Está en la página 1de 18

CRONOGRAMA VALORIZADO DE AVANCE DE OBRA

Obra: MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCIÓN EDUCATIVA INTEGRADA N°277-21 y 54177 "EL BUEN PASTOR" DE TALAVERA" DISTRITO DE TALAVERA - PROVINCIA ANDAHUALAS - REGIÓN APURÍMAC
Ubicación: APURIMAC - ANDAHUAYLAS - TALAVERA

PLAZO DE EJECUCION
MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 MES 11 MES 12 MES 13 MES 14 MES 15 MES 16 MES 17 MES 18 MES 19 MES 20 MES 21 MES 22 MES 23 MES 24 MES 25 MES 26 MES 27 MES 28 MES 29 MES 30 MES 31 MES 32 MES 33 MES 34 MES 35 MES 36 TOTAL
Item Descripcion Unid Metrado PU S/ PARCIAL
MAR - 2019 ABR - 2019 MAY - 2019 JUN - 2019 JUL - 2019 AGO - 2019 SET - 2019 0CT - 2019 NOV - 2019 DIC - 2019 ENE - 2020 FEB - 2020 MAR - 2020 JUL - 2020 AGO - 2020 SET - 2020 0CT - 2020 NOV - 2020 DIC - 2020 ENE - 2021 FEB - 2021 MAR - 2021 ABR - 2021 MAY - 2021 JUN - 2021 JUL - 2021 AGO - 2021 SET -2021 0CT - 2021 NOV - 2021 DIC - 2021 ENE - 2022 FEB - 2022 MAR - 2022 ABR - 2022 MAY - 2022 1188 Dias

OBRA BUEB PASTOR (CD) S/ 15,109,177.68 -


01
OBRAS GENERALES S/ 2,384,198.29 211,511.01 428,566.98 663,614.56 406,144.23 424,556.96 334,989.35 366,644.30 820,827.79 800,280.36 549,636.40 570,633.96 589,833.55 475,387.85 212,668.33 284,077.19 651,689.83 322,026.13 255,106.62 145,179.17 98,917.89 222,811.29 237,464.00 398,689.32 325,674.13 256,656.57 268,718.76 132,666.01 180,920.36 71,022.88 119,398.52 697,143.90 697,143.90 697,143.90 697,143.90 697,143.90 797,143.90 15,109,177.68

01.01 OBRAS PROVISIONALES S/ 120,241.98


01.01.01 CONSTRUCCION DE CERCO PROVISIONAL m 316.8 S/ 19.41 S/ 6,149.09 6,012.86 22.70 22.70 22.70 22.70 22.70 22.70
01.01.02 HABILITACION DE AMBIENTES PARA OFICINA gbl 1 S/ 872.18 S/ 872.18 827.32 7.48 7.48 7.48 7.48 7.48 7.48
01.01.03 HABILITACION DE AMBIENTES PARA ALMACEN (12.00X6.50) gbl 1 S/ 1,662.21 S/ 1,662.21 1,599.72 10.42 10.42 10.42 10.42 10.42 10.42
01.01.04 CASETA DE GUARDIANIA gbl 1 S/ 4,720.00 S/ 4,720.00 4,720.00 - - - - - -
01.01.05 SERVICIOS HIGIENICOS gbl 1 S/ 3,200.00 S/ 3,200.00 3,200.00 - - - - - -
01.01.06 DEPOSITO PARA AGUA (2.00X3.00X1.00) gbl 1 S/ 1,998.73 S/ 1,998.73 1,925.57 12.19 12.19 12.19 12.19 12.19 12.19
01.01.07 CARTEL DE INDENTIFICACION DE LA OBRA DE (3.60X2.40) UND. 1 S/ 1,639.77 S/ 1,639.77 1,608.69 5.18 5.18 5.18 5.18 5.18 5.18
01.01.08 ELABORACION DE EXPEDIENTE Y EJECUCIÓN DE SUB ESTACION
GLBELECTRICA
1 S/ 100,000.00 S/ 100,000.00 - - - - - 100,000.00
01.02 INSTALACIONES PROVISIONALES S/ 5,900.00 - - - - - -
01.02.01 AGUA PARA LA CONSTRUCCION gbl 1 S/ 1,400.00 S/ 1,400.00 140.00 140.00 140.00 140.00 420.00 84.00 84.00 84.00 77.78 77.78 12.44 - - - 0.00 0.00 0.00 0.00 0.00 0.00
01.02.02 CONEXIÓN E INSTALACION DE ENERGIA ELECTRICA PROVISIONAL
gbl 1 S/ 4,500.00 S/ 4,500.00 4,500.00 - - - - - -
01.03 SEGURIDAD DURANTE LA EJECUCION S/ 325,031.04 - - - - - -
01.03.01 SEGURIDAD Y SALUD EN OBRA GLB 18 S/ 17,700.00 S/ 318,600.00 17,700.00 17,700.00 17,700.00 17,700.00 17,700.00 17,700.00 17,700.00 17,700.00 17,700.00 17,700.00 17,700.00 983.33 17,700.00 5,310.00 20,001.00 26,550.00 26,550.00 26,727.00 13.11 13.11 13.11 13.11 13.11 13.11
01.03.02 SEÑALIZACION DURANTE LA EJECUCION m 633.6 S/ 10.15 S/ 6,431.04 440.00 2,000.00 2,220.00 400.00 352.00 352.00 352.00 315.04 - - - - - - - - - - -
01.04 SEGURIDAD Y SALUD EN EL CONTEXTO COVID-19 S/ 446,230.00 - - - - - -
01.04.01 EQUIPOS DE PROTECCION INDIVIDUAL GLB 1 S/ 68,590.00 S/ 68,590.00 20,577.00 20,577.00 27,436.00 - - - - - -
01.04.02 EQUIPOS DE PROTECCION COLECTIVA GLB 1 S/ 89,640.00 S/ 89,640.00 26,892.00 26,892.00 35,856.00 - - - - - -
01.04.03 RECURSOS PARA PREVENCION ANTE EMERGENCIAS EN SEGURIDAD
GLB Y SALUD
12 DURANTE EL TRABAJO
S/ 12,000.00 S/ 144,000.00 1,000.00 1,000.00 10,000.00 22,000.00 22,000.00 22,000.00 22,000.00 22,000.00 22,000.00
01.04.04 RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD
GLB Y SALUD
12 DURANTE EL S/
TRABAJO
12,000.00 S/ 144,000.00 1,500.00 1,500.00 15,000.00 21,000.00 21,000.00 21,000.00 21,000.00 21,000.00 21,000.00
01.05 EXPLANACION GENERAL PARA LA CONSTRUCCION S/ 63,534.65 - - - - - -
01.05.01 CORTE DE MATERIAL SUELTO C/MAQUINARIA m3 2945.51 S/ 21.57 S/ 63,534.65 6,247.43 56,226.84 176.73 176.73 176.73 176.73 176.73 176.73
01.06 DEMOLICIONES, DESMONTAJES y RETIROS S/ 352,942.96 - - - - - -
01.06.01 DEMOLICION DE LOSA DE CONCRETO EXISTENTE EN PATIO m2 704 S/ 23.93 S/ 16,846.72 1,569.92 14,129.28 191.25 191.25 191.25 191.25 191.25 191.25
01.06.02 DEMOLICION Y RETIRO DE CERCO PERIMETRICO EXISTENTE m2 3352.95 S/ 35.70 S/ 119,700.32 1,696.77 7,416.88 51,868.60 47,243.40 2,772.80 693.20 1,334.78 1,334.78 1,334.78 1,334.78 1,334.78 1,334.78
01.06.03 DESMONTAJE Y RETIRO DE PUERTAS EXISTENTES m2 123.5 S/ 70.74 S/ 8,736.39 8,132.48 - 100.65 100.65 100.65 100.65 100.65 100.65
01.06.04 DESMONTAJE Y RETIRO DE VENTANAS EXISTENTES m2 801.12 S/ 35.42 S/ 28,375.67 26,428.95 - 324.45 324.45 324.45 324.45 324.45 324.45
01.06.05 DESMONTAJE Y RETIRO DE COBERTURA EN TECHO EXISTENTEm2 1509.76 S/ 8.93 S/ 13,482.16 12,546.11 - 156.01 156.01 156.01 156.01 156.01 156.01
01.06.06 ACARREO DE MATERIAL DE DESMONTAJE m3 840.95 S/ 36.81 S/ 30,955.37 28,472.45 1,053.30 238.27 238.27 238.27 238.27 238.27 238.27
01.06.07 ELIMINACION DE MATERIAL DE DESMONTAJE m3 840.95 S/ 160.35 S/ 134,846.33 83,742.75 47,374.47 3,022.71 117.73 117.73 117.73 117.73 117.73 117.73
01.07 PLATAFORMAS, RAMPAS, GRADERIAS y SARDINELES EXTERIORES S/ 175,961.51 - - - - - -
01.07.01 MOVIMIENTO DE TIERRAS S/ 18,001.70 - - - - - -
01.07.01.01 EXCAVACION MANUAL m3 140.57 S/ 73.63 S/ 10,350.17 7,403.12 2,467.71 79.89 79.89 79.89 79.89 79.89 79.89
01.07.01.02 NIVELACION y COMPACTADO CON MATERIAL DE PRESTAMO (E=0.15m)
m3 88.06 S/ 86.89 S/ 7,651.53 7,492.14 26.56 26.56 26.56 26.56 26.56 26.56
01.07.02 CONCRETO SIMPLE S/ 85,145.91 - - - - - -
01.07.02.01 SARDINEL DE PROTECCION EN AREAS VERDES C:H 1:8 + 30%m3
P.M. 4" 39.26 S/ 398.54 S/ 15,646.68 314.48 2,555.37 2,555.37 2,555.37 2,555.37 2,555.37 2,555.37
01.07.02.02 SARDINEL ENCOFRADO Y DESENCOFRADO NORMAL m2 556.23 S/ 111.79 S/ 62,180.95 962.29 10,203.11 10,203.11 10,203.11 10,203.11 10,203.11 10,203.11
01.07.02.03 JUNTA DE DILATACION (ASFALTICA) E=1" m 91 S/ 10.74 S/ 977.34 162.89 162.89 162.89 162.89 162.89 162.89
01.07.02.04 GRADERIA EXTERIOR CONCRETO 175 kg/cm2 m3 3.2 S/ 439.48 S/ 1,406.34 1,249.05 26.22 26.22 26.22 26.22 26.22 26.22
01.07.02.05 GRADERIA EXTERIOR ENCOFRADO Y DESENCOFRADO NORMAL
m2 26.95 S/ 89.68 S/ 2,416.88 755.56 276.89 276.89 276.89 276.89 276.89 276.89
01.07.02.06 PASAMANO DE TUBO FºGº DE 3" EN ESCALERA EMPOTRADO AmLA PARED
19.12 S/ 131.68 S/ 2,517.72 419.62 419.62 419.62 419.62 419.62 419.62
01.07.03 CONCRETO ARMADO S/ 72,813.90 - - - - - -
01.07.03.01 PISO DE CONCRETO ESTAMPADO S/ 61,012.52 - - - - - -
01.07.03.01.01 ACERO CORRUGADO FY= 4200kg/cm2 kg 1676.3 S/ 6.17 S/ 10,342.77 1,723.80 1,723.80 1,723.80 1,723.80 1,723.80 1,723.80
01.07.03.01.02 ENCOFRADO Y DESENCOFRADO m2 34.1 S/ 89.60 S/ 3,055.36 509.23 509.23 509.23 509.23 509.23 509.23
01.07.03.01.03 CONCRETO F'C=210 KG/CM2 PARA PISO ESTAMPADO m3 113.5 S/ 419.51 S/ 47,614.39 7,935.73 7,935.73 7,935.73 7,935.73 7,935.73 7,935.73
01.07.03.02 ESCALERA EXTERIOR S/ 11,801.38 - - - - - -
01.07.03.02.01 ENCOFRADO Y DESENCOFRADO m2 48.14 S/ 89.60 S/ 4,313.34 718.89 718.89 718.89 718.89 718.89 718.89
01.07.03.02.02 ACERO CORRUGADO FY= 4200kg/cm2 kg 654.5 S/ 6.17 S/ 4,038.27 673.05 673.05 673.05 673.05 673.05 673.05
01.07.03.02.03 CONCRETO F´C=210 KG/CM2 m3 9.05 S/ 381.19 S/ 3,449.77 574.96 574.96 574.96 574.96 574.96 574.96
01.08 MUROS DE CONTENCION EN EXTERIORES S/ 391,444.26 - - - - - -
01.08.01 TRABAJOS PRELIMINARES S/ 437.33 - - - - - -
01.08.01.01 TRAZO NIVELACION Y REPLANTEO m2 178.5 S/ 2.45 S/ 437.33 72.89 72.89 72.89 72.89 72.89 72.89
01.08.02 MOVIMIENTO DE TIERRAS S/ 75,698.36 - - - - - -
01.08.02.01 EXCAVACIO DE ZANJAS EN TERRENO COMPACTADO m3 1053.15 S/ 29.45 S/ 31,015.27 9,128.60 575.10 21,311.57 0.00 0.00 0.00 0.00 0.00 0.00
01.08.02.02 PERFILADO Y COMPACTACION A NIVEL DE SUBRASANTE CONm3
PLANCHA
178.5
COMPACTADORA S/ 150.35 S/ 26,837.48 26,310.90 87.76 87.76 87.76 87.76 87.76 87.76
01.08.02.03 RELLENO Y COMPACTADO CON APIZONADOR TIPO CANGUROm3
C/MAT 102.15 S/ 41.60 S/ 4,249.44 4,160.57 14.81 14.81 14.81 14.81 14.81 14.81
01.08.02.04 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=5KM
m3 1053.15 S/ 12.91 S/ 13,596.17 13,532.98 10.53 10.53 10.53 10.53 10.53 10.53
01.08.03 CONCRETO ARMADO S/ 315,308.57 - - - - - -
01.08.03.01 SOLADO E=4" MEZCLA 1:10 CEMENTO-HORMIGON m2 178.5 S/ 43.33 S/ 7,734.41 4,834.42 2,899.99 0.00 0.00 0.00 0.00 0.00 0.00
01.08.03.02 ACERO GRADO 60° EN MURO DE CONCRETO ARMADO kg 17702.28 S/ 6.76 S/ 119,667.41 27,468.36 11,772.16 80,426.89 0.00 0.00 0.00 0.00 0.00 0.00
01.08.03.03 ENCOFRADO Y DESENCOFRADO EN MURO DE CONCRETO m2 425.24 S/ 68.80 S/ 29,256.51 29,256.51 - - - - - -
01.08.03.04 CONCRETO F´C=210 KG/CM2, EN MUROS DE CONTENCION m3 242.55 S/ 514.68 S/ 124,835.63 16,206.33 108,629.30 0.00 0.00 0.00 0.00 0.00 0.00
01.08.03.05 JUNTA DE DILATACION CON ESPUMA PLASTICA E = 1" m2 20.01 S/ 42.73 S/ 855.03 842.82 2.03 2.03 2.03 2.03 2.03 2.03
01.08.03.06 DRENAJE CON TUBERIA DE PVC DE 1" m2 72 S/ 6.05 S/ 435.60 429.12 1.08 1.08 1.08 1.08 1.08 1.08
01.08.03.07 CERCO PERIMETRICO CON MALLA METALICA OLIMPICA m 31.6 S/ 1,029.24 S/ 32,523.98 32,437.40 14.43 14.43 14.43 14.43 14.43 14.43
01.09 ASTA DE BANDERA S/ 502,911.89 - - - - - -
01.09.01 ESTRUCTURAS S/ 2,602.96 - - - - - -
01.09.01.01 CONCRETO ARMADO S/ 2,602.96 - - - - - -
01.09.01.01.01 ASTA DE BANDERA CONCRETO 175 kg/cm2 m3 2.51 S/ 626.09 S/ 1,571.49 261.92 261.92 261.92 261.92 261.92 261.92
01.09.01.01.02 ASTA DE BANDERA ENCOFRADO DESENCOFRADO m2 7.98 S/ 95.89 S/ 765.20 127.53 127.53 127.53 127.53 127.53 127.53
01.09.01.01.03 ASTA DE BANDERA ACERO FY=4200KG/CM2 kg 43.65 S/ 6.10 S/ 266.27 183.94 13.72 13.72 13.72 13.72 13.72 13.72
01.09.02 ARQUITECTURA S/ 9,538.09 - - - - - -
01.09.02.01 REVOQUES, ENLUCIDOS Y MOLDURAS S/ 50.50 - - - - - -
01.09.02.01.01 TARRAJEO EN SUPERFICIE DE ASTA DE BANDERA m2 1.4 S/ 36.07 S/ 50.50 8.42 8.42 8.42 8.42 8.42 8.42
01.09.02.02 PISOS Y PAVIMENTOS S/ 388.07 - - - - - -
01.09.02.02.01 PISO DE CEMENTO PULIDO CON OCRE M2 8.58 S/ 45.23 S/ 388.07 64.68 64.68 64.68 64.68 64.68 64.68
01.09.02.03 CARPINTERIA S/ 7,216.38 - - - - - -
01.09.02.03.01 CARPINTERIA METALICA S/ 7,216.38 - - - - - -
01.09.02.03.01.01 ASTA DE BANDERA INC/ACCESORIOS und 2 S/ 3,608.19 S/ 7,216.38 1,202.73 1,202.73 1,202.73 1,202.73 1,202.73 1,202.73
01.09.02.04 VARIOS S/ 1,883.14 - - - - - -
01.09.02.04.01 BANDERA BICOLOR DE TELA und 2 S/ 941.57 S/ 1,883.14 313.86 313.86 313.86 313.86 313.86 313.86
01.09.03 PLACA RECORDATORIA
S/ 23,460.41 - - - - - -
01.09.03.01 ESTRUCTURAS S/ 609.90 - - - - - -
01.09.03.01.01 CONCRETO ARMADO S/ 609.90 - - - - - -
01.09.03.01.01.01 PLACA RECORDATORIA S/ 609.90 - - - - - -
01.09.03.01.01.01.01 PLACA RECORDATORIA CONCRETO 175 kg/cm2 m3 1 S/ 498.06 S/ 498.06 83.01 83.01 83.01 83.01 83.01 83.01
01.09.03.01.01.01.02 PLACA RECORDATORIA ENCOFRADO DESENCOFRADO m2 0.99 S/ 95.89 S/ 94.93 15.82 15.82 15.82 15.82 15.82 15.82
01.09.03.01.01.01.03 PLACA RECORDATORIA ACERO FY=4200KG/CM2 kg 2.68 S/ 6.31 S/ 16.91 11.69 0.87 0.87 0.87 0.87 0.87 0.87
01.09.03.02 ARQUITECTURA S/ 3,558.05 - - - - - -
01.09.03.02.01 REVOQUES, ENLUCIDOS Y MOLDURAS S/ 35.71 - - - - - -
01.09.03.02.01.01 TARRAJEO EN SUPERFICIE DE PLACA RECORDATORIA m2 0.99 S/ 36.07 S/ 35.71 5.95 5.95 5.95 5.95 5.95 5.95
01.09.03.02.02 VARIOS S/ 3,522.34 - - - - - -
01.09.03.02.02.01 PLACA RECORDATORIA DE BRONCE BLINDADO GLB 1 S/ 3,522.34 S/ 3,522.34 587.06 587.06 587.06 587.06 587.06 587.06
01.09.03.03 SISTEMA DE PARARRAYO S/ 19,292.46 - - - - - -
01.09.03.03.01 ESTRUCTURAS S/ 833.11 - - - - - -
01.09.03.03.01.01 MOVIMIENTO DE TIERRAS S/ 833.11 - - - - - -
01.09.03.03.01.01.01 EXCAVACION m3 7.5 S/ 73.63 S/ 552.23 535.80 2.74 2.74 2.74 2.74 2.74 2.74
01.09.03.03.01.01.02 ACARREO INTERNO DE MATERIAL m3 7.5 S/ 24.54 S/ 184.05 178.58 0.91 0.91 0.91 0.91 0.91 0.91
01.09.03.03.01.01.03 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINA m3 7.5 S/ 12.91 S/ 96.83 96.38 0.08 0.08 0.08 0.08 0.08 0.08
01.09.03.03.02 SISTEMA DE PARARRAYO S/ 18,459.35 - - - - - -
01.09.03.03.02.01 POZO CONEXION A TIERRA PARARRAYO und 7.5 S/ 1,515.85 S/ 11,368.88 11,258.03 18.48 18.48 18.48 18.48 18.48 18.48
01.09.03.03.02.02 POSTE METALICO PARARRAYO und 1 S/ 7,090.47 S/ 7,090.47 7,075.69 2.46 2.46 2.46 2.46 2.46 2.46
01.09.04 TRANSPORTE DE HERRAMIENTAS, EQUIPOS y MAQUINARIAS S/ 45,000.00 - - - - - -
01.09.04.01 TRANSPORTE DE HERRAMIENTAS, EQUIPOS y MAQUINARIASGLB 1 S/ 45,000.00 S/ 45,000.00 33,750.00 11,250.00 - - - - - -
01.09.05 INSTALACION DE HUERTOS Y JARDINES S/ 6,056.63 - - - - - -
01.09.05.01 ARQUITECTURA S/ 6,056.63 - - - - - -
01.09.05.01.01 JARDINERIA, PLANTAS ORNAMENTALES Y DEPOSITOS S/ 6,056.63 - - - - - -
01.09.05.01.01.01 REGEVETACION m2 226.6 S/ 12.88 S/ 2,918.61 486.44 486.44 486.44 486.44 486.44 486.44
01.09.05.01.01.02 PLANTAS ORNAMENTALES und 36 S/ 47.89 S/ 1,724.04 287.34 287.34 287.34 287.34 287.34 287.34
01.09.05.01.01.03 RIEGO EN AREAS VERDES Y PLANTAS ORNAMENTALES m2 226.6 S/ 6.24 S/ 1,413.98 235.66 235.66 235.66 235.66 235.66 235.66
01.09.06 CONTENEDORES DE RESIDUOS SOLIDOS S/ 1,117.20 - - - - - -
01.09.06.01 COLOCACION DE CONTENDOR DE RESIDUOS SOLIDOS und 28 S/ 39.90 S/ 1,117.20 186.20 186.20 186.20 186.20 186.20 186.20
01.09.07 PRUEBA DE LABORATORIO S/ 4,750.50 - - - - - -
01.09.07.01 PRUEBA DE BRIQUETAS und 50 S/ 95.01 S/ 4,750.50 1,520.16 3,230.34 - - - - - -
01.09.08 INSTALACIONES SANITARIAS DE AGUA GENERALES S/ 22,556.23 - - - - - -
01.09.08.01 MOVIMIENTO DE TIERRAS Y/O ACONDICIONAMIENTO PARA TUBERIAS S/ 6,123.15 - - - - - -
01.09.08.01.01 EXCAVACION DE ZANJAS PARA REDES EXTERIORES m3 67.6 S/ 49.09 S/ 3,318.48 1,980.02 1,338.46 - - 0.00 0.00 0.00 0.00 0.00 0.00
01.09.08.01.02 RELLENO MANUAL CON MATERIAL PROPIO EN ZANJAS m3 67.42 S/ 41.60 S/ 2,804.67 1,661.91 1,142.76 - - 0.00 0.00 0.00 0.00 0.00 0.00
01.09.08.02 SISTEMA DE AGUA FRIA S/ 15,162.32 - - - - - -
CRONOGRAMA VALORIZADO DE AVANCE DE OBRA

Obra: MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCIÓN EDUCATIVA INTEGRADA N°277-21 y 54177 "EL BUEN PASTOR" DE TALAVERA" DISTRITO DE TALAVERA - PROVINCIA ANDAHUALAS - REGIÓN APURÍMAC
Ubicación: APURIMAC - ANDAHUAYLAS - TALAVERA

PLAZO DE EJECUCION
MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 MES 11 MES 12 MES 13 MES 14 MES 15 MES 16 MES 17 MES 18 MES 19 MES 20 MES 21 MES 22 MES 23 MES 24 MES 25 MES 26 MES 27 MES 28 MES 29 MES 30 MES 31 MES 32 MES 33 MES 34 MES 35 MES 36 TOTAL
Item Descripcion Unid Metrado PU S/ PARCIAL
MAR - 2019 ABR - 2019 MAY - 2019 JUN - 2019 JUL - 2019 AGO - 2019 SET - 2019 0CT - 2019 NOV - 2019 DIC - 2019 ENE - 2020 FEB - 2020 MAR - 2020 JUL - 2020 AGO - 2020 SET - 2020 0CT - 2020 NOV - 2020 DIC - 2020 ENE - 2021 FEB - 2021 MAR - 2021 ABR - 2021 MAY - 2021 JUN - 2021 JUL - 2021 AGO - 2021 SET -2021 0CT - 2021 NOV - 2021 DIC - 2021 ENE - 2022 FEB - 2022 MAR - 2022 ABR - 2022 MAY - 2022 1188 Dias
01.09.08.02.01 RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAP m 176.2 S/ 20.65 S/ 3,638.53 3,423.57 214.96 - - 0.00 0.00 0.00 0.00 0.00 0.00
01.09.08.02.02 TEE PVC-SAP 3/4" pza 9 S/ 35.83 S/ 322.47 304.20 18.27 - - - - - -
01.09.08.02.03 CODO PVC-SAP 3/4"X90º pza 12 S/ 36.33 S/ 435.96 411.60 24.36 - - - - - - -
01.09.08.02.04 RED DE DISTRIBUCION TUBERIA DE 1" PVC - SAP m 134.7 S/ 21.41 S/ 2,883.93 2,189.50 694.43 - - - - - - -
01.09.08.02.05 TEE PVC - SAP 1" pza 10 S/ 37.00 S/ 370.00 61.67 61.67 61.67 61.67 61.67 61.67
01.09.08.02.06 CODO PVC - SAP 1"X90° pza 10 S/ 42.33 S/ 423.30 70.55 70.55 70.55 70.55 70.55 70.55
01.09.08.02.07 RED DE DISTRIBUCION TUBERIA DE 1 1/2" PVC - SAP m 138.7 S/ 26.21 S/ 3,635.33 605.89 605.89 605.89 605.89 605.89 605.89
01.09.08.02.08 TEE PVC - SAP 1 1/2" pza 15 S/ 44.67 S/ 670.05 111.68 111.68 111.68 111.68 111.68 111.68
01.09.08.02.09 CODO PVC - SAP 1 1/2"X90° pza 10 S/ 55.33 S/ 553.30 92.22 92.22 92.22 92.22 92.22 92.22
01.09.08.02.10 CAJA DE VALVULAS DE 10" X 20" und 5 S/ 445.89 S/ 2,229.45 371.58 371.58 371.58 371.58 371.58 371.58
01.09.08.03 CONEXION A LA RED PUBLICA DE AGUA S/ 1,270.76 - - - - - -
01.09.08.03.01 CONEXION A LA RED PUBLICA DE AGUA GLB 2 S/ 635.38 S/ 1,270.76 625.16 107.60 107.60 107.60 107.60 107.60 107.60
01.09.09 INSTALACIONES SANITARIAS DE DESAGÜE GENERALES S/ 23,765.02 - - - - - -
01.09.09.01 MOVIMIENTO DE TIERRAS Y/O ACONDICIONAMIENTO PARA TUBERIAS S/ 5,436.18 - - - - - -
01.09.09.01.01 EXCAVACION DE ZANJAS PARA REDES EXTERIORES m3 62.08 S/ 49.09 S/ 3,047.51 2,045.10 1,002.41 - - 0.00 0.00 0.00 0.00 0.00 0.00
01.09.09.01.02 RELLENO MANUAL CON MATERIAL PROPIO EN ZANJAS m3 57.42 S/ 41.60 S/ 2,388.67 1,625.70 762.97 - - 0.00 0.00 0.00 0.00 0.00 0.00
01.09.09.02 SISTEMA DE DESAGÜE S/ 10,269.94 - - - - - -
01.09.09.02.01 TUBERIA DE PVC UF 150mm S-25 m 206.93 S/ 49.63 S/ 10,269.94 7,048.50 3,221.44 - 0.00 0.00 0.00 0.00 0.00 0.00
01.09.09.03 CAJA DE REGISTRO S/ 6,588.12 - - - - - -
01.09.09.03.01 CAJA DE REGISTRO DE DESAGUE 12" X 24" pza 21 S/ 313.72 S/ 6,588.12 1,801.56 4,011.80 308.60 308.60 26.26 26.26 26.26 26.26 26.26 26.26
01.09.09.04 CONEXION A LA RED COLECTORA DE DESAGÜE S/ 1,470.78 - - - - - -
01.09.09.04.01 CONEXION A LA RED COLECTORA DE DESAGúE GLB 2 S/ 735.39 S/ 1,470.78 362.59 362.59 725.17 3.41 3.41 3.41 3.41 3.41 3.41
01.09.10 SISTEMA DE DRENAJE PLUVIAL S/ 104,933.13 - - - - - -
01.09.10.01 MOVIMIENTO DE TIERRAS S/ 7,443.66 - - - - - -
01.09.10.01.01 EXCAVACION DE ZANJAS PARA CANALETA m3 78.78 S/ 73.63 S/ 5,800.57 2,814.02 292.90 1,064.46 321.48 571.52 122.70 122.70 122.70 122.70 122.70 122.70
01.09.10.01.02 NIVELACION y COMPACTADO CON MATERIAL DE PRESTAMOm3
(E=0.10m)
18.91 S/ 86.89 S/ 1,643.09 85.71 1,182.80 214.28 26.72 26.72 26.72 26.72 26.72 26.72
01.09.10.02 SISTEMA DE DRENAJE PLUVIAL S/ 88,489.47 - - - - - -
01.09.10.02.01 CANALETA ENCOFRADO DESENCOFRADO m2 346.62 S/ 84.83 S/ 29,403.77 11,582.82 9,811.77 728.47 2,490.33 798.40 798.40 798.40 798.40 798.40 798.40
01.09.10.02.02 CANALETA EN EXTERIOR CONCRETO 175 kg/cm2 m3 22.06 S/ 614.09 S/ 13,546.83 5,355.95 4,736.55 1,250.94 910.88 215.42 215.42 215.42 215.42 215.42 215.42
01.09.10.02.03 JUNTA DE DILATACION (ASFALTICA) E=1" m 181.05 S/ 10.74 S/ 1,944.48 324.08 324.08 324.08 324.08 324.08 324.08
01.09.10.02.04 REJILLA DE CRUCE (0.20m) EN EXTERIOR m 630.25 S/ 69.17 S/ 43,594.39 17,404.98 780.15 1,781.23 3,938.00 3,938.00 3,938.00 3,938.00 3,938.00 3,938.00
01.09.10.03 PRUEBA HIDRAULICA S/ 9,000.00 - - - - - -
01.09.10.03.01 PRUEBA DE PRESION DE AGUA POTABLE GLB 1 S/ 5,000.00 S/ 5,000.00 2,500.00 500.00 500.00 250.00 250.00 250.00 250.00 250.00 250.00
01.09.10.03.02 PRUEBA DE DESAGUE GLB 1 S/ 4,000.00 S/ 4,000.00 2,000.00 2,000.00 - - - - - -
01.09.11 INSTALACIONES ELECTRICAS GENERALES S/ 68,740.89 - - - - - -
01.09.11.01 MOVIMIENTO DE TIERRAS Y/O ACONDICIONAMIENTO PARA TUBERIAS S/ 4,065.43 - - - - - -
01.09.11.01.01 EXCAVACION DE ZANJAS PARA REDES EXTERIORES m3 58.24 S/ 49.09
S/ 2,859.00 1,249.33 971.65 271.49 281.49 14.17 14.17 14.17 14.17 14.17 14.17

01.09.11.01.02 RELLENO MANUAL CON MATERIAL PROPIO EN ZANJAS m3 57.34 S/ 21.04


S/ 1,206.43 1,150.81 55.62 - - - 0.00 0.00 0.00 0.00 0.00 0.00
01.09.11.02 SISTEMA ELECTRICO S/ 50,591.37 - - - - - -
01.09.11.02.01 TENDIDO CABLE ELECTRICO NYY 3-1x16mm2 m 311.6 S/ 144.89 S/ 45,147.72 27,069.94 18,077.78 0.00 0.00 0.00 0.00 0.00 0.00
01.09.11.02.02 TENDIDO CABLE ELECTRICO NYY 3-1x6mm2 m 84.6 S/ 49.75 S/ 4,208.85 2,520.23 1,688.62 0.00 0.00 0.00 0.00 0.00 0.00
01.09.11.02.03 TABLERO METALICO TIPO ENGRAMPE DE 06 POLOS und 1 S/ 180.98 S/ 180.98 103.30 12.95 12.95 12.95 12.95 12.95 12.95
01.09.11.02.04 INTERRUPTOR THERMOMAGNETICO 3 X 60A pza 7 S/ 40.79 S/ 285.53 165.52 20.00 20.00 20.00 20.00 20.00 20.00
01.09.11.02.05 INTERRUPTOR THERMOMAGNETICO 3 X 200A pza 1 S/ 768.29 S/ 768.29 460.15 51.36 51.36 51.36 51.36 51.36 51.36
01.09.11.03 POZO CONEXIONA TIERRA S/ 1,565.43 - - - - - -
01.09.11.03.01 EXCAVACION MANUAL DE ZANJAS m3 1.01 S/ 49.09 S/ 49.58 48.11 0.25 0.25 0.25 0.25 0.25 0.25
01.09.11.03.02 POZO CONEXION A TIERRA und 1 S/ 1,515.85 S/ 1,515.85 1,501.07 2.46 2.46 2.46 2.46 2.46 2.46
01.09.11.04 CAJA DE INSPECCION S/ 1,518.66 - - - - - -
01.09.11.04.01 CAJA DE INSPECCION 12" X 24" pza 6 S/ 253.11 S/ 1,518.66 1,487.40 5.21 5.21 5.21 5.21 5.21 5.21
01.09.11.05 CONEXION A LA RED PUBLICA S/ 7,000.00 - - - - - -
01.09.11.05.01 CONEXION ELECTRICA MONOFASICO GLB 1 S/ 2,500.00 S/ 2,500.00 416.67 416.67 416.67 416.67 416.67 416.67
01.09.11.05.02 CONEXION ELECTRICA TRIFASICO GLB 1 S/ 4,500.00 S/ 4,500.00 750.00 750.00 750.00 750.00 750.00 750.00
01.09.11.06 PRUEBA DE CONEXIÓN ELECTRICA S/ 4,000.00 - - - - - -
01.09.11.06.01 PRUEBA DE RESISTIVIDAD GLB 1 S/ 4,000.00 S/ 4,000.00 666.67 666.67 666.67 666.67 666.67 666.67
01.09.12 SISTEMA CONTRAINCENDIOS S/ 123,390.83 - - - - - -
01.09.12.01 SALIDA DE AGUA CONTRAINCENDIOS S/ 2,047.92 - - - - - -
01.09.12.01.01 SALIDA DE AGUA CONTRAINCENDIO DE SCH40 DE 1 1/2 IN pto 7 S/ 292.56 S/ 2,047.92 341.32 341.32 341.32 341.32 341.32 341.32
01.09.12.02 RED DE AGUA CONTRAINCENDIO PARA GABINETES C.I S/ 23,438.70 - - - - - -
01.09.12.02.01 TUBERIA DE ACERO CEDULA 40 1 1/2" (COLGADA) m 185.1 S/ 97.81 S/ 18,104.63 3,017.44 3,017.44 3,017.44 3,017.44 3,017.44 3,017.44
01.09.12.02.02 TUBERIA DE ACERO CEDULA 40 2 1/2" (COLGADA) m 46.7 S/ 114.22 S/ 5,334.07 889.01 889.01 889.01 889.01 889.01 889.01
01.09.12.03 VALVULAS Y ACCESORIOS S/ 41,545.98 - - - - - -
01.09.12.03.01 ANTISISMICO DE 2 VIAS pza 10 S/ 543.20 S/ 5,432.00 905.33 905.33 905.33 905.33 905.33 905.33
01.09.12.03.02 GABINETE TIPO 1 PARA SISTEMA DE CONTRA INCENDIOS (C/ACCES)
und 7 S/ 3,753.22 S/ 26,272.54 4,378.76 4,378.76 4,378.76 4,378.76 4,378.76 4,378.76
01.09.12.03.03 VALVULA CHECK DE 1 1/2'' pza 1 S/ 460.27 S/ 460.27 76.71 76.71 76.71 76.71 76.71 76.71
01.09.12.03.04 SOPORTE METALICO PARA ADOSAR MONTANTE und 93 S/ 83.65 S/ 7,779.45 1,296.58 1,296.58 1,296.58 1,296.58 1,296.58 1,296.58
01.09.12.03.05 VALVULA SIAMESA DE 4''x2 1/2''x2 1/2'' pza 1 S/ 1,601.72 S/ 1,601.72 266.95 266.95 266.95 266.95 266.95 266.95
01.09.12.04 EMPALME, LIMPIEZA Y DESINFECCION S/ 2,888.23 - - - - - -
01.09.12.04.01 PRUEBA DE RED DE AGUA CONTRAINCENDIO m 231.8 S/ 12.46 S/ 2,888.23 481.37 481.37 481.37 481.37 481.37 481.37
01.09.12.05 EQUIPO SANITARIO S/ 53,470.00 - - - - - -
01.09.12.05.01 SISTEMA DE PRESURIZACION DE AGUA CONTRAINCENDIO GLB
(BP LISTADA
1 30 HP, 250GPM, BJS/253,470.00
HP, 1 LPS HDT 75 TAB. 220V)
S/ 53,470.00 8,911.67 8,911.67 8,911.67 8,911.67 8,911.67 8,911.67
01.09.13 EVALUACIÓN DEL IMPACTO AMBIENTAL S/ 67,000.00 - - - - - -
01.09.13.01 PLAN DE MANEJO AMBIENTAL S/ 67,000.00 - - - - - -
01.09.13.01.01 PROGRAMA DE RESIDUOS SÓLIDOS, DESMONTE Y EFLUENTES
GLB 1 S/ 27,800.00 S/ 27,800.00 4,633.33 4,633.33 4,633.33 4,633.33 4,633.33 4,633.33
01.09.13.01.02 PROGRAMA DE EDUCACION AMBIENTAL GLB 1 S/ 9,300.00 S/ 9,300.00 1,550.00 1,550.00 1,550.00 1,550.00 1,550.00 1,550.00
01.09.13.01.03 PROGRAMA DE MONITOREO Y SEGUIMIENTO GLB 1 S/ 15,600.00 S/ 15,600.00 2,600.00 2,600.00 2,600.00 2,600.00 2,600.00 2,600.00
01.09.13.01.04 PLAN DE CIERRE DE OBRA GLB 1 S/ 14,300.00 S/ 14,300.00 2,383.33 2,383.33 2,383.33 2,383.33 2,383.33 2,383.33
02 MODULO I - NIVEL INICIAL S/ 487,536.98 - - - - - -
02.01 ESTRUCTURAS S/ 269,813.27 - - - - - -
02.01.01 TRABAJOS PRELIMINARES S/ 747.20 - - - - - -
02.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 163.5 S/ 1.84 S/ 300.84 292.67 1.36 1.36 1.36 1.36 1.36 1.36
02.01.01.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 163.5 S/ 2.73 S/ 446.36 443.09 0.55 0.55 0.55 0.55 0.55 0.55
02.01.02 MOVIMIENTO DE TIERRAS S/ 40,233.15 - - - - - -
02.01.02.01 EXCAVACION MANUAL DE ZANJAS PARA TERRENO NORMAL m3 129.68 S/ 73.63 S/ 9,548.34 9,264.34 47.33 47.33 47.33 47.33 47.33 47.33
02.01.02.02 EXCAVACION MANUAL DE ZANJAS PARA CIMIENTO CORRIDO m3 41.44 S/ 49.09 S/ 2,034.29 1,973.79 10.08 10.08 10.08 10.08 10.08 10.08
02.01.02.03 RELLENO CON MATERIAL PROPIO m3 86.99 S/ 21.04 S/ 1,830.27 1,775.47 9.13 9.13 9.13 9.13 9.13 9.13
02.01.02.04 ACARREO DE MATERIAL EXCEDENTE m3 100.96 S/ 24.54 S/ 2,477.56 2,403.86 12.28 12.28 12.28 12.28 12.28 12.28
02.01.02.05 ELIMINACION DE MATERIAL EXCEDENTE m2 100.96 S/ 160.35 S/ 16,188.94 16,145.52 7.24 7.24 7.24 7.24 7.24 7.24
02.01.02.06 NIVELACION Y APISONADO m2 163.5 S/ 49.87 S/ 8,153.75 4,064.61 4,064.61 4.09 4.09 4.09 4.09 4.09 4.09
02.01.03 OBRAS DE CONCRETO SIMPLE S/ 18,917.95 - - - - - -
02.01.03.01 FALSA ZAPATA MEZCLA 1:10 CEMENTO-HORMIGON + 30% P.G.m3
8" 28.36 S/ 265.48 S/ 7,529.01 7,467.19 10.30 10.30 10.30 10.30 10.30 10.30
02.01.03.02 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30%
m3 PG 11.95 S/ 253.55 S/ 3,029.92 1,408.62 1,597.28 4.00 4.00 4.00 4.00 4.00 4.00
02.01.03.03 CONCRETO PARA SOBRECOMIENTOS H: 1:8 + 25% P.M. e=15cm
m3 1.29 S/ 444.74 S/ 573.71 565.61 1.35 1.35 1.35 1.35 1.35 1.35
02.01.03.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO h=0.30 m 2 10.92 S/ 100.73 S/ 1,099.97 1,099.97 - - - - - -
02.01.03.05 FALSO PISO, MEZCLA CONCRETO 1:8 CEMENTO-HORMIGON e=4"
m2 148.09 S/ 32.67 S/ 4,838.10 4,747.77 15.06 15.06 15.06 15.06 15.06 15.06
02.01.03.06 CONTRAPISO DE 2" ACABADO Y FROTACHADO m2 46.02 S/ 40.14 S/ 1,847.24 1,817.33 4.99 4.99 4.99 4.99 4.99 4.99
02.01.04 CONCRETO ARMADO S/ 174,894.86 - - - - - -
02.01.04.01 SOBRECIMIENTO ARMADO S/ 20,463.79 - - - - - -
02.01.04.01.01 SOBRECIMIENTO ARMADO CONCRETO 175 kg/cm2 e=15cm m3 5.84 S/ 439.48 S/ 2,566.56 2,550.50 2.68 2.68 2.68 2.68 2.68 2.68
02.01.04.01.02 SOBRECIMIENTO ARMADO CONCRETO 175 kg/cm2 e=25cm m3 7.09 S/ 439.48 S/ 3,115.91 3,096.42 3.25 3.25 3.25 3.25 3.25 3.25
02.01.04.01.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO m2 134.54 S/ 84.83 S/ 11,413.03 11,239.47 28.93 28.93 28.93 28.93 28.93 28.93
02.01.04.01.04 ACERO EN SOBRECIMIENTO ARMADO FY= 4200 kg/cm2 GRADO
kg 60 545.03 S/ 6.18 S/ 3,368.29 3,368.29 - - - - - -
02.01.04.02 ZAPATAS S/ 10,796.17 - - - - - -
02.01.04.02.01 CONCRETO F'C= 210 KG/CM2. PARA ZAPATAS m3 14.18 S/ 614.24 S/ 8,709.92 8,612.93 16.16 16.16 16.16 16.16 16.16 16.16
02.01.04.02.02 ACERO EN ZAPATAS FY= 4200 kg/cm2 GRADO 60 kg 335.41 S/ 6.22 S/ 2,086.25 2,072.83 2.24 2.24 2.24 2.24 2.24 2.24
02.01.04.03 COLUMNAS S/ 36,804.47 - - - - - -
02.01.04.03.01 CONCRETO F'C= 210 KG/CM2. PARA COLUMNAS m3 13.51 S/ 644.68 S/ 8,709.63 8,610.06 16.60 16.60 16.60 16.60 16.60 16.60
02.01.04.03.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 110.6 S/ 92.14 S/ 10,190.68 10,072.34 19.72 19.72 19.72 19.72 19.72 19.72
02.01.04.03.03 ACERO Fy=4200 KG/CM2 GRADO 60, EN COLUMNAS kg 2388.98 S/ 6.22 S/ 14,859.46 14,763.90 15.93 15.93 15.93 15.93 15.93 15.93
02.01.04.03.04 SELLADO DE JUNTAS DE DILATACION DE COLUMNAS m 45 S/ 67.66 S/ 3,044.70 507.45 507.45 507.45 507.45 507.45 507.45
02.01.04.04 VIGAS DE CIMENTACION S/ 12,431.39 - - - - - -
02.01.04.04.01 CONCRETO f'c=210 kg/cm2 EN VIGAS DE CIMENTACION m3 6.16 S/ 496.21 S/ 3,056.65 3,035.65 3.50 3.50 3.50 3.50 3.50 3.50
02.01.04.04.02 ENCOFRADO Y DESENCOFRADO EN VIGA DE CIMENTACIONm2 49.28 S/ 77.46 S/ 3,817.23 3,764.50 8.79 8.79 8.79 8.79 8.79 8.79
02.01.04.04.03 ACERO FY= 4200 kg/cm2 GRADO 60, EN VIGAS DE CIMENTACION
kg 893.49 S/ 6.22 S/ 5,557.51 1,808.95 3,712.82 5.96 5.96 5.96 5.96 5.96 5.96
02.01.04.05 COLUMNETAS S/ 17,674.40 - - - - - -
02.01.04.05.01 CONCRETO f'c=175 kg/cm2 PARA COLUMNETAS m3 1.04 S/ 456.29 S/ 474.54 122.59 349.61 0.39 0.39 0.39 0.39 0.39 0.39
02.01.04.05.02 ENCOFRADO Y DESENCOFRADO EN COLUMNETAS m2 147.31 S/ 95.89 S/ 14,125.56 333.79 1,622.73 11,933.34 39.28 39.28 39.28 39.28 39.28 39.28
02.01.04.05.03 ACERO FY= 4200 kg/cm2 GRADO 60, EN COLUMNETAS kg 494.26 S/ 6.22 S/ 3,074.30 135.34 940.60 1,978.59 3.30 3.30 3.30 3.30 3.30 3.30
02.01.04.06 VIGAS S/ 32,225.54 - - - - - -
02.01.04.06.01 CONCRETO F'C= 210 KG/CM2. EN VIGAS m3 10.11 S/ 663.68 S/ 6,709.80 6,635.29 12.42 12.42 12.42 12.42 12.42 12.42
02.01.04.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 48.93 S/ 129.21 S/ 6,322.25 6,227.32 15.82 15.82 15.82 15.82 15.82 15.82
02.01.04.06.03 ACERO FY= 4200 kg/cm2 GRADO 60, EN VIGAS kg 3085.77 S/ 6.22 S/ 19,193.49 19,070.06 20.57 20.57 20.57 20.57 20.57 20.57
02.01.04.07 VIGUETAS S/ 1,354.32 - - - - - -
02.01.04.07.01 CONCRETO F'C=175 KG/CM2. EN VIGUETAS m3 0.49 S/ 513.78 S/ 251.75 249.91 0.31 0.31 0.31 0.31 0.31 0.31
02.01.04.07.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGUETAS m2 6.48 S/ 123.50 S/ 800.28 784.53 2.62 2.62 2.62 2.62 2.62 2.62
CRONOGRAMA VALORIZADO DE AVANCE DE OBRA

Obra: MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCIÓN EDUCATIVA INTEGRADA N°277-21 y 54177 "EL BUEN PASTOR" DE TALAVERA" DISTRITO DE TALAVERA - PROVINCIA ANDAHUALAS - REGIÓN APURÍMAC
Ubicación: APURIMAC - ANDAHUAYLAS - TALAVERA

