CERCOR
CERCOR
AREA CORTADA
ALTURA m 21
LARGO m 12.5
AREA m2 262.5
HORAS
FECHA HORA INICIAL HORA FINAL TRABAJADAS
10/16/2021 16:30 17:30 1.0
10/17/2021 8:00 11:00 3.0
10/18/2021 8:00 17:25 9.4
10/19/2021 6:30 16:45 10.3
TOTAL horas 23.7
HOROMETRO HOROMETRO
FECHA TOTAL HORAS D2
INICIAL FINAL
10/15/2021 17934 17938 4 50
10/16/2021 17938 17941 3
10/17/2021 17941 17945 4 35
10/18/2021 17945 17955 10
10/19/2021 17955 17965 10 35
TOTAL 31.0 120
HORAS METROS
FECHA HORA INICIAL HORA FINAL
TRABAJADAS PERFORADOS
10/7/2021 10:00 17:00 7.0 21.0
10/8/2021 9:00 10:00 1.0 21.0
10/11/2021 15:00 18:00 3.0 14.5
10/12/2021 8:30 12:30 4.0 14.5
10/13/2021 15:00 18:30 3.5 4.0
10/19/2021 14:00 16:00 2.0 4.0
10/20/2021 8:30 10:00 1.5 4.0
10/20/2021 11:00 11:30 0.5 2.5
10/20/2021 15:00 16:30 1.5 2.0
10/21/2021 8:00 14:00 6.0 3.2
TOTAL horas 30.0 90.7
EQUIPO COMPRENSORA 535
HOROMETRO HOROMETRO
FECHA TOTAL HORAS D2
INICIAL FINAL
10/7/2021 10741 10746 5 60
10/8/2021 10746 10747 1
10/11/2021 10747 10750 3 30
10/12/2021 10750 10756 6 30
10/13/2021 10756 10763 7 50
10/19/2021 10763 10767 4 15
10/20/2021 10767 10770 3 15
10/21/2021 10770 10772 2 35
TOTAL 31.0 235
GLS
CONSUMIDOS Costo S/ . Gls COSTO S/
TOTAL
248
240
248
S/ 736.00
LABOR: CERCOR
Profundidad de Perforacion m 21
Taladros perforados: und 8
Metros perforados: m 90.7
AREA DE CORTE m2 262.5