Documentos de Académico
Documentos de Profesional
Documentos de Cultura
E=581800
E=581900
E=582000
E=582100
E=582200
IBIS 1" 25.01m.c.a P= 16.61 mca IBIS 1" 25.35m.c.a
N=8495700 A=0.11 ha 2.13 l/s
A=0.26 ha 5.05 l/s N=8495700 AREA POR TURNO CAUDAL POR TURNO DIAMETRO PRESIONES CAUDAL SUPERPOSICION
DIA HIDRANTE
PARCELA CAUDAL VALVULA N° DE TIPO DE DEL
H-57 D2 T2 V. AIRE N°5 DE TURNO N° AREA AREA AREA CAUDAL CAUDAL CAUDAL POR
H-67 D2 T3 N° PARA 1 DE ASPERSORES DINAMICA ESTATICA ASPERSOR ASPERSOR ASPERSOR LATERAL
3,182.82 44.00m.c.a N-80 3,203.12 16.02m.c.a PROYECTADO RIEGO (m2) (ha) (ha) (m3/h) (l/s) (l/s) PARCELA
VYR 60 57.63m.c.a ha (l/s) HIDRANTE LPH
P= 16.99 mca IBIS 1" 22.05m.c.a N-95
A=0.13 ha 2.53 l/s P= 17.66 mca
H-73 D2 T4 A=0.12 ha 2.30 l/s V. CONTROL D:3" N°5 D2
D1 T4
T1 71
1 1166.79
726.81 0.12
0.07 19.53 8.21
5.11 2.28
1.42 1 1.5 23 16.96
25.47 24.02
27.02 IBIS SECTORIAL 1" 3168 21 21
3,181.22 29.68m.c.a
N-74 IBIS 1" 43.95m.c.a
PROYECTADO D2 T4 72 1594.22 0.16 19.53 11.20 3.11 1 2.0 4 19.21 27.27 IBIS SECTORIAL 1" 3168 21 21
P= 44.44 mca A=0.11 ha 2.11 l/s D2 T4 73 1079.29 0.11 19.53 7.60 2.11 1 1.5 3 29.68 43.95 IBIS SECTORIAL 1" 3168 21 21
H-74 D2 T4
D2 T4 74 1075.78 0.11 19.53 7.56 2.10 1 1.5 4 30.84 44.57 VYR 60 1800 18 18
3,180.60 30.84m.c.a 4 0.85 16.68
VYR 60 44.57m.c.a H-75 D2 T4 D2 T4 75 875.00 0.09 19.53 6.16 1.71 1 1.5 3 30.92 42.26 VYR 60 1800 18 18
A=0.11 ha 2.10 l/s 3,182.91 30.92m.c.a N-42
H-58 D2 T2 VYR 60 42.26m.c.a P= 16.24 mca V. AIRE N°13 D2 T4 76 842.93 0.08 19.53 5.94 1.65 1 1.5 3 31.47 42.43 VYR 60 1800 18 18
3,182.72 44.47m.c.a A=0.09 ha 1.71 l/s N-90
VYR 60 57.73m.c.a PROYECTADO D2 T4 77 949.89 0.09 19.53 6.70 1.86 1 1.5 3 27.95 38.39 IBIS SECTORIAL 1" 3168 21 21
P= 18.96 mca N-43
A=0.10 ha 1.88 l/s
P= 17.04 mca D2 T4 78 951.85 0.10 19.53 6.70 1.86 1 1.5 3 25.09 36.56 IBIS SECTORIAL 1" 3168 21 21
N-89 D3 T1 79 1200.09 0.12 19.53 8.42 2.34 1 1.5 4 32.90 45.91 VYR 60 1800 18 18
P= 31.11 mca
H-71 D2 T4 D3 T1 80 579.71 0.06 19.53 4.07 1.13 1 1.5 2 32.26 43.91 VYR 60 1800 18 18