PLAZO DE EJECUCION
MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 MES 11 MES 12 MES 13 MES 14 MES 15 MES 16 MES 17 MES 18 MES 19 MES 20 MES 21 MES 22 MES 23 MES 24 MES 25 MES 26 MES 27 MES 28 MES 29 MES 30 MES 31 MES 32 MES 33 MES 34 MES 35 MES 36 TOTAL
Item Descripcion Unid Metrado PU S/ PARCIAL
MAR - 2019 ABR - 2019 MAY - 2019 JUN - 2019 JUL - 2019 AGO - 2019 SET - 2019 0CT - 2019 NOV - 2019 DIC - 2019 ENE - 2020 FEB - 2020 MAR - 2020 JUL - 2020 AGO - 2020 SET - 2020 0CT - 2020 NOV - 2020 DIC - 2020 ENE - 2021 FEB - 2021 MAR - 2021 ABR - 2021 MAY - 2021 JUN - 2021 JUL - 2021 AGO - 2021 SET -2021 0CT - 2021 NOV - 2021 DIC - 2021 ENE - 2022 FEB - 2022 MAR - 2022 ABR - 2022 MAY - 2022 1188 Dias
02.01.04.07.03 ACERO FY= 4200 kg/cm2 GRADO 60, EN VIGUETAS kg 48.6 S/ 6.22 S/ 302.29 300.35 0.32 0.32 0.32 0.32 0.32 0.32
02.01.04.08 TECHO INCLINADO DE CONCRETO ARMADO S/ 43,144.78 - - - - - -
02.01.04.08.01 CONCRETO F'C=210 KG/CM2 EN LOSA ALIGERADA INCLINADA
m3 19.87 S/ 518.44 S/ 10,301.40 10,228.28 12.19 12.19 12.19 12.19 12.19 12.19
02.01.04.08.02 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA INCLINADA
m2 198.66 S/ 102.97 S/ 20,456.02 20,136.18 53.31 53.31 53.31 53.31 53.31 53.31
02.01.04.08.03 ACERO Fy=4200 KG/CM2 GRADO 60, EN LOSA ALIGERADA INCLINADA
kg 552.2 S/ 6.22 S/ 3,434.68 3,412.60 3.68 3.68 3.68 3.68 3.68 3.68
02.01.04.08.04 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA LOSA ALIGERADA
und 1654.84
INCLINADA S/ 5.41 S/ 8,952.68 8,903.04 8.27 8.27 8.27 8.27 8.27 8.27
02.01.05 COBERTURAS S/ 35,020.11 - - - - - -
02.01.05.01 IMPERMEABILIZACION DE TECHO CON PINTURA ASFALTICA m2 235.29 S/ 6.84 S/ 1,609.38 1,574.09 5.88 5.88 5.88 5.88 5.88 5.88
02.01.05.02 VIGUETAS DE MADERA P/FIJAR COBERTURA DE TEJA ANDINAm 138 S/ 19.61 S/ 2,706.18 2,706.18 - - - - - -
02.01.05.03 COBERTURA DE TEJA ANDINA m2 235.29 S/ 116.22 S/ 27,345.40 27,272.46 12.16 12.16 12.16 12.16 12.16 12.16
02.01.05.04 CUMBRERA DE TEJA ANDINA m 23 S/ 146.05 S/ 3,359.15 3,356.62 0.42 0.42 0.42 0.42 0.42 0.42
02.02 ARQUITECTURA S/ 147,768.45 - - - - - -
02.02.01 MUROS Y TABIQUES DE ALBAÑILERIA S/ 20,883.06 - - - - - -
02.02.01.01 MURO DE LADRILLO KK DE CABEZA JUNTA 1.5 cm. MORTEROm2
1:4 69.6 S/ 167.45 S/ 11,654.52 5,396.47 6,142.15 19.32 19.32 19.32 19.32 19.32 19.32
02.02.01.02 MURO DE LADRILLO KK DE SOGA JUNTA 1.5 cm. MORTERO 1:4m2 74.55 S/ 123.79 S/ 9,228.54 7,490.22 1,656.32 13.67 13.67 13.67 13.67 13.67 13.67
02.02.02 REVOQUES ENLUCIDOS Y MOLDURAS S/ 34,125.04 - - - - - -
02.02.02.01 TARRAJEO DE COLUMNAS m² 110.6 S/ 68.16 S/ 7,538.50 4,447.70 1,523.60 261.20 261.20 261.20 261.20 261.20 261.20
02.02.02.02 TARRAJEO DE VIGAS m² 48.93 S/ 66.55 S/ 3,256.29 3,194.15 10.36 10.36 10.36 10.36 10.36 10.36
02.02.02.03 TARRAJEO MUROS EXTERIOR MORTERO 1:4 m2 204.88 S/ 36.07 S/ 7,390.02 2,558.58 3,737.38 182.34 182.34 182.34 182.34 182.34 182.34
02.02.02.04 TARRAJEO MUROS INTERIORES MORTERO 1:4 m2 204.88 S/ 36.07 S/ 7,390.02 4,441.80 491.37 491.37 491.37 491.37 491.37 491.37
02.02.02.05 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS.m 94.84 S/ 37.61 S/ 3,566.93 3,470.20 16.12 16.12 16.12 16.12 16.12 16.12
02.02.02.06 TARRAJEO PRIMARIO Y RAYADO CON CEMENTO : ARENA. m2 45.6 S/ 33.96 S/ 1,548.58 - 1,517.57 5.17 5.17 5.17 5.17 5.17 5.17
02.02.02.07 BRUÑAS DE 1 X 1 cm m 299.19 S/ 11.48 S/ 3,434.70 3,338.96 15.96 15.96 15.96 15.96 15.96 15.96
02.02.03 CIELORRASOS S/ 12,839.40 - - - - - -
02.02.03.01 CIELORRASOS CON MEZCLA CEMENTO : ARENA 1:5 m² 198.66 S/ 64.63 S/ 12,839.40 12,606.96 38.74 38.74 38.74 38.74 38.74 38.74
02.02.04 PISOS Y PAVIMENTOS S/ 14,721.19 - - - - - -
02.02.04.01 PISO DE CERAMICO DE ALTO TRANSITO 45x45 cm. m2 21.95 S/ 84.21 S/ 1,848.41 1,228.21 103.37 103.37 103.37 103.37 103.37 103.37
02.02.04.02 PISO DE PORCELANATO 0.60X0.60M m2 126.34 S/ 101.89 S/ 12,872.78 2,145.46 2,145.46 2,145.46 2,145.46 2,145.46 2,145.46
02.02.05 CEMENTO PULIDO, BRUÑADO Y COLOREADO S/ 3,128.93 - - - - - -
02.02.05.01 VEREDAS DE CEMENTO FROTACHADO y BRUÑADOf´c=140 kg/cm2,
m3 e=15cm
12.52 S/ 54.32 S/ 680.09 111.68 94.74 94.74 94.74 94.74 94.74 94.74
02.02.05.02 JUNTA DE DILATACION ASFALTICA 1" m 16.2 S/ 10.74 S/ 173.99 29.00 29.00 29.00 29.00 29.00 29.00
02.02.05.03 AFIRMADO DE 4" PARA VEREDAS m2 4.82 S/ 214.48 S/ 1,033.79 986.65 7.86 7.86 7.86 7.86 7.86 7.86
02.02.05.04 ENCOFRADO Y DESENCOFRADO DE VEREDAS h=0.15 m. m2 14.63 S/ 84.83 S/ 1,241.06 384.28 142.80 142.80 142.80 142.80 142.80 142.80
02.02.06 ZOCALOS Y CONTRAZOCALOS S/ 3,139.77 - - - - - -
02.02.06.01 ZOCALO DE CERAMICO BLANCO DE 20 X 30 cm. H= 2.05 m. m2 45.6 S/ 17.89 S/ 815.78 815.78 - - - - - -
02.02.06.02 ZOCALO DE CEMENTO S/COLOREAR h=0.30 m, PINTADO m2 15.06 S/ 17.89 S/ 269.42 44.90 44.90 44.90 44.90 44.90 44.90
02.02.06.03 CONTRAZOCALO DE PORCELANATO H=0.10M m 80.1 S/ 25.65 S/ 2,054.57 342.43 342.43 342.43 342.43 342.43 342.43
02.02.07 CARPINTERIA DE MADERA S/ 14,599.10 - - - - - -
02.02.07.01 PUERTA DE MADERA AGUANO TABLERO REBAJADO m2 15.6 S/ 935.84 S/ 14,599.10 2,433.18 2,433.18 2,433.18 2,433.18 2,433.18 2,433.18
02.02.08 CARPINTERIA DE ALUMINIO S/ 16,571.43 - - - - - -
02.02.08.01 VENTANA DE ALUMINIO NATURAL PESADO e=1.5mm INC. VIDRIO
m2 TEMPLADO
45.64 S/ 363.09 S/ 16,571.43 2,761.91 2,761.91 2,761.91 2,761.91 2,761.91 2,761.91
02.02.09 CARPINTERIA METALICA S/ 1,100.00 - - - - - -
02.02.09.01 MODULO PRE FABRICADO PARA BAÑOS NIÑAS Y NIÑOS und 2 S/ 550.00 S/ 1,100.00 183.33 183.33 183.33 183.33 183.33 183.33
02.02.10 CERRAJERIA S/ 2,849.56 - - - - - -
02.02.10.01 BISAGRAS CAPUCHINA ALUMINIZADA DE 4"x 4" pza 30 S/ 17.30 S/ 519.00 86.50 86.50 86.50 86.50 86.50 86.50
02.02.10.02 CERRADURA TUBULAR - TIPO MANIJA pza 2 S/ 104.52 S/ 209.04 34.84 34.84 34.84 34.84 34.84 34.84
02.02.10.03 CERRADURA DE TRES GOLPÈS PARA PUERTA pza 4 S/ 105.75 S/ 423.00 70.50 70.50 70.50 70.50 70.50 70.50
02.02.10.04 BRAZO EXTERIOR PARA VENTANA PROYECTANTE pza 24 S/ 68.58 S/ 1,645.92 274.32 274.32 274.32 274.32 274.32 274.32
02.02.10.05 CERROJO "CARACOL" DE ALUMINIO SEGURIDAD PARA VENTANA
pza 4 S/ 13.15 S/ 52.60 8.77 8.77 8.77 8.77 8.77 8.77
02.02.11 PINTURA S/ 23,810.97 - - - - - -
02.02.11.01 PINTURA LATEX EN CIELO RASO 2 MANOS m2 198.66 S/ 21.40 S/ 4,251.32 1,885.28 394.34 394.34 394.34 394.34 394.34 394.34
02.02.11.02 PINTURA SATINADO EN EXTERIORES, MUROS, COLUMNAS, VIGAS,
m2 DOS
143.15
MANOS S/ 23.94 S/ 3,427.01 571.17 571.17 571.17 571.17 571.17 571.17
02.02.11.03 PINTURA SATINADO EN INTERIORES, MUROS, COLUMNAS, VIGAS,
m2 DOS300.6
MANOS S/ 23.94 S/ 7,196.36 1,199.39 1,199.39 1,199.39 1,199.39 1,199.39 1,199.39
02.02.11.04 PINTURA ESMALTE EN ZOCALOS Y CONTRAZOCALOS m 15.06 S/ 22.36 S/ 336.74 56.12 56.12 56.12 56.12 56.12 56.12
02.02.11.05 PINTURA BARNIZ EN CARPINTERIA DE MADERA m2 66.04 S/ 24.43 S/ 1,613.36 268.89 268.89 268.89 268.89 268.89 268.89
02.02.11.06 PASTA MURAL PARA INTERIORES m2 697.92 S/ 10.01 S/ 6,986.18 463.03 1,468.88 1,333.24 620.17 620.17 620.17 620.17 620.17 620.17
02.03 INSTALACIONES SANITARIAS S/ 19,799.70 - - - - - -
02.03.01 MOVIMIENTO DE TIERRAS
S/ 910.73 - - - - - -

02.03.01.01 EXCAVACION DE ZANJA m3 10.4 S/ 49.09 S/ 510.54 495.35 2.53 2.53 2.53 2.53 2.53 2.53
02.03.01.02 RELLENO DE ZANJA m3 9.62 S/ 41.60 S/ 400.19 391.82 1.39 1.39 1.39 1.39 1.39 1.39
02.03.02 SISTEMA DE AGUA FRIA S/ 1,188.02 - - - - - -
02.03.02.01 RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP m 35 S/ 23.75 S/ 831.25 813.05 18.20 - - - - - -
02.03.02.02 SALIDA DE AGUA FRIA CON TUBERIA PVC C-10 1/2" pto 9 S/ 23.75 S/ 213.75 209.07 0.78 0.78 0.78 0.78 0.78 0.78
02.03.02.03 VALVULA TIPO BOLA DE PVC DE 1/2" und 2 S/ 14.50 S/ 29.00 29.00 - - - - - -
02.03.02.04 CAJA PARA VALVULAS EN NICHO CERAMICO und 2 S/ 57.01 S/ 114.02 24.00 15.00 15.00 15.00 15.00 15.00 15.00
02.03.03 INSTALACIONES SANITARIAS S/ 2,276.35 - - - - - -
02.03.03.01 SALIDA DE DESAGUE EN PVC SAL DE 4" pto 4 S/ 119.51 S/ 478.04 467.60 1.74 1.74 1.74 1.74 1.74 1.74
02.03.03.02 SALIDA DE DESAGUE EN PVC SAL DE 2" pto 6 S/ 99.31
S/ 595.86 580.20 2.61 2.61 2.61 2.61 2.61 2.61

02.03.03.03 SUMINISTRO Y COLOCACION DE TUBERIA EN PVC SAL DE 4" m 20 S/ 16.97 S/ 339.40 266.00 12.23 12.23 12.23 12.23 12.23 12.23
02.03.03.04 SUMINISTRO Y COLOCACION DE TUBERIA EN PVC SAL DE 2" m 10 S/ 12.77 S/ 127.70 109.00 3.12 3.12 3.12 3.12 3.12 3.12
02.03.03.05 CODO DE 90 DE 4" und 4 S/ 41.18
S/ 164.72 160.72 0.67 0.67 0.67 0.67 0.67 0.67
02.03.03.06 CODO DE 45 DE 4" und 3 S/ 40.49
S/ 121.47 118.47 0.50 0.50 0.50 0.50 0.50 0.50

02.03.03.07 YEE DE 4" und 2 S/ 30.95


S/ 61.90 60.68 0.20 0.20 0.20 0.20 0.20 0.20
02.03.03.08 YEE DE 4" A 2" und 6 S/ 31.46 S/ 188.76 185.10 0.61 0.61 0.61 0.61 0.61 0.61
02.03.03.09 YEE DE 2" und 1 S/ 23.96 S/ 23.96 23.35 0.10 0.10 0.10 0.10 0.10 0.10
02.03.03.10 SUMIDERO DE 2" und 3 S/ 58.18 S/ 174.54 171.21 0.55 0.55 0.55 0.55 0.55 0.55
02.03.04 APARATOS Y ACCESORIOS SANITARIOS S/ 7,546.24 - - - - - -
02.03.04.01 INODORO TANQUE BAJO, BLANCO NACIONAL und 4 S/ 897.75 S/ 3,591.00 598.50 598.50 598.50 598.50 598.50 598.50
02.03.04.02 LAVATORIO DE LOSA BLANCA NACIONAL und 4 S/ 547.80 S/ 2,191.20 365.20 365.20 365.20 365.20 365.20 365.20
02.03.04.03 URINARIO DE CONCRETO und 1 S/ 1,249.40 S/ 1,249.40 1,215.21 5.70 5.70 5.70 5.70 5.70 5.70
02.03.04.04 PAPELERA DE LOSA BLANCA und 4 S/ 128.66 S/ 514.64 85.77 85.77 85.77 85.77 85.77 85.77
02.03.05 RED DE DRENAJE PLUVIAL (Aulas + Esaclera + Administración) S/ 6,708.58 - - - - - -
02.03.05.01 CANALETA DE FIERRO GALVANIZADO e= 1/27" m 46 S/ 121.07 S/ 5,569.22 2,221.25 3,331.87 2.68 2.68 2.68 2.68 2.68 2.68
02.03.05.02 TUBERIA DE BAJADA P/LLUVIAS, PVC SAL Ø 4". m 19.4 S/ 58.73 S/ 1,139.36 1,131.21 1.36 1.36 1.36 1.36 1.36 1.36
02.03.06 COLUMNETAS DE PROTECCION S/ 1,169.78 - - - - - -
02.03.06.01 PROTECCION TUBERIA DE DRENAJE CONCRETO 175 kg/cm2 m3 0.65 S/ 614.24 S/ 399.26 66.54 66.54 66.54 66.54 66.54 66.54
02.03.06.02 PROTECCION TUBERIA DE DRENAJE ENCOFRADO DESENCOFRADO
m2 6.48 S/ 95.89 S/ 621.37 103.56 103.56 103.56 103.56 103.56 103.56
02.03.06.03 PROTECCION TUBERIA DE DRENAJE ACERO FY=4200KG/CM2kg 24.45 S/ 6.10 S/ 149.15 24.86 24.86 24.86 24.86 24.86 24.86
02.04 INSTALACIONES ELECTRICAS S/ 50,155.56 - - - - - -
02.04.01 MOVIMIENTO DE TIERRAS S/ 421.67 - - - - - -
02.04.01.01 EXCAVACION DE ZANJA m3 4.2 S/ 49.09 S/ 206.18 200.05 1.02 1.02 1.02 1.02 1.02 1.02
02.04.01.02 RELLENO DE ZANJA m3 5.18 S/ 41.60 S/ 215.49 210.98 0.75 0.75 0.75 0.75 0.75 0.75
02.04.02 INSTALACIONES ELECTRICAS S/ 2,919.58 - - - - - -
02.04.02.01 SALIDA PARA CENTRO DE LUZ EN TECHO pto 26 S/ 78.92 S/ 2,051.92 2,005.64 7.71 7.71 7.71 7.71 7.71 7.71
02.04.02.02 SALIDA PARA INTERRUPTOR DOBLE pto 2 S/ 90.51 S/ 181.02 161.66 3.23 3.23 3.23 3.23 3.23 3.23
02.04.02.03 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON LINEA Apto
TIERRA. 8 S/ 85.83 S/ 686.64 578.48 18.03 18.03 18.03 18.03 18.03 18.03
02.04.03 TABLEROS ELECTRICOS S/ 10,314.44 - - - - - -
02.04.03.01 TABLERO DE DISTRIBUCION TD-1 Y TD-2 INT. AUT. 1-2x30A, 1-2x20A,
und 2-2x15A,
2 1 I.D. 2x25A-30mA,
S/ 5,157.22
18 POLOS S/ 10,314.44 581.89 1,622.09 1,622.09 1,622.09 1,622.09 1,622.09 1,622.09
02.04.04 INTERRUPTORES TERMOMAGNTICOS S/ 155.16 - - - - - -
02.04.04.01 INTERRUPTOR DIFERENCIAL DE 2X15A,30mA pza 2 S/ 36.79 S/ 73.58 12.26 12.26 12.26 12.26 12.26 12.26
02.04.04.02 INTERRUPTOR DIFERENCIAL DE 2X20A,30mA pza 2 S/ 40.79 S/ 81.58 13.60 13.60 13.60 13.60 13.60 13.60
02.04.05 CABLES S/ 2,183.28 - - - - - -
02.04.05.01 CABLE ELECTRICO TW 2.5MM2 m 377.5 S/ 4.43 S/ 1,672.33 278.72 278.72 278.72 278.72 278.72 278.72
02.04.05.02 CABLE ELECTRICO TW 4.0MM2 m 44.2 S/ 11.56 S/ 510.95 85.16 85.16 85.16 85.16 85.16 85.16
02.04.06 CONDUCTOS S/ 1,772.65 - - - - - -
02.04.06.01 TUBERIA PVC - CEL D=20MM m 146.5 S/ 12.10 S/ 1,772.65 189.00 263.94 263.94 263.94 263.94 263.94 263.94
02.04.07 ARTEFACTOS ELECTRICOS S/ 2,388.78 - - - - - -
02.04.07.01 ARTEFACTO FLUORESCENTE TUBULAR DE 32W, C/DIFUSOR ACRILICO
und TRANSPARENTE,
10 SIMILAR
S/ 73.82
A TP DE JOSFEL S/ 738.20 123.03 123.03 123.03 123.03 123.03 123.03
02.04.07.02 ARTEFACTO 02 FLUORESCENTE DE 40W, SIMILAR A BE DE JOSFEL
und 10 S/ 134.93 S/ 1,349.30 224.88 224.88 224.88 224.88 224.88 224.88
02.04.07.03 LAMPARA LUZ DE EMERGENCIA 2 FAROS und 2 S/ 150.64 S/ 301.28 50.21 50.21 50.21 50.21 50.21 50.21
02.04.08 INSTALACIONES ESPECIALES S/ 30,000.00 - - - - - -
02.04.08.01 SUMINISTRO E INSTALACION DE LAS INSTALACIONES ESPECIALES
GLB (INTERNET,
1 TV CABLE, MULTIMEDIA,
S/ 30,000.00 ALARMA CONTRAS/INCENDIO,
30,000.00 DETECTORES DE HUMO, PULSADORES) 1,884.03 1,884.03 4,371.99 4,371.99 4,371.99 4,371.99 4,371.99 4,371.99
03 MODULO II - NIVEL INICIAL S/ 1,048,472.67 - - - - - -
03.01 ESTRUCTURAS S/ 550,869.56 - - - - - -
03.01.01 TRABAJOS PRELIMINARES S/ 1,815.78 - - - - - -
03.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 356.94 S/ 1.84 S/ 656.77 514.39 23.73 23.73 23.73 23.73 23.73 23.73
03.01.01.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 293.42 S/ 3.95 S/ 1,159.01 910.78 41.37 41.37 41.37 41.37 41.37 41.37
03.01.02 MOVIMIENTO DE TIERRAS S/ 36,693.41 - - - - - -
03.01.02.01 EXCAVACION MANUAL DE ZANJAS PARA TERRENO NORMAL m3 223.64 S/ 73.63 S/ 16,466.61 16,466.61 - - - - - -
03.01.02.02 EXCAVACION MANUAL DE ZANJAS PARA CIMIENTO CORRIDO m3 35.76 S/ 49.09 S/ 1,755.46 1,703.25 52.21 0.00 0.00 0.00 0.00 0.00 0.00
03.01.02.03 RELLENO CON MATERIAL PROPIO m3 132.52 S/ 21.04 S/ 2,788.22 2,349.80 73.07 73.07 73.07 73.07 73.07 73.07
03.01.02.04 ACARREO DE MATERIAL EXCEDENTE m3 152.26 S/ 24.54 S/ 3,736.46 3,625.31 18.52 18.52 18.52 18.52 18.52 18.52
CRONOGRAMA VALORIZADO DE AVANCE DE OBRA

Obra: MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCIÓN EDUCATIVA INTEGRADA N°277-21 y 54177 "EL BUEN PASTOR" DE TALAVERA" DISTRITO DE TALAVERA - PROVINCIA ANDAHUALAS - REGIÓN APURÍMAC
Ubicación: APURIMAC - ANDAHUAYLAS - TALAVERA

PLAZO DE EJECUCION
MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 MES 11 MES 12 MES 13 MES 14 MES 15 MES 16 MES 17 MES 18 MES 19 MES 20 MES 21 MES 22 MES 23 MES 24 MES 25 MES 26 MES 27 MES 28 MES 29 MES 30 MES 31 MES 32 MES 33 MES 34 MES 35 MES 36 TOTAL
Item Descripcion Unid Metrado PU S/ PARCIAL
MAR - 2019 ABR - 2019 MAY - 2019 JUN - 2019 JUL - 2019 AGO - 2019 SET - 2019 0CT - 2019 NOV - 2019 DIC - 2019 ENE - 2020 FEB - 2020 MAR - 2020 JUL - 2020 AGO - 2020 SET - 2020 0CT - 2020 NOV - 2020 DIC - 2020 ENE - 2021 FEB - 2021 MAR - 2021 ABR - 2021 MAY - 2021 JUN - 2021 JUL - 2021 AGO - 2021 SET -2021 0CT - 2021 NOV - 2021 DIC - 2021 ENE - 2022 FEB - 2022 MAR - 2022 ABR - 2022 MAY - 2022 1188 Dias
03.01.02.05 ELIMINACION DE MATERIAL EXCEDENTE m2 152.26 S/ 12.91 S/ 1,965.68 1,956.54 1.52 1.52 1.52 1.52 1.52 1.52
03.01.02.06 NIVELACION Y APISONADO m2 200.14 S/ 49.87 S/ 9,980.98 4,934.71 5,046.27 - - - - - -
03.01.03 OBRAS DE CONCRETO SIMPLE S/ 29,280.80 - - - - - -
03.01.03.01 FALSA ZAPATA MEZCLA 1:10 CEMENTO-HORMIGON + 30% P.G.m3
8" 42.19 S/ 265.48 S/ 11,200.60 11,200.60 - - - - - -
03.01.03.02 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30%
m3 PG 8.64 S/ 253.55 S/ 2,190.67 2,173.31 17.36 0.00 0.00 0.00 0.00 0.00 0.00
03.01.03.03 CONCRETO PARA SOBRECOMIENTOS H: 1:8 + 25% P.M. e=15cm
m3 1.44 S/ 444.74 S/ 640.43 456.00 92.08 83.31 1.51 1.51 1.51 1.51 1.51 1.51
03.01.03.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO h=0.30 m 2 6.72 S/ 100.73 S/ 676.91 676.91 - - - - - - - -
03.01.03.05 FALSO PISO, MEZCLA CONCRETO 1:8 CEMENTO-HORMIGON e=4"
m2 200.14 S/ 32.67 S/ 6,538.57 6,416.49 20.35 20.35 20.35 20.35 20.35 20.35
03.01.03.06 CONTRAPISO DE 2" ACABADO Y FROTACHADO m2 200.14 S/ 40.14 S/ 8,033.62 7,903.53 21.68 21.68 21.68 21.68 21.68 21.68
03.01.04 CONCRETO ARMADO S/ 432,943.48 - - - - - -
03.01.04.01 SOBRECIMIENTO ARMADO S/ 63,253.25 - - - - - -
03.01.04.01.01 CONCRETO PARA SOBRECOMIENTOS ARMADO H: 1:8 + 25%m3
P.M. e=15cm
75 S/ 444.74 S/ 33,355.50 3,398.07 4,992.91 4,992.91 4,992.91 4,992.91 4,992.91 4,992.91
03.01.04.01.02 CONCRETO PARA SOBRECOMIENTOS ARMADO H: 1:8 + 25%m3
P.M. e=25cm
10.53 S/ 517.12 S/ 5,445.27 5,392.31 8.83 8.83 8.83 8.83 8.83 8.83
03.01.04.01.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO m2 187.56 S/ 100.73 S/ 18,892.92 12,707.09 1,030.97 1,030.97 1,030.97 1,030.97 1,030.97 1,030.97
03.01.04.01.04 ACERO EN SOBRECIMIENTO ARMADO FY= 4200 kg/cm2 GRADO
kg 60 893.82 S/ 6.22 S/ 5,559.56 3,543.69 1,199.97 135.98 135.98 135.98 135.98 135.98 135.98
03.01.04.02 ZAPATAS S/ 41,005.26 - - - - - -
03.01.04.02.01 CONCRETO F'C= 210 KG/CM2. PARA ZAPATAS m3 55.91 S/ 577.11 S/ 32,266.22 25,982.78 1,026.07 876.23 876.23 876.23 876.23 876.23 876.23
03.01.04.02.02 ACERO EN ZAPATAS FY= 4200 kg/cm2 GRADO 60 kg 1404.99 S/ 6.22 S/ 8,739.04 6,734.90 306.53 1,697.61 - - - - - -
03.01.04.03 COLUMNAS S/ 74,110.14 - - - - - -
03.01.04.03.01 CONCRETO F'C= 210 KG/CM2. PARA COLUMNAS m3 35.59 S/ 644.68 S/ 22,944.16 9,926.10 7,877.15 4,763.89 62.84 62.84 62.84 62.84 62.84 62.84
03.01.04.03.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 279.9 S/ 92.14 S/ 25,789.99 14,589.41 6,010.62 2,540.85 441.52 441.52 441.52 441.52 441.52 441.52
03.01.04.03.03 ACERO Fy=4200 KG/CM2 GRADO 60, EN COLUMNAS kg 3590.24 S/ 6.22 S/ 22,331.29 21,349.68 838.01 23.93 23.93 23.93 23.93 23.93 23.93
03.01.04.03.04 SELLADO DE JUNTAS DE DILATACION DE COLUMNAS m 45 S/ 67.66 S/ 3,044.70 507.45 507.45 507.45 507.45 507.45 507.45
03.01.04.04 VIGAS DE CIMENTACION S/ 26,889.65 - - - - - -
03.01.04.04.01 CONCRETO f'c=210 kg/cm2 EN VIGAS DE CIMENTACION m3 8.82 S/ 541.19 S/ 4,773.30 4,773.30 - - - - - -
03.01.04.04.02 ENCOFRADO Y DESENCOFRADO EN VIGA DE CIMENTACIONm2 70.56 S/ 132.37 S/ 9,340.03 4,847.88 748.69 748.69 748.69 748.69 748.69 748.69
03.01.04.04.03 ACERO FY= 4200 kg/cm2 GRADO 60, EN VIGAS DE CIMENTACION
kg 2054.07 S/ 6.22 S/ 12,776.32 12,142.71 105.60 105.60 105.60 105.60 105.60 105.60
03.01.04.05 COLUMNETAS S/ 10,179.66 - - - - - -
03.01.04.05.01 CONCRETO f'c=175 kg/cm2 PARA COLUMNETAS m3 3.16 S/ 456.29 S/ 1,441.88 122.59 326.91 290.59 701.79 0.00 0.00 0.00 0.00 0.00 0.00
03.01.04.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNETASm2 57.86 S/ 123.50 S/ 7,145.71 428.59 1,188.91 1,145.32 2,842.72 1,399.57 23.43 23.43 23.43 23.43 23.43 23.43
03.01.04.05.03 ACERO FY= 4200 kg/cm2 GRADO 60, EN COLUMNETAS kg 255.96 S/ 6.22 S/ 1,592.07 135.34 1,177.91 278.82 - - - - - -
03.01.04.06 VIGAS S/ 62,307.88 - - - - - -
03.01.04.06.01 CONCRETO F'C= 210 KG/CM2. EN VIGAS m3 32.76 S/ 663.68 S/ 21,742.16 8,597.66 12,903.06 40.24 40.24 40.24 40.24 40.24 40.24
03.01.04.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 92.22 S/ 84.83 S/ 7,823.02 785.28 5,899.59 1,138.15 0.00 0.00 0.00 0.00 0.00 0.00
03.01.04.06.03 ACERO FY= 4200 kg/cm2 GRADO 60, EN VIGAS kg 5264.1 S/ 6.22 S/ 32,742.70 5,135.58 10,218.32 17,178.23 35.09 35.09 35.09 35.09 35.09 35.09
03.01.04.07 VIGUETAS S/ 10,250.63 - - - - - -
03.01.04.07.01 CONCRETO F'C= 175 KG/CM2. EN VIGUETAS m3 3.97 S/ 513.78 S/ 2,039.71 617.14 1,422.57 0.00 0.00 0.00 0.00 0.00 0.00
03.01.04.07.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGUETAS m2 52.98 S/ 123.50 S/ 6,543.03 1,960.12 4,454.17 21.46 21.46 21.46 21.46 21.46 21.46
03.01.04.07.03 ACERO FY= 4200 kg/cm2 GRADO 60, EN VIGUETAS kg 268.15 S/ 6.22 S/ 1,667.89 347.32 1,309.85 1.79 1.79 1.79 1.79 1.79 1.79
03.01.04.08 LOSA ALIGERADA DE CONCRETO ARMADO S/ 62,322.35 - - - - - -
03.01.04.08.01 CONCRETO F'C=210 KG/CM2 EN LOSA ALIGERADA m3 27.65 S/ 518.44 S/ 14,334.87 14,233.11 16.96 16.96 16.96 16.96 16.96 16.96
03.01.04.08.02 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA m2 240.12 S/ 102.97 S/ 24,725.16 24,338.56 64.43 64.43 64.43 64.43 64.43 64.43
03.01.04.08.03 ACERO Fy=4200 KG/CM2 GRADO 60, EN LOSA ALIGERADA kg 2000.2 S/ 6.22 S/ 12,441.24 9,703.96 2,657.28 13.33 13.33 13.33 13.33 13.33 13.33
03.01.04.08.04 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA LOSA ALIGERADA
und 2000.2 S/ 5.41 S/ 10,821.08 10,761.08 10.00 10.00 10.00 10.00 10.00 10.00
03.01.04.09 TECHO INCLINADO DE CONCRETO ARMADO S/ 82,624.66 - - - - - -
03.01.04.09.01 CONCRETO F'C=210 KG/CM2 EN LOSA ALIGERADA INCLINADA
m3 31.57 S/ 482.03 S/ 15,217.69 13,055.59 2,075.28 14.47 14.47 14.47 14.47 14.47 14.47
03.01.04.09.02 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA INCLINADA
m2 312.62 S/ 102.88 S/ 32,162.35 28,831.57 2,827.46 83.89 83.89 83.89 83.89 83.89 83.89
03.01.04.09.03 ACERO Fy=4200 KG/CM2 GRADO 60, EN LOSA ALIGERADA INCLINADA
kg 3401.34 S/ 6.22 S/ 21,156.33 13,033.68 7,986.60 22.68 22.68 22.68 22.68 22.68 22.68
03.01.04.09.04 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA LOSA ALIGERADA
und 2604.12
INCLINADA S/ 5.41 S/ 14,088.29 14,010.17 13.02 13.02 13.02 13.02 13.02 13.02
03.01.05 COBERTURAS S/ 49,667.16 - - - - - -
03.01.05.01 IMPERMEABILIZACION DE TECHO CON PINTURA ASFALTICA m2 312.62 S/ 6.84 S/ 2,138.32 2,091.42 7.82 7.82 7.82 7.82 7.82 7.82
03.01.05.02 VIGUETAS DE MADERA P/FIJAR COBERTURA DE TEJA ANDINAm 341.55 S/ 19.61 S/ 6,697.80 6,697.80 - - - - - -
03.01.05.03 COBERTURA DE TEJA ANDINA m2 312.62 S/ 116.22 S/ 36,332.70 25,260.27 10,975.52 16.15 16.15 16.15 16.15 16.15 16.15
03.01.05.04 CUMBRERAS DE TEJA ANDINA m 30.8 S/ 146.05 S/ 4,498.34 4,494.95 0.56 0.56 0.56 0.56 0.56 0.56
03.01.06 VARIOS S/ 468.93 - - - - - -
03.01.06.01 GARGOLA PREFABRICADA und 3 S/ 156.31 S/ 468.93 385.23 13.95 13.95 13.95 13.95 13.95 13.95
03.02 ARQUITECTURA S/ 389,318.92 - - - - - -
03.02.01 MUROS Y TABIQUES DE ALBAÑILERIA S/ 66,220.73 - - - - - -
03.02.01.01 MURO DE LADRILLO KK DE CABEZA JUNTA 1.5 cm. MORTEROm2
1:4 221.62 S/ 167.45 S/ 37,110.27 16,823.35 17,201.33 2,715.48 61.68 61.68 61.68 61.68 61.68 61.68
03.02.01.02 MURO DE LADRILLO KK DE SOGA JUNTA 1.5 cm. MORTERO 1:4m2 235.16 S/ 123.79 S/ 29,110.46 6,020.40 2,881.99 2,873.40 5,968.87 11,107.13 43.11 43.11 43.11 43.11 43.11 43.11
03.02.02 REVOQUES ENLUCIDOS Y MOLDURAS S/ 76,240.86 - - - - - -
03.02.02.01 TARRAJEO DE COLUMNAS m² 281.1 S/ 68.16 S/ 19,159.78 1,933.38 7,532.68 743.98 4,966.54 663.87 663.87 663.87 663.87 663.87 663.87
03.02.02.02 TARRAJEO DE VIGAS m² 184.91 S/ 66.55 S/ 12,305.76 3,290.11 7,152.73 1,628.08 - 39.14 39.14 39.14 39.14 39.14 39.14
03.02.02.03 TARRAJEO MUROS EXTERIOR MORTERO 1:4 m2 247.21 S/ 36.07 S/ 8,916.86 - 5,126.69 1,469.51 386.78 386.78 386.78 386.78 386.78 386.78
03.02.02.04 TARRAJEO MUROS INTERIORES MORTERO 1:4 m2 590.69 S/ 36.07 S/ 21,306.19 3,410.48 7,335.21 2,685.07 1,000.57 1,145.81 1,145.81 1,145.81 1,145.81 1,145.81 1,145.81
03.02.02.05 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS.m 122.32 S/ 37.61 S/ 4,600.46 - 2,398.47 2,201.99 0.00 0.00 0.00 0.00 0.00 0.00
03.02.02.06 TARRAJEO PRIMARIO Y RAYADO CON CEMENTO : ARENA. m2 37.25 S/ 33.96 S/ 1,265.01 - 1,265.01 - - - - - -
03.02.02.07 BRUÑAS DE 1 X 1 cm m 756.69 S/ 11.48 S/ 8,686.80 1,160.64 6,134.88 343.73 402.76 107.47 107.47 107.47 107.47 107.47 107.47
03.02.03 CIELORRASOS S/ 40,855.21 - - - - - -
03.02.03.01 CIELORRASOS CON MEZCLA CEMENTO : ARENA 1:5 m² 632.14 S/ 64.63 S/ 40,855.21 13,206.03 19,627.54 5,746.30 845.92 1,379.62 8.30 8.30 8.30 8.30 8.30 8.30
03.02.04 PISOS Y PAVIMENTOS S/ 68,692.75 - - - - - -
03.02.04.01 CONTRAPISO 48 MM m2 503.64 S/ 39.84 S/ 20,065.02 2,108.42 - 2,992.77 2,992.77 2,992.77 2,992.77 2,992.77 2,992.77
03.02.04.02 PISO DE CERAMICO DE ALTO TRANSITO 45x45 cm. m2 43.11 S/ 89.31 S/ 3,850.15 - 2,166.27 280.65 280.65 280.65 280.65 280.65 280.65
03.02.04.03 PISO DE PORCELANATO 0.60X0.60M m2 380 S/ 101.89 S/ 38,718.20 - 13,112.50 4,267.62 4,267.62 4,267.62 4,267.62 4,267.62 4,267.62
03.02.04.04 CEMENTO PULIDO, BRUÑADO y COLOREADO m2 5.69 S/ 41.61 S/ 236.76 39.46 39.46 39.46 39.46 39.46 39.46
03.02.04.05 VEREDAS DE CEMENTO FROTACHADO y BRUÑADOf´c=140 kg/cm2,
m3 e=15cm
16.99 S/ 54.32 S/ 922.90 149.44 36.69 727.78 1.50 1.50 1.50 1.50 1.50 1.50
03.02.04.06 JUNTA DE DILATACION ASFALTICA 1" m 20.4 S/ 10.74 S/ 219.10 36.52 36.52 36.52 36.52 36.52 36.52
03.02.04.07 AFIRMADO E=4" m3 11.16 S/ 214.48 S/ 2,393.60 1,256.86 1,027.59 18.19 18.19 18.19 18.19 18.19 18.19
03.02.04.08 ENCOFRADO Y DESENCOFRADO DE VEREDAS h=0.15 m. m2 26.96 S/ 84.83 S/ 2,287.02 514.61 125.31 1,576.40 11.78 11.78 11.78 11.78 11.78 11.78
03.02.05 ZOCALOS Y CONTRAZOCALOS S/ 8,714.81 - - - - - -
03.02.05.01 ZOCALO DE CERAMICO BLANCO DE 20 X 30 cm. H= 2.05 m. m2 64.8 S/ 17.89 S/ 1,159.27 1,159.27 - - - - - - -
03.02.05.02 ZOCALO DE CEMENTO S/COLOREAR h=0.30 m, PINTADO m2 45.11 S/ 17.89 S/ 807.02 134.50 134.50 134.50 134.50 134.50 134.50
03.02.05.03 CONTRAZOCALO DE PORCELANATO H=0.10M m 263.1 S/ 25.65 S/ 6,748.52 1,193.69 925.81 925.81 925.81 925.81 925.81 925.81
03.02.06 CARPINTERIA DE MADERA S/ 31,444.22 - - - - - -
03.02.06.01 PUERTA DE MADERA AGUANO TABLERO REBAJADO m2 33.6 S/ 935.84 S/ 31,444.22 5,240.70 5,240.70 5,240.70 5,240.70 5,240.70 5,240.70
03.02.07 CARPINTERIA DE ALUMINIO S/ 23,197.82 - - - - - -
03.02.07.01 VENTANA DE ALUMINIO NATURAL PESADO e=1.5mm INC. VIDRIO
m2 TEMPLADO
63.89 S/ 363.09 S/ 23,197.82 3,866.30 3,866.30 3,866.30 3,866.30 3,866.30 3,866.30
03.02.08 CARPINTERIA METALICA S/ 1,100.00 - - - - - -
03.02.08.01 MODULO PRE FABRICADO PARA BAÑOS NIÑAS Y NIÑOS und 2 S/ 550.00 S/ 1,100.00 183.33 183.33 183.33 183.33 183.33 183.33
03.02.09 CERRAJERIA S/ 6,274.69 - - - - - -
03.02.09.01 BISAGRAS CAPUCHINA ALUMINIZADA DE 4"x 4" pza 36 S/ 17.30 S/ 622.80 103.80 103.80 103.80 103.80 103.80 103.80
03.02.09.02 CERRADURA DE TRES GOLPÈS PARA PUERTA pza 6 S/ 105.75 S/ 634.50 105.75 105.75 105.75 105.75 105.75 105.75
03.02.09.03 CERROJO "CARACOL" DE ALUMINIO SEGURIDAD PARA VENTANA
pza 13 S/ 13.15 S/ 170.95 28.49 28.49 28.49 28.49 28.49 28.49
03.02.09.04 CERRADURA TUBULAR - TIPO MANIJA pza 1 S/ 104.52 S/ 104.52 17.42 17.42 17.42 17.42 17.42 17.42
03.02.09.05 CERRADURA CILINDRICA - TIPO PERILLA pza 6 S/ 104.52
S/ 627.12 104.52 104.52 104.52 104.52 104.52 104.52

03.02.09.06 BRAZO EXTERIOR PARA VENTANA PROYECTANTE pza 60 S/ 68.58 S/ 4,114.80 685.80 685.80 685.80 685.80 685.80 685.80
03.02.10 PINTURA S/ 66,577.83 - - - - - -
03.02.10.01 PINTURA LATEX EN CIELO RASO 2 MANOS m2 632.14 S/ 21.40 S/ 13,527.80 4,806.87 1,453.49 1,453.49 1,453.49 1,453.49 1,453.49 1,453.49
03.02.10.02 PINTURA SATINADO EN EXTERIORES, MUROS, COLUMNAS, VIGAS,
m2 DOS
433.62
MANOS S/ 23.94 S/ 10,380.86 1,730.14 1,730.14 1,730.14 1,730.14 1,730.14 1,730.14
03.02.10.03 PINTURA SATINADO EN INTERIORES, MUROS, COLUMNAS, VIGAS,
m2 DOS870.3
MANOS S/ 23.94 S/ 20,834.98 3,472.50 3,472.50 3,472.50 3,472.50 3,472.50 3,472.50
03.02.10.04 PINTURA ESMALTE EN ZOCALOS Y CONTRAZOCALOS m 45.11 S/ 22.36 S/ 1,008.66 168.11 168.11 168.11 168.11 168.11 168.11
03.02.10.05 PINTURA BARNIZ EN CARPINTERIA DE MADERA m² 33.6 S/ 24.43 S/ 820.85 136.81 136.81 136.81 136.81 136.81 136.81
03.02.10.06 PASTA MURAL PARA INTERIORES m2 1998.47 S/ 10.01 S/ 20,004.68 473.17 936.00 2,227.20 4,933.78 952.29 1,747.04 1,747.04 1,747.04 1,747.04 1,747.04 1,747.04
03.03 INSTALACIONES SANITARIAS S/ 22,316.60 - - - - - -
03.03.01 SISTEMA DE AGUA FRIA
S/ 1,343.08 - - - - - -
03.03.01.01 RED DE TUBERIA DE 1/2" PVC-SAP m 42 S/ 20.65 S/ 867.30 845.46 21.84 - - - - - -
03.03.01.02 SALIDA DE AGUA FRIA CON TUBERIA PVC C-10 1/2" pto 11 S/ 23.75 S/ 261.25 255.53 0.95 0.95 0.95 0.95 0.95 0.95
03.03.01.03 VALVULA TIPO BOLA DE PVC DE 1/2" und 3 S/ 14.50 S/ 43.50 43.50 - - - - - -
03.03.01.04 CAJA PARA VALVULAS EN NICHO CERAMICO und 3 S/ 57.01
S/ 171.03 36.00 22.51 22.51 22.51 22.51 22.51 22.51

03.03.02 INSTALACIONES SANITARIAS


S/ 2,555.78 - - - - - -

03.03.02.01 SALIDA DE DESAGUE EN PVC SAL DE 4" pto 4 S/ 119.51 S/ 478.04 467.60 1.74 1.74 1.74 1.74 1.74 1.74
03.03.02.02 SALIDA DE DESAGUE EN PVC SAL DE 2" pto 7 S/ 99.31 S/ 695.17 676.90 3.05 3.05 3.05 3.05 3.05 3.05
03.03.02.03 SUMINISTRO Y COLOCACION DE TUBERIA EN PVC SAL DE 4" m 20 S/ 16.97 S/ 339.40 266.00 12.23 12.23 12.23 12.23 12.23 12.23
03.03.02.04 SUMINISTRO Y COLOCACION DE TUBERIA EN PVC SAL DE 2" m 16 S/ 12.77 S/ 204.32 174.40 4.99 4.99 4.99 4.99 4.99 4.99
03.03.02.05 CODO DE 90 DE 4" und 4 S/ 46.52 S/ 186.08 181.92 0.69 0.69 0.69 0.69 0.69 0.69
03.03.02.06 CODO DE 45 DE 4" und 3 S/ 40.49 S/ 121.47 118.47 0.50 0.50 0.50 0.50 0.50 0.50
03.03.02.07 YEE DE 4" und 2 S/ 30.95 S/ 61.90 60.68 0.20 0.20 0.20 0.20 0.20 0.20
03.03.02.08 YEE DE 4" A 2" und 6 S/ 31.46 S/ 188.76 185.10 0.61 0.61 0.61 0.61 0.61 0.61
03.03.02.09 YEE DE 2" und 2 S/ 23.96 S/ 47.92 46.70 0.20 0.20 0.20 0.20 0.20 0.20
03.03.02.10 SUMIDERO DE 2" und 4 S/ 58.18 S/ 232.72 228.28 0.74 0.74 0.74 0.74 0.74 0.74
03.03.03 APARATOS Y ACCESORIOS SANITARIOS S/ 8,039.90 - - - - - -
03.03.03.01 INODORO TANQUE BAJO, BLANCO NACIONAL und 4 S/ 897.75 S/ 3,591.00 598.50 598.50 598.50 598.50 598.50 598.50
CRONOGRAMA VALORIZADO DE AVANCE DE OBRA

Obra: MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCIÓN EDUCATIVA INTEGRADA N°277-21 y 54177 "EL BUEN PASTOR" DE TALAVERA" DISTRITO DE TALAVERA - PROVINCIA ANDAHUALAS - REGIÓN APURÍMAC
Ubicación: APURIMAC - ANDAHUAYLAS - TALAVERA

