Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LADO 1 HOR. Ø3/8'' |_____| kg 2 1.92 0.40 0.00 9 41.76 0.56 23.39
LADO 1 VER. Ø3/8'' |_____| kg 2 2.32 0.40 0.00 8 43.52 0.56 24.37
LADO 2TUB HOR. Ø3/8'' |_____| kg 2 1.26 0.40 0.00 2 6.64 0.56 3.72
LADO 2 DIAGONAL TUB HOR. Ø3/8'' |_____| kg 2 0.72 0.40 0.00 4 8.96 0.56 5.02
LADO 2 HOR. Ø3/8'' |_____| kg 2 1.40 0.40 0.00 3 10.80 0.56 6.05
LADO 2 VER. Ø3/8'' |_____| kg 2 2.32 0.40 0.00 2 10.88 0.56 6.09
LADO 2TUB VER. Ø3/8'' |_____| kg 2 1.76 0.40 0.00 2 8.64 0.56 4.84
LADO 3.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 3.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 3.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 3.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 3.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
LADO 4.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 4.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 4.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 4.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 4.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
BASE LON.1 Ø3/8'' |_____| kg 1 2.09 0.30 0.00 8 19.12 0.56 10.71
BASE LON.2 SUP. Ø3/8'' |_____| kg 1 2.09 0.30 0.00 6 14.34 0.56 8.03
BASE TRANS.1 Ø3/8'' |_____| kg 1 1.92 0.30 0.00 8 17.76 0.56 9.95
BASE TRANS.2 SUP. Ø3/8'' |_____| kg 1 1.92 0.30 0.00 7 15.54 0.56 8.70
Página 1
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
LADO 1 HOR. Ø3/8'' |_____| kg 2 1.92 0.40 0.00 9 41.76 0.56 23.39
LADO 1 VER. Ø3/8'' |_____| kg 2 2.32 0.40 0.00 8 43.52 0.56 24.37
LADO 2TUB HOR. Ø3/8'' |_____| kg 2 1.26 0.40 0.00 2 6.64 0.56 3.72
LADO 2 DIAGONAL TUB HOR. Ø3/8'' |_____| kg 2 0.72 0.40 0.00 4 8.96 0.56 5.02
LADO 2 HOR. Ø3/8'' |_____| kg 2 1.40 0.40 0.00 3 10.80 0.56 6.05
LADO 2 VER. Ø3/8'' |_____| kg 2 2.32 0.40 0.00 2 10.88 0.56 6.09
LADO 2TUB VER. Ø3/8'' |_____| kg 2 1.76 0.40 0.00 2 8.64 0.56 4.84
LADO 3.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 3.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 3.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 3.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 3.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
LADO 4.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 4.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 4.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 4.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 4.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
BASE LON.1 Ø3/8'' |_____| kg 1 2.09 0.30 0.00 8 19.12 0.56 10.71
BASE LON.2 SUP. Ø3/8'' |_____| kg 1 2.09 0.30 0.00 6 14.34 0.56 8.03
BASE TRANS.1 Ø3/8'' |_____| kg 1 1.92 0.30 0.00 8 17.76 0.56 9.95
BASE TRANS.2 SUP. Ø3/8'' |_____| kg 1 1.92 0.30 0.00 7 15.54 0.56 8.70
Página 2
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
LADO 1 HOR. Ø3/8'' |_____| kg 2 1.92 0.40 0.00 9 41.76 0.56 23.39
LADO 1 VER. Ø3/8'' |_____| kg 2 2.32 0.40 0.00 8 43.52 0.56 24.37
LADO 2TUB HOR. Ø3/8'' |_____| kg 2 1.26 0.40 0.00 2 6.64 0.56 3.72
LADO 2 DIAGONAL TUB HOR. Ø3/8'' |_____| kg 2 0.72 0.40 0.00 4 8.96 0.56 5.02
LADO 2 HOR. Ø3/8'' |_____| kg 2 1.40 0.40 0.00 3 10.80 0.56 6.05
LADO 2 VER. Ø3/8'' |_____| kg 2 2.32 0.40 0.00 2 10.88 0.56 6.09
LADO 2TUB VER. Ø3/8'' |_____| kg 2 1.76 0.40 0.00 2 8.64 0.56 4.84
LADO 3.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 3.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 3.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 3.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 3.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
LADO 4.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 4.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 4.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 4.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 4.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
BASE LON.1 Ø3/8'' |_____| kg 1 2.09 0.30 0.00 8 19.12 0.56 10.71
BASE LON.2 SUP. Ø3/8'' |_____| kg 1 2.09 0.30 0.00 6 14.34 0.56 8.03
BASE TRANS.1 Ø3/8'' |_____| kg 1 1.92 0.30 0.00 8 17.76 0.56 9.95
BASE TRANS.2 SUP. Ø3/8'' |_____| kg 1 1.92 0.30 0.00 7 15.54 0.56 8.70
Página 3
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
LADO 1 HOR. Ø3/8'' |_____| kg 2 1.92 0.40 0.00 9 41.76 0.56 23.39
LADO 1 VER. Ø3/8'' |_____| kg 2 2.32 0.40 0.00 8 43.52 0.56 24.37
LADO 2TUB HOR. Ø3/8'' |_____| kg 2 1.26 0.40 0.00 2 6.64 0.56 3.72
LADO 2 DIAGONAL TUB HOR. Ø3/8'' |_____| kg 2 0.72 0.40 0.00 4 8.96 0.56 5.02
LADO 2 HOR. Ø3/8'' |_____| kg 2 1.40 0.40 0.00 3 10.80 0.56 6.05
LADO 2 VER. Ø3/8'' |_____| kg 2 2.32 0.40 0.00 2 10.88 0.56 6.09
LADO 2TUB VER. Ø3/8'' |_____| kg 2 1.76 0.40 0.00 2 8.64 0.56 4.84
LADO 3.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 3.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 3.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 3.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 3.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
LADO 4.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 4.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 4.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 4.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 4.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
BASE LON.1 Ø3/8'' |_____| kg 1 2.09 0.30 0.00 8 19.12 0.56 10.71
BASE LON.2 SUP. Ø3/8'' |_____| kg 1 2.09 0.30 0.00 6 14.34 0.56 8.03
BASE TRANS.1 Ø3/8'' |_____| kg 1 1.92 0.30 0.00 8 17.76 0.56 9.95
BASE TRANS.2 SUP. Ø3/8'' |_____| kg 1 1.92 0.30 0.00 7 15.54 0.56 8.70
Página 4
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
LADO 1 HOR. Ø3/8'' |_____| kg 2 1.92 0.40 0.00 9 41.76 0.56 23.39
LADO 1 VER. Ø3/8'' |_____| kg 2 2.32 0.40 0.00 8 43.52 0.56 24.37
LADO 2TUB HOR. Ø3/8'' |_____| kg 2 1.26 0.40 0.00 2 6.64 0.56 3.72
LADO 2 DIAGONAL TUB HOR. Ø3/8'' |_____| kg 2 0.72 0.40 0.00 4 8.96 0.56 5.02
LADO 2 HOR. Ø3/8'' |_____| kg 2 1.40 0.40 0.00 3 10.80 0.56 6.05
LADO 2 VER. Ø3/8'' |_____| kg 2 2.32 0.40 0.00 2 10.88 0.56 6.09
LADO 2TUB VER. Ø3/8'' |_____| kg 2 1.76 0.40 0.00 2 8.64 0.56 4.84
LADO 3.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 3.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 3.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 3.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 3.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
LADO 4.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 4.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 4.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 4.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 4.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
BASE LON.1 Ø3/8'' |_____| kg 1 2.09 0.30 0.00 8 19.12 0.56 10.71
BASE LON.2 SUP. Ø3/8'' |_____| kg 1 2.09 0.30 0.00 6 14.34 0.56 8.03
BASE TRANS.1 Ø3/8'' |_____| kg 1 1.92 0.30 0.00 8 17.76 0.56 9.95
BASE TRANS.2 SUP. Ø3/8'' |_____| kg 1 1.92 0.30 0.00 7 15.54 0.56 8.70
Página 5
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
LADO 1 HOR. Ø3/8'' |_____| kg 2 1.92 0.40 0.00 9 41.76 0.56 23.39
LADO 1 VER. Ø3/8'' |_____| kg 2 2.32 0.40 0.00 8 43.52 0.56 24.37
LADO 2TUB HOR. Ø3/8'' |_____| kg 2 1.26 0.40 0.00 2 6.64 0.56 3.72
LADO 2 DIAGONAL TUB HOR. Ø3/8'' |_____| kg 2 0.72 0.40 0.00 4 8.96 0.56 5.02
LADO 2 HOR. Ø3/8'' |_____| kg 2 1.40 0.40 0.00 3 10.80 0.56 6.05
LADO 2 VER. Ø3/8'' |_____| kg 2 2.32 0.40 0.00 2 10.88 0.56 6.09
LADO 2TUB VER. Ø3/8'' |_____| kg 2 1.76 0.40 0.00 2 8.64 0.56 4.84
LADO 3.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 3.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 3.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 3.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 3.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
LADO 4.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 4.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 4.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 4.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 4.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
BASE LON.1 Ø3/8'' |_____| kg 1 2.09 0.30 0.00 8 19.12 0.56 10.71
BASE LON.2 SUP. Ø3/8'' |_____| kg 1 2.09 0.30 0.00 6 14.34 0.56 8.03
BASE TRANS.1 Ø3/8'' |_____| kg 1 1.92 0.30 0.00 8 17.76 0.56 9.95
BASE TRANS.2 SUP. Ø3/8'' |_____| kg 1 1.92 0.30 0.00 7 15.54 0.56 8.70
Página 6
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
LADO 1 HOR. Ø3/8'' |_____| kg 2 1.92 0.40 0.00 9 41.76 0.56 23.39
LADO 1 VER. Ø3/8'' |_____| kg 2 2.32 0.40 0.00 8 43.52 0.56 24.37
LADO 2TUB HOR. Ø3/8'' |_____| kg 2 1.26 0.40 0.00 2 6.64 0.56 3.72
LADO 2 DIAGONAL TUB HOR. Ø3/8'' |_____| kg 2 0.72 0.40 0.00 4 8.96 0.56 5.02
LADO 2 HOR. Ø3/8'' |_____| kg 2 1.40 0.40 0.00 3 10.80 0.56 6.05
LADO 2 VER. Ø3/8'' |_____| kg 2 2.32 0.40 0.00 2 10.88 0.56 6.09
LADO 2TUB VER. Ø3/8'' |_____| kg 2 1.76 0.40 0.00 2 8.64 0.56 4.84
LADO 3.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 3.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 3.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 3.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 3.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
LADO 4.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 4.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 4.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 4.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 4.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
BASE LON.1 Ø3/8'' |_____| kg 1 2.09 0.30 0.00 8 19.12 0.56 10.71
BASE LON.2 SUP. Ø3/8'' |_____| kg 1 2.09 0.30 0.00 6 14.34 0.56 8.03
BASE TRANS.1 Ø3/8'' |_____| kg 1 1.92 0.30 0.00 8 17.76 0.56 9.95
Página 7
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
BASE TRANS.2 SUP. Ø3/8'' |_____| kg 1 1.92 0.30 0.00 7 15.54 0.56 8.70
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
LADO 1 HOR. Ø3/8'' |_____| kg 2 1.92 0.40 0.00 9 41.76 0.56 23.39
LADO 1 VER. Ø3/8'' |_____| kg 2 2.32 0.40 0.00 8 43.52 0.56 24.37
LADO 2TUB HOR. Ø3/8'' |_____| kg 2 1.26 0.40 0.00 2 6.64 0.56 3.72
LADO 2 DIAGONAL TUB HOR. Ø3/8'' |_____| kg 2 0.72 0.40 0.00 4 8.96 0.56 5.02
LADO 2 HOR. Ø3/8'' |_____| kg 2 1.40 0.40 0.00 3 10.80 0.56 6.05
LADO 2 VER. Ø3/8'' |_____| kg 2 2.32 0.40 0.00 2 10.88 0.56 6.09
LADO 2TUB VER. Ø3/8'' |_____| kg 2 1.76 0.40 0.00 2 8.64 0.56 4.84
LADO 3.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 3.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 3.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 3.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 3.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