3,201.15 16.96m.c.a D3 T1 81 1386.09 0.14 19.53 9.76 2.71 1 1.5 5 33.54 46.44 VYR 60 1800 18 18
IBIS 1" 24.02m.c.a
A=0.12 ha 2.28 l/s 1 D3 T1 82 851.71 0.09 0.82 19.53 5.98 1.66 15.96 1 1.5 3 32.08 45.06 VYR 60 1800 18 18
H-76 D2 T4 D3 T1 83 1412.61 0.14 19.53 9.94 2.76 1 1.5 5 34.41 48.48 VYR 60 1800 18 18
3,182.74 31.47m.c.a N-44 H-66 D2 T3
P= 31.20 mca 3,202.30 16.53m.c.a N-91 D3 T1 84 1131.48 0.11 19.53 7.96 2.21 1 1.5 4 32.74 47.03 VYR 60 1800 18 18
VYR 60 42.43m.c.a P= 17.91 mca
A=0.08 ha 1.65 l/s IBIS 1" 22.87m.c.a
A=0.13 ha 2.59 l/s D3 T1 85 1614.81 0.16 19.53 11.34 3.15 1 2.0 5 31.78 49.78 VYR 60 1800 18 18
H-79 D3 T1
3,179.26 32.90m.c.a H-72 D2 T4 D3 T2 86 2715.78 0.27 19.53 19.08 5.30 1 2.0 9 30.51 46.57 VYR 60 1800 18 18
N-54 3,197.90 19.21m.c.a
VYR 60 45.91m.c.a N-49 IBIS 1" 27.27m.c.a
V. PURGA N°5 D3 T2 87 1339.93 0.13 19.53 9.43 2.62 1 1.5 4 22.04 32.72 IBIS SECTORIAL 1" 3168 21 21
A=0.12 ha 2.34 l/s P= 32.57 mca
P= 20.62 mca V. CONTROL D:6" N°6 PROYECTADO H-63 D2 T3
N-99 A=0.16 ha 3.11 l/s D3 T2 88 936.39 0.09 19.53 6.59 1.83 1 1.5 3 22.04 32.29 IBIS SECTORIAL 1" 3168 21 21
N-126 PROYECTADO 3,195.45 18.01m.c.a 2 0.84 16.41
P= 31.05 mca
P= 27.98 mca IBIS 1" 29.72m.c.a D3 T2 89 1122.78 0.11 19.53 7.88 2.19 1 1.5 3 21.33 31.02 IBIS SECTORIAL 1" 3168 21 21
N-55
P= 32.57 mca A=0.11 ha 2.08 l/s
N-72 V. AIRE N°6 D3 T2 90 1486.97 0.15 19.53 10.44 2.90 1 1.5 4 22.33 31.22 IBIS SECTORIAL 1" 3168 21 21
H-81 D3 T1 P= 32.44 mca 3
3,178.73 33.54m.c.a PROYECTADO D3 T2 91 802.74 0.08 19.53 5.65 1.57 1 1.5 2 20.30 29.31 IBIS SECTORIAL 1" 3168 21 21
N-15 H-80 D3 T1
VYR 60 46.44m.c.a
3,181.26 32.26m.c.a N-92 D3 T3 92 866.86 0.09 19.53 6.08 1.69 1 1.5 3 17.23 23.67 IBIS SECTORIAL 1" 3168 21 21
A=0.14 ha 2.71 l/s P= 32.85 mca P= 17.75 mca
VYR 60 43.91m.c.a H-91 D3 T2 D3 T3 93 894.77 0.09 19.53 6.30 1.75 1 1.5 3 15.96 24.17 IBIS SECTORIAL 1" 3168 21 21
N-16 H-82 D3 T1 A=0.06 ha 1.13 l/s N-50 3,195.86 20.30m.c.a V. CONTROL D:4" N°7