PLAZO DE EJECUCION
MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 MES 11 MES 12 MES 13 MES 14 MES 15 MES 16 MES 17 MES 18 MES 19 MES 20 MES 21 MES 22 MES 23 MES 24 MES 25 MES 26 MES 27 MES 28 MES 29 MES 30 MES 31 MES 32 MES 33 MES 34 MES 35 MES 36 TOTAL
Item Descripcion Unid Metrado PU S/ PARCIAL
MAR - 2019 ABR - 2019 MAY - 2019 JUN - 2019 JUL - 2019 AGO - 2019 SET - 2019 0CT - 2019 NOV - 2019 DIC - 2019 ENE - 2020 FEB - 2020 MAR - 2020 JUL - 2020 AGO - 2020 SET - 2020 0CT - 2020 NOV - 2020 DIC - 2020 ENE - 2021 FEB - 2021 MAR - 2021 ABR - 2021 MAY - 2021 JUN - 2021 JUL - 2021 AGO - 2021 SET -2021 0CT - 2021 NOV - 2021 DIC - 2021 ENE - 2022 FEB - 2022 MAR - 2022 ABR - 2022 MAY - 2022 1188 Dias
03.03.03.02 LAVATORIO DE LOSA BLANCA NACIONAL und 4 S/ 547.80 S/ 2,191.20 365.20 365.20 365.20 365.20 365.20 365.20
03.03.03.03 LAVERO DE ACERO INOXIDABLE und 1 S/ 493.66 S/ 493.66 82.28 82.28 82.28 82.28 82.28 82.28
03.03.03.04 URINARIO DE CONCRETO und 1 S/ 1,249.40 S/ 1,249.40 1,215.21 5.70 5.70 5.70 5.70 5.70 5.70
03.03.03.05 PAPELERA DE LOSA BLANCA und 4 S/ 128.66 S/ 514.64 85.77 85.77 85.77 85.77 85.77 85.77
03.03.04 RED DE DRENAJE PLUVIAL (Aulas + Esaclera + Administración) S/ 9,208.06 - - - - - -
03.03.04.01 CANALETA DE FIERRO GALVANIZADO e= 1/27" m 61.6 S/ 121.07 S/ 7,457.91 2,974.54 4,461.81 3.59 3.59 3.59 3.59 3.59 3.59
03.03.04.02 TUBERIA DE BAJADA P/LLUVIAS, PVC SAL Ø 4". m 29.8 S/ 58.73 S/ 1,750.15 868.82 868.82 2.09 2.09 2.09 2.09 2.09 2.09
03.03.05 COLUMNETAS DE PROTECCION S/ 1,169.78 - - - - - -
03.03.05.01 PROTECCION TUBERIA DE DRENAJE CONCRETO 175 kg/cm2 m3 0.65 S/ 614.24 S/ 399.26 200.44 194.37 0.74 0.74 0.74 0.74 0.74 0.74
03.03.05.02 PROTECCION TUBERIA DE DRENAJE ENCOFRADO DESENCOFRADO
m2 6.48 S/ 95.89 S/ 621.37 305.50 305.50 1.73 1.73 1.73 1.73 1.73 1.73
03.03.05.03 PROTECCION TUBERIA DE DRENAJE ACERO FY=4200KG/CM2kg 24.45 S/ 6.10 S/ 149.15 74.11 74.05 0.16 0.16 0.16 0.16 0.16 0.16
03.04 INSTALACIONES ELECTRICAS S/ 85,967.59 - - - - - -
03.04.01 SALIDA PARA CENTRO DE LUZ EN TECHO pto 60 S/ 78.92 S/ 4,735.20 4,628.40 17.80 17.80 17.80 17.80 17.80 17.80
03.04.02 SALIDA PARA INTERRUPTOR SIMPLE pto 16 S/ 90.51 S/ 1,448.16 1,365.28 13.81 13.81 13.81 13.81 13.81 13.81
03.04.03 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON LINEA A TIERRA.
pto 28 S/ 56.29 S/ 1,576.12 1,215.20 60.15 60.15 60.15 60.15 60.15 60.15
03.04.04 TABLEROS ELECTRICOS S/ 20,628.88 - - - - - -
03.04.04.01 TABLERO DE DISTRIBUCION TD-1 Y TD-2 INT. AUT. 1-2x30A, 1-2x20A,
und 2-2x15A,
4 1 I.D. 2x25A-30mA,
S/ 5,157.22
18 POLOS S/ 20,628.88 581.89 3,341.17 3,341.17 3,341.17 3,341.17 3,341.17 3,341.17
03.04.05 INTERRUPTORES TERMOMAGNTICOS S/ 155.16 - - - - - -
03.04.05.01 INTERRUPTOR DIFERENCIAL DE 2X15A,30mA pza 2 S/ 36.79 S/ 73.58 12.26 12.26 12.26 12.26 12.26 12.26
03.04.05.02 INTERRUPTOR DIFERENCIAL DE 2X20A,30mA pza 2 S/ 40.79 S/ 81.58 13.60 13.60 13.60 13.60 13.60 13.60
03.04.06 CABLES S/ 13,314.19 - - - - - -
03.04.06.01 CABLE ELECTRICO TW 2.5MM2 m 1228.3 S/ 4.43 S/ 5,441.37 1,090.00 725.23 725.23 725.23 725.23 725.23 725.23
03.04.06.02 CABLE ELECTRICO TW 4.0MM2 m 681.04 S/ 11.56 S/ 7,872.82 1,312.14 1,312.14 1,312.14 1,312.14 1,312.14 1,312.14
03.04.07 CONDUCTOS S/ 6,874.62 - - - - - -
03.04.07.01 TUBERIA PVC - CEL D=20MM m 568.15 S/ 12.10 S/ 6,874.62 1,338.75 922.65 922.65 922.65 922.65 922.65 922.65
03.04.08 ARTEFACTOS ELECTRICOS S/ 7,235.26 - - - - - -
03.04.08.01 ARTEFACTO FLUORESCENTE TUBULAR DE 32W, C/DIFUSOR ACRILICO
und TRANSPARENTE,
20 SIMILAR
S/ 67.82
A TP DE JOSFEL S/ 1,356.40 226.07 226.07 226.07 226.07 226.07 226.07
03.04.08.02 ARTEFACTO 02 FLUORESCENTE DE 40W, SIMILAR A BE DE JOSFEL
und 20 S/ 134.93 S/ 2,698.60 449.77 449.77 449.77 449.77 449.77 449.77
03.04.08.03 ARTEFACTO TIPO GLOBO ADOSADO A PARED und 39 S/ 73.82 S/ 2,878.98 479.83 479.83 479.83 479.83 479.83 479.83
03.04.08.04 LAMPARA LUZ DE EMERGENCIA 2 FAROS und 2 S/ 150.64 S/ 301.28 50.21 50.21 50.21 50.21 50.21 50.21
03.04.09 INSTALACIONES ESPECIALES S/ 30,000.00 - - - - - -
03.04.09.01 SUMINISTRO E INSTALACION DE LAS INSTALACIONES ESPECIALES
GLB (INTERNET,
1 TV CABLE, MULTIMEDIA,
S/ 30,000.00 ALARMA CONTRAS/INCENDIO,
30,000.00 DETECTORES DE HUMO, PULSADORES) 1,884.03 1,884.03 4,371.99 4,371.99 4,371.99 4,371.99 4,371.99 4,371.99
04 MODULO III - NIVEL INICIAL S/ 1,131,489.72 - - - - - -
04.01 ESTRUCTURAS S/ 628,346.58 - - - - - -
04.01.01 TRABAJOS PRELIMINARES S/ 1,182.35 - - - - - -
04.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 258.72 S/ 1.84 S/ 476.04 463.11 2.16 2.16 2.16 2.16 2.16 2.16
04.01.01.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 258.72 S/ 2.73 S/ 706.31 701.13 0.86 0.86 0.86 0.86 0.86 0.86
04.01.02 MOVIMIENTO DE TIERRAS S/ 32,555.23 - - - - - -
04.01.02.01 EXCAVACION MANUAL DE ZANJAS PARA TERRENO NORMAL m3 182.5 S/ 73.63 S/ 13,437.48 13,037.80 66.61 66.61 66.61 66.61 66.61 66.61
04.01.02.02 EXCAVACION MANUAL DE ZANJAS PARA CIMIENTO CORRIDO m3 58.46 S/ 49.09 S/ 2,869.80 2,784.45 14.23 14.23 14.23 14.23 14.23 14.23
04.01.02.03 RELLENO CON MATERIAL PROPIO m3 106.37 S/ 21.04 S/ 2,238.02 2,171.01 11.17 11.17 11.17 11.17 11.17 11.17
04.01.02.04 ACARREO DE MATERIAL EXCEDENTE m3 161.5 S/ 24.54 S/ 3,963.21 3,845.32 19.65 19.65 19.65 19.65 19.65 19.65
04.01.02.05 ELIMINACION DE MATERIAL EXCEDENTE m2 161.5 S/ 12.91 S/ 2,084.97 2,075.28 1.62 1.62 1.62 1.62 1.62 1.62
04.01.02.06 NIVELACION Y APISONADO m2 159.65 S/ 49.87 S/ 7,961.75 3,007.07 4,930.73 3.99 3.99 3.99 3.99 3.99 3.99
04.01.03 OBRAS DE CONCRETO SIMPLE S/ 82,824.59 - - - - - -
04.01.03.01 FALSA ZAPATA C:H:1:10+30%P.G.8" m3 155.82 S/ 265.48 S/ 41,367.09 9,942.21 4,391.89 4,505.50 4,505.50 4,505.50 4,505.50 4,505.50 4,505.50
04.01.03.02 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30%
m3 PG 17.46 S/ 253.55 S/ 4,426.98 737.83 737.83 737.83 737.83 737.83 737.83
04.01.03.03 CONCRETO PARA SOBRECOMIENTOS H: 1:8 + 25% P.M. e=15cm
m3 2.1 S/ 444.74 S/ 933.95 920.77 2.20 2.20 2.20 2.20 2.20 2.20
04.01.03.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO h=0.30 m 2 27.97 S/ 100.73 S/ 2,817.42 2,817.42 - - - - - -
04.01.03.05 FALSO PISO, MEZCLA CONCRETO 1:8 CEMENTO-HORMIGON e=4"
m2 159.65 S/ 32.67 S/ 5,215.77 4,747.77 370.61 16.23 16.23 16.23 16.23 16.23 16.23
04.01.03.06 ENCOFRADO EN FALSA ZAPATA m2 278.6 S/ 100.73 S/ 28,063.38 27,614.83 74.76 74.76 74.76 74.76 74.76 74.76
04.01.04 CONCRETO ARMADO S/ 461,642.85 - - - - - -
04.01.04.01 SOBRECIMIENTO ARMADO S/ 51,464.45 - - - - - -
04.01.04.01.01 CONCRETO PARA SOBRECOMIENTOS ARMADO f'c=175kg/cm2.
m3e=15cm9.56 S/ 517.12 S/ 4,943.67 2,632.14 240.68 2,022.76 8.01 8.01 8.01 8.01 8.01 8.01
04.01.04.01.02 CONCRETO PARA SOBRECOMIENTOS ARMADO f'c=175kg/cm2.
m3e=25cm18.91 S/ 565.87 S/ 10,700.60 4,381.59 2,456.60 3,743.66 19.79 19.79 19.79 19.79 19.79 19.79
04.01.04.01.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO m2 279.55 S/ 100.73 S/ 28,159.07 16,572.33 5,215.04 6,371.70 0.00 0.00 0.00 0.00 0.00 0.00
04.01.04.01.04 ACERO EN SOBRECIMIENTO ARMADO FY= 4200 kg/cm2 GRADO
kg 60 1231.69 S/ 6.22 S/ 7,661.11 3,805.95 1,763.96 735.05 560.65 746.24 8.21 8.21 8.21 8.21 8.21 8.21
04.01.04.02 ZAPATAS S/ 38,667.63 - - - - - -
04.01.04.02.01 CONCRETO F'C= 210 KG/CM2. PARA ZAPATAS m3 54.97 S/ 541.19 S/ 29,749.21 29,479.31 44.98 44.98 44.98 44.98 44.98 44.98
04.01.04.02.02 ACERO EN ZAPATAS FY= 4200 kg/cm2 GRADO 60 kg 1433.83 S/ 6.22 S/ 8,918.42 8,861.07 9.56 9.56 9.56 9.56 9.56 9.56
04.01.04.03 COLUMNAS S/ 126,603.31 - - - - - -
04.01.04.03.01 CONCRETO F'C= 210 KG/CM2. PARA COLUMNAS m3 44.5 S/ 644.68 S/ 28,688.26 2,568.36 8,227.67 815.76 1,140.78 8,527.21 1,083.43 5,997.09 54.66 54.66 54.66 54.66 54.66 54.66
04.01.04.03.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 460.45 S/ 92.14 S/ 42,425.86 5,874.02 8,560.58 1,306.85 1,306.85 11,344.59 2,005.36 11,534.93 82.11 82.11 82.11 82.11 82.11 82.11
04.01.04.03.03 ACERO Fy=4200 KG/CM2 GRADO 60, EN COLUMNAS kg 8431.59 S/ 6.22 S/ 52,444.49 52,107.23 - 56.21 56.21 56.21 56.21 56.21 56.21
04.01.04.03.04 SELLADO DE JUNTAS DE DILATACION DE COLUMNAS m 45 S/ 67.66 S/ 3,044.70 3,035.70 1.50 1.50 1.50 1.50 1.50 1.50
04.01.04.04 VIGAS DE CIMENTACION S/ 37,929.68 - - - - - -
04.01.04.04.01 CONCRETO f'c=210 kg/cm2 EN VIGAS DE CIMENTACION m3 11.3 S/ 541.19 S/ 6,115.45 6,059.96 9.25 9.25 9.25 9.25 9.25 9.25
04.01.04.04.02 ENCOFRADO Y DESENCOFRADO EN VIGA DE CIMENTACIONm2 90.43 S/ 84.83 S/ 7,671.18 7,554.52 19.44 19.44 19.44 19.44 19.44 19.44
04.01.04.04.03 ACERO FY= 4200 kg/cm2 GRADO 60, EN VIGAS DE CIMENTACION
kg 3881.52 S/ 6.22 S/ 24,143.05 23,987.79 25.88 25.88 25.88 25.88 25.88 25.88
04.01.04.05 COLUMNETAS S/ 13,117.52 - - - - - -
04.01.04.05.01 CONCRETO f'c=175 kg/cm2 PARA COLUMNETAS m3 2.35 S/ 456.29 S/ 1,072.28 99.89 99.89 199.78 667.44 0.88 0.88 0.88 0.88 0.88 0.88
04.01.04.05.02 ENCOFRADO Y DESENCOFRADO EN COLUMNETAS m2 54.92 S/ 123.50 S/ 6,782.62 374.11 374.11 834.17 5,066.78 22.24 22.24 22.24 22.24 22.24 22.24
04.01.04.05.03 ACERO FY= 4200 kg/cm2 GRADO 60, EN COLUMNETAS kg 846.08 S/ 6.22 S/ 5,262.62 581.11 886.52 1,146.76 2,614.39 5.64 5.64 5.64 5.64 5.64 5.64
04.01.04.06 VIGAS S/ 63,749.00 - - - - - -
04.01.04.06.01 CONCRETO F'C= 210 KG/CM2. EN VIGAS m3 27.98 S/ 663.68 S/ 18,569.77 2,900.89 7,534.44 1,355.74 1,355.74 1,355.74 1,355.74 1,355.74 1,355.74
04.01.04.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 217.2 S/ 84.83 S/ 18,425.08 4,638.98 3,500.33 5,082.57 867.20 867.20 867.20 867.20 867.20 867.20
04.01.04.06.03 ACERO FY= 4200 kg/cm2 GRADO 60, EN VIGAS kg 4301.31 S/ 6.22 S/ 26,754.15 8,710.40 12,646.69 2,970.91 2,426.15 0.00 0.00 0.00 0.00 0.00 0.00
04.01.04.07 VIGUETAS S/ 4,098.55 - - - - - -
04.01.04.07.01 CONCRETO F'C= 175 KG/CM2. EN VIGUETAS m3 1.46 S/ 513.78 S/ 750.12 178.51 178.51 45.90 341.72 0.91 0.91 0.91 0.91 0.91 0.91
04.01.04.07.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGUETAS m2 19.41 S/ 123.50 S/ 2,397.14 559.34 559.34 147.71 1,083.58 7.86 7.86 7.86 7.86 7.86 7.86
04.01.04.07.03 ACERO FY= 4200 kg/cm2 GRADO 60, EN VIGUETAS kg 152.94 S/ 6.22 S/ 951.29 105.31 105.31 30.16 704.40 1.02 1.02 1.02 1.02 1.02 1.02
04.01.04.08 LOSA ALIGERADA DE CONCRETO ARMADO S/ 52,461.94 - - - - - -
04.01.04.08.01 CONCRETO F'C=210 KG/CM2 EN LOSA ALIGERADA m3 17.39 S/ 518.44 S/ 9,015.67 8,951.68 10.67 10.67 10.67 10.67 10.67 10.67
04.01.04.08.02 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA m2 173.94 S/ 102.88 S/ 17,894.95 5,570.86 12,044.04 46.67 46.67 46.67 46.67 46.67 46.67
04.01.04.08.03 ACERO Fy=4200 KG/CM2 GRADO 60, EN LOSA ALIGERADA kg 2847.73 S/ 6.22 S/ 17,712.88 297.88 9,892.39 7,408.71 18.98 18.98 18.98 18.98 18.98 18.98
04.01.04.08.04 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA LOSA ALIGERADA
und 1448.88 S/ 5.41 S/ 7,838.44 7,794.97 7.24 7.24 7.24 7.24 7.24 7.24
04.01.04.09 LOSA MACIZA DE CONCRETO ARMADO S/ 3,171.55 - - - - - -
04.01.04.09.01 CONCRETO F'C=210 KG/CM2 EN LOSA MACIZA m3 1.29 S/ 505.64 S/ 652.28 646.99 0.88 0.88 0.88 0.88 0.88 0.88
04.01.04.09.02 ENCOFRADO Y DESENCOFRADO EN LOSA MACIZA m2 6.46 S/ 109.82 S/ 709.44 699.10 1.72 1.72 1.72 1.72 1.72 1.72
04.01.04.09.03 ACERO Fy=4200 KG/CM2 GRADO 60, EN LOSA MACIZA kg 290.97 S/ 6.22 S/ 1,809.83 1,798.19 1.94 1.94 1.94 1.94 1.94 1.94
04.01.04.10 TECHO INCLINADO DE CONCRETO ARMADO S/ 62,161.13 - - - - - -
04.01.04.10.01 CONCRETO F'C=210 KG/CM2 EN LOSA ALIGERADA INCLINADA
m3 27.24 S/ 489.40 S/ 13,331.26 13,250.90 13.39 13.39 13.39 13.39 13.39 13.39
04.01.04.10.02 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA INCLINADA
m2 272.41 S/ 102.97 S/ 28,050.06 27,611.48 73.10 73.10 73.10 73.10 73.10 73.10
04.01.04.10.03 ACERO Fy=4200 KG/CM2 GRADO 60, EN LOSA ALIGERADA INCLINADA
kg 1367.12 S/ 6.22 S/ 8,503.49 8,448.80 9.11 9.11 9.11 9.11 9.11 9.11
04.01.04.10.04 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA LOSA ALIGERADA
und 2269.19
INCLINADA S/ 5.41 S/ 12,276.32 247.48 11,960.76 11.35 11.35 11.35 11.35 11.35 11.35
04.01.04.11 ESCALERA DOS TRAMOS DE CONCRETO ARMADO S/ 8,218.09 - - - - - -
04.01.04.11.01 CONCRETO F'C=210 KG/CM2 EN ESCALERA m3 5.35 S/ 566.86 S/ 3,032.70 3,006.43 4.38 4.38 4.38 4.38 4.38 4.38
04.01.04.11.02 ENCOFRADO Y DESENCOFRADO EN ESCALERA m2 31.24 S/ 90.85 S/ 2,838.15 2,804.73 5.57 5.57 5.57 5.57 5.57 5.57
04.01.04.11.03 ACERO Fy=4200 KG/CM2 GRADO 60, EN ESCALERA kg 377.37 S/ 6.22 S/ 2,347.24 2,332.15 2.52 2.52 2.52 2.52 2.52 2.52
04.01.05 COBERTURAS S/ 49,516.32 - - - - - -
04.01.05.01 IMPERMEABILIZACION DE TECHO CON PINTURA ASFALTICA m2 334.98 S/ 6.84 S/ 2,291.26 1,120.51 1,120.51 8.37 8.37 8.37 8.37 8.37 8.37
04.01.05.02 VIGUETAS DE MADERA P/FIJAR COBERTURA DE TEJA ANDINAm 188.7 S/ 19.61 S/ 3,700.41 3,700.41 - - - - - -
04.01.05.03 COBERTURA DE TEJA ANDINA m2 334.98 S/ 116.22 S/ 38,931.38 38,827.53 17.31 17.31 17.31 17.31 17.31 17.31
04.01.05.04 CUMBRERAS DE TEJA ANDINA m 31.45 S/ 146.05 S/ 4,593.27 4,589.81 0.58 0.58 0.58 0.58 0.58 0.58
04.01.06 VARIOS S/ 625.24 - - - - - -
04.01.06.01 GARGOLA PREFABRICADA und 4 S/ 156.31 S/ 625.24 513.64 18.60 18.60 18.60 18.60 18.60 18.60
04.02 ARQUITECTURA S/ 411,227.29 - - - - - -
04.02.01 MUROS Y TABIQUES DE ALBAÑILERIA S/ 72,803.46 - - - - - -
04.02.01.01 MURO DE LADRILLO KK DE CABEZA JUNTA 1.5 cm. MORTEROm2
1:4 249.34 S/ 167.45 S/ 41,751.98 11,866.53 6,357.66 17,556.10 5,555.29 69.40 69.40 69.40 69.40 69.40 69.40
04.02.01.02 MURO DE LADRILLO KK DE SOGA JUNTA 1.5 cm. MORTERO 1:4m2 250.84 S/ 123.79 S/ 31,051.48 2,478.34 220.84 4,242.62 11,914.43 11,919.33 45.99 45.99 45.99 45.99 45.99 45.99
04.02.02 REVOQUES ENLUCIDOS Y MOLDURAS S/ 107,635.25 - - - - - -
04.02.02.01 TARRAJEO DE COLUMNAS m² 460.45 S/ 68.16 S/ 31,384.27 6,155.40 10,674.90 8,029.39 1,087.43 1,087.43 1,087.43 1,087.43 1,087.43 1,087.43
04.02.02.02 TARRAJEO DE VIGAS m² 217.2 S/ 66.55 S/ 14,454.66 4,764.13 4,651.85 4,426.64 336.19 45.97 45.97 45.97 45.97 45.97 45.97
04.02.02.03 TARRAJEO MUROS EXTERIOR MORTERO 1:4 m2 320.63 S/ 36.07 S/ 11,565.12 - 7,694.18 1,848.10 310.68 285.36 285.36 285.36 285.36 285.36 285.36
04.02.02.04 TARRAJEO MUROS INTERIORES MORTERO 1:4 m2 544.07 S/ 36.07 S/ 19,624.60 7,344.10 4,451.34 - - 1,304.86 1,304.86 1,304.86 1,304.86 1,304.86 1,304.86
04.02.02.05 VESTIDURA DE DERRAME E=0.15M m 260.35 S/ 37.61 S/ 9,791.76 554.34 6,769.15 1,260.53 942.19 44.26 44.26 44.26 44.26 44.26 44.26
04.02.02.06 TARRAJEO PRIMARIO Y RAYADO CON CEMENTO : ARENA. m2 54.3 S/ 33.96 S/ 1,844.03 1,807.10 - - 6.15 6.15 6.15 6.15 6.15 6.15
04.02.02.07 BRUÑAS DE 1 X 1 cm m 1652.51 S/ 11.48 S/ 18,970.81 473.18 10,602.00 6,696.00 670.83 88.13 88.13 88.13 88.13 88.13 88.13
04.02.03 CIELORRASOS S/ 30,367.70 - - - - - -
04.02.03.01 CIELORRASOS CON MEZCLA CEMENTO : ARENA 1:5 m² 469.87 S/ 64.63 S/ 30,367.70 16,675.38 11,797.21 1,345.35 91.62 91.62 91.62 91.62 91.62 91.62
04.02.04 PISOS Y PAVIMENTOS S/ 47,327.35 - - - - - -
04.02.04.01 CONTRAPISO DE 48MM m2 307.71 S/ 39.00 S/ 12,000.69 12,000.69 - - - - - -
04.02.04.02 PISO DE CERAMICO DE ALTO TRANSITO 45x45 cm. m2 24.43 S/ 89.31 S/ 2,181.84 159.48 1,422.03 100.06 100.06 100.06 100.06 100.06 100.06
04.02.04.03 PISO DE PORCELANATO 0.60X0.60M m2 325.3 S/ 101.89 S/ 33,144.82 9,521.43 3,937.23 3,937.23 3,937.23 3,937.23 3,937.23 3,937.23
04.02.05 CEMENTO PULIDO, BRUÑADO y COLOREADO S/ 3,897.21 - - - - - -
04.02.05.01 VEREDAS DE CEMENTO FROTACHADO y BRUÑADOf´c=140 kg/cm2,
m3 e=15cm
15.47 S/ 54.32 S/ 840.33 75.53 717.54 41.54 0.95 0.95 0.95 0.95 0.95 0.95
CRONOGRAMA VALORIZADO DE AVANCE DE OBRA

Obra: MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCIÓN EDUCATIVA INTEGRADA N°277-21 y 54177 "EL BUEN PASTOR" DE TALAVERA" DISTRITO DE TALAVERA - PROVINCIA ANDAHUALAS - REGIÓN APURÍMAC
Ubicación: APURIMAC - ANDAHUAYLAS - TALAVERA

PLAZO DE EJECUCION
MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 MES 11 MES 12 MES 13 MES 14 MES 15 MES 16 MES 17 MES 18 MES 19 MES 20 MES 21 MES 22 MES 23 MES 24 MES 25 MES 26 MES 27 MES 28 MES 29 MES 30 MES 31 MES 32 MES 33 MES 34 MES 35 MES 36 TOTAL
Item Descripcion Unid Metrado PU S/ PARCIAL
MAR - 2019 ABR - 2019 MAY - 2019 JUN - 2019 JUL - 2019 AGO - 2019 SET - 2019 0CT - 2019 NOV - 2019 DIC - 2019 ENE - 2020 FEB - 2020 MAR - 2020 JUL - 2020 AGO - 2020 SET - 2020 0CT - 2020 NOV - 2020 DIC - 2020 ENE - 2021 FEB - 2021 MAR - 2021 ABR - 2021 MAY - 2021 JUN - 2021 JUL - 2021 AGO - 2021 SET -2021 0CT - 2021 NOV - 2021 DIC - 2021 ENE - 2022 FEB - 2022 MAR - 2022 ABR - 2022 MAY - 2022 1188 Dias
04.02.05.02 JUNTA DE DILATACION ASFALTICA 1" m 4.08 S/ 10.74 S/ 43.82 - 7.30 7.30 7.30 7.30 7.30 7.30
04.02.05.03 AFIRMADO E=4" m3 6.66 S/ 214.48 S/ 1,428.44 1,363.30 - 10.86 10.86 10.86 10.86 10.86 10.86
04.02.05.04 ENCOFRADO Y DESENCOFRADO DE VEREDAS h=0.15 m. m2 18.68 S/ 84.83 S/ 1,584.62 609.84 868.82 81.87 4.02 4.02 4.02 4.02 4.02 4.02
04.02.06 ZOCALOS Y CONTRAZOCALOS S/ 6,988.07 - - - - - -
04.02.06.01 ZOCALO DE CERAMICO BLANCO DE 20 X 30 cm. H= 2.05 m. m2 64.34 S/ 17.89 S/ 1,151.04 790.60 360.44 0.00 0.00 0.00 0.00 0.00 0.00
04.02.06.02 ZOCALO DE CEMENTO S/COLOREAR h=0.30 m, PINTADO m2 19.95 S/ 17.89 S/ 356.91 59.49 59.49 59.49 59.49 59.49 59.49
04.02.06.03 CONTRAZOCALO DE PORCELANATO H=0.10M m 213.65 S/ 25.65 S/ 5,480.12 952.93 754.53 754.53 754.53 754.53 754.53 754.53
04.02.07 CARPINTERIA DE MADERA S/ 30,461.59 - - - - - -
04.02.07.01 PUERTA DE MADERA AGUANO TABLERO REBAJADO m2 32.55 S/ 935.84 S/ 30,461.59 5,076.93 5,076.93 5,076.93 5,076.93 5,076.93 5,076.93
04.02.08 CARPINTERIA DE ALUMINIO S/ 31,857.52 - - - - - -
04.02.08.01 VENTANA DE ALUMINIO NATURAL PESADO e=1.5mm INC. VIDRIO
m2 TEMPLADO
87.74 S/ 363.09 S/ 31,857.52 5,309.59 5,309.59 5,309.59 5,309.59 5,309.59 5,309.59
04.02.09 CARPINTERIA METALICA S/ 5,149.45 - - - - - -
04.02.09.01 MODULO PRE FABRICADO PARA BAÑOS NIÑAS Y NIÑOS und 2 S/ 550.00 S/ 1,100.00 183.33 183.33 183.33 183.33 183.33 183.33
04.02.09.02 BARANDA METALICA DE TUB REDONDO DE 2" m 12.6 S/ 285.44 S/ 3,596.54 599.42 599.42 599.42 599.42 599.42 599.42
04.02.09.03 CANTONERA DE HIERRO ESTRIADO m 31 S/ 14.61 S/ 452.91 446.09 1.14 1.14 1.14 1.14 1.14 1.14
04.02.10 CERRAJERIA S/ 5,790.91 - - - - - -
04.02.10.01 BISAGRAS CAPUCHINA ALUMINIZADA DE 4"x 4" pza 48 S/ 17.30 S/ 830.40 138.40 138.40 138.40 138.40 138.40 138.40
04.02.10.02 CERRADURA DE TRES GOLPÈS PARA PUERTA pza 7 S/ 105.75 S/ 740.25 123.38 123.38 123.38 123.38 123.38 123.38
04.02.10.03 BRAZO EXTERIOR PARA VENTANA PROYECTANTE pza 52 S/ 68.58
S/ 3,566.16 594.36 594.36 594.36 594.36 594.36 594.36

04.02.10.04 CERROJO "CARACOL" DE ALUMINIO SEGURIDAD PARA VENTANA


pza 10 S/ 13.15 S/ 131.50 21.92 21.92 21.92 21.92 21.92 21.92
04.02.10.05 CERRADURA CILINDRICA - TIPO PERILLA pza 3 S/ 104.52 S/ 313.56 52.26 52.26 52.26 52.26 52.26 52.26
04.02.10.06 CERRADURA TUBULAR - TIPO MANIJA pza 2 S/ 104.52 S/ 209.04 34.84 34.84 34.84 34.84 34.84 34.84
04.02.11 PINTURA S/ 68,948.78 - - - - - -
04.02.11.01 PINTURA LATEX EN CIELO RASO 2 MANOS m2 469.87 S/ 21.40 S/ 10,055.22 4,459.16 932.68 932.68 932.68 932.68 932.68 932.68
04.02.11.02 PINTURA SATINADO EN EXTERIORES, MUROS, COLUMNAS, VIGAS,
m2 DOS
561.69
MANOS S/ 23.94 S/ 13,446.86 657.63 2,131.54 2,131.54 2,131.54 2,131.54 2,131.54 2,131.54
04.02.11.03 PINTURA SATINADO EN INTERIORES, MUROS, COLUMNAS, VIGAS,
m2 DOS
950.66
MANOS S/ 23.94 S/ 22,758.80 3,793.13 3,793.13 3,793.13 3,793.13 3,793.13 3,793.13
04.02.11.04 PINTURA ESMALTE EN ZOCALOS Y CONTRAZOCALOS m 17.43 S/ 22.36 S/ 389.73 64.96 64.96 64.96 64.96 64.96 64.96
04.02.11.05 PINTURA BARNIZ EN CARPINTERIA DE MADERA m² 125.09 S/ 24.43
S/ 3,055.95 509.33 509.33 509.33 509.33 509.33 509.33
04.02.11.06 PASTA MURAL PARA INTERIORES m2 1922.3 S/ 10.01 S/ 19,242.22 755.37 2,960.66 4,645.23 929.01 1,658.66 1,658.66 1,658.66 1,658.66 1,658.66 1,658.66
04.03 INSTALACIONES SANITARIAS S/ 91,915.85 - - - - - -
04.03.01 MOVIMIENTO DE TIERRAS
S/ 22.02 - - - - - -

04.03.01.01 EXCAVACION DE ZANJA m3 0.32 S/ 49.09


S/ 15.71 15.24 0.08 0.08 0.08 0.08 0.08 0.08

04.03.01.02 RELLENO DE ZANJA m3 0.3 S/ 21.04 S/ 6.31 6.12 0.03 0.03 0.03 0.03 0.03 0.03
04.03.02 SISTEMA DE AGUA FRIA S/ 1,236.73 - - - - - -
04.03.02.01 RED DE TUBERIA DE 1/2" PVC-SAP m 38 S/ 20.65 S/ 784.70 764.94 3.29 3.29 3.29 3.29 3.29 3.29
04.03.02.02 SALIDA DE AGUA FRIA CON TUBERIA PVC C-10 1/2" pto 10 S/ 23.75 S/ 237.50 39.58 39.58 39.58 39.58 39.58 39.58
04.03.02.03 VALVULA TIPO BOLA DE PVC DE 1/2" und 3 S/ 14.50 S/ 43.50 43.50 - - - - - -
04.03.02.04 CAJA PARA VALVULAS EN NICHO CERAMICO und 3 S/ 57.01 S/ 171.03 36.00 22.51 22.51 22.51 22.51 22.51 22.51
04.03.03 INSTALACIONES SANITARIAS S/ 3,991.12 - - - - - -
04.03.03.01 SALIDA DE DESAGUE EN PVC SAL DE 4" pto 6 S/ 119.51 S/ 717.06 701.40 2.61 2.61 2.61 2.61 2.61 2.61
04.03.03.02 SALIDA DE DESAGUE EN PVC SAL DE 2" pto 9 S/ 99.31 S/ 893.79 870.30 3.91 3.91 3.91 3.91 3.91 3.91
04.03.03.03 SUMINISTRO Y COLOCACION DE TUBERIA EN PVC SAL DE 4" m 68 S/ 16.97 S/ 1,153.96 904.40 41.59 41.59 41.59 41.59 41.59 41.59
04.03.03.04 SUMINISTRO Y COLOCACION DE TUBERIA EN PVC SAL DE 2" m 24 S/ 12.77 S/ 306.48 261.60 7.48 7.48 7.48 7.48 7.48 7.48
04.03.03.05 CODO DE 90 DE 4" und 4 S/ 46.52 S/ 186.08 181.92 0.69 0.69 0.69 0.69 0.69 0.69
04.03.03.06 CODO DE 45 DE 4" und 5 S/ 40.49 S/ 202.45 197.45 0.83 0.83 0.83 0.83 0.83 0.83
04.03.03.07 YEE DE 4" und 2 S/ 30.95 S/ 61.90 60.68 0.20 0.20 0.20 0.20 0.20 0.20
04.03.03.08 YEE DE 4" A 2" und 6 S/ 31.46 S/ 188.76 185.10 0.61 0.61 0.61 0.61 0.61 0.61
04.03.03.09 YEE DE 2" und 2 S/ 23.96 S/ 47.92 46.70 0.20 0.20 0.20 0.20 0.20 0.20
04.03.03.10 SUMIDERO DE 2" und 4 S/ 58.18 S/ 232.72 228.28 0.74 0.74 0.74 0.74 0.74 0.74
04.03.04 APARATOS Y ACCESORIOS SANITARIOS S/ 9,120.45 - - - - - -
04.03.04.01 INODORO TANQUE BAJO, BLANCO NACIONAL und 5 S/ 897.75 S/ 4,488.75 748.13 748.13 748.13 748.13 748.13 748.13
04.03.04.02 LAVATORIO DE LOSA BLANCA NACIONAL und 5 S/ 547.80 S/ 2,739.00 456.50 456.50 456.50 456.50 456.50 456.50
04.03.04.03 URINARIO DE CONCRETO und 1 S/ 1,249.40 S/ 1,249.40 1,215.21 5.70 5.70 5.70 5.70 5.70 5.70
04.03.04.04 PAPELERA DE LOSA BLANCA und 5 S/ 128.66 S/ 643.30 107.22 107.22 107.22 107.22 107.22 107.22
04.03.05 RED DE DRENAJE PLUVIAL (Aulas + Esaclera + Administración) S/ 8,676.63 - - - - - -
04.03.05.01 CANALETA DE FIERRO GALVANIZADO e= 1/27" m 54.3 S/ 121.07 S/ 6,574.10 2,622.04 3,933.06 3.17 3.17 3.17 3.17 3.17 3.17
04.03.05.02 TUBERIA DE BAJADA P/LLUVIAS, PVC SAL Ø 4". m 35.8 S/ 58.73 S/ 2,102.53 835.00 1,252.50 2.51 2.51 2.51 2.51 2.51 2.51
04.03.06 COLUMNETAS DE PROTECCION S/ 1,169.78 - - - - - -
04.03.06.01 PROTECCION TUBERIA DE DRENAJE CONCRETO 175 kg/cm2 m3 0.65 S/ 614.24 S/ 399.26 394.81 0.74 0.74 0.74 0.74 0.74 0.74
04.03.06.02 PROTECCION TUBERIA DE DRENAJE ENCOFRADO DESENCOFRADO
m2 6.48 S/ 95.89 S/ 621.37 611.00 1.73 1.73 1.73 1.73 1.73 1.73
04.03.06.03 PROTECCION TUBERIA DE DRENAJE ACERO FY=4200KG/CM2kg 24.45 S/ 6.10 S/ 149.15 148.17 0.16 0.16 0.16 0.16 0.16 0.16
04.03.07 INSTALACIONES ELECTRICAS S/ 7,104.37 - - - - - -
04.03.07.01 SALIDA PARA CENTRO DE LUZ EN TECHO pto 48 S/ 78.92 S/ 3,788.16 3,702.72 14.24 14.24 14.24 14.24 14.24 14.24
04.03.07.02 SALIDA PARA INTERRUPTOR SIMPLE pto 18 S/ 90.51 S/ 1,629.18 1,535.94 15.54 15.54 15.54 15.54 15.54 15.54
04.03.07.03 SALIDA PARA INTERRUPTOR CONMUTADOR pto 1 S/ 110.91 S/ 110.91 93.33 2.93 2.93 2.93 2.93 2.93 2.93
04.03.07.04 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON LINEA Apto
TIERRA. 28 S/ 56.29 S/ 1,576.12 1,215.20 60.15 60.15 60.15 60.15 60.15 60.15
04.03.08 TABLEROS ELECTRICOS S/ 10,314.44 - - - - - -
04.03.08.01 TABLERO DE DISTRIBUCION TD-1 Y TD-2 INT. AUT. 1-2x30A, 1-2x20A,
und 2-2x15A,
2 1 I.D. 2x25A-30mA,
S/ 5,157.22
18 POLOS S/ 10,314.44 1,719.07 1,719.07 1,719.07 1,719.07 1,719.07 1,719.07
04.03.09 INTERRUPTORES TERMOMAGNTICOS S/ 73.58 - - - - - -
04.03.09.01 INTERRUPTOR DIFERENCIAL DE 2X20A,30mA pza 2 S/ 36.79 S/ 73.58 12.26 12.26 12.26 12.26 12.26 12.26
04.03.10 CABLES S/ 8,963.06 - - - - - -
04.03.10.01 CABLE ELECTRICO TW 2.5MM2 m 953.48 S/ 4.43 S/ 4,223.92 1,168.48 1,591.40 244.01 244.01 244.01 244.01 244.01 244.01
04.03.10.02 CABLE ELECTRICO TW 4.0MM2 m 409.96 S/ 11.56 S/ 4,739.14 2,116.88 437.04 437.04 437.04 437.04 437.04 437.04
04.03.11 CONDUCTOS S/ 5,932.39 - - - - - -
04.03.11.01 TUBERIA PVC - CEL D=20MM m 490.28 S/ 12.10 S/ 5,932.39 1,993.95 656.41 656.41 656.41 656.41 656.41 656.41
04.03.12 ARTEFACTOS ELECTRICOS S/ 5,311.28 - - - - - -
04.03.12.01 ARTEFACTO FLUORESCENTE TUBULAR DE 32W, C/DIFUSOR ACRILICO
und TRANSPARENTE,
24 SIMILAR
S/ 73.82
A TP DE JOSFEL S/ 1,771.68 436.68 222.50 222.50 222.50 222.50 222.50 222.50
04.03.12.02 ARTEFACTO 02 FLUORESCENTE DE 40W, SIMILAR A BE DE JOSFEL
und 24 S/ 134.93 S/ 3,238.32 539.72 539.72 539.72 539.72 539.72 539.72
04.03.12.03 LAMPARA LUZ DE EMERGENCIA 2 FAROS und 2 S/ 150.64 S/ 301.28 50.21 50.21 50.21 50.21 50.21 50.21
04.03.13 INSTALACIONES ESPECIALES S/ 30,000.00 - - - - - -
04.03.13.01 SUMINISTRO E INSTALACION DE LAS INSTALACIONES ESPECIALES
GLB (INTERNET,
1 TV CABLE, MULTIMEDIA,
S/ 30,000.00 ALARMA CONTRAS/INCENDIO,
30,000.00 DETECTORES DE HUMO, PULSADORES) 1,884.03 1,884.03 4,371.99 4,371.99 4,371.99 4,371.99 4,371.99 4,371.99
05 MODULO IV - NIVEL PRIMARIA S/ 1,853,730.17 - - - - - -
05.01 ESTRUCTURAS S/ 879,141.45 - - - - - -
05.01.01 TRABAJOS PRELIMINARES S/ 1,558.64 - - - - - -
05.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 341.06 S/ 1.84 S/ 627.55 596.86 5.12 5.12 5.12 5.12 5.12 5.12
05.01.01.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 341.06 S/ 2.73 S/ 931.09 917.45 2.27 2.27 2.27 2.27 2.27 2.27
05.01.02 MOVIMIENTO DE TIERRAS S/ 52,554.01 - - - - - -
05.01.02.01 EXCAVACION MANUAL DE ZANJAS PARA TERRENO NORMAL m3 339.41 S/ 73.63 S/ 24,990.76 23,833.37 192.90 192.90 192.90 192.90 192.90 192.90
05.01.02.02 EXCAVACION MANUAL DE ZANJAS PARA CIMIENTO CORRIDO m3 59.2 S/ 49.09 S/ 2,906.13 2,771.74 22.40 22.40 22.40 22.40 22.40 22.40
05.01.02.03 RELLENO CON MATERIAL PROPIO m3 204.4 S/ 21.04 S/ 4,300.58 4,102.31 33.05 33.05 33.05 33.05 33.05 33.05
05.01.02.04 ACARREO DE MATERIAL EXCEDENTE m3 233.04 S/ 24.54 S/ 5,718.80 5,453.14 44.28 44.28 44.28 44.28 44.28 44.28
05.01.02.05 ELIMINACION DE MATERIAL EXCEDENTE m2 233.04 S/ 12.91 S/ 3,008.55 2,987.57 3.50 3.50 3.50 3.50 3.50 3.50
05.01.02.06 NIVELACION Y APISONADO m2 233.19 S/ 49.87 S/ 11,629.19 11,575.55 8.94 8.94 8.94 8.94 8.94 8.94
05.01.03 OBRAS DE CONCRETO SIMPLE S/ 34,428.06 - - - - - -
05.01.03.01 FALSA ZAPATA MEZCLA 1:10 CEMENTO-HORMIGON + 30% P.G.m3
8" 61.71 S/ 265.48 S/ 16,382.77 16,153.83 38.16 38.16 38.16 38.16 38.16 38.16
05.01.03.02 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30%
m3 PG 20.4 S/ 253.55 S/ 5,172.42 5,102.24 11.70 11.70 11.70 11.70 11.70 11.70
05.01.03.03 CONCRETO PARA SOBRECOMIENTOS H: 1:8 + 25% P.M. e=15cm
m3 2.69 S/ 444.74 S/ 1,196.35 1,167.65 4.78 4.78 4.78 4.78 4.78 4.78
05.01.03.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO h=0.30 m 2 36.37 S/ 100.73 S/ 3,663.55 3,548.62 19.15 19.15 19.15 19.15 19.15 19.15
05.01.03.05 FALSO PISO, MEZCLA CONCRETO 1:8 CEMENTO-HORMIGON e=4"
m2 245.27 S/ 32.67 S/ 8,012.97 7,721.10 48.65 48.65 48.65 48.65 48.65 48.65
05.01.04 CONCRETO ARMADO S/ 733,607.43 - - - - - -
05.01.04.01 SOBRECIMIENTO ARMADO S/ 103,662.73 - - - - - -
05.01.04.01.01 CONCRETO PARA SOBRECOMIENTOS ARMADO H: 1:8 + 25%m3
P.M. e=15cm
7.74 S/ 517.12 S/ 4,002.51 3,936.56 10.99 10.99 10.99 10.99 10.99 10.99
05.01.04.01.02 CONCRETO PARA SOBRECOMIENTOS ARMADO H: 1:8 + 25%m3
P.M. e=25cm
19.53 S/ 565.87 S/ 11,051.44 10,843.06 34.73 34.73 34.73 34.73 34.73 34.73
05.01.04.01.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO m2 789.55 S/ 100.73 S/ 79,531.37 77,036.39 415.83 415.83 415.83 415.83 415.83 415.83
05.01.04.01.04 ACERO EN SOBRECIMIENTO ARMADO FY= 4200 kg/cm2 GRADO
kg 60 1459.39 S/ 6.22 S/ 9,077.41 8,960.65 19.46 19.46 19.46 19.46 19.46 19.46
05.01.04.02 ZAPATAS S/ 43,287.56 - - - - - -
05.01.04.02.01 CONCRETO F'C= 210 KG/CM2. PARA ZAPATAS m3 61.71 S/ 541.19 S/ 33,396.83 32,861.81 89.17 89.17 89.17 89.17 89.17 89.17
05.01.04.02.02 ACERO EN ZAPATAS FY= 4200 kg/cm2 GRADO 60 kg 1590.15 S/ 6.22 S/ 9,890.73 9,763.52 21.20 21.20 21.20 21.20 21.20 21.20
05.01.04.03 COLUMNAS S/ 210,229.63 - - - - - -
05.01.04.03.01 CONCRETO F'C= 210 KG/CM2. PARA COLUMNAS m3 96.59 S/ 644.68 S/ 62,269.64 30,506.02 30,506.02 209.60 209.60 209.60 209.60 209.60 209.60
05.01.04.03.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 918.33 S/ 92.14 S/ 84,614.93 41,246.79 41,246.79 353.56 353.56 353.56 353.56 353.56 353.56
05.01.04.03.03 ACERO Fy=4200 KG/CM2 GRADO 60, EN COLUMNAS kg 9553.18 S/ 6.22 S/ 59,420.78 29,328.26 - 29,328.26 127.38 127.38 127.38 127.38 127.38 127.38
05.01.04.03.04 SELLADO DE JUNTAS DE DILATACION DE COLUMNAS m 58 S/ 67.66 S/ 3,924.28 1,299.78 2,599.56 4.16 4.16 4.16 4.16 4.16 4.16
05.01.04.04 VIGAS DE CIMENTACION S/ 33,786.98 - - - - - -
05.01.04.04.01 CONCRETO f'c=210 kg/cm2 EN VIGAS DE CIMENTACION m3 14.98 S/ 541.19 S/ 8,107.03 7,977.15 21.65 21.65 21.65 21.65 21.65 21.65
05.01.04.04.02 ENCOFRADO Y DESENCOFRADO EN VIGA DE CIMENTACIONm2 111.19 S/ 84.83 S/ 9,432.25 9,125.36 51.15 51.15 51.15 51.15 51.15 51.15
05.01.04.04.03 ACERO FY= 4200 kg/cm2 GRADO 60, EN VIGAS DE CIMENTACION
kg 2612.17 S/ 6.22 S/ 16,247.70 16,038.72 34.83 34.83 34.83 34.83 34.83 34.83
05.01.04.05 COLUMNETAS S/ 13,065.20 - - - - - -
05.01.04.05.01 CONCRETO f'c=175 kg/cm2 PARA COLUMNETAS m3 2.42 S/ 456.29 S/ 1,104.22 364.74 364.74 364.74 1.67 1.67 1.67 1.67 1.67 1.67
05.01.04.05.02 ENCOFRADO Y DESENCOFRADO EN COLUMNETAS m2 56.49 S/ 123.50 S/ 6,976.52 2,236.25 2,236.25 2,236.25 44.63 44.63 44.63 44.63 44.63 44.63
05.01.04.05.03 ACERO FY= 4200 kg/cm2 GRADO 60, EN COLUMNETAS kg 801.36 S/ 6.22 S/ 4,984.46 1,640.12 1,640.12 1,640.12 10.68 10.68 10.68 10.68 10.68 10.68
05.01.04.06 VIGAS S/ 124,357.58 - - - - - -
CRONOGRAMA VALORIZADO DE AVANCE DE OBRA

Obra: MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCIÓN EDUCATIVA INTEGRADA N°277-21 y 54177 "EL BUEN PASTOR" DE TALAVERA" DISTRITO DE TALAVERA - PROVINCIA ANDAHUALAS - REGIÓN APURÍMAC
Ubicación: APURIMAC - ANDAHUAYLAS - TALAVERA

PLAZO DE EJECUCION
MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 MES 11 MES 12 MES 13 MES 14 MES 15 MES 16 MES 17 MES 18 MES 19 MES 20 MES 21 MES 22 MES 23 MES 24 MES 25 MES 26 MES 27 MES 28 MES 29 MES 30 MES 31 MES 32 MES 33 MES 34 MES 35 MES 36 TOTAL
Item Descripcion Unid Metrado PU S/ PARCIAL
MAR - 2019 ABR - 2019 MAY - 2019 JUN - 2019 JUL - 2019 AGO - 2019 SET - 2019 0CT - 2019 NOV - 2019 DIC - 2019 ENE - 2020 FEB - 2020 MAR - 2020 JUL - 2020 AGO - 2020 SET - 2020 0CT - 2020 NOV - 2020 DIC - 2020 ENE - 2021 FEB - 2021 MAR - 2021 ABR - 2021 MAY - 2021 JUN - 2021 JUL - 2021 AGO - 2021 SET -2021 0CT - 2021 NOV - 2021 DIC - 2021 ENE - 2022 FEB - 2022 MAR - 2022 ABR - 2022 MAY - 2022 1188 Dias
05.01.04.06.01 CONCRETO F'C= 210 KG/CM2. EN VIGAS m3 46.31 S/ 663.68
S/ 30,735.02 10,044.02 10,044.02 10,044.02 100.49 100.49 100.49 100.49 100.49 100.49
05.01.04.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 306.33 S/ 129.21 S/ 39,580.90 12,806.64 12,806.64 12,806.64 193.50 193.50 193.50 193.50 193.50 193.50
05.01.04.06.03 ACERO FY= 4200 kg/cm2 GRADO 60, EN VIGAS kg 8688.37 S/ 6.22 S/ 54,041.66 17,782.20 17,782.20 17,782.20 115.84 115.84 115.84 115.84 115.84 115.84
05.01.04.07 VIGUETAS S/ 11,048.93 - - - - - -
05.01.04.07.01 CONCRETO F'C= 175 KG/CM2. EN VIGUETAS m3 2.69 S/ 513.78 S/ 1,382.07 454.54 454.54 454.54 3.08 3.08 3.08 3.08 3.08 3.08
05.01.04.07.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGUETAS m2 62.85 S/ 123.50 S/ 7,761.98 2,488.02 2,488.02 2,488.02 49.65 49.65 49.65 49.65 49.65 49.65
05.01.04.07.03 ACERO FY= 4200 kg/cm2 GRADO 60, EN VIGUETAS kg 306.25 S/ 6.22 S/ 1,904.88 626.79 626.79 626.79 4.08 4.08 4.08 4.08 4.08 4.08
05.01.04.08 LOSA ALIGERADA DE CONCRETO ARMADO S/ 119,556.31 - - - - - -
05.01.04.08.01 CONCRETO F'C=210 KG/CM2 EN LOSA ALIGERADA m3 52.14 S/ 518.44 S/ 27,031.46 13,346.28 13,346.28 56.48 56.48 56.48 56.48 56.48 56.48
05.01.04.08.02 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA m2 521.37 S/ 102.88 S/ 53,638.55 25,995.51 25,995.51 274.59 274.59 274.59 274.59 274.59 274.59
05.01.04.08.03 ACERO Fy=4200 KG/CM2 GRADO 60, EN LOSA ALIGERADA kg 2474.41 S/ 6.22 S/ 15,390.83 7,596.44 7,596.44 32.99 32.99 32.99 32.99 32.99 32.99
05.01.04.08.04 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA LOSA ALIGERADA
und 4342.97 S/ 5.41 S/ 23,495.47 11,639.16 11,639.16 36.19 36.19 36.19 36.19 36.19 36.19
05.01.04.09 TECHO INCLINADO DE CONCRETO ARMADO S/ 74,612.51 - - - - - -
05.01.04.09.01 CONCRETO F'C=210 KG/CM2 EN LOSA ALIGERADA INCLINADA
m3 32.05 S/ 566.86
S/ 18,167.86 17,889.99 46.31 46.31 46.31 46.31 46.31 46.31
05.01.04.09.02 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA INCLINADA
m2 320.46 S/ 102.97
S/ 32,997.77 31,985.11 168.78 168.78 168.78 168.78 168.78 168.78
05.01.04.09.03 ACERO Fy=4200 KG/CM2 GRADO 60, EN LOSA ALIGERADA INCLINADA
kg 1447.8 S/ 6.22 S/ 9,005.32 8,889.49 19.30 19.30 19.30 19.30 19.30 19.30
05.01.04.09.04 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA LOSA ALIGERADA
und 2669.42
INCLINADA S/ 5.41 S/ 14,441.56 14,308.09 22.24 22.24 22.24 22.24 22.24 22.24
05.01.05 COBERTURAS S/ 55,742.83 - - - - - -
05.01.05.01 IMPERMEABILIZACION DE TECHO CON PINTURA ASFALTICA m2 378.72 S/ 6.84 S/ 2,590.44 1,720.52 737.37 132.55 0.00 0.00 0.00 0.00 0.00 0.00
05.01.05.02 VIGUETAS DE MADERA P/FIJAR COBERTURA DE TEJA ANDINAm 207.9 S/ 19.61 S/ 4,076.92 3,140.54 936.38 - 0.00 0.00 0.00 0.00 0.00 0.00
05.01.05.03 COBERTURA DE TEJA ANDINA m2 378.72 S/ 116.22 S/ 44,014.84 30,653.98 13,137.42 37.24 37.24 37.24 37.24 37.24 37.24
05.01.05.04 CUMBRERAS DE TEJA ANDINA m 34.65 S/ 146.05 S/ 5,060.63 3,536.62 1,515.69 1.39 1.39 1.39 1.39 1.39 1.39
05.01.06 VARIOS S/ 1,250.48 - - - - - -
05.01.06.01 GARGOLA PREFABRICADA und 8 S/ 156.31 S/ 1,250.48 1,027.28 37.20 37.20 37.20 37.20 37.20 37.20
05.02 ARQUITECTURA S/ 772,819.72 - - - - - -
05.02.01 MUROS Y TABIQUES DE ALBAÑILERIA S/ 154,754.56 - - - - - -
05.02.01.01 MURO DE LADRILLO KK DE CABEZA JUNTA 1.5 cm. MORTEROm2
1:4 230.25 S/ 167.45 S/ 38,555.36 12,547.09 12,547.09 12,547.09 152.35 152.35 152.35 152.35 152.35 152.35
05.02.01.02 MURO DE LADRILLO KK DE SOGA JUNTA 1.5 cm. MORTERO 1:4m2 938.68 S/ 123.79 S/ 116,199.20 37,910.16 37,910.16 37,910.16 411.46 411.46 411.46 411.46 411.46 411.46
05.02.02 REVOQUES ENLUCIDOS Y MOLDURAS S/ 184,557.55 - - - - - -
05.02.02.01 TARRAJEO DE COLUMNAS m² 374.43 S/ 68.16 S/ 25,521.15 19,560.22 993.49 993.49 993.49 993.49 993.49 993.49
05.02.02.02 TARRAJEO DE VIGAS m² 306.33 S/ 66.55 S/ 20,386.26 19,390.69 165.93 165.93 165.93 165.93 165.93 165.93
05.02.02.03 TARRAJEO MUROS EXTERIOR MORTERO 1:4 m2 177.71 S/ 36.07 S/ 6,410.00 2,635.44 2,635.44 189.85 189.85 189.85 189.85 189.85 189.85
05.02.02.04 TARRAJEO MUROS INTERIORES MORTERO 1:4 m2 1294.51 S/ 36.07 S/ 46,692.98 22,697.08 4,539.42 3,242.75 3,242.75 3,242.75 3,242.75 3,242.75 3,242.75
05.02.02.05 VESTIDURA DE DERRAME E=0.15M m 446.55 S/ 37.61 S/ 16,794.75 13,016.93 2,603.39 195.74 195.74 195.74 195.74 195.74 195.74
05.02.02.06 TARRAJEO PRIMARIO Y RAYADO CON CEMENTO : ARENA. m2 505.22 S/ 33.96 S/ 17,157.27 13,560.95 2,712.19 147.36 147.36 147.36 147.36 147.36 147.36
05.02.02.07 BRUÑAS DE 1 X 1 cm m 4494.35 S/ 11.48 S/ 51,595.14 39,849.90 7,969.98 629.21 629.21 629.21 629.21 629.21 629.21
05.02.03 CIELORRASOS S/ 62,939.28 - - - - - -
05.02.03.01 CIELORRASOS CON MEZCLA CEMENTO : ARENA 1:5 m² 973.84 S/ 64.63 S/ 62,939.28 40,005.35 20,002.67 488.54 488.54 488.54 488.54 488.54 488.54
05.02.04 PISOS Y PAVIMENTOS S/ 109,963.91 - - - - - -
05.02.04.01 CONTRAPISO DE 48MM m2 789.3 S/ 39.00 S/ 30,782.70 30,372.26 68.41 68.41 68.41 68.41 68.41 68.41
05.02.04.02 PISO DE CERAMICO DE ALTO TRANSITO 45x45 cm. m2 165.11 S/ 89.31 S/ 14,745.97 2,457.66 2,457.66 2,457.66 2,457.66 2,457.66 2,457.66
05.02.04.03 PISO DE PORCELANATO 0.60X0.60M m2 632.4 S/ 101.89 S/ 64,435.24 16,310.61 20,420.41 4,617.37 4,617.37 4,617.37 4,617.37 4,617.37 4,617.37
05.02.05 CEMENTO PULIDO, BRUÑADO y COLOREADO S/ 4,500.15 - - - - - -
05.02.05.01 VEREDAS DE CEMENTO FROTACHADO y BRUÑADOf´c=140 kg/cm2,
m3 e=15cm
17.15 S/ 54.32 S/ 931.59 302.12 162.39 77.85 77.85 77.85 77.85 77.85 77.85
05.02.05.02 JUNTA DE DILATACION ASFALTICA 1" m 29.3 S/ 10.74 S/ 314.68 - - 52.45 52.45 52.45 52.45 52.45 52.45
05.02.05.03 AFIRMADO E=4" m3 6.62 S/ 214.48 S/ 1,419.86 1,329.76 - - 15.02 15.02 15.02 15.02 15.02 15.02
05.02.05.04 ENCOFRADO Y DESENCOFRADO DE VEREDAS h=0.15 m. m2 21.62 S/ 84.83 S/ 1,834.02 413.52 558.88 143.60 143.60 143.60 143.60 143.60 143.60
05.02.06 ZOCALOS Y CONTRAZOCALOS S/ 17,182.05 - - - - - -
05.02.06.01 ZOCALO DE CERAMICO BLANCO DE 20 X 30 cm. H= 2.05 m. m2 319.89 S/ 17.89 S/ 5,722.83 5,722.83 - - - - - - -
05.02.06.02 ZOCALO DE CEMENTO S/COLOREAR h=0.30 m, PINTADO m2 24.45 S/ 17.89 S/ 437.41 437.41 - - - - - -
05.02.06.03 CONTRAZOCALO DE PORCELANATO H=0.10M m 429.7 S/ 25.65 S/ 11,021.81 1,302.07 2,904.42 3,630.52 530.80 530.80 530.80 530.80 530.80 530.80
05.02.07 CARPINTERIA DE MADERA S/ 33,942.92 - - - - - -
05.02.07.01 PUERTA DE MADERA AGUANO TABLERO REBAJADO m2 36.27 S/ 935.84 S/ 33,942.92 5,657.15 5,657.15 5,657.15 5,657.15 5,657.15 5,657.15
05.02.08 CARPINTERIA DE ALUMINIO S/ 55,044.44 - - - - - -
05.02.08.01 VENTANA DE ALUMINIO NATURAL PESADO e=1.5mm INC. VIDRIO
m2 TEMPLADO
151.6 S/ 363.09
S/ 55,044.44 38,273.24 16,402.82 61.40 61.40 61.40 61.40 61.40 61.40

05.02.09 CARPINTERIA METALICA S/ 26,887.50 - - - - - -


05.02.09.01 PUERTA METALICA und 30 S/ 300.00 S/ 9,000.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00
05.02.09.02 DIVISION METALICA EN SS.HH m 64.35 S/ 250.00 S/ 16,087.50 2,681.25 2,681.25 2,681.25 2,681.25 2,681.25 2,681.25
05.02.09.03 DIVISION METALICA EN URINARIO und 12 S/ 150.00 S/ 1,800.00 300.00 300.00 300.00 300.00 300.00 300.00
05.02.10 CERRAJERIA S/ 7,324.17 - - - - - -
05.02.10.01 BISAGRAS CAPUCHINA ALUMINIZADA DE 4"x 4" pza 42 S/ 17.30 S/ 726.60 121.10 121.10 121.10 121.10 121.10 121.10
05.02.10.02 CERRADURA DE TRES GOLPÈS PARA PUERTA pza 9 S/ 105.75 S/ 951.75 158.63 158.63 158.63 158.63 158.63 158.63
05.02.10.03 BRAZO EXTERIOR PARA VENTANA PROYECTANTE pza 72 S/ 68.58 S/ 4,937.76 822.96 822.96 822.96 822.96 822.96 822.96
05.02.10.04 CERROJO "CARACOL" DE ALUMINIO SEGURIDAD PARA VENTANA
pza 30 S/ 13.15
S/ 394.50 65.75 65.75 65.75 65.75 65.75 65.75

05.02.10.05 CERRADURA TUBULAR - TIPO MANIJA pza 3 S/ 104.52 S/ 313.56 52.26 52.26 52.26 52.26 52.26 52.26
05.02.11 PINTURA S/ 115,723.19 - - - - - -
05.02.11.01 PINTURA LATEX EN CIELO RASO 2 MANOS m2 973.84 S/ 21.40
S/ 20,840.18 3,139.17 7,748.02 766.41 573.20 5,545.96 511.24 511.24 511.24 511.24 511.24 511.24

05.02.11.02 PINTURA SATINADO EN EXTERIORES, MUROS, COLUMNAS, VIGAS,


m2 DOS
450.01
MANOS S/ 23.94
S/ 10,773.24 1,789.24 1,633.78 2,671.75 1,912.71 1,865.40 150.06 150.06 150.06 150.06 150.06 150.06