LADO 4.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 4.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 4.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 4.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 4.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
Página 8
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
BASE LON.1 Ø3/8'' |_____| kg 1 2.09 0.30 0.00 8 19.12 0.56 10.71
BASE LON.2 SUP. Ø3/8'' |_____| kg 1 2.09 0.30 0.00 6 14.34 0.56 8.03
BASE TRANS.1 Ø3/8'' |_____| kg 1 1.92 0.30 0.00 8 17.76 0.56 9.95
BASE TRANS.2 SUP. Ø3/8'' |_____| kg 1 1.92 0.30 0.00 7 15.54 0.56 8.70
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
ENTRADA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.25 0.00 5 12.50 0.56 7.00
H2 Ø3/8'' |_____| kg 2 0.36 0.40 0.00 2 3.04 0.56 1.70
H3 Ø3/8'' |_____| kg 2 0.21 0.40 0.00 2 2.44 0.56 1.37
H4 Ø3/8'' |_____| kg 2 0.23 0.40 0.00 2 2.52 0.56 1.41
H5 Ø3/8'' |_____| kg 2 0.45 0.40 0.00 2 3.40 0.56 1.90
V1 Ø3/8'' |_____| kg 2 2.42 0.20 0.00 2 10.48 0.56 5.87
V2 Ø3/8'' |_____| kg 2 1.93 0.20 0.00 2 8.52 0.56 4.77
V3 Ø3/8'' |_____| kg 2 1.56 0.20 0.00 2 7.04 0.56 3.94
DIA1 Ø3/8'' _____ kg 2 0.72 0.00 4 5.76 0.56 3.23
Página 9
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
SALIDA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.25 0.00 5 12.50 0.56 7.00
H2 Ø3/8'' |_____| kg 2 0.36 0.40 0.00 2 3.04 0.56 1.70
H3 Ø3/8'' |_____| kg 2 0.21 0.40 0.00 2 2.44 0.56 1.37
H4 Ø3/8'' |_____| kg 2 0.23 0.40 0.00 2 2.52 0.56 1.41
H5 Ø3/8'' |_____| kg 2 0.45 0.40 0.00 2 3.40 0.56 1.90
V1 Ø3/8'' |_____| kg 2 2.42 0.20 0.00 2 10.48 0.56 5.87
V2 Ø3/8'' |_____| kg 2 1.93 0.20 0.00 2 8.52 0.56 4.77
V3 Ø3/8'' |_____| kg 2 1.56 0.20 0.00 2 7.04 0.56 3.94
DIA1 Ø3/8'' _____ kg 2 0.72 0.00 4 5.76 0.56 3.23
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
LADO 1 HOR. Ø3/8'' |_____| kg 2 2.52 0.40 0.00 12 70.08 0.56 39.24
LADO 1 VER. Ø3/8'' |_____| kg 2 2.92 0.40 0.00 10 66.40 0.56 37.18
LADO 2 HOR.1 Ø3/8'' |_____| kg 2 2.52 0.40 0.00 6 35.04 0.56 19.62
LADO 2 HOR.2 Ø3/8'' |_____ kg 2 0.91 0.20 0.00 4 8.88 0.56 4.97
Página 10
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LADO 2 HOR.3 Ø3/8'' |_____ kg 2 0.66 0.20 0.00 4 6.88 0.56 3.85
LADO 2 HOR.4 Ø3/8'' |_____ kg 2 0.55 0.20 0.00 4 6.00 0.56 3.36
LADO 2 VER.1 Ø3/8'' |_____ kg 2 2.92 0.20 0.00 4 24.96 0.56 13.98
LADO 2 VER.2 Ø3/8'' |_____ kg 2 2.10 0.20 0.00 2 9.20 0.56 5.15
LADO 2 VER.3 Ø3/8'' |_____ kg 2 1.65 0.20 0.00 2 7.40 0.56 4.14
LADO 2 VER.4 Ø3/8'' |_____ kg 2 1.47 0.20 0.00 2 6.68 0.56 3.74
LADO 2 DIAGONAL TUB Ø3/8'' _____ kg 2 1.10 0.00 4 8.80 0.56 4.93
LADO 3.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 3.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 3.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 3.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 3.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
LADO 4.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 4.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 4.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 4.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 4.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
BASE LON.1 Ø3/8'' |_____| kg 1 2.14 0.30 0.00 10 24.40 0.56 13.66
BASE LON.2 SUP. Ø3/8'' |_____| kg 1 2.14 0.30 0.00 8 19.52 0.56 10.93
BASE TRANS.1 Ø3/8'' |_____| kg 1 2.52 0.30 0.00 9 25.38 0.56 14.21
BASE TRANS.2 SUP. Ø3/8'' |_____| kg 1 2.52 0.30 0.00 7 19.74 0.56 11.05
LON.1 SUP Ø3/8'' |_____| kg 1 4.75 0.40 0.00 1 5.15 0.56 2.88
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 3.98 0.40 0.00 4 17.52 0.56 9.81
TRANS.1 SUP Ø3/8'' _____ kg 1 1.99 0.00 7 13.93 0.56 7.80
TRANS.2 SUP Ø3/8'' _____ kg 1 1.64 0.00 2 3.28 0.56 1.84
TRANS.2 SUP Ø3/8'' _____ kg 1 1.15 0.00 2 2.30 0.56 1.29
TRANS.3 SUP Ø3/8'' _____ kg 1 0.59 0.00 2 1.18 0.56 0.66
Página 11
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
ENTRADA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.92 0.00 4 15.36 0.56 8.60
H2 Ø3/8'' |_____| kg 2 0.56 0.20 0.00 4 6.08 0.56 3.40
H3 Ø3/8'' |_____| kg 2 0.34 0.20 0.00 4 4.32 0.56 2.42
H4 Ø3/8'' |_____| kg 2 0.26 0.20 0.00 4 3.68 0.56 2.06
V1 Ø3/8'' |_____| kg 2 2.83 0.20 0.00 2 12.12 0.56 6.79
V2 Ø3/8'' |_____| kg 2 1.98 0.20 0.00 2 8.72 0.56 4.88
V3 Ø3/8'' |_____| kg 2 1.52 0.20 0.00 2 6.88 0.56 3.85
V4 Ø3/8'' |_____| kg 2 1.35 0.20 0.00 2 6.20 0.56 3.47
DIA1 Ø3/8'' _____ kg 2 1.10 0.00 4 8.80 0.56 4.93
LON.1 SUP Ø3/8'' |_____| kg 1 4.75 0.40 0.00 1 5.15 0.56 2.88
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 3.98 0.40 0.00 4 17.52 0.56 9.81
TRANS.1 SUP Ø3/8'' _____ kg 1 1.99 0.00 7 13.93 0.56 7.80
TRANS.2 SUP Ø3/8'' _____ kg 1 1.64 0.00 2 3.28 0.56 1.84
TRANS.2 SUP Ø3/8'' _____ kg 1 1.15 0.00 2 2.30 0.56 1.29
TRANS.3 SUP Ø3/8'' _____ kg 1 0.59 0.00 2 1.18 0.56 0.66
SALIDA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.92 0.00 4 15.36 0.56 8.60
H2 Ø3/8'' |_____| kg 2 0.56 0.20 0.00 4 6.08 0.56 3.40
H3 Ø3/8'' |_____| kg 2 0.34 0.20 0.00 4 4.32 0.56 2.42
H4 Ø3/8'' |_____| kg 2 0.26 0.20 0.00 4 3.68 0.56 2.06
V1 Ø3/8'' |_____| kg 2 2.83 0.20 0.00 2 12.12 0.56 6.79
V2 Ø3/8'' |_____| kg 2 1.98 0.20 0.00 2 8.72 0.56 4.88
V3 Ø3/8'' |_____| kg 2 1.52 0.20 0.00 2 6.88 0.56 3.85
V4 Ø3/8'' |_____| kg 2 1.35 0.20 0.00 2 6.20 0.56 3.47
DIA1 Ø3/8'' _____ kg 2 1.10 0.00 4 8.80 0.56 4.93
Página 12
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LON.1 SUP Ø3/8'' |_____| kg 1 4.75 0.40 0.00 1 5.15 0.56 2.88
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 3.98 0.40 0.00 4 17.52 0.56 9.81
TRANS.1 SUP Ø3/8'' _____ kg 1 1.99 0.00 7 13.93 0.56 7.80
TRANS.2 SUP Ø3/8'' _____ kg 1 1.64 0.00 2 3.28 0.56 1.84
TRANS.2 SUP Ø3/8'' _____ kg 1 1.15 0.00 2 2.30 0.56 1.29
TRANS.3 SUP Ø3/8'' _____ kg 1 0.59 0.00 2 1.18 0.56 0.66
ENTRADA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.25 0.00 5 12.50 0.56 7.00
H2 Ø3/8'' |_____| kg 2 0.36 0.40 0.00 2 3.04 0.56 1.70
H3 Ø3/8'' |_____| kg 2 0.21 0.40 0.00 2 2.44 0.56 1.37
H4 Ø3/8'' |_____| kg 2 0.23 0.40 0.00 2 2.52 0.56 1.41
H5 Ø3/8'' |_____| kg 2 0.45 0.40 0.00 2 3.40 0.56 1.90
V1 Ø3/8'' |_____| kg 2 2.42 0.20 0.00 2 10.48 0.56 5.87
V2 Ø3/8'' |_____| kg 2 1.93 0.20 0.00 2 8.52 0.56 4.77
V3 Ø3/8'' |_____| kg 2 1.56 0.20 0.00 2 7.04 0.56 3.94
DIA1 Ø3/8'' _____ kg 2 0.72 0.00 4 5.76 0.56 3.23
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
SALIDA
CABEZAL - PARAPETO gancho empal kg/m
Página 13
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
ENTRADA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 7.47 0.00 3 44.82 0.56 25.10
H2 Ø3/8'' |_____| kg 2 0.78 0.20 0.00 4 7.84 0.56 4.39
H3 Ø3/8'' |_____| kg 2 0.49 0.20 0.00 4 5.52 0.56 3.09
H4 Ø3/8'' |_____| kg 2 0.35 0.20 0.00 4 4.40 0.56 2.46
H5 Ø3/8'' |_____| kg 2 0.31 0.20 0.00 2 2.04 0.56 1.14
H6 Ø3/8'' |_____| kg 2 1.74 4 13.92 0.56 7.80
H6 Ø3/8'' |_____| kg 2 1.16 4 9.28 0.56 5.20
H6 Ø3/8'' |_____| kg 2 0.90 4 7.20 0.56 4.03
H6 Ø3/8'' |_____| kg 2 0.80 2 3.20 0.56 1.79
V1 Ø3/8'' |_____| kg 2 2.83 0.20 0.00 8 48.48 0.56 27.15
V2 Ø3/8'' |_____| kg 2 2.37 0.20 0.00 6 30.84 0.56 17.27
V3 Ø3/8'' |_____| kg 2 1.53 0.20 0.00 6 20.76 0.56 11.63
V4 Ø3/8'' |_____| kg 2 1.20 0.20 0.00 6 16.80 0.56 9.41
V5 Ø3/8'' |_____| kg 2 1.05 0.20 0.00 6 15.00 0.56 8.40
DIA1 Ø3/8'' _____ kg 2 1.38 0.00 12 33.12 0.56 18.55
Página 14
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LON.2 PROM. Ø1/2'' |_____| kg 1 9.78 0.40 0.50 6 64.08 0.99 63.44
TRANS.1 Ø1/2'' _____ kg 1 2.10 0.00 28 58.80 0.99 58.21
TRANS.2 Ø1/2'' _____ kg 1 2.03 0.00 2 4.06 0.99 4.02
TRANS.3 Ø1/2'' _____ kg 1 1.67 0.00 2 3.34 0.99 3.31
TRANS.4 Ø1/2'' _____ kg 1 1.31 0.00 2 2.62 0.99 2.59
TRANS.5 Ø1/2'' _____ kg 1 0.95 0.00 2 1.90 0.99 1.88
TRANS.6 Ø1/2'' _____ kg 1 0.50 0.00 2 1.00 0.99 0.99
DIA.1 Ø1/2'' _____ kg 1 2.34 0.00 2 4.68 0.99 4.63
DIA.2 Ø1/2'' _____ kg 2 1.00 0.00 8 16.00 0.99 15.84
LON.1 SUP Ø3/8'' |_____| kg 1 10.57 0.40 0.00 2 21.94 0.56 12.29
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 9.78 0.40 0.00 6 61.08 0.56 34.20
TRANS.1 SUP Ø3/8'' _____ kg 1 2.10 0.00 28 58.80 0.56 32.93
TRANS.2 SUP Ø3/8'' _____ kg 1 2.03 0.00 2 4.06 0.56 2.27
TRANS.3 SUP Ø3/8'' _____ kg 1 1.67 0.00 2 3.34 0.56 1.87
TRANS.4 SUP Ø3/8'' _____ kg 1 1.31 0.00 2 2.62 0.56 1.47
TRANS.5 SUP Ø3/8'' _____ kg 1 0.95 0.00 2 1.90 0.56 1.06
TRANS.6 SUP Ø3/8'' _____ kg 1 0.50 0.00 2 1.00 0.56 0.56
SALIDA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 7.47 0.00 3 44.82 0.56 25.10
H2 Ø3/8'' |_____| kg 2 0.78 0.20 0.00 4 7.84 0.56 4.39
H3 Ø3/8'' |_____| kg 2 0.49 0.20 0.00 4 5.52 0.56 3.09
H4 Ø3/8'' |_____| kg 2 0.35 0.20 0.00 4 4.40 0.56 2.46
H5 Ø3/8'' |_____| kg 2 0.31 0.20 0.00 2 2.04 0.56 1.14
H6 Ø3/8'' |_____| kg 2 1.74 4 13.92 0.56 7.80
H6 Ø3/8'' |_____| kg 2 1.16 4 9.28 0.56 5.20
H6 Ø3/8'' |_____| kg 2 0.90 4 7.20 0.56 4.03
H6 Ø3/8'' |_____| kg 2 0.80 2 3.20 0.56 1.79
V1 Ø3/8'' |_____| kg 2 2.83 0.20 0.00 8 48.48 0.56 27.15
V2 Ø3/8'' |_____| kg 2 2.37 0.20 0.00 6 30.84 0.56 17.27
V3 Ø3/8'' |_____| kg 2 1.53 0.20 0.00 6 20.76 0.56 11.63
V4 Ø3/8'' |_____| kg 2 1.20 0.20 0.00 6 16.80 0.56 9.41
V5 Ø3/8'' |_____| kg 2 1.05 0.20 0.00 6 15.00 0.56 8.40
DIA1 Ø3/8'' _____ kg 2 1.38 0.00 12 33.12 0.56 18.55
LON.1 SUP Ø3/8'' |_____| kg 1 10.57 0.40 0.00 2 21.94 0.56 12.29
Página 15
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 9.78 0.40 0.00 6 61.08 0.56 34.20
TRANS.1 SUP Ø3/8'' _____ kg 1 2.10 0.00 28 58.80 0.56 32.93
TRANS.2 SUP Ø3/8'' _____ kg 1 2.03 0.00 2 4.06 0.56 2.27
TRANS.3 SUP Ø3/8'' _____ kg 1 1.67 0.00 2 3.34 0.56 1.87
TRANS.4 SUP Ø3/8'' _____ kg 1 1.31 0.00 2 2.62 0.56 1.47
TRANS.5 SUP Ø3/8'' _____ kg 1 0.95 0.00 2 1.90 0.56 1.06
TRANS.6 SUP Ø3/8'' _____ kg 1 0.50 0.00 2 1.00 0.56 0.56
LADO 1 HOR. Ø3/8'' |_____| kg 2 1.92 0.40 0.00 9 41.76 0.56 23.39
LADO 1 VER. Ø3/8'' |_____| kg 2 2.32 0.40 0.00 8 43.52 0.56 24.37
LADO 2TUB HOR. Ø3/8'' |_____| kg 2 1.26 0.40 0.00 2 6.64 0.56 3.72
LADO 2 DIAGONAL TUB HOR. Ø3/8'' |_____| kg 2 0.72 0.40 0.00 4 8.96 0.56 5.02
LADO 2 HOR. Ø3/8'' |_____| kg 2 1.40 0.40 0.00 3 10.80 0.56 6.05
LADO 2 VER. Ø3/8'' |_____| kg 2 2.32 0.40 0.00 2 10.88 0.56 6.09
LADO 2TUB VER. Ø3/8'' |_____| kg 2 1.76 0.40 0.00 2 8.64 0.56 4.84
