2 308.00

Inferior 3/4" 17 9.40 2 319.60


Superior 1" 47 4.95 1 232.65
Superior 1" 34 6.82 1 231.88
Inferior 3/4" 56 4.95 1 277.20

Inferior 3/4" 41 6.82 1 279.62

SECTOR C-3
Z-9 2 3.60 3.10 1.00 22.32 Superior 3/4" 25 3.10 2 155.00
Superior 3/4" 22 3.60 2 158.40

Inferior 3/4" 25 3.10 2 155.00


Inferior 1" 15 3.60 2 108.00
Z-10 3 3.80 3.30 1.00 37.62 Superior 1" 18 3.30 3 178.20

Superior 1" 16 3.80 3 182.40


Inferior 1" 17 3.30 3 168.30

Página 17 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

Inferior 1" 16 3.80 3 182.40

Z-11 2 3.65 3.30 1.00 24.09 Superior 1" 16 3.30 2 105.60


Superior 1" 15 3.65 2 109.50
Inferior 1" 18 3.30 2 118.80

Inferior 1" 18 3.65 2 131.40


Z-12 1 7.60 2.50 0.90 17.10 Superior 3/4" 39 2.50 1 97.50

Superior 3/4" 14 7.60 1 106.40


Inferior 3/4" 39 2.50 1 97.50
Inferior 3/4" 14 7.60 1 106.40

SECTOR D
Z-1 1 0.90 0.75 0.60 0.41 1/2" 6 0.75 1 4.50
1/2" 5 0.90 1 4.50

Z-2 2 1.00 0.75 0.60 0.90 1/2" 6 0.75 2 9.00


1/2" 5 1.00 2 10.00
Z-3 1 1.75 0.75 0.60 0.79 1/2" 10 0.75 1 7.50
1/2" 5 1.75 1 8.75
Z-4 3 1.10 0.75 0.60 1.49 1/2" 7 0.75 3 15.75

1/2" 5 1.10 3 16.50


Z-5 2 1.40 1.30 0.60 2.18 1/2" 8 1.30 2 20.80
1/2" 8 1.40 2 22.40

Z-6 1 1.00 0.70 0.60 0.42 1/2" 6 0.70 1 4.20


1/2" 5 1.00 1 5.00
Z-7 1 0.90 0.70 0.60 0.38 1/2" 6 0.70 1 4.20
1/2" 5 0.90 1 4.50
SECTOR E

Z-13 4 2.20 2.00 0.70 12.32 Superior 5/8" 12 2.00 4 96.00


Superior 5/8" 13 2.20 4 114.40
Inferior 5/8" 12 2.00 4 96.00
Inferior 5/8" 13 2.20 4 114.40

Z-14 3 2.35 2.10 0.60 8.88 Superior 5/8" 15 2.10 3 94.50


Superior 5/8" 13 2.35 3 91.65
Inferior 5/8" 17 2.10 3 107.10

Inferior 5/8" 15 2.35 3 105.75


Z-15 1 21.05 2.45 0.75 38.68 Superior 3/4" 107 2.45 1 262.15
Superior 3/4" 18 21.05 1 378.90

Inferior 3/4" 107 2.45 1 262.15


Inferior 3/4" 14 21.05 1 294.70
1 9.00 8.40 0.75 56.70 Superior 3/4" 46 8.40 1 386.40

Superior 3/4" 57 9.00 1 513.00


Inferior 3/4" 46 8.40 1 386.40
Inferior 3/4" 43 9.00 1 387.00
Z-18 1 3.55 2.10 0.75 5.59 Superior 5/8" 19 2.10 1 39.90
Superior 5/8" 13 3.55 1 46.15

Inferior 5/8" 19 2.10 1 39.90


Inferior 5/8" 13 3.55 1 46.15
Z-19 1 8.95 2.10 0.75 14.10 Superior 3/4" 61 2.10 1 128.10

Superior 3/4" 12 8.95 1 107.40


Inferior 3/4" 46 2.10 1 96.60
Inferior 3/4" 12 8.95 1 107.40
Z-S/N 1 2.55 2.55 0.60 3.90 Superior 5/8" 14 2.55 1 35.70

Superior 5/8" 16 2.55 1 40.80

Inferior 5/8" 14 2.55 1 35.70


Inferior 5/8" 16 2.55 1 40.80
SECTOR F
Z-16 2 2.00 2.00 0.75 6.00 Superior 5/8" 15 2.00 2 60.00

Superior 5/8" 13 2.00 2 52.00


Inferior 5/8" 15 2.00 2 60.00
Inferior 5/8" 13 2.00 2 52.00

Z-17 1 2.75 2.75 0.75 5.67 Superior 3/4" 17 2.75 1 46.75


Superior 5/8" 17 2.75 1 46.75

Página 18 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

Inferior 3/4" 17 2.75 1 46.75

Inferior 3/4" 17 2.75 1 46.75


Z-19 1 5.90 1.95 0.75 8.63 Superior 5/8" 34 1.95 1 66.30
Superior 5/8" 12 5.90 1 70.80

Inferior 5/8" 41 1.95 1 79.95


Inferior 5/8" 14 5.90 1 82.60

TOTALES M3 504.48 M2 0.00 ML 0.00 0.00 137.60 1715.30 7632.75 4856.58


KG - 136.22 2,658.72 16,792.05 19,280.62 38,867.61

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL

Elemento
06.02.01 VIGAS DE CIMENTACION CONCRETO F`C = 210 KG/CM2
06.02.02 VIGAS DE CIMENTACION ENCOFRADO Y DESENCOFRADO
06.02.03 ACERO DE REFUERZO Fy=4200 kg/cm2
SECTOR A
EJE P 1 24.34 0.30 0.70 5.11 1 24.34 0.70 17.04 Horizontales 3/4" 7 25.14 1 175.98
Estribos 3/8" 110 2.10 1 231.00

EJE P1 1 24.30 0.30 0.70 5.10 1 24.30 0.70 17.01 Horizontales 3/4" 7 25.10 1 175.70
Estribos 3/8" 110 2.10 1 231.00
EJE 2 1 14.85 0.30 0.70 3.12 1 14.85 0.70 10.40 Horizontales 3/4" 7 15.65 1 109.55

Estribos 3/8" 72 2.10 1 151.20


EJE 9 1 16.70 0.30 0.70 3.51 1 16.70 0.70 11.69 Horizontales 3/4" 7 17.50 1 122.50
Estribos 3/8" 79 2.10 1 165.90
SECTOR B
EJE 2 1 32.10 0.30 0.70 6.74 1 32.10 0.70 22.47 Horizontales 3/4" 7 32.90 1 230.30

Estribos 3/8" 29 2.10 1 60.90


Estribos 3/8" 24 2.10 1 50.40
Estribos 3/8" 20 2.10 1 42.00

Estribos 3/8" 28 2.10 4 235.20


EJE 3 1 3.40 0.30 0.70 0.71 1 3.40 0.70 2.38 Horizontales 3/4" 7 4.20 1 29.40
Estribos 3/8" 23 2.10 1 48.30

EJE 6 1 2.10 0.30 0.70 0.44 1 2.10 0.70 1.47 Horizontales 3/4" 7 2.90 1 20.30
Estribos 3/8" 18 2.10 1 37.80
EJE 8 1 1.90 0.30 0.70 0.40 1 1.90 0.70 1.33 Horizontales 3/4" 7 2.70 1 18.90
Estribos 3/8" 17 2.10 1 35.70

EJE 9 1 13.15 0.30 0.70 2.76 1 13.15 0.70 9.21 Horizontales 3/4" 7 13.95 1 97.65
Estribos 3/8" 29 2.10 1 60.90
Estribos 3/8" 25 2.10 1 52.50
Estribos 3/8" 21 2.10 1 44.10

EJE 9 1 13.95 0.30 0.70 2.93 1 13.95 0.70 9.77 Horizontales 3/4" 7 14.75 1 103.25
Estribos 3/8" 24 2.10 1 50.40
Estribos 3/8" 24 2.10 1 50.40
Estribos 3/8" 23 2.10 1 48.30

Estribos 3/8" 19 2.10 1 39.90


Estribos 3/8" 21 2.10 1 44.10
EJE 9 1 7.15 0.30 0.70 1.50 1 7.15 0.70 5.01 Horizontales 3/4" 7 7.95 1 55.65

Estribos 3/8" 30 2.10 1 63.00


Estribos 3/8" 20 2.10 1 42.00
EJE 9 1 7.25 0.30 0.70 1.52 1 7.25 0.70 5.08 Horizontales 3/4" 7 8.05 1 56.35

Estribos 3/8" 39 2.10 1 81.90


EJE E1 1 4.30 0.30 0.70 0.90 1 4.30 0.70 3.01 Horizontales 3/4" 7 5.10 1 35.70
Estribos 3/8" 30 2.10 1 63.00

EJE F 1 6.90 0.30 0.70 1.45 1 6.90 0.70 4.83 Horizontales 3/4" 7 7.70 1 53.90
Estribos 3/8" 29 2.10 1 60.90
EJE E3 1 10.25 0.30 0.70 2.15 1 10.25 0.70 7.18 Horizontales 3/4" 7 11.05 1 77.35
Estribos 3/8" 29 2.10 1 60.90

Estribos 3/8" 19 2.10 1 39.90

Página 19 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

Estribos 3/8" 22 2.10 1 46.20

EJES H-I-E5 3 3.15 0.30 0.70 1.98 3 3.15 0.70 6.62 Horizontales 3/4" 7 3.95 3 82.95
Estribos 3/8" 25 2.10 3 157.50
EJE E-6 1 27.20 0.30 0.70 5.71 1 27.20 0.70 19.04 Horizontales 3/4" 7 28.00 1 196.00

Estribos 3/8" 28 2.10 7 411.60


SECTOR C1

EJE O 1 14.25 0.30 0.70 2.99 1 14.25 0.70 9.98 Horizontales 3/4" 7 15.05 1 105.35
Estribos 3/8" 69 2.10 1 144.90
EJE U 1 14.25 0.30 0.70 2.99 1 14.25 0.70 9.98 Horizontales 3/4" 7 15.05 1 105.35

Estribos 3/8" 69 2.10 1 144.90


EJE 10 1 27.80 0.30 0.70 5.84 1 27.80 0.70 19.46 Horizontales 3/4" 7 28.60 1 200.20
Estribos 3/8" 124 2.10 1 260.40

EJE 12 1 27.80 0.30 0.70 5.84 1 27.80 0.70 19.46 Horizontales 3/4" 7 28.60 1 200.20
Estribos 3/8" 124 2.10 1 260.40
SECTOR C2
EJE D 1 14.25 0.30 0.70 2.99 1 14.25 0.70 9.98 Horizontales 3/4" 7 15.05 1 105.35
Estribos 3/8" 69 2.10 1 144.90
EJE Ñ 1 21.10 0.30 0.70 4.43 1 21.10 0.70 14.77 Horizontales 3/4" 7 21.90 1 153.30
Estribos 3/8" 97 2.10 1 203.70
EJE M 1 7.25 0.30 0.70 1.52 1 7.25 0.70 5.08 Horizontales 3/4" 7 8.05 1 56.35
Estribos 3/8" 41 2.10 1 86.10
EJE 10 1 55.25 0.30 0.70 11.60 1 55.25 0.70 38.68 Horizontales 3/4" 7 56.05 1 392.35

Estribos 3/8" 233 2.10 1 489.30


EJE 12 1 42.25 0.30 0.70 8.87 1 42.25 0.70 29.58 Horizontales 3/4" 7 43.05 1 301.35
Estribos 3/8" 181 2.10 1 380.10

EJE 14 1 13.35 0.30 0.70 2.80 1 13.35 0.70 9.35 Horizontales 3/4" 7 14.15 1 99.05
Estribos 3/8" 66 2.10 1 138.60
SECTOR C3
EJE C 1 3.75 0.30 0.70 0.79 1 3.75 0.70 2.63 Horizontales 3/4" 7 4.55 1 31.85
Estribos 3/8" 27 2.10 1 56.70

EJE D 1 23.85 0.30 0.70 5.01 1 23.85 0.70 16.70 Horizontales 3/4" 7 24.65 1 172.55
Estribos 3/8" 108 2.10 1 226.80
EJE 13 1 17.65 0.30 0.70 3.71 1 17.65 0.70 12.36 Horizontales 3/4" 7 18.45 1 129.15
Estribos 3/8" 83 2.10 1 174.30

EJE 18 1 6.75 0.30 0.70 1.42 1 6.75 0.70 4.73 Horizontales 3/4" 7 7.55 1 52.85
Estribos 3/8" 39 2.10 1 81.90
SECTOR F
EJE D 1 30.90 0.30 0.70 6.49 1 30.90 0.70 21.63 Horizontales 3/4" 7 31.70 1 221.90
Estribos 3/8" 136 2.10 1 285.60

EJE G 1 3.60 0.30 0.70 0.76 1 3.60 0.70 2.52 Horizontales 3/4" 7 4.40 1 30.80
Estribos 3/8" 27 2.10 1 56.70
EJE 27 1 13.60 0.30 0.70 2.86 1 13.60 0.70 9.52 Horizontales 3/4" 7 14.40 1 100.80

Estribos 3/8" 67 2.10 1 140.70


EJE 28 1 13.30 0.30 0.70 2.79 1 13.30 0.70 9.31 Horizontales 3/4" 7 14.10 1 98.70
Estribos 3/8" 66 2.10 1 138.60

TOTALES M3 119.75 M2 399.17 ML 0.00 6121.50 0.00 0.00 4198.88 0.00


KG - 3,428.04 - - 9,237.54 - 12,665.58

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL

perimet Elemento
06.16 LOSAS DE PISO
06.16.01 LOSAS DE PISO CONCRETO F`C = 210 KG/CM2
06.16.02 ACERO DE REFUERZO Fy=4200 kg/cm2

SECTOR A Area
ENTRE EJES 2-9 Y P-P1 1 351.80 0.60 211.08 Verticales 3/4" 314 16.05 1 5,039.70
Horizontales 3/4" 204 24.30 1 4,957.20

Página 20 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

SECTOR B
ENTRE EJES 2-9 Y E1-E6 1 875.75 0.60 525.45 Verticales 5/8" 360 36.80 1 13,248.00
Horizontales 5/8" 480 27.80 1 13,344.00
SECTOR C1
ENTRE EJES 10-12 Y O-U 1 367.20 0.60 220.32 Verticales 3/4" 144 28.60 1 4,118.40
Horizontales 3/4" 278 15.05 1 4,183.90
SECTOR C2
ENTRE EJES 10-12 Y D-Ñ 1 817.44 0.60 490.46 Verticales 3/4" 136 55.20 1 7,507.20
Horizontales 3/4" 544 14.25 1 7,752.00
SECTOR C3
ENTRE EJES 13-19 Y C-I 1 508.00 0.60 304.80 Verticales 3/4" 137 18.45 1 2,527.65
Horizontales 3/4" 89 24.55 1 2,184.95

Verticales 3/4" 19 7.55 1 143.45


Horizontales 3/4" 34 4.55 1 154.70
SECTOR F
ENTRE EJES 13-19 Y C-I 1 920.80 0.60 552.48 Verticales sup 3/4" 155 14.40 1 2,232.00
Horizontales sup 3/4" 68 31.70 1 2,155.60
Verticales inf 3/4" 155 14.40 1 2,232.00

Horizontales inf 3/4" 68 31.70 1 2,155.60


Verticales sup 3/4" 174 14.10 1 2,453.40
Horizontales sup 3/4" 67 35.55 1 2,381.85

Verticales inf 3/4" 174 14.10 1 2,453.40


Horizontales inf 3/4" 67 35.55 1 2,381.85
Verticales sup 3/4" 52 4.26 1 221.52

Horizontales sup 3/4" 18 11.20 1 201.60


Verticales inf 3/4" 52 4.26 1 221.52
Horizontales inf 3/4" 18 11.20 1 201.60

TOTALES M3 2304.59 M2 0.00 ML - 0.00 0.00 26592.00 57861.09 0.00


KG - - 41,217.60 127,294.40 168,512.00

Página 21 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
06.03.01 PLACAS CONCRETO F`C = 210 KG/CM2
06.03.02 PLACAS ENCOFRADO Y DESENCOFRADO
06.03.03 ACERO DE REFUERZO Fy=4200 kg/cm2
SECTOR A

P-1
PRIMER PISO 1 2.17 0.40 7.5 6.51 1 5.14 7.50 38.55 Verticales 3/4" 18 8.9 1 160.20
1 2.10 0.25 7.5 3.94 1 4.20 7.50 31.50 Verticales 1/2" 14 8.9 1 124.60
Verticales 1/2" 12 8.9 1 106.80
Horizontales 1/2" 60 8.00 1 480.00

Horizontales 1/2" 60 5.55 1 333.00


Estribos 3/8" 45 1.90 1 85.50
Estribos 3/8" 45 1.60 1 72.00
Estribos 3/8" 90 0.60 1 54.00
Estribos 3/8" 120 0.45 1 54.00

P-2
PRIMER PISO 2 2.10 0.40 7.5 12.60 2 5.00 7.50 75.00 Verticales 5/8" 16 8.9 2 284.80
2 1.70 0.25 7.5 6.38 2 3.40 7.50 51.00 Verticales 1/2" 12 8.9 2 213.60
Verticales 1/2" 10 8.9 2 178.00

Horizontales 1/2" 60 2.90 2 348.00


Horizontales 1/2" 60 2.60 2 312.00
Estribos 3/8" 45 1.90 2 171.00
Estribos 3/8" 45 1.60 2 144.00
Estribos 3/8" 90 0.60 2 108.00

Estribos 3/8" 90 0.45 2 81.00


P-3
PRIMER PISO 1 2.50 0.40 7.5 7.50 1 5.80 7.50 43.50 Verticales 5/8" 12 8.9 1 106.80
Verticales 1/2" 12 8.9 1 106.80
Horizontales 1/2" 60 3.30 1 198.00

Estribos 3/8" 90 1.90 1 171.00


Estribos 3/8" 60 0.60 1 36.00
CORTE X-X 2 3.73 0.15 0.75 0.84 2 7.46 0.75 11.19 Horizontales 3/8" 10 4.23 2 84.60
2 3.73 0.40 0.7 2.09 Estribos 3/8" 13 3.30 2 85.80

2 1.20 0.15 0.75 0.27 2 2.40 0.75 3.60 Horizontales 3/8" 10 1.70 2 34.00
2 1.20 0.40 0.7 0.67 Estribos 3/8" 4 3.30 2 26.40
1 14.25 0.15 0.75 1.60 1 28.50 0.75 21.38 Horizontales 3/8" 10 13.65 1 136.50
1 14.25 0.40 0.7 3.99 Estribos 3/8" 48 3.30 1 158.40
SECTOR B

P-1
PRIMER Y SEGUNDO PISO 1 4.45 0.40 7.00 12.46 1 9.70 7.00 67.90 Verticales 3/4" 22 9.2 1 202.40
Verticales 3/4" 40 9.2 1 368.00
Horizontales 1er P 3/4" 38 5.25 1 199.50
Horizontales 2do P 3/4" 38 5.25 1 199.50

Estribos 1er Piso 3/8" 52 1.70 1 88.40


Estribos 2do Piso 3/8" 52 1.70 1 88.40

P-2
PRIMER Y SEGUNDO PISO 2 2.00 0.25 7.00 7.00 2 4.50 7.00 63.00 Verticales 1/2" 8 9.2 2 147.20

Verticales 1/2" 12 9.2 2 220.80


Horizontales 1er P 1/2" 30 2.50 2 150.00
Horizontales 2do P 1/2" 30 2.50 2 150.00
Estribos 1er Piso 3/8" 52 1.40 2 145.60
Estribos 2do Piso 3/8" 52 1.40 2 145.60

P-3
PRIMER Y SEGUNDO PISO 1 4.25 0.25 7.00 7.44 1 9.00 7.00 63.00 Verticales 5/8" 24 9.2 1 220.80
1 6.97 0.25 7.00 12.20 1 14.44 7.00 101.08 Verticales 1/2" 34 9.2 1 312.80
1 4.00 0.25 7.00 7.00 1 8.50 7.00 59.50 Verticales 1/2" 54 9.2 1 496.80

Página 22 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO
1 4.92 0.25 7.00 8.61 1 10.34 7.00 72.38 Verticales 1/2" 34 9.2 1 312.80
Verticales 1/2" 36 9.2 1 331.20
Horizontales 1er P 1/2" 30 5.00 1 150.00

Horizontales 1er P 1/2" 30 7.47 1 224.10


Horizontales 1er P 1/2" 30 5.00 1 150.00
Horizontales 1er P 1/2" 30 5.25 1 157.50
Horizontales 2do P 1/2" 30 5.00 1 150.00

Horizontales 2do P 1/2" 30 7.47 1 224.10


Horizontales 2do P 1/2" 30 5.00 1 150.00
Horizontales 2do P 1/2" 30 5.25 1 157.50
Estribos 1er Piso 3/8" 52 1.40 1 72.80
Estribos 1er Piso 3/8" 26 1.10 1 28.60

Estribos 1er Piso 3/8" 52 1.44 1 74.88


Estribos 1er Piso 3/8" 52 1.40 1 72.80
Estribos 1er Piso 3/8" 26 1.10 1 28.60
Estribos 1er Piso 3/8" 52 1.44 1 74.88

P-4
PRIMER Y SEGUNDO PISO 2 2.00 0.25 7.00 7.00 2 4.50 7.00 63.00 Verticales 5/8" 8 9.2 2 147.20
Verticales 1/2" 14 9.2 2 257.60
Horizontales 1er P 1/2" 30 2.50 2 150.00
Horizontales 2do P 1/2" 30 2.50 2 150.00
Estribos 1er Piso 3/8" 52 1.20 2 124.80

Estribos 2do Piso 3/8" 52 1.20 2 124.80

P-5
PRIMER Y SEGUNDO PISO 2 3.05 0.25 7.00 10.68 2 6.60 7.00 92.40 Verticales 5/8" 8 9.2 2 147.20
Verticales 1/2" 22 9.2 2 404.80
Horizontales 1er P 1/2" 30 3.55 2 213.00

Horizontales 2do P 1/2" 30 3.55 2 213.00


Estribos 1er Piso 3/8" 52 1.20 2 124.80
Estribos 2do Piso 3/8" 52 1.20 2 124.80

P-6

PRIMER Y SEGUNDO PISO 1 2.10 0.25 7.00 3.68 1 4.70 7.00 32.90 Verticales 5/8" 8 9.2 1 73.60
Verticales 1/2" 16 9.2 1 147.20
Horizontales 1er P 1/2" 30 2.60 1 78.00
Horizontales 2do P 1/2" 30 2.60 1 78.00
Estribos 1er Piso 3/8" 52 1.10 1 57.20
Estribos 2do Piso 3/8" 52 1.10 1 57.20

P-7
PRIMER Y SEGUNDO PISO 1 0.40 0.25 7.00 0.70 1 1.30 7.00 9.10 Verticales 5/8" 8 9.2 1 73.60
1 4.20 0.25 7.00 7.35 1 8.40 7.00 58.80 Verticales 1/2" 34 9.2 1 312.80
Horizontales 1er P 1/2" 30 4.95 1 148.50
Horizontales 2do P 1/2" 30 4.95 1 148.50

Estribos 1er Piso 3/8" 26 1.20 1 31.20


Estribos 1er Piso 3/8" 26 1.40 1 36.40
Estribos 2do Piso 3/8" 26 1.20 1 31.20
Estribos 2do Piso 3/8" 26 1.40 1 36.40

P-8
PRIMER Y SEGUNDO PISO 1 4.50 0.25 7.00 7.88 1 9.50 7.00 66.50 Verticales 5/8" 8 9.2 1 73.60
Verticales 1/2" 34 9.2 1 312.80
Horizontales 1er P 1/2" 30 5.00 1 150.00
Horizontales 2do P 1/2" 30 5.00 1 150.00

Estribos 1er Piso 3/8" 52 1.20 1 62.40


Estribos 2do Piso 3/8" 52 1.20 1 62.40

P-9
PRIMER Y SEGUNDO PISO 1 4.30 0.25 7.00 7.53 1 9.10 7.00 63.70 Verticales 5/8" 8 9.2 1 73.60

Verticales 1/2" 32 9.2 1 294.40


Horizontales 1er P 1/2" 30 4.80 1 144.00
Horizontales 2do P 1/2" 30 4.80 1 144.00
Estribos 1er Piso 3/8" 52 1.20 1 62.40

Página 23 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO
Estribos 2do Piso 3/8" 52 1.20 1 62.40

P-10

PRIMER Y SEGUNDO PISO 1 3.15 0.25 7.00 5.51 1 6.80 7.00 47.60 Verticales 5/8" 8 9.2 1 73.60
Verticales 1/2" 24 9.2 1 220.80
Horizontales 1er P 1/2" 30 3.65 1 109.50
Horizontales 2do P 1/2" 30 3.65 1 109.50
Estribos 1er Piso 3/8" 52 1.20 1 62.40
Estribos 2do Piso 3/8" 52 1.20 1 62.40

P-11
PRIMER Y SEGUNDO PISO 1 2.20 0.25 7.00 3.85 1 4.90 7.00 34.30 Verticales 5/8" 8 9.2 1 73.60
Verticales 1/2" 16 9.2 1 147.20
Horizontales 1er P 1/2" 30 2.70 1 81.00
Horizontales 2do P 1/2" 30 2.70 1 81.00

Estribos 1er Piso 3/8" 52 1.20 1 62.40


Estribos 2do Piso 3/8" 52 1.20 1 62.40

P-12
PRIMER Y SEGUNDO PISO 1 0.55 0.25 7.00 0.96 1 1.60 7.00 11.20 Verticales 5/8" 8 9.2 1 73.60

1 2.30 0.25 7.00 4.03 1 4.60 7.00 32.20 Verticales 1/2" 18 9.2 1 165.60
Horizontales 1er P 1/2" 30 3.00 1 90.00
Horizontales 2do P 1/2" 30 3.00 1 90.00
Estribos 1er Piso 3/8" 26 1.70 1 44.20

Estribos 1er Piso 3/8" 26 1.20 1 31.20


Estribos 2do Piso 3/8" 26 1.70 1 44.20
Estribos 2do Piso 3/8" 26 1.20 1 31.20

P-13

PRIMER Y SEGUNDO PISO 1 2.00 0.25 7.00 3.50 1 4.50 7.00 31.50 Verticales 5/8" 8 9.2 1 73.60
Verticales 1/2" 14 9.2 1 128.80
Horizontales 1er P 1/2" 30 2.50 1 75.00
Horizontales 2do P 1/2" 30 2.50 1 75.00
Estribos 1er Piso 3/8" 52 1.20 1 62.40
Estribos 2do Piso 3/8" 52 1.20 1 62.40

P-14
PRIMER Y SEGUNDO PISO 1 1.00 0.25 7.00 1.75 1 2.50 7.00 17.50 Verticales 5/8" 8 9.2 1 73.60
Verticales 1/2" 6 9.2 1 55.20
Horizontales 1er P 1/2" 30 1.50 1 45.00
Horizontales 2do P 1/2" 30 1.50 1 45.00

Estribos 1er Piso 3/8" 52 1.20 1 62.40


Estribos 2do Piso 3/8" 52 1.20 1 62.40

P-15
PRIMER Y SEGUNDO PISO 1 1.50 0.25 7.00 2.63 1 3.50 7.00 24.50 Verticales 5/8" 8 9.2 1 73.60

Verticales 1/2" 10 9.2 1 92.00


Horizontales 1er P 1/2" 30 2.00 1 60.00
Horizontales 2do P 1/2" 30 2.00 1 60.00
Estribos 1er Piso 3/8" 52 1.20 1 62.40
Estribos 2do Piso 3/8" 52 1.20 1 62.40

P-16
PRIMER Y SEGUNDO PISO 1 4.60 0.25 7.00 8.05 1 9.70 7.00 67.90 Verticales 5/8" 8 9.2 1 73.60
Verticales 1/2" 30 9.2 1 276.00
Horizontales 1er P 1/2" 30 5.10 1 153.00
Horizontales 2do P 1/2" 30 5.10 1 153.00
Estribos 1er Piso 3/8" 52 1.80 1 93.60

Estribos 2do Piso 3/8" 52 1.80 1 93.60

P-17
PRIMER Y SEGUNDO PISO 1 2.30 0.25 7.00 4.03 1 5.10 7.00 35.70 Verticales 5/8" 12 9.2 1 110.40
Verticales 1/2" 14 9.2 1 128.80
Horizontales 1er P 1/2" 30 2.80 1 84.00

Horizontales 2do P 1/2" 30 2.80 1 84.00


Estribos 1er Piso 3/8" 52 1.40 1 72.80
Estribos 2do Piso 3/8" 52 1.40 1 72.80

Página 24 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

P-18
PRIMER Y SEGUNDO PISO 1 0.40 0.25 7.00 0.70 1 1.30 7.00 9.10 Verticales 5/8" 16 9.2 1 147.20

1 3.95 0.15 7.00 4.15 1 7.90 7.00 55.30 Verticales 1/2" 34 9.2 1 312.80
1 2.00 0.25 7.00 3.50 1 4.50 7.00 31.50 Verticales 1/2" 16 9.2 1 147.20
Horizontales 1er P 1/2" 30 4.75 1 142.50
Horizontales 2do P 1/2" 30 2.50 1 75.00
Estribos 1er Piso 3/8" 26 1.40 1 36.40
Estribos 1er Piso 3/8" 26 0.90 1 23.40

Estribos 1er Piso 3/8" 26 1.20 1 31.20


Estribos 2do Piso 3/8" 26 1.40 1 36.40
Estribos 2do Piso 3/8" 26 0.90 1 23.40
Estribos 2do Piso 3/8" 26 1.20 1 31.20

P-19
PRIMER Y SEGUNDO PISO 1 4.45 0.25 7.00 7.79 1 9.40 7.00 65.80 Verticales 5/8" 12 9.2 1 110.40
Verticales 1/2" 32 9.2 1 294.40
Horizontales 1er P 1/2" 30 4.95 1 148.50
Horizontales 2do P 1/2" 30 4.95 1 148.50

Estribos 1er Piso 3/8" 52 1.40 1 72.80


Estribos 2do Piso 3/8" 52 1.40 1 72.80

P-20
PRIMER Y SEGUNDO PISO 1 1.50 0.25 7.00 2.63 1 3.50 7.00 24.50 Verticales 5/8" 8 9.2 1 73.60

Verticales 1/2" 10 9.2 1 92.00


Horizontales 1er P 1/2" 30 2.00 1 60.00
Horizontales 2do P 1/2" 30 2.00 1 60.00
Estribos 1er Piso 3/8" 52 1.10 1 57.20
Estribos 2do Piso 3/8" 52 1.10 1 57.20

SECTOR C1

P-1
PRIMER Y SEGUNDO PISO 1 7.40 0.30 8.00 17.76 1 15.40 8.00 123.20 Verticales 5/8" 96 10.4 1 998.40
1 7.40 0.30 8.00 17.76 1 15.40 8.00 123.20 Verticales 5/8" 96 10.4 1 998.40
1 4.85 0.20 8.00 7.76 1 9.70 8.00 77.60 Verticales 5/8" 80 10.4 1 832.00

1 4.45 0.25 8.00 8.90 1 8.90 8.00 71.20 Verticales 5/8" 74 10.4 1 769.60
1 1.40 0.25 8.00 2.80 1 2.80 8.00 22.40 Verticales 5/8" 26 10.4 1 270.40
1 3.30 0.25 8.00 6.60 1 6.60 8.00 52.80 Verticales 5/8" 56 10.4 1 582.40
Verticales 3/4" 14 10.4 4 582.40
Estribos 3/8" 80 1.9 4 608.00

Horizontales 1/2" 124 8.00 1 992.00


Horizontales 1/2" 124 8.00 1 992.00
Horizontales 1/2" 124 7.35 1 911.40
Horizontales 1/2" 124 5.25 1 651.00
Horizontales 1/2" 124 2.20 1 272.80

Horizontales 1/2" 124 4.10 1 508.40


TERCER A SEXTO PISO 1 7.40 0.30 14.85 32.97 1 15.40 14.85 228.69 Verticales 3/8" 80 16.15 1 1,292.00
1 7.40 0.30 14.85 32.97 1 15.40 14.85 228.69 Verticales 3/8" 80 16.15 1 1,292.00
1 4.85 0.20 14.85 14.40 1 9.70 14.85 144.05 Verticales 3/8" 68 16.15 1 1,098.20
1 4.45 0.25 14.85 16.52 1 8.90 14.85 132.17 Verticales 3/8" 62 16.15 1 1,001.30

1 1.40 0.25 14.85 5.20 1 2.80 14.85 41.58 Verticales 3/8" 22 16.15 1 355.30
1 3.30 0.25 14.85 12.25 1 6.60 14.85 98.01 Verticales 3/8" 46 16.15 1 742.90
Verticales 3/4" 14 16.15 4 904.40
Estribos 3/8" 160 1.9 4 1,216.00
Horizontales 1/2" 184 8.00 1 1,472.00

Horizontales 1/2" 184 8.00 1 1,472.00


Horizontales 1/2" 184 7.35 1 1,352.40
Horizontales 1/2" 184 5.25 1 966.00
Horizontales 1/2" 184 2.20 1 404.80
Horizontales 1/2" 184 4.10 1 754.40

P-2
DE SOTANO A SEGUNDO PISO 1 7.40 0.30 12.00 26.64 1 15.40 12.00 184.80 Verticales 5/8" 96 15.5 1 1,488.00

Página 25 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO
1 7.40 0.30 12.00 26.64 1 15.40 12.00 184.80 Verticales 5/8" 96 15.5 1 1,488.00
1 2.65 0.20 12.00 6.36 1 5.30 12.00 63.60 Verticales 5/8" 46 15.5 1 713.00
1 4.85 0.25 12.00 14.55 1 9.70 12.00 116.40 Verticales 5/8" 80 15.5 1 1,240.00
1 1.40 0.25 12.00 4.20 1 2.80 12.00 33.60 Verticales 5/8" 26 15.5 1 403.00

Verticales 3/4" 14 15.5 4 868.00


Estribos 3/8" 120 1.9 4 912.00
Horizontales 1/2" 156 8.00 1 1,248.00
Horizontales 1/2" 156 8.00 1 1,248.00
Horizontales 1/2" 156 5.15 1 803.40

Horizontales 1/2" 156 5.65 1 881.40


Horizontales 1/2" 156 2.20 1 343.20
DE TERCER A QUINTO PISO 1 7.40 0.30 11.00 24.42 1 15.40 11.00 169.40 Verticales 3/8" 96 13.3 1 1,276.80
1 7.40 0.30 11.00 24.42 1 15.40 11.00 169.40 Verticales 3/8" 96 13.3 1 1,276.80
1 2.65 0.20 11.00 5.83 1 5.30 11.00 58.30 Verticales 3/8" 46 13.3 1 611.80

1 4.85 0.25 11.00 13.34 1 9.70 11.00 106.70 Verticales 3/8" 80 13.3 1 1,064.00
1 1.40 0.25 11.00 3.85 1 2.80 11.00 30.80 Verticales 3/8" 26 13.3 1 345.80
Verticales 3/4" 14 13.3 4 744.80
Estribos 3/8" 120 1.9 4 912.00
Horizontales 1/2" 156 8.00 1 1,248.00

Horizontales 1/2" 156 8.00 1 1,248.00


Horizontales 1/2" 156 5.15 1 803.40
Horizontales 1/2" 156 5.65 1 881.40
Horizontales 1/2" 156 2.20 1 343.20

P-3
DE SOTANO A SEGUNDO PISO 1 6.45 0.25 12.00 19.35 1 13.40 12.00 160.80 Verticales 3/8" 88 15.2 1 1,337.60
Horizontales 3/8" 120 8.05 1 966.00
DE TERCER A QUINTO PISO 1 6.45 0.25 12.00 19.35 1 13.40 12.00 160.80 Verticales 3/8" 68 12.3 1 836.40
Horizontales 3/8" 120 8.05 1 966.00

P-4

DE SOTANO A CUARTO PISO 1 5.25 0.20 20.00 21.00 1 10.90 20.00 218.00 Verticales 3/4" 4 24.2 1 96.80
Verticales 3/8" 54 24.2 1 1,306.80
Horizontales 3/8" 200 6.55 1 1,310.00
Estribos 3/8" 100 1 1 100.00

P-5

DE PRIMER A SEGUNDO PISO 1 2.80 0.25 8.00 5.60 1 6.10 8.00 48.80 Verticales 3/4" 4 9.9 1 39.60
Verticales 1/2" 28 9.9 1 277.20
Horizontales 3/8" 80 3.90 1 312.00
Estribos 3/8" 40 1 1 40.00
DE TERCER A QUINTO PISO 1 2.80 0.25 12.00 8.40 1 6.10 12.00 73.20 Verticales 5/8" 4 13 1 52.00
Verticales 3/8" 28 13 1 364.00
Horizontales 3/8" 120 3.90 1 468.00

Estribos 3/8" 40 1 1 40.00

P-6
DE SOTANO A SEGUNDO PISO 1 2.80 0.25 12.00 8.40 1 6.10 12.00 73.20 Verticales 3/4" 4 13.2 1 52.80
Verticales 1/2" 28 13.2 1 369.60
Horizontales 3/8" 120 3.90 1 468.00

Estribos 3/8" 60 1 1 60.00


SECTOR C2

P-1
DE PRIMER A CUARTO PISO 1 6.20 0.25 16.00 24.80 1 12.90 16.00 206.40 Verticales 5/8" 102 19.9 1 2,029.80
Horizontales 1/2" 248 7.50 1 1,860.00

P-2
DE PRIMER A SEXTO PISO 1 7.40 0.30 23.75 52.73 1 15.40 23.75 365.75 Verticales 5/8" 122 28.55 1 3,483.10
1 7.40 0.30 23.75 52.73 1 15.40 23.75 365.75 Verticales 5/8" 122 28.55 1 3,483.10
1 4.85 0.20 23.75 23.04 1 9.70 23.75 230.38 Verticales 5/8" 80 28.55 1 2,284.00
1 4.45 0.25 23.75 26.42 1 8.90 23.75 211.38 Verticales 5/8" 74 28.55 1 2,112.70

1 1.40 0.25 23.75 8.31 1 2.80 23.75 66.50 Verticales 5/8" 26 28.55 1 742.30
1 3.30 0.25 23.75 19.59 1 6.60 23.75 156.75 Verticales 5/8" 56 28.55 1 1,598.80
Horizontales 1/2" 372 8.00 1 2,976.00

Página 26 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO
Horizontales 1/2" 372 8.00 1 2,976.00
Horizontales 1/2" 372 7.35 1 2,734.20
Horizontales 1/2" 372 5.25 1 1,953.00

Horizontales 1/2" 372 2.20 1 818.40


Horizontales 1/2" 372 4.10 1 1,525.20

P-3
DE PRIMER A QUINTO PISO 1 6.45 0.25 20.00 32.25 1 13.40 20.00 268.00 Verticales 5/8" 106 24.8 1 2,628.80

Horizontales 1/2" 310 7.75 1 2,402.50

P-4
DE PRIMER A QUINTO PISO 1 6.45 0.25 20.00 32.25 1 13.40 20.00 268.00 Verticales 5/8" 106 24.8 1 2,628.80

Horizontales 1/2" 310 7.75 1 2,402.50

P-5
DE PRIMER A SEXTO PISO 1 2.35 0.25 26.15 15.36 1 5.20 26.15 135.98 Verticales 5/8" 40 28.55 1 1,142.00
1 6.65 0.20 26.15 34.78 1 13.70 26.15 358.26 Verticales 5/8" 110 28.55 1 3,140.50
1 6.45 0.20 26.15 33.73 1 13.30 26.15 347.80 Verticales 5/8" 106 28.55 1 3,026.30
1 2.00 0.20 26.15 10.46 1 4.40 26.15 115.06 Verticales 5/8" 34 28.55 1 970.70

1 4.60 0.20 26.15 24.06 1 9.60 26.15 251.04 Verticales 5/8" 76 28.55 1 2,169.80
1 2.50 0.20 26.15 13.08 1 5.40 26.15 141.21 Verticales 5/8" 42 28.55 1 1,199.10
1 2.50 0.20 26.15 13.08 1 5.40 26.15 141.21 Verticales 5/8" 42 28.55 1 1,199.10
Horizontales 1/2" 372 3.05 1 1,134.60

Horizontales 1/2" 372 7.25 1 2,697.00


Horizontales 1/2" 372 7.05 1 2,622.60
Horizontales 1/2" 372 2.60 1 967.20
Horizontales 1/2" 372 5.20 1 1,934.40
Horizontales 1/2" 372 3.10 1 1,153.20

P-6 Horizontales 1/2" 372 3.10 1 1,153.20


DE PRIMER A SEXTO PISO 1 3.10 0.20 26.15 16.21 1 6.60 26.15 172.59 Verticales 5/8" 52 28.55 1 1,484.60
1 7.05 0.20 26.15 36.87 1 14.50 26.15 379.18 Verticales 5/8" 116 28.55 1 3,311.80
1 3.30 0.20 26.15 17.26 1 7.00 26.15 183.05 Verticales 5/8" 56 28.55 1 1,598.80
1 6.50 0.20 26.15 34.00 1 13.40 26.15 350.41 Verticales 5/8" 106 28.55 1 3,026.30

Horizontales 1/2" 372 3.80 1 1,413.60


Horizontales 1/2" 372 7.65 1 2,845.80
Horizontales 1/2" 372 3.90 1 1,450.80
Horizontales 1/2" 372 7.10 1 2,641.20

P-7
DE PRIMER A QUINTO PISO 1 2.79 0.30 20.00 16.74 1 6.18 20.00 123.60 Verticales 5/8" 106 24.8 1 2,628.80
Horizontales 1/2" 310 3.79 1 1,174.90
SECTOR C3

P-1
DE PRIMER A SEGUNDO PISO 1 6.20 0.25 8.00 12.40 1 12.90 8.00 103.20 Verticales 3/8" 74 9.9 1 732.60
Horizontales 3/8" 80 7.50 1 600.00
TERCER Y CUARTO PISO 1 6.20 0.25 8.00 12.40 1 12.90 8.00 103.20 Verticales 3/8" 64 8.3 1 531.20
Horizontales 3/8" 80 7.50 1 600.00

P-3

DE PRIMER A TERCER PISO 1 2.35 0.25 12.00 7.05 1 5.20 12.00 62.40 Verticales 5/8" 40 13.9 1 556.00
Verticales 3/4" 6 13.9 1 83.40
Horizontales 1/2" 120 3.25 1 390.00
Estribos 3/8" 120 1.00 1 120.00
CUARTO Y QUINTO PISO 1 2.35 0.25 8.00 4.70 1 5.20 8.00 41.60 Verticales 3/8" 22 8.3 1 182.60
Verticales 3/4" 6 8.3 1 49.80
Horizontales 3/8" 80 3.25 1 260.00
Estribos 3/8" 80 1.00 1 80.00

P-4
DE PRIMER A QUINTO PISO 1 2.80 0.25 20.00 14.00 1 6.10 20.00 122.00 Verticales 3/8" 26 22.9 1 595.40
Verticales 3/4" 6 22.9 1 137.40
Horizontales 3/8" 200 3.70 1 740.00
Estribos 3/8" 200 1.00 1 200.00

P-5

Página 27 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO
DE PRIMER A SEGUNDO PISO 1 6.45 0.25 8.00 12.90 1 13.40 8.00 107.20 Verticales 1/2" 68 9.9 1 673.20
Horizontales 3/8" 80 7.75 1 620.00
DE TERCER A QUINTO PISO 1 6.45 0.25 12.00 19.35 1 13.40 12.00 160.80 Verticales 3/8" 68 12.3 1 836.40
Horizontales 3/8" 120 7.75 1 930.00

P-6
DE PRIMER A QUINTO PISO 2 3.40 0.25 20.00 34.00 2 7.30 20.00 292.00 Verticales 3/8" 32 22.9 2 1,465.60
Verticales 3/4" 6 22.9 2 274.80
Horizontales 3/8" 200 3.90 2 1,560.00
Estribos 3/8" 200 1.00 2 400.00

P-7

DE PRIMER A QUINTO PISO 1 4.25 0.25 20.00 21.25 1 9.00 20.00 180.00 Verticales 3/8" 42 22.9 1 961.80
Verticales 3/4" 6 22.9 1 137.40
Horizontales 3/8" 200 4.75 1 950.00
Estribos 3/8" 200 1.00 1 200.00

P-2
DE SOTANO A TERCER PISO 1 7.40 0.30 16.00 35.52 1 15.40 16.00 246.40 Verticales 3/8" 70 20.5 1 1,435.00

1 7.40 0.30 16.00 35.52 1 15.40 16.00 246.40 Verticales 3/8" 70 20.5 1 1,435.00
1 4.45 0.20 16.00 14.24 1 8.90 16.00 142.40 Verticales 3/8" 48 20.5 1 984.00

1 4.85 0.25 16.00 19.40 1 9.70 16.00 155.20 Verticales 3/8" 52 20.5 1 1,066.00
1 1.40 0.25 16.00 5.60 1 2.80 16.00 44.80 Verticales 3/8" 16 20.5 1 328.00
1 3.30 0.25 16.00 13.20 1 6.60 16.00 105.60 Verticales 3/8" 36 20.5 1 738.00
Verticales 3/4" 14 20.5 4 1,148.00

Estribos 3/8" 120 1.9 4 912.00


Verticales 5/8" 8 20.5 1 164.00
Horizontales 3/8" 184 8.00 1 1,472.00
Horizontales 3/8" 184 8.00 1 1,472.00
Horizontales 3/8" 160 6.95 1 1,112.00

Horizontales 1/2" 160 5.65 1 904.00


Horizontales 3/8" 160 2.20 1 352.00
Horizontales 1/2" 160 4.10 1 656.00

P-8

DE SOTANO A QUINTO PISO 1 6.45 0.25 20.00 32.25 1 13.40 20.00 268.00 Verticales 3/8" 64 28.5 1 1,824.00
Verticales 3/4" 6 28.5 1 171.00
Horizontales 3/8" 240 7.35 1 1,764.00
Estribos 3/8" 240 1.00 1 240.00

P-9
DE SOTANO A QUINTO PISO 1 3.00 0.25 20.00 15.00 1 6.50 20.00 130.00 Verticales 3/8" 28 28.5 1 798.00

Verticales 3/4" 6 28.5 1 171.00


Horizontales 3/8" 240 3.90 1 936.00
Estribos 3/8" 240 1.00 1 240.00

P-11
DE SOTANO A TERCER PISO 1 4.70 0.25 16.00 18.80 1 9.90 16.00 158.40 Verticales 3/8" 46 20.5 1 943.00
Verticales 3/4" 6 20.5 1 123.00
Horizontales 3/8" 160 5.60 1 896.00
Estribos 3/8" 160 1.00 1 160.00

SECTOR E

P-6
DE SOTANO A TERCER PISO 1 6.45 0.25 16.00 25.80 1 12.90 16.00 206.40 Verticales 3/4" 16 19.65 1 314.40
2 0.40 0.40 16.00 5.12 2 1.60 16.00 51.20 Verticales 1/2" 54 19.65 1 1,061.10
Horizontales 1/2" 128 7.75 1 992.00
Estribos 3/8" 216 1.70 1 367.20

P-8
DE SOTANO A TERCER PISO 1 6.60 0.25 16.00 26.40 1 13.70 16.00 219.20 Verticales 3/4" 16 19.65 1 314.40
2 0.40 0.40 16.00 5.12 2 1.60 16.00 51.20 Verticales 1/2" 56 19.65 1 1,100.40
Horizontales 1/2" 128 7.90 1 1,011.20
Estribos 3/8" 216 1.30 1 280.80

P-9

DE SOTANO A TERCER PISO 1 7.40 0.20 16.00 23.68 1 15.20 16.00 243.20 Verticales 1/2" 62 19.65 1 1,218.30
Horizontales 1/2" 128 7.90 1 1,011.20
1 7.40 0.30 16.00 35.52 1 15.40 16.00 246.40 Verticales 1/2" 62 19.65 1 1,218.30

Página 28 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO
Horizontales 1/2" 128 7.90 1 1,011.20
1 6.30 0.30 16.00 30.24 1 13.20 16.00 211.20 Verticales 1/2" 54 19.65 1 1,061.10
Horizontales 1/2" 128 6.80 1 870.40
1 4.10 0.30 16.00 19.68 1 8.80 16.00 140.80 Verticales 1/2" 36 19.65 1 707.40

Horizontales 1/2" 128 4.60 1 588.80


1 4.60 0.20 16.00 14.72 1 9.60 16.00 153.60 Verticales 1/2" 40 19.65 1 786.00
Horizontales 1/2" 128 5.10 1 652.80
2 2.00 0.20 16.00 12.80 2 4.40 16.00 140.80 Verticales 1/2" 18 19.65 2 707.40
Horizontales 1/2" 128 2.50 2 640.00

1 1.40 0.30 16.00 6.72 1 3.40 16.00 54.40 Verticales 1/2" 14 19.65 1 275.10
Horizontales 1/2" 128 1.90 1 243.20
Verticales 5/8" 4 19.65 1 78.60

P-10
DE SOTANO A TERCER PISO 1 1.45 0.25 16.00 5.80 1 3.40 16.00 54.40 Verticales 3/4" 6 19.65 1 117.90
1 0.40 0.40 16.00 2.56 1 1.60 16.00 25.60 Verticales 5/8" 4 19.65 1 78.60
Verticales 1/2" 12 19.65 1 235.80
Horizontales 1/2" 128 2.35 1 300.80
Estribos 3/8" 108 1.70 1 183.60
SECTOR F Estribos 3/8" 108 1.20 1 129.60

P-2
DE PRIMER A TERCER PISO 1 3.40 0.25 12.00 10.20 1 6.80 12.00 81.60 Verticales 3/4" 14 15.5 1 217.00
1 0.40 0.40 12.00 1.92 1 1.60 12.00 19.20 Verticales 1/2" 26 15.5 1 403.00
Horizontales 1/2" 96 4.30 1 412.80
Estribos 3/8" 81 1.70 1 137.70
Estribos 3/8" 81 1.40 1 113.40

P-3
DE PRIMER A TERCER PISO 1 4.25 0.25 12.00 12.75 1 8.50 12.00 102.00 Verticales 3/4" 14 15.5 1 217.00
1 0.40 0.40 12.00 1.92 1 1.60 12.00 19.20 Verticales 1/2" 34 15.5 1 527.00
Horizontales 1/2" 96 5.15 1 494.40
Estribos 3/8" 81 1.70 1 137.70
Estribos 3/8" 81 1.40 1 113.40

P-4
DE PRIMER A TERCER PISO 1 4.48 0.25 12.00 13.44 1 8.96 12.00 107.52 Verticales 3/4" 20 15.5 1 310.00
1 0.40 0.40 12.00 1.92 1 1.60 12.00 19.20 Verticales 1/2" 32 15.5 1 496.00
Horizontales 1/2" 96 5.38 1 516.48
Estribos 3/8" 81 1.70 1 137.70
Estribos 3/8" 162 1.40 1 226.80

P-5
DE PRIMER A TERCER PISO 1 6.60 0.25 12.00 19.80 1 13.20 12.00 158.40 Verticales 3/4" 14 15.5 1 217.00
2 0.40 0.40 12.00 3.84 2 1.60 12.00 38.40 Verticales 1/2" 56 15.5 1 868.00
Horizontales 1/2" 96 7.90 1 758.40
Estribos 3/8" 162 1.70 1 275.40

P-5

DE PRIMER A TERCER PISO 1 3.25 0.25 12.00 9.75 1 6.50 12.00 78.00 Verticales 3/4" 14 15.5 1 217.00
1 3.15 0.25 12.00 9.45 1 6.30 12.00 75.60 Verticales 1/2" 26 15.5 1 403.00
1 0.40 0.40 12.00 1.92 1 1.60 12.00 19.20 Verticales 1/2" 28 15.5 1 434.00
Horizontales 1/2" 96 4.30 1 412.80
Horizontales 1/2" 96 3.75 1 360.00
Estribos 3/8" 81 1.70 1 137.70
Estribos 3/8" 81 1.40 1 113.40

P-6
DE SOTANO A TERCER PISO 3 6.45 0.25 16.00 77.40 3 12.90 16.00 619.20 Verticales 3/4" 16 19.65 3 943.20
6 0.40 0.40 16.00 15.36 6 1.60 16.00 153.60 Verticales 1/2" 54 19.65 3 3,183.30
Horizontales 1/2" 128 7.75 3 2,976.00
Estribos 3/8" 216 1.70 3 1,101.60

P-7
DE SOTANO A TERCER PISO 3 6.60 0.25 16.00 79.20 3 13.20 16.00 633.60 Verticales 3/4" 32 19.65 1 628.80

4 0.40 0.40 16.00 10.24 4 1.60 16.00 102.40 Verticales 1/2" 168 19.65 1 3,301.20
Horizontales 1/2" 128 7.90 3 3,033.60
Estribos 3/8" 108 1.70 4 734.40

Página 29 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

M3 1,955.77 M2 16,307.15 ML - 63,313.46 111,648.48 58,759.60 10,210.90 -


KG - 35,455.54 110,532.00 91,077.38 22,463.98 - 259,528.89

Página 30 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
05.05.01 MUROS DE CONTENCION CONCRETO F`C = 280 KG/CM2
05.05.02 MUROS DE CONTENCION ENCOFRADO Y DESENCOFRADO
05.05.03 ACERO DE REFUERZO Fy=4200 kg/cm2

SOTANO
SECTOR C-1 Caras
Muros M5 1 21.15 0.20 4.75 20.09 1 21.15 1 4.75 100.46 Verticales 5/8" 282 6.15 1 1,734.30
Horizontales 5/8" 38 23.55 1 894.90

Cimientos 1 21.15 1.50 0.6 19.04 Superior 1/2" 172 2.10 1 361.20
Inferior 1/2" 22 23.55 1 518.10
SECTOR C-3 Caras
Muros M1 1 60.20 0.20 4.75 57.19 1 60.20 1 4.75 285.95 Verticales 5/8" 803 6.15 1 4,936.40
Horizontales 5/8" 38 67.60 1 2,568.80

Cimientos 1 60.20 1.50 0.6 54.18 Superior 1/2" 484 2.10 1 1,016.40
Inferior 1/2" 22 67.60 1 1,487.20
SECTOR F Caras
Muros M1 1 50.00 0.20 4.75 47.50 1 50.00 1 4.75 237.50 Verticales 5/8" 667 6.15 1 4,100.00
Horizontales 5/8" 38 57.40 1 2,181.20

Cimientos 1 50.00 1.50 0.6 45.00 Superior 1/2" 402 2.10 1 844.20
Inferior 1/2" 22 57.40 1 1,262.80

M3 243.00 M2 623.91 ML - - 5,489.90 16,415.60 - -

KG - - 5,435.00 25,444.18 - - 19,439.80

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
06.05.01 COLUMNAS CONCRETO F`C = 210 KG/CM2
06.05.02 COLUMNAS ENCOFRADO Y DESENCOFRADO
06.05.03 ACERO DE REFUERZO Fy=4200 kg/cm2
SECTOR A
C-1 4 0.40 0.40 7.5 4.80 4 1.60 7.50 48.00 Verticales 5/8" 8 8.9 4 284.80
Estribo 1er Piso 3/8" 80 1.70 4 544.00
C-2 2 0.30 0.60 7.5 2.70 2 1.80 7.50 27.00 Verticales 5/8" 10 8.9 2 178.00
Estribo 1er Piso 3/8" 40 1.90 2 152.00
Estribo 1er Piso 3/8" 40 0.50 2 40.00
C-3 3 0.40 0.40 7.5 3.60 3 1.60 7.50 36.00 Verticales 3/4" 4 8.9 3 106.80
Verticales 5/8" 4 8.9 3 106.80

Estribo 1er Piso 3/8" 80 1.70 3 408.00


C-4 1 0.40 0.40 7.5 1.20 1 1.60 7.50 12.00 Verticales 5/8" 12 8.9 1 106.80
1 0.65 0.25 7.5 1.22 1 1.30 7.50 9.75 Estribo 1er Piso 3/8" 80 1.70 1 136.00
Estribo 1er Piso 3/8" 40 2.70 1 108.00
C-5 2 0.25 0.90 7.5 3.38 2 2.30 7.50 34.50 Verticales 3/4" 12 8.9 2 213.60

Estribo 1er Piso 3/8" 160 1.10 2 352.00


C-6 4 0.25 0.25 7.5 1.88 4 1.00 7.50 30.00 Verticales 5/8" 4 8.9 4 142.40
Estribo 1er Piso 3/8" 40 1.10 4 176.00
C-7 3 0.25 0.70 7.5 3.94 3 1.90 7.50 42.75 Verticales 3/4" 8 8.9 3 213.60
Estribo 1er Piso 3/8" 80 1.20 3 288.00
C-8 1 0.25 0.30 7.5 0.56 1 1.10 7.50 8.25 Verticales 5/8" 4 8.9 1 35.60
1 0.15 0.60 7.5 0.68 1 1.20 7.50 9.00 Verticales 1/2" 4 8.9 1 35.60
Estribo 1er Piso 3/8" 40 1.20 1 48.00
Estribo 1er Piso 3/8" 40 2.00 1 80.00
C-10 1 0.25 0.50 7.5 1.88 1 1.10 7.50 8.25 Verticales 3/4" 10 8.9 1 89.00
Estribo 1er Piso 3/8" 120 1.00 1 120.00

Página 31 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO
CA-1 10 0.30 0.15 5.7 2.57 10 0.90 5.70 51.30 Verticales 1/2" 4 7.15 10 286.00
Estribo 1er Piso 1/4" 33 1.00 10 330.00
CA-2 3 0.40 0.15 5.7 1.03 3 1.10 5.70 18.81 Verticales 1/2" 6 7.15 3 128.70
Estribo 1er Piso 1/4" 33 1.20 3 118.80

Estribo 1er Piso 1/4" 33 0.40 3 39.60

SECTOR B
C-1 1 0.40 0.25 7.4 0.74 1 1.30 7.40 9.62 Verticales 5/8" 12 9.2 1 110.40
1 0.70 0.25 7.4 1.30 1 1.40 7.40 10.36 Estribo 1er y 2do Piso 3/8" 60 1.40 1 84.00
Estribo 1er y 2do Piso 3/8" 60 2.50 1 150.00

Estribo 1er y 2do Piso 3/8" 60 1.10 1 66.00


Estribo 1er y 2do Piso 3/8" 60 0.45 1 27.00
C-2 47 0.40 0.25 7.4 34.78 47 1.30 7.40 452.14 Verticales 5/8" 6 9.2 47 2,594.40
Estribo 1er y 2do Piso 3/8" 60 1.40 47 3,948.00
C-3 8 0.25 0.25 7.4 3.70 8 1.00 7.40 59.20 Verticales 5/8" 4 9.2 8 294.40
Estribo 1er Piso 3/8" 60 1.10 8 528.00
C-4 4 0.40 0.25 7.4 2.96 4 1.30 7.40 38.48 Verticales 3/4" 8 5.2 4 166.40
Verticales 5/8" 8 4 4 128.00
Estribo 1er y 2do Piso 3/8" 120 1.00 4 480.00
C-5 1 0.25 0.25 7.4 0.46 1 1.00 7.40 7.40 Verticales 5/8" 6 5.2 1 31.20
Verticales 5/8" 4 4 1 16.00
Estribo 1er y 2do Piso 3/8" 60 1.10 1 66.00
C-6 6 0.15 0.25 7.4 1.67 6 0.80 7.40 35.52 Verticales 1/2" 4 9.2 6 220.80

Estribo 1er y 2do Piso 3/8" 60 0.90 6 324.00


C-7 2 0.25 0.25 7.4 0.93 2 1.00 7.40 14.80 Verticales 5/8" 8 5.2 2 83.20
Verticales 5/8" 6 4 2 48.00
Estribo 1er y 2do Piso 3/8" 60 1.10 2 132.00
C-8 1 0.25 0.25 7.4 0.46 1 1.00 7.40 7.40 Verticales 5/8" 7 9.2 1 64.40
1 0.15 0.20 7.4 0.22 1 0.30 7.40 2.22 Estribo 1er y 2do Piso 3/8" 60 1.10 1 66.00

Estribo 1er y 2do Piso 3/8" 60 0.80 1 48.00


C-9 6 0.35 0.35 7.4 5.44 6 1.40 7.40 62.16 Verticales 5/8" 6 9.2 6 331.20
Estribo 1er Piso 3/8" 60 1.50 6 540.00
C-10 6 0.40 0.25 7.4 17.76 6 1.10 7.40 48.84 Verticales 3/4" 6 5.2 6 187.20
Verticales 5/8" 6 4 6 144.00
Estribo 1er y 2do Piso 3/8" 60 1.20 6 432.00
C-11 1 0.40 0.25 7.4 2.96 1 1.10 7.40 8.14 Verticales 5/8" 8 5.2 1 41.60
Verticales 5/8" 6 4 1 24.00
Estribo 1er Piso 3/8" 60 1.00 1 60.00
Estribo 2do Piso 3/8" 30 1.20 1 36.00
C-13 2 0.60 0.25 7.4 8.88 2 1.10 7.40 16.28 Verticales 5/8" 8 9.2 2 147.20
Estribo 1er y 2do Piso 3/8" 60 1.20 2 144.00
CA-1 Primer Piso 180 0.30 0.15 3.7 29.97 180 0.90 3.70 599.40 Verticales 1/2" 4 4.2 180 3,024.00
Estribos 1/4" 25 1.00 180 4,500.00
CA-1 Segundo Piso 132 0.30 0.15 3.7 21.98 132 0.90 3.70 439.56 Verticales 1/2" 4 4.2 132 2,217.60
Estribos 1/4" 25 1.00 132 3,300.00
CA-3 Primer Piso 8 0.25 0.25 3.7 1.85 8 1.00 3.70 29.60 Verticales 1/2" 4 4.2 8 134.40
Estribos 1/4" 25 1.10 8 220.00
CA-3 Segundo Piso 3 0.25 0.25 3.7 0.69 3 1.00 3.70 11.10 Verticales 1/2" 4 4.2 3 50.40
Estribos 1/4" 25 1.10 3 82.50

SECTOR C1
En eje 12
C-1 de Sotano a Primer Piso 2 0.60 0.40 7.8 3.74 2 2.00 7.80 31.20 Verticales 1" 6 10.5 2 126.00
Verticales 3/4" 6 10.5 2 126.00

Estribos 3/8" 168 1.30 2 436.80


C-1 Segundo Piso 2 0.60 0.40 3.7 1.78 2 2.00 3.70 14.80 Verticales 3/4" 12 4.8 2 115.20
Estribos 3/8" 84 1.30 2 218.40
C-1 de Tercer a Quinto Piso 2 0.60 0.40 11.1 5.33 2 2.00 11.10 44.40 Verticales 3/4" 10 12.3 2 246.00
Estribos 3/8" 168 1.50 2 504.00

Página 32 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO
C-2 de Sotano a Primer Piso 3 0.60 0.40 7.8 5.62 3 2.00 7.80 46.80 Verticales 1" 10 10.5 3 315.00
Estribos 3/8" 168 1.30 3 655.20
C-2 Segundo Piso 3 0.60 0.40 3.7 2.66 3 2.00 3.70 22.20 Verticales 3/4" 12 4.8 3 172.80

Estribos 3/8" 84 1.30 3 327.60


C-2 de Tercer a Quinto Piso 3 0.60 0.40 11.1 7.99 3 2.00 11.10 66.60 Verticales 3/4" 10 12.3 3 369.00
Estribos 3/8" 168 1.50 3 756.00
Entre ejes 11 y 10

C-1 Primer Piso 4 0.60 0.40 3.7 3.55 4 2.00 3.70 29.60 Verticales 1" 6 5.7 4 136.80
Verticales 3/4" 6 5.7 4 136.80
Estribos 3/8" 84 1.30 4 436.80
C-1 Segundo Piso 4 0.60 0.40 3.7 3.55 4 2.00 3.70 29.60 Verticales 3/4" 12 4.8 4 230.40
Estribos 3/8" 84 1.30 4 436.80

C-1 de Tercer a Sexto Piso 4 0.60 0.40 14.8 14.21 4 2.00 14.80 118.40 Verticales 3/4" 10 16.3 4 652.00
Estribos 3/8" 224 1.50 4 1,344.00
C-2 de Primer Piso 2 0.60 0.40 3.7 1.78 2 2.00 3.70 14.80 Verticales 1" 10 5.7 2 114.00
Estribos 3/8" 84 1.30 2 218.40
C-2 Segundo Piso 2 0.60 0.40 3.7 1.78 2 2.00 3.70 14.80 Verticales 3/4" 12 4.8 2 115.20

Estribos 3/8" 84 1.30 2 218.40


C-2 de Tercer a Sexto Piso 2 0.60 0.40 14.8 7.10 2 2.00 14.80 59.20 Verticales 3/4" 10 16.3 2 326.00
Estribos 3/8" 224 1.50 2 672.00
Entre ejes 15 y 17
C-1 de Sotano a Primer Piso 3 0.60 0.40 7.8 5.62 3 2.00 7.80 46.80 Verticales 1" 6 10.5 3 189.00

Verticales 3/4" 6 10.5 3 189.00


Estribos 3/8" 168 1.30 3 655.20
C-1 Segundo Piso 3 0.60 0.40 3.7 2.66 3 2.00 3.70 22.20 Verticales 3/4" 12 4.8 3 172.80
Estribos 3/8" 84 1.30 3 327.60

C-1 Tercer y Cuarto Piso 3 0.60 0.40 7.4 5.33 3 2.00 7.40 44.40 Verticales 3/4" 10 8.3 3 249.00
Estribos 3/8" 112 1.50 3 504.00
C-2 de Sotano a Primer Piso 3 0.60 0.40 7.8 5.62 3 2.00 7.80 46.80 Verticales 1" 10 10.5 3 315.00
Estribos 3/8" 168 1.30 3 655.20
C-2 Segundo Piso 3 0.60 0.40 3.7 2.66 3 2.00 3.70 22.20 Verticales 3/4" 12 4.8 3 172.80

Estribos 3/8" 84 1.30 3 327.60


C-2 Tercer y Cuarto Piso 3 0.60 0.40 7.4 5.33 3 2.00 7.40 44.40 Verticales 3/4" 10 8.3 3 249.00
Estribos 3/8" 112 1.50 3 504.00
C-5 de Sotano a Tercer Piso 1 0.60 0.40 7.8 1.87 1 2.00 7.80 15.60 Verticales 1" 10 18.5 1 185.00
Estribos 3/8" 336 1.30 1 436.80

C-5 Cuarto Piso 1 0.60 0.40 3.7 0.89 1 2.00 3.70 7.40 Verticales 3/4" 10 4.3 1 43.00
Estribos 3/8" 84 1.30 1 109.20
C-6 de Sotano a Primer Piso 1 0.50 0.40 7.8 1.56 1 1.80 7.80 14.04 Verticales 1" 10 10.5 1 105.00
Estribos 3/8" 112 1.40 1 156.80

C-6 de Segundo a Cuarto Piso 1 0.50 0.40 3.7 0.74 1 1.80 3.70 6.66 Verticales 3/4" 10 10.5 1 105.00
Estribos 3/8" 168 1.40 1 235.20
C-7 de Sotano a Primer Piso 1 0.60 0.40 7.8 1.87 1 2.00 7.80 15.60 Verticales 3/4" 12 10.5 1 126.00
Estribos 3/8" 112 1.40 1 156.80
C-6 de Segundo a Cuarto Piso 1 0.60 0.40 3.7 0.89 1 2.00 3.70 7.40 Verticales 3/4" 10 10.5 1 105.00

Estribos 3/8" 168 1.40 1 235.20


CA-1 Sotano 23 0.30 0.15 3.7 3.83 23 0.90 3.70 76.59 Verticales 1/2" 4 4.2 23 386.40
Estribos 1/4" 25 1.00 23 575.00
CA-1 Primer Piso 199 0.30 0.15 3.7 33.13 199 0.90 3.70 662.67 Verticales 1/2" 4 4.2 199 3,343.20
Estribos 1/4" 25 1.00 199 4,975.00
CA-1 Segundo Piso 180 0.30 0.15 3.7 29.97 180 0.90 3.70 599.40 Verticales 1/2" 4 4.2 180 3,024.00

Estribos 1/4" 25 1.00 180 4,500.00


CA-1 Tercer Piso 215 0.30 0.15 3.7 35.80 215 0.90 3.70 715.95 Verticales 1/2" 4 4.2 215 3,612.00
Estribos 1/4" 25 1.00 215 5,375.00
CA-1 Cuarto Piso 192 0.30 0.15 3.7 31.97 192 0.90 3.70 639.36 Verticales 1/2" 4 4.2 192 3,225.60
Estribos 1/4" 25 1.00 192 4,800.00
CA-1 Quinto Piso 85 0.30 0.15 3.7 14.15 85 0.90 3.70 283.05 Verticales 1/2" 4 4.2 85 1,428.00
Estribos 1/4" 25 1.00 85 2,125.00

Página 33 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO
SECTOR C2
C-2 de Primer Piso 26 0.60 0.40 3.7 23.09 26 2.00 3.70 192.40 Verticales 1" 10 5.7 26 1,482.00
Estribos 3/8" 84 1.30 26 2,839.20

C-2 Segundo Piso 26 0.60 0.40 3.7 23.09 26 2.00 3.70 192.40 Verticales 3/4" 12 4.8 26 1,497.60
Estribos 3/8" 84 1.30 26 2,839.20
C-2 de Tercer a Cuarto Piso 2 0.60 0.40 7.4 3.55 2 2.00 7.40 29.60 Verticales 3/4" 10 8.3 2 166.00
Estribos 3/8" 112 1.50 2 336.00

C-2 de Tercer a Quinto Piso 24 0.60 0.40 11.1 63.94 24 2.00 11.10 532.80 Verticales 3/4" 10 12.3 24 2,952.00
Estribos 3/8" 168 1.50 24 6,048.00
CA-1 Primer Piso 31 0.30 0.15 3.7 5.16 31 0.90 3.70 103.23 Verticales 1/2" 4 4.2 31 520.80
Estribos 1/4" 25 1.00 31 775.00
CA-1 Segundo Piso 99 0.30 0.15 3.7 16.48 99 0.90 3.70 329.67 Verticales 1/2" 4 4.2 99 1,663.20
Estribos 1/4" 25 1.00 99 2,475.00
CA-1 Tercer Piso 123 0.30 0.15 3.7 20.48 123 0.90 3.70 409.59 Verticales 1/2" 4 4.2 123 2,066.40

Estribos 1/4" 25 1.00 123 3,075.00


CA-1 Cuarto Piso 134 0.30 0.15 3.7 22.31 134 0.90 3.70 446.22 Verticales 1/2" 4 4.2 134 2,251.20
Estribos 1/4" 25 1.00 134 3,350.00
CA-1 Quinto Piso 143 0.30 0.15 3.7 23.81 143 0.90 3.70 476.19 Verticales 1/2" 4 4.2 143 2,402.40
Estribos 1/4" 25 1.00 143 3,575.00

SECTOR C3
En eje D
C-2 de Primer Piso 6 0.60 0.40 3.7 5.33 6 2.00 3.70 44.40 Verticales 1" 10 5.7 6 342.00
Estribos 3/8" 84 1.30 6 655.20
C-2 Segundo Piso 6 0.60 0.40 3.7 5.33 6 2.00 3.70 44.40 Verticales 3/4" 12 4.8 6 345.60

Estribos 3/8" 84 1.30 6 655.20


Entre ejes G y H
C-2 de Primer Piso 12 0.60 0.40 3.7 10.66 12 2.00 3.70 88.80 Verticales 1" 10 5.7 12 684.00
Estribos 3/8" 84 1.30 12 1,310.40
C-2 Segundo Piso 12 0.60 0.40 3.7 10.66 12 2.00 3.70 88.80 Verticales 3/4" 12 4.8 12 691.20

Estribos 3/8" 84 1.30 12 1,310.40


C-2 de Tercer a Cuarto Piso 12 0.60 0.40 7.4 21.31 12 2.00 7.40 177.60 Verticales 3/4" 10 8.3 12 996.00
Estribos 3/8" 112 1.50 12 2,016.00
Entre ejes I y J
C-2 de Sotano a Primer Piso 5 0.60 0.40 7.8 9.36 5 2.00 7.80 78.00 Verticales 1" 10 10.5 5 525.00
Estribos 3/8" 168 1.30 5 1,092.00

C-2 Segundo Piso 5 0.60 0.40 3.7 4.44 5 2.00 3.70 37.00 Verticales 3/4" 12 4.8 5 288.00
Estribos 3/8" 84 1.30 5 546.00
C-2 de Tercer a Sexto Piso 5 0.60 0.40 14.8 17.76 5 2.00 14.80 148.00 Verticales 3/4" 10 16.3 5 815.00
Estribos 3/8" 224 1.50 5 1,680.00
Entre ejes J y M

C-2 de Sotano a Primer Piso 6 0.60 0.40 7.8 11.23 6 2.00 7.80 93.60 Verticales 1" 10 10.5 6 630.00
Estribos 3/8" 168 1.30 6 1,310.40
C-2 Segundo Piso 6 0.60 0.40 3.7 5.33 6 2.00 3.70 44.40 Verticales 3/4" 12 4.8 6 345.60
Estribos 3/8" 84 1.30 6 655.20
C-2 de Tercer a Cuarto Piso 6 0.60 0.40 7.4 10.66 6 2.00 7.40 88.80 Verticales 3/4" 10 8.3 6 498.00

Estribos 3/8" 112 1.50 6 1,008.00


En eje N
C-2 de Sotano a Primer Piso 3 0.60 0.40 7.8 5.62 3 2.00 7.80 46.80 Verticales 1" 10 10.5 3 315.00
Estribos 3/8" 168 1.30 3 655.20
C-2 Segundo Piso 3 0.60 0.40 3.7 2.66 3 2.00 3.70 22.20 Verticales 3/4" 12 4.8 3 172.80

Estribos 3/8" 84 1.30 3 327.60


C-2 de Tercer a Sexto Piso 3 0.60 0.40 14.8 10.66 3 2.00 14.80 88.80 Verticales 3/4" 10 16.3 3 489.00
Estribos 3/8" 224 1.50 3 1,008.00
En eje Ñ
C-2 de Sotano a Primer Piso 3 0.60 0.40 7.8 5.62 3 2.00 7.80 46.80 Verticales 1" 10 10.5 3 315.00

Estribos 3/8" 168 1.30 3 655.20


C-2 Segundo Piso 3 0.60 0.40 3.7 2.66 3 2.00 3.70 22.20 Verticales 3/4" 12 4.8 3 172.80
Estribos 3/8" 84 1.30 3 327.60

Página 34 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO
C-2 de Tercer a Quinto Piso 3 0.60 0.40 11.1 7.99 3 2.00 11.10 66.60 Verticales 3/4" 10 12.3 3 369.00
Estribos 3/8" 168 1.50 3 756.00
CA-1 Sotano 68 0.30 0.15 3.7 11.32 68 0.90 3.70 226.44 Verticales 1/2" 4 4.2 68 1,142.40

Estribos 1/4" 25 1.00 68 1,700.00


CA-1 Primer Piso 205 0.30 0.15 3.7 34.13 205 0.90 3.70 682.65 Verticales 1/2" 4 4.2 205 3,444.00
Estribos 1/4" 25 1.00 205 5,125.00
CA-1 Segundo Piso 138 0.30 0.15 3.7 22.98 138 0.90 3.70 459.54 Verticales 1/2" 4 4.2 138 2,318.40
Estribos 1/4" 25 1.00 138 3,450.00
CA-1 Tercer Piso 120 0.30 0.15 3.7 19.98 120 0.90 3.70 399.60 Verticales 1/2" 4 4.2 120 2,016.00

Estribos 1/4" 25 1.00 120 3,000.00


CA-1 Cuarto Piso 195 0.30 0.15 3.7 32.47 195 0.90 3.70 649.35 Verticales 1/2" 4 4.2 195 3,276.00
Estribos 1/4" 25 1.00 195 4,875.00
CA-1 Quinto Piso 12 0.30 0.15 3.7 2.00 12 0.90 3.70 39.96 Verticales 1/2" 4 4.2 12 201.60
Estribos 1/4" 25 1.00 12 300.00
CA-3 Segundo Piso 1 0.25 0.25 3.7 0.23 1 1.00 3.70 3.70 Verticales 1/2" 4 4.2 1 16.80
Estribos 1/4" 25 1.10 1 27.50
CA-3 Cuarto Piso 6 0.25 0.25 3.7 1.39 6 1.00 3.70 22.20 Verticales 1/2" 4 4.2 6 100.80
Estribos 1/4" 25 1.10 6 165.00
CA-3 Quinto Piso 4 0.25 0.25 3.7 0.93 4 1.00 3.70 14.80 Verticales 1/2" 4 4.2 4 67.20
Estribos 1/4" 25 1.10 4 110.00

SECTOR D
C-1 en Sotano 2 0.50 0.25 4.5 1.13 2 1.50 4.50 13.50 Verticales 5/8" 6 5.7 2 68.40
Estribo Sotano 3/8" 26 1.60 2 83.20

Estribo Sotano 3/8" 26 0.45 2 23.40


C-2 en Sotano 8 0.60 0.25 4.5 5.40 8 1.70 4.50 61.20 Verticales 5/8" 4 5.7 8 182.40
Verticales 1/2" 4 5.7 8 182.40
Estribo Sotano 3/8" 26 1.80 8 374.40
Estribo Sotano 3/8" 26 1.20 8 249.60

C-3 en Sotano 1 0.40 0.25 4.5 0.45 1 1.30 4.50 5.85 Verticales 5/8" 4 5.7 1 22.80
Estribo Sotano 3/8" 26 1.40 1 36.40
C-4 en Sotano 10 0.25 0.25 4.5 2.81 10 1.00 4.50 45.00 Verticales 1/2" 4 5.7 10 228.00
Estribo Sotano 3/8" 26 1.10 10 286.00
C-4´ en Sotano y Primer Piso 2 0.25 0.25 8.5 1.06 2 1.00 8.50 17.00 Verticales 1/2" 4 9.7 2 77.60
Estribo Sotano 3/8" 26 1.10 2 57.20

Estribo 1er Piso 3/8" 25 1.10 2 55.00


C-5 en Sotano 4 0.40 0.25 4.5 1.80 4 1.30 4.50 23.40 Verticales 5/8" 6 5.7 4 136.80
Estribo Sotano 3/8" 26 1.40 4 145.60
C-7 en Sotano y Primer Piso 1 1.20 0.25 4.5 1.35 1 2.90 4.50 13.05 Verticales 5/8" 4 9.7 1 38.80
1 0.25 0.25 4 0.25 1 1.00 4.00 4.00 Verticales 5/8" 6 5.7 1 34.20
Estribo Sotano 3/8" 26 3.00 1 78.00

Estribo Sotano 3/8" 26 1.80 1 46.80


Estribo 1er Piso 3/8" 25 1.10 1 27.50
C-8 en Sotano y Primer Piso 1 1.20 0.25 8.5 2.55 1 2.90 8.50 24.65 Verticales 5/8" 10 9.7 1 97.00
Estribo Sotano 3/8" 26 3.00 1 78.00
Estribo Sotano 3/8" 26 1.80 1 46.80
Estribo Sotano 3/8" 26 0.45 1 11.70
Estribo 1er Piso 3/8" 25 3.00 1 75.00
Estribo 1er Piso 3/8" 25 1.80 1 45.00
Estribo 1er Piso 3/8" 25 0.45 1 11.25
C-9 en Sotano y Primer Piso 1 0.80 0.25 8.5 1.70 1 2.10 8.50 17.85 Verticales 5/8" 8 9.7 1 77.60
Estribo Sotano 3/8" 26 2.20 1 57.20
Estribo Sotano 3/8" 26 1.10 1 28.60
Estribo 1er Piso 3/8" 25 2.20 1 55.00

Estribo 1er Piso 3/8" 25 1.10 1 27.50


C-10 en Sotano 2 1.00 0.25 4.5 2.25 2 2.50 4.50 22.50 Verticales 3/4" 8 5.7 2 91.20
2 0.65 0.25 4.5 1.46 2 1.30 4.50 11.70 Verticales 5/8" 2 5.7 2 22.80
Estribo Sotano 3/8" 26 2.60 2 135.20
Estribo Sotano 3/8" 26 2.40 2 124.80

Página 35 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO
Estribo Sotano 3/8" 26 0.45 2 23.40
C-11 en Primer Piso 2 0.40 0.25 4 0.80 2 1.30 4.00 10.40 Verticales 5/8" 4 4.85 2 38.80
Verticales 1/2" 2 4.85 2 19.40
Estribo Sotano 3/8" 26 1.40 2 72.80
Estribo Sotano 3/8" 26 0.45 2 23.40

SECTOR E
C-1 de Sotano a Tercer Piso 1 0.40 0.40 15.1 2.42 1 1.60 15.10 24.16 Verticales 5/8" 8 18.65 1 149.20
Estribos 3/8" 208 1.30 1 270.40
C-2 de Sotano a Tercer Piso 3 0.40 0.40 15.1 7.25 3 1.60 15.10 72.48 Verticales 3/4" 6 18.65 3 335.70
Estribos 3/8" 104 1.70 3 530.40
C-3 de Sotano a Primer Piso 1 0.40 0.40 7.7 1.23 1 1.60 7.70 12.32 Verticales 1" 16 11.35 1 181.60
Estribos 3/8" 104 1.30 1 135.20
C-3 en Segundo Piso 1 0.40 0.40 3.7 0.59 1 1.60 3.70 5.92 Verticales 3/4" 10 4 1 40.00
Estribos 3/8" 52 1.30 1 67.60
C-3 en Tercer Piso 1 0.40 0.40 3.7 0.59 1 1.60 3.70 5.92 Verticales 3/4" 8 4.3 1 34.40
Estribos 3/8" 26 1.70 1 44.20
C-4 de Sotano a Primer Piso 1 0.40 0.40 7.7 1.23 1 1.60 7.70 12.32 Verticales 1" 16 11.35 1 181.60
Estribos 3/8" 104 1.30 1 135.20
C-4 en Segundo Piso 1 0.40 0.40 3.7 0.59 1 1.60 3.70 5.92 Verticales 3/4" 8 4 1 32.00
Estribos 3/8" 52 1.30 1 67.60
C-4 en Tercer Piso 1 0.40 0.40 3.7 0.59 1 1.60 3.70 5.92 Verticales 3/4" 8 4.3 1 34.40
Estribos 3/8" 26 1.70 1 44.20
C-5 de Sotano a Primer Piso 1 0.40 0.40 7.7 1.23 1 1.60 7.70 12.32 Verticales 1" 14 11.35 1 158.90
Estribos 3/8" 104 1.30 1 135.20

C-5 en Segundo Piso 1 0.40 0.40 3.7 0.59 1 1.60 3.70 5.92 Verticales 3/4" 6 4 1 24.00
Estribos 3/8" 52 1.30 1 67.60
C-5 en Tercer Piso 1 0.40 0.40 3.7 0.59 1 1.60 3.70 5.92 Verticales 3/4" 6 4.3 1 25.80
Estribos 3/8" 26 1.70 1 44.20
C-6 de Sotano a Primer Piso 1 0.40 0.40 7.7 1.23 1 1.60 7.70 12.32 Verticales 1" 16 11.35 1 181.60
Estribos 3/8" 104 1.30 1 135.20

C-6 en Segundo Piso 1 0.40 0.40 3.7 0.59 1 1.60 3.70 5.92 Verticales 3/4" 8 4 1 32.00
Estribos 3/8" 52 1.30 1 67.60
C-6 en Tercer Piso 1 0.40 0.40 3.7 0.59 1 1.60 3.70 5.92 Verticales 3/4" 8 4.3 1 34.40
Estribos 3/8" 26 1.70 1 44.20
C-7 de Sotano a Primer Piso 2 0.40 0.40 7.7 2.46 2 1.60 7.70 24.64 Verticales 1" 14 11.35 2 317.80
Estribos 3/8" 104 1.30 2 270.40

C-7 en Segundo Piso 2 0.40 0.40 3.7 1.18 2 1.60 3.70 11.84 Verticales 1" 8 4 2 64.00
Estribos 3/8" 52 1.30 2 135.20
C-7 en Tercer Piso 2 0.40 0.40 3.7 1.18 2 1.60 3.70 11.84 Verticales 3/4" 6 4.3 2 51.60
Estribos 3/8" 26 1.70 2 88.40
C-8 de Sotano a Primer Piso 1 0.40 0.40 7.7 1.23 1 1.60 7.70 12.32 Verticales 3/4" 14 11.35 1 158.90
Estribos 3/8" 104 1.30 1 135.20
C-8 en Segundo Piso 1 0.40 0.40 3.7 0.59 1 1.60 3.70 5.92 Verticales 3/4" 6 4 1 24.00
Estribos 3/8" 52 1.30 1 67.60
C-8 en Tercer Piso 1 0.40 0.40 3.7 0.59 1 1.60 3.70 5.92 Verticales 3/4" 6 4.3 1 25.80
Estribos 3/8" 26 1.70 1 44.20
CA-1 Sotano 28 0.30 0.15 3.7 4.66 28 0.90 3.70 93.24 Verticales 1/2" 4 4.2 28 470.40
Estribos 1/4" 25 1.00 28 700.00
CA-1 Primer Piso 45 0.30 0.15 3.7 7.49 45 0.90 3.70 149.85 Verticales 1/2" 4 4.2 45 756.00