05.02.11.03 PINTURA SATINADO EN INTERIORES, MUROS, COLUMNAS, VIGAS,


m2 DOS
1702.97
MANOS S/ 23.94 S/ 40,769.10 6,771.01 6,647.06 6,647.06 3,450.66 3,450.66 3,450.66 3,450.66 3,450.66 3,450.66
05.02.11.04 PINTURA ESMALTE EN ZOCALOS Y CONTRAZOCALOS m 24.45 S/ 22.36 S/ 546.70 - 91.12 91.12 91.12 91.12 91.12 91.12
05.02.11.05 PINTURA BARNIZ EN CARPINTERIA DE MADERA m² 222.97 S/ 24.43 S/ 5,447.16 - 907.86 907.86 907.86 907.86 907.86 907.86
05.02.11.06 PASTA MURAL PARA INTERIORES m2 3730.95 S/ 10.01 S/ 37,346.81 3,501.25 5,571.95 1,169.88 1,662.93 2,776.75 3,777.34 3,777.34 3,777.34 3,777.34 3,777.34 3,777.34
05.03 INSTALACIONES SANITARIAS S/ 106,653.86 - - - - - -
05.03.01 MOVIMIENTO DE TIERRAS S/ 29.87 - - - - - -
05.03.01.01 EXCAVACION DE ZANJA m3 0.32 S/ 73.63 S/ 23.56 22.47 0.18 0.18 0.18 0.18 0.18 0.18
05.03.01.02 RELLENO DE ZANJA m3 0.3 S/ 21.04 S/ 6.31 6.02 0.05 0.05 0.05 0.05 0.05 0.05
05.03.02 SISTEMA DE AGUA FRIA S/ 6,826.03 - - - - - -
05.03.02.01 SALIDA DE AGUA FRIA CON TUBERIA PVC C-10 1/2" pto 75 S/ 23.75 S/ 1,781.25 563.25 1,126.50 15.25 15.25 15.25 15.25 15.25 15.25
05.03.02.02 CAJA PARA VALVULAS EN NICHO CERAMICO und 18 S/ 57.01 S/ 1,026.18 72.00 159.03 159.03 159.03 159.03 159.03 159.03
05.03.02.03 RED DE TUBERIA DE 1" PVC - SAP m 17.4 S/ 24.11 S/ 419.51 419.51 - - - - - - -
05.03.02.04 RED DE TUBERIA DE 3/4" PVC - SAP m 144.47 S/ 20.65 S/ 2,983.31 2,908.18 12.52 12.52 12.52 12.52 12.52 12.52
05.03.02.05 VALVULA TIPO BOLA DE PVC DE 3/4" und 18 S/ 34.21 S/ 615.78 87.00 528.78 - - - - - -
05.03.03 INSTALACIONES SANITARIAS S/ 20,352.31 - - - - - -
05.03.03.01 SALIDA DE DESAGUE EN PVC SAL DE 4" pto 41 S/ 119.51 S/ 4,899.91 1,549.66 1,549.66 1,549.66 41.82 41.82 41.82 41.82 41.82 41.82
05.03.03.02 SALIDA DE DESAGUE EN PVC SAL DE 2" pto 45 S/ 99.31 S/ 4,468.95 1,397.85 1,397.85 1,397.85 45.90 45.90 45.90 45.90 45.90 45.90
05.03.03.03 SUMINISTRO Y COLOCACION DE TUBERIA EN PVC SAL DE 4" m 204 S/ 16.97 S/ 3,461.88 894.20 894.20 894.20 129.88 129.88 129.88 129.88 129.88 129.88
05.03.03.04 SUMINISTRO Y COLOCACION DE TUBERIA EN PVC SAL DE 2" m 186 S/ 12.77 S/ 2,375.22 666.50 666.50 666.50 62.62 62.62 62.62 62.62 62.62 62.62
05.03.03.05 CODO DE 90 DE 4" und 39 S/ 46.52 S/ 1,814.28 484.99 484.99 484.99 59.89 59.89 59.89 59.89 59.89 59.89
05.03.03.06 CODO DE 45 DE 4" und 6 S/ 40.49 S/ 242.94 75.10 75.10 75.10 2.94 2.94 2.94 2.94 2.94 2.94
05.03.03.07 YEE DE 4" und 33 S/ 30.95 S/ 1,021.35 77.84 77.84 77.84 131.31 131.31 131.31 131.31 131.31 131.31
05.03.03.08 YEE DE 4" A 2" und 6 S/ 31.46 S/ 188.76 59.40 59.40 59.40 1.76 1.76 1.76 1.76 1.76 1.76
05.03.03.09 YEE DE 2" und 42 S/ 23.96 S/ 1,006.32 88.80 88.80 88.80 123.32 123.32 123.32 123.32 123.32 123.32
05.03.03.10 SUMIDERO DE 2" und 15 S/ 58.18 S/ 872.70 276.85 276.85 276.85 7.03 7.03 7.03 7.03 7.03 7.03
05.03.04 APARATOS Y ACCESORIOS SANITARIOS S/ 53,634.48 - - - - - -
05.03.04.01 INODORO TANQUE BAJO, BLANCO NACIONAL und 33 S/ 897.75 S/ 29,625.75 6,130.08 1,021.68 3,745.67 3,745.67 3,745.67 3,745.67 3,745.67 3,745.67
05.03.04.02 LAVATORIO DE LOSA BLANCA NACIONAL und 27 S/ 547.80 S/ 14,790.60 4,028.13 671.36 1,681.85 1,681.85 1,681.85 1,681.85 1,681.85 1,681.85
05.03.04.03 URINARIO und 15 S/ 331.49 S/ 4,972.35 1,683.72 280.62 501.34 501.34 501.34 501.34 501.34 501.34
05.03.04.04 PAPELERA DE LOSA BLANCA und 33 S/ 128.66 S/ 4,245.78 1,639.04 273.17 388.93 388.93 388.93 388.93 388.93 388.93
05.03.05 RED DE DRENAJE PLUVIAL (Aulas + Esaclera + Administración) S/ 11,232.68 - - - - - -
05.03.05.01 CANALETA DE FIERRO GALVANIZADO e= 1/27" m 69.3 S/ 121.07 S/ 8,390.15 8,333.33 9.47 9.47 9.47 9.47 9.47 9.47
05.03.05.02 TUBERIA DE BAJADA P/LLUVIAS, PVC SAL Ø 4". m 48.4 S/ 58.73 S/ 2,842.53 1,677.06 1,165.47 - - - - - - -
05.03.06 COLUMNETAS DE PROTECCION S/ 1,169.78 - - - - - -
05.03.06.01 PROTECCION TUBERIA DE DRENAJE CONCRETO 175 kg/cm2 m3 0.65 S/ 614.24 S/ 399.26 200.44 33.14 33.14 33.14 33.14 33.14 33.14
05.03.06.02 PROTECCION TUBERIA DE DRENAJE ENCOFRADO DESENCOFRADO
m2 6.48 S/ 95.89 S/ 621.37 305.50 52.65 52.65 52.65 52.65 52.65 52.65
05.03.06.03 PROTECCION TUBERIA DE DRENAJE ACERO FY=4200KG/CM2kg 24.45 S/ 6.10 S/ 149.15 74.11 12.51 12.51 12.51 12.51 12.51 12.51
05.03.07 MESAS DE LAVAMANOS S/ 13,408.71 - - - - - -
05.03.07.01 ESTRUCTURAS S/ 3,017.29 - - - - - -
05.03.07.01.01 MURO DE CONCRETO S/ 1,192.76 - - - - - -
05.03.07.01.01.01 CONCRETO F´C=175 KG/CM2 MUROS DE CONCRETO m3 0.71 S/ 350.21 S/ 248.65 238.23 1.74 1.74 1.74 1.74 1.74 1.74
05.03.07.01.01.02 ENCOFRADO Y DESENCOFRADO EN MURO DE CONCRETOm2 8.66 S/ 68.80 S/ 595.81 589.75 1.01 1.01 1.01 1.01 1.01 1.01
05.03.07.01.01.03 ACERO GRADO 60° EN MURO kg 56.45 S/ 6.17 S/ 348.30 346.04 0.38 0.38 0.38 0.38 0.38 0.38
05.03.07.01.02 MESAS DE LAVAMANOS S/ 1,824.53 - - - - - -
05.03.07.01.02.01 CONCRETO F´C=175 KG/CM2 MESA DE LAVAMANO m3 0.88 S/ 350.21 S/ 308.18 294.97 2.20 2.20 2.20 2.20 2.20 2.20
05.03.07.01.02.02 ENCOFRADO Y DESENCOFRADO EN LAVAMANO m2 14.07 S/ 68.80 S/ 968.02 958.17 1.64 1.64 1.64 1.64 1.64 1.64
05.03.07.01.02.03 ACERO FY= 4200kg/cm2 GRADO 60, LAVAMANO kg 88.87 S/ 6.17 S/ 548.33 544.77 0.59 0.59 0.59 0.59 0.59 0.59
05.03.07.02 ARQUITECTURA S/ 10,391.42 - - - - - -
05.03.07.02.01 REVOQUES ENLUCIDOS Y MOLDURAS S/ 10,391.42 - - - - - -
05.03.07.02.01.01 PORCELANATO TIPO GRANITO m2 33.08 S/ 314.13 S/ 10,391.42 606.37 1,975.19 1,301.64 1,301.64 1,301.64 1,301.64 1,301.64 1,301.64
05.04 INSTALACIONES ELECTRICAS S/ 95,115.14 - - - - - -
05.04.01 SALIDA PARA CENTRO DE LUZ EN TECHO pto 111 S/ 78.92 S/ 8,760.12 2,770.19 2,770.19 2,770.19 74.93 74.93 74.93 74.93 74.93 74.93
CRONOGRAMA VALORIZADO DE AVANCE DE OBRA

Obra: MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCIÓN EDUCATIVA INTEGRADA N°277-21 y 54177 "EL BUEN PASTOR" DE TALAVERA" DISTRITO DE TALAVERA - PROVINCIA ANDAHUALAS - REGIÓN APURÍMAC
Ubicación: APURIMAC - ANDAHUAYLAS - TALAVERA

PLAZO DE EJECUCION
MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 MES 11 MES 12 MES 13 MES 14 MES 15 MES 16 MES 17 MES 18 MES 19 MES 20 MES 21 MES 22 MES 23 MES 24 MES 25 MES 26 MES 27 MES 28 MES 29 MES 30 MES 31 MES 32 MES 33 MES 34 MES 35 MES 36 TOTAL
Item Descripcion Unid Metrado PU S/ PARCIAL
MAR - 2019 ABR - 2019 MAY - 2019 JUN - 2019 JUL - 2019 AGO - 2019 SET - 2019 0CT - 2019 NOV - 2019 DIC - 2019 ENE - 2020 FEB - 2020 MAR - 2020 JUL - 2020 AGO - 2020 SET - 2020 0CT - 2020 NOV - 2020 DIC - 2020 ENE - 2021 FEB - 2021 MAR - 2021 ABR - 2021 MAY - 2021 JUN - 2021 JUL - 2021 AGO - 2021 SET -2021 0CT - 2021 NOV - 2021 DIC - 2021 ENE - 2022 FEB - 2022 MAR - 2022 ABR - 2022 MAY - 2022 1188 Dias
05.04.02 SALIDA PARA INTERRUPTOR SIMPLE pto 21 S/ 90.51 S/ 1,900.71 581.42 581.42 581.42 26.08 26.08 26.08 26.08 26.08 26.08
05.04.03 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON LINEA A TIERRA.
pto 36 S/ 56.29 S/ 2,026.44 507.24 507.24 507.24 84.12 84.12 84.12 84.12 84.12 84.12
05.04.04 TABLEROS ELECTRICOS S/ 15,471.66 - - - - - -
05.04.04.01 TABLERO DE DISTRIBUCION TD-1 Y TD-2 INT. AUT. 1-2x30A, 1-2x20A,
und 2-2x15A,
3 1 I.D. 2x25A-30mA,
S/ 5,157.22
18 POLOS S/ 15,471.66 575.08 1,150.16 581.89 2,194.09 2,194.09 2,194.09 2,194.09 2,194.09 2,194.09
05.04.05 INTERRUPTORES TERMOMAGNTICOS S/ 110.37 - - - - - -
05.04.05.01 INTERRUPTOR DIFERENCIAL DE 2X20A,30mA pza 3 S/ 36.79 S/ 110.37 49.57 21.25 6.59 6.59 6.59 6.59 6.59 6.59
05.04.06 CABLES S/ 13,946.36 - - - - - -
05.04.06.01 CABLE ELECTRICO TW 2.5MM2 m 1716.13 S/ 4.43 S/ 7,602.46 1,184.69 584.24 972.25 972.25 972.25 972.25 972.25 972.25
05.04.06.02 CABLE ELECTRICO TW 4.0MM2 m 548.78 S/ 11.56
S/ 6,343.90 2,108.23 1,058.44 529.54 529.54 529.54 529.54 529.54 529.54
05.04.07 CONDUCTOS S/ 8,276.40 - - - - - -
05.04.07.01 TUBERIA PVC - CEL D=20MM m 684 S/ 12.10 S/ 8,276.40 718.20 718.20 718.20 2,154.60 661.20 661.20 661.20 661.20 661.20 661.20
05.04.08 ARTEFACTOS ELECTRICOS S/ 14,623.08 - - - - - -
05.04.08.01 ARTEFACTO FLUORESCENTE TUBULAR DE 32W, C/DIFUSOR ACRILICO
und TRANSPARENTE,
42 SIMILAR
S/ 73.82
A TP DE JOSFEL S/ 3,100.44 1,320.72 628.12 1,151.61 0.00 0.00 0.00 0.00 0.00 0.00
05.04.08.02 ARTEFACTO 02 FLUORESCENTE DE 40W, SIMILAR A BE DE JOSFEL
und 72 S/ 134.93 S/ 9,714.96 2,451.25 1,165.79 5,220.54 877.38 0.00 0.00 0.00 0.00 0.00 0.00
05.04.08.03 LAMPARA LUZ DE EMERGENCIA 2 FAROS und 12 S/ 150.64 S/ 1,807.68 301.28 301.28 301.28 301.28 301.28 301.28
05.04.09 INSTALACIONES ESPECIALES S/ 30,000.00 - - - - - -
05.04.09.01 SUMINISTRO E INSTALACION DE LAS INSTALACIONES ESPECIALES
GLB (INTERNET,
1 TV CABLE, MULTIMEDIA,
S/ 30,000.00 ALARMA CONTRAS/INCENDIO,
30,000.00 DETECTORES DE HUMO, PULSADORES) 3,140.05 3,108.65 3,171.45 3,429.97 3,429.97 3,429.97 3,429.97 3,429.97 3,429.97
06 MODULO V - NIVEL PRIMARIA S/ 2,079,715.33 - - - - - -
06.01 ESTRUCTURAS S/ 961,424.48 - - - - - -
06.01.01 TRABAJOS PRELIMINARES S/ 1,854.14 - - - - - -
06.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 405.72 S/ 1.84 S/ 746.52 710.01 6.09 6.09 6.09 6.09 6.09 6.09
06.01.01.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 405.72 S/ 2.73 S/ 1,107.62 1,091.39 2.71 2.71 2.71 2.71 2.71 2.71
06.01.02 MOVIMIENTO DE TIERRAS S/ 59,210.81 - - - - - -
06.01.02.01 EXCAVACION MANUAL DE ZANJAS PARA TERRENO NORMAL m3 389.62 S/ 73.63 S/ 28,687.72 25,953.31 1,405.80 221.43 221.43 221.43 221.43 221.43 221.43
06.01.02.02 EXCAVACION MANUAL DE ZANJAS PARA CIMIENTO CORRIDO m3 72.91 S/ 49.09 S/ 3,579.15 3,413.65 27.58 27.58 27.58 27.58 27.58 27.58
06.01.02.03 RELLENO CON MATERIAL PROPIO m3 231.75 S/ 21.04 S/ 4,876.02 4,651.22 37.47 37.47 37.47 37.47 37.47 37.47
06.01.02.04 ACARREO DE MATERIAL EXCEDENTE m3 276.94 S/ 24.54 S/ 6,796.11 6,247.80 232.60 52.62 52.62 52.62 52.62 52.62 52.62
06.01.02.05 ELIMINACION DE MATERIAL EXCEDENTE m2 276.94 S/ 12.91 S/ 3,575.30 3,422.94 127.43 4.15 4.15 4.15 4.15 4.15 4.15
06.01.02.06 NIVELACION Y APISONADO m2 234.54 S/ 49.87 S/ 11,696.51 11,642.57 8.99 8.99 8.99 8.99 8.99 8.99
06.01.03 OBRAS DE CONCRETO SIMPLE S/ 41,633.56 - - - - - -
06.01.03.01 FALSA ZAPATA MEZCLA 1:10 CEMENTO-HORMIGON + 30% P.G.m3
8" 70.84 S/ 265.48 S/ 18,806.60 17,423.41 1,120.38 43.80 43.80 43.80 43.80 43.80 43.80
06.01.03.02 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30%
m3 PG 33.61 S/ 253.55 S/ 8,521.82 1,323.58 7,082.61 19.27 19.27 19.27 19.27 19.27 19.27
06.01.03.03 CONCRETO PARA SOBRECOMIENTOS H: 1:8 + 25% P.M. e=15cm
m3 3.41 S/ 444.74 S/ 1,516.56 1,480.18 6.06 6.06 6.06 6.06 6.06 6.06
06.01.03.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO h=0.30 m 2 47.41 S/ 100.73 S/ 4,775.61 4,625.79 24.97 24.97 24.97 24.97 24.97 24.97
06.01.03.05 FALSO PISO, MEZCLA CONCRETO 1:8 CEMENTO-HORMIGON e=4"
m2 245.27 S/ 32.67 S/ 8,012.97 7,721.10 48.65 48.65 48.65 48.65 48.65 48.65
06.01.04 CONCRETO ARMADO S/ 794,619.37 - - - - - -
06.01.04.01 SOBRECIMIENTO ARMADO S/ 58,726.82 - - - - - -
06.01.04.01.01 CONCRETO PARA SOBRECOMIENTOS ARMADO H: 1:8 + 25%m3
P.M. e=15cm
8.68 S/ 517.12 S/ 4,488.60 4,190.00 224.65 12.33 12.33 12.33 12.33 12.33 12.33
06.01.04.01.02 CONCRETO PARA SOBRECOMIENTOS ARMADO H: 1:8 + 25%m3
P.M. e=25cm
17.54 S/ 565.87 S/ 9,925.36 7,228.70 2,509.50 31.19 31.19 31.19 31.19 31.19 31.19
06.01.04.01.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO m2 373.83 S/ 100.73 S/ 37,655.90 32,084.14 4,390.45 196.88 196.88 196.88 196.88 196.88 196.88
06.01.04.01.04 ACERO EN SOBRECIMIENTO ARMADO FY= 4200 kg/cm2 GRADO
kg 60 1070.25 S/ 6.22 S/ 6,656.96 5,775.02 796.31 14.27 14.27 14.27 14.27 14.27 14.27
06.01.04.02 ZAPATAS S/ 66,725.32 - - - - - -
06.01.04.02.01 CONCRETO F'C= 210 KG/CM2. PARA ZAPATAS m3 100.02 S/ 541.19 S/ 54,129.82 53,265.21 144.10 144.10 144.10 144.10 144.10 144.10
06.01.04.02.02 ACERO EN ZAPATAS FY= 4200 kg/cm2 GRADO 60 kg 2025 S/ 6.22 S/ 12,595.50 11,907.67 525.83 27.00 27.00 27.00 27.00 27.00 27.00
06.01.04.03 COLUMNAS S/ 245,874.21 - - - - - -
06.01.04.03.01 CONCRETO F'C= 210 KG/CM2. PARA COLUMNAS m3 106.79 S/ 644.68 S/ 68,845.38 19,789.91 19,789.91 22,790.29 5,084.86 231.73 231.73 231.73 231.73 231.73 231.73
06.01.04.03.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 1037.52 S/ 92.14 S/ 95,597.09 25,183.84 48,135.41 12,010.27 7,870.90 399.44 399.44 399.44 399.44 399.44 399.44
06.01.04.03.03 ACERO Fy=4200 KG/CM2 GRADO 60, EN COLUMNAS kg 12493.64 S/ 6.22 S/ 77,710.44 46,176.02 30,534.93 - 166.58 166.58 166.58 166.58 166.58 166.58
06.01.04.03.04 SELLADO DE JUNTAS DE DILATACION DE COLUMNAS m 55 S/ 67.66 S/ 3,721.30 1,882.44 1,344.60 494.26 - - - - - -
06.01.04.04 VIGAS DE CIMENTACION S/ 31,834.22 - - - - - -
06.01.04.04.01 CONCRETO f'c=210 kg/cm2 EN VIGAS DE CIMENTACION m3 13.87 S/ 541.19 S/ 7,506.31 5,916.30 1,469.76 20.04 20.04 20.04 20.04 20.04 20.04
06.01.04.04.02 ENCOFRADO Y DESENCOFRADO EN VIGA DE CIMENTACIONm2 95.43 S/ 84.83 S/ 8,095.33 5,096.22 2,735.72 43.90 43.90 43.90 43.90 43.90 43.90
06.01.04.04.03 ACERO FY= 4200 kg/cm2 GRADO 60, EN VIGAS DE CIMENTACION
kg 2609.74 S/ 6.22 S/ 16,232.58 11,613.74 4,410.06 34.80 34.80 34.80 34.80 34.80 34.80
06.01.04.05 COLUMNETAS S/ 13,339.03 - - - - - -
06.01.04.05.01 CONCRETO f'c=175 kg/cm2 PARA COLUMNETAS m3 3.45 S/ 456.29 S/ 1,574.20 393.38 605.89 560.68 2.37 2.37 2.37 2.37 2.37 2.37
06.01.04.05.02 ENCOFRADO Y DESENCOFRADO EN COLUMNETAS m2 77.91 S/ 95.89 S/ 7,470.79 1,869.86 2,665.68 1,294.02 1,371.66 44.93 44.93 44.93 44.93 44.93 44.93
06.01.04.05.03 ACERO FY= 4200 kg/cm2 GRADO 60, EN COLUMNETAS kg 690.36 S/ 6.22 S/ 4,294.04 1,845.56 177.08 796.67 1,419.51 9.20 9.20 9.20 9.20 9.20 9.20
06.01.04.06 VIGAS S/ 131,066.65 - - - - - -
06.01.04.06.01 CONCRETO F'C= 210 KG/CM2. EN VIGAS m3 54.68 S/ 663.68 S/ 36,290.02 9,066.27 12,557.74 12,557.74 2,108.27 0.00 0.00 0.00 0.00 0.00 0.00
06.01.04.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 381.77 S/ 84.83 S/ 32,385.55 21,346.25 9,451.18 1,588.11 - - - - 0.00 0.00 0.00 0.00 0.00 0.00
06.01.04.06.03 ACERO FY= 4200 kg/cm2 GRADO 60, EN VIGAS kg 10030.72 S/ 6.22 S/ 62,391.08 21,346.26 18,896.10 3,691.45 3,691.45 3,691.45 3,691.45 3,691.45 3,691.45
06.01.04.07 VIGUETAS S/ 11,944.36 - - - - - -
06.01.04.07.01 CONCRETO F'C= 175 KG/CM2. EN VIGUETAS m3 2.98 S/ 513.78 S/ 1,531.06 288.94 1,003.70 217.98 3.41 3.41 3.41 3.41 3.41 3.41
06.01.04.07.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGUETAS m2 69.5 S/ 123.50
S/ 8,583.25 1,488.06 4,966.54 1,799.21 54.91 54.91 54.91 54.91 54.91 54.91
06.01.04.07.03 ACERO FY= 4200 kg/cm2 GRADO 60, EN VIGUETAS kg 294.22 S/ 6.22
S/ 1,830.05 787.39 787.46 231.66 3.92 3.92 3.92 3.92 3.92 3.92
06.01.04.08 LOSA ALIGERADA DE CONCRETO ARMADO S/ 135,543.35 - - - - - -
06.01.04.08.01 CONCRETO F'C=210 KG/CM2 EN LOSA ALIGERADA m3 53.29 S/ 518.44 S/ 27,627.67 13,643.20 13,638.08 57.73 57.73 57.73 57.73 57.73 57.73
06.01.04.08.02 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA m2 521.37 S/ 102.88 S/ 53,638.55 25,995.01 25,996.01 274.59 274.59 274.59 274.59 274.59 274.59
06.01.04.08.03 ACERO Fy=4200 KG/CM2 GRADO 60, EN LOSA ALIGERADA kg 4948.82 S/ 6.22 S/ 30,781.66 15,192.88 15,192.88 65.98 65.98 65.98 65.98 65.98 65.98
06.01.04.08.04 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA LOSA ALIGERADA
und 4342.97 S/ 5.41 S/ 23,495.47 11,639.16 11,639.16 36.19 36.19 36.19 36.19 36.19 36.19
06.01.04.09 LOSA MACIZA DE CONCRETO ARMADO S/ 3,171.55 - - - - - -
06.01.04.09.01 CONCRETO F'C=210 KG/CM2 EN LOSA MACIZA m3 1.29 S/ 505.64 S/ 652.28 642.92 1.56 1.56 1.56 1.56 1.56 1.56
06.01.04.09.02 ENCOFRADO Y DESENCOFRADO EN LOSA MACIZA m2 6.46 S/ 109.82 S/ 709.44 690.32 3.19 3.19 3.19 3.19 3.19 3.19
06.01.04.09.03 ACERO Fy=4200 KG/CM2 GRADO 60, EN LOSA MACIZA kg 290.97 S/ 6.22 S/ 1,809.83 1,786.56 3.88 3.88 3.88 3.88 3.88 3.88
06.01.04.10 TECHO INCLINADO DE CONCRETO ARMADO S/ 82,216.15 - - - - - -
06.01.04.10.01 CONCRETO F'C=210 KG/CM2 EN LOSA ALIGERADA INCLINADA
m3 35.65 S/ 566.86 S/ 20,208.56 19,899.47 51.51 51.51 51.51 51.51 51.51 51.51
06.01.04.10.02 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA INCLINADA
m2 356.53 S/ 102.97 S/ 36,711.89 35,585.26 187.77 187.77 187.77 187.77 187.77 187.77
06.01.04.10.03 ACERO Fy=4200 KG/CM2 GRADO 60, EN LOSA ALIGERADA INCLINADA
kg 1483.67 S/ 6.22 S/ 9,228.43 9,109.73 19.78 19.78 19.78 19.78 19.78 19.78
06.01.04.10.04 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA LOSA ALIGERADA
und 2969.92
INCLINADA S/ 5.41 S/ 16,067.27 15,918.77 24.75 24.75 24.75 24.75 24.75 24.75
06.01.04.11 ESCALERA DOS TRAMOS DE CONCRETO ARMADO S/ 14,177.71 - - - - - -
06.01.04.11.01 CONCRETO F'C=210 KG/CM2 EN ESCALERA m3 9.41 S/ 489.40 S/ 4,605.25 4,556.13 8.19 8.19 8.19 8.19 8.19 8.19
06.01.04.11.02 ENCOFRADO Y DESENCOFRADO EN ESCALERA m2 59.61 S/ 90.85 S/ 5,415.57 5,277.87 22.95 22.95 22.95 22.95 22.95 22.95
06.01.04.11.03 ACERO Fy=4200 KG/CM2 GRADO 60, EN ESCALERA kg 668.31 S/ 6.22 S/ 4,156.89 4,103.42 8.91 8.91 8.91 8.91 8.91 8.91
06.01.05 COBERTURAS S/ 62,699.81 - - - - - -
06.01.05.01 IMPERMEABILIZACION DE TECHO CON PINTURA ASFALTICA m2 425.61 S/ 6.84 S/ 2,911.17 2,762.21 24.83 24.83 24.83 24.83 24.83 24.83
06.01.05.02 VIGUETAS DE MADERA P/FIJAR COBERTURA DE TEJA ANDINAm 234.9 S/ 19.61 S/ 4,606.39 4,606.39 - - - - - -
06.01.05.03 COBERTURA DE TEJA ANDINA m2 425.61 S/ 116.22 S/ 49,464.39 49,213.28 41.85 41.85 41.85 41.85 41.85 41.85
06.01.05.04 CUMBRERAS DE TEJA ANDINA m 39.15 S/ 146.05 S/ 5,717.86 5,708.46 1.57 1.57 1.57 1.57 1.57 1.57
06.01.06 VARIOS S/ 1,406.79 - - - - - -
06.01.06.01 GARGOLA UND 9 S/ 156.31 S/ 1,406.79 624.50 499.60 47.12 47.12 47.12 47.12 47.12 47.12
06.02 ARQUITECTURA S/ 948,560.82 - - - - - -
06.02.01 MUROS Y TABIQUES DE ALBAÑILERIA S/ 208,004.15 - - - - - -
06.02.01.01 MURO DE LADRILLO KK DE CABEZA JUNTA 1.5 cm. MORTEROm2
1:4 499.2 S/ 167.45 S/ 83,591.04 19,627.41 8,174.00 22,233.28 15,713.70 15,860.83 330.30 330.30 330.30 330.30 330.30 330.30
06.02.01.02 MURO DE LADRILLO KK DE SOGA JUNTA 1.5 cm. MORTERO 1:4m2 718.63 S/ 123.79 S/ 88,959.21 30,054.95 14,224.37 23,850.35 9,372.94 9,494.10 327.09 327.09 327.09 327.09 327.09 327.09
06.02.01.03 MURO DE CONCRETO DE 7 CM DE ESPESOR m2 230.25 S/ 153.98 S/ 35,453.90 35,437.78 2.69 2.69 2.69 2.69 2.69 2.69
06.02.02 REVOQUES ENLUCIDOS Y MOLDURAS S/ 245,370.95 - - - - - -
06.02.02.01 TARRAJEO DE COLUMNAS m² 1037.52 S/ 68.16 S/ 70,717.36 18,066.68 18,066.68 18,066.68 2,752.89 2,752.89 2,752.89 2,752.89 2,752.89 2,752.89
06.02.02.02 TARRAJEO DE VIGAS m² 383.86 S/ 66.55 S/ 25,545.88 8,099.45 8,099.45 8,099.45 207.92 207.92 207.92 207.92 207.92 207.92
06.02.02.03 TARRAJEO MUROS EXTERIOR MORTERO 1:4 m2 516.11 S/ 36.07 S/ 18,616.09 2,041.04 4,762.51 8,504.27 551.38 551.38 551.38 551.38 551.38 551.38
06.02.02.04 TARRAJEO MUROS INTERIORES MORTERO 1:4 m2 1448.74 S/ 36.07 S/ 52,256.05 10,160.50 10,160.50 10,160.50 3,629.09 3,629.09 3,629.09 3,629.09 3,629.09 3,629.09
06.02.02.05 VESTIDURA DE DERRAME E=0.15M m 611.45 S/ 37.61 S/ 22,996.63 7,129.51 7,129.51 7,129.51 268.02 268.02 268.02 268.02 268.02 268.02
06.02.02.06 TARRAJEO PRIMARIO Y RAYADO CON CEMENTO : ARENA. m2 588.97 S/ 33.96 S/ 20,001.42 6,323.57 6,323.57 6,323.57 171.78 171.78 171.78 171.78 171.78 171.78
06.02.02.07 BRUÑAS DE 1 X 1 cm m 3069.47 S/ 11.48 S/ 35,237.52 10,886.39 10,886.39 10,886.39 429.73 429.73 429.73 429.73 429.73 429.73
06.02.03 CIELORRASOS
S/ 69,494.70 - - - - - -
06.02.03.01 CIELORRASOS CON MEZCLA CEMENTO : ARENA 1:5 m² 1075.27 S/ 64.63 S/ 69,494.70 22,086.05 22,086.05 22,086.05 539.43 539.43 539.43 539.43 539.43 539.43
06.02.04 PISOS Y PAVIMENTOS
S/ 112,220.57 - - - - - -
06.02.04.01 CONTRAPISO DE 48MM m2 797.87 S/ 39.00 S/ 31,116.93 30,702.04 69.15 69.15 69.15 69.15 69.15 69.15
06.02.04.02 PISO DE CERAMICO DE ALTO TRANSITO 45x45 cm. m2 161.16 S/ 89.31 S/ 14,393.20 10,266.47 687.79 687.79 687.79 687.79 687.79 687.79
06.02.04.03 PISO DE PORCELANATO 0.60X0.60M m2 654.73 S/ 101.89 S/ 66,710.44 12,236.53 32,635.50 3,639.74 3,639.74 3,639.74 3,639.74 3,639.74 3,639.74
06.02.05 CEMENTO PULIDO, BRUÑADO y COLOREADO S/ 5,498.30 - - - - - -
06.02.05.01 VEREDAS DE CEMENTO FROTACHADO y BRUÑADOf´c=140 kg/cm2,
m3 e=15cm
22.15 S/ 54.32 S/ 1,203.19 666.28 205.01 323.70 1.37 1.37 1.37 1.37 1.37 1.37
06.02.05.02 JUNTA DE DILATACION ASFALTICA 1" m 31.4 S/ 10.74 S/ 337.24 - - 56.21 56.21 56.21 56.21 56.21 56.21
06.02.05.03 AFIRMADO E=4" m3 8.87 S/ 214.48 S/ 1,902.44 1,781.72 - - 20.12 20.12 20.12 20.12 20.12 20.12
06.02.05.04 ENCOFRADO Y DESENCOFRADO DE VEREDAS h=0.15 m. m2 24.23 S/ 84.83 S/ 2,055.43 1,309.91 320.79 393.47 5.21 5.21 5.21 5.21 5.21 5.21
06.02.06 ZOCALOS Y CONTRAZOCALOS
S/ 23,918.40 - - - - - -
06.02.06.01 ZOCALO DE CERAMICO BLANCO DE 20 X 30 cm. H= 2.05 m. m2 576.8 S/ 17.89 S/ 10,318.95 10,318.95 - - - - - -
06.02.06.02 ZOCALO DE CEMENTO S/COLOREAR h=0.30 m, PINTADO m2 25.62 S/ 17.89 S/ 458.34 396.09 10.38 10.38 10.38 10.38 10.38 10.38
06.02.06.03 CONTRAZOCALO DE PORCELANATO 7.5 CM m 454.7 S/ 25.65
S/ 11,663.06 2,178.31 4,356.62 854.69 854.69 854.69 854.69 854.69 854.69

06.02.06.04 CONTRAZOCALO CEMENTO S/COLOREAR H = 10 CM MZ 1:2 E=1.5CM


m 103.65 S/ 14.26
S/ 1,478.05 1,478.05 - - - - - -

06.02.07 CARPINTERIA DE MADERA S/ 41,775.90 - - - - - -


CRONOGRAMA VALORIZADO DE AVANCE DE OBRA

Obra: MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCIÓN EDUCATIVA INTEGRADA N°277-21 y 54177 "EL BUEN PASTOR" DE TALAVERA" DISTRITO DE TALAVERA - PROVINCIA ANDAHUALAS - REGIÓN APURÍMAC
Ubicación: APURIMAC - ANDAHUAYLAS - TALAVERA

PLAZO DE EJECUCION
MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 MES 11 MES 12 MES 13 MES 14 MES 15 MES 16 MES 17 MES 18 MES 19 MES 20 MES 21 MES 22 MES 23 MES 24 MES 25 MES 26 MES 27 MES 28 MES 29 MES 30 MES 31 MES 32 MES 33 MES 34 MES 35 MES 36 TOTAL
Item Descripcion Unid Metrado PU S/ PARCIAL
MAR - 2019 ABR - 2019 MAY - 2019 JUN - 2019 JUL - 2019 AGO - 2019 SET - 2019 0CT - 2019 NOV - 2019 DIC - 2019 ENE - 2020 FEB - 2020 MAR - 2020 JUL - 2020 AGO - 2020 SET - 2020 0CT - 2020 NOV - 2020 DIC - 2020 ENE - 2021 FEB - 2021 MAR - 2021 ABR - 2021 MAY - 2021 JUN - 2021 JUL - 2021 AGO - 2021 SET -2021 0CT - 2021 NOV - 2021 DIC - 2021 ENE - 2022 FEB - 2022 MAR - 2022 ABR - 2022 MAY - 2022 1188 Dias
06.02.07.01 PUERTA DE MADERA AGUANO TABLERO REBAJADO m2 44.64 S/ 935.84 S/ 41,775.90 6,962.65 6,962.65 6,962.65 6,962.65 6,962.65 6,962.65
06.02.08 CARPINTERIA DE ALUMINIO S/ 55,465.63 - - - - - -
06.02.08.01 VENTANA DE ALUMINIO NATURAL PESADO e=1.5mm INC. VIDRIO
m2 TEMPLADO
152.76 S/ 363.09 S/ 55,465.63 27,554.42 21,845.18 5,694.82 61.87 61.87 61.87 61.87 61.87 61.87
06.02.09 CARPINTERIA METALICA S/ 20,528.80 - - - - - -
06.02.09.01 PUERTA METALICA und 42 S/ 300.00 S/ 12,600.00 2,100.00 2,100.00 2,100.00 2,100.00 2,100.00 2,100.00
06.02.09.02 BARANDA METALICA 2" m 20.4 S/ 285.44 S/ 5,822.98 970.50 970.50 970.50 970.50 970.50 970.50
06.02.09.03 CANTONERA DE HIERRO ESTRIADO m 62 S/ 14.61 S/ 905.82 802.96 89.22 2.27 2.27 2.27 2.27 2.27 2.27
06.02.09.04 DIVISION METALICA EN URINARIO und 8 S/ 150.00 S/ 1,200.00 200.00 200.00 200.00 200.00 200.00 200.00
06.02.10 CERRAJERIA S/ 10,092.36 - - - - - -
06.02.10.01 BISAGRAS CAPUCHINA ALUMINIZADA DE 4"x 4" pza 174 S/ 17.30 S/ 3,010.20 501.70 501.70 501.70 501.70 501.70 501.70
06.02.10.02 BRAZO EXTERIOR PARA VENTANA PROYECTANTE pza 76 S/ 68.58 S/ 5,212.08 868.68 868.68 868.68 868.68 868.68 868.68
06.02.10.03 CERRADURA DE TRES GOLPÈS PARA PUERTA pza 10 S/ 105.75 S/ 1,057.50 176.25 176.25 176.25 176.25 176.25 176.25
06.02.10.04 CERRADURA TUBULAR - TIPO MANIJAS pza 4 S/ 104.52 S/ 418.08 69.68 69.68 69.68 69.68 69.68 69.68
06.02.10.05 CERROJO "CARACOL" DE ALUMINIO SEGURIDAD VENTANA pza 30 S/ 13.15 S/ 394.50 65.75 65.75 65.75 65.75 65.75 65.75
06.02.11 PINTURA S/ 156,191.06 - - - - - -
06.02.11.01 PINTURA LATEX EN CIELO RASO 2 MANOS m2 1075.27 S/ 21.40 S/ 23,010.78 5,941.94 1,144.87 811.21 2,046.04 2,046.04 1,023.02 412.06 - 6,802.81 463.80 463.80 463.80 463.80 463.80 463.80
06.02.11.02 PINTURA SATINADO EN EXTERIORES, MUROS, COLUMNAS, VIGAS,
m2 DOS
1084.66
MANOS S/ 23.94 S/ 25,966.76 7,393.04 - 4,234.34 7,196.97 1,190.40 1,190.40 1,190.40 1,190.40 1,190.40 1,190.40
06.02.11.03 PINTURA SATINADO EN INTERIORES, MUROS, COLUMNAS, VIGAS,
m2 DOS
2301.57
MANOS S/ 23.94 S/ 55,099.59 15,687.50 1,796.78 8,983.91 13,475.63 2,525.96 2,525.96 2,525.96 2,525.96 2,525.96 2,525.96
06.02.11.04 PINTURA ESMALTE EN ZOCALOS H=0.3 M m 25.62 S/ 22.36 S/ 572.86 - - 95.48 95.48 95.48 95.48 95.48 95.48
06.02.11.05 PINTURA BARNIZ EN CARPINTERIA DE MADERA m² 249.02 S/ 24.43 S/ 6,083.56 - - 1,013.93 1,013.93 1,013.93 1,013.93 1,013.93 1,013.93
06.02.11.06 PASTA MURAL PARA INTERIORES m2 4541.21 S/ 10.01 S/ 45,457.51 19,876.11 988.00 1,220.43 3,895.50 3,895.50 3,895.50 3,895.50 3,895.50 3,895.50
06.03 INSTALACIONES SANITARIAS S/ 83,003.09 - - - - - -
06.03.01 MOVIMIENTO DE TIERRAS S/ 29.87 - - - - - -
06.03.01.01 EXCAVACION DE ZANJA m3 0.32 S/ 73.63 S/ 23.56 22.47 0.18 0.18 0.18 0.18 0.18 0.18
06.03.01.02 RELLENO DE ZANJA m3 0.3 S/ 21.04 S/ 6.31 6.02 0.05 0.05 0.05 0.05 0.05 0.05
06.03.02 SISTEMA DE AGUA FRIA S/ 5,463.03 - - - - - -
06.03.02.01 SALIDA DE AGUA FRIA CON TUBERIA PVC C-10 1/2" pto 54 S/ 23.75 S/ 1,282.50 901.20 381.30 - - - - - -
06.03.02.02 CAJA PARA VALVULAS EN NICHO CERAMICO und 4 S/ 57.01 S/ 228.04 48.00 30.01 30.01 30.01 30.01 30.01 30.01
06.03.02.03 RED DE TUBERIA DE 1" PVC - SAP m 27.4 S/ 24.11 S/ 660.61 660.61 - - - - - - -
06.03.02.04 RED DE TUBERIA DE 3/4" PVC - SAP m 136.22 S/ 20.65 S/ 2,812.94 2,742.11 11.81 11.81 11.81 11.81 11.81 11.81
06.03.02.05 VALVULA TIPO BOLA DE PVC DE 3/4" und 14 S/ 34.21 S/ 478.94 58.00 420.94 - - - - - -
06.03.03 INSTALACIONES SANITARIAS S/ 18,353.91 - - - - - -
06.03.03.01 SALIDA DE DESAGUE EN PVC SAL DE 4" pto 28 S/ 119.51 S/ 3,346.28 2,041.02 1,057.93 41.22 41.22 41.22 41.22 41.22 41.22
06.03.03.02 SALIDA DE DESAGUE EN PVC SAL DE 2" pto 44 S/ 99.31 S/ 4,369.64 2,795.70 1,366.79 34.53 34.53 34.53 34.53 34.53 34.53
06.03.03.03 SUMINISTRO Y COLOCACION DE TUBERIA EN PVC SAL DE 4" m 204 S/ 16.97 S/ 3,461.88 1,788.40 894.20 129.88 129.88 129.88 129.88 129.88 129.88
06.03.03.04 SUMINISTRO Y COLOCACION DE TUBERIA EN PVC SAL DE 2" m 186 S/ 12.77 S/ 2,375.22 1,333.00 666.50 62.62 62.62 62.62 62.62 62.62 62.62
06.03.03.05 CODO DE 90 DE 4" und 30 S/ 46.52 S/ 1,395.60 661.35 323.33 68.49 68.49 68.49 68.49 68.49 68.49
06.03.03.06 CODO DE 45 DE 4" und 5 S/ 40.49 S/ 202.45 150.20 52.25 - - - - - -
06.03.03.07 YEE DE 4" und 24 S/ 30.95 S/ 742.80 379.47 194.60 28.12 28.12 28.12 28.12 28.12 28.12
06.03.03.08 YEE DE 4" A 2" und 4 S/ 31.46 S/ 125.84 89.10 36.74 - - - - - -
06.03.03.09 YEE DE 2" und 44 S/ 23.96 S/ 1,054.24 88.80 44.40 153.51 153.51 153.51 153.51 153.51 153.51
06.03.03.10 SUMIDERO DE 2" und 22 S/ 58.18 S/ 1,279.96 830.55 406.05 7.23 7.23 7.23 7.23 7.23 7.23
06.03.04 APARATOS Y ACCESORIOS SANITARIOS S/ 36,713.54 - - - - - -
06.03.04.01 INODORO TANQUE BAJO, BLANCO NACIONAL und 24 S/ 897.75 S/ 21,546.00 5,201.28 2,724.12 2,724.12 2,724.12 2,724.12 2,724.12 2,724.12
06.03.04.02 LAVATORIO DE LOSA BLANCA NACIONAL und 16 S/ 547.80 S/ 8,764.80 2,784.88 996.65 996.65 996.65 996.65 996.65 996.65
06.03.04.03 URINARIO und 10 S/ 331.49 S/ 3,314.90 1,309.56 334.22 334.22 334.22 334.22 334.22 334.22
06.03.04.04 PAPELERA DE LOSA BLANCA und 24 S/ 128.66 S/ 3,087.84 1,390.70 282.86 282.86 282.86 282.86 282.86 282.86
06.03.05 RED DE DRENAJE PLUVIAL (Aulas + Esaclera + Administración) S/ 12,334.42 - - - - - -
06.03.05.01 CANALETA DE FIERRO GALVANIZADO e= 1/27" m 78.4 S/ 121.07 S/ 9,491.89 4,713.80 4,713.80 10.71 10.71 10.71 10.71 10.71 10.71
06.03.05.02 TUBERIA DE BAJADA P/LLUVIAS, PVC SAL Ø 4". m 48.4 S/ 58.73 S/ 2,842.53 1,677.06 705.55 459.92 - 0.00 0.00 0.00 0.00 0.00 0.00
06.03.06 COLUMNETAS DE PROTECCION S/ 1,169.78 - - - - - -
06.03.06.01 PROTECCION TUBERIA DE DRENAJE CONCRETO 175 kg/cm2 m3 0.65 S/ 614.24 S/ 399.26 394.81 0.74 0.74 0.74 0.74 0.74 0.74
06.03.06.02 PROTECCION TUBERIA DE DRENAJE ENCOFRADO DESENCOFRADO
m2 6.48 S/ 95.89 S/ 621.37 611.00 1.73 1.73 1.73 1.73 1.73 1.73
06.03.06.03 PROTECCION TUBERIA DE DRENAJE ACERO FY=4200KG/CM2kg 24.45 S/ 6.10 S/ 149.15 148.17 0.16 0.16 0.16 0.16 0.16 0.16
06.03.07 MESAS DE LAVAMANOS S/ 8,938.54 - - - - - -
06.03.07.01 ESTRUCTURAS S/ 2,011.97 - - - - - -
06.03.07.01.01 MURO DE CONCRETO S/ 794.44 - - - - - -
06.03.07.01.01.01 CONCRETO F´C=175 KG/CM2 MUROS DE CONCRETO m3 0.47 S/ 350.21 S/ 164.60 157.70 1.15 1.15 1.15 1.15 1.15 1.15
06.03.07.01.01.02 ENCOFRADO Y DESENCOFRADO EN MURO DE CONCRETOm2 5.78 S/ 68.80 S/ 397.66 393.62 0.67 0.67 0.67 0.67 0.67 0.67
06.03.07.01.01.03 ACERO GRADO 60° EN MURO kg 37.63 S/ 6.17 S/ 232.18 230.67 0.25 0.25 0.25 0.25 0.25 0.25
06.03.07.01.02 MESAS DE LAVAMANOS S/ 1,217.53 - - - - - -
06.03.07.01.02.01 CONCRETO F´C=175 KG/CM2 MESA DE LAVAMANO m3 0.59 S/ 350.21 S/ 206.62 197.76 1.48 1.48 1.48 1.48 1.48 1.48
06.03.07.01.02.02 ENCOFRADO Y DESENCOFRADO EN LAVAMANO m2 9.38 S/ 68.80 S/ 645.34 638.78 1.09 1.09 1.09 1.09 1.09 1.09
06.03.07.01.02.03 ACERO FY= 4200kg/cm2 GRADO 60, LAVAMANO kg 59.25 S/ 6.17 S/ 365.57 363.20 0.39 0.39 0.39 0.39 0.39 0.39
06.03.07.02 ARQUITECTURA S/ 6,926.57 - - - - - -
06.03.07.02.01 REVOQUES ENLUCIDOS Y MOLDURAS S/ 6,926.57 - - - - - -
06.03.07.02.01.01 PORCELANATO TIPO GRANITO m2 22.05 S/ 314.13 S/ 6,926.57 430.00 1,290.78 867.63 867.63 867.63 867.63 867.63 867.63
06.04 INSTALACIONES ELECTRICAS S/ 86,726.94 - - - - - -
06.04.01 SALIDA PARA CENTRO DE LUZ EN TECHO pto 122 S/ 78.92 S/ 9,628.24 6,064.47 3,044.71 86.51 86.51 86.51 86.51 86.51 86.51
06.04.02 SALIDA PARA INTERRUPTOR SIMPLE pto 26 S/ 90.51 S/ 2,353.26 1,335.52 680.85 56.15 56.15 56.15 56.15 56.15 56.15
06.04.03 SALIDA PARA INTERRUPTOR CONMUTADOR pto 4 S/ 110.91 S/ 443.64 273.18 121.41 8.17 8.17 8.17 8.17 8.17 8.17
06.04.04 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON LINEA A TIERRA.
pto 36 S/ 56.29 S/ 2,026.44 1,014.48 507.24 84.12 84.12 84.12 84.12 84.12 84.12
06.04.05 TABLEROS ELECTRICOS S/ 5,157.22 - - - - - -
06.04.05.01 TABLERO DE DISTRIBUCION TD-1 Y TD-2 INT. AUT. 1-2x30A, 1-2x20A,
und 2-2x15A,
1 1 I.D. 2x25A-30mA,
S/ 5,157.22
18 POLOS S/ 5,157.22 681.31 1,150.16 581.89 457.31 457.31 457.31 457.31 457.31 457.31
06.04.06 CABLES S/ 13,628.10 - - - - - -
06.04.06.01 CABLE ELECTRICO TW 2.5MM2 m 1633.8 S/ 4.43 S/ 7,237.73 1,184.69 872.00 880.72 716.72 716.72 716.72 716.72 716.72 716.72
06.04.06.02 CABLE ELECTRICO TW 4.0MM2 m 552.8 S/ 11.56 S/ 6,390.37 2,108.23 2,049.32 1,126.00 184.47 184.47 184.47 184.47 184.47 184.47
06.04.07 CONDUCTOS S/ 8,276.40 - - - - - -
06.04.07.01 TUBERIA PVC - CEL D=20MM m 684 S/ 12.10 S/ 8,276.40 2,154.60 2,154.60 661.20 661.20 661.20 661.20 661.20 661.20
06.04.08 ARTEFACTOS ELECTRICOS S/ 15,213.64 - - - - - -
06.04.08.01 ARTEFACTO FLUORESCENTE TUBULAR DE 32W, C/DIFUSOR ACRILICO
und TRANSPARENTE,
50 SIMILAR
S/ 73.82
A TP DE JOSFEL S/ 3,691.00 1,784.75 713.90 1,018.92 173.43 - - - - - - -
06.04.08.02 ARTEFACTO 02 FLUORESCENTE DE 40W, SIMILAR A BE DE JOSFEL
und 72 S/ 134.93 S/ 9,714.96 4,770.00 1,908.00 2,141.76 895.20 - - - - - - -
06.04.08.03 LAMPARA LUZ DE EMERGENCIA 2 FAROS und 12 S/ 150.64 S/ 1,807.68 301.28 301.28 301.28 301.28 301.28 301.28
06.04.09 INSTALACIONES ESPECIALES S/ 30,000.00 - - - - - -
06.04.09.01 SUMINISTRO E INSTALACION DE LAS INSTALACIONES ESPECIALES
GLB (INTERNET,
1 TV CABLE, MULTIMEDIA,
S/ 30,000.00 ALARMA CONTRAS/INCENDIO,
30,000.00 DETECTORES DE HUMO, PULSADORES) 3,140.05 3,108.65 3,171.45 3,429.97 3,429.97 3,429.97 3,429.97 3,429.97 3,429.97
07 MODULO VI - NIVEL PRIMARIA S/ 1,139,403.58 - - - - - -
07.01 ESTRUCTURAS S/ 649,892.97 - - - - - -
07.01.01 TRABAJOS PRELIMINARES S/ 995.84 - - - - - -
07.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 217.91 S/ 1.84 S/ 400.95 381.34 3.27 3.27 3.27 3.27 3.27 3.27
07.01.01.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 217.91 S/ 2.73 S/ 594.89 234.47 351.71 1.45 1.45 1.45 1.45 1.45 1.45
07.01.02 MOVIMIENTO DE TIERRAS S/ 35,291.22 - - - - - -
07.01.02.01 EXCAVACION MANUAL DE ZANJAS PARA TERRENO NORMAL m3 242.87 S/ 73.63 S/ 17,882.52 9,516.21 7,538.12 1.00 137.86 137.86 137.86 137.86 137.86 137.86
07.01.02.02 EXCAVACION MANUAL DE ZANJAS PARA CIMIENTO CORRIDO m3 39.61 S/ 49.09 S/ 1,944.45 1,854.54 14.98 14.98 14.98 14.98 14.98 14.98
07.01.02.03 RELLENO CON MATERIAL PROPIO m3 142.27 S/ 21.04 S/ 2,993.36 2,855.36 23.00 23.00 23.00 23.00 23.00 23.00
07.01.02.04 ACARREO DE MATERIAL EXCEDENTE m3 168.25 S/ 24.54 S/ 4,128.86 1,968.53 1,968.64 31.95 31.95 31.95 31.95 31.95 31.95
07.01.02.05 ELIMINACION DE MATERIAL EXCEDENTE m2 168.25 S/ 12.91 S/ 2,172.11 1,078.48 1,078.55 2.51 2.51 2.51 2.51 2.51 2.51
07.01.02.06 NIVELACION Y APISONADO m2 123.72 S/ 49.87 S/ 6,169.92 6,141.46 4.74 4.74 4.74 4.74 4.74 4.74
07.01.03 OBRAS DE CONCRETO SIMPLE S/ 21,787.73 - - - - - -
07.01.03.01 FALSA ZAPATA MEZCLA 1:10 CEMENTO-HORMIGON + 30% P.G.m3
8" 44.16 S/ 265.48 S/ 11,723.60 5,779.88 5,779.88 27.31 27.31 27.31 27.31 27.31 27.31
07.01.03.02 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30%
m3 PG 15.44 S/ 253.55 S/ 3,914.81 3,861.70 8.85 8.85 8.85 8.85 8.85 8.85
07.01.03.03 CONCRETO PARA SOBRECOMIENTOS H: 1:8 + 25% P.M. e=15cm
m3 1.13 S/ 517.12 S/ 584.35 574.72 1.61 1.61 1.61 1.61 1.61 1.61
07.01.03.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO h=0.30 m 2 15.12 S/ 100.73 S/ 1,523.04 1,475.26 7.96 7.96 7.96 7.96 7.96 7.96
07.01.03.05 FALSO PISO, MEZCLA CONCRETO 1:8 CEMENTO-HORMIGON e=4"
m2 123.72 S/ 32.67 S/ 4,041.93 3,894.71 24.54 24.54 24.54 24.54 24.54 24.54
07.01.04 CONCRETO ARMADO S/ 553,707.82 - - - - - -
07.01.04.01 SOBRECIMIENTO ARMADO S/ 27,449.58 - - - - - -
07.01.04.01.01 CONCRETO PARA SOBRECOMIENTOS ARMADO H: 1:8 + 25%m3
P.M. e=15cm
4.01 S/ 517.12 S/ 2,073.65 2,039.49 5.69 5.69 5.69 5.69 5.69 5.69
07.01.04.01.02 CONCRETO PARA SOBRECOMIENTOS ARMADO H: 1:8 + 25%m3
P.M. e=25cm
7.32 S/ 565.87 S/ 4,142.17 4,064.06 13.02 13.02 13.02 13.02 13.02 13.02
07.01.04.01.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO m2 172.4 S/ 100.73 S/ 17,365.85 16,821.07 90.80 90.80 90.80 90.80 90.80 90.80
07.01.04.01.04 ACERO EN SOBRECIMIENTO ARMADO FY= 4200 kg/cm2 GRADO
kg 60 621.85 S/ 6.22 S/ 3,867.91 3,818.16 8.29 8.29 8.29 8.29 8.29 8.29
07.01.04.02 ZAPATAS S/ 50,992.92 - - - - - -
07.01.04.02.01 CONCRETO F'C= 210 KG/CM2. PARA ZAPATAS m3 73.33 S/ 541.19 S/ 39,685.46 39,049.69 105.96 105.96 105.96 105.96 105.96 105.96
07.01.04.02.02 ACERO EN ZAPATAS FY= 4200 kg/cm2 GRADO 60 kg 1817.92 S/ 6.22 S/ 11,307.46 11,162.03 24.24 24.24 24.24 24.24 24.24 24.24
07.01.04.03 COLUMNAS S/ 172,495.16 - - - - - -
07.01.04.03.01 CONCRETO F'C= 210 KG/CM2. PARA COLUMNAS m3 64.75 S/ 644.68 S/ 41,743.03 20,449.99 10,225.00 10,225.00 140.51 140.51 140.51 140.51 140.51 140.51
07.01.04.03.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 640.76 S/ 92.14 S/ 59,039.63 28,779.74 14,389.87 14,389.87 246.69 246.69 246.69 246.69 246.69 246.69
07.01.04.03.03 ACERO Fy=4200 KG/CM2 GRADO 60, EN COLUMNAS kg 11039.84 S/ 6.22
S/ 68,667.80 33,892.31 33,892.31 147.20 147.20 147.20 147.20 147.20 147.20
07.01.04.03.04 SELLADO DE JUNTAS DE DILATACION DE COLUMNAS m 45 S/ 67.66
S/ 3,044.70 1,008.45 756.34 1,260.56 3.22 3.22 3.22 3.22 3.22 3.22
07.01.04.04 VIGAS DE CIMENTACION S/ 25,355.53 - - - - - -
07.01.04.04.01 CONCRETO f'c=210 kg/cm2 EN VIGAS DE CIMENTACION m3 9.64 S/ 541.19 S/ 5,217.07 5,133.49 13.93 13.93 13.93 13.93 13.93 13.93
07.01.04.04.02 ENCOFRADO Y DESENCOFRADO EN VIGA DE CIMENTACIONm2 88.34 S/ 84.83 S/ 7,493.88 7,250.06 40.64 40.64 40.64 40.64 40.64 40.64
07.01.04.04.03 ACERO FY= 4200 kg/cm2 GRADO 60, EN VIGAS DE CIMENTACION
kg 2032.89 S/ 6.22 S/ 12,644.58 12,481.94 27.11 27.11 27.11 27.11 27.11 27.11
07.01.04.05 COLUMNETAS S/ 14,686.02 - - - - - -
07.01.04.05.01 CONCRETO f'c=175 kg/cm2 PARA COLUMNETAS m3 3.04 S/ 456.29 S/ 1,387.12 916.38 458.19 2.09 2.09 2.09 2.09 2.09 2.09
07.01.04.05.02 ENCOFRADO Y DESENCOFRADO EN COLUMNETAS m2 66.64 S/ 123.50 S/ 8,230.04 5,276.11 2,638.06 52.65 52.65 52.65 52.65 52.65 52.65
07.01.04.05.03 ACERO FY= 4200 kg/cm2 GRADO 60, EN COLUMNETAS kg 814.93 S/ 6.22 S/ 5,068.86 3,335.78 288.85 288.85 288.85 288.85 288.85 288.85
CRONOGRAMA VALORIZADO DE AVANCE DE OBRA