P= 32.77 mca 3,180.11 32.08m.c.a H-77 D2 T4 P= 21.48 mca IBIS 1" 29.31m.c.a PROYECTADO D3 T3 94 1498.19 0.15 19.53 10.55 2.93 1 1.5 4 17.99 26.29 IBIS SECTORIAL 1" 3168 21 21
3,186.78 27.95m.c.a A=0.08 ha 1.57 l/s 3 0.74 14.45
VYR 60 45.06m.c.a H-90 D3 T2 H-92 D3 T3 D3 T3 95 1019.40 0.10 19.53 7.16 1.99 1 1.5 3 19.67 28.52 IBIS SECTORIAL 1" 3168 21 21
A=0.09 ha 1.66 l/s IBIS 1" 38.39m.c.a N-17 3,193.95 22.33m.c.a N-28
V. AIRE N°7
3,201.50 17.23m.c.a D3 T3 96 1078.83 0.11 19.53 7.60 2.11 1 1.5 3 19.45 28.76 IBIS SECTORIAL 1" 3168 21 21
A=0.09 ha 1.86 l/s P= 27.56 mca PROYECTADO
IBIS 1" 31.22m.c.a IBIS 1" 23.67m.c.a P= 17.62 mca
A=0.15 ha 2.90 l/s N-51 A=0.09 ha 1.69 l/s D3 T3 97 2037.02 0.20 19.53 14.33 3.98 1 2.0 5 22.28 33.95 IBIS SECTORIAL 1" 3168 21 21
P= 21.46 mca
H-95 D3 T3
D3 T4 98 1340.23 0.13 19.53 9.43 2.62 1 1.5 4 23.98 34.41 IBIS SECTORIAL 1" 3168 21 21
N-82
P= 19.60 mca
3,196.65 19.67m.c.a D3 T4 99 1351.48 0.14 19.53 9.50 2.64 1 1.5 4 14.40 18.51 IBIS SECTORIAL 1" 3168 21 21
IBIS 1" 28.52m.c.a
N=8495600 A=0.10 ha 1.99 l/s N=8495600 4 D3 T4 100 1738.17 0.17 0.80 19.53 12.24 3.40 15.62 1 2.0 5 17.18 23.84 IBIS SECTORIAL 1" 3168 21 21
N-85
H-83 D3 T1 P= 18.75 mca D3 T4 101 2347.15 0.23 19.53 16.49 4.58 1 2.0 6 21.93 31.62 IBIS SECTORIAL 1" 3168 21 21
3,176.69 34.41m.c.a
VYR 60 48.48m.c.a D3 T4 102 1216.85 0.12 19.53 8.57 2.38 1 1.5 3 14.66 20.42 IBIS SECTORIAL 1" 3168 21 21
N-117
A=0.14 ha 2.76 l/s P= 16.98 mca D4 T1 103 1064.20 0.11 19.53 7.49 2.08 1 1.5 3 18.84 28.19 IBIS SECTORIAL 1" 3168 21 21
N-86 H-96 D3 T3
P= 21.57 mca 3,196.41 19.45m.c.a D4 T1 104 757.83 0.08 19.53 5.33 1.48 1 1.5 2 23.71 33.37 IBIS SECTORIAL 1" 3168 21 21
N-11 N-135 IBIS 1" 28.76m.c.a
N-48
A=0.11 ha 2.11 l/s
D4 T1 105 983.41 0.10 19.53 6.91 1.92 1 1.5 3 24.27 35.79 IBIS SECTORIAL 1" 3168 21 21
P= 34.69 mca H-94 D3 T3 P= 19.39 mca
P= 34.81 mca
3,198.88 17.99m.c.a D4 T1 106 1594.98 0.16 19.53 11.23 3.12 1 2.0 4 28.62 41.33 IBIS SECTORIAL 1" 3168 21 21
N-10 IBIS 1" 26.29m.c.a
P= 22.12 mca N-41 A=0.15 ha 2.93 l/s