Estribos 1/4" 25 1.00 45 1,125.00


CA-1 Segundo Piso 42 0.30 0.15 3.7 6.99 42 0.90 3.70 139.86 Verticales 1/2" 4 4.2 42 705.60
Estribos 1/4" 25 1.00 42 1,050.00
CA-1 Tercer Piso 45 0.30 0.15 3.7 7.49 45 0.90 3.70 149.85 Verticales 1/2" 4 4.2 45 756.00
Estribos 1/4" 25 1.00 45 1,125.00

SECTOR F

C-1 de Primer a Segundo Piso 9 0.40 0.40 7.7 11.09 9 1.60 7.70 110.88 Verticales 5/8" 8 10.5 9 756.00
Estribos 3/8" 104 1.30 9 1,216.80
C-2 en Primer Piso 5 0.40 0.40 4 3.20 5 1.60 4.00 32.00 Verticales 5/8" 10 5.9 5 295.00

Página 36 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO
Estribos 3/8" 52 1.30 5 338.00
C-2 en Segundo Piso 5 0.40 0.40 3.7 2.96 5 1.60 3.70 29.60 Verticales 5/8" 8 6.2 5 248.00
Estribos 3/8" 52 1.30 5 338.00
C-3 en Primer Piso 2 0.40 0.40 4 1.28 2 1.60 4.00 12.80 Verticales 3/4" 8 5.9 2 94.40
Estribos 3/8" 52 1.30 2 135.20
C-3 en Segundo Piso 2 0.40 0.40 3.7 1.18 2 1.60 3.70 11.84 Verticales 3/4" 6 6.2 2 74.40
Estribos 3/8" 52 1.30 2 135.20
C-2 de Sotano a Primer Piso 4 0.40 0.40 7.7 4.93 4 1.60 7.70 49.28 Verticales 5/8" 10 10.35 4 414.00
Estribos 3/8" 104 1.30 4 540.80
C-2 en Segundo Piso 4 0.40 0.40 3.7 2.37 4 1.60 3.70 23.68 Verticales 5/8" 8 8.3 4 265.60
Estribos 3/8" 6 1.30 4 31.20

C-4 de Sotano a Primer Piso 4 0.40 0.40 7.7 4.93 4 1.60 7.70 49.28 Verticales 3/4" 8 10.35 4 331.20
Estribos 3/8" 104 1.30 4 540.80
C-4 en Segundo Piso 4 0.40 0.40 3.7 2.37 4 1.60 3.70 23.68 Verticales 3/4" 6 8.3 4 199.20
Estribos 3/8" 52 1.30 4 270.40
C-5 de Sotano a Primer Piso 1 0.40 0.40 7.7 1.23 1 1.60 7.70 12.32 Verticales 3/4" 12 10.35 1 124.20
Estribos 3/8" 104 1.30 1 135.20

C-5 en Segundo Piso 1 0.40 0.40 3.7 0.59 1 1.60 3.70 5.92 Verticales 3/4" 6 8.3 1 49.80
Estribos 3/8" 52 1.30 1 67.60
C-6 de Sotano a Primer Piso 1 0.40 0.40 7.7 1.23 1 1.60 7.70 12.32 Verticales 3/4" 10 10.35 1 103.50
Estribos 3/8" 104 1.30 1 135.20
C-6 en Segundo Piso 1 0.40 0.40 3.7 0.59 1 1.60 3.70 5.92 Verticales 3/4" 6 8.3 1 49.80
Estribos 3/8" 52 1.30 1 67.60

C-7 de Sotano a Segundo Piso 1 0.40 0.40 11.4 1.82 1 1.60 11.40 18.24 Verticales 3/4" 8 14.35 1 114.80
Estribos 3/8" 156 1.30 1 202.80
CA-1 Sotano 49 0.30 0.15 3.7 8.16 49 0.90 3.70 163.17 Verticales 1/2" 4 4.2 49 823.20
Estribos 1/4" 25 1.00 49 1,225.00
CA-1 Primer Piso 66 0.30 0.15 3.7 10.99 66 0.90 3.70 219.78 Verticales 1/2" 4 4.2 66 1,108.80
Estribos 1/4" 25 1.00 66 1,650.00
CA-1 Segundo Piso 66 0.30 0.15 3.7 10.99 66 0.90 3.70 219.78 Verticales 1/2" 4 4.2 66 1,108.80

Estribos 1/4" 25 1.00 66 1,650.00

M3 1,029.86 M2 14,457.44 ML 71,468.40 57,105.15 48,840.10 7,759.80 16,761.70 6,864.30

KG 17,867.10 31,978.88 48,351.70 12,027.69 36,875.74 27,251.27 174,352.38

Página 37 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
06.06.01 VIGAS CONCRETO F`C = 210 KG/CM2
06.06.02 VIGAS ENCOFRADO Y DESENCOFRADO Superficie
06.06.03 ACERO DE REFUERZO Fy=4200 kg/cm2 de contacto
SECTOR A
PRIMER PISO
AUDITORIO - VA-5 (.40x.30), Eje P 1 24.35 0.40 0.30 2.92 1 24.35 1.00 24.35 5/8" 4 25.55 1 102.20
Estribos 3/8" 121 1.60 1 193.60
AUDITORIO - VA-5 (.40x.30) 1 24.30 0.40 0.30 2.92 1 24.30 1.00 24.30 5/8" 4 25.50 1 102.00
Estribos 3/8" 121 1.60 1 193.60
AUDITORIO - VA-2 (.25x.20), Eje 9 1 15.90 0.25 0.20 0.80 1 15.90 0.65 10.34 5/8" 4 16.70 1 66.80
Estribos 3/8" 83 1.10 1 91.30
AUDITORIO - VA-3 (.25x.20) 1 4.50 0.15 0.50 0.34 1 4.50 1.15 5.18 5/8" 4 5.30 1 21.20
Estribos 3/8" 33 1.50 1 49.50
AUDITORIO - VA (.15x.20) 1 8.70 0.15 0.20 0.26 1 8.70 0.55 4.79 1/2" 4 9.50 1 38.00
Estribos 3/8" 51 0.90 1 45.90
AUDITORIO - VA (.15x.20) 2 3.85 0.15 0.20 0.23 2 3.85 0.55 4.24 1/2" 4 4.65 2 37.20
Estribos 3/8" 30 0.90 2 54.00
AUDITORIO - VA (.15x.20) 1 2.50 0.15 0.20 0.08 1 2.50 0.55 1.38 1/2" 4 3.30 1 13.20
Estribos 3/8" 24 0.90 1 21.60
AUDITORIO - VA-2 (.25x.20) 1 8.80 0.25 0.20 0.44 1 8.80 0.65 5.72 5/8" 4 9.60 1 38.40
Estribos 3/8" 52 1.10 1 57.20
AUDITORIO - VA-2 (.25x.20) 1 11.60 0.25 0.20 0.58 1 11.60 0.65 7.54 5/8" 4 12.40 1 49.60
Estribos 3/8" 64 1.10 1 70.40
AUDITORIO - V-B (.20x.80), Eje P 1 25.95 0.20 0.80 4.15 1 25.95 1.80 46.71 5/8" 4 27.15 1 108.60
1/2" 2 27.15 1 54.30
Estribos 3/8" 124 2.20 1 272.80
AUDITORIO - V-B (.20x.80), Eje P 1 25.90 0.20 0.80 4.14 1 25.90 1.80 46.62 5/8" 4 27.10 1 108.40
1/2" 2 27.10 1 54.20
Estribos 3/8" 124 2.20 1 272.80
AUDITORIO - V-B (.20x.80), Eje 2 1 16.40 0.20 0.80 2.62 1 16.40 1.80 29.52 5/8" 4 17.20 1 68.80
1/2" 2 17.20 1 34.40
Estribos 3/8" 86 2.20 1 189.20
AUDITORIO - V-B (.20x.80), Eje 9 1 18.35 0.20 0.80 2.94 1 18.35 1.80 33.03 5/8" 4 19.15 1 76.60
1/2" 2 19.15 1 38.30
Estribos 3/8" 94 2.20 1 206.80
AUDITORIO - 1V-1 (.40x.50), Eje P 1 24.10 0.40 0.50 4.82 1 24.10 1.40 33.74 5/8" 6 25.30 1 151.80
Estribos 3/8" 117 2.00 1 234.00
AUDITORIO - 1V-1 (.40x.50), Eje P 1 23.40 0.40 0.50 4.68 1 23.40 1.40 32.76 5/8" 6 24.60 1 147.60
Estribos 3/8" 114 2.00 1 228.00
AUDITORIO - 1V-2 (.25x.50), Eje 2 1 14.85 0.25 0.50 1.86 1 14.85 1.25 18.56 5/8" 6 15.65 1 93.90
Estribos 3/8" 80 1.70 1 136.00
AUDITORIO - 1V-2 (.25x.50), Eje 9 1 16.70 0.25 0.50 2.09 1 16.70 1.25 20.88 5/8" 6 17.50 1 105.00
Estribos 3/8" 87 1.70 1 147.90
AUDITORIO - V-B1 (.25x.80) 20 0.70 0.25 0.80 2.80 20 0.70 1.85 25.90 1/2" 6 0.95 20 114.00
Estribos 3/8" 10 2.30 20 460.00
SECTOR B
PRIMER PISO
BV-8 EN EJE 2 ENTRE EJES I y E4 1 2.70 0.25 0.50 0.34 1 2.70 0.85 2.30 5/8" 4 8.45 1 33.80
1 4.25 0.25 0.50 0.53 1 4.25 0.85 3.61 3/4" 1 2.25 1 2.25
Estribos 3/8" 25 1.70 1 42.50
Estribos 3/8" 32 1.70 1 54.40
BV-7 EN EJE 2 ENTRE EJES I y E6 3 3.80 0.25 0.50 1.43 3 3.80 0.85 9.69 5/8" 2 7.30 1 14.60
1 3.90 0.25 0.50 0.49 1 3.90 0.85 3.32 3/4" 1 2.70 3 8.10
5/8" 2 4.70 1 9.40
5/8" 2 7.40 1 14.80
5/8" 2 8.50 1 17.00
5/8" 2 6.20 1 12.40
5/8" 2 4.25 1 8.50
Estribos 3/8" 30 1.70 3 153.00

Página 38 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
Estribos 3/8" 30 1.70 1 51.00
BV-9 EN EJE 3 ENTRE EJES L y E6 1 4.67 0.25 0.50 0.58 1 4.67 0.85 3.97 5/8" 4 6.22 1 24.88
5/8" 2 3.67 1 7.34
Estribos 3/8" 33 1.70 1 56.10
BV-2 EN EJE 3 ENTRE EJES E-5 y J 1 3.90 0.25 0.20 0.20 1 3.90 0.25 0.98 1/2" 4 6.75 1 27.00
1 2.00 0.25 0.20 0.10 1 2.00 0.25 0.50 Estribos 3/8" 26 1.10 1 28.60
Estribos 3/8" 19 1.10 1 20.90
BV-3 EN EJE 3 ENTRE EJES E-5 y J 1 1.90 0.25 0.50 0.24 1 1.90 0.85 1.62 5/8" 4 4.00 1 16.00
1 1.00 0.25 0.50 0.13 1 1.00 0.85 0.85 Estribos 3/8" 20 1.70 1 34.00
Estribos 3/8" 17 1.70 1 28.90
BV-2 EN EJE 3 ENTRE EJES J y H 1 2.60 0.25 0.20 0.13 1 2.60 0.25 0.65 1/2" 4 5.00 1 20.00
1 1.65 0.25 0.20 0.08 1 1.65 0.25 0.41 Estribos 3/8" 21 1.10 1 23.10
Estribos 3/8" 17 1.10 1 18.70
BV-3 EN EJE 3 ENTRE EJES H y E4 1 1.00 0.25 0.50 0.13 1 1.00 0.85 0.85 5/8" 4 2.95 1 11.80
1 1.00 0.25 0.50 0.13 1 1.00 0.85 0.85 Estribos 3/8" 17 1.70 1 28.90
Estribos 3/8" 17 1.70 1 28.90
BV-2 EN EJE 3 ENTRE EJES H y E4 1 3.20 0.25 0.20 0.16 1 3.20 0.25 0.80 1/2" 4 3.85 1 15.40
Estribos 3/8" 24 1.10 1 26.40
BV-3 EN EJE 3 ENTRE EJES E4 y E3 1 2.60 0.25 0.50 0.33 1 2.60 0.85 2.21 5/8" 4 3.05 1 12.20
Estribos 3/8" 23 1.70 1 39.10
BV-10 EN EJE 4 ENTRE EJES E5 y E6 1 4.87 0.25 0.50 0.61 1 4.87 0.85 4.14 5/8" 4 6.82 1 27.28
3/4" 1 2.40 1 2.40
5/8" 1 3.37 1 3.37
Estribos 3/8" 34 1.70 1 57.80
BV-3 EN EJE 4 ENTRE EJES E5 y J 1 2.30 0.25 0.50 0.29 1 2.30 0.85 1.96 5/8" 4 2.85 1 11.40
Estribos 3/8" 22 1.70 1 37.40
BV-2 EN EJE 4 ENTRE EJES E5 y J 1 2.50 0.25 0.20 0.13 1 2.50 0.25 0.63 1/2" 4 3.20 1 12.80
Estribos 3/8" 21 1.10 1 23.10
BV-3 EN EJE 4 ENTRE EJES J y I 1 1.70 0.25 0.50 0.21 1 1.70 0.85 1.45 5/8" 4 7.80 1 31.20
1 0.90 0.25 0.50 0.11 1 0.90 0.85 0.77 Estribos 3/8" 20 1.70 1 34.00
1 2.50 0.25 0.50 0.31 1 2.50 0.85 2.13 Estribos 3/8" 16 1.70 1 27.20
1 1.10 0.25 0.50 0.14 1 1.10 0.85 0.94 Estribos 3/8" 23 1.70 1 39.10
Estribos 3/8" 17 1.70 1 28.90
BV-10 EN EJE 4 ENTRE EJES I y H 1 4.50 0.25 0.50 0.56 1 4.50 0.85 3.83 5/8" 4 7.65 1 30.60
1 1.50 0.25 0.50 0.19 1 1.50 0.85 1.28 3/4" 1 2.40 1 2.40
5/8" 1 3.37 1 3.37
Estribos 3/8" 33 1.70 1 56.10
Estribos 3/8" 19 1.70 1 32.30
BV-2 EN EJE 4 ENTRE EJES H y E3 1 1.40 0.25 0.20 0.07 1 1.40 0.25 0.35 1/2" 4 2.10 1 8.40
Estribos 3/8" 16 1.10 1 17.60
BV-11 EN EJE 4 ENTRE EJES H y E3 1 1.00 0.25 0.50 0.13 1 1.00 0.85 0.85 5/8" 4 2.95 1 11.80
1 1.00 0.25 0.50 0.13 1 1.00 0.85 0.85 Estribos 3/8" 16 1.70 1 27.20
Estribos 3/8" 16 1.70 1 27.20
1/2" 1 2.95 1 2.95
BV-2 EN EJE 4 ENTRE EJES H y E3 1 3.15 0.25 0.20 0.16 1 3.15 0.25 0.79 1/2" 4 3.85 1 15.40
Estribos 3/8" 23 1.10 1 25.30
VCH-1 EN EJE 4 ENTRE EJES H y E3 1 2.75 0.25 0.20 0.14 1 2.75 0.25 0.69 1/2" 6 3.45 1 20.70
Estribos 3/8" 22 1.10 1 24.20
VCH-1 ENTRE EJES G-E3 y 4-5 1 2.75 0.25 0.20 0.14 1 2.75 0.25 0.69 1/2" 6 3.45 1 20.70
Estribos 3/8" 22 1.10 1 24.20
BV-11 EN EJE 5 ENTRE EJES E6 y E3 1 2.25 0.25 0.50 0.28 1 2.25 0.85 1.91 5/8" 4 37.85 1 151.40
1 5.00 0.25 0.50 0.63 1 5.00 0.85 4.25 1/2" 1 37.85 1 37.85
1 2.85 0.25 0.50 0.36 1 2.85 0.85 2.42 Estribos 3/8" 21 1.70 1 35.70
1 2.50 0.25 0.50 0.31 1 2.50 0.85 2.13 Estribos 3/8" 32 1.70 1 54.40
1 4.40 0.25 0.50 0.55 1 4.40 0.85 3.74 Estribos 3/8" 23 1.70 1 39.10
1 1.50 0.25 0.50 0.19 1 1.50 0.85 1.28 Estribos 3/8" 22 1.70 1 37.40
1 2.65 0.25 0.50 0.33 1 2.65 0.85 2.25 Estribos 3/8" 29 1.70 1 49.30
1 2.60 0.25 0.50 0.33 1 2.60 0.85 2.21 Estribos 3/8" 18 1.70 1 30.60
Estribos 3/8" 22 1.70 1 37.40

Página 39 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
Estribos 3/8" 22 1.70 1 37.40
BV-3 EN EJE 5 ENTRE EJES H 1 1.50 0.25 0.50 0.19 1 1.50 0.85 1.28 5/8" 4 2.85 1 11.40
Estribos 3/8" 19 1.70 1 32.30
BV-12 EN EJE 5 ENTRE EJES J y E6 1 5.16 0.25 0.50 0.65 1 5.16 0.85 4.39 5/8" 4 9.05 1 36.20
1 2.25 0.25 0.50 0.28 1 2.25 0.85 1.91 1/2" 1 9.05 1 9.05
3/4" 1 3.80 1 3.80
Estribos 3/8" 21 1.70 1 35.70
Estribos 3/8" 12 1.70 1 20.40
BV-13 EN EJE 6 ENTRE EJES E6 y E2 1 5.35 0.25 0.50 0.67 1 5.35 0.85 4.55 5/8" 4 39.65 1 158.60
1 2.25 0.25 0.50 0.28 1 2.25 0.85 1.91
1 1.70 0.25 0.50 0.21 1 1.70 0.85 1.45 5/8" 1 39.65 1 39.65
1 3.20 0.25 0.50 0.40 1 3.20 0.85 2.72 Estribos 3/8" 33 1.70 1 56.10
1 2.13 0.25 0.50 0.27 1 2.13 0.85 1.81 Estribos 3/8" 21 1.70 1 35.70
1 2.78 0.25 0.50 0.35 1 2.78 0.85 2.36 Estribos 3/8" 18 1.70 1 30.60
1 1.50 0.25 0.50 0.19 1 1.50 0.85 1.28 Estribos 3/8" 24 1.70 1 40.80
1 2.75 0.25 0.50 0.34 1 2.75 0.85 2.34 Estribos 3/8" 20 1.70 1 34.00
1 1.93 0.25 0.50 0.24 1 1.93 0.85 1.64 Estribos 3/8" 23 1.70 1 39.10
1 2.03 0.25 0.50 0.25 1 2.03 0.85 1.72 Estribos 3/8" 18 1.70 1 30.60
1 2.75 0.25 0.50 0.34 1 2.75 0.85 2.34 Estribos 3/8" 23 1.70 1 39.10
Estribos 3/8" 19 1.70 1 32.30
Estribos 3/8" 20 1.70 1 34.00
Estribos 3/8" 23 1.70 1 39.10

BV-14 EN EJE 7 ENTRE EJES E6 y E2 1 5.67 0.25 0.50 0.71 1 5.67 0.85 4.82 5/8" 4 37.00 1 148.00
1 4.55 0.25 0.50 0.57 1 4.55 0.85 3.87
1 1.70 0.25 0.50 0.21 1 1.70 0.85 1.45 5/8" 1 37.00 1 37.00
1 1.00 0.25 0.50 0.13 1 1.00 0.85 0.85 Estribos 3/8" 34 1.70 1 57.80
1 1.95 0.25 0.50 0.24 1 1.95 0.85 1.66 Estribos 3/8" 30 1.70 1 51.00
1 1.75 0.25 0.50 0.22 1 1.75 0.85 1.49 Estribos 3/8" 18 1.70 1 30.60
1 1.00 0.25 0.50 0.13 1 1.00 0.85 0.85 Estribos 3/8" 16 1.70 1 27.20
1 1.00 0.25 0.50 0.13 1 1.00 0.85 0.85 Estribos 3/8" 19 1.70 1 32.30
1 1.50 0.25 0.50 0.19 1 1.50 0.85 1.28 Estribos 3/8" 19 1.70 1 32.30
1 2.75 0.25 0.50 0.34 1 2.75 0.85 2.34 Estribos 3/8" 16 1.70 1 27.20
1 1.55 0.25 0.50 0.19 1 1.55 0.85 1.32 Estribos 3/8" 16 1.70 1 27.20
1 1.00 0.25 0.50 0.13 1 1.00 0.85 0.85 Estribos 3/8" 18 1.70 1 30.60
1 2.75 0.25 0.50 0.34 1 2.75 0.85 2.34 Estribos 3/8" 23 1.70 1 39.10
Estribos 3/8" 18 1.70 1 30.60
Estribos 3/8" 16 1.70 1 27.20
Estribos 3/8" 23 1.70 1 39.10
VCH-1 En EJE 7 ENTRE EJES E3 y E2 1 2.75 0.25 0.20 0.14 1 2.75 0.25 0.69 1/2" 6 3.45 1 20.70
Estribos 3/8" 22 1.10 1 24.20
BV-14 EN EJE 8 ENTRE EJES J y E6 1 5.86 0.25 0.50 0.73 1 5.86 0.85 4.98 5/8" 5 14.40 1 72.00
1 2.20 0.25 0.50 0.28 1 2.20 0.85 1.87 Estribos 3/8" 35 1.70 1 59.50
1 2.60 0.25 0.50 0.33 1 2.60 0.85 2.21 Estribos 3/8" 20 1.70 1 34.00
Estribos 3/8" 22 1.70 1 37.40
BV-3 EN EJE 8 ENTRE EJES J y E1 1 1.65 0.25 0.50 0.21 1 1.65 0.85 1.40 5/8" 4 27.90 1 111.60
1 1.00 0.25 0.50 0.13 1 1.00 0.85 0.85 Estribos 3/8" 19 1.70 1 32.30
1 1.00 0.25 0.50 0.13 1 1.00 0.85 0.85 Estribos 3/8" 17 1.70 1 28.90
1 1.75 0.25 0.50 0.22 1 1.75 0.85 1.49 Estribos 3/8" 17 1.70 1 28.90
1 1.00 0.25 0.50 0.13 1 1.00 0.85 0.85 Estribos 3/8" 20 1.70 1 34.00
1 1.50 0.25 0.50 0.19 1 1.50 0.85 1.28 Estribos 3/8" 17 1.70 1 28.90
1 1.35 0.25 0.50 0.17 1 1.35 0.85 1.15 Estribos 3/8" 19 1.70 1 32.30
1 1.00 0.25 0.50 0.13 1 1.00 0.85 0.85 Estribos 3/8" 18 1.70 1 30.60
1 2.90 0.25 0.50 0.36 1 2.90 0.85 2.47 Estribos 3/8" 17 1.70 1 28.90
1 1.00 0.25 0.50 0.13 1 1.00 0.85 0.85 Estribos 3/8" 24 1.70 1 40.80
1 1.25 0.25 0.50 0.16 1 1.25 0.85 1.06 Estribos 3/8" 17 1.70 1 28.90
1 2.60 0.25 0.50 0.33 1 2.60 0.85 2.21 Estribos 3/8" 18 1.70 1 30.60
1 1.10 0.25 0.50 0.14 1 1.10 0.85 0.94 Estribos 3/8" 23 1.70 1 39.10
Estribos 3/8" 17 1.70 1 28.90

Página 40 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
BV-15 EN EJE 9 ENTRE EJES E6 y E5 1 6.27 0.25 0.50 0.78 1 6.27 0.85 5.33 5/8" 4 7.20 1 28.80
1/2" 2 7.20 1 14.40
Estribos 3/8" 38 1.70 1 64.60

BV-15 EN EJE 9 ENTRE EJES E5 y E1 1 2.10 0.25 0.50 0.26 1 2.10 0.85 1.79 5/8" 4 35.40 1 141.60
1 1.55 0.25 0.50 0.19 1 1.55 0.85 1.32 Estribos 3/8" 22 1.70 1 37.40
1 2.60 0.25 0.50 0.33 1 2.60 0.85 2.21 Estribos 3/8" 19 1.70 1 32.30
1 2.90 0.25 0.50 0.36 1 2.90 0.85 2.47 Estribos 3/8" 24 1.70 1 40.80
1 3.00 0.25 0.50 0.38 1 3.00 0.85 2.55 Estribos 3/8" 25 1.70 1 42.50
1 1.50 0.25 0.50 0.19 1 1.50 0.85 1.28 Estribos 3/8" 25 1.70 1 42.50
1 2.75 0.25 0.50 0.34 1 2.75 0.85 2.34 Estribos 3/8" 19 1.70 1 32.30
1 3.05 0.25 0.50 0.38 1 3.05 0.85 2.59 Estribos 3/8" 24 1.70 1 40.80
1 4.15 0.25 0.50 0.52 1 4.15 0.85 3.53 Estribos 3/8" 25 1.70 1 42.50
Estribos 3/8" 30 1.70 1 51.00
BV-2 EN EJE 9 ENTRE EJES I 1 1.80 0.25 0.20 0.09 1 1.80 0.25 0.45 1/2" 4 3.85 1 15.40
Estribos 3/8" 18 1.10 1 19.80
BV-22 EN EJE 10 ENTRE EJES E6 y I 1 6.50 0.25 0.50 0.81 1 6.50 0.85 5.53 5/8" 2 4.05 1 8.10
1 6.45 0.25 0.50 0.81 1 6.45 0.85 5.48 5/8" 2 7.35 1 14.70
1 6.30 0.25 0.50 0.79 1 6.30 0.85 5.36 3/4" 1 3.75 1 3.75
5/8" 2 7.20 1 14.40
3/4" 1 3.65 1 3.65
5/8" 2 4.15 1 8.30
5/8" 2 8.50 1 17.00
5/8" 1 4.60 1 4.60
5/8" 2 5.20 1 10.40
5/8" 1 4.00 1 4.00
5/8" 2 8.45 1 16.90
5/8" 1 4.50 1 4.50
Estribos 3/8" 42 1.70 1 71.40
Estribos 3/8" 41 1.70 1 69.70
Estribos 3/8" 41 1.70 1 69.70
BV-3 EN EJE 10 ENTRE EJES I y H 1 1.80 0.25 0.50 0.23 1 1.80 0.85 1.53 5/8" 4 2.65 1 10.60
Estribos 3/8" 20 1.70 1 34.00
BV-23 EN EJE 10 ENTRE EJES I y H 1 4.45 0.25 0.50 0.56 1 4.45 0.85 3.78 5/8" 4 5.35 1 21.40
Estribos 3/8" 32 1.70 1 54.40
BV-3 EN EJE E6 ENTRE EJES 2 y 9 1 3.90 0.25 0.50 0.49 1 3.90 0.85 3.32 5/8" 4 24.60 1 98.40
1 2.20 0.25 0.50 0.28 1 2.20 0.85 1.87 Estribos 3/8" 28 1.70 1 47.60
1 2.45 0.25 0.50 0.31 1 2.45 0.85 2.08 Estribos 3/8" 22 1.70 1 37.40
1 2.00 0.25 0.50 0.25 1 2.00 0.85 1.70 Estribos 3/8" 23 1.70 1 39.10
1 3.60 0.25 0.50 0.45 1 3.60 0.85 3.06 Estribos 3/8" 21 1.70 1 35.70
1 2.20 0.25 0.50 0.28 1 2.20 0.85 1.87 Estribos 3/8" 27 1.70 1 45.90
1 2.25 0.25 0.50 0.28 1 2.25 0.85 1.91 Estribos 3/8" 22 1.70 1 37.40
Estribos 3/8" 22 1.70 1 37.40
BV-3 EN EJE E5 ENTRE EJES 2 y 9 1 3.95 0.25 0.50 0.49 1 3.95 0.85 3.36 5/8" 4 25.45 1 101.80
1 2.20 0.25 0.50 0.28 1 2.20 0.85 1.87 Estribos 3/8" 29 1.70 1 49.30
1 3.60 0.25 0.50 0.45 1 3.60 0.85 3.06 Estribos 3/8" 22 1.70 1 37.40
1 2.00 0.25 0.50 0.25 1 2.00 0.85 1.70 Estribos 3/8" 27 1.70 1 45.90
1 3.60 0.25 0.50 0.45 1 3.60 0.85 3.06 Estribos 3/8" 21 1.70 1 35.70
1 2.20 0.25 0.50 0.28 1 2.20 0.85 1.87 Estribos 3/8" 27 1.70 1 45.90
1 2.85 0.25 0.50 0.36 1 2.85 0.85 2.42 Estribos 3/8" 22 1.70 1 37.40
Estribos 3/8" 24 1.70 1 40.80
BV-2 EN EJE E5, ENTRE EJES 9 y 10 1 2.50 0.25 0.20 0.13 1 2.50 0.25 0.63 1/2" 4 3.85 1 15.40
Estribos 3/8" 21 1.10 1 23.10
BV-3 ENTRE EJES K-J y 5-6 1 2.13 0.25 0.50 0.27 1 2.13 0.85 1.81 5/8" 4 3.00 1 12.00
Estribos 3/8" 21 1.70 1 35.70
VCH-1 ENTRE EJES K-J y 5-6 1 3.95 0.25 0.20 0.20 1 3.95 0.25 0.99 1/2" 6 4.65 1 27.90
Estribos 3/8" 27 1.10 1 29.70
VCH-1 ENTRE EJES K-J y 5-6 2 2.20 0.25 0.20 0.22 2 2.20 0.25 1.10 1/2" 6 2.80 2 33.60
Estribos 3/8" 20 1.10 2 44.00

Página 41 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
BV-3 ENTRE EJES K-J y 5-6 1 3.35 0.25 0.50 0.42 1 3.35 0.85 2.85 5/8" 4 4.50 1 18.00
Estribos 3/8" 26 1.70 1 44.20
BV-3 ENTRE EJES K-J y 5-6 1 2.20 0.25 0.50 0.28 1 2.20 0.85 1.87 5/8" 4 2.90 1 11.60
Estribos 3/8" 22 1.70 1 37.40
BV-2 ENTRE EJES K-J y 5-6 1 3.80 0.25 0.20 0.19 1 3.80 0.25 0.95 1/2" 4 4.65 1 18.60
Estribos 3/8" 26 1.10 1 28.60
BV-2 EN EJE J ENTRE EJES 6 y 9 1 3.35 0.25 0.20 0.17 1 3.35 0.25 0.84 1/2" 4 4.50 1 18.00
Estribos 3/8" 24 1.10 1 26.40
BV-3 EN EJE J ENTRE EJES 6 y 9 1 2.20 0.25 0.50 0.28 1 2.20 0.85 1.87 5/8" 4 2.90 1 11.60
Estribos 3/8" 22 1.70 1 37.40
BV-2 EN EJE J ENTRE EJES 6 y 9 1 3.65 0.25 0.20 0.18 1 3.65 0.25 0.91 1/2" 4 4.65 1 18.60
Estribos 3/8" 25 1.10 1 27.50
BV-6 EN EJE J ENTRE EJES 6 y 9 1 2.50 0.40 0.20 0.20 1 2.50 0.40 1.00 5/8" 5 3.20 1 16.00
Estribos 3/8" 21 1.40 1 29.40
BV-3 ENTRE EJES J-I y 2-5 1 3.70 0.25 0.50 0.46 1 3.70 0.85 3.15 5/8" 4 11.40 1 45.60
1 2.20 0.25 0.50 0.28 1 2.20 0.85 1.87 Estribos 3/8" 28 1.70 1 47.60
1 3.50 0.25 0.50 0.44 1 3.50 0.85 2.98 Estribos 3/8" 22 1.70 1 37.40
Estribos 3/8" 27 1.70 1 45.90
BV-2 ENTRE EJES J-I y 6-9 1 3.50 0.25 0.20 0.18 1 3.50 0.25 0.88 1/2" 4 4.50 1 18.00
Estribos 3/8" 25 1.10 1 27.50
BV-3 ENTRE EJES J-I y 6-9 1 2.20 0.25 0.50 0.28 1 2.20 0.85 1.87 5/8" 4 3.10 1 12.40
Estribos 3/8" 22 1.70 1 37.40
BV-2 ENTRE EJES J-I y 6-9 1 3.65 0.25 0.20 0.18 1 3.65 0.25 0.91 1/2" 4 4.30 1 17.20
Estribos 3/8" 25 1.10 1 27.50
BV-2 ENTRE EJES J-I y 2-3 1 4.00 0.25 0.20 0.20 1 4.00 0.25 1.00 1/2" 4 4.70 1 18.80
Estribos 3/8" 27 1.10 1 29.70
BV-3 ENTRE EJES J-I y 3-4 1 2.20 0.25 0.50 0.28 1 2.20 0.85 1.87 5/8" 4 3.10 1 12.40
Estribos 3/8" 22 1.70 1 37.40
BV-2 ENTRE EJES J-I y 4-5 1 3.50 0.25 0.20 0.18 1 3.50 0.25 0.88 1/2" 4 4.50 1 18.00
Estribos 3/8" 25 1.10 1 27.50
BV-2 EJE I ENTRE EJES 6 y 9 1 3.65 0.25 0.20 0.18 1 3.65 0.25 0.91 1/2" 4 4.50 1 18.00
Estribos 3/8" 25 1.10 1 27.50
BV-3 EJE I ENTRE EJES 6 y 9 1 2.20 0.25 0.50 0.28 1 2.20 0.85 1.87 5/8" 4 3.10 1 12.40
Estribos 3/8" 22 1.70 1 37.40
BV-3 EJE I ENTRE EJES 6 y 9 2 2.50 0.25 0.50 0.63 2 2.50 0.85 4.25 5/8" 4 3.40 2 27.20
Estribos 3/8" 23 1.70 2 78.20
VCH-2 ENTRE EJES I-H y 2-3 1 4.00 0.40 0.20 0.32 1 4.00 0.40 1.60 1/2" 6 4.60 1 27.60
Estribos 3/8" 29 1.40 1 40.60
BV-6 ENTRE EJES I-H y 3-4 1 2.20 0.40 0.20 0.18 1 2.20 0.40 0.88 5/8" 5 2.90 1 14.50
Estribos 3/8" 20 1.40 1 28.00
BV-5 ENTRE EJES I-H y 4-5 2 1.78 0.15 0.50 0.27 2 1.78 0.75 2.66 5/8" 5 4.50 1 22.50
Estribos 3/8" 20 1.50 2 60.00
BV-3 ENTRE EJES I-H y 5-6 1 1.98 0.25 0.50 0.25 1 1.98 0.85 1.68 5/8" 4 3.03 1 12.10
Estribos 3/8" 21 1.70 1 35.70
BV-5 ENTRE EJES I-H y 6-7 2 1.78 0.15 0.50 0.27 2 1.78 0.75 2.66 5/8" 5 4.50 1 22.50
Estribos 3/8" 20 1.50 2 60.00
BV-3 ENTRE EJES I-H y 7-8 1 2.20 0.25 0.50 0.28 1 2.20 0.85 1.87 5/8" 4 3.10 1 12.40
Estribos 3/8" 22 1.70 1 37.40
BV-5 ENTRE EJES I-H y 8-9 2 1.85 0.15 0.50 0.28 2 1.85 0.75 2.78 5/8" 5 4.65 1 23.25
Estribos 3/8" 21 1.50 2 63.00
BV-3 ENTRE EJES H y 9-10 1 2.35 0.25 0.50 0.29 1 2.35 0.85 2.00 5/8" 4 3.40 1 13.60
Estribos 3/8" 22 1.70 1 37.40
BV-2 ENTRE EJES H-E4 y 2-3 1 3.65 0.25 0.20 0.18 1 3.65 0.25 0.91 1/2" 4 4.65 1 18.60
Estribos 3/8" 25 1.10 1 27.50
BV-3 ENTRE EJES H-E4 y 3-4 1 2.20 0.25 0.50 0.28 1 2.20 0.85 1.87 5/8" 4 3.10 1 12.40
Estribos 3/8" 22 1.70 1 37.40
BV-2 ENTRE EJES H-E4 y 4-5 1 3.50 0.25 0.20 0.18 1 3.50 0.25 0.88 1/2" 4 4.50 1 18.00
Estribos 3/8" 25 1.10 1 27.50
BV-2 ENTRE EJES H-E4 y 6-7 1 3.50 0.25 0.20 0.18 1 3.50 0.25 0.88 1/2" 4 4.50 1 18.00

Página 42 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
Estribos 3/8" 25 1.10 1 27.50
BV-3 ENTRE EJES H-E4 y 7-9 1 2.20 0.25 0.50 0.28 1 2.20 0.85 1.87 5/8" 4 7.30 1 29.20
1 3.80 0.25 0.50 0.48 1 3.80 0.85 3.23 Estribos 3/8" 22 1.70 1 37.40
Estribos 3/8" 28 1.70 1 47.60
BV-2 ENTRE EJES H-E4 y 6-7 1 3.65 0.25 0.20 0.18 1 3.65 0.25 0.91 1/2" 4 4.50 1 18.00
Estribos 3/8" 25 1.10 1 27.50
BV-3 ENTRE EJES H-E4 y 7-8 1 2.20 0.25 0.50 0.28 1 2.20 0.85 1.87 5/8" 4 3.10 1 12.40
Estribos 3/8" 22 1.70 1 37.40
BV-3 ENTRE EJES E4 y 3-5 1 2.20 0.25 0.50 0.28 1 2.20 0.85 1.87 5/8" 4 5.25 1 21.00
1 1.60 0.25 0.50 0.20 1 1.60 0.85 1.36 Estribos 3/8" 22 1.70 1 37.40
Estribos 3/8" 19 1.70 1 32.30
BV-2 ENTRE EJES E4 y 3-5 1 1.65 0.25 0.20 0.08 1 1.65 0.25 0.41 1/2" 4 2.50 1 10.00
Estribos 3/8" 17 1.10 1 18.70
BV-2 ENTRE EJES G-E3 y 6-7 1 3.65 0.25 0.20 0.18 1 3.65 0.25 0.91 1/2" 4 4.50 1 18.00
Estribos 3/8" 25 1.10 1 27.50
BV-3 ENTRE EJES G-E3 y 7-8 1 2.20 0.25 0.50 0.28 1 2.20 0.85 1.87 5/8" 4 3.10 1 12.40
Estribos 3/8" 22 1.70 1 37.40
BV-1 ENTRE EJES E3 y 3-5 1 4.20 0.25 0.50 0.53 1 4.20 0.85 3.57 5/8" 4 7.85 1 31.40
1 1.65 0.25 0.50 0.21 1 1.65 0.85 1.40 1/2" 1 3.10 1 3.10
Estribos 3/8" 32 1.70 1 54.40
Estribos 3/8" 20 1.70 1 34.00
BV-3 ENTRE EJES E2 y 6-8 1 2.50 0.25 0.50 0.31 1 2.50 0.85 2.13 5/8" 4 7.10 1 28.40
1 1.30 0.25 0.50 0.16 1 1.30 0.85 1.11 Estribos 3/8" 23 1.70 1 39.10
Estribos 3/8" 18 1.70 1 30.60

SEGUNDO PISO
B 2V-6 EN EJE 2 ENTRE EJES I y E6 3 3.80 0.25 0.50 1.43 3 3.80 0.85 9.69 5/8" 2 10.30 1 20.60
1 3.90 0.25 0.50 0.49 1 3.90 0.85 3.32 5/8" 2 2.70 3 16.20
5/8" 2 4.70 1 9.40
5/8" 2 7.40 1 14.80
5/8" 2 8.50 1 17.00
5/8" 2 6.20 1 12.40
5/8" 1 4.25 1 4.25
Estribos 3/8" 30 1.70 3 153.00
Estribos 3/8" 30 1.70 1 51.00
B 2V-7 EN EJE 2 ENTRE EJES I y E4 1 2.70 0.20 0.50 0.27 1 2.70 0.80 2.16 5/8" 2 8.45 2 33.80
1 4.25 0.25 0.50 0.53 1 4.25 0.85 3.61 5/8" 1 2.25 1 2.25
Estribos 3/8" 25 1.60 1 40.00
Estribos 3/8" 32 1.70 1 54.40
B 2V-8 EN EJE 3 ENTRE EJES L y E6 1 4.67 0.25 0.50 0.58 1 4.67 0.85 3.97 5/8" 2 6.22 2 24.88
5/8" 1 3.67 1 3.67
Estribos 3/8" 33 1.70 1 56.10
BV-2 EN EJE 3 ENTRE EJES E5 y J 1 3.90 0.25 0.20 0.20 1 3.90 0.25 0.98 1/2" 4 7.75 1 31.00
1 2.75 0.25 0.20 0.14 1 2.75 0.25 0.69 Estribos 3/8" 26 1.10 1 28.60
Estribos 3/8" 22 1.10 1 24.20
B2V-1 EN EJE 3 ENTRE EJES I y J 1 0.90 0.25 0.50 0.11 1 0.90 0.85 0.77 5/8" 6 3.05 1 18.30
1 1.00 0.25 0.50 0.13 1 1.00 0.85 0.85 Estribos 3/8" 17 1.70 1 28.90
Estribos 3/8" 17 1.70 1 28.90
BV-2 EN EJE 3 ENTRE EJES J y H 1 2.75 0.25 0.20 0.14 1 2.75 0.25 0.69 1/2" 4 3.45 1 13.80
1 1.65 0.25 0.20 0.08 1 1.65 0.25 0.41 Estribos 3/8" 22 1.10 1 24.20
1/2" 4 2.30 1 9.20
Estribos 3/8" 17 1.10 1 18.70
B2V-1 EN EJE 3 ENTRE EJES H y E4 1 1.00 0.25 0.50 0.13 1 1.00 0.85 0.85 5/8" 4 3.15 1 12.60
1 1.00 0.25 0.50 0.13 1 1.00 0.85 0.85 Estribos 3/8" 17 1.70 1 28.90
Estribos 3/8" 17 1.70 1 28.90
BV-2 EN EJE 3 ENTRE EJES H y E4 1 3.15 0.25 0.20 0.16 1 3.15 0.25 0.79 1/2" 4 3.85 1 15.40
Estribos 3/8" 23 1.10 1 25.30
BV-3 EN EJE 3 ENTRE EJES E4 y E3 1 2.60 0.25 0.50 0.33 1 2.60 0.85 2.21 5/8" 4 3.65 1 14.60
Estribos 3/8" 23 1.70 1 39.10

Página 43 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
B 2V-9 EN EJE 4 ENTRE EJES E5 y E6 1 4.87 0.25 0.50 0.61 1 4.87 0.85 4.14 5/8" 6 8.85 1 53.10
1 2.25 0.25 0.50 0.28 1 2.25 0.85 1.91 Estribos 3/8" 31 1.70 1 52.70
Estribos 3/8" 21 1.70 1 35.70
BV-2 EN EJE 4 ENTRE EJES E5 y J 1 2.50 0.25 0.20 0.13 1 2.50 0.25 0.63 1/2" 4 3.40 1 13.60
Estribos 3/8" 21 1.10 1 23.10
B2V-1 (a) EN EJE 4 ENTRE EJES J y H 1 1.70 0.25 0.50 0.21 1 1.70 0.85 1.45 5/8" 4 15.35 1 61.40
1 0.90 0.25 0.50 0.11 1 0.90 0.85 0.77 Estribos 3/8" 20 1.70 1 34.00
1 2.50 0.25 0.50 0.31 1 2.50 0.85 2.13 Estribos 3/8" 16 1.70 1 27.20
1 1.10 0.25 0.50 0.14 1 1.10 0.85 0.94 Estribos 3/8" 23 1.70 1 39.10
1 4.50 0.25 0.50 0.56 1 4.50 0.85 3.83 Estribos 3/8" 17 1.70 1 28.90
1 1.50 0.25 0.50 0.19 1 1.50 0.85 1.28 Estribos 3/8" 31 1.70 1 52.70
Estribos 3/8" 19 1.70 1 32.30
B2V-2 EN EJE 4 ENTRE EJES H y E4 1 1.40 0.25 0.20 0.07 1 1.40 0.25 0.35 1/2" 4 2.30 1 9.20
Estribos 3/8" 16 1.10 1 17.60
B2V-1 EN EJE 4 ENTRE EJES H y E4 1 1.00 0.25 0.50 0.13 1 1.00 0.85 0.85 5/8" 6 3.15 1 18.90
1 1.00 0.25 0.50 0.13 1 1.00 0.85 0.85 Estribos 3/8" 16 1.70 1 27.20
Estribos 3/8" 16 1.70 1 27.20
B2V-2 EN EJE 4 ENTRE EJES H y E4 1 3.15 0.25 0.20 0.16 1 3.15 0.25 0.79 1/2" 4 4.05 1 16.20
Estribos 3/8" 23 1.10 1 25.30
VCH-1 EN EJE 4 ENTRE EJES E4 y E3 2 2.75 0.25 0.20 0.28 2 2.75 0.25 1.38 1/2" 4 3.65 2 29.20
Estribos 3/8" 22 1.10 2 48.40
B 2V-10 EN EJE 5 ENTRE EJES E6 y E3 1 5.30 0.25 0.50 0.66 1 5.30 0.85 4.51 5/8" 6 38.20 1 229.20
1 5.00 0.25 0.50 0.63 1 5.00 0.85 4.25 Estribos 3/8" 33 1.70 1 56.10
1 2.85 0.25 0.50 0.36 1 2.85 0.85 2.42 Estribos 3/8" 32 1.70 1 54.40
1 2.50 0.25 0.50 0.31 1 2.50 0.85 2.13 Estribos 3/8" 23 1.70 1 39.10
1 4.40 0.25 0.50 0.55 1 4.40 0.85 3.74 Estribos 3/8" 22 1.70 1 37.40
1 1.50 0.25 0.50 0.19 1 1.50 0.85 1.28 Estribos 3/8" 29 1.70 1 49.30
1 2.65 0.25 0.50 0.33 1 2.65 0.85 2.25 Estribos 3/8" 18 1.70 1 30.60
1 2.65 0.25 0.50 0.33 1 2.65 0.85 2.25 Estribos 3/8" 22 1.70 1 37.40
1 2.60 0.25 0.50 0.33 1 2.60 0.85 2.21 Estribos 3/8" 22 1.70 1 37.40
B 2V-11 EN EJE 5 ENTRE EJES E6 y J 1 5.20 0.25 0.50 0.65 1 5.20 0.85 4.42 5/8" 6 11.50 1 69.00
1 2.25 0.25 0.50 0.28 1 2.25 0.85 1.91 Estribos 3/8" 32 1.70 1 54.40
Estribos 3/8" 21 1.70 1 35.70
B 2V-12 EN EJE 6 ENTRE EJES E6 y J 1 5.40 0.25 0.50 0.68 1 5.40 0.85 4.59 5/8" 7 11.50 1 80.50
1 2.25 0.25 0.50 0.28 1 2.25 0.85 1.91 Estribos 3/8" 33 1.70 1 56.10
Estribos 3/8" 21 1.70 1 35.70
B 2V-13 EN EJE 6 ENTRE EJES J y E2 1 1.70 0.25 0.50 0.21 1 1.70 0.85 1.45 5/8" 5 29.15 1 145.75
1 3.20 0.25 0.50 0.40 1 3.20 0.85 2.72 Estribos 3/8" 18 1.70 1 30.60
1 2.13 0.25 0.50 0.27 1 2.13 0.85 1.81 Estribos 3/8" 24 1.70 1 40.80
1 2.78 0.25 0.50 0.35 1 2.78 0.85 2.36 Estribos 3/8" 20 1.70 1 34.00
1 1.50 0.25 0.50 0.19 1 1.50 0.85 1.28 Estribos 3/8" 23 1.70 1 39.10
1 2.75 0.25 0.50 0.34 1 2.75 0.85 2.34 Estribos 3/8" 18 1.70 1 30.60
1 1.93 0.25 0.50 0.24 1 1.93 0.85 1.64 Estribos 3/8" 23 1.70 1 39.10
1 2.03 0.25 0.50 0.25 1 2.03 0.85 1.72 Estribos 3/8" 19 1.70 1 32.30
1 2.75 0.25 0.50 0.34 1 2.75 0.85 2.34 Estribos 3/8" 20 1.70 1 34.00
Estribos 3/8" 23 1.70 1 39.10
B 2V-14 EN EJE 7 ENTRE EJES E6 y J 1 5.70 0.25 0.50 0.71 1 5.70 0.85 4.85 5/8" 7 12.35 1 86.45
1 4.55 0.25 0.50 0.57 1 4.55 0.85 3.87 Estribos 3/8" 34 1.70 1 57.80
Estribos 3/8" 30 1.70 1 51.00
B2V-1 EN EJE 7 ENTRE EJES J y I 1 1.70 0.25 0.50 0.21 1 1.70 0.85 1.45 5/8" 6 3.15 1 18.90
1 1.00 0.25 0.50 0.13 1 1.00 0.85 0.85 Estribos 3/8" 18 1.70 1 30.60
Estribos 3/8" 16 1.70 1 27.20
B2V-2 EN EJE 7 ENTRE EJES J y I 1 1.00 0.25 0.20 0.05 1 1.00 0.25 0.25 1/2" 4 4.85 1 19.40
1 1.00 0.25 0.20 0.05 1 1.00 0.25 0.25 Estribos 3/8" 15 1.10 1 16.50
Estribos 3/8" 15 1.10 1 16.50
B2V-1 EN EJE 7 ENTRE EJES I y H 1 1.00 0.25 0.50 0.13 1 1.00 0.85 0.85 5/8" 6 3.15 1 18.90
1 1.00 0.25 0.50 0.13 1 1.00 0.85 0.85 Estribos 3/8" 16 1.70 1 27.20
Estribos 3/8" 16 1.70 1 27.20
B 2V-14 EN EJE 7 ENTRE EJES H y E4 1 1.50 0.25 0.50 0.19 1 1.50 0.85 1.28 5/8" 7 8.15 1 57.05

Página 44 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
1 2.75 0.25 0.50 0.34 1 2.75 0.85 2.34 Estribos 3/8" 18 1.70 1 30.60
1 1.55 0.25 0.50 0.19 1 1.55 0.85 1.32 Estribos 3/8" 23 1.70 1 39.10
Estribos 3/8" 18 1.70 1 30.60
B2V-1 (a) EN EJE 7 ENTRE EJES E4 y E3 1 1.00 0.25 0.50 0.13 1 1.00 0.85 0.85 5/8" 4 5.45 1 21.80
1 2.75 0.25 0.50 0.34 1 2.75 0.85 2.34 Estribos 3/8" 17 1.70 1 28.90
Estribos 3/8" 24 1.70 1 40.80
VCH-1 EN EJE 7 ENTRE EJES E3 y E2 1 2.75 0.25 0.20 0.14 1 2.75 0.25 0.69 1/2" 4 3.65 1 14.60
Estribos 3/8" 22 1.10 1 24.20
B 2V-14 EN EJE 8 ENTRE EJES E6 y E5 1 5.85 0.25 0.50 0.73 1 5.85 0.85 4.97 5/8" 7 7.65 1 53.55
Estribos 3/8" 35 1.70 1 59.50
B2V-1 EN EJE 8 ENTRE EJES E5 y J 1 2.15 0.25 0.50 0.27 1 2.15 0.85 1.83 5/8" 6 3.15 1 18.90
Estribos 3/8" 20 1.70 1 34.00
B 2V-14 EN EJE 8 ENTRE EJES E5 y J 1 2.60 0.25 0.50 0.33 1 2.60 0.85 2.21 5/8" 7 3.70 1 25.90
Estribos 3/8" 22 1.70 1 37.40
B2V-2 EN EJE 8 ENTRE EJES J y I 1 1.65 0.25 0.20 0.08 1 1.65 0.25 0.41 1/2" 4 2.55 1 10.20
Estribos 3/8" 17 1.10 1 18.70
B2V-1 EN EJE 8 ENTRE EJES J y I 1 1.00 0.25 0.50 0.13 1 1.00 0.85 0.85 5/8" 6 3.15 1 18.90
1 1.00 0.25 0.50 0.13 1 1.00 0.85 0.85 Estribos 3/8" 16 1.70 1 27.20
Estribos 3/8" 16 1.70 1 27.20
B2V-2 EN EJE 8 ENTRE EJES J y I 1 1.75 0.25 0.20 0.09 1 1.75 0.25 0.44 1/2" 4 2.65 1 10.60
Estribos 3/8" 18 1.10 1 19.80
B2V-1 EN EJE 8 ENTRE EJES I y H 1 1.00 0.25 0.50 0.13 1 1.00 0.85 0.85 5/8" 6 1.80 1 10.80
Estribos 3/8" 16 1.70 1 27.20
B2V-1 EN EJE 8 ENTRE EJES H y E4 1 1.50 0.25 0.50 0.19 1 1.50 0.85 1.28 5/8" 6 4.30 1 25.80
1 1.35 0.25 0.50 0.17 1 1.35 0.85 1.15 Estribos 3/8" 18 1.70 1 30.60
1 1.00 0.25 0.50 0.13 1 1.00 0.85 0.85 Estribos 3/8" 17 1.70 1 28.90
1 2.90 0.25 0.50 0.36 1 2.90 0.85 2.47 Estribos 3/8" 16 1.70 1 27.20
Estribos 3/8" 23 1.70 1 39.10
B2V-1 (a) EN EJE 8 ENTRE EJES E4 y E3 1 1.00 0.25 0.50 0.13 1 1.00 0.85 0.85 5/8" 4 4.10 1 16.40
1 1.25 0.25 0.50 0.16 1 1.25 0.85 1.06 Estribos 3/8" 17 1.70 1 28.90
Estribos 3/8" 18 1.70 1 30.60
B2V-2 EN EJE 8 ENTRE EJES E3 y E1 1 2.60 0.25 0.20 0.13 1 2.60 0.25 0.65 1/2" 4 5.30 1 21.20
1 1.10 0.25 0.20 0.06 1 1.10 0.25 0.28 Estribos 3/8" 21 1.10 1 23.10
Estribos 3/8" 15 1.10 1 16.50
B2V-15 EN EJE 9 ENTRE EJES E6 y E5 1 6.27 0.25 0.50 0.78 1 6.27 0.85 5.33 5/8" 7 7.30 1 51.10
Estribos 3/8" 37 1.70 1 62.90
B2V-1 EN EJE 9 ENTRE EJES E5 y J 1 2.10 0.25 0.50 0.26 1 2.10 0.85 1.79 5/8" 6 3.15 1 18.90
Estribos 3/8" 20 1.70 1 34.00
B2V-16 EN EJE 9 ENTRE EJES E5 y J 1 1.55 0.25 0.50 0.19 1 1.55 0.85 1.32 5/8" 4 2.45 1 9.80
Estribos 3/8" 19 1.70 1 32.30
B2V-1 EN EJE 9 ENTRE EJES E5 y I 1 2.60 0.25 0.50 0.33 1 2.60 0.85 2.21 5/8" 6 12.50 1 75.00
1 2.90 0.25 0.50 0.36 1 2.90 0.85 2.47 Estribos 3/8" 22 1.70 1 37.40
1 3.00 0.25 0.50 0.38 1 3.00 0.85 2.55 Estribos 3/8" 23 1.70 1 39.10
1 1.80 0.25 0.50 0.23 1 1.80 0.85 1.53 Estribos 3/8" 24 1.70 1 40.80
Estribos 3/8" 19 1.70 1 32.30
B2V-16 EN EJE 9 ENTRE EJES I y H 1 1.50 0.25 0.50 0.19 1 1.50 0.85 1.28 5/8" 4 2.55 1 10.20
Estribos 3/8" 19 1.70 1 32.30
B2V-1 EN EJE 9 ENTRE EJES I y H 1 2.75 0.25 0.50 0.34 1 2.75 0.85 2.34 5/8" 6 3.80 1 22.80
Estribos 3/8" 23 1.70 1 39.10
B2V-16 EN EJE 9 ENTRE EJES H y E4 1 3.05 0.25 0.50 0.38 1 3.05 0.85 2.59 5/8" 4 4.00 1 16.00
Estribos 3/8" 25 1.70 1 42.50
B2V-1 EN EJE 9 ENTRE EJES E4 y E1 1 4.15 0.25 0.50 0.52 1 4.15 0.85 3.53 5/8" 6 5.00 1 30.00
Estribos 3/8" 28 1.70 1 47.60
B2V-1 EN EJE 10 ENTRE EJES E6 y E5 1 6.50 0.25 0.50 0.81 1 6.50 0.85 5.53 5/8" 6 7.55 1 45.30
Estribos 3/8" 38 1.70 1 64.60
B2V-17 EN EJE 10 ENTRE EJES E5 y J 1 4.85 0.25 0.50 0.61 1 4.85 0.85 4.12 5/8" 5 5.60 1 28.00
Estribos 3/8" 36 1.70 1 61.20
B2V-1 EN EJE E6 ENTRE EJES 2 y 5 1 3.85 0.25 0.50 0.48 1 3.85 0.85 3.27 5/8" 6 10.50 1 63.00
1 2.20 0.25 0.50 0.28 1 2.20 0.85 1.87 Estribos 3/8" 27 1.70 1 45.90

Página 45 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
1 2.45 0.25 0.50 0.31 1 2.45 0.85 2.08 Estribos 3/8" 20 1.70 1 34.00
Estribos 3/8" 21 1.70 1 35.70
B2V-1 EN EJE E6 ENTRE EJES 5 y 9 1 2.00 0.25 0.50 0.25 1 2.00 0.85 1.70 5/8" 6 12.30 1 73.80
1 3.60 0.25 0.50 0.45 1 3.60 0.85 3.06 Estribos 3/8" 20 1.70 1 34.00
1 2.20 0.25 0.50 0.28 1 2.20 0.85 1.87 Estribos 3/8" 26 1.70 1 44.20
1 2.25 0.25 0.50 0.28 1 2.25 0.85 1.91 Estribos 3/8" 20 1.70 1 34.00
Estribos 3/8" 21 1.70 1 35.70
B2V-1a EN EJE E5 ENTRE EJES 2 y 5 1 3.90 0.25 0.50 0.49 1 3.90 0.85 3.32 5/8" 4 11.75 1 47.00
1 2.20 0.25 0.50 0.28 1 2.20 0.85 1.87 Estribos 3/8" 28 1.70 1 47.60
1 3.60 0.25 0.50 0.45 1 3.60 0.85 3.06 Estribos 3/8" 22 1.70 1 37.40
Estribos 3/8" 27 1.70 1 45.90
B2V-1a EN EJE E5 ENTRE EJES 5 y 10 1 2.00 0.25 0.50 0.25 1 2.00 0.85 1.70 5/8" 4 16.90 1 67.60
1 3.60 0.25 0.50 0.45 1 3.60 0.85 3.06 Estribos 3/8" 21 1.70 1 35.70
1 2.20 0.25 0.50 0.28 1 2.20 0.85 1.87 Estribos 3/8" 27 1.70 1 45.90
1 3.65 0.25 0.50 0.46 1 3.65 0.85 3.10 Estribos 3/8" 22 1.70 1 37.40
1 2.65 0.25 0.50 0.33 1 2.65 0.85 2.25 Estribos 3/8" 27 1.70 1 45.90
Estribos 3/8" 23 1.70 1 39.10
B2V-1a ENTRE EJES K.J y 5-6 1 2.15 0.25 0.50 0.27 1 2.15 0.85 1.83 5/8" 4 3.00 1 12.00
Estribos 3/8" 21 1.70 1 35.70
VCH-1 ENTRE EJES K-J y 5-6 1 3.95 0.25 0.20 0.20 1 3.95 0.25 0.99 1/2" 6 4.65 1 27.90
Estribos 3/8" 27 1.10 1 29.70
VCH-1 ENTRE EJES K-J y 3-4 2 2.20 0.25 0.20 0.22 2 2.20 0.25 1.10 1/2" 6 2.90 2 34.80
Estribos 3/8" 20 1.10 2 44.00
B2V-1 ENTRE EJES K-J y 5-6 1 1.00 0.25 0.50 0.13 1 1.00 0.85 0.85 5/8" 6 1.90 1 11.40
Estribos 3/8" 16 1.70 1 27.20
B2V-1a ENTRE EJES K-J y 6-8 1 3.35 0.25 0.50 0.42 1 3.35 0.85 2.85 5/8" 4 7.70 1 30.80
1 2.20 0.25 0.50 0.28 1 2.20 0.85 1.87 Estribos 3/8" 26 1.70 1 44.20
Estribos 3/8" 22 1.70 1 37.40
B2V-2 ENTRE EJES K-J y 8-9 1 3.80 0.25 0.20 0.19 1 3.80 0.25 0.95 1/2" 4 4.85 1 19.40
Estribos 3/8" 26 1.10 1 28.60
B2V-2 EN EJE J ENTRE EJES 6 y 7 1 3.50 0.25 0.20 0.18 1 3.50 0.25 0.88 1/2" 4 4.70 1 18.80
Estribos 3/8" 25 1.10 1 27.50
B2V-1a ENTRE EJES K-J y 7-8 1 2.20 0.25 0.50 0.28 1 2.20 0.85 1.87 5/8" 4 3.10 1 12.40
Estribos 3/8" 22 1.70 1 37.40
B2V-2 EN EJE J ENTRE EJES 8 y 9 1 3.65 0.25 0.20 0.18 1 3.65 0.25 0.91 1/2" 4 4.85 1 19.40
Estribos 3/8" 25 1.10 1 27.50
B2V-1a ENTRE EJES J-I y 3-4 1 1.35 0.25 0.50 0.17 1 1.35 0.85 1.15 5/8" 4 2.40 1 9.60
Estribos 3/8" 18 1.70 1 30.60
B2V-2 ENTRE EJES J-I y 3-4 1 2.05 0.25 0.20 0.10 1 2.05 0.25 0.51 1/2" 4 3.10 1 12.40
Estribos 3/8" 19 1.10 1 20.90
B2V-1a ENTRE EJES J-I y 3-5 1 2.20 0.25 0.50 0.28 1 2.20 0.85 1.87 5/8" 4 7.30 1 29.20
1 3.50 0.25 0.50 0.44 1 3.50 0.85 2.98 Estribos 3/8" 22 1.70 1 37.40
Estribos 3/8" 27 1.70 1 45.90
B2V-2 ENTRE EJES J-I y 6-7 1 3.50 0.25 0.20 0.18 1 3.50 0.25 0.88 1/2" 4 4.70 1 18.80
Estribos 3/8" 25 1.10 1 27.50
B2V-1a ENTRE EJES J-I y 7-8 1 2.20 0.25 0.50 0.28 1 2.20 0.85 1.87 5/8" 4 3.10 1 12.40
Estribos 3/8" 22 1.70 1 37.40
B2V-2 ENTRE EJES J-I y 8-9 1 3.65 0.25 0.20 0.18 1 3.65 0.25 0.91 1/2" 4 4.85 1 19.40
Estribos 3/8" 25 1.10 1 27.50
B2V-2 ENTRE EJES J-I y 4-5 1 3.50 0.25 0.20 0.18 1 3.50 0.25 0.88 1/2" 4 4.70 1 18.80
Estribos 3/8" 25 1.10 1 27.50
B2V-2 ENTRE EJES J-I y 2-3 1 4.00 0.25 0.20 0.20 1 4.00 0.25 1.00 1/2" 4 8.00 1 32.00
1 2.20 0.25 0.20 0.11 1 2.20 0.25 0.55 Estribos 3/8" 27 1.10 1 29.70
Estribos 3/8" 20 1.10 1 22.00
VCH-1 ENTRE EJES J-I y 2-3 1 3.80 0.25 0.20 0.19 1 3.80 0.25 0.95 1/2" 6 4.50 1 27.00
Estribos 3/8" 26 1.10 1 28.60
B2V-2 EN EJE I, ENTRE EJES 6 y 7 1 3.65 0.25 0.20 0.18 1 3.65 0.25 0.91 1/2" 4 4.70 1 18.80
Estribos 3/8" 25 1.10 1 27.50
B2V-1a EN EJE I, ENTRE EJES 6 y 7 1 2.20 0.25 0.50 0.28 1 2.20 0.85 1.87 5/8" 4 3.10 1 12.40

Página 46 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
Estribos 3/8" 22 1.70 1 37.40
B2V-1 ENTRE EJES I-H y 9-10 1 2.35 0.25 0.50 0.29 1 2.35 0.85 2.00 5/8" 6 3.40 1 20.40
Estribos 3/8" 21 1.70 1 35.70
VCH-E ENTRE EJES H-I y 2-3 1 4.00 0.40 0.20 0.32 1 4.00 0.40 1.60 1/2" 6 4.70 1 28.20
Estribos 3/8" 29 1.40 1 40.60
B2V-5 ENTRE EJES H-I y 3-4 1 2.20 0.40 0.20 0.18 1 2.20 0.40 0.88 5/8" 5 2.90 1 14.50
Estribos 3/8" 20 1.40 1 28.00
B2V-4 ENTRE EJES H-I y 4-5 1 3.80 0.15 0.50 0.29 1 3.80 0.75 2.85 5/8" 4 4.70 1 18.80
Estribos 3/8" 27 1.50 1 40.50
B2V-1aENTRE EJES H-I y 5-6 1 1.98 0.25 0.50 0.25 1 1.98 0.85 1.68 5/8" 4 3.05 1 12.20
Estribos 3/8" 21 1.70 1 35.70
B2V-4 ENTRE EJES H-I y 6-7 1 3.80 0.15 0.50 0.29 1 3.80 0.75 2.85 5/8" 4 4.70 1 18.80
Estribos 3/8" 27 1.50 1 40.50
B2V-1aENTRE EJES H-I y 7-8 1 2.20 0.25 0.50 0.28 1 2.20 0.85 1.87 5/8" 4 3.10 1 12.40
Estribos 3/8" 22 1.70 1 37.40
B2V-4 ENTRE EJES H-I y 8-9 1 3.95 0.15 0.50 0.30 1 3.95 0.75 2.96 5/8" 4 4.85 1 19.40
Estribos 3/8" 28 1.50 1 42.00
VCH-1 ENTRE EJES H-I y 9-10 1 2.50 0.25 0.20 0.13 1 2.50 0.25 0.63 1/2" 6 3.20 1 19.20
Estribos 3/8" 21 1.10 1 23.10
B2V-2 ENTRE EJES H-I y 2-3 1 4.00 0.25 0.20 0.20 1 4.00 0.25 1.00 1/2" 4 4.90 1 19.60
Estribos 3/8" 27 1.10 1 29.70
B2V-3 ENTRE EJES H-I y 3-4 1 2.20 0.15 0.50 0.17 1 2.20 0.75 1.65 5/8" 4 3.10 1 12.40
Estribos 3/8" 19 1.50 1 28.50
B2V-4 ENTRE EJES H-I y 4-5 1 3.80 0.15 0.50 0.29 1 3.80 0.75 2.85 5/8" 4 4.70 1 18.80
Estribos 3/8" 27 1.50 1 40.50
B2V-1aENTRE EJES H-I y 5-6 1 1.98 0.25 0.50 0.25 1 1.98 0.85 1.68 5/8" 4 3.05 1 12.20
Estribos 3/8" 21 1.70 1 35.70
B2V-4 ENTRE EJES H-I y 6-7 1 3.80 0.15 0.50 0.29 1 3.80 0.75 2.85 5/8" 4 4.70 1 18.80
Estribos 3/8" 27 1.50 1 40.50
B2V-1aENTRE EJES H-I y 7-8 1 2.20 0.25 0.50 0.28 1 2.20 0.85 1.87 5/8" 4 3.10 1 12.40
Estribos 3/8" 22 1.70 1 37.40
B2V-4 ENTRE EJES H-I y 8-9 1 3.95 0.15 0.50 0.30 1 3.95 0.75 2.96 5/8" 4 4.85 1 19.40
Estribos 3/8" 28 1.50 1 42.00
B2V-1 ENTRE EJES I-H y 9-10 1 2.35 0.25 0.50 0.29 1 2.35 0.85 2.00 5/8" 6 3.40 1 20.40
Estribos 3/8" 21 1.70 1 35.70
B2V-2 ENTRE EJES H-E4 y 2-3 1 3.65 0.25 0.20 0.18 1 3.65 0.25 0.91 1/2" 4 4.85 1 19.40
Estribos 3/8" 25 1.10 1 27.50
B2V-1 ENTRE EJES H-E4 y 3-4 1 2.20 0.25 0.50 0.28 1 2.20 0.85 1.87 5/8" 6 3.10 1 18.60
Estribos 3/8" 20 1.70 1 34.00
B2V-2 ENTRE EJES H-E4 y 4-5 1 3.50 0.25 0.20 0.18 1 3.50 0.25 0.88 1/2" 4 4.70 1 18.80
Estribos 3/8" 25 1.10 1 27.50
B2V-2 ENTRE EJES H-E4 y 6-7 2 3.50 0.25 0.20 0.35 2 3.50 0.25 1.75 1/2" 4 4.70 2 37.60
Estribos 3/8" 25 1.10 2 55.00
B2V-1 ENTRE EJES H-E4 y 7-8 1 2.20 0.25 0.50 0.28 1 2.20 0.85 1.87 5/8" 6 3.10 1 18.60
Estribos 3/8" 20 1.70 1 34.00
B2V-2 ENTRE EJES H-E4 y 8-9 1 3.80 0.25 0.20 0.19 1 3.80 0.25 0.95 1/2" 4 4.85 1 19.40
Estribos 3/8" 26 1.10 1 28.60
BV-3ENTRE EJES H-E4 y 7-8 1 2.20 0.25 0.50 0.28 1 2.20 0.85 1.87 5/8" 4 3.10 1 12.40
Estribos 3/8" 22 1.70 1 37.40
B2V-1a EN EJE E4 ENTRE EJES 3-5 1 2.20 0.25 0.50 0.28 1 2.20 0.85 1.87 5/8" 4 5.25 1 21.00
1 1.60 0.25 0.50 0.20 1 1.60 0.85 1.36 Estribos 3/8" 22 1.70 1 37.40
Estribos 3/8" 19 1.70 1 32.30
B2V-2 EN EJE E4 ENTRE EJES 4-5 1 1.65 0.25 0.20 0.08 1 1.65 0.25 0.41 1/2" 4 2.70 1 10.80
Estribos 3/8" 17 1.10 1 18.70
B2V-2 ENTRE EJES E4-E3 y 6-7 1 3.65 0.25 0.20 0.18 1 3.65 0.25 0.91 1/2" 4 4.70 1 18.80
Estribos 3/8" 25 1.10 1 27.50
B2V-1a ENTRE EJES E4-E3 y 7-8 1 2.20 0.25 0.50 0.28 1 2.20 0.85 1.87 5/8" 4 3.10 1 12.40
Estribos 3/8" 22 1.70 1 37.40
B2V-1 EN EJE E3 ENTRE EJES 3-5 1 4.20 0.25 0.50 0.53 1 4.20 0.85 3.57 5/8" 6 7.85 1 47.10

Página 47 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
1 1.65 0.25 0.50 0.21 1 1.65 0.85 1.40 Estribos 3/8" 28 1.70 1 47.60
Estribos 3/8" 18 1.70 1 30.60
VCH-2 EN EJE E3 ENTRE EJES 8-9 1 3.95 0.40 0.20 0.32 1 3.95 0.40 1.58 1/2" 6 4.65 1 27.90
Estribos 3/8" 29 1.40 1 40.60
B2V-1 EN EJE E2 ENTRE EJES 6-8 1 4.20 0.25 0.50 0.53 1 4.20 0.85 3.57 5/8" 6 6.85 1 41.10
Estribos 3/8" 28 1.70 1 47.60

SECTOR C1
SOTANO
VS-01 EN EJE O ENTRE EJES 15 y 17 1 6.25 0.30 0.65 1.22 1 6.25 1.10 6.88 3/4" 2 4.45 1 8.90
1 6.50 0.30 0.65 1.27 1 6.50 1.10 7.15 3/4" 2 7.70 1 15.40
3/4" 2 3.70 1 7.40
3/4" 2 4.60 1 9.20
3/4" 2 8.85 1 17.70
3/4" 2 5.80 1 11.60
5/8" 1 4.65 1 4.65
5/8" 1 5.30 1 5.30
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 2.10 1 75.60
VS-02 EN EJE Q ENTRE EJES 12 y 17 1 6.90 0.30 0.65 1.35 1 6.90 1.10 7.59 3/4" 2 6.90 1 13.80
1 6.25 0.30 0.65 1.22 1 6.25 1.10 6.88 3/4" 2 3.10 1 6.20
1 6.50 0.30 0.65 1.27 1 6.50 1.10 7.15 3/4" 2 5.85 1 11.70
3/4" 2 7.70 1 15.40
3/4" 2 3.75 1 7.50
3/4" 2 4.55 1 9.10
3/4" 2 7.30 1 14.60
5/8" 1 7.30 1 7.30
3/4" 2 7.35 1 14.70
5/8" 1 4.05 1 4.05
3/4" 2 9.10 1 18.20
5/8" 2 4.90 1 9.80
Estribos 3/8" 23 2.10 1 48.30
Estribos 3/8" 8 2.10 1 16.80
Estribos 3/8" 23 2.10 1 48.30
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 0.20 1 7.20
VS-03 EN EJE R ENTRE EJES 12 y 17 2 6.90 0.30 0.65 2.69 2 6.90 1.10 15.18 3/4" 2 4.85 2 19.40
VS-03 EN EJE S ENTRE EJES 12 y 17 2 6.35 0.30 0.65 2.48 2 6.35 1.10 13.97 3/4" 1 2.50 2 5.00
3/4" 2 7.45 2 29.80
3/4" 2 3.75 2 15.00
3/4" 2 4.00 2 16.00
3/4" 1 2.40 2 4.80
3/4" 2 7.30 2 29.20
3/4" 1 5.10 2 10.20
3/4" 2 8.65 2 34.60
5/8" 1 4.35 2 8.70
Estribos 3/8" 37 2.10 2 155.40
Estribos 3/8" 35 2.10 2 147.00
VS-04 EN EJE U ENTRE EJES 12 y 17 1 6.90 0.30 0.65 1.35 1 6.90 1.10 7.59 3/4" 2 4.85 1 9.70
1 6.05 0.30 0.65 1.18 1 6.05 1.10 6.66 3/4" 1 2.50 1 2.50
1 3.60 0.30 0.65 0.70 1 3.60 1.10 3.96 3/4" 2 7.45 1 14.90
3/4" 2 3.75 1 7.50
3/4" 2 4.00 1 8.00
3/4" 1 2.40 1 2.40
3/4" 2 7.30 1 14.60
3/4" 1 5.10 1 5.10
3/4" 2 8.65 1 17.30
5/8" 1 4.35 1 4.35
Estribos 3/8" 37 2.10 1 77.70

Página 48 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
Estribos 3/8" 34 2.10 1 71.40
VS-05 EN EJE 15 ENTRE EJES Q y U 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 5/8" 1 2.20 1 2.20
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 22.90 2 91.60
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 1 4.70 1 4.70
5/8" 1 4.70 1 4.70
3/4" 1 4.40 1 4.40
3/4" 1 2.45 1 2.45
5/8" 1 5.25 2 10.50
Estribos 3/8" 40 2.10 1 84.00
Estribos 3/8" 40 2.10 1 84.00
Estribos 3/8" 40 2.10 1 84.00
VS-06 EN EJE 16 ENTRE EJES O y U 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 5/8" 1 2.20 2 4.40
1 6.65 0.30 0.65 1.30 1 6.65 1.10 7.32 3/4" 2 4.45 2 17.80
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 7.70 3 46.20
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 3.65 3 21.90
5/8" 1 3.65 3 10.95
3/4" 2 8.75 1 17.50
3/4" 1 4.85 1 4.85
3/4" 2 7.55 1 15.10
3/4" 1 4.45 1 4.45
3/4" 2 5.25 1 10.50
5/8" 2 4.05 1 8.10
3/4" 2 8.85 1 17.70
5/8" 1 4.85 1 4.85
Estribos 3/8" 36 2.10 1 75.60
Estribos 3/8" 36 2.10 1 75.60
Estribos 3/8" 36 2.10 1 75.60
Estribos 3/8" 36 2.10 1 75.60
VS-07 EN EJE 17 ENTRE EJES O y U 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 8.05 2 32.20
1 1.80 0.30 0.65 0.35 1 1.80 1.10 1.98 3/4" 2 2.45 1 4.90
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 5/8" 1 2.45 1 2.45
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 5/8" 1 4.85 1 4.85
3/4" 2 6.55 1 13.10
3/4" 1 4.55 1 4.55
3/4" 2 7.70 1 15.40
3/4" 1 3.70 1 3.70
3/4" 2 4.05 1 8.10
5/8" 1 2.20 1 2.20
3/4" 2 8.55 1 17.10
5/8" 1 7.95 1 7.95
3/4" 2 9.45 1 18.90
5/8" 1 4.85 1 4.85
Estribos 3/8" 36 2.10 1 75.60
Estribos 3/8" 18 2.10 1 37.80
Estribos 3/8" 36 2.10 1 75.60
Estribos 3/8" 36 2.10 1 75.60
PRIMER PISO
V-1 EN EJE O ENTRE EJES 10-12 1 6.20 0.30 0.65 1.21 1 6.20 1.10 6.82 3/4" 2 4.50 2 18.00
1 6.25 0.30 0.65 1.22 1 6.25 1.10 6.88 3/4" 2 3.80 1 7.60
3/4" 2 7.60 1 15.20
3/4" 2 9.00 1 18.00
5/8" 1 4.60 1 4.60
3/4" 2 6.65 1 13.30
5/8" 1 5.05 1 5.05
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 35 2.10 1 73.50
V-2 EN EJE O ENTRE EJES 15-17 1 6.25 0.30 0.65 1.22 1 6.25 1.10 6.88 3/4" 2 4.40 1 8.80
1 6.50 0.30 0.65 1.27 1 6.50 1.10 7.15 3/4" 2 7.70 1 15.40
3/4" 2 3.75 1 7.50

Página 49 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
3/4" 2 4.55 1 9.10
3/4" 2 8.45 1 16.90
5/8" 1 4.65 1 4.65
3/4" 2 6.80 1 13.60
5/8" 1 5.30 1 5.30
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 2.10 1 75.60
V-3 EN EJE Q ENTRE EJES 11-17 1 6.25 0.30 0.65 1.22 1 6.25 1.10 6.88 3/4" 2 2.40 1 4.80
1 6.90 0.30 0.65 1.35 1 6.90 1.10 7.59 3/4" 2 4.30 1 8.60
1 6.25 0.30 0.65 1.22 1 6.25 1.10 6.88 3/4" 2 5.50 1 11.00
1 6.50 0.30 0.65 1.27 1 6.50 1.10 7.15 3/4" 2 3.20 1 6.40
3/4" 2 8.80 1 17.60
5/8" 1 8.80 1 8.80
3/4" 2 3.10 1 6.20
3/4" 2 7.70 1 15.40
5/8" 1 7.70 1 7.70
3/4" 2 3.80 1 7.60
3/4" 2 4.55 1 9.10
5/8" 1 2.20 1 2.20
3/4" 2 6.25 1 12.50
3/4" 1 4.05 1 4.05
3/4" 2 8.10 1 16.20
5/8" 1 8.10 1 8.10
3/4" 2 7.35 1 14.70
5/8" 1 4.05 1 4.05
3/4" 2 8.70 1 17.40
3/4" 1 4.90 1 4.90
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 47 2.10 1 98.70
Estribos 3/8" 8 2.10 1 16.80
Estribos 3/8" 47 2.10 1 98.70
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 2.10 1 75.60
V-4 EN EJE R ENTRE EJES 11-16 1 6.25 0.30 0.65 1.22 1 6.25 1.10 6.88 5/8" 1 2.40 2 4.80
1 6.90 0.30 0.65 1.35 1 6.90 1.10 7.59 3/4" 2 4.35 1 8.70
1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 3/4" 2 8.00 1 16.00
3/4" 2 3.90 1 7.80
3/4" 2 7.95 1 15.90
3/4" 2 3.80 1 7.60
3/4" 2 4.40 1 8.80
3/4" 2 8.65 1 17.30
5/8" 1 4.25 1 4.25
3/4" 2 5.70 1 11.40
5/8" 1 4.50 1 4.50
3/4" 2 8.65 1 17.30
5/8" 1 4.75 1 4.75
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 37 2.10 1 77.70
Estribos 3/8" 35 2.10 1 73.50
V-5 EN EJE S ENTRE EJES 10-16 1 6.20 0.30 0.65 1.21 1 6.20 1.10 6.82 5/8" 1 2.40 2 4.80
1 6.25 0.30 0.65 1.22 1 6.25 1.10 6.88 3/4" 2 4.50 1 9.00
1 6.90 0.30 0.65 1.35 1 6.90 1.10 7.59 3/4" 2 7.65 1 15.30
1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 3/4" 2 3.80 2 15.20
3/4" 2 8.00 1 16.00
3/4" 2 3.90 1 7.80
3/4" 2 7.95 1 15.90
3/4" 2 4.40 1 8.80
3/4" 2 8.60 1 17.20
5/8" 1 4.60 1 4.60

Página 50 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
3/4" 1 7.45 1 7.45
3/4" 1 4.65 1 4.65
3/4" 2 5.70 1 11.40
3/4" 1 4.50 1 4.50
3/4" 2 8.65 1 17.30
5/8" 1 4.75 1 4.75
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 37 2.10 1 77.70
Estribos 3/8" 35 2.10 1 73.50
V-6 EN EJE U ENTRE EJES 10-17 1 3.40 0.30 0.65 0.66 1 3.40 1.10 3.74 3/4" 2 6.40 1 12.80
1 6.25 0.30 0.65 1.22 1 6.25 1.10 6.88 3/4" 2 8.25 1 16.50
1 6.90 0.30 0.65 1.35 1 6.90 1.10 7.59 5/8" 1 8.25 1 8.25
1 6.25 0.30 0.65 1.22 1 6.25 1.10 6.88 3/4" 2 8.00 1 16.00
1 3.60 0.30 0.65 0.70 1 3.60 1.10 3.96 3/4" 1 3.90 1 3.90
3/4" 2 7.50 1 15.00
3/4" 1 3.80 1 3.80
3/4" 2 8.45 1 16.90
3/4" 1 6.50 1 6.50
3/4" 2 5.40 1 10.80
5/8" 1 5.40 1 5.40
5/8" 1 4.05 2 8.10
3/4" 2 7.45 1 14.90
3/4" 2 5.70 1 11.40
5/8" 1 4.50 1 4.50
3/4" 2 7.35 1 14.70
3/4" 2 8.90 1 17.80
5/8" 1 5.90 1 5.90
Estribos 3/8" 25 2.10 1 52.50
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 37 2.10 1 77.70
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 26 2.10 1 54.60
V-7 EN EJE 10 ENTRE EJES O-U 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 4.45 1 8.90
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 7.65 1 15.30
1 1.80 0.20 0.65 0.23 1 1.80 1.00 1.80 3/4" 1 3.70 1 3.70
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 4.45 1 8.90
3/4" 1 2.45 1 2.45
3/4" 2 6.55 1 13.10
3/4" 1 4.25 1 4.25
3/4" 2 4.45 1 8.90
3/4" 2 8.85 1 17.70
5/8" 1 4.85 1 4.85
5/8" 1 4.25 1 4.25
3/4" 2 6.45 1 12.90
3/4" 2 3.60 1 7.20
5/8" 1 3.60 1 3.60
5/8" 1 4.65 1 4.65
3/4" 2 6.65 1 13.30
Estribos 3/8" 36 2.10 3 226.80
Estribos 3/8" 18 1.90 1 34.20
V-8 EN EJE 11 ENTRE EJES O-U 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 4.05 1 8.10
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 7.65 1 15.30
1 3.35 0.25 0.65 0.54 1 3.35 1.05 3.52 3/4" 1 2.20 1 2.20
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 7.65 1 15.30
3/4" 2 3.70 1 7.40
3/4" 2 4.45 1 8.90
3/4" 2 2.45 1 4.90
3/4" 2 8.10 1 16.20

Página 51 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
3/4" 2 6.10 1 12.20
3/4" 2 4.05 1 8.10
5/8" 1 1.80 1 1.80
3/4" 2 8.85 1 17.70
3/4" 1 4.85 1 4.85
3/4" 2 6.45 1 12.90
5/8" 1 4.25 1 4.25
3/4" 2 5.15 1 10.30
5/8" 1 5.15 1 5.15
3/4" 2 6.65 1 13.30
3/4" 1 4.65 1 4.65
Estribos 3/8" 36 2.10 3 226.80
Estribos 3/8" 25 2.00 1 50.00
V-9 EN EJE 12 ENTRE EJES Q-U 3 6.45 0.30 0.65 3.77 3 6.45 1.10 21.29 3/4" 2 4.45 1 8.90
3/4" 1 2.20 1 2.20
3/4" 2 7.65 2 30.60
3/4" 2 3.70 2 14.80
3/4" 2 5.10 1 10.20
3/4" 2 2.45 1 4.90
3/4" 2 8.45 1 16.90
3/4" 1 4.85 1 4.85
3/4" 2 5.25 1 10.50
5/8" 1 4.05 1 4.05
3/4" 2 8.65 1 17.30
3/4" 1 4.45 1 4.45
Estribos 3/8" 36 2.10 3 226.80
V-10 EN EJE 14 ENTRE EJES Q-U 3 6.45 0.30 0.65 3.77 3 6.45 1.10 21.29 3/4" 2 4.45 1 8.90
3/4" 1 2.20 1 2.20
3/4" 2 7.65 2 30.60
3/4" 2 3.70 2 14.80
3/4" 2 5.10 1 10.20
3/4" 2 2.45 1 4.90
3/4" 2 8.45 1 16.90
3/4" 1 4.85 1 4.85
3/4" 2 5.25 1 10.50
5/8" 1 4.05 1 4.05
3/4" 2 8.65 1 17.30
3/4" 1 4.45 1 4.45
Estribos 3/8" 36 2.10 3 226.80
V-11 EN EJE 16 ENTRE EJES O-U 3 6.45 0.30 0.65 3.77 3 6.45 1.10 21.29 3/4" 1 2.20 2 4.40
1 6.65 0.30 0.65 1.30 1 6.65 1.10 7.32 3/4" 2 4.45 2 17.80
3/4" 2 7.65 3 45.90
3/4" 2 3.70 3 22.20
3/4" 2 8.75 1 17.50
3/4" 1 4.85 1 4.85
3/4" 2 7.55 1 15.10
3/4" 1 4.45 1 4.45
3/4" 2 5.25 1 10.50
3/4" 1 4.05 1 4.05
3/4" 2 8.85 1 17.70
3/4" 1 4.85 1 4.85
Estribos 3/8" 36 2.10 3 226.80
Estribos 3/8" 36 2.10 1 75.60
V-12 EN EJE 17 ENTRE EJES O-U 3 6.45 0.30 0.65 3.77 3 6.45 1.10 21.29 3/4" 2 8.05 1 16.10
1 1.80 0.25 0.65 0.29 1 1.80 1.05 1.89 3/4" 1 2.45 1 2.45
3/4" 2 6.55 1 13.10
3/4" 1 4.55 1 4.55
3/4" 2 7.65 1 15.30
3/4" 1 3.70 1 3.70