Obra: MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCIÓN EDUCATIVA INTEGRADA N°277-21 y 54177 "EL BUEN PASTOR" DE TALAVERA" DISTRITO DE TALAVERA - PROVINCIA ANDAHUALAS - REGIÓN APURÍMAC
Ubicación: APURIMAC - ANDAHUAYLAS - TALAVERA

PLAZO DE EJECUCION
MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 MES 11 MES 12 MES 13 MES 14 MES 15 MES 16 MES 17 MES 18 MES 19 MES 20 MES 21 MES 22 MES 23 MES 24 MES 25 MES 26 MES 27 MES 28 MES 29 MES 30 MES 31 MES 32 MES 33 MES 34 MES 35 MES 36 TOTAL
Item Descripcion Unid Metrado PU S/ PARCIAL
MAR - 2019 ABR - 2019 MAY - 2019 JUN - 2019 JUL - 2019 AGO - 2019 SET - 2019 0CT - 2019 NOV - 2019 DIC - 2019 ENE - 2020 FEB - 2020 MAR - 2020 JUL - 2020 AGO - 2020 SET - 2020 0CT - 2020 NOV - 2020 DIC - 2020 ENE - 2021 FEB - 2021 MAR - 2021 ABR - 2021 MAY - 2021 JUN - 2021 JUL - 2021 AGO - 2021 SET -2021 0CT - 2021 NOV - 2021 DIC - 2021 ENE - 2022 FEB - 2022 MAR - 2022 ABR - 2022 MAY - 2022 1188 Dias
07.01.04.06 VIGAS S/ 67,901.96 - - - - - -
07.01.04.06.01 CONCRETO F'C= 210 KG/CM2. EN VIGAS m3 32.65 S/ 663.68 S/ 21,669.15 7,081.35 14,162.70 70.85 70.85 70.85 70.85 70.85 70.85
07.01.04.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 221.74 S/ 84.83 S/ 18,810.20 6,066.07 12,132.13 102.00 102.00 102.00 102.00 102.00 102.00
07.01.04.06.03 ACERO FY= 4200 kg/cm2 GRADO 60, EN VIGAS kg 4408.78 S/ 6.22 S/ 27,422.61 1,667.89 9,023.30 16,731.42 0.00 0.00 0.00 0.00 0.00 0.00
07.01.04.07 VIGUETAS S/ 6,713.96 - - - - - -
07.01.04.07.01 CONCRETO F'C= 175 KG/CM2. EN VIGUETAS m3 0.38 S/ 513.78 S/ 195.24 128.42 64.21 0.44 0.44 0.44 0.44 0.44 0.44
07.01.04.07.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGUETAS m2 43.23 S/ 123.50 S/ 5,338.91 3,422.66 1,711.33 34.15 34.15 34.15 34.15 34.15 34.15
07.01.04.07.03 ACERO FY= 4200 kg/cm2 GRADO 60, EN VIGUETAS kg 189.68 S/ 6.22 S/ 1,179.81 388.21 388.21 388.21 2.53 2.53 2.53 2.53 2.53 2.53
07.01.04.08 LOSA ALIGERADA DE CONCRETO ARMADO S/ 62,936.81 - - - - - -
07.01.04.08.01 CONCRETO F'C=210 KG/CM2 EN LOSA ALIGERADA m3 27.18 S/ 518.44 S/ 14,091.20 13,914.53 29.45 29.45 29.45 29.45 29.45 29.45
07.01.04.08.02 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA m2 271.82 S/ 102.88 S/ 27,964.84 27,105.89 143.16 143.16 143.16 143.16 143.16 143.16
07.01.04.08.03 ACERO Fy=4200 KG/CM2 GRADO 60, EN LOSA ALIGERADA kg 1387.64 S/ 6.22 S/ 8,631.12 8,520.11 18.50 18.50 18.50 18.50 18.50 18.50
07.01.04.08.04 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA LOSA ALIGERADA
und 2264.26 S/ 5.41 S/ 12,249.65 12,136.43 18.87 18.87 18.87 18.87 18.87 18.87
07.01.04.09 LOSA MACIZA DE CONCRETO ARMADO S/ 28,782.02 - - - - - -
07.01.04.09.01 CONCRETO F'C=210 KG/CM2 EN LOSA MACIZA m3 16.82 S/ 505.64 S/ 8,504.86 1,417.48 1,417.48 1,417.48 1,417.48 1,417.48 1,417.48
07.01.04.09.02 ENCOFRADO Y DESENCOFRADO EN LOSA MACIZA m2 168.16 S/ 109.82 S/ 18,467.33 3,077.89 3,077.89 3,077.89 3,077.89 3,077.89 3,077.89
07.01.04.09.03 ACERO Fy=4200 KG/CM2 GRADO 60, EN LOSA MACIZA kg 290.97 S/ 6.22 S/ 1,809.83 893.28 152.76 152.76 152.76 152.76 152.76 152.76
07.01.04.10 TECHO INCLINADO DE CONCRETO ARMADO S/ 82,216.15 - - - - - -
07.01.04.10.01 CONCRETO F'C=210 KG/CM2 EN LOSA ALIGERADA INCLINADA
m3 35.65 S/ 566.86 S/ 20,208.56 19,899.47 51.51 51.51 51.51 51.51 51.51 51.51
07.01.04.10.02 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA INCLINADA
m2 356.53 S/ 102.97 S/ 36,711.89 35,585.26 187.77 187.77 187.77 187.77 187.77 187.77
07.01.04.10.03 ACERO Fy=4200 KG/CM2 GRADO 60, EN LOSA ALIGERADA INCLINADA
kg 1483.67 S/ 6.22 S/ 9,228.43 9,109.73 19.78 19.78 19.78 19.78 19.78 19.78
07.01.04.10.04 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA LOSA ALIGERADA
und 2969.92
INCLINADA S/ 5.41 S/ 16,067.27 15,918.77 24.75 24.75 24.75 24.75 24.75 24.75
07.01.04.11 ESCALERA DOS TRAMOS DE CONCRETO ARMADO S/ 14,177.71 - - - - - -
07.01.04.11.01 CONCRETO F'C=210 KG/CM2 EN ESCALERA m3 9.41 S/ 489.40 S/ 4,605.25 767.54 767.54 767.54 767.54 767.54 767.54
07.01.04.11.02 ENCOFRADO Y DESENCOFRADO EN ESCALERA m2 59.61 S/ 90.85 S/ 5,415.57 902.60 902.60 902.60 902.60 902.60 902.60
07.01.04.11.03 ACERO Fy=4200 KG/CM2 GRADO 60, EN ESCALERA kg 668.31 S/ 6.22 S/ 4,156.89 2,051.71 350.86 350.86 350.86 350.86 350.86 350.86
07.01.05 COBERTURAS S/ 36,703.57 - - - - - -
07.01.05.01 IMPERMEABILIZACION DE TECHO CON PINTURA ASFALTICA m2 249.72 S/ 6.84 S/ 1,708.08 1,134.48 486.20 14.57 14.57 14.57 14.57 14.57 14.57
07.01.05.02 VIGUETAS DE MADERA P/FIJAR COBERTURA DE TEJA ANDINAm 135.9 S/ 19.61
S/ 2,665.00 2,052.91 612.09 0.00 0.00 0.00 0.00 0.00 0.00
07.01.05.03 COBERTURA DE TEJA ANDINA m2 249.72 S/ 116.22 S/ 29,022.46 20,212.59 8,662.54 24.56 24.56 24.56 24.56 24.56 24.56
07.01.05.04 CUMBRERAS DE TEJA ANDINA m 22.65 S/ 146.05 S/ 3,308.03 2,311.82 990.78 0.91 0.91 0.91 0.91 0.91 0.91
07.01.06 VARIOS S/ 1,406.79 - - - - - -
07.01.06.01 GARGOLA UND 9 S/ 156.31 S/ 1,406.79 1,124.10 47.12 47.12 47.12 47.12 47.12 47.12
07.02 ARQUITECTURA S/ 367,583.38 - - - - - -
07.02.01 MUROS Y TABIQUES DE ALBAÑILERIA S/ 60,780.53 - - - - - -
07.02.01.01 MURO DE LADRILLO KK DE CABEZA JUNTA 1.5 cm. MORTEROm2
1:4 307 S/ 167.45 S/ 51,407.15 16,729.45 16,729.45 2,991.37 2,991.37 2,991.37 2,991.37 2,991.37 2,991.37
07.02.01.02 MURO DE LADRILLO KK DE SOGA JUNTA 1.5 cm. MORTERO 1:4m2 75.72 S/ 123.79 S/ 9,373.38 3,058.08 3,058.08 542.87 542.87 542.87 542.87 542.87 542.87
07.02.02 REVOQUES ENLUCIDOS Y MOLDURAS
S/ 78,951.65 - - - - - -
07.02.02.01 TARRAJEO DE COLUMNAS m² 249.62 S/ 68.16 S/ 17,014.10 8,693.43 4,346.72 662.33 662.33 662.33 662.33 662.33 662.33
07.02.02.02 TARRAJEO DE VIGAS m² 231.32 S/ 66.55 S/ 15,394.35 9,761.70 4,880.85 125.30 125.30 125.30 125.30 125.30 125.30
07.02.02.03 TARRAJEO MUROS EXTERIOR MORTERO 1:4 m2 308.44 S/ 36.07
S/ 11,125.43 6,098.89 3,049.44 329.52 329.52 329.52 329.52 329.52 329.52

07.02.02.04 TARRAJEO MUROS INTERIORES MORTERO 1:4 m2 531.95 S/ 36.07


S/ 19,187.44 7,461.49 3,730.74 1,332.54 1,332.54 1,332.54 1,332.54 1,332.54 1,332.54

07.02.02.05 VESTIDURA DE DERRAME E=0.15M m 262.18 S/ 37.61 S/ 9,860.59 6,114.04 3,057.02 114.92 114.92 114.92 114.92 114.92 114.92
07.02.02.06 TARRAJEO PRIMARIO Y RAYADO CON CEMENTO : ARENA. m2 20.91 S/ 33.96 S/ 710.10 449.01 224.50 6.10 6.10 6.10 6.10 6.10 6.10
07.02.02.07 BRUÑAS DE 1 X 1 cm m 493 S/ 11.48 S/ 5,659.64 3,497.01 1,748.51 69.02 69.02 69.02 69.02 69.02 69.02
07.02.03 CIELORRASOS S/ 34,742.50 - - - - - -
07.02.03.01 CIELORRASOS CON MEZCLA CEMENTO : ARENA 1:5 m² 537.56 S/ 64.63 S/ 34,742.50 22,082.96 11,041.48 269.68 269.68 269.68 269.68 269.68 269.68
07.02.04 PISOS Y PAVIMENTOS S/ 61,976.92 - - - - - -
07.02.04.01 CONTRAPISO DE 48MM m2 342.75 S/ 39.00 S/ 13,367.25 13,189.02 29.71 29.71 29.71 29.71 29.71 29.71
07.02.04.02 PISO DE CERAMICO DE ALTO TRANSITO 45x45 cm. m2 5.3 S/ 89.31 S/ 473.34 78.89 78.89 78.89 78.89 78.89 78.89
07.02.04.03 PISO DE PORCELANATO 0.60X0.60M m2 433.35 S/ 101.89 S/ 44,154.03 16,510.67 7,592.28 3,341.85 3,341.85 3,341.85 3,341.85 3,341.85 3,341.85
07.02.04.04 VEREDAS DE CEMENTO FROTACHADO y BRUÑADOf´c=140 kg/cm2,
m3 e=15cm
15.63 S/ 54.32 S/ 849.02 65.82 106.28 112.82 112.82 112.82 112.82 112.82 112.82
07.02.04.05 JUNTA DE DILATACION ASFALTICA 1" m 31.4 S/ 10.74 S/ 337.24 56.21 56.21 56.21 56.21 56.21 56.21
07.02.04.06 AFIRMADO E=4" m3 6.19 S/ 214.48 S/ 1,327.63 1,243.39 14.04 14.04 14.04 14.04 14.04 14.04
07.02.04.07 ENCOFRADO Y DESENCOFRADO DE VEREDAS h=0.15 m. m2 17.31 S/ 84.83 S/ 1,468.41 160.40 365.91 157.02 157.02 157.02 157.02 157.02 157.02
07.02.05 ZOCALOS Y CONTRAZOCALOS S/ 8,889.33 - - - - - -
07.02.05.01 ZOCALO DE CERAMICO BLANCO DE 20 X 30 cm. H= 2.05 m. m2 18.35 S/ 17.89 S/ 328.28 328.28 - - - - - -
07.02.05.02 ZOCALO DE CEMENTO S/COLOREAR h=0.30 m, PINTADO m2 15.72 S/ 17.89 S/ 281.23 162.02 81.01 6.37 6.37 6.37 6.37 6.37 6.37
07.02.05.03 CONTRAZOCALO DE PORCELANATO H=0.10M m 322.8 S/ 25.65 S/ 8,279.82 933.57 466.79 2,216.53 2,180.56 413.73 413.73 413.73 413.73 413.73 413.73
07.02.06 CARPINTERIA DE MADERA S/ 23,208.83 - - - - - -
07.02.06.01 PUERTA DE MADERA AGUANO TABLERO REBAJADO m2 24.8 S/ 935.84 S/ 23,208.83 3,868.14 3,868.14 3,868.14 3,868.14 3,868.14 3,868.14
07.02.07 CARPINTERIA DE ALUMINIO S/ 21,647.43 - - - - - -
07.02.07.01 VENTANA DE ALUMINIO NATURAL PESADO e=1.5mm INC. VIDRIO
m2 TEMPLADO
59.62 S/ 363.09 S/ 21,647.43 15,039.52 6,463.03 24.15 24.15 24.15 24.15 24.15 24.15
07.02.08 CARPINTERIA METALICA S/ 5,822.98 - - - - - -
07.02.08.01 BARANDA METALICA 2" m 20.4 S/ 285.44 S/ 5,822.98 970.50 970.50 970.50 970.50 970.50 970.50
07.02.09 CERRAJERIA S/ 5,503.35 - - - - - -
07.02.09.01 BISAGRAS CAPUCHINA ALUMINIZADA DE 4"x 4" pza 30 S/ 17.30 S/ 519.00 86.50 86.50 86.50 86.50 86.50 86.50
07.02.09.02 CERRADURA DE TRES GOLPÈS PARA PUERTA pza 5 S/ 105.75 S/ 528.75 88.13 88.13 88.13 88.13 88.13 88.13
07.02.09.03 BRAZO EXTERIOR PARA VENTANA PROYECTANTE pza 52 S/ 68.58 S/ 3,566.16 594.36 594.36 594.36 594.36 594.36 594.36
07.02.09.04 CERRADURA CILINDRICA - TIPO PERILLA pza 7 S/ 104.52 S/ 731.64 121.94 121.94 121.94 121.94 121.94 121.94
07.02.09.05 CERROJO "CARACOL" DE ALUMINIO SEGURIDAD PARA VENTANA
pza 12 S/ 13.15 S/ 157.80 26.30 26.30 26.30 26.30 26.30 26.30
07.02.10 PINTURA S/ 66,059.86 - - - - - -
07.02.10.01 PINTURA LATEX EN CIELO RASO 2 MANOS m2 537.56 S/ 21.40 S/ 11,503.78 1,732.82 2,203.96 2,046.04 766.41 792.42 792.42 792.42 792.42 792.42 792.42
07.02.10.02 PINTURA SATINADO EN EXTERIORES, MUROS, COLUMNAS, VIGAS,
m2 DOS
537.56
MANOS S/ 23.94 S/ 12,869.19 2,137.34 - 1,139.38 4,211.38 1,086.69 715.73 715.73 715.73 715.73 715.73 715.73
07.02.10.03 PINTURA SATINADO EN INTERIORES, MUROS, COLUMNAS, VIGAS,
m2 DOS
820.51
MANOS S/ 23.94 S/ 19,643.01 3,262.35 480.34 2,562.15 3,202.92 1,689.21 1,689.21 1,689.21 1,689.21 1,689.21 1,689.21
07.02.10.04 PINTURA ESMALTE EN ZOCALOS Y CONTRAZOCALOS m 15.72 S/ 22.36 S/ 351.50 - 58.58 58.58 58.58 58.58 58.58 58.58
07.02.10.05 PINTURA BARNIZ EN CARPINTERIA DE MADERA m² 87.21 S/ 24.43 S/ 2,130.54 - 355.09 355.09 355.09 355.09 355.09 355.09
07.02.10.06 PASTA MURAL PARA INTERIORES m2 1954.23 S/ 10.01 S/ 19,561.84 5,329.05 2,216.08 1,336.65 1,780.01 1,780.01 1,780.01 1,780.01 1,780.01 1,780.01
07.03 INSTALACIONES SANITARIAS S/ 13,187.86 - - - - - -
07.03.01 MOVIMIENTO DE TIERRAS S/ 29.87 - - - - - -
07.03.01.01 EXCAVACION DE ZANJA m3 0.32 S/ 73.63 S/ 23.56 22.47 0.18 0.18 0.18 0.18 0.18 0.18
07.03.01.02 RELLENO DE ZANJA m3 0.3 S/ 21.04 S/ 6.31 6.02 0.05 0.05 0.05 0.05 0.05 0.05
07.03.02 SISTEMA DE AGUA FRIA S/ 709.96 - - - - - -
07.03.02.01 SALIDA DE AGUA FRIA CON TUBERIA PVC C-10 1/2" pto 8 S/ 23.75 S/ 190.00 45.06 24.16 24.16 24.16 24.16 24.16 24.16
07.03.02.02 CAJA PARA VALVULAS EN NICHO CERAMICO und 1 S/ 57.01 S/ 57.01 12.00 7.50 7.50 7.50 7.50 7.50 7.50
07.03.02.03 RED DE TUBERIA DE 1" PVC - SAP m 18.6 S/ 24.11 S/ 448.45 180.24 268.21 - - - - - -
07.03.02.04 VALVULA TIPO BOLA DE PVC 1" und 1 S/ 14.50 S/ 14.50 14.50 - - - - - - -
07.03.03 INSTALACIONES SANITARIAS S/ 581.65 - - - - - -
07.03.03.01 SALIDA DE DESAGUE EN PVC SAL DE 4" pto 1 S/ 119.51 S/ 119.51 113.39 1.02 1.02 1.02 1.02 1.02 1.02
07.03.03.02 SALIDA DE DESAGUE EN PVC SAL DE 2" pto 2 S/ 99.31 S/ 198.62 186.38 2.04 2.04 2.04 2.04 2.04 2.04
07.03.03.03 SUMINISTRO Y COLOCACION DE TUBERIA EN PVC SAL DE 4" m 6 S/ 16.97 S/ 101.82 78.90 3.82 3.82 3.82 3.82 3.82 3.82
07.03.03.04 SUMINISTRO Y COLOCACION DE TUBERIA EN PVC SAL DE 2" m 2 S/ 12.77 S/ 25.54 21.50 0.67 0.67 0.67 0.67 0.67 0.67
07.03.03.05 CODO DE 90 DE 4" und 1 S/ 46.52 S/ 46.52 44.09 0.41 0.41 0.41 0.41 0.41 0.41
07.03.03.06 YEE DE 4" A 2" und 1 S/ 31.46 S/ 31.46 29.70 0.29 0.29 0.29 0.29 0.29 0.29
07.03.03.07 SUMIDERO DE 2" und 1 S/ 58.18 S/ 58.18 55.37 0.47 0.47 0.47 0.47 0.47 0.47
07.03.04 APARATOS Y ACCESORIOS SANITARIOS S/ 1,574.21 - - - - - -
07.03.04.01 INODORO TANQUE BAJO, BLANCO NACIONAL und 1 S/ 897.75
S/ 897.75 216.72 113.51 113.51 113.51 113.51 113.51 113.51
07.03.04.02 LAVATORIO DE LOSA BLANCA NACIONAL und 1 S/ 547.80 S/ 547.80 174.06 62.29 62.29 62.29 62.29 62.29 62.29
07.03.04.03 PAPELERA DE LOSA BLANCA und 1 S/ 128.66 S/ 128.66 57.95 11.79 11.79 11.79 11.79 11.79 11.79
07.03.05 RED DE DRENAJE PLUVIAL (Aulas + Esaclera + Administración) S/ 9,122.39 - - - - - -
07.03.05.01 CANALETA DE FIERRO GALVANIZADO e= 1/27" m 46 S/ 121.07 S/ 5,569.22 5,531.50 6.29 6.29 6.29 6.29 6.29 6.29
07.03.05.02 TUBERIA DE BAJADA P/LLUVIAS, PVC SAL Ø 4". m 60.5 S/ 58.73 S/ 3,553.17 2,096.33 1,456.85 - - - - - - - - -
07.03.06 COLUMNETAS DE PROTECCION S/ 1,169.78 - - - - - -
07.03.06.01 PROTECCION TUBERIA DE DRENAJE CONCRETO 175 kg/cm2 m3 0.65 S/ 614.24 S/ 399.26 157.92 40.22 40.22 40.22 40.22 40.22 40.22
07.03.06.02 PROTECCION TUBERIA DE DRENAJE ENCOFRADO DESENCOFRADO
m2 6.48 S/ 95.89 S/ 621.37 244.21 62.86 62.86 62.86 62.86 62.86 62.86
07.03.06.03 PROTECCION TUBERIA DE DRENAJE ACERO FY=4200KG/CM2kg 24.45 S/ 6.10 S/ 149.15 59.27 14.98 14.98 14.98 14.98 14.98 14.98
07.04 INSTALACIONES ELECTRICAS S/ 73,503.63 - - - - - -
07.04.01 SALIDA PARA CENTRO DE LUZ EN TECHO pto 58 S/ 78.92 S/ 4,577.36 1,447.49 2,894.97 39.15 39.15 39.15 39.15 39.15 39.15
07.04.02 SALIDA PARA INTERRUPTOR SIMPLE pto 13 S/ 90.51 S/ 1,176.63 359.93 719.85 16.14 16.14 16.14 16.14 16.14 16.14
07.04.03 SALIDA PARA INTERRUPTOR CONMUTADOR pto 4 S/ 110.91 S/ 443.64 121.41 242.83 13.23 13.23 13.23 13.23 13.23 13.23
07.04.04 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON LINEA A TIERRA.
pto 20 S/ 56.29 S/ 1,125.80 281.80 563.60 46.73 46.73 46.73 46.73 46.73 46.73
07.04.05 TABLEROS ELECTRICOS S/ 15,471.66 - - - - - -
07.04.05.01 TABLERO DE DISTRIBUCION TD-1 Y TD-2 INT. AUT. 1-2x30A, 1-2x20A,
und 2-2x15A,
3 1 I.D. 2x25A-30mA,
S/ 5,157.22
18 POLOS S/ 15,471.66 402.56 805.17 581.89 2,280.34 2,280.34 2,280.34 2,280.34 2,280.34 2,280.34
07.04.06 INTERRUPTORES TERMOMAGNTICOS S/ 147.16 - - - - - -
07.04.06.01 INTERRUPTOR DIFERENCIAL DE 2X20A,30mA pza 4 S/ 36.79 S/ 147.16 74.36 12.13 12.13 12.13 12.13 12.13 12.13
07.04.07 CABLES S/ 8,052.27 - - - - - -
07.04.07.01 CABLE ELECTRICO TW 2.5MM2 m 864.11 S/ 4.43 S/ 3,828.01 565.82 279.04 279.04 450.68 450.68 450.68 450.68 450.68 450.68
07.04.07.02 CABLE ELECTRICO TW 4.0MM2 m 365.42 S/ 11.56 S/ 4,224.26 1,839.10 990.88 855.76 89.75 89.75 89.75 89.75 89.75 89.75
07.04.08 CONDUCTOS S/ 5,894.03 - - - - - -
07.04.08.01 TUBERIA PVC - CEL D=20MM m 487.11 S/ 12.10 S/ 5,894.03 459.90 919.80 1,379.70 522.44 522.44 522.44 522.44 522.44 522.44
07.04.09 ARTEFACTOS ELECTRICOS S/ 6,615.08 - - - - - -
07.04.09.01 ARTEFACTO FLUORESCENTE TUBULAR DE 32W, C/DIFUSOR ACRILICO
und TRANSPARENTE,
42 SIMILAR
S/ 73.82
A TP DE JOSFEL S/ 3,100.44 1,499.19 599.68 582.24 69.89 69.89 69.89 69.89 69.89 69.89
CRONOGRAMA VALORIZADO DE AVANCE DE OBRA

Obra: MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCIÓN EDUCATIVA INTEGRADA N°277-21 y 54177 "EL BUEN PASTOR" DE TALAVERA" DISTRITO DE TALAVERA - PROVINCIA ANDAHUALAS - REGIÓN APURÍMAC
Ubicación: APURIMAC - ANDAHUAYLAS - TALAVERA

PLAZO DE EJECUCION
MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 MES 11 MES 12 MES 13 MES 14 MES 15 MES 16 MES 17 MES 18 MES 19 MES 20 MES 21 MES 22 MES 23 MES 24 MES 25 MES 26 MES 27 MES 28 MES 29 MES 30 MES 31 MES 32 MES 33 MES 34 MES 35 MES 36 TOTAL
Item Descripcion Unid Metrado PU S/ PARCIAL
MAR - 2019 ABR - 2019 MAY - 2019 JUN - 2019 JUL - 2019 AGO - 2019 SET - 2019 0CT - 2019 NOV - 2019 DIC - 2019 ENE - 2020 FEB - 2020 MAR - 2020 JUL - 2020 AGO - 2020 SET - 2020 0CT - 2020 NOV - 2020 DIC - 2020 ENE - 2021 FEB - 2021 MAR - 2021 ABR - 2021 MAY - 2021 JUN - 2021 JUL - 2021 AGO - 2021 SET -2021 0CT - 2021 NOV - 2021 DIC - 2021 ENE - 2022 FEB - 2022 MAR - 2022 ABR - 2022 MAY - 2022 1188 Dias
07.04.09.02 ARTEFACTO 02 FLUORESCENTE DE 40W, SIMILAR A BE DE JOSFEL
und 16 S/ 134.93 S/ 2,158.88 1,060.00 424.00 674.88 - - - - - - -
07.04.09.03 LAMPARA LUZ DE EMERGENCIA 2 FAROS und 9 S/ 150.64 S/ 1,355.76 225.96 225.96 225.96 225.96 225.96 225.96
07.04.10 INSTALACIONES ESPECIALES S/ 30,000.00 - - - - - -
07.04.10.01 SUMINISTRO E INSTALACION DE LAS INSTALACIONES ESPECIALES
GLB (INTERNET,
1 TV CABLE, MULTIMEDIA,
S/ 30,000.00 ALARMA CONTRAS/INCENDIO,
30,000.00 DETECTORES DE HUMO, PULSADORES) 3,140.05 3,140.05 3,140.05 3,429.97 3,429.97 3,429.97 3,429.97 3,429.97 3,429.97
07.05 MESAS DE LABORATORIO S/ 35,235.74 - - - - - -
07.05.01 ESTRUCTURAS S/ 3,661.55 - - - - - -
07.05.01.01 MURO DE CONCRETO S/ 2,859.36 - - - - - -
07.05.01.01.01 CONCRETO F´C=210 KG/CM2 MUROS DE CONCRETO m3 2.24 S/ 335.61 S/ 751.77 751.61 0.03 0.03 0.03 0.03 0.03 0.03
07.05.01.01.02 ENCOFRADO Y DESENCOFRADO EN MURO DE CONCRETO m2 23.93 S/ 68.80 S/ 1,646.38 1,629.63 2.79 2.79 2.79 2.79 2.79 2.79
07.05.01.01.03 ACERO GRADO 60° EN MURO kg 74.75 S/ 6.17 S/ 461.21 458.22 0.50 0.50 0.50 0.50 0.50 0.50
07.05.01.02 MESAS DE CONCRETO S/ 802.19 - - - - - -
07.05.01.02.01 CONCRETO F´C=210 KG/CM2 MESA DE CONCRETO m3 1.29 S/ 335.25 S/ 432.47 432.40 0.01 0.01 0.01 0.01 0.01 0.01
07.05.01.02.02 ENCOFRADO Y DESENCOFRADO EN MESA DE CONCRETO m2 3.92 S/ 68.80 S/ 269.70 266.95 0.46 0.46 0.46 0.46 0.46 0.46
07.05.01.02.03 ACERO GRADO 60° EN PANTALLA kg 16.21 S/ 6.17 S/ 100.02 99.37 0.11 0.11 0.11 0.11 0.11 0.11
07.05.02 ARQUITECTURA S/ 31,574.19 - - - - - -
07.05.02.01 REVOQUES ENLUCIDOS Y MOLDURAS S/ 28,899.96 - - - - - -
07.05.02.01.01 PORCELANATO TIPO GRANITO m2 92 S/ 314.13 S/ 28,899.96 4,816.66 4,816.66 4,816.66 4,816.66 4,816.66 4,816.66
07.05.02.02 ZOCALO SANITARIO S/ 2,674.23 - - - - - -
07.05.02.02.01 ZOCALO DE MARMOLINA m 64.72 S/ 41.32 S/ 2,674.23 445.71 445.71 445.71 445.71 445.71 445.71
08 MODULO VII - NIVEL PRIMARIA S/ 1,208,333.14 - - - - - -
08.01 ESTRUCTURAS S/ 637,317.23 - - - - - -
08.01.01 TRABAJOS PRELIMINARES S/ 1,290.98 - - - - - -
08.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 282.49 S/ 1.84 S/ 519.78 443.52 12.71 12.71 12.71 12.71 12.71 12.71
08.01.01.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 282.49 S/ 2.73 S/ 771.20 654.85 26.90 14.91 14.91 14.91 14.91 14.91 14.91
08.01.02 MOVIMIENTO DE TIERRAS S/ 43,128.20 - - - - - -
08.01.02.01 EXCAVACION MANUAL DE ZANJAS PARA TERRENO NORMAL m3 266.48 S/ 73.63 S/ 19,620.92 10,813.88 7,898.35 151.45 151.45 151.45 151.45 151.45 151.45
08.01.02.02 EXCAVACION MANUAL DE ZANJAS PARA CIMIENTO CORRIDO m3 23.9 S/ 49.09 S/ 1,173.25 1,037.06 22.70 22.70 22.70 22.70 22.70 22.70
08.01.02.03 RELLENO CON MATERIAL PROPIO m3 164.89 S/ 21.04 S/ 3,469.29 3,047.43 70.31 70.31 70.31 70.31 70.31 70.31
08.01.02.04 ACARREO DE MATERIAL EXCEDENTE m3 166.24 S/ 24.54 S/ 4,079.53 1,404.00 2,436.88 39.78 39.78 39.78 39.78 39.78 39.78
08.01.02.05 ELIMINACION DE MATERIAL EXCEDENTE m2 166.24 S/ 12.91 S/ 2,146.16 769.20 1,335.07 6.98 6.98 6.98 6.98 6.98 6.98
08.01.02.06 NIVELACION Y APISONADO m2 253.44 S/ 49.87 S/ 12,639.05 12,580.76 9.71 9.71 9.71 9.71 9.71 9.71
08.01.03 OBRAS DE CONCRETO SIMPLE S/ 22,077.39 - - - - - -
08.01.03.01 FALSA ZAPATA MEZCLA 1:10 CEMENTO-HORMIGON + 30% P.G.m3
8" 48.45 S/ 265.48 S/ 12,862.51 10,892.25 1,790.51 29.96 29.96 29.96 29.96 29.96 29.96
08.01.03.02 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30%
m3 PG 13.89 S/ 253.55 S/ 3,521.81 2,538.62 163.87 163.87 163.87 163.87 163.87 163.87
08.01.03.03 FALSO PISO, MEZCLA CONCRETO 1:8 CEMENTO-HORMIGON e=4"
m2 174.26 S/ 32.67 S/ 5,693.07 5,485.70 34.56 34.56 34.56 34.56 34.56 34.56
08.01.04 CONCRETO ARMADO S/ 527,402.27 - - - - - -
08.01.04.01 SOBRECIMIENTO ARMADO S/ 14,927.88 - - - - - -
08.01.04.01.01 CONCRETO PARA SOBRECOMIENTOS ARMADO H: 1:8 + 25%m3
P.M. e=15cm
5.84 S/ 517.12 S/ 3,019.98 2,970.22 8.29 8.29 8.29 8.29 8.29 8.29
08.01.04.01.02 CONCRETO PARA SOBRECOMIENTOS ARMADO H: 1:8 + 25%m3
P.M. e=25cm
4.34 S/ 565.87 S/ 2,455.88 2,409.57 7.72 7.72 7.72 7.72 7.72 7.72
08.01.04.01.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO m2 56.28 S/ 100.73 S/ 5,669.08 5,491.24 29.64 29.64 29.64 29.64 29.64 29.64
08.01.04.01.04 ACERO EN SOBRECIMIENTO ARMADO FY= 4200 kg/cm2 GRADO
kg 60 608.19 S/ 6.22 S/ 3,782.94 3,734.29 8.11 8.11 8.11 8.11 8.11 8.11
08.01.04.02 ZAPATAS S/ 38,153.36 - - - - - -
08.01.04.02.01 CONCRETO F'C= 210 KG/CM2. PARA ZAPATAS m3 48.45 S/ 541.19 S/ 26,220.66 25,800.59 70.01 70.01 70.01 70.01 70.01 70.01
08.01.04.02.02 ACERO EN ZAPATAS FY= 4200 kg/cm2 GRADO 60 kg 1918.44 S/ 6.22 S/ 11,932.70 10,887.45 891.77 25.58 25.58 25.58 25.58 25.58 25.58
08.01.04.03 COLUMNAS S/ 193,137.39 - - - - - -
08.01.04.03.01 CONCRETO F'C= 210 KG/CM2. PARA COLUMNAS m3 77.66 S/ 644.68
S/ 50,065.85 19,789.91 15,633.59 13,631.22 168.52 168.52 168.52 168.52 168.52 168.52
08.01.04.03.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 684.07 S/ 92.14 S/ 63,030.21 20,866.61 26,036.33 14,547.07 263.37 263.37 263.37 263.37 263.37 263.37
08.01.04.03.03 ACERO Fy=4200 KG/CM2 GRADO 60, EN COLUMNAS kg 12378.88 S/ 6.22 S/ 76,996.63 57,321.81 3,791.51 14,893.00 165.05 165.05 165.05 165.05 165.05 165.05
08.01.04.03.04 SELLADO DE JUNTAS DE DILATACION DE COLUMNAS m 45 S/ 67.66 S/ 3,044.70 1,008.45 2,016.90 3.22 3.22 3.22 3.22 3.22 3.22
08.01.04.04 VIGAS DE CIMENTACION S/ 17,214.62 - - - - - -
08.01.04.04.01 CONCRETO f'c=210 kg/cm2 EN VIGAS DE CIMENTACION m3 6.74 S/ 541.19 S/ 3,647.62 3,589.18 9.74 9.74 9.74 9.74 9.74 9.74
08.01.04.04.02 ENCOFRADO Y DESENCOFRADO EN VIGA DE CIMENTACIONm2 26.98 S/ 84.83 S/ 2,288.71 2,214.25 12.41 12.41 12.41 12.41 12.41 12.41
08.01.04.04.03 ACERO FY= 4200 kg/cm2 GRADO 60, EN VIGAS DE CIMENTACION
kg 1813.23 S/ 6.22 S/ 11,278.29 11,133.23 24.18 24.18 24.18 24.18 24.18 24.18
08.01.04.05 COLUMNETAS S/ 12,214.90 - - - - - -
08.01.04.05.01 CONCRETO f'c=175 kg/cm2 PARA COLUMNETAS m3 3.84 S/ 456.29 S/ 1,752.15 180.86 1,284.13 47.86 47.86 47.86 47.86 47.86 47.86
08.01.04.05.02 ENCOFRADO Y DESENCOFRADO EN COLUMNETAS m2 72.97 S/ 95.89 S/ 6,997.09 85.04 5,365.56 257.75 257.75 257.75 257.75 257.75 257.75
08.01.04.05.03 ACERO FY= 4200 kg/cm2 GRADO 60, EN COLUMNETAS kg 557.18 S/ 6.22 S/ 3,465.66 842.90 207.10 2,371.08 7.43 7.43 7.43 7.43 7.43 7.43
08.01.04.06 VIGAS S/ 97,847.43 - - - - - -
08.01.04.06.01 CONCRETO F'C= 210 KG/CM2. EN VIGAS m3 32.47 S/ 663.68 S/ 21,549.69 271.30 10,482.13 5,322.40 912.31 912.31 912.31 912.31 912.31 912.31
08.01.04.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 253.23 S/ 84.83 S/ 21,481.50 1,294.02 11,099.15 4,841.31 1,694.75 425.38 425.38 425.38 425.38 425.38 425.38
08.01.04.06.03 ACERO FY= 4200 kg/cm2 GRADO 60, EN VIGAS kg 8812.9 S/ 6.22 S/ 54,816.24 17,528.17 18,291.55 6,310.56 2,114.33 2,114.33 2,114.33 2,114.33 2,114.33 2,114.33
08.01.04.07 VIGUETAS S/ 5,932.14 - - - - - -
08.01.04.07.01 CONCRETO F'C= 175 KG/CM2. EN VIGUETAS m3 2.18 S/ 513.78 S/ 1,120.04 212.91 207.84 684.34 14.95 0.00 0.00 0.00 0.00 0.00 0.00
08.01.04.07.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGUETAS m2 29.1 S/ 123.50 S/ 3,593.85 660.31 1,969.04 826.57 137.93 0.00 0.00 0.00 0.00 0.00 0.00
08.01.04.07.03 ACERO FY= 4200 kg/cm2 GRADO 60, EN VIGUETAS kg 195.86 S/ 6.22 S/ 1,218.25 252.60 187.82 762.16 15.67 - - - - - - -
08.01.04.08 LOSA ALIGERADA S/ 81,660.71 - - - - - -
08.01.04.08.01 CONCRETO F'C=210 KG/CM2 EN LOSA ALIGERADA m3 39.28 S/ 518.44 S/ 20,364.32 10,054.50 10,054.50 42.55 42.55 42.55 42.55 42.55 42.55
08.01.04.08.02 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA m2 263.56 S/ 102.88 S/ 27,115.05 13,141.10 13,141.10 138.81 138.81 138.81 138.81 138.81 138.81
08.01.04.08.03 ACERO Fy=4200 KG/CM2 GRADO 60, EN LOSA ALIGERADA kg 1676.29 S/ 6.22 S/ 10,426.52 5,146.24 5,146.18 22.35 22.35 22.35 22.35 22.35 22.35
08.01.04.08.04 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA LOSA ALIGERADA
und 4390.91 S/ 5.41 S/ 23,754.82 11,767.64 11,767.64 36.59 36.59 36.59 36.59 36.59 36.59
08.01.04.09 TECHO INCLINADO DE CONCRETO ARMADO S/ 56,211.35 - - - - - -
08.01.04.09.01 CONCRETO F'C=210 KG/CM2 EN LOSA ALIGERADA INCLINADA
m3 24.67 S/ 566.86 S/ 13,984.44 13,770.55 35.65 35.65 35.65 35.65 35.65 35.65
08.01.04.09.02 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA INCLINADA
m2 246.74 S/ 102.97 S/ 25,406.82 4,925.42 19,701.70 129.95 129.95 129.95 129.95 129.95 129.95
08.01.04.09.03 ACERO Fy=4200 KG/CM2 GRADO 60, EN LOSA ALIGERADA INCLINADA
kg 916.52 S/ 6.22 S/ 5,700.75 5,627.43 12.22 12.22 12.22 12.22 12.22 12.22
08.01.04.09.04 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA LOSA ALIGERADA
und 2055.33
INCLINADA S/ 5.41 S/ 11,119.34 11,016.57 17.13 17.13 17.13 17.13 17.13 17.13
08.01.04.10 ESCENARIO S/ 10,102.49 - - - - - -
08.01.04.10.01 ACERO CORRUGADO FY= 4200kg/cm2 kg 301.51 S/ 6.17 S/ 1,860.32 310.05 310.05 310.05 310.05 310.05 310.05
08.01.04.10.02 ENCOFRADO Y DESENCOFRADO m2 56.88 S/ 89.60 S/ 5,096.45 849.41 849.41 849.41 849.41 849.41 849.41
08.01.04.10.03 CONCRETO F´C=175 KG/CM2 m3 0.5 S/ 513.78 S/ 256.89 42.82 42.82 42.82 42.82 42.82 42.82
08.01.04.10.04 CONCRETO F´C=210 KG/CM2 m3 4.15 S/ 381.19 S/ 1,581.94 263.66 263.66 263.66 263.66 263.66 263.66
08.01.04.10.05 LADRILLO HUECO DE ARCILLA 15X30X3 CM und 241.57 S/ 5.41 S/ 1,306.89 217.82 217.82 217.82 217.82 217.82 217.82
08.01.05 COBERTURA S/ 42,793.15 - - - - - -
08.01.05.01 IMPERMEABILIZACION DE TECHO CON PINTURA ASFALTICA m2 290.74 S/ 6.84 S/ 1,988.66 1,886.90 16.96 16.96 16.96 16.96 16.96 16.96
08.01.05.02 VIGUETAS DE MADERA P/FIJAR COBERTURA DE TEJA ANDINAm 159.6 S/ 19.61 S/ 3,129.76 3,129.76 - - - - - -
08.01.05.03 COBERTURA DE TEJA ANDINA m2 290.74 S/ 116.22 S/ 33,789.80 33,618.27 28.59 28.59 28.59 28.59 28.59 28.59
08.01.05.04 CUMBRERAS DE TEJA ANDINA m 26.6 S/ 146.05 S/ 3,884.93 3,878.55 1.06 1.06 1.06 1.06 1.06 1.06
08.01.06 VARIOS S/ 625.24 - - - - - -
08.01.06.01 GARGOLAS unid 4 S/ 156.31 S/ 625.24 249.80 249.80 20.94 20.94 20.94 20.94 20.94 20.94
08.02 ARQUITECTURA S/ 473,213.47 - - - - - -
08.02.01 MUROS Y TABIQUES DE ALBAÑILERIA S/ 55,347.41 - - - - - -
08.02.01.01 MURO DE LADRILLO KK DE CABEZA JUNTA 1.5 cm. MORTEROm2
1:4 203.88 S/ 167.45 S/ 34,139.71 10,932.45 10,217.50 11,647.41 223.73 223.73 223.73 223.73 223.73 223.73
08.02.01.02 MURO DE LADRILLO KK DE SOGA JUNTA 1.5 cm. MORTERO 1:4m2 171.32 S/ 123.79 S/ 21,207.70 6,825.75 2,554.46 5,452.20 5,644.84 121.74 121.74 121.74 121.74 121.74 121.74
08.02.02 REVOQUES ENLUCIDOS Y MOLDURAS S/ 112,032.25 - - - - - -
08.02.02.01 TARRAJEO DE COLUMNAS m² 684.07 S/ 68.16 S/ 46,626.21 11,911.94 11,911.94 11,911.94 1,815.07 1,815.07 1,815.07 1,815.07 1,815.07 1,815.07
08.02.02.02 TARRAJEO DE VIGAS m² 253.23 S/ 66.55 S/ 16,852.46 5,343.15 5,343.15 5,343.15 137.17 137.17 137.17 137.17 137.17 137.17
08.02.02.03 TARRAJEO MUROS EXTERIOR MORTERO 1:4 m2 411.48 S/ 36.07 S/ 14,842.08 1,618.13 5,123.77 1,983.19 3,410.90 451.02 451.02 451.02 451.02 451.02 451.02
08.02.02.04 TARRAJEO MUROS INTERIORES MORTERO 1:4 m2 546.06 S/ 36.07 S/ 19,696.38 3,813.50 3,813.50 3,813.50 1,375.98 1,375.98 1,375.98 1,375.98 1,375.98 1,375.98
08.02.02.05 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS.m 261.72 S/ 37.61 S/ 9,843.29 2,920.83 2,920.83 2,046.33 874.50 180.13 180.13 180.13 180.13 180.13 180.13
08.02.02.06 BRUÑAS DE 1 X 1 cm m 363.4 S/ 11.48 S/ 4,171.83 1,272.83 1,272.83 1,272.83 58.89 58.89 58.89 58.89 58.89 58.89
08.02.03 CIELORRASOS S/ 32,980.69 - - - - - -
08.02.03.01 CIELORRASOS CON MEZCLA CEMENTO : ARENA 1:5 m² 510.3 S/ 64.63 S/ 32,980.69 10,481.56 10,481.56 10,481.56 256.00 256.00 256.00 256.00 256.00 256.00
08.02.04 PISOS Y PAVIMENTOS S/ 89,554.82 - - - - - -
08.02.04.01 CONTRAPISO 48MM m² 516.58 S/ 39.00 S/ 20,146.62 16,565.00 3,313.00 44.77 44.77 44.77 44.77 44.77 44.77
08.02.04.02 PISO DE PORCELANATO 0.60X0.60M m2 649.67 S/ 101.89 S/ 66,194.88 228.28 8,155.30 10,371.68 7,906.60 7,906.60 7,906.60 7,906.60 7,906.60 7,906.60
08.02.04.03 VEREDAS DE CEMENTO FROTACHADO y BRUÑADOf´c=140 kg/cm2,
m3 e=15cm
13.49 S/ 54.32 S/ 732.78 372.79 124.09 39.32 39.32 39.32 39.32 39.32 39.32
08.02.04.04 JUNTA DE DILATACION 1" m 16.2 S/ 10.74 S/ 173.99 - - 29.00 29.00 29.00 29.00 29.00 29.00
08.02.04.05 AFIRMADO E=4" m3 4.77 S/ 214.48 S/ 1,023.07 958.15 - - 10.82 10.82 10.82 10.82 10.82 10.82
08.02.04.06 ENCOFRADO Y DESENCOFRADO DE VEREDA m2 15.13 S/ 84.83 S/ 1,283.48 571.41 447.77 44.05 44.05 44.05 44.05 44.05 44.05
08.02.05 ZOCALOS Y CONTRAZOCALOS S/ 11,195.08 - - - - - -
08.02.05.01 ZOCALO DE CEMENTO S/COLOREAR h=0.30 m, PINTADO m2 18.08 S/ 17.89 S/ 323.45 279.52 7.32 7.32 7.32 7.32 7.32 7.32
08.02.05.02 CONTRAZOCALO DE CEMENTO S/COLOREAR H=0.30M. PULIDOm 102.62 S/ 32.23 S/ 3,307.44 3,091.94 35.92 35.92 35.92 35.92 35.92 35.92
08.02.05.03 CONTRAZOCALO DE PORCELANATO H=0.10M m 294.9 S/ 25.65 S/ 7,564.19 125.20 1,407.25 1,524.14 751.27 751.27 751.27 751.27 751.27 751.27
08.02.06 CARPINTERIA DE MADERA S/ 34,045.86 - - - - - -
08.02.06.01 PUERTA DE MADERA AGUANO TABLERO REBAJADO m2 36.38 S/ 935.84 S/ 34,045.86 5,674.31 5,674.31 5,674.31 5,674.31 5,674.31 5,674.31
08.02.07 CARPINTERIA DE ALUMINIO S/ 48,363.59 - - - - - -
08.02.07.01 VENTANA DE ALUMINIO NATURAL PESADO e=1.5mm INC. VIDRIO
m2 TEMPLADO
133.2 S/ 363.09 S/ 48,363.59 19,223.18 14,404.76 14,411.97 53.95 53.95 53.95 53.95 53.95 53.95
08.02.08 CERRAJERIA S/ 7,835.41 - - - - - -
08.02.08.01 BISAGRAS CAPUCHINA ALUMINIZADA DE 4"x 4" pza 28 S/ 17.30 S/ 484.40 80.73 80.73 80.73 80.73 80.73 80.73
08.02.08.02 CERRADURA DE TRES GOLPÈS PARA PUERTA pza 7 S/ 105.75 S/ 740.25 123.38 123.38 123.38 123.38 123.38 123.38
08.02.08.03 BRAZO EXTERIOR PARA VENTANA PROYECTANTE pza 72 S/ 68.58 S/ 4,937.76 822.96 822.96 822.96 822.96 822.96 822.96
08.02.08.04 CERROJO "CARACOL" DE ALUMINIO SEGURIDAD PARA VENTANA
pza 16 S/ 13.15 S/ 210.40 35.07 35.07 35.07 35.07 35.07 35.07
08.02.08.05 CERRADURA TUBULAR - TIPO MANIJA pza 1 S/ 104.52 S/ 104.52 17.42 17.42 17.42 17.42 17.42 17.42
08.02.08.06 CERRADURA DE BARRA TRAMPA DE 1 PUNTO pza 2 S/ 679.04 S/ 1,358.08 226.35 226.35 226.35 226.35 226.35 226.35
08.02.09 PINTURA S/ 81,858.36 - - - - - -
08.02.09.01 PINTURA LATEX EN CIELO RASO 2 MANOS m2 510.3 S/ 21.40 S/ 10,920.42 2,819.92 3,305.75 3,069.07 405.03 220.11 220.11 220.11 220.11 220.11 220.11
CRONOGRAMA VALORIZADO DE AVANCE DE OBRA

