Está en la página 1de 8

PRECIOS UNITARIOS

VALOR * UND(($) VIDA UTIL PRECIO MES($) PRECIO DIA($)


DRILLER 20000 5 333.33 13.33
COMPRESORA 535* 2250.00 90.00
GENERADOR ELEC.
CORTADORA SUPER 37000 5 616.67 24.67
OPERARIO 506.33 16.88

* Seco, sin petroleo


T.C. 3.95

PRECIO DIA(S/.) PRECIO HR(S/.)


52.67
355.50 59.25
220
97.43 13.92
66.67 8.3
LABOR CERCOR

AREA CORTADA
ALTURA m 21
LARGO m 12.5
AREA m2 262.5

EQUIPO CORTADORA SUPER

HORAS
FECHA HORA INICIAL HORA FINAL TRABAJADAS
10/16/2021 16:30 17:30 1.0
10/17/2021 8:00 11:00 3.0
10/18/2021 8:00 17:25 9.4
10/19/2021 6:30 16:45 10.3
TOTAL horas 23.7

EQUIPO GRUPO ELECTROGENO

HOROMETRO HOROMETRO
FECHA TOTAL HORAS D2
INICIAL FINAL
10/15/2021 17934 17938 4 50
10/16/2021 17938 17941 3
10/17/2021 17941 17945 4 35
10/18/2021 17945 17955 10
10/19/2021 17955 17965 10 35
TOTAL 31.0 120

EQUIPO DRILLER VERDE

HORAS METROS
FECHA HORA INICIAL HORA FINAL
TRABAJADAS PERFORADOS
10/7/2021 10:00 17:00 7.0 21.0
10/8/2021 9:00 10:00 1.0 21.0
10/11/2021 15:00 18:00 3.0 14.5
10/12/2021 8:30 12:30 4.0 14.5
10/13/2021 15:00 18:30 3.5 4.0
10/19/2021 14:00 16:00 2.0 4.0
10/20/2021 8:30 10:00 1.5 4.0
10/20/2021 11:00 11:30 0.5 2.5
10/20/2021 15:00 16:30 1.5 2.0
10/21/2021 8:00 14:00 6.0 3.2
TOTAL horas 30.0 90.7
EQUIPO COMPRENSORA 535

HOROMETRO HOROMETRO
FECHA TOTAL HORAS D2
INICIAL FINAL
10/7/2021 10741 10746 5 60
10/8/2021 10746 10747 1
10/11/2021 10747 10750 3 30
10/12/2021 10750 10756 6 30
10/13/2021 10756 10763 7 50
10/19/2021 10763 10767 4 15
10/20/2021 10767 10770 3 15
10/21/2021 10770 10772 2 35
TOTAL 31.0 235

GLS
CONSUMIDOS Costo S/ . Gls COSTO S/

COMBUSTIBLE 355 15.5 S/ 5,502.50

COSTO MANO HORAS


N° TRABAJADORES CARGO DE OBRA S/h TRABAJADAS
CESARIO JUAN
1 MAYTA MAESTRO DRILLERO 8 31.0
HUAYNALAYA

MICHAEL JONATAN AYUDANTE DE


2 8 30.0
BEJARANO ESPEJO DRILLERO

3 JESUS GARCIA SOTO OPERADOR 8 31.0

TOTAL

ACCESORIOS CANTIDAD m PRECIO S/ .m PRECIO TOTAL VIDA UTIL


S/ m2
HILO
70 300 S/ 21,000.00 100000
DIAMANTADO

PRECIO S// PRECIO TOTAL VIDA UTIL


ACCESORIOS CANTIDAD UNIDAD S/ m
BARRENOS 14 4000 S/ 56,000.00 100000
BROCA 1 5000 S/ 5,000.00 100000
COSTO TOTAL
S/

248

240

248

S/ 736.00

COSTO S/ por m2 m2 CORTADOS COSTO TOTAL S/

0.21 262.5 55.125

COSTO S/ por m METRO perforados COSTO TOTAL S/


0.56 60.0 33.6
0.1 60.0 3
PERFORACION Y CORTE CON HILOS DIAMANTADOS

LABOR: CERCOR
Profundidad de Perforacion m 21
Taladros perforados: und 8
Metros perforados: m 90.7
AREA DE CORTE m2 262.5

ITEM DESCRIPCION UNIDAD CANTIDAD P.U. (S/.)

EQUIPO DRILLER VERDE DIAS 8.0 52.67


COMPRENSORA 535 HR 31.0 59.25
CORTADORA SUPER HR 23.7 13.92
GRUPO ELECTROGENO HR 31.0 220.00
PERSONAL MAESTRO DRILLERO DIAS 9.0 66.67
AYUDANTE DE DRILLERO DIAS 9.0 66.67
OPERADOR DIAS 9.0 66.67
ACCESORIOS BARRAS UND 14.0 10.00
BROCA UND 1.0 20.00
HILO DIAMANTADO UND 70.0 15.00
COMBUSTIBLE COMPRENSORA 535 GLN 235.0 15.50
GRUPO ELECTROGENO GLN 120.0 15.50
TOTAL - S/.

PRECIO X METRO PERFORADO: 177.07


Oct-21
SUBTOTAL
S/.
421.33
1,836.75
329.42
6,820.00
600.00
600.00
600.00
140.00
20.00
1,050.00
3,642.50
1,860.00
16,060.00

También podría gustarte