Página 52 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
3/4" 2 4.45 1 8.90
3/4" 2 7.85 1 15.70
5/8" 1 4.85 1 4.85
5/8" 1 3.90 1 3.90
3/4" 2 3.90 1 7.80
3/4" 2 5.00 1 10.00
3/4" 2 5.25 1 10.50
5/8" 1 4.05 1 4.05
5/8" 1 4.85 1 4.85
3/4" 2 8.45 1 16.90
Estribos 3/8" 36 2.10 3 226.80
Estribos 3/8" 18 2.00 1 36.00
SEGUNDO PISO
XXX C1-2V-1 EN EJE O ENTRE EJES 10-12 1 6.40 0.30 0.65 1.25 1 6.40 1.10 7.04 3/4" 2 15.55 2 62.20
1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 3/4" 1 3.80 1 3.80
5/8" 1 4.60 1 4.60
5/8" 1 5.05 1 5.05
Estribos 3/8" 40 2.10 1 84.00
Estribos 3/8" 40 2.10 1 84.00
C1-2V-2 EN EJE O ENTRE EJES 15-17 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 4.40 1 8.80
1 6.60 0.30 0.65 1.29 1 6.60 1.10 7.26 3/4" 2 7.70 1 15.40
3/4" 2 3.75 1 7.50
3/4" 2 4.55 1 9.10
3/4" 2 8.45 1 16.90
5/8" 1 4.65 1 4.65
3/4" 2 6.80 1 13.60
5/8" 1 5.30 1 5.30
Estribos 3/8" 41 2.10 1 86.10
Estribos 3/8" 41 2.10 1 86.10
C1-2V-3 EN EJE Q ENTRE EJES 11-17 1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 3/4" 2 2.40 1 4.80
1 6.90 0.30 0.65 1.35 1 6.90 1.10 7.59 3/4" 2 4.30 1 8.60
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 5.50 1 11.00
1 6.60 0.30 0.65 1.29 1 6.60 1.10 7.26 3/4" 2 3.20 1 6.40
3/4" 2 8.80 1 17.60
5/8" 1 8.80 1 8.80
3/4" 2 3.10 1 6.20
3/4" 2 7.70 1 15.40
5/8" 1 7.70 1 7.70
3/4" 2 3.80 1 7.60
3/4" 2 4.55 1 9.10
5/8" 1 2.20 1 2.20
3/4" 2 6.25 1 12.50
3/4" 1 4.05 1 4.05
3/4" 2 8.10 1 16.20
5/8" 1 8.10 1 8.10
3/4" 2 7.35 1 14.70
5/8" 1 4.05 1 4.05
3/4" 2 8.70 1 17.40
3/4" 1 4.90 1 4.90
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 37 2.10 1 77.70
Estribos 3/8" 36 2.10 1 75.60
Estribos 3/8" 36 2.10 1 75.60
C1-2V-4 EN EJE R ENTRE EJES 11-16 1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 5/8" 1 2.40 2 4.80
1 6.90 0.30 0.65 1.35 1 6.90 1.10 7.59 3/4" 2 4.35 1 8.70
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 8.00 1 16.00
3/4" 2 3.90 1 7.80
3/4" 2 7.95 1 15.90
3/4" 2 3.80 1 7.60

Página 53 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
3/4" 2 4.40 1 8.80
3/4" 2 8.65 1 17.30
5/8" 1 4.25 1 4.25
3/4" 2 5.70 1 11.40
5/8" 1 4.50 1 4.50
3/4" 2 8.65 1 17.30
5/8" 1 4.75 1 4.75
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 37 2.10 1 77.70
Estribos 3/8" 36 2.10 1 75.60
C1-2V-5 EN EJE S ENTRE EJES 10-12 1 6.40 0.30 0.65 1.25 1 6.40 1.10 7.04 3/4" 2 15.55 2 62.20
1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 5/8" 1 2.30 1 2.30
3/4" 1 3.80 1 3.80
5/8" 1 5.00 1 5.00
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 35 2.10 1 73.50
C1-2V-16 EN EJE S ENTRE EJES 12-15 1 6.90 0.30 0.65 1.35 1 6.90 1.10 7.59 3/4" 6 7.70 1 46.20
Estribos 3/8" 42 2.10 1 88.20
C1-2V-6 EN EJE S ENTRE EJES 15-16 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 5/8" 5 7.25 1 36.25
Estribos 3/8" 41 2.10 1 86.10
C1-2V-7 EN EJE U ENTRE EJES 10-12 1 3.60 0.30 0.65 0.70 1 3.60 1.10 3.96 3/4" 4 13.35 1 53.40
1 6.50 0.30 0.65 1.27 1 6.50 1.10 7.15 3/4" 2 7.00 1 14.00
5/8" 1 7.00 1 7.00
5/8" 1 2.40 1 2.40
5/8" 1 4.95 1 4.95
Estribos 3/8" 29 2.10 1 60.90
Estribos 3/8" 41 2.10 1 86.10
C1-2V-8 EN EJE U ENTRE EJES 15-17 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 4 13.00 1 52.00
1 3.60 0.30 0.65 0.70 1 3.60 1.10 3.96 5/8" 1 2.30 1 2.30
3/4" 2 7.00 1 14.00
5/8" 1 5.05 1 5.05
Estribos 3/8" 41 2.10 1 86.10
Estribos 3/8" 29 2.10 1 60.90
C1-2V-9 EN EJE 10 ENTRE EJES O-U 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 4.45 1 8.90
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 7.65 1 15.30
1 1.80 0.20 0.65 0.23 1 1.80 1.00 1.80 3/4" 1 3.70 1 3.70
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 4.45 1 8.90
3/4" 1 2.45 1 2.45
3/4" 2 6.55 1 13.10
5/8" 1 4.25 1 4.25
3/4" 2 8.85 1 17.70
5/8" 1 4.85 1 4.85
3/4" 2 6.45 1 12.90
5/8" 1 4.25 1 4.25
3/4" 1 4.45 1 4.45
3/4" 1 4.45 1 4.45
3/4" 2 6.65 1 13.30
5/8" 1 4.65 1 4.65
3/4" 2 3.90 1 7.80
5/8" 1 3.90 1 3.90
Estribos 3/8" 36 2.10 3 226.80
Estribos 3/8" 18 1.90 1 34.20
C1-2V-10 ENTRE EJES R-Q y 10-11 1 0.80 0.25 0.65 0.13 1 0.80 1.10 0.88 5/8" 5 2.60 1 13.00
1 1.80 0.25 0.65 0.29 1 1.80 1.10 1.98 5/8" 5 3.40 1 17.00
3/8" 18 2.00 1 36.00
3/8" 22 2.00 1 44.00
C1-2V-11 EN EJE 11 ENTRE EJES O-U 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 4.40 1 8.80
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 7.65 1 15.30
1 3.35 0.25 0.65 0.54 1 3.35 1.05 3.52 3/4" 1 2.20 1 2.20

Página 54 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 7.65 1 15.30
3/4" 2 3.70 1 7.40
3/4" 2 4.45 1 8.90
3/4" 2 2.45 1 4.90
3/4" 2 8.10 1 16.20
3/4" 2 6.10 1 12.20
3/4" 2 4.05 1 8.10
5/8" 1 1.80 1 1.80
3/4" 2 8.85 1 17.70
3/4" 1 4.85 1 4.85
3/4" 2 6.45 1 12.90
5/8" 1 4.25 1 4.25
3/4" 2 5.15 1 10.30
5/8" 1 5.15 1 5.15
3/4" 2 6.65 1 13.30
3/4" 1 4.65 1 4.65
Estribos 3/8" 36 2.10 3 226.80
Estribos 3/8" 25 2.00 1 50.00
C1-2V-12 EN EJE 12 ENTRE EJES Q-U 3 6.45 0.30 0.65 3.77 3 6.45 1.10 21.29 3/4" 2 4.45 1 8.90
3/4" 1 2.20 1 2.20
3/4" 2 7.65 2 30.60
3/4" 2 3.70 2 14.80
3/4" 2 5.10 1 10.20
3/4" 2 2.45 1 4.90
3/4" 2 8.45 1 16.90
3/4" 1 4.85 1 4.85
3/4" 2 5.25 1 10.50
5/8" 1 4.05 1 4.05
3/4" 2 8.65 1 17.30
3/4" 1 4.45 1 4.45
Estribos 3/8" 36 2.10 3 226.80
C1-2V-13 EN EJE 14 ENTRE EJES Q-U 3 6.45 0.30 0.65 3.77 3 6.45 1.10 21.29 3/4" 2 4.45 1 8.90
3/4" 1 2.20 1 2.20
3/4" 2 7.65 2 30.60
3/4" 2 3.70 2 14.80
3/4" 2 5.10 1 10.20
3/4" 2 2.45 1 4.90
3/4" 2 8.45 1 16.90
3/4" 1 4.85 1 4.85
3/4" 2 5.25 1 10.50
5/8" 1 4.05 1 4.05
3/4" 2 8.65 1 17.30
3/4" 1 4.45 1 4.45
Estribos 3/8" 36 2.10 3 226.80
C1-2V-14 EN EJE 16 ENTRE EJES O-U 3 6.45 0.30 0.65 3.77 3 6.45 1.10 21.29 3/4" 1 2.20 2 4.40
1 6.65 0.30 0.65 1.30 1 6.65 1.10 7.32 3/4" 2 4.45 2 17.80
3/4" 2 7.65 3 45.90
3/4" 2 3.70 3 22.20
3/4" 2 8.75 1 17.50
3/4" 1 4.85 1 4.85
3/4" 2 7.55 1 15.10
3/4" 1 4.45 1 4.45
3/4" 2 5.25 1 10.50
3/4" 1 4.05 1 4.05
3/4" 2 8.85 1 17.70
3/4" 1 4.85 1 4.85
Estribos 3/8" 36 2.10 3 226.80
Estribos 3/8" 36 2.10 1 75.60
C-1-2V-15 EN EJE 17 ENTRE EJES O-U 3 6.45 0.30 0.65 3.77 3 6.45 1.10 21.29 3/4" 2 8.05 1 16.10

Página 55 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
1 1.80 0.25 0.65 0.29 1 1.80 1.05 1.89 3/4" 1 2.45 1 2.45
3/4" 2 6.55 1 13.10
3/4" 1 4.55 1 4.55
3/4" 2 7.65 1 15.30
3/4" 1 3.70 1 3.70
3/4" 2 4.45 1 8.90
3/4" 2 7.85 1 15.70
5/8" 1 4.85 1 4.85
5/8" 1 3.90 1 3.90
3/4" 2 3.90 1 7.80
3/4" 2 5.00 1 10.00
3/4" 2 5.25 1 10.50
5/8" 1 4.05 1 4.05
5/8" 1 4.85 1 4.85
3/4" 2 8.45 1 16.90
Estribos 3/8" 36 2.10 3 226.80
Estribos 3/8" 18 2.00 1 36.00
C1-2V-10 ENTRE EJES R-Q y 10-11 1 0.80 0.25 0.65 0.13 1 0.80 1.10 0.88 5/8" 5 2.60 1 13.00
1 1.80 0.25 0.65 0.29 1 1.80 1.10 1.98 5/8" 5 3.40 1 17.00
3/8" 18 2.00 1 36.00
3/8" 22 2.00 1 44.00
TERCER PISO
XXX C1-3V-1 EN EJE O ENTRE EJES 10-12 1 6.60 0.30 0.65 1.29 1 6.60 1.10 7.26 3/4" 2 4.50 1 9.00
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 1 2.40 2 4.80
3/4" 2 7.60 1 15.20
3/4" 2 3.80 1 7.60
3/4" 2 4.50 1 9.00
3/4" 2 6.65 1 13.30
5/8" 1 4.65 2 9.30
3/4" 2 8.95 2 35.80
Estribos 3/8" 36 2.10 2 151.20
Estribos 3/8" 36 2.10 2 151.20
C1-3V-2 EN EJE O ENTRE EJES 15-17 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 4.45 1 8.90
1 6.60 0.30 0.65 1.29 1 6.60 1.10 7.26 3/4" 2 7.70 1 15.40
3/4" 2 3.75 1 7.50
3/4" 2 4.55 1 9.10
3/4" 2 8.45 1 16.90
5/8" 1 4.65 1 4.65
3/4" 2 6.80 1 13.60
5/8" 1 5.30 1 5.30
Estribos 3/8" 36 2.10 1 75.60
Estribos 3/8" 36 2.10 1 75.60
C1-3V-3a EN EJE O ENTRE EJES 15-17 1 1.30 0.30 0.65 0.25 1 1.30 1.10 1.43 3/4" 5 2.70 1 13.50
Estribos 3/8" 13 2.10 1 27.30
C1-3V-3 EN EJE Q ENTRE EJES 11-12 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 8.15 2 32.60
3/4" 2 3.75 1 7.50
5/8" 1 3.75 1 3.75
3/4" 1 3.05 1 3.05
3/4" 1 5.45 1 5.45
Estribos 3/8" 41 2.10 1 86.10
C1-3V-4 EN EJE Q ENTRE EJES 15-17 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 4.40 1 8.80
1 6.60 0.30 0.65 1.29 1 6.60 1.10 7.26 3/4" 2 2.65 2 10.60
3/4" 2 7.65 1 15.30
3/4" 2 3.75 1 7.50
5/8" 1 3.75 1 3.75
3/4" 2 4.50 1 9.00
3/4" 2 6.80 1 13.60
3/4" 1 4.65 1 4.65
3/4" 2 8.75 1 17.50

Página 56 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
3/4" 1 4.65 1 4.65
Estribos 3/8" 36 2.10 1 75.60
Estribos 3/8" 36 2.10 1 75.60
C1-3V-5 EN EJE R ENTRE EJES 11-12 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 8.15 2 32.60
3/4" 2 3.75 1 7.50
5/8" 1 3.75 1 3.75
3/4" 1 3.05 1 3.05
3/4" 1 5.45 1 5.45
Estribos 3/8" 41 2.10 1 86.10
C1-3V-6 EN EJE R ENTRE EJES 15-16 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 8.15 2 32.60
3/4" 2 2.45 1 4.90
5/8" 2 2.45 1 4.90
5/8" 1 5.40 1 5.40
Estribos 3/8" 41 2.10 1 86.10
C1-3V-7 EN EJE S ENTRE EJES 10-16 1 6.60 0.30 0.65 1.29 1 6.60 1.10 7.26 3/4" 2 13.75 2 55.00
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 3.35 1 6.70
5/8" 1 3.35 1 3.35
3/4" 2 5.40 1 10.80
5/8" 1 3.05 1 3.05
5/8" 1 5.35 1 5.35
5/8" 1 5.55 1 5.55
Estribos 3/8" 41 2.10 1 86.10
Estribos 3/8" 41 2.10 1 86.10
C1-3V-8 EN EJE S ENTRE EJES 15-16 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 8.15 2 32.60
3/4" 2 2.45 1 4.90
5/8" 2 2.45 1 4.90
5/8" 1 5.40 1 5.40
Estribos 3/8" 41 2.10 1 86.10
C1-3V-9 EN EJE U ENTRE EJES 10-12 1 3.80 0.25 0.65 0.62 1 3.80 1.10 4.18 3/4" 5 13.40 1 67.00
1 6.45 0.25 0.65 1.05 1 6.45 1.10 7.10 3/4" 2 7.00 1 14.00
5/8" 1 7.00 1 7.00
5/8" 1 2.50 1 2.50
Estribos 3/8" 30 2.00 1 60.00
Estribos 3/8" 41 2.00 1 82.00
C1-3V-10 EN EJE 10 ENTRE EJES O-U 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 4.45 1 8.90
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 7.65 1 15.30
1 1.80 0.20 0.65 0.23 1 1.80 1.00 1.80 3/4" 1 3.70 1 3.70
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 4.45 1 8.90
3/4" 1 2.45 1 2.45
3/4" 2 6.55 1 13.10
3/4" 1 4.25 1 4.25
3/4" 2 4.45 1 8.90
3/4" 2 8.85 1 17.70
5/8" 1 4.85 1 4.85
5/8" 1 4.25 1 4.25
3/4" 2 6.45 1 12.90
3/4" 2 3.60 1 7.20
5/8" 1 3.60 1 3.60
5/8" 1 4.65 1 4.65
3/4" 2 6.65 1 13.30
Estribos 3/8" 36 2.10 3 226.80
Estribos 3/8" 18 1.90 1 34.20
C1-3V-13 EN EJE 11 ENTRE EJES O-U 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 4.05 1 8.10
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 7.65 1 15.30
1 3.35 0.25 0.65 0.54 1 3.35 1.05 3.52 3/4" 1 2.20 1 2.20
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 7.65 1 15.30
3/4" 2 3.70 1 7.40
3/4" 2 4.45 1 8.90
3/4" 2 2.45 1 4.90

Página 57 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
3/4" 2 8.10 1 16.20
3/4" 2 6.10 1 12.20
3/4" 2 4.05 1 8.10
5/8" 1 1.80 1 1.80
3/4" 2 8.85 1 17.70
3/4" 1 4.85 1 4.85
3/4" 2 6.45 1 12.90
5/8" 1 4.25 1 4.25
3/4" 2 5.15 1 10.30
5/8" 1 5.15 1 5.15
3/4" 2 6.65 1 13.30
3/4" 1 4.65 1 4.65
Estribos 3/8" 36 2.10 3 226.80
Estribos 3/8" 25 2.00 1 50.00
C1-3V-14 EN EJE 12 ENTRE EJES Q-U 3 6.45 0.30 0.65 3.77 3 6.45 1.10 21.29 3/4" 2 4.45 1 8.90
3/4" 1 2.20 1 2.20
3/4" 2 7.65 2 30.60
3/4" 2 3.70 2 14.80
3/4" 2 5.10 1 10.20
3/4" 2 2.45 1 4.90
3/4" 2 8.45 1 16.90
3/4" 1 4.85 1 4.85
3/4" 2 5.25 1 10.50
5/8" 1 4.05 1 4.05
3/4" 2 8.65 1 17.30
3/4" 1 4.45 1 4.45
Estribos 3/8" 36 2.10 3 226.80
C1.3V-15 EN EJE 14 ENTRE EJES Q-U 2 6.45 0.30 0.65 2.52 2 6.45 1.10 14.19 3/4" 2 4.45 1 8.90
5/8" 1 2.40 1 2.40
3/4" 2 7.65 1 15.30
3/4" 2 3.70 1 7.40
3/4" 2 4.45 2 17.80
3/4" 2 2.45 2 9.80
3/4" 2 8.65 2 34.60
3/4" 2 5.25 1 10.50
5/8" 1 4.05 1 4.05
3/4" 2 1.95 1 3.90
Estribos 3/8" 36 2.10 2 151.20
C1-3V-16 EN EJE 16 ENTRE EJES O-S 2 6.45 0.30 0.65 2.52 2 6.45 1.10 14.19 3/4" 1 2.20 2 4.40
1 6.65 0.30 0.65 1.30 1 6.65 1.10 7.32 3/4" 2 4.45 2 17.80
3/4" 2 7.65 3 45.90
3/4" 2 3.70 2 14.80
3/4" 2 8.85 1 17.70
3/4" 1 4.85 1 4.85
3/4" 2 7.55 1 15.10
3/4" 1 4.45 1 4.45
3/4" 2 1.50 1 3.00
Estribos 3/8" 36 2.10 2 151.20
Estribos 3/8" 36 2.10 1 75.60
C1-3V-17 EN EJE 17 ENTRE EJES O-S 2 6.45 0.30 0.65 2.52 2 6.45 1.10 14.19 3/4" 2 6.55 1 13.10
1 1.80 0.25 0.65 0.29 1 1.80 1.05 1.89 3/4" 1 4.55 1 4.55
3/4" 2 7.65 1 15.30
3/4" 1 3.70 1 3.70
3/4" 2 4.45 1 8.90
3/4" 2 8.85 1 17.70
5/8" 1 4.85 1 4.85
5/8" 1 3.90 1 3.90
3/4" 2 3.90 1 7.80
Estribos 3/8" 36 2.10 2 151.20

Página 58 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
Estribos 3/8" 18 2.00 1 36.00
C1-3V-12 ENTRE EJES R-Q y 10-11 1 0.80 0.25 0.65 0.13 1 0.80 1.05 0.84 3/4" 6 2.60 1 15.60
1 1.80 0.25 0.65 0.29 1 1.80 1.05 1.89 3/4" 6 3.40 1 20.40
3/8" 18 2.00 1 36.00
3/8" 22 2.00 1 44.00
CUARTO PISO
XXX C1-4V-1 EN EJE O ENTRE EJES 10-12 1 6.60 0.30 0.65 1.29 1 6.60 1.10 7.26 3/4" 2 4.50 2 18.00
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 3.80 1 7.60
3/4" 2 7.60 1 15.20
3/4" 2 4.55 1 9.10
3/4" 1 2.40 1 2.40
3/4" 2 6.65 1 13.30
5/8" 1 4.65 1 4.65
3/4" 2 9.00 1 18.00
5/8" 1 4.70 1 4.70
Estribos 3/8" 36 2.10 1 75.60
Estribos 3/8" 36 2.10 1 75.60
C1-4V-2 EN EJE O ENTRE EJES 15-17 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 4.40 1 8.80
1 6.60 0.30 0.65 1.29 1 6.60 1.10 7.26 3/4" 2 7.70 1 15.40
3/4" 2 3.75 1 7.50
3/4" 2 4.55 1 9.10
3/4" 2 8.45 1 16.90
5/8" 1 4.65 1 4.65
3/4" 2 6.80 1 13.60
5/8" 1 5.30 1 5.30
Estribos 3/8" 36 2.10 1 75.60
Estribos 3/8" 36 2.10 1 75.60
C1-4V-3a EN EJE O ENTRE EJES 10 1 1.30 0.30 0.65 0.25 1 1.30 1.10 1.43 3/4" 5 2.70 1 13.50
Estribos 3/8" 13 2.10 1 27.30
C1-4V-3 EN EJE Q ENTRE EJES 11-12 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 8.15 2 32.60
3/4" 3 3.75 1 11.25
3/4" 1 3.05 1 3.05
3/4" 1 5.45 1 5.45
Estribos 3/8" 41 2.10 1 86.10
C1-4V-4 EN EJE Q ENTRE EJES 15-17 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 2.40 1 4.80
1 6.60 0.30 0.65 1.29 1 6.60 1.10 7.26 3/4" 2 4.30 1 8.60
3/4" 2 7.65 1 15.30
3/4" 2 3.75 1 7.50
5/8" 1 3.75 1 3.75
3/4" 2 4.50 1 9.00
3/4" 2 2.90 1 5.80
3/4" 2 6.80 1 13.60
3/4" 1 4.65 1 4.65
3/4" 2 8.90 1 17.80
3/4" 1 4.65 1 4.65
Estribos 3/8" 36 2.10 1 75.60
Estribos 3/8" 36 2.10 1 75.60
C1-4V-5 EN EJE R ENTRE EJES 11-12 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 8.15 2 32.60
3/4" 3 3.75 1 11.25
3/4" 1 3.05 1 3.05
3/4" 1 5.45 1 5.45
Estribos 3/8" 41 2.10 1 86.10
C1-4V-6 EN EJE R ENTRE EJES 15-16 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 8.15 2 32.60
3/4" 2 2.45 1 4.90
5/8" 2 2.45 1 4.90
5/8" 1 5.40 1 5.40
Estribos 3/8" 41 2.10 1 86.10
C1-4V-7 EN EJE S ENTRE EJES 10-16 1 6.60 0.30 0.65 1.29 1 6.60 1.10 7.26 3/4" 2 15.75 2 63.00
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 1 3.40 1 3.40

Página 59 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
5/8" 1 3.40 1 3.40
3/4" 2 5.40 1 10.80
5/8" 1 3.20 1 3.20
5/8" 1 5.35 1 5.35
5/8" 1 5.55 1 5.55
Estribos 3/8" 41 2.10 1 86.10
Estribos 3/8" 41 2.10 1 86.10
C1-4V-8 EN EJE S ENTRE EJES 15-16 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 8.15 2 32.60
3/4" 2 2.45 1 4.90
5/8" 2 2.45 1 4.90
5/8" 1 5.40 1 5.40
Estribos 3/8" 41 2.10 1 86.10
C1-4V-9 EN EJE U ENTRE EJES 10-12 1 3.80 0.25 0.65 0.62 1 3.80 1.05 3.99 3/4" 5 13.40 1 67.00
1 6.45 0.25 0.65 1.05 1 6.45 1.05 6.77 3/4" 2 7.00 1 14.00
5/8" 1 7.00 1 7.00
5/8" 1 2.50 1 2.50
Estribos 3/8" 30 2.00 1 60.00
Estribos 3/8" 41 2.00 1 82.00
C1-4V-10 EN EJE 10 ENTRE EJES O-U 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 4.45 1 8.90
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 7.65 1 15.30
1 1.80 0.20 0.65 0.23 1 1.80 1.00 1.80 3/4" 1 3.70 1 3.70
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 4.45 1 8.90
3/4" 1 2.45 1 2.45
3/4" 2 6.55 1 13.10
3/4" 1 4.25 1 4.25
3/4" 2 4.45 1 8.90
3/4" 2 8.85 1 17.70
5/8" 1 4.85 1 4.85
5/8" 1 4.25 1 4.25
3/4" 2 6.45 1 12.90
3/4" 2 3.60 1 7.20
5/8" 1 3.60 1 3.60
5/8" 1 4.65 1 4.65
3/4" 2 6.65 1 13.30
Estribos 3/8" 36 2.10 3 226.80
Estribos 3/8" 18 1.90 1 34.20
C1-4V-13 EN EJE 11 ENTRE EJES O-U 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 4.45 1 8.90
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 7.65 1 15.30
1 3.35 0.25 0.65 0.54 1 3.35 1.05 3.52 3/4" 1 2.20 1 2.20
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 7.65 1 15.30
3/4" 2 3.70 1 7.40
3/4" 2 4.45 1 8.90
3/4" 2 2.45 1 4.90
3/4" 2 8.10 1 16.20
3/4" 2 6.10 1 12.20
3/4" 2 4.05 1 8.10
5/8" 1 1.80 1 1.80
3/4" 2 8.85 1 17.70
3/4" 1 4.85 1 4.85
3/4" 2 6.45 1 12.90
5/8" 1 4.25 1 4.25
3/4" 2 5.15 1 10.30
5/8" 1 5.15 1 5.15
3/4" 2 6.65 1 13.30
3/4" 1 4.65 1 4.65
Estribos 3/8" 36 2.10 3 226.80
Estribos 3/8" 25 2.00 1 50.00
C1-4V-14 EN EJE 12 ENTRE EJES Q-U 3 6.45 0.30 0.65 3.77 3 6.45 1.10 21.29 3/4" 2 4.45 1 8.90
3/4" 1 2.20 1 2.20

Página 60 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
3/4" 2 7.65 2 30.60
3/4" 2 3.70 2 14.80
3/4" 2 5.10 1 10.20
3/4" 2 2.45 1 4.90
3/4" 2 8.45 1 16.90
3/4" 1 4.85 1 4.85
3/4" 2 5.25 1 10.50
5/8" 1 4.05 1 4.05
3/4" 2 8.65 1 17.30
3/4" 1 4.45 1 4.45
Estribos 3/8" 36 2.10 3 226.80
C1-4V-15 EN EJE 14 ENTRE EJES Q-U 2 6.45 0.30 0.65 2.52 2 6.45 1.10 14.19 3/4" 2 4.45 1 8.90
5/8" 1 2.40 1 2.40
3/4" 2 7.65 1 15.30
3/4" 2 3.70 1 7.40
3/4" 2 4.45 2 17.80
3/4" 2 2.45 2 9.80
3/4" 2 8.65 2 34.60
3/4" 2 5.25 1 10.50
5/8" 1 4.05 1 4.05
3/4" 2 1.95 1 3.90
Estribos 3/8" 36 2.10 2 151.20
C1-4V-16 EN EJE 16 ENTRE EJES O-S 2 6.45 0.30 0.65 2.52 2 6.45 1.10 14.19 3/4" 1 2.20 2 4.40
1 6.65 0.30 0.65 1.30 1 6.65 1.10 7.32 3/4" 2 4.45 2 17.80
3/4" 2 7.65 3 45.90
3/4" 2 3.70 2 14.80
3/4" 2 8.85 1 17.70
3/4" 1 4.85 1 4.85
3/4" 2 7.55 1 15.10
3/4" 1 4.45 1 4.45
3/4" 2 1.50 1 3.00
Estribos 3/8" 36 2.10 2 151.20
Estribos 3/8" 36 2.10 1 75.60
C1-4V-17 EN EJE 17 ENTRE EJES O-S 2 6.45 0.30 0.65 2.52 2 6.45 1.10 14.19 3/4" 2 6.55 1 13.10
1 1.80 0.25 0.65 0.29 1 1.80 1.05 1.89 3/4" 1 4.55 1 4.55
3/4" 2 7.65 1 15.30
3/4" 1 3.70 1 3.70
3/4" 2 4.45 1 8.90
3/4" 2 8.85 1 17.70
5/8" 1 4.85 1 4.85
5/8" 1 3.90 1 3.90
3/4" 2 3.90 1 7.80
Estribos 3/8" 36 2.10 2 151.20
Estribos 3/8" 18 2.00 1 36.00
C1-3V-12 ENTRE EJES R-Q y 10-11 1 0.80 0.25 0.65 0.13 1 0.80 1.05 0.84 3/4" 6 2.60 1 15.60
1 1.80 0.25 0.65 0.29 1 1.80 1.05 1.89 3/4" 6 3.40 1 20.40
3/8" 18 2.00 1 36.00
3/8" 22 2.00 1 44.00
QUINTO PISO
XXX C1-5V-1 EN EJE O ENTRE EJES 10-12 1 6.60 0.30 0.65 1.29 1 6.60 1.10 7.26 3/4" 2 4.50 2 18.00
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 3.80 1 7.60
3/4" 2 7.60 1 15.20
3/4" 2 9.00 1 18.00
5/8" 1 4.60 1 4.60
3/4" 2 6.65 1 13.30
5/8" 1 5.05 1 5.05
Estribos 3/8" 36 2.10 1 75.60
Estribos 3/8" 36 2.10 1 75.60
C1-5V-2a EN EJE O ENTRE EJES 10 1 1.30 0.30 0.65 0.25 1 1.30 1.10 1.43 3/4" 5 2.70 1 13.50

Página 61 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
Estribos 3/8" 13 2.10 1 27.30
C1-5V-2 EN EJE Q ENTRE EJES 11-12 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 8.15 2 32.60
3/4" 3 3.75 1 11.25
3/4" 1 3.05 1 3.05
3/4" 1 5.45 1 5.45
Estribos 3/8" 41 2.10 1 86.10
C1-5V-3 EN EJE R ENTRE EJES 11-12 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 8.15 2 32.60
3/4" 3 3.75 1 11.25
5/8" 1 2.30 1 2.30
3/4" 1 5.45 1 5.45
Estribos 3/8" 41 2.10 1 86.10
C1-5V-4 EN EJE S ENTRE EJES 10-12 1 6.60 0.30 0.65 1.29 1 6.60 1.10 7.26 3/4" 2 14.90 2 59.60
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10
5/8" 1 3.40 0 0.00
3/4" 2 5.40 1 10.80
5/8" 1 3.20 0 0.00
5/8" 1 5.35 0 0.00
5/8" 1 5.55 0 0.00
Estribos 3/8" 41 2.10 1 86.10
Estribos 3/8" 41 2.10 1 86.10

C1-5V-5 EN EJE U ENTRE EJES 10-12 1 6.60 0.30 0.65 1.29 1 6.60 1.10 7.26 3/4" 5 15.05 1 75.25
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10
Estribos 3/8" 40 2.10 1 84.00
Estribos 3/8" 40 2.10 1 84.00
C1-5V-6 EN EJE 10 ENTRE EJES O-U 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 4.45 1 8.90
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 7.65 1 15.30
1 1.80 0.20 0.65 0.23 1 1.80 1.00 1.80 3/4" 1 3.70 1 3.70
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 4.45 1 8.90
3/4" 1 2.45 1 2.45
3/4" 2 6.55 1 13.10
3/4" 1 4.25 1 4.25
3/4" 2 4.45 1 8.90
3/4" 2 8.85 1 17.70
5/8" 1 4.85 1 4.85
5/8" 1 4.25 1 4.25
3/4" 2 6.45 1 12.90
3/4" 2 3.60 1 7.20
5/8" 1 3.60 1 3.60
5/8" 1 4.65 1 4.65
3/4" 2 6.65 1 13.30
Estribos 3/8" 36 2.10 3 226.80
Estribos 3/8" 18 1.90 1 34.20
C1-5V-8 ENTRE EJES R-Q y 10-11 1 0.80 0.25 0.65 0.13 1 0.80 1.05 0.84 3/4" 6 2.60 1 15.60
1 1.80 0.25 0.65 0.29 1 1.80 1.05 1.89 3/4" 6 3.40 1 20.40
3/8" 18 2.00 1 36.00
3/8" 22 2.00 1 44.00
C1-5V-9 EN EJE 11 ENTRE EJES O-S 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 8.10 2 32.40
1 3.35 0.25 0.65 0.54 1 3.35 1.05 3.52 5/8" 1 2.45 1 2.45
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 2.45 1 4.90
5/8" 1 4.25 1 4.25
3/4" 2 8.10 1 16.20
3/4" 2 6.10 1 12.20
3/4" 2 4.45 1 8.90
5/8" 1 2.10 1 2.10
3/4" 2 6.60 1 13.20
3/4" 1 4.65 1 4.65
3/4" 2 5.45 1 10.90
5/8" 1 5.45 1 5.45

Página 62 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
3/4" 2 7.40 1 14.80
5/8" 1 4.25 1 4.25
Estribos 3/8" 36 2.10 2 151.20
Estribos 3/8" 25 2.00 1 50.00
C1-5V-8 ENTRE EJES R-S y 11-12 1 6.55 0.30 0.65 1.28 1 6.55 1.10 7.21 3/4" 6 7.95 1 47.70
3/8" 41 2.10 1 86.10
C1-5V-10 EN EJE 12 ENTRE EJES Q-U 3 6.45 0.30 0.65 3.77 3 6.45 1.10 21.29 3/4" 2 4.45 2 17.80
3/4" 2 3.70 2 14.80
3/4" 2 7.65 2 30.60
3/4" 2 5.25 1 10.50
5/8" 1 4.05 1 4.05
3/4" 2 8.85 1 17.70
5/8" 1 4.85 1 4.85
Estribos 3/8" 36 2.10 3 226.80
C1-6V-11 EN EJE 16 ENTRE EJES R-S 1 6.65 0.30 0.65 1.30 1 6.65 1.10 7.32 3/4" 6 7.95 1 47.70
Estribos 3/8" 41 2.10 1 86.10
C1-5V-8 ENTRE EJES R-S y 16-17 1 0.80 0.25 0.65 0.13 1 0.80 1.05 0.84 3/4" 6 2.60 1 15.60
1 1.80 0.25 0.65 0.29 1 1.80 1.05 1.89 3/4" 6 3.40 1 20.40
3/8" 18 2.00 1 36.00
3/8" 22 2.00 1 44.00
C1-6V-12 EN EJE 17 ENTRE EJES R-S 1 1.80 0.30 0.65 0.35 1 1.80 1.10 1.98 3/4" 6 3.40 1 20.40
Estribos 3/8" 21 2.10 1 44.10
SECTOR C-2
PRIMER PISO
C2 V-1 EN EJE D 1 6.25 0.30 0.65 1.22 1 6.25 1.10 6.88 3/4" 2 8.15 1 16.30
3/4" 3 7.95 1 23.85
3/4" 1 2.30 1 2.30
3/4" 1 2.60 1 2.60
Estribos 3/8" 35 2.00 1 70.00
C2 V-2 EN EJE G y H 2 6.25 0.30 0.65 2.44 2 6.25 1.10 13.75 3/4" 2 8.15 2 32.60
3/4" 3 7.95 2 47.70
3/4" 2 2.30 2 9.20
3/4" 1 2.60 2 5.20
5/8" 1 4.65 2 9.30
Estribos 3/8" 35 2.00 2 140.00
C2 V-3 ENTRE EJES H-I 1 6.25 0.30 0.65 1.22 1 6.25 1.10 6.88 3/4" 4 7.85 1 31.40
3/4" 1 5.05 1 5.05
Estribos 3/8" 35 2.00 1 70.00
C2 V-4 EN EJES I-J y K 3 6.20 0.30 0.65 3.63 3 6.20 1.10 20.46 3/4" 4 16.85 3 202.20
3 6.25 0.30 0.65 3.66 3 6.25 1.10 20.63 3/4" 2 3.80 3 22.80
5/8" 2 2.60 3 15.60
5/8" 1 4.40 3 13.20
5/8" 1 4.65 3 13.95
Estribos 3/8" 35 2.10 3 220.50
Estribos 3/8" 35 2.10 3 220.50
C2 V-5 EN EJE M 1 6.20 0.30 0.65 1.21 1 6.20 1.10 6.82 3/4" 2 14.00 1 28.00
1 3.90 0.30 0.65 0.76 1 3.90 1.10 4.29 3/4" 2 13.80 1 27.60
5/8" 2 2.60 1 5.20
5/8" 2 6.90 1 13.80
5/8" 1 4.40 1 4.40
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 27 2.10 1 56.70
C2 V-6 ENTRE EJES M y N 1 1.30 0.20 0.65 0.17 1 1.30 1.10 1.43 5/8" 4 8.05 1 32.20
1 3.65 0.20 0.65 0.47 1 3.65 1.10 4.02 Estribos 3/8" 18 1.90 1 34.20
1 1.30 0.20 0.65 0.17 1 1.30 1.10 1.43 Estribos 3/8" 26 1.90 1 49.40
Estribos 3/8" 18 1.90 1 34.20
C2 V-7 EN EJE N 1 6.20 0.30 0.65 1.21 1 6.20 1.10 6.82 3/4" 4 15.85 1 63.40
1 6.65 0.30 0.65 1.30 1 6.65 1.10 7.32 3/4" 2 3.80 1 7.60
5/8" 2 4.40 1 8.80

Página 63 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
5/8" 2 5.05 1 10.10
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 2.10 1 75.60
C2 V-8 EN EJE Ñ 1 3.40 0.30 0.65 0.66 1 3.40 1.10 3.74 3/4" 4 20.35 1 81.40
1 6.20 0.30 0.65 1.21 1 6.20 1.10 6.82 3/4" 2 3.80 1 7.60
1 6.65 0.30 0.65 1.30 1 6.65 1.10 7.32 5/8" 2 4.40 1 8.80
3/4" 2 5.05 1 10.10
3/4" 1 2.20 1 2.20
Estribos 3/8" 25 2.10 1 52.50
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 2.10 1 75.60
C2 V-9 EN EJE 10 ENTRE D y H 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 6 10.45 1 62.70
1 1.80 0.20 0.65 0.23 1 1.80 1.10 1.98 Estribos 3/8" 41 2.10 1 86.10
Estribos 3/8" 22 1.90 1 41.80
C2 V-9 EN EJE 10 ENTRE H y Ñ 6 6.45 0.30 0.65 7.55 6 6.45 1.10 42.57 3/4" 6 46.40 6 1,670.40
Estribos 3/8" 41 2.10 6 516.60
C2 V-10 ENTRE EJES 10-11 y G-H 1 0.80 0.20 0.65 0.10 1 0.80 1.10 0.88 3/4" 6 2.80 1 16.80
Estribos 3/8" 18 1.90 1 34.20
C2 V-11 EN EJE 11 ENTRE D y H 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 5 12.80 1 64.00
1 3.35 0.20 0.65 0.44 1 3.35 1.10 3.69 5/8" 1 12.80 1 12.80
Estribos 3/8" 41 1.90 1 77.90
Estribos 3/8" 28 1.90 1 53.20
C2 V-11 EN EJE 11 ENTRE H y Ñ 6 6.45 0.30 0.65 7.55 6 6.45 1.10 42.57 3/4" 5 46.40 6 1,392.00
5/8" 1 46.40 6 278.40
Estribos 3/8" 41 2.10 6 516.60
C2 V-12 EN EJE 12 ENTRE D y G 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 4 8.45 1 33.80
5/8" 2 8.45 1 16.90
Estribos 3/8" 41 2.10 1 86.10
C2 V-12 EN EJE 12 ENTRE H y I 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 4 8.45 1 33.80
5/8" 2 8.45 1 16.90
Estribos 3/8" 41 2.10 1 86.10
C2 V-12 EN EJE 12 ENTRE J y M 2 6.45 0.30 0.65 2.52 2 6.45 1.10 14.19 3/4" 4 16.10 2 128.80
5/8" 2 16.10 2 64.40
Estribos 3/8" 41 2.10 2 172.20
C2 V-12 EN EJE 12 ENTRE N y Ñ 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 4 8.45 1 33.80
5/8" 2 8.45 1 16.90
Estribos 3/8" 41 2.10 1 86.10
C2 V-13 EN EJE 14 ENTRE N y Ñ 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 4 8.45 1 33.80
5/8" 2 8.45 1 16.90
Estribos 3/8" 41 2.10 1 86.10
V CH 1 ENTRE EJES 10-11 y G-H 1 2.80 0.25 0.25 0.18 1 2.80 0.25 0.70 1/2" 5 3.80 1 19.00
Estribos 1/4" 22 1.20 1 26.40
V CH 2 ENTRE EJES 11-12 y H-I 1 4.20 0.30 0.25 0.32 1 4.20 0.30 1.26 1/2" 5 5.20 1 26.00
Estribos 1/4" 28 1.30 1 36.40
V CH 3 ENTRE EJES 10-11 y G-H 1 4.10 0.20 0.25 0.21 1 4.10 0.20 0.82 1/2" 5 5.10 1 25.50
Estribos 1/4" 27 1.10 1 29.70
V CH 3 ENTRE EJES 10-11 y M-N 1 7.80 0.20 0.25 0.39 1 7.80 0.20 1.56 1/2" 5 8.80 1 44.00
Estribos 1/4" 42 1.10 1 46.20
V ESC ENTRE EJES 10-11 y G-H 1 3.90 0.40 0.25 0.39 1 3.90 0.40 1.56 5/8" 6 4.90 1 29.40
Estribos 3/8" 26 1.50 1 39.00
V ESC ENTRE EJES 11-12 y H-I 1 4.05 0.40 0.25 0.41 1 4.05 0.40 1.62 5/8" 6 5.05 1 30.30
Estribos 3/8" 27 1.50 1 40.50
SEGUNDO PISO
C2 2V-1 EN EJE D 1 6.25 0.30 0.65 1.22 1 6.25 1.10 6.88 3/4" 2 8.15 1 16.30
3/4" 3 7.95 1 23.85
3/4" 1 2.30 1 2.30
3/4" 1 2.60 1 2.60
Estribos 3/8" 35 2.00 1 70.00
C2 2V-2 EN EJE G y H 2 6.25 0.30 0.65 2.44 2 6.25 1.10 13.75 3/4" 2 8.15 2 32.60

Página 64 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
3/4" 3 7.95 2 47.70
3/4" 2 2.30 2 9.20
3/4" 1 2.60 2 5.20
5/8" 1 4.65 2 9.30
Estribos 3/8" 35 2.00 2 140.00
C2 2V-3 EN EJES I-J y K 3 6.20 0.30 0.65 3.63 3 6.20 1.10 20.46 3/4" 4 16.85 3 202.20
3 6.25 0.30 0.65 3.66 3 6.25 1.10 20.63 3/4" 2 3.80 3 22.80
5/8" 2 2.60 3 15.60
5/8" 1 4.40 3 13.20
5/8" 1 4.65 3 13.95
Estribos 3/8" 35 2.10 3 220.50
Estribos 3/8" 35 2.10 3 220.50
C2 2V-4 EN EJE M 1 6.20 0.30 0.65 1.21 1 6.20 1.10 6.82 3/4" 2 14.00 1 28.00
1 3.90 0.30 0.65 0.76 1 3.90 1.10 4.29 3/4" 2 13.80 1 27.60
5/8" 2 2.60 1 5.20
5/8" 2 6.90 1 13.80
5/8" 1 4.40 1 4.40
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 27 2.10 1 56.70
C2 2V-5 ENTRE EJES M y N 1 1.30 0.20 0.65 0.17 1 1.30 1.10 1.43 5/8" 6 8.05 1 48.30
1 3.65 0.20 0.65 0.47 1 3.65 1.10 4.02 Estribos 3/8" 18 1.90 1 34.20
1 1.30 0.20 0.65 0.17 1 1.30 1.10 1.43 Estribos 3/8" 26 1.90 1 49.40
Estribos 3/8" 18 1.90 1 34.20
C2 2V-6 EN EJE N 1 6.40 0.30 0.65 1.25 1 6.40 1.10 7.04 3/4" 4 23.70 1 94.80
1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 3/4" 1 2.60 1 2.60
1 6.65 0.30 0.65 1.30 1 6.65 1.10 7.32 3/4" 2 3.90 1 7.80
3/4" 2 3.70 1 7.40
5/8" 2 4.80 1 9.60
5/8" 2 4.50 1 9.00
5/8" 2 5.05 1 10.10
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 2.10 1 75.60
C2 2V-7 EN EJE Ñ 1 3.40 0.30 0.65 0.66 1 3.40 1.10 3.74 3/4" 4 20.35 1 81.40
1 6.20 0.30 0.65 1.21 1 6.20 1.10 6.82 3/4" 2 3.80 1 7.60
1 6.65 0.30 0.65 1.30 1 6.65 1.10 7.32 5/8" 2 4.40 1 8.80
3/4" 2 5.05 1 10.10
3/4" 1 2.20 1 2.20
Estribos 3/8" 25 2.10 1 52.50
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 2.10 1 75.60
C2 2V-8 EN EJE 10 ENTRE D y H 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 6 10.45 1 62.70
1 1.80 0.20 0.65 0.23 1 1.80 1.10 1.98 Estribos 3/8" 41 2.10 1 86.10
Estribos 3/8" 22 1.90 1 41.80
C2 2V-8 EN EJE 10 ENTRE H y Ñ 6 6.45 0.30 0.65 7.55 6 6.45 1.10 42.57 3/4" 6 46.40 6 1,670.40
Estribos 3/8" 41 2.10 6 516.60
C2 2V-9 ENTRE EJES 10-11 y G-H 1 0.80 0.20 0.65 0.10 1 0.80 1.10 0.88 3/4" 6 2.80 1 16.80
Estribos 3/8" 18 1.90 1 34.20
1 1.80 0.20 0.65 0.23 1 1.80 1.10 1.98 3/4" 6 3.80 1 22.80
Estribos 3/8" 22 1.90 1 41.80
C2 2V-10 EN EJE 11 ENTRE D y H 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 5 12.80 1 64.00
1 3.35 0.20 0.65 0.44 1 3.35 1.10 3.69 5/8" 2 12.80 1 25.60
Estribos 3/8" 41 1.90 1 77.90
Estribos 3/8" 28 1.90 1 53.20
C2 2V-10 EN EJE 11 ENTRE H y Ñ 6 6.45 0.30 0.65 7.55 6 6.45 1.10 42.57 3/4" 5 46.40 6 1,392.00
5/8" 2 46.40 6 556.80
Estribos 3/8" 41 2.10 6 516.60
C2 2V-11 EN EJE 12 ENTRE D y G 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 4 8.45 1 33.80
5/8" 2 8.45 1 16.90

Página 65 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
Estribos 3/8" 41 2.10 1 86.10
C2 2V-11 EN EJE 12 ENTRE H y I 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 4 8.45 1 33.80
5/8" 2 8.45 1 16.90
Estribos 3/8" 41 2.10 1 86.10
C2 2V-11 EN EJE 12 ENTRE J y M 2 6.45 0.30 0.65 2.52 2 6.45 1.10 14.19 3/4" 4 16.10 2 128.80
5/8" 2 16.10 2 64.40
Estribos 3/8" 41 2.10 2 172.20
C2 2V-11 EN EJE 12 ENTRE N y Ñ 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 4 8.45 1 33.80
5/8" 2 8.45 1 16.90
Estribos 3/8" 41 2.10 1 86.10
C2 2V-12 EN EJE 14 ENTRE N y Ñ 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 4 8.45 1 33.80
5/8" 2 8.45 1 16.90
Estribos 3/8" 41 2.10 1 86.10
V CH 1 ENTRE EJES 10-11 y G-H 1 2.80 0.25 0.25 0.18 1 2.80 0.25 0.70 1/2" 5 3.80 1 19.00
Estribos 1/4" 22 1.20 1 26.40
V CH 3 ENTRE EJES 10-11 y G-H 1 4.10 0.20 0.25 0.21 1 4.10 0.20 0.82 1/2" 5 5.10 1 25.50
Estribos 1/4" 27 1.10 1 29.70
V ESC ENTRE EJES 10-11 y G-H 1 3.90 0.40 0.25 0.39 1 3.90 0.40 1.56 5/8" 6 4.90 1 29.40
Estribos 3/8" 26 1.50 1 39.00
TERCER PISO
C2 3V-1 EN EJE D 1 6.25 0.30 0.65 1.22 1 6.25 1.10 6.88 3/4" 2 8.15 1 16.30
3/4" 3 7.95 1 23.85
3/4" 1 2.30 1 2.30
3/4" 1 2.60 1 2.60
Estribos 3/8" 35 2.00 1 70.00
C2 3V-2 EN EJE G y H 2 6.25 0.30 0.65 2.44 2 6.25 1.10 13.75 3/4" 2 8.15 2 32.60
3/4" 3 7.95 2 47.70
3/4" 2 2.30 2 9.20
3/4" 1 2.60 2 5.20
5/8" 1 4.65 2 9.30
Estribos 3/8" 35 2.00 2 140.00
C2 3V-3 EN EJES I-J y K 3 6.20 0.30 0.65 3.63 3 6.20 1.10 20.46 3/4" 4 16.85 3 202.20
3 6.25 0.30 0.65 3.66 3 6.25 1.10 20.63 3/4" 2 3.80 3 22.80
5/8" 2 2.60 3 15.60
5/8" 1 4.40 3 13.20
5/8" 1 4.65 3 13.95
3/4" 1 2.60 3 7.80
Estribos 3/8" 35 2.10 3 220.50
Estribos 3/8" 35 2.10 3 220.50
C2 3V-4 EN EJE M 1 6.20 0.30 0.65 1.21 1 6.20 1.10 6.82 3/4" 2 14.00 1 28.00
1 3.90 0.30 0.65 0.76 1 3.90 1.10 4.29 3/4" 2 13.80 1 27.60
5/8" 2 2.60 1 5.20
3/4" 2 6.90 1 13.80
5/8" 1 4.40 1 4.40
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 27 2.10 1 56.70
C2 3V-5 ENTRE EJES M y N 1 1.30 0.20 0.65 0.17 1 1.30 1.10 1.43 5/8" 6 8.05 1 48.30
1 3.65 0.20 0.65 0.47 1 3.65 1.10 4.02 Estribos 3/8" 18 1.90 1 34.20
1 1.30 0.20 0.65 0.17 1 1.30 1.10 1.43 Estribos 3/8" 26 1.90 1 49.40
Estribos 3/8" 18 1.90 1 34.20
C2 3V-6 EN EJE N 1 6.40 0.30 0.65 1.25 1 6.40 1.10 7.04 3/4" 4 23.70 1 94.80
1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 3/4" 1 2.60 1 2.60
1 6.65 0.30 0.65 1.30 1 6.65 1.10 7.32 3/4" 2 3.90 1 7.80
3/4" 2 3.70 1 7.40
5/8" 2 4.80 1 9.60
5/8" 2 4.50 1 9.00
5/8" 2 5.05 1 10.10
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 35 2.10 1 73.50

Página 66 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
Estribos 3/8" 36 2.10 1 75.60
C2 3V-7 EN EJE Ñ 1 3.40 0.30 0.65 0.66 1 3.40 1.10 3.74 3/4" 4 20.35 1 81.40
1 6.20 0.30 0.65 1.21 1 6.20 1.10 6.82 3/4" 2 3.80 1 7.60
1 6.65 0.30 0.65 1.30 1 6.65 1.10 7.32 5/8" 2 4.40 1 8.80
3/4" 2 5.05 1 10.10
3/4" 1 2.20 1 2.20
Estribos 3/8" 25 2.10 1 52.50
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 2.10 1 75.60
C2 3V-8 EN EJE 10 ENTRE D y H 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 6 10.45 1 62.70
1 1.80 0.20 0.65 0.23 1 1.80 1.10 1.98 Estribos 3/8" 41 2.10 1 86.10
Estribos 3/8" 22 1.90 1 41.80
5/8" 1 10.45 1 10.45
C2 3V-8 EN EJE 10 ENTRE H y Ñ 6 6.45 0.30 0.65 7.55 6 6.45 1.10 42.57 3/4" 6 46.40 6 1,670.40
Estribos 3/8" 41 2.10 6 516.60
5/8" 1 10.45 6 62.70
C2 3V-9 ENTRE EJES 10-11 y G-H 1 0.80 0.20 0.65 0.10 1 0.80 1.10 0.88 3/4" 6 2.80 1 16.80
Estribos 3/8" 18 1.90 1 34.20
1 1.80 0.20 0.65 0.23 1 1.80 1.10 1.98 3/4" 6 3.80 1 22.80
Estribos 3/8" 22 1.90 1 41.80
C2 3V-10 EN EJE 11 ENTRE D y H 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 5 12.80 1 64.00
1 3.35 0.20 0.65 0.44 1 3.35 1.10 3.69 5/8" 2 12.80 1 25.60
Estribos 3/8" 41 1.90 1 77.90
Estribos 3/8" 28 1.90 1 53.20
C2 3V-10 EN EJE 11 ENTRE H y Ñ 6 6.45 0.30 0.65 7.55 6 6.45 1.10 42.57 3/4" 5 46.40 6 1,392.00
5/8" 2 46.40 6 556.80
Estribos 3/8" 41 2.10 6 516.60
C2 3V-11 EN EJE 12 ENTRE D y G 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 4 8.45 1 33.80
5/8" 2 8.45 1 16.90
Estribos 3/8" 41 2.10 1 86.10
C2 3V-11 EN EJE 12 ENTRE H y I 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 4 8.45 1 33.80
5/8" 2 8.45 1 16.90
Estribos 3/8" 41 2.10 1 86.10
C2 3V-11 EN EJE 12 ENTRE J y M 2 6.45 0.30 0.65 2.52 2 6.45 1.10 14.19 3/4" 4 16.10 2 128.80
5/8" 2 16.10 2 64.40
Estribos 3/8" 41 2.10 2 172.20
C2 3V-11 EN EJE 12 ENTRE N y Ñ 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 4 8.45 1 33.80
5/8" 2 8.45 1 16.90
Estribos 3/8" 41 2.10 1 86.10
C2 3V-12 EN EJE 14 ENTRE N y Ñ 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 4 8.45 1 33.80
5/8" 2 8.45 1 16.90
Estribos 3/8" 41 2.10 1 86.10
V CH 1 ENTRE EJES 10-11 y G-H 1 2.80 0.25 0.25 0.18 1 2.80 0.25 0.70 1/2" 5 3.80 1 19.00
Estribos 1/4" 22 1.20 1 26.40
V CH 3 ENTRE EJES 10-11 y G-H 1 4.10 0.20 0.25 0.21 1 4.10 0.20 0.82 1/2" 5 5.10 1 25.50
Estribos 1/4" 27 1.10 1 29.70
V ESC ENTRE EJES 10-11 y G-H 1 3.90 0.40 0.25 0.39 1 3.90 0.40 1.56 5/8" 6 4.90 1 29.40
Estribos 3/8" 26 1.50 1 39.00
CUARTO PISO
C2 4V-1 EN EJE D 1 6.25 0.30 0.65 1.22 1 6.25 1.10 6.88 3/4" 2 8.15 1 16.30
3/4" 3 7.95 1 23.85
3/4" 1 2.30 1 2.30
3/4" 1 2.60 1 2.60
Estribos 3/8" 35 2.00 1 70.00
C2 4V-2 EN EJE G 1 6.25 0.30 0.65 1.22 1 6.25 1.10 6.88 3/4" 2 8.15 1 16.30
3/4" 3 7.95 1 23.85
3/4" 2 2.30 1 4.60
3/4" 1 2.60 1 2.60
5/8" 1 4.65 1 4.65

Página 67 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
Estribos 3/8" 35 2.00 1 70.00
C2 4V-3 EN EJE H 1 6.25 0.30 0.65 1.22 1 6.25 1.10 6.88 3/4" 2 8.15 1 16.30
3/4" 3 7.95 1 23.85
3/4" 2 2.30 1 4.60
3/4" 1 2.60 1 2.60
5/8" 1 4.65 1 4.65
Estribos 3/8" 35 2.00 1 70.00
C2 4V-3a EN EJE H 1 1.30 0.30 0.65 0.25 1 1.30 1.10 1.43 3/4" 5 2.80 1 14.00
Estribos 3/8" 18 2.00 1 36.00
C2 4V-4 EN EJES I yJ 2 1.30 0.30 0.65 0.51 2 1.30 1.10 2.86 3/4" 4 18.15 2 145.20
2 6.20 0.30 0.65 2.42 2 6.20 1.10 13.64 3/4" 1 4.50 2 9.00
2 6.25 0.30 0.65 2.44 2 6.25 1.10 13.75 3/4" 2 3.80 2 15.20
5/8" 2 2.60 2 10.40
5/8" 1 4.40 2 8.80
5/8" 1 4.65 2 9.30
Estribos 3/8" 18 2.10 2 75.60
Estribos 3/8" 35 2.10 2 147.00
Estribos 3/8" 35 2.10 2 147.00
C2 4V-5 EN EJE K 1 1.30 0.30 0.65 0.25 1 1.30 1.10 1.43 3/4" 4 18.15 1 72.60
1 6.20 0.30 0.65 1.21 1 6.20 1.10 6.82 3/4" 1 4.50 1 4.50
1 6.25 0.30 0.65 1.22 1 6.25 1.10 6.88 3/4" 2 3.80 1 7.60
5/8" 2 2.60 1 5.20
5/8" 1 4.40 1 4.40
5/8" 1 4.65 1 4.65
5/8" 2 4.20 1 8.40
Estribos 3/8" 18 2.10 1 37.80
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 35 2.10 1 73.50
C2 4V-6 EN EJE M 1 1.30 0.30 0.65 0.25 1 1.30 1.10 1.43 3/4" 2 15.50 1 31.00
1 6.20 0.30 0.65 1.21 1 6.20 1.10 6.82 3/4" 2 15.30 1 30.60
1 3.90 0.30 0.65 0.76 1 3.90 1.10 4.29 5/8" 2 3.90 1 7.80
5/8" 2 6.90 1 13.80
5/8" 1 4.40 1 4.40
Estribos 3/8" 18 2.10 1 37.80
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 27 2.10 1 56.70
C2 4V-7 ENTRE EJES M y N 1 1.30 0.20 0.65 0.17 1 1.30 1.10 1.43 5/8" 6 8.05 1 48.30
1 3.65 0.20 0.65 0.47 1 3.65 1.10 4.02 Estribos 3/8" 18 1.90 1 34.20
1 1.30 0.20 0.65 0.17 1 1.30 1.10 1.43 Estribos 3/8" 26 1.90 1 49.40
Estribos 3/8" 18 1.90 1 34.20
C2 4V-8 EN EJE N 1 1.30 0.30 0.65 0.25 1 1.30 1.10 1.43 3/4" 4 25.80 1 103.20
1 6.40 0.30 0.65 1.25 1 6.40 1.10 7.04 3/4" 1 3.90 1 3.90
1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 3/4" 2 3.90 1 7.80
1 6.65 0.30 0.65 1.30 1 6.65 1.10 7.32 3/4" 2 3.70 1 7.40
5/8" 2 4.80 1 9.60
5/8" 2 4.50 1 9.00
5/8" 2 5.05 1 10.10
Estribos 3/8" 18 2.10 1 37.80
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 2.10 1 75.60
C2 4V-9 EN EJE Ñ 1 1.30 0.30 0.65 0.25 1 1.30 1.10 1.43 3/4" 4 20.35 1 81.40
1 3.40 0.30 0.65 0.66 1 3.40 1.10 3.74 3/4" 4 20.35 1 81.40
1 6.20 0.30 0.65 1.21 1 6.20 1.10 6.82 3/4" 2 3.80 1 7.60
1 6.65 0.30 0.65 1.30 1 6.65 1.10 7.32 5/8" 2 4.40 1 8.80
3/4" 2 5.05 1 10.10
3/4" 1 2.20 1 2.20
3/4" 5 2.80 1 14.00
Estribos 3/8" 18 2.10 1 37.80

Página 68 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
Estribos 3/8" 25 2.10 1 52.50
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 2.10 1 75.60
C2 4V-10 EN EJE 10 ENTRE H y N 1 40.80 0.15 0.65 3.98 1 40.80 1.45 59.16 3/4" 6 10.45 1 62.70
Estribos 3/8" 178 1.80 1 320.40
C2 4V-11 EN EJE 10 ENTRE D y H 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 7 10.45 1 73.15
1 1.80 0.20 0.65 0.23 1 1.80 1.10 1.98 Estribos 3/8" 41 2.10 1 86.10
Estribos 3/8" 22 1.90 1 41.80
C2 4V-11 EN EJE 10 ENTRE H y Ñ 6 6.45 0.30 0.65 7.55 6 6.45 1.10 42.57 3/4" 7 46.40 6 1,948.80
Estribos 3/8" 41 2.10 6 516.60
C2 4V-12 ENTRE EJES 10-11 y G-H 1 0.80 0.20 0.65 0.10 1 0.80 1.10 0.88 3/4" 6 2.80 1 16.80
Estribos 3/8" 18 1.90 1 34.20
1 1.80 0.20 0.65 0.23 1 1.80 1.10 1.98 3/4" 6 3.80 1 22.80
Estribos 3/8" 22 1.90 1 41.80
C2 4V-13 EN EJE 11 ENTRE D y H 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 5 12.80 1 64.00
1 3.35 0.20 0.65 0.44 1 3.35 1.10 3.69 5/8" 2 12.80 1 25.60
Estribos 3/8" 41 1.90 1 77.90
Estribos 3/8" 28 1.90 1 53.20
C2 4V-13 EN EJE 11 ENTRE H y Ñ 6 6.45 0.30 0.65 7.55 6 6.45 1.10 42.57 3/4" 5 46.40 6 1,392.00
5/8" 2 46.40 6 556.80
Estribos 3/8" 41 2.10 6 516.60
C2 4V-14 ENTRE EJES 11 - 12 y K-M 1 6.45 0.25 0.65 1.05 1 6.45 1.05 6.77 5/8" 6 8.00 1 48.00
Estribos 3/8" 40 2.00 1 80.00
C2 4V-15 EN EJE 12 ENTRE D y G 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 4 8.45 1 33.80
5/8" 2 8.45 1 16.90
Estribos 3/8" 41 2.10 1 86.10
C2 4V-15 EN EJE 12 ENTRE H y I 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 4 8.45 1 33.80
5/8" 2 8.45 1 16.90
Estribos 3/8" 41 2.10 1 86.10
C2 4V-15 EN EJE 12 ENTRE J y M 2 6.45 0.30 0.65 2.52 2 6.45 1.10 14.19 3/4" 4 16.10 2 128.80
5/8" 2 16.10 2 64.40
Estribos 3/8" 41 2.10 2 172.20
C2 4V-15 EN EJE 12 ENTRE N y Ñ 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 4 8.45 1 33.80
5/8" 2 8.45 1 16.90
Estribos 3/8" 41 2.10 1 86.10
C2 4V-16 EN EJE 14 ENTRE N y Ñ 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 4 8.45 1 33.80
5/8" 2 8.45 1 16.90
Estribos 3/8" 41 2.10 1 86.10
V CH 1 ENTRE EJES 10-11 y G-H 1 2.80 0.25 0.25 0.18 1 2.80 0.25 0.70 1/2" 5 3.80 1 19.00
Estribos 1/4" 22 1.20 1 26.40
V CH 3 ENTRE EJES 10-11 y G-H 1 4.10 0.20 0.25 0.21 1 4.10 0.20 0.82 1/2" 5 5.10 1 25.50
Estribos 1/4" 27 1.10 1 29.70
V ESC ENTRE EJES 10-11 y G-H 1 3.90 0.40 0.25 0.39 1 3.90 0.40 1.56 5/8" 6 4.90 1 29.40
Estribos 3/8" 26 1.50 1 39.00
QUINTO PISO
C2 5V-1 EN EJE G 1 6.25 0.30 0.65 1.22 1 6.25 1.10 6.88 3/4" 2 8.15 1 16.30
3/4" 3 7.95 1 23.85
3/4" 2 2.30 1 4.60
3/4" 1 2.60 1 2.60
5/8" 1 4.65 1 4.65
Estribos 3/8" 35 2.00 1 70.00
C2 5V-2 EN EJE H 1 6.25 0.30 0.65 1.22 1 6.25 1.10 6.88 3/4" 2 8.15 1 16.30
3/4" 3 7.95 1 23.85
3/4" 2 2.30 1 4.60
3/4" 1 2.60 1 2.60
5/8" 1 4.65 1 4.65
Estribos 3/8" 35 2.00 1 70.00
C2 4V-3a EN EJE H 1 1.30 0.30 0.65 0.25 1 1.30 1.10 1.43 3/4" 5 2.80 1 14.00
Estribos 3/8" 18 2.00 1 36.00

Página 69 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
C2 5V-3 EN EJES I yJ 2 1.30 0.30 0.65 0.51 2 1.30 1.10 2.86 3/4" 4 18.15 2 145.20
2 6.20 0.30 0.65 2.42 2 6.20 1.10 13.64 3/4" 1 4.50 2 9.00
2 6.25 0.30 0.65 2.44 2 6.25 1.10 13.75 3/4" 2 3.80 2 15.20
3/4" 1 2.60 2 5.20
5/8" 1 4.40 2 8.80
5/8" 1 4.65 2 9.30
Estribos 3/8" 18 0.20 2 7.20
Estribos 3/8" 35 2.10 2 147.00
Estribos 3/8" 35 2.10 2 147.00
C2 5V-5 EN EJE K 1 1.30 0.30 0.65 0.25 1 1.30 1.10 1.43 3/4" 4 18.15 1 72.60
1 6.20 0.30 0.65 1.21 1 6.20 1.10 6.82 5/8" 2 3.90 1 7.80
1 6.25 0.30 0.65 1.22 1 6.25 1.10 6.88 5/8" 2 4.30 1 8.60
3/4" 1 3.40 1 3.40
5/8" 1 4.40 1 4.40
3/4" 1 4.55 1 4.55
Estribos 3/8" 18 2.10 1 37.80
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 35 2.10 1 73.50
C2 5V-6 EN EJE M 1 1.30 0.30 0.65 0.25 1 1.30 1.10 1.43 3/4" 2 15.50 1 31.00
1 6.20 0.30 0.65 1.21 1 6.20 1.10 6.82 3/4" 2 15.30 1 30.60
1 3.90 0.30 0.65 0.76 1 3.90 1.10 4.29 5/8" 2 3.90 1 7.80
5/8" 2 6.90 1 13.80
5/8" 1 4.40 1 4.40
Estribos 3/8" 18 2.10 1 37.80
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 27 2.10 1 56.70
C2 5V-7a ENTRE EJES M y N 1 1.30 0.20 0.65 0.17 1 1.30 1.10 1.43 5/8" 6 8.05 1 48.30
1 3.65 0.20 0.65 0.47 1 3.65 1.10 4.02 Estribos 3/8" 18 1.90 1 34.20
1 1.30 0.20 0.65 0.17 1 1.30 1.10 1.43 Estribos 3/8" 26 1.90 1 49.40
Estribos 3/8" 18 1.90 1 34.20
C2 5V-7 EN EJE N 1 1.30 0.30 0.65 0.25 1 1.30 1.10 1.43 3/4" 4 25.80 1 103.20
1 6.40 0.30 0.65 1.25 1 6.40 1.10 7.04 3/4" 1 3.90 1 3.90
1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 3/4" 2 3.90 1 7.80
1 6.65 0.30 0.65 1.30 1 6.65 1.10 7.32 3/4" 2 3.70 1 7.40
5/8" 2 4.80 1 9.60
5/8" 2 4.50 1 9.00
5/8" 2 5.05 1 10.10
Estribos 3/8" 18 2.10 1 37.80
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 2.10 1 75.60
C2 5V-8 EN EJE Ñ 1 1.30 0.30 0.65 0.25 1 1.30 1.10 1.43 3/4" 4 20.35 1 81.40
1 3.40 0.30 0.65 0.66 1 3.40 1.10 3.74 3/4" 4 20.35 1 81.40
1 6.20 0.30 0.65 1.21 1 6.20 1.10 6.82 3/4" 2 3.80 1 7.60
1 6.65 0.30 0.65 1.30 1 6.65 1.10 7.32 5/8" 2 4.40 1 8.80
3/4" 2 5.05 1 10.10
3/4" 1 2.20 1 2.20
3/4" 5 2.80 1 14.00
Estribos 3/8" 18 2.10 1 37.80
Estribos 3/8" 25 2.10 1 52.50
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 2.10 1 75.60
C2 5V-9 EN EJE 10 ENTRE H y N 1 40.80 0.15 0.65 3.98 1 40.80 1.45 59.16 3/4" 6 10.45 1 62.70
Estribos 3/8" 178 1.80 1 320.40
C2 5V-10 EN EJE 10 ENTRE D y H 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 7 10.45 1 73.15
1 1.80 0.20 0.65 0.23 1 1.80 1.10 1.98 Estribos 3/8" 41 2.10 1 86.10
Estribos 3/8" 22 1.90 1 41.80
C2 5V-10 EN EJE 10 ENTRE H y Ñ 6 6.45 0.30 0.65 7.55 6 6.45 1.10 42.57 3/4" 7 46.40 6 1,948.80
Estribos 3/8" 41 2.10 6 516.60

Página 70 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
C2 5V-10 EN EJE D 1 6.40 0.30 0.65 1.25 1 6.40 1.10 7.04 3/4" 7 16.85 1 117.95
1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 Estribos 3/8" 40 2.10 1 84.00
Estribos 3/8" 39 2.10 1 81.90
C2 5V-11 ENTRE EJES 10-11 y G-H 1 0.80 0.20 0.65 0.10 1 0.80 1.10 0.88 3/4" 6 2.80 1 16.80
Estribos 3/8" 18 1.90 1 34.20
1 1.80 0.20 0.65 0.23 1 1.80 1.10 1.98 3/4" 6 3.80 1 22.80
Estribos 3/8" 22 1.90 1 41.80
C2 5V-12 EN EJE 11 ENTRE D y H 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 4 12.80 1 51.20
1 3.35 0.20 0.65 0.44 1 3.35 1.10 3.69 5/8" 2 12.80 1 25.60
Estribos 3/8" 41 1.90 1 77.90
Estribos 3/8" 28 1.90 1 53.20
C2 5V-12 EN EJE 11 ENTRE H y Ñ 6 6.45 0.30 0.65 7.55 6 6.45 1.10 42.57 3/4" 4 46.40 6 1,113.60
5/8" 2 46.40 6 556.80
Estribos 3/8" 41 2.10 6 516.60
C2 5V-13 ENTRE EJES 11 - 12 y K-M 1 6.45 0.25 0.65 1.05 1 6.45 1.05 6.77 5/8" 6 8.00 1 48.00
Estribos 3/8" 40 2.00 1 80.00
C2 5V-14 EN EJE 12 ENTRE D y G 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 4 8.45 1 33.80
Estribos 3/8" 41 2.10 1 86.10
C2 5V-14 EN EJE 12 ENTRE H y I 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 4 8.45 1 33.80
Estribos 3/8" 41 2.10 1 86.10
C2 5V-14 EN EJE 12 ENTRE J y M 2 6.45 0.30 0.65 2.52 2 6.45 1.10 14.19 3/4" 4 16.10 2 128.80
Estribos 3/8" 41 2.10 2 172.20
C2 5V-14 EN EJE 12 ENTRE N y Ñ 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 4 8.45 1 33.80
Estribos 3/8" 41 2.10 1 86.10
C2 5V-15 EN EJE 14 ENTRE N y Ñ 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 6 8.45 1 50.70
5/8" 1 8.45 1 8.45
Estribos 3/8" 41 2.10 1 86.10
V CH 1 ENTRE EJES 10-11 y G-H 1 2.80 0.25 0.25 0.18 1 2.80 0.25 0.70 1/2" 5 3.80 1 19.00
Estribos 1/4" 22 1.20 1 26.40
V CH 3 ENTRE EJES 10-11 y G-H 1 4.10 0.20 0.25 0.21 1 4.10 0.20 0.82 1/2" 5 5.10 1 25.50
Estribos 1/4" 27 1.10 1 29.70
V ESC ENTRE EJES 10-11 y G-H 1 3.90 0.40 0.25 0.39 1 3.90 0.40 1.56 5/8" 6 4.90 1 29.40
Estribos 3/8" 26 1.50 1 39.00
SECTOR C-3
SOTANO
C3 VS-1 EN EJE I 1 6.30 0.30 0.65 1.23 1 6.30 1.10 6.93 3/4" 4 7.80 1 31.20
3/4" 2 2.35 1 4.70
Estribos 3/8" 35 2.10 1 73.50
C3 VS-1a y b EN EJE I 2 2.10 0.25 0.65 0.68 2 2.10 1.05 4.41 3/4" 4 6.95 2 55.60
2 2.80 0.25 0.65 0.91 2 2.80 1.05 5.88 5/8" 4 4.60 2 36.80
3/4" 2 6.75 2 27.00
Estribos 3/8" 21 2.00 2 84.00
Estribos 3/8" 23 2.00 2 92.00
C3 VS-1 c y d EN EJE I 2 2.40 0.25 0.65 0.78 2 2.40 1.05 5.04 3/4" 4 3.95 2 31.60
5/8" 4 3.75 2 30.00
3/4" 2 3.75 2 15.00
Estribos 3/8" 22 2.00 2 88.00
C3 VS-2 ENTRE EJES I-J 1 2.80 0.30 0.65 0.55 1 2.80 1.10 3.08 3/4" 4 4.40 1 17.60
3/4" 2 4.20 1 8.40
5/8" 4 3.70 1 14.80
Estribos 3/8" 23 2.10 1 48.30
C3 VS-3 ENTRE EJES I-J 1 6.30 0.30 0.65 1.23 1 6.30 1.10 6.93 3/4" 4 7.80 1 31.20
Estribos 3/8" 35 2.10 1 73.50
C3 VS-3 ENTRE EJES 10-17 y I-J 1 3.80 0.30 0.65 0.74 1 3.80 1.10 4.18 3/4" 4 4.80 1 19.20
Estribos 3/8" 27 2.10 1 56.70
VCH ENTRE EJES I-J 1 2.40 0.30 0.25 0.18 1 2.40 0.30 0.72 5/8" 6 3.60 1 21.60
Estribos 1/4" 18 1.30 1 23.40
C3 VS-4 EN EJE J 1 6.05 0.30 0.65 1.18 1 6.05 1.10 6.66 3/4" 4 19.45 1 77.80
1 6.40 0.30 0.65 1.25 1 6.40 1.10 7.04 3/4" 2 2.70 1 5.40

Página 71 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
1 2.40 0.30 0.65 0.47 1 2.40 1.10 2.64 3/4" 3 3.80 1 11.40
3/4" 2 5.30 1 10.60
3/4" 2 4.15 1 8.30
5/8" 1 4.15 1 4.15
3/4" 2 4.20 1 8.40
Estribos 3/8" 34 2.10 1 71.40
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 22 2.10 1 46.20
C3 VS-5 EN EJE K 1 6.05 0.30 0.65 1.18 1 6.05 1.10 6.66 3/4" 4 23.50 1 94.00
1 6.40 0.30 0.65 1.25 1 6.40 1.10 7.04 3/4" 2 2.70 1 5.40
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 3 3.80 1 11.40
3/4" 3 3.80 1 11.40
3/4" 2 2.30 1 4.60
3/4" 2 4.15 1 8.30
5/8" 1 4.15 1 4.15
3/4" 2 4.20 1 8.40
3/4" 1 5.25 1 5.25
Estribos 3/8" 34 2.10 1 71.40
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 2.10 1 75.60
C3 VS-6 EN EJE M 1 6.05 0.30 0.65 1.18 1 6.05 1.10 6.66 3/4" 4 19.10 1 76.40
1 6.40 0.30 0.65 1.25 1 6.40 1.10 7.04 3/4" 2 2.70 1 5.40
1 2.00 0.30 0.65 0.39 1 2.00 1.10 2.20 3/4" 3 3.80 1 11.40
3/4" 1 4.95 1 4.95
3/4" 2 4.15 1 8.30
5/8" 1 4.15 1 4.15
3/4" 2 4.20 1 8.40
Estribos 3/8" 34 2.10 1 71.40
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 19 2.10 1 39.90
C3 VS-7 EN EJE N 1 6.05 0.30 0.65 1.18 1 6.05 1.10 6.66 3/4" 4 19.35 1 77.40
1 6.40 0.30 0.65 1.25 1 6.40 1.10 7.04 3/4" 2 2.70 1 5.40
1 2.25 0.30 0.65 0.44 1 2.25 1.10 2.48 3/4" 3 3.80 1 11.40
3/4" 3 5.15 1 15.45
3/4" 2 4.15 1 8.30
5/8" 1 4.15 1 4.15
3/4" 2 4.20 1 8.40
Estribos 3/8" 34 2.10 1 71.40
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 21 2.10 1 44.10
C3 VS-8 EN EJE Ñ 1 6.05 0.30 0.65 1.18 1 6.05 1.10 6.66 3/4" 2 11.15 1 22.30
1 1.80 0.25 0.65 0.29 1 1.80 1.05 1.89 3/4" 2 10.95 1 21.90
1 2.25 0.25 0.65 0.37 1 2.25 1.05 2.36 5/8" 4 3.60 1 14.40
3/4" 1 4.15 1 4.15
3/4" 2 3.75 1 7.50
3/4" 1 2.60 1 2.60
3/4" 2 3.35 1 6.70
Estribos 3/8" 34 2.10 1 71.40
Estribos 3/8" 20 2.00 1 40.00
Estribos 3/8" 21 2.00 1 42.00
C3 VS-9 EN EJE 15 3 6.45 0.30 0.65 3.77 3 6.45 1.10 21.29 3/4" 2 8.15 1 16.30
1 1.20 0.30 0.65 0.23 1 1.20 1.10 1.32 3/4" 2 7.95 1 15.90
3/4" 3 2.40 1 7.20
5/8" 1 2.40 1 2.40
3/4" 2 4.90 1 9.80
3/4" 2 17.30 1 34.60
3/4" 2 8.65 1 17.30
3/4" 3 5.25 1 15.75
5/8" 1 4.05 1 4.05

Página 72 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
3/4" 3 3.40 1 10.20
5/8" 4 2.80 1 11.20
Estribos 3/8" 36 2.10 3 226.80
Estribos 3/8" 14 2.10 1 29.40
C3 VS-9a EN EJE 14 1 2.25 0.25 0.65 0.37 1 2.25 1.05 2.36 3/4" 4 3.80 1 15.20
3/4" 3 3.60 1 10.80
5/8" 4 3.10 1 12.40
Estribos 3/8" 22 2.00 1 44.00
C3 VS-9b EN EJE 15 1 2.25 0.25 0.65 0.37 1 2.25 1.05 2.36 3/4" 7 3.75 1 26.25
5/8" 4 3.35 1 13.40
Estribos 3/8" 22 2.00 1 44.00
C3 VS-10 EN EJE 16 5 6.45 0.30 0.65 6.29 5 6.45 1.10 35.48 3/4" 2 39.50 1 79.00
3/4" 3 8.95 1 26.85
3/4" 2 30.35 1 60.70
3/4" 2 2.50 1 5.00
3/4" 11 3.60 1 39.60
3/4" 3 2.35 1 7.05
3/4" 1 4.75 1 4.75
3/4" 2 4.05 1 8.10
3/4" 6 3.85 1 23.10
Estribos 3/8" 36 2.10 5 378.00
C3 VS-10a EN EJE 16 1 2.25 0.30 0.65 0.44 1 2.25 1.10 2.48 3/4" 7 3.50 1 24.50
5/8" 4 3.35 1 13.40
Estribos 3/8" 22 2.10 1 46.20
C3 VS-11 EN EJE 17 1 1.20 0.25 0.65 0.20 1 1.20 1.05 1.26 3/4" 4 2.90 1 11.60
1 0.80 0.25 0.65 0.13 1 0.80 1.05 0.84 3/4" 3 2.70 1 8.10
3 6.45 0.30 0.65 3.77 3 6.45 1.10 21.29 5/8" 4 2.50 1 10.00
1 2.25 0.30 0.65 0.44 1 2.25 1.10 2.48 3/4" 4 31.80 1 127.20
1 2.80 0.30 0.65 0.55 1 2.80 1.10 3.08 3/4" 9 3.60 1 32.40
3/4" 3 5.70 1 17.10
3/4" 5 4.25 1 21.25
3/4" 1 4.25 1 4.25
Estribos 3/8" 14 2.00 1 28.00
Estribos 3/8" 11 2.00 1 22.00
Estribos 3/8" 36 2.10 3 226.80
Estribos 3/8" 22 2.10 1 46.20
Estribos 3/8" 23 2.10 1 48.30
C3 VS-11a EN EJE 17 1 2.25 0.30 0.65 0.44 1 2.25 1.10 2.48 3/4" 7 3.75 1 26.25
5/8" 4 3.35 1 13.40
Estribos 3/8" 22 2.10 1 46.20
C3 VS-12 EN EJE 18 1 6.70 0.25 0.65 1.09 1 6.70 1.05 7.04 3/4" 4 24.25 1 97.00
1 6.45 0.25 0.65 1.05 1 6.45 1.05 6.77 3/4" 2 3.50 1 7.00
1 6.55 0.25 0.65 1.06 1 6.55 1.05 6.88
Estribos 3/8" 36 2.00 1 72.00
Estribos 3/8" 36 2.00 1 72.00
Estribos 3/8" 36 2.00 1 72.00
C3 VS-12 EN EJE 19 1 6.20 0.25 0.65 1.01 1 6.20 1.05 6.51 3/4" 4 4.90 1 19.60
3/4" 2 2.50 1 5.00
3/4" 3 2.40 1 7.20
3/4" 2 4.50 1 9.00
Estribos 3/8" 35 2.00 1 70.00
V ESC 1 3.90 0.40 0.25 0.39 1 3.90 0.40 1.56 5/8" 6 4.90 1 29.40
Estribos 3/8" 26 1.50 1 39.00
PRIMER PISO
C3 V1 EN EJE D 1 4.40 0.30 0.65 0.86 1 4.40 1.10 4.84 3/4" 2 6.20 1 12.40
3/4" 2 5.75 1 11.50
3/4" 2 2.50 1 5.00
5/8" 1 2.50 1 2.50
3/4" 1 2.70 1 2.70

Página 73 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
Estribos 3/8" 29 2.10 1 60.90
C3 V1 a EN EJE D 1 3.35 0.30 0.65 0.65 1 3.35 1.10 3.69 3/4" 3 7.85 1 23.55
1 2.40 0.30 0.65 0.47 1 2.40 1.10 2.64 3/4" 3 7.65 1 22.95
5/8" 4 4.00 1 16.00
3/4" 3 4.90 1 14.70
Estribos 3/8" 25 2.10 1 52.50
Estribos 3/8" 22 2.10 1 46.20
C3 V2 EN EJES G y H 2 6.25 0.30 0.65 2.44 2 6.25 1.10 13.75 3/4" 4 24.40 2 195.20
2 6.50 0.30 0.65 2.54 2 6.50 1.10 14.30 3/4" 3 2.50 2 15.00
2 6.45 0.30 0.65 2.52 2 6.45 1.10 14.19 3/4" 6 3.70 2 44.40
3/4" 4 2.50 2 20.00
3/4" 2 4.45 2 17.80
3/4" 2 4.30 2 17.20
3/4" 2 4.55 2 18.20
5/8" 1 4.55 2 9.10
Estribos 3/8" 35 2.10 2 147.00
Estribos 3/8" 36 2.10 2 151.20
Estribos 3/8" 36 2.10 2 151.20
C3 V2 a EN EJE G 1 4.80 0.30 0.65 0.94 1 4.80 1.10 5.28 3/4" 2 6.60 1 13.20
3/4" 2 5.70 1 11.40
3/4" 2 2.50 1 5.00
5/8" 1 2.50 1 2.50
3/4" 1 3.10 1 3.10
Estribos 3/8" 30 2.10 1 63.00
C3 V2 b EN EJE H 1 6.00 0.30 0.65 1.17 1 6.00 1.10 6.60 3/4" 4 7.80 1 31.20
3/4" 2 2.50 1 5.00
5/8" 1 2.50 1 2.50
3/4" 1 4.30 1 4.30
Estribos 3/8" 34 2.10 1 71.40

