1 F011007 LIMPIEZA DE TERRENO CON TRACTOR M2 17.

39
2 F260022 CORTE DE MATERIAL CON TRACTOR D-6 M3 53.20
3 F013004 TRAZADO Y MARCADO CON NIVEL M.L. 14.24
4 F014004 EXCAVACION DE MATERIAL NO CLASIFICADO M3 206.25
5 F015005 RELLENO COMPACTO CON MATERIAL DEL SITIO M3 105.83
6 F024022 ZAPATA AISLADA 1.00 x 1.00, e=0.30 , 6 Nú4, a.s. UNID 1,574.44
7 F021010 CIMENTACION MAMPOSTERIA,CAMA ARENA e=5cm,MORT 1:5 M3 1,752.71
8 B3154 SOLERA 15X15 3#3, #2@15cm CONC. 1:2:2 ML 223.09
9 FB34030 COLUMNA 30X30, 8#4;#3@0.20 CONCERTO 1:2:2 M.L. 755.31
10 F037073 VIGA DE B=25, H=45,6#4; #2 @ 0.20 CONCRETO 1:2:2 M.L. 859.83
11 F042020 PARED DE BLOQUE SIMPLE SISADO DE 15cm M2 436.88
12 B3206 CASTILLO 15X15 4#3, #2@15cm CONC. 1:2:2 ML 269.99
13 F033010 JAMBA 10X15cm, 2#3, #2@20cm, CONC 1:2:4 ML 167.67
14 F031051 SOLERA 15X15cm,4#3,#2@15cm,CONC 1:2:2 ML 247.71
15 F082037 CUBIERTA DE TECHO M2 521.86
16 F082050 TECHO DE CANALE 4" ,LAMINA ALUZ 8'X42" CAL. 26 SC M2 417.63
17 F082050 TECHO DE CANALE 4" ,LAMINA ALUZ 8'X42" CAL. 26 SC M2 417.63
18 F085010 CAPOTE DE ZINC (SUM / INST) ML 125.03
19 F047010 ENTABICADO BLOQUE 15cm (REPELLO/PULIDO)MORT 1:6 ML 130.86
20 F015005 RELLENO COMPACTO CON MATERIAL DEL SITIO M3 105.83
21 F071006 PISO DE CONCRETO REFORZADO e=10 CM. #2 @ 15 CM. M2 578.19
22 F061001 AFINADO e=0.5 CM M2 79.41
23 F013004 TRAZADO Y MARCADO CON NIVEL M.L. 14.24
24 F014005 EXCAVACION MATERIAL TIPO I (MATERIAL COMUN) M3 110.55
25 F021010 CIMENTACION MAMPOSTERIA,CAMA ARENA e=5cm,MORT 1:5 M3 1,752.71
26 F031051 SOLERA 15X15cm,4#3,#2@15cm,CONC 1:2:2 ML 247.71
27 FB04201 PARED DE BLOQUE REF. 20 CM, V:#3@40CM Y H #3@HILAD M2 705.60
28 F031051 SOLERA 15X15cm,4#3,#2@15cm,CONC 1:2:2 ML 247.71
29 F015005 RELLENO COMPACTO CON MATERIAL DEL SITIO M3 105.83
30 F071007 PISO DE CONCRETO REF. e=15 CM. #3 @ 30 CM M2 829.78
31 F061001 AFINADO e=0.5 CM M2 79.41
32 F061010 REPELLO Y PULIDO DE PAREDES e=2 CM MORTERO DE 1:4 M2 152.87
33 F172001 PINTURA DE ACEITE M2 49.36
34 F013004 TRAZADO Y MARCADO CON NIVEL M.L. 14.24
35 F014005 EXCAVACION MATERIAL TIPO I (MATERIAL COMUN) M3 110.55
36 F021010 CIMENTACION MAMPOSTERIA,CAMA ARENA e=5cm,MORT 1:5 M3 1,752.71
37 F031051 SOLERA 15X15cm,4#3,#2@15cm,CONC 1:2:2 ML 247.71