1 D4 T1 107 864.87 0.09 0.85 19.53 6.08 1.69 16.68 1 1.5 3 17.99 26.14 IBIS SECTORIAL 1" 3168 21 21
H-78 D2 T4 P= 22.08 mca H-89 D3 T2 D4 T1 108 823.82 0.08 19.53 5.80 1.61 1 1.5 3 20.78 29.59 IBIS SECTORIAL 1" 3168 21 21
3,188.61 25.09m.c.a 3,194.15 21.33m.c.a
IBIS 1" 36.56m.c.a IBIS 1" 31.02m.c.a D4 T1 109 958.98 0.10 19.53 6.73 1.87 1 1.5 3 25.24 35.75 IBIS SECTORIAL 1" 3168 21 21
A=0.10 ha 1.86 l/s H-88 D3 T2 A=0.11 ha 2.19 l/s H-93 D3 T3 D4 T1 110 846.98 0.08 19.53 5.94 1.65 1 1.5 3 26.49 39.39 IBIS SECTORIAL 1" 3168 21 21
3,201.00 15.96m.c.a N-67 H-97 D3 T3
3,192.88 22.04m.c.a 3,191.22 22.28m.c.a
IBIS 1" 32.29m.c.a IBIS 1" 24.17m.c.a P= 16.13 mca D4 T1 111 645.73 0.06 19.53 4.54 1.26 1 1.5 2 28.14 41.24 IBIS SECTORIAL 1" 3168 21 21
A=0.09 ha 1.75 l/s IBIS 1" 33.95m.c.a
A=0.09 ha 1.83 l/s A=0.20 ha 3.98 l/s D4 T2 112 973.40 0.10 19.53 6.84 1.90 1 1.5 3 26.47 38.53 IBIS SECTORIAL 1" 3168 21 21
H-84 D3 T1 D4 T2 113 865.60 0.09 19.53 6.08 1.69 1 1.5 3 24.90 36.04 IBIS SECTORIAL 1" 3168 21 21
3,178.14 32.74m.c.a
VYR 60 47.03m.c.a D4 T2 114 1142.41 0.11 19.53 8.03 2.23 1 1.5 3 23.02 32.46 IBIS SECTORIAL 1" 3168 21 21
A=0.11 ha 2.21 l/s H-85 D3 T1 N-75 V. CONTROL D:2.5" N°8 2 D4 T2 115 928.54 0.09 0.73 19.53 6.52 1.81 14.20 1 1.5 3 19.75 27.69 IBIS SECTORIAL 1" 3168 21 21
3,175.39 31.78m.c.a P= 15.97 mca
VYR 60 49.78m.c.a PROYECTADO D4 T2 116 1088.99 0.11 19.53 7.67 2.13 1 1.5 3 14.37 20.77 IBIS SECTORIAL 1" 3168 21 21
A=0.16 ha 3.15 l/s N-76 D4 T2 117 979.37 0.10 19.53 6.88 1.91 1 1.5 3 14.38 21.89 IBIS SECTORIAL 1" 3168 21 21
E=582300
P= 17.50 mca 4
V. AIRE N°7 D4 T2 118 1295.25 0.13 19.53 9.11 2.53 1 1.5 4 17.78 32.50 IBIS SECTORIAL 1" 3168 21 21
H-103 D4 T1 D4 T3 119 1440.77 0.14 19.53 10.12 2.81 1 1.5 5 30.22 48.52 VYR 60 1800 18 18
3,196.98 18.84m.c.a PROYECTADO
H-87 D3 T2 D4 T3 120 901.15 0.09 19.53 6.34 1.76 1 1.5 3 27.71 44.10 IBIS SECTORIAL 1" 3168 21 21
IBIS 1" 28.19m.c.a
3,192.45 22.04m.c.a
A=0.11 ha 2.08 l/s D4 T3 121 1702.24 0.17 19.53 11.95 3.32 1 2.0 5 23.72 37.35 IBIS SECTORIAL 1" 3168 21 21