C3 V3 EN EJE I 1 6.30 0.30 0.65 1.23 1 6.30 1.10 6.93 3/4" 4 7.80 1 31.20
3/4" 2 2.35 1 4.70
5/8" 1 2.35 1 2.35
3/4" 1 4.60 1 4.60
Estribos 3/8" 35 2.10 1 73.50
C3 V3a EN EJE I 1 2.10 0.30 0.65 0.41 1 2.10 1.10 2.31 3/4" 7 7.00 1 49.00
1 2.80 0.30 0.65 0.55 1 2.80 1.10 3.08 5/8" 4 6.80 1 27.20
1 2.40 0.30 0.65 0.47 1 2.40 1.10 2.64 1" 3 4.80 1 14.40
1" 3 4.00 1 12.00
5/8" 4 4.00 1 16.00
Estribos 3/8" 21 2.10 1 44.10
Estribos 3/8" 23 2.10 1 48.30
Estribos 3/8" 22 2.10 1 46.20
C3 V3 b EN EJE I 1 2.10 0.30 0.65 0.41 1 2.10 1.10 2.31 3/4" 7 7.00 1 49.00
1 2.80 0.30 0.65 0.55 1 2.80 1.10 3.08 5/8" 4 6.80 1 27.20
1 2.40 0.30 0.65 0.47 1 2.40 1.10 2.64 1" 3 4.80 1 14.40
1" 3 4.00 1 12.00
5/8" 4 4.00 1 16.00
Estribos 3/8" 21 2.10 1 44.10
Estribos 3/8" 23 2.10 1 48.30
Estribos 3/8" 22 2.10 1 46.20
C3 V3' ENTRE EJES I-J Y 16-18 1 2.80 0.25 0.65 0.46 1 2.80 1.05 2.94 3/4" 5 4.40 1 22.00
5/8" 4 4.20 1 16.80
Estribos 3/8" 23 2.00 1 46.00
VCH ENTRE EJES I-J Y 16-18 1 2.40 0.30 0.25 0.18 1 2.40 0.30 0.72 1/2" 6 3.50 1 21.00
Estribos 1/4" 18 1.30 1 23.40
C3 V4 ENTRE EJES I y J 1 1.40 0.30 0.65 0.27 1 1.40 1.10 1.54 3/4" 4 7.80 1 31.20
1 4.70 0.30 0.65 0.92 1 4.70 1.10 5.17 3/4" 1 3.85 1 3.85
3/4" 1 2.05 1 2.05

Página 74 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
3/4" 1 3.30 1 3.30
Estribos 3/8" 19 2.10 1 39.90
Estribos 3/8" 30 2.10 1 63.00
C3 V4 ENTRE EJES I y J 1 1.40 0.30 0.65 0.27 1 1.40 1.10 1.54 3/4" 4 5.25 1 21.00
3/8" 2 5.25 1 10.50
Estribos 3/8" 19 2.10 1 39.90
C3 V6 EN EJE J 1 6.25 0.30 0.65 1.22 1 6.25 1.10 6.88 3/4" 4 19.50 1 78.00
1 6.50 0.30 0.65 1.27 1 6.50 1.10 7.15 3/4" 2 2.60 1 5.20
1 2.40 0.30 0.65 0.47 1 2.40 1.10 2.64 3/4" 3 3.70 1 11.10
3/4" 3 5.25 1 15.75
3/4" 2 4.25 1 8.50
3/4" 2 4.10 1 8.20
5/8" 1 4.85 1 4.85
5/8" 4 4.25 1 17.00
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 2.10 1 75.60
Estribos 3/8" 22 2.10 1 46.20
C3 V7 ENTRE EJES J y K 1 1.70 0.25 0.65 0.28 1 1.70 1.05 1.79 3/4" 4 8.15 1 32.60
1 0.45 0.25 0.65 0.07 1 0.45 1.05 0.47 Estribos 3/8" 20 2.00 1 40.00
1 4.00 0.25 0.65 0.65 1 4.00 1.05 4.20 Estribos 3/8" 16 2.00 1 32.00
Estribos 3/8" 27 2.00 1 54.00
C3 V7' ENTRE EJES I y J 1 0.30 0.20 0.65 0.04 1 0.30 1.00 0.30 3/4" 4 3.20 1 12.80
Estribos 3/8" 15 1.90 1 28.50
C3 V8 EN EJE K y N 2 6.25 0.30 0.65 2.44 2 6.25 1.10 13.75 3/4" 4 19.50 2 156.00
2 6.50 0.30 0.65 2.54 2 6.50 1.10 14.30 3/4" 2 2.60 2 10.40
2 1.70 0.30 0.65 0.66 2 1.70 1.10 3.74 3/4" 3 3.70 2 22.20
3/4" 3 5.25 2 31.50
3/4" 2 4.25 2 17.00
3/4" 2 4.10 2 16.40
5/8" 1 4.85 2 9.70
5/8" 4 4.25 2 34.00
Estribos 3/8" 35 2.10 2 147.00
Estribos 3/8" 36 2.10 2 151.20
Estribos 3/8" 17 2.10 2 71.40
C3 V-9 EN EJE M 1 6.25 0.30 0.65 1.22 1 6.25 1.10 6.88 3/4" 2 20.20 1 40.40
1 6.50 0.30 0.65 1.27 1 6.50 1.10 7.15 3/4" 3 4.35 1 13.05
1 6.90 0.30 0.65 1.35 1 6.90 1.10 7.59 3/4" 3 8.35 1 25.05
3/4" 2 13.90 1 27.80
3/4" 3 8.75 1 26.25
3/4" 2 3.90 1 7.80
5/8" 2 4.10 1 8.20
3/4" 1 6.40 1 6.40
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 2.10 1 75.60
Estribos 3/8" 37 2.10 1 77.70
C3 V-10 EN EJE M 1 4.95 0.30 0.65 0.97 1 4.95 1.10 5.45 3/4" 7 6.45 1 45.15
Estribos 3/8" 31 2.10 1 65.10
C3 V-11 EN EJE Ñ 1 6.25 0.30 0.65 1.22 1 6.25 1.10 6.88 3/4" 4 11.15 1 44.60
1 1.80 0.30 0.65 0.35 1 1.80 1.10 1.98 3/4" 1 2.60 1 2.60
1 1.95 0.30 0.65 0.38 1 1.95 1.10 2.15 3/4" 2 4.80 1 9.60
3/4" 4 3.60 1 14.40
5/8" 2 4.25 1 8.50
3/4" 2 3.45 1 6.90
3/4" 2 3.05 1 6.10
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 20 2.10 1 42.00
Estribos 3/8" 19 2.10 1 39.90
C3 V-12 EN EJE 13 1 6.45 0.25 0.65 1.05 1 6.45 1.05 6.77 3/4" 5 22.15 1 110.75
1 5.25 0.25 0.65 0.85 1 5.25 1.05 5.51 3/4" 1 3.60 1 3.60

Página 75 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
1 4.95 0.25 0.65 0.80 1 4.95 1.05 5.20 3/4" 2 5.20 1 10.40
Estribos 3/8" 36 2.00 1 72.00
Estribos 3/8" 32 2.00 1 64.00
Estribos 3/8" 31 2.00 1 62.00
C3 V-13a EN EJE 15 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 23.55 1 47.10
1 4.75 0.30 0.65 0.93 1 4.75 1.10 5.23 3/4" 3 8.85 1 26.55
1 6.55 0.30 0.65 1.28 1 6.55 1.10 7.21 3/4" 2 14.40 1 28.80
3/4" 2 3.60 1 7.20
3/4" 2 5.20 1 10.40
Estribos 3/8" 36 2.10 1 75.60
Estribos 3/8" 30 2.10 1 63.00
Estribos 3/8" 36 2.10 1 75.60
C3 V-13b EN EJE 15 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 23.55 1 47.10
1 4.75 0.30 0.65 0.93 1 4.75 1.10 5.23 3/4" 3 8.85 1 26.55
1 6.55 0.30 0.65 1.28 1 6.55 1.10 7.21 3/4" 2 14.40 1 28.80
3/4" 2 3.60 1 7.20
3/4" 2 5.20 1 10.40
Estribos 3/8" 36 2.10 1 75.60
Estribos 3/8" 30 2.10 1 63.00
Estribos 3/8" 36 2.10 1 75.60

C3 V-13 EN EJE 15 3 6.45 0.30 0.65 3.77 3 6.45 1.10 21.29 3/4" 5 8.35 1 41.75
1 1.20 0.30 0.65 0.23 1 1.20 1.10 1.32 3/4" 2 2.50 1 5.00
3/4" 3 2.60 1 7.80
3/4" 1 4.75 1 4.75
3/4" 4 16.70 1 66.80
3/4" 3 3.60 1 10.80
5/8" 1 9.05 1 9.05
3/4" 1 4.75 1 4.75
3/4" 2 4.05 1 8.10
5/8" 1 3.40 1 3.40
5/8" 4 2.80 1 11.20
Estribos 3/8" 36 2.10 3 226.80
Estribos 3/8" 18 2.10 1 37.80
C3 V-14 EN EJE 16 4 6.45 0.30 0.65 5.03 4 6.45 1.10 28.38 3/4" 4 39.35 1 157.40
1 2.25 0.30 0.65 0.44 1 2.25 1.10 2.48 3/4" 2 2.50 1 5.00
1 3.80 0.30 0.65 0.74 1 3.80 1.10 4.18 3/4" 3 3.60 4 43.20
3/4" 3 2.35 1 7.05
3/4" 2 4.75 1 9.50
5/8" 1 8.45 1 8.45
3/4" 2 4.05 1 8.10
3/4" 2 4.25 2 17.00
3/4" 2 4.10 1 8.20
Estribos 3/8" 36 2.10 4 302.40
Estribos 3/8" 22 2.10 1 46.20
Estribos 3/8" 27 2.10 1 56.70
C3 V-14a EN EJE 16 2 6.45 0.30 0.65 2.52 2 6.45 1.10 14.19 3/4" 4 24.10 1 96.40
1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 3/4" 2 2.30 1 4.60
3/4" 3 3.60 2 21.60
3/4" 3 2.50 1 7.50
5/8" 1 8.45 1 8.45
3/4" 2 4.05 1 8.10
3/4" 2 4.45 1 8.90
3/4" 2 3.95 1 7.90
Estribos 3/8" 36 2.10 2 151.20
Estribos 3/8" 35 2.10 1 73.50

Página 76 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
C3 V-15 EN EJE 17 1 1.20 0.25 0.65 0.20 1 1.20 1.05 1.26 3/4" 6 2.90 1 17.40
1 0.80 0.25 0.65 0.13 1 0.80 1.05 0.84 5/8" 4 2.70 1 10.80
2 6.45 0.30 0.65 2.52 2 6.45 1.10 14.19 3/4" 4 33.35 1 133.40
1 3.70 0.30 0.65 0.72 1 3.70 1.10 4.07 3/4" 2 3.60 3 21.60
1 2.50 0.30 0.65 0.49 1 2.50 1.10 2.75 5/8" 1 3.60 2 7.20
1 2.25 0.30 0.65 0.44 1 2.25 1.10 2.48 3/4" 2 8.90 1 17.80
1 1.80 0.30 0.65 0.35 1 1.80 1.10 1.98 5/8" 1 8.90 1 8.90
1 1.80 0.30 0.65 0.35 1 1.80 1.10 1.98 3/4" 2 2.00 1 4.00
5/8" 4 2.80 1 11.20
3/4" 2 4.25 1 8.50
5/8" 2 4.25 2 17.00
Estribos 3/8" 18 2.00 1 36.00
Estribos 3/8" 17 2.00 1 34.00
Estribos 3/8" 49 2.10 2 205.80
Estribos 3/8" 30 2.10 1 63.00
Estribos 3/8" 22 2.10 1 46.20
Estribos 3/8" 21 2.10 1 44.10
Estribos 3/8" 18 2.10 1 37.80
Estribos 3/8" 18 2.10 1 37.80
C3 V-15a EN EJE 17 1 6.20 0.25 0.65 1.01 1 6.20 1.05 6.51 3/4" 5 8.55 1 42.75
1 4.30 0.25 0.65 0.70 1 4.30 1.05 4.52 3/4" 2 2.35 1 4.70
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 3 2.50 1 7.50
3/4" 2 4.50 1 9.00
3/4" 4 13.75 1 55.00
3/4" 3 3.60 1 10.80
3/4" 3 2.50 1 7.50
3/4" 1 3.10 1 3.10
3/4" 2 5.25 1 10.50
Estribos 3/8" 35 2.00 1 70.00
Estribos 3/8" 28 2.00 1 56.00
Estribos 3/8" 49 2.10 1 102.90
C3 V-16 EN EJE 18 1 6.70 0.25 0.65 1.09 1 6.70 1.05 7.04 3/4" 4 26.55 1 106.20
1 4.40 0.25 0.65 0.72 1 4.40 1.05 4.62 3/4" 1 3.50 2 7.00
1 1.75 0.25 0.65 0.28 1 1.75 1.05 1.84 Estribos 3/8" 36 2.00 1 72.00
1 6.65 0.25 0.65 1.08 1 6.65 1.05 6.98 Estribos 3/8" 29 2.00 1 58.00
1 3.70 0.25 0.65 0.60 1 3.70 1.05 3.89 Estribos 3/8" 20 2.00 1 40.00
Estribos 3/8" 36 2.00 1 72.00
Estribos 3/8" 26 2.00 1 52.00
C3 V-17 EN EJE 19 1 6.45 0.25 0.65 1.05 1 6.45 1.05 6.77 3/4" 4 8.90 1 35.60
1 2.20 0.30 0.65 0.43 1 2.20 1.10 2.42 3/4" 2 2.35 1 4.70
1 6.45 0.25 0.65 1.05 1 6.45 1.05 6.77 3/4" 3 2.50 1 7.50
1 1.20 0.30 0.65 0.23 1 1.20 1.10 1.32 5/8" 1 8.10 1 8.10
3/4" 2 4.75 1 9.50
3/4" 4 12.35 1 49.40
3/4" 3 5.00 1 15.00
3/4" 3 4.85 1 14.55
Estribos 3/8" 36 2.00 1 72.00
Estribos 3/8" 21 2.10 1 44.10
Estribos 3/8" 49 2.00 1 98.00
Estribos 3/8" 14 2.10 1 29.40
V ESC 2 3.90 0.40 0.25 0.78 2 3.90 0.40 3.12 5/8" 6 4.90 2 58.80
Estribos 3/8" 26 1.50 2 78.00
SEGUNDO PISO
C3 2V1 EN EJE D 1 4.40 0.30 0.65 0.86 1 4.40 1.10 4.84 3/4" 2 6.20 1 12.40
3/4" 2 5.75 1 11.50
3/4" 2 2.50 1 5.00
5/8" 1 2.50 1 2.50
3/4" 1 2.70 1 2.70
Estribos 3/8" 29 2.10 1 60.90

Página 77 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
C3 2V1 a EN EJE D 1 3.35 0.30 0.65 0.65 1 3.35 1.10 3.69 3/4" 3 7.85 1 23.55
1 2.40 0.30 0.65 0.47 1 2.40 1.10 2.64 3/4" 3 7.65 1 22.95
5/8" 4 4.00 1 16.00
3/4" 3 4.90 1 14.70
Estribos 3/8" 25 2.10 1 52.50
Estribos 3/8" 22 2.10 1 46.20
C3 2V2 EN EJES G y H 2 6.25 0.30 0.65 2.44 2 6.25 1.10 13.75 3/4" 4 24.40 2 195.20
2 6.50 0.30 0.65 2.54 2 6.50 1.10 14.30 3/4" 3 2.50 2 15.00
2 6.45 0.30 0.65 2.52 2 6.45 1.10 14.19 3/4" 6 3.70 2 44.40
3/4" 4 2.50 2 20.00
3/4" 2 4.45 2 17.80
3/4" 2 4.30 2 17.20
3/4" 2 4.55 2 18.20
5/8" 1 4.55 2 9.10
Estribos 3/8" 35 2.10 2 147.00
Estribos 3/8" 36 2.10 2 151.20
Estribos 3/8" 36 2.10 2 151.20
C3 2V2 a EN EJE G 1 4.80 0.30 0.65 0.94 1 4.80 1.10 5.28 3/4" 2 6.60 1 13.20
3/4" 2 5.70 1 11.40
3/4" 2 2.50 1 5.00
5/8" 1 2.50 1 2.50
3/4" 1 3.10 1 3.10
Estribos 3/8" 30 2.10 1 63.00
C3 2V2 b EN EJE H 1 6.00 0.30 0.65 1.17 1 6.00 1.10 6.60 3/4" 4 7.80 1 31.20
3/4" 2 2.50 1 5.00
5/8" 1 2.50 1 2.50
3/4" 1 4.30 1 4.30
Estribos 3/8" 34 2.10 1 71.40

C3 2V3 EN EJE I 1 6.30 0.30 0.65 1.23 1 6.30 1.10 6.93 3/4" 4 7.80 1 31.20
3/4" 2 2.35 1 4.70
5/8" 1 2.35 1 2.35
3/4" 1 4.60 1 4.60
Estribos 3/8" 35 2.10 1 73.50
C3 2V3a EN EJE I 1 2.10 0.30 0.65 0.41 1 2.10 1.10 2.31 3/4" 7 7.00 1 49.00
1 2.80 0.30 0.65 0.55 1 2.80 1.10 3.08 5/8" 4 6.80 1 27.20
1 2.40 0.30 0.65 0.47 1 2.40 1.10 2.64 1" 3 4.80 1 14.40
1" 3 4.00 1 12.00
5/8" 4 4.00 1 16.00
Estribos 3/8" 21 2.10 1 44.10
Estribos 3/8" 23 2.10 1 48.30
Estribos 3/8" 22 2.10 1 46.20
C3 2V3 b EN EJE I 1 2.10 0.30 0.65 0.41 1 2.10 1.10 2.31 3/4" 7 7.00 1 49.00
1 2.80 0.30 0.65 0.55 1 2.80 1.10 3.08 5/8" 4 6.80 1 27.20
1 2.40 0.30 0.65 0.47 1 2.40 1.10 2.64 1" 3 4.80 1 14.40
1" 3 4.00 1 12.00
5/8" 4 4.00 1 16.00
Estribos 3/8" 21 2.10 1 44.10
Estribos 3/8" 23 2.10 1 48.30
Estribos 3/8" 22 2.10 1 46.20
C3 2V3' ENTRE EJES I-J Y 16-18 1 2.80 0.25 0.65 0.46 1 2.80 1.05 2.94 3/4" 5 4.40 1 22.00
5/8" 4 4.20 1 16.80
Estribos 3/8" 23 2.00 1 46.00
VCH ENTRE EJES I-J Y 16-18 1 2.40 0.30 0.25 0.18 1 2.40 0.30 0.72 1/2" 6 3.50 1 21.00
Estribos 1/4" 18 1.30 1 23.40
C3 2V4 ENTRE EJES I y J 1 1.40 0.30 0.65 0.27 1 1.40 1.10 1.54 3/4" 4 7.80 1 31.20
1 4.70 0.30 0.65 0.92 1 4.70 1.10 5.17 3/4" 1 3.85 1 3.85
3/4" 2 2.05 1 4.10
3/4" 1 3.30 1 3.30

Página 78 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
Estribos 3/8" 19 2.10 1 39.90
Estribos 3/8" 30 2.10 1 63.00
C3 2V4 ENTRE EJES I y J 2 1.80 0.20 0.65 0.47 2 1.80 1.00 3.60 3/4" 4 5.30 1 21.20
5/8" 1 5.30 1 5.30
5/8" 1 2.40 1 2.40
Estribos 3/8" 20 1.90 2 76.00

C3 2V6 EN EJE J 1 6.25 0.30 0.65 1.22 1 6.25 1.10 6.88 3/4" 4 19.50 1 78.00
1 6.50 0.30 0.65 1.27 1 6.50 1.10 7.15 3/4" 2 2.60 1 5.20
1 2.40 0.30 0.65 0.47 1 2.40 1.10 2.64 3/4" 3 3.70 1 11.10
3/4" 3 5.25 1 15.75
3/4" 2 4.25 1 8.50
3/4" 2 4.10 1 8.20
5/8" 1 4.85 1 4.85
5/8" 4 4.25 1 17.00
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 2.10 1 75.60
Estribos 3/8" 22 2.10 1 46.20
C3 2V7 ENTRE EJES J y K 1 1.70 0.25 0.65 0.28 1 1.70 1.05 1.79 3/4" 4 8.15 1 32.60
1 0.45 0.25 0.65 0.07 1 0.45 1.05 0.47 Estribos 3/8" 20 2.00 1 40.00
1 4.00 0.25 0.65 0.65 1 4.00 1.05 4.20 Estribos 3/8" 16 2.00 1 32.00
Estribos 3/8" 27 2.00 1 54.00
C3 2V7' ENTRE EJES I y J 1 0.30 0.20 0.65 0.04 1 0.30 1.00 0.30 3/4" 4 3.20 1 12.80
Estribos 3/8" 15 1.90 1 28.50
C3 2V8 EN EJE K y N 2 6.25 0.30 0.65 2.44 2 6.25 1.10 13.75 3/4" 4 19.50 2 156.00
2 6.50 0.30 0.65 2.54 2 6.50 1.10 14.30 3/4" 2 2.60 2 10.40
2 1.70 0.30 0.65 0.66 2 1.70 1.10 3.74 3/4" 3 3.70 2 22.20
3/4" 3 5.25 2 31.50
3/4" 2 4.25 2 17.00
3/4" 2 4.10 2 16.40
5/8" 1 4.85 2 9.70
5/8" 4 4.25 2 34.00
Estribos 3/8" 35 2.10 2 147.00
Estribos 3/8" 36 2.10 2 151.20
Estribos 3/8" 17 2.10 2 71.40
C3 2V-9 EN EJE M 1 6.25 0.30 0.65 1.22 1 6.25 1.10 6.88 3/4" 2 20.20 1 40.40
1 6.50 0.30 0.65 1.27 1 6.50 1.10 7.15 3/4" 3 4.35 1 13.05
1 6.90 0.30 0.65 1.35 1 6.90 1.10 7.59 3/4" 3 8.35 1 25.05
3/4" 2 13.90 1 27.80
3/4" 3 8.75 1 26.25
3/4" 2 3.90 1 7.80
5/8" 2 4.10 1 8.20
3/4" 1 6.40 1 6.40
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 2.10 1 75.60
Estribos 3/8" 37 2.10 1 77.70
C3 2V-10 EN EJE M 1 4.95 0.30 0.65 0.97 1 4.95 1.10 5.45 3/4" 6 6.45 1 38.70
Estribos 3/8" 31 2.10 1 65.10
C3 2V-11 EN EJE Ñ 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 4 18.00 1 72.00
1 1.80 0.30 0.65 0.35 1 1.80 1.10 1.98 3/4" 1 2.50 1 2.50
1 1.00 0.30 0.65 0.20 1 1.00 1.10 1.10 3/4" 2 11.45 1 22.90
1 1.25 0.30 0.65 0.24 1 1.25 1.10 1.38 5/8" 4 10.45 1 41.80
1 1.65 0.30 0.65 0.32 1 1.65 1.10 1.82 5/8" 2 4.55 1 9.10
Estribos 3/8" 36 2.10 1 75.60
Estribos 3/8" 12 2.10 1 25.20
Estribos 3/8" 6 2.10 1 12.60
Estribos 3/8" 8 2.10 1 16.80
Estribos 3/8" 11 2.10 1 23.10
C3 2V-12 EN EJE 13 1 6.45 0.25 0.65 1.05 1 6.45 1.05 6.77 3/4" 5 22.15 1 110.75

Página 79 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
1 5.25 0.25 0.65 0.85 1 5.25 1.05 5.51 3/4" 2 3.60 1 7.20
1 4.95 0.25 0.65 0.80 1 4.95 1.05 5.20 3/4" 2 5.20 1 10.40
Estribos 3/8" 36 2.00 1 72.00
Estribos 3/8" 32 2.00 1 64.00
Estribos 3/8" 31 2.00 1 62.00
C3 2V-13a EN EJE 15 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 6 23.45 1 140.70
1 4.75 0.30 0.65 0.93 1 4.75 1.10 5.23 3/4" 2 3.60 1 7.20
1 6.55 0.30 0.65 1.28 1 6.55 1.10 7.21 3/4" 2 5.20 1 10.40
Estribos 3/8" 36 2.10 1 75.60
Estribos 3/8" 30 2.10 1 63.00
Estribos 3/8" 36 2.10 1 75.60
C3 2V-13b EN EJE 15 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 23.55 1 47.10
1 4.75 0.30 0.65 0.93 1 4.75 1.10 5.23 3/4" 3 8.85 1 26.55
1 6.55 0.30 0.65 1.28 1 6.55 1.10 7.21 3/4" 2 14.40 1 28.80
3/4" 2 3.60 1 7.20
3/4" 2 5.20 1 10.40
Estribos 3/8" 36 2.10 1 75.60
Estribos 3/8" 30 2.10 1 63.00
Estribos 3/8" 36 2.10 1 75.60

C3 2V-13 EN EJE 15 3 6.45 0.30 0.65 3.77 3 6.45 1.10 21.29 3/4" 5 8.35 1 41.75
1 1.20 0.30 0.65 0.23 1 1.20 1.10 1.32 3/4" 2 2.50 1 5.00
3/4" 3 2.60 1 7.80
3/4" 2 4.75 1 9.50
3/4" 4 16.70 1 66.80
3/4" 2 2.60 1 5.20
3/4" 3 3.60 1 10.80
3/4" 2 4.75 1 9.50
3/4" 2 4.05 1 8.10
5/8" 1 3.40 1 3.40
5/8" 4 2.80 1 11.20
Estribos 3/8" 36 2.10 3 226.80
Estribos 3/8" 18 2.10 1 37.80
C3 2V-14 EN EJE 16 4 6.45 0.30 0.65 5.03 4 6.45 1.10 28.38 3/4" 4 39.35 1 157.40
1 2.25 0.30 0.65 0.44 1 2.25 1.10 2.48 3/4" 2 2.50 1 5.00
1 3.80 0.30 0.65 0.74 1 3.80 1.10 4.18 3/4" 3 3.60 4 43.20
3/4" 3 2.35 1 7.05
3/4" 2 4.75 1 9.50
5/8" 1 8.45 1 8.45
3/4" 2 4.05 1 8.10
3/4" 2 4.25 2 17.00
3/4" 2 4.10 1 8.20
Estribos 3/8" 36 2.10 4 302.40
Estribos 3/8" 22 2.10 1 46.20
Estribos 3/8" 27 2.10 1 56.70
C3 2V-14a EN EJE 16 2 6.45 0.30 0.65 2.52 2 6.45 1.10 14.19 3/4" 4 24.10 1 96.40
1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 3/4" 2 2.30 1 4.60
3/4" 3 3.60 2 21.60
3/4" 3 2.50 1 7.50
5/8" 1 8.45 1 8.45
3/4" 2 4.05 1 8.10
3/4" 2 4.45 1 8.90
3/4" 2 3.95 1 7.90
Estribos 3/8" 36 2.10 2 151.20
Estribos 3/8" 35 2.10 1 73.50
C3 2V-15 EN EJE 17 1 1.20 0.25 0.65 0.20 1 1.20 1.05 1.26 3/4" 6 2.90 1 17.40

Página 80 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
1 0.80 0.25 0.65 0.13 1 0.80 1.05 0.84 5/8" 4 2.70 1 10.80
2 6.45 0.30 0.65 2.52 2 6.45 1.10 14.19 3/4" 4 33.35 1 133.40
1 3.70 0.30 0.65 0.72 1 3.70 1.10 4.07 3/4" 2 3.60 3 21.60
1 2.50 0.30 0.65 0.49 1 2.50 1.10 2.75 5/8" 1 3.60 2 7.20
1 2.25 0.30 0.65 0.44 1 2.25 1.10 2.48 3/4" 2 8.90 1 17.80
1 1.80 0.30 0.65 0.35 1 1.80 1.10 1.98 5/8" 1 8.90 1 8.90
1 1.80 0.30 0.65 0.35 1 1.80 1.10 1.98 3/4" 2 2.00 1 4.00
5/8" 4 2.80 1 11.20
3/4" 2 4.25 1 8.50
3/4" 2 4.25 2 17.00
Estribos 3/8" 18 2.00 1 36.00
Estribos 3/8" 17 2.00 1 34.00
Estribos 3/8" 49 2.10 2 205.80
Estribos 3/8" 30 2.10 1 63.00
Estribos 3/8" 22 2.10 1 46.20
Estribos 3/8" 21 2.10 1 44.10
Estribos 3/8" 18 2.10 1 37.80
Estribos 3/8" 18 2.10 1 37.80
C3 2V-15a EN EJE 17 1 6.20 0.25 0.65 1.01 1 6.20 1.05 6.51 3/4" 5 8.55 1 42.75
1 4.30 0.25 0.65 0.70 1 4.30 1.05 4.52 3/4" 2 2.35 1 4.70
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 3 2.50 1 7.50
3/4" 2 4.50 1 9.00
3/4" 4 13.75 1 55.00
3/4" 3 3.60 1 10.80
3/4" 3 2.50 1 7.50
3/4" 1 3.10 1 3.10
3/4" 2 5.25 1 10.50
Estribos 3/8" 35 2.00 1 70.00
Estribos 3/8" 28 2.00 1 56.00
Estribos 3/8" 49 2.10 1 102.90
C3 2V-16 EN EJE 18 1 6.70 0.25 0.65 1.09 1 6.70 1.05 7.04 3/4" 4 26.55 1 106.20
1 4.40 0.25 0.65 0.72 1 4.40 1.05 4.62 3/4" 1 3.50 2 7.00
1 1.75 0.25 0.65 0.28 1 1.75 1.05 1.84 Estribos 3/8" 36 2.00 1 72.00
1 6.65 0.25 0.65 1.08 1 6.65 1.05 6.98 Estribos 3/8" 29 2.00 1 58.00
1 3.70 0.25 0.65 0.60 1 3.70 1.05 3.89 Estribos 3/8" 20 2.00 1 40.00
Estribos 3/8" 36 2.00 1 72.00
Estribos 3/8" 26 2.00 1 52.00
C3 2V-17 EN EJE 19 1 6.45 0.25 0.65 1.05 1 6.45 1.05 6.77 3/4" 4 8.90 1 35.60
1 2.20 0.30 0.65 0.43 1 2.20 1.10 2.42 3/4" 2 2.35 1 4.70
1 6.45 0.25 0.65 1.05 1 6.45 1.05 6.77 3/4" 3 2.50 1 7.50
1 1.20 0.30 0.65 0.23 1 1.20 1.10 1.32 5/8" 1 8.10 1 8.10
3/4" 2 4.75 1 9.50
3/4" 4 12.35 1 49.40
3/4" 3 5.00 1 15.00
3/4" 3 4.85 1 14.55
Estribos 3/8" 36 2.00 1 72.00
Estribos 3/8" 21 2.10 1 44.10
Estribos 3/8" 49 2.00 1 98.00
Estribos 3/8" 14 2.10 1 29.40
V ESC 2 3.90 0.40 0.25 0.78 2 3.90 0.40 3.12 5/8" 6 4.90 2 58.80
Estribos 3/8" 26 1.50 2 78.00
TERCER PISO
C3 3V1 EN EJE G 1 4.80 0.30 0.65 0.94 1 4.80 1.10 5.28 3/4" 4 6.60 1 26.40
3/4" 2 2.50 1 5.00
5/8" 1 2.50 1 2.50
3/4" 1 3.10 1 3.10
Estribos 3/8" 30 2.10 1 63.00
C3 3V1 a EN EJE D 1 3.35 0.30 0.65 0.65 1 3.35 1.10 3.69 3/4" 6 5.15 1 30.90
Estribos 3/8" 28 2.10 1 58.80

Página 81 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
C3 3V1c EN EJE G 1 6.25 0.30 0.65 1.22 1 6.25 1.10 6.88 3/4" 4 16.75 1 67.00
1 6.50 0.30 0.65 1.27 1 6.50 1.10 7.15 3/4" 3 2.50 1 7.50
3/4" 3 3.70 1 11.10
3/4" 3 2.60 1 7.80
3/4" 2 3.85 1 7.70
3/4" 2 4.30 1 8.60
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 2.10 1 75.60
C3 3V2 EN EJE H 1 6.00 0.30 0.65 1.17 1 6.00 1.10 6.60 3/4" 4 7.80 1 31.20
3/4" 2 2.50 1 5.00
5/8" 1 2.50 1 2.50
3/4" 1 4.30 1 4.30
Estribos 3/8" 34 2.10 1 71.40
C3 3V2 EN EJE H 1 6.25 0.30 0.65 1.22 1 6.25 1.10 6.88 3/4" 4 16.75 1 67.00
1 6.50 0.30 0.65 1.27 1 6.50 1.10 7.15 3/4" 3 2.50 1 7.50
3/4" 3 3.70 1 11.10
3/4" 3 2.60 1 7.80
3/4" 2 3.85 1 7.70
3/4" 2 4.30 1 8.60
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 2.10 1 75.60
C3 3V3 EN EJE I 1 6.30 0.30 0.65 1.23 1 6.30 1.10 6.93 3/4" 4 7.80 1 31.20
3/4" 2 2.35 1 4.70
3/4" 1 2.35 1 2.35
3/4" 2 4.60 1 9.20
Estribos 3/8" 35 2.10 1 73.50
C3 3V3a EN EJE I 1 2.10 0.30 0.65 0.41 1 2.10 1.10 2.31 3/4" 7 7.00 1 49.00
1 2.80 0.30 0.65 0.55 1 2.80 1.10 3.08 5/8" 4 6.80 1 27.20
1 2.40 0.30 0.65 0.47 1 2.40 1.10 2.64 1" 3 4.80 1 14.40
1" 3 4.00 1 12.00
5/8" 4 4.00 1 16.00
Estribos 3/8" 21 2.10 1 44.10
Estribos 3/8" 23 2.10 1 48.30
Estribos 3/8" 22 2.10 1 46.20
C3 3V4 EN EJE I 1 2.10 0.30 0.65 0.41 1 2.10 1.10 2.31 3/4" 7 7.00 1 49.00
1 2.80 0.30 0.65 0.55 1 2.80 1.10 3.08 5/8" 4 6.80 1 27.20
1 2.40 0.30 0.65 0.47 1 2.40 1.10 2.64 1" 3 4.80 1 14.40
1" 3 4.00 1 12.00
5/8" 4 4.00 1 16.00
Estribos 3/8" 21 2.10 1 44.10
Estribos 3/8" 23 2.10 1 48.30
Estribos 3/8" 22 2.10 1 46.20
C3 3V5 ENTRE EJES I y J 1 1.40 0.30 0.65 0.27 1 1.40 1.10 1.54 3/4" 4 7.80 1 31.20
1 4.70 0.30 0.65 0.92 1 4.70 1.10 5.17 3/4" 1 3.85 1 3.85
3/4" 2 2.05 1 4.10
3/4" 1 3.30 1 3.30
Estribos 3/8" 19 2.10 1 39.90
Estribos 3/8" 30 2.10 1 63.00
C3 3V5 ENTRE EJES I y J 2 1.80 0.20 0.65 0.47 2 1.80 1.00 3.60 3/4" 4 5.30 1 21.20
5/8" 1 5.30 1 5.30
5/8" 1 2.40 1 2.40
Estribos 3/8" 20 1.90 2 76.00
C3 3V6 ENTRE EJES I-J Y 16-18 1 2.80 0.25 0.65 0.46 1 2.80 1.05 2.94 3/4" 5 4.40 1 22.00
5/8" 4 4.20 1 16.80
Estribos 3/8" 23 2.00 1 46.00
VCH ENTRE EJES I-J Y 16-18 1 2.40 0.30 0.25 0.18 1 2.40 0.30 0.72 1/2" 6 3.50 1 21.00
Estribos 1/4" 18 1.30 1 23.40
C3 3V7 EN EJE J 1 6.25 0.30 0.65 1.22 1 6.25 1.10 6.88 3/4" 4 19.50 1 78.00
1 6.50 0.30 0.65 1.27 1 6.50 1.10 7.15 3/4" 2 2.60 1 5.20

Página 82 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
1 2.40 0.30 0.65 0.47 1 2.40 1.10 2.64 3/4" 3 3.70 1 11.10
3/4" 3 5.25 1 15.75
3/4" 2 4.25 1 8.50
3/4" 2 4.10 1 8.20
5/8" 1 4.85 1 4.85
5/8" 4 4.25 1 17.00
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 2.10 1 75.60
Estribos 3/8" 22 2.10 1 46.20
C3 3V8 EN EJE K y N 2 6.25 0.30 0.65 2.44 2 6.25 1.10 13.75 3/4" 4 19.50 2 156.00
2 6.50 0.30 0.65 2.54 2 6.50 1.10 14.30 3/4" 2 2.60 2 10.40
2 1.70 0.30 0.65 0.66 2 1.70 1.10 3.74 3/4" 3 3.70 2 22.20
3/4" 3 5.25 2 31.50
3/4" 2 4.25 2 17.00
3/4" 2 4.10 2 16.40
5/8" 4 4.25 2 34.00
Estribos 3/8" 35 2.10 2 147.00
Estribos 3/8" 36 2.10 2 151.20
Estribos 3/8" 17 2.10 2 71.40
C3 3V9 EN EJE M 2 6.25 0.30 0.65 2.44 2 6.25 1.10 13.75 3/4" 4 19.50 2 156.00
2 6.50 0.30 0.65 2.54 2 6.50 1.10 14.30 3/4" 2 2.60 2 10.40
2 1.70 0.30 0.65 0.66 2 1.70 1.10 3.74 3/4" 3 3.70 2 22.20
3/4" 3 5.25 2 31.50
3/4" 2 4.25 2 17.00
3/4" 2 4.10 2 16.40
5/8" 4 4.25 2 34.00
Estribos 3/8" 35 2.10 2 147.00
Estribos 3/8" 36 2.10 2 151.20
Estribos 3/8" 17 2.10 2 71.40
C3 3V-10 EN EJE Ñ 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 4 18.00 1 72.00
1 1.80 0.30 0.65 0.35 1 1.80 1.10 1.98 3/4" 1 2.50 1 2.50
1 1.00 0.30 0.65 0.20 1 1.00 1.10 1.10 3/4" 2 11.45 1 22.90
1 1.25 0.30 0.65 0.24 1 1.25 1.10 1.38 5/8" 4 10.45 1 41.80
1 1.65 0.30 0.65 0.32 1 1.65 1.10 1.82 5/8" 2 4.55 1 9.10
Estribos 3/8" 36 2.10 1 75.60
Estribos 3/8" 12 2.10 1 25.20
Estribos 3/8" 6 2.10 1 12.60
Estribos 3/8" 8 2.10 1 16.80
Estribos 3/8" 11 2.10 1 23.10
C3 3V7' ENTRE EJES I y J 1 0.30 0.20 0.65 0.04 1 0.30 1.00 0.30 3/4" 4 3.20 1 12.80
Estribos 3/8" 15 1.90 1 28.50
C3 3V-11 EN EJE 13 1 6.45 0.25 0.65 1.05 1 6.45 1.05 6.77 3/4" 6 15.70 1 94.20
1 5.25 0.25 0.65 0.85 1 5.25 1.05 5.51 3/4" 2 2.60 1 5.20
3/4" 2 3.60 1 7.20
3/4" 3 2.60 1 7.80
Estribos 3/8" 36 2.00 1 72.00
Estribos 3/8" 35 2.00 1 70.00
C3 3V-12a EN EJE 15 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 6 23.45 1 140.70
1 4.75 0.30 0.65 0.93 1 4.75 1.10 5.23 3/4" 2 3.60 1 7.20
3/4" 2 5.20 1 10.40
Estribos 3/8" 36 2.10 1 75.60
Estribos 3/8" 30 2.10 1 63.00
Estribos 3/8" 14 0.20 0 0.00
C3 3V-12b EN EJE 15 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 23.55 1 47.10
1 4.75 0.30 0.65 0.93 1 4.75 1.10 5.23 3/4" 3 8.85 1 26.55
1 6.55 0.30 0.65 1.28 1 6.55 1.10 7.21 3/4" 2 14.40 1 28.80
3/4" 2 3.60 1 7.20
3/4" 2 5.20 1 10.40
Estribos 3/8" 36 2.10 1 75.60

Página 83 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
Estribos 3/8" 30 2.10 1 63.00
Estribos 3/8" 36 2.10 1 75.60
C3 3V-12 EN EJE 15 3 6.45 0.30 0.65 3.77 3 6.45 1.10 21.29 3/4" 5 8.35 1 41.75
1 1.20 0.30 0.65 0.23 1 1.20 1.10 1.32 3/4" 2 2.50 1 5.00
3/4" 3 2.60 1 7.80
3/4" 2 4.75 1 9.50
3/4" 4 16.70 1 66.80
3/4" 2 2.60 1 5.20
3/4" 3 3.60 1 10.80
3/4" 2 4.75 1 9.50
3/4" 2 4.05 1 8.10
5/8" 1 3.40 1 3.40
5/8" 4 2.80 1 11.20
Estribos 3/8" 36 2.10 3 226.80
Estribos 3/8" 18 2.10 1 37.80
C3 3V-13 EN EJE 16 4 6.45 0.30 0.65 5.03 4 6.45 1.10 28.38 3/4" 4 39.35 1 157.40
1 2.25 0.30 0.65 0.44 1 2.25 1.10 2.48 3/4" 2 2.50 1 5.00
1 3.80 0.30 0.65 0.74 1 3.80 1.10 4.18 3/4" 3 3.60 4 43.20
3/4" 3 2.35 1 7.05
3/4" 2 4.75 1 9.50
5/8" 1 8.45 1 8.45
3/4" 2 4.05 1 8.10
3/4" 2 4.25 2 17.00
3/4" 2 4.10 1 8.20
Estribos 3/8" 36 2.10 4 302.40
Estribos 3/8" 22 2.10 1 46.20
Estribos 3/8" 27 2.10 1 56.70
C3 3V-13a EN EJE 16 2 6.45 0.30 0.65 2.52 2 6.45 1.10 14.19 3/4" 4 24.10 1 96.40
1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 3/4" 2 2.30 1 4.60
3/4" 3 3.60 2 21.60
3/4" 3 2.50 1 7.50
5/8" 1 8.45 1 8.45
3/4" 2 4.05 1 8.10
3/4" 2 4.45 1 8.90
3/4" 2 3.95 1 7.90
Estribos 3/8" 36 2.10 2 151.20
Estribos 3/8" 35 2.10 1 73.50
C3 3V-14 EN EJE 17 1 1.20 0.25 0.65 0.20 1 1.20 1.05 1.26 3/4" 6 2.90 1 17.40
1 0.80 0.25 0.65 0.13 1 0.80 1.05 0.84 5/8" 4 2.70 1 10.80
2 6.45 0.30 0.65 2.52 2 6.45 1.10 14.19 3/4" 4 33.35 1 133.40
1 3.70 0.30 0.65 0.72 1 3.70 1.10 4.07 3/4" 2 3.60 3 21.60
1 2.50 0.30 0.65 0.49 1 2.50 1.10 2.75 5/8" 1 3.60 2 7.20
1 2.25 0.30 0.65 0.44 1 2.25 1.10 2.48 3/4" 2 8.90 1 17.80
1 1.80 0.30 0.65 0.35 1 1.80 1.10 1.98 5/8" 1 8.90 1 8.90
1 1.80 0.30 0.65 0.35 1 1.80 1.10 1.98 3/4" 2 2.00 1 4.00
5/8" 4 2.80 1 11.20
3/4" 2 4.25 1 8.50
3/4" 2 4.25 2 17.00
Estribos 3/8" 18 2.00 1 36.00
Estribos 3/8" 17 2.00 1 34.00
Estribos 3/8" 49 2.10 2 205.80
Estribos 3/8" 30 2.10 1 63.00
Estribos 3/8" 22 2.10 1 46.20
Estribos 3/8" 21 2.10 1 44.10
Estribos 3/8" 18 2.10 1 37.80
Estribos 3/8" 18 2.10 1 37.80
C3 3V-14a EN EJE 17 1 6.20 0.25 0.65 1.01 1 6.20 1.05 6.51 3/4" 5 8.55 1 42.75
1 4.30 0.25 0.65 0.70 1 4.30 1.05 4.52 3/4" 2 2.35 1 4.70
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 3 2.50 1 7.50

Página 84 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
3/4" 2 4.50 1 9.00
3/4" 4 13.75 1 55.00
3/4" 3 3.60 1 10.80
3/4" 3 2.50 1 7.50
3/4" 1 3.10 1 3.10
3/4" 2 5.25 1 10.50
Estribos 3/8" 35 2.00 1 70.00
Estribos 3/8" 28 2.00 1 56.00
Estribos 3/8" 49 2.10 1 102.90
C3 3V-15 EN EJE 18 1 6.70 0.15 0.65 0.65 1 6.70 0.95 6.37 3/4" 4 26.55 1 106.20
1 4.40 0.15 0.65 0.43 1 4.40 0.95 4.18 3/4" 1 3.50 2 7.00
1 1.75 0.15 0.65 0.17 1 1.75 0.95 1.66 Estribos 3/8" 36 1.80 1 64.80
1 6.65 0.15 0.65 0.65 1 6.65 0.95 6.32 Estribos 3/8" 29 1.80 1 52.20
1 3.70 0.15 0.65 0.36 1 3.70 0.95 3.52 Estribos 3/8" 20 1.80 1 36.00
Estribos 3/8" 36 1.80 1 64.80
Estribos 3/8" 26 1.80 1 46.80
C3 3V-15 EN EJE 18 2 2.70 0.15 0.65 0.53 2 2.70 0.95 5.13 3/4" 5 3.70 1 18.50
Estribos 3/8" 23 1.80 1 41.40

V ESC 1 3.90 0.40 0.25 0.39 1 3.90 0.40 1.56 5/8" 6 4.90 1 29.40
Estribos 3/8" 26 1.50 1 39.00
CUARTO PISO
C3 4V1 EN EJE G 1 4.80 0.30 0.65 0.94 1 4.80 1.10 5.28 3/4" 4 6.60 1 26.40
3/4" 2 2.50 1 5.00
5/8" 1 2.50 1 2.50
3/4" 1 3.10 1 3.10
Estribos 3/8" 30 2.10 1 63.00
C3 4V1 a EN EJE D 1 3.35 0.30 0.65 0.65 1 3.35 1.10 3.69 3/4" 6 5.15 1 30.90
Estribos 3/8" 28 2.10 1 58.80
C3 4V1 EN EJE G 1 6.25 0.30 0.65 1.22 1 6.25 1.10 6.88 3/4" 4 16.75 1 67.00
1 6.50 0.30 0.65 1.27 1 6.50 1.10 7.15 3/4" 3 2.50 1 7.50
3/4" 3 3.70 1 11.10
3/4" 3 2.60 1 7.80
3/4" 2 3.85 1 7.70
3/4" 2 4.30 1 8.60
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 2.10 1 75.60
C3 4V2 EN EJE H 1 6.00 0.30 0.65 1.17 1 6.00 1.10 6.60 3/4" 4 7.80 1 31.20
3/4" 2 2.50 1 5.00
5/8" 1 2.50 1 2.50
3/4" 1 4.30 1 4.30
Estribos 3/8" 34 2.10 1 71.40
C3 4V2 EN EJE H 1 6.25 0.30 0.65 1.22 1 6.25 1.10 6.88 3/4" 4 16.75 1 67.00
1 6.50 0.30 0.65 1.27 1 6.50 1.10 7.15 3/4" 3 2.50 1 7.50
3/4" 3 3.70 1 11.10
3/4" 3 2.60 1 7.80
3/4" 2 3.85 1 7.70
3/4" 2 4.30 1 8.60
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 2.10 1 75.60
C3 4V3 EN EJE I 1 6.30 0.30 0.65 1.23 1 6.30 1.10 6.93 3/4" 4 7.80 1 31.20
3/4" 2 2.35 1 4.70
3/4" 1 2.35 1 2.35
3/4" 2 4.60 1 9.20
Estribos 3/8" 35 2.10 1 73.50
C3 4V3a EN EJE I 1 2.10 0.30 0.65 0.41 1 2.10 1.10 2.31 3/4" 7 7.00 1 49.00
1 2.80 0.30 0.65 0.55 1 2.80 1.10 3.08 5/8" 4 6.80 1 27.20
1 2.40 0.30 0.65 0.47 1 2.40 1.10 2.64 1" 3 4.80 1 14.40

Página 85 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
1" 3 4.00 1 12.00
5/8" 4 4.00 1 16.00
Estribos 3/8" 21 2.10 1 44.10
Estribos 3/8" 23 2.10 1 48.30
Estribos 3/8" 22 2.10 1 46.20
C3 4V4 EN EJE I 1 2.10 0.30 0.65 0.41 1 2.10 1.10 2.31 3/4" 7 7.00 1 49.00
1 2.80 0.30 0.65 0.55 1 2.80 1.10 3.08 5/8" 4 6.80 1 27.20
1 2.40 0.30 0.65 0.47 1 2.40 1.10 2.64 1" 3 4.80 1 14.40
1" 3 4.00 1 12.00
5/8" 4 4.00 1 16.00
Estribos 3/8" 21 2.10 1 44.10
Estribos 3/8" 23 2.10 1 48.30
Estribos 3/8" 22 2.10 1 46.20
C3 4V5 ENTRE EJES I y J 1 1.40 0.30 0.65 0.27 1 1.40 1.10 1.54 3/4" 4 7.80 1 31.20
1 4.70 0.30 0.65 0.92 1 4.70 1.10 5.17 3/4" 1 3.85 1 3.85
3/4" 2 2.05 1 4.10
3/4" 1 3.30 1 3.30
Estribos 3/8" 19 2.10 1 39.90
Estribos 3/8" 30 2.10 1 63.00
C3 4V5 ENTRE EJES I y J 2 1.80 0.20 0.65 0.47 2 1.80 1.00 3.60 3/4" 4 5.30 1 21.20
5/8" 1 5.30 1 5.30
5/8" 1 2.40 1 2.40
Estribos 3/8" 20 1.90 2 76.00
C3 4V6 ENTRE EJES I-J Y 16-18 1 2.80 0.25 0.65 0.46 1 2.80 1.05 2.94 3/4" 5 4.40 1 22.00
5/8" 4 4.20 1 16.80
Estribos 3/8" 23 2.00 1 46.00
VCH ENTRE EJES I-J Y 16-18 1 2.40 0.30 0.25 0.18 1 2.40 0.30 0.72 1/2" 6 3.50 1 21.00
Estribos 1/4" 18 1.30 1 23.40
C3 4V7 EN EJE J 1 6.25 0.30 0.65 1.22 1 6.25 1.10 6.88 3/4" 4 19.50 1 78.00
1 6.50 0.30 0.65 1.27 1 6.50 1.10 7.15 3/4" 2 2.60 1 5.20
1 2.40 0.30 0.65 0.47 1 2.40 1.10 2.64 3/4" 3 3.70 1 11.10
3/4" 3 5.25 1 15.75
3/4" 2 4.25 1 8.50
3/4" 2 4.10 1 8.20
5/8" 1 4.85 1 4.85
5/8" 4 4.25 1 17.00
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 2.10 1 75.60
Estribos 3/8" 22 2.10 1 46.20
C3 4V8 EN EJE K y N 2 6.25 0.30 0.65 2.44 2 6.25 1.10 13.75 3/4" 4 19.50 2 156.00
2 6.50 0.30 0.65 2.54 2 6.50 1.10 14.30 3/4" 2 2.60 2 10.40
2 1.70 0.30 0.65 0.66 2 1.70 1.10 3.74 3/4" 3 3.70 2 22.20
3/4" 3 5.25 2 31.50
3/4" 2 4.25 2 17.00
3/4" 2 4.10 2 16.40
5/8" 4 4.25 2 34.00
Estribos 3/8" 35 2.10 2 147.00
Estribos 3/8" 36 2.10 2 151.20
Estribos 3/8" 17 2.10 2 71.40
C3 4V9 EN EJE M 2 6.25 0.30 0.65 2.44 2 6.25 1.10 13.75 3/4" 4 19.50 2 156.00
2 6.50 0.30 0.65 2.54 2 6.50 1.10 14.30 3/4" 2 2.60 2 10.40
2 1.70 0.30 0.65 0.66 2 1.70 1.10 3.74 3/4" 3 3.70 2 22.20
3/4" 3 5.25 2 31.50
3/4" 2 4.25 2 17.00
3/4" 2 4.10 2 16.40
5/8" 4 4.25 2 34.00
Estribos 3/8" 35 2.10 2 147.00
Estribos 3/8" 36 2.10 2 151.20
Estribos 3/8" 17 2.10 2 71.40

Página 86 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
C3 4V-10 EN EJE Ñ 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 4 18.00 1 72.00
1 1.80 0.30 0.65 0.35 1 1.80 1.10 1.98 3/4" 1 2.50 1 2.50
1 1.00 0.30 0.65 0.20 1 1.00 1.10 1.10 3/4" 2 11.45 1 22.90
1 1.25 0.30 0.65 0.24 1 1.25 1.10 1.38 5/8" 4 10.45 1 41.80
1 1.65 0.30 0.65 0.32 1 1.65 1.10 1.82 5/8" 2 4.55 1 9.10
Estribos 3/8" 36 2.10 1 75.60
Estribos 3/8" 12 2.10 1 25.20
Estribos 3/8" 6 2.10 1 12.60
Estribos 3/8" 8 2.10 1 16.80
Estribos 3/8" 11 2.10 1 23.10
C3 4V7' ENTRE EJES I y J 1 0.30 0.20 0.65 0.04 1 0.30 1.00 0.30 3/4" 4 3.20 1 12.80
Estribos 3/8" 15 1.90 1 28.50
C3 4V-11 EN EJE 13 1 6.45 0.25 0.65 1.05 1 6.45 1.05 6.77 3/4" 6 15.70 1 94.20
1 5.25 0.25 0.65 0.85 1 5.25 1.05 5.51 3/4" 2 2.60 1 5.20
3/4" 2 3.60 1 7.20
3/4" 3 2.60 1 7.80
Estribos 3/8" 36 2.00 1 72.00
Estribos 3/8" 35 2.00 1 70.00
C3 4V-12a EN EJE 15 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 6 23.45 1 140.70
1 4.75 0.30 0.65 0.93 1 4.75 1.10 5.23 3/4" 2 3.60 1 7.20
3/4" 2 5.20 1 10.40
Estribos 3/8" 36 2.10 1 75.60
Estribos 3/8" 30 2.10 1 63.00
Estribos 3/8" 14 0.20 0 0.00
C3 4V-12b EN EJE 15 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 23.55 1 47.10
1 4.75 0.30 0.65 0.93 1 4.75 1.10 5.23 3/4" 3 8.85 1 26.55
1 6.55 0.30 0.65 1.28 1 6.55 1.10 7.21 3/4" 2 14.40 1 28.80
3/4" 2 3.60 1 7.20
3/4" 2 5.20 1 10.40
Estribos 3/8" 36 2.10 1 75.60
Estribos 3/8" 30 2.10 1 63.00
Estribos 3/8" 36 2.10 1 75.60
C3 4V-12 EN EJE 15 3 6.45 0.30 0.65 3.77 3 6.45 1.10 21.29 3/4" 5 8.35 1 41.75
1 1.20 0.30 0.65 0.23 1 1.20 1.10 1.32 3/4" 2 2.50 1 5.00
3/4" 3 2.60 1 7.80
3/4" 2 4.75 1 9.50
3/4" 4 16.70 1 66.80
3/4" 2 2.60 1 5.20
3/4" 3 3.60 1 10.80
3/4" 2 4.75 1 9.50
3/4" 2 4.05 1 8.10
5/8" 1 3.40 1 3.40
5/8" 4 2.80 1 11.20
Estribos 3/8" 36 2.10 3 226.80
Estribos 3/8" 18 2.10 1 37.80
C3 4V-13 EN EJE 16 4 6.45 0.30 0.65 5.03 4 6.45 1.10 28.38 3/4" 4 39.35 1 157.40
1 2.25 0.30 0.65 0.44 1 2.25 1.10 2.48 3/4" 2 2.50 1 5.00
1 3.80 0.30 0.65 0.74 1 3.80 1.10 4.18 3/4" 3 3.60 4 43.20
3/4" 3 2.35 1 7.05
3/4" 2 4.75 1 9.50
5/8" 1 8.45 1 8.45
3/4" 2 4.05 1 8.10
3/4" 2 4.25 2 17.00
3/4" 2 4.10 1 8.20
Estribos 3/8" 36 2.10 4 302.40
Estribos 3/8" 22 2.10 1 46.20
Estribos 3/8" 27 2.10 1 56.70
C3 4V-13a EN EJE 16 2 6.45 0.30 0.65 2.52 2 6.45 1.10 14.19 3/4" 4 24.10 1 96.40
1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 3/4" 2 2.30 1 4.60

Página 87 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
3/4" 3 3.60 2 21.60
3/4" 3 2.50 1 7.50
5/8" 1 8.45 1 8.45
3/4" 2 4.05 1 8.10
3/4" 2 4.45 1 8.90
3/4" 2 3.95 1 7.90
Estribos 3/8" 36 2.10 2 151.20
Estribos 3/8" 35 2.10 1 73.50
C3 4V-14 EN EJE 17 1 1.20 0.25 0.65 0.20 1 1.20 1.05 1.26 3/4" 6 2.90 1 17.40
1 0.80 0.25 0.65 0.13 1 0.80 1.05 0.84 5/8" 4 2.70 1 10.80
2 6.45 0.30 0.65 2.52 2 6.45 1.10 14.19 3/4" 4 33.35 1 133.40
1 3.70 0.30 0.65 0.72 1 3.70 1.10 4.07 3/4" 2 3.60 3 21.60
1 2.50 0.30 0.65 0.49 1 2.50 1.10 2.75 5/8" 1 3.60 2 7.20
1 2.25 0.30 0.65 0.44 1 2.25 1.10 2.48 3/4" 2 8.90 1 17.80
1 1.80 0.30 0.65 0.35 1 1.80 1.10 1.98 5/8" 1 8.90 1 8.90
1 1.80 0.30 0.65 0.35 1 1.80 1.10 1.98 3/4" 2 2.00 1 4.00
5/8" 4 2.80 1 11.20
3/4" 2 4.25 1 8.50
3/4" 2 4.25 2 17.00
Estribos 3/8" 18 2.00 1 36.00
Estribos 3/8" 17 2.00 1 34.00
Estribos 3/8" 49 2.10 2 205.80
Estribos 3/8" 30 2.10 1 63.00
Estribos 3/8" 22 2.10 1 46.20
Estribos 3/8" 21 2.10 1 44.10
Estribos 3/8" 18 2.10 1 37.80
Estribos 3/8" 18 2.10 1 37.80
C3 4V-14a EN EJE 17 1 6.20 0.25 0.65 1.01 1 6.20 1.05 6.51 3/4" 5 8.55 1 42.75
1 4.30 0.25 0.65 0.70 1 4.30 1.05 4.52 3/4" 2 2.35 1 4.70
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 3 2.50 1 7.50
3/4" 2 4.50 1 9.00
3/4" 4 13.75 1 55.00
3/4" 3 3.60 1 10.80
3/4" 3 2.50 1 7.50
3/4" 1 3.10 1 3.10
3/4" 2 5.25 1 10.50
Estribos 3/8" 35 2.00 1 70.00
Estribos 3/8" 28 2.00 1 56.00
Estribos 3/8" 49 2.10 1 102.90
C3 4V-15 EN EJE 18 1 6.70 0.15 0.65 0.65 1 6.70 0.95 6.37 3/4" 4 26.55 1 106.20
1 4.40 0.15 0.65 0.43 1 4.40 0.95 4.18 3/4" 1 3.50 2 7.00
1 1.75 0.15 0.65 0.17 1 1.75 0.95 1.66 Estribos 3/8" 36 1.80 1 64.80
1 6.65 0.15 0.65 0.65 1 6.65 0.95 6.32 Estribos 3/8" 29 1.80 1 52.20
1 3.70 0.15 0.65 0.36 1 3.70 0.95 3.52 Estribos 3/8" 20 1.80 1 36.00
Estribos 3/8" 36 1.80 1 64.80
Estribos 3/8" 26 1.80 1 46.80
C3 4V-15 EN EJE 18 2 2.70 0.15 0.65 0.53 2 2.70 0.95 5.13 3/4" 5 3.70 1 18.50
Estribos 3/8" 23 1.80 1 41.40

V ESC 1 3.90 0.40 0.25 0.39 1 3.90 0.40 1.56 5/8" 6 4.90 1 29.40
Estribos 3/8" 26 1.50 1 39.00
QUINTO PISO
C3 5V1 EN EJES 13 Y 18 7 2.65 0.25 0.65 3.01 7 2.65 1.05 19.48 3/4" 2 4.25 1 8.50
5/8" 2 4.25 1 8.50
3/8" 2 4.25 1 8.50
Estribos 3/8" 27 2.00 7 378.00
C3 5V1 ENTRE EJES 13 -15 Y H-I 1 7.10 0.20 0.65 0.92 1 7.10 1.00 7.10 3/4" 2 8.70 1 17.40
5/8" 2 8.70 1 17.40

Página 88 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
3/8" 2 8.70 1 17.40
Estribos 3/8" 49 1.90 1 93.10
C3 5V1 ENTRE EJES 13 -15 Y H-I 1 6.60 0.20 0.65 0.86 1 6.60 1.00 6.60 3/4" 2 19.45 1 38.90
1 2.90 0.20 0.65 0.38 1 2.90 1.00 2.90 5/8" 2 19.45 1 38.90
1 3.70 0.20 0.65 0.48 1 3.70 1.00 3.70 3/8" 2 19.45 1 38.90
1 2.40 0.20 0.65 0.31 1 2.40 1.00 2.40 Estribos 3/8" 46 1.90 1 87.40
Estribos 3/8" 28 1.90 1 53.20
Estribos 3/8" 32 1.90 1 60.80
Estribos 3/8" 25 1.90 1 47.50
C3 5V2 EN EJE I 1 6.60 0.30 0.65 1.29 1 6.60 1.10 7.26 3/4" 7 8.20 1 57.40
3/8" 2 8.20 1 16.40
Estribos 3/8" 46 2.10 1 96.60
C3 5V2 ENTRE EJES 13 -15 Y H-I 1 6.60 0.30 0.65 1.29 1 6.60 1.10 7.26 3/4" 7 12.05 1 84.35
1 2.80 0.30 0.65 0.55 1 2.80 1.10 3.08 3/8" 2 12.05 1 24.10
Estribos 3/8" 46 2.10 1 96.60
C3 5V2 ENTRE EJES 15 y 17 1 3.80 0.30 0.65 0.74 1 3.80 1.10 4.18 3/4" 7 5.40 1 37.80
3/8" 2 5.40 1 10.80
Estribos 3/8" 32 2.10 1 67.20
C3 5V2 EN EJE I 1 2.80 0.30 0.65 0.55 1 2.80 1.10 3.08 3/4" 7 4.40 1 30.80
3/8" 2 4.40 1 8.80
Estribos 3/8" 27 2.10 1 56.70
C3 5V3 ENTRE EJE I y J 1 6.60 0.30 0.65 1.29 1 6.60 1.10 7.26 3/4" 6 8.20 1 49.20
5/8" 1 8.20 1 8.20
3/8" 2 8.20 1 16.40
Estribos 3/8" 46 2.10 1 96.60
1 2.80 0.30 0.65 0.55 1 2.80 1.10 3.08 3/4" 6 4.40 1 26.40
5/8" 1 4.40 1 4.40
3/8" 2 4.40 1 8.80
Estribos 3/8" 27 2.10 1 56.70
C3 5V3 ENTRE EJE I y J 1 6.60 0.30 0.65 1.29 1 6.60 1.10 7.26 3/4" 6 12.05 1 72.30
1 2.80 0.30 0.65 0.55 1 2.80 1.10 3.08 5/8" 1 12.05 1 12.05
3/8" 2 12.05 1 24.10
Estribos 3/8" 46 2.10 1 96.60
Estribos 3/8" 27 2.10 1 56.70
C3 5V4 ENTRE EJE I y J 1 3.80 0.30 0.65 0.74 1 3.80 1.10 4.18 3/4" 4 5.40 1 21.60
Estribos 3/8" 32 2.10 1 67.20
C3 5V7 EN EJE 16 1 3.70 0.30 0.65 0.72 1 3.70 1.10 4.07 3/4" 4 5.30 1 21.20
Estribos 3/8" 32 2.10 1 67.20
C3 5V10 EN EJE 18 1 1.80 0.30 0.65 0.35 1 1.80 1.10 1.98 3/4" 4 3.40 1 13.60
Estribos 3/8" 22 2.10 1 46.20

SECTOR D
V CIST 1 1 17.65 0.25 0.65 2.87 1 17.65 1.05 18.53 3/4" 4 18.25 1 73.00
Estribos 3/8" 76 2.00 1 152.00
V CIST 2 2 6.15 0.25 0.65 2.00 2 6.15 1.05 12.92 3/4" 4 7.60 1 30.40
3/4" 2 2.30 2 9.20
3/4" 2 4.20 1 8.40
Estribos 3/8" 39 2.00 2 156.00
V CIST 2' 1 6.60 0.40 0.65 1.72 1 6.60 1.20 7.92 3/4" 5 16.05 1 80.25
1 6.10 0.40 0.65 1.59 1 6.10 1.20 7.32 3/4" 3 3.75 1 11.25
3/4" 2 4.70 1 9.40
3/4" 2 4.50 1 9.00
Estribos 3/8" 41 2.30 1 94.30
Estribos 3/8" 39 2.30 1 89.70
V CIST 3 1 1.40 0.25 0.65 0.23 1 1.40 1.05 1.47 3/4" 4 4.40 1 17.60
1 1.30 0.25 0.65 0.21 1 1.30 1.05 1.37 Estribos 3/8" 16 2.00 1 32.00
Estribos 3/8" 16 2.00 1 32.00
V CIST 4 3 2.85 0.25 0.65 1.39 3 2.85 1.05 8.98 3/4" 4 3.45 1 13.80
Estribos 3/8" 26 2.00 3 156.00

Página 89 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
V SUB ESTAC 1 1 3.65 0.25 0.65 0.59 1 3.65 1.05 3.83 3/4" 4 4.25 1 17.00
1 3.65 0.25 0.65 0.59 1 3.65 1.05 3.83 Estribos 3/8" 29 2.00 1 58.00
Estribos 3/8" 29 2.00 1 58.00
V SUB ESTAC 2 1 3.40 0.25 0.65 0.55 1 3.40 1.05 3.57 3/4" 4 4.00 1 16.00
1 3.40 0.25 0.65 0.55 1 3.40 1.05 3.57 Estribos 3/8" 28 2.00 1 56.00
Estribos 3/8" 28 2.00 1 56.00
5/8" 1 3.40 1 3.40
V SUB ESTAC 3 1 3.40 0.25 0.65 0.55 1 3.40 1.05 3.57 3/4" 4 4.00 1 16.00
1 3.40 0.25 0.65 0.55 1 3.40 1.05 3.57 Estribos 3/8" 28 2.00 1 56.00
Estribos 3/8" 28 2.00 1 56.00
V SUB ESTAC 4 1 6.70 0.25 0.25 0.42 1 6.70 0.25 1.68 1/2" 4 7.30 1 29.20
Estribos 1/4" 35 1.20 1 42.00
V SUB ESTAC 5 1 2.80 0.25 0.65 0.46 1 2.80 1.05 2.94 3/4" 4 3.40 1 13.60
Estribos 3/8" 26 2.00 1 52.00
V SUB ESTAC 6 1 3.40 0.25 0.65 0.55 1 3.40 1.05 3.57 3/4" 4 12.05 1 48.20
1 3.40 0.25 0.65 0.55 1 3.40 1.05 3.57 3/4" 1 2.00 1 2.00
3/4" 3 3.40 1 10.20
3/4" 2 3.70 1 7.40
Estribos 3/8" 28 2.00 1 56.00
Estribos 3/8" 28 2.00 1 56.00
VC FUERZA 1 1 6.60 0.25 0.65 1.07 1 6.60 1.05 6.93 3/4" 4 7.20 1 28.80
1 3.80 0.25 0.65 0.62 1 3.80 1.05 3.99 Estribos 3/8" 39 2.00 1 78.00
Estribos 3/8" 29 2.00 1 58.00
VC FUERZA 2 1 4.60 0.25 0.65 0.75 1 4.60 1.05 4.83 3/4" 4 5.20 1 20.80
Estribos 3/8" 32 2.00 1 64.00
VC FUERZA 3 1 6.70 0.25 0.25 0.42 1 6.70 0.25 1.68 1/2" 4 7.30 1 29.20
Estribos 1/4" 35 1.20 1 42.00
VC FUERZA 4 1 5.60 0.25 0.65 0.91 1 5.60 1.05 5.88 3/4" 4 9.30 1 37.20
1 1.80 0.25 0.65 0.29 1 1.80 1.05 1.89 5/8" 1 4.35 1 4.35
Estribos 3/8" 35 2.00 1 70.00
Estribos 3/8" 23 2.00 1 46.00
VC FUERZA 5 1 7.10 0.25 0.65 1.15 1 7.10 1.05 7.46 3/4" 5 9.30 1 46.50
3/4" 2 3.00 1 6.00
3/4" 1 3.00 1 3.00
3/4" 2 5.70 1 11.40
Estribos 3/8" 42 2.00 1 84.00

SECTOR E
SOTANO
E VS-1 EN EJE L 1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 3/4" 4 14.85 1 59.40
1 6.40 0.30 0.65 1.25 1 6.40 1.10 7.04 5/8" 1 3.70 1 3.70
1 6.60 0.30 0.65 1.29 1 6.60 1.10 7.26 3/4" 1 2.40 1 2.40
1 1.85 0.30 0.65 0.36 1 1.85 1.10 2.04 3/4" 4 8.20 1 32.80
3/4" 1 2.40 3 7.20
3/4" 1 2.40 1 2.40
5/8" 1 4.60 1 4.60
3/4" 2 4.20 1 8.40
5/8" 1 4.20 1 4.20
3/4" 2 2.95 1 5.90
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 2.10 1 75.60
Estribos 3/8" 20 2.10 1 42.00
E VS-2 EN EJE L-M ENTRE EJES 26-28 1 2.20 0.25 0.65 0.36 1 2.20 1.05 2.31 3/4" 4 3.20 1 12.80
Estribos 3/8" 21 2.00 1 42.00
VCH 1 1.60 0.20 0.25 0.08 1 1.60 0.20 0.32 1/2" 6 2.60 1 15.60
Estribos 1/4" 15 1.10 1 16.50
E VS-3 EN EJE M 1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 3/4" 2 32.70 1 65.40
1 6.40 0.30 0.65 1.25 1 6.40 1.10 7.04 3/4" 2 32.05 1 64.10

Página 90 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
1 5.15 0.25 0.65 0.84 1 5.15 1.05 5.41 5/8" 1 2.30 1 2.30
1 6.60 0.30 0.65 1.29 1 6.60 1.10 7.26 3/4" 3 3.70 1 11.10
1 1.85 0.30 0.65 0.36 1 1.85 1.10 2.04 3/4" 2 3.50 1 7.00
3/4" 3 5.05 1 15.15
3/4" 3 2.40 1 7.20
5/8" 2 4.65 1 9.30
3/4" 2 4.00 1 8.00
5/8" 1 5.20 1 5.20
3/4" 2 4.60 1 9.20
5/8" 1 7.80 1 7.80
3/4" 2 4.20 1 8.40
3/4" 2 2.95 1 5.90
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 31 2.00 1 62.00
Estribos 3/8" 36 2.10 1 75.60
Estribos 3/8" 20 2.10 1 42.00
E VS-4 EN EJE N 1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 3/4" 4 42.25 1 169.00
1 6.40 0.30 0.65 1.25 1 6.40 1.10 7.04 5/8" 1 2.30 1 2.30
3 6.50 0.30 0.65 3.80 3 6.50 1.10 21.45 3/4" 2 3.70 4 29.60
1 1.60 0.30 0.65 0.31 1 1.60 1.10 1.76 3/4" 1 3.33 1 3.33
5/8" 1 4.65 1 4.65
5/8" 1 4.00 1 4.00
5/8" 1 4.30 3 12.90
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 2.10 3 226.80
Estribos 3/8" 19 2.10 1 39.90
E VS-5 EN EJES N-O ENTRE EJES 20-28 1 6.35 0.25 0.65 1.03 1 6.35 1.05 6.67 5/8" 4 40.15 1 160.60
1 6.40 0.25 0.65 1.04 1 6.40 1.05 6.72 Estribos 3/8" 35 2.00 1 70.00
3 6.50 0.25 0.65 3.17 3 6.50 1.05 20.48 Estribos 3/8" 35 2.00 1 70.00
Estribos 3/8" 36 2.00 3 216.00
E VS-6 EN EJE 20 1 1.80 0.25 0.65 0.29 1 1.80 1.05 1.89 3/4" 2 4.10 1 8.20
1 5.90 0.30 0.65 1.15 1 5.90 1.10 6.49 5/8" 1 4.10 1 4.10
3/4" 2 2.90 1 5.80
3/4" 2 7.70 1 15.40
3/4" 2 7.50 1 15.00
3/4" 1 2.30 1 2.30
5/8" 1 2.40 1 2.40
5/8" 1 4.40 1 4.40
Estribos 3/8" 20 2.00 1 40.00
Estribos 3/8" 34 2.10 1 71.40
E VS-7 EN EJES 23-24 y 25 3 1.80 0.30 0.65 1.05 3 1.80 1.10 5.94 3/4" 4 18.05 3 216.60
3 6.45 0.30 0.65 3.77 3 6.45 1.10 21.29 3/4" 1 3.20 3 9.60
3 5.90 0.30 0.65 3.45 3 5.90 1.10 19.47 3/4" 3 3.50 3 31.50
5/8" 1 2.40 3 7.20
3/4" 2 4.25 3 25.50
5/8" 1 4.40 3 13.20
3/4" 1 4.40 3 13.20
Estribos 3/8" 20 2.10 3 126.00
Estribos 3/8" 36 2.10 3 226.80
Estribos 3/8" 34 2.10 3 214.20
E VS-8 EN EJE 26 1 1.80 0.30 0.65 0.35 1 1.80 1.10 1.98 3/4" 2 6.32 1 12.64
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 3 4.42 1 13.26
3/4" 2 9.25 1 18.50
3/4" 2 4.25 1 8.50
3/4" 3 2.40 1 7.20
Estribos 3/8" 20 2.10 1 42.00
Estribos 3/8" 36 2.10 1 75.60

Página 91 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
E VS-9 EN EJE 28 1 1.80 0.30 0.65 0.35 1 1.80 1.10 1.98 3/4" 2 9.45 1 18.90
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 9.25 1 18.50
1 0.80 0.30 0.65 0.16 1 0.80 1.10 0.88 5/8" 2 2.40 1 4.80
5/8" 1 4.25 1 4.25
5/8" 4 2.00 1 8.00
3/4" 2 2.00 1 4.00
Estribos 3/8" 20 2.10 1 42.00
Estribos 3/8" 36 2.10 1 75.60
Estribos 3/8" 9 2.10 1 18.90
E VS-10 1 13.65 0.25 0.65 2.22 1 13.65 1.05 14.33 3/4" 4 14.65 1 58.60
Estribos 3/8" 60 2.00 1 120.00
V ESC 1 3.90 0.40 0.25 0.39 1 3.90 0.40 1.56 5/8" 6 4.90 1 29.40
Estribos 3/8" 26 1.50 1 39.00
PRIMER PISO
E V-1 EN EJE L 1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 3/4" 4 14.85 1 59.40
1 6.40 0.30 0.65 1.25 1 6.40 1.10 7.04 5/8" 1 3.70 1 3.70
1 6.60 0.30 0.65 1.29 1 6.60 1.10 7.26 3/4" 1 2.40 1 2.40
3/4" 4 8.20 1 32.80
3/4" 1 2.40 3 7.20
3/4" 1 2.40 1 2.40
5/8" 1 4.60 1 4.60
5/8" 1 4.65 1 4.65
5/8" 1 4.20 1 4.20
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 2.10 1 75.60
E V-2 EN EJE L-M ENTRE EJES 26-28 1 2.20 0.25 0.65 0.36 1 2.20 1.05 2.31 3/4" 4 3.20 1 12.80
Estribos 3/8" 21 2.00 1 42.00
E V-3 EN EJE M 1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 3/4" 4 36.50 1 146.00
1 6.40 0.30 0.65 1.25 1 6.40 1.10 7.04 5/8" 1 2.30 1 2.30
1 5.15 0.25 0.65 0.84 1 5.15 1.05 5.41 3/4" 2 3.70 1 7.40
1 6.60 0.30 0.65 1.29 1 6.60 1.10 7.26 5/8" 1 3.70 1 3.70
1 2.20 0.30 0.65 0.43 1 2.20 1.10 2.42 3/4" 3 3.50 1 10.50
1 1.85 0.30 0.65 0.36 1 1.85 1.10 2.04 3/4" 2 4.85 1 9.70
1 0.80 0.30 0.65 0.16 1 0.80 1.10 0.88 3/4" 2 3.30 1 6.60
5/8" 1 3.30 1 3.30
5/8" 1 4.65 1 4.65
3/4" 2 4.00 1 8.00
5/8" 1 4.00 1 4.00
3/4" 2 4.40 1 8.80
5/8" 1 6.60 1 6.60
5/8" 4 6.75 1 27.02
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 31 2.00 1 62.00
Estribos 3/8" 36 2.10 1 75.60
Estribos 3/8" 21 2.10 1 44.10
Estribos 3/8" 20 2.10 1 42.00
Estribos 3/8" 17 2.10 1 35.70
E V-4 EN EJE N ENTRE EJES 20-28 1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 3/4" 4 40.65 1 162.60
1 6.40 0.30 0.65 1.25 1 6.40 1.10 7.04 5/8" 1 2.30 1 2.30
3 6.50 0.30 0.65 3.80 3 6.50 1.10 21.45 3/4" 2 3.70 4 29.60
3/4" 1 3.33 1 3.33
5/8" 1 4.65 1 4.65
5/8" 1 4.00 1 4.00
5/8" 1 4.30 3 12.90
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 2.10 3 226.80

Página 92 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
E V-5 EN EJES N-O ENTRE EJES 20-28 1 6.35 0.25 0.65 1.03 1 6.35 1.05 6.67 5/8" 4 40.15 1 160.60
1 6.40 0.25 0.65 1.04 1 6.40 1.05 6.72 Estribos 3/8" 35 2.00 1 70.00
3 6.50 0.25 0.65 3.17 3 6.50 1.05 20.48 Estribos 3/8" 35 2.00 1 70.00
Estribos 3/8" 36 2.00 3 216.00
E V-6 EN EJE 20 1 1.80 0.25 0.65 0.29 1 1.80 1.05 1.89 3/4" 2 4.10 1 8.20
1 5.90 0.30 0.65 1.15 1 5.90 1.10 6.49 5/8" 1 4.10 1 4.10
3/4" 2 2.90 1 5.80
3/4" 2 7.70 1 15.40
3/4" 2 7.50 1 15.00
3/4" 1 2.30 1 2.30
5/8" 1 2.40 1 2.40
5/8" 1 4.40 1 4.40
Estribos 3/8" 20 2.00 1 40.00
Estribos 3/8" 34 2.10 1 71.40
E V-7 EN EJES 23-24 y 25 3 1.80 0.30 0.65 1.05 3 1.80 1.10 5.94 3/4" 4 18.05 3 216.60
3 6.45 0.30 0.65 3.77 3 6.45 1.10 21.29 3/4" 1 3.20 3 9.60
3 5.90 0.30 0.65 3.45 3 5.90 1.10 19.47 3/4" 3 3.50 3 31.50
5/8" 1 2.40 3 7.20
3/4" 2 4.25 3 25.50
5/8" 1 4.40 3 13.20
3/4" 1 4.40 3 13.20
Estribos 3/8" 20 2.10 3 126.00
Estribos 3/8" 36 2.10 3 226.80
Estribos 3/8" 34 2.10 3 214.20
E V-8 EN EJE 26 1 1.80 0.30 0.65 0.35 1 1.80 1.10 1.98 3/4" 2 6.32 1 12.64
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 3 4.42 1 13.26
3/4" 2 9.25 1 18.50
3/4" 2 4.25 1 8.50
3/4" 3 2.40 1 7.20
Estribos 3/8" 20 2.10 1 42.00
Estribos 3/8" 36 2.10 1 75.60
E V-9 EN EJE 28 1 1.80 0.30 0.65 0.35 1 1.80 1.10 1.98 3/4" 2 9.45 1 18.90
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 9.25 1 18.50
1 0.80 0.30 0.65 0.16 1 0.80 1.10 0.88 5/8" 2 2.40 1 4.80
5/8" 1 4.25 1 4.25
5/8" 4 2.00 1 8.00
3/4" 2 2.00 1 4.00
Estribos 3/8" 20 2.10 1 42.00
Estribos 3/8" 36 2.10 1 75.60
Estribos 3/8" 9 2.10 1 18.90
V ESC 1 3.90 0.40 0.25 0.39 1 3.90 0.40 1.56 5/8" 6 4.90 1 29.40
Estribos 3/8" 26 1.50 1 39.00
SEGUNDO PISO
E 2V-1 EN EJE L 1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 3/4" 4 14.85 1 59.40
1 6.40 0.30 0.65 1.25 1 6.40 1.10 7.04 5/8" 1 3.70 1 3.70
1 6.60 0.30 0.65 1.29 1 6.60 1.10 7.26 3/4" 1 2.40 1 2.40
3/4" 4 8.20 1 32.80
3/4" 1 2.40 3 7.20
3/4" 1 2.40 1 2.40
5/8" 1 4.60 1 4.60
5/8" 1 4.65 1 4.65
5/8" 1 4.20 1 4.20
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 2.10 1 75.60
E 2V-3 EN EJE M 1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 3/4" 4 36.50 1 146.00
1 6.40 0.30 0.65 1.25 1 6.40 1.10 7.04 5/8" 1 2.30 1 2.30
1 5.15 0.25 0.65 0.84 1 5.15 1.05 5.41 3/4" 2 3.70 1 7.40
1 6.60 0.30 0.65 1.29 1 6.60 1.10 7.26 5/8" 1 3.70 1 3.70

Página 93 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
1 2.20 0.30 0.65 0.43 1 2.20 1.10 2.42 3/4" 3 3.50 1 10.50
1 1.85 0.30 0.65 0.36 1 1.85 1.10 2.04 3/4" 2 4.85 1 9.70
1 0.80 0.30 0.65 0.16 1 0.80 1.10 0.88 3/4" 2 3.30 1 6.60
5/8" 1 3.30 1 3.30
5/8" 1 4.65 1 4.65
3/4" 2 4.00 1 8.00
5/8" 1 4.00 1 4.00
3/4" 2 4.40 1 8.80
5/8" 1 6.60 1 6.60
5/8" 4 6.75 1 27.02
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 31 2.00 1 62.00
Estribos 3/8" 36 2.10 1 75.60
Estribos 3/8" 21 2.10 1 44.10
Estribos 3/8" 20 2.10 1 42.00
Estribos 3/8" 17 2.10 1 35.70
E 2V-4 EN EJE N ENTRE EJES 20-28 1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 3/4" 4 40.65 1 162.60
1 6.40 0.30 0.65 1.25 1 6.40 1.10 7.04 5/8" 1 2.30 1 2.30
3 6.50 0.30 0.65 3.80 3 6.50 1.10 21.45 3/4" 2 3.70 4 29.60
3/4" 1 3.33 1 3.33
5/8" 1 4.65 1 4.65
5/8" 1 4.00 1 4.00
5/8" 1 4.30 3 12.90
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 2.10 3 226.80