LADO 3.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 3.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 3.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 3.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 3.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
LADO 4.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 4.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 4.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 4.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 4.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
BASE LON.1 Ø3/8'' |_____| kg 1 2.09 0.30 0.00 8 19.12 0.56 10.71
BASE LON.2 SUP. Ø3/8'' |_____| kg 1 2.09 0.30 0.00 6 14.34 0.56 8.03
BASE TRANS.1 Ø3/8'' |_____| kg 1 1.92 0.30 0.00 8 17.76 0.56 9.95
BASE TRANS.2 SUP. Ø3/8'' |_____| kg 1 1.92 0.30 0.00 7 15.54 0.56 8.70
Página 16
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
LADO 1 HOR. Ø3/8'' |_____| kg 2 1.92 0.40 0.00 9 41.76 0.56 23.39
LADO 1 VER. Ø3/8'' |_____| kg 2 2.32 0.40 0.00 8 43.52 0.56 24.37
LADO 2TUB HOR. Ø3/8'' |_____| kg 2 1.26 0.40 0.00 2 6.64 0.56 3.72
LADO 2 DIAGONAL TUB HOR. Ø3/8'' |_____| kg 2 0.72 0.40 0.00 4 8.96 0.56 5.02
LADO 2 HOR. Ø3/8'' |_____| kg 2 1.40 0.40 0.00 3 10.80 0.56 6.05
LADO 2 VER. Ø3/8'' |_____| kg 2 2.32 0.40 0.00 2 10.88 0.56 6.09
LADO 2TUB VER. Ø3/8'' |_____| kg 2 1.76 0.40 0.00 2 8.64 0.56 4.84
LADO 3.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 3.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 3.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 3.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 3.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
LADO 4.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 4.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 4.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 4.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 4.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
BASE LON.1 Ø3/8'' |_____| kg 1 2.09 0.30 0.00 8 19.12 0.56 10.71
BASE LON.2 SUP. Ø3/8'' |_____| kg 1 2.09 0.30 0.00 6 14.34 0.56 8.03
BASE TRANS.1 Ø3/8'' |_____| kg 1 1.92 0.30 0.00 8 17.76 0.56 9.95
BASE TRANS.2 SUP. Ø3/8'' |_____| kg 1 1.92 0.30 0.00 7 15.54 0.56 8.70
Página 17
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
LADO 1 HOR. Ø3/8'' |_____| kg 2 1.92 0.40 0.00 9 41.76 0.56 23.39
LADO 1 VER. Ø3/8'' |_____| kg 2 2.32 0.40 0.00 8 43.52 0.56 24.37
LADO 2TUB HOR. Ø3/8'' |_____| kg 2 1.26 0.40 0.00 2 6.64 0.56 3.72
LADO 2 DIAGONAL TUB HOR. Ø3/8'' |_____| kg 2 0.72 0.40 0.00 4 8.96 0.56 5.02
LADO 2 HOR. Ø3/8'' |_____| kg 2 1.40 0.40 0.00 3 10.80 0.56 6.05
LADO 2 VER. Ø3/8'' |_____| kg 2 2.32 0.40 0.00 2 10.88 0.56 6.09
LADO 2TUB VER. Ø3/8'' |_____| kg 2 1.76 0.40 0.00 2 8.64 0.56 4.84
LADO 3.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 3.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 3.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 3.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 3.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
LADO 4.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 4.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
Página 18
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LADO 4.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 4.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 4.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
BASE LON.1 Ø3/8'' |_____| kg 1 2.09 0.30 0.00 8 19.12 0.56 10.71
BASE LON.2 SUP. Ø3/8'' |_____| kg 1 2.09 0.30 0.00 6 14.34 0.56 8.03
BASE TRANS.1 Ø3/8'' |_____| kg 1 1.92 0.30 0.00 8 17.76 0.56 9.95
BASE TRANS.2 SUP. Ø3/8'' |_____| kg 1 1.92 0.30 0.00 7 15.54 0.56 8.70
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
LADO 1 HOR. Ø3/8'' |_____| kg 2 1.92 0.40 0.00 9 41.76 0.56 23.39
LADO 1 VER. Ø3/8'' |_____| kg 2 2.32 0.40 0.00 8 43.52 0.56 24.37
LADO 2TUB HOR. Ø3/8'' |_____| kg 2 1.26 0.40 0.00 2 6.64 0.56 3.72
LADO 2 DIAGONAL TUB HOR. Ø3/8'' |_____| kg 2 0.72 0.40 0.00 4 8.96 0.56 5.02
LADO 2 HOR. Ø3/8'' |_____| kg 2 1.40 0.40 0.00 3 10.80 0.56 6.05
LADO 2 VER. Ø3/8'' |_____| kg 2 2.32 0.40 0.00 2 10.88 0.56 6.09
LADO 2TUB VER. Ø3/8'' |_____| kg 2 1.76 0.40 0.00 2 8.64 0.56 4.84
LADO 3.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
Página 19
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LADO 3.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 3.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 3.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 3.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
LADO 4.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 4.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 4.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 4.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 4.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
BASE LON.1 Ø3/8'' |_____| kg 1 2.09 0.30 0.00 8 19.12 0.56 10.71
BASE LON.2 SUP. Ø3/8'' |_____| kg 1 2.09 0.30 0.00 6 14.34 0.56 8.03
BASE TRANS.1 Ø3/8'' |_____| kg 1 1.92 0.30 0.00 8 17.76 0.56 9.95
BASE TRANS.2 SUP. Ø3/8'' |_____| kg 1 1.92 0.30 0.00 7 15.54 0.56 8.70
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
ENTRADA
CABEZAL - PARAPETO gancho empal kg/m
Página 20
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
SALIDA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.25 0.00 5 12.50 0.56 7.00
H2 Ø3/8'' |_____| kg 2 0.36 0.40 0.00 2 3.04 0.56 1.70
H3 Ø3/8'' |_____| kg 2 0.21 0.40 0.00 2 2.44 0.56 1.37
H4 Ø3/8'' |_____| kg 2 0.23 0.40 0.00 2 2.52 0.56 1.41
H5 Ø3/8'' |_____| kg 2 0.45 0.40 0.00 2 3.40 0.56 1.90
V1 Ø3/8'' |_____| kg 2 2.42 0.20 0.00 2 10.48 0.56 5.87
V2 Ø3/8'' |_____| kg 2 1.93 0.20 0.00 2 8.52 0.56 4.77
V3 Ø3/8'' |_____| kg 2 1.56 0.20 0.00 2 7.04 0.56 3.94
DIA1 Ø3/8'' _____ kg 2 0.72 0.00 4 5.76 0.56 3.23
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
Página 21
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LADO 1 HOR. Ø3/8'' |_____| kg 2 1.92 0.40 0.00 9 41.76 0.56 23.39
LADO 1 VER. Ø3/8'' |_____| kg 2 2.32 0.40 0.00 8 43.52 0.56 24.37
LADO 2TUB HOR. Ø3/8'' |_____| kg 2 1.26 0.40 0.00 2 6.64 0.56 3.72
LADO 2 DIAGONAL TUB HOR. Ø3/8'' |_____| kg 2 0.72 0.40 0.00 4 8.96 0.56 5.02
LADO 2 HOR. Ø3/8'' |_____| kg 2 1.40 0.40 0.00 3 10.80 0.56 6.05
LADO 2 VER. Ø3/8'' |_____| kg 2 2.32 0.40 0.00 2 10.88 0.56 6.09
LADO 2TUB VER. Ø3/8'' |_____| kg 2 1.76 0.40 0.00 2 8.64 0.56 4.84
LADO 3.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 3.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 3.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 3.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 3.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
LADO 4.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 4.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 4.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 4.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 4.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
BASE LON.1 Ø3/8'' |_____| kg 1 2.09 0.30 0.00 8 19.12 0.56 10.71
BASE LON.2 SUP. Ø3/8'' |_____| kg 1 2.09 0.30 0.00 6 14.34 0.56 8.03
BASE TRANS.1 Ø3/8'' |_____| kg 1 1.92 0.30 0.00 8 17.76 0.56 9.95
BASE TRANS.2 SUP. Ø3/8'' |_____| kg 1 1.92 0.30 0.00 7 15.54 0.56 8.70
Página 22
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
ENTRADA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.50 0.00 4 12.00 0.56 6.72
H2 Ø3/8'' |_____| kg 2 0.44 0.20 0.00 4 5.12 0.56 2.87
H3 Ø3/8'' |_____| kg 2 0.25 0.20 0.00 4 3.60 0.56 2.02
H4 Ø3/8'' |_____| kg 2 0.20 0.20 0.00 2 1.60 0.56 0.90
V1 Ø3/8'' |_____| kg 2 2.50 0.20 0.00 2 10.80 0.56 6.05
V2 Ø3/8'' |_____| kg 2 1.87 0.20 0.00 2 8.28 0.56 4.64
V3 Ø3/8'' |_____| kg 2 1.42 0.20 0.00 2 6.48 0.56 3.63
V4 Ø3/8'' |_____| kg 2 1.30 0.20 0.00 1 3.00 0.56 1.68
DIA1 Ø3/8'' _____ kg 2 0.72 0.00 4 5.76 0.56 3.23
LON.1 SUP Ø3/8'' |_____| kg 1 4.06 0.40 0.00 1 4.46 0.56 2.50
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 3.34 0.40 0.00 4 14.96 0.56 8.38
TRANS.1 SUP Ø3/8'' _____ kg 1 1.73 0.00 5 8.65 0.56 4.84
TRANS.2 SUP Ø3/8'' _____ kg 1 1.10 0.00 2 2.20 0.56 1.23
TRANS.2 SUP Ø3/8'' _____ kg 1 1.56 0.00 2 3.12 0.56 1.75
SALIDA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.50 0.00 4 12.00 0.56 6.72
Página 23
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LON.1 SUP Ø3/8'' |_____| kg 1 4.06 0.40 0.00 1 4.46 0.56 2.50
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 3.34 0.40 0.00 4 14.96 0.56 8.38
TRANS.1 SUP Ø3/8'' _____ kg 1 1.73 0.00 5 8.65 0.56 4.84
TRANS.2 SUP Ø3/8'' _____ kg 1 1.10 0.00 2 2.20 0.56 1.23
TRANS.2 SUP Ø3/8'' _____ kg 1 1.56 0.00 2 3.12 0.56 1.75
LADO 1 HOR. Ø3/8'' |_____| kg 2 2.22 0.40 0.00 10 52.40 0.56 29.34
LADO 1 VER. Ø3/8'' |_____| kg 2 2.62 0.40 0.00 9 54.36 0.56 30.44
LADO 2 HOR.1 Ø3/8'' |_____| kg 2 2.22 0.40 0.00 6 31.44 0.56 17.61
LADO 2 HOR.2 Ø3/8'' |_____ kg 2 0.79 0.20 0.00 4 7.92 0.56 4.44
LADO 2 HOR.3 Ø3/8'' |_____ kg 2 0.60 0.20 0.00 4 6.40 0.56 3.58
LADO 2 HOR.4 Ø3/8'' |_____ kg 2 0.55 0.20 0.00 2 3.00 0.56 1.68
LADO 2 VER.1 Ø3/8'' |_____ kg 2 2.62 0.20 0.00 4 22.56 0.56 12.63
LADO 2 VER.2 Ø3/8'' |_____ kg 2 2.09 0.20 0.00 2 9.16 0.56 5.13
LADO 2 VER.3 Ø3/8'' |_____ kg 2 1.64 0.20 0.00 2 7.36 0.56 4.12
LADO 2 VER.4 Ø3/8'' |_____ kg 2 1.52 0.20 0.00 1 3.44 0.56 1.93
LADO 2 DIAGONAL TUB Ø3/8'' _____ kg 2 0.72 0.00 4 5.76 0.56 3.23
LADO 3.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 3.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 3.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 3.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 3.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
Página 24
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LADO 4.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 4.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 4.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 4.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 4.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
BASE LON.1 Ø3/8'' |_____| kg 1 2.06 0.30 0.00 9 21.24 0.56 11.89
BASE LON.2 SUP. Ø3/8'' |_____| kg 1 2.06 0.30 0.00 7 16.52 0.56 9.25
BASE TRANS.1 Ø3/8'' |_____| kg 1 2.22 0.30 0.00 8 20.16 0.56 11.29
BASE TRANS.2 SUP. Ø3/8'' |_____| kg 1 2.22 0.30 0.00 7 17.64 0.56 9.88
LON.1 SUP Ø3/8'' |_____| kg 1 4.06 0.40 0.00 1 4.46 0.56 2.50
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 3.34 0.40 0.00 4 14.96 0.56 8.38
TRANS.1 SUP Ø3/8'' _____ kg 1 1.73 0.00 5 8.65 0.56 4.84
TRANS.2 SUP Ø3/8'' _____ kg 1 1.10 0.00 2 2.20 0.56 1.23