38 B042 PARED DE BLOQUE REF. 20cm V:#3@40cm Y H:#3@HILADA M2 729.14
39 F031051 SOLERA 15X15cm,4#3,#2@15cm,CONC 1:2:2 ML 247.71
40 F015005 RELLENO COMPACTO CON MATERIAL DEL SITIO M3 105.83
41 F071006 PISO DE CONCRETO REFORZADO e=10 CM. #2 @ 15 CM. M2 578.19
42 F061001 AFINADO e=0.5 CM M2 79.41
43 F061010 REPELLO Y PULIDO DE PAREDES e=2 CM MORTERO DE 1:4 M2 152.87
44 FB28008 PINTURA DE ACEITE M2 0.00
45 F282001 PASAMANOS DE HG 1" H= 1 M. DE POSTES A/C 1 MT. M.L. 822.84
46 F013004 TRAZADO Y MARCADO CON NIVEL M.L. 14.24
47 F043002 PARED DE TABLA YESO M2 152.25
48 F084002 CIELO FALSO DE LAMINA PANELIT 2 X 4 X 5 mm M2 250.36
49 FB28008 PINTURA DE ACEITE M2 0.00
50 F072003 MOLDURA PARA PISO TERRAZO 30X30 Cms. M.L. 65.32
51 F121001 CONTRAMARCO DE MADERA UNID 847.41
52 F121039 PUERTA TERMOFORMADA P/BAÑO 0,80x2,10 C/LLAVIN UND 0.00
53 F122011 VENTANA DE ALUMINIO Y VIDRIO FIJO CORREDIZA M2 0.00
54 F2140006 ACOMETIDA ELECTRICA AEREA CABLE TRIPLEX #6 ML 63.75
55 F219005 BASE PARA CONTADOR (200 AMPERIOS) UND 2,341.60
56 F213008 CENTRO DE CARGA DE 16 ESPACIOS UND 2,293.67
57 F212013 CIRCUITO DE FUER. 30 AMP.POLIDUCTO 3/4 M.L. 58.24
58 F211002 CIRCUITO DE ILUM. HASTA 20 AMP, PVC ELECTRICO ø M.L. 53.34
59 F212005 CIRCUITO DE FUER. HASTA 50 AMP, TUBO EMT õ M.L. 189.45
60 F217003 LAMPARA FLUORECENTE 2 X 40W (SUM/INST) UND 719.30
61 F215006 TOMA CORRIENTE DOBLE POLARIZADO UND 210.70
62 F215003 TOMA CORRIENTE PARA ESTUFA UND 416.90
63 F216001 INTERRUPTOR SENCILLO UNID 257.86
64 F216002 INTERRUPTOR DOBLE UND 328.28
65 F014005 EXCAVACION MATERIAL TIPO I (MATERIAL COMUN) M3 110.55
66 F101003 SUMINISTRO DE TUBERIA PVC DE 1/2" RD-26 M.L. 7.51
67 F102001 INSTALACION DE TUBERIA PVC ø" M.L. 7.39
68 F101040 SUMINISTRO DE TUBERIA PVC DE 4" RD-41 M.L. 83.50
69 F102008 INSTALACION DE TUBERIA PVC DE 4" M.L. 13.44
70 F111002 CAJA DE REGISTRO DE 40X40X60 CM. UNID 1,142.47
71 F112007 TANQUE SEPTICO 4M3 46-60 PERSONAS PARED DE BLOQUE UNIDA 17,426.17
72 F114001 POZO ABSO 4.5Xý1.9 MTS. NO INC. EXCAV. Y ACARREO UNID 48,172.65
73 F061022 TALLADO DE ELEMENTOS L= 0.30m ML 70.28
74 F061027 TALLADO DE ELEMENTOS DE L= 0.45m ML 78.34
75 F061019 TALLADO DE ELEMENTOS DE L= 0.15 m ML 64.18
76 FB28008 PINTURA DE ACEITE M2 0.00