E 2V-5 EN EJE L-M ENTRE EJES 26-28 1 2.20 0.25 0.65 0.36 1 2.20 1.05 2.31 3/4" 4 3.20 1 12.80
Estribos 3/8" 21 2.00 1 42.00
E 2V-6 EN EJES N-O ENTRE EJES 20-28 1 6.35 0.25 0.65 1.03 1 6.35 1.05 6.67 5/8" 4 40.15 1 160.60
1 6.40 0.25 0.65 1.04 1 6.40 1.05 6.72 Estribos 3/8" 35 2.00 1 70.00
3 6.50 0.25 0.65 3.17 3 6.50 1.05 20.48 Estribos 3/8" 35 2.00 1 70.00
Estribos 3/8" 36 2.00 3 216.00
E 2 V-7 EN EJE 20 1 1.80 0.25 0.65 0.29 1 1.80 1.05 1.89 3/4" 2 4.10 1 8.20
1 5.90 0.30 0.65 1.15 1 5.90 1.10 6.49 5/8" 1 4.10 1 4.10
3/4" 2 2.90 1 5.80
3/4" 2 7.70 1 15.40
3/4" 2 7.50 1 15.00
3/4" 1 2.30 1 2.30
5/8" 1 2.40 1 2.40
5/8" 1 4.40 1 4.40
Estribos 3/8" 20 2.00 1 40.00
Estribos 3/8" 34 2.10 1 71.40
E 2V-8 EN EJES 23-24 y 25 3 1.80 0.30 0.65 1.05 3 1.80 1.10 5.94 3/4" 4 18.05 3 216.60
3 6.45 0.30 0.65 3.77 3 6.45 1.10 21.29 3/4" 1 3.20 3 9.60
3 5.90 0.30 0.65 3.45 3 5.90 1.10 19.47 3/4" 3 3.50 3 31.50
5/8" 1 2.40 3 7.20
3/4" 2 4.25 3 25.50
5/8" 1 4.40 3 13.20
3/4" 1 4.40 3 13.20
Estribos 3/8" 20 2.10 3 126.00
Estribos 3/8" 36 2.10 3 226.80
Estribos 3/8" 34 2.10 3 214.20
E 2V-9 EN EJE 26 1 1.80 0.30 0.65 0.35 1 1.80 1.10 1.98 3/4" 2 6.32 1 12.64
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 3 4.42 1 13.26
3/4" 2 9.25 1 18.50
3/4" 2 4.25 1 8.50
3/4" 3 2.40 1 7.20

Página 94 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
Estribos 3/8" 20 2.10 1 42.00
Estribos 3/8" 36 2.10 1 75.60
E 2V-10 EN EJE 28 1 1.80 0.30 0.65 0.35 1 1.80 1.10 1.98 3/4" 2 9.45 1 18.90
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 9.25 1 18.50
1 0.80 0.30 0.65 0.16 1 0.80 1.10 0.88 5/8" 2 2.40 1 4.80
5/8" 1 4.25 1 4.25
5/8" 4 2.00 1 8.00
3/4" 2 2.00 1 4.00
Estribos 3/8" 20 2.10 1 42.00
Estribos 3/8" 36 2.10 1 75.60
Estribos 3/8" 9 2.10 1 18.90
V ESC 1 3.90 0.40 0.25 0.39 1 3.90 0.40 1.56 5/8" 6 4.90 1 29.40
Estribos 3/8" 26 1.50 1 39.00
TERCER PISO
E 3V-1 EN EJE L 1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 3/4" 4 14.85 1 59.40
1 6.40 0.30 0.65 1.25 1 6.40 1.10 7.04 5/8" 1 3.70 1 3.70
1 6.60 0.30 0.65 1.29 1 6.60 1.10 7.26 3/4" 1 2.40 1 2.40
3/4" 4 8.20 1 32.80
3/4" 1 2.40 3 7.20
3/4" 1 2.40 1 2.40
5/8" 1 4.60 1 4.60
5/8" 1 4.65 1 4.65
5/8" 1 4.20 1 4.20
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 2.10 1 75.60
E 3V-3 EN EJE M 1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 3/4" 4 36.50 1 146.00
1 6.40 0.30 0.65 1.25 1 6.40 1.10 7.04 5/8" 1 2.30 1 2.30
1 5.15 0.25 0.65 0.84 1 5.15 1.05 5.41 3/4" 2 3.70 1 7.40
1 6.60 0.30 0.65 1.29 1 6.60 1.10 7.26 5/8" 1 3.70 1 3.70
1 2.20 0.30 0.65 0.43 1 2.20 1.10 2.42 3/4" 3 3.50 1 10.50
1 1.85 0.30 0.65 0.36 1 1.85 1.10 2.04 3/4" 2 4.85 1 9.70
1 0.80 0.30 0.65 0.16 1 0.80 1.10 0.88 3/4" 2 3.30 1 6.60
5/8" 1 3.30 1 3.30
5/8" 1 4.65 1 4.65
3/4" 2 4.00 1 8.00
5/8" 1 4.00 1 4.00
3/4" 2 4.40 1 8.80
5/8" 1 6.60 1 6.60
5/8" 4 6.75 1 27.02
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 31 2.00 1 62.00
Estribos 3/8" 36 2.10 1 75.60
Estribos 3/8" 21 2.10 1 44.10
Estribos 3/8" 20 2.10 1 42.00
Estribos 3/8" 17 2.10 1 35.70
E 3V-4 EN EJE N ENTRE EJES 20-28 1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 3/4" 4 40.65 1 162.60
1 6.40 0.30 0.65 1.25 1 6.40 1.10 7.04 5/8" 1 2.30 1 2.30
3 6.50 0.30 0.65 3.80 3 6.50 1.10 21.45 3/4" 2 3.70 4 29.60
3/4" 1 3.33 1 3.33
5/8" 1 4.65 1 4.65
5/8" 1 4.00 1 4.00
5/8" 1 4.30 3 12.90
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 2.10 3 226.80

E 3V-5 EN EJE L-M ENTRE EJES 26-28 1 2.20 0.25 0.65 0.36 1 2.20 1.05 2.31 3/4" 4 3.20 1 12.80

Página 95 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
Estribos 3/8" 21 2.00 1 42.00
E 3V-6 EN EJES N-O ENTRE EJES 20-28 1 6.35 0.25 0.65 1.03 1 6.35 1.05 6.67 5/8" 4 40.15 1 160.60
1 6.40 0.25 0.65 1.04 1 6.40 1.05 6.72 Estribos 3/8" 35 2.00 1 70.00
3 6.50 0.25 0.65 3.17 3 6.50 1.05 20.48 Estribos 3/8" 35 2.00 1 70.00
Estribos 3/8" 36 2.00 3 216.00
E 3 V-7 EN EJE 20 1 1.80 0.25 0.65 0.29 1 1.80 1.05 1.89 3/4" 2 4.10 1 8.20
1 5.90 0.30 0.65 1.15 1 5.90 1.10 6.49 5/8" 1 4.10 1 4.10
3/4" 2 2.90 1 5.80
3/4" 2 7.70 1 15.40
3/4" 2 7.50 1 15.00
3/4" 1 2.30 1 2.30
5/8" 1 2.40 1 2.40
5/8" 1 4.40 1 4.40
Estribos 3/8" 20 2.00 1 40.00
Estribos 3/8" 34 2.10 1 71.40
E 3V-8 EN EJES 23-24 y 25 3 1.80 0.30 0.65 1.05 3 1.80 1.10 5.94 3/4" 4 18.05 3 216.60
3 6.45 0.30 0.65 3.77 3 6.45 1.10 21.29 3/4" 1 3.20 3 9.60
3 5.90 0.30 0.65 3.45 3 5.90 1.10 19.47 3/4" 3 3.50 3 31.50
5/8" 1 2.40 3 7.20
3/4" 2 4.25 3 25.50
5/8" 1 4.40 3 13.20
3/4" 1 4.40 3 13.20
Estribos 3/8" 20 2.10 3 126.00
Estribos 3/8" 36 2.10 3 226.80
Estribos 3/8" 34 2.10 3 214.20
E 3V-9 EN EJE 26 1 1.80 0.30 0.65 0.35 1 1.80 1.10 1.98 3/4" 2 6.32 1 12.64
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 3 4.42 1 13.26
3/4" 2 9.25 1 18.50
3/4" 2 4.25 1 8.50
3/4" 3 2.40 1 7.20
Estribos 3/8" 20 2.10 1 42.00
Estribos 3/8" 36 2.10 1 75.60
E 3V-10 EN EJE 28 1 1.80 0.30 0.65 0.35 1 1.80 1.10 1.98 3/4" 2 9.45 1 18.90
1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 9.25 1 18.50
1 0.80 0.30 0.65 0.16 1 0.80 1.10 0.88 5/8" 2 2.40 1 4.80
5/8" 1 4.25 1 4.25
5/8" 4 2.00 1 8.00
3/4" 2 2.00 1 4.00
Estribos 3/8" 20 2.10 1 42.00
Estribos 3/8" 36 2.10 1 75.60
Estribos 3/8" 9 2.10 1 18.90
V ESC 1 3.90 0.40 0.25 0.39 1 3.90 0.40 1.56 5/8" 6 4.90 1 29.40
Estribos 3/8" 26 1.50 1 39.00
SECTOR F
SOTANO
VS-1 EN EJE J 1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 3/4" 1 2.20 1 2.20
3 6.60 0.30 0.65 3.86 3 6.60 1.10 21.78 3/4" 2 4.40 1 8.80
1 2.80 0.30 0.65 0.55 1 2.80 1.10 3.08 3/4" 2 7.70 1 15.40
1 1.85 0.30 0.65 0.36 1 1.85 1.10 2.04 3/4" 2 3.60 1 7.20
3/4" 4 4.50 1 18.00
5/8" 2 2.40 1 4.80
5/8" 2 5.60 1 11.20
3/4" 4 9.00 1 36.00
3/4" 4 6.50 1 26.00
5/8" 2 3.60 1 7.20
3/4" 2 6.35 1 12.70
3/4" 2 3.20 1 6.40
3/4" 1 8.35 1 8.35
5/8" 1 8.35 1 8.35

Página 96 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
3/4" 2 4.65 1 9.30
3/4" 2 6.60 1 13.20
3/4" 1 4.40 1 4.40
3/4" 2 5.00 1 10.00
5/8" 1 5.00 1 5.00
3/4" 2 7.60 1 15.20
5/8" 1 7.60 1 7.60
3/4" 2 8.65 1 17.30
3/4" 2 4.40 1 8.80
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 2.10 3 226.80
Estribos 3/8" 23 2.10 1 48.30
Estribos 3/8" 20 2.10 1 42.00
VS-2 EN EJE K 1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 3/4" 2 8.05 1 16.10
1 6.60 0.30 0.65 1.29 1 6.60 1.10 7.26 3/4" 2 7.85 1 15.70
1 1.85 0.30 0.65 0.36 1 1.85 1.10 2.04 3/4" 2 2.40 2 9.60
5/8" 1 4.35 1 4.35
3/4" 2 3.20 1 6.40
3/4" 2 10.95 1 21.90
3/4" 2 10.75 1 21.50
5/8" 1 4.40 1 4.40
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 2.10 1 75.60
Estribos 3/8" 20 2.10 1 42.00
VS-3 EN EJE 20 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 8.05 1 16.10
3/4" 2 2.30 1 4.60
3/4" 2 7.95 1 15.90
5/8" 1 4.75 1 4.75
Estribos 3/8" 36 2.10 1 75.60
VS-4 EN EJE 23 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 12.50 1 25.00
1 3.15 0.30 0.65 0.61 1 3.15 1.10 3.47 3/4" 2 12.30 1 24.60
3/4" 2 2.50 1 5.00
3/4" 3 3.20 1 9.60
3/4" 2 4.55 1 9.10
5/8" 1 4.55 1 4.55
Estribos 3/8" 36 2.10 1 75.60
Estribos 3/8" 25 2.10 1 52.50
VS-5 ENTRE EJES 22-24 y I-J 1 3.15 0.30 0.65 0.61 1 3.15 1.10 3.47 3/4" 2 4.35 1 8.70
3/4" 2 4.15 1 8.30
Estribos 3/8" 25 2.10 1 52.50
VS-6 EN EJES 24,25 Y 26 3 6.45 0.30 0.65 3.77 3 6.45 1.10 21.29 3/4" 4 16.70 3 200.40
3 6.45 0.30 0.65 3.77 3 6.45 1.10 21.29 3/4" 2 2.50 3 15.00
3/4" 2 3.20 3 19.20
5/8" 1 3.20 3 9.60
3/4" 1 2.30 3 6.90
3/4" 2 4.55 3 27.30
5/8" 1 4.55 3 13.65
3/4" 2 4.55 3 27.30
5/8" 1 4.55 3 13.65
Estribos 3/8" 36 2.10 3 226.80
Estribos 3/8" 36 2.10 3 226.80
VS-7 EN EJE 28 1 6.45 0.30 0.65 1.26 1 6.45 1.10 7.10 3/4" 2 8.15 1 16.30
3/4" 2 7.95 1 15.90
3/4" 1 2.40 1 2.40
5/8" 1 4.45 1 4.45
Estribos 3/8" 36 2.10 1 75.60
VS-8 ENTRE EJES 28-29 y J-K 1 6.55 0.30 0.65 1.28 1 6.55 1.10 7.21 5/8" 4 8.15 1 32.60
5/8" 1 5.15 1 5.15
Estribos 3/8" 36 2.10 1 75.60

Página 97 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
PRIMER PISO
V-1 EN EJE C 1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 3/4" 4 8.05 1 32.20
2 6.60 0.30 0.65 2.57 2 6.60 1.10 14.52 5/8" 1 2.50 1 2.50
3/4" 1 2.30 1 2.30
5/8" 1 4.65 1 4.65
3/4" 4 16.80 1 67.20
3/4" 1 2.40 1 2.40
3/4" 1 3.60 1 3.60
5/8" 1 2.40 1 2.40
5/8" 1 4.40 1 4.40
5/8" 2 4.60 1 9.20
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 2.10 2 151.20
V-2 EN EJE D 1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 3/4" 4 34.75 1 139.00
3 6.60 0.30 0.65 3.86 3 6.60 1.10 21.78 5/8" 1 2.50 1 2.50
1 3.40 0.30 0.65 0.66 1 3.40 1.10 3.74 3/4" 1 3.60 1 3.60
5/8" 2 3.60 2 14.40
5/8" 2 5.00 1 10.00
5/8" 1 4.35 1 4.35
5/8" 1 4.20 3 12.60
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 2.10 3 226.80
Estribos 3/8" 25 2.10 1 52.50
V-3 EN EJE G 1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 5/8" 1 2.40 1 2.40
1 3.90 0.30 0.65 0.76 1 3.90 1.10 4.29 3/4" 2 4.40 1 8.80
1 4.60 0.30 0.65 0.90 1 4.60 1.10 5.06 3/4" 2 8.70 1 17.40
1 6.60 0.30 0.65 1.29 1 6.60 1.10 7.26 3/4" 2 6.70 1 13.40
1 3.20 0.30 0.65 0.62 1 3.20 1.10 3.52 3/4" 2 9.50 1 19.00
3/4" 1 2.20 1 2.20
3/4" 2 3.40 1 6.80
3/4" 2 5.60 1 11.20
3/4" 2 2.40 1 4.80
3/4" 2 4.80 1 9.60
3/4" 2 4.90 2 19.60
5/8" 2 4.90 2 19.60
3/4" 1 4.45 1 4.45
3/4" 2 6.80 1 13.60
3/4" 3 6.60 1 19.80
3/4" 2 4.40 1 8.80
3/4" 2 4.60 1 9.20
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 27 2.10 1 56.70
Estribos 3/8" 29 2.10 1 60.90
Estribos 3/8" 36 2.10 1 75.60
Estribos 3/8" 25 2.10 1 52.50
V-4 EN EJE H 1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 3/4" 2 2.40 1 4.80
3 6.60 0.30 0.65 3.86 3 6.60 1.10 21.78 3/4" 2 4.40 1 8.80
3/4" 2 7.80 2 31.20
3/4" 2 3.60 1 7.20
5/8" 1 3.60 1 3.60
3/4" 2 4.50 2 18.00
3/4" 3 2.40 2 14.40
3/4" 2 4.90 1 9.80
3/4" 4 3.60 1 14.40
5/8" 1 2.20 1 2.20
3/4" 2 6.55 1 13.10
3/4" 2 4.45 2 17.80
3/4" 2 8.80 2 35.20
3/4" 2 4.60 1 9.20

Página 98 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
3/4" 2 6.60 1 13.20
3/4" 2 4.40 1 8.80
3/4" 2 9.00 1 18.00
5/8" 1 9.00 1 9.00
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 2.10 3 226.80
V-5 EN EJE I 1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 5/8" 1 2.40 1 2.40
4 6.60 0.30 0.65 5.15 4 6.60 1.10 29.04 3/4" 2 4.40 1 8.80
3/4" 2 7.80 4 62.40
3/4" 3 3.60 4 43.20
5/8" 1 3.60 1 3.60
3/4" 2 4.50 1 9.00
5/8" 1 2.20 1 2.20
3/4" 2 8.75 1 17.50
3/4" 2 4.65 1 9.30
3/4" 2 4.20 1 8.40
3/4" 2 5.40 1 10.80
3/4" 2 4.40 2 17.60
3/4" 2 7.60 2 30.40
3/4" 2 4.90 1 9.80
3/4" 2 9.00 1 18.00
5/8" 1 9.00 1 9.00
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 2.10 4 302.40
V-6 EN EJE J 1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 3/4" 1 2.40 1 2.40
3 6.60 0.30 0.65 3.86 3 6.60 1.10 21.78 3/4" 2 4.40 1 8.80
1 2.80 0.30 0.65 0.55 1 2.80 1.10 3.08 3/4" 2 7.80 2 31.20
3/4" 3 3.60 2 21.60
3/4" 2 4.50 1 9.00
5/8" 4 2.40 1 9.60
3/4" 2 7.70 1 15.40
3/4" 2 5.60 1 11.20
3/4" 2 4.50 1 9.00
5/8" 2 2.20 1 4.40
3/4" 2 6.55 1 13.10
3/4" 2 4.45 1 8.90
3/4" 2 4.60 1 9.20
3/4" 2 8.80 1 17.60
3/4" 2 5.00 1 10.00
5/8" 1 5.00 1 5.00
3/4" 2 5.40 1 10.80
5/8" 1 5.40 1 5.40
3/4" 2 4.20 1 8.40
3/4" 2 4.90 1 9.80
3/4" 3 9.00 1 27.00
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 2.10 3 226.80
Estribos 3/8" 23 2.10 1 48.30
V-7 EN EJE K 1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 3/4" 2 4.40 1 8.80
3 6.60 0.30 0.65 3.86 3 6.60 1.10 21.78 3/4" 2 7.80 2 31.20
3/4" 1 3.60 2 7.20
3/4" 2 4.50 2 18.00
3/4" 2 2.40 2 9.60
3/4" 2 4.50 1 9.00
3/4" 2 6.55 1 13.10
5/8" 1 4.45 1 4.45
3/4" 2 8.80 1 17.60
5/8" 1 4.60 1 4.60
3/4" 2 6.60 1 13.20

Página 99 de 209
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
5/8" 2 4.40 1 8.80
3/4" 2 9.00 1 18.00
5/8" 1 4.90 1 4.90
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 2.10 3 226.80
V-8 EN EJE 20 4 6.45 0.30 0.65 5.03 4 6.45 1.10 28.38 3/4" 2 4.45 1 8.90
1 2.20 0.25 0.65 0.36 1 2.20 1.05 2.31 3/4" 2 7.65 2 30.60
1 1.20 0.25 0.65 0.20 1 1.20 1.05 1.26 3/4" 3 3.60 2 21.60
3/4" 2 4.45 1 8.90
5/8" 2 2.40 1 4.80
3/4" 2 6.40 1 12.80
5/8" 2 5.20 1 10.40
3/4" 2 5.65 1 11.30
5/8" 2 4.00 1 8.00
5/8" 2 3.40 2 13.60
3/4" 2 8.45 1 16.90
5/8" 1 4.75 1 4.75
3/4" 2 4.65 1 9.30
5/8" 1 4.05 1 4.05
3/4" 2 8.65 1 17.30
5/8" 1 4.45 1 4.45
3/4" 2 9.05 1 18.10
5/8" 1 3.20 1 3.20
5/8" 1 4.25 1 4.25
3/4" 2 3.40 1 6.80
Estribos 3/8" 36 2.10 4 302.40
Estribos 3/8" 21 2.00 1 42.00
Estribos 3/8" 13 2.00 1 26.00
V-9 EN EJE 23 5 6.45 0.30 0.65 6.29 5 6.45 1.10 35.48 3/4" 2 4.45 1 8.90
1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 3/4" 1 2.40 1 2.40
3/4" 2 7.65 5 76.50
3/4" 3 3.60 5 54.00
3/4" 2 4.40 1 8.80
5/8" 1 2.20 1 2.20
3/4" 2 8.85 1 17.70
5/8" 1 4.75 1 4.75
3/4" 2 5.25 1 10.50
5/8" 1 4.05 1 4.05
3/4" 2 7.45 3 44.70
3/4" 2 4.25 3 25.50
3/4" 2 4.65 1 9.30
3/4" 2 8.75 1 17.50
5/8" 1 8.75 1 8.75
Estribos 3/8" 36 2.10 5 378.00
Estribos 3/8" 35 2.10 1 73.50
V-10 EN EJE 24 3 6.45 0.30 0.65 3.77 3 6.45 1.10 21.29 3/4" 2 4.45 1 8.90
2 2.20 0.25 0.65 0.72 2 2.20 1.05 4.62 3/4" 2 2.40 1 4.80
1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 3/4" 2 7.65 1 15.30
3/4" 3 3.60 1 10.80
3/4" 2 7.05 2 28.20
3/4" 3 5.00 2 30.00
3/4" 2 4.45 1 8.90
3/4" 3 2.40 1 7.20
3/4" 2 7.95 1 15.90
3/4" 4 2.40 1 9.60
5/8" 1 2.20 1 2.20
3/4" 2 8.85 1 17.70
3/4" 2 4.75 1 9.50
3/4" 2 5.25 1 10.50

Página 100 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
3/4" 2 4.05 1 8.10
3/4" 2 4.40 2 17.60
5/8" 1 4.40 2 8.80
3/4" 2 6.45 1 12.90
3/4" 2 4.25 1 8.50
3/4" 2 7.75 1 15.50
5/8" 1 7.75 1 7.75
3/4" 2 4.65 1 9.30
Estribos 3/8" 36 2.10 3 226.80
Estribos 3/8" 21 2.00 2 84.00
Estribos 3/8" 35 2.10 1 73.50
V-11 EN EJE 25 4 6.45 0.30 0.65 5.03 4 6.45 1.10 28.38 3/4" 2 4.45 1 8.90
1 2.20 0.25 0.65 0.36 1 2.20 1.05 2.31 3/4" 2 2.40 1 4.80
1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 3/4" 2 7.65 3 45.90
3/4" 3 3.60 3 32.40
3/4" 2 7.05 1 14.10
3/4" 3 5.00 1 15.00
5/8" 2 3.80 2 15.20
3/4" 2 7.95 1 15.90
3/4" 4 2.40 1 9.60
5/8" 1 2.20 1 2.20
3/4" 2 8.85 1 17.70
3/4" 2 4.75 1 9.50
3/4" 2 5.25 1 10.50
3/4" 2 4.05 1 8.10
3/4" 2 7.45 1 14.90
5/8" 1 7.45 1 7.45
3/4" 2 4.25 2 17.00
3/4" 2 8.05 1 16.10
3/4" 2 3.80 1 7.60
5/8" 1 3.80 1 3.80
3/4" 2 7.75 1 15.50
5/8" 1 7.75 1 7.75
3/4" 2 4.65 1 9.30
Estribos 3/8" 36 2.10 4 302.40
Estribos 3/8" 23 2.00 1 46.00
Estribos 3/8" 35 2.10 1 73.50
V-12 EN EJE 26 4 6.45 0.30 0.65 5.03 4 6.45 1.10 28.38 3/4" 2 4.45 1 8.90
1 2.20 0.25 0.65 0.36 1 2.20 1.05 2.31 3/4" 1 2.60 1 2.60
1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 3/4" 2 7.65 3 45.90
3/4" 3 3.60 3 32.40
3/4" 2 7.05 1 14.10
3/4" 3 5.00 1 15.00
5/8" 2 3.80 2 15.20
3/4" 2 4.45 1 8.90
3/4" 3 2.40 1 7.20
3/4" 2 4.40 1 8.80
5/8" 2 2.20 1 4.40
3/4" 2 8.85 1 17.70
5/8" 1 8.85 1 8.85
3/4" 2 4.75 1 9.50
3/4" 2 5.25 2 21.00
3/4" 2 4.05 2 16.20
3/4" 2 4.40 1 8.80
5/8" 1 4.40 1 4.40
3/4" 2 8.65 1 17.30
3/4" 2 4.45 1 8.90
3/4" 2 8.75 1 17.50
3/4" 1 6.65 1 6.65

Página 101 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
Estribos 3/8" 36 2.10 4 302.40
Estribos 3/8" 23 2.00 1 46.00
Estribos 3/8" 35 2.10 1 73.50
V-13 EN EJE 27 1 3.45 0.25 0.65 0.56 1 3.45 1.05 3.62 3/4" 2 8.25 1 16.50
1 6.35 0.25 0.65 1.03 1 6.35 1.05 6.67 3/4" 1 6.25 1 6.25
3/4" 2 4.40 1 8.80
5/8" 1 2.20 1 2.20
3/4" 2 5.65 1 11.30
3/4" 2 6.55 1 13.10
5/8" 1 4.45 1 4.45
Estribos 3/8" 26 2.00 1 52.00
Estribos 3/8" 65 2.00 1 130.00
V-14 EN EJE 28 3 6.45 0.30 0.65 3.77 3 6.45 1.10 21.29 3/4" 2 8.05 1 16.10
3/4" 1 2.40 1 2.40
3/4" 2 4.45 1 8.90
5/8" 2 2.40 1 4.80
3/4" 2 7.65 1 15.30
3/4" 1 3.60 1 3.60
3/4" 2 4.45 1 8.90
3/4" 2 2.20 1 4.40
3/4" 2 8.65 1 17.30
5/8" 1 4.45 1 4.45
3/4" 2 6.65 1 13.30
5/8" 2 4.55 1 9.10
Estribos 3/8" 36 2.10 3 226.80
SEGUNDO PISO
2V-1 EN EJE C 1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 3/4" 4 8.05 1 32.20
2 6.60 0.30 0.65 2.57 2 6.60 1.10 14.52 5/8" 1 2.50 1 2.50
3/4" 1 2.30 1 2.30
5/8" 1 4.65 1 4.65
3/4" 4 16.80 1 67.20
3/4" 1 2.40 1 2.40
3/4" 1 3.60 1 3.60
5/8" 1 2.40 1 2.40
5/8" 1 4.40 1 4.40
5/8" 2 4.60 1 9.20
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 2.10 2 151.20
2V-2 EN EJE D 1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 3/4" 4 34.75 1 139.00
3 6.60 0.30 0.65 3.86 3 6.60 1.10 21.78 5/8" 1 2.50 1 2.50
1 3.40 0.30 0.65 0.66 1 3.40 1.10 3.74 3/4" 1 3.60 1 3.60
5/8" 2 3.60 2 14.40
5/8" 2 5.00 1 10.00
5/8" 1 4.35 1 4.35
5/8" 1 4.20 3 12.60
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 2.10 3 226.80
Estribos 3/8" 25 2.10 1 52.50
2V-3 EN EJE G ENTRE EJES 20-28 1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 3/4" 2 4.40 1 8.80
1 3.90 0.25 0.65 0.63 1 3.90 1.05 4.10 5/8" 1 2.40 1 2.40
1 4.58 0.25 0.65 0.74 1 4.58 1.05 4.81 3/4" 2 8.70 1 17.40
1 6.60 0.30 0.65 1.29 1 6.60 1.10 7.26 3/4" 1 6.70 1 6.70
1 3.20 0.25 0.65 0.52 1 3.20 1.05 3.36 3/4" 2 9.50 1 19.00
5/8" 1 2.40 1 2.40
3/4" 2 4.50 1 9.00
3/4" 1 2.40 1 2.40
3/4" 2 6.55 1 13.10
5/8" 1 4.45 1 4.45
3/4" 2 6.10 1 12.20

Página 102 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
5/8" 1 6.10 1 6.10
3/4" 2 6.80 1 13.60
3/4" 2 6.60 1 13.20
5/8" 2 4.40 1 8.80
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 27 2.00 1 54.00
Estribos 3/8" 29 2.00 1 58.00
Estribos 3/8" 36 2.10 1 75.60
Estribos 3/8" 25 2.00 1 50.00
2V-4 EN EJE H ENTRE EJES 20-28 1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 3/4" 2 4.40 1 8.80
3 6.60 0.30 0.65 3.86 3 6.60 1.10 21.78 3/4" 2 7.70 1 15.40
5/8" 2 3.60 1 7.20
3/4" 2 4.50 1 9.00
3/4" 3 2.40 1 7.20
3/4" 2 4.50 1 9.00
5/8" 2 2.40 1 4.80
3/4" 2 7.80 1 15.60
3/4" 2 3.60 1 7.20
3/4" 2 4.50 1 9.00
3/4" 2 6.55 1 13.10
5/8" 1 4.45 1 4.45
3/4" 2 8.80 1 17.60
5/8" 1 4.60 1 4.60
3/4" 3 6.60 1 19.80
3/4" 2 4.40 1 8.80
3/4" 2 9.00 1 18.00
5/8" 1 4.90 1 4.90
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 2.10 3 226.80
2V-5 EN EJE I ENTRE EJES 20-28 1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 3/4" 2 4.40 1 8.80
4 6.60 0.30 0.65 5.15 4 6.60 1.10 29.04 3/4" 2 7.80 4 62.40
5/8" 2 3.60 4 28.80
3/4" 2 4.50 1 9.00
3/4" 2 8.35 1 16.70
5/8" 1 4.65 1 4.65
3/4" 2 5.40 1 10.80
5/8" 1 4.20 1 4.20
3/4" 2 4.50 1 9.00
3/4" 2 7.60 2 30.40
5/8" 1 4.40 2 8.80
3/4" 2 4.40 1 8.80
3/4" 2 9.00 1 18.00
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 2.10 4 302.40
2V-6 EN EJE J ENTRE EJES 20-28 1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 3/4" 2 4.40 1 8.80
3 6.60 0.30 0.65 3.86 3 6.60 1.10 21.78 5/8" 1 2.40 1 2.40
1 2.80 0.25 0.65 0.46 1 2.80 1.05 2.94 3/4" 2 7.70 1 15.40
5/8" 2 3.60 1 7.20
3/4" 2 4.50 1 9.00
3/4" 2 2.40 1 4.80
3/4" 2 7.30 1 14.60
5/8" 2 5.60 1 11.20
3/4" 2 8.80 1 17.60
3/4" 2 3.60 1 7.20
3/4" 2 4.40 1 8.80
3/4" 1 2.20 1 2.20
3/4" 2 4.75 1 9.50
3/4" 1 4.45 1 4.45
3/4" 2 8.80 1 17.60

Página 103 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
3/4" 1 4.60 1 4.60
3/4" 2 5.00 1 10.00
3/4" 2 5.40 1 10.80
3/4" 2 4.20 1 8.40
3/4" 2 9.00 1 18.00
3/4" 2 5.90 1 11.80
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 2.10 3 226.80
Estribos 3/8" 23 2.00 1 46.00
2V-7 EN EJE K ENTRE EJES 20-28 1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 3/4" 2 4.40 1 8.80
3 6.60 0.30 0.65 3.86 3 6.60 1.10 21.78 3/4" 2 7.70 1 15.40
5/8" 2 3.60 1 7.20
3/4" 2 4.50 1 9.00
3/4" 3 2.40 1 7.20
3/4" 2 4.50 1 9.00
5/8" 2 2.40 1 4.80
3/4" 2 7.80 1 15.60
3/4" 2 3.60 1 7.20
3/4" 2 4.50 1 9.00
3/4" 2 6.55 1 13.10
5/8" 1 4.45 1 4.45
3/4" 2 8.80 1 17.60
5/8" 1 4.60 1 4.60
3/4" 3 6.60 1 19.80
3/4" 2 4.40 1 8.80
3/4" 2 9.00 1 18.00
5/8" 1 4.90 1 4.90
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 36 2.10 3 226.80
2V-8 EN EJE 20 ENTRE EJES C-K 4 6.45 0.30 0.65 5.03 4 6.45 1.10 28.38 3/4" 2 8.05 1 16.10
1 2.20 0.25 0.65 0.36 1 2.20 1.05 2.31 3/4" 2 5.65 1 11.30
1 1.20 0.25 0.65 0.20 1 1.20 1.05 1.26 3/4" 2 3.60 1 7.20
3/4" 2 7.65 1 15.30
3/4" 1 3.60 1 3.60
3/4" 2 4.45 1 8.90
5/8" 2 2.40 1 4.80
3/4" 2 7.05 1 14.10
5/8" 2 5.00 1 10.00
3/4" 2 6.05 1 12.10
5/8" 2 4.00 1 8.00
5/8" 2 3.80 2 15.20
3/4" 2 9.00 1 18.00
3/4" 2 6.65 1 13.30
5/8" 1 4.25 1 4.25
3/4" 2 8.65 1 17.30
5/8" 2 4.45 1 8.90
3/4" 2 9.05 1 18.10
5/8" 1 3.20 1 3.20
5/8" 1 6.25 1 6.25
3/4" 2 3.40 1 6.80
Estribos 3/8" 36 2.10 4 302.40
Estribos 3/8" 21 2.00 1 42.00
Estribos 3/8" 13 2.00 1 26.00
2V-9 EN EJE 23 ENTRE EJES C-K 1 6.45 0.40 0.30 0.77 1 6.45 0.50 3.23 5/8" 3 11.30 1 33.90
4 6.45 0.30 0.65 5.03 4 6.45 1.10 28.38 3/4" 3 3.60 5 54.00
1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 3/4" 2 7.65 4 61.20
3/4" 2 4.00 1 8.00
5/8" 3 9.25 1 27.75
3/4" 2 6.65 1 13.30

Página 104 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
5/8" 2 4.25 4 34.00
3/4" 2 7.45 3 44.70
3/4" 2 8.75 1 17.50
3/4" 1 4.65 1 4.65
Estribos 3/8" 36 1.60 1 57.60
Estribos 3/8" 36 2.10 4 302.40
Estribos 3/8" 65 2.10 1 136.50
2V-10 EN EJE 24 ENTRE EJES C-K 1 6.45 0.40 0.30 0.77 1 6.45 0.50 3.23 5/8" 3 11.30 1 33.90
2 6.45 0.30 0.65 2.52 2 6.45 1.10 14.19 3/4" 3 3.60 1 10.80
2 2.20 0.25 0.65 0.72 2 2.20 1.05 4.62 3/4" 2 7.05 1 14.10
1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 3/4" 3 5.00 1 15.00
3/4" 2 4.45 1 8.90
5/8" 2 2.40 1 4.80
3/4" 2 5.00 1 10.00
5/8" 2 7.05 1 14.10
3/4" 2 2.40 1 4.80
3/4" 1 7.95 1 7.95
5/8" 3 9.25 1 27.75
3/4" 2 6.65 1 13.30
5/8" 1 4.25 1 4.25
3/4" 2 4.40 1 8.80
3/4" 2 6.45 1 12.90
5/8" 1 4.25 1 4.25
3/4" 2 4.40 1 8.80
3/4" 2 7.75 1 15.50
3/4" 1 4.65 1 4.65
Estribos 3/8" 36 1.60 1 57.60
Estribos 3/8" 36 2.10 2 151.20
Estribos 3/8" 23 2.00 2 92.00
Estribos 3/8" 65 2.10 1 136.50
2V-11 EN EJE 25 ENTRE EJES C-K 1 6.45 0.40 0.30 0.77 1 6.45 0.50 3.23 5/8" 3 11.30 1 33.90
3 6.45 0.30 0.65 3.77 3 6.45 1.10 21.29 3/4" 3 3.60 1 10.80
1 2.20 0.25 0.65 0.36 1 2.20 1.05 2.31 3/4" 2 7.65 2 30.60
1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 5/8" 2 3.60 2 14.40
3/4" 2 7.05 1 14.10
3/4" 2 5.00 1 10.00
5/8" 2 3.80 2 15.20
3/4" 2 7.95 1 15.90
3/4" 1 7.95 1 7.95
5/8" 2 2.40 1 4.80
5/8" 1 2.20 1 2.20
5/8" 3 9.25 1 27.75
3/4" 2 6.65 1 13.30
5/8" 1 4.25 3 12.75
3/4" 2 7.45 2 29.80
5/8" 2 3.80 1 7.60
3/4" 2 7.75 1 15.50
5/8" 1 4.65 1 4.65
Estribos 3/8" 36 1.60 1 57.60
Estribos 3/8" 36 2.10 3 226.80
Estribos 3/8" 23 2.00 1 46.00
Estribos 3/8" 65 2.10 1 136.50
2V-12 EN EJE 26 ENTRE EJES C-K 1 6.45 0.40 0.30 0.77 1 6.45 0.50 3.23 5/8" 3 11.30 1 33.90
3 6.45 0.30 0.65 3.77 3 6.45 1.10 21.29 5/8" 2 3.60 1 7.20
1 2.20 0.25 0.65 0.36 1 2.20 1.05 2.31 3/4" 2 7.05 1 14.10
1 6.35 0.30 0.65 1.24 1 6.35 1.10 6.99 5/8" 2 5.00 1 10.00
5/8" 2 3.80 2 15.20
3/4" 2 4.45 1 8.90
5/8" 2 2.40 1 4.80

Página 105 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Altura Parcial FORMA D Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Nro N. Elem N° Vec.
Vec. Vec. Elemento
3/4" 2 7.65 2 30.60
5/8" 2 3.60 2 14.40
3/4" 2 4.40 1 8.80
5/8" 1 2.20 1 2.20
5/8" 3 9.25 1 27.75
3/4" 2 6.65 1 13.30
5/8" 1 4.25 1 4.25
3/4" 2 4.40 1 8.80
3/4" 2 8.65 1 17.30
5/8" 1 4.45 1 4.45
3/4" 2 5.25 1 10.50
5/8" 1 4.05 1 4.05
3/4" 2 8.75 1 17.50
5/8" 1 4.65 1 4.65
Estribos 3/8" 36 1.60 1 57.60
Estribos 3/8" 36 2.10 3 226.80
Estribos 3/8" 23 2.00 1 46.00
Estribos 3/8" 65 2.10 1 136.50
2V-13 EN EJE 27 ENTRE EJES C-G 1 3.45 0.25 0.65 0.56 1 3.45 1.05 3.62 3/4" 2 8.25 1 16.50
1 6.35 0.25 0.65 1.03 1 6.35 1.05 6.67 3/4" 1 6.25 1 6.25
3/4" 2 4.40 1 8.80
5/8" 1 2.20 1 2.20
3/4" 2 5.65 2 22.60
3/4" 2 6.55 1 13.10
5/8" 1 4.45 1 4.45
Estribos 3/8" 26 2.00 1 52.00
Estribos 3/8" 35 2.00 1 70.00
2V-14 EN EJE 28 ENTRE EJES G-K 3 6.45 0.30 0.65 3.77 3 6.45 1.10 21.29 3/4" 2 8.05 1 16.10
5/8" 1 2.40 1 2.40
3/4" 2 11.30 1 22.60
3/4" 1 3.60 1 3.60
3/4" 2 4.45 1 8.90
3/4" 2 2.20 1 4.40
3/4" 2 7.85 1 15.70
5/8" 1 5.15 1 5.15
3/4" 2 8.65 1 17.30
5/8" 2 4.45 1 8.90
3/4" 2 6.65 1 13.30
5/8" 1 4.45 1 4.45
Estribos 3/8" 36 2.10 3 226.80
TOTALES M3 1,277.39 M2 7,659.77 ML 580.60 94,267.00 2,129.05 15,076.49 52,323.17 211.20 164,587.51
KG 145.15 52,789.52 2,107.76 23,368.56 115,110.97 838.46 194,360.42

Página 106 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Vec. Nro Vec. Elemento N° Vec.
06.07 LOSAS MACIZAS
06.07.01 LOSAS MACIZAS CONCRETO F`C = 210 KG/CM2
06.07.02 LOSAS MACIZAS ENCOFRADO Y DESENCOFRADO
06.07.03 ACERO DE REFUERZO Fy=4200 kg/cm2
SECTOR A
PRIMER PISO
LOSA ALERO ENTRE EJES 2-9 y P 3 0.70 0.70 0.12 0.18 3 0.70 0.70 1.47 3/8" 2 27.20 4 217.60
1 5.30 0.70 0.12 0.45 1 5.30 0.70 3.71 3/8" 2 1.20 122 292.80
1 4.50 0.70 0.12 0.38 1 4.50 0.70 3.15 3/8" 2 18.70 4 149.60
1 4.40 0.70 0.12 0.37 1 4.40 0.70 3.08 3/8" 2 1.20 84 201.60
1 4.25 0.70 0.12 0.36 1 4.25 0.70 2.98 3/8" 2 27.10 4 216.80
1 4.50 0.70 0.12 0.38 1 4.50 0.70 3.15 3/8" 2 1.20 122 292.80
1 0.75 0.70 0.12 0.06 1 0.75 0.70 0.53 3/8" 2 16.80 4 134.40
1 3.35 0.70 0.12 0.28 1 3.35 0.70 2.35 3/8" 2 1.20 76 182.40
2 4.00 0.70 0.12 0.67 2 4.00 0.70 5.60
1 4.15 0.70 0.12 0.35 1 4.15 0.70 2.91
1 9.05 0.70 0.12 0.76 1 9.05 0.70 6.34
1 4.35 0.70 0.12 0.37 1 4.35 0.70 3.05
2 5.25 0.70 0.12 0.88 2 5.25 0.70 7.35
1 4.60 0.70 0.12 0.39 1 4.60 0.70 3.22
1 4.70 0.70 0.12 0.39 1 4.70 0.70 3.29
1 4.50 0.70 0.12 0.38 1 4.50 0.70 3.15
LOSA ENTRE EJES 16-17 y R-S 0.00 0 0.00 0.00 0.00 3/8" 0 0.55 2 0.00
3/8" 0 1.10 1
3/8" 0 0.80 1 0.00
1 2.75 2.30 0.25 1.58 1 2.75 2.30 6.33 3/8" 12 3.50 1 42.00
3/8" 12 3.20 1
3/8" 14 3.40 1
3/8" 14 3.10 1
SEGUNDO PISO
LOSA ENTRE EJES 10-11 y Q-R 1 3.90 1.45 0.25 1.41 1 3.90 1.45 5.66 3/8" 8 4.45 2 71.20
3/8" 20 2.55 1 51.00
3/8" 20 2.25 1 45.00
1 2.80 2.30 0.25 1.61 1 2.80 2.30 6.44 3/8" 12 3.55 1 42.60
3/8" 12 3.25 1
3/8" 14 3.40 1 47.60
3/8" 14 3.10 1
LOSA ENTRE EJES 16-17 y R-S 1 3.90 1.45 0.25 1.41 1 3.90 1.45 5.66 3/8" 8 4.45 2 71.20
3/8" 20 2.55 1
3/8" 20 2.25 1 45.00
1 2.75 2.30 0.25 1.58 1 2.75 2.30 6.33 3/8" 12 3.50 1 42.00
3/8" 12 3.20 1
3/8" 14 3.40 1
3/8" 14 3.10 1
TERCER PISO
LOSA ENTRE EJES 10-11 y Q-R 1 3.90 1.45 0.25 1.41 1 3.90 1.45 5.66 3/8" 8 4.45 2 71.20
3/8" 20 2.55 1 51.00
3/8" 20 2.25 1 45.00
1 2.80 2.30 0.25 1.61 1 2.80 2.30 6.44 3/8" 12 3.55 1 42.60
3/8" 12 3.25 1
3/8" 14 3.40 1 47.60
3/8" 14 3.10 1
LOSA ENTRE EJES 16-17 y R-S 1 3.90 1.45 0.25 1.41 1 3.90 1.45 5.66 3/8" 8 4.45 2 71.20
3/8" 20 2.55 1
3/8" 20 2.25 1 45.00
1 2.75 2.30 0.25 1.58 1 2.75 2.30 6.33 3/8" 12 3.50 1 42.00
3/8" 12 3.20 1
3/8" 14 3.40 1
3/8" 14 3.10 1
CUARTO PISO

Página 107 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Vec. Nro Vec. Elemento N° Vec.
LOSA ENTRE EJES 10-11 y Q-R 1 3.90 1.45 0.25 1.41 1 3.90 1.45 5.66 3/8" 8 4.45 2 71.20
3/8" 20 2.55 1 51.00
3/8" 20 2.25 1 45.00
1 2.80 2.30 0.25 1.61 1 2.80 2.30 6.44 3/8" 12 3.55 1 42.60
3/8" 12 3.25 1
3/8" 14 3.40 1 47.60
3/8" 14 3.10 1
LOSA ENTRE EJES 16-17 y R-S 1 3.90 1.45 0.25 1.41 1 3.90 1.45 5.66 3/8" 8 4.45 2 71.20
3/8" 20 2.55 1
3/8" 20 2.25 1 45.00
1 2.75 2.30 0.25 1.58 1 2.75 2.30 6.33 3/8" 12 3.50 1 42.00
3/8" 12 3.20 1
3/8" 14 3.40 1
3/8" 14 3.10 1
SECTOR C2
PRIMER PISO
LOSA ENTRE EJES 10-11 y G-H 1 3.90 1.45 0.25 1.41 1 3.90 1.45 5.66 3/8" 8 4.45 2 71.20
3/8" 20 2.55 1 51.00
3/8" 20 2.25 1 45.00
1 2.80 2.30 0.25 1.61 1 2.80 2.30 6.44 3/8" 12 3.55 1 42.60
3/8" 12 3.25 1
3/8" 14 3.40 1 47.60
3/8" 14 3.10 1
LOSA ENTRE EJES 12-14 y M-N 1 6.65 1.20 0.25 2.00 1 6.65 1.20 7.98 3/8" 6 7.50 1 45.00
3/8" 6 7.30 1
3/8" 34 2.10 1 71.40
3/8" 34 1.90 1 64.60
SEGUNDO PISO
LOSA ENTRE EJES 10-11 y G-H 1 3.90 1.45 0.25 1.41 1 3.90 1.45 5.66 3/8" 8 4.45 2 71.20
3/8" 20 2.55 1 51.00
3/8" 20 2.25 1 45.00
1 2.80 2.30 0.25 1.61 1 2.80 2.30 6.44 3/8" 12 3.55 1 42.60
3/8" 12 3.25 1
3/8" 14 3.40 1 47.60
3/8" 14 3.10 1
LOSA ENTRE EJES 12-14 y M-N 1 6.65 1.20 0.25 2.00 1 6.65 1.20 7.98 3/8" 6 7.50 1 45.00
3/8" 6 7.30 1
3/8" 34 2.10 1 71.40
3/8" 34 1.90 1 64.60
TERCER PISO
LOSA ENTRE EJES 10-11 y G-H 1 3.90 1.45 0.25 1.41 1 3.90 1.45 5.66 3/8" 8 4.45 2 71.20
3/8" 20 2.55 1 51.00
3/8" 20 2.25 1 45.00
1 2.80 2.30 0.25 1.61 1 2.80 2.30 6.44 3/8" 12 3.55 1 42.60
3/8" 12 3.25 1
3/8" 14 3.40 1 47.60
3/8" 14 3.10 1
LOSA ENTRE EJES 12-14 y M-N 1 6.65 1.20 0.25 2.00 1 6.65 1.20 7.98 3/8" 6 7.50 1 45.00
3/8" 6 7.30 1
3/8" 34 2.10 1 71.40
3/8" 34 1.90 1 64.60
CUARTO PISO
LOSA ENTRE EJES 10-11 y G-H 1 3.90 1.45 0.25 1.41 1 3.90 1.45 5.66 3/8" 8 4.45 2 71.20
3/8" 20 2.55 1 51.00
3/8" 20 2.25 1 45.00
1 2.80 2.30 0.25 1.61 1 2.80 2.30 6.44 3/8" 12 3.55 1 42.60
3/8" 12 3.25 1
3/8" 14 3.40 1 47.60
3/8" 14 3.10 1
LOSA ENTRE EJES 12-14 y M-N 1 6.65 1.20 0.25 2.00 1 6.65 1.20 7.98 3/8" 6 7.50 1 45.00

Página 108 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Vec. Nro Vec. Elemento N° Vec.
3/8" 6 7.30 1
3/8" 34 2.10 1 71.40
3/8" 34 1.90 1 64.60
QUINTO PISO
LOSA ENTRE EJES 12-14 y M-N 1 6.65 1.20 0.25 2.00 1 6.65 1.20 7.98 3/8" 6 7.50 1 45.00
3/8" 6 7.30 1
3/8" 34 2.10 1 71.40
3/8" 34 1.90 1 64.60
SECTOR C3
SOTANO
LOSA ENTRE EJES 13-15 y I-J 1 6.60 1.70 0.25 2.81 1 6.60 1.70 11.22 3/8" 9 7.50 1 67.50
3/8" 9 7.30 1 65.70
3/8" 33 2.60 1 85.80
3/8" 33 2.40 1
LOSA ENTRE EJES 16-17 y I-J 1 3.80 2.80 0.25 2.66 1 3.80 2.80 10.64 3/8" 14 5.00 1 70.00
3/8" 14 4.60 1
3/8" 19 3.70 1 70.30
3/8" 19 3.50 1 66.50
LOSA ENTRE EJES 16-17 y I-J 2 1.80 1.40 0.25 1.26 2 1.80 1.40 5.04 3/8" 7 5.00 1 35.00
3/8" 7 4.60 1
3/8" 9 2.00 2 36.00
LOSA ENTRE EJES 17-18 y I-J 1 3.80 2.40 0.25 2.28 1 3.80 2.40 9.12 3/8" 12 5.00 1 60.00
3/8" 12 4.60 1
3/8" 19 2.90 2 110.20
LOSA ENTRE EJES 18-19 y I-J 1 3.95 1.70 0.25 1.68 1 3.95 1.70 6.72 3/8" 9 7.45 2 134.10
1 3.95 4.55 0.25 4.49 1 3.95 4.55 17.97 3/8" 20 4.85 2
PRIMER PISO
LOSA ENTRE EJES 18-19 y C-D 1 3.90 1.55 0.25 1.51 1 3.90 1.55 6.05 3/8" 8 4.55 2 72.80
3/8" 20 2.45 2 98.00
LOSA ENTRE EJES 13-15 y I-J 1 6.60 1.70 0.25 2.81 1 6.60 1.70 11.22 3/8" 9 7.50 1 67.50
3/8" 9 7.30 1 65.70
3/8" 33 2.60 1 85.80
3/8" 33 2.40 1
LOSA ENTRE EJES 16-17 y I-J 1 3.80 2.80 0.25 2.66 1 3.80 2.80 10.64 3/8" 14 5.00 1 70.00
3/8" 14 4.60 1
3/8" 19 3.70 1 70.30
3/8" 19 3.50 1 66.50
LOSA ENTRE EJES 16-17 y I-J 2 1.80 1.40 0.25 1.26 2 1.80 1.40 5.04 3/8" 7 5.00 1 35.00
3/8" 7 4.60 1
3/8" 9 2.00 2 36.00
LOSA ENTRE EJES 17-18 y I-J 1 3.80 2.40 0.25 2.28 1 3.80 2.40 9.12 3/8" 12 5.00 1 60.00
3/8" 12 4.60 1
3/8" 19 2.90 2 110.20
LOSA ENTRE EJES 18-19 y I-J 1 3.95 1.45 0.25 1.43 1 3.95 1.45 5.73 3/8" 8 4.60 1 36.80
3/8" 20 2.55 1
3/8" 20 2.35 1
LOSA ENTRE EJES 18-19 y J-K 1 4.00 1.10 0.25 1.10 1 4.00 1.10 4.40 3/8" 6 4.90 1 29.40
3/8" 6 4.70 1
3/8" 20 1.80 1
SEGUNDO PISO
LOSA ENTRE EJES 18-19 y C-D 1 3.90 1.55 0.25 1.51 1 3.90 1.55 6.05 3/8" 8 4.55 2 72.80
3/8" 20 2.45 2 98.00
LOSA ENTRE EJES 13-15 y I-J 1 6.60 1.70 0.25 2.81 1 6.60 1.70 11.22 3/8" 9 7.50 1 67.50
3/8" 9 7.30 1 65.70
3/8" 33 2.60 1 85.80
3/8" 33 2.40 1
LOSA ENTRE EJES 16-17 y I-J 1 3.80 2.80 0.25 2.66 1 3.80 2.80 10.64 3/8" 14 5.00 1 70.00
3/8" 14 4.60 1
3/8" 19 3.70 1 70.30
3/8" 19 3.50 1 66.50

Página 109 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Vec. Nro Vec. Elemento N° Vec.
LOSA ENTRE EJES 16-17 y I-J 2 1.80 1.40 0.25 1.26 2 1.80 1.40 5.04 3/8" 7 5.00 1 35.00
3/8" 7 4.60 1
3/8" 9 2.00 2 36.00
LOSA ENTRE EJES 17-18 y I-J 1 3.80 2.40 0.25 2.28 1 3.80 2.40 9.12 3/8" 12 5.00 1 60.00
3/8" 12 4.60 1
3/8" 19 2.90 2 110.20
LOSA ENTRE EJES 18-19 y I-J 1 3.95 1.45 0.25 1.43 1 3.95 1.45 5.73 3/8" 8 4.60 1 36.80
3/8" 20 2.55 1
3/8" 20 2.35 1
LOSA ENTRE EJES 18-19 y J-K 1 4.00 1.10 0.25 1.10 1 4.00 1.10 4.40 3/8" 6 4.90 1 29.40
3/8" 6 4.70 1
3/8" 20 1.80 1
TERCER PISO
LOSA ENTRE EJES 18-19 y C-D 1 3.90 6.50 0.25 6.34 1 3.90 6.50 25.35 3/8" 26 4.55 2 236.60
3/8" 16 7.20 2 230.40
LOSA ENTRE EJES 13-15 y I-J 1 6.60 1.70 0.25 2.81 1 6.60 1.70 11.22 3/8" 9 7.50 1 67.50
3/8" 9 7.30 1 65.70
3/8" 33 2.60 1 85.80
3/8" 33 2.40 1
LOSA ENTRE EJES 16-17 y I-J 1 3.80 2.80 0.25 2.66 1 3.80 2.80 10.64 3/8" 14 5.00 1 70.00
3/8" 14 4.60 1
3/8" 19 3.70 1 70.30
3/8" 19 3.50 1 66.50
LOSA ENTRE EJES 16-17 y I-J 2 1.80 1.40 0.25 1.26 2 1.80 1.40 5.04 3/8" 7 5.00 1 35.00
3/8" 7 4.60 1
3/8" 9 2.00 2 36.00
LOSA ENTRE EJES 17-18 y H-I 1 2.40 2.50 0.25 1.50 1 2.40 2.50 6.00 3/8" 13 4.35 2 113.10
1/2" 13 4.65 1
3/8" 12 3.10 2 74.40
LOSA ENTRE EJES 17-18 y I-J 1 3.80 2.40 0.25 2.28 1 3.80 2.40 9.12 3/8" 12 5.00 1 60.00
3/8" 12 4.60 1
3/8" 19 2.90 2 110.20
LOSA ENTRE EJES 18-19 y I-J 1 3.95 1.45 0.25 1.43 1 3.95 1.45 5.73 3/8" 8 4.60 1 36.80
3/8" 20 2.55 1
3/8" 20 2.35 1
LOSA ENTRE EJES 18-19 y J-K 1 4.00 1.10 0.25 1.10 1 4.00 1.10 4.40 3/8" 6 4.90 1 29.40
3/8" 6 4.70 1
3/8" 20 1.80 1
CUARTO PISO
LOSA ENTRE EJES 13-15 y I-J 1 6.60 1.70 0.25 2.81 1 6.60 1.70 11.22 3/8" 9 7.50 1 67.50
3/8" 9 7.30 1 65.70
3/8" 33 2.60 1 85.80
3/8" 33 2.40 1
LOSA ENTRE EJES 16-17 y I-J 1 3.80 2.80 0.25 2.66 1 3.80 2.80 10.64 3/8" 14 5.00 1 70.00
3/8" 14 4.60 1
3/8" 19 3.70 1 70.30
3/8" 19 3.50 1 66.50
LOSA ENTRE EJES 16-17 y I-J 2 1.80 1.40 0.25 1.26 2 1.80 1.40 5.04 3/8" 7 5.00 1 35.00
3/8" 7 4.60 1
3/8" 9 2.00 2 36.00
LOSA ENTRE EJES 17-18 y H-I 1 2.40 2.50 0.25 1.50 1 2.40 2.50 6.00 3/8" 13 4.35 2 113.10
1/2" 13 4.65 1
3/8" 12 3.10 2 74.40
LOSA ENTRE EJES 17-18 y I-J 1 3.80 2.40 0.25 2.28 1 3.80 2.40 9.12 3/8" 12 5.00 1 60.00
3/8" 12 4.60 1
3/8" 19 2.90 2 110.20
LOSA ENTRE EJES 18-19 y I-J 1 3.95 1.45 0.25 1.43 1 3.95 1.45 5.73 3/8" 8 4.60 1 36.80
3/8" 20 2.55 1
3/8" 20 2.35 1
LOSA ENTRE EJES 18-19 y J-K 1 4.00 1.10 0.25 1.10 1 4.00 1.10 4.40 3/8" 6 4.90 1 29.40

Página 110 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Vec. Nro Vec. Elemento N° Vec.
3/8" 6 4.70 1
3/8" 20 1.80 1
QUINTO PISO
LOSA ENTRE EJES 13-15 y I-J 1 6.60 1.70 0.25 2.81 1 6.60 1.70 11.22 3/8" 19 7.50 1 142.50
1 1.65 2.80 0.25 1.16 1 1.65 2.80 4.62 3/8" 7 7.30 1 51.10
1 4.70 2.80 0.25 3.29 1 4.70 2.80 13.16 3/8" 27 5.60 1 151.20
3/8" 27 5.40 1
LOSA ENTRE EJES 16-18 y I-J 1 2.10 3.80 0.25 2.00 1 2.10 3.80 7.98 3/8" 16 7.10 1 113.60
2 1.40 1.80 0.25 1.26 2 1.40 1.80 5.04 3/8" 16 6.90 1 110.40
1 2.40 3.80 0.25 2.28 1 2.40 3.80 9.12 3/8" 26 4.80 1 124.80
3/8" 26 4.60 1
LOSA ENTRE EJES 18-19 y I-J 1 3.95 6.65 0.25 6.57 1 3.95 6.65 26.27 3/8" 27 4.65 2 251.10
3/8" 16 7.35 2 235.20
SECTOR E
SOTANO
LOSA ENTRE EJES 26-27 y L-M 1 1.60 3.90 0.25 1.56 1 1.60 3.90 6.24 3/8" 20 2.40 2 96.00
3/8" 8 4.70 2 75.20
LOSA ENTRE EJES 26-27 y L-M 1 2.20 1.95 0.25 1.07 1 2.20 1.95 4.29 3/8" 10 3.00 2 60.00
3/8" 11 2.75 2
LOSA ENTRE EJES 26-28 y L-M 1 4.82 3.90 0.25 4.70 1 4.82 3.90 18.80 3/8" 20 5.62 2 224.80
3/8" 25 4.70 2
PRIMER PISO
LOSA ENTRE EJES 26-27 y L-M 1 1.60 3.90 0.25 1.56 1 1.60 3.90 6.24 3/8" 20 2.40 2 96.00
3/8" 8 4.70 2 75.20
LOSA ENTRE EJES 26-27 y L-M 1 2.20 1.95 0.25 1.07 1 2.20 1.95 4.29 3/8" 10 3.00 2 60.00
3/8" 11 2.75 2
SEGUNDO PISO
LOSA ENTRE EJES 26-27 y L-M 1 1.60 3.90 0.25 1.56 1 1.60 3.90 6.24 3/8" 20 2.40 2 96.00
3/8" 8 4.70 2 75.20
LOSA ENTRE EJES 26-27 y L-M 1 2.20 1.95 0.25 1.07 1 2.20 1.95 4.29 3/8" 10 3.00 2 60.00
3/8" 11 2.75 2
TERCER PISO
LOSA ENTRE EJES 26-27 y L-M 1 1.60 3.90 0.25 1.56 1 1.60 3.90 6.24 3/8" 20 2.40 2 96.00
3/8" 8 4.70 2 75.20
LOSA ENTRE EJES 26-27 y L-M 1 2.20 1.95 0.25 1.07 1 2.20 1.95 4.29 3/8" 10 3.00 2 60.00
3/8" 11 2.75 2
SECTOR F
SEGUNDO PISO
LOSA ENTRE EJES 20-28 y J-K 1 6.45 6.55 0.25 10.56 1 6.45 6.55 42.25 1/2" 30 36.60 1 1,098.00
3 6.60 6.55 0.25 32.42 3 6.60 6.55 129.69 3/8" 110 7.35 1 808.50
1 6.70 6.55 0.25 10.97 1 6.70 6.55 43.89 3/8" 110 5.15 1 566.50
3/8" 132 1.80 2 475.20
SECTOR D
SOTANO
LOSA ENTRE EJES 17-24 y R-T1 1 6.60 2.85 0.25 4.70 1 6.60 2.85 18.81 3/8" 117 15.30 1 1,790.10
1 6.60 3.45 0.25 5.69 1 6.60 3.45 22.77 3/8" 70 1.55 1 108.50
1 6.60 1.80 0.25 2.97 1 6.60 1.80 11.88 1/2" 88 3.25 1 286.00
1 6.60 5.65 0.25 9.32 1 6.60 5.65 37.29 1/2" 88 2.65 1 233.20
1 6.15 2.85 0.25 4.38 1 6.15 2.85 17.53 3/8" 70 0.95 1 66.50
1 6.15 3.45 0.25 5.30 1 6.15 3.45 21.22
1 6.15 1.80 0.25 2.77 1 6.15 1.80 11.07 3/8" 92 19.30 1 1,775.60
1 6.15 5.65 0.25 8.69 1 6.15 5.65 34.75 3/8" 46 1.55 1 71.30
1 4.75 2.85 0.25 3.38 1 4.75 2.85 13.54 3/8" 46 2.65 2 243.80
1 4.75 5.00 0.25 5.94 1 4.75 5.00 23.75 3/8" 46 1.25 1 57.50
1 4.75 6.30 0.25 7.48 1 4.75 6.30 29.93
LOSA ENTRE EJES 24-25 y R-T1 2 4.20 2.80 0.25 5.88 2 4.20 2.80 23.52 3/8" 56 10.45 1 585.20
2 4.20 6.70 0.25 14.07 2 4.20 6.70 56.28 3/8" 34 1.75 1 59.50
3/8" 42 2.55 1 107.10
3/8" 34 0.95 1 32.30

Página 111 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL
Nro Vec. Nro Vec. Elemento N° Vec.
3/8" 64 9.35 1 598.40
3/8" 38 1.25 2 95.00
3/8" 48 2.85 1 136.80

TOTALES M3 291.15 M2 1,193.34 ML - 19,736.20 1,617.20 - - -


KG - 11,052.27 1,601.03 - - - 12,653.30

Página 112 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
06.08 LOSAS ALIGERADAS EN UN SENTIDO

06.08.01 LOSAS ALIGERADA CONCRETO F`C = 210 KG/CM2


06.08.02 LOSAS ALIGERADA ENCOFRADO Y DESENCOFRADO

06.08.03 ACERO DE REFUERZO Fy=4200 kg/cm2


06.08.04 LOSA ALIGERADA LADRILLO HUECO 15 x 30 x 30 cm.

SECTOR A

PRIMER PISO AUDITORIO


LOSA ENTRE EJES 2-9 y P 1 2.65 1.80 4.77 3/8" 2 2.50 7 35.00
1 6.25 1.20 7.50 3/8" 1 4.60 16 73.60
1 6.25 2.50 15.63 3/8" 1 2.50 16 40.00
3/8" 1 0.95 16 15.20

Temperatura 1/4" 1 3.15 7 22.05


1/4" 1 6.55 15 98.25

SECTOR B
PRIMER PISO 1 3.95 4.60 18.17 1/2" 1 4.45 11 48.95

LOSA ENTRE EJES 2-5 y E1-E6 1 2.30 4.90 11.27 3/8" 1 2.70 11 29.70
1 3.75 5.15 19.31 1/2" 1 4.35 12 52.20

1 4.05 4.00 16.20 3/8" 2 1.15 11 25.30

1 8.15 2.25 18.34 1/2" 1 4.90 11 53.90


1 2.30 3.75 8.63 3/8" 1 4.30 11 47.30
1 2.50 3.80 9.50 1/2" 1 4.45 10 44.50
1 3.90 4.00 15.60 3/8" 1 1.15 10 11.50
1 2.85 3.80 10.83 3/8" 1 2.70 10 27.00

1 2.50 3.80 9.50 1/2" 1 4.35 6 26.10


1 3.80 4.00 15.20 3/8" 1 4.90 10 49.00

1 1.25 3.80 4.75 3/8" 1 4.30 10 43.00


1 4.50 2.20 9.90 3/8" 1 1.15 6 6.90
1 1.50 2.20 3.30 1/2" 1 4.35 6 26.10

1 4.75 3.80 18.05 3/8" 1 1.15 6 6.90


1 1.50 3.80 5.70 3/8" 1 4.90 2 9.80

1 2.90 4.00 11.60 3/8" 1 4.30 2 8.60


1 2.90 2.20 6.38 3/8" 1 2.70 2 5.40

1 2.90 3.80 11.02 1/2" 1 4.45 19 84.55


1 4.40 3.95 17.38 3/8" 1 1.15 19 21.85

1 4.40 2.20 9.68 3/8" 1 4.90 17 83.30

1 4.40 3.80 16.72 3/8" 1 4.30 17 73.10


1 2.90 2.75 7.98 1/2" 1 4.35 16 69.60

1 1.75 2.75 4.81 3/8" 1 1.15 16 18.40


1 1.80 2.75 4.95 3/8" 1 2.75 14 38.50

1/2" 1 4.30 14 60.20

3/8" 1 1.15 14 16.10


3/8" 1 3.85 14 53.90

3/8" 1 1.65 14 23.10


1/2" 1 4.45 18 80.10

3/8" 2 1.15 18 41.40


3/8" 1 2.70 18 48.60

1/2" 1 4.35 18 78.30


3/8" 1 4.90 18 88.20
3/8" 1 4.30 18 77.40

3/8" 1 3.40 15 51.00


3/8" 1 0.95 15 14.25

Página 113 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
3/8" 1 1.15 15 17.25

Temperatura 1/4" 1 7.45 11 81.95

1/4" 1 8.05 42 338.10


1/4" 1 24.65 25 616.25

1/4" 1 17.40 16 278.40


PRIMER PISO

LOSA ENTRE EJES 5-9 y E1-E6


1 2.18 5.51 11.99 Baston 3/8" 2 0.88 15 26.25

1 3.70 5.81 21.50 Acero Negativo 1/2" 2 2.15 15 64.50

1 2.30 6.00 13.80 Acero Negativo 3/8" 2 4.40 15 132.00


1 3.70 6.25 23.14 Acero Intermedio 3/8" 1 5.00 15 75.00

1 2.70 6.47 17.47 Acero Positivo 3/8" 1 16.33 15 244.88

1 2.13 2.30 4.89 Baston 3/8" 2 1.18 11 25.85

1 2.13 1.70 3.62 Acero Negativo 1/2" 1 2.15 11 23.65


1 3.79 4.60 17.43 Acero Negativo 3/8" 1 4.30 11 47.30

1 2.20 4.00 8.80 Acero Intermedio 3/8" 1 5.00 11 55.00


1 3.95 2.25 8.89 Acero Positivo 1/2" 1 6.80 11 74.80

1 3.95 1.55 6.12 Acero Positivo 3/8" 1 7.03 11 77.28

1 3.80 1.70 6.46 Baston 3/8" 2 1.18 20 47.00


1 2.20 2.60 5.72 Acero Negativo 3/8" 1 4.30 20 86.00
1 3.95 2.60 10.26 Acero Intermedio 3/8" 1 5.00 20 100.00

1 3.80 3.20 12.16 Acero Positivo 1/2" 1 4.43 20 88.50


1 2.20 2.90 6.38 Acero Positivo 3/8" 1 2.70 20 54.00

1 3.95 2.90 11.45

1 3.80 3.00 11.40


1 2.20 3.00 6.60

1 3.95 3.00 11.84

1 3.80 3.90 14.82 Baston 3/8" 2 2.05 10 41.00


1 2.20 3.80 8.36 Acero Negativo 3/8" 1 4.30 10 43.00

1 3.95 3.90 15.41 Acero Intermedio 3/8" 1 5.00 10 50.00


1 2.50 1.80 4.50 Acero Negativo 3/8" 1 2.15 10 21.50
1 2.50 1.60 4.00 Acero Positivo 1/2" 1 4.43 10 44.25

Acero Positivo 3/8" 1 9.78 10 97.75

1 1.50 2.13 3.19 Baston 3/8" 2 0.88 3 5.25

1 3.80 1.50 5.70 Acero Negativo 1/2" 1 1.85 3 5.55


1 2.20 1.50 3.30 Acero Negativo 1/2" 1 2.15 3 6.45

1 3.95 1.50 5.93 Acero Negativo 3/8" 1 4.30 3 12.90


1 2.50 2.60 6.50 Acero Intermedio 3/8" 1 5.00 3 15.00

Acero Positivo 1/2" 1 6.80 3 20.40


Acero Positivo 3/8" 1 9.78 3 29.33

1 3.80 3.00 11.40 Baston 3/8" 2 2.05 3 12.30


1 2.20 2.90 6.38 Acero Negativo 3/8" 1 4.30 3 12.90
1 3.95 3.00 11.85 Acero Intermedio 3/8" 1 5.00 3 15.00
Acero Negativo 3/8" 1 2.15 3 6.45

Acero Positivo 1/2" 1 4.43 3 13.28

Acero Positivo 3/8" 1 9.78 3 29.33

Página 114 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.

1 3.80 2.80 10.64 Baston 3/8" 2 1.18 19 44.65

1 2.20 2.80 6.16 Acero Negativo 3/8" 1 4.30 19 81.70


1 3.95 4.30 16.99 Acero Intermedio 3/8" 1 5.00 19 95.00

1 3.80 2.90 11.02 Acero Positivo 1/2" 1 4.43 19 84.08


1 2.20 2.90 6.38 Acero Positivo 3/8" 1 2.70 19 51.30

1 2.85 3.95 11.26

1 3.80 2.75 10.45 Baston 3/8" 1 0.98 14 13.65

1 2.20 2.75 6.05 Acero Negativo 3/8" 1 1.15 14 16.10


Acero Positivo 3/8" 1 3.50 14 49.00

1 3.95 2.85 11.26 Baston 3/8" 2 1.18 9 21.15

Acero Intermedio 3/8" 1 3.15 9 28.35

Acero Positivo 3/8" 1 4.70 9 42.30

1 2.50 6.60 16.50 Baston 3/8" 2 0.87 33 57.62


1 2.50 6.45 16.13 Acero Positivo 3/8" 1 3.25 33 107.33

Temperatura 1/4" 1 10.73 9 93.35

Temperatura 1/4" 1 34.48 42 1,448.30


Temperatura 1/4" 1 6.25 11 68.75
Temperatura 1/4" 1 39.43 16 630.89

Temperatura 1/4" 1 26.82 10 268.19

SECTOR B

SEGUNDO PISO 1 3.95 4.60 18.17 1/2" 1 4.45 11 48.95


LOSA ENTRE EJES 2-5 y E1-E6 1 2.30 4.90 11.27 3/8" 1 2.70 11 29.70

1 3.75 5.15 19.31 3/8" 2 1.65 12 39.60


1 4.05 4.00 16.20 3/8" 2 1.15 11 25.30

1 8.15 2.25 18.34 1/2" 1 4.90 11 53.90


1 2.30 3.75 8.63 3/8" 2 1.65 11 36.30

1 2.50 3.80 9.50 1/2" 1 4.45 10 44.50


1 3.90 4.00 15.60 3/8" 1 1.15 10 11.50
1 2.85 3.80 10.83 3/8" 1 2.70 10 27.00

1 2.50 3.80 9.50 3/8" 2 1.65 6 19.80


1 3.80 4.00 15.20 3/8" 1 4.90 10 49.00

1 1.25 3.80 4.75 3/8" 2 1.65 10 33.00

1 4.50 2.20 9.90 3/8" 1 1.15 6 6.90


1 1.50 2.20 3.30 3/8" 2 1.65 6 19.80

1 4.75 3.80 18.05 3/8" 1 1.15 6 6.90


1 1.50 3.80 5.70 3/8" 1 4.90 2 9.80

1 2.90 4.00 11.60 3/8" 2 1.65 2 6.60


1 2.90 2.20 6.38 3/8" 1 2.70 2 5.40

1 2.90 3.80 11.02 1/2" 1 4.45 19 84.55

1 4.40 3.95 17.38 3/8" 1 1.15 19 21.85


1 4.40 2.20 9.68 3/8" 1 4.90 17 83.30
1 4.40 3.80 16.72 3/8" 2 1.65 17 56.10
1 2.90 2.75 7.98 1/2" 1 4.35 16 69.60

1 1.75 2.75 4.81 3/8" 1 1.15 16 18.40

1 1.80 2.75 4.95 3/8" 1 2.75 14 38.50

Página 115 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
3/8" 2 1.65 14 46.20

3/8" 1 1.15 14 16.10

3/8" 1 3.85 14 53.90


3/8" 1 1.65 14 23.10

1/2" 1 4.45 18 80.10


3/8" 2 1.15 18 41.40

3/8" 1 2.70 18 48.60


3/8" 2 1.65 18 59.40

3/8" 1 4.90 18 88.20

3/8" 2 1.65 18 59.40


3/8" 1 3.40 15 51.00

3/8" 1 0.95 15 14.25


3/8" 1 1.15 15 17.25

Temperatura 1/4" 1 7.45 11 81.95

1/4" 1 8.05 42 338.10


1/4" 1 24.65 25 616.25

1/4" 1 17.40 16 278.40

SEGUNDO PISO
LOSA ENTRE EJES 5-9 y E1-E6 1 2.18 5.51 11.99 Baston 3/8" 2 0.88 20 35.00

1 3.70 5.81 21.50 Acero Negativo 1/2" 1 2.15 20 43.00


1 2.30 6.00 13.80 Acero Negativo 3/8" 1 2.15 20 43.00
1 3.70 6.25 23.14 Acero Negativo 3/8" 2 1.65 20 66.00

1 2.70 6.47 17.47 Acero Intermedio 3/8" 1 5.00 20 100.00


Acero Positivo 3/8" 1 16.33 20 326.50

1 2.13 2.30 4.89 Baston 3/8" 2 1.18 5 11.75


1 2.13 1.70 3.62 Acero Negativo 1/2" 1 2.15 5 10.75

1 3.79 4.60 17.43 Acero Negativo 3/8" 1 4.30 5 21.50


1 2.20 4.00 8.80 Acero Intermedio 3/8" 1 5.00 5 25.00

1 3.95 2.25 8.89 Acero Positivo 1/2" 1 6.80 5 34.00


1 3.95 1.55 6.12 Acero Positivo 3/8" 1 7.03 5 35.13

1 3.80 1.70 6.46 Baston 3/8" 2 1.18 25 58.75


1 2.20 2.60 5.72 Acero Negativo 3/8" 2 1.65 25 82.50

1 3.95 2.60 10.26 Acero Intermedio 3/8" 1 5.00 25 125.00


1 3.80 3.20 12.16 Acero Positivo 1/2" 1 4.43 25 110.63

1 2.20 2.90 6.38 Acero Positivo 3/8" 1 2.70 25 67.50

1 3.95 2.90 11.45


1 3.80 3.00 11.40

1 2.20 3.00 6.60


1 3.95 3.00 11.84

1 3.80 3.90 14.82 Baston 3/8" 2 2.05 5 20.50

1 2.20 3.80 8.36 Acero Negativo 3/8" 2 1.65 5 16.50

1 3.95 3.90 15.41 Acero Intermedio 3/8" 1 5.00 5 25.00


1 2.50 1.80 4.50 Acero Negativo 3/8" 1 2.15 5 10.75
1 2.50 1.60 4.00 Acero Positivo 1/2" 1 4.43 5 22.13
Acero Positivo 3/8" 1 9.78 5 48.88

1 1.50 2.13 3.19 Baston 3/8" 2 0.88 3 5.25

Página 116 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
1 3.80 1.50 5.70 Acero Negativo 1/2" 1 1.85 3 5.55

1 2.20 1.50 3.30 Acero Negativo 1/2" 1 2.15 3 6.45

1 3.95 1.50 5.93 Acero Negativo 3/8" 2 1.65 3 9.90


1 2.50 2.60 6.50 Acero Intermedio 3/8" 1 5.00 3 15.00

Acero Positivo 1/2" 1 6.80 3 20.40


Acero Positivo 3/8" 1 9.78 3 29.33

1 3.80 3.00 11.40 Baston 3/8" 2 2.05 3 12.30

1 2.20 2.90 6.38 Acero Negativo 3/8" 2 1.65 3 9.90

1 3.95 3.00 11.85 Acero Intermedio 3/8" 1 5.00 3 15.00


Acero Negativo 3/8" 1 2.15 3 6.45

Acero Positivo 1/2" 1 4.43 3 13.28


Acero Positivo 3/8" 1 9.78 3 29.33

1 3.80 2.80 10.64 Baston 3/8" 2 1.18 19 44.65


1 2.20 2.80 6.16 Acero Negativo 3/8" 2 1.65 19 62.70

1 3.95 4.30 16.99 Acero Intermedio 3/8" 1 5.00 19 95.00


1 3.80 2.90 11.02 Acero Positivo 1/2" 1 4.43 19 84.08

1 2.20 2.90 6.38 Acero Positivo 3/8" 1 2.70 19 51.30


1 2.85 3.95 11.26

1 3.80 2.75 10.45 Baston 3/8" 1 0.98 14 13.65


1 2.20 2.75 6.05 Acero Negativo 3/8" 1 1.15 14 16.10

Acero Positivo 3/8" 1 3.50 14 49.00

1 3.95 2.85 11.26 Baston 3/8" 2 1.18 9 21.15

Acero Positivo 3/8" 1 4.70 9 42.30

Temperatura 1/4" 1 10.73 9 93.35


Temperatura 1/4" 1 34.48 42 1,448.30

Temperatura 1/4" 1 6.25 11 68.75


Temperatura 1/4" 1 39.43 16 630.89

Temperatura 1/4" 1 13.32 10 133.19

TOTALES M3 127.13 M2 1,452.95 ML 7,633.64 5,782.04 1,781.80 - - -

KG 1,908.41 3,237.94 1,763.98 - - - 6,910.33


Nro de ladrillo de techo 30x30x15 1,452.95 x 8.5 = 12,350

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO

N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long Ancho Parcial Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
1 2 Elemento
06.09 LOSAS ALIGERADAS EN DOS SENTIDOS

06.09.01 LOSAS ALIGERADA CONCRETO F`C = 210 KG/CM2

06.09.02 LOSAS ALIGERADA ENCOFRADO Y DESENCOFRADO


06.09.03 ACERO DE REFUERZO Fy=4200 kg/cm2

06.09.04 LOSA ALIGERADA LADRILLO HUECO 20 x 30 x 30 cm.

SECTOR C1
SOTANO

Página 117 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
SENTIDO HORIZONTAL

LOSA ENTRE EJES 12-17 y O-U 1 6.55 7.00 45.85 Baston 1/2" 2 2.18 17 73.95

1 6.55 6.65 43.56 Acero Negativo 1/2" 2 5.30 17 180.20


1 6.70 6.55 43.89 Acero Intermedio 3/8" 2 4.29 17 145.87

Acero Positivo 3/8" 3 5.80 17 295.56


Acero Positivo 1/2" 1 21.80 17 370.60

1 6.55 7.00 45.85 Baston 1/2" 1 2.18 17 36.98


1 6.65 6.65 44.22 Baston 1/2" 1 5.33 17 90.53

1 2.65 6.65 17.62 Acero Negativo 1/2" 1 4.30 17 73.10

Acero Intermedio 3/8" 1 3.31 17 56.20


Acero Positivo 3/8" 2 5.80 17 197.04

Acero Positivo 1/2" 1 17.70 17 300.90


1 6.45 7.00 45.15 Baston 1/2" 2 2.18 16 69.60

1 6.45 6.65 42.89 Acero Negativo 1/2" 2 5.30 16 169.60

1 6.45 6.70 43.22 Acero Intermedio 3/8" 2 4.29 16 137.29


Acero Positivo 3/8" 3 5.80 16 278.17

Acero Positivo 1/2" 1 21.80 16 348.80


1 6.70 6.65 44.56 Baston 1/2" 2 2.08 17 70.55

1 6.70 6.65 44.56 Acero Negativo 1/2" 1 4.90 17 83.30


Acero Intermedio 3/8" 1 4.30 17 73.06

Acero Positivo 3/8" 2 5.50 17 187.05


Acero Positivo 1/2" 1 14.50 17 246.50
Temperatura 1/4" 1 20.25 28 567.00

Temperatura 1/4" 1 27.20 27 723.52


Temperatura 1/4" 1 6.55 27 175.54

Temperatura 1/4" 1 13.40 27 359.12

SENTIDO VERTICAL
LOSA ENTRE EJES O-U y 12-17 Baston 1/2" 2 2.20 17 74.80

Acero Negativo 1/2" 2 5.30 17 180.20


Acero Intermedio 3/8" 1 4.29 17 72.93

Acero Positivo 3/8" 3 5.80 17 295.56


Acero Positivo 1/2" 1 21.04 17 357.72

Baston 1/2" 1 2.13 16 34.00


Baston 1/2" 1 2.18 16 34.80
Acero Negativo 1/2" 3 5.30 16 254.40

Acero Intermedio 3/8" 3 4.40 16 211.16


Acero Positivo 3/8" 4 5.25 16 335.81

Acero Positivo 1/2" 1 28.05 16 448.80

Baston 1/2" 2 2.23 17 75.65


Acero Intermedio 3/8" 1 5.35 17 90.95

Acero Positivo 1/2" 1 7.40 17 125.80


Baston 1/2" 2 2.13 17 72.25

Acero Negativo 1/2" 1 5.30 17 90.10


Acero Intermedio 3/8" 1 4.40 17 74.79

Acero Positivo 3/8" 2 5.26 17 178.73

Acero Positivo 1/2" 1 14.25 17 242.25


Temperatura 1/4" 1 20.95 26 548.89
Temperatura 1/4" 1 16.90 27 449.54
Temperatura 1/4" 1 20.95 26 540.51

Temperatura 1/4" 1 13.70 27 367.16

SECTOR C1

Página 118 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
PRIMER PISO

SENTIDO HORIZONTAL

LOSA ENTRE EJES 10-17 y O-U 1 6.60 6.80 44.88 Baston 1/2" 2 1.98 8 31.60
1 6.60 6.55 43.23 Acero Negativo 3/8" 4 3.00 8 96.00

1 6.60 6.90 45.54 Acero Intermedio 1/2" 4 3.60 8 115.20


1 6.60 6.55 43.23 Acero Positivo 3/8" 2 5.10 8 81.60

1 6.60 6.80 44.88 Acero Positivo 3/8" 5 7.50 8 300.00


Baston 3/8" 2 1.98 9 35.55

Acero Negativo 3/8" 4 3.00 9 108.00

Acero Intermedio 3/8" 4 3.60 9 129.60


Acero Positivo 1/2" 5 7.50 9 337.50

1 6.55 6.80 44.54 Baston 1/2" 1 1.98 8 15.80


1 6.55 6.55 42.90 Acero Negativo 3/8" 3 3.00 8 72.00

1 6.55 6.90 45.20 Acero Intermedio 1/2" 3 3.60 8 86.40

1 6.55 6.55 42.90 Acero Negativo 3/8" 1 2.00 8 16.00


Acero Positivo 3/8" 4 5.10 8 163.20

Acero Positivo 1/2" 1 28.55 8 228.40


Baston 3/8" 1 1.98 9 17.78

Acero Negativo 3/8" 1 1.98 9 17.78


Acero Negativo 3/8" 3 3.00 9 81.00

Acero Intermedio 3/8" 3 3.60 9 97.20


Acero Positivo 1/2" 1 28.55 9 256.95
1 6.55 6.55 42.90 Baston 1/2" 1 1.98 8 15.80

1 6.45 6.90 44.51 Acero Negativo 3/8" 3 3.00 8 72.00


1 6.45 6.55 42.25 Acero Intermedio 1/2" 3 3.60 8 86.40

1 6.45 6.80 43.86 Acero Negativo 3/8" 1 2.00 8 16.00

Acero Positivo 3/8" 4 5.10 8 163.20


Acero Positivo 1/2" 1 28.55 8 228.40

Baston 3/8" 1 1.98 9 17.78


Acero Negativo 3/8" 1 1.98 9 17.78

Acero Negativo 3/8" 3 3.00 9 81.00


Acero Intermedio 3/8" 3 3.60 9 97.20

Acero Positivo 1/2" 1 28.55 9 256.95


1 6.55 6.80 44.54 Baston 1/2" 2 1.98 8 31.60
1 6.55 6.60 43.23 Acero Negativo 1/2" 1 3.00 8 24.00

Acero Intermedio 1/2" 1 3.60 8 28.80


Acero Positivo 3/8" 2 5.10 8 81.60

Acero Positivo 3/8" 1 14.50 8 116.00

Baston 3/8" 1 1.98 9 17.78


Acero Negativo 3/8" 1 3.00 9 27.00

Acero Intermedio 3/8" 1 3.60 9 32.40


Acero Positivo 1/2" 1 14.50 9 130.50

1 6.65 6.60 43.89 Baston 1/2" 2 1.98 8 31.60


1 6.65 6.80 45.22 Acero Negativo 3/8" 1 3.00 8 24.00

Acero Intermedio 1/2" 1 3.60 8 28.80

Acero Positivo 3/8" 2 5.10 8 81.60


Acero Positivo 3/8" 1 14.50 8 116.00
Baston 3/8" 1 1.98 9 17.78
Acero Negativo 3/8" 1 3.00 9 27.00