TRANS.2 SUP Ø3/8'' _____ kg 1 1.56 0.00 2 3.12 0.56 1.75
LADO 1 HOR. Ø3/8'' |_____| kg 2 2.22 0.40 0.00 10 52.40 0.56 29.34
LADO 1 VER. Ø3/8'' |_____| kg 2 2.62 0.40 0.00 9 54.36 0.56 30.44
LADO 2 HOR.1 Ø3/8'' |_____| kg 2 2.22 0.40 0.00 6 31.44 0.56 17.61
LADO 2 HOR.2 Ø3/8'' |_____ kg 2 0.79 0.20 0.00 4 7.92 0.56 4.44
LADO 2 HOR.3 Ø3/8'' |_____ kg 2 0.60 0.20 0.00 4 6.40 0.56 3.58
Página 25
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LADO 2 HOR.4 Ø3/8'' |_____ kg 2 0.55 0.20 0.00 2 3.00 0.56 1.68
LADO 2 VER.1 Ø3/8'' |_____ kg 2 2.62 0.20 0.00 4 22.56 0.56 12.63
LADO 2 VER.2 Ø3/8'' |_____ kg 2 2.09 0.20 0.00 2 9.16 0.56 5.13
LADO 2 VER.3 Ø3/8'' |_____ kg 2 1.64 0.20 0.00 2 7.36 0.56 4.12
LADO 2 VER.4 Ø3/8'' |_____ kg 2 1.52 0.20 0.00 1 3.44 0.56 1.93
LADO 2 DIAGONAL TUB Ø3/8'' _____ kg 2 0.72 0.00 4 5.76 0.56 3.23
LADO 3.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 3.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 3.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 3.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 3.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
LADO 4.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 4.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 4.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 4.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 4.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
BASE LON.1 Ø3/8'' |_____| kg 1 2.06 0.30 0.00 9 21.24 0.56 11.89
BASE LON.2 SUP. Ø3/8'' |_____| kg 1 2.06 0.30 0.00 7 16.52 0.56 9.25
BASE TRANS.1 Ø3/8'' |_____| kg 1 2.22 0.30 0.00 8 20.16 0.56 11.29
BASE TRANS.2 SUP. Ø3/8'' |_____| kg 1 2.22 0.30 0.00 7 17.64 0.56 9.88
LON.1 SUP Ø3/8'' |_____| kg 1 4.06 0.40 0.00 1 4.46 0.56 2.50
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 3.34 0.40 0.00 4 14.96 0.56 8.38
Página 26
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LADO 1 HOR. Ø3/8'' |_____| kg 2 2.22 0.40 0.00 10 52.40 0.56 29.34
LADO 1 VER. Ø3/8'' |_____| kg 2 2.62 0.40 0.00 9 54.36 0.56 30.44
LADO 2 HOR.1 Ø3/8'' |_____| kg 2 2.22 0.40 0.00 6 31.44 0.56 17.61
LADO 2 HOR.2 Ø3/8'' |_____ kg 2 0.79 0.20 0.00 4 7.92 0.56 4.44
LADO 2 HOR.3 Ø3/8'' |_____ kg 2 0.60 0.20 0.00 4 6.40 0.56 3.58
LADO 2 HOR.4 Ø3/8'' |_____ kg 2 0.55 0.20 0.00 2 3.00 0.56 1.68
LADO 2 VER.1 Ø3/8'' |_____ kg 2 2.62 0.20 0.00 4 22.56 0.56 12.63
LADO 2 VER.2 Ø3/8'' |_____ kg 2 2.09 0.20 0.00 2 9.16 0.56 5.13
LADO 2 VER.3 Ø3/8'' |_____ kg 2 1.64 0.20 0.00 2 7.36 0.56 4.12
LADO 2 VER.4 Ø3/8'' |_____ kg 2 1.52 0.20 0.00 1 3.44 0.56 1.93
LADO 2 DIAGONAL TUB Ø3/8'' _____ kg 2 0.72 0.00 4 5.76 0.56 3.23
LADO 3.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 3.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 3.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 3.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 3.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
LADO 4.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 4.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 4.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 4.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 4.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
BASE LON.1 Ø3/8'' |_____| kg 1 2.06 0.30 0.00 9 21.24 0.56 11.89
BASE LON.2 SUP. Ø3/8'' |_____| kg 1 2.06 0.30 0.00 7 16.52 0.56 9.25
BASE TRANS.1 Ø3/8'' |_____| kg 1 2.22 0.30 0.00 8 20.16 0.56 11.29
BASE TRANS.2 SUP. Ø3/8'' |_____| kg 1 2.22 0.30 0.00 7 17.64 0.56 9.88
Página 27
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LON.1 SUP Ø3/8'' |_____| kg 1 4.06 0.40 0.00 1 4.46 0.56 2.50
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 3.34 0.40 0.00 4 14.96 0.56 8.38
TRANS.1 SUP Ø3/8'' _____ kg 1 1.73 0.00 5 8.65 0.56 4.84
TRANS.2 SUP Ø3/8'' _____ kg 1 1.10 0.00 2 2.20 0.56 1.23
TRANS.2 SUP Ø3/8'' _____ kg 1 1.56 0.00 2 3.12 0.56 1.75
ENTRADA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.50 0.00 4 12.00 0.56 6.72
H2 Ø3/8'' |_____| kg 2 0.44 0.20 0.00 4 5.12 0.56 2.87
H3 Ø3/8'' |_____| kg 2 0.25 0.20 0.00 4 3.60 0.56 2.02
H4 Ø3/8'' |_____| kg 2 0.20 0.20 0.00 2 1.60 0.56 0.90
V1 Ø3/8'' |_____| kg 2 2.50 0.20 0.00 2 10.80 0.56 6.05
V2 Ø3/8'' |_____| kg 2 1.87 0.20 0.00 2 8.28 0.56 4.64
V3 Ø3/8'' |_____| kg 2 1.42 0.20 0.00 2 6.48 0.56 3.63
V4 Ø3/8'' |_____| kg 2 1.30 0.20 0.00 1 3.00 0.56 1.68
DIA1 Ø3/8'' _____ kg 2 0.72 0.00 4 5.76 0.56 3.23
LON.1 SUP Ø3/8'' |_____| kg 1 4.06 0.40 0.00 1 4.46 0.56 2.50
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 3.34 0.40 0.00 4 14.96 0.56 8.38
TRANS.1 SUP Ø3/8'' _____ kg 1 1.73 0.00 5 8.65 0.56 4.84
TRANS.2 SUP Ø3/8'' _____ kg 1 1.10 0.00 2 2.20 0.56 1.23
TRANS.2 SUP Ø3/8'' _____ kg 1 1.56 0.00 2 3.12 0.56 1.75
Página 28
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
SALIDA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.50 0.00 4 12.00 0.56 6.72
H2 Ø3/8'' |_____| kg 2 0.44 0.20 0.00 4 5.12 0.56 2.87
H3 Ø3/8'' |_____| kg 2 0.25 0.20 0.00 4 3.60 0.56 2.02
H4 Ø3/8'' |_____| kg 2 0.20 0.20 0.00 2 1.60 0.56 0.90
V1 Ø3/8'' |_____| kg 2 2.50 0.20 0.00 2 10.80 0.56 6.05
V2 Ø3/8'' |_____| kg 2 1.87 0.20 0.00 2 8.28 0.56 4.64
V3 Ø3/8'' |_____| kg 2 1.42 0.20 0.00 2 6.48 0.56 3.63
V4 Ø3/8'' |_____| kg 2 1.30 0.20 0.00 1 3.00 0.56 1.68
DIA1 Ø3/8'' _____ kg 2 0.72 0.00 4 5.76 0.56 3.23
LON.1 SUP Ø3/8'' |_____| kg 1 4.06 0.40 0.00 1 4.46 0.56 2.50
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 3.34 0.40 0.00 4 14.96 0.56 8.38
TRANS.1 SUP Ø3/8'' _____ kg 1 1.73 0.00 5 8.65 0.56 4.84
TRANS.2 SUP Ø3/8'' _____ kg 1 1.10 0.00 2 2.20 0.56 1.23
TRANS.2 SUP Ø3/8'' _____ kg 1 1.56 0.00 2 3.12 0.56 1.75
LADO 1 HOR. Ø3/8'' |_____| kg 2 2.22 0.40 0.00 10 52.40 0.56 29.34
LADO 1 VER. Ø3/8'' |_____| kg 2 2.62 0.40 0.00 9 54.36 0.56 30.44
LADO 2 HOR.1 Ø3/8'' |_____| kg 2 2.22 0.40 0.00 6 31.44 0.56 17.61
LADO 2 HOR.2 Ø3/8'' |_____ kg 2 0.79 0.20 0.00 4 7.92 0.56 4.44
LADO 2 HOR.3 Ø3/8'' |_____ kg 2 0.60 0.20 0.00 4 6.40 0.56 3.58
LADO 2 HOR.4 Ø3/8'' |_____ kg 2 0.55 0.20 0.00 2 3.00 0.56 1.68
LADO 2 VER.1 Ø3/8'' |_____ kg 2 2.62 0.20 0.00 4 22.56 0.56 12.63
LADO 2 VER.2 Ø3/8'' |_____ kg 2 2.09 0.20 0.00 2 9.16 0.56 5.13
LADO 2 VER.3 Ø3/8'' |_____ kg 2 1.64 0.20 0.00 2 7.36 0.56 4.12
LADO 2 VER.4 Ø3/8'' |_____ kg 2 1.52 0.20 0.00 1 3.44 0.56 1.93
LADO 2 DIAGONAL TUB Ø3/8'' _____ kg 2 0.72 0.00 4 5.76 0.56 3.23
LADO 3.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
Página 29
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LADO 3.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 3.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 3.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 3.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
LADO 4.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 4.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 4.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 4.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 4.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
BASE LON.1 Ø3/8'' |_____| kg 1 2.06 0.30 0.00 9 21.24 0.56 11.89
BASE LON.2 SUP. Ø3/8'' |_____| kg 1 2.06 0.30 0.00 7 16.52 0.56 9.25
BASE TRANS.1 Ø3/8'' |_____| kg 1 2.22 0.30 0.00 8 20.16 0.56 11.29
BASE TRANS.2 SUP. Ø3/8'' |_____| kg 1 2.22 0.30 0.00 7 17.64 0.56 9.88
LON.1 SUP Ø3/8'' |_____| kg 1 4.06 0.40 0.00 1 4.46 0.56 2.50
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 3.34 0.40 0.00 4 14.96 0.56 8.38
TRANS.1 SUP Ø3/8'' _____ kg 1 1.73 0.00 5 8.65 0.56 4.84
TRANS.2 SUP Ø3/8'' _____ kg 1 1.10 0.00 2 2.20 0.56 1.23
TRANS.2 SUP Ø3/8'' _____ kg 1 1.56 0.00 2 3.12 0.56 1.75
Página 30
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LADO 1 HOR. Ø3/8'' |_____| kg 2 2.52 0.40 0.00 12 70.08 0.56 39.24
LADO 1 VER. Ø3/8'' |_____| kg 2 2.92 0.40 0.00 10 66.40 0.56 37.18
LADO 2 HOR.1 Ø3/8'' |_____| kg 2 2.52 0.40 0.00 6 35.04 0.56 19.62
LADO 2 HOR.2 Ø3/8'' |_____ kg 2 0.91 0.20 0.00 4 8.88 0.56 4.97
LADO 2 HOR.3 Ø3/8'' |_____ kg 2 0.66 0.20 0.00 4 6.88 0.56 3.85
LADO 2 HOR.4 Ø3/8'' |_____ kg 2 0.55 0.20 0.00 4 6.00 0.56 3.36
LADO 2 VER.1 Ø3/8'' |_____ kg 2 2.92 0.20 0.00 4 24.96 0.56 13.98
LADO 2 VER.2 Ø3/8'' |_____ kg 2 2.10 0.20 0.00 2 9.20 0.56 5.15
LADO 2 VER.3 Ø3/8'' |_____ kg 2 1.65 0.20 0.00 2 7.40 0.56 4.14
LADO 2 VER.4 Ø3/8'' |_____ kg 2 1.47 0.20 0.00 2 6.68 0.56 3.74
LADO 2 DIAGONAL TUB Ø3/8'' _____ kg 2 1.10 0.00 4 8.80 0.56 4.93
LADO 3.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 3.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 3.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 3.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 3.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
LADO 4.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 4.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 4.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 4.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 4.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
BASE LON.1 Ø3/8'' |_____| kg 1 2.14 0.30 0.00 10 24.40 0.56 13.66
BASE LON.2 SUP. Ø3/8'' |_____| kg 1 2.14 0.30 0.00 8 19.52 0.56 10.93
BASE TRANS.1 Ø3/8'' |_____| kg 1 2.52 0.30 0.00 9 25.38 0.56 14.21
BASE TRANS.2 SUP. Ø3/8'' |_____| kg 1 2.52 0.30 0.00 7 19.74 0.56 11.05
Página 31
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LON.1 SUP Ø3/8'' |_____| kg 1 4.75 0.40 0.00 1 5.15 0.56 2.88
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 3.98 0.40 0.00 4 17.52 0.56 9.81
TRANS.1 SUP Ø3/8'' _____ kg 1 1.99 0.00 7 13.93 0.56 7.80
TRANS.2 SUP Ø3/8'' _____ kg 1 1.64 0.00 2 3.28 0.56 1.84
TRANS.2 SUP Ø3/8'' _____ kg 1 1.15 0.00 2 2.30 0.56 1.29
TRANS.3 SUP Ø3/8'' _____ kg 1 0.59 0.00 2 1.18 0.56 0.66
ENTRADA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.50 0.00 4 12.00 0.56 6.72
H2 Ø3/8'' |_____| kg 2 0.44 0.20 0.00 4 5.12 0.56 2.87
H3 Ø3/8'' |_____| kg 2 0.25 0.20 0.00 4 3.60 0.56 2.02
H4 Ø3/8'' |_____| kg 2 0.20 0.20 0.00 2 1.60 0.56 0.90
V1 Ø3/8'' |_____| kg 2 2.50 0.20 0.00 2 10.80 0.56 6.05
V2 Ø3/8'' |_____| kg 2 1.87 0.20 0.00 2 8.28 0.56 4.64
V3 Ø3/8'' |_____| kg 2 1.42 0.20 0.00 2 6.48 0.56 3.63
V4 Ø3/8'' |_____| kg 2 1.30 0.20 0.00 1 3.00 0.56 1.68
DIA1 Ø3/8'' _____ kg 2 0.72 0.00 4 5.76 0.56 3.23
LON.1 SUP Ø3/8'' |_____| kg 1 4.06 0.40 0.00 1 4.46 0.56 2.50
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 3.34 0.40 0.00 4 14.96 0.56 8.38
TRANS.1 SUP Ø3/8'' _____ kg 1 1.73 0.00 5 8.65 0.56 4.84