Obra: MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCIÓN EDUCATIVA INTEGRADA N°277-21 y 54177 "EL BUEN PASTOR" DE TALAVERA" DISTRITO DE TALAVERA - PROVINCIA ANDAHUALAS - REGIÓN APURÍMAC
Ubicación: APURIMAC - ANDAHUAYLAS - TALAVERA

PLAZO DE EJECUCION
MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 MES 11 MES 12 MES 13 MES 14 MES 15 MES 16 MES 17 MES 18 MES 19 MES 20 MES 21 MES 22 MES 23 MES 24 MES 25 MES 26 MES 27 MES 28 MES 29 MES 30 MES 31 MES 32 MES 33 MES 34 MES 35 MES 36 TOTAL
Item Descripcion Unid Metrado PU S/ PARCIAL
MAR - 2019 ABR - 2019 MAY - 2019 JUN - 2019 JUL - 2019 AGO - 2019 SET - 2019 0CT - 2019 NOV - 2019 DIC - 2019 ENE - 2020 FEB - 2020 MAR - 2020 JUL - 2020 AGO - 2020 SET - 2020 0CT - 2020 NOV - 2020 DIC - 2020 ENE - 2021 FEB - 2021 MAR - 2021 ABR - 2021 MAY - 2021 JUN - 2021 JUL - 2021 AGO - 2021 SET -2021 0CT - 2021 NOV - 2021 DIC - 2021 ENE - 2022 FEB - 2022 MAR - 2022 ABR - 2022 MAY - 2022 1188 Dias
08.02.09.02 PINTURA SATINADO EN EXTERIORES, MUROS, COLUMNAS, VIGAS,
m2 DOS
788.71
MANOS S/ 23.94 S/ 18,881.72 5,344.36 1,867.98 890.90 2,407.58 1,439.63 1,155.21 1,155.21 1,155.21 1,155.21 1,155.21 1,155.21
08.02.09.03 PINTURA SATINADO EN INTERIORES, MUROS, COLUMNAS, VIGAS,
m2 DOS
1106.13
MANOS S/ 23.94 S/ 26,480.75 7,539.38 857.17 4,318.65 323.20 1,262.34 2,030.00 2,030.00 2,030.00 2,030.00 2,030.00 2,030.00
08.02.09.04 PINTURA ESMALTE EN ZOCALOS Y CONTRAZOCALOS m 120.7 S/ 22.36 S/ 2,698.85 449.81 449.81 449.81 449.81 449.81 449.81
08.02.09.05 PINTURA BARNIZ EN CARPINTERIA DE MADERA m² 166.53 S/ 24.43 S/ 4,068.33 678.06 678.06 678.06 678.06 678.06 678.06
08.02.09.06 PASTA MURAL PARA INTERIORES m2 1878.95 S/ 10.01 S/ 18,808.29 5,253.65 928.81 2,573.62 1,675.37 1,675.37 1,675.37 1,675.37 1,675.37 1,675.37
08.03 INSTALACIONES SANITARIAS S/ 10,946.56 - - - - - -
08.03.01 RED DE DRENAJE PLUVIAL (Aulas + Esaclera + Administración) S/ 9,776.78 - - - - - -
08.03.01.01 CANALETA DE FIERRO GALVANIZADO e= 1/27" m 53.2 S/ 121.07 S/ 6,440.92 3,198.65 3,198.65 7.27 7.27 7.27 7.27 7.27 7.27
08.03.01.02 TUBERIA DE BAJADA P/LLUVIAS, PVC SAL Ø 4". m 56.8 S/ 58.73 S/ 3,335.86 1,656.00 1,656.00 3.98 3.98 3.98 3.98 3.98 3.98
08.03.02 COLUMNETAS DE PROTECCION S/ 1,169.78 - - - - - -
08.03.02.01 PROTECCION TUBERIA DE DRENAJE CONCRETO 175 kg/cm2 m3 0.65 S/ 614.24 S/ 399.26 157.92 97.18 24.03 24.03 24.03 24.03 24.03 24.03
08.03.02.02 PROTECCION TUBERIA DE DRENAJE ENCOFRADO DESENCOFRADO
m2 6.48 S/ 95.89 S/ 621.37 244.21 147.09 38.34 38.34 38.34 38.34 38.34 38.34
08.03.02.03 PROTECCION TUBERIA DE DRENAJE ACERO FY=4200KG/CM2kg 24.45 S/ 6.10 S/ 149.15 59.27 35.57 9.05 9.05 9.05 9.05 9.05 9.05
08.04 INSTALACIONES ELECTRICAS S/ 86,855.88 - - - - - -
08.04.01 SALIDA PARA CENTRO DE LUZ EN TECHO pto 78 S/ 78.92 S/ 6,155.76 1,946.62 3,893.24 52.65 52.65 52.65 52.65 52.65 52.65
08.04.02 SALIDA PARA INTERRUPTOR SIMPLE pto 12 S/ 90.51 S/ 1,086.12 498.36 498.36 14.90 14.90 14.90 14.90 14.90 14.90
08.04.03 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON LINEA A TIERRA.
pto 38 S/ 56.29 S/ 2,139.02 549.51 1,056.75 88.79 88.79 88.79 88.79 88.79 88.79
08.04.04 TABLEROS ELECTRICOS S/ 15,471.66 - - - - - -
08.04.04.01 TABLERO DE DISTRIBUCION TD-1 Y TD-2 INT. AUT. 1-2x30A, 1-2x20A,
und 2-2x15A,
3 1 I.D. 2x25A-30mA,
S/ 5,157.22
18 POLOS S/ 15,471.66 402.56 805.17 581.89 2,280.34 2,280.34 2,280.34 2,280.34 2,280.34 2,280.34
08.04.05 INTERRUPTORES TERMOMAGNTICOS S/ 110.37 - - - - - -
08.04.05.01 INTERRUPTOR DIFERENCIAL DE 2X20A,30mA pza 3 S/ 36.79 S/ 110.37 74.36 6.00 6.00 6.00 6.00 6.00 6.00
08.04.06 CABLES S/ 13,755.10 - - - - - -
08.04.06.01 CABLE ELECTRICO TW 2.5MM2 m 1431.58 S/ 4.43 S/ 6,341.90 1,134.60 1,116.16 562.44 588.12 588.12 588.12 588.12 588.12 588.12
08.04.06.02 CABLE ELECTRICO TW 4.0MM2 m 641.28 S/ 11.56 S/ 7,413.20 3,648.29 3,659.50 105.41 0.00 0.00 0.00 0.00 0.00 0.00
08.04.07 CONDUCTOS S/ 7,357.53 - - - - - -
08.04.07.01 TUBERIA PVC - CEL D=20MM m 608.06 S/ 12.10 S/ 7,357.53 2,749.95 2,749.95 309.61 309.61 309.61 309.61 309.61 309.61
08.04.08 ARTEFACTOS ELECTRICOS S/ 10,780.32 - - - - - -
08.04.08.01 ARTEFACTO FLUORESCENTE TUBULAR DE 32W, C/DIFUSOR ACRILICO
und TRANSPARENTE,
18 SIMILAR
S/ 73.82
A TP DE JOSFEL S/ 1,328.76 642.51 257.00 429.25 - - - - - - -
08.04.08.02 ARTEFACTO 02 FLUORESCENTE DE 40W, SIMILAR A BE DE JOSFEL
und 60 S/ 134.93 S/ 8,095.80 3,975.00 1,590.00 2,530.80 - - - - - - -
08.04.08.03 LAMPARA LUZ DE EMERGENCIA 2 FAROS und 9 S/ 150.64
S/ 1,355.76 225.96 225.96 225.96 225.96 225.96 225.96
08.04.09 INSTALACIONES ESPECIALES
S/ 30,000.00 - - - - - -
08.04.09.01 SUMINISTRO E INSTALACION DE LAS INSTALACIONES ESPECIALES
GLB (INTERNET,
1 TV CABLE, MULTIMEDIA,
S/ 30,000.00 ALARMA CONTRAS/INCENDIO,
30,000.00 DETECTORES DE HUMO, PULSADORES) 3,108.65 3,202.85 3,108.65 942.02 3,272.97 3,272.97 3,272.97 3,272.97 3,272.97 3,272.97
09 MODULO VIII - NIVEL PRIMARIA S/ 960,602.89 - - - - - -
09.01 ESTRUCTURAS S/ 519,078.63 - - - - - -
09.01.01 TRABAJOS PRELIMINARES S/ 753.32 - - - - - -
09.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 164.84 S/ 1.84 S/ 303.31 288.47 2.47 2.47 2.47 2.47 2.47 2.47
09.01.01.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 164.84 S/ 2.73 S/ 450.01 443.42 1.10 1.10 1.10 1.10 1.10 1.10
09.01.02 MOVIMIENTO DE TIERRAS S/ 45,908.22 - - - - - -
09.01.02.01 EXCAVACION MANUAL DE ZANJAS PARA TERRENO NORMAL m3 192.65 S/ 73.63 S/ 14,184.82 12,506.18 1,021.70 109.49 109.49 109.49 109.49 109.49 109.49
09.01.02.02 EXCAVACION MANUAL DE ZANJAS PARA CIMIENTO CORRIDO m3 28.6 S/ 49.09 S/ 1,403.97 1,339.05 10.82 10.82 10.82 10.82 10.82 10.82
09.01.02.03 RELLENO CON MATERIAL PROPIO m3 134.4 S/ 21.04 S/ 2,827.78 1,859.89 837.52 21.73 21.73 21.73 21.73 21.73 21.73
09.01.02.04 ACARREO DE MATERIAL EXCEDENTE m3 104.23 S/ 24.54 S/ 2,557.80 2,045.16 393.82 19.80 19.80 19.80 19.80 19.80 19.80
09.01.02.05 ELIMINACION DE MATERIAL EXCEDENTE m2 104.23 S/ 160.35 S/ 16,713.28 13,941.17 2,684.55 14.59 14.59 14.59 14.59 14.59 14.59
09.01.02.06 NIVELACION Y APISONADO m2 164.84 S/ 49.87 S/ 8,220.57 8,182.66 6.32 6.32 6.32 6.32 6.32 6.32
09.01.03 OBRAS DE CONCRETO SIMPLE S/ 24,076.39 - - - - - -
09.01.03.01 FALSA ZAPATA MEZCLA 1:10 CEMENTO-HORMIGON + 30% P.G.m3
8" 58.38 S/ 265.48 S/ 15,498.72 13,138.24 2,143.90 36.10 36.10 36.10 36.10 36.10 36.10
09.01.03.02 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30%
m3 PG 13.76 S/ 253.55 S/ 3,488.85 3,441.51 7.89 7.89 7.89 7.89 7.89 7.89
09.01.03.03 CONCRETO PARA SOBRECOMIENTOS H: 1:8 + 25% P.M. e=15cm
m3 0.99 S/ 517.12 S/ 511.95 503.51 1.41 1.41 1.41 1.41 1.41 1.41
09.01.03.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO h=0.30 m 2 13.14 S/ 100.73 S/ 1,323.59 1,282.07 6.92 6.92 6.92 6.92 6.92 6.92
09.01.03.05 FALSO PISO, MEZCLA CONCRETO 1:8 CEMENTO-HORMIGON e=4"
m2 99.58 S/ 32.67 S/ 3,253.28 3,134.78 19.75 19.75 19.75 19.75 19.75 19.75
09.01.04 CONCRETO ARMADO S/ 418,506.85 - - - - - -
09.01.04.01 SOBRECIMIENTO ARMADO S/ 21,192.38 - - - - - -
09.01.04.01.01 CONCRETO PARA SOBRECOMIENTOS ARMADO H: 1:8 + 25%m3
P.M. e=15cm
3.78 S/ 517.12 S/ 1,954.71 1,922.51 5.37 5.37 5.37 5.37 5.37 5.37
09.01.04.01.02 CONCRETO PARA SOBRECOMIENTOS ARMADO H: 1:8 + 25%m3
P.M. e=25cm
7.6 S/ 565.87 S/ 4,300.61 4,219.52 13.51 13.51 13.51 13.51 13.51 13.51
09.01.04.01.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO m2 111.12 S/ 100.73 S/ 11,193.12 10,841.98 58.52 58.52 58.52 58.52 58.52 58.52
09.01.04.01.04 ACERO EN SOBRECIMIENTO ARMADO FY= 4200 kg/cm2 GRADO
kg 60 601.92 S/ 6.22 S/ 3,743.94 3,695.79 8.03 8.03 8.03 8.03 8.03 8.03
09.01.04.02 ZAPATAS S/ 27,538.38 - - - - - -
09.01.04.02.01 CONCRETO F'C= 210 KG/CM2. PARA ZAPATAS m3 35.03 S/ 541.19 S/ 18,957.89 18,654.18 50.62 50.62 50.62 50.62 50.62 50.62
09.01.04.02.02 ACERO EN ZAPATAS FY= 4200 kg/cm2 GRADO 60 kg 1379.5 S/ 6.22 S/ 8,580.49 8,086.99 383.14 18.39 18.39 18.39 18.39 18.39 18.39
09.01.04.03 COLUMNAS S/ 143,878.25 - - - - - -
09.01.04.03.01 CONCRETO F'C= 210 KG/CM2. PARA COLUMNAS m3 57.17 S/ 644.68 S/ 36,856.36 36,112.00 744.36 - - - 0.00 0.00 0.00 0.00 0.00 0.00
09.01.04.03.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 525.11 S/ 92.14 S/ 48,383.64 15,723.54 19,849.74 5,843.44 5,753.91 202.17 202.17 202.17 202.17 202.17 202.17
09.01.04.03.03 ACERO Fy=4200 KG/CM2 GRADO 60, EN COLUMNAS kg 8937.87 S/ 6.22 S/ 55,593.55 32,997.16 4,221.86 1,824.32 7,914.52 7,920.66 119.17 119.17 119.17 119.17 119.17 119.17
09.01.04.03.04 SELLADO DE JUNTAS DE DILATACION DE COLUMNAS m 45 S/ 67.66
S/ 3,044.70 806.76 1,210.14 504.23 504.23 3.22 3.22 3.22 3.22 3.22 3.22

09.01.04.04 VIGAS DE CIMENTACION S/ 22,913.89 - - - - - -


09.01.04.04.01 CONCRETO f'c=210 kg/cm2 EN VIGAS DE CIMENTACION m3 6.87 S/ 541.19 S/ 3,717.98 3,658.41 9.93 9.93 9.93 9.93 9.93 9.93
09.01.04.04.02 ENCOFRADO Y DESENCOFRADO EN VIGA DE CIMENTACIONm2 54.96 S/ 84.83 S/ 4,662.26 4,510.57 25.28 25.28 25.28 25.28 25.28 25.28
09.01.04.04.03 ACERO FY= 4200 kg/cm2 GRADO 60, EN VIGAS DE CIMENTACION
kg 2336.6 S/ 6.22 S/ 14,533.65 14,346.72 31.15 31.15 31.15 31.15 31.15 31.15
09.01.04.05 COLUMNETAS S/ 9,051.89 - - - - - -
09.01.04.05.01 CONCRETO f'c=175 kg/cm2 PARA COLUMNETAS m3 2.23 S/ 456.29 S/ 1,017.53 336.11 280.34 391.87 1.54 1.54 1.54 1.54 1.54 1.54
09.01.04.05.02 ENCOFRADO Y DESENCOFRADO EN COLUMNETAS m2 40.99 S/ 95.89 S/ 3,930.53 1,262.90 49.91 2,475.89 23.64 23.64 23.64 23.64 23.64 23.64
09.01.04.05.03 ACERO FY= 4200 kg/cm2 GRADO 60, EN COLUMNETAS kg 659.78 S/ 6.22 S/ 4,103.83 1,491.28 1,279.88 1,279.88 8.80 8.80 8.80 8.80 8.80 8.80
09.01.04.06 VIGAS S/ 79,853.97 - - - - - -
09.01.04.06.01 CONCRETO F'C= 210 KG/CM2. EN VIGAS m3 31.04 S/ 663.68 S/ 20,600.63 6,732.16 13,464.32 67.36 67.36 67.36 67.36 67.36 67.36
09.01.04.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 166.03 S/ 84.83 S/ 14,084.32 4,542.03 9,084.05 76.37 76.37 76.37 76.37 76.37 76.37
09.01.04.06.03 ACERO FY= 4200 kg/cm2 GRADO 60, EN VIGAS kg 7261.9 S/ 6.22 S/ 45,169.02 14,862.69 109.29 29,616.09 96.83 96.83 96.83 96.83 96.83 96.83
09.01.04.07 VIGUETAS S/ 3,098.35 - - - - - -
09.01.04.07.01 CONCRETO F'C=175 KG/CM2. EN VIGUETAS m3 1.31 S/ 513.78 S/ 673.05 140.42 258.53 131.80 133.32 1.50 1.50 1.50 1.50 1.50 1.50
09.01.04.07.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGUETAS m2 17.42 S/ 123.50 S/ 2,151.37 427.54 820.63 409.72 410.91 13.76 13.76 13.76 13.76 13.76 13.76
09.01.04.07.03 ACERO FY= 4200 kg/cm2 GRADO 60, EN VIGUETAS kg 44.04 S/ 6.22 S/ 273.93 90.14 90.14 45.07 45.07 0.59 0.59 0.59 0.59 0.59 0.59
09.01.04.08 LOSA ALIGERADA S/ 72,374.02 - - - - - -
09.01.04.08.01 CONCRETO F'C=210 KG/CM2 EN LOSA ALIGERADA m3 26.36 S/ 518.44 S/ 13,666.08 6,747.37 6,918.71 0.00 0.00 0.00 0.00 0.00 0.00
09.01.04.08.02 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA m2 263.56 S/ 102.88 S/ 27,115.05 5,577.34 3,868.63 2,944.85 2,944.85 2,944.85 2,944.85 2,944.85 2,944.85
09.01.04.08.03 ACERO Fy=4200 KG/CM2 GRADO 60, EN LOSA ALIGERADA kg 1260.14 S/ 6.22 S/ 7,838.07 3,868.63 3,969.44 0.00 0.00 0.00 0.00 0.00 0.00
09.01.04.08.04 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA LOSA ALIGERADA
und 4390.91 S/ 5.41 S/ 23,754.82 11,767.64 1,997.86 1,997.86 1,997.86 1,997.86 1,997.86 1,997.86
09.01.04.09 TECHO INCLINADO DE CONCRETO ARMADO S/ 38,605.72 - - - - - -
09.01.04.09.01 CONCRETO F'C=210 KG/CM2 EN LOSA ALIGERADA INCLINADA
m3 16.7 S/ 566.86 S/ 9,466.56 9,321.77 24.13 24.13 24.13 24.13 24.13 24.13
09.01.04.09.02 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA INCLINADA
m2 167 S/ 102.97 S/ 17,195.99 16,668.27 87.95 87.95 87.95 87.95 87.95 87.95
09.01.04.09.03 ACERO Fy=4200 KG/CM2 GRADO 60, EN LOSA ALIGERADA INCLINADA
kg 710.17 S/ 6.22 S/ 4,417.26 4,360.44 9.47 9.47 9.47 9.47 9.47 9.47
09.01.04.09.04 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA LOSA ALIGERADA
und 1391.11
INCLINADA S/ 5.41 S/ 7,525.91 7,456.35 11.59 11.59 11.59 11.59 11.59 11.59
09.01.05 COBERTURA S/ 29,521.23 - - - - - -
09.01.05.01 IMPERMEABILIZACION DE TECHO CON PINTURA ASFALTICA m2 200.57 S/ 6.84 S/ 1,371.90 1,301.70 11.70 11.70 11.70 11.70 11.70 11.70
09.01.05.02 VIGUETAS DE MADERA P/FIJAR COBERTURA DE TEJA ANDINAm 110.1 S/ 19.61 S/ 2,159.06 2,159.06 - - - - - -
09.01.05.03 COBERTURA DE TEJA ANDINA m2 200.57 S/ 116.22 S/ 23,310.25 23,191.91 19.72 19.72 19.72 19.72 19.72 19.72
09.01.05.04 CUMBRERAS DE TEJA ANDINA m 18.35 S/ 146.05 S/ 2,680.02 2,675.61 0.73 0.73 0.73 0.73 0.73 0.73
09.01.06 VARIOS S/ 312.62 - - - - - -
09.01.06.01 GARGOLAS unid 2 S/ 156.31 S/ 312.62 124.90 124.90 10.47 10.47 10.47 10.47 10.47 10.47
09.02 ARQUITECTURA S/ 350,416.87 - - - - - -
09.02.01 MUROS Y TABIQUES DE ALBAÑILERIA S/ 48,333.08 - - - - - -
09.02.01.01 MURO DE LADRILLO KK DE CABEZA JUNTA 1.5 cm. MORTEROm2
1:4 147.59 S/ 167.45 S/ 24,713.95 10,820.74 5,878.74 7,428.53 97.66 97.66 97.66 97.66 97.66 97.66
09.02.01.02 MURO DE LADRILLO KK DE SOGA JUNTA 1.5 cm. MORTERO 1:4m2 190.8 S/ 123.79 S/ 23,619.13 7,705.78 8,043.81 7,367.74 83.63 83.63 83.63 83.63 83.63 83.63
09.02.02 REVOQUES ENLUCIDOS Y MOLDURAS S/ 88,413.85 - - - - - -
09.02.02.01 TARRAJEO DE COLUMNAS m² 525.11 S/ 68.16 S/ 35,791.50 9,143.92 18,287.83 1,393.29 1,393.29 1,393.29 1,393.29 1,393.29 1,393.29
09.02.02.02 TARRAJEO DE VIGAS m² 166.03 S/ 66.55 S/ 11,049.30 3,503.23 7,006.47 89.93 89.93 89.93 89.93 89.93 89.93
09.02.02.03 TARRAJEO MUROS EXTERIOR MORTERO 1:4 m2 465.78 S/ 36.07 S/ 16,800.68 1,842.00 5,833.23 3,025.50 3,114.30 497.61 497.61 497.61 497.61 497.61 497.61
09.02.02.04 TARRAJEO MUROS INTERIORES MORTERO 1:4 m2 404.67 S/ 36.07 S/ 14,596.45 2,838.09 5,676.17 1,013.70 1,013.70 1,013.70 1,013.70 1,013.70 1,013.70
09.02.02.05 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS.m 142.88 S/ 37.61 S/ 5,373.72 1,665.98 3,331.96 62.63 62.63 62.63 62.63 62.63 62.63
09.02.02.06 TARRAJEO PRIMARIO Y RAYADO CON CEMENTO : ARENA. m2 20.09 S/ 33.96 S/ 682.26 215.70 431.40 5.86 5.86 5.86 5.86 5.86 5.86
09.02.02.07 BRUÑAS DE 1 X 1 cm m 358.88 S/ 11.48 S/ 4,119.94 1,272.83 2,545.66 50.24 50.24 50.24 50.24 50.24 50.24
09.02.03 CIELORRASOS S/ 27,827.09 - - - - - -
09.02.03.01 CIELORRASOS CON MEZCLA CEMENTO : ARENA 1:5 m² 430.56 S/ 64.63 S/ 27,827.09 8,843.70 8,843.70 8,843.70 216.00 216.00 216.00 216.00 216.00 216.00
09.02.04 PISOS Y PAVIMENTOS S/ 50,649.80 - - - - - -
09.02.04.01 CONTRAPISO 48MM m² 344.09 S/ 39.00 S/ 13,419.51 8,827.06 4,413.53 29.82 29.82 29.82 29.82 29.82 29.82
09.02.04.02 PISO DE CERAMICO DE ALTO TRANSITO 45x45 cm. m2 27.35 S/ 89.31 S/ 2,442.63 407.11 407.11 407.11 407.11 407.11 407.11
09.02.04.03 PISO DE PORCELANATO 0.60X0.60M m2 322.2 S/ 101.89 S/ 32,828.96 10,265.94 13,376.15 1,531.14 1,531.14 1,531.14 1,531.14 1,531.14 1,531.14
09.02.04.04 VEREDAS DE CEMENTO FROTACHADO y BRUÑADOf´c=140 kg/cm2,
m3 e=15cm
8.49 S/ 54.32 S/ 461.18 243.85 81.46 132.72 0.52 0.52 0.52 0.52 0.52 0.52
09.02.04.05 AFIRMADO E=4" m3 2.88 S/ 214.48 S/ 617.70 578.51 - - 6.53 6.53 6.53 6.53 6.53 6.53
09.02.04.06 ENCOFRADO Y DESENCOFRADO DE VEREDAS h=0.15 m. m2 9.46 S/ 84.83 S/ 802.49 340.01 360.06 90.22 2.03 2.03 2.03 2.03 2.03 2.03
09.02.04.07 JUNTA ASFALTICA 1" m 7.2 S/ 10.74 S/ 77.33 12.89 12.89 12.89 12.89 12.89 12.89
09.02.05 ZOCALOS Y CONTRAZOCALOS S/ 7,614.92 - - - - - -
09.02.05.01 ZOCALO DE CERAMICO BLANCO DE 20 X 30 cm. H= 2.05m. m2 54.62 S/ 17.89 S/ 977.15 162.86 162.86 162.86 162.86 162.86 162.86
09.02.05.02 ZOCALO DE CEMENTO S/COLOREAR h=0.30 m, PULIDO m2 14.37 S/ 17.89 S/ 257.08 222.16 5.82 5.82 5.82 5.82 5.82 5.82
09.02.05.03 CONTRAZOCALO DE PORCELANATO H=0.10M m 248.76 S/ 25.65 S/ 6,380.69 1,216.31 1,556.52 2,214.06 232.30 232.30 232.30 232.30 232.30 232.30
09.02.06 CARPINTERIA DE MADERA S/ 39,745.12 - - - - - -
CRONOGRAMA VALORIZADO DE AVANCE DE OBRA

Obra: MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCIÓN EDUCATIVA INTEGRADA N°277-21 y 54177 "EL BUEN PASTOR" DE TALAVERA" DISTRITO DE TALAVERA - PROVINCIA ANDAHUALAS - REGIÓN APURÍMAC
Ubicación: APURIMAC - ANDAHUAYLAS - TALAVERA

PLAZO DE EJECUCION
MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 MES 11 MES 12 MES 13 MES 14 MES 15 MES 16 MES 17 MES 18 MES 19 MES 20 MES 21 MES 22 MES 23 MES 24 MES 25 MES 26 MES 27 MES 28 MES 29 MES 30 MES 31 MES 32 MES 33 MES 34 MES 35 MES 36 TOTAL
Item Descripcion Unid Metrado PU S/ PARCIAL
MAR - 2019 ABR - 2019 MAY - 2019 JUN - 2019 JUL - 2019 AGO - 2019 SET - 2019 0CT - 2019 NOV - 2019 DIC - 2019 ENE - 2020 FEB - 2020 MAR - 2020 JUL - 2020 AGO - 2020 SET - 2020 0CT - 2020 NOV - 2020 DIC - 2020 ENE - 2021 FEB - 2021 MAR - 2021 ABR - 2021 MAY - 2021 JUN - 2021 JUL - 2021 AGO - 2021 SET -2021 0CT - 2021 NOV - 2021 DIC - 2021 ENE - 2022 FEB - 2022 MAR - 2022 ABR - 2022 MAY - 2022 1188 Dias
09.02.06.01 PUERTA DE MADERA AGUANO TABLERO REBAJADO m2 42.47 S/ 935.84 S/ 39,745.12 6,624.19 6,624.19 6,624.19 6,624.19 6,624.19 6,624.19
09.02.07 CARPINTERIA DE ALUMINIO S/ 13,408.91 - - - - - -
09.02.07.01 VENTANA DE ALUMINIO NATURAL PESADO e=1.5mm INC. VIDRIO
m2 TEMPLADO
36.93 S/ 363.09 S/ 13,408.91 13,319.17 14.96 14.96 14.96 14.96 14.96 14.96
09.02.08 CERRAJERIA S/ 7,050.28 - - - - - -
09.02.08.01 BISAGRAS CAPUCHINA ALUMINIZADA DE 4"x 4" pza 30 S/ 17.30 S/ 519.00 86.50 86.50 86.50 86.50 86.50 86.50
09.02.08.02 BRAZO EXTERIOR PARA VENTANA PROYECTANTE pza 48 S/ 68.58 S/ 3,291.84 548.64 548.64 548.64 548.64 548.64 548.64
09.02.08.03 CERROJO "CARACOL" DE ALUMINIO SEGURIDAD PARA VENTANA
pza 8 S/ 13.15 S/ 105.20 17.53 17.53 17.53 17.53 17.53 17.53
09.02.08.04 CERRADURA CILINDRICA - TIPO PERILLA pza 4 S/ 104.52 S/ 418.08 69.68 69.68 69.68 69.68 69.68 69.68
09.02.08.05 CERRADURA DE BARRA TRAMPA DE 1 PUNTO pza 4 S/ 679.04 S/ 2,716.16 452.69 452.69 452.69 452.69 452.69 452.69
09.02.09 PINTURA S/ 67,373.82 - - - - - -
09.02.09.01 PINTURA LATEX EN CIELO RASO 2 MANOS m2 430.56 S/ 21.40 S/ 9,213.98 2,379.27 2,724.20 2,046.04 1,607.61 456.86 - - 0.00 0.00 0.00 0.00 0.00 0.00
09.02.09.02 PINTURA SATINADO EN EXTERIORES, MUROS, COLUMNAS, VIGAS,
m2 DOS
742.23
MANOS S/ 23.94 S/ 17,768.99 5,059.04 1,867.98 600.72 2,943.66 2,817.43 746.69 746.69 746.69 746.69 746.69 746.69
09.02.09.03 PINTURA SATINADO EN INTERIORES, MUROS, COLUMNAS, VIGAS,
m2 DOS
819.36
MANOS S/ 23.94 S/ 19,615.48 5,584.76 639.60 2,558.64 1,805.41 1,805.41 1,805.41 1,805.41 1,805.41 1,805.41
09.02.09.04 PINTURA ESMALTE EN ZOCALOS Y CONTRAZOCALOS m 76.49 S/ 22.36 S/ 1,710.32 285.05 285.05 285.05 285.05 285.05 285.05
09.02.09.05 PINTURA BARNIZ EN CARPINTERIA DE MADERA m² 79.4 S/ 24.43 S/ 1,939.74 323.29 323.29 323.29 323.29 323.29 323.29
09.02.09.06 PASTA MURAL PARA INTERIORES m2 1710.82 S/ 10.01 S/ 17,125.31 6,129.29 1,042.41 1,002.78 1,491.81 1,491.81 1,491.81 1,491.81 1,491.81 1,491.81
09.03 INSTALACIONES SANITARIAS S/ 10,677.67 - - - - - -
09.03.01 MOVIMIENTO DE TIERRAS S/ 330.61 - - - - - -
09.03.01.01 EXCAVACION DE ZANJA m3 3.55 S/ 73.63 S/ 261.39 249.28 2.02 2.02 2.02 2.02 2.02 2.02
09.03.01.02 RELLENO DE ZANJA m3 3.29 S/ 21.04 S/ 69.22 66.03 0.53 0.53 0.53 0.53 0.53 0.53
09.03.02 SISTEMA DE AGUA FRIA S/ 385.01 - - - - - -
09.03.02.01 RED DE TUBERIA DE 1/2" PVC-SAP m 12.2 S/ 23.75 S/ 289.75 90.12 183.24 2.73 2.73 2.73 2.73 2.73 2.73
09.03.02.02 SALIDA DE AGUA FRIA CON TUBERIA PVC C-10 1/2" pto 1 S/ 23.75 S/ 23.75 22.53 0.20 0.20 0.20 0.20 0.20 0.20
09.03.02.03 VALVULA TIPO BOLA DE PVC DE 1/2" und 1 S/ 14.50 S/ 14.50 14.50 - - - - - -
09.03.02.04 CAJA PARA VALVULAS EN NICHO CERAMICO und 1 S/ 57.01 S/ 57.01 12.00 7.50 7.50 7.50 7.50 7.50 7.50
09.03.03 INSTALACIONES SANITARIAS S/ 519.48 - - - - - -
09.03.03.01 SALIDA DE DESAGUE EN PVC SAL DE 2" pto 2 S/ 99.31 S/ 198.62 186.38 2.04 2.04 2.04 2.04 2.04 2.04
09.03.03.02 SUMINISTRO Y COLOCACION DE TUBERIA EN PVC SAL DE 2" m 10 S/ 12.77 S/ 127.70 107.50 3.37 3.37 3.37 3.37 3.37 3.37
09.03.03.03 CODO DE 90° DE 2" und 2 S/ 36.67 S/ 73.34 67.46 0.98 0.98 0.98 0.98 0.98 0.98
09.03.03.04 CODO DE 45° DE 2" und 1 S/ 37.68 S/ 37.68 34.74 0.49 0.49 0.49 0.49 0.49 0.49
09.03.03.05 YEE DE 2" und 1 S/ 23.96 S/ 23.96 22.20 0.29 0.29 0.29 0.29 0.29 0.29
09.03.03.06 SUMIDERO DE 2" und 1 S/ 58.18 S/ 58.18 55.37 0.47 0.47 0.47 0.47 0.47 0.47
09.03.04 APARATOS Y ACCESORIOS SANITARIOS S/ 493.66 - - - - - -
09.03.04.01 LAVADERO DE ACERO INOXIDABLE und 1 S/ 493.66 S/ 493.66 292.67 200.00 0.17 0.17 0.17 0.17 0.17 0.17
09.03.05 RED DE DRENAJE PLUVIAL (Aulas + Esaclera + Administración) S/ 7,779.13 - - - - - -
09.03.05.01 CANALETA DE FIERRO GALVANIZADO e= 1/27" m 36.7 S/ 121.07 S/ 4,443.27 2,206.59 2,206.59 5.02 5.02 5.02 5.02 5.02 5.02
09.03.05.02 TUBERIA DE BAJADA P/LLUVIAS, PVC SAL Ø 4". m 56.8 S/ 58.73 S/ 3,335.86 1,968.12 1,367.74 - - - - - -
09.03.06 COLUMNETAS DE PROTECCION S/ 1,169.78 - - - - - -
09.03.06.01 PROTECCION TUBERIA DE DRENAJE CONCRETO 175 kg/cm2 m3 0.65 S/ 614.24 S/ 399.26 157.92 236.89 0.74 0.74 0.74 0.74 0.74 0.74
09.03.06.02 PROTECCION TUBERIA DE DRENAJE ENCOFRADO DESENCOFRADO
m2 6.48 S/ 95.89 S/ 621.37 244.21 366.79 1.73 1.73 1.73 1.73 1.73 1.73
09.03.06.03 PROTECCION TUBERIA DE DRENAJE ACERO FY=4200KG/CM2kg 24.45 S/ 6.10 S/ 149.15 59.27 88.90 0.16 0.16 0.16 0.16 0.16 0.16
09.04 INSTALACIONES ELECTRICAS S/ 80,429.72 - - - - - -
09.04.01 SALIDA PARA CENTRO DE LUZ EN TECHO pto 53 S/ 78.92 S/ 4,182.76 2,695.32 1,322.70 27.46 27.46 27.46 27.46 27.46 27.46
09.04.02 SALIDA PARA INTERRUPTOR SIMPLE pto 10 S/ 90.51 S/ 905.10 415.30 415.30 12.42 12.42 12.42 12.42 12.42 12.42
09.04.03 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON LINEA A TIERRA.
pto 80 S/ 56.29 S/ 4,503.20 422.70 1,690.80 398.28 398.28 398.28 398.28 398.28 398.28
09.04.04 TABLEROS ELECTRICOS S/ 15,471.66 - - - - - -
09.04.04.01 TABLERO DE DISTRIBUCION TD-1 Y TD-2 INT. AUT. 1-2x30A, 1-2x20A,
und 2-2x15A,
3 1 I.D. 2x25A-30mA,
S/ 5,157.22
18 POLOS S/ 15,471.66 402.56 805.17 581.89 2,280.34 2,280.34 2,280.34 2,280.34 2,280.34 2,280.34
09.04.05 INTERRUPTORES TERMOMAGNTICOS S/ 359.11 - - - - - -
09.04.05.01 INTERRUPTOR DIFERENCIAL DE 2X15A,30mA pza 2 S/ 36.79 S/ 73.58 49.57 4.00 4.00 4.00 4.00 4.00 4.00
09.04.05.02 INTERRUPTOR DIFERENCIAL DE 2X20A,30mA pza 7 S/ 40.79 S/ 285.53 55.17 38.39 38.39 38.39 38.39 38.39 38.39
09.04.06 CABLES S/ 12,183.00 - - - - - -
09.04.06.01 CABLE ELECTRICO TW 2.5MM2 m 1127.12 S/ 4.43 S/ 4,993.14 545.20 806.60 606.89 606.89 606.89 606.89 606.89 606.89
09.04.06.02 CABLE ELECTRICO TW 4.0MM2 m 621.96 S/ 11.56 S/ 7,189.86 1,981.14 2,983.90 370.80 370.80 370.80 370.80 370.80 370.80
09.04.07 CONDUCTOS S/ 6,199.44 - - - - - -
09.04.07.01 TUBERIA PVC - CEL D=20MM m 512.35 S/ 12.10 S/ 6,199.44 1,417.50 1,417.50 560.74 560.74 560.74 560.74 560.74 560.74
09.04.08 ARTEFACTOS ELECTRICOS S/ 6,625.45 - - - - - -
09.04.08.01 ARTEFACTO FLUORESCENTE TUBULAR DE 32W, C/DIFUSOR ACRILICO
und TRANSPARENTE,
16 SIMILAR
S/ 73.82
A TP DE JOSFEL S/ 1,181.12 571.12 228.45 381.55 - 0.00 0.00 0.00 0.00 0.00 0.00
09.04.08.02 ARTEFACTO 02 FLUORESCENTE DE 40W, SIMILAR A BE DE JOSFEL
und 37 S/ 134.93 S/ 4,992.41 2,517.50 914.32 1,560.59 - 0.00 0.00 0.00 0.00 0.00 0.00
09.04.08.03 LAMPARA LUZ DE EMERGENCIA 2 FAROS und 3 S/ 150.64 S/ 451.92 75.32 75.32 75.32 75.32 75.32 75.32
09.04.09 INSTALACIONES ESPECIALES S/ 30,000.00 - - - - - -
09.04.09.01 SUMINISTRO E INSTALACION DE LAS INSTALACIONES ESPECIALES
GLB (INTERNET,
1 TV CABLE, MULTIMEDIA,
S/ 30,000.00 ALARMA CONTRAS/INCENDIO,
30,000.00 DETECTORES DE HUMO, PULSADORES) 1,968.22 4,336.16 3,115.78 1,884.03 3,115.97 3,115.97 3,115.97 3,115.97 3,115.97 3,115.97
10 SALA DE PROFESORES - NIVEL INICIAL S/ 169,842.70 - - - - - -
10.01 ESTRUCTURAS S/ 93,729.76 - - - - - -
10.01.01 TRABAJOS PRELIMINARES S/ 213.86 - - - - - -
10.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 59.66 S/ 1.84 S/ 109.77 106.80 0.50 0.50 0.50 0.50 0.50 0.50
10.01.01.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 38.13 S/ 2.73 S/ 104.09 103.33 0.13 0.13 0.13 0.13 0.13 0.13
10.01.02 MOVIMIENTO DE TIERRAS S/ 4,523.74 - - - - - -
10.01.02.01 EXCAVACION MANUAL DE ZANJAS PARA TERRENO NORMAL m3 11.88 S/ 73.63 S/ 874.72 848.71 4.34 4.34 4.34 4.34 4.34 4.34
10.01.02.02 EXCAVACION MANUAL DE ZANJAS PARA CIMIENTO CORRIDO m3 15.31 S/ 49.09 S/ 751.57 729.21 3.73 3.73 3.73 3.73 3.73 3.73
10.01.02.03 RELLENO CON MATERIAL PROPIO m3 11.86 S/ 21.04 S/ 249.53 242.06 1.24 1.24 1.24 1.24 1.24 1.24
10.01.02.04 ACARREO DE MATERIAL EXCEDENTE m3 19.93 S/ 24.54 S/ 489.08 474.53 2.42 2.42 2.42 2.42 2.42 2.42
10.01.02.05 ELIMINACION DE MATERIAL EXCEDENTE m2 19.93 S/ 12.91 S/ 257.30 256.10 0.20 0.20 0.20 0.20 0.20 0.20
10.01.02.06 NIVELACION Y APISONADO m2 38.13 S/ 49.87 S/ 1,901.54 1,895.82 0.95 0.95 0.95 0.95 0.95 0.95
10.01.03 OBRAS DE CONCRETO SIMPLE S/ 25,720.63 - - - - - -
10.01.03.01 FALSA ZAPATA MEZCLA 1:10 CEMENTO-HORMIGON + 30% P.G.m3
8" 1.78 S/ 265.48 S/ 472.55 472.55 - - - - - -
10.01.03.02 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30%
m3 PG 93 S/ 253.55 S/ 23,580.15 988.55 3,765.27 3,765.27 3,765.27 3,765.27 3,765.27 3,765.27
10.01.03.03 CONCRETO PARA SOBRECOMIENTOS H: 1:8 + 25% P.M. e=15cm
m3 0.48 S/ 444.74 S/ 213.48 210.46 0.50 0.50 0.50 0.50 0.50 0.50
10.01.03.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO m2 6.36 S/ 100.73 S/ 640.64 640.64 - - - - - -
10.01.03.05 FALSO PISO, MEZCLA CONCRETO 1:8 CEMENTO-HORMIGON e=4"
m2 24.91 S/ 32.67 S/ 813.81 135.64 135.64 135.64 135.64 135.64 135.64
10.01.04 CONCRETO ARMADO S/ 54,831.28 - - - - - -
10.01.04.01 SOBRECIMIENTO ARMADO S/ 6,963.07 - - - - - -
10.01.04.01.01 CONCRETO PARA SOBRECOMIENTOS ARMADO H: 1:8 + 25%m3
P.M. e=15cm
1.08 S/ 517.12 S/ 558.49 553.06 0.91 0.91 0.91 0.91 0.91 0.91
10.01.04.01.02 CONCRETO PARA SOBRECOMIENTOS ARMADO H: 1:8 + 25%m3
P.M. e=25cm
1.2 S/ 565.87 S/ 679.04 671.51 1.26 1.26 1.26 1.26 1.26 1.26
10.01.04.01.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO m2 41.09 S/ 100.73 S/ 4,139.00 4,139.00 0.00 0.00 0.00 0.00 0.00 0.00
10.01.04.01.04 ACERO EN SOBRECIMIENTO ARMADO FY= 4200 kg/cm2 GRADO
kg 60 255.07 S/ 6.22 S/ 1,586.54 1,570.33 2.70 2.70 2.70 2.70 2.70 2.70
10.01.04.02 ZAPATAS S/ 2,196.99 - - - - - -
10.01.04.02.01 CONCRETO F'C= 210 KG/CM2. PARA ZAPATAS m3 2.97 S/ 541.19 S/ 1,607.33 1,592.75 14.58 0.00 0.00 0.00 0.00 0.00 0.00
10.01.04.02.02 ACERO EN ZAPATAS FY= 4200 kg/cm2 GRADO 60 kg 94.8 S/ 6.22
S/ 589.66 435.63 25.67 25.67 25.67 25.67 25.67 25.67
10.01.04.03 COLUMNAS S/ 14,288.45 - - - - - -
10.01.04.03.01 CONCRETO F'C= 210 KG/CM2. PARA COLUMNAS m3 3.16 S/ 644.68 S/ 2,037.19 1,357.47 337.77 318.66 3.88 3.88 3.88 3.88 3.88 3.88
10.01.04.03.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 41 S/ 92.14 S/ 3,777.74 2,322.29 637.49 136.33 136.33 136.33 136.33 136.33 136.33
10.01.04.03.03 ACERO Fy=4200 KG/CM2 GRADO 60, EN COLUMNAS kg 872.8 S/ 6.22 S/ 5,428.82 3,735.07 1,658.84 5.82 5.82 5.82 5.82 5.82 5.82
10.01.04.03.04 SELLADO DE JUNTAS DE DILATACION DE COLUMNAS m 45 S/ 67.66 S/ 3,044.70 507.45 507.45 507.45 507.45 507.45 507.45
10.01.04.04 VIGAS DE CIMENTACION S/ 4,657.56 - - - - - -
10.01.04.04.01 CONCRETO f'c=210 kg/cm2 EN VIGAS DE CIMENTACION m3 1.95 S/ 541.19 S/ 1,055.32 1,045.75 1.60 1.60 1.60 1.60 1.60 1.60
10.01.04.04.02 ENCOFRADO Y DESENCOFRADO EN VIGA DE CIMENTACIONm2 15.62 S/ 84.83 S/ 1,325.04 1,304.29 3.46 3.46 3.46 3.46 3.46 3.46
10.01.04.04.03 ACERO FY= 4200 kg/cm2 GRADO 60, EN VIGAS DE CIMENTACION
kg 366.11 S/ 6.22 S/ 2,277.20 1,562.18 700.38 2.44 2.44 2.44 2.44 2.44 2.44
10.01.04.05 COLUMNETAS S/ 2,060.26 - - - - - -
10.01.04.05.01 CONCRETO f'c=175 kg/cm2 PARA COLUMNETAS m3 0.68 S/ 456.29
S/ 310.28 127.13 181.62 0.25 0.25 0.25 0.25 0.25 0.25

10.01.04.05.02 ENCOFRADO Y DESENCOFRADO EN COLUMNETAS m2 14.26 S/ 95.89 S/ 1,367.39 646.83 697.75 3.80 3.80 3.80 3.80 3.80 3.80
10.01.04.05.03 ACERO FY= 4200 kg/cm2 GRADO 60, EN COLUMNETAS kg 61.51 S/ 6.22 S/ 382.59 380.13 0.41 0.41 0.41 0.41 0.41 0.41
10.01.04.06 VIGAS S/ 11,061.99 - - - - - -
10.01.04.06.01 CONCRETO F'C= 210 KG/CM2. EN VIGAS m3 5.32 S/ 663.68 S/ 3,530.78 3,491.57 39.21 0.00 0.00 0.00 0.00 0.00 0.00
10.01.04.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 32.3 S/ 84.83 S/ 2,740.01 1,082.68 140.44 1,516.89 0.00 0.00 0.00 0.00 0.00 0.00
10.01.04.06.03 ACERO FY= 4200 kg/cm2 GRADO 60, EN VIGAS kg 770.29 S/ 6.22 S/ 4,791.20 429.02 2,439.56 50.24 1,831.82 6.76 6.76 6.76 6.76 6.76 6.76
10.01.04.07 VIGUETAS S/ 650.42 - - - - - -
10.01.04.07.01 CONCRETO F'C= 175 KG/CM2. EN VIGUETAS m3 0.18 S/ 626.09 S/ 112.70 55.73 9.50 9.50 9.50 9.50 9.50 9.50
10.01.04.07.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGUETAS m2 3.8 S/ 123.50 S/ 469.30 319.62 24.95 24.95 24.95 24.95 24.95 24.95
10.01.04.07.03 ACERO FY= 4200 kg/cm2 GRADO 60, EN VIGUETAS kg 11 S/ 6.22 S/ 68.42 17.74 8.45 8.45 8.45 8.45 8.45 8.45
10.01.04.08 TECHO INCLINADO DE CONCRETO ARMADO S/ 12,952.54 - - - - - -
10.01.04.08.01 CONCRETO F'C=210 KG/CM2 EN LOSA ALIGERADA INCLINADA
m3 5.01 S/ 566.86 S/ 2,839.97 2,815.37 4.10 4.10 4.10 4.10 4.10 4.10
10.01.04.08.02 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA INCLINADA
m2 53.3 S/ 102.97 S/ 5,488.30 5,402.49 14.30 14.30 14.30 14.30 14.30 14.30
10.01.04.08.03 ACERO Fy=4200 KG/CM2 GRADO 60, EN LOSA ALIGERADA INCLINADA
kg 357.28 S/ 6.22 S/ 2,222.28 2,207.99 2.38 2.38 2.38 2.38 2.38 2.38
10.01.04.08.04 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA LOSA ALIGERADA
und 443.99
INCLINADA S/ 5.41 S/ 2,401.99 2,388.66 2.22 2.22 2.22 2.22 2.22 2.22
10.01.05 COBERTURAS S/ 8,440.25 - - - - - -
10.01.05.01 IMPERMEABILIZACION DE TECHO CON PINTURA ASFALTICA m2 53.3 S/ 6.84 S/ 364.57 356.58 1.33 1.33 1.33 1.33 1.33 1.33
10.01.05.02 VIGUETAS DE MADERA P/FIJAR COBERTURA DE TEJA ANDINAm 57.2 S/ 19.61 S/ 1,121.69 1,121.69 - - - - - -
10.01.05.03 COBERTURA DE TEJA ANDINA m2 53.3 S/ 116.22 S/ 6,194.53 6,178.00 2.75 2.75 2.75 2.75 2.75 2.75
10.01.05.04 CUMBRERAS DE TEJA ANDINA m 5.2 S/ 146.05 S/ 759.46 758.89 0.10 0.10 0.10 0.10 0.10 0.10
10.02 ARQUITECTURA S/ 45,697.76 - - - - - -
10.02.01 MUROS Y TABIQUES DE ALBAÑILERIA S/ 10,054.11 - - - - - -
10.02.01.01 MURO DE LADRILLO KK DE CABEZA JUNTA 1.5 cm. MORTEROm2
1:4 44.03 S/ 167.45 S/ 7,372.82 865.37 968.16 923.22 923.22 923.22 923.22 923.22 923.22
10.02.01.02 MURO DE LADRILLO KK DE SOGA JUNTA 1.5 cm. MORTERO 1:4m2 21.66 S/ 123.79 S/ 2,681.29 1,450.97 205.05 205.05 205.05 205.05 205.05 205.05
10.02.02 REVOQUES ENLUCIDOS Y MOLDURAS S/ 10,079.15 - - - - - -
CRONOGRAMA VALORIZADO DE AVANCE DE OBRA

Obra: MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCIÓN EDUCATIVA INTEGRADA N°277-21 y 54177 "EL BUEN PASTOR" DE TALAVERA" DISTRITO DE TALAVERA - PROVINCIA ANDAHUALAS - REGIÓN APURÍMAC
Ubicación: APURIMAC - ANDAHUAYLAS - TALAVERA

