01 OBRAS EXTERIORES
Detalle
Monomio Factor Porcentaje % IU Descripcion Indice Unificado
C 0.213 100.00 % 21 CEMENTO PORTLAND TIPO I
P.1/2
PLANTILLA PARA DETERMINAR K
PRESUPUESTO S/. 119,539.40 MES Agosto
ZONA ÁREA 6
SÍMBOLO C A D J M G 0 0
ÍNDICE 21 5 30 47 48 39 0 0
MES ANTERIOR 41.96 591.06 349.36 470.79 325.11 381.48
MES ACTUAL 426.76 668.58 650.49 633.53 402 489.4
2.16634604385129 0.107459649 0.130336329 0.538269717 0.0853188151702501 0.1962834225
Obtenemos el valor K
K 3.02773
K-1 2.02773
R = Vo(k-1) S/.242,393.69
VR = Vo + R S/.361,933.09 2021