TRANS.2 SUP Ø3/8'' _____ kg 1 1.10 0.00 2 2.20 0.56 1.23
TRANS.2 SUP Ø3/8'' _____ kg 1 1.56 0.00 2 3.12 0.56 1.75
SALIDA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.50 0.00 4 12.00 0.56 6.72
H2 Ø3/8'' |_____| kg 2 0.44 0.20 0.00 4 5.12 0.56 2.87
H3 Ø3/8'' |_____| kg 2 0.25 0.20 0.00 4 3.60 0.56 2.02
Página 32
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LON.1 SUP Ø3/8'' |_____| kg 1 4.06 0.40 0.00 1 4.46 0.56 2.50
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 3.34 0.40 0.00 4 14.96 0.56 8.38
TRANS.1 SUP Ø3/8'' _____ kg 1 1.73 0.00 5 8.65 0.56 4.84
TRANS.2 SUP Ø3/8'' _____ kg 1 1.10 0.00 2 2.20 0.56 1.23
TRANS.2 SUP Ø3/8'' _____ kg 1 1.56 0.00 2 3.12 0.56 1.75
ENTRADA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.25 0.00 5 12.50 0.56 7.00
H2 Ø3/8'' |_____| kg 2 0.36 0.40 0.00 2 3.04 0.56 1.70
H3 Ø3/8'' |_____| kg 2 0.21 0.40 0.00 2 2.44 0.56 1.37
H4 Ø3/8'' |_____| kg 2 0.23 0.40 0.00 2 2.52 0.56 1.41
H5 Ø3/8'' |_____| kg 2 0.45 0.40 0.00 2 3.40 0.56 1.90
V1 Ø3/8'' |_____| kg 2 2.42 0.20 0.00 2 10.48 0.56 5.87
V2 Ø3/8'' |_____| kg 2 1.93 0.20 0.00 2 8.52 0.56 4.77
V3 Ø3/8'' |_____| kg 2 1.56 0.20 0.00 2 7.04 0.56 3.94
DIA1 Ø3/8'' _____ kg 2 0.72 0.00 4 5.76 0.56 3.23
Página 33
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
SALIDA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.25 0.00 5 12.50 0.56 7.00
H2 Ø3/8'' |_____| kg 2 0.36 0.40 0.00 2 3.04 0.56 1.70
H3 Ø3/8'' |_____| kg 2 0.21 0.40 0.00 2 2.44 0.56 1.37
H4 Ø3/8'' |_____| kg 2 0.23 0.40 0.00 2 2.52 0.56 1.41
H5 Ø3/8'' |_____| kg 2 0.45 0.40 0.00 2 3.40 0.56 1.90
V1 Ø3/8'' |_____| kg 2 2.42 0.20 0.00 2 10.48 0.56 5.87
V2 Ø3/8'' |_____| kg 2 1.93 0.20 0.00 2 8.52 0.56 4.77
V3 Ø3/8'' |_____| kg 2 1.56 0.20 0.00 2 7.04 0.56 3.94
DIA1 Ø3/8'' _____ kg 2 0.72 0.00 4 5.76 0.56 3.23
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
ENTRADA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.50 0.00 4 12.00 0.56 6.72
H2 Ø3/8'' |_____| kg 2 0.44 0.20 0.00 4 5.12 0.56 2.87
H3 Ø3/8'' |_____| kg 2 0.25 0.20 0.00 4 3.60 0.56 2.02
H4 Ø3/8'' |_____| kg 2 0.20 0.20 0.00 2 1.60 0.56 0.90
V1 Ø3/8'' |_____| kg 2 2.50 0.20 0.00 2 10.80 0.56 6.05
V2 Ø3/8'' |_____| kg 2 1.87 0.20 0.00 2 8.28 0.56 4.64
V3 Ø3/8'' |_____| kg 2 1.42 0.20 0.00 2 6.48 0.56 3.63
V4 Ø3/8'' |_____| kg 2 1.30 0.20 0.00 1 3.00 0.56 1.68
DIA1 Ø3/8'' _____ kg 2 0.72 0.00 4 5.76 0.56 3.23
Página 34
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LON.1 SUP Ø3/8'' |_____| kg 1 4.06 0.40 0.00 1 4.46 0.56 2.50
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 3.34 0.40 0.00 4 14.96 0.56 8.38
TRANS.1 SUP Ø3/8'' _____ kg 1 1.73 0.00 5 8.65 0.56 4.84
TRANS.2 SUP Ø3/8'' _____ kg 1 1.10 0.00 2 2.20 0.56 1.23
TRANS.2 SUP Ø3/8'' _____ kg 1 1.56 0.00 2 3.12 0.56 1.75
SALIDA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.50 0.00 4 12.00 0.56 6.72
H2 Ø3/8'' |_____| kg 2 0.44 0.20 0.00 4 5.12 0.56 2.87
H3 Ø3/8'' |_____| kg 2 0.25 0.20 0.00 4 3.60 0.56 2.02
H4 Ø3/8'' |_____| kg 2 0.20 0.20 0.00 2 1.60 0.56 0.90
V1 Ø3/8'' |_____| kg 2 2.50 0.20 0.00 2 10.80 0.56 6.05
V2 Ø3/8'' |_____| kg 2 1.87 0.20 0.00 2 8.28 0.56 4.64
V3 Ø3/8'' |_____| kg 2 1.42 0.20 0.00 2 6.48 0.56 3.63
V4 Ø3/8'' |_____| kg 2 1.30 0.20 0.00 1 3.00 0.56 1.68
DIA1 Ø3/8'' _____ kg 2 0.72 0.00 4 5.76 0.56 3.23
LON.1 SUP Ø3/8'' |_____| kg 1 4.06 0.40 0.00 1 4.46 0.56 2.50
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 3.34 0.40 0.00 4 14.96 0.56 8.38
TRANS.1 SUP Ø3/8'' _____ kg 1 1.73 0.00 5 8.65 0.56 4.84
TRANS.2 SUP Ø3/8'' _____ kg 1 1.10 0.00 2 2.20 0.56 1.23
TRANS.2 SUP Ø3/8'' _____ kg 1 1.56 0.00 2 3.12 0.56 1.75
Página 35
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
ENTRADA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.25 0.00 5 12.50 0.56 7.00
H2 Ø3/8'' |_____| kg 2 0.36 0.40 0.00 2 3.04 0.56 1.70
H3 Ø3/8'' |_____| kg 2 0.21 0.40 0.00 2 2.44 0.56 1.37
H4 Ø3/8'' |_____| kg 2 0.23 0.40 0.00 2 2.52 0.56 1.41
H5 Ø3/8'' |_____| kg 2 0.45 0.40 0.00 2 3.40 0.56 1.90
V1 Ø3/8'' |_____| kg 2 2.42 0.20 0.00 2 10.48 0.56 5.87
V2 Ø3/8'' |_____| kg 2 1.93 0.20 0.00 2 8.52 0.56 4.77
V3 Ø3/8'' |_____| kg 2 1.56 0.20 0.00 2 7.04 0.56 3.94
DIA1 Ø3/8'' _____ kg 2 0.72 0.00 4 5.76 0.56 3.23
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
SALIDA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.25 0.00 5 12.50 0.56 7.00
H2 Ø3/8'' |_____| kg 2 0.36 0.40 0.00 2 3.04 0.56 1.70
H3 Ø3/8'' |_____| kg 2 0.21 0.40 0.00 2 2.44 0.56 1.37
H4 Ø3/8'' |_____| kg 2 0.23 0.40 0.00 2 2.52 0.56 1.41
H5 Ø3/8'' |_____| kg 2 0.45 0.40 0.00 2 3.40 0.56 1.90
V1 Ø3/8'' |_____| kg 2 2.42 0.20 0.00 2 10.48 0.56 5.87
V2 Ø3/8'' |_____| kg 2 1.93 0.20 0.00 2 8.52 0.56 4.77
V3 Ø3/8'' |_____| kg 2 1.56 0.20 0.00 2 7.04 0.56 3.94
DIA1 Ø3/8'' _____ kg 2 0.72 0.00 4 5.76 0.56 3.23
Página 36
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
ENTRADA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.25 0.00 5 12.50 0.56 7.00
H2 Ø3/8'' |_____| kg 2 0.36 0.40 0.00 2 3.04 0.56 1.70
H3 Ø3/8'' |_____| kg 2 0.21 0.40 0.00 2 2.44 0.56 1.37
H4 Ø3/8'' |_____| kg 2 0.23 0.40 0.00 2 2.52 0.56 1.41
H5 Ø3/8'' |_____| kg 2 0.45 0.40 0.00 2 3.40 0.56 1.90
V1 Ø3/8'' |_____| kg 2 2.42 0.20 0.00 2 10.48 0.56 5.87
V2 Ø3/8'' |_____| kg 2 1.93 0.20 0.00 2 8.52 0.56 4.77
V3 Ø3/8'' |_____| kg 2 1.56 0.20 0.00 2 7.04 0.56 3.94
DIA1 Ø3/8'' _____ kg 2 0.72 0.00 4 5.76 0.56 3.23
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
SALIDA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.25 0.00 5 12.50 0.56 7.00
H2 Ø3/8'' |_____| kg 2 0.36 0.40 0.00 2 3.04 0.56 1.70
H3 Ø3/8'' |_____| kg 2 0.21 0.40 0.00 2 2.44 0.56 1.37
H4 Ø3/8'' |_____| kg 2 0.23 0.40 0.00 2 2.52 0.56 1.41
H5 Ø3/8'' |_____| kg 2 0.45 0.40 0.00 2 3.40 0.56 1.90
V1 Ø3/8'' |_____| kg 2 2.42 0.20 0.00 2 10.48 0.56 5.87
V2 Ø3/8'' |_____| kg 2 1.93 0.20 0.00 2 8.52 0.56 4.77
V3 Ø3/8'' |_____| kg 2 1.56 0.20 0.00 2 7.04 0.56 3.94
Página 37
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
ENTRADA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.50 0.00 4 12.00 0.56 6.72
H2 Ø3/8'' |_____| kg 2 0.44 0.20 0.00 4 5.12 0.56 2.87
H3 Ø3/8'' |_____| kg 2 0.25 0.20 0.00 4 3.60 0.56 2.02
H4 Ø3/8'' |_____| kg 2 0.20 0.20 0.00 2 1.60 0.56 0.90
V1 Ø3/8'' |_____| kg 2 2.50 0.20 0.00 2 10.80 0.56 6.05
V2 Ø3/8'' |_____| kg 2 1.87 0.20 0.00 2 8.28 0.56 4.64
V3 Ø3/8'' |_____| kg 2 1.42 0.20 0.00 2 6.48 0.56 3.63
V4 Ø3/8'' |_____| kg 2 1.30 0.20 0.00 1 3.00 0.56 1.68
DIA1 Ø3/8'' _____ kg 2 0.72 0.00 4 5.76 0.56 3.23
LON.1 SUP Ø3/8'' |_____| kg 1 4.06 0.40 0.00 1 4.46 0.56 2.50
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 3.34 0.40 0.00 4 14.96 0.56 8.38
TRANS.1 SUP Ø3/8'' _____ kg 1 1.73 0.00 5 8.65 0.56 4.84
TRANS.2 SUP Ø3/8'' _____ kg 1 1.10 0.00 2 2.20 0.56 1.23
TRANS.2 SUP Ø3/8'' _____ kg 1 1.56 0.00 2 3.12 0.56 1.75
Página 38
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
SALIDA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.50 0.00 4 12.00 0.56 6.72
H2 Ø3/8'' |_____| kg 2 0.44 0.20 0.00 4 5.12 0.56 2.87
H3 Ø3/8'' |_____| kg 2 0.25 0.20 0.00 4 3.60 0.56 2.02
H4 Ø3/8'' |_____| kg 2 0.20 0.20 0.00 2 1.60 0.56 0.90
V1 Ø3/8'' |_____| kg 2 2.50 0.20 0.00 2 10.80 0.56 6.05
V2 Ø3/8'' |_____| kg 2 1.87 0.20 0.00 2 8.28 0.56 4.64
V3 Ø3/8'' |_____| kg 2 1.42 0.20 0.00 2 6.48 0.56 3.63
V4 Ø3/8'' |_____| kg 2 1.30 0.20 0.00 1 3.00 0.56 1.68
DIA1 Ø3/8'' _____ kg 2 0.72 0.00 4 5.76 0.56 3.23
LON.1 SUP Ø3/8'' |_____| kg 1 4.06 0.40 0.00 1 4.46 0.56 2.50
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 3.34 0.40 0.00 4 14.96 0.56 8.38
TRANS.1 SUP Ø3/8'' _____ kg 1 1.73 0.00 5 8.65 0.56 4.84
TRANS.2 SUP Ø3/8'' _____ kg 1 1.10 0.00 2 2.20 0.56 1.23
TRANS.2 SUP Ø3/8'' _____ kg 1 1.56 0.00 2 3.12 0.56 1.75
ENTRADA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.25 0.00 5 12.50 0.56 7.00
H2 Ø3/8'' |_____| kg 2 0.36 0.40 0.00 2 3.04 0.56 1.70
H3 Ø3/8'' |_____| kg 2 0.21 0.40 0.00 2 2.44 0.56 1.37
H4 Ø3/8'' |_____| kg 2 0.23 0.40 0.00 2 2.52 0.56 1.41
H5 Ø3/8'' |_____| kg 2 0.45 0.40 0.00 2 3.40 0.56 1.90
V1 Ø3/8'' |_____| kg 2 2.42 0.20 0.00 2 10.48 0.56 5.87
V2 Ø3/8'' |_____| kg 2 1.93 0.20 0.00 2 8.52 0.56 4.77
V3 Ø3/8'' |_____| kg 2 1.56 0.20 0.00 2 7.04 0.56 3.94
DIA1 Ø3/8'' _____ kg 2 0.72 0.00 4 5.76 0.56 3.23
Página 39
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
SALIDA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.25 0.00 5 12.50 0.56 7.00
H2 Ø3/8'' |_____| kg 2 0.36 0.40 0.00 2 3.04 0.56 1.70
H3 Ø3/8'' |_____| kg 2 0.21 0.40 0.00 2 2.44 0.56 1.37
H4 Ø3/8'' |_____| kg 2 0.23 0.40 0.00 2 2.52 0.56 1.41
H5 Ø3/8'' |_____| kg 2 0.45 0.40 0.00 2 3.40 0.56 1.90
V1 Ø3/8'' |_____| kg 2 2.42 0.20 0.00 2 10.48 0.56 5.87
V2 Ø3/8'' |_____| kg 2 1.93 0.20 0.00 2 8.52 0.56 4.77
V3 Ø3/8'' |_____| kg 2 1.56 0.20 0.00 2 7.04 0.56 3.94
DIA1 Ø3/8'' _____ kg 2 0.72 0.00 4 5.76 0.56 3.23
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
ENTRADA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.25 0.00 5 12.50 0.56 7.00
H2 Ø3/8'' |_____| kg 2 0.36 0.40 0.00 2 3.04 0.56 1.70
H3 Ø3/8'' |_____| kg 2 0.21 0.40 0.00 2 2.44 0.56 1.37
H4 Ø3/8'' |_____| kg 2 0.23 0.40 0.00 2 2.52 0.56 1.41
Página 40
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
SALIDA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.25 0.00 5 12.50 0.56 7.00
H2 Ø3/8'' |_____| kg 2 0.36 0.40 0.00 2 3.04 0.56 1.70
H3 Ø3/8'' |_____| kg 2 0.21 0.40 0.00 2 2.44 0.56 1.37
H4 Ø3/8'' |_____| kg 2 0.23 0.40 0.00 2 2.52 0.56 1.41
H5 Ø3/8'' |_____| kg 2 0.45 0.40 0.00 2 3.40 0.56 1.90
V1 Ø3/8'' |_____| kg 2 2.42 0.20 0.00 2 10.48 0.56 5.87
V2 Ø3/8'' |_____| kg 2 1.93 0.20 0.00 2 8.52 0.56 4.77
V3 Ø3/8'' |_____| kg 2 1.56 0.20 0.00 2 7.04 0.56 3.94
DIA1 Ø3/8'' _____ kg 2 0.72 0.00 4 5.76 0.56 3.23
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
Página 41
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
ENTRADA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.25 0.00 5 12.50 0.56 7.00
H2 Ø3/8'' |_____| kg 2 0.36 0.40 0.00 2 3.04 0.56 1.70
H3 Ø3/8'' |_____| kg 2 0.21 0.40 0.00 2 2.44 0.56 1.37
H4 Ø3/8'' |_____| kg 2 0.23 0.40 0.00 2 2.52 0.56 1.41
H5 Ø3/8'' |_____| kg 2 0.45 0.40 0.00 2 3.40 0.56 1.90
V1 Ø3/8'' |_____| kg 2 2.42 0.20 0.00 2 10.48 0.56 5.87
V2 Ø3/8'' |_____| kg 2 1.93 0.20 0.00 2 8.52 0.56 4.77
V3 Ø3/8'' |_____| kg 2 1.56 0.20 0.00 2 7.04 0.56 3.94
DIA1 Ø3/8'' _____ kg 2 0.72 0.00 4 5.76 0.56 3.23
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