Acero Intermedio 1/2" 1 3.60 9 32.40

Acero Positivo 1/2" 1 14.50 9 130.50

Página 119 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
Temperatura 1/4" 2 13.45 27 731.68

Temperatura 1/4" 2 6.55 27 356.32

Temperatura 1/4" 2 27.20 26 1,436.16


Temperatura 1/4" 1 20.25 28 564.98

SENTIDO VERTICAL
LOSA ENTRE EJES O-U y 10-17 Baston 1/2" 2 1.98 8 31.60

Acero Negativo 3/8" 1 3.00 8 24.00


Acero Intermedio 1/2" 1 3.60 8 28.80

Acero Positivo 3/8" 2 4.90 8 78.40

Acero Positivo 3/8" 1 14.25 8 114.00


Baston 3/8" 2 1.98 9 35.55

Acero Negativo 3/8" 1 3.00 9 27.00


Acero Intermedio 3/8" 1 3.60 9 32.40

Acero Positivo 1/2" 1 14.25 9 128.25

Baston 1/2" 1 1.98 8 15.80


Acero Negativo 1/2" 1 2.00 8 16.00

Acero Positivo 3/8" 1 5.15 8 41.20


Acero Positivo 3/8" 1 7.20 8 57.60

Baston 3/8" 1 1.98 9 17.78


Acero Negativo 3/8" 1 2.00 9 18.00

Acero Positivo 1/2" 1 14.25 9 128.25


Baston 1/2" 2 1.98 8 31.60
Acero Negativo 3/8" 3 3.00 8 72.00

Acero Intermedio 1/2" 3 3.60 8 86.40


Acero Positivo 3/8" 4 4.90 8 156.80

Acero Positivo 3/8" 1 28.05 8 224.40

Baston 3/8" 2 1.98 9 35.55


Acero Negativo 3/8" 3 3.00 9 81.00

Acero Intermedio 3/8" 3 3.60 9 97.20


Acero Positivo 1/2" 1 28.05 9 252.45

Baston 1/2" 2 1.98 8 31.60


Acero Negativo 3/8" 2 3.00 8 48.00

Acero Intermedio 1/2" 2 3.60 8 57.60


Acero Positivo 3/8" 4 4.90 8 156.80
Acero Positivo 3/8" 1 21.10 8 168.80

Baston 3/8" 2 1.98 9 35.55


Acero Negativo 3/8" 3 3.00 9 81.00

Acero Intermedio 3/8" 3 3.60 9 97.20

Acero Positivo 1/2" 1 28.05 9 252.45


Baston 1/2" 2 1.98 8 31.60

Acero Negativo 3/8" 3 3.00 8 72.00


Acero Intermedio 1/2" 3 3.60 8 86.40

Acero Positivo 3/8" 4 4.90 8 156.80


Acero Positivo 3/8" 1 21.10 8 168.80

Baston 3/8" 2 1.98 9 35.55

Acero Negativo 3/8" 3 3.00 9 81.00


Acero Intermedio 3/8" 3 3.60 9 97.20
Acero Positivo 1/2" 1 21.10 9 189.90
Baston 1/2" 2 1.98 8 31.60

Acero Negativo 3/8" 1 3.00 8 24.00

Acero Intermedio 1/2" 1 3.60 8 28.80

Página 120 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
Acero Positivo 3/8" 2 4.90 8 78.40

Acero Positivo 3/8" 1 14.25 8 114.00

Baston 3/8" 2 1.98 9 35.55


Acero Negativo 3/8" 1 3.00 9 27.00

Acero Intermedio 3/8" 1 3.60 9 32.40


Acero Positivo 1/2" 1 14.25 9 128.25

Baston 3/8" 1 1.98 8 15.80


Acero Negativo 3/8" 1 2.00 8 16.00

Acero Positivo 3/8" 1 5.15 8 41.20

Acero Positivo 3/8" 1 7.20 8 57.60


Temperatura 1/4" 1 34.80 26 918.72

Temperatura 1/4" 2 27.70 27 1,473.64


Temperatura 1/4" 2 13.70 26 723.36

SECTOR C1

SEGUNDO PISO
SENTIDO HORIZONTAL

LOSA ENTRE EJES 10-17 y O-U 1 6.70 6.80 45.56 Baston 1/2" 2 1.98 8 31.60
1 6.70 6.55 43.89 Acero Negativo 3/8" 1 3.00 8 24.00

Acero Intermedio 1/2" 1 3.60 8 28.80


Acero Positivo 3/8" 2 5.10 8 81.60

Acero Positivo 1/2" 1 14.50 8 116.00


Baston 3/8" 2 1.98 9 35.55
Acero Negativo 3/8" 1 3.00 9 27.00

Acero Intermedio 3/8" 1 3.60 9 32.40


Acero Positivo 1/2" 1 14.50 9 130.50

1 6.45 6.80 43.86 Baston 1/2" 2 1.98 8 31.60

1 6.45 6.55 42.25 Acero Negativo 3/8" 1 3.00 8 24.00


Acero Intermedio 1/2" 1 3.60 8 28.80

Acero Positivo 3/8" 2 5.10 8 81.60


Acero Positivo 1/2" 1 14.50 8 116.00

Baston 3/8" 2 1.98 9 35.55


Acero Negativo 3/8" 1 3.00 9 27.00

Acero Intermedio 3/8" 1 3.60 9 32.40


Acero Positivo 1/2" 1 14.50 9 130.50
1 6.55 6.80 44.54 Baston 1/2" 1 1.98 8 15.80

1 6.55 6.55 42.90 Acero Negativo 3/8" 1 3.00 8 24.00


Acero Intermedio 1/2" 1 3.60 8 28.80

Acero Negativo 1/2" 1 2.00 8 16.00

Acero Positivo 3/8" 2 5.10 8 81.60


Acero Positivo 1/2" 1 14.50 8 116.00

Baston 3/8" 1 1.98 9 17.78


Acero Negativo 3/8" 1 2.00 9 18.00

Acero Negativo 3/8" 1 3.00 9 27.00


Acero Intermedio 3/8" 1 3.60 9 32.40

Acero Positivo 1/2" 1 14.50 9 130.50

1 6.55 6.55 42.90 Baston 1/2" 1 1.98 8 15.80


Acero Negativo 3/8" 1 2.00 8 16.00
Acero Positivo 3/8" 1 4.85 8 38.80
Acero Positivo 3/8" 1 7.40 8 59.20

Baston 3/8" 1 1.98 9 17.78

Acero Negativo 3/8" 1 2.00 9 18.00

Página 121 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
Acero Positivo 1/2" 1 7.40 9 66.60

1 6.55 6.55 42.90 Baston 1/2" 1 1.98 8 15.80

1 6.45 6.90 44.51 Acero Negativo 3/8" 3 3.00 8 72.00


1 6.45 6.55 42.25 Acero Intermedio 1/2" 3 3.60 8 86.40

1 6.45 6.80 43.86 Acero Negativo 3/8" 1 2.00 8 16.00


Acero Positivo 3/8" 4 5.10 8 163.20

Acero Positivo 1/2" 1 28.55 8 228.40


Baston 3/8" 1 1.98 9 17.78

Acero Negativo 3/8" 1 1.98 9 17.78

Acero Negativo 3/8" 3 3.00 9 81.00


Acero Intermedio 3/8" 3 3.60 9 97.20

Acero Positivo 1/2" 1 28.55 9 256.95


1 6.55 6.80 44.54 Baston 1/2" 2 1.98 8 31.60

1 6.55 6.60 43.23 Acero Negativo 1/2" 1 3.00 8 24.00

Acero Intermedio 1/2" 1 3.60 8 28.80


Acero Positivo 3/8" 2 5.10 8 81.60

Acero Positivo 3/8" 1 14.50 8 116.00


Baston 3/8" 1 1.98 9 17.78

Acero Negativo 3/8" 1 3.00 9 27.00


Acero Intermedio 3/8" 1 3.60 9 32.40

Acero Positivo 1/2" 1 14.50 9 130.50


1 6.65 6.60 43.89 Baston 1/2" 2 1.98 8 31.60
1 6.65 6.80 45.22 Acero Negativo 3/8" 1 3.00 8 24.00

Acero Intermedio 1/2" 1 3.60 8 28.80


Acero Positivo 3/8" 2 5.10 8 81.60

Acero Positivo 3/8" 1 14.50 8 116.00

1 3.75 6.90 25.88 Baston 3/8" 1 1.98 9 17.78


Acero Negativo 3/8" 1 3.00 9 27.00

Acero Intermedio 1/2" 1 3.60 9 32.40


Acero Positivo 1/2" 1 14.50 9 130.50

Temperatura 1/4" 2 13.45 27 731.68


Temperatura 1/4" 2 6.55 27 356.32

Temperatura 1/4" 2 27.20 26 1,436.16


SEGUNDO PISO
SENTIDO VERTICAL

LOSA ENTRE EJES O-U y 10-17 Baston 1/2" 2 1.98 8 31.60


Acero Negativo 3/8" 1 3.00 8 24.00

Acero Intermedio 1/2" 1 3.60 8 28.80

Acero Positivo 3/8" 2 4.90 8 78.40


Acero Positivo 3/8" 1 14.25 8 114.00

Baston 3/8" 2 1.98 9 35.55


Acero Negativo 3/8" 1 3.00 9 27.00

Acero Intermedio 3/8" 1 3.60 9 32.40


Acero Positivo 1/2" 1 14.25 9 128.25

Baston 1/2" 1 1.98 8 15.80

Acero Negativo 1/2" 1 2.00 8 16.00


Acero Positivo 3/8" 1 5.15 8 41.20
Acero Positivo 3/8" 1 7.20 8 57.60
Baston 3/8" 1 1.98 9 17.78

Acero Negativo 3/8" 1 2.00 9 18.00

Acero Positivo 1/2" 1 14.25 9 128.25

Página 122 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
Baston 1/2" 2 1.98 8 31.60

Acero Negativo 3/8" 3 3.00 8 72.00

Acero Intermedio 1/2" 3 3.60 8 86.40


Acero Positivo 3/8" 4 4.90 8 156.80

Acero Positivo 3/8" 1 28.05 8 224.40


Baston 3/8" 2 1.98 9 35.55

Acero Negativo 3/8" 3 3.00 9 81.00


Acero Intermedio 3/8" 3 3.60 9 97.20

Acero Positivo 1/2" 1 28.05 9 252.45

Baston 3/8" 1 1.23 8 9.80


Baston 1/2" 1 1.98 8 15.80

Acero Negativo 3/8" 2 2.45 8 39.20


Acero Intermedio 1/2" 2 3.15 8 50.40

Acero Positivo 3/8" 4 4.85 8 155.20

Acero Positivo 3/8" 1 11.48 8 91.80


Baston 3/8" 1 1.23 9 11.03

Baston 3/8" 1 1.98 9 17.78


Acero Negativo 3/8" 3 3.00 9 81.00

Acero Intermedio 3/8" 3 3.60 9 97.20


Acero Positivo 1/2" 1 28.05 9 252.45

Baston 1/2" 2 1.98 8 31.60


Acero Negativo 3/8" 3 3.00 8 72.00
Acero Intermedio 1/2" 3 3.60 8 86.40

Acero Positivo 3/8" 4 4.90 8 156.80


Acero Positivo 3/8" 1 21.10 8 168.80

Baston 3/8" 2 1.98 9 35.55

Acero Negativo 3/8" 3 3.00 9 81.00


Acero Intermedio 3/8" 3 3.60 9 97.20

Acero Positivo 1/2" 1 21.10 9 189.90


Baston 1/2" 2 1.98 8 31.60

Acero Negativo 3/8" 1 3.00 8 24.00


Acero Intermedio 1/2" 1 3.60 8 28.80

Acero Positivo 3/8" 2 4.90 8 78.40


Acero Positivo 3/8" 1 14.25 8 114.00
Baston 3/8" 2 1.98 9 35.55

Acero Negativo 3/8" 1 3.00 9 27.00


Acero Intermedio 3/8" 1 3.60 9 32.40

Acero Positivo 1/2" 1 14.25 9 128.25

Baston 3/8" 1 1.98 8 15.80


Acero Negativo 3/8" 1 2.00 8 16.00

Acero Positivo 3/8" 1 5.15 8 41.20


Acero Positivo 3/8" 1 7.20 8 57.60

Temperatura 1/4" 2 13.65 26 720.72


Temperatura 1/4" 2 27.70 27 1,473.64

Temperatura 1/4" 2 13.70 26 723.36

SECTOR C1
TERCER PISO
SENTIDO HORIZONTAL
LOSA ENTRE EJES 10-17 y O-U 1 6.60 6.80 44.88

1 6.55 6.55 42.90

1 6.55 6.80 44.54 Baston 1/2" 1 1.98 8 15.80

Página 123 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
1 6.55 6.55 42.90 Acero Negativo 3/8" 1 3.00 8 24.00

Acero Intermedio 1/2" 1 3.60 8 28.80

Acero Negativo 1/2" 1 2.00 8 16.00


Acero Positivo 3/8" 2 5.10 8 81.60

Acero Positivo 1/2" 1 14.50 8 116.00


Baston 3/8" 1 1.98 9 17.78

Acero Negativo 3/8" 1 2.00 9 18.00


Acero Negativo 3/8" 1 3.00 9 27.00

Acero Intermedio 3/8" 1 3.60 9 32.40

Acero Positivo 1/2" 1 14.50 9 130.50


1 6.65 6.55 43.56 Baston 1/2" 1 1.98 8 15.80

Acero Negativo 3/8" 1 2.00 8 16.00


Acero Positivo 3/8" 1 4.85 8 38.80

Acero Positivo 3/8" 1 7.40 8 59.20

Baston 3/8" 1 1.98 9 17.78

Acero Negativo 3/8" 1 2.00 9 18.00


Acero Positivo 1/2" 1 7.40 9 66.60

1 6.65 6.55 43.56 Baston 3/8" 1 1.98 8 15.80


Acero Negativo 1/2" 1 1.95 8 15.60

Acero Positivo 3/8" 1 4.85 8 38.80


Acero Positivo 1/2" 1 7.38 8 59.00

Baston 3/8" 1 1.98 9 17.78


Acero Negativo 1/2" 1 1.95 9 17.55

Acero Positivo 1/2" 1 7.38 9 66.38

1 6.45 6.55 42.25 Baston 1/2" 2 1.98 8 31.60


1 6.45 6.80 43.86 Acero Negativo 3/8" 1 3.00 8 24.00

Acero Intermedio 1/2" 1 3.60 8 28.80


Acero Positivo 3/8" 2 4.85 8 77.60
Acero Positivo 1/2" 1 14.53 8 116.20

Baston 3/8" 2 1.98 9 35.55

Acero Negativo 3/8" 1 3.00 9 27.00

Acero Intermedio 3/8" 1 3.60 9 32.40


Acero Positivo 1/2" 1 14.53 9 130.73

1 6.55 6.80 44.54 Baston 1/2" 1 3.43 8 27.40

1 6.55 6.60 43.23 Baston 1/2" 1 1.98 8 15.84


Acero Negativo 1/2" 1 3.00 8 24.00

Acero Intermedio 1/2" 1 3.60 8 28.80

Acero Positivo 3/8" 1 4.80 8 38.40


Acero Positivo 3/8" 1 4.90 8 39.20
Acero Positivo 3/8" 1 15.83 8 126.60

Baston 3/8" 1 3.43 9 30.83

Baston 3/8" 1 1.98 9 17.82

Página 124 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
Acero Negativo 3/8" 1 3.00 9 27.00

Acero Intermedio 1/2" 1 3.60 9 32.40

Acero Positivo 1/2" 1 15.83 9 142.43

1 6.65 6.60 43.89 Baston 1/2" 2 1.98 8 31.60


1 6.65 6.80 45.22 Acero Negativo 3/8" 1 3.00 8 24.00

Acero Intermedio 1/2" 1 3.60 8 28.80


Acero Positivo 3/8" 2 5.10 8 81.60

Acero Positivo 3/8" 1 14.53 8 116.20

Baston 3/8" 2 1.98 9 35.55

Acero Negativo 3/8" 1 3.00 9 27.00


Acero Intermedio 1/2" 1 3.60 9 32.40

Acero Positivo 1/2" 1 14.53 9 130.73

Temperatura 1/4" 4 13.65 27 1,463.28

Temperatura 1/4" 2 6.55 27 348.46


Temperatura 1/4" 1 15.15 27 402.99

TERCER PISO
SENTIDO VERTICAL

LOSA ENTRE EJES O-U y 10-17 Baston 1/2" 2 1.98 8 31.60


Acero Negativo 3/8" 1 3.00 8 24.00
Acero Intermedio 1/2" 1 3.60 8 28.80

Acero Positivo 3/8" 2 4.90 8 78.40


Acero Positivo 3/8" 1 14.25 8 114.00

Baston 3/8" 2 1.98 9 35.55


Acero Negativo 3/8" 1 3.00 9 27.00

Acero Intermedio 3/8" 1 3.60 9 32.40


Acero Positivo 1/2" 1 14.25 9 128.25

Baston 1/2" 1 1.98 8 15.80

Acero Negativo 1/2" 1 2.00 8 16.00


Acero Positivo 3/8" 1 5.15 8 41.20
Acero Positivo 3/8" 1 7.20 8 57.60

Baston 3/8" 1 1.98 9 17.78

Acero Negativo 3/8" 1 2.00 9 18.00

Acero Positivo 1/2" 1 14.25 9 128.25

Baston 1/2" 2 1.98 8 31.60


Acero Negativo 3/8" 3 3.00 8 72.00

Acero Intermedio 1/2" 3 3.60 8 86.40


Acero Positivo 3/8" 4 4.90 8 156.80

Acero Positivo 3/8" 1 28.05 8 224.40

Baston 3/8" 2 1.98 9 35.55


Acero Negativo 3/8" 3 3.00 9 81.00
Acero Intermedio 3/8" 3 3.60 9 97.20

Acero Positivo 1/2" 1 28.05 9 252.45

Página 125 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
Baston 1/2" 2 1.98 8 31.60

Acero Negativo 3/8" 2 3.00 8 48.00

Acero Intermedio 1/2" 2 3.60 8 57.60


Acero Positivo 3/8" 3 4.90 8 117.60

Acero Positivo 3/8" 1 21.23 8 169.80

Baston 1/2" 2 1.98 8 31.60


Acero Negativo 3/8" 1 3.00 8 24.00

Acero Intermedio 1/2" 1 3.60 8 28.80

Acero Positivo 3/8" 2 4.90 8 78.40


Acero Positivo 3/8" 1 14.25 8 114.00

Baston 3/8" 2 1.98 9 35.55

Acero Negativo 3/8" 1 3.00 9 27.00

Acero Intermedio 3/8" 1 3.60 9 32.40


Acero Positivo 1/2" 1 14.25 9 128.25

Temperatura 1/4" 2 13.45 27 731.68

Temperatura 1/4" 1 27.70 27 736.82


Temperatura 1/4" 1 6.55 26 172.92

Temperatura 1/4" 1 20.35 26 537.24


SECTOR C1
CUARTO PISO

SENTIDO HORIZONTAL
LOSA ENTRE EJES 10-17 y O-U 1 6.60 6.80 44.88

1 6.55 6.55 42.90

1 6.55 6.80 44.54 Baston 1/2" 1 1.98 8 15.80

1 6.55 6.55 42.90 Acero Negativo 3/8" 1 3.00 8 24.00


Acero Intermedio 1/2" 1 3.60 8 28.80

Acero Negativo 1/2" 1 2.00 8 16.00


Acero Positivo 3/8" 2 5.10 8 81.60

Acero Positivo 1/2" 1 14.50 8 116.00

Baston 3/8" 1 1.98 9 17.78

Acero Negativo 3/8" 1 2.00 9 18.00


Acero Negativo 3/8" 1 3.00 9 27.00

Acero Intermedio 3/8" 1 3.60 9 32.40

Acero Positivo 1/2" 1 14.50 9 130.50

1 6.55 6.55 42.90 Baston 1/2" 1 1.98 8 15.80


Acero Negativo 3/8" 1 2.00 8 16.00

Acero Positivo 3/8" 1 4.85 8 38.80


Acero Positivo 3/8" 1 7.40 8 59.20

Baston 3/8" 1 1.98 9 17.78


Acero Negativo 3/8" 1 2.00 9 18.00
Acero Positivo 1/2" 1 7.40 9 66.60

Página 126 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
1 6.55 6.55 42.90 Baston 3/8" 1 1.98 8 15.80

Acero Negativo 1/2" 1 1.95 8 15.60

Acero Positivo 3/8" 1 4.85 8 38.80


Acero Positivo 1/2" 1 7.38 8 59.00

Baston 3/8" 1 1.98 9 17.78

Acero Negativo 1/2" 1 1.95 9 17.55


Acero Positivo 1/2" 1 7.38 9 66.38

1 6.45 6.55 42.25 Baston 1/2" 2 1.98 8 31.60


1 6.45 6.80 43.86 Acero Negativo 3/8" 1 3.00 8 24.00

Acero Intermedio 1/2" 1 3.60 8 28.80


Acero Positivo 3/8" 2 4.85 8 77.60

Acero Positivo 1/2" 1 14.53 8 116.20

Baston 3/8" 2 1.98 9 35.55

Acero Negativo 3/8" 1 3.00 9 27.00


Acero Intermedio 3/8" 1 3.60 9 32.40

Acero Positivo 1/2" 1 14.53 9 130.73

1 6.55 6.80 44.54 Baston 1/2" 1 3.43 8 27.40


1 6.55 6.60 43.23 Baston 1/2" 1 1.98 8 15.84
Acero Negativo 1/2" 1 3.00 8 24.00

Acero Intermedio 1/2" 1 3.60 8 28.80


Acero Positivo 3/8" 1 4.80 8 38.40

Acero Positivo 3/8" 1 4.90 8 39.20

Acero Positivo 3/8" 1 15.83 8 126.60

Baston 3/8" 1 3.43 9 30.83


Baston 3/8" 1 1.98 9 17.82

Acero Negativo 3/8" 1 3.00 9 27.00


Acero Intermedio 1/2" 1 3.60 9 32.40

Acero Positivo 1/2" 1 15.83 9 142.43

1 6.65 6.60 43.89 Baston 1/2" 2 1.98 8 31.60

1 6.65 6.80 45.22 Acero Negativo 3/8" 1 3.00 8 24.00


Acero Intermedio 1/2" 1 3.60 8 28.80

Acero Positivo 3/8" 2 5.10 8 81.60

Acero Positivo 3/8" 1 14.53 8 116.20

Baston 3/8" 2 1.98 9 35.55


Acero Negativo 3/8" 1 3.00 9 27.00

Acero Intermedio 1/2" 1 3.60 9 32.40


Acero Positivo 1/2" 1 14.53 9 130.73

Temperatura 1/4" 4 13.65 27 1,463.28


Temperatura 1/4" 2 6.55 27 348.46
Temperatura 1/4" 1 15.15 27 402.99
CUARTO PISO

SENTIDO VERTICAL

LOSA ENTRE EJES O-U y 10-17 Baston 1/2" 2 1.98 8 31.60

Página 127 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
Acero Negativo 3/8" 1 3.00 8 24.00

Acero Intermedio 1/2" 1 3.60 8 28.80

Acero Positivo 3/8" 2 4.90 8 78.40


Acero Positivo 3/8" 1 14.25 8 114.00

Baston 3/8" 2 1.98 9 35.55

Acero Negativo 3/8" 1 3.00 9 27.00


Acero Intermedio 3/8" 1 3.60 9 32.40

Acero Positivo 1/2" 1 14.25 9 128.25

Baston 1/2" 1 1.98 8 15.80

Acero Negativo 1/2" 1 2.00 8 16.00


Acero Positivo 3/8" 1 5.15 8 41.20

Acero Positivo 3/8" 1 7.20 8 57.60

Baston 3/8" 1 1.98 9 17.78

Acero Negativo 3/8" 1 2.00 9 18.00


Acero Positivo 1/2" 1 14.25 9 128.25

Baston 1/2" 2 1.98 8 31.60

Acero Negativo 3/8" 3 3.00 8 72.00


Acero Intermedio 1/2" 3 3.60 8 86.40
Acero Positivo 3/8" 4 4.90 8 156.80

Acero Positivo 3/8" 1 28.05 8 224.40

Baston 3/8" 2 1.98 9 35.55

Acero Negativo 3/8" 3 3.00 9 81.00


Acero Intermedio 3/8" 3 3.60 9 97.20

Acero Positivo 1/2" 1 28.05 9 252.45

Baston 1/2" 2 1.98 8 31.60


Acero Negativo 3/8" 2 3.00 8 48.00

Acero Intermedio 1/2" 2 3.60 8 57.60


Acero Positivo 3/8" 3 4.90 8 117.60
Acero Positivo 3/8" 1 21.23 8 169.80

Baston 1/2" 2 1.98 8 31.60

Acero Negativo 3/8" 1 3.00 8 24.00

Acero Intermedio 1/2" 1 3.60 8 28.80


Acero Positivo 3/8" 2 4.90 8 78.40

Acero Positivo 3/8" 1 14.25 8 114.00

Baston 3/8" 2 1.98 9 35.55


Acero Negativo 3/8" 1 3.00 9 27.00

Acero Intermedio 3/8" 1 3.60 9 32.40

Acero Positivo 1/2" 1 14.25 9 128.25

Temperatura 1/4" 2 13.45 27 731.68


Temperatura 1/4" 1 27.70 27 736.82

Temperatura 1/4" 1 6.55 26 172.92

Temperatura 1/4" 1 20.35 26 537.24

Página 128 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
SECTOR C1

QUINTO PISO

SENTIDO HORIZONTAL
LOSA ENTRE EJES 10-17 y O-U 1 6.55 6.80 44.54 Baston 3/8" 1 1.22 8 9.78

1 6.55 6.60 43.23 Baston 1/2" 1 4.63 8 37.00


1 6.55 1.15 7.53 Acero Positivo 1/2" 1 10.03 8 80.20

Baston 3/8" 1 2.40 8 19.20

Baston 3/8" 1 4.63 8 37.00

Acero Positivo 3/8" 1 7.53 8 60.20


Acero Positivo 1/2" 1 2.93 8 23.40

1 6.65 6.55 43.56 Baston 3/8" 1 1.98 8 15.80

1 6.65 2.80 18.62 Baston 3/8" 1 1.22 8 9.76

1 6.65 3.90 25.94 Acero Negativo 1/2" 1 2.25 8 18.00


Acero Negativo 3/8" 1 2.20 8 17.60

Acero Intermedio 1/2" 1 2.80 8 22.40


Acero Positivo 3/8" 1 7.53 8 60.20

Acero Positivo 1/2" 1 7.23 8 57.80

Baston 3/8" 1 1.98 8 15.80


Baston 3/8" 1 1.22 8 9.76
Acero Negativo 1/2" 1 2.25 8 18.00

Acero Intermedio 1/2" 1 2.80 8 22.40


Acero Positivo 3/8" 1 7.53 8 60.20

Acero Positivo 1/2" 1 7.23 8 57.80

1 6.55 6.80 44.54 Baston 1/2" 1 3.43 8 27.40

1 6.55 6.60 43.23 Baston 1/2" 1 1.98 8 15.84


Acero Negativo 1/2" 1 3.00 8 24.00

Acero Intermedio 1/2" 1 3.60 8 28.80


Acero Positivo 3/8" 1 4.80 8 38.40

Acero Positivo 3/8" 1 4.90 8 39.20


Acero Positivo 3/8" 1 15.83 8 126.60

Baston 3/8" 1 3.43 9 30.83


Baston 3/8" 1 1.98 9 17.82

Acero Negativo 3/8" 1 3.00 9 27.00

Acero Intermedio 1/2" 1 3.60 9 32.40


Acero Positivo 1/2" 1 15.83 9 142.43

1 6.65 2.10 13.97 Baston 3/8" 2 1.22 8 19.52

Acero Negativo 1/2" 1 2.25 8 18.00


1 6.65 2.75 18.29 Acero Positivo 1/2" 1 7.68 8 61.40

1 6.65 3.90 25.94

Temperatura 1/4" 1 6.55 37 240.90


Temperatura 1/4" 1 13.50 27 359.10
Temperatura 1/4" 1 6.55 26 172.92
Temperatura 1/4" 1 6.55 28 182.75

QUINTO PISO

SENTIDO VERTICAL

Página 129 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
LOSA ENTRE EJES 10-17 y O-U Baston 3/8" 1 1.98 8 15.80

Baston 3/8" 1 2.00 8 16.00

Acero Positivo 1/2" 1 7.68 8 61.40

Baston 3/8" 2 1.98 9 35.55


Acero Positivo 1/2" 1 7.68 9 69.08

Baston 1/2" 1 1.98 8 15.80

Acero Negativo 1/2" 1 2.00 8 16.00

Acero Positivo 3/8" 1 5.15 8 41.20


Acero Positivo 3/8" 1 7.20 8 57.60

Baston 3/8" 1 1.98 9 17.78

Acero Negativo 3/8" 1 2.00 9 18.00

Acero Positivo 1/2" 1 14.25 9 128.25

Baston 1/2" 2 1.98 8 31.60


Acero Negativo 3/8" 3 3.00 8 72.00

Acero Intermedio 1/2" 3 3.60 8 86.40


Acero Positivo 3/8" 4 4.90 8 156.80

Acero Positivo 3/8" 1 28.05 8 224.40

Baston 3/8" 2 1.98 9 35.55

Acero Intermedio 3/8" 1 3.60 9 32.40


Acero Positivo 1/2" 1 28.05 9 252.45

Temperatura 1/4" 1 9.20 37 338.56


Temperatura 1/4" 1 6.55 26 170.30

Temperatura 1/4" 1 15.15 26 399.96


SECTOR C2 y C3

PRIMER PISO
SENTIDO HORIZONTAL

LOSA ENTRE EJES 10-12 y D-Ñ 1 6.65 6.55 43.56 Baston 1/2" 2 1.98 8 31.60
1 6.55 6.55 42.90 Acero Negativo 3/8" 1 3.00 8 24.00
Acero Intermedio 1/2" 1 3.60 8 28.80
Acero Positivo 3/8" 2 4.95 8 79.20
Acero Positivo 3/8" 1 14.35 8 114.80

Baston 3/8" 2 1.98 8 31.60

Acero Negativo 3/8" 1 3.00 8 24.00

Acero Intermedio 1/2" 1 3.60 8 28.80


Acero Positivo 1/2" 1 14.35 8 114.80

1 6.70 6.75 45.23 Baston 1/2" 2 1.98 8 31.60

Acero Positivo 3/8" 1 4.95 8 39.60


Acero Positivo 3/8" 1 7.50 8 60.00

Baston 3/8" 2 1.98 4 15.80


Acero Negativo 3/8" 1 3.00 4 12.00

Acero Intermedio 1/2" 1 3.60 4 14.40


Acero Positivo 1/2" 1 7.50 4 30.00

Página 130 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.

Acero Negativo 3/8" 1 4.00 4 16.00

Baston 3/8" 1 2.55 4 10.20


Baston 3/8" 1 1.98 4 7.90

Acero Positivo 3/8" 1 1.90 4 7.60


Acero Positivo 1/2" 1 7.55 4 30.20

1 6.70 6.55 43.89 Baston 1/2" 2 1.98 8 31.60

1 6.55 6.65 43.56 Acero Negativo 3/8" 1 3.00 8 24.00

Acero Intermedio 1/2" 1 3.60 8 28.80


Acero Positivo 3/8" 2 5.00 8 80.00

Acero Positivo 3/8" 1 14.50 8 116.00

Baston 3/8" 2 1.98 8 31.60

Acero Negativo 3/8" 1 3.00 8 24.00


Acero Intermedio 1/2" 1 3.60 8 28.80

Acero Positivo 1/2" 1 14.50 8 116.00

1 6.70 6.55 43.89 Baston 1/2" 2 1.98 8 31.60


1 6.65 6.55 43.56 Acero Negativo 3/8" 1 3.00 8 24.00

Acero Intermedio 1/2" 1 3.60 8 28.80


Acero Positivo 3/8" 2 5.00 8 80.00
Acero Positivo 3/8" 1 14.50 8 116.00

Baston 3/8" 2 1.98 8 31.60

Acero Negativo 3/8" 1 3.00 8 24.00

Acero Intermedio 1/2" 1 3.60 8 28.80


Acero Positivo 1/2" 1 14.50 8 116.00

1 6.70 6.65 44.56 Baston 1/2" 2 1.98 8 31.60

1 6.70 6.65 44.56 Acero Negativo 3/8" 1 3.00 8 24.00


Acero Intermedio 1/2" 1 3.60 8 28.80

Acero Positivo 3/8" 2 5.00 8 80.00


Acero Positivo 3/8" 1 14.50 8 116.00

Baston 3/8" 2 1.98 8 31.60


Acero Negativo 3/8" 1 3.00 8 24.00

Acero Intermedio 1/2" 1 3.60 8 28.80

Acero Positivo 1/2" 1 14.50 8 116.00

1 6.55 2.15 14.08


1 6.80 6.45 43.86 Baston 1/2" 1 1.98 8 15.80

Acero Negativo 1/2" 1 2.00 8


Acero Positivo 3/8" 1 5.00 8 40.00

Acero Positivo 3/8" 1 7.65 8 61.20

Baston 3/8" 1 1.98 8 15.80


Acero Negativo 3/8" 1 2.00 8 16.00
Acero Positivo 3/8" 1 7.65 8 61.20

1 1.95 4.05 7.90

Página 131 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
1 1.60 4.20 6.72

1 6.60 6.65 43.89 Baston 1/2" 1 2.53 8 20.20


1 4.10 0.55 2.26 Baston 1/2" 1 1.98 8 15.80
Acero Positivo 3/8" 1 5.20 8 41.60
Acero Positivo 3/8" 1 8.10 8 64.80

Baston 3/8" 1 2.53 4 10.10


Baston 3/8" 1 1.98 4 7.90
Acero Positivo 1/2" 1 8.10 4 32.40

Baston 3/8" 1 2.00 4 8.00


Baston 3/8" 1 1.98 4 7.90
Acero Positivo 1/2" 1 8.10 4 32.40

1 6.80 6.60 44.88 Baston 1/2" 2 1.98 8 31.60


1 6.55 6.55 42.90 Acero Negativo 3/8" 1 3.00 8 24.00
Acero Intermedio 1/2" 1 3.60 8 28.80

Acero Positivo 3/8" 2 5.00 8 80.00


Acero Positivo 3/8" 1 14.50 8 116.00

Baston 3/8" 2 1.98 8 31.60

Acero Negativo 3/8" 1 3.00 8 24.00


Acero Intermedio 1/2" 1 3.60 8 28.80

Acero Positivo 1/2" 1 14.50 8 116.00

Temperatura 1/4" 1 27.70 27 747.90


Temperatura 1/4" 1 6.60 27 178.20
Temperatura 1/4" 1 54.60 26 1,441.44
Temperatura 1/4" 1 6.55 26 172.92

PRIMER PISO

SENTIDO VERTICAL
LOSA ENTRE EJES D-Ñ y 10-12 Baston 1/2" 1 1.98 8 15.80

Acero Negativo 3/8" 1 2.00 8 16.00


Acero Positivo 3/8" 1 5.00 8 40.00

Acero Positivo 3/8" 1 7.40 8 59.20

Baston 3/8" 1 1.98 8 15.80

Acero Negativo 3/8" 1 2.00 8 16.00


Acero Positivo 1/2" 1 7.40 8 59.20

Baston 1/2" 1 1.98 8 15.80


Baston 1/2" 1 4.48 8 35.80

Acero Negativo 1/2" 1 2.65 8 21.20


Acero Negativo 3/8" 4 3.00 8 96.00

Acero Intermedio 1/2" 4 3.60 8 115.20


Acero Positivo 3/8" 5 4.85 8 194.00

Acero Positivo 3/8" 1 37.30 8 298.40

Baston 3/8" 1 1.98 4 7.90

Baston 3/8" 1 4.48 4 17.90


Acero Negativo 3/8" 1 2.65 4 10.60

Página 132 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
Acero Negativo 3/8" 4 3.00 4 48.00

Acero Intermedio 3/8" 4 3.60 4 57.60

Acero Positivo 1/2" 1 37.30 4 149.20

Baston 3/8" 1 1.98 4 7.90


Baston 3/8" 1 4.48 4 17.90

Acero Negativo 3/8" 1 2.65 4 10.60


Acero Negativo 3/8" 4 3.00 4 48.00

Acero Intermedio 3/8" 4 3.60 4 57.60

Acero Positivo 1/2" 1 37.30 4 149.20

Baston 1/2" 1 1.98 8 15.80

Baston 1/2" 1 4.13 8 33.00


Acero Negativo 3/8" 1 2.65 8 21.20

Acero Negativo 3/8" 1 3.00 8 24.00


Acero Intermedio 1/2" 1 3.60 8 28.80

Acero Positivo 3/8" 2 4.65 8 74.40


Acero Positivo 3/8" 1 16.25 8 130.00

Baston 3/8" 1 1.98 4 7.90


Baston 3/8" 1 4.13 4 16.50

Acero Negativo 3/8" 1 2.65 4 10.60

Acero Negativo 3/8" 1 3.00 4 12.00


Acero Intermedio 3/8" 1 3.60 4 14.40

Acero Positivo 1/2" 1 2.30 4 9.20


Acero Positivo 1/2" 1 13.95 4 55.80

Baston 1/2" 1 2.00 8 16.00

Baston 1/2" 1 1.98 8 15.84


Acero Negativo 3/8" 3 3.00 8 72.00
Acero Intermedio 1/2" 3 3.60 8 86.40

Acero Positivo 3/8" 4 4.85 8 155.20


Acero Positivo 3/8" 1 28.27 8 226.16

Baston 3/8" 2 1.98 4 15.80


Acero Negativo 3/8" 3 3.00 4 36.00

Acero Intermedio 3/8" 3 3.60 4 43.20


Acero Positivo 1/2" 1 28.27 4 113.08

Acero Negativo 3/8" 1 2.55 4

Baston 3/8" 1 3.54 4 14.16

Baston 3/8" 1 1.98 4 7.90


Acero Negativo 3/8" 3 3.00 4 36.00
Acero Intermedio 3/8" 3 3.60 4 43.20
Acero Positivo 3/8" 1 2.15 4 8.60

Acero Positivo 1/2" 1 26.12 4 104.48

Página 133 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
Baston 1/2" 1 1.98 8 15.80

Acero Negativo 3/8" 1 2.00 8 16.00

Acero Positivo 3/8" 1 5.20 8 41.60


Acero Positivo 3/8" 1 7.40 8 59.20

Baston 3/8" 1 1.98 8 15.80

Acero Negativo 3/8" 1 2.00 8 16.00


Acero Positivo 1/2" 1 7.40 8 59.20

Temperatura 1/4" 2 13.50 26 702.00


Temperatura 1/4" 2 6.75 26 351.00

Temperatura 1/4" 5 13.65 27 1,842.75


SECTOR C2 y C3

SEGUNDO PISO

SENTIDO HORIZONTAL
LOSA ENTRE EJES 10-12 y D-Ñ 1 6.65 6.55 43.56 Baston 1/2" 2 1.98 8 31.60

1 6.55 6.55 42.90 Acero Negativo 3/8" 2 3.00 8 48.00


1 6.70 6.65 44.56 Acero Intermedio 1/2" 2 3.60 8 57.60

Acero Positivo 3/8" 3 5.00 8 120.00


Acero Positivo 3/8" 1 21.35 8 170.80

Baston 3/8" 2 1.98 8 31.60


Acero Negativo 3/8" 2 3.00 8 48.00

Acero Intermedio 3/8" 2 3.60 8 57.60


Acero Positivo 1/2" 1 21.35 8 170.80

1 6.70 6.75 45.23 Baston 1/2" 2 1.98 8 31.60


1 6.70 6.45 43.22 Acero Negativo 3/8" 1 3.00 8 24.00

Acero Intermedio 1/2" 1 3.60 8 28.80


Acero Positivo 3/8" 2 5.00 8 80.00

Acero Positivo 3/8" 1 14.60 8 116.80

Baston 3/8" 2 1.98 8 31.60


Acero Negativo 3/8" 1 3.00 8 24.00
Acero Intermedio 3/8" 1 3.60 8 28.80

Acero Positivo 1/2" 1 14.60 8 116.80

1 6.70 6.55 43.89 Baston 1/2" 2 1.98 8 31.60

1 6.55 6.45 42.25 Acero Negativo 3/8" 1 3.00 8 24.00


Acero Intermedio 1/2" 1 3.60 8 28.80

Acero Positivo 3/8" 2 5.00 8 80.00


Acero Positivo 3/8" 1 14.50 8 116.00

Baston 3/8" 2 1.98 8 31.60

Acero Negativo 3/8" 1 3.00 8 24.00

Acero Intermedio 1/2" 1 3.60 8 28.80


Acero Positivo 1/2" 1 14.50 8 116.00

1 6.70 6.55 43.89 Baston 1/2" 2 1.98 8 31.60

1 6.70 6.55 43.89 Acero Negativo 3/8" 1 3.00 8 24.00

Acero Intermedio 1/2" 1 3.60 8 28.80

Página 134 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
Acero Positivo 3/8" 2 5.00 8 80.00

Acero Positivo 3/8" 1 14.50 8 116.00

Baston 3/8" 2 1.98 8 31.60

Acero Negativo 3/8" 1 3.00 8 24.00


Acero Intermedio 1/2" 1 3.60 8 28.80

Acero Positivo 1/2" 1 14.50 8 116.00

1 6.70 6.55 43.89 Baston 1/2" 2 1.98 8 31.60

1 6.70 6.55 43.89 Acero Negativo 3/8" 1 3.00 8 24.00


Acero Intermedio 1/2" 1 3.60 8 28.80

Acero Positivo 3/8" 2 5.00 8 80.00


Acero Positivo 3/8" 1 14.50 8 116.00

Baston 3/8" 2 1.98 8 31.60


Acero Negativo 3/8" 1 3.00 8 24.00

Acero Intermedio 1/2" 1 3.60 8 28.80


Acero Positivo 1/2" 1 14.50 8 116.00

1 6.55 2.15 14.08 Baston 1/2" 2 1.98 8 31.60

1 6.55 6.55 42.90 Acero Negativo 3/8" 1 3.00 8 24.00


Acero Intermedio 1/2" 1 3.60 8
Acero Positivo 3/8" 2 5.00 8 80.00

Acero Positivo 3/8" 1 14.50 8 116.00

Baston 3/8" 2 1.98 8 31.60

Acero Negativo 3/8" 1 3.00 8 24.00


Acero Intermedio 1/2" 1 3.60 8 28.80

Acero Positivo 1/2" 1 14.50 8 116.00

1 6.60 6.65 43.89 Baston 1/2" 1 2.53 8 20.20


1 4.10 0.55 2.26 Baston 1/2" 1 1.98 8 15.80

Acero Positivo 3/8" 1 5.20 8 41.60


Acero Positivo 3/8" 1 8.10 8 64.80

Baston 3/8" 1 2.53 4


Baston 3/8" 1 1.98 4

Acero Positivo 1/2" 1 8.10 4

Baston 3/8" 1 2.00 4

Baston 3/8" 1 1.98 4


Acero Positivo 1/2" 1 8.10 4

1 6.80 6.60 44.88 Baston 1/2" 2 1.98 8 31.60

1 6.55 6.55 42.90 Acero Negativo 3/8" 1 3.00 8 24.00

Acero Intermedio 1/2" 1 3.60 8 28.80


Acero Positivo 3/8" 2 5.00 8 80.00
Acero Positivo 3/8" 1 14.50 8 116.00

Baston 3/8" 2 1.98 8 31.60

Acero Negativo 3/8" 1 3.00 8 24.00

Página 135 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
Acero Intermedio 1/2" 1 3.60 8 28.80

Acero Positivo 1/2" 1 14.50 8 116.00

Temperatura 1/4" 1 40.80 27 1,101.60

Temperatura 1/4" 1 6.60 27 178.20


Temperatura 1/4" 1 54.60 26 1,441.44

Temperatura 1/4" 1 6.55 26 172.92

SEGUNDO PISO

SENTIDO VERTICAL
LOSA ENTRE EJES D-Ñ y 10-12 Baston 1/2" 1 1.98 8 15.80

Acero Negativo 3/8" 1 2.00 8 16.00


Acero Positivo 3/8" 1 5.00 8 40.00

Acero Positivo 3/8" 1 7.40 8 59.20

Baston 3/8" 1 1.98 8 15.80

Acero Negativo 3/8" 1 2.00 8 16.00


Acero Positivo 1/2" 1 7.40 8 59.20

Baston 1/2" 2 1.98 8 31.60

Acero Negativo 3/8" 7 3.00 8 168.00


Acero Intermedio 1/2" 7 3.60 8 201.60
Acero Positivo 3/8" 8 4.85 8 310.40

Acero Positivo 3/8" 1 54.85 8 438.80

Baston 3/8" 2 1.98 8 31.60

Acero Negativo 3/8" 4 3.00 8 96.00


Acero Intermedio 3/8" 4 3.60 8 115.20

Acero Positivo 1/2" 1 54.85 8 438.80

Baston 1/2" 2 1.98 8 31.60

Acero Negativo 3/8" 5 3.00 8 120.00


Acero Intermedio 1/2" 5 3.60 8 144.00
Acero Positivo 3/8" 6 4.85 8 232.80

Acero Positivo 3/8" 1 41.65 8 333.20

Baston 3/8" 2 1.98 8 31.60

Acero Negativo 3/8" 5 3.00 8 120.00


Acero Intermedio 3/8" 5 3.60 8 144.00

Acero Positivo 1/2" 1 41.65 8 333.20

Baston 1/2" 1 1.98 8 15.80


Acero Negativo 3/8" 1 2.00 8 16.00

Acero Positivo 3/8" 1 5.20 8 41.60

Acero Positivo 3/8" 1 7.40 8 59.20

Baston 3/8" 1 1.98 8 15.80


Acero Negativo 3/8" 1 2.00 8 16.00

Acero Positivo 1/2" 1 7.40 8 59.20

Página 136 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
Temperatura 1/4" 2 20.50 26 1,066.00

Temperatura 1/4" 1 6.75 26 175.50

Temperatura 1/4" 6 13.65 27 2,211.30

SECTOR C2 y C3
TERCER PISO

SENTIDO HORIZONTAL
LOSA ENTRE EJES 10-12 y D-Ñ 1 6.65 6.55 43.56 Baston 1/2" 2 1.98 8 31.60

1 6.55 6.55 42.90 Acero Negativo 3/8" 2 3.00 8 48.00

1 6.70 6.65 44.56 Acero Intermedio 1/2" 2 3.60 8 57.60


Acero Positivo 3/8" 3 5.00 8 120.00

Acero Positivo 3/8" 1 21.35 8 170.80

Baston 3/8" 2 1.98 8 31.60

Acero Negativo 3/8" 2 3.00 8 48.00


Acero Intermedio 3/8" 2 3.60 8 57.60

Acero Positivo 1/2" 1 21.35 8 170.80

1 6.70 6.75 45.23 Baston 1/2" 2 1.98 8 31.60


1 6.70 6.45 43.22 Acero Negativo 3/8" 1 3.00 8 24.00

Acero Intermedio 1/2" 1 3.60 8 28.80


Acero Positivo 3/8" 2 5.00 8 80.00
Acero Positivo 3/8" 1 14.60 8 116.80

Baston 3/8" 2 1.98 8 31.60

Acero Negativo 3/8" 1 3.00 8 24.00

Acero Intermedio 3/8" 1 3.60 8 28.80


Acero Positivo 1/2" 1 14.60 8 116.80

1 6.70 6.55 43.89 Baston 1/2" 2 1.98 8 31.60

1 6.55 6.45 42.25 Acero Negativo 3/8" 1 3.00 8 24.00


Acero Intermedio 1/2" 1 3.60 8 28.80

Acero Positivo 3/8" 2 5.00 8 80.00


Acero Positivo 3/8" 1 14.50 8 116.00

Baston 3/8" 2 1.98 8 31.60


Acero Negativo 3/8" 1 3.00 8 24.00

Acero Intermedio 1/2" 1 3.60 8 28.80

Acero Positivo 1/2" 1 14.50 8 116.00

1 6.70 6.55 43.89 Baston 1/2" 2 1.98 8 31.60


1 6.70 6.55 43.89 Acero Negativo 3/8" 1 3.00 8 24.00

Acero Intermedio 1/2" 1 3.60 8 28.80


Acero Positivo 3/8" 2 5.00 8 80.00

Acero Positivo 3/8" 1 14.50 8 116.00

Baston 3/8" 2 1.98 8 31.60


Acero Negativo 3/8" 1 3.00 8 24.00
Acero Intermedio 1/2" 1 3.60 8 28.80

Acero Positivo 1/2" 1 14.50 8 116.00

Página 137 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
1 6.70 6.55 43.89 Baston 1/2" 2 1.98 8 31.60

1 6.70 6.55 43.89 Acero Negativo 3/8" 1 3.00 8 24.00

Acero Intermedio 1/2" 1 3.60 8 28.80


Acero Positivo 3/8" 2 5.00 8 80.00

Acero Positivo 3/8" 1 14.50 8 116.00

Baston 3/8" 2 1.98 8 31.60


Acero Negativo 3/8" 1 3.00 8 24.00

Acero Intermedio 1/2" 1 3.60 8 28.80

Acero Positivo 1/2" 1 14.50 8 116.00

1 6.55 2.15 14.08 Baston 1/2" 2 1.98 8 31.60


1 6.55 6.55 42.90 Acero Negativo 3/8" 1 3.00 8 24.00

Acero Intermedio 1/2" 1 3.60 8

Acero Positivo 3/8" 2 5.00 8 80.00


Acero Positivo 3/8" 1 14.50 8 116.00

Baston 3/8" 2 1.98 8 31.60

Acero Negativo 3/8" 1 3.00 8 24.00


Acero Intermedio 1/2" 1 3.60 8 28.80

Acero Positivo 1/2" 1 14.50 8 116.00

1 6.60 6.65 43.89 Baston 1/2" 1 2.53 8 20.20

1 4.10 0.55 2.26 Baston 1/2" 1 1.98 8 15.80


Acero Positivo 3/8" 1 5.20 8 41.60

Acero Positivo 3/8" 1 8.10 8 64.80

Baston 3/8" 1 2.53 4

Baston 3/8" 1 1.98 4


Acero Positivo 1/2" 1 8.10 4

Baston 3/8" 1 2.00 4

Baston 3/8" 1 1.98 4


Acero Positivo 1/2" 1 8.10 4

1 6.80 6.60 44.88 Baston 1/2" 2 1.98 8 31.60


1 6.55 6.55 42.90 Acero Negativo 3/8" 1 3.00 8 24.00

Acero Intermedio 1/2" 1 3.60 8 28.80

Acero Positivo 3/8" 2 5.00 8 80.00


Acero Positivo 3/8" 1 14.50 8 116.00

Baston 3/8" 2 1.98 8 31.60

Acero Negativo 3/8" 1 3.00 8 24.00


Acero Intermedio 1/2" 1 3.60 8 28.80

Acero Positivo 1/2" 1 14.50 8 116.00

Temperatura 1/4" 1 40.80 27 1,101.60


Temperatura 1/4" 1 6.60 27 178.20
Temperatura 1/4" 1 54.60 26 1,441.44

Temperatura 1/4" 1 6.55 26 172.92

Página 138 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
TERCER PISO

SENTIDO VERTICAL

LOSA ENTRE EJES D-Ñ y 10-12 Baston 1/2" 1 1.98 8 15.80


Acero Negativo 3/8" 1 2.00 8 16.00

Acero Positivo 3/8" 1 5.00 8 40.00


Acero Positivo 3/8" 1 7.40 8 59.20

Baston 3/8" 1 1.98 8 15.80

Acero Negativo 3/8" 1 2.00 8 16.00

Acero Positivo 1/2" 1 7.40 8 59.20

Baston 1/2" 2 1.98 8 31.60


Acero Negativo 3/8" 7 3.00 8 168.00

Acero Intermedio 1/2" 7 3.60 8 201.60

Acero Positivo 3/8" 8 4.85 8 310.40


Acero Positivo 3/8" 1 54.85 8 438.80

Baston 3/8" 2 1.98 8 31.60

Acero Negativo 3/8" 4 3.00 8 96.00


Acero Intermedio 3/8" 4 3.60 8 115.20

Acero Positivo 1/2" 1 54.85 8 438.80

Baston 1/2" 2 1.98 8 31.60


Acero Negativo 3/8" 5 3.00 8 120.00

Acero Intermedio 1/2" 5 3.60 8 144.00

Acero Positivo 3/8" 6 4.85 8 232.80


Acero Positivo 3/8" 1 41.65 8 333.20

Baston 3/8" 2 1.98 8 31.60

Acero Negativo 3/8" 5 3.00 8 120.00


Acero Intermedio 3/8" 5 3.60 8 144.00

Acero Positivo 1/2" 1 41.65 8 333.20

Baston 1/2" 1 1.98 8 15.80

Acero Negativo 3/8" 1 2.00 8 16.00


Acero Positivo 3/8" 1 5.20 8 41.60

Acero Positivo 3/8" 1 7.40 8 59.20

Baston 3/8" 1 1.98 8 15.80

Acero Negativo 3/8" 1 2.00 8 16.00


Acero Positivo 1/2" 1 7.40 8 59.20

Temperatura 1/4" 2 20.50 26 1,066.00

Temperatura 1/4" 1 6.75 26 175.50

Temperatura 1/4" 6 13.65 27 2,211.30

SECTOR C2 y C3
CUARTO PISO

SENTIDO HORIZONTAL

LOSA ENTRE EJES 10-12 y D-Ñ 1 6.65 6.55 43.56 Baston 1/2" 1 1.98 8 15.80

Página 139 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
1 6.55 6.55 42.90 Baston 3/8" 1 3.38 8 27.00

1 6.70 6.65 44.56 Acero Negativo 3/8" 1 2.35 8 18.80

1 1.15 6.55 7.53 Acero Negativo 3/8" 2 3.00 8 48.00


Acero Intermedio 1/2" 2 3.60 8 57.60

Acero Positivo 3/8" 3 5.00 8 120.00


Acero Positivo 3/8" 1 22.69 8 181.52

Baston 1/2" 1 3.13 8 25.00

Baston 3/8" 2 1.98 8 31.60

Acero Negativo 3/8" 2 3.00 8 48.00


Acero Intermedio 3/8" 2 3.60 8 57.60

Acero Positivo 3/8" 1 1.73 8 13.80


Acero Positivo 1/2" 1 21.23 8 169.80

1 6.70 6.75 45.23 Baston 1/2" 1 1.98 8 15.80


1 6.70 6.45 43.22 Baston 3/8" 1 3.38 8 27.00

1 1.15 6.65 7.65 Acero Negativo 3/8" 1 2.35 8 18.80


Acero Negativo 3/8" 1 3.00 8 24.00

Acero Intermedio 1/2" 1 3.60 8 28.80


Acero Positivo 3/8" 2 5.00 8 80.00

Acero Positivo 3/8" 1 15.75 8 126.00

Baston 1/2" 1 3.13 8 25.00

Baston 3/8" 2 1.98 8 31.60


Acero Negativo 3/8" 1 3.00 8 24.00

Acero Intermedio 3/8" 1 3.60 8 28.80

Acero Positivo 3/8" 1 1.73 8 13.80


Acero Positivo 1/2" 1 15.75 8 126.00

1 6.70 6.55 43.89 Baston 1/2" 1 4.43 8 35.40

1 6.55 6.45 42.25 Baston 3/8" 1 3.38 8 27.00


1 1.15 6.45 7.42 Acero Negativo 3/8" 1 2.35 8 18.80

Acero Negativo 1/2" 1 2.65 8 21.20


Acero Positivo 3/8" 1 5.00 8 40.00
Acero Positivo 3/8" 1 11.30 8 90.40

Baston 3/8" 1 4.43 8 35.44

Baston 1/2" 1 3.13 8 25.00

Acero Negativo 1/2" 1 2.35 8 18.80


Acero Positivo 3/8" 1 1.73 8 13.80

Acero Positivo 1/2" 1 11.30 8 90.40

1 6.70 6.55 43.89 Baston 1/2" 1 1.98 8 15.80


1 6.70 6.55 43.89 Baston 3/8" 1 3.38 8 27.00

1 1.15 6.45 7.42 Acero Negativo 3/8" 1 2.35 8 18.80

Acero Negativo 3/8" 1 3.00 8 24.00


Acero Intermedio 1/2" 1 3.60 8 28.80
Acero Positivo 3/8" 2 5.00 8 80.00
Acero Positivo 3/8" 1 15.80 8 126.40

Baston 1/2" 1 3.13 8 25.00

Página 140 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
Baston 3/8" 2 1.98 8 31.60

Acero Negativo 3/8" 1 3.00 8 24.00

Acero Intermedio 3/8" 1 3.60 8 28.80


Acero Positivo 3/8" 1 1.73 8 13.80

Acero Positivo 1/2" 1 15.80 8 126.40

1 6.70 6.55 43.89 Baston 1/2" 1 1.98 8 15.80


1 6.70 6.55 43.89 Baston 3/8" 1 3.38 8 27.00

Acero Negativo 3/8" 1 2.35 8 18.80

Acero Negativo 3/8" 1 3.00 8 24.00


Acero Intermedio 1/2" 1 3.60 8 28.80

Acero Positivo 3/8" 2 5.00 8 80.00


Acero Positivo 3/8" 1 15.80 8 126.40

Baston 1/2" 1 3.13 8 25.00


Baston 3/8" 2 1.98 8 31.60

Acero Negativo 3/8" 1 3.00 8 24.00


Acero Intermedio 3/8" 1 3.60 8 28.80

Acero Positivo 3/8" 1 1.73 8 13.80


Acero Positivo 1/2" 1 15.80 8 126.40

1 6.55 2.15 14.08 Baston 1/2" 1 1.98 8 15.80


1 6.55 6.55 42.90 Baston 3/8" 1 3.38 8 27.00

Acero Negativo 3/8" 1 2.35 8


Acero Negativo 3/8" 1 3.00 8 24.00

Acero Intermedio 1/2" 1 3.60 8 28.80

Acero Positivo 3/8" 2 5.00 8


Acero Positivo 3/8" 1 15.80 8

Baston 1/2" 1 3.13 8

Baston 3/8" 2 1.98 8


Acero Negativo 3/8" 1 3.00 8 24.00

Acero Intermedio 3/8" 1 3.60 8 28.80


Acero Positivo 3/8" 1 1.73 8 13.80
Acero Positivo 1/2" 1 15.80 8 126.40

1 6.60 6.65 43.89 Baston 1/2" 1 2.53 8 20.20

1 4.10 0.55 2.26 Baston 1/2" 1 1.98 8 15.80

Acero Positivo 3/8" 1 5.20 8 41.60


Acero Positivo 3/8" 1 8.10 8 64.80

Baston 3/8" 1 2.53 4

Baston 3/8" 1 1.98 4


Acero Positivo 1/2" 1 8.10 4

Baston 3/8" 1 2.00 4


Baston 3/8" 1 1.98 4
Acero Positivo 1/2" 1 8.10 4

1 6.80 6.60 44.88 Baston 1/2" 2 1.98 8 31.60

1 6.55 6.55 42.90 Acero Negativo 3/8" 1 3.00 8 24.00

Página 141 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
Acero Intermedio 1/2" 1 3.60 8 28.80

Acero Positivo 3/8" 2 5.00 8 80.00

Acero Positivo 3/8" 1 14.50 8 116.00

Baston 3/8" 2 1.98 8 31.60


Acero Negativo 3/8" 1 3.00 8 24.00

Acero Intermedio 1/2" 1 3.60 8 28.80


Acero Positivo 1/2" 1 14.50 8 116.00

Temperatura 1/4" 1 40.80 33 1,346.40


Temperatura 1/4" 1 6.60 27 178.20

Temperatura 1/4" 1 54.60 26 1,441.44


Temperatura 1/4" 1 6.55 26 172.92

CUARTO PISO
SENTIDO VERTICAL

LOSA ENTRE EJES D-Ñ y 10-12 Baston 1/2" 1 1.98 8 15.80


Acero Negativo 3/8" 1 2.00 8 16.00

Acero Positivo 3/8" 1 5.00 8 40.00


Acero Positivo 3/8" 1 7.40 8 59.20

Baston 3/8" 1 1.98 8 15.80


Acero Negativo 3/8" 1 2.00 8 16.00

Acero Positivo 1/2" 1 7.40 8 59.20

Baston 1/2" 2 1.98 8 31.60

Acero Negativo 3/8" 7 3.00 8 168.00


Acero Intermedio 1/2" 7 3.60 8 201.60

Acero Positivo 3/8" 8 4.85 8 310.40


Acero Positivo 3/8" 1 54.85 8 438.80

Baston 3/8" 2 1.98 8 31.60

Acero Negativo 3/8" 4 3.00 8 96.00


Acero Intermedio 3/8" 4 3.60 8 115.20
Acero Positivo 1/2" 1 54.85 8 438.80

Baston 1/2" 2 1.98 8 31.60

Acero Negativo 3/8" 5 3.00 8 120.00

Acero Intermedio 1/2" 5 3.60 8 144.00

Acero Positivo 3/8" 6 4.85 8 232.80

Acero Positivo 3/8" 1 41.65 8 333.20

Baston 3/8" 2 1.98 8 31.60

Acero Negativo 3/8" 5 3.00 8 120.00


Acero Intermedio 3/8" 5 3.60 8 144.00

Página 142 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
Acero Positivo 1/2" 1 41.65 8 333.20

Baston 1/2" 1 1.98 8 15.80


Acero Negativo 3/8" 1 2.00 8 16.00

Acero Positivo 3/8" 1 5.20 8 41.60


Acero Positivo 3/8" 1 7.40 8 59.20

Baston 3/8" 1 1.98 8 15.80

Acero Negativo 3/8" 1 2.00 8 16.00

Acero Positivo 1/2" 1 7.40 8 59.20

Temperatura 1/4" 2 20.50 26 1,066.00


Temperatura 1/4" 1 6.75 26 175.50

Temperatura 1/4" 6 13.65 27 2,211.30

SECTOR C2 y C3

QUINTO PISO
SENTIDO HORIZONTAL

LOSA ENTRE EJES 10-12 y D-Ñ 1 6.65 6.55 43.56 Baston 1/2" 1 1.98 8 15.80
1 6.55 6.55 42.90 Baston 3/8" 1 3.38 8 27.00

1 6.70 6.65 44.56 Acero Negativo 3/8" 1 2.35 8 18.80


1 1.15 6.55 7.53 Acero Negativo 3/8" 2 3.00 8 48.00
Acero Intermedio 1/2" 2 3.60 8 57.60

Acero Positivo 3/8" 3 5.00 8 120.00


Acero Positivo 3/8" 1 22.69 8 181.52

Baston 1/2" 1 3.13 8 25.00


Baston 3/8" 2 1.98 8 31.60

Acero Negativo 3/8" 2 3.00 8 48.00


Acero Intermedio 3/8" 2 3.60 8 57.60

Acero Positivo 3/8" 1 1.73 8 13.80


Acero Positivo 1/2" 1 21.23 8 169.80

1 6.70 6.75 45.23 Baston 1/2" 1 1.98 8 15.80


1 6.70 6.45 43.22 Baston 3/8" 1 3.38 8 27.00

1 1.15 6.65 7.65 Acero Negativo 3/8" 1 2.35 8 18.80


Acero Negativo 3/8" 1 3.00 8 24.00

Acero Intermedio 1/2" 1 3.60 8 28.80

Acero Positivo 3/8" 2 5.00 8 80.00


Acero Positivo 3/8" 1 15.75 8 126.00

Baston 1/2" 1 3.13 8 25.00

Baston 3/8" 2 1.98 8 31.60


Acero Negativo 3/8" 1 3.00 8 24.00

Acero Intermedio 3/8" 1 3.60 8 28.80

Acero Positivo 3/8" 1 1.73 8 13.80


Acero Positivo 1/2" 1 15.75 8 126.00

1 6.70 6.55 43.89 Baston 1/2" 1 4.43 8 35.40

1 6.55 6.45 42.25 Baston 3/8" 1 3.38 8 27.00

1 1.15 6.45 7.42 Acero Negativo 3/8" 1 2.35 8 18.80

Página 143 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
Acero Negativo 1/2" 1 2.65 8 21.20

Acero Positivo 3/8" 1 5.00 8 40.00

Acero Positivo 3/8" 1 11.30 8 90.40

Baston 3/8" 1 4.43 8 35.44


Baston 1/2" 1 3.13 8 25.00

Acero Negativo 1/2" 1 2.35 8 18.80


Acero Positivo 3/8" 1 1.73 8 13.80

Acero Positivo 1/2" 1 11.30 8 90.40

1 6.70 6.55 43.89 Baston 1/2" 1 1.98 8 15.80

1 6.70 6.55 43.89 Baston 3/8" 1 3.38 8 27.00


1 1.15 6.45 7.42 Acero Negativo 3/8" 1 2.35 8 18.80

Acero Negativo 3/8" 1 3.00 8 24.00

Acero Intermedio 1/2" 1 3.60 8 28.80


Acero Positivo 3/8" 2 5.00 8 80.00

Acero Positivo 3/8" 1 15.80 8 126.40

Baston 1/2" 1 3.13 8 25.00


Baston 3/8" 2 1.98 8 31.60

Acero Negativo 3/8" 1 3.00 8 24.00


Acero Intermedio 3/8" 1 3.60 8 28.80
Acero Positivo 3/8" 1 1.73 8 13.80

Acero Positivo 1/2" 1 15.80 8 126.40

1 6.70 6.55 43.89 Baston 1/2" 1 1.98 8 15.80

1 6.70 6.55 43.89 Baston 3/8" 1 3.38 8 27.00


Acero Negativo 3/8" 1 2.35 8 18.80

Acero Negativo 3/8" 1 3.00 8 24.00


Acero Intermedio 1/2" 1 3.60 8 28.80

Acero Positivo 3/8" 2 5.00 8 80.00


Acero Positivo 3/8" 1 15.80 8 126.40

Baston 1/2" 1 3.13 8 25.00


Baston 3/8" 2 1.98 8 31.60

Acero Negativo 3/8" 1 3.00 8 24.00


Acero Intermedio 3/8" 1 3.60 8 28.80

Acero Positivo 3/8" 1 1.73 8 13.80

Acero Positivo 1/2" 1 15.80 8 126.40

1 6.55 2.15 14.08 Baston 1/2" 1 1.98 8 15.80


1 6.55 6.55 42.90 Baston 3/8" 1 3.38 8 27.00

Acero Negativo 3/8" 1 2.35 8


Acero Negativo 3/8" 1 3.00 8 24.00

Acero Intermedio 1/2" 1 3.60 8 28.80

Acero Positivo 3/8" 2 5.00 8


Acero Positivo 3/8" 1 15.80 8

Baston 1/2" 1 3.13 8

Baston 3/8" 2 1.98 8

Acero Negativo 3/8" 1 3.00 8 24.00

Página 144 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
Acero Intermedio 3/8" 1 3.60 8 28.80

Acero Positivo 3/8" 1 1.73 8 13.80

Acero Positivo 1/2" 1 15.80 8 126.40

1 6.60 6.65 43.89 Baston 1/2" 1 2.53 8 20.20


1 4.10 0.55 2.26 Baston 1/2" 1 1.98 8 15.80

Acero Positivo 3/8" 1 5.20 8 41.60


Acero Positivo 3/8" 1 8.10 8 64.80

Baston 3/8" 1 2.53 4


Baston 3/8" 1 1.98 4

Acero Positivo 1/2" 1 8.10 4

Baston 3/8" 1 2.00 4

Baston 3/8" 1 1.98 4


Acero Positivo 1/2" 1 8.10 4

Temperatura 1/4" 1 40.80 33 1,346.40

Temperatura 1/4" 1 6.60 27 178.20


Temperatura 1/4" 1 54.60 26 1,441.44

Temperatura 1/4" 1 6.55 26 172.92


SENTIDO VERTICAL
LOSA ENTRE EJES D-Ñ y 10-12 Baston 1/2" 1 1.98 8 15.80

Acero Negativo 3/8" 1 2.00 8 16.00


Acero Positivo 3/8" 1 5.00 8 40.00

Acero Positivo 3/8" 1 7.40 8 59.20

Baston 3/8" 1 1.98 8 15.80

Acero Negativo 3/8" 1 2.00 8 16.00


Acero Positivo 1/2" 1 7.40 8 59.20

Baston 1/2" 2 1.98 8 31.60

Acero Negativo 3/8" 7 3.00 8 168.00


Acero Intermedio 1/2" 7 3.60 8 201.60
Acero Positivo 3/8" 8 4.85 8 310.40

Acero Positivo 3/8" 1 54.85 8 438.80

Baston 3/8" 2 1.98 8 31.60

Acero Negativo 3/8" 4 3.00 8 96.00


Acero Intermedio 3/8" 4 3.60 8 115.20

Acero Positivo 1/2" 1 54.85 8 438.80

Baston 1/2" 2 1.98 8 31.60

Acero Negativo 3/8" 5 3.00 8 120.00

Acero Intermedio 1/2" 5 3.60 8 144.00

Acero Positivo 3/8" 6 4.85 8 232.80

Página 145 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
Acero Positivo 3/8" 1 41.65 8 333.20

Baston 3/8" 2 1.98 8 31.60

Acero Negativo 3/8" 5 3.00 8 120.00


Acero Intermedio 3/8" 5 3.60 8 144.00

Acero Positivo 1/2" 1 41.65 8 333.20

Temperatura 1/4" 2 20.50 26 1,066.00

Temperatura 1/4" 1 6.75 26 175.50


Temperatura 1/4" 6 13.65 27 2,211.30

SECTOR C3

PLANTA SOTANO

SENTIDO HORIZONTAL Baston 3/8" 1 1.83 8


LOSA ENTRE EJES 13-19 y Ñ-I 1 2.00 6.70 13.40 Baston 3/8" 1 4.28 8 34.20

1 6.70 6.75 45.23 Acero Negativo 3/8" 1 3.00 8 24.00


1 6.65 6.65 44.22 Acero Intermedio 1/2" 1 3.60 8 28.80

Acero Positivo 3/8" 1 4.95 8 39.60


Acero Positivo 3/8" 1 16.45 8 131.60

Baston 3/8" 1 1.83 8 14.60


Baston 3/8" 1 4.28 8 34.20

Acero Negativo 3/8" 1 3.00 8 24.00


Acero Intermedio 3/8" 1 3.60 8 28.80

Acero Positivo 1/2" 1 16.45 8 131.60

1 2.00 6.70 13.40 Baston 3/8" 1 1.83 8

1 6.70 6.75 45.23 Baston 3/8" 1 4.28 8 34.20


1 6.65 6.65 44.22 Acero Negativo 3/8" 1 3.00 8 24.00

Acero Intermedio 1/2" 1 3.60 8 28.80


Acero Positivo 3/8" 1 4.95 8 39.60

Acero Positivo 3/8" 1 16.45 8 131.60

Baston 3/8" 1 1.83 8 14.60

Baston 3/8" 1 4.28 8 34.20


Acero Negativo 3/8" 1 3.00 8 24.00

Acero Intermedio 3/8" 1 3.60 8 28.80

Acero Positivo 1/2" 1 16.45 8 131.60

1 2.00 6.70 13.40 Baston 3/8" 1 1.83 8


1 6.70 6.75 45.23 Baston 3/8" 1 4.28 8 34.20

1 6.65 6.65 44.22 Acero Negativo 3/8" 1 3.00 8 24.00


Acero Intermedio 1/2" 1 3.60 8 28.80

Acero Positivo 3/8" 1 4.95 8 39.60

Acero Positivo 3/8" 1 16.45 8 131.60

Baston 3/8" 1 1.83 8 14.60


Baston 3/8" 1 4.28 8 34.20

Acero Negativo 3/8" 1 3.00 8 24.00

Acero Intermedio 3/8" 1 3.60 8 28.80

Página 146 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
Acero Positivo 1/2" 1 16.45 8 131.60

1 6.55 6.55 42.90 Baston 3/8" 2 1.83 8 29.20


1 6.70 6.75 45.23 Acero Negativo 3/8" 2 3.00 8 48.00

1 6.65 6.65 44.22 Acero Intermedio 1/2" 2 3.60 8 57.60


Acero Positivo 3/8" 2 4.95 8 79.20

Acero Positivo 3/8" 1 20.75 8 166.00

Baston 3/8" 1 1.83 8 14.60

Acero Negativo 3/8" 2 3.00 8 48.00


Acero Intermedio 3/8" 2 3.60 8 57.60

Acero Positivo 1/2" 1 20.75 8 166.00

1 2.40 2.30 5.52 Acero Negativo 3/8" 2 3.50 5 35.00

1 6.70 2.35 15.75 Acero Intermedio 3/8" 2 3.15 5 31.50


1 6.70 6.40 42.88 Baston 3/8" 1 1.83 8 14.60

Baston 3/8" 1 2.00 8 16.00


Acero Intermedio 3/8" 1 5.30 8 42.40

Acero Positivo 3/8" 1 7.45 8 59.60

1 2.40 2.25 5.40


1 6.70 2.25 15.08
1 6.70 2.25 15.08

1 6.30 2.25 14.18


Temperatura 1/4" 1 2.25 26 58.50

Temperatura 1/4" 2 36.60 26 1,903.20

Temperatura 1/4" 6 11.35 27 1,838.70

PLANTA SOTANO Baston 3/8" 2 1.83 8 29.20


SENTIDO VERTICAL Acero Negativo 3/8" 4 3.00 8 96.00

LOSA ENTRE EJES 13-19 y Ñ-I Acero Intermedio 1/2" 4 3.60 8 115.20
Acero Positivo 3/8" 4 4.95 8 158.40
Acero Positivo 3/8" 1 30.58 8 244.60

Baston 3/8" 2 1.83 8 29.20

Acero Negativo 3/8" 4 3.00 8 96.00

Acero Intermedio 3/8" 4 3.60 8 115.20


Acero Positivo 1/2" 1 30.58 8 244.60

Baston 3/8" 2 1.83 8 29.20

Acero Negativo 3/8" 4 3.00 8 96.00


Acero Intermedio 1/2" 4 3.60 8 115.20

Acero Positivo 3/8" 5 4.95 8 198.00

Acero Positivo 3/8" 1 34.60 8 276.80

Baston 3/8" 2 1.83 8 29.20


Acero Negativo 3/8" 4 3.00 8 96.00

Acero Intermedio 3/8" 5 3.60 8 144.00

Acero Positivo 1/2" 1 34.60 8 276.80

Página 147 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.