PLAZO DE EJECUCION
MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 MES 11 MES 12 MES 13 MES 14 MES 15 MES 16 MES 17 MES 18 MES 19 MES 20 MES 21 MES 22 MES 23 MES 24 MES 25 MES 26 MES 27 MES 28 MES 29 MES 30 MES 31 MES 32 MES 33 MES 34 MES 35 MES 36 TOTAL
Item Descripcion Unid Metrado PU S/ PARCIAL
MAR - 2019 ABR - 2019 MAY - 2019 JUN - 2019 JUL - 2019 AGO - 2019 SET - 2019 0CT - 2019 NOV - 2019 DIC - 2019 ENE - 2020 FEB - 2020 MAR - 2020 JUL - 2020 AGO - 2020 SET - 2020 0CT - 2020 NOV - 2020 DIC - 2020 ENE - 2021 FEB - 2021 MAR - 2021 ABR - 2021 MAY - 2021 JUN - 2021 JUL - 2021 AGO - 2021 SET -2021 0CT - 2021 NOV - 2021 DIC - 2021 ENE - 2022 FEB - 2022 MAR - 2022 ABR - 2022 MAY - 2022 1188 Dias
10.02.02.01 TARRAJEO DE COLUMNAS m² 31.2 S/ 68.16 S/ 2,126.59 1,684.49 73.68 73.68 73.68 73.68 73.68 73.68
10.02.02.02 TARRAJEO DE VIGAS m² 29.84 S/ 66.55 S/ 1,985.85 1,947.95 6.32 6.32 6.32 6.32 6.32 6.32
10.02.02.03 TARRAJEO MUROS EXTERIOR MORTERO 1:4 m2 44.02 S/ 36.07 S/ 1,587.80 1,352.73 39.18 39.18 39.18 39.18 39.18 39.18
10.02.02.04 TARRAJEO MUROS INTERIORES MORTERO 1:4 m2 89.48 S/ 36.07 S/ 3,227.54 416.39 1,683.88 187.88 187.88 187.88 187.88 187.88 187.88
10.02.02.05 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS.m 9.43 S/ 37.61 S/ 354.66 345.04 1.60 1.60 1.60 1.60 1.60 1.60
10.02.02.06 BRUÑAS DE 1 X 1 cm m 69.4 S/ 11.48 S/ 796.71 774.50 3.70 3.70 3.70 3.70 3.70 3.70
10.02.03 CIELORRASOS S/ 1,730.15 - - - - - -
10.02.03.01 CIELORRASOS CON MEZCLA CEMENTO : ARENA 1:5 m² 26.77 S/ 64.63 S/ 1,730.15 399.80 1,299.03 5.22 5.22 5.22 5.22 5.22 5.22
10.02.04 PISOS Y PAVIMENTOS S/ 5,148.76 - - - - - -
10.02.04.01 CONTRAPISO 48MM m² 24.91 S/ 39.00 S/ 971.49 161.92 161.92 161.92 161.92 161.92 161.92
10.02.04.02 PISO DE CERAMICO DE ALTO TRANSITO 45x45 cm. m² 6.38 S/ 89.31 S/ 569.80 423.95 24.31 24.31 24.31 24.31 24.31 24.31
10.02.04.03 PISO DE PORCELANATO 0.60X0.60M m2 18.53 S/ 101.89 S/ 1,888.02 314.67 314.67 314.67 314.67 314.67 314.67
10.02.04.04 VEREDAS DE CEMENTO FROTACHADO y BRUÑADOf´c=140 kg/cm2,
m3 e=15cm
4.89 S/ 54.32 S/ 265.62 61.50 202.31 0.30 0.30 0.30 0.30 0.30 0.30
10.02.04.05 AFIRMADO E=4" m3 1.61 S/ 214.48 S/ 345.31 329.57 2.62 2.62 2.62 2.62 2.62 2.62
10.02.04.06 ENCOFRADO Y DESENCOFRADO DE VEREDAS h=0.15 m. m2 12.08 S/ 84.83 S/ 1,024.75 130.32 878.84 2.60 2.60 2.60 2.60 2.60 2.60
10.02.04.07 JUNTA DE DILATACION ASFALTICA 1" m 7.8 S/ 10.74 S/ 83.77 13.96 13.96 13.96 13.96 13.96 13.96
10.02.05 ZOCALOS Y CONTRAZOCALOS S/ 1,011.03 - - - - - -
10.02.05.01 ZOCALO DE CEMENTO S/COLOREAR h=0.30 m, PINTADO m2 6.18 S/ 17.89 S/ 110.56 18.43 18.43 18.43 18.43 18.43 18.43
10.02.05.02 ZOCALO DE CERAMICO BLANCO DE 20X30 cm H=2.05m. m2 26.82 S/ 17.89 S/ 479.81 479.81 - - - - - -
10.02.05.03 CONTRAZOCALO DE PORCELANATO H=0.10M m 16.4 S/ 25.65 S/ 420.66 70.11 70.11 70.11 70.11 70.11 70.11
10.02.06 CARPINTERIA DE MADERA S/ 6,738.05 - - - - - -
10.02.06.01 PUERTA DE MADERA AGUANO TABLERO REBAJADO m2 7.2 S/ 935.84 S/ 6,738.05 1,123.01 1,123.01 1,123.01 1,123.01 1,123.01 1,123.01
10.02.07 CARPINTERIA DE ALUMINIO S/ 2,185.80 - - - - - -
10.02.07.01 VENTANA DE ALUMINIO NATRURAL PESADO e=1.5mm INC. VIDRIO
m2 TEMPLADO
6.02 S/ 363.09 S/ 2,185.80 364.30 364.30 364.30 364.30 364.30 364.30
10.02.08 CERRAJERIA S/ 757.96 - - - - - -
10.02.08.01 BISAGRAS CAPUCHINA ALUMINIZADA DE 4"x 4" pza 9 S/ 17.30 S/ 155.70 25.95 25.95 25.95 25.95 25.95 25.95
10.02.08.02 CERRADURA DE TRES GOLPÈS PARA PUERTA pza 1 S/ 105.75 S/ 105.75 17.63 17.63 17.63 17.63 17.63 17.63
10.02.08.03 BRAZO EXTERIOR PARA VENTANA PROYECTANTE pza 4 S/ 68.58 S/ 274.32 45.72 45.72 45.72 45.72 45.72 45.72
10.02.08.04 CERROJO "CARACOL" DE ALUMINIO SEGURIDAD PARA VENTANA
pza 1 S/ 13.15 S/ 13.15 2.19 2.19 2.19 2.19 2.19 2.19
10.02.08.05 CERRADURA CILINDRICA - TIPO PERILLA pza 2 S/ 104.52 S/ 209.04 34.84 34.84 34.84 34.84 34.84 34.84
10.02.09 PINTURA S/ 7,992.75 - - - - - -
10.02.09.01 PINTURA LATEX EN CIELO RASO 2 MANOS m2 26.77 S/ 21.40 S/ 572.88 95.48 95.48 95.48 95.48 95.48 95.48
10.02.09.02 PINTURA SATINADO EN EXTERIORES, MUROS, COLUMNAS, VIGAS,
m2 DOS
68.43
MANOS S/ 23.94 S/ 1,638.21 158.79 246.57 246.57 246.57 246.57 246.57 246.57
10.02.09.03 PINTURA SATINADO EN INTERIORES, MUROS, COLUMNAS, VIGAS,
m2 DOS126.1
MANOS S/ 23.94 S/ 3,018.83 503.14 503.14 503.14 503.14 503.14 503.14
10.02.09.04 PINTURA ESMALTE EN ZOCALOS Y CONTRAZOCALOS m 28.55 S/ 22.36 S/ 638.38 106.40 106.40 106.40 106.40 106.40 106.40
10.02.09.05 PINTURA BARNIZ EN CARPINTERIA DE MADERA m² 7.2 S/ 24.43 S/ 175.90 29.32 29.32 29.32 29.32 29.32 29.32
10.02.09.06 PASTA MURAL PARA INTERIORES m2 194.66 S/ 10.01 S/ 1,948.55 1,027.63 153.49 153.49 153.49 153.49 153.49 153.49
10.03 INSTALACIONES SANITARIAS S/ 17,637.94 - - - - - -
10.03.01 MOVIMIENTO DE TIERRA S/ 194.81 - - - - - -
10.03.01.01 EXCAVACION DE ZANJA m3 2.08 S/ 73.63 S/ 153.15 148.60 0.76 0.76 0.76 0.76 0.76 0.76
10.03.01.02 RELLENO DE ZANJA m3 1.98 S/ 21.04 S/ 41.66 40.41 0.21 0.21 0.21 0.21 0.21 0.21
10.03.02 SISTEMA DE AGUA FRIA S/ 237.76 - - - - - -
10.03.02.01 RED DE TUBERIA DE 1/2" PVC-SAP m 5 S/ 23.75 S/ 118.75 116.15 0.43 0.43 0.43 0.43 0.43 0.43
10.03.02.02 SALIDA DE AGUA FRIA CON TUBERIA PVC C-10 1/2" pto 2 S/ 23.75 S/ 47.50 46.46 0.17 0.17 0.17 0.17 0.17 0.17
10.03.02.03 VALVULA TIPO BOLA DE PVC DE 1/2" und 1 S/ 14.50 S/ 14.50 14.50 - - - - - -
10.03.02.04 CAJA PARA VALVULAS EN NICHO CERAMICO und 1 S/ 57.01 S/ 57.01 12.00 7.50 7.50 7.50 7.50 7.50 7.50
10.03.03 INSTALACIONES SANITARIAS S/ 1,164.65 - - - - - -
10.03.03.01 SALIDA DE DESAGUE EN PVC SAL DE 4" pto 2 S/ 119.51 S/ 239.02 233.80 0.87 0.87 0.87 0.87 0.87 0.87
10.03.03.02 SALIDA DE DESAGUE EN PVC SAL DE 2" pto 4 S/ 99.31 S/ 397.24 386.80 1.74 1.74 1.74 1.74 1.74 1.74
10.03.03.03 SUMINISTRO Y COLOCACION DE TUBERIA EN PVC SAL DE 4" m 5 S/ 16.97 S/ 84.85 66.50 3.06 3.06 3.06 3.06 3.06 3.06
10.03.03.04 SUMINISTRO Y COLOCACION DE TUBERIA EN PVC SAL DE 2" m 3 S/ 12.77 S/ 38.31 32.70 0.94 0.94 0.94 0.94 0.94 0.94
10.03.03.05 CODO DE 90 DE 4" und 2 S/ 46.52 S/ 93.04 90.96 0.35 0.35 0.35 0.35 0.35 0.35
10.03.03.06 CODO DE 90 DE 2" und 2 S/ 36.67 S/ 73.34 71.34 0.33 0.33 0.33 0.33 0.33 0.33
10.03.03.07 REDUCCION DE 4" A 2" und 1 S/ 55.85 S/ 55.85 54.34 0.25 0.25 0.25 0.25 0.25 0.25
10.03.03.08 YEE DE 4" und 2 S/ 30.95 S/ 61.90 60.68 0.20 0.20 0.20 0.20 0.20 0.20
10.03.03.09 YEE DE 4" A 2" und 2 S/ 31.46 S/ 62.92 61.70 0.20 0.20 0.20 0.20 0.20 0.20
10.03.03.10 SUMIDERO DE 2" und 1 S/ 58.18 S/ 58.18 9.70 9.70 9.70 9.70 9.70 9.70
10.03.04 APARATOS Y ACCESORIOS SANITARIOS S/ 2,351.00 - - - - - -
10.03.04.01 INODORO NACIONAL und 2 S/ 897.75 S/ 1,795.50 299.25 299.25 299.25 299.25 299.25 299.25
10.03.04.02 OVALIN NACIONAL und 2 S/ 277.75 S/ 555.50 92.58 92.58 92.58 92.58 92.58 92.58
10.03.05 RED DE DRENAJE PLUVIAL S/ 12,519.94 - - - - - -
10.03.05.01 CANALETA DE FIERRO GALVANIZADO e= 1/27" m 94 S/ 121.07 S/ 11,380.58 1,896.76 1,896.76 1,896.76 1,896.76 1,896.76 1,896.76
10.03.05.02 TUBERIA DE BAJADA P/LLUVIAS, PVC SAL Ø 4". m 19.4 S/ 58.73 S/ 1,139.36 565.61 565.61 1.36 1.36 1.36 1.36 1.36 1.36
10.03.06 COLUMNETAS DE PROTECCION S/ 1,169.78 - - - - - -
10.03.06.01 PROTECCION TUBERIA DE DRENAJE CONCRETO 175 kg/cm2 m3 0.65 S/ 614.24 S/ 399.26 66.54 66.54 66.54 66.54 66.54 66.54
10.03.06.02 PROTECCION TUBERIA DE DRENAJE ENCOFRADO DESENCOFRADO
m2 6.48 S/ 95.89 S/ 621.37 305.50 52.65 52.65 52.65 52.65 52.65 52.65
10.03.06.03 PROTECCION TUBERIA DE DRENAJE ACERO FY=4200KG/CM2kg 24.45 S/ 6.10 S/ 149.15 74.11 12.51 12.51 12.51 12.51 12.51 12.51
10.04 INSTALACIONES ELECTRICAS S/ 12,777.24 - - - - - -
10.04.01 SALIDAS INSTALACIONES ELECTRICAS S/ 677.16 - - - - - -
10.04.01.01 SALIDA PARA CENTRO DE LUZ EN TECHO pto 3 S/ 78.92 S/ 236.76 231.42 0.89 0.89 0.89 0.89 0.89 0.89
10.04.01.02 SALIDA PARA INTERRUPTOR SIMPLE pto 3 S/ 90.51 S/ 271.53 255.99 2.59 2.59 2.59 2.59 2.59 2.59
10.04.01.03 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON LINEA Apto
TIERRA. 3 S/ 56.29 S/ 168.87 130.20 6.45 6.45 6.45 6.45 6.45 6.45
10.04.02 TABLEROS ELECTRICOS S/ 10,314.44 - - - - - -
10.04.02.01 TABLERO DE DISTRIBUCION TD-1 Y TD-2 INT. AUT. 1-2x30A, 1-2x20A,
und 2-2x15A,
2 1 I.D. 2x25A-30mA,
S/ 5,157.22
18 POLOS S/ 10,314.44 1,719.07 1,719.07 1,719.07 1,719.07 1,719.07 1,719.07
10.04.03 INTERRUPTORES TERMOMAGNTICOS S/ 36.79 - - - - - -
10.04.03.01 INTERRUPTOR DIFERENCIAL DE 2X20A,30mA pza 1 S/ 36.79 S/ 36.79 6.13 6.13 6.13 6.13 6.13 6.13
10.04.04 CABLES S/ 643.48 - - - - - -
10.04.04.01 CABLE ELECTRICO TW 2.5MM2 m 20 S/ 4.43 S/ 88.60 14.77 14.77 14.77 14.77 14.77 14.77
10.04.04.02 CABLE ELECTRICO TW 4.0MM2 m 48 S/ 11.56 S/ 554.88 92.48 92.48 92.48 92.48 92.48 92.48
10.04.05 CONDUCTOS S/ 822.80 - - - - - -
10.04.05.01 TUBERIA PVC - CEL D=20MM m 68 S/ 12.10 S/ 822.80 137.13 137.13 137.13 137.13 137.13 137.13
10.04.06 ARTEFACTOS ELECTRICOS S/ 282.57 - - - - - -
10.04.06.01 ARTEFACTO 02 LAMPARAS DE 40W und 1 S/ 134.93
S/ 134.93 22.49 22.49 22.49 22.49 22.49 22.49

10.04.06.02 ARTEFACTO FLUORESCENTE CIRCULAR DE 32W, SIMILAR A BE


undDE JOSFEL
2 S/ 73.82 S/ 147.64 24.61 24.61 24.61 24.61 24.61 24.61
11 RAMPA - NIVEL INICIAL Y PRIMARIA S/ 591,017.52 - - - - - -
11.01 ESTRUCTURAS S/ 383,132.98 - - - - - -
11.01.01 TRABAJOS PRELIMINARES S/ 752.64 - - - - - -
11.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 205.57 S/ 1.84 S/ 378.25 119.86 245.37 2.17 2.17 2.17 2.17 2.17 2.17
11.01.01.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 137.14 S/ 2.73 S/ 374.39 184.24 186.04 0.69 0.69 0.69 0.69 0.69 0.69
11.01.02 MOVIMIENTO DE TIERRAS S/ 19,257.40 - - - - - -
11.01.02.01 EXCAVACION MANUAL DE ZANJAS PARA TERRENO NORMAL m3 162.85 S/ 73.63 S/ 11,990.65 1,813.78 9,788.71 64.69 64.69 64.69 64.69 64.69 64.69
11.01.02.02 EXCAVACION MANUAL DE ZANJAS PARA CIMIENTO CORRIDO m3 20.73 S/ 49.09 S/ 1,017.64 346.47 634.91 6.04 6.04 6.04 6.04 6.04 6.04
11.01.02.03 RELLENO CON MATERIAL PROPIO m3 83.72 S/ 21.04 S/ 1,761.47 314.70 1,388.70 9.68 9.68 9.68 9.68 9.68 9.68
11.01.02.04 ACARREO DE MATERIAL EXCEDENTE m3 119.83 S/ 24.54
S/ 2,940.63 493.04 2,351.48 16.02 16.02 16.02 16.02 16.02 16.02

11.01.02.05 ELIMINACION DE MATERIAL EXCEDENTE m2 119.83 S/ 12.91 S/ 1,547.01 270.12 1,269.07 1.30 1.30 1.30 1.30 1.30 1.30
11.01.03 OBRAS DE CONCRETO SIMPLE S/ 10,365.66 - - - - - -
11.01.03.01 FALSA ZAPATAS MEZCLA 1:12 CEMENTO-HORMIGON E= 0.60 M.
m3 34.9 S/ 265.48 S/ 9,265.25 1,450.21 7,730.49 14.09 14.09 14.09 14.09 14.09 14.09
11.01.03.02 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30%
m3 PG 4.34 S/ 253.55 S/ 1,100.41 782.84 304.36 2.20 2.20 2.20 2.20 2.20 2.20
11.01.04 CONCRETO ARMADO S/ 352,757.28 - - - - - -
11.01.04.01 ZAPATAS S/ 25,702.35 - - - - - -
11.01.04.01.01 CONCRETO F'C= 210 KG/CM2. PARA ZAPATAS m3 34.9 S/ 541.19 S/ 18,887.53 3,440.08 15,251.80 32.61 32.61 32.61 32.61 32.61 32.61
11.01.04.01.02 ACERO EN ZAPATAS FY= 4200 kg/cm2 GRADO 60 kg 1095.63 S/ 6.22 S/ 6,814.82 1,286.21 5,476.41 8.70 8.70 8.70 8.70 8.70 8.70
11.01.04.02 VIGA DE CIMENTACION S/ 7,569.96 - - - - - -
11.01.04.02.01 CONCRETO F'C= 210 KG/CM2. PARA VIGA DE CIMENTACION m3 4.69 S/ 541.19 S/ 2,538.18 1,251.42 1,254.90 5.31 5.31 5.31 5.31 5.31 5.31
11.01.04.02.02 ENCOFRADO Y DESENCOFRADO EN VIGA DE CIMENTACIONm2 31.3 S/ 84.83 S/ 2,655.18 1,284.40 1,307.40 10.56 10.56 10.56 10.56 10.56 10.56
11.01.04.02.03 ACERO EN VIGA DE CIMENTACION FY= 4200 kg/cm2 GRADO kg
60 382.09 S/ 6.22 S/ 2,376.60 1,117.17 1,236.87 3.76 3.76 3.76 3.76 3.76 3.76
11.01.04.03 COLUMNAS S/ 65,370.53 - - - - - -
11.01.04.03.01 CONCRETO F'C= 210 KG/CM2. PARA COLUMNAS m3 25.36 S/ 644.68 S/ 16,349.08 1,802.34 1,442.05 1,701.62 802.98 1,542.29 1,274.62 7,564.87 36.39 36.39 36.39 36.39 36.39 36.39
11.01.04.03.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 171.58 S/ 92.14 S/ 15,809.38 1,821.45 1,457.34 1,070.98 3,000.76 1,228.53 7,001.46 38.14 38.14 38.14 38.14 38.14 38.14
11.01.04.03.03 ACERO Fy=4200 KG/CM2 GRADO 60, EN COLUMNAS kg 4850.06 S/ 6.22 S/ 30,167.37 5,412.96 3,633.84 859.95 20,031.36 38.21 38.21 38.21 38.21 38.21 38.21
11.01.04.03.04 SELLADO DE JUNTAS DE DILATACION DE COLUMNAS m 45 S/ 67.66 S/ 3,044.70 507.45 507.45 507.45 507.45 507.45 507.45
11.01.04.04 VIGAS S/ 109,263.88 - - - - - -
11.01.04.04.01 CONCRETO F'C= 210 KG/CM2. EN VIGAS m3 44.68 S/ 663.68 S/ 29,653.22 5,504.58 4,404.22 6,425.27 2,238.02 3,229.05 2,126.44 5,309.55 69.35 69.35 69.35 69.35 69.35 69.35
11.01.04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 370.21 S/ 84.83 S/ 31,404.91 5,345.22 4,276.71 2,675.79 5,638.95 1,810.31 11,008.07 108.31 108.31 108.31 108.31 108.31 108.31
11.01.04.04.03 ACERO FY= 4200 kg/cm2 GRADO 60, EN VIGAS kg 7750.12 S/ 6.22 S/ 48,205.75 16,992.40 6,103.68 9,011.50 3,393.25 12,284.23 70.12 70.12 70.12 70.12 70.12 70.12
11.01.04.05 LOSA MACIZA DE CONCRETO ARMADO S/ 121,649.31 - - - - - -
11.01.04.05.01 CONCRETO F'C=210 KG/CM2 EN LOSA MACIZA m3 51.66 S/ 505.64 S/ 26,121.36 3,189.70 1,594.85 3,876.90 5,205.99 4,273.12 1,935.94 5,802.82 40.34 40.34 40.34 40.34 40.34 40.34
11.01.04.05.02 ENCOFRADO Y DESENCOFRADO EN LOSA MACIZA m2 335.03 S/ 109.82 S/ 36,792.99 4,393.01 2,195.97 3,946.78 7,493.15 2,784.50 15,359.66 103.32 103.32 103.32 103.32 103.32 103.32
11.01.04.05.03 ACERO Fy=4200 KG/CM2 GRADO 60, EN LOSA MACIZA kg 9442.92 S/ 6.22 S/ 58,734.96 17,871.08 11,716.04 18,056.91 3,532.24 7,064.54 82.36 82.36 82.36 82.36 82.36 82.36
11.01.04.06 PARAPETO DE CONCRETO ARMADO S/ 23,201.25 - - - - - -
11.01.04.06.01 CONCRETO F'C=210 KG/CM2 EN PARAPETO m3 9.96 S/ 577.11 S/ 5,748.02 3,026.35 2,421.38 300.30 - - - - - -0.00 -0.00 -0.00 -0.00 -0.00 -0.00
11.01.04.06.02 ENCOFRADO Y DESENCOFRADO EN PARAPETO m2 150.53 S/ 89.68 S/ 13,499.53 6,191.85 4,954.10 2,353.59 - - - - -0.00 -0.00 -0.00 -0.00 -0.00 -0.00
11.01.04.06.03 ACERO Fy=4200 KG/CM2 GRADO 60, EN PARAPETO kg 622.63 S/ 6.35 S/ 3,953.70 2,132.40 515.84 575.66 230.44 83.23 83.23 83.23 83.23 83.23 83.23
11.02 ARQUITECTURA S/ 194,923.73 - - - - - -
CRONOGRAMA VALORIZADO DE AVANCE DE OBRA

Obra: MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCIÓN EDUCATIVA INTEGRADA N°277-21 y 54177 "EL BUEN PASTOR" DE TALAVERA" DISTRITO DE TALAVERA - PROVINCIA ANDAHUALAS - REGIÓN APURÍMAC
Ubicación: APURIMAC - ANDAHUAYLAS - TALAVERA

PLAZO DE EJECUCION
MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 MES 11 MES 12 MES 13 MES 14 MES 15 MES 16 MES 17 MES 18 MES 19 MES 20 MES 21 MES 22 MES 23 MES 24 MES 25 MES 26 MES 27 MES 28 MES 29 MES 30 MES 31 MES 32 MES 33 MES 34 MES 35 MES 36 TOTAL
Item Descripcion Unid Metrado PU S/ PARCIAL
MAR - 2019 ABR - 2019 MAY - 2019 JUN - 2019 JUL - 2019 AGO - 2019 SET - 2019 0CT - 2019 NOV - 2019 DIC - 2019 ENE - 2020 FEB - 2020 MAR - 2020 JUL - 2020 AGO - 2020 SET - 2020 0CT - 2020 NOV - 2020 DIC - 2020 ENE - 2021 FEB - 2021 MAR - 2021 ABR - 2021 MAY - 2021 JUN - 2021 JUL - 2021 AGO - 2021 SET -2021 0CT - 2021 NOV - 2021 DIC - 2021 ENE - 2022 FEB - 2022 MAR - 2022 ABR - 2022 MAY - 2022 1188 Dias
11.02.01 REVOQUES ENLUCIDOS Y MOLDURAS S/ 37,707.92 - - - - - -
11.02.01.01 TARRAJEO DE COLUMNAS m² 171.58 S/ 68.16 S/ 11,694.89 2,437.11 6,826.49 405.21 405.21 405.21 405.21 405.21 405.21
11.02.01.02 TARRAJEO DE VIGAS m² 368.37 S/ 66.55 S/ 24,515.02 13,605.00 8,349.31 2,560.70 0.00 0.00 0.00 0.00 0.00 0.00
11.02.01.03 VESTIDURA DE DERRAMES m 39.83 S/ 37.61 S/ 1,498.01 1,457.38 6.77 6.77 6.77 6.77 6.77 6.77
11.02.02 CIELORRASOS S/ 21,652.99 - - - - - -
11.02.02.01 CIELORRASOS CON MEZCLA CEMENTO : ARENA 1:5 m² 335.03 S/ 64.63 S/ 21,652.99 9,637.04 11,623.97 391.99 0.00 0.00 0.00 0.00 0.00 0.00
11.02.03 PISOS Y PAVIMENTOS S/ 9,551.16 - - - - - -
11.02.03.01 CEMENTO PULIDO, BRUÑADO@0.10m m2 229.54 S/ 41.61 S/ 9,551.16 6,371.98 334.40 474.13 474.13 474.13 474.13 474.13 474.13
11.02.04 ZOCALOS Y CONTRAZOCALOS S/ 9,499.59 - - - - - -
11.02.04.01 ZOCALO DE CEMENTO PULIDO S/COLOREAR H=0.60M. m 531 S/ 17.89 S/ 9,499.59 1,583.27 1,583.27 1,583.27 1,583.27 1,583.27 1,583.27
11.02.05 CARPINTERIA DE METALICA S/ 75,784.32 - - - - - -
11.02.05.01 BARANDA DE F°G° DE 2" m 265.5 S/ 285.44 S/ 75,784.32 12,630.72 12,630.72 12,630.72 12,630.72 12,630.72 12,630.72
11.02.06 PINTURA S/ 40,727.75 - - - - - -
11.02.06.01 PINTURA LATEX EN CIELO RASO 2 MANOS m2 335.03 S/ 21.40 S/ 7,169.64 1,194.94 1,194.94 1,194.94 1,194.94 1,194.94 1,194.94
11.02.06.02 PINTURA SATINADO EN EXTERIORES, MUROS, COLUMNAS, VIGAS,
m2 DOS
215.98
MANOS S/ 23.94 S/ 5,170.56 861.76 861.76 861.76 861.76 861.76 861.76
11.02.06.03 PINTURA SATINADO EN INTERIORES, MUROS, COLUMNAS, VIGAS,
m2 DOS
323.97
MANOS S/ 23.94 S/ 7,755.84 1,292.64 1,292.64 1,292.64 1,292.64 1,292.64 1,292.64
11.02.06.04 PINTURA ESMALTE EN ZOCALOS Y CONTRAZOCALOS m² 531 S/ 22.36 S/ 11,873.16 1,978.86 1,978.86 1,978.86 1,978.86 1,978.86 1,978.86
11.02.06.05 PASTA MURAL PARA INTERIORES m2 874.98 S/ 10.01 S/ 8,758.55 1,459.76 1,459.76 1,459.76 1,459.76 1,459.76 1,459.76
11.03 INSTALACIONES ELECTRICAS S/ 12,960.81 - - - - - -
11.03.01 SALIDAS INSTALACIONES ELECTRICAS S/ 1,657.32 - - - - - -
11.03.01.01 SALIDA PARA CENTRO DE LUZ EN TECHO pto 21 S/ 78.92 S/ 1,657.32 276.22 276.22 276.22 276.22 276.22 276.22
11.03.02 CABLES S/ 3,735.38 - - - - - -
11.03.02.01 CABLE ELECTRICO TW 2.5MM2 m 843.2 S/ 4.43 S/ 3,735.38 622.56 622.56 622.56 622.56 622.56 622.56
11.03.03 CONDUCTOS S/ 2,155.25 - - - - - -
11.03.03.01 TUBERIA PVC - CEL D=20MM m 178.12 S/ 12.10 S/ 2,155.25 359.21 359.21 359.21 359.21 359.21 359.21
11.03.04 ARTEFACTOS ELECTRICOS S/ 5,412.86 - - - - - -
11.03.04.01 ARTEFACTO FLUORESCENTE TUBULAR DE 32W, C/DIFUSOR ACRILICO
und TRANSPARENTE,
57 SIMILAR
S/ A73.82
TP DE JOSFEL S/ 4,207.74 701.29 701.29 701.29 701.29 701.29 701.29
11.03.04.02 LAMPARA LUZ DE EMERGENCIA 2 FAROS und 8 S/ 150.64 S/ 1,205.12 200.85 200.85 200.85 200.85 200.85 200.85
12 LOSA MULTIDEPORTIVA - NIVEL PRIMARIA S/ 682,480.03 - - - - - -
12.01 ESTRUCTURA S/ 535,865.27 - - - - - -
12.01.01 OBRAS PRELIMINARES S/ 3,445.47 - - - - - -
12.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 731.25 S/ 1.84 S/ 1,345.50 1,139.25 34.38 34.38 34.38 34.38 34.38 34.38
12.01.01.02 TRAZO Y REPLANTEO m2 769.22 S/ 2.73 S/ 2,099.97 2,099.97 - - - - - -
12.01.02 MOVIMIENTO DE TIERRAS S/ 70,096.59 - - - - - -
12.01.02.01 EXCAVACION DE ZAPATA m3 152.06 S/ 73.63 S/ 11,196.18 1,866.03 1,866.03 1,866.03 1,866.03 1,866.03 1,866.03
12.01.02.02 RELLENO CON MATERIAL PROPIO m3 76.03 S/ 41.60 S/ 3,162.85 3,096.70 11.02 11.02 11.02 11.02 11.02 11.02
12.01.02.03 ACARREO DE MATERIAL m3 23.17 S/ 24.54 S/ 568.59 556.45 12.14 - - - - - -
12.01.02.04 PREPARACION DE SUB BASE, PERFILADO, REGADO Y COMPACTADO
m2 714 S/ 1.84 S/ 1,313.76 1,299.48 2.38 2.38 2.38 2.38 2.38 2.38
12.01.02.05 BASE GRANULAR E=0.15 m.COMPACTADA CON EQUIPO LIVIANO
m2 714 S/ 53.23 S/ 38,006.22 37,970.52 5.95 5.95 5.95 5.95 5.95 5.95
12.01.02.06 ELIMINACION DE MATERIAL EXCEDENTE m3 98.84 S/ 160.35 S/ 15,848.99 3,793.15 2,009.31 2,009.31 2,009.31 2,009.31 2,009.31 2,009.31
12.01.03 CONCRETO SIMPLE S/ 7,340.52 - - - - - -
12.01.03.01 FALSA ZAPATA C:H:1:10+30%P.G.8" m3 27.65 S/ 265.48 S/ 7,340.52 1,223.42 1,223.42 1,223.42 1,223.42 1,223.42 1,223.42
12.01.04 CONCRETO ARMADO S/ 241,772.59 - - - - - -
12.01.04.01 ZAPATA S/ 34,251.98 - - - - - -
12.01.04.01.01 CONCRETO F'C= 210 KG/CM2. PARA ZAPATAS m3 48.38 S/ 541.19 S/ 26,182.77 4,363.80 4,363.80 4,363.80 4,363.80 4,363.80 4,363.80
12.01.04.01.02 ACERO CORRUGADO FY=4200 kg/cm2 ZAPATA kg 1297.3 S/ 6.22 S/ 8,069.21 2,177.07 982.02 982.02 982.02 982.02 982.02 982.02
12.01.04.02 COLUMNA S/ 137,249.14 - - - - - -
12.01.04.02.01 CONCRETO F´C=280 KG/CM2 PARA COLUMNAS m3 56.45 S/ 715.60 S/ 40,395.62 6,742.74 8,833.12 7,807.05 2,835.45 2,835.45 2,835.45 2,835.45 2,835.45 2,835.45
12.01.04.02.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 228.99 S/ 92.14 S/ 21,099.14 5,864.91 7,100.73 588.83 1,257.45 1,257.45 1,257.45 1,257.45 1,257.45 1,257.45
12.01.04.02.03 ACERO Fy=4200 KG/CM2 GRADO 60, EN COLUMNAS kg 12179.16 S/ 6.22 S/ 75,754.38 6,099.04 17,429.76 14,104.80 6,353.46 6,353.46 6,353.46 6,353.46 6,353.46 6,353.46
12.01.04.03 VIGA S/ 18,412.25 - - - - - -
12.01.04.03.01 CONCRETO F´C=280 KG/CM2 PARA VIGAS m3 7 S/ 452.11 S/ 3,164.77 1,333.12 1,333.12 83.09 83.09 83.09 83.09 83.09 83.09
12.01.04.03.02 ENCOFRADO Y DESENCOFRADO m2 73.5 S/ 89.60 S/ 6,585.60 3,437.13 3,052.19 16.05 16.05 16.05 16.05 16.05 16.05
12.01.04.03.03 ACERO CORRUGADO FY= 4200kg/cm2 kg 1403.87 S/ 6.17 S/ 8,661.88 4,302.89 4,302.83 9.36 9.36 9.36 9.36 9.36 9.36
12.01.04.04 LOSA POLIDEPORTIVA S/ 47,447.68 - - - - - -
12.01.04.04.01 ENCOFRADO Y DESENCOFRADO m2 15.6 S/ 84.83 S/ 1,323.35 1,303.22 3.35 3.35 3.35 3.35 3.35 3.35
12.01.04.04.02 CONCRETO PREMEZCLADO F´C=210 KG/CM2 m3 90 S/ 382.00 S/ 34,380.00 5,730.00 5,730.00 5,730.00 5,730.00 5,730.00 5,730.00
12.01.04.04.03 ACERO CORRUGADO FY= 4200kg/cm2 PARA LOSA DEPORTIVA
kg 1849.5 S/ 6.35 S/ 11,744.33 1,957.39 1,957.39 1,957.39 1,957.39 1,957.39 1,957.39
12.01.04.05 JUNTAS S/ 3,343.84 - - - - - -
12.01.04.05.01 JUNTA ASFALTICA RC-250(1CMX1CM) m 250 S/ 10.74 S/ 2,685.00 447.50 447.50 447.50 447.50 447.50 447.50
12.01.04.05.02 JUNTA CON POLIETILENO EXPANDIDO m 52 S/ 12.67 S/ 658.84 109.81 109.81 109.81 109.81 109.81 109.81
12.01.04.06 DADOS DE PROTECCION PARA SUBIDAD DE TUBERIA S/ 1,067.70 - - - - - -
12.01.04.06.01 PROTECCION TUBERIA DE DRENAJE CONCRETO 175 kg/cm2m3 0.42 S/ 614.24 S/ 257.98 43.00 43.00 43.00 43.00 43.00 43.00
12.01.04.06.02 PROTECCION TUBERIA DE DRENAJE ENCOFRADO DESENCOFRADO
m2 6.24 S/ 95.89 S/ 598.35 99.73 99.73 99.73 99.73 99.73 99.73
12.01.04.06.03 PROTECCION TUBERIA DE DRENAJE ACERO FY=4200KG/CM2
kg 34.65 S/ 6.10 S/ 211.37 14.00 32.90 32.90 32.90 32.90 32.90 32.90
12.01.05 ESTRUCTURA METALICA S/ 145,701.19 - - - - - -
12.01.05.01 SISTEMA DE ANCLAJE S/ 8,240.80 - - - - - -
12.01.05.01.01 SISTEMA DE ANCLAJE TIJERAL - COLUMNA und 16 S/ 515.05 S/ 8,240.80 8,200.80 6.67 6.67 6.67 6.67 6.67 6.67
12.01.05.02 SISTEMA METALICO S/ 137,460.39 - - - - - -
12.01.05.02.01 TIJERAL TJ01 PERFIL LAC 4" x 2" x 2.5 mm m 475.6 S/ 91.74 S/ 43,631.54 30,980.64 2,108.48 2,108.48 2,108.48 2,108.48 2,108.48 2,108.48
12.01.05.02.02 TIJERAL TJ02 PERFIL LAC 2" x 2" x 2.5 mm m 142.15 S/ 74.29 S/ 10,560.32 10,560.32 - - - - - -
12.01.05.02.03 TIJERAL TJ02 PERFIL LAC 4" x 2" x 2.5 mm m 164 S/ 61.59 S/ 10,100.76 8,605.76 249.17 249.17 249.17 249.17 249.17 249.17
12.01.05.02.04 TIJERAL TJ02 PERFIL LAC 2" x 2" x 2.5 mm m 792 S/ 74.29 S/ 58,837.68 9,628.44 8,201.54 8,201.54 8,201.54 8,201.54 8,201.54 8,201.54
12.01.05.02.05 TENSOR LISO DE 1/2 m 30.1 S/ 21.72 S/ 653.77 650.76 0.50 0.50 0.50 0.50 0.50 0.50
12.01.05.02.06 TEMPLADOR DE ACERO LISO DE 5/8 m 41 S/ 24.82 S/ 1,017.62 1,013.52 0.68 0.68 0.68 0.68 0.68 0.68
12.01.05.02.07 ARRIOSTRE DE ACERO LISO DE 5/8 (CRUCE SAN ANDRES) m 510.02 S/ 24.82 S/ 12,658.70 12,607.69 8.50 8.50 8.50 8.50 8.50 8.50
12.01.06 COBERTURA S/ 67,508.91 - - - - - -
12.01.06.01 PANEL PRECOR TR-4 m2 869.4 S/ 77.65 S/ 67,508.91 10,323.83 9,530.85 9,530.85 9,530.85 9,530.85 9,530.85 9,530.85
12.02 ARQUITECTURA S/ 55,773.57 - - - - - -
12.02.01 REVOQUES, ENLUCIDOS Y MOLDURAS S/ 30,740.93 - - - - - -
12.02.01.01 SOLAQUEADO EN COLUMNAS m2 383.5 S/ 64.87 S/ 24,877.65 4,146.28 4,146.28 4,146.28 4,146.28 4,146.28 4,146.28
12.02.01.02 SOLAQUEADO EN VIGAS m2 80.22 S/ 73.09 S/ 5,863.28 977.21 977.21 977.21 977.21 977.21 977.21
12.02.02 CARPINTERIA METALICA S/ 14,400.00 - - - - - -
12.02.03 EQUIPAMIENTO CON ARCOS DE METAL, TABLERO DE BASQUET Y VOLEY S/ 14,400.00 - - - - - -
12.02.03.01 SUMINISTRO E INSTALACION DE ARCOS DE METAL Y TABLERO
undDE BASQUET
2 S/ 4,800.00 S/ 9,600.00 1,600.00 1,600.00 1,600.00 1,600.00 1,600.00 1,600.00
12.02.03.02 SUMINISTRO E INSTALACION DE POSTES DE METAL Y NET PARA
und VOLEY1 S/ 4,800.00 S/ 4,800.00 800.00 800.00 800.00 800.00 800.00 800.00
12.02.04 PINTURA S/ 7,905.93 - - - - - -
12.02.04.01 PINTURA PARA DEMARCACION DE JUEGO m 342.1 S/ 23.11 S/ 7,905.93 1,317.66 1,317.66 1,317.66 1,317.66 1,317.66 1,317.66
12.02.05 VARIOS S/ 2,726.71 - - - - - -
12.02.05.01 PROTECCION ACOLCHONADO H=2M m2 10.24 S/ 266.28 S/ 2,726.71 454.45 454.45 454.45 454.45 454.45 454.45
12.03 INSTALACIONES SANITARIAS S/ 9,663.70 - - - - - -
12.03.01 RED DE DISTRIBUCION S/ 678.80 - - - - - -
12.03.01.01 TUBERIA DE Ø4" m 40 S/ 16.97 S/ 678.80 678.80 - - - - - -
12.03.02 ADITAMENTOS S/ 8,984.90 - - - - - -
12.03.02.01 CODO Ø4" 90° pza 4 S/ 46.52 S/ 186.08 31.01 31.01 31.01 31.01 31.01 31.01
12.03.02.02 CODO Ø4" 45° pza 8 S/ 40.49 S/ 323.92 53.99 53.99 53.99 53.99 53.99 53.99
12.03.02.03 CANALETA METALICA DE Ø8" DE E=1/27" m 70 S/ 121.07 S/ 8,474.90 724.32 1,291.76 1,291.76 1,291.76 1,291.76 1,291.76 1,291.76
12.04 INSTALACIONES ELECTRICAS S/ 23,946.71 - - - - - -
12.04.01 SALIDAS INSTALACIONES ELECTRICAS S/ 942.41 - - - - - -
12.04.01.01 SALIDA DE TECHO pto 6 S/ 78.92 S/ 473.52 78.92 78.92 78.92 78.92 78.92 78.92
12.04.01.02 SALIDA DE TOMACORRIENTE pto 6 S/ 56.29 S/ 337.74 177.53 26.70 26.70 26.70 26.70 26.70 26.70
12.04.01.03 SALIDA DE AUDIO pto 5 S/ 26.23 S/ 131.15 21.86 21.86 21.86 21.86 21.86 21.86
12.04.02 TABLEROS PRINCIPALES S/ 5,157.22 - - - - - -
12.04.02.01 TABLERO PRINCIPAL und 1 S/ 5,157.22
S/ 5,157.22 402.56 792.44 792.44 792.44 792.44 792.44 792.44

12.04.03 INTERRUPTORES TERMOMAGNETICO S/ 110.37 - - - - - -


12.04.03.01 NTERRUPTOR DIFERENCIAL DE 2X20A,30mA und 3 S/ 36.79 S/ 110.37 18.40 18.40 18.40 18.40 18.40 18.40
12.04.04 CABLES S/ 8,983.56 - - - - - -
12.04.04.01 2-1x4 mm2 THW m 431.28 S/ 20.83 S/ 8,983.56 2,801.43 1,030.36 1,030.36 1,030.36 1,030.36 1,030.36 1,030.36
12.04.05 DUCTOS S/ 1,358.53 - - - - - -
12.04.05.01 Ø 20mm PVC m 431.28 S/ 3.15 S/ 1,358.53 226.42 226.42 226.42 226.42 226.42 226.42
12.04.06 ARTEFACTOS S/ 7,394.62 - - - - - -
12.04.06.01 REFLECTORES und 6 S/ 338.73 S/ 2,032.38 338.73 338.73 338.73 338.73 338.73 338.73
12.04.06.02 AMPLIFICADOR CX DE 8 CANALES und 1 S/ 1,571.18 S/ 1,571.18 261.86 261.86 261.86 261.86 261.86 261.86
12.04.06.03 ALTAVOZ ACTIVO SERIE HPR152i 500 Watt und 2 S/ 1,202.76
S/ 2,405.52 400.92 400.92 400.92 400.92 400.92 400.92

12.04.06.04 SUB ALTAVOZ ACTIVO HPR181W und 2 S/ 692.77 S/ 1,385.54 230.92 230.92 230.92 230.92 230.92 230.92
12.05 VARIOS S/ 80.38 - - - - - -
12.05.01 MURETE 25x60x80 m2 0.48 S/ 167.45 S/ 80.38 13.40 13.40 13.40 13.40 13.40 13.40
12.06 COBERTURA S/ 57,150.40 - - - - - -
12.06.01 COBERTURA CON PLANCHAS DE POLICARBONATO m2 736 S/ 77.65 S/ 57,150.40 9,525.07 9,525.07 9,525.07 9,525.07 9,525.07 9,525.07
13 LOSA DEPORTIVA - NIVEL INICIAL S/ 302,488.32 - - - - - -
13.01 ESTRUCTURAS S/ 52,128.28 - - - - - -
13.01.01 TRABAJOS PRELIMINARES S/ 1,668.81 - - - - - -
13.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 389 S/ 1.84 S/ 715.76 715.76 - - - - - -
13.01.01.02 TRAZO NIVELACION Y REPLANTEO m2 389 S/ 2.45 S/ 953.05 953.05 - - - - - -
CRONOGRAMA VALORIZADO DE AVANCE DE OBRA

Obra: MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCIÓN EDUCATIVA INTEGRADA N°277-21 y 54177 "EL BUEN PASTOR" DE TALAVERA" DISTRITO DE TALAVERA - PROVINCIA ANDAHUALAS - REGIÓN APURÍMAC
Ubicación: APURIMAC - ANDAHUAYLAS - TALAVERA