SALIDA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.25 0.00 5 12.50 0.56 7.00
H2 Ø3/8'' |_____| kg 2 0.36 0.40 0.00 2 3.04 0.56 1.70
H3 Ø3/8'' |_____| kg 2 0.21 0.40 0.00 2 2.44 0.56 1.37
H4 Ø3/8'' |_____| kg 2 0.23 0.40 0.00 2 2.52 0.56 1.41
H5 Ø3/8'' |_____| kg 2 0.45 0.40 0.00 2 3.40 0.56 1.90
V1 Ø3/8'' |_____| kg 2 2.42 0.20 0.00 2 10.48 0.56 5.87
V2 Ø3/8'' |_____| kg 2 1.93 0.20 0.00 2 8.52 0.56 4.77
V3 Ø3/8'' |_____| kg 2 1.56 0.20 0.00 2 7.04 0.56 3.94
DIA1 Ø3/8'' _____ kg 2 0.72 0.00 4 5.76 0.56 3.23
Página 42
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
ENTRADA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.25 0.00 5 12.50 0.56 7.00
H2 Ø3/8'' |_____| kg 2 0.36 0.40 0.00 2 3.04 0.56 1.70
H3 Ø3/8'' |_____| kg 2 0.21 0.40 0.00 2 2.44 0.56 1.37
H4 Ø3/8'' |_____| kg 2 0.23 0.40 0.00 2 2.52 0.56 1.41
H5 Ø3/8'' |_____| kg 2 0.45 0.40 0.00 2 3.40 0.56 1.90
V1 Ø3/8'' |_____| kg 2 2.42 0.20 0.00 2 10.48 0.56 5.87
V2 Ø3/8'' |_____| kg 2 1.93 0.20 0.00 2 8.52 0.56 4.77
V3 Ø3/8'' |_____| kg 2 1.56 0.20 0.00 2 7.04 0.56 3.94
DIA1 Ø3/8'' _____ kg 2 0.72 0.00 4 5.76 0.56 3.23
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
SALIDA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.25 0.00 5 12.50 0.56 7.00
H2 Ø3/8'' |_____| kg 2 0.36 0.40 0.00 2 3.04 0.56 1.70
H3 Ø3/8'' |_____| kg 2 0.21 0.40 0.00 2 2.44 0.56 1.37
H4 Ø3/8'' |_____| kg 2 0.23 0.40 0.00 2 2.52 0.56 1.41
H5 Ø3/8'' |_____| kg 2 0.45 0.40 0.00 2 3.40 0.56 1.90
Página 43
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
LADO 1 HOR. Ø3/8'' |_____| kg 2 1.92 0.40 0.00 9 41.76 0.56 23.39
LADO 1 VER. Ø3/8'' |_____| kg 2 2.32 0.40 0.00 8 43.52 0.56 24.37
LADO 2TUB HOR. Ø3/8'' |_____| kg 2 1.26 0.40 0.00 2 6.64 0.56 3.72
LADO 2 DIAGONAL TUB HOR. Ø3/8'' |_____| kg 2 0.72 0.40 0.00 4 8.96 0.56 5.02
LADO 2 HOR. Ø3/8'' |_____| kg 2 1.40 0.40 0.00 3 10.80 0.56 6.05
LADO 2 VER. Ø3/8'' |_____| kg 2 2.32 0.40 0.00 2 10.88 0.56 6.09
LADO 2TUB VER. Ø3/8'' |_____| kg 2 1.76 0.40 0.00 2 8.64 0.56 4.84
LADO 3.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 3.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 3.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 3.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 3.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
LADO 4.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 4.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 4.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 4.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 4.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
BASE LON.1 Ø3/8'' |_____| kg 1 2.09 0.30 0.00 8 19.12 0.56 10.71
Página 44
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
BASE LON.2 SUP. Ø3/8'' |_____| kg 1 2.09 0.30 0.00 6 14.34 0.56 8.03
BASE TRANS.1 Ø3/8'' |_____| kg 1 1.92 0.30 0.00 8 17.76 0.56 9.95
BASE TRANS.2 SUP. Ø3/8'' |_____| kg 1 1.92 0.30 0.00 7 15.54 0.56 8.70
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
LADO 1 HOR. Ø3/8'' |_____| kg 2 1.92 0.40 0.00 9 41.76 0.56 23.39
LADO 1 VER. Ø3/8'' |_____| kg 2 2.32 0.40 0.00 8 43.52 0.56 24.37
LADO 2TUB HOR. Ø3/8'' |_____| kg 2 1.26 0.40 0.00 2 6.64 0.56 3.72
LADO 2 DIAGONAL TUB HOR. Ø3/8'' |_____| kg 2 0.72 0.40 0.00 4 8.96 0.56 5.02
LADO 2 HOR. Ø3/8'' |_____| kg 2 1.40 0.40 0.00 3 10.80 0.56 6.05
LADO 2 VER. Ø3/8'' |_____| kg 2 2.32 0.40 0.00 2 10.88 0.56 6.09
LADO 2TUB VER. Ø3/8'' |_____| kg 2 1.76 0.40 0.00 2 8.64 0.56 4.84
LADO 3.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 3.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 3.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 3.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 3.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
Página 45
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LADO 4.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 4.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 4.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 4.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 4.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
BASE LON.1 Ø3/8'' |_____| kg 1 2.09 0.30 0.00 8 19.12 0.56 10.71
BASE LON.2 SUP. Ø3/8'' |_____| kg 1 2.09 0.30 0.00 6 14.34 0.56 8.03
BASE TRANS.1 Ø3/8'' |_____| kg 1 1.92 0.30 0.00 8 17.76 0.56 9.95
BASE TRANS.2 SUP. Ø3/8'' |_____| kg 1 1.92 0.30 0.00 7 15.54 0.56 8.70
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
ENTRADA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.25 0.00 5 12.50 0.56 7.00
H2 Ø3/8'' |_____| kg 2 0.36 0.40 0.00 2 3.04 0.56 1.70
H3 Ø3/8'' |_____| kg 2 0.21 0.40 0.00 2 2.44 0.56 1.37
H4 Ø3/8'' |_____| kg 2 0.23 0.40 0.00 2 2.52 0.56 1.41
H5 Ø3/8'' |_____| kg 2 0.45 0.40 0.00 2 3.40 0.56 1.90
V1 Ø3/8'' |_____| kg 2 2.42 0.20 0.00 2 10.48 0.56 5.87
Página 46
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
SALIDA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.25 0.00 5 12.50 0.56 7.00
H2 Ø3/8'' |_____| kg 2 0.36 0.40 0.00 2 3.04 0.56 1.70
H3 Ø3/8'' |_____| kg 2 0.21 0.40 0.00 2 2.44 0.56 1.37
H4 Ø3/8'' |_____| kg 2 0.23 0.40 0.00 2 2.52 0.56 1.41
H5 Ø3/8'' |_____| kg 2 0.45 0.40 0.00 2 3.40 0.56 1.90
V1 Ø3/8'' |_____| kg 2 2.42 0.20 0.00 2 10.48 0.56 5.87
V2 Ø3/8'' |_____| kg 2 1.93 0.20 0.00 2 8.52 0.56 4.77
V3 Ø3/8'' |_____| kg 2 1.56 0.20 0.00 2 7.04 0.56 3.94
DIA1 Ø3/8'' _____ kg 2 0.72 0.00 4 5.76 0.56 3.23
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
Página 47
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
ENTRADA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.25 0.00 5 12.50 0.56 7.00
H2 Ø3/8'' |_____| kg 2 0.36 0.40 0.00 2 3.04 0.56 1.70
H3 Ø3/8'' |_____| kg 2 0.21 0.40 0.00 2 2.44 0.56 1.37
H4 Ø3/8'' |_____| kg 2 0.23 0.40 0.00 2 2.52 0.56 1.41
H5 Ø3/8'' |_____| kg 2 0.45 0.40 0.00 2 3.40 0.56 1.90
V1 Ø3/8'' |_____| kg 2 2.42 0.20 0.00 2 10.48 0.56 5.87
V2 Ø3/8'' |_____| kg 2 1.93 0.20 0.00 2 8.52 0.56 4.77
V3 Ø3/8'' |_____| kg 2 1.56 0.20 0.00 2 7.04 0.56 3.94
DIA1 Ø3/8'' _____ kg 2 0.72 0.00 4 5.76 0.56 3.23
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
SALIDA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.25 0.00 5 12.50 0.56 7.00
H2 Ø3/8'' |_____| kg 2 0.36 0.40 0.00 2 3.04 0.56 1.70
H3 Ø3/8'' |_____| kg 2 0.21 0.40 0.00 2 2.44 0.56 1.37
H4 Ø3/8'' |_____| kg 2 0.23 0.40 0.00 2 2.52 0.56 1.41
H5 Ø3/8'' |_____| kg 2 0.45 0.40 0.00 2 3.40 0.56 1.90
V1 Ø3/8'' |_____| kg 2 2.42 0.20 0.00 2 10.48 0.56 5.87
V2 Ø3/8'' |_____| kg 2 1.93 0.20 0.00 2 8.52 0.56 4.77
V3 Ø3/8'' |_____| kg 2 1.56 0.20 0.00 2 7.04 0.56 3.94
DIA1 Ø3/8'' _____ kg 2 0.72 0.00 4 5.76 0.56 3.23
Página 48
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
LADO 1 HOR. Ø3/8'' |_____| kg 2 1.92 0.40 0.00 9 41.76 0.56 23.39
LADO 1 VER. Ø3/8'' |_____| kg 2 2.32 0.40 0.00 8 43.52 0.56 24.37
LADO 2TUB HOR. Ø3/8'' |_____| kg 2 1.26 0.40 0.00 2 6.64 0.56 3.72
LADO 2 DIAGONAL TUB HOR. Ø3/8'' |_____| kg 2 0.72 0.40 0.00 4 8.96 0.56 5.02
LADO 2 HOR. Ø3/8'' |_____| kg 2 1.40 0.40 0.00 3 10.80 0.56 6.05
LADO 2 VER. Ø3/8'' |_____| kg 2 2.32 0.40 0.00 2 10.88 0.56 6.09
LADO 2TUB VER. Ø3/8'' |_____| kg 2 1.76 0.40 0.00 2 8.64 0.56 4.84
LADO 3.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 3.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 3.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 3.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 3.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
LADO 4.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 4.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 4.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 4.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 4.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
BASE LON.1 Ø3/8'' |_____| kg 1 2.09 0.30 0.00 8 19.12 0.56 10.71
BASE LON.2 SUP. Ø3/8'' |_____| kg 1 2.09 0.30 0.00 6 14.34 0.56 8.03
BASE TRANS.1 Ø3/8'' |_____| kg 1 1.92 0.30 0.00 8 17.76 0.56 9.95
BASE TRANS.2 SUP. Ø3/8'' |_____| kg 1 1.92 0.30 0.00 7 15.54 0.56 8.70
Página 49
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
ENTRADA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.25 0.00 5 12.50 0.56 7.00
H2 Ø3/8'' |_____| kg 2 0.36 0.40 0.00 2 3.04 0.56 1.70
H3 Ø3/8'' |_____| kg 2 0.21 0.40 0.00 2 2.44 0.56 1.37
H4 Ø3/8'' |_____| kg 2 0.23 0.40 0.00 2 2.52 0.56 1.41
H5 Ø3/8'' |_____| kg 2 0.45 0.40 0.00 2 3.40 0.56 1.90
V1 Ø3/8'' |_____| kg 2 2.42 0.20 0.00 2 10.48 0.56 5.87
V2 Ø3/8'' |_____| kg 2 1.93 0.20 0.00 2 8.52 0.56 4.77
V3 Ø3/8'' |_____| kg 2 1.56 0.20 0.00 2 7.04 0.56 3.94
DIA1 Ø3/8'' _____ kg 2 0.72 0.00 4 5.76 0.56 3.23
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
Página 50
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
SALIDA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.25 0.00 5 12.50 0.56 7.00
H2 Ø3/8'' |_____| kg 2 0.36 0.40 0.00 2 3.04 0.56 1.70
H3 Ø3/8'' |_____| kg 2 0.21 0.40 0.00 2 2.44 0.56 1.37
H4 Ø3/8'' |_____| kg 2 0.23 0.40 0.00 2 2.52 0.56 1.41
H5 Ø3/8'' |_____| kg 2 0.45 0.40 0.00 2 3.40 0.56 1.90
V1 Ø3/8'' |_____| kg 2 2.42 0.20 0.00 2 10.48 0.56 5.87
V2 Ø3/8'' |_____| kg 2 1.93 0.20 0.00 2 8.52 0.56 4.77
V3 Ø3/8'' |_____| kg 2 1.56 0.20 0.00 2 7.04 0.56 3.94
DIA1 Ø3/8'' _____ kg 2 0.72 0.00 4 5.76 0.56 3.23
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
ENTRADA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.25 0.00 5 12.50 0.56 7.00
H2 Ø3/8'' |_____| kg 2 0.36 0.40 0.00 2 3.04 0.56 1.70
H3 Ø3/8'' |_____| kg 2 0.21 0.40 0.00 2 2.44 0.56 1.37
H4 Ø3/8'' |_____| kg 2 0.23 0.40 0.00 2 2.52 0.56 1.41
H5 Ø3/8'' |_____| kg 2 0.45 0.40 0.00 2 3.40 0.56 1.90
V1 Ø3/8'' |_____| kg 2 2.42 0.20 0.00 2 10.48 0.56 5.87
V2 Ø3/8'' |_____| kg 2 1.93 0.20 0.00 2 8.52 0.56 4.77
V3 Ø3/8'' |_____| kg 2 1.56 0.20 0.00 2 7.04 0.56 3.94
DIA1 Ø3/8'' _____ kg 2 0.72 0.00 4 5.76 0.56 3.23
Página 51
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
SALIDA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.25 0.00 5 12.50 0.56 7.00
H2 Ø3/8'' |_____| kg 2 0.36 0.40 0.00 2 3.04 0.56 1.70
H3 Ø3/8'' |_____| kg 2 0.21 0.40 0.00 2 2.44 0.56 1.37
H4 Ø3/8'' |_____| kg 2 0.23 0.40 0.00 2 2.52 0.56 1.41
H5 Ø3/8'' |_____| kg 2 0.45 0.40 0.00 2 3.40 0.56 1.90
V1 Ø3/8'' |_____| kg 2 2.42 0.20 0.00 2 10.48 0.56 5.87
V2 Ø3/8'' |_____| kg 2 1.93 0.20 0.00 2 8.52 0.56 4.77
V3 Ø3/8'' |_____| kg 2 1.56 0.20 0.00 2 7.04 0.56 3.94
DIA1 Ø3/8'' _____ kg 2 0.72 0.00 4 5.76 0.56 3.23