Baston 3/8" 2 3.00 5 30.00

Baston 3/8" 6 3.00 64 1,152.00

Baston 3/8" 2 1.83 8 29.20


Acero Negativo 3/8" 1 3.00 8 24.00

Acero Intermedio 1/2" 1 3.60 8 28.80

Acero Positivo 3/8" 1 3.65 8 29.20


Acero Positivo 3/8" 1 5.65 8 45.20

Baston 3/8" 2 2.00 8 32.00

Acero Positivo 1/2" 1 5.65 8 45.20

Temperatura 1/4" 4 16.30 27

Temperatura 1/4" 1 20.50 27


SECTOR C3

PRIMER PISO
SENTIDO HORIZONTAL

LOSA ENTRE EJES 13-19 y D-G 1 6.65 6.65 44.22 1/2" 1 7.45 8 62.58
1 6.55 6.65 43.56 1/2" 1 7.15 8 60.06
1 6.70 6.65 44.56 1/2" 1 7.30 8 61.32

1 6.55 6.70 43.89 3/8" 1 7.35 8 61.74


3/8" 2 1.90 8 31.92

3/8" 3 3.00 8 75.60

3/8" 3 3.60 8 90.72


3/8" 1 7.45 8 61.46

3/8" 1 7.15 8 58.99


3/8" 1 7.30 8 60.23

3/8" 1 7.35 8 60.64


3/8" 1 4.95 8 40.84

3/8" 1 4.55 8 37.54


3/8" 1 4.70 8 38.78
3/8" 1 4.85 8 40.01

1/2" 2 1.90 8 31.35


3/8" 3 3.00 8 74.25

1/2" 3 3.60 8 89.10

Temperatura 1/4" 27 6.95 1 184.87


Temperatura 1/4" 27 6.85 1 182.21

Temperatura 1/4" 27 7.00 1 186.20


Temperatura 1/4" 27 6.85 1 183.58

LOSA ENTRE EJES 13-19 y G-H 1 6.70 6.45 43.22 1/2" 1 7.50 8 63.00
1 6.55 6.45 42.25 1/2" 1 7.15 8 60.06

1 6.70 6.45 43.22 1/2" 1 7.30 8 61.32

1 6.60 6.45 42.57 3/8" 1 7.40 8 62.16


3/8" 2 1.90 8 31.92
3/8" 3 3.00 8 75.60
3/8" 3 3.60 8 90.72

3/8" 1 7.50 8 61.88

3/8" 1 7.15 8 58.99

Página 148 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
3/8" 1 7.30 8 60.23

3/8" 1 7.40 8 61.05

3/8" 1 5.00 8 41.25


3/8" 1 4.55 8 37.54

3/8" 1 4.70 8 38.78


3/8" 1 4.90 8 40.43

1/2" 2 1.90 8 31.35


3/8" 3 3.00 8 74.25

1/2" 3 3.60 8 89.10

Temperatura 1/4" 26 7.00 1 180.60


Temperatura 1/4" 26 6.85 1 176.73

Temperatura 1/4" 26 7.00 1 180.60


Temperatura 1/4" 26 6.90 1 178.02

LOSA ENTRE EJES 13-19 y H-I 1 6.60 6.55 43.23 1/2" 1 7.40 8 62.16

1 6.70 6.55 43.89 1/2" 1 7.30 8 61.32


1 6.60 6.55 43.23 1/2" 1 7.20 8 60.48

1 6.65 6.55 43.56 3/8" 1 7.45 8 62.58


3/8" 2 1.90 8 31.92

3/8" 3 3.00 8 75.60


3/8" 3 3.60 8 90.72

3/8" 1 7.40 8 61.05


3/8" 1 7.30 8 60.23
3/8" 1 7.20 8 59.40

3/8" 1 7.45 8 61.46


3/8" 1 4.90 8 40.43

3/8" 1 4.70 8 38.78

3/8" 1 4.60 8 37.95


3/8" 1 4.95 8 40.84

1/2" 2 1.90 8 31.35


3/8" 3 3.00 8 74.25

1/2" 3 3.60 8 89.10


Temperatura 1/4" 26 6.90 1 180.78

Temperatura 1/4" 26 7.00 1 183.40


Temperatura 1/4" 26 6.90 1 180.78
Temperatura 1/4" 26 6.95 1 182.09

LOSA ENTRE EJES 15-18 y I-J 1 6.70 6.55 43.89 1/2" 1 7.70 8 64.68
1 2.40 2.55 6.12 3/8" 2 2.00 8 33.60

1 6.70 2.55 17.09

3/8" 1 7.70 8 63.53


3/8" 1 5.30 8 43.73

3/8" 2 2.00 8 33.00


3/8" 1 3.40 6 21.68

3/8" 1 3.60 6 22.95


Temperatura 1/4" 26 7.00 1 183.40

Temperatura 1/4" 10 2.70 1 27.54

Temperatura 1/4" 10 7.00 1 71.40


LOSA ENTRE EJES 15-18 y J-K 1 6.65 6.45 42.89 1/2" 1 7.45 4 31.29
1 6.70 6.45 43.22 1/2" 1 7.30 4 30.66
1 2.40 2.50 6.00 3/8" 1 3.20 4 13.44

1 1.70 3.70 6.29 3/8" 1 1.90 4 7.98

3/8" 2 3.00 4 25.20

Página 149 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
3/8" 1 3.60 4 15.12

3/8" 1 4.65 4 19.53

3/8" 1 7.45 9 68.91


3/8" 1 7.30 9 67.53

3/8" 1 2.50 9 23.13


3/8" 1 4.95 9 45.79

3/8" 1 5.00 9 46.25


3/8" 1 1.90 9 17.58

3/8" 2 3.00 9 55.50

1/2" 1 3.60 9 33.30


1/2" 1 3.85 9 35.61

Temperatura 1/4" 26 6.95 1 179.31


Temperatura 1/4" 26 7.00 1 180.60

Temperatura 1/4" 10 2.70 1 27.00

Temperatura 1/4" 15 2.00 1 29.60


LOSA ENTRE EJES 15-18 y K-M 1 6.65 6.70 44.56 1/2" 1 7.45 8 62.58

1 6.70 6.65 44.56 1/2" 1 7.30 8 61.32


1 1.70 6.65 11.31 3/8" 1 2.50 8 21.00

3/8" 1 1.90 8 15.96


3/8" 2 3.00 8 50.40

3/8" 1 3.60 8 30.24


3/8" 1 3.85 8 32.34
3/8" 1 7.45 8 61.46

3/8" 1 9.45 8 77.96


3/8" 1 4.95 8 40.84

3/8" 1 4.70 8 38.78

3/8" 1 1.90 8 15.68


3/8" 2 3.00 8 49.50

1/2" 1 3.60 8 29.70


3/8" 1 3.85 8 31.76

Temperatura 1/4" 27 6.95 1 186.26


Temperatura 1/4" 27 7.00 1 186.20

Temperatura 1/4" 27 2.00 1 53.20


LOSA ENTRE EJES 15-18 y M-N 1 6.70 6.45 43.22 1/2" 1 7.50 8 63.00
1 6.70 6.45 43.22 1/2" 1 7.30 8 61.32

1 1.70 6.45 10.97 3/8" 1 2.50 8 21.00


1 4.95 1.80 8.91 3/8" 1 1.90 8 15.96

3/8" 2 3.00 8 50.40


3/8" 1 3.60 8 30.24

3/8" 1 3.95 8 33.18

3/8" 1 7.50 8 61.88


3/8" 1 9.45 8 77.96

3/8" 1 5.30 8 43.73


3/8" 1 4.70 8 38.78

3/8" 1 1.90 8 15.68


3/8" 2 3.00 8 49.50

1/2" 1 3.60 8 29.70


3/8" 1 3.85 8 31.76
Temperatura 1/4" 26 7.00 1 180.60

Temperatura 1/4" 26 7.00 1 180.60


Temperatura 1/4" 26 2.00 1 51.60

Página 150 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
Temperatura 1/4" 7 5.25 1 37.80

LOSA ENTRE EJES 15-18 y N-Ñ 1 6.65 6.65 44.22 1/2" 1 7.45 8 62.58

1 6.75 6.70 45.23 1/2" 1 7.35 8 61.74


1 1.70 6.70 11.39 3/8" 1 2.50 8 21.00

3/8" 1 1.90 8 15.96


3/8" 2 3.00 8 50.40

3/8" 1 3.60 8 30.24


3/8" 1 3.95 8 33.18

3/8" 1 7.45 8 61.46

3/8" 1 9.50 8 78.38


3/8" 1 5.25 8 43.31

3/8" 1 4.75 8 39.19


3/8" 1 1.90 8 15.68

3/8" 2 3.00 8 49.50

1/2" 1 3.60 8 29.70


3/8" 1 3.85 8 31.76

Temperatura 1/4" 27 6.95 1 184.87


Temperatura 1/4" 27 7.05 1 188.94

SECTOR C3 Temperatura 1/4" 27 2.00 1 53.60


SENTIDO VERTICAL

LOSA ENTRE EJES D-I y 13-15 3/8" 1 7.45 8 62.58


1/2" 1 7.05 8 59.22
1/2" 1 7.35 8 61.74

3/8" 2 1.90 8 31.92


3/8" 2 3.00 8 50.40

3/8" 2 3.60 8 60.48

3/8" 1 7.45 8 61.46


3/8" 1 7.05 8 58.16

3/8" 1 7.35 8 60.64


3/8" 1 4.95 8 40.84

3/8" 1 4.45 8 36.71


3/8" 1 4.85 8 40.01

3/8" 1 1.90 8 15.68


3/8" 2 3.00 8 49.50
1/2" 2 3.60 8 59.40

1/2" 1 1.90 8 15.68


LOSA ENTRE EJES D-Ñ y 15-16 1/2" 1 7.45 8 62.58

1/2" 1 7.05 8 59.22

1/2" 1 7.15 8 60.06


1/2" 1 7.25 8 60.90
1/2" 1 7.05 8 59.22
1/2" 1 7.30 8 61.32
1/2" 1 7.05 8 59.22
1/2" 1 7.45 8 62.58
3/8" 2 1.90 8 31.92

3/8" 7 3.00 8 176.40


3/8" 7 3.60 8 211.68

3/8" 1 7.45 8 61.46


3/8" 1 7.05 8 58.16

3/8" 1 7.15 8 58.99


3/8" 1 7.25 8 59.81

Página 151 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
3/8" 1 7.05 8 58.16

3/8" 1 7.30 8 60.23

3/8" 1 7.05 8 58.16


3/8" 1 7.45 8 61.46

3/8" 1 4.95 8 40.84


3/8" 1 4.45 8 36.71

3/8" 1 4.55 8 37.54


3/8" 1 4.65 8 38.36

3/8" 1 4.45 8 36.71

3/8" 1 4.70 8 38.78


3/8" 1 4.45 8 36.71

3/8" 1 4.95 8 40.84


3/8" 2 1.90 8 31.35

3/8" 7 3.00 8 173.25

1/2" 7 3.60 8 207.90


LOSA ENTRE EJES D-I y 16-17 1/2" 1 7.50 8 63.00

1/2" 1 7.05 8 59.22


1/2" 1 7.35 8 61.74

3/8" 2 1.90 8 31.92


3/8" 2 3.00 8 50.40

3/8" 2 3.60 8 60.48


3/8" 1 7.50 8 61.88
3/8" 1 7.05 8 58.16

3/8" 1 7.35 8 60.64


3/8" 1 5.00 8 41.25

3/8" 1 4.45 8 36.71

3/8" 1 4.85 8 40.01


3/8" 2 1.90 8 31.35

3/8" 2 3.00 8 49.50


1/2" 2 3.60 8 59.40

LOSA ENTRE EJES J-Ñ y 16-17 3/8" 1 3.30 8 27.72


1/2" 1 7.05 8 59.22

1/2" 1 7.25 8 60.90


1/2" 1 7.05 8 59.22
1/2" 1 7.50 8 63.00

3/8" 1 1.90 8 15.96


3/8" 4 3.00 8 100.80

3/8" 3 3.60 8 90.72

3/8" 1 5.10 8 42.84


3/8" 1 3.30 8 27.23

3/8" 1 7.05 8 58.16


3/8" 1 7.25 8 59.81

3/8" 1 7.05 8 58.16


3/8" 1 7.50 8 61.88

3/8" 1 4.75 8 39.19

3/8" 1 4.65 8 38.36


3/8" 1 4.45 8 36.71
3/8" 1 5.00 8 41.25
1/2" 1 1.90 8 15.68

3/8" 4 3.00 8 99.00

1/2" 3 3.60 8 89.10

Página 152 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
1/2" 1 5.10 8 42.08

LOSA ENTRE EJES D-I y 17-18 1/2" 1 7.50 8 63.00

1/2" 1 7.05 8 59.22


1/2" 1 7.35 8 61.74

3/8" 2 1.90 8 31.92


3/8" 2 3.00 8 50.40

3/8" 2 3.60 8 60.48


3/8" 1 7.50 8 61.88

3/8" 1 7.05 8 58.16

3/8" 1 7.35 8 60.64


3/8" 1 5.00 8 41.25

3/8" 1 4.45 8 36.71


3/8" 1 4.85 8 40.01

3/8" 2 1.90 8 31.35

3/8" 2 3.00 8 49.50


1/2" 2 3.60 8 59.40

LOSA ENTRE EJES M-N y 18-19 3/8" 2 2.80 12 69.30

SECTOR C3
SEGUNDO PISO

SENTIDO HORIZONTAL
LOSA ENTRE EJES 13-19 y D-G 1 6.65 6.65 44.22 1/2" 1 7.45 8 62.58
1 6.55 6.65 43.56 1/2" 1 7.15 8 60.06

1 6.70 6.65 44.56 1/2" 1 7.30 8 61.32


1 6.55 6.70 43.89 3/8" 1 7.35 8 61.74

3/8" 2 1.90 8 31.92

3/8" 3 3.00 8 75.60


3/8" 3 3.60 8 90.72

3/8" 1 7.45 8 61.46


3/8" 1 7.15 8 58.99

3/8" 1 7.30 8 60.23


3/8" 1 7.35 8 60.64

3/8" 1 4.95 8 40.84


3/8" 1 4.55 8 37.54
3/8" 1 4.70 8 38.78

3/8" 1 4.85 8 40.01


1/2" 2 1.90 8 31.35

3/8" 3 3.00 8 74.25

1/2" 3 3.60 8 89.10


Temperatura 1/4" 27 6.95 1 184.87

Temperatura 1/4" 27 6.85 1 182.21


Temperatura 1/4" 27 7.00 1 186.20

Temperatura 1/4" 27 6.85 1 183.58


LOSA ENTRE EJES 13-19 y G-H 1 6.70 6.45 43.22 1/2" 1 7.50 8 63.00

1 6.55 6.45 42.25 1/2" 1 7.15 8 60.06

1 6.70 6.45 43.22 1/2" 1 7.30 8 61.32


1 6.60 6.45 42.57 3/8" 1 7.40 8 62.16
3/8" 2 1.90 8 31.92
3/8" 3 3.00 8 75.60

3/8" 3 3.60 8 90.72

3/8" 1 7.50 8 61.88

Página 153 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
3/8" 1 7.15 8 58.99

3/8" 1 7.30 8 60.23

3/8" 1 7.40 8 61.05


3/8" 1 5.00 8 41.25

3/8" 1 4.55 8 37.54


3/8" 1 4.70 8 38.78

3/8" 1 4.90 8 40.43


1/2" 2 1.90 8 31.35

3/8" 3 3.00 8 74.25

1/2" 3 3.60 8 89.10


Temperatura 1/4" 26 7.00 1 180.60

Temperatura 1/4" 26 6.85 1 176.73


Temperatura 1/4" 26 7.00 1 180.60

Temperatura 1/4" 26 6.90 1 178.02

LOSA ENTRE EJES 13-19 y H-I 1 6.60 6.55 43.23 1/2" 1 7.40 8 62.16
1 6.70 6.55 43.89 1/2" 1 7.30 8 61.32

1 6.60 6.55 43.23 1/2" 1 7.20 8 60.48


1 6.65 6.55 43.56 3/8" 1 7.45 8 62.58

3/8" 2 1.90 8 31.92


3/8" 3 3.00 8 75.60

3/8" 3 3.60 8 90.72


3/8" 1 7.40 8 61.05
3/8" 1 7.30 8 60.23

3/8" 1 7.20 8 59.40


3/8" 1 7.45 8 61.46

3/8" 1 4.90 8 40.43

3/8" 1 4.70 8 38.78


3/8" 1 4.60 8 37.95

3/8" 1 4.95 8 40.84


1/2" 2 1.90 8 31.35

3/8" 3 3.00 8 74.25


1/2" 3 3.60 8 89.10

Temperatura 1/4" 26 6.90 1 180.78


Temperatura 1/4" 26 7.00 1 183.40
Temperatura 1/4" 26 6.90 1 180.78

Temperatura 1/4" 26 6.95 1 182.09


LOSA ENTRE EJES 15-18 y I-J 1 6.70 6.55 43.89 1/2" 1 7.70 8 64.68

1 2.40 2.55 6.12 3/8" 2 2.00 8 33.60

1 6.70 2.55 17.09


3/8" 1 7.70 8 63.53

3/8" 1 5.30 8 43.73


3/8" 2 2.00 8 33.00

3/8" 1 3.40 6 21.68


3/8" 1 3.60 6 22.95

Temperatura 1/4" 26 7.00 1 183.40

Temperatura 1/4" 10 2.70 1 27.54


Temperatura 1/4" 10 7.00 1 71.40
LOSA ENTRE EJES 15-18 y J-K 1 6.65 6.45 42.89 1/2" 1 7.45 4 31.29
1 6.70 6.45 43.22 1/2" 1 7.30 4 30.66

1 2.40 2.50 6.00 3/8" 1 3.20 4 13.44

1 1.65 3.70 6.11 3/8" 1 1.90 4 7.98

Página 154 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
3/8" 2 3.00 4 25.20

3/8" 1 3.60 4 15.12

3/8" 1 4.65 4 19.53


3/8" 1 7.45 9 68.91

3/8" 1 7.30 9 67.53


3/8" 1 2.45 9 22.66

3/8" 1 4.95 9 45.79


3/8" 1 5.00 9 46.25

3/8" 1 1.90 9 17.58

3/8" 2 3.00 9 55.50


1/2" 1 3.60 9 33.30

1/2" 1 3.80 9 35.15


Temperatura 1/4" 26 6.95 1 179.31

Temperatura 1/4" 26 7.00 1 180.60

Temperatura 1/4" 10 2.70 1 27.00


Temperatura 1/4" 15 1.95 1 28.86

LOSA ENTRE EJES 15-18 y K-M 1 6.65 6.70 44.56 1/2" 1 7.45 8 62.58
1 6.70 6.65 44.56 1/2" 1 7.30 8 61.32

1 1.65 6.65 10.97 3/8" 1 2.45 8 20.58


3/8" 1 1.90 8 15.96

3/8" 2 3.00 8 50.40


3/8" 1 3.60 8 30.24
3/8" 1 3.80 8 31.92

3/8" 1 7.45 8 61.46


3/8" 1 9.40 8 77.55

3/8" 1 4.95 8 40.84

3/8" 1 4.70 8 38.78


3/8" 1 1.90 8 15.68

3/8" 2 3.00 8 49.50


1/2" 1 3.60 8 29.70

3/8" 1 3.80 8 31.35


Temperatura 1/4" 27 6.95 1 186.26

Temperatura 1/4" 27 7.00 1 186.20


Temperatura 1/4" 27 1.95 1 51.87
LOSA ENTRE EJES 15-18 y M-N 1 6.70 6.45 43.22 1/2" 1 7.50 4 31.50

1 6.70 6.45 43.22 1/2" 1 7.30 4 30.66


1 1.65 1.80 2.97 3/8" 1 2.45 4 10.29

1 4.95 1.80 8.91 3/8" 1 1.90 4 7.98

3/8" 2 3.00 4 25.20


3/8" 1 3.60 4 15.12

3/8" 1 3.90 4 16.38


3/8" 1 7.50 8 61.88

3/8" 1 9.40 8 77.55


3/8" 1 5.30 8 43.73

3/8" 1 4.70 8 38.78


3/8" 2 1.90 8 31.35

3/8" 1 3.00 8 24.75


1/2" 1 3.60 8 29.70
1/2" 1 7.50 4 31.50

1/2" 1 7.50 4 31.50


3/8" 2 1.90 4 15.96

Página 155 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
3/8" 1 3.00 4 12.60

3/8" 1 3.60 4 15.12

Temperatura 1/4" 26 7.00 1 180.60


Temperatura 1/4" 26 7.00 1 180.60

Temperatura 1/4" 7 1.95 1 14.04


Temperatura 1/4" 7 5.25 1 37.80

LOSA ENTRE EJES 15-18 y N-Ñ 1 6.65 6.65 44.22 1/2" 1 7.45 8 62.58
1 6.75 6.70 45.23 1/2" 1 7.55 8 63.42

3/8" 2 1.90 8 31.92

3/8" 1 3.00 8 25.20


3/8" 1 3.60 8 30.24

3/8" 1 7.45 8 61.46


3/8" 1 7.55 8 62.29

3/8" 1 5.25 8 43.31

3/8" 1 5.35 8 44.14


3/8" 1 1.90 8 15.68

3/8" 1 3.00 8 24.75


1/2" 1 3.60 8 29.70

Temperatura 1/4" 27 6.95 1 184.87


Temperatura 1/4" 27 7.05 1 188.94

SENTIDO VERTICAL
LOSA ENTRE EJES D-I y 13-15 3/8" 1 7.45 8 62.58
1/2" 1 7.05 8 59.22

1/2" 1 7.35 8 61.74


3/8" 2 1.90 8 31.92

3/8" 2 3.00 8 50.40

3/8" 2 3.60 8 60.48


3/8" 1 7.45 8 61.46

3/8" 1 7.05 8 58.16


3/8" 1 7.35 8 60.64

3/8" 1 4.95 8 40.84


3/8" 1 4.45 8 36.71

3/8" 1 4.85 8 40.01


3/8" 1 1.90 8 15.68
3/8" 2 3.00 8 49.50

1/2" 2 3.60 8 59.40


1/2" 1 1.90 8 15.68

LOSA ENTRE EJES D-Ñ y 15-16 1/2" 1 7.45 8 62.58

1/2" 1 7.05 8 59.22


1/2" 1 7.15 8 60.06

1/2" 1 7.25 8 60.90


1/2" 1 7.05 8 59.22
1/2" 1 7.30 8 61.32
1/2" 1 7.05 8 59.22
1/2" 1 7.45 8 62.58
3/8" 2 1.90 8 31.92
3/8" 7 3.00 8 176.40
3/8" 7 3.60 8 211.68
3/8" 1 7.45 8 61.46

3/8" 1 7.05 8 58.16


3/8" 1 7.15 8 58.99

Página 156 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
3/8" 1 7.25 8 59.81

3/8" 1 7.05 8 58.16

3/8" 1 7.30 8 60.23


3/8" 1 7.05 8 58.16

3/8" 1 7.45 8 61.46


3/8" 1 4.95 8 40.84

3/8" 1 4.45 8 36.71


3/8" 1 4.55 8 37.54

3/8" 1 4.65 8 38.36

3/8" 1 4.45 8 36.71


3/8" 1 4.70 8 38.78

3/8" 1 4.45 8 36.71


3/8" 1 4.95 8 40.84

3/8" 2 1.90 8 31.35

3/8" 7 3.00 8 173.25


1/2" 7 3.60 8 207.90

LOSA ENTRE EJES D-I y 16-17 1/2" 1 7.50 8 63.00


1/2" 1 7.05 8 59.22

1/2" 1 7.35 8 61.74


3/8" 2 1.90 8 31.92

3/8" 2 3.00 8 50.40


3/8" 2 3.60 8 60.48
3/8" 1 7.50 8 61.88

3/8" 1 7.05 8 58.16


3/8" 1 7.35 8 60.64

3/8" 1 5.00 8 41.25

3/8" 1 4.45 8 36.71


3/8" 1 4.85 8 40.01

3/8" 2 1.90 8 31.35


3/8" 2 3.00 8 49.50

1/2" 2 3.60 8 59.40


LOSA ENTRE EJES J-Ñ y 16-17 3/8" 1 3.30 8 27.72

1/2" 1 7.05 8 59.22


1/2" 1 7.25 8 60.90
1/2" 1 7.05 8 59.22

1/2" 1 7.50 8 63.00


3/8" 1 1.90 8 15.96

3/8" 4 3.00 8 100.80

3/8" 3 3.60 8 90.72


3/8" 1 5.10 8 42.84

3/8" 1 3.30 8 27.23


3/8" 1 7.05 8 58.16

3/8" 1 7.25 8 59.81


3/8" 1 7.05 8 58.16

3/8" 1 7.50 8 61.88

3/8" 1 4.75 8 39.19


3/8" 1 4.65 8 38.36
3/8" 1 4.45 8 36.71
3/8" 1 5.00 8 41.25

1/2" 1 1.90 8 15.68

3/8" 4 3.00 8 99.00

Página 157 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
1/2" 3 3.60 8 89.10

1/2" 1 5.10 8 42.08

LOSA ENTRE EJES D-I y 17-18 1/2" 1 7.50 8 63.00


1/2" 1 7.05 8 59.22

1/2" 1 7.35 8 61.74


3/8" 2 1.90 8 31.92

3/8" 2 3.00 8 50.40


3/8" 2 3.60 8 60.48

3/8" 1 7.50 8 61.88

3/8" 1 7.05 8 58.16


3/8" 1 7.35 8 60.64

3/8" 1 5.00 8 41.25


3/8" 1 4.45 8 36.71

3/8" 1 4.85 8 40.01

3/8" 2 1.90 8 31.35


3/8" 2 3.00 8 49.50

SECTOR C3 1/2" 2 3.60 8 59.40


TERCER PISO

SENTIDO HORIZONTAL
LOSA ENTRE EJES 13-17 y G-H 1 6.60 6.55 43.23 1/2" 1 7.40 8 62.16

1 6.55 6.55 42.90 1/2" 1 7.15 8 60.06


1 6.80 6.55 44.54 1/2" 1 7.60 8 63.84
3/8" 2 1.90 8 31.92

3/8" 2 3.00 8 50.40


3/8" 2 3.60 8 60.48

3/8" 1 7.40 8 61.05

3/8" 1 7.15 8 58.99


3/8" 1 7.60 8 62.70

3/8" 1 4.90 8 40.43


3/8" 1 4.55 8 37.54

3/8" 1 5.10 8 42.08


1/2" 2 1.90 8 31.35

3/8" 2 3.00 8 49.50


1/2" 2 3.60 8 59.40
Temperatura 1/4" 26 6.90 1 180.78

Temperatura 1/4" 26 6.85 1 179.47


Temperatura 1/4" 26 7.10 1 186.02

LOSA ENTRE EJES 13-17 y H-I 1 6.60 6.55 43.23 1/2" 1 7.40 8 62.16

1 6.55 6.55 42.90 1/2" 1 7.15 8 60.06


1 6.80 6.55 44.54 1/2" 1 7.60 8 63.84

3/8" 2 1.90 8 31.92


3/8" 2 3.00 8 50.40

3/8" 2 3.60 8 60.48


3/8" 1 7.40 8 61.05

3/8" 1 7.15 8 58.99

3/8" 1 7.60 8 62.70


3/8" 1 4.90 8 40.43
3/8" 1 4.55 8 37.54
3/8" 1 5.10 8 42.08

1/2" 2 1.90 8 31.35

3/8" 2 3.00 8 49.50

Página 158 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
1/2" 2 3.60 8 59.40

Temperatura 1/4" 26 6.90 1 180.78

Temperatura 1/4" 26 6.85 1 179.47


Temperatura 1/4" 26 7.10 1 186.02

LOSA ENTRE EJES 15-18 y I-J 1 6.55 6.55 42.90 1/2" 1 7.55 8 63.42
1 2.40 2.55 6.12 3/8" 2 2.00 8 33.60

1 6.80 2.45 16.66


3/8" 1 7.55 8 62.29

3/8" 1 5.15 8 42.49

3/8" 2 1.90 8 31.35


3/8" 1 3.40 6 21.68

3/8" 1 3.60 6 22.95


Temperatura 1/4" 26 6.85 1 179.47

Temperatura 1/4" 10 2.70 1 27.54

Temperatura 1/4" 10 7.10 1 69.58


LOSA ENTRE EJES 15-18 y J-K 1 6.55 6.55 42.90 1/2" 1 7.35 8 61.74

1 6.80 6.55 44.54 1/2" 1 7.40 8 62.16


1 2.40 1.20 2.88 3/8" 1 3.20 8 26.88

1 1.80 5.05 9.09 3/8" 1 1.90 8 15.96


3/8" 2 3.00 8 50.40

3/8" 1 3.60 8 30.24


3/8" 1 4.65 8 39.06
3/8" 1 7.35 8 60.64

3/8" 1 9.55 8 78.79


3/8" 1 4.85 8 40.01

3/8" 1 5.10 8 42.08

3/8" 1 1.90 8 15.68


3/8" 1 3.00 8 24.75

1/2" 1 3.60 8 29.70


1/2" 1 3.90 8 32.18

Temperatura 1/4" 26 6.85 1 179.47


Temperatura 1/4" 26 7.10 1 186.02

Temperatura 1/4" 5 2.70 1 12.96


Temperatura 1/4" 20 2.10 1 42.42
LOSA ENTRE EJES 15-18 y K-M 1 6.55 6.70 43.89 1/2" 1 7.35 8 61.74

1 6.80 6.55 44.54 1/2" 1 7.40 8 62.16


1 1.80 6.55 11.79 3/8" 1 2.60 8 21.84

3/8" 1 1.90 8 15.96

3/8" 2 3.00 8 50.40


3/8" 1 3.60 8 30.24

3/8" 1 3.90 8 32.76


3/8" 1 7.35 8 60.64

3/8" 1 9.55 8 78.79


3/8" 1 4.85 8 40.01

3/8" 1 5.10 8 42.08

3/8" 1 1.90 8 15.68


3/8" 1 3.00 8 24.75
1/2" 1 3.60 8 29.70
1/2" 1 3.90 8 32.18

Temperatura 1/4" 27 6.85 1 183.58

Temperatura 1/4" 26 7.10 1 186.02

Página 159 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
Temperatura 1/4" 26 2.10 1 55.02

LOSA ENTRE EJES 15-18 y M-N 1 6.55 6.45 42.25 1/2" 1 7.35 8 61.74

1 6.80 6.55 44.54 1/2" 1 7.40 8 62.16


1 1.80 6.55 11.79 3/8" 1 2.60 8 21.84

3/8" 1 1.90 8 15.96


3/8" 2 3.00 8 50.40
3/8" 1 3.60 8 30.24
3/8" 1 3.90 8 32.76
3/8" 1 7.35 8 60.64
3/8" 1 9.55 8 78.79
3/8" 1 4.85 8 40.01

3/8" 1 5.10 8 42.08


3/8" 1 1.90 8 15.68

3/8" 1 3.00 8 24.75


1/2" 1 3.60 8 29.70

1/2" 1 3.90 8 32.18


Temperatura 1/4" 26 6.85 1 176.73

Temperatura 1/4" 26 7.10 1 186.02

Temperatura 1/4" 26 2.10 1 55.02


LOSA ENTRE EJES 15-18 y N-Ñ 1 6.55 6.65 43.56 1/2" 1 7.35 8 61.74
1 6.80 6.70 45.56 1/2" 1 7.40 8 62.16
1 1.80 6.70 12.06 3/8" 1 2.60 8 21.84
3/8" 1 1.90 8 15.96

3/8" 2 3.00 8 50.40


3/8" 1 3.60 8 30.24

3/8" 1 3.90 8 32.76


3/8" 1 7.35 8 60.64
3/8" 1 9.55 8 78.79

3/8" 1 4.85 8 40.01


3/8" 1 5.10 8 42.08

3/8" 1 1.90 8 15.68


3/8" 1 3.00 8 24.75

1/2" 1 3.60 8 29.70


1/2" 1 3.90 8 32.18

Temperatura 1/4" 27 6.85 1 182.21

Temperatura 1/4" 27 7.10 1 190.28


Temperatura 1/4" 27 2.10 1 56.28

SENTIDO VERTICAL
LOSA ENTRE EJES G-I y 13-15 1/2" 1 7.35 8 61.74

1/2" 1 7.35 8 61.74

3/8" 2 1.90 8 31.92


3/8" 1 3.00 8 25.20

3/8" 1 3.60 8 30.24


3/8" 1 7.35 8 60.64

3/8" 1 7.35 8 60.64


3/8" 1 4.85 8 40.01

3/8" 1 4.55 8 37.54


3/8" 2 1.90 8 31.35
3/8" 1 3.00 8 24.75

1/2" 1 3.60 8 29.70


LOSA ENTRE EJES G-Ñ y 15-16 1/2" 1 7.35 8 61.74

Página 160 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
1/2" 1 7.15 8 60.06

1/2" 1 7.15 8 60.06

1/2" 1 7.15 8 60.06


1/2" 1 7.30 8 61.32
1/2" 1 7.05 8 59.22
1/2" 1 7.45 8 62.58
3/8" 2 1.90 8 31.92

3/8" 6 3.00 8 151.20


3/8" 6 3.60 8 181.44

3/8" 1 7.35 8 60.64


3/8" 1 7.15 8 58.99
3/8" 1 7.15 8 58.99
3/8" 1 7.15 8 58.99
3/8" 1 7.30 8 60.23

3/8" 1 7.05 8 58.16


3/8" 1 7.45 8 61.46

3/8" 1 4.85 8 40.01


3/8" 1 4.55 8 37.54

3/8" 1 4.55 8 37.54


3/8" 1 4.55 8 37.54

3/8" 1 4.70 8 38.78

3/8" 1 4.45 8 36.71


3/8" 1 4.95 8 40.84

3/8" 2 1.90 8 31.35


3/8" 6 3.00 8 148.50
1/2" 6 3.60 8 178.20

LOSA ENTRE EJES G-I y 16-17 1/2" 1 7.35 8 61.74


1/2" 1 7.35 8 61.74

3/8" 2 1.90 8 31.92


3/8" 1 3.00 8 25.20

3/8" 1 3.60 8 30.24


3/8" 1 7.35 8 60.64

3/8" 1 7.35 8 60.64

3/8" 1 4.85 8 40.01


3/8" 1 4.55 8 37.54

3/8" 2 1.90 8 31.35


3/8" 1 3.00 8 24.75

1/2" 1 3.60 8 29.70

LOSA ENTRE EJES J-Ñ y 16-17 3/8" 1 3.25 8 27.30


1/2" 1 7.15 8 60.06

1/2" 1 7.15 8 60.06


1/2" 1 7.15 8 60.06

1/2" 1 7.50 8 63.00

3/8" 1 1.90 8 15.96


3/8" 4 3.00 8 100.80

3/8" 3 3.60 8 90.72


3/8" 1 5.00 8 42.00

3/8" 1 3.25 8 26.81


3/8" 1 7.15 8 58.99

3/8" 1 7.15 8 58.99

3/8" 1 7.15 8 58.99

Página 161 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
3/8" 1 7.50 8 61.88

3/8" 1 4.85 8 40.01

3/8" 1 4.55 8 37.54


3/8" 1 4.55 8 37.54

3/8" 1 5.00 8 41.25


1/2" 1 1.90 8 15.68

3/8" 4 3.00 8 99.00


1/2" 3 3.60 8 89.10

SECTOR C3 1/2" 1 5.00 8 41.25

CUARTO PISO
SENTIDO HORIZONTAL

LOSA ENTRE EJES 13-17 y G-H 1 6.60 6.55 43.23 1/2" 1 7.40 8 62.16
1 6.55 6.55 42.90 1/2" 1 7.15 8 60.06

1 6.80 6.55 44.54 1/2" 1 7.60 8 63.84

3/8" 2 1.90 8 31.92


3/8" 2 3.00 8 50.40

3/8" 2 3.60 8 60.48


3/8" 1 7.40 8 61.05

3/8" 1 7.15 8 58.99


3/8" 1 7.60 8 62.70

3/8" 1 4.90 8 40.43


3/8" 1 4.55 8 37.54
3/8" 1 5.10 8 42.08

1/2" 2 1.90 8 31.35


3/8" 2 3.00 8 49.50

1/2" 2 3.60 8 59.40

Temperatura 1/4" 26 6.90 1 180.78


Temperatura 1/4" 26 6.85 1 179.47

Temperatura 1/4" 26 7.10 1 186.02


LOSA ENTRE EJES 13-17 y H-I 1 6.60 6.55 43.23 1/2" 1 7.40 8 62.16

1 6.55 6.55 42.90 1/2" 1 7.15 8 60.06


1 6.80 6.55 44.54 1/2" 1 7.60 8 63.84

3/8" 2 1.90 8 31.92


3/8" 2 3.00 8 50.40
3/8" 2 3.60 8 60.48

3/8" 1 7.40 8 61.05


3/8" 1 7.15 8 58.99

3/8" 1 7.60 8 62.70

3/8" 1 4.90 8 40.43


3/8" 1 4.55 8 37.54

3/8" 1 5.10 8 42.08


1/2" 2 1.90 8 31.35

3/8" 2 3.00 8 49.50


1/2" 2 3.60 8 59.40

Temperatura 1/4" 26 6.90 1 180.78

Temperatura 1/4" 26 6.85 1 179.47


Temperatura 1/4" 26 7.10 1 186.02
LOSA ENTRE EJES 15-18 y I-J 1 6.55 6.55 42.90 1/2" 1 7.55 8 63.42
1 2.40 2.55 6.12 3/8" 2 2.00 8 33.60

1 6.80 2.45 16.66

3/8" 1 7.55 8 62.29

Página 162 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
3/8" 1 5.15 8 42.49

3/8" 2 1.90 8 31.35

3/8" 1 3.40 6 21.68


3/8" 1 3.60 6 22.95

Temperatura 1/4" 26 6.85 1 179.47


Temperatura 1/4" 10 2.70 1 27.54

Temperatura 1/4" 10 7.10 1 69.58


LOSA ENTRE EJES 15-18 y J-K 1 6.55 6.55 42.90 1/2" 1 7.35 8 61.74

1 6.80 6.55 44.54 1/2" 1 8.80 8 73.92

1 1.05 6.55 6.88 3/8" 1 1.90 8 15.96


3/8" 1 3.00 8 25.20

1/2" 1 3.60 8 30.24


1/2" 1 3.55 8 29.82

1/2" 1 7.35 8 60.64

1/2" 1 7.40 8 61.05


3/8" 1 1.90 8 15.68

3/8" 2 3.00 8 49.50


1/2" 1 3.60 8 29.70

3/8" 1 3.35 8 27.64


Temperatura 1/4" 26 6.85 1 179.47

Temperatura 1/4" 26 7.10 1 186.02


Temperatura 1/4" 26 1.35 1 35.37
LOSA ENTRE EJES 15-18 y K-M 1 6.55 6.70 43.89 1/2" 1 7.35 8 61.74

1 6.80 6.55 44.54 1/2" 1 8.80 8 73.92


1 1.05 6.55 6.88 3/8" 1 1.90 8 15.96

3/8" 1 3.00 8 25.20

1/2" 1 3.60 8 30.24


1/2" 1 3.55 8 29.82

1/2" 1 7.35 8 60.64


1/2" 1 7.40 8 61.05

3/8" 1 1.90 8 15.68


3/8" 2 3.00 8 49.50

1/2" 1 3.60 8 29.70


3/8" 1 3.35 8 27.64
Temperatura 1/4" 27 6.85 1 183.58

Temperatura 1/4" 26 7.10 1 186.02


Temperatura 1/4" 26 1.35 1 35.37

LOSA ENTRE EJES 15-18 y M-N 1 6.55 6.45 42.25 1/2" 1 7.35 8 61.74

1 6.80 6.55 44.54 1/2" 1 8.80 8 73.92


1 1.05 6.55 6.88 3/8" 1 1.90 8 15.96

3/8" 1 3.00 8 25.20


1/2" 1 3.60 8 30.24
1/2" 1 3.55 8 29.82
1/2" 1 7.35 8 60.64

1/2" 1 7.40 8 61.05


3/8" 1 1.90 8 15.68

3/8" 2 3.00 8 49.50


1/2" 1 3.60 8 29.70
3/8" 1 3.35 8 27.64

Temperatura 1/4" 26 6.85 1 176.73


Temperatura 1/4" 26 7.10 1 186.02

Página 163 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
Temperatura 1/4" 26 1.35 1 35.37

LOSA ENTRE EJES 15-18 y N-Ñ 1 6.55 6.65 43.56 1/2" 1 7.35 8 61.74

1 6.80 6.70 45.56 1/2" 1 8.80 8 73.92


1 1.05 6.70 7.04 3/8" 1 1.90 8 15.96

3/8" 1 3.00 8 25.20


1/2" 1 3.60 8 30.24

1/2" 1 3.55 8 29.82


1/2" 1 7.35 8 60.64

1/2" 1 7.40 8 61.05

3/8" 1 1.90 8 15.68


3/8" 2 3.00 8 49.50

1/2" 1 3.60 8 29.70


3/8" 1 3.35 8 27.64

Temperatura 1/4" 27 6.85 1 182.21

Temperatura 1/4" 27 7.10 1 190.28


Temperatura 1/4" 27 1.35 1 36.18

SENTIDO VERTICAL
LOSA ENTRE EJES G-I y 13-15 1/2" 1 7.35 8 61.74

1/2" 1 7.35 8 61.74


3/8" 2 1.90 8 31.92

3/8" 1 3.00 8 25.20


3/8" 1 3.60 8 30.24
3/8" 1 7.35 8 60.64

3/8" 1 7.35 8 60.64


3/8" 1 4.85 8 40.01

3/8" 1 4.55 8 37.54

3/8" 2 1.90 8 31.35


3/8" 1 3.00 8 24.75

1/2" 1 3.60 8 29.70


LOSA ENTRE EJES G-Ñ y 15-16 1/2" 1 7.35 8 61.74

1/2" 1 7.15 8 60.06


1/2" 1 7.15 8 60.06

1/2" 1 7.15 8 60.06


1/2" 1 7.30 8 61.32
1/2" 1 7.05 8 59.22
1/2" 1 7.45 8 62.58
3/8" 2 1.90 8 31.92
3/8" 6 3.00 8 151.20
3/8" 6 3.60 8 181.44
3/8" 1 7.35 8 60.64

3/8" 1 7.15 8 58.99


3/8" 1 7.15 8 58.99

3/8" 1 7.15 8 58.99

3/8" 1 7.30 8 60.23


3/8" 1 7.05 8 58.16

3/8" 1 7.45 8 61.46


3/8" 1 4.85 8 40.01

3/8" 1 4.55 8 37.54


3/8" 1 4.55 8 37.54

3/8" 1 4.55 8 37.54

3/8" 1 4.70 8 38.78

Página 164 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
3/8" 1 4.45 8 36.71

3/8" 1 4.95 8 40.84

3/8" 2 1.90 8 31.35


3/8" 6 3.00 8 148.50

1/2" 6 3.60 8 178.20


LOSA ENTRE EJES G-I y 16-17 1/2" 1 7.35 8 61.74

1/2" 1 7.35 8 61.74


3/8" 2 1.90 8 31.92

3/8" 1 3.00 8 25.20

3/8" 1 3.60 8 30.24


3/8" 1 7.35 8 60.64

3/8" 1 7.35 8 60.64


3/8" 1 4.85 8 40.01

3/8" 1 4.55 8 37.54

3/8" 2 1.90 8 31.35


3/8" 1 3.00 8 24.75

1/2" 1 3.60 8 29.70


LOSA ENTRE EJES J-Ñ y 16-17 3/8" 1 3.25 8 27.30

1/2" 1 7.15 8 60.06


1/2" 1 7.15 8 60.06

1/2" 1 7.15 8 60.06


1/2" 1 7.50 8 63.00
3/8" 1 1.90 8 15.96

3/8" 4 3.00 8 100.80


3/8" 3 3.60 8 90.72

3/8" 1 5.00 8 42.00

3/8" 1 3.25 8 26.81


3/8" 1 7.15 8 58.99

3/8" 1 7.15 8 58.99


3/8" 1 7.15 8 58.99

3/8" 1 7.50 8 61.88


3/8" 1 4.85 8 40.01

3/8" 1 4.55 8 37.54


3/8" 1 4.55 8 37.54
3/8" 1 5.00 8 41.25

1/2" 1 1.90 8 15.68


3/8" 4 3.00 8 99.00

1/2" 3 3.60 8 89.10

SECTOR C3 1/2" 1 5.00 8 41.25


QUINTO PISO

SENTIDO VERTICAL
LOSA ENTRE EJES 13-15 y H-I 1 6.60 2.45 16.17 3/8" 1 3.55 17 58.58

3/8" 1 3.45 17 56.93


Temperatura 1/4" 10 6.90 1 67.62

LOSA ENTRE EJES 15-16 y H-J 1 6.60 2.45 16.17 3/8" 1 7.45 17 122.93

1 6.60 3.80 25.08 3/8" 1 1.30 17 21.45


3/8" 1 1.70 17 28.05
3/8" 1 4.35 17 71.78
Temperatura 1/4" 10 6.90 1 67.62

Temperatura 1/4" 15 6.90 1 104.88

LOSA ENTRE EJES 16-17 y H-J 1 2.90 2.45 7.11 3/8" 1 7.45 7 54.01

Página 165 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
1 2.90 3.80 11.02 3/8" 1 1.30 7 9.43

3/8" 1 1.70 7 12.33

3/8" 1 4.35 7 31.54


Temperatura 1/4" 10 3.20 1 31.36

Temperatura 1/4" 15 3.20 1 48.64


LOSA ENTRE EJES 16-17 y H-I 1 3.70 2.45 9.07 3/8" 1 3.55 9 32.84

3/8" 1 3.45 9 31.91


Temperatura 1/4" 10 4.00 1 39.20

LOSA ENTRE EJES 17-18 y H-I 1 2.40 2.45 5.88 3/8" 1 3.55 6 21.30

3/8" 1 3.45 6 20.70


Temperatura 1/4" 10 2.70 1 26.46

SECTOR E
SOTANO

SENTIDO HORIZONTAL

LOSA ENTRE EJES 20-29 y L-M 1 6.45 6.20 39.99 1/2" 1 7.25 8 56.19
1 6.80 6.20 42.16 1/2" 1 7.40 8 57.35

1 6.70 6.30 42.21 1/2" 1 7.30 8 56.58


1 6.60 6.20 40.92 1/2" 1 7.40 8 57.35

1 1.60 3.90 6.24 3/8" 2 1.90 8 29.45


1 1.60 2.00 3.20 3/8" 3 3.00 8 69.75

3/8" 2 3.60 8 55.80


1/2" 1 3.60 8 27.90

3/8" 1 7.25 8 56.19


3/8" 1 7.40 8 57.35

3/8" 1 7.30 8 56.58

3/8" 1 7.40 8 57.35


3/8" 1 4.75 8 36.81

3/8" 1 4.80 8 37.20


3/8" 1 4.70 8 36.43

3/8" 1 4.90 8 37.98


3/8" 2 1.90 8 29.45

3/8" 1 3.00 8 23.25


1/2" 2 3.00 8 46.50
1/2" 3 3.60 8 83.70

3/8" 1 2.60 15 38.35


3/8" 1 2.60 15 38.35

Temperatura 1/4" 25 6.75 1 167.40

Temperatura 1/4" 25 7.10 1 176.08


Temperatura 1/4" 25 7.00 1 176.40

Temperatura 1/4" 25 6.90 1 171.12


Temperatura 1/4" 16 1.90 1 29.64

Temperatura 1/4" 8 1.90 1 15.20


LOSA ENTRE EJES 20-29 y L-M 1 6.50 6.55 42.58 1/2" 1 7.30 8 59.86

1 6.80 6.55 44.54 1/2" 1 7.40 8 60.68

1 6.70 6.55 43.89 1/2" 1 7.30 8 59.86


1 6.60 6.55 43.23 3/8" 1 7.20 8 59.04
1 6.80 6.75 45.90 1/2" 1 7.40 8 60.68
1 1.60 6.65 10.64 3/8" 1 2.40 8 19.68

1/2" 1 1.90 8 15.58

3/8" 4 3.00 8 98.40

Página 166 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
3/8" 4 3.60 8 118.08

3/8" 1 4.10 8 33.62

3/8" 1 7.30 8 59.86


3/8" 1 7.40 8 60.68

3/8" 1 7.30 8 59.86


3/8" 1 7.20 8 59.04

3/8" 1 9.50 8 77.90


3/8" 1 4.80 8 39.36

3/8" 1 4.80 8 39.36

3/8" 1 4.70 8 38.54


3/8" 1 4.60 8 37.72

3/8" 1 5.10 8 41.82


1/2" 1 1.90 8 15.58

1/2" 3 3.00 8 73.80

3/8" 1 3.00 8 24.60


3/8" 1 2.50 8 20.50

1/2" 4 3.60 8 118.08


1/2" 1 4.10 8 33.62

Temperatura 1/4" 26 6.80 1 178.16


Temperatura 1/4" 26 7.10 1 186.02

Temperatura 1/4" 26 7.00 1 183.40


Temperatura 1/4" 26 6.90 1 180.78
Temperatura 1/4" 27 7.10 1 191.70

Temperatura 1/4" 27 1.90 1 50.54


SENTIDO VERTICAL

LOSA ENTRE EJES L-N y 20-23 1 6.50 1.55 10.08 1/2" 1 7.00 8 57.75

1/2" 1 7.15 8 58.99


3/8" 1 2.35 8 19.39

3/8" 1 1.90 8 15.68


3/8" 1 3.00 8 24.75

3/8" 1 3.60 8 29.70


1/2" 1 4.19 8 34.57

3/8" 1 7.00 8 56.88


3/8" 1 9.20 8 74.75
3/8" 1 4.50 8 36.56

3/8" 1 4.55 8 36.97


3/8" 1 1.90 8 15.44

3/8" 1 3.00 8 24.38

3/8" 1 2.45 8 19.91


1/2" 1 3.60 8 29.25

1/2" 1 4.00 8 32.50


Temperatura 1/4" 6 6.80 1 42.16

LOSA ENTRE EJES L-N y 23-24 1 6.80 1.55 10.54 1/2" 1 7.00 8 57.75
1/2" 1 7.15 8 58.99

3/8" 1 2.35 8 19.39

3/8" 1 1.90 8 15.68


3/8" 1 3.00 8 24.75
3/8" 1 3.60 8 29.70
1/2" 1 4.19 8 34.57

3/8" 1 7.00 8 56.88

3/8" 1 9.20 8 74.75

Página 167 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
3/8" 1 4.50 8 36.56

3/8" 1 4.55 8 36.97

3/8" 1 1.90 8 15.44


3/8" 1 3.00 8 24.38

3/8" 1 2.45 8 19.91


1/2" 1 3.60 8 29.25

1/2" 1 4.00 8 32.50


Temperatura 1/4" 6 7.10 1 44.02

LOSA ENTRE EJES L-N y 24-25 1 6.70 1.55 10.39 1/2" 1 7.00 8 57.75

1/2" 1 7.15 8 58.99


3/8" 1 2.35 8 19.39

3/8" 1 1.90 8 15.68


3/8" 1 3.00 8 24.75

3/8" 1 3.60 8 29.70

1/2" 1 4.19 8 34.57


3/8" 1 7.00 8 56.88

3/8" 1 9.20 8 74.75


3/8" 1 4.50 8 36.56

3/8" 1 4.55 8 36.97


3/8" 1 1.90 8 15.44

3/8" 1 3.00 8 24.38


3/8" 1 2.45 8 19.91
1/2" 1 3.60 8 29.25

1/2" 1 4.00 8 32.50


Temperatura 1/4" 6 7.00 1 43.40

LOSA ENTRE EJES L-N y 25-26 1 6.60 1.55 10.23 1/2" 1 7.00 8 57.75

1/2" 1 7.15 8 58.99


3/8" 1 2.35 8 19.39

3/8" 1 1.90 8 15.68


3/8" 1 3.00 8 24.75

3/8" 1 3.60 8 29.70


1/2" 1 4.19 8 34.57

3/8" 1 7.00 8 56.88


3/8" 1 9.20 8 74.75
3/8" 1 4.50 8 36.56

3/8" 1 4.55 8 36.97


3/8" 1 1.90 8 15.44

3/8" 1 3.00 8 24.38

3/8" 1 2.45 8 19.91


1/2" 1 3.60 8 29.25

1/2" 1 4.00 8 32.50


Temperatura 1/4" 6 6.90 1 42.78

LOSA ENTRE EJES M-N y 26-28 1 6.80 1.55 10.54 1/2" 1 7.35 8 60.64
3/8" 1 2.35 8 19.39

3/8" 1 1.90 8 15.68

1/2" 1 4.19 8 34.57


3/8" 1 7.35 8 59.72
3/8" 1 2.35 8 19.09
3/8" 1 4.85 8 39.41

1/2" 1 1.90 8 15.44

3/8" 1 2.45 8 19.91

Página 168 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
1/2" 1 4.19 8 34.04

Temperatura 1/4" 6 7.10 1 44.02

PRIMER PISO
SENTIDO HORIZONTAL

LOSA ENTRE EJES 20-29 y L-M 1 6.45 6.20 39.99 1/2" 1 7.25 8 56.19
1 6.80 6.20 42.16 1/2" 1 7.40 8 57.35

1 6.70 6.30 42.21 1/2" 1 7.30 8 56.58


1 6.60 6.20 40.92 1/2" 1 7.40 8 57.35

3/8" 2 1.90 8 29.45

3/8" 3 3.00 8 69.75


3/8" 2 3.60 8 55.80

1/2" 1 3.60 8 27.90


3/8" 1 7.25 8 56.19

3/8" 1 7.40 8 57.35

3/8" 1 7.30 8 56.58


3/8" 1 7.40 8 57.35

3/8" 1 4.75 8 36.81


3/8" 1 4.80 8 37.20

3/8" 1 4.70 8 36.43


3/8" 1 4.90 8 37.98

3/8" 2 1.90 8 29.45


3/8" 1 3.00 8 23.25
1/2" 2 3.00 8 46.50

1/2" 3 3.60 8 83.70


Temperatura 1/4" 25 6.75 1 167.40

Temperatura 1/4" 25 7.10 1 176.08

Temperatura 1/4" 25 7.00 1 176.40


Temperatura 1/4" 25 6.90 1 171.12

LOSA ENTRE EJES 20-29 y L-M 1 6.50 6.55 42.58 1/2" 1 7.30 8 59.86
1 6.80 6.55 44.54 1/2" 1 7.40 8 60.68

1 6.70 6.55 43.89 1/2" 1 7.30 8 59.86


1 6.60 6.55 43.23 1/2" 1 7.20 8 59.04

1 6.80 6.75 45.90 1/2" 1 7.40 8 60.68


3/8" 2 1.90 8 31.16
3/8" 4 3.00 8 98.40

3/8" 4 3.60 8 118.08


3/8" 1 7.30 8 59.86

3/8" 1 7.40 8 60.68

3/8" 1 7.30 8 59.86


3/8" 1 7.20 8 59.04

3/8" 1 7.60 8 62.32


3/8" 1 4.80 8 39.36

3/8" 1 4.80 8 39.36


3/8" 1 4.70 8 38.54

3/8" 1 4.60 8 37.72

3/8" 1 5.10 8 41.82


1/2" 2 1.90 8 31.16
1/2" 3 3.00 8 73.80
3/8" 1 3.00 8 24.60

3/8" 1 3.60 8 29.52

1/2" 3 3.60 8 88.56

Página 169 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
Temperatura 1/4" 26 6.80 1 178.16

Temperatura 1/4" 26 7.10 1 186.02

Temperatura 1/4" 26 7.00 1 183.40


Temperatura 1/4" 26 6.90 1 180.78

Temperatura 1/4" 27 7.10 1 191.70


SENTIDO VERTICAL

LOSA ENTRE EJES L-N y 20-23 1 6.50 1.55 10.08 1/2" 1 7.00 8 57.75
1/2" 1 7.15 8 58.99

3/8" 1 2.35 8 19.39

3/8" 1 1.90 8 15.68


3/8" 1 3.00 8 24.75

1/2" 1 3.60 8 29.70


1/2" 1 4.19 8 34.57

3/8" 1 7.00 8 56.88

3/8" 1 9.20 8 74.75


3/8" 1 4.50 8 36.56

3/8" 1 4.55 8 36.97


3/8" 1 1.90 8 15.44

1/2" 1 3.00 8 24.38


3/8" 1 2.45 8 19.91

1/2" 1 3.60 8 29.25


1/2" 1 4.00 8 32.50
Temperatura 1/4" 6 6.80 1 42.16

LOSA ENTRE EJES L-N y 23-24 1 6.80 1.55 10.54 1/2" 1 7.00 8 57.75
1/2" 1 7.15 8 58.99

3/8" 1 2.35 8 19.39

3/8" 1 1.90 8 15.68


3/8" 1 3.00 8 24.75

1/2" 1 3.60 8 29.70


1/2" 1 4.19 8 34.57

3/8" 1 7.00 8 56.88


3/8" 1 9.20 8 74.75

3/8" 1 4.50 8 36.56


3/8" 1 4.55 8 36.97
3/8" 1 1.90 8 15.44

3/8" 1 3.00 8 24.38


3/8" 1 2.45 8 19.91

1/2" 1 3.60 8 29.25

1/2" 1 4.00 8 32.50


Temperatura 1/4" 6 7.10 1 44.02

LOSA ENTRE EJES L-N y 24-25 1 6.70 1.55 10.39 1/2" 1 7.00 8 57.75
1/2" 1 7.15 8 58.99

3/8" 1 2.35 8 19.39


3/8" 1 1.90 8 15.68

3/8" 1 3.00 8 24.75

1/2" 1 3.60 8 29.70


1/2" 1 4.19 8 34.57
3/8" 1 7.00 8 56.88
3/8" 1 9.20 8 74.75

3/8" 1 4.50 8 36.56

3/8" 1 4.55 8 36.97

Página 170 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
3/8" 1 1.90 8 15.44

3/8" 1 3.00 8 24.38

3/8" 1 2.45 8 19.91


1/2" 1 3.60 8 29.25

1/2" 1 4.00 8 32.50


Temperatura 1/4" 6 7.00 1 43.40

LOSA ENTRE EJES L-N y 25-26 1 6.60 1.55 10.23 1/2" 1 7.00 8 57.75
1/2" 1 7.15 8 58.99

3/8" 1 2.35 8 19.39

3/8" 1 1.90 8 15.68


3/8" 1 3.00 8 24.75

3/8" 1 3.60 8 29.70


1/2" 1 4.19 8 34.57

3/8" 1 7.00 8 56.88

3/8" 1 9.20 8 74.75


3/8" 1 4.50 8 36.56

3/8" 1 4.55 8 36.97


3/8" 1 1.90 8 15.44

3/8" 1 3.00 8 24.38


3/8" 1 2.45 8 19.91

1/2" 1 3.60 8 29.25


1/2" 1 4.00 8 32.50
Temperatura 1/4" 6 6.90 1 42.78

LOSA ENTRE EJES M-N y 26-28 1 6.80 1.55 10.54 1/2" 1 7.35 8 60.64
3/8" 1 2.35 8 19.39

3/8" 1 1.90 8 15.68

1/2" 1 4.19 8 34.57


3/8" 1 7.35 8 59.72

3/8" 1 2.35 8 19.09


3/8" 1 4.85 8 39.41

1/2" 1 1.90 8 15.44


3/8" 1 2.45 8 19.91

1/2" 1 4.19 8 34.04


Temperatura 1/4" 6 7.10 1 44.02
SEGUNDO PISO

SENTIDO HORIZONTAL
LOSA ENTRE EJES 20-29 y L-M 1 6.45 6.20 39.99 1/2" 1 7.25 8 56.19

1 6.80 6.20 42.16 1/2" 1 7.40 8 57.35

1 6.70 6.30 42.21 1/2" 1 7.30 8 56.58


1 6.60 6.20 40.92 1/2" 1 7.40 8 57.35

3/8" 2 1.90 8 29.45


3/8" 3 3.00 8 69.75

3/8" 2 3.60 8 55.80


1/2" 1 3.60 8 27.90

3/8" 1 7.25 8 56.19

3/8" 1 7.40 8 57.35


3/8" 1 7.30 8 56.58
3/8" 1 7.40 8 57.35
3/8" 1 4.75 8 36.81

3/8" 1 4.80 8 37.20

3/8" 1 4.70 8 36.43

Página 171 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
3/8" 1 4.90 8 37.98

3/8" 2 1.90 8 29.45

3/8" 1 3.00 8 23.25


1/2" 2 3.00 8 46.50

1/2" 3 3.60 8 83.70


Temperatura 1/4" 25 6.75 1 167.40

Temperatura 1/4" 25 7.10 1 176.08


Temperatura 1/4" 25 7.00 1 176.40

Temperatura 1/4" 25 6.90 1 171.12

LOSA ENTRE EJES 20-29 y L-M 1 6.50 6.55 42.58 1/2" 1 7.30 8 59.86
1 6.80 6.55 44.54 1/2" 1 7.40 8 60.68

1 6.70 6.55 43.89 1/2" 1 7.30 8 59.86


1 6.60 6.55 43.23 1/2" 1 7.20 8 59.04

1 6.80 6.75 45.90 1/2" 1 7.40 8 60.68

3/8" 2 1.90 8 31.16


3/8" 4 3.00 8 98.40

3/8" 4 3.60 8 118.08


3/8" 1 7.30 8 59.86

3/8" 1 7.40 8 60.68


3/8" 1 7.30 8 59.86

3/8" 1 7.20 8 59.04


3/8" 1 7.60 8 62.32
3/8" 1 4.80 8 39.36

3/8" 1 4.80 8 39.36


3/8" 1 4.70 8 38.54

3/8" 1 4.60 8 37.72

3/8" 1 5.10 8 41.82


1/2" 2 1.90 8 31.16

1/2" 3 3.00 8 73.80


3/8" 1 3.00 8 24.60

3/8" 1 3.60 8 29.52


1/2" 3 3.60 8 88.56

Temperatura 1/4" 26 6.80 1 178.16


Temperatura 1/4" 26 7.10 1 186.02
Temperatura 1/4" 26 7.00 1 183.40

Temperatura 1/4" 26 6.90 1 180.78


SENTIDO VERTICAL

LOSA ENTRE EJES L-N y 20-23 1 6.50 1.55 10.08 1/2" 1 7.00 8 57.75

1/2" 1 7.15 8 58.99


3/8" 1 2.35 8 19.39

3/8" 1 1.90 8 15.68


3/8" 1 3.00 8 24.75

1/2" 1 3.60 8 29.70


1/2" 1 4.19 8 34.57

3/8" 1 7.00 8 56.88

3/8" 1 9.20 8 74.75


3/8" 1 4.50 8 36.56
3/8" 1 4.55 8 36.97
3/8" 1 1.90 8 15.44

1/2" 1 3.00 8 24.38

3/8" 1 2.45 8 19.91

Página 172 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
1/2" 1 3.60 8 29.25

1/2" 1 4.00 8 32.50

Temperatura 1/4" 6 6.80 1 42.16


LOSA ENTRE EJES L-N y 23-24 1 6.80 1.55 10.54 1/2" 1 7.00 8 57.75

1/2" 1 7.15 8 58.99


3/8" 1 2.35 8 19.39

3/8" 1 1.90 8 15.68


3/8" 1 3.00 8 24.75

1/2" 1 3.60 8 29.70

1/2" 1 4.19 8 34.57


3/8" 1 7.00 8 56.88

3/8" 1 9.20 8 74.75


3/8" 1 4.50 8 36.56

3/8" 1 4.55 8 36.97

3/8" 1 1.90 8 15.44


3/8" 1 3.00 8 24.38

3/8" 1 2.45 8 19.91


1/2" 1 3.60 8 29.25

1/2" 1 4.00 8 32.50


Temperatura 1/4" 6 7.10 1 44.02

LOSA ENTRE EJES L-N y 24-25 1 6.70 1.55 10.39 1/2" 1 7.00 8 57.75
1/2" 1 7.15 8 58.99
3/8" 1 2.35 8 19.39

3/8" 1 1.90 8 15.68


3/8" 1 3.00 8 24.75

1/2" 1 3.60 8 29.70

1/2" 1 4.19 8 34.57


3/8" 1 7.00 8 56.88

3/8" 1 9.20 8 74.75


3/8" 1 4.50 8 36.56

3/8" 1 4.55 8 36.97


3/8" 1 1.90 8 15.44

3/8" 1 3.00 8 24.38


3/8" 1 2.45 8 19.91
1/2" 1 3.60 8 29.25

1/2" 1 4.00 8 32.50


Temperatura 1/4" 6 7.00 1 43.40

LOSA ENTRE EJES L-N y 25-26 1 6.60 1.55 10.23 1/2" 1 7.00 8 57.75

1/2" 1 7.15 8 58.99


3/8" 1 2.35 8 19.39

3/8" 1 1.90 8 15.68


3/8" 1 3.00 8 24.75

3/8" 1 3.60 8 29.70


1/2" 1 4.19 8 34.57

3/8" 1 7.00 8 56.88


3/8" 1 9.20 8 74.75
3/8" 1 4.50 8 36.56
3/8" 1 4.55 8 36.97

3/8" 1 1.90 8 15.44

3/8" 1 3.00 8 24.38

Página 173 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
3/8" 1 2.45 8 19.91

1/2" 1 3.60 8 29.25

1/2" 1 4.00 8 32.50


Temperatura 1/4" 6 6.90 1 42.78

LOSA ENTRE EJES M-N y 26-28 1 6.80 1.55 10.54 1/2" 1 7.35 8 60.64
3/8" 1 2.35 8 19.39

3/8" 1 1.90 8 15.68


1/2" 1 4.19 8 34.57

3/8" 1 7.35 8 59.72

3/8" 1 2.35 8 19.09


3/8" 1 4.85 8 39.41

1/2" 1 1.90 8 15.44


3/8" 1 2.45 8 19.91

1/2" 1 4.19 8 34.04

Temperatura 1/4" 6 7.10 1 44.02


TERCER PISO

SENTIDO HORIZONTAL
LOSA ENTRE EJES 20-29 y L-M 1 6.45 6.20 39.99 1/2" 1 7.25 8 56.19

1 6.80 6.20 42.16 1/2" 1 7.40 8 57.35


1 6.70 6.30 42.21 1/2" 1 7.30 8 56.58

1 6.60 6.20 40.92 1/2" 1 7.40 8 57.35


3/8" 2 1.90 8 29.45
3/8" 1 3.60 8 27.90

1/2" 2 3.60 8 55.80


1/2" 1 7.25 8 56.19

1/2" 1 7.40 8 57.35

1/2" 1 7.30 8 56.58


1/2" 1 7.40 8 57.35

1/2" 1 1.90 8 14.73


3/8" 1 1.90 8 14.73

3/8" 3 3.00 8 69.75


1/2" 3 3.60 8 83.70

Temperatura 1/4" 25 6.75 1 167.40


Temperatura 1/4" 25 7.10 1 176.08
Temperatura 1/4" 25 7.00 1 176.40

Temperatura 1/4" 25 6.90 1 171.12


LOSA ENTRE EJES 20-29 y L-M 1 6.50 6.55 42.58 1/2" 1 7.30 8 59.86

1 6.80 6.55 44.54 1/2" 1 7.40 8 60.68

1 6.70 6.55 43.89 1/2" 1 7.30 8 59.86


1 6.60 6.55 43.23 1/2" 1 7.20 8 59.04

1 6.80 6.75 45.90 1/2" 1 7.40 8 60.68


3/8" 2 1.90 8 31.16

3/8" 1 3.00 8 24.60


1/2" 3 3.60 8 88.56

3/8" 1 3.60 8 29.52

1/2" 1 7.30 8 59.86


1/2" 1 7.40 8 60.68
1/2" 1 7.30 8 59.86
1/2" 1 7.20 8 59.04

1/2" 1 7.60 8 62.32

3/8" 2 1.90 8 31.16

Página 174 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
3/8" 4 3.00 8 98.40

1/2" 4 3.60 8 118.08

Temperatura 1/4" 26 6.80 1 178.16


Temperatura 1/4" 26 7.10 1 186.02

Temperatura 1/4" 26 7.00 1 183.40


Temperatura 1/4" 26 6.90 1 180.78

Temperatura 1/4" 27 7.10 1 191.70


SENTIDO VERTICAL

LOSA ENTRE EJES L-N y 20-23 1 6.50 1.55 10.08 1/2" 1 7.00 8 57.75

1/2" 1 7.15 8 58.99


3/8" 1 2.35 8 19.39

3/8" 1 1.90 8 15.68


1/2" 1 3.60 8 29.70

1/2" 1 4.19 8 34.57

1/2" 1 7.00 8 56.88


1/2" 1 9.20 8 74.75

3/8" 1 1.90 8 15.44


3/8" 1 3.00 8 24.38

3/8" 1 2.45 8 19.91


1/2" 1 3.60 8 29.25

1/2" 1 4.00 8 32.50


Temperatura 1/4" 6 6.80 1 42.16
LOSA ENTRE EJES L-N y 23-24 1 6.80 1.55 10.54 1/2" 1 7.00 8 57.75

1/2" 1 7.15 8 58.99


3/8" 1 2.35 8 19.39

3/8" 1 1.90 8 15.68

1/2" 1 3.60 8 29.70


1/2" 1 4.19 8 34.57

1/2" 1 7.00 8 56.88


1/2" 1 9.20 8 74.75

3/8" 1 1.90 8 15.44


3/8" 1 3.00 8 24.38

3/8" 1 2.45 8 19.91


1/2" 1 3.60 8 29.25
1/2" 1 4.00 8 32.50

Temperatura 1/4" 6 7.10 1 44.02


LOSA ENTRE EJES L-N y 24-25 1 6.70 1.55 10.39 1/2" 1 7.00 8 57.75

1/2" 1 7.15 8 58.99

3/8" 1 2.35 8 19.39


3/8" 1 1.90 8 15.68

1/2" 1 3.60 8 29.70


1/2" 1 4.19 8 34.57

1/2" 1 7.00 8 56.88


1/2" 1 9.20 8 74.75

3/8" 1 1.90 8 15.44

3/8" 1 3.00 8 24.38


3/8" 1 2.45 8 19.91
1/2" 1 3.60 8 29.25
1/2" 1 4.00 8 32.50

Temperatura 1/4" 6 7.00 1 43.40

LOSA ENTRE EJES L-N y 25-26 1 6.60 1.55 10.23 1/2" 1 7.00 8 57.75

Página 175 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
1/2" 1 7.15 8 58.99

3/8" 1 2.35 8 19.39

3/8" 1 1.90 8 15.68


1/2" 1 3.60 8 29.70

1/2" 1 4.19 8 34.57


1/2" 1 7.00 8 56.88

1/2" 1 9.20 8 74.75


3/8" 1 1.90 8 15.44

3/8" 1 3.00 8 24.38

3/8" 1 2.45 8 19.91


1/2" 1 3.60 8 29.25

1/2" 1 4.00 8 32.50


Temperatura 1/4" 6 6.90 1 42.78

LOSA ENTRE EJES M-N y 26-28 1 6.80 1.55 10.54 1/2" 1 7.35 8 60.64

3/8" 1 2.35 8 19.39


3/8" 1 1.90 8 15.68

1/2" 1 4.19 8 34.57


1/2" 1 7.35 8 59.72

3/8" 1 2.35 8 19.09


1/2" 1 1.90 8 15.44

3/8" 1 2.45 8 19.91


1/2" 1 4.19 8 34.04
Temperatura 1/4" 6 7.10 1 44.02

1/2" 1 3.65 8 30.11

SECTOR F

SOTANO
SENTIDO HORIZONTAL

LOSA ENTRE EJES 20-28 y I-J 1 6.50 3.25 21.13 3/8" 1 4.25 8 35.70
1 3.10 3.25 10.08 1/2" 1 7.30 8 61.32

1 3.45 6.70 23.12 1/2" 1 7.30 8 61.32


1 6.70 6.75 45.23 1/2" 1 7.55 8 63.42

1 6.70 6.70 44.89 1/2" 1 1.90 8 15.96


1 6.75 6.70 45.23 1/2" 1 1.30 8 10.92
3/8" 2 3.00 8 50.40

3/8" 2 3.60 8 60.48


3/8" 1 2.45 8 20.58

3/8" 1 2.75 8 23.10

3/8" 1 4.25 8 35.06


3/8" 1 7.30 8 60.23

3/8" 1 7.30 8 60.23


3/8" 1 7.55 8 62.29

3/8" 1 4.70 8 38.78


3/8" 1 4.70 8 38.78

3/8" 1 5.05 8 41.66

3/8" 1 1.90 8 15.68


3/8" 1 1.30 8 10.73
3/8" 2 3.00 8 49.50
3/8" 2 3.60 8 59.40

3/8" 1 2.45 8 20.21

3/8" 1 2.75 8 22.69

Página 176 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
Temperatura 1/4" 13 6.80 1 88.40

Temperatura 1/4" 13 3.40 1 44.20

Temperatura 1/4" 27 3.75 1 100.50


Temperatura 1/4" 27 7.00 1 189.00

Temperatura 1/4" 27 7.00 1 187.60


Temperatura 1/4" 27 7.05 1 188.94

LOSA ENTRE EJES 20-28 y J-K 1 6.45 6.55 42.25 1/2" 1 7.25 8 60.90
1 6.80 6.60 44.88 1/2" 1 7.40 8 62.16

1 6.70 6.60 44.22 1/2" 1 7.30 8 61.32

1 6.70 6.60 44.22 1/2" 1 7.30 8 61.32


1 6.70 6.55 43.89 1/2" 1 7.30 8 61.32

1 1.60 6.55 10.48 3/8" 1 2.40 8 20.16


3/8" 1 1.90 8 15.96

3/8" 4 3.00 8 100.80

3/8" 1 3.60 8 30.24


1/2" 3 3.60 8 90.72

1/2" 1 3.75 8 31.50


3/8" 1 7.25 8 59.81

3/8" 1 7.40 8 61.05


3/8" 1 7.30 8 60.23

3/8" 1 7.30 8 60.23


3/8" 1 7.30 8 60.23
3/8" 1 2.40 8 19.80

3/8" 1 4.75 8 39.19


3/8" 1 4.80 8 39.60

3/8" 1 4.70 8 38.78

3/8" 1 4.70 8 38.78


3/8" 1 4.70 8 38.78

3/8" 1 1.90 8 15.68


1/2" 1 3.75 8 30.94

3/8" 1 2.20 8 18.15


3/8" 4 3.00 8 99.00

3/8" 3 3.60 8 89.10


1/2" 1 3.60 8 29.70
Temperatura 1/4" 26 6.75 1 176.85

Temperatura 1/4" 26 7.10 1 187.44


Temperatura 1/4" 26 7.00 1 184.80

Temperatura 1/4" 26 7.00 1 184.80

Temperatura 1/4" 26 7.00 1 183.40


Temperatura 1/4" 26 1.90 1 49.78

SENTIDO VERTICAL
LOSA ENTRE EJES I-K y 20-23 1/2" 1 7.35 8 61.74

3/8" 1 4.05 8 34.02


3/8" 1 1.90 8 15.96

3/8" 1 1.30 8 10.92

3/8" 1 2.45 8 20.58


3/8" 1 3.05 8 25.62
3/8" 1 7.35 8 60.64
3/8" 1 4.05 8 33.41

3/8" 1 4.85 8 40.01

1/2" 1 1.90 8 15.68

Página 177 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
3/8" 1 1.30 8 10.73

3/8" 1 2.45 8 20.21

1/2" 1 3.05 8 25.16


LOSA ENTRE EJES I-K y 23-24 1/2" 1 7.40 8 57.35

3/8" 1 4.05 8 31.39


1/2" 1 1.90 8 14.73

3/8" 1 1.30 8 10.08


3/8" 1 2.45 8 18.99

1/2" 1 3.05 8 23.64

3/8" 1 7.60 5 38.00


3/8" 1 5.20 5 26.00

1/2" 1 1.90 5 9.50


3/8" 1 2.00 5 10.00

1/2" 1 7.60 4 31.92

3/8" 1 1.90 4 7.98


3/8" 1 2.00 4 8.40

LOSA ENTRE EJES I-K y 24-25 1/2" 1 7.55 8 63.42


1/2" 1 7.40 8 62.16

3/8" 1 1.90 8 15.96


1/2" 1 1.90 8 15.96

3/8" 1 3.05 8 25.62


3/8" 1 3.65 8 30.66
3/8" 1 7.55 8 62.29

3/8" 1 7.40 8 61.05


3/8" 1 5.05 8 41.66

3/8" 1 4.90 8 40.43

1/2" 2 1.90 8 31.35


3/8" 1 3.05 8 25.16

1/2" 1 3.65 8 30.11


LOSA ENTRE EJES I-K y 25-26 1/2" 1 7.50 8 63.00

1/2" 1 7.40 8 62.16


3/8" 1 1.90 8 15.96

1/2" 1 1.90 8 15.96


3/8" 1 3.05 8 25.62
3/8" 1 3.65 8 30.66

3/8" 1 7.50 8 61.88


3/8" 1 7.40 8 61.05

3/8" 1 5.00 8 41.25

3/8" 1 4.90 8 40.43


1/2" 2 1.90 8 31.35

3/8" 1 3.05 8 25.16


1/2" 1 3.65 8 30.11

LOSA ENTRE EJES I-K y 26-28 1/2" 1 7.50 8 63.00


1/2" 1 7.35 8 61.74

3/8" 1 1.90 8 15.96

1/2" 1 1.90 8 15.96


3/8" 1 3.05 8 25.62
3/8" 1 3.65 8 30.66
3/8" 1 7.50 8 61.88

3/8" 1 7.35 8 60.64

3/8" 1 5.00 8 41.25

Página 178 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
3/8" 1 4.85 8 40.01

1/2" 2 1.90 8 31.35

SECTOR F 3/8" 1 3.05 8 25.16


PRIMER PISO

SENTIDO HORIZONTAL
LOSA ENTRE EJES 20-27 y C-D 1 6.50 6.45 41.93 1/2" 1 7.30 8 61.32

1 6.70 6.50 43.55 1/2" 1 7.30 8 61.32


1 6.80 6.45 43.86 1/2" 1 7.40 8 62.16

1 6.70 6.45 43.22 1/2" 1 7.30 8 61.32

1 3.15 6.50 20.48 3/8" 1 3.95 8 33.18


3/8" 1 1.90 8 15.96

3/8" 3 3.00 8 75.60


3/8" 3 3.60 8 90.72

1/2" 1 2.55 8 21.42

3/8" 1 3.15 8 26.46


3/8" 1 1.20 8 10.08

3/8" 1 7.30 8 60.23


3/8" 1 7.30 8 60.23

3/8" 1 7.40 8 61.05


3/8" 1 7.30 8 60.23

3/8" 1 3.95 8 32.59


3/8" 1 4.80 8 39.60
3/8" 1 4.70 8 38.78

3/8" 1 4.80 8 39.60


3/8" 1 4.70 8 38.78

3/8" 1 1.90 8 15.68

3/8" 3 3.00 8 74.25


3/8" 3 3.60 8 89.10

1/2" 1 2.55 8 21.04


3/8" 1 3.15 8 25.99

3/8" 1 1.20 8 9.90


Temperatura 1/4" 26 6.80 1 175.44

Temperatura 1/4" 26 7.00 1 182.00


Temperatura 1/4" 26 7.10 1 183.18
Temperatura 1/4" 26 7.00 1 180.60

Temperatura 1/4" 26 3.45 1 89.70


LOSA ENTRE EJES 20-27 y D-G 1 6.45 6.65 42.89 1/2" 1 7.25 8 60.90

1 6.70 6.65 44.56 1/2" 1 7.30 8 61.32

1 6.90 6.70 46.23 1/2" 1 7.50 8 63.00


1 6.70 6.55 43.89 1/2" 1 7.30 8 61.32

1 3.15 6.55 20.63 3/8" 1 3.95 8 33.18


3/8" 1 1.90 8 15.96

3/8" 3 3.00 8 75.60


3/8" 3 3.60 8 90.72

3/8" 1 2.55 8 21.42

3/8" 1 3.15 8 26.46


3/8" 1 1.20 8 10.08
3/8" 1 7.25 8 59.81
3/8" 1 7.30 8 60.23

3/8" 1 7.50 8 61.88

3/8" 1 7.30 8 60.23

Página 179 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
3/8" 1 3.95 8 32.59

3/8" 1 4.75 8 39.19

3/8" 1 4.70 8 38.78


3/8" 1 4.90 8 40.43

3/8" 1 4.70 8 38.78


3/8" 1 1.90 8 15.68

3/8" 3 3.00 8 74.25


3/8" 3 3.60 8 89.10

1/2" 1 2.55 8 21.04

3/8" 1 3.15 8 25.99


3/8" 1 1.20 8 9.90

Temperatura 1/4" 27 6.75 1 179.55


Temperatura 1/4" 27 7.00 1 186.20

Temperatura 1/4" 27 7.20 1 192.96

Temperatura 1/4" 26 7.00 1 183.40


Temperatura 1/4" 26 3.45 1 90.39

LOSA ENTRE EJES 20-28 y G-H 1 6.50 6.45 41.93 1/2" 1 7.30 8 61.32
1 6.70 6.45 43.22 1/2" 1 7.30 8 61.32

1 6.80 6.45 43.86 1/2" 1 7.40 8 62.16


1 6.60 6.55 43.23 1/2" 1 7.20 8 60.48

1 6.80 6.60 44.88 3/8" 1 7.60 8 63.84


3/8" 1 1.90 8 15.96
3/8" 4 3.00 8 100.80

3/8" 4 3.60 8 120.96


3/8" 1 1.20 8 10.08

3/8" 1 7.30 8 60.23

3/8" 1 7.30 8 60.23


3/8" 1 7.40 8 61.05

3/8" 1 7.20 8 59.40


3/8" 1 7.60 8 62.70

3/8" 1 4.80 8 39.60


3/8" 1 4.70 8 38.78

3/8" 1 4.80 8 39.60


3/8" 1 4.60 8 37.95
3/8" 1 5.10 8 42.08

3/8" 2 1.90 8 31.35


3/8" 4 3.00 8 99.00

3/8" 4 3.60 8 118.80

Temperatura 1/4" 26 6.80 1 175.44


Temperatura 1/4" 26 7.00 1 180.60

Temperatura 1/4" 26 7.10 1 183.18


Temperatura 1/4" 26 6.90 1 180.78

Temperatura 1/4" 26 7.10 1 187.44


LOSA ENTRE EJES 20-28 y H-I 1 6.45 6.55 42.25 1/2" 1 7.25 8 60.90

1 6.70 6.55 43.89 1/2" 1 7.30 8 61.32

1 6.85 6.60 45.21 1/2" 1 7.45 8 62.58


1 6.60 6.55 43.23 1/2" 1 7.20 8 60.48
1 6.85 6.55 44.87 3/8" 1 7.65 8 64.26
3/8" 1 1.90 8 15.96

3/8" 4 3.00 8 100.80

3/8" 4 3.60 8 120.96

Página 180 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
3/8" 1 1.20 8 10.08

3/8" 1 7.25 8 59.81

3/8" 1 7.30 8 60.23


3/8" 1 7.45 8 61.46

3/8" 1 7.20 8 59.40


3/8" 1 7.65 8 63.11

3/8" 1 4.75 8 39.19


3/8" 1 4.70 8 38.78

3/8" 1 4.85 8 40.01

3/8" 1 4.60 8 37.95


3/8" 1 5.15 8 42.49

3/8" 2 1.90 8 31.35


3/8" 4 3.00 8 99.00

3/8" 4 3.60 8 118.80

Temperatura 1/4" 26 6.75 1 176.85


Temperatura 1/4" 26 7.00 1 183.40

Temperatura 1/4" 26 7.15 1 188.76


Temperatura 1/4" 26 6.90 1 180.78

Temperatura 1/4" 26 7.15 1 187.33


LOSA ENTRE EJES 20-28 y I-J 1 6.45 6.55 42.25 1/2" 1 7.25 8 60.90

1 6.70 6.55 43.89 1/2" 1 7.30 8 61.32


1 6.85 6.70 45.90 1/2" 1 7.45 8 62.58
1 6.60 6.55 43.23 1/2" 1 7.20 8 60.48

1 6.85 6.55 44.87 3/8" 1 7.65 8 64.26


3/8" 1 1.90 8 15.96

3/8" 4 3.00 8 100.80

3/8" 4 3.60 8 120.96


3/8" 1 1.20 8 10.08

3/8" 1 7.25 8 59.81


3/8" 1 7.30 8 60.23

3/8" 1 7.45 8 61.46


3/8" 1 7.20 8 59.40

3/8" 1 7.65 8 63.11


3/8" 1 4.75 8 39.19
3/8" 1 4.70 8 38.78

3/8" 1 4.85 8 40.01


3/8" 1 4.60 8 37.95

3/8" 1 5.15 8 42.49

3/8" 2 1.90 8 31.35


3/8" 4 3.00 8 99.00

3/8" 4 3.60 8 118.80


Temperatura 1/4" 26 6.75 1 176.85

Temperatura 1/4" 26 7.00 1 183.40


Temperatura 1/4" 27 7.15 1 191.62

Temperatura 1/4" 26 6.90 1 180.78

Temperatura 1/4" 26 7.15 1 187.33


LOSA ENTRE EJES 20-28 y J-K 1 6.45 6.65 42.89 1/2" 1 7.25 8 60.90
1 6.70 6.65 44.56 1/2" 1 7.30 8 61.32
1 6.85 6.60 45.21 1/2" 1 7.45 8 62.58

1 6.60 6.65 43.89 1/2" 1 7.20 8 60.48

1 6.80 6.65 45.22 3/8" 1 7.60 8 63.84

Página 181 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
3/8" 1 1.90 8 15.96

3/8" 4 3.00 8 100.80

3/8" 4 3.60 8 120.96


3/8" 1 1.20 8 10.08

3/8" 1 7.25 8 59.81


3/8" 1 7.30 8 60.23

3/8" 1 7.45 8 61.46


3/8" 1 7.20 8 59.40

3/8" 1 7.60 8 62.70

3/8" 1 4.75 8 39.19


3/8" 1 4.70 8 38.78

3/8" 1 4.85 8 40.01


3/8" 1 4.60 8 37.95

3/8" 1 5.10 8 42.08

3/8" 2 1.90 8 31.35


3/8" 4 3.00 8 99.00

3/8" 4 3.60 8 118.80


Temperatura 1/4" 27 6.75 1 179.55

Temperatura 1/4" 27 7.00 1 186.20


Temperatura 1/4" 26 7.15 1 188.76

Temperatura 1/4" 27 6.90 1 183.54


Temperatura 1/4" 27 7.10 1 188.86
SENTIDO VERTICAL

LOSA ENTRE EJES C-K y 20-23 1/2" 1 7.25 8 60.90


1/2" 1 7.25 8 60.90

1/2" 1 7.05 8 59.22

1/2" 1 7.15 8 60.06


1/2" 1 7.15 8 60.06

1/2" 1 7.45 8 62.58


3/8" 2 1.90 8 31.92

3/8" 5 3.00 8 126.00


3/8" 5 3.60 8 151.20

3/8" 1 7.25 8 59.81


3/8" 1 7.25 8 59.81
3/8" 1 7.05 8 58.16

3/8" 1 7.15 8 58.99


3/8" 1 7.15 8 58.99

3/8" 1 7.45 8 61.46

3/8" 1 4.75 8 39.19


3/8" 1 4.65 8 38.36

3/8" 1 4.45 8 36.71


3/8" 1 4.55 8 37.54

3/8" 1 4.55 8 37.54


3/8" 1 4.85 8 40.01

1/2" 2 1.90 8 31.35

3/8" 5 3.00 8 123.75


1/2" 5 3.60 8 148.50
LOSA ENTRE EJES C-K y 23-24 1/2" 1 7.30 8 61.32
1/2" 1 7.30 8 61.32

1/2" 1 7.05 8 59.22

1/2" 1 7.15 8 60.06

Página 182 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
1/2" 1 7.30 8 61.32

1/2" 1 7.45 8 62.58

3/8" 2 1.90 8 31.92


3/8" 5 3.00 8 126.00

3/8" 5 3.60 8 151.20


3/8" 1 7.30 8 60.23

3/8" 1 7.30 8 60.23


3/8" 1 7.05 8 58.16

3/8" 1 7.15 8 58.99

3/8" 1 7.30 8 60.23


3/8" 1 7.45 8 61.46

3/8" 1 4.80 8 39.60


3/8" 1 4.70 8 38.78

3/8" 1 4.45 8 36.71

3/8" 1 4.55 8 37.54


3/8" 1 4.70 8 38.78

3/8" 1 4.95 8 40.84


1/2" 2 1.90 8 31.35

3/8" 5 3.00 8 123.75


1/2" 5 3.60 8 148.50

LOSA ENTRE EJES C-K y 24-25 1/2" 1 7.25 8 60.90


1/2" 1 7.30 8 61.32
1/2" 1 7.05 8 59.22

1/2" 1 7.20 8 60.48


1/2" 1 7.30 8 61.32

1/2" 1 7.40 8 62.16

3/8" 2 1.90 8 31.92


3/8" 5 3.00 8 126.00

3/8" 5 3.60 8 151.20


3/8" 1 7.25 8 59.81

3/8" 1 7.30 8 60.23


3/8" 1 7.05 8 58.16

3/8" 1 7.20 8 59.40


3/8" 1 7.30 8 60.23
3/8" 1 7.40 8 61.05

3/8" 1 4.75 8 39.19


3/8" 1 4.70 8 38.78

3/8" 1 4.45 8 36.71

3/8" 1 4.60 8 37.95


3/8" 1 4.70 8 38.78

3/8" 1 4.90 8 40.43


1/2" 2 1.90 8 31.35

3/8" 5 3.00 8 123.75


1/2" 5 3.60 8 148.50

LOSA ENTRE EJES C-K y 25-26 1/2" 1 7.25 8 60.90

1/2" 1 7.15 8 60.06


1/2" 1 7.15 8 60.06
1/2" 1 7.15 8 60.06
1/2" 1 7.15 8 60.06

1/2" 1 7.45 8 62.58

3/8" 2 1.90 8 31.92

Página 183 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
3/8" 5 3.00 8 126.00

3/8" 5 3.60 8 151.20

3/8" 1 7.25 8 59.81


3/8" 1 7.15 8 58.99

3/8" 1 7.15 8 58.99


3/8" 1 7.15 8 58.99

3/8" 1 7.15 8 58.99


3/8" 1 7.45 8 61.46

3/8" 1 4.75 8 39.19

3/8" 1 4.55 8 37.54


3/8" 1 4.55 8 37.54

3/8" 1 4.55 8 37.54


3/8" 1 4.55 8 37.54

3/8" 1 4.95 8 40.84

1/2" 2 1.90 8 31.35


3/8" 5 3.00 8 123.75

1/2" 5 3.60 8 148.50


LOSA ENTRE EJES G-K y 26-28 1/2" 1 7.40 8 62.16

1/2" 1 7.15 8 60.06


1/2" 1 7.15 8 60.06

1/2" 1 7.45 8 62.58


3/8" 2 1.90 8 31.92
3/8" 3 3.00 8 75.60

3/8" 3 3.60 8 90.72


3/8" 1 7.40 8 61.05

3/8" 1 7.15 8 58.99

3/8" 1 7.15 8 58.99


3/8" 1 7.45 8 61.46

3/8" 1 4.90 8 40.43


3/8" 1 4.55 8 37.54

3/8" 1 4.55 8 37.54


3/8" 1 4.95 8 40.84

1/2" 2 1.90 8 31.35


3/8" 3 3.00 8 74.25
SECTOR F 1/2" 3 3.60 8 89.10

SEGUNDO PISO
SENTIDO HORIZONTAL

LOSA ENTRE EJES 20-27 y C-D 1 6.50 6.45 41.93 1/2" 1 7.30 8 61.32

1 6.70 6.50 43.55 1/2" 1 7.30 8 61.32


1 6.80 6.45 43.86 1/2" 1 7.40 8 62.16

1 6.70 6.45 43.22 1/2" 1 7.30 8 61.32


1 3.15 6.50 20.48 3/8" 1 3.95 8 33.18

3/8" 1 1.90 8 15.96


1/2" 3 3.60 8 90.72

1/2" 1 2.95 8 24.78

3/8" 1 1.20 8 10.08


1/2" 1 7.30 8 60.23
1/2" 1 7.30 8 60.23
1/2" 1 7.40 8 61.05

1/2" 1 7.30 8 60.23

3/8" 1 3.95 8 32.59

Página 184 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
3/8" 1 1.90 8 15.68

3/8" 3 3.00 8 74.25

3/8" 3 3.60 8 89.10


1/2" 1 2.55 8 21.04

3/8" 1 3.15 8 25.99


3/8" 1 1.20 8 9.90

Temperatura 1/4" 26 6.80 1 175.44


Temperatura 1/4" 26 7.00 1 182.00

Temperatura 1/4" 26 7.10 1 183.18

Temperatura 1/4" 26 7.00 1 180.60


Temperatura 1/4" 26 3.45 1 89.70

LOSA ENTRE EJES 20-27 y D-G 1 6.45 6.65 42.89 1/2" 1 7.25 8 60.90
1 6.70 6.65 44.56 1/2" 1 7.30 8 61.32

1 6.90 6.70 46.23 1/2" 1 7.50 8 63.00

1 6.70 6.55 43.89 1/2" 1 7.30 8 61.32


1 3.15 6.55 20.63 3/8" 1 3.95 8 33.18

3/8" 1 1.90 8 15.96


1/2" 3 3.60 8 90.72

1/2" 1 2.95 8 24.78


3/8" 1 1.20 8 10.08

1/2" 1 7.25 8 59.81


1/2" 1 7.30 8 60.23
1/2" 1 7.50 8 61.88

1/2" 1 7.30 8 60.23


3/8" 1 3.95 8 32.59

3/8" 1 1.90 8 15.68

3/8" 3 3.00 8 74.25


3/8" 3 3.60 8 89.10

1/2" 1 2.55 8 21.04


3/8" 1 3.15 8 25.99

3/8" 1 1.20 8 9.90


Temperatura 1/4" 27 6.75 1 179.55

Temperatura 1/4" 27 7.00 1 186.20


Temperatura 1/4" 27 7.20 1 192.96
Temperatura 1/4" 26 7.00 1 183.40

Temperatura 1/4" 26 3.45 1 90.39


LOSA ENTRE EJES 20-28 y G-H 1 6.50 6.45 41.93 1/2" 1 7.30 8 61.32

1 6.70 6.45 43.22 1/2" 1 7.30 8 61.32

1 6.80 6.45 43.86 1/2" 1 7.40 8 62.16


1 6.60 6.55 43.23 1/2" 1 7.20 8 60.48

1 6.80 6.60 44.88 3/8" 1 7.60 8 63.84


3/8" 1 1.90 8 15.96

1/2" 4 3.60 8 120.96


3/8" 1 1.20 8 10.08

1/2" 1 7.30 8 60.23

1/2" 1 7.30 8 60.23


1/2" 1 7.40 8 61.05
1/2" 1 7.20 8 59.40
1/2" 1 7.60 8 62.70

3/8" 2 1.90 8 31.35

3/8" 4 3.00 8 99.00

Página 185 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
3/8" 4 3.60 8 118.80