77 F144007 PORTON METALICO DOBLE HOJA 3.85 X 2.75 M UND 17,348.48
78 F144007 PORTON METALICO DOBLE HOJA 3.85 X 2.75 M UND 17,348.48
79 F013004 TRAZADO Y MARCADO CON NIVEL M.L. 14.24
80 F014005 EXCAVACION MATERIAL TIPO I (MATERIAL COMUN) M3 110.55
81 F015007 RELLENO CON MATERIAL DEL SITIO CON COMP. DE PLATO M3 47.85
82 BF0150 CONCRETO DE 210KG/CM2 M3 3,710.67
83 F053002 ACERO DE REFUERZO GRADO 60 Fy=4200 Kg/cm2 KG 35.60
84 F154007 BORDILLO DE CONCRETO DE 15x15 cms ML 194.85
85 FB28008 PINTURA DE ACEITE M2 0.00
86 F013004 TRAZADO Y MARCADO CON NIVEL M.L. 14.24
87 F014005 EXCAVACION MATERIAL TIPO I (MATERIAL COMUN) M3 110.55
88 F021010 CIMENTACION MAMPOSTERIA,CAMA ARENA e=5cm,MORT 1:5 M3 1,752.71
89 F015005 RELLENO COMPACTO CON MATERIAL DEL SITIO M3 105.83
90 F071007 PISO DE CONCRETO REF. e=15 CM. #3 @ 30 CM M2 829.78
500.00 8,695.00
750.00 39,900.00
90.00 1,281.60
50.05 10,322.82
10.86 1,149.32
20.00 31,488.80
30.69 53,790.67
85.00 18,962.65
123.40 93,205.25
152.00 130,694.16
321.00 140,238.48
76.00 20,519.24
18.90 3,168.99
9.00 2,229.39
181.24 94,581.90
142.50 59,512.30
84.00 35,080.92
16.00 2,000.48
45.00 5,888.70
30.00 3,174.90
300.00 173,457.00
300.00 23,823.00
8.24 117.34
2.97 328.34
2.97 5,205.54
8.24 2,041.13
9.20 6,491.52
8.24 2,041.13
24.30 2,571.67
27.00 22,404.06
27.00 2,144.07
9.10 1,391.11
9.10 449.18
7.00 99.68
2.52 278.59
2.52 4,416.83
8.24 2,041.13
7.70 5,614.39
7.00 1,733.97
9.24 977.87
8.40 4,856.79
8.40 667.04
7.70 1,177.11
7.70 0.00
7.00 5,759.88
6.00 85.44
18.00 2,740.50
7.80 1,952.81
18.00 0.00
6.00 391.92
1.00 847.41
1.00 0.00
1.44 0.00
15.00 956.25
1.00 2,341.60
1.00 2,293.67
82.00 4,775.68
110.00 5,867.40
57.00 10,798.65
14.00 10,070.20
16.00 3,371.20
4.00 1,667.60
2.00 515.72
4.00 1,313.12
3.67 405.72
120.00 901.20
120.00 886.80
12.00 1,002.00
12.00 161.28
2.00 2,284.94
1.00 17,426.17
1.00 48,172.65
246.80 17,345.10
304.00 23,815.36
182.60 11,719.28
238.23 0.00
1.00 17,348.48
2.00 34,696.96
30.00 427.20
63.00 6,964.65
31.50 1,507.28
31.50 116,886.12
34.79 1,238.52
70.00 13,639.50
21.00 0.00
170.00 2,420.80
15.30 1,691.42
10.98 19,244.76
133.80 14,160.05
133.80 111,024.55
AM-0001 APORTE MUNICIPAL
1,541,333.90
1

3
0001 APORTE MUNICIPAL
1,541,333.90
Total Presupuesto : 1,541,333.90