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
ENTRADA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.25 0.00 5 12.50 0.56 7.00
H2 Ø3/8'' |_____| kg 2 0.36 0.40 0.00 2 3.04 0.56 1.70
H3 Ø3/8'' |_____| kg 2 0.21 0.40 0.00 2 2.44 0.56 1.37
H4 Ø3/8'' |_____| kg 2 0.23 0.40 0.00 2 2.52 0.56 1.41
H5 Ø3/8'' |_____| kg 2 0.45 0.40 0.00 2 3.40 0.56 1.90
V1 Ø3/8'' |_____| kg 2 2.42 0.20 0.00 2 10.48 0.56 5.87
V2 Ø3/8'' |_____| kg 2 1.93 0.20 0.00 2 8.52 0.56 4.77
V3 Ø3/8'' |_____| kg 2 1.56 0.20 0.00 2 7.04 0.56 3.94
Página 52
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
SALIDA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.25 0.00 5 12.50 0.56 7.00
H2 Ø3/8'' |_____| kg 2 0.36 0.40 0.00 2 3.04 0.56 1.70
H3 Ø3/8'' |_____| kg 2 0.21 0.40 0.00 2 2.44 0.56 1.37
H4 Ø3/8'' |_____| kg 2 0.23 0.40 0.00 2 2.52 0.56 1.41
H5 Ø3/8'' |_____| kg 2 0.45 0.40 0.00 2 3.40 0.56 1.90
V1 Ø3/8'' |_____| kg 2 2.42 0.20 0.00 2 10.48 0.56 5.87
V2 Ø3/8'' |_____| kg 2 1.93 0.20 0.00 2 8.52 0.56 4.77
V3 Ø3/8'' |_____| kg 2 1.56 0.20 0.00 2 7.04 0.56 3.94
DIA1 Ø3/8'' _____ kg 2 0.72 0.00 4 5.76 0.56 3.23
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
Página 53
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LADO 1 HOR. Ø3/8'' |_____| kg 2 1.92 0.40 0.00 9 41.76 0.56 23.39
LADO 1 VER. Ø3/8'' |_____| kg 2 2.32 0.40 0.00 8 43.52 0.56 24.37
LADO 2TUB HOR. Ø3/8'' |_____| kg 2 1.26 0.40 0.00 2 6.64 0.56 3.72
LADO 2 DIAGONAL TUB HOR. Ø3/8'' |_____| kg 2 0.72 0.40 0.00 4 8.96 0.56 5.02
LADO 2 HOR. Ø3/8'' |_____| kg 2 1.40 0.40 0.00 3 10.80 0.56 6.05
LADO 2 VER. Ø3/8'' |_____| kg 2 2.32 0.40 0.00 2 10.88 0.56 6.09
LADO 2TUB VER. Ø3/8'' |_____| kg 2 1.76 0.40 0.00 2 8.64 0.56 4.84
LADO 3.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 3.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 3.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 3.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 3.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
LADO 4.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 4.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 4.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 4.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 4.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
BASE LON.1 Ø3/8'' |_____| kg 1 2.09 0.30 0.00 8 19.12 0.56 10.71
BASE LON.2 SUP. Ø3/8'' |_____| kg 1 2.09 0.30 0.00 6 14.34 0.56 8.03
BASE TRANS.1 Ø3/8'' |_____| kg 1 1.92 0.30 0.00 8 17.76 0.56 9.95
BASE TRANS.2 SUP. Ø3/8'' |_____| kg 1 1.92 0.30 0.00 7 15.54 0.56 8.70
Página 54
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
ENTRADA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.25 0.00 5 12.50 0.56 7.00
H2 Ø3/8'' |_____| kg 2 0.36 0.40 0.00 2 3.04 0.56 1.70
H3 Ø3/8'' |_____| kg 2 0.21 0.40 0.00 2 2.44 0.56 1.37
H4 Ø3/8'' |_____| kg 2 0.23 0.40 0.00 2 2.52 0.56 1.41
H5 Ø3/8'' |_____| kg 2 0.45 0.40 0.00 2 3.40 0.56 1.90
V1 Ø3/8'' |_____| kg 2 2.42 0.20 0.00 2 10.48 0.56 5.87
V2 Ø3/8'' |_____| kg 2 1.93 0.20 0.00 2 8.52 0.56 4.77
V3 Ø3/8'' |_____| kg 2 1.56 0.20 0.00 2 7.04 0.56 3.94
DIA1 Ø3/8'' _____ kg 2 0.72 0.00 4 5.76 0.56 3.23
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
SALIDA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.25 0.00 5 12.50 0.56 7.00
H2 Ø3/8'' |_____| kg 2 0.36 0.40 0.00 2 3.04 0.56 1.70
H3 Ø3/8'' |_____| kg 2 0.21 0.40 0.00 2 2.44 0.56 1.37
H4 Ø3/8'' |_____| kg 2 0.23 0.40 0.00 2 2.52 0.56 1.41
H5 Ø3/8'' |_____| kg 2 0.45 0.40 0.00 2 3.40 0.56 1.90
V1 Ø3/8'' |_____| kg 2 2.42 0.20 0.00 2 10.48 0.56 5.87
V2 Ø3/8'' |_____| kg 2 1.93 0.20 0.00 2 8.52 0.56 4.77
V3 Ø3/8'' |_____| kg 2 1.56 0.20 0.00 2 7.04 0.56 3.94
DIA1 Ø3/8'' _____ kg 2 0.72 0.00 4 5.76 0.56 3.23
Página 55
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
LADO 1 HOR. Ø3/8'' |_____| kg 2 1.92 0.40 0.00 9 41.76 0.56 23.39
LADO 1 VER. Ø3/8'' |_____| kg 2 2.32 0.40 0.00 8 43.52 0.56 24.37
LADO 2TUB HOR. Ø3/8'' |_____| kg 2 1.26 0.40 0.00 2 6.64 0.56 3.72
LADO 2 DIAGONAL TUB HOR. Ø3/8'' |_____| kg 2 0.72 0.40 0.00 4 8.96 0.56 5.02
LADO 2 HOR. Ø3/8'' |_____| kg 2 1.40 0.40 0.00 3 10.80 0.56 6.05
LADO 2 VER. Ø3/8'' |_____| kg 2 2.32 0.40 0.00 2 10.88 0.56 6.09
LADO 2TUB VER. Ø3/8'' |_____| kg 2 1.76 0.40 0.00 2 8.64 0.56 4.84
LADO 3.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 3.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 3.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 3.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 3.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
LADO 4.1 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 2.12 0.00 5 21.20 0.56 11.87
LADO 4.2 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.71 0.00 2 2.84 0.56 1.59
LADO 4.3 EN CUNETA HOR.PROM Ø3/8'' _____ kg 2 0.74 0.00 2 2.96 0.56 1.66
LADO 4.DIAGONAL1 EN CUNETA Ø3/8'' _____ kg 2 1.56 0.00 1 3.12 0.56 1.75
LADO 4.DIAGONAL2 EN CUNETA Ø3/8'' _____ kg 2 1.60 0.00 1 3.20 0.56 1.79
BASE LON.1 Ø3/8'' |_____| kg 1 2.09 0.30 0.00 8 19.12 0.56 10.71
BASE LON.2 SUP. Ø3/8'' |_____| kg 1 2.09 0.30 0.00 6 14.34 0.56 8.03
BASE TRANS.1 Ø3/8'' |_____| kg 1 1.92 0.30 0.00 8 17.76 0.56 9.95
BASE TRANS.2 SUP. Ø3/8'' |_____| kg 1 1.92 0.30 0.00 7 15.54 0.56 8.70
Página 56
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
ENTRADA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.25 0.00 5 12.50 0.56 7.00
H2 Ø3/8'' |_____| kg 2 0.36 0.40 0.00 2 3.04 0.56 1.70
H3 Ø3/8'' |_____| kg 2 0.21 0.40 0.00 2 2.44 0.56 1.37
H4 Ø3/8'' |_____| kg 2 0.23 0.40 0.00 2 2.52 0.56 1.41
H5 Ø3/8'' |_____| kg 2 0.45 0.40 0.00 2 3.40 0.56 1.90
V1 Ø3/8'' |_____| kg 2 2.42 0.20 0.00 2 10.48 0.56 5.87
V2 Ø3/8'' |_____| kg 2 1.93 0.20 0.00 2 8.52 0.56 4.77
V3 Ø3/8'' |_____| kg 2 1.56 0.20 0.00 2 7.04 0.56 3.94
DIA1 Ø3/8'' _____ kg 2 0.72 0.00 4 5.76 0.56 3.23
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
Página 57
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
SALIDA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.25 0.00 5 12.50 0.56 7.00
H2 Ø3/8'' |_____| kg 2 0.36 0.40 0.00 2 3.04 0.56 1.70
H3 Ø3/8'' |_____| kg 2 0.21 0.40 0.00 2 2.44 0.56 1.37
H4 Ø3/8'' |_____| kg 2 0.23 0.40 0.00 2 2.52 0.56 1.41
H5 Ø3/8'' |_____| kg 2 0.45 0.40 0.00 2 3.40 0.56 1.90
V1 Ø3/8'' |_____| kg 2 2.42 0.20 0.00 2 10.48 0.56 5.87
V2 Ø3/8'' |_____| kg 2 1.93 0.20 0.00 2 8.52 0.56 4.77
V3 Ø3/8'' |_____| kg 2 1.56 0.20 0.00 2 7.04 0.56 3.94
DIA1 Ø3/8'' _____ kg 2 0.72 0.00 4 5.76 0.56 3.23
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
ENTRADA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.25 0.00 5 12.50 0.56 7.00
H2 Ø3/8'' |_____| kg 2 0.36 0.40 0.00 2 3.04 0.56 1.70
H3 Ø3/8'' |_____| kg 2 0.21 0.40 0.00 2 2.44 0.56 1.37
H4 Ø3/8'' |_____| kg 2 0.23 0.40 0.00 2 2.52 0.56 1.41
H5 Ø3/8'' |_____| kg 2 0.45 0.40 0.00 2 3.40 0.56 1.90
V1 Ø3/8'' |_____| kg 2 2.42 0.20 0.00 2 10.48 0.56 5.87
V2 Ø3/8'' |_____| kg 2 1.93 0.20 0.00 2 8.52 0.56 4.77
V3 Ø3/8'' |_____| kg 2 1.56 0.20 0.00 2 7.04 0.56 3.94
DIA1 Ø3/8'' _____ kg 2 0.72 0.00 4 5.76 0.56 3.23
Página 58
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
SALIDA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.25 0.00 5 12.50 0.56 7.00
H2 Ø3/8'' |_____| kg 2 0.36 0.40 0.00 2 3.04 0.56 1.70
H3 Ø3/8'' |_____| kg 2 0.21 0.40 0.00 2 2.44 0.56 1.37
H4 Ø3/8'' |_____| kg 2 0.23 0.40 0.00 2 2.52 0.56 1.41
H5 Ø3/8'' |_____| kg 2 0.45 0.40 0.00 2 3.40 0.56 1.90
V1 Ø3/8'' |_____| kg 2 2.42 0.20 0.00 2 10.48 0.56 5.87
V2 Ø3/8'' |_____| kg 2 1.93 0.20 0.00 2 8.52 0.56 4.77
V3 Ø3/8'' |_____| kg 2 1.56 0.20 0.00 2 7.04 0.56 3.94
DIA1 Ø3/8'' _____ kg 2 0.72 0.00 4 5.76 0.56 3.23
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
ENTRADA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.25 0.00 5 12.50 0.56 7.00
H2 Ø3/8'' |_____| kg 2 0.36 0.40 0.00 2 3.04 0.56 1.70
H3 Ø3/8'' |_____| kg 2 0.21 0.40 0.00 2 2.44 0.56 1.37
Página 59
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
SALIDA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.25 0.00 5 12.50 0.56 7.00
H2 Ø3/8'' |_____| kg 2 0.36 0.40 0.00 2 3.04 0.56 1.70
H3 Ø3/8'' |_____| kg 2 0.21 0.40 0.00 2 2.44 0.56 1.37
H4 Ø3/8'' |_____| kg 2 0.23 0.40 0.00 2 2.52 0.56 1.41
H5 Ø3/8'' |_____| kg 2 0.45 0.40 0.00 2 3.40 0.56 1.90
V1 Ø3/8'' |_____| kg 2 2.42 0.20 0.00 2 10.48 0.56 5.87
V2 Ø3/8'' |_____| kg 2 1.93 0.20 0.00 2 8.52 0.56 4.77
V3 Ø3/8'' |_____| kg 2 1.56 0.20 0.00 2 7.04 0.56 3.94
DIA1 Ø3/8'' _____ kg 2 0.72 0.00 4 5.76 0.56 3.23
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
Página 60
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
ENTRADA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.25 0.00 5 12.50 0.56 7.00
H2 Ø3/8'' |_____| kg 2 0.36 0.40 0.00 2 3.04 0.56 1.70
H3 Ø3/8'' |_____| kg 2 0.21 0.40 0.00 2 2.44 0.56 1.37
H4 Ø3/8'' |_____| kg 2 0.23 0.40 0.00 2 2.52 0.56 1.41
H5 Ø3/8'' |_____| kg 2 0.45 0.40 0.00 2 3.40 0.56 1.90
V1 Ø3/8'' |_____| kg 2 2.42 0.20 0.00 2 10.48 0.56 5.87
V2 Ø3/8'' |_____| kg 2 1.93 0.20 0.00 2 8.52 0.56 4.77
V3 Ø3/8'' |_____| kg 2 1.56 0.20 0.00 2 7.04 0.56 3.94
DIA1 Ø3/8'' _____ kg 2 0.72 0.00 4 5.76 0.56 3.23
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
SALIDA
CABEZAL - PARAPETO gancho empal kg/m
H1 Ø3/8'' _____ kg 2 1.25 0.00 5 12.50 0.56 7.00
H2 Ø3/8'' |_____| kg 2 0.36 0.40 0.00 2 3.04 0.56 1.70
H3 Ø3/8'' |_____| kg 2 0.21 0.40 0.00 2 2.44 0.56 1.37
H4 Ø3/8'' |_____| kg 2 0.23 0.40 0.00 2 2.52 0.56 1.41
H5 Ø3/8'' |_____| kg 2 0.45 0.40 0.00 2 3.40 0.56 1.90
V1 Ø3/8'' |_____| kg 2 2.42 0.20 0.00 2 10.48 0.56 5.87
V2 Ø3/8'' |_____| kg 2 1.93 0.20 0.00 2 8.52 0.56 4.77
V3 Ø3/8'' |_____| kg 2 1.56 0.20 0.00 2 7.04 0.56 3.94
DIA1 Ø3/8'' _____ kg 2 0.72 0.00 4 5.76 0.56 3.23
Página 61
METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
LON.1 SUP Ø3/8'' |_____| kg 1 3.35 0.40 0.00 1 3.75 0.56 2.10
LON.2 SUP PROM. Ø3/8'' |_____| kg 1 2.81 0.40 0.00 3 9.63 0.56 5.39
TRANS.1 SUP Ø3/8'' _____ kg 1 2.81 0.00 5 14.05 0.56 7.87
TRANS.2 SUP Ø3/8'' _____ kg 1 0.49 0.00 2 0.98 0.56 0.55
TRANS.2 SUP Ø3/8'' _____ kg 1 1.04 0.00 2 2.08 0.56 1.16
Página 62
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
PONTON KM 4+466
VEREDA
LON. Ø3/8'' |_____| ͞ Kg 2 2.09 34 142.12 0.56
TRANS.(+) Ø1'' |_____| Kg 2 8.50 0.80 1.30 4 84.80 3.98
Página 63
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
ESTRIBO IZQUIERDO
VER.1 Ø1/2'' |______/ Kg 1 1.02 140 142.80 0.99
VER.2 Ø5/8'' |_____| Kg 1 3.64 52 189.28 1.55