Temperatura 1/4" 26 6.80 1 175.44

Temperatura 1/4" 26 7.00 1 180.60


Temperatura 1/4" 26 7.10 1 183.18

Temperatura 1/4" 26 6.90 1 180.78


Temperatura 1/4" 26 7.10 1 187.44

LOSA ENTRE EJES 20-28 y H-I 1 6.45 6.55 42.25 1/2" 1 7.25 8 60.90
1 6.70 6.55 43.89 1/2" 1 7.30 8 61.32

1 6.85 6.60 45.21 1/2" 1 7.45 8 62.58

1 6.60 6.55 43.23 1/2" 1 7.20 8 60.48


1 6.85 6.55 44.87 3/8" 1 7.65 8 64.26

3/8" 1 1.90 8 15.96


1/2" 4 3.60 8 120.96

3/8" 1 1.20 8 10.08

1/2" 1 7.25 8 59.81

1/2" 1 7.30 8 60.23


1/2" 1 7.45 8 61.46

1/2" 1 7.20 8 59.40


1/2" 1 7.65 8 63.11

3/8" 2 1.90 8 31.35


3/8" 4 3.00 8 99.00
3/8" 4 3.60 8 118.80

Temperatura 1/4" 26 6.75 1 176.85


Temperatura 1/4" 26 7.00 1 183.40

Temperatura 1/4" 26 7.15 1 188.76

Temperatura 1/4" 26 6.90 1 180.78


Temperatura 1/4" 26 7.15 1 187.33

LOSA ENTRE EJES 20-28 y I-J 1 6.45 6.55 42.25 1/2" 1 7.25 8 60.90
1 6.70 6.55 43.89 1/2" 1 7.30 8 61.32

1 6.85 6.70 45.90 1/2" 1 7.45 8 62.58


1 6.60 6.55 43.23 1/2" 1 7.20 8 60.48

1 6.85 6.55 44.87 3/8" 1 7.65 8 64.26


3/8" 1 1.90 8 15.96
3/8" 4 3.00 8 100.80

3/8" 4 3.60 8 120.96


3/8" 1 1.20 8 10.08

1/2" 1 7.25 8 59.81


1/2" 1 7.30 8 60.23

1/2" 1 7.45 8 61.46


1/2" 1 7.20 8 59.40

1/2" 1 7.65 8 63.11


3/8" 2 1.90 8 31.35

3/8" 4 3.00 8 99.00

3/8" 4 3.60 8 118.80


Temperatura 1/4" 26 6.75 1 176.85
Temperatura 1/4" 26 7.00 1 183.40
Temperatura 1/4" 27 7.15 1 191.62

Temperatura 1/4" 26 6.90 1 180.78

Temperatura 1/4" 26 7.15 1 187.33

Página 186 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
SENTIDO VERTICAL

LOSA ENTRE EJES C-J y 20-23 1/2" 1 7.25 8 60.90

1/2" 1 7.25 8 60.90


1/2" 1 7.05 8 59.22

1/2" 1 7.15 8 60.06


1/2" 1 7.35 8 61.74

3/8" 2 1.90 8 31.92


1/2" 4 3.60 8 120.96

1/2" 1 7.25 8 59.81

1/2" 1 7.25 8 59.81


1/2" 1 7.05 8 58.16

1/2" 1 7.15 8 58.99


1/2" 1 7.35 8 60.64

1/2" 2 1.90 8 31.35

3/8" 4 3.00 8 99.00


1/2" 4 3.60 8 118.80

LOSA ENTRE EJES C-J y 23-24 1/2" 1 7.30 8 61.32


1/2" 1 7.30 8 61.32

1/2" 1 7.05 8 59.22


1/2" 1 7.15 8 60.06

1/2" 1 7.50 8 63.00


3/8" 2 1.90 8 31.92
1/2" 4 3.60 8 120.96

3/8" 1 7.30 8 60.23


3/8" 1 7.30 8 60.23

3/8" 1 7.05 8 58.16

3/8" 1 7.15 8 58.99


3/8" 1 7.50 8 61.88

1/2" 2 1.90 8 31.35


3/8" 4 3.00 8 99.00

1/2" 4 3.60 8 118.80


LOSA ENTRE EJES C-J y 24-25 1/2" 1 7.25 8 60.90

1/2" 1 7.30 8 61.32


1/2" 1 7.05 8 59.22
1/2" 1 7.20 8 60.48

1/2" 1 7.30 8 61.32


1/2" 1 7.40 8 62.16

3/8" 2 1.90 8 31.92

1/2" 4 3.60 8 120.96


3/8" 1 7.25 8 59.81

3/8" 1 7.30 8 60.23


3/8" 1 7.05 8 58.16

3/8" 1 7.20 8 59.40


3/8" 1 7.50 8 61.88

1/2" 2 1.90 8 31.35

3/8" 4 3.00 8 99.00


1/2" 4 3.60 8 118.80
LOSA ENTRE EJES C-J y 25-26 1/2" 1 7.25 8 60.90
1/2" 1 7.15 8 60.06

1/2" 1 7.15 8 60.06

1/2" 1 7.15 8 60.06

Página 187 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Descripción Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTAL
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Nro Vec. Nro Vec. Elemento N° Vec.
1/2" 1 7.35 8 61.74

3/8" 2 1.90 8 31.92

3/8" 4 3.60 8 120.96


3/8" 1 7.25 8 59.81

3/8" 1 7.15 8 58.99


3/8" 1 7.15 8 58.99

3/8" 1 7.15 8 58.99


3/8" 1 7.35 8 60.64

1/2" 2 1.90 8 31.35

3/8" 4 3.00 8 99.00


1/2" 4 3.60 8 118.80

LOSA ENTRE EJES G-J y 26-28 1/2" 1 7.40 8 62.16


1/2" 1 7.15 8 60.06

1/2" 1 7.35 8 61.74

3/8" 2 1.90 8 31.92


3/8" 2 3.00 8 50.40

3/8" 2 3.60 8 60.48


3/8" 1 7.40 8 61.05

3/8" 1 7.15 8 58.99


3/8" 1 7.35 8 60.64

1/2" 2 1.90 8 31.35


3/8" 2 3.00 8 49.50
1/2" 2 3.60 8 59.40

TOTALES M3 2,062.56 M2 1,235.38 13,850.13 ML 94,525.53 100,311.70 65,357.11 - - - 260,194.35

KG 23,631.38 56,174.55 64,703.54 - - - 144,509.48

Nro de ladrillo de techo 30x30x20 1,235.38 x 8.5 = 10,500.73


Nro de ladrillo de techo 30x30x20 13,850.13 x 4.5 = 62,325.60
Total 72,826.33

Página 188 de 209


HOJA DE METRADOS
PROYECTO: CONSTRUCCION HOSPITAL ATE
PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO

N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97


Descripción
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Longitud Ancho Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL

Elemento
06.10.01 ESCALERAS CONCRETO F`C = 210 KG/CM2
06.10.02 ESCALERAS ENCOFRADO Y DESENCOFRADO

06.10.03 ACERO DE REFUERZO Fy=4200 kg/cm2

ESCALERA 1
TRAMO 1

CIMENTACION 1 0.90 0.40 1.80 0.65 1/2" 6 4.80 1 28.80


PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 14 1.80 0.18 4.54 3/8" 8 5.65 1 45.20

LOSA 1 3.55 1.80 0.15 0.96 1 3.55 1.80 6.39 5/8" 12 1.70 1 20.40

DESCANSO 1 1.30 1.80 0.15 0.35 1 1.30 1.80 2.34 3/8" 36 1.20 1 43.20

TRAMO 2
PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 12 1.80 0.18 3.89 1/2" 12 4.80 1 57.60
LOSA 1 2.95 1.80 0.15 0.80 1 2.95 1.80 5.31 1/2" 12 5.65 1 67.80

DESCANSO 1 1 1.30 1.80 0.20 0.47 1 1.30 1.80 2.34 5/8" 12 1.70 1 20.40
DESCANSO 2 1 2.50 1.80 0.25 1.13 1 2.50 1.80 4.50 5/8" 12 1.70 1 20.40

3/8" 50 1.20 1 60.00


TRAMO 3

PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 11 1.80 0.18 3.56 3/8" 12 5.05 1 60.60

LOSA 1 3.15 1.20 0.15 0.57 1 3.15 1.20 3.78 1/2" 12 3.35 1 40.20
DESCANSO 1 1 1.30 1.20 0.20 0.31 1 1.30 1.20 1.56 5/8" 12 6.60 1 79.20

DESCANSO 2 1 2.50 1.30 0.25 0.81 1 2.50 1.30 3.25 5/8" 12 1.80 1 21.60
3/8" 52 1.20 1 62.40

TRAMO 4
PASOS Y CONTRAPASOS 12 1.20 0.02 0.32 12 1.20 0.18 2.59 1/2" 12 4.80 1 57.60

LOSA 1 2.95 1.80 0.15 0.80 1 2.95 1.80 5.31 1/2" 12 5.65 1 67.80

DESCANSO 1 1 1.30 1.80 0.20 0.47 1 1.30 1.80 2.34 5/8" 12 1.70 1 20.40
DESCANSO 2 1 2.50 1.80 0.25 1.13 1 2.50 1.80 4.50 5/8" 12 1.70 1 20.40

3/8" 50 1.20 1 60.00


TRAMO 5

PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 11 1.80 0.18 3.56 3/8" 12 5.05 1 60.60

LOSA 1 3.15 1.80 0.15 0.85 1 3.15 1.80 5.67 1/2" 12 3.35 1 40.20
DESCANSO 1 1 1.30 1.80 0.20 0.47 1 1.30 1.80 2.34 5/8" 12 6.60 1 79.20

DESCANSO 2 1 2.50 1.80 0.25 1.13 1 2.50 1.80 4.50 5/8" 12 1.80 1 21.60
3/8" 52 1.20 1 62.40

TRAMO 6
PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 12 1.80 0.18 3.89 1/2" 12 4.80 1 57.60

LOSA 1 2.95 1.80 0.15 0.80 1 2.95 1.80 5.31 1/2" 12 5.65 1 67.80

DESCANSO 1 1 1.30 1.80 0.20 0.47 1 1.30 1.80 2.34 5/8" 12 1.70 1 20.40
DESCANSO 2 1 2.50 1.80 0.25 1.13 1 2.50 1.80 4.50 5/8" 12 1.70 1 20.40

3/8" 50 1.20 1 60.00


TRAMO 7

PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 11 1.80 0.18 3.56 3/8" 12 5.05 1 60.60

LOSA 1 3.15 1.80 0.15 0.85 1 3.15 1.80 5.67 1/2" 12 3.35 1 40.20
DESCANSO 1 1 1.30 1.80 0.20 0.47 1 1.30 1.80 2.34 5/8" 12 6.60 1 79.20

DESCANSO 2 1 2.50 1.80 0.25 1.13 1 2.50 1.80 4.50 5/8" 12 1.80 1 21.60
3/8" 52 1.20 1 62.40

TRAMO 8
PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 12 1.80 0.18 3.89 1/2" 12 4.80 1 57.60

LOSA 1 2.95 1.80 0.15 0.80 1 2.95 1.80 5.31 1/2" 12 5.65 1 67.80
DESCANSO 1 1 1.30 1.80 0.20 0.47 1 1.30 1.80 2.34 5/8" 12 1.70 1 20.40
DESCANSO 2 12 2.50 1.80 0.25 13.50 1 2.50 1.80 4.50 5/8" 12 1.70 1 20.40

Página 189 de 209


HOJA DE METRADOS
PROYECTO: CONSTRUCCION HOSPITAL ATE
PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO
3/8" 50 1.20 1 60.00
ESCALERA 2

TRAMO 1
CIMENTACION 1 0.90 0.40 1.80 0.65 1/2" 6 4.80 1 28.80

PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 14 1.80 0.18 4.54 3/8" 8 5.65 1 45.20
LOSA 1 3.55 1.80 0.15 0.96 1 3.55 1.80 6.39 5/8" 12 1.70 1 20.40

DESCANSO 1 1.30 1.80 0.15 0.35 1 1.30 1.80 2.34 3/8" 36 1.20 1 43.20

TRAMO 2

PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 12 1.80 0.18 3.89 1/2" 12 4.80 1 57.60
LOSA 1 2.95 1.80 0.15 0.80 1 2.95 1.80 5.31 1/2" 12 5.65 1 67.80
DESCANSO 1 1 1.30 1.80 0.20 0.47 1 1.30 1.80 2.34 5/8" 12 1.70 1 20.40

DESCANSO 2 1 2.50 1.80 0.25 1.13 1 2.50 1.80 4.50 5/8" 12 1.70 1 20.40
3/8" 50 1.20 1 60.00

TRAMO 3
PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 11 1.80 0.18 3.56 3/8" 12 5.05 1 60.60

LOSA 1 3.15 1.20 0.15 0.57 1 3.15 1.20 3.78 1/2" 12 3.35 1 40.20

DESCANSO 1 1 1.30 1.20 0.20 0.31 1 1.30 1.20 1.56 5/8" 12 6.60 1 79.20
DESCANSO 2 1 2.50 1.30 0.25 0.81 1 2.50 1.30 3.25 5/8" 12 1.80 1 21.60

3/8" 52 1.20 1 62.40


TRAMO 4

PASOS Y CONTRAPASOS 12 1.20 0.02 0.32 12 1.20 0.18 2.59 1/2" 12 4.80 1 57.60
LOSA 1 2.95 1.80 0.15 0.80 1 2.95 1.80 5.31 1/2" 12 5.65 1 67.80

DESCANSO 1 1 1.30 1.80 0.20 0.47 1 1.30 1.80 2.34 5/8" 12 1.70 1 20.40
DESCANSO 2 1 2.50 1.80 0.25 1.13 1 2.50 1.80 4.50 5/8" 12 1.70 1 20.40
3/8" 50 1.20 1 60.00

TRAMO 5
PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 11 1.80 0.18 3.56 3/8" 12 5.05 1 60.60

LOSA 1 3.15 1.80 0.15 0.85 1 3.15 1.80 5.67 1/2" 12 3.35 1 40.20

DESCANSO 1 1 1.30 1.80 0.20 0.47 1 1.30 1.80 2.34 5/8" 12 6.60 1 79.20
DESCANSO 2 1 2.50 1.80 0.25 1.13 1 2.50 1.80 4.50 5/8" 12 1.80 1 21.60

3/8" 52 1.20 1 62.40


TRAMO 6

PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 12 1.80 0.18 3.89 1/2" 12 4.80 1 57.60
LOSA 1 2.95 1.80 0.15 0.80 1 2.95 1.80 5.31 1/2" 12 5.65 1 67.80

DESCANSO 1 1 1.30 1.80 0.20 0.47 1 1.30 1.80 2.34 5/8" 12 1.70 1 20.40
DESCANSO 2 1 2.50 1.80 0.25 1.13 1 2.50 1.80 4.50 5/8" 12 1.70 1 20.40
3/8" 50 1.20 1 60.00

TRAMO 7
PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 11 1.80 0.18 3.56 3/8" 12 5.05 1 60.60

LOSA 1 3.15 1.80 0.15 0.85 1 3.15 1.80 5.67 1/2" 12 3.35 1 40.20

DESCANSO 1 1 1.30 1.80 0.20 0.47 1 1.30 1.80 2.34 5/8" 12 6.60 1 79.20
DESCANSO 2 1 2.50 1.80 0.25 1.13 1 2.50 1.80 4.50 5/8" 12 1.80 1 21.60

3/8" 52 1.20 1 62.40


TRAMO 8

PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 12 1.80 0.18 3.89 1/2" 12 4.80 1 57.60
LOSA 1 2.95 1.80 0.15 0.80 1 2.95 1.80 5.31 1/2" 12 5.65 1 67.80

DESCANSO 1 1 1.30 1.80 0.20 0.47 1 1.30 1.80 2.34 5/8" 12 1.70 1 20.40
DESCANSO 2 12 2.50 1.80 0.25 13.50 1 2.50 1.80 4.50 5/8" 12 1.70 1 20.40
3/8" 50 1.20 1 60.00

ESCALERA 3
TRAMO 1

CIMENTACION 1 0.90 0.40 1.80 0.65 1/2" 6 4.80 1 28.80

PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 14 1.80 0.18 4.54 3/8" 8 5.65 1 45.20
LOSA 1 3.55 1.80 0.15 0.96 1 3.55 1.80 6.39 5/8" 12 1.70 1 20.40

DESCANSO 1 1.30 1.80 0.15 0.35 1 1.30 1.80 2.34 3/8" 36 1.20 1 43.20

Página 190 de 209


HOJA DE METRADOS
PROYECTO: CONSTRUCCION HOSPITAL ATE
PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO

TRAMO 2

PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 12 1.80 0.18 3.89 1/2" 12 4.80 1 57.60
LOSA 1 2.95 1.80 0.15 0.80 1 2.95 1.80 5.31 1/2" 12 5.65 1 67.80

DESCANSO 1 1 1.30 1.80 0.20 0.47 1 1.30 1.80 2.34 5/8" 12 1.70 1 20.40
DESCANSO 2 1 2.50 1.80 0.25 1.13 1 2.50 1.80 4.50 5/8" 12 1.70 1 20.40

3/8" 50 1.20 1 60.00

TRAMO 3
PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 11 1.80 0.18 3.56 3/8" 12 5.05 1 60.60

LOSA 1 3.15 1.20 0.15 0.57 1 3.15 1.20 3.78 1/2" 12 3.35 1 40.20
DESCANSO 1 1 1.30 1.20 0.20 0.31 1 1.30 1.20 1.56 5/8" 12 6.60 1 79.20
DESCANSO 2 1 2.50 1.30 0.25 0.81 1 2.50 1.30 3.25 5/8" 12 1.80 1 21.60

3/8" 52 1.20 1 62.40


TRAMO 4

PASOS Y CONTRAPASOS 12 1.20 0.02 0.32 12 1.20 0.18 2.59 1/2" 12 4.80 1 57.60
LOSA 1 2.95 1.80 0.15 0.80 1 2.95 1.80 5.31 1/2" 12 5.65 1 67.80

DESCANSO 1 1 1.30 1.80 0.20 0.47 1 1.30 1.80 2.34 5/8" 12 1.70 1 20.40

DESCANSO 2 1 2.50 1.80 0.25 1.13 1 2.50 1.80 4.50 5/8" 12 1.70 1 20.40
3/8" 50 1.20 1 60.00

TRAMO 5
PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 11 1.80 0.18 3.56 3/8" 12 5.05 1 60.60

LOSA 1 3.15 1.80 0.15 0.85 1 3.15 1.80 5.67 1/2" 12 3.35 1 40.20
DESCANSO 1 1 1.30 1.80 0.20 0.47 1 1.30 1.80 2.34 5/8" 12 6.60 1 79.20

DESCANSO 2 1 2.50 1.80 0.25 1.13 1 2.50 1.80 4.50 5/8" 12 1.80 1 21.60
3/8" 52 1.20 1 62.40
TRAMO 6

PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 12 1.80 0.18 3.89 1/2" 12 4.80 1 57.60
LOSA 1 2.95 1.80 0.15 0.80 1 2.95 1.80 5.31 1/2" 12 5.65 1 67.80

DESCANSO 1 1 1.30 1.80 0.20 0.47 1 1.30 1.80 2.34 5/8" 12 1.70 1 20.40

DESCANSO 2 1 2.50 1.80 0.25 1.13 1 2.50 1.80 4.50 5/8" 12 1.70 1 20.40
3/8" 50 1.20 1 60.00

TRAMO 7
PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 11 1.80 0.18 3.56 3/8" 12 5.05 1 60.60

LOSA 1 3.15 1.80 0.15 0.85 1 3.15 1.80 5.67 1/2" 12 3.35 1 40.20
DESCANSO 1 1 1.30 1.80 0.20 0.47 1 1.30 1.80 2.34 5/8" 12 6.60 1 79.20

DESCANSO 2 1 2.50 1.80 0.25 1.13 1 2.50 1.80 4.50 5/8" 12 1.80 1 21.60
3/8" 52 1.20 1 62.40
TRAMO 8

PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 12 1.80 0.18 3.89 1/2" 12 4.80 1 57.60
LOSA 1 2.95 1.80 0.15 0.80 1 2.95 1.80 5.31 1/2" 12 5.65 1 67.80

DESCANSO 1 1 1.30 1.80 0.20 0.47 1 1.30 1.80 2.34 5/8" 12 1.70 1 20.40

DESCANSO 2 12 2.50 1.80 0.25 13.50 1 2.50 1.80 4.50 5/8" 12 1.70 1 20.40
3/8" 50 1.20 1 60.00

ESCALERA 4
TRAMO 1

CIMENTACION 1 0.90 0.40 1.80 0.65 1/2" 6 4.80 1 28.80


PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 14 1.80 0.18 4.54 3/8" 8 5.65 1 45.20

LOSA 1 3.55 1.80 0.15 0.96 1 3.55 1.80 6.39 5/8" 12 1.70 1 20.40
DESCANSO 1 1.30 1.80 0.15 0.35 1 1.30 1.80 2.34 3/8" 36 1.20 1 43.20

TRAMO 2
PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 12 1.80 0.18 3.89 1/2" 12 4.80 1 57.60

LOSA 1 2.95 1.80 0.15 0.80 1 2.95 1.80 5.31 1/2" 12 5.65 1 67.80

DESCANSO 1 1 1.30 1.80 0.20 0.47 1 1.30 1.80 2.34 5/8" 12 1.70 1 20.40
DESCANSO 2 1 2.50 1.80 0.25 1.13 1 2.50 1.80 4.50 5/8" 12 1.70 1 20.40

3/8" 50 1.20 1 60.00

Página 191 de 209


HOJA DE METRADOS
PROYECTO: CONSTRUCCION HOSPITAL ATE
PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO
TRAMO 3
PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 11 1.80 0.18 3.56 3/8" 12 5.05 1 60.60

LOSA 1 3.15 1.20 0.15 0.57 1 3.15 1.20 3.78 1/2" 12 3.35 1 40.20
DESCANSO 1 1 1.30 1.20 0.20 0.31 1 1.30 1.20 1.56 5/8" 12 6.60 1 79.20

DESCANSO 2 1 2.50 1.30 0.25 0.81 1 2.50 1.30 3.25 5/8" 12 1.80 1 21.60
3/8" 52 1.20 1 62.40

TRAMO 4

PASOS Y CONTRAPASOS 12 1.20 0.02 0.32 12 1.20 0.18 2.59 1/2" 12 4.80 1 57.60
LOSA 1 2.95 1.80 0.15 0.80 1 2.95 1.80 5.31 1/2" 12 5.65 1 67.80

DESCANSO 1 1 1.30 1.80 0.20 0.47 1 1.30 1.80 2.34 5/8" 12 1.70 1 20.40
DESCANSO 2 1 2.50 1.80 0.25 1.13 1 2.50 1.80 4.50 5/8" 12 1.70 1 20.40
3/8" 50 1.20 1 60.00

TRAMO 5
PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 11 1.80 0.18 3.56 3/8" 12 5.05 1 60.60

LOSA 1 3.15 1.80 0.15 0.85 1 3.15 1.80 5.67 1/2" 12 3.35 1 40.20
DESCANSO 1 1 1.30 1.80 0.20 0.47 1 1.30 1.80 2.34 5/8" 12 6.60 1 79.20

DESCANSO 2 1 2.50 1.80 0.25 1.13 1 2.50 1.80 4.50 5/8" 12 1.80 1 21.60

3/8" 52 1.20 1 62.40


TRAMO 6

PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 12 1.80 0.18 3.89 1/2" 12 4.80 1 57.60
LOSA 1 2.95 1.80 0.15 0.80 1 2.95 1.80 5.31 1/2" 12 5.65 1 67.80

DESCANSO 1 1 1.30 1.80 0.20 0.47 1 1.30 1.80 2.34 5/8" 12 1.70 1 20.40
DESCANSO 2 1 2.50 1.80 0.25 1.13 1 2.50 1.80 4.50 5/8" 12 1.70 1 20.40

3/8" 50 1.20 1 60.00


TRAMO 7
PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 11 1.80 0.18 3.56 3/8" 12 5.05 1 60.60

LOSA 1 3.15 1.80 0.15 0.85 1 3.15 1.80 5.67 1/2" 12 3.35 1 40.20
DESCANSO 1 1 1.30 1.80 0.20 0.47 1 1.30 1.80 2.34 5/8" 12 6.60 1 79.20

DESCANSO 2 1 2.50 1.80 0.25 1.13 1 2.50 1.80 4.50 5/8" 12 1.80 1 21.60

3/8" 52 1.20 1 62.40


TRAMO 8

PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 12 1.80 0.18 3.89 1/2" 12 4.80 1 57.60
LOSA 1 2.95 1.80 0.15 0.80 1 2.95 1.80 5.31 1/2" 12 5.65 1 67.80

DESCANSO 1 1 1.30 1.80 0.20 0.47 1 1.30 1.80 2.34 5/8" 12 1.70 1 20.40
DESCANSO 2 12 2.50 1.80 0.25 13.50 1 2.50 1.80 4.50 5/8" 12 1.70 1 20.40

3/8" 50 1.20 1 60.00


ESCALERA 5
TRAMO 1

CIMENTACION 1 0.90 0.40 1.80 0.65 1/2" 6 4.80 1 28.80


PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 14 1.80 0.18 4.54 3/8" 8 5.65 1 45.20

LOSA 1 3.55 1.80 0.15 0.96 1 3.55 1.80 6.39 5/8" 12 1.70 1 20.40

DESCANSO 1 1.30 1.80 0.15 0.35 1 1.30 1.80 2.34 3/8" 36 1.20 1 43.20

TRAMO 2
PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 12 1.80 0.18 3.89 1/2" 12 4.80 1 57.60

LOSA 1 2.95 1.80 0.15 0.80 1 2.95 1.80 5.31 1/2" 12 5.65 1 67.80
DESCANSO 1 1 1.30 1.80 0.20 0.47 1 1.30 1.80 2.34 5/8" 12 1.70 1 20.40

DESCANSO 2 1 2.50 1.80 0.25 1.13 1 2.50 1.80 4.50 5/8" 12 1.70 1 20.40
3/8" 50 1.20 1 60.00
TRAMO 3

PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 11 1.80 0.18 3.56 3/8" 12 5.05 1 60.60
LOSA 1 3.15 1.20 0.15 0.57 1 3.15 1.20 3.78 1/2" 12 3.35 1 40.20

DESCANSO 1 1 1.30 1.20 0.20 0.31 1 1.30 1.20 1.56 5/8" 12 6.60 1 79.20

DESCANSO 2 1 2.50 1.30 0.25 0.81 1 2.50 1.30 3.25 5/8" 12 1.80 1 21.60
3/8" 52 1.20 1 62.40

TRAMO 4

Página 192 de 209


HOJA DE METRADOS
PROYECTO: CONSTRUCCION HOSPITAL ATE
PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO
PASOS Y CONTRAPASOS 12 1.20 0.02 0.32 12 1.20 0.18 2.59 1/2" 12 4.80 1 57.60
LOSA 1 2.95 1.80 0.15 0.80 1 2.95 1.80 5.31 1/2" 12 5.65 1 67.80

DESCANSO 1 1 1.30 1.80 0.20 0.47 1 1.30 1.80 2.34 5/8" 12 1.70 1 20.40
DESCANSO 2 1 2.50 1.80 0.25 1.13 1 2.50 1.80 4.50 5/8" 12 1.70 1 20.40

3/8" 50 1.20 1 60.00


TRAMO 5

PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 11 1.80 0.18 3.56 3/8" 12 5.05 1 60.60

LOSA 1 3.15 1.80 0.15 0.85 1 3.15 1.80 5.67 1/2" 12 3.35 1 40.20
DESCANSO 1 1 1.30 1.80 0.20 0.47 1 1.30 1.80 2.34 5/8" 12 6.60 1 79.20

DESCANSO 2 1 2.50 1.80 0.25 1.13 1 2.50 1.80 4.50 5/8" 12 1.80 1 21.60
3/8" 52 1.20 1 62.40
TRAMO 6

PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 12 1.80 0.18 3.89 1/2" 12 4.80 1 57.60
LOSA 1 2.95 1.80 0.15 0.80 1 2.95 1.80 5.31 1/2" 12 5.65 1 67.80

DESCANSO 1 1 1.30 1.80 0.20 0.47 1 1.30 1.80 2.34 5/8" 12 1.70 1 20.40
DESCANSO 2 1 2.50 1.80 0.25 1.13 1 2.50 1.80 4.50 5/8" 12 1.70 1 20.40

3/8" 50 1.20 1 60.00

TRAMO 7
PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 11 1.80 0.18 3.56 3/8" 12 5.05 1 60.60

LOSA 1 3.15 1.80 0.15 0.85 1 3.15 1.80 5.67 1/2" 12 3.35 1 40.20
DESCANSO 1 1 1.30 1.80 0.20 0.47 1 1.30 1.80 2.34 5/8" 12 6.60 1 79.20

DESCANSO 2 1 2.50 1.80 0.25 1.13 1 2.50 1.80 4.50 5/8" 12 1.80 1 21.60
3/8" 52 1.20 1 62.40

TRAMO 8
PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 12 1.80 0.18 3.89 1/2" 12 4.80 1 57.60
LOSA 1 2.95 1.80 0.15 0.80 1 2.95 1.80 5.31 1/2" 12 5.65 1 67.80

DESCANSO 1 1 1.30 1.80 0.20 0.47 1 1.30 1.80 2.34 5/8" 12 1.70 1 20.40
DESCANSO 2 12 2.50 1.80 0.25 13.50 1 2.50 1.80 4.50 5/8" 12 1.70 1 20.40

3/8" 50 1.20 1 60.00

ESCALERA 6
TRAMO 1

CIMENTACION 1 1.80 0.40 1.80 1.30 1/2" 6 4.80 1 28.80


PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 14 1.80 0.18 4.54 3/8" 8 5.65 1 45.20

LOSA 1 3.55 1.80 0.15 0.96 1 3.55 1.80 6.39 5/8" 12 1.70 1 20.40
DESCANSO 1 1.30 1.80 0.15 0.35 1 1.30 1.80 2.34 3/8" 36 1.20 1 43.20

TRAMO 2
PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 12 1.80 0.18 3.89 1/2" 12 4.80 1 57.60

LOSA 1 2.95 1.80 0.15 0.80 1 2.95 1.80 5.31 1/2" 12 5.65 1 67.80
DESCANSO 1 1 1.30 1.80 0.20 0.47 1 1.30 1.80 2.34 5/8" 12 1.70 1 20.40

DESCANSO 2 1 2.50 1.80 0.25 1.13 1 2.50 1.80 4.50 5/8" 12 1.70 1 20.40

3/8" 50 1.20 1 60.00


TRAMO 3

PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 11 1.80 0.18 3.56 3/8" 12 5.05 1 60.60
LOSA 1 3.15 1.20 0.15 0.57 1 3.15 1.20 3.78 1/2" 12 3.35 1 40.20

DESCANSO 1 1 1.30 1.20 0.20 0.31 1 1.30 1.20 1.56 5/8" 12 6.60 1 79.20
DESCANSO 2 1 2.50 1.30 0.25 0.81 1 2.50 1.30 3.25 5/8" 12 1.80 1 21.60

3/8" 52 1.20 1 62.40


TRAMO 4
PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 12 1.80 0.18 3.89 1/2" 12 4.80 1 57.60

LOSA 1 2.95 1.80 0.15 0.80 1 2.95 1.80 5.31 1/2" 12 5.65 1 67.80
DESCANSO 1 1 1.30 1.80 0.20 0.47 1 1.30 1.80 2.34 5/8" 12 1.70 1 20.40

DESCANSO 2 1 2.50 1.80 0.25 1.13 1 2.50 1.80 4.50 5/8" 12 1.70 1 20.40

3/8" 50 1.20 1 60.00


TRAMO 5

PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 11 1.80 0.18 3.56 3/8" 12 5.05 1 60.60

Página 193 de 209


HOJA DE METRADOS
PROYECTO: CONSTRUCCION HOSPITAL ATE
PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO
LOSA 1 3.15 1.80 0.15 0.85 1 3.15 1.80 5.67 1/2" 12 3.35 1 40.20
DESCANSO 1 1 1.30 1.80 0.20 0.47 1 1.30 1.80 2.34 5/8" 12 6.60 1 79.20

DESCANSO 2 1 2.50 1.80 0.25 1.13 1 2.50 1.80 4.50 5/8" 12 1.80 1 21.60
3/8" 52 1.20 1 62.40

TRAMO 6
PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 12 1.80 0.18 3.89 1/2" 12 4.80 1 57.60

LOSA 1 2.95 1.80 0.15 0.80 1 2.95 1.80 5.31 1/2" 12 5.65 1 67.80

DESCANSO 1 1 1.30 1.80 0.20 0.47 1 1.30 1.80 2.34 5/8" 12 1.70 1 20.40
DESCANSO 2 1 2.50 1.80 0.25 1.13 1 2.50 1.80 4.50 5/8" 12 1.70 1 20.40

3/8" 50 1.20 1 60.00


ESCALERA 7
TRAMO 1

CIMENTACION 1 0.90 0.40 1.80 0.65 1/2" 6 4.80 1 28.80


PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 14 1.80 0.18 4.54 3/8" 8 5.65 1 45.20

LOSA 1 3.55 1.80 0.15 0.96 1 3.55 1.80 6.39 5/8" 12 1.70 1 20.40
DESCANSO 1 1.30 1.80 0.15 0.35 1 1.30 1.80 2.34 3/8" 36 1.20 1 43.20

TRAMO 2
PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 12 1.80 0.18 3.89 1/2" 12 4.80 1 57.60

LOSA 1 2.95 1.80 0.15 0.80 1 2.95 1.80 5.31 1/2" 12 5.65 1 67.80
DESCANSO 1 1 1.30 1.80 0.20 0.47 1 1.30 1.80 2.34 5/8" 12 1.70 1 20.40

DESCANSO 2 1 2.50 1.80 0.25 1.13 1 2.50 1.80 4.50 5/8" 12 1.70 1 20.40
3/8" 50 1.20 1 60.00

TRAMO 3
PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 11 1.80 0.18 3.56 3/8" 12 5.05 1 60.60
LOSA 1 3.15 1.80 0.15 0.85 1 3.15 1.80 5.67 1/2" 12 3.35 1 40.20

DESCANSO 1 1 1.30 1.80 0.20 0.47 1 1.30 1.80 2.34 5/8" 12 6.60 1 79.20
DESCANSO 2 1 2.50 1.80 0.25 1.13 1 2.50 1.80 4.50 5/8" 12 1.80 1 21.60

3/8" 52 1.20 1 62.40

TRAMO 4
PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 12 1.80 0.18 3.89 1/2" 12 4.80 1 57.60

LOSA 1 2.95 1.80 0.15 0.80 1 2.95 1.80 5.31 1/2" 12 5.65 1 67.80
DESCANSO 1 1 1.30 1.80 0.20 0.47 1 1.30 1.80 2.34 5/8" 12 1.70 1 20.40

DESCANSO 2 1 2.50 1.80 0.25 1.13 1 2.50 1.80 4.50 5/8" 12 1.70 1 20.40
3/8" 50 1.20 1 60.00

ESCALERA 8
TRAMO 1
CIMENTACION 1 0.90 0.40 1.80 0.65 1/2" 6 4.80 1 28.80

PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 14 1.80 0.18 4.54 3/8" 8 5.65 1 45.20
LOSA 1 3.55 1.80 0.15 0.96 1 3.55 1.80 6.39 5/8" 12 1.70 1 20.40

DESCANSO 1 1.30 1.80 0.15 0.35 1 1.30 1.80 2.34 3/8" 36 1.20 1 43.20

TRAMO 2

PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 12 1.80 0.18 3.89 1/2" 12 4.80 1 57.60
LOSA 1 2.95 1.80 0.15 0.80 1 2.95 1.80 5.31 1/2" 12 5.65 1 67.80

DESCANSO 1 1 1.80 1.80 0.20 0.65 1 1.80 1.80 3.24 5/8" 12 1.70 1 20.40
DESCANSO 2 1 2.50 1.80 0.25 1.13 1 2.50 1.80 4.50 5/8" 12 1.70 1 20.40

3/8" 50 1.20 1 60.00


TRAMO 3
PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 11 1.80 0.18 3.56 3/8" 12 5.05 1 60.60

LOSA 1 3.15 1.80 0.15 0.85 1 3.15 1.80 5.67 1/2" 12 3.35 1 40.20
DESCANSO 1 1 2.50 1.80 0.20 0.90 1 2.50 1.80 4.50 5/8" 12 6.60 1 79.20

DESCANSO 2 1 2.50 1.80 0.25 1.13 1 2.50 1.80 4.50 5/8" 12 1.80 1 21.60

3/8" 52 1.20 1 62.40


TRAMO 4

PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 12 1.80 0.18 3.89 1/2" 12 4.80 1 57.60

Página 194 de 209


HOJA DE METRADOS
PROYECTO: CONSTRUCCION HOSPITAL ATE
PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO
LOSA 1 2.95 1.80 0.15 0.80 1 2.95 1.80 5.31 1/2" 12 5.65 1 67.80
DESCANSO 1 1 1.80 1.80 0.20 0.65 1 1.80 1.80 3.24 5/8" 12 1.70 1 20.40

DESCANSO 2 1 2.50 1.80 0.25 1.13 1 2.50 1.80 4.50 5/8" 12 1.70 1 20.40
3/8" 50 1.20 1 60.00

ESCALERA 9

TRAMO 1

CIMENTACION 1 0.90 0.40 1.80 0.65 3/8" 12 4.10 1 49.20


PASOS Y CONTRAPASOS 7 1.80 0.02 0.28 8 1.80 0.18 2.59 1/2" 12 2.85 1 34.20

LOSA 1 2.00 1.80 0.15 0.54 1 2.00 1.80 3.60 1/2" 12 1.25 1 15.00
DESCANSO 1 1.30 1.80 0.15 0.35 1 1.30 1.80 2.34 1/2" 12 0.95 1 11.40
5/8" 4 1.20 1 4.80

3/8" 34 1.20 1 40.80


1/4" 8 0.80 1 6.40

TRAMO 2
PASOS Y CONTRAPASOS 4 1.80 0.02 0.16 5 1.80 0.18 1.62 3/8" 12 3.75 1 45.00

LOSA 1 1.35 1.80 0.15 0.36 1 1.35 1.80 2.43 1/2" 12 1.65 1 19.80

DESCANSO 1 1 1.30 1.80 0.15 0.35 1 1.30 1.80 2.34 1/2" 12 3.35 1 40.20
DESCANSO 2 1 2.00 1.80 0.15 0.54 1 2.00 1.80 3.60 1/2" 12 2.40 1 28.80

5/8" 4 1.20 1 4.80


3/8" 54 1.20 1 64.80

1/4" 8 0.80 1 6.40


Adicionales 5/8" 4 3.80 1 15.20

1/2" 4 3.45 1 13.80


ESCALERA 10

TRAMO 1
CIMENTACION 1 0.90 0.40 1.80 0.65 3/8" 12 4.10 1 49.20

PASOS Y CONTRAPASOS 7 1.80 0.02 0.28 8 1.80 0.18 2.59 1/2" 12 2.85 1 34.20

LOSA 1 2.00 1.80 0.15 0.54 1 2.00 1.80 3.60 1/2" 12 1.25 1 15.00
DESCANSO 1 1.30 1.80 0.15 0.35 1 1.30 1.80 2.34 1/2" 12 0.95 1 11.40

5/8" 4 1.20 1 4.80


3/8" 34 1.20 1 40.80

1/4" 8 0.80 1 6.40


TRAMO 2

PASOS Y CONTRAPASOS 4 1.80 0.02 0.16 5 1.80 0.18 1.62 3/8" 12 3.75 1 45.00
LOSA 1 1.35 1.80 0.15 0.36 1 1.35 1.80 2.43 1/2" 12 1.65 1 19.80
DESCANSO 1 1 1.30 1.80 0.15 0.35 1 1.30 1.80 2.34 1/2" 12 3.35 1 40.20

DESCANSO 2 1 2.00 1.80 0.15 0.54 1 2.00 1.80 3.60 1/2" 12 2.40 1 28.80
5/8" 4 1.20 1 4.80

3/8" 54 1.20 1 64.80

1/4" 8 0.80 1 6.40


Adicionales 5/8" 4 3.80 1 15.20

1/2" 4 3.45 1 13.80


ESCALERA 11

TRAMO 1
CIMENTACION 1 0.90 0.40 1.80 0.65 1/2" 6 4.80 1 28.80

PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 14 1.80 0.18 4.54 3/8" 8 5.65 1 45.20
LOSA 1 3.55 1.80 0.15 0.96 1 3.55 1.80 6.39 5/8" 12 1.70 1 20.40
DESCANSO 1 1.30 1.80 0.15 0.35 1 1.30 1.80 2.34 3/8" 36 1.20 1 43.20

TRAMO 2

PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 12 1.80 0.18 3.89 1/2" 12 4.80 1 57.60

LOSA 1 2.95 1.80 0.15 0.80 1 2.95 1.80 5.31 1/2" 12 5.65 1 67.80
DESCANSO 1 1 1.80 1.80 0.20 0.65 1 1.80 1.80 3.24 5/8" 12 1.70 1 20.40

DESCANSO 2 1 2.50 1.80 0.25 1.13 1 2.50 1.80 4.50 5/8" 12 1.70 1 20.40

Página 195 de 209


HOJA DE METRADOS
PROYECTO: CONSTRUCCION HOSPITAL ATE
PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO
3/8" 50 1.20 1 60.00
TRAMO 3

PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 11 1.80 0.18 3.56 3/8" 12 5.05 1 60.60
LOSA 1 3.15 1.80 0.15 0.85 1 3.15 1.80 5.67 1/2" 12 3.35 1 40.20

DESCANSO 1 1 2.50 1.80 0.20 0.90 1 2.50 1.80 4.50 5/8" 12 6.60 1 79.20
DESCANSO 2 1 2.50 1.80 0.25 1.13 1 2.50 1.80 4.50 5/8" 12 1.80 1 21.60

3/8" 52 1.20 1 62.40

TRAMO 4
PASOS Y CONTRAPASOS 12 1.80 0.02 0.49 12 1.80 0.18 3.89 1/2" 12 4.80 1 57.60

LOSA 1 2.95 1.80 0.15 0.80 1 2.95 1.80 5.31 1/2" 12 5.65 1 67.80
DESCANSO 1 1 1.80 1.80 0.20 0.65 1 1.80 1.80 3.24 5/8" 12 1.70 1 20.40
DESCANSO 2 1 2.50 1.80 0.25 1.13 1 2.50 1.80 4.50 5/8" 12 1.70 1 20.40

3/8" 50 1.20 1 60.00


ESCALERA 12

TRAMO 1

CIMENTACION 1 0.90 0.40 1.80 0.65 3/8" 12 4.10 1 49.20

PASOS Y CONTRAPASOS 7 1.80 0.02 0.28 8 1.80 0.18 2.59 1/2" 12 2.85 1 34.20
LOSA 1 2.00 1.80 0.15 0.54 1 2.00 1.80 3.60 1/2" 12 1.25 1 15.00

DESCANSO 1 1.30 1.80 0.15 0.35 1 1.30 1.80 2.34 1/2" 12 0.95 1 11.40
5/8" 4 1.20 1 4.80

3/8" 34 1.20 1 40.80


1/4" 8 0.80 1 6.40

TRAMO 2
PASOS Y CONTRAPASOS 4 1.80 0.02 0.16 5 1.80 0.18 1.62 3/8" 12 3.75 1 45.00
LOSA 1 1.35 1.80 0.15 0.36 1 1.35 1.80 2.43 1/2" 12 1.65 1 19.80

DESCANSO 1 1 1.30 1.80 0.15 0.35 1 1.30 1.80 2.34 1/2" 12 3.35 1 40.20
DESCANSO 2 1 2.00 1.80 0.15 0.54 1 2.00 1.80 3.60 1/2" 12 2.40 1 28.80

5/8" 4 1.20 1 4.80

3/8" 54 1.20 1 64.80


1/4" 8 0.80 1 6.40

Adicionales 5/8" 4 3.80 1 15.20


1/2" 4 3.45 1 13.80

TOTALES M3 232.48 M2 939.46 ML 38.40 5,595.00 5,189.40 3,457.20 - -

KG 9.60 3,133.20 5,137.51 5,358.66 13,638.97

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO

N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97


Descripción
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Longitud Ancho Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL

Elemento
06.11.01 CISTERNA CONCRETO F`C = 210 KG/CM2

06.11.02 CISTERNA ENCOFRADO Y DESENCOFRADO

06.11.03 ACERO DE REFUERZO Fy=4200 kg/cm2

CIMENTACION
CORTE 1 2 12.05 0.45 0.50 5.42

CORTE 1 2 6.60 0.45 0.50 2.97


CORTE 1 2 4.75 0.45 0.50 2.14
CORTE 1 - 2 1 12.05 0.45 0.50 2.71

CORTE 3 1 6.60 0.45 0.50 1.49


CORTE 3 1 4.75 0.45 0.50 1.07

CORTE 4 1 6.35 0.45 0.50 1.43

CORTE 1 1 12.05 0.45 0.50 2.71


MUROS Caras

Página 196 de 209


HOJA DE METRADOS
PROYECTO: CONSTRUCCION HOSPITAL ATE
PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO
CORTE 1 2 12.05 0.25 4.00 24.10 2 12.05 2 4.00 192.80 VERTICALES 3/8" 122 5.15 2 1,256.60
HORIZONTALES 3/8" 38 12.85 2 976.60

REF SUPERIOR 1/2" 4 12.45 2 99.60


ESTRIBO 3/8" 61 1.10 2 134.20

REF INFERIOR 1/2" 4 12.45 2 99.60


ESTRIBO 3/8" 61 1.60 2 195.20

CORTE 1 2 6.60 0.25 4.00 13.20 2 6.60 2 4.00 105.60 VERTICALES 3/8" 66 5.15 2 679.80

HORIZONTALES 3/8" 38 7.40 2 562.40


REF SUPERIOR 1/2" 4 7.00 2 56.00

ESTRIBO 3/8" 33 1.10 2 72.60


REF INFERIOR 1/2" 4 7.00 2 56.00
ESTRIBO 3/8" 33 1.60 2 105.60

CORTE 1 2 4.75 0.25 4.00 9.50 2 4.75 2 4.00 76.00 VERTICALES 3/8" 48 5.15 2 494.40
HORIZONTALES 3/8" 38 5.55 2 421.80

REF SUPERIOR 1/2" 4 5.15 2 41.20


ESTRIBO 3/8" 24 1.10 2 52.80

REF INFERIOR 1/2" 4 5.15 2 41.20

ESTRIBO 3/8" 24 1.60 2 76.80


CORTE 1 - 2 1 12.05 0.25 4.00 12.05 1 12.05 2 4.00 96.40 VERTICALES 3/8" 122 5.15 1 628.30

HORIZONTALES 3/8" 38 12.85 1 488.30


REF SUPERIOR 1/2" 4 12.45 1 49.80

ESTRIBO 3/8" 61 1.10 1 67.10


REF INFERIOR 1/2" 4 12.45 1 49.80

ESTRIBO 3/8" 61 1.60 1 97.60


CORTE 3 1 6.60 0.25 3.00 4.95 1 6.60 2 3.00 39.60 VERTICALES 3/8" 66 4.15 1 273.90
HORIZONTALES 3/8" 28 7.40 1 207.20

REF SUPERIOR 1/2" 4 7.00 1 28.00


ESTRIBO 3/8" 33 1.10 1 36.30

REF INFERIOR 1/2" 4 7.00 1 28.00

ESTRIBO 3/8" 33 1.60 1 52.80


CORTE 3 1 4.75 0.25 3.00 3.56 1 4.75 2 3.00 28.50 VERTICALES 3/8" 48 5.15 1 247.20

HORIZONTALES 3/8" 38 5.55 1 210.90


REF SUPERIOR 1/2" 4 5.15 1 20.60

ESTRIBO 3/8" 24 1.10 1 26.40


REF INFERIOR 1/2" 4 5.15 1 20.60

ESTRIBO 3/8" 24 1.60 1 38.40


CORTE 4 1 6.35 0.25 3.00 4.76 1 6.35 2 3.00 38.10 VERTICALES 3/8" 64 4.15 1 265.60
HORIZONTALES 3/8" 28 7.15 1 200.20

REF SUPERIOR 1/2" 4 6.75 1 27.00


ESTRIBO 3/8" 32 1.10 1 35.20

REF INFERIOR 1/2" 4 6.75 1 27.00

ESTRIBO 3/8" 32 1.60 1 51.20


CORTE 5 1 12.05 0.25 4.00 12.05 1 12.05 2 4.00 96.40 VERTICALES 3/8" 122 5.15 1 628.30

HORIZONTALES 3/8" 38 12.85 1 488.30


REF SUPERIOR 1/2" 4 12.45 1 49.80

ESTRIBO 3/8" 61 1.10 1 67.10


REF INFERIOR 1/2" 4 12.45 1 49.80

ESTRIBO 3/8" 61 1.60 1 97.60


LOSA DE PISO 2 6.60 5.65 0.20 14.92 LONGITUDINAL 3/8" 66 12.45 1 821.70
1 4.75 5.00 0.20 4.75 TRANSVERSAL 3/8" 122 7.50 1 915.00

1 4.75 6.30 0.20 5.99 LONGITUDINAL 3/8" 48 12.45 1 597.60


TRANSVERSAL 3/8" 122 5.65 1 689.30

TOTALES M3 129.76 M2 673.40 ML - 12,260.30 744.00 - - -


KG 6,865.77 736.56 - - - 7,602.33

Página 197 de 209


HOJA DE METRADOS
PROYECTO: CONSTRUCCION HOSPITAL ATE
PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Descripción
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Longitud Ancho Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL

Elemento

06.12.01 TANQUE DE PETROLEO CONCRETO F`C = 210 KG/CM2


06.12.02 TANQUE DE PETROLEO ENCOFRADO Y DESENCOFRADO

06.12.03 ACERO DE REFUERZO Fy=4200 kg/cm2 Caras

MUROS CORTE 1 2 5.40 0.20 2.30 4.97 2 5.40 2 2.30 49.68 VERTICALES 3/8" 54 3.65 2 394.20
2 3.25 0.20 2.30 2.99 2 3.25 2 2.30 29.90 VERTICALES 3/8" 34 3.65 2 248.20

HORIZONTALES 3/8" 24 5.80 2 278.40


HORIZONTALES 3/8" 24 4.05 2 194.40
REF SUPERIOR 1/2" 4 5.80 2 46.40

ESTRIBO 3/8" 27 1.00 2 54.00


REF INFERIOR 1/2" 4 4.05 2 32.40

ESTRIBO 3/8" 17 1.50 2 51.00


MUROS CORTE 3 2 1.80 0.20 1.50 1.08 2 1.80 2 1.50 10.80 VERTICALES 3/8" 12 2.10 2 50.40

1 3.25 0.20 1.50 0.98 1 3.25 2 1.50 9.75 VERTICALES 3/8" 22 3.65 1 80.30

HORIZONTALES 3/8" 12 2.20 2 52.80


HORIZONTALES 3/8" 12 4.05 1 48.60

COLUMNAS C1 VERTICALES 1/2" 4 3.65 4 58.40


ESTRIBO 3/8" 18 0.90 4 64.80

VERTICALES 1/2" 4 1.90 2 15.20


ESTRIBO 3/8" 14 0.90 2 25.20

LOSA DE PISO 1 5.00 3.25 0.20 3.25 LONGITUDINAL 3/8" 40 4.05 1 162.00
TRANSVERSAL 3/8" 26 5.80 1 150.80
1 1.60 3.25 0.20 1.04 LONGITUDINAL 3/8" 14 4.05 1 56.70

TRANSVERSAL 3/8" 26 2.40 1 62.40


LOSA DE TECHO 1 5.40 3.65 0.20 3.94 1 5.00 3.25 16.25 LONGITUDINAL 3/8" 36 4.45 1 160.20

FRISOS 2 5.40 0.20 2.16 TRANSVERSAL 3/8" 26 6.20 1 161.20

FRISOS 2 3.65 0.20 1.46


VIGAS VCH-1 LONGITUDINAL 1/2" 4 3.80 2 30.40

ESTRIBOS 1/4" 20 0.90 2 36.00


VIGAS VTP-1 2 3.25 0.25 0.20 0.33 2 3.25 0.65 4.23 LONGITUDINAL 5/8" 4 4.25 2 34.00

LONGITUDINAL 5/8" 1 2.45 2 4.90


ESTRIBOS 3/8" 25 1.40 2 70.00

TOTALES M3 18.57 M2 124.23 ML 36.00 2,365.60 182.80 38.90 - -


KG 9.00 1,324.74 180.97 60.30 - - 1,575.00

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO

N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97


Descripción
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Longitud Ancho Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL

Elemento
06.13.01 TANQUE DE GAS LICUADO CONCRETO F`C = 210 KG/CM2
06.13.02 TANQUE DE GAS LICUADO ENCOFRADO Y DESENCOFRADO
06.13.03 ACERO DE REFUERZO Fy=4200 kg/cm2 Area

MUROS 2 8.00 0.20 2.10 6.72 2 8.00 2 2.10 67.20 VERTICALES 3/8" 64 3.45 2 441.60
2 6.40 0.20 2.10 5.38 2 6.40 2 2.10 53.76 VERTICALES 3/8" 52 3.45 2 358.80

HORIZONTALES 3/8" 18 8.40 2 302.40


HORIZONTALES 3/8" 18 7.20 2 259.20

REF SUPERIOR 1/2" 4 8.40 2 67.20


ESTRIBO 3/8" 40 1.00 2 80.00

REF INFERIOR 1/2" 4 7.20 2 57.60

ESTRIBO 3/8" 32 1.50 2 96.00


COLUMNAS C1 VERTICALES 1/2" 4 3.45 4 55.20

Página 198 de 209


HOJA DE METRADOS
PROYECTO: CONSTRUCCION HOSPITAL ATE
PARTIDA : 06.00.00 OBRAS DE CONCRETO ARMADO
ESTRIBO 3/8" 17 0.90 4 61.20
COLUMNAS C2 2 0.60 0.25 2.10 0.63 2 1.00 2.10 4.20 VERTICALES 5/8" 8 3.45 2 55.20

ESTRIBO 3/8" 17 2.20 2 74.80


ESTRIBO 3/8" 17 1.10 2

LOSA DE PISO 1 7.60 6.40 0.20 9.73 LONGITUDINAL 3/8" 62 7.20 1 446.40
TRANSVERSAL 3/8" 52 8.40 1 436.80

LOSA DE TECHO 2 8.00 3.20 0.20 10.24 2 7.60 3.00 45.60 LONGITUDINAL 3/8" 54 4.00 2 432.00

FRISOS 2 8.00 0.20 3.20 TRANSVERSAL 3/8" 22 8.80 2 387.20


2 6.40 0.20 2.56

VIGAS VCH-1 LONGITUDINAL 1/2" 4 7.40 4 118.40


ESTRIBOS 1/4" 34 0.90 4 122.40
VIGAS VCH-1 LONGITUDINAL 1/2" 4 5.50 4 88.00

ESTRIBOS 1/4" 27 0.90 4 97.20


VIGAS VCH-2 LONGITUDINAL 1/2" 6 7.40 2 88.80

ESTRIBOS 1/4" 20 1.30 2 52.00


VIGAS VTP-1 1 7.60 0.25 0.65 1.24 1 7.60 1.15 8.74 LONGITUDINAL 3/4" 4 8.60 1 34.40

LONGITUDINAL 3/4" 2 4.90 1 9.80

REFUERZO 3/4" 2 2.10 1


ESTRIBOS 3/8" 40 1.90 1 76.00

TOTALES M3 33.93 M2 185.26 ML 271.60 3,452.40 475.20 55.20 44.20 -

KG 67.90 1,933.34 470.45 85.56 97.24 - 2,654.49

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO

N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97


Descripción
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Longitud Ancho Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL

Elemento

06.14.01 RAMPAS CONCRETO F`C = 210 KG/CM2


06.14.02 RAMPAS ENCOFRADO Y DESENCOFRADO

06.14.03 ACERO DE REFUERZO Fy=4200 kg/cm2


RAMPA VEHICULAR

INGRESOA SOTANO

MURO LATERAL 1 33.00 0.25 2.00 16.50 1 33.00 2 2.00 132.00 VERTICALES 1/2" 330 3.40 1 1,122.00
HORIZONTALES 1/2" 20 33.00 1 660.00

LOSA 1 33.00 6.00 0.20 6.60 LONGITUDINAL 1/2" 30 33.40 1 1,002.00


TRANSVERSAL 1/2" 165 6.40 1 1,056.00
RAMPA PEATONAL

INGRESOA SOTANO
MUROS LATERALES 2 50.00 0.20 2.00 40.00 2 50.00 2 2.00 400.00 VERTICALES 1/2" 200 3.40 2 1,360.00

HORIZONTALES 1/2" 10 50.00 2 1,000.00


LOSA 1 50.00 1.20 0.20 10.00 LONGITUDINAL 3/8" 6 50.40 1 302.40

TRANSVERSAL 3/8" 250 1.60 1 400.00

TOTALES M3 73.10 M2 532.00 ML - 702.40 4,418.00 - - -


KG 393.34 4,373.82 - - - 4,767.16

Página 199 de 209


HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

CONCRETO
N° Dimensiones
Descripción
Part. Nro Vec. Longitud Ancho Altura Parcial

06.15.01.01 EXACAVACION DE ZANJAS Y ZAPATAS

FRENTE A CARRETERA CENTRAL 1 90.90 0.40 0.80 29.09


FRENTE PASAJE UNION 1 156.00 0.40 0.80 49.92
FRENTE AV. J.C. MARIATEGUI 1 110.00 0.40 0.80 35.20
FRENTE PROPIEDAD DE TERCEROS 1 129.60 0.40 0.80 41.47

TOTALES M3 155.68

CONCRETO
N° Dimensiones
Descripción
Part. Nro Vec. Longitud Ancho Altura Parcial

06.15.01.02 RELLENO COMPACTADO C/EQUIPO MAT/PROPIO


FRENTE A CARRETERA CENTRAL 1 90.90 0.25 0.10 2.27
FRENTE PASAJE UNION 1 156.00 0.25 0.10 3.90
FRENTE AV. J.C. MARIATEGUI 1 110.00 0.25 0.10 2.75
FRENTE PROPIEDAD DE TERCEROS 1 129.60 0.25 0.10 3.24

TOTALES M3 12.16

CONCRETO
N° Dimensiones
Descripción
Part. Nro Vec. Longitud Ancho Altura Parcial

06.15.01.03 ELIM INACION DE MATERIAL EXCEDENTE C/MAQUINARIA


VOLUMEN DE EXCAVACION 1 155.68 155.68
MENOS VOLUNEN DE RELLENO -1 12.16 -12.16

TOTALES M3 143.52

CONCRETO
N° Dimensiones
Descripción
Part. Nro Vec. Longitud Ancho Altura Parcial

06.15.02.01 CIMIENTO CORRIDOS 1:10 + 30% P.G


FRENTE A CARRETERA CENTRAL 1 90.90 0.40 0.70 25.45
FRENTE PASAJE UNION 1 156.00 0.40 0.70 43.68
FRENTE AV. J.C. MARIATEGUI 1 110.00 0.40 0.70 30.80
FRENTE PROPIEDAD DE TERCEROS 1 129.60 0.40 0.70 36.29
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

TOTALES M3 136.22

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.99
Descripción
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 1/2" TOTAL
perimet Elemento
06.15.02.02 SOBRECIMIENTO CONCRETO C:H 1:8 +25% P.M Caras
06.15.02.03 SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO
FRENTE A CARRETERA CENTRAL 1 73.90 0.15 0.60 6.65 1 73.90 2 0.60 88.68
FRENTE PASAJE UNION 1 156.00 0.15 0.60 14.04 1 156.00 2 0.60 187.20
FRENTE AV. J.C. MARIATEGUI 1 58.00 0.15 0.60 5.22 1 58.00 2 0.60 69.60
FRENTE PROPIEDAD DE TERCEROS 1 129.60 0.15 0.60 11.66 1 129.60 2 0.60 155.52
0.00 0.00
TOTALES M3 37.58 M2 501.00 ML - -
KG - -

CONCRETO ENCOFRADO Y DESENCOFRADO ACERO


N° Dimensiones Dimensiones Dimensiones 0.25 0.99
Descripción
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 1/2" TOTAL
perimet Elemento
06.15.03.01 COLUMNAS CONCRETO F`C = 210 KG/CM2
06.15.03.02 COLUMNAS ENCOFRADO Y DESENCOFRADO
06.15.03.03 ACERO DE REFUERZO Fy=4200 kg/cm2

FRENTE A CARRETERA CENTRAL 34 0.30 0.15 2.85 4.36 34 0.90 2 2.85 174.42 1/2" 4 4.45 34 605.20
1/4" 22 1.00 34 748.00
FRENTE PASAJE UNION 62 0.30 0.15 2.85 7.95 62 0.90 2 2.85 318.06 1/2" 4 4.45 62 1,103.60
1/4" 22 1.00 62 1,364.00
FRENTE AV. J.C. MARIATEGUI 34 0.30 0.15 2.85 4.36 34 0.90 2 2.85 174.42 1/2" 4 4.45 34 605.20
1/4" 22 1.00 34 748.00
FRENTE PROPIEDAD DE TERCEROS 20 0.30 0.15 2.85 2.57 20 0.90 2 2.85 102.60 1/2" 4 4.45 20 356.00
1/4" 22 1.00 20 440.00

TOTALES M3 19.24 M2 769.50 ML 3,300.00 2,670.00


KG 825.00 2,643.30 3,468.30

N° Descripción Dimensiones
Part. Nro Vec. Longitud Ancho Altura Parcial
06.15.04.01 MURO DE LADRILLO KK DE ARCILLA DE SOGA C/M 1:5 X 1.5 CM

FRENTE PROPIEDAD DE TERCEROS 1 129.60 2.85 369.36


MENOS COLUMNAS -20 0.30 2.85 -17.10

TOTALES M2 352.26

Descripción
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE


N° Descripción Dimensiones
Part. Nro Vec. Longitud Ancho Altura Parcial
06.15.05.01 TARRAJEO FROTACHADO DE MUROS EXTERIORES 1:4 , e = 1.5 cm
DE MUROS Caras
FRENTE PROPIEDAD DE TERCEROS 1 129.60 2 3.45 894.24
SOBRECIMIENTOS
IDEM ENCOFRADO DE SOBRECIM. 501.00

TOTALES M2 1395.24

N° Descripción Dimensiones
Part. Nro Vec. Longitud Ancho Altura Parcial
06.15.05.02 TARRAJEO DE COLUMNAS Y PLACAS
Caras
IDEM ENCOFRADO DE COLUMNAS 769.50

TOTALES M2 769.50

N° Descripción Dimensiones
Part. Nro Vec. Longitud Ancho Altura Parcial
06.15.06.01 PINTURA LATEX DOS MANOS EN EXTERIORES
DE MUROS Caras
FRENTE PROPIEDAD DE TERCEROS 1 129.60 2 3.45 894.24
SOBRECIMIENTOS
FRENTE A CARRETERA CENTRAL 1 73.90 2 0.60 88.68
FRENTE PASAJE UNION 1 156.00 2 0.60 187.20
FRENTE AV. J.C. MARIATEGUI 1 58.00 2 0.60 69.60
COLUMNAS
IDEM ENCOFRADO DE COLUMNAS 769.50

TOTALES M2 2009.22

N° Descripción Dimensiones
Part. Nro Vec. Longitud Ancho Altura Parcial
06.15.07 CARPINTERÍA METÁLICA Y HERRERIA
PUERTAS
Pf 04 5 4.57 3.00 68.55
Pf 05 2 2.00 3.00 12.00
Pf 06 1 4.50 3.00 13.50
Pf 06 1 6.15 3.00 18.45
Pf 07 2 1.40 3.00 8.40
Pf 08 1 1.20 3.00 3.60

TOTALES M2 124.50
HOJA DE METRADOS

PROYECTO: CONSTRUCCION HOSPITAL ATE

N° Descripción Dimensiones
Part. Nro Vec. Longitud Ancho Altura Parcial
06.15.08.01 CARPINTERÍA METÁLICA Y HERRERIA
CERCO
FRENTE A CARRETERA CENTRAL 1 90.90 90.90
MENOS COLUMNAS -34 0.30 -10.20
FRENTE PASAJE UNION 1 156.00 156.00
MENOS COLUMNAS -62 0.30 -18.60
FRENTE AV. J.C. MARIATEGUI 1 110.00 110.00
MENOS COLUMNAS -34 0.30 -10.20

TOTALES ML 317.90

N° Descripción Dimensiones
Part. Nro Vec. Longitud Ancho Altura Parcial
07.01.01 TECHO METALICO INCL. COBERTURA
Area
TECHO DE AUDITORIUM 1 385.00 385.00
TECHO DE ESCALERA 5 1 55.00 55.00 440.00

TOTALES M2 440.00
HOJA DE METRADOS
ARQUITECTURA
PROYECTO: HOSPITAL ATE

N° AREA
Part. Partidas Dimensiones
Und. Nro Vec. Largo Ancho Altura Parcial Total
08. MUROS Y TABIQUES DE ALBAÑILERIA
08.01 MURO DE LADRILLO KK DE ARCILLA DE CABEZA C/M 1:5 X 1.5 CM
SOTANO
EJE 12 m2 1 5.15 3.70 19.06
ENTRE EJES 12 y 15 m2 1 4.15 3.70 15.36
ENTRE EJES 16 y 17 m2 1 6.00 3.70 22.20
GRUPO ELECTROGENO m2 1 8.95 3.70 33.12
TRATAMIENTO DE RESIDUOS m2 1 12.20 3.70 45.14
SUBESTACION Y TABLERO m2 1 37.95 3.70 140.42
menos puertas y rejas de fierro m2 -2 3.45 3.30 -22.77
m2 -1 3.45 1.50 -5.18
m2 -1 3.80 1.50 -5.70 241.64
PRIMER PISO
EJE 2 m2 1 5.75 3.70 21.28
EJE 3 m2 1 6.80 3.70 25.16
ENTRE EJES 2 y 3 m2 1 8.60 3.70 31.82
ENTRE EJES 15 y 16 m2 1 5.85 3.70 21.65
ENTRE EJES 16 y 17 m2 1 3.20 3.70 11.84
EJE 19 m2 1 1.20 3.70 4.44
EJE 20 m2 1 3.00 3.70 11.10
EJE 28 m2 1 2.60 3.70 9.62
ENTRE EJES 26 y 28 m2 1 0.70 3.70 2.59
CASA DE FUERZA m2 1 38.00 3.70 140.60
Menos puertas de fierro m2 -1 4.62 1.00 -4.62
m2 -2 3.00 3.30 -19.80
AUDITORIO Y CAPILLA m2 1 55.35 5.70 315.50
Muros doble cabeza (0.40) m2 2 43.90 5.70 500.46 1,071.63
SEGUNDO PISO
EJE 2 m2 1 6.97 3.70 25.79
EJE 3 m2 1 6.97 3.70 25.79
ENTRE EJES 2 y 3 m2 1 8.30 3.70 30.71
EJE 10 m2 1 2.00 3.70 7.40
ENTRE EJES 10 y 11 m2 1 2.00 3.70 7.40
EJE 12 m2 1 1.50 3.70 5.55
EJE 13 m2 1 0.85 3.70 3.15
ENTRE EJES 13 y 15 m2 1 5.85 3.70 21.65
ENTRE EJES 16 y 17 m2 1 3.10 3.70 11.47
EJE 18 m2 1 1.20 3.70 4.44
EJE 20 m2 1 1.80 3.70 6.66
ENTRE EJES 20 y 23 m2 1 7.50 3.70 27.75
EJE 28 m2 1 2.60 3.70 9.62
ENTRE EJES 26 y 28 m2 1 2.90 3.70 10.73 198.10
TERCER PISO
EJE 2 m2 1 5.97 3.70 22.09
EJE 3 m2 1 6.97 3.70 25.79
ENTRE EJES 2 y 3 m2 1 8.00 3.70 29.60
EJE 10 m2 1 1.60 3.70 5.92
ENTRE EJES 10 y 11 m2 1 1.60 3.70 5.92
EJE 12 m2 1 1.65 3.70 6.11
ENTRE EJES 12 y 14 m2 1 5.85 3.70 21.65
ENTRE EJES 16 y 17 m2 1 1.25 3.30 4.13
m2 1 1.40 3.70 5.18
EJE 18 m2 1 1.45 3.70 5.37
EJE 19 m2 1 1.80 3.70 6.66
ENTRE EJES 26 y 28 m2 1 1.50 3.70 5.55
EJE 28 m2 1 2.60 3.70 9.62 153.57
CUARTO PISO
EJE 10 m2 1 1.60 3.70 5.92
ENTRE EJES 13 y 15 m2 1 5.85 3.70 21.65
EJE 17 m2 1 0.80 3.70 2.96
EJE 18 m2 1 0.60 3.30 1.98
ENTRE EJES 18 y 17 m2 1 2.20 3.70 8.14 40.65
QUINTO PISO
EJE 10 m2 1 1.60 3.70 5.92
ENTRE EJES 9 y 11 m2 1 2.70 3.70 9.99

Página 204 de 209


HOJA DE METRADOS
ARQUITECTURA
PROYECTO: HOSPITAL ATE

N° AREA
Part. Partidas Dimensiones
Und. Nro Vec. Largo Ancho Altura Parcial Total
ENTRE EJES 12 y 14 m2 1 4.35 3.70 16.10
EJE 12 m2 1 1.65 3.70 6.11
ENTRE EJES 16 y 17 m2 1 1.40 3.70 5.18 43.29
Total M2 1,748.86
08.02 MURO DE LADRILLO KK DE ARCILLA DE SOGA C/M 1:5 X 1.5 CM
SOTANO
ENTRE EJES 12 y 15 m2 1 42.60 3.70 157.62
m2 1 15.40 3.30 50.82
EJE 15 m2 1 40.50 3.30 133.65
ENTRE EJES 15 y 16 m2 1 27.80 3.30 91.74
m2 1 27.55 3.70 101.94
EJE 16 m2 1 18.35 3.30 60.56
ENTRE EJES 16 y 17 m2 1 22.85 3.30 75.41
m2 1 68.65 3.70 254.01
EJE 17 m2 1 43.25 3.30 142.73
EJE 20 m2 1 12.45 3.30 41.09
ENTRE EJES 20 y 23 m2 1 12.70 3.30 41.91
m2 1 44.95 3.70 166.32
EJE 23 m2 1 2.70 3.30 8.91
ENTRE EJES 23 y 24 m2 1 18.35 3.30 60.56
m2 1 29.30 3.70 108.41
EJE 24 m2 1 12.45 3.30 41.09
ENTRE EJES 24 y 25 m2 1 28.35 3.70 104.90
ENTRE EJES 25 y 26 m2 1 10.15 3.30 33.50
m2 1 39.00 3.70 144.30
m2 1 8.00 2.40 19.20
EJE 26 m2 1 19.75 3.30 65.18
m2 1 1.65 3.70 6.11
ENTRE EJES 26 y 28 m2 1 13.25 3.30 43.73
m2 1 6.90 3.70 25.53
EJE 28 m2 1 1.30 3.30 4.29
m2 1 1.65 3.70 6.11
GRUPO ELECTROGENO m2 1 14.80 3.70 54.76
TRATAMIENTO DE RESIDUOS m2 1 10.90 3.70 40.33 2,084.64
PRIMER PISO
EJE 2 m2 1 20.75 3.70 76.78
ENTRE EJES 2 y 3 m2 1 29.75 3.70 110.08
EJE 3 m2 1 20.50 3.70 75.85
EJE 4 m2 1 23.05 3.70 85.29
ENTRE EJES 3 y 5 m2 1 46.35 3.70 171.50
EJE 5 m2 1 26.20 3.70 96.94
ENTRE EJES 5 y 6 m2 1 11.50 3.70 42.55
EJE 6 m2 1 27.85 3.70 103.05
EJE 7 m2 1 22.45 3.70 83.07
EJE 8 m2 1 33.45 3.70 123.77
m2 1 4.40 2.40 10.56
ENTRE EJES 6 y 8 m2 1 52.55 3.70 194.44
EJE 9 m2 1 31.95 3.30 105.44
ENTRE EJES 8 y 9 m2 1 45.75 3.70 169.28
EJE 10 m2 1 28.75 3.30 94.88
m2 1 9.75 2.40 23.40
ENTRE EJES 9 y 10 m2 1 16.05 3.70 59.39
EJE 11 m2 1 23.50 3.30 77.55
ENTRE EJES 10 y 11 m2 1 48.25 3.70 178.53
m2 1 13.45 3.30 44.39
EJE 12 m2 1 29.00 3.30 95.70
EJE 13 m2 1 12.90 3.30 42.57
ENTRE EJES 11 y 12 m2 1 72.70 3.70 268.99
m2 1 35.70 3.30 117.81
EJE 15 m2 1 24.45 3.30 80.69
ENTRE EJES 13 y 15 m2 1 42.35 3.70 156.70
m2 1 21.35 3.30 70.46
EJE 16 m2 1 52.70 3.30 173.91
ENTRE EJES 15 y 16 m2 1 148.33 3.70 548.82
m2 1 54.45 3.30 179.69

Página 205 de 209


HOJA DE METRADOS
ARQUITECTURA
PROYECTO: HOSPITAL ATE

N° AREA
Part. Partidas Dimensiones
Und. Nro Vec. Largo Ancho Altura Parcial Total
EJE 17 m2 1 49.50 3.30 163.35
ENTRE EJES 16 y 17 m2 1 129.75 3.70 480.08
m2 1 43.85 3.30 144.71
EJE 18 m2 1 11.15 3.70 41.26
EJE 19 m2 1 10.65 3.30 35.15
EJE 20 m2 1 23.60 3.30 77.88
ENTRE EJES 17 y 20 m2 1 37.70 3.70 139.49
m2 1 17.80 3.30 58.74
EJE 23 m2 1 38.70 3.30 127.71
ENTRE EJES 20 y 23 m2 1 93.00 3.70 344.10
m2 1 34.60 3.30 114.18
EJE 24 m2 1 19.20 3.30 63.36
ENTRE EJES 23 y 24 m2 1 58.15 3.70 215.16
m2 1 33.55 3.30 110.72
EJE 25 m2 1 38.40 3.30 126.72
ENTRE EJES 24 y 25 m2 1 62.20 3.70 230.14
m2 1 25.75 3.30 84.98
EJE 26 m2 1 16.60 3.30 54.78
ENTRE EJES 25 y 26 m2 1 32.60 3.70 120.62
m2 1 33.00 3.30 108.90
EJE 27 m2 1 4.75 3.30 15.68
m2 1 9.70 3.70 35.89
EJE 28 m2 1 0.75 3.30 2.48
ENTRE EJES 26 y 28 m2 1 31.25 3.70 115.63
m2 1 16.80 3.30 55.44
EEJE DE VENTANAS V-32 A V-38 m2 1 35.15 3.70 130.06
CASETAS DE GUARDIANIA m2 3 9.30 2.65 73.94
CENTRAL DE VACIO Y AIRE C. m2 1 32.30 3.50 113.05
Menos puertas y rejas de fierro m2 -3 4.20 1.00 -12.60
m2 -2 2.30 1.00 -4.60
m2 -2 2.30 2.10 -9.66
CENTRAL DE OXIGENO m2 1 21.00 3.50 73.50
Menos puertas y rejas de fierro m2 -1 5.40 1.00 -5.40
m2 -2 3.40 1.00 -6.80
m2 -1 3.60 1.00 -3.60
m2 -1 1.80 2.10 -3.78
AUDITORIO Y CAPILLA m2 1 22.25 5.50 122.38 7,195.57
SEGUNDO PISO
EJE 2 m2 1 20.33 3.70 75.22
ENTRE EJES 2 y 3 m2 1 31.15 3.70 115.26
EJE 3 m2 1 20.33 3.70 75.22
EJE 4 m2 1 23.10 3.70 85.47
ENTRE EJES 3 y 5 m2 1 47.55 3.70 175.94
EJE 5 m2 1 26.20 3.70 96.94
ENTRE EJES 5 y 6 m2 1 14.15 3.70 52.36
EJE 6 m2 1 27.85 3.70 103.05
ENTRE EJES 6 y 7 m2 1 41.80 3.70 154.66
EJE 7 m2 1 25.45 3.70 94.17
ENTRE EJES 7 y 8 m2 1 2.20 3.70 8.14
EJE 8 m2 1 29.35 3.70 108.60
ENTRE EJES 8 y 9 m2 1 41.50 3.70 153.55
EJE 9 m2 1 29.35 3.70 108.60
ENTRE EJES 9 y 10 m2 1 14.60 3.70 54.02
EJE 10 m2 1 40.25 3.30 132.83
ENTRE EJES 10 y 11 m2 1 86.25 3.70 319.13
m2 1 16.30 3.30 53.79
EJE 11 m2 1 39.50 3.30 130.35
ENTRE EJES 11 y 12
vertical m2 1 58.45 3.70 216.27
m2 1 68.45 3.70 253.27
m2 1 32.55 3.30 107.42
EJE 12 m2 1 37.85 3.30 124.91
EJE 13 m2 1 10.65 3.30 35.15
ENTRE EJES 13 y 15 m2 1 26.70 3.30 88.11
m2 1 27.00 3.70 99.90

Página 206 de 209


HOJA DE METRADOS
ARQUITECTURA
PROYECTO: HOSPITAL ATE

N° AREA
Part. Partidas Dimensiones
Und. Nro Vec. Largo Ancho Altura Parcial Total
m2 1 6.90 1.00 6.90
EJE 15 m2 1 46.25 3.30 152.63
ENTRE EJES 15 y 16 m2 1 175.00 3.70 647.50
m2 1 44.95 3.30 148.34
EJE 16 m2 1 33.90 3.30 111.87
ENTRE EJES 16 y 17 m2 1 113.25 3.70 419.03
m2 1 26.95 3.30 88.94
m2 1 26.10 1.20 31.32
EJE 17 m2 1 53.05 3.30 175.07
ENTRE EJES 17 y 20 m2 1 66.60 3.70 246.42
m2 1 12.75 3.30 42.08
EJE 18 m2 1 15.25 3.70 56.43
EJE 19 m2 1 12.85 3.30 42.41
EJE 20 m2 1 21.15 3.30 69.80
ENTRE EJES 20 y 23 m2 1 86.30 3.70 319.31
m2 1 34.75 3.30 114.68
m2 1 1.80 1.80 3.24
EJE 23 m2 1 30.65 3.30 101.15
ENTRE EJES 23 y 24 m2 1 85.85 3.70 317.65
m2 1 29.15 3.30 96.20
EJE 24 m2 1 7.35 3.30 24.26
ENTRE EJES 24 y 25 m2 1 73.25 3.70 271.03
m2 1 14.00 3.30 46.20
EJE 25 m2 1 6.10 3.30 20.13
ENTRE EJES 25 y 26 m2 1 83.15 3.70 307.66
m2 1 43.55 3.30 143.72
EJE 26 m2 1 11.90 3.30 39.27
EJE 27 m2 1 10.35 3.30 34.16
ENTRE EJES 26 y 28 m2 1 23.55 3.70 87.14
m2 1 16.40 3.30 54.12
EJE 28 m2 1 26.95 3.30 88.94
EJE DE V-76 m2 1 34.55 3.70 127.84 7,457.60
TERCER PISO
EJE 10 m2 1 64.50 3.30 212.85
ENTRE EJES 10 y 11 m2 1 63.80 3.70 236.06
m2 1 11.85 3.30 39.11
EJE 11 m2 1 62.35 3.30 205.76
ENTRE EJES 11 y 12
vertical m2 1 61.35 3.70 227.00
m2 1 102.85 3.70 380.55
m2 1 38.80 3.30 128.04
EJE 12 m2 1 45.15 3.30 149.00
ENTRE EJES 12 y 14 m2 1 13.80 3.70 51.06
m2 1 6.45 3.30 21.29
EJE 14 m2 1 37.20 3.30 122.76
ENTRE EJES 14 y 16 m2 1 139.95 3.70 517.82
m2 1 43.85 3.30 144.71
EJE 16 m2 1 49.70 3.30 164.01
ENTRE EJES 16 y 17 m2 1 84.55 3.70 312.84
m2 1 25.60 3.30 84.48
EJE 17 m2 1 48.90 3.30 161.37
ENTRE EJES 17 y 19 m2 1 28.95 3.70 107.12
EJE 18 m2 1 2.65 3.70 9.81
EJE 19 m2 1 7.80 3.30 25.74
ENTRE EJES 19 y 22 m2 1 14.60 3.70 54.02
m2 1 10.25 3.30 33.83
ENTRE EJES 22 y 24 m2 1 9.40 3.70 34.78
m2 1 6.60 3.30 21.78
EJE 24 m2 1 3.85 3.30 12.71
EJE 25 m2 1 3.15 3.30 10.40
ENTRE EJES 25 y 26 m2 1 13.20 3.70 48.84
m2 1 2.20 3.30 7.26
ENTRE EJES 26 y 28 m2 1 3.60 3.70 13.32
m2 1 1.50 3.30 4.95
EJE 28 m2 1 6.45 3.30 21.29

Página 207 de 209


HOJA DE METRADOS
ARQUITECTURA
PROYECTO: HOSPITAL ATE

N° AREA
Part. Partidas Dimensiones
Und. Nro Vec. Largo Ancho Altura Parcial Total
ventana en eje N m2 1 34.55 3.70 127.84
TERRAZA ENTRE EJES 2-9 y D-M
parapeto m2 1 178.05 0.70 124.64
ducto m2 1 8.15 0.30 2.45
TERRAZA ENTRE EJES 13-28 y C-K
parapeto m2 1 119.65 0.70 83.76
ducto m2 1 3.90 0.30 1.17
TERRAZA ENTRE EJES 15-17 y S-U
parapeto m2 1 27.95 0.70 19.57 3,923.89
CUARTO PISO
ENTRE EJES 9 y 10 m2 1 48.60 3.70 179.82
EJE 10 m2 1 19.35 3.30 63.86
ENTRE EJES 9 y 11
modulo de baños m2 3 11.65 3.70 129.32
modulo de baños m2 4 20.15 3.70 298.22
modulo de baños m2 4 5.70 3.30 75.24
modulo de baños m2 1 14.85 3.70 54.95
m2 1 42.30 3.70 156.51
m2 1 26.85 3.30 88.61
EJE 11 m2 1 71.20 3.30 234.96
ENTRE EJES 11 y 12
vertical m2 1 52.30 3.70 193.51
m2 1 64.85 3.70 239.95
m2 1 39.60 3.30 130.68
EJE 12 m2 1 32.70 3.30 107.91
m2 1 12.90 1.80 23.22
EJE 13 m2 1 5.25 3.30 17.33
ENTRE EJES 13 y 15 m2 1 12.90 3.30 42.57
m2 1 10.70 3.70 39.59
EJE 15 m2 1 1.00 3.70 3.70
m2 1 37.25 3.30 122.93
ENTRE EJES 15 y 16
vertical m2 1 55.35 3.70 204.80
m2 1 70.95 3.70 262.52
m2 1 30.15 3.30 99.50
EJE 16 m2 1 64.50 3.30 212.85
ENTRE EJES 16 y 18 m2 1 31.60 3.30 104.28
m2 1 55.45 3.70 205.17
modulo de baños m2 1 13.75 3.70 50.88
modulo de baños m2 4 19.85 3.70 293.78
m2 4 5.70 3.30 75.24
ENTRE EJES 17 y 18 (Vertical) m2 1 52.95 3.70 195.92
EJE 18 m2 1 2.65 3.70 9.81
TERRAZA EJES 18-28 y K-N
parapeto m2 1 86.55 0.70 60.59
parapeto m2 1 11.40 2.10 23.94
ducto m2 1 14.40 0.70 10.08
ducto m2 1 3.95 0.30 1.19
hall y pozo ascensor m2 1 2.90 3.70 10.73 4,024.08
QUINTO PISO
SOLARIO EJES 10-12 y D-G m2 1 31.25 1.20 37.50
SOLARIO EJES 10-12 y S-U m2 1 35.95 1.20 43.14
ENTRE EJES 9 y 10 m2 1 48.60 3.70 179.82
EJE 10 m2 1 6.45 3.30 21.29
ENTRE EJES 9 y 11
modulo de baños m2 1 19.80 3.70 73.26
modulo de baños m2 1 18.50 3.70 68.45
modulo de baños m2 3 20.75 3.70 230.33
modulo de baños m2 1 23.70 3.70 87.69
modulo de baños m2 4 5.10 3.30 67.32
modulo de baños m2 1 22.70 3.70 83.99
m2 1 22.10 3.30 72.93
m2 1 22.60 3.70 83.62
EJE 11 m2 1 58.30 3.30 192.39
ENTRE EJES 11 y 12

Página 208 de 209


HOJA DE METRADOS
ARQUITECTURA
PROYECTO: HOSPITAL ATE

N° AREA
Part. Partidas Dimensiones
Und. Nro Vec. Largo Ancho Altura Parcial Total
vertical m2 1 44.15 3.70 163.36
m2 1 30.70 3.30 101.31
m2 1 50.80 3.70 187.96
EJE 12 m2 1 17.70 3.30 58.41
ENTRE EJES 12 y 14 m2 1 27.10 3.70 100.27
EJE 14 m2 1 6.45 3.30 21.29
EJE 15 m2 1 7.10 3.70 26.27
ENTRE EJES 15 y 16 m2 1 22.75 3.70 84.18
m2 1 1.75 3.30 5.78
EJE 16 m2 1 10.50 3.30 34.65
ENTRE EJES 16 y 17 m2 1 12.90 3.70 47.73
m2 1 2.80 3.30 9.24
EJE 17 m2 1 1.80 3.70 6.66
ENTRE EJES 17 y 18 m2 1 2.40 3.70 8.88
EJE 18 m2 1 1.80 3.30 5.94
TERRAZA EJES 12-18 y G-I
Parapetos perimetrales m2 1 34.70 0.70 24.29
Ductos m2 1 21.20 0.70 14.84
TERRAZA EJES 12-18 y I-U
Parapetos perimetrales m2 1 84.35 0.70 59.05
Ductos m2 1 33.70 0.70 23.59
Ductos m2 1 14.40 0.30 4.32 2,229.72
AZOTEA
PARAPETO m2 1 195.10 0.70 136.57
Ductos m2 1 38.70 0.70 27.09
Ductos m2 1 22.40 0.30 6.72 170.38
Sub Total 27,085.86
Total M2 27,085.86

08.03 ALAMBRE #8 REFUERZO HORIZONTAL


MURO DE LADRILLO KK CABEZA m2 1 1748.86
MURO DE LADRILLO KK SOGA m2 1 27085.86
28834.72 0.25 7,200.00
Total KG 7,200.00