IBIS 1" 32.72m.c.a N-46
V. PURGA N°7 A=0.13 ha 2.62 l/s P= 18.24 mca H-98 D3 T4
3,190.76 23.98m.c.a D4 T3 122 710.48 0.07 19.53 5.00 1.39 1 1.5 2 20.87 33.66 IBIS SECTORIAL 1" 3168 21 21
PROYECTADO IBIS 1" 34.41m.c.a
3 0.79 15.34
D4 T3 123 712.83 0.07 19.53 5.00 1.39 1 1.5 2 19.39 32.11 IBIS SECTORIAL 1" 3168 21 21
A=0.13 ha 2.62 l/s
N-129 D4 T3 124 742.74 0.07 19.53 5.22 1.45 1 1.5 2 18.77 29.88 IBIS SECTORIAL 1" 3168 21 21
C.R.P T-6 C/VAVULA D=4" N-120 N-97 P= 12.20 mca D4 T3 125 965.01 0.10 19.53 6.77 1.88 1 1.5 3 20.15 32.20 IBIS SECTORIAL 1" 3168 21 21
V. PURGA N°6 COTA: 3,195.87 P= 2.66 mca P= 23.42 mca
PROYECTADO D4 T3 126 683.61 0.07 19.53 4.82 1.34 1 1.5 2 21.85 33.99 IBIS SECTORIAL 1" 3168 21 21
PROYECTADO N°4
D4 T4 127 1617.54 0.16 19.53 11.38 3.16 1 2.0 4 21.35 36.32 IBIS SECTORIAL 1" 3168 21 21
D4 T4 128 1175.56 0.12 19.53 8.28 2.30 1 1.5 3 22.98 37.53 IBIS SECTORIAL 1" 3168 21 21
H-104 D4 T1
3,191.80 23.71m.c.a D4 T4 129 1577.53 0.16 19.53 11.09 3.08 1 2.0 4 22.15 33.41 IBIS SECTORIAL 1" 3168 21 21
IBIS 1" 33.37m.c.a 4 0.91 17.71
D4 T4 130 1097.69 0.11 19.53 7.70 2.14 1 1.5 3 21.02 37.23 IBIS SECTORIAL 1" 3168 21 21
H-86 D3 T2 A=0.08 ha 1.48 l/s
3,178.60 30.51m.c.a N-32
D4 T4 131 1536.73 0.15 19.53 10.80 3.00 1 2.0 4 21.89 36.23 IBIS SECTORIAL 1" 3168 21 21
VYR 60 46.57m.c.a P= 23.92 mca D4 T4 132 2060.86 0.21 19.53 14.51 4.03 1 2.0 6 22.17 37.15 IBIS SECTORIAL 1" 3168 21 21
A=0.27 ha 5.30 l/s
N=8495500 N=8495500
N-71 DISEÑO AGRONOMICO - SAN MIGUEL DE ACCO SUBSECTOR
E=581750
E=582000
E=582250
H-15 D1 T2
P= 14.70 mca
3,243.91 46.73m.c.a
VYR 60 50.27m.c.a
A=0.11 ha 2.08 l/s
H-105 D4 T1 02 N-35
P= 48.32 mca
3,189.38 24.27m.c.a
H-99 D3 T4 PARAMETROS DE DISEÑO UNIDAD DETALLE N-23
P= 41.79 mca C.R.P T-6 C/VAVULA D=6"
PROYECTADO
A=0.14 ha 2.64 l/s H-100 D3 T4 Area del proyecto ha. 15.45 H-4 D1 T1
V. CONTROL D:6" N°3
PROYECTADO
N-123
P= 13.30 mca
3,270.37 22.67m.c.a
H-16 D1 T2
IBIS 1" 23.81m.c.a
3,172.03 17.18m.c.a