VER.3 Ø1/2'' |______ Kg 1 0.65 84 54.60 0.99
VER.4 Ø5/8'' |_____ Kg 1 2.37 105 248.85 1.55
VER.5 Ø5/8'' |_____/ Kg 1 3.65 140 511.00 1.55
VER.6 Ø1/2'' |______/ Kg 1 0.80 84 67.20 0.99
Página 64
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
ESTRIBO DERECHO
VER.1 Ø1/2'' |______/ Kg 1 1.02 140 142.80 0.99
VER.2 Ø5/8'' |_____| Kg 1 3.64 52 189.28 1.55
VER.3 Ø1/2'' |______ Kg 1 0.65 84 54.60 0.99
VER.4 Ø5/8'' |_____ Kg 1 2.37 105 248.85 1.55
VER.5 Ø5/8'' |_____/ Kg 1 3.65 140 511.00 1.55
VER.6 Ø1/2'' |______/ Kg 1 0.80 84 67.20 0.99
Página 65
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
PONTON KM 7+862
VEREDA
LON. Ø3/8'' |_____| ͞ Kg 2 2.09 34 142.12 0.56
TRANS.(+) Ø1'' |_____| Kg 2 8.50 0.80 1.30 4 84.80 3.98
ESTRIBO IZQUIERDO
Página 66
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
ESTRIBO DERECHO
VER.1 Ø1/2'' |______/ Kg 1 1.02 139 141.78 0.99
VER.2 Ø5/8'' |_____| Kg 1 3.64 52 189.28 1.55
VER.3 Ø1/2'' |______ Kg 1 0.65 83 53.95 0.99
VER.4 Ø5/8'' |_____ Kg 1 2.37 104 246.48 1.55
VER.5 Ø5/8'' |_____/ Kg 1 3.65 139 507.35 1.55
Página 67
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
PONTON KM 9+016
Página 68
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
VEREDA
LON. Ø3/8'' |_____| ͞ Kg 2 2.09 34 142.12 0.56
TRANS.(+) Ø1'' |_____| Kg 2 8.50 0.80 1.30 4 84.80 3.98
Página 69
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
ESTRIBO IZQUIERDO
VER.1 Ø1/2'' |______/ Kg 1 1.02 175 178.50 0.99
VER.2 Ø5/8'' |_____| Kg 1 3.64 66 240.24 1.55
VER.3 Ø1/2'' |______ Kg 1 0.65 105 68.25 0.99
VER.4 Ø5/8'' |_____ Kg 1 2.37 131 310.47 1.55
VER.5 Ø5/8'' |_____/ Kg 1 3.65 175 638.75 1.55
VER.6 Ø1/2'' |______/ Kg 1 0.80 105 84.00 0.99
ESTRIBO DERECHO
VER.1 Ø1/2'' |______/ Kg 1 1.02 173 176.46 0.99
VER.2 Ø5/8'' |_____| Kg 1 3.64 65 236.60 1.55
Página 70
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
=========== TOTAL 0.00 843.96 25842.26 7850.52 0.00 2671.72 0.00 0.00 0.00 0.00
Página 71
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 72
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 73
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 74
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 75
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 76
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 77
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 78
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 79
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 80
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 81
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 82
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 83
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 84
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 85
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 86
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 87
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 88
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 89
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 90
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 91
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 92
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 93
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 94
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 95
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 96
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 97
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 98
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 99
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 100
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 101
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 102
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 103
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 104
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 105
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 106
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 107
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 108
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 109
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 110
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 111
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 112
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 113
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 114
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 115
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 116
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 117
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 118
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 119
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 120
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 121
DESAGREGADO DE VARILLAS DE ACERO TIPO TMC
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Propietario :
GOBIERNO REGIONAL DE PUNO Hecho por : Diam. Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm
Fecha :
julio/2018 Revisado por : Ø(en cm) 0.64 0.95 1.27 1.59 1.91 2.54 3.49 0.60 0.80
Especialidad:
ESTRUCTURAS DE OBRAS DE ARTE Y DRENAJE Area 0.32 0.71 1.27 1.98 2.85 5.07 9.58 0.28 0.50
Modulo :
ALCANTARILLAS TIPO TMC Kg/m 0.25 0.56 0.99 1.55 2.24 3.98 7.52 0.22 0.39
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCIÓN
Largo Gancho Empal Ø1/4'' Ø3/8'' Ø1/2" Ø5/8'' Ø3/4'' Ø1'' Ø1 3/8'' Ø6mm Ø8mm Ø12mm kg/m
Página 122
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
48858.21
350.66
366.80
481.74
3290.66
152.17
152.17
79.59
337.50
220.77
241.46
Página 123
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
52.98
134.15
110.48
82.96
58.46
220.77
241.46
52.98
134.15
110.48
82.96
58.46
141.37
293.38
54.05
385.72
792.05
66.53
Página 124
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
436.59
436.59
62.37
872.47
484.70
363.53
96.94
141.37
293.38
54.05
385.72
792.05
66.53
436.59
436.59
62.37
872.47
Página 125
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
484.70
363.53
96.94
310.60
298.68
424.95
2887.97
145.37
145.37
79.59
337.50
Página 126
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
140.36
293.38
53.41
382.04
786.39
65.74
436.59
433.47
61.63
868.55
482.53
361.89
96.51
140.36
293.38
53.41
382.04
786.39
Página 127
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
65.74
436.59
433.47
61.63
868.55
482.53
361.89
96.51
354.02
373.43
494.76
3442.30
152.17
152.17
Página 128
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
79.59
337.50
404.51
424.12
53.94
424.12
110.48
84.44
58.46
404.51
424.12
53.94
424.12
110.48
84.44
58.46
Página 129
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
176.72
372.37
67.57
481.23
990.06
83.16
436.59
436.59
62.37
1060.29
589.05
441.79
117.81
174.70
366.73
Página 130
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
66.92
477.56
978.75
82.37
539.50
539.50
77.22
1052.09
584.50
438.37
116.90
48858.21
Página 131
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 132
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 133
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 134
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 135
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 136
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 137
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 138
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 139
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 140
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 141
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 142
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 143
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 144
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 145
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 146
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 147
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 148
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 149
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 150
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 151
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 152
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 153
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 154
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 155
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 156
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 157
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 158
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 159
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 160
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 161
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 162
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 163
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 164
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 165
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 166
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 167
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 168
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 169
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 170
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 171
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 172
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 173
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 174
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 175
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 176
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 177
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 178
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 179
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 180
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 181
DO DE VARILLAS DE ACERO TIPO TMC
Ø12mm
1.20
1.13
0.89
Parcial Total
Página 182
RESUMEN DE METRADOS
Proyecto : MEJORAMIENTO DE LA CARRETERA PU N-110:EMP.PE-341 ASIRUNI - ROSASPATA - HUAYRAPATA - EMP. PE-34I PUNOTramo I: Dv. Asiruni - Rosaspata (00+000a 20+100)
Página 183
ALCANTARILLA TMC D=36"
11.35
ALCANTARILLA TMC D=48"
12.15
ALCANTARILLA TMC D=60"
30
ALCANTARILLA TMC D=72"
13.8
11.22 11.8 12 13.4 11.3 11.25 11.3 11.45
11 12
11.9 12
12.7 11.5 13.65 11.25 12.7 11.6 178.47
35.15
53.9
13.8
1.1 196.317
1.1 38.665
1.1 59.29
1.1 15.18