Documentos de Académico
Documentos de Profesional
Documentos de Cultura
FECHA 26 DE JUNIO
AVANCE
%
TOTAL REAL ACUMULADO
PARTIDAS DE CONTROL UND ACUMULADO
A EJECUTAR REAL
REAL
ESTRUCTURAS
PLACAS & COLUMNAS
ENCOFRADO m2 1,555.10 #DIV/0!
ACERO kg 24,698.65 #DIV/0!
CONCRETO m3 194.98 #DIV/0!
VIGAS Y LOSAS
ENCOFRADO m2 2,426.42 #DIV/0!
ACERO kg 33,269.93 #DIV/0!
CONCRETO m3 309.51 #DIV/0!
ARQUITECTURA
ALBAÑILERÍA
MURO DE LADRILLO K.K. DE SOGA C:A, 1:5 Y m2 331.55 #DIV/0!
1cm DE ESPESOR DE JUNTA
MURO DE LADRILLO K.K. DE CABEZA C:A, 1:5 m2 0.00 #DIV/0!
Y 1cm DE ESPESOR DE JUNTA
REVOQUES Y ENLUCIDOS
TARRAJEO FROTACHADO EN MUROS m2 0.00 #DIV/0!
INTERIORES C:A, 1:5, e=1.5cm
TARRAJEO FROTACHADO EN MUROS m2 0.00 #DIV/0!
EXTERIORES C:A, 1:5, e=1.5cm
TARRAJEO DE VIGAS C:A, 1:5, e=1.5cm m2 0.00 #DIV/0!
VESTIDURA DE DERRAMES m 0.00 #DIV/0!
BRUÑAS m 0.00 #DIV/0!
CIELO RASO 0.00
TARRAJEO FROTACHADO EN CIELO RASO m2 0.00 #DIV/0!
C:A, 1:5, e=1.5cm
REPORTE DE PRODUCTIVIDAD
2,207.21
1,521.71
407.19
3,102.52
2,236.14
409.54
597.85
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
REAL HH ganadas o
REAL SEMANAL PROYECTADO S/.
ACUMULADO perdidas
0.00 0.00