3,215.32 18.10m.c.a
A=0.09 ha 1.69 l/s
Area de riego
V. AIRE N°3 IBIS 1" 19.40m.c.a
H-17 D1 T2
IBIS 1"
D1 T1
3,275.40 17.95m.c.a
18.78m.c.a
A=0.08 ha 1.47 l/s
N-132
P= 44.41 mca
H-18 D1 T2
3,213.13 20.21m.c.a
N-112
P= 19.50 mca
m3/hr 99.92
VYR 60 49.28m.c.a
A=0.10 ha 1.94 l/s N-70 N-31
C.R.P T-6 C/VAVULA D=6" P= 20.63 mca P= 21.90 mca
N-14
COTA: 3,240.45 H-21 D1 T2
N-61
N-5 P= 35.81 mca
3,210.01 21.95m.c.a
P= 26.66 mca C.R.P T-6 C/VAVULA D=6" PROYECTADO N°2 H-7 D1 T1 IBIS 1" 24.71m.c.a
COTA: 3,294.18 3,222.74 15.22m.c.a A=0.12 ha 2.37 l/s
IBIS 1"
D1 T2
3,208.21 24.62m.c.a
26.51m.c.a
A=0.09 ha 1.78 l/s N-79 H-22 D1 T2
PROYECTADO P= 21.98 mca 3,209.24 21.48m.c.a
Relieve predominante
N-26
Variable
IBIS 1" 25.48m.c.a
P= 25.02 mca A=0.08 ha 1.57 l/s
H-20 D1 T2 N-1
V. AIRE N°2 3,208.82 22.13m.c.a P= 21.72 mca
PROYECTADO IBIS 1" 25.90m.c.a N-2
A=0.08 ha 1.55 l/s P= 21.69 mca
N-56
P= 17.82 mca N-57 C.R.P T-6 C/VAVULA D=3"
Reservorio
H-23 D1 T2
P= 26.66 mca
PROYECTADO Nº3 3,208.84
IBIS 1"
21.79m.c.a
25.88m.c.a H-25 D1 T2
H-8 D1 T1 3,211.00 17.08m.c.a
3,217.81 21.58m.c.a A=0.09 ha 1.79 l/s
IBIS 1" 23.72m.c.a
IBIS 1" 22.64m.c.a A=0.07 ha 1.38 l/s
A=0.11 ha 2.22 l/s
H-35 D1 T4 H-32 D1 T4
V. AIRE N°4
PROYECTADO
H-24
IBIS 1"
D1 T2
3,209.55 19.53m.c.a
25.17m.c.a
A=0.17 ha 3.34 l/s N=8496000
A=0.11 ha 2.19 l/s
H-36 D1 T4 3,203.78 26.93m.c.a
H-37 D1 T4 3,203.57 25.28m.c.a IBIS 1" 30.94m.c.a
IBIS 1" 31.15m.c.a N-62 A=0.10 ha 1.93 l/s
3,203.07 24.38m.c.a P= 28.18 mca
H-106 D4 T1
A=0.09 ha 1.71 l/s
P= 29.86 mca 3,208.30 19.11m.c.a
Tipo de suelo
IBIS 1" 26.42m.c.a
3,183.84 28.62m.c.a
3,175.45 14.66m.c.a H-38 D1 T4
H-28 D1 T3
3,208.06 18.23m.c.a
IBIS 1" 26.66m.c.a
VYR 60 44.97m.c.a A=0.13 ha 2.47 l/s
P= 41.40 mca
H-41 D2 T1 A=0.16 ha 3.09 l/s
3,206.99 30.55m.c.a
% 15.0
VYR 60 33.46m.c.a
3,204.29 34.29m.c.a H-39 D1 T4
A=0.13 ha 2.62 l/s
VYR 60 36.16m.c.a 3,200.45 27.18m.c.a
A=0.14 ha 2.74 l/s IBIS 1" 34.27m.c.a
N-18 A=0.13 ha 2.45 l/s H-30 D1 T3
P= 32.25 mca N-40 3,207.33 18.35m.c.a
P= 18.56 mca IBIS 