PLAZO DE EJECUCION
MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 MES 11 MES 12 MES 13 MES 14 MES 15 MES 16 MES 17 MES 18 MES 19 MES 20 MES 21 MES 22 MES 23 MES 24 MES 25 MES 26 MES 27 MES 28 MES 29 MES 30 MES 31 MES 32 MES 33 MES 34 MES 35 MES 36 TOTAL
Item Descripcion Unid Metrado PU S/ PARCIAL
MAR - 2019 ABR - 2019 MAY - 2019 JUN - 2019 JUL - 2019 AGO - 2019 SET - 2019 0CT - 2019 NOV - 2019 DIC - 2019 ENE - 2020 FEB - 2020 MAR - 2020 JUL - 2020 AGO - 2020 SET - 2020 0CT - 2020 NOV - 2020 DIC - 2020 ENE - 2021 FEB - 2021 MAR - 2021 ABR - 2021 MAY - 2021 JUN - 2021 JUL - 2021 AGO - 2021 SET -2021 0CT - 2021 NOV - 2021 DIC - 2021 ENE - 2022 FEB - 2022 MAR - 2022 ABR - 2022 MAY - 2022 1188 Dias
13.01.02 MOVIMIENTO DE TIERRAS S/ 5,182.92 - - - - - -
13.01.02.01 EXCAVACION PARA ZAPATA Y CIMIENTOS m3 35.7 S/ 73.63 S/ 2,628.59 2,628.59 - - - - - -
13.01.02.02 RELLENO Y COMPACTADO CON APIZONADOR TIPO CANGUROm3
C/MAT 24.12 S/ 41.60 S/ 1,003.39 167.23 167.23 167.23 167.23 167.23 167.23
13.01.02.03 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=5KM
m3 41.06 S/ 12.91 S/ 530.08 530.08 - - - - - -
13.01.02.04 ACARREO DE MATERIAL EXCEDENTE D=30M m3 41.6 S/ 24.54 S/ 1,020.86 170.14 170.14 170.14 170.14 170.14 170.14
13.01.03 CONCRETO SIMPLE S/ 108.33 - - - - - -
13.01.03.01 SOLADO E=4" MEZCLA 1:10 CEMENTO-HORMIGON m2 2.5 S/ 43.33 S/ 108.33 108.33 - - - - - -
13.01.04 CONCRETO ARMADO S/ 45,168.22 - - - - - -
13.01.04.01 ZAPATAS S/ 8,623.86 - - - - - -
13.01.04.01.01 CONCRETO F´C=210 KG/CM2, PARA ZAPATAS m3 11.93 S/ 541.19 S/ 6,456.40 6,456.40 - - - - - -
13.01.04.01.02 ACERO CORRUGADO FY= 4200kg/cm2 kg 351.29 S/ 6.17 S/ 2,167.46 324.59 512.26 221.77 221.77 221.77 221.77 221.77 221.77
13.01.04.02 COLUMNAS S/ 5,397.46 - - - - - -
13.01.04.02.01 CONCRETO F´C=210 KG/CM2 m3 1.99 S/ 381.19 S/ 758.57 758.57 - - - - - -
13.01.04.02.02 ACERO CORRUGADO FY= 4200kg/cm2 kg 405.79 S/ 6.17 S/ 2,503.72 2,503.72 - - - - - -
13.01.04.02.03 ENCOFRADO Y DESENCOFRADO m2 23.83 S/ 89.60 S/ 2,135.17 2,135.17 - - - - - -
13.01.04.03 LOSA POLIDEPORTIVA S/ 31,146.90 - - - - - -
13.01.04.03.01 ENCOFRADO Y DESENCOFRADO m2 21.03 S/ 89.60 S/ 1,884.29 314.05 314.05 314.05 314.05 314.05 314.05
13.01.04.03.02 CONCRETO PREMEZCLADO F´C=210 KG/CM2 m3 62 S/ 382.00 S/ 23,684.00 3,947.33 3,947.33 3,947.33 3,947.33 3,947.33 3,947.33
13.01.04.03.03 ACERO CORRUGADO FY= 4200kg/cm2 kg 904.15 S/ 6.17 S/ 5,578.61 1,185.55 732.18 732.18 732.18 732.18 732.18 732.18
13.02 COBERTURA Y ESTRUCTURA METALICA S/ 220,012.68 - - - - - -
13.02.01 ESTRUCTURAS METALICAS S/ 61,265.16 - - - - - -
13.02.01.01 COLUMNA DE ACERO ASTM 500 8"X8"X6mm H=5.8 M INC/ANCLAJE
und Y PINTURA
6 S/ 2,925.16 S/ 17,550.96 2,925.16 2,925.16 2,925.16 2,925.16 2,925.16 2,925.16
13.02.01.02 COLUMNA DE ACERO ASTM 500 6"X6"X6mm H=5.8 M INC/ANCLAJE
und Y PINTURA
4 S/ 972.61 S/ 3,890.44 648.41 648.41 648.41 648.41 648.41 648.41
13.02.01.03 COLUMNA DE ACERO ASTM 500 6"X6"X6mm H=5.10 M INC/ANCLAJE
und Y PINTURA
4 S/ 972.61 S/ 3,890.44 648.41 648.41 648.41 648.41 648.41 648.41
13.02.01.04 TIJERAL TJ01 PERFIL LAC 2" x 2" x 2.5 mm m 43.2 S/ 74.29 S/ 3,209.33 534.89 534.89 534.89 534.89 534.89 534.89
13.02.01.05 TIJERAL TJ02 PERFIL LAC 2" x 2" x 2.5 mm m 18.16 S/ 74.29 S/ 1,349.11 224.85 224.85 224.85 224.85 224.85 224.85
13.02.01.06 VIGA DE ACERO 2"X6"X2.5mm INC/ANCLAJE Y PINTURA m 52.37 S/ 51.05 S/ 2,673.49 445.58 445.58 445.58 445.58 445.58 445.58
13.02.01.07 TENSOR LISO DE 1/2 m 35.7 S/ 21.72 S/ 775.40 129.23 129.23 129.23 129.23 129.23 129.23
13.02.01.08 TEMPLADOR DE ACERO LISO DE 5/8 m 50.7 S/ 24.82 S/ 1,258.37 209.73 209.73 209.73 209.73 209.73 209.73
13.02.01.09 CORREAS METALICAS DE PERFIL LAC 3" x 2" x 2.5 mm m 131.83 S/ 75.86 S/ 10,000.62 1,666.77 1,666.77 1,666.77 1,666.77 1,666.77 1,666.77
13.02.01.10 CORREAS METALICAS DE PERFIL LAC 2" x 2" x 2.5 mm m 87.5 S/ 190.48 S/ 16,667.00 2,777.83 2,777.83 2,777.83 2,777.83 2,777.83 2,777.83
13.02.02 COBERTURA S/ 158,747.52 - - - - - -
13.02.02.01 PANEL PRECOR TR-4 m2 1725.25 S/ 77.65 S/ 133,965.66 56,959.04 12,834.44 12,834.44 12,834.44 12,834.44 12,834.44 12,834.44
13.02.02.02 PLANCHA DE POLICARBONATO m2 111 S/ 223.26 S/ 24,781.86 4,130.31 4,130.31 4,130.31 4,130.31 4,130.31 4,130.31
13.03 ARQUITECTURA S/ 20,262.42 - - - - - -
13.03.01 PATIO DE JUEGOS und 1 S/ 20,000.00 S/ 20,000.00 3,333.33 3,333.33 3,333.33 3,333.33 3,333.33 3,333.33
13.03.02 TARRAJEO DE COLUMNAS m2 3.85 S/ 68.16 S/ 262.42 43.74 43.74 43.74 43.74 43.74 43.74
13.04 INSTALACIONES ELECTRICAS S/ 5,000.00 - - - - - -
13.04.01 ILUMINACION DE LOSA MULTIUSO GLB 1 S/ 5,000.00 S/ 5,000.00 833.33 833.33 833.33 833.33 833.33 833.33
13.05 INSTALACIONES SANITARIAS S/ 5,084.94 - - - - - -
13.05.01 CANALETA DE DRENAJE PLUVIAL m 42 S/ 121.07 S/ 5,084.94 1,242.95 3,841.99 - - - - - -
14 TANQUE ELEVADO S/ 153,361.22 - - - - - -
14.01 ESTRUCTURAS S/ 98,023.77 - - - - - -
14.01.01 OBRAS PRELIMINARES S/ 132.67 - - - - - -
14.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 29.03 S/ 1.84 S/ 53.42 41.65 1.96 1.96 1.96 1.96 1.96 1.96
14.01.01.02 TRAZO Y REPLANTEO M2 29.03 S/ 2.73 S/ 79.25 63.06 2.70 2.70 2.70 2.70 2.70 2.70
14.01.02 MOVIMIENTO DE TIERRA S/ 4,748.19 - - - - - -
14.01.02.01 CORTE MACIVO PARA CISTERNA M3 64.08 S/ 21.57 S/ 1,382.21 1,120.50 43.62 43.62 43.62 43.62 43.62 43.62
14.01.02.02 REFINE, NIVELACION Y COMPACTADO EN TERRENO NORMAL m2
C/EQUIPO
23.58 S/ 11.83 S/ 278.95 46.49 46.49 46.49 46.49 46.49 46.49
14.01.02.03 RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO SELECCIONADO
m3 1.16 S/ 20.68 S/ 23.99 4.00 4.00 4.00 4.00 4.00 4.00
14.01.02.04 ACARREO DE MATERIAL EXCEDENTE D=30M m3 81.79 S/ 24.54 S/ 2,007.13 334.52 334.52 334.52 334.52 334.52 334.52
14.01.02.05 ELIMINACION DE MATERIAL EXCEDENTE M3 81.79 S/ 12.91 S/ 1,055.91 672.83 63.85 63.85 63.85 63.85 63.85 63.85
14.01.03 CONCRETO SIMPLE S/ 1,041.22 - - - - - -
14.01.03.01 SOLADO PARA ZAPATAS E=4" MEZCLA 1:10 CEMENTO-HORMIGON
m2 24.03 S/ 43.33 S/ 1,041.22 173.54 173.54 173.54 173.54 173.54 173.54
14.01.04 OBRAS DE CONCRETO ARMADO S/ 92,101.69 - - - - - -
14.01.04.01 ZAPATAS S/ 9,428.69 - - - - - -
14.01.04.01.01 CONCRETO F´C=210 KG/CM2, PARA ZAPATAS m3 8 S/ 541.19 S/ 4,329.52 721.59 721.59 721.59 721.59 721.59 721.59
14.01.04.01.02 ENCOFRADO Y DESENCOFRADO m2 9.67 S/ 89.60 S/ 866.43 144.41 144.41 144.41 144.41 144.41 144.41
14.01.04.01.03 ACERO CORRUGADO FY= 4200kg/cm2 kg 686.02 S/ 6.17 S/ 4,232.74 705.46 705.46 705.46 705.46 705.46 705.46
14.01.04.02 TANQUE CISTERNA S/ 28,427.38 - - - - - -
14.01.04.02.01 CONCRETO F´C=210 KG/CM2 m3 18.62 S/ 381.19 S/ 7,097.76 1,182.96 1,182.96 1,182.96 1,182.96 1,182.96 1,182.96
14.01.04.02.02 ENCOFRADO Y DESENCOFRADO m2 105.98 S/ 89.60 S/ 9,495.81 1,582.64 1,582.64 1,582.64 1,582.64 1,582.64 1,582.64
14.01.04.02.03 ACERO CORRUGADO FY= 4200kg/cm2 kg 1917.96 S/ 6.17 S/ 11,833.81 1,972.30 1,972.30 1,972.30 1,972.30 1,972.30 1,972.30
14.01.04.03 COLUMNAS S/ 23,978.42 - - - - - -
14.01.04.03.01 CONCRETO F'C= 210 KG/CM2. COLUMNAS M3 6.89 S/ 644.68 S/ 4,441.85 1,395.71 507.69 507.69 507.69 507.69 507.69 507.69
14.01.04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS M2 76.32 S/ 123.50 S/ 9,425.52 4,364.57 843.49 843.49 843.49 843.49 843.49 843.49
14.01.04.03.03 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS KG 1625.57 S/ 6.22 S/ 10,111.05 7,956.13 359.15 359.15 359.15 359.15 359.15 359.15
14.01.04.04 COLUMNETAS S/ 1,198.17 - - - - - -
14.01.04.04.01 CONCRETO F´C=210 KG/CM2 m3 0.43 S/ 381.19 S/ 163.91 163.91 - - - - - -
14.01.04.04.02 ENCOFRADO Y DESENCOFRADO m2 7.2 S/ 89.60 S/ 645.12 645.12 - - - - - -
14.01.04.04.03 ACERO CORRUGADO FY= 4200kg/cm2 kg 63.07 S/ 6.17 S/ 389.14 64.86 64.86 64.86 64.86 64.86 64.86
14.01.04.05 VIGUETAS DE AMARRE S/ 422.05 - - - - - -
14.01.04.05.01 CONCRETO F´C=210 KG/CM2 m3 0.2 S/ 381.19 S/ 76.24 12.71 12.71 12.71 12.71 12.71 12.71
14.01.04.05.02 ENCOFRADO Y DESENCOFRADO m2 2.64 S/ 89.60 S/ 236.54 39.42 39.42 39.42 39.42 39.42 39.42
14.01.04.05.03 ACERO CORRUGADO FY= 4200kg/cm2 kg 17.71 S/ 6.17 S/ 109.27 18.21 18.21 18.21 18.21 18.21 18.21
14.01.04.06 VIGAS S/ 14,665.26 - - - - - -
14.01.04.06.01 CONCRETO F'C= 210 KG/CM2. VIGAS M3 5.12 S/ 645.24 S/ 3,303.63 319.20 319.20 444.21 444.21 444.21 444.21 444.21 444.21
14.01.04.06.02 ENCOFRADO Y DESENCOFRADO DE VIGA m2 53.76 S/ 84.83 S/ 4,560.46 417.70 417.70 620.84 620.84 620.84 620.84 620.84 620.84
14.01.04.06.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS KG 1072.74 S/ 6.34 S/ 6,801.17 1,756.94 1,756.94 547.88 547.88 547.88 547.88 547.88 547.88
14.01.04.07 LOSA ARMADA S/ 3,677.89 - - - - - -
14.01.04.07.01 CONCRETO F'C=210 KG/CM2 EN LOSA MACIZA m3 2.42 S/ 505.64 S/ 1,223.65 1,223.65 - - - - - -
14.01.04.07.02 ENCOFRADO DESENCOFRADO LOSA MACIZA m2 16.16 S/ 109.82 S/ 1,774.69 727.24 174.58 174.58 174.58 174.58 174.58 174.58
14.01.04.07.03 ACERO ESTRUCTURAL TRABAJADO PARA LOSA MACIZA KG 109.96 S/ 6.18 S/ 679.55 679.55 - - - - - -
14.01.04.08 TANQUE ELEVADO S/ 10,303.83 - - - - - -
14.01.04.08.01 TANQUE PARA ALMACENAMIENTO DE AGUA und 1 S/ 10,303.83 S/ 10,303.83 1,717.31 1,717.31 1,717.31 1,717.31 1,717.31 1,717.31
14.02 ARQUITECTURA S/ 30,943.74 - - - - - -
14.02.01 ALBAÑILERIA S/ 3,028.07 - - - - - -
14.02.01.01 MUROS DE ARCILLA KK DE SOGA C/M 1:4 X 1.5CM. M2 21.02 S/ 140.24 S/ 2,947.84 1,596.67 225.19 225.19 225.19 225.19 225.19 225.19
14.02.01.02 JUNTA DE CONSTRUCCION CON TEKNOPOR E = 1" m2 2.14 S/ 37.49 S/ 80.23 13.37 13.37 13.37 13.37 13.37 13.37
14.02.02 REVOQUES ENLUCIDOS Y MOLDURAS S/ 17,193.84 - - - - - -
14.02.02.01 TARRAJEO MUROS EXTERIOR MORTERO 1:4 m2 25.89 S/ 36.07 S/ 933.85 155.64 155.64 155.64 155.64 155.64 155.64
14.02.02.02 TARRAJEO EN MURO INTERIOR CEMENTO-ARENA 1:4X1.5CM M2 25.89 S/ 35.77 S/ 926.09 154.35 154.35 154.35 154.35 154.35 154.35
14.02.02.03 TARRAJEO EN COLUMNAS CEMENTO - ARENA 1:4X1.5CM M2 76.32 S/ 68.16 S/ 5,201.97 867.00 867.00 867.00 867.00 867.00 867.00
14.02.02.04 TARRAJEO EN VIGAS CEMENTO-ARENA 1:4X1.5CMS M2 66.56 S/ 66.55 S/ 4,429.57 738.26 738.26 738.26 738.26 738.26 738.26
14.02.02.05 DERRAME DE VANOS 1X1CM M 23.48 S/ 37.61 S/ 883.08 147.18 147.18 147.18 147.18 147.18 147.18
14.02.02.06 TARRAJEO IMPERMEABILIZANTE MEZCLA 1:2, E=2 CM M2 112.6 S/ 42.80 S/ 4,819.28 2,545.07 379.03 379.03 379.03 379.03 379.03 379.03
14.02.03 CIELORRASOS S/ 911.93 - - - - - -
14.02.03.01 CIELO RASO CON MEZCLA C:A 1:5 m2 14.11 S/ 64.63 S/ 911.93 151.99 151.99 151.99 151.99 151.99 151.99
14.02.04 PISOS Y PAVIMENTOS S/ 6,418.15 - - - - - -
14.02.04.01 CONTRAPISO DE 50 mm m2 53.38 S/ 49.71 S/ 2,653.52 442.25 442.25 442.25 442.25 442.25 442.25
14.02.04.02 ACABADO CON CEMENTO PULIDO m2 53.38 S/ 62.35 S/ 3,328.24 554.71 554.71 554.71 554.71 554.71 554.71
14.02.04.03 BRUÑADO EN PISO DE CONCRETO m 104.4 S/ 4.18 S/ 436.39 72.73 72.73 72.73 72.73 72.73 72.73
14.02.05 CARPINTERIA METALICA S/ 3,391.75 - - - - - -
14.02.05.01 PUERTA METALICA INCLUYE ACABADO m2 1.68 S/ 367.50 S/ 617.40 102.90 102.90 102.90 102.90 102.90 102.90
14.02.05.02 VENTANA CON MARCOS DE ALUMINIO CORRED. 4H (2F,2M)m2 10.28 S/ 16.96 S/ 174.35 29.06 29.06 29.06 29.06 29.06 29.06
14.02.05.03 TAPA DE F°G° und 2 S/ 550.00 S/ 1,100.00 183.33 183.33 183.33 183.33 183.33 183.33
14.02.05.04 ESCALERA DE GATO PZA 1 S/ 1,500.00 S/ 1,500.00 250.00 250.00 250.00 250.00 250.00 250.00
14.02.06 CERRAJERIA S/ 233.05 - - - - - -
14.02.06.01 BISAGRA ALUMINIZADA PESADA DE 3 1/2" X 3 1/2" pza 3 S/ 4.77 S/ 14.31 2.39 2.39 2.39 2.39 2.39 2.39
14.02.06.02 CERRADURA TIPO PESADA DE 2 GOLPES CON TIRA pza 1 S/ 196.39 S/ 196.39 32.73 32.73 32.73 32.73 32.73 32.73
14.02.06.03 MANIJA DE BRONCE 4" PARA PUERTAS pza 1 S/ 22.35 S/ 22.35 3.73 3.73 3.73 3.73 3.73 3.73
14.02.07 VIDRIOS, CRISTALES Y SIMILARES S/ 4,597.51 - - - - - -
14.02.07.01 VIDRIO TEMPLADO INCOLORO DE 6mm p2 110.65 S/ 41.55 S/ 4,597.51 766.25 766.25 766.25 766.25 766.25 766.25
14.02.08 PINTURA S/ 4,219.27 - - - - - -
14.02.08.01 PINTURA LATEX EN EXTERIORES 2 MANOS m2 25.89 S/ 18.74 S/ 485.18 80.86 80.86 80.86 80.86 80.86 80.86
14.02.08.02 PINTURA LATEX MATE EN INTERIORES 2 MANOS m2 29.41 S/ 15.27 S/ 449.09 74.85 74.85 74.85 74.85 74.85 74.85
14.02.08.03 PINTURA LATEX MATE EN CIELORRASO 2 MANOS m2 14.11 S/ 20.80 S/ 293.49 48.92 48.92 48.92 48.92 48.92 48.92
14.02.08.04 PINTURA LATEX MATE EN COLUMNAS 2 MANOS m2 76.32 S/ 20.65 S/ 1,576.01 262.67 262.67 262.67 262.67 262.67 262.67
14.02.08.05 PINTURA LATEX MATE EN VIGAS 2 MANOS m2 66.56 S/ 20.65 S/ 1,374.46 229.08 229.08 229.08 229.08 229.08 229.08
14.02.08.06 PINTURA BARNIZ EN CARPINTERIA DE MADERA m2 1.68 S/ 24.43 S/ 41.04 6.84 6.84 6.84 6.84 6.84 6.84
14.03 INSTALACIONES ELECTRICAS S/ 7,780.92 - - - - - -
14.03.01 SALIDAS DE ALUMBRADO Y TOMACORRIENTE S/ 135.21 - - - - - -
14.03.01.01 SALIDA DE TECHO CENTROS DE LUZ PTO 1 S/ 78.92 S/ 78.92 13.15 13.15 13.15 13.15 13.15 13.15
14.03.01.02 SALIDA PARA TOMACORRIENTES PTO 1 S/ 56.29 S/ 56.29 9.38 9.38 9.38 9.38 9.38 9.38
14.03.02 TABLEROS Y CUCHILLAS (LLAVES) S/ 7,577.89 - - - - - -
CRONOGRAMA VALORIZADO DE AVANCE DE OBRA

Obra: MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCIÓN EDUCATIVA INTEGRADA N°277-21 y 54177 "EL BUEN PASTOR" DE TALAVERA" DISTRITO DE TALAVERA - PROVINCIA ANDAHUALAS - REGIÓN APURÍMAC
Ubicación: APURIMAC - ANDAHUAYLAS - TALAVERA

PLAZO DE EJECUCION
MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 MES 11 MES 12 MES 13 MES 14 MES 15 MES 16 MES 17 MES 18 MES 19 MES 20 MES 21 MES 22 MES 23 MES 24 MES 25 MES 26 MES 27 MES 28 MES 29 MES 30 MES 31 MES 32 MES 33 MES 34 MES 35 MES 36 TOTAL
Item Descripcion Unid Metrado PU S/ PARCIAL
MAR - 2019 ABR - 2019 MAY - 2019 JUN - 2019 JUL - 2019 AGO - 2019 SET - 2019 0CT - 2019 NOV - 2019 DIC - 2019 ENE - 2020 FEB - 2020 MAR - 2020 JUL - 2020 AGO - 2020 SET - 2020 0CT - 2020 NOV - 2020 DIC - 2020 ENE - 2021 FEB - 2021 MAR - 2021 ABR - 2021 MAY - 2021 JUN - 2021 JUL - 2021 AGO - 2021 SET -2021 0CT - 2021 NOV - 2021 DIC - 2021 ENE - 2022 FEB - 2022 MAR - 2022 ABR - 2022 MAY - 2022 1188 Dias
14.03.02.01 TABLERO DE DISTRIBUCION TD UND 1 S/ 5,157.22 S/ 5,157.22 859.54 859.54 859.54 859.54 859.54 859.54
14.03.02.02 TABLERO DE CONTROL DE ELECTROBOMBA - TB UND 1 S/ 2,189.22 S/ 2,189.22 364.87 364.87 364.87 364.87 364.87 364.87
14.03.02.03 LLAVE INTERRUPTOR DE TERMANAGNETICO DE 3 X 60 AMP. UND 1 S/ 88.29 S/ 88.29 14.72 14.72 14.72 14.72 14.72 14.72
14.03.02.04 LLAVE INTERRUPTOR DE TERMONAGNETICO DE 2 X 23 AMP.UND 2 S/ 32.79 S/ 65.58 10.93 10.93 10.93 10.93 10.93 10.93
14.03.02.05 LLAVE INTERRUPTOR DE TERMONAGNETICO DE 2 X 33 AMP.UND 1 S/ 36.79 S/ 36.79 6.13 6.13 6.13 6.13 6.13 6.13
14.03.02.06 LLAVE INTERRUPTOR DE TERMONAGNETICO DE 3 X 45 AMP.UND 1 S/ 40.79 S/ 40.79 6.80 6.80 6.80 6.80 6.80 6.80
14.03.03 ARTEFACTOS S/ 67.82 - - - - - -
14.03.03.01 ARTEFACTO CON 1 LAMPARA FLUORECENTE CIRCULAR DE 32W
UND 1 S/ 67.82 S/ 67.82 11.30 11.30 11.30 11.30 11.30 11.30
14.04 INSTALACIONES SANITARIAS S/ 7,562.96 - - - - - -
14.04.01 ACCESORIOS DE TANQUE ELEVADO CISTERNA S/ 6,240.02 - - - - - -
14.04.01.01 SUCCION E IMPULSION INCLUYE INSTALACION Y ACCESORIOS
GLB 1 S/ 4,479.30 S/ 4,479.30 746.55 746.55 746.55 746.55 746.55 746.55
14.04.01.02 REBOSE Y LIMPIA INCLUYE INSTALACION Y ACCESORIOS GLB 1 S/ 1,760.72 S/ 1,760.72 293.45 293.45 293.45 293.45 293.45 293.45
14.04.02 EQUIPAMIENTO S/ 1,322.94 - - - - - -
14.04.02.01 ELECTROBOMBA DE 0.5HP UND 2 S/ 661.47 S/ 1,322.94 220.49 220.49 220.49 220.49 220.49 220.49
15 CERCO PERIMETRICO S/ 856,421.19 - - - - - -
15.01 ESTRUCTURAS S/ 660,401.17 - - - - - -
15.01.01 OBRAS PRELIMINARES S/ 2,443.50 - - - - - -
15.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 422.02 S/ 1.84 S/ 776.52 52.64 685.90 8.70 19.55 9.74 - 0.00 0.00 0.00 0.00 0.00 0.00
15.01.01.02 TRAZO Y REPLANTEO m2 422.02 S/ 3.95 S/ 1,666.98 117.31 1,528.57 19.10 2.00 - - 0.00 0.00 0.00 0.00 0.00 0.00
15.01.02 MOVIMIENTO DE TIERRAS S/ 37,245.11 - - - - - -
15.01.02.01 EXCAVACION MANUAL DE ZANJAS PARA CIMIENTACION m3 330.66 S/ 73.63 S/ 24,346.50 883.37 8,426.40 3,890.89 10,018.29 347.20 255.04 525.32 - - - - 0.00 0.00 0.00 0.00 0.00 0.00
15.01.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 119.39 S/ 41.77 S/ 4,986.92 104.66 2,295.29 1,224.42 1,200.18 162.37 - 0.00 0.00 0.00 0.00 0.00 0.00
15.01.02.03 ACARREO INTERNO DE MATERIAL EXCEDENTE PROCEDENTEm3
DE EXCAVACIONES
211.26 S/ 24.54 S/ 5,184.32 67.39 3,121.09 1,995.84 - - - - 0.00 0.00 0.00 0.00 0.00 0.00
15.01.02.04 ELIMINACIÓN DE MATERIAL EXCEDENTE PROCEDENTE DE LAm3
EXCAVACIÓN
211.26 S/ 12.91 S/ 2,727.37 320.50 1,317.64 1,070.21 19.02 - - 0.00 0.00 0.00 0.00 0.00 0.00
15.01.03 OBRAS DE CONCRETO SIMPLE S/ 80,506.90 - - - - - -
15.01.03.01 SOLADO C:H: 1:12 E=10CM m2 204.66 S/ 36.73 S/ 7,517.16 228.94 3,533.00 1,771.09 1,697.61 17.75 240.57 28.20 - 0.00 0.00 0.00 0.00 0.00 0.00
15.01.03.02 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30%
m3 PG 81.06 S/ 253.55 S/ 20,552.76 1,980.87 12,505.50 5,787.55 278.84 - - - - - - - - - - -
15.01.03.03 CONCRETO 1:8 C:H + 25% P.M. EN SOBRECIMIENTO m3 35.47 S/ 444.74 S/ 15,774.93 1,171.99 8,681.40 5,543.07 197.31 144.69 36.47 - 0.00 0.00 0.00 0.00 0.00 0.00
15.01.03.04 ENCOFRADO Y DESENCOFRADO NORMAL -SOBRECIMIENTOSm2 283.74 S/ 129.21 S/ 36,662.05 1,354.54 18,813.00 15,419.13 400.90 674.48 - - 0.00 0.00 0.00 0.00 0.00 0.00
15.01.04 OBRAS DE CONCRETO ARMADO S/ 539,077.59 - - - - - -
15.01.04.01 ZAPATA S/ 24,309.97 - - - - - -
15.01.04.01.01 CONCRETO F´C=210 KG/CM2, PARA ZAPATAS m3 35.99 S/ 541.19 S/ 19,477.43 2,417.64 5,325.20 5,815.12 5,607.44 312.04 - - - - - - - - -
15.01.04.01.02 ACERO Fy=4200 KG/CM2 GRADO 60, EN ZAPATAS kg 792.22 S/ 6.10 S/ 4,832.54 375.47 903.00 2,096.10 1,394.59 63.38 - - - - - - - - -
15.01.04.02 COLUMNAS S/ 82,547.38 - - - - - -
15.01.04.02.01 CONCRETO 210 kg/cm2, COLUMNAS m3 27.11 S/ 644.68 S/ 17,477.27 1,136.99 6,316.60 9,670.71 352.97 0.00 - - - - - - - - - -
15.01.04.02.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 293.58 S/ 92.14 S/ 27,050.46 1,810.97 2,694.90 21,866.42 678.17 - - - - 0.00 0.00 0.00 0.00 0.00 0.00
15.01.04.02.03 ACERO Fy=4200 KG/CM2 GRADO 60, EN COLUMNAS kg 3393.03 S/ 6.22 S/ 21,104.65 1,354.05 6,140.00 13,339.15 271.45 - - - - - - - - - - -
15.01.04.02.04 SELLADO DE JUNTAS DE DILATACION DE COLUMNAS m 250 S/ 67.66 S/ 16,915.00 134.46 8,269.29 1,418.54 1,418.54 1,418.54 1,418.54 1,418.54 1,418.54
15.01.04.03 MURO DE CONTENCION S/ 394,626.64 - - - - - -
15.01.04.03.01 CONCRETO F'c= 210 Kg/cm2 - MURO DE CONTENCION m3 234.12 S/ 663.68 S/ 155,380.76 36,436.96 45,682.84 12,210.16 12,210.16 12,210.16 12,210.16 12,210.16 12,210.16
15.01.04.03.02 ENCOFRADO Y DESENCOFRADO EN MURO DE CONTENCIONm2 1236.9 S/ 123.50 S/ 152,757.15 20,189.20 45,479.14 14,514.80 14,514.80 14,514.80 14,514.80 14,514.80 14,514.80
15.01.04.03.03 ACERO FY= 4200 kg/cm2 GRADO 60, EN MURO DE CONTENCION
kg 13904.94 S/ 6.22 S/ 86,488.73 15,350.00 30,096.56 6,840.36 6,840.36 6,840.36 6,840.36 6,840.36 6,840.36
15.01.04.04 VIGAS S/ 37,593.60 - - - - - -
15.01.04.04.01 CONCRETO 210 kg/cm2, VIGAS m3 13.34 S/ 663.68 S/ 8,853.49 650.66 3,253.30 4,775.84 173.69 - - - - - - - - -
15.01.04.04.02 ENCOFRADO Y DESENCOFRADO DE VIGA m2 133.35 S/ 84.83 S/ 11,312.08 820.70 4,924.20 5,199.13 368.05 - - - - - - - - -
15.01.04.04.03 ACERO FY= 4200 kg/cm2 GRADO 60, EN VIGAS kg 2748.9 S/ 6.34 S/ 17,428.03 1,922.26 3,756.00 11,529.86 219.92 - - - - - - - - - - - -
15.01.05 VARIOS S/ 1,128.07 - - - - - -
15.01.05.01 JUNTA DE DILATACION CON ESPUMA PLASTICA DE 1" m 26.4 S/ 42.73 S/ 1,128.07 40.97 409.70 648.65 4.79 4.79 4.79 4.79 4.79 4.79
15.02 ARQUITECTURA S/ 180,140.95 - - - - - -
15.02.01 MUROS Y TABIQUES DE ALBAÑILERIA S/ 97,166.87 - - - - - -
15.02.01.01 MURO DE LADRILLO KK SOGA M:1:1:4 m2 536.2 S/ 123.79 S/ 66,376.20 6,121.80 27,208.00 6,842.54 13,855.84 6,708.24 5,639.78 0.00 0.00 0.00 0.00 0.00 0.00
15.02.01.02 MURO DE TUBO DE FIERRO GALVANIZADO DE 3" H=2.3m @ 0.125
m 58.79 S/ 523.74 S/ 30,790.67 5,131.78 5,131.78 5,131.78 5,131.78 5,131.78 5,131.78
15.02.02 REVOQUES ENLUCIDOS Y MOLDURAS S/ 44,446.79 - - - - - -
15.02.02.01 TARRAJEO DE COLUMNAS m² 238.14 S/ 68.16 S/ 16,231.62 6,220.22 996.22 487.53 1,736.32 1,214.78 716.99 809.93 809.93 809.93 809.93 809.93 809.93
15.02.02.02 TARRAJEO DE VIGAS m2 133.35 S/ 66.55 S/ 8,874.44 2,111.06 413.88 1,441.38 2,048.49 1,039.91 755.29 414.53 108.32 108.32 108.32 108.32 108.32 108.32
15.02.02.03 TARRAJEO MUROS EXTERIOR MORTERO 1:4 m2 536.2 S/ 36.07 S/ 19,340.73 3,223.46 3,223.46 3,223.46 3,223.46 3,223.46 3,223.46
15.02.03 COTRAZOCALO S/ 5,915.89 - - - - - -
15.02.03.01 CONTRAZOCALO DE CEMENTO H=0.30m m 214.48 S/ 17.89 S/ 3,837.05 639.51 639.51 639.51 639.51 639.51 639.51
15.02.03.02 ZOCALO DE CEMENTO PULIDO H=0.90m m 64.5 S/ 32.23 S/ 2,078.84 346.47 346.47 346.47 346.47 346.47 346.47
15.02.04 PINTURA S/ 26,518.88 - - - - - -
15.02.04.01 PINTURA EN COLUMNAS m2 238.14 S/ 23.62 S/ 5,624.87 937.48 937.48 937.48 937.48 937.48 937.48
15.02.04.02 PINTURA EN VIGAS m2 133.35 S/ 22.41 S/ 2,988.37 498.06 498.06 498.06 498.06 498.06 498.06
15.02.04.03 PINTURA EN CONTRAZOCALO m 226.7 S/ 22.36 S/ 5,069.01 844.84 844.84 844.84 844.84 844.84 844.84
15.02.04.04 PINTURA SATINADO EN MUROS, DOS MANOS m2 536.2 S/ 23.94 S/ 12,836.63 2,139.44 2,139.44 2,139.44 2,139.44 2,139.44 2,139.44
15.02.05 COBERTURA S/ 6,092.52 - - - - - -
15.02.05.01 COBERTURA DE TEJA ARABE A=36cm m 85 S/ 27.24 S/ 2,315.40 2,315.40 - - - - - - - -
15.02.05.02 COBERTURA DE TEJA ARABE A=72cm m 129 S/ 22.62 S/ 2,917.98 932.38 863.93 544.71 576.96 - 0.00 0.00 0.00 0.00 0.00 0.00
15.02.05.03 CUMBRERA COBERTURA DE TEJA ARTESANAL m 64.5 S/ 13.32 S/ 859.14 843.02 16.13 - - - - - -
15.03 INSTALACIONES ELECTRICAS S/ 15,879.07 - - - - - -
15.03.01 SALIDAS INSTALACIONES ELECTRICAS S/ 5,518.38 - - - - - -
15.03.01.01 SALIDA PARA CENTRO DE LUZ EN TECHO pto 54 S/ 78.92 S/ 4,261.68 710.28 710.28 710.28 710.28 710.28 710.28
15.03.01.02 SALIDA PARA INTERRUPTOR SIMPLE pto 6 S/ 95.01 S/ 570.06 95.01 95.01 95.01 95.01 95.01 95.01
15.03.01.03 SALIDA TOMACORRIENTE DOBLE CON LINEA DE TIERRA pto 8 S/ 85.83 S/ 686.64 114.44 114.44 114.44 114.44 114.44 114.44
15.03.02 INTERRUPTORES TERMOMAGNETICOS S/ 128.42 - - - - - -
15.03.02.01 INTERRUPTOR THERMOMAGNETICO 3 X 30A, 30mA pza 2 S/ 64.21 S/ 128.42 21.40 21.40 21.40 21.40 21.40 21.40
15.03.03 CABLES S/ 3,691.32 - - - - - -
15.03.03.01 CABLE ELECTRICO TW 2.5MM2 m 531.18 S/ 4.43 S/ 2,353.13 392.19 392.19 392.19 392.19 392.19 392.19
15.03.03.02 CABLE ELECTRICO TW 4.0MM2 m 115.76 S/ 11.56 S/ 1,338.19 223.03 223.03 223.03 223.03 223.03 223.03
15.03.04 CONDUCTOS S/ 2,554.67 - - - - - -
15.03.04.01 TUBERIA PVC - CEL D=20MM m 211.13 S/ 12.10 S/ 2,554.67 425.78 425.78 425.78 425.78 425.78 425.78
15.03.05 ARTEFACTOS ELECTRICOS S/ 3,986.28 - - - - - -
15.03.05.01 ARTEFACTO FLUORESCENTE TUBULAR DE 32W, C/DIFUSOR ACRILICO
und TRANSPARENTE,
54 SIMILAR
S/ A73.82
TP DE JOSFEL S/ 3,986.28 664.38 664.38 664.38 664.38 664.38 664.38
16 PORTADA S/ 29,204.06 - - - - - -
16.01 ESTRUCTURAS S/ 8,385.59 - - - - - -
16.01.01 OBRAS PRELIMINARES S/ 33.11 - - - - - -
16.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 5.72 S/ 1.84 S/ 10.52 1.75 1.75 1.75 1.75 1.75 1.75
16.01.01.02 TRAZO Y REPLANTEO m2 5.72 S/ 3.95 S/ 22.59 3.77 3.77 3.77 3.77 3.77 3.77
16.01.02 MOVIMIENTO DE TIERRAS S/ 409.18 - - - - - -
16.01.02.01 EXCAVACION MANUAL DE ZANJAS PARA CIMIENTACION m3 4.62 S/ 49.09 S/ 226.80 37.80 37.80 37.80 37.80 37.80 37.80
16.01.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 2.08 S/ 41.77 S/ 86.88 14.48 14.48 14.48 14.48 14.48 14.48
16.01.02.03 ACARREO INTERNO DE MATERIAL EXCEDENTE PROCEDENTEm3
DE EXCAVACIONES
2.55 S/ 24.54 S/ 62.58 10.43 10.43 10.43 10.43 10.43 10.43
16.01.02.04 ELIMINACIÓN DE MATERIAL EXCEDENTE PROCEDENTE DE LAm3
EXCAVACIÓN
2.55 S/ 12.91 S/ 32.92 5.49 5.49 5.49 5.49 5.49 5.49
16.01.03 OBRAS DE CONCRETO SIMPLE S/ 133.81 - - - - - -
16.01.03.01 SOLADO C:H: 1:12 E=7CM m2 3.64 S/ 36.76 S/ 133.81 22.30 22.30 22.30 22.30 22.30 22.30
16.01.04 OBRAS DE CONCRETO ARMADO S/ 7,809.49 - - - - - -
16.01.04.01 ZAPATA S/ 1,519.98 - - - - - -
16.01.04.01.01 CONCRETO F'C= 210 KG/CM2. PARA ZAPATAS m3 2.18 S/ 593.09 S/ 1,292.94 215.49 215.49 215.49 215.49 215.49 215.49
16.01.04.01.02 ACERO Fy=4200 KG/CM2 GRADO 60, EN ZAPATAS kg 37.22 S/ 6.10 S/ 227.04 37.84 37.84 37.84 37.84 37.84 37.84
16.01.04.02 COLUMNAS S/ 4,784.74 - - - - - -
16.01.04.02.01 CONCRETO F'C= 210KG/CM2. PARA COLUMNAS m3 0.67 S/ 496.21 S/ 332.46 55.41 55.41 55.41 55.41 55.41 55.41
16.01.04.02.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 9.12 S/ 92.14 S/ 840.32 140.05 140.05 140.05 140.05 140.05 140.05
16.01.04.02.03 ACERO Fy=4200 KG/CM2 GRADO 60, EN COLUMNAS kg 91.2 S/ 6.22
S/ 567.26 94.54 94.54 94.54 94.54 94.54 94.54

16.01.04.02.04 SELLADO DE JUNTAS DE DILATACION DE COLUMNAS m 45 S/ 67.66 S/ 3,044.70 507.45 507.45 507.45 507.45 507.45 507.45
16.01.04.03 MURO DE CONCRETO S/ 895.04 - - - - - -
16.01.04.03.01 CONCRETO F'c= 210 Kg/cm2 -MURO DE CONCRETO m3 0.53 S/ 663.68 S/ 351.75 58.63 58.63 58.63 58.63 58.63 58.63
16.01.04.03.02 ENCOFRADO Y DESENCOFRADO MURO DE CONCRETO m2 3.91 S/ 123.50 S/ 482.89 80.48 80.48 80.48 80.48 80.48 80.48
16.01.04.03.03 ACERO FY= 4200 kg/cm2 GRADO 60, EN PANTALLA SOBRE VIGA
kg 9.71 S/ 6.22 S/ 60.40 10.07 10.07 10.07 10.07 10.07 10.07
16.01.04.04 VIGAS S/ 609.73 - - - - - -
16.01.04.04.01 CONCRETO 210 kg/cm2 VIGA m3 0.29 S/ 663.68 S/ 192.47 32.08 32.08 32.08 32.08 32.08 32.08
16.01.04.04.02 ENCOFRADO Y DESENCOFRADO DE VIGA m2 2.93 S/ 84.83 S/ 248.55 41.43 41.43 41.43 41.43 41.43 41.43
16.01.04.04.03 ACERO FY= 4200 kg/cm2 GRADO 60, EN VIGAS kg 24.45 S/ 6.90 S/ 168.71 28.12 28.12 28.12 28.12 28.12 28.12
16.02 ARQUITECTURA S/ 20,818.47 - - - - - -
16.02.01 REVOQUES ENLUCIDOS Y MOLDURAS S/ 1,066.38 - - - - - -
16.02.01.01 TARRAJEO DE COLUMNAS m2 7.2 S/ 68.16 S/ 490.75 81.79 81.79 81.79 81.79 81.79 81.79
16.02.01.02 TARRAJEO DE VIGAS m2 3.19 S/ 66.55 S/ 212.29 35.38 35.38 35.38 35.38 35.38 35.38
16.02.01.03 TARRAJEO DE MURO DE CONCRETO m2 3.91 S/ 43.39 S/ 169.65 28.28 28.28 28.28 28.28 28.28 28.28
16.02.01.04 VESTIDURAS DE DERRAMES M1;2 m 5.15 S/ 37.61 S/ 193.69 32.28 32.28 32.28 32.28 32.28 32.28
16.02.02 CARPINTERIA S/ 13,500.00 - - - - - -
16.02.02.01 CARPINTERIA METALICA S/ 13,500.00 - - - - - -
16.02.02.01.01 PORTON PRINCIPAL und 1 S/ 10,000.00 S/ 10,000.00 1,666.67 1,666.67 1,666.67 1,666.67 1,666.67 1,666.67
16.02.02.01.02 PUERTA SECUNDARIA und 1 S/ 3,500.00 S/ 3,500.00 583.33 583.33 583.33 583.33 583.33 583.33
16.02.03 PINTURA S/ 352.09 - - - - - -
16.02.03.01 PINTURA AL OLEO 2 MANOS EN COLUMNAS m1 7.2 S/ 23.62 S/ 170.06 28.34 28.34 28.34 28.34 28.34 28.34
16.02.03.02 PINTURA OLEO 2 MANOS EN VIGAS m2 3.19 S/ 22.41 S/ 71.49 11.92 11.92 11.92 11.92 11.92 11.92
16.02.03.03 PINTURA OLEO 2 MANOS EN MUROS m2 4.68 S/ 23.62 S/ 110.54 18.42 18.42 18.42 18.42 18.42 18.42
CRONOGRAMA VALORIZADO DE AVANCE DE OBRA

Obra: MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCIÓN EDUCATIVA INTEGRADA N°277-21 y 54177 "EL BUEN PASTOR" DE TALAVERA" DISTRITO DE TALAVERA - PROVINCIA ANDAHUALAS - REGIÓN APURÍMAC
Ubicación: APURIMAC - ANDAHUAYLAS - TALAVERA

PLAZO DE EJECUCION
MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 MES 11 MES 12 MES 13 MES 14 MES 15 MES 16 MES 17 MES 18 MES 19 MES 20 MES 21 MES 22 MES 23 MES 24 MES 25 MES 26 MES 27 MES 28 MES 29 MES 30 MES 31 MES 32 MES 33 MES 34 MES 35 MES 36 TOTAL
Item Descripcion Unid Metrado PU S/ PARCIAL
MAR - 2019 ABR - 2019 MAY - 2019 JUN - 2019 JUL - 2019 AGO - 2019 SET - 2019 0CT - 2019 NOV - 2019 DIC - 2019 ENE - 2020 FEB - 2020 MAR - 2020 JUL - 2020 AGO - 2020 SET - 2020 0CT - 2020 NOV - 2020 DIC - 2020 ENE - 2021 FEB - 2021 MAR - 2021 ABR - 2021 MAY - 2021 JUN - 2021 JUL - 2021 AGO - 2021 SET -2021 0CT - 2021 NOV - 2021 DIC - 2021 ENE - 2022 FEB - 2022 MAR - 2022 ABR - 2022 MAY - 2022 1188 Dias
16.02.04 VARIOS S/ 5,900.00 - - - - - -
16.02.04.01 LETRAS DE IDENTIFICACION Y ESCUDO GLB 1 S/ 5,900.00 S/ 5,900.00 983.33 983.33 983.33 983.33 983.33 983.33
17 GUARDIANIA S/ 30,879.87 - - - - - -
17.01 ESTRUCTURAS S/ 15,555.12 - - - - - -
17.01.01 TRABAJOS PRELIMINARES S/ 49.50 - - - - - -
17.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 10.83 S/ 1.84 S/ 19.93 3.32 3.32 3.32 3.32 3.32 3.32
17.01.01.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 10.83 S/ 2.73 S/ 29.57 4.93 4.93 4.93 4.93 4.93 4.93
17.01.02 S/ 1,377.82 - - - - - -
17.01.02.01 EXCAVACION MANUAL DE ZANJAS PARA TERRENO NORMAL m3 3.4 S/ 73.63 S/ 250.34 41.72 41.72 41.72 41.72 41.72 41.72
17.01.02.02 EXCAVACION MANUAL DE ZANJAS PARA CIMIENTO CORRIDO m3 5.08 S/ 49.09 S/ 249.38 41.56 41.56 41.56 41.56 41.56 41.56
17.01.02.03 RELLENO CON MATERIAL PROPIO m3 1.79 S/ 21.04 S/ 37.66 6.28 6.28 6.28 6.28 6.28 6.28
17.01.02.04 ACARREO DE MATERIAL EXCEDENTE m3 8.02 S/ 24.54 S/ 196.81 32.80 32.80 32.80 32.80 32.80 32.80
17.01.02.05 ELIMINACION DE MATERIAL EXCEDENTE m2 8.02 S/ 12.91 S/ 103.54 17.26 17.26 17.26 17.26 17.26 17.26
17.01.02.06 NIVELACION Y APISONADO m3 10.83 S/ 49.87 S/ 540.09 90.02 90.02 90.02 90.02 90.02 90.02
17.01.03 OBRAS DE CONCRETO SIMPLE S/ 3,019.73 - - - - - -
17.01.03.01 FALSA ZAPATA MEZCLA 1:10 CEMENTO-HORMIGON + 30% P.G.m3
8" 2.4 S/ 265.48 S/ 637.15 106.19 106.19 106.19 106.19 106.19 106.19
17.01.03.02 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30%
m3 PG 2.12 S/ 253.55 S/ 537.53 89.59 89.59 89.59 89.59 89.59 89.59
17.01.03.03 CONCRETO PARA SOBRECOMIENTOS H: 1:8 + 25% P.M. e=15cm
m3 0.77 S/ 444.74 S/ 342.45 57.08 57.08 57.08 57.08 57.08 57.08
17.01.03.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO h=0.30 m 2 10.32 S/ 100.73 S/ 1,039.53 173.26 173.26 173.26 173.26 173.26 173.26
17.01.03.05 FALSO PISO, MEZCLA CONCRETO 1:8 CEMENTO-HORMIGON e=4"
m2 6.36 S/ 32.67 S/ 207.78 34.63 34.63 34.63 34.63 34.63 34.63
17.01.03.06 CONTRAPISO DE 2" ACABADO Y FROTACHADO m2 6.36 S/ 40.14 S/ 255.29 42.55 42.55 42.55 42.55 42.55 42.55
17.01.04 CONCRETO ARMADO S/ 11,108.07 - - - - - -
17.01.05 ZAPATAS S/ 1,161.47 - - - - - -
17.01.05.01 CONCRETO F'C= 210 KG/CM2. PARA ZAPATAS m3 1.6 S/ 541.19 S/ 865.90 144.32 144.32 144.32 144.32 144.32 144.32
17.01.05.02 ACERO EN ZAPATAS FY= 4200 kg/cm2 GRADO 60 kg 47.52 S/ 6.22 S/ 295.57 49.26 49.26 49.26 49.26 49.26 49.26
17.01.06 COLUMNAS S/ 5,288.63 - - - - - -
17.01.06.01 CONCRETO F'C= 210 KG/CM2. PARA COLUMNAS m3 0.72 S/ 644.68 S/ 464.17 77.36 77.36 77.36 77.36 77.36 77.36
17.01.06.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 11.5 S/ 92.14 S/ 1,059.61 176.60 176.60 176.60 176.60 176.60 176.60
17.01.06.03 ACERO Fy=4200 KG/CM2 GRADO 60, EN COLUMNAS kg 115.78 S/ 6.22 S/ 720.15 120.03 120.03 120.03 120.03 120.03 120.03
17.01.06.04 SELLADO DE JUNTAS DE DILATACION DE COLUMNAS m 45 S/ 67.66 S/ 3,044.70 507.45 507.45 507.45 507.45 507.45 507.45
17.01.07 VIGAS S/ 1,947.27 - - - - - -
17.01.07.01 CONCRETO F'C= 210 KG/CM2. EN VIGAS m3 0.63 S/ 663.68 S/ 418.12 69.69 69.69 69.69 69.69 69.69 69.69
17.01.07.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 6.32 S/ 84.83 S/ 536.13 89.36 89.36 89.36 89.36 89.36 89.36
17.01.07.03 ACERO FY= 4200 kg/cm2 GRADO 60, EN VIGAS kg 159.65 S/ 6.22 S/ 993.02 165.50 165.50 165.50 165.50 165.50 165.50
17.01.08 TECHO INCLINADO DE CONCRETO ARMADO S/ 1,322.10 - - - - - -
17.01.08.01 CONCRETO F'C=210 KG/CM2 EN LOSA ALIGERADA INCLINADAm3 0.59 S/ 566.86 S/ 334.45 55.74 55.74 55.74 55.74 55.74 55.74
17.01.08.02 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA INCLINADA
m2 5.85 S/ 102.97 S/ 602.37 100.40 100.40 100.40 100.40 100.40 100.40
17.01.08.03 ACERO Fy=4200 KG/CM2 GRADO 60, EN LOSA ALIGERADA INCLINADA
kg 19.54 S/ 6.22 S/ 121.54 20.26 20.26 20.26 20.26 20.26 20.26
17.01.08.04 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA LOSA ALIGERADA
und INCLINADA
48.75 S/ 5.41 S/ 263.74 43.96 43.96 43.96 43.96 43.96 43.96
17.01.09 COBERTURAS S/ 1,388.60 - - - - - -
17.01.09.01 IMPERMEABILIZACION DE TECHO CON PINTURA ASFALTICA m2 9.41 S/ 6.84 S/ 64.36 10.73 10.73 10.73 10.73 10.73 10.73
17.01.09.02 VIGUETAS DE MADERA P/FIJAR COBERTURA DE TEJA ANDINAm 11.76 S/ 19.61 S/ 230.61 38.44 38.44 38.44 38.44 38.44 38.44
17.01.09.03 COBERTURA DE TEJA ANDINA m2 9.41 S/ 116.22 S/ 1,093.63 182.27 182.27 182.27 182.27 182.27 182.27
17.02 ARQUITECTURA S/ 9,086.21 - - - - - -
17.02.01 MUROS Y TABIQUES DE ALBAÑILERIA S/ 1,583.27 - - - - - -
17.02.01.01 MURO DE LADRILLO KK DE SOGA JUNTA 1.5 cm. MORTERO 1:4m2 12.79 S/ 123.79 S/ 1,583.27 263.88 263.88 263.88 263.88 263.88 263.88
17.02.02 REVOQUES ENLUCIDOS Y MOLDURAS S/ 2,879.74 - - - - - -
17.02.02.01 TARRAJEO DE COLUMNAS m² 11.5 S/ 68.16 S/ 783.84 130.64 130.64 130.64 130.64 130.64 130.64
17.02.02.02 TARRAJEO DE VIGAS m² 6.32 S/ 66.55 S/ 420.60 70.10 70.10 70.10 70.10 70.10 70.10
17.02.02.03 TARRAJEO MUROS EXTERIOR MORTERO 1:4 m2 12.79 S/ 36.07 S/ 461.34 76.89 76.89 76.89 76.89 76.89 76.89
17.02.02.04 TARRAJEO MUROS INTERIORES MORTERO 1:4 m2 12.79 S/ 36.07 S/ 461.34 76.89 76.89 76.89 76.89 76.89 76.89
17.02.02.05 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS.m 12.96 S/ 37.61 S/ 487.43 81.24 81.24 81.24 81.24 81.24 81.24
17.02.02.06 BRUÑAS DE 1 X 1 cm m 23.1 S/ 11.48 S/ 265.19 44.20 44.20 44.20 44.20 44.20 44.20
17.02.03 CIELORRASOS S/ 378.09 - - - - - -
17.02.03.01 CIELORRASOS CON MEZCLA CEMENTO : ARENA 1:5 m² 5.85 S/ 64.63 S/ 378.09 63.02 63.02 63.02 63.02 63.02 63.02
17.02.04 PISOS Y PAVIMENTOS S/ 264.64 - - - - - -
17.02.04.01 CEMENTO PULIDO, BRUÑADO y COLOREADO m2 6.36 S/ 41.61 S/ 264.64 44.11 44.11 44.11 44.11 44.11 44.11
17.02.05 ZOCALOS Y CONTRAZOCALOS S/ 74.65 - - - - - -
17.02.05.01 CONTRAZOCALO DE CEMENTO PULIDO S/COLOREAR H=0.30M.m 8.64 S/ 8.64 S/ 74.65 12.44 12.44 12.44 12.44 12.44 12.44
17.02.06 CARPINTERIA DE MADERA S/ 2,106.73 - - - - - -
17.02.06.01 PUERTA DE MADERA AGUANO TABLERO REBAJADO m2 1.32 S/ 935.84 S/ 1,235.31 205.89 205.89 205.89 205.89 205.89 205.89
17.02.06.02 VENTANA DE ALUMINIO NEGRO PESADO e=1.5mm INC. VIDRIOm2
TEMPLADO
2.4 S/ 363.09 S/ 871.42 145.24 145.24 145.24 145.24 145.24 145.24
17.02.07 CERRAJERIA S/ 157.65 - - - - - -
17.02.07.01 BISAGRAS CAPUCHINA ALUMINIZADA DE 4"x 4" pza 3 S/ 17.30 S/ 51.90 8.65 8.65 8.65 8.65 8.65 8.65
17.02.07.02 CERRADURA DE TRES GOLPÈS PARA PUERTA pza 1 S/ 105.75 S/ 105.75 17.63 17.63 17.63 17.63 17.63 17.63
17.02.08 PINTURA S/ 1,641.44 - - - - - -
17.02.08.01 PINTURA LATEX EN CIELO RASO 2 MANOS m2 5.85 S/ 21.40 S/ 125.19 20.87 20.87 20.87 20.87 20.87 20.87
17.02.08.02 PINTURA SATINADO EN EXTERIORES, MUROS, COLUMNAS, VIGAS,
m2 DOS
19.92
MANOS S/ 23.94 S/ 476.88 79.48 79.48 79.48 79.48 79.48 79.48
17.02.08.03 PINTURA SATINADO EN INTERIORES, MUROS, COLUMNAS, VIGAS,
m2 DOS23.48
MANOS S/ 23.94 S/ 562.11 93.69 93.69 93.69 93.69 93.69 93.69
17.02.08.04 PINTURA ESMALTE EN ZOCALOS Y CONTRAZOCALOS m² 17.28 S/ 22.36 S/ 386.38 64.40 64.40 64.40 64.40 64.40 64.40
17.02.08.05 PINTURA BARNIZ EN CARPINTERIA DE MADERA m² 3.72 S/ 24.43 S/ 90.88 15.15 15.15 15.15 15.15 15.15 15.15
17.03 INSTALACIONES ELECTRICAS S/ 6,238.54 - - - - - -
17.03.01 SALIDA PARA CENTRO DE LUZ EN TECHO pto 2 S/ 78.92 S/ 157.84 26.31 26.31 26.31 26.31 26.31 26.31
17.03.02 SALIDA PARA INTERRUPTOR SIMPLE pto 2 S/ 90.51 S/ 181.02 30.17 30.17 30.17 30.17 30.17 30.17
17.03.03 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON LINEA A TIERRA.
pto 2 S/ 56.29 S/ 112.58 18.76 18.76 18.76 18.76 18.76 18.76
17.03.04 TABLEROS ELECTRICOS S/ 5,157.22 - - - - - -
17.03.04.01 TABLERO DE DISTRIBUCION TD-3 INT. AUT. 1-2x30A, 1-2x20A, 2-2x15A,
und 1 I.D.
1 2x25A-30mA, 18 POLOS
S/ 5,157.22 S/ 5,157.22 859.54 859.54 859.54 859.54 859.54 859.54
17.03.05 INTERRUPTORES TERMOMAGNTICOS S/ 81.58 - - - - - -
17.03.05.01 INTERRUPTOR DIFERENCIAL DE 2X15A,30mA pza 2 S/ 40.79 S/ 81.58 13.60 13.60 13.60 13.60 13.60 13.60
17.03.06 CABLES S/ 98.16 - - - - - -
17.03.06.01 CABLE ELECTRICO TW 2.5MM2 m 6.5 S/ 4.43 S/ 28.80 4.80 4.80 4.80 4.80 4.80 4.80
17.03.06.02 CABLE ELECTRICO TW 4.0MM2 m 6 S/ 11.56 S/ 69.36 11.56 11.56 11.56 11.56 11.56 11.56
17.03.07 CONDUCTOS S/ 302.50 - - - - - -
17.03.07.01 TUBERIA PVC - CEL D=20MM m 25 S/ 12.10 S/ 302.50 50.42 50.42 50.42 50.42 50.42 50.42
17.03.08 ARTEFACTOS ELECTRICOS S/ 147.64 - - - - - -
17.03.08.01 ARTEFACTO FLUORESCENTE TUBULAR DE 32W, C/DIFUSOR ACRILICO
und TRANSPARENTE,
2 SIMILAR
S/ 73.82
A TP DE JOSFEL S/ 147.64 24.61 24.61 24.61 24.61 24.61 24.61
-

COSTO DIRECTO 15,109,177.68 211,511.01 428,566.98 663,614.56 406,144.23 424,556.96 334,989.35 366,644.30 820,827.79 800,280.36 549,636.40 570,633.96 589,833.55 475,387.85 212,668.33 284,077.19 651,689.83 322,026.13 255,106.62 145,179.17 98,917.89 222,811.29 237,464.00 398,689.32 325,674.13 256,656.57 268,718.76 132,666.01 180,920.36 71,022.88 119,398.52 697,143.90 697,143.90 697,143.90 697,143.90 697,143.90 797,143.90 15,109,177.68
GASTOS GENERALES 1,428,387.03 9.45% 19,995.77 40,515.74 62,736.60 38,395.94 40,136.64 31,669.13 34,661.71 77,599.18 75,656.67 51,961.37 53,946.43 55,761.51 44,942.08 20,105.18 26,856.01 61,609.26 30,443.61 24,117.19 13,724.91 9,351.47 21,064.07 22,449.30 37,691.17 30,788.49 24,263.72 25,404.06 12,541.94 17,103.80 6,714.34 11,287.66 65,906.39 65,906.39 65,906.39 65,906.39 65,906.39 75,360.16 1,428,387.03
COMPONENTE N° 02 EQUIPAMIENTO 3,032,125.00 3,032,125.00 3,032,125.00
COMPONENTE N° 03 CAPACITACION 0.01 40,000.00 40,000.00 40,000.00
SUPERVISION DE OBRA 417,984.98 2.77% 5,851.31 11,856.01 18,358.44 11,235.70 11,745.08 9,267.25 10,142.96 22,707.63 22,139.20 15,205.31 15,786.19 16,317.34 13,151.28 5,883.32 7,858.80 18,028.55 8,908.63 7,057.35 4,016.28 2,736.50 6,163.92 6,569.28 11,029.46 9,009.55 7,100.23 7,433.92 3,670.11 5,005.04 1,964.80 3,303.08 19,286.01 19,286.01 19,286.01 19,286.01 19,286.01 22,052.44 417,984.98
ELABORACION DE EXPEDIENTE TECNICO 0.02 254,322.00 254,322.00 254,322.00
LIQUIDACION 20,000.00 20,000.00 20,000.00
PRESUPUESTO TOTAL 20,301,996.69 491,680.09 480,938.73 744,709.59 455,775.88 476,438.67 375,925.72 411,448.97 921,134.61 898,076.24 616,803.08 640,366.58 661,912.40 533,481.20 238,656.83 318,792.00 731,327.64 361,378.37 286,281.16 162,920.35 111,005.86 250,039.28 266,482.58 447,409.96 365,472.17 288,020.52 301,556.74 148,878.07 203,029.19 79,702.02 133,989.26 782,336.29 782,336.29 782,336.29 782,336.29 782,336.29 3,986,681.49 20,301,996.69

También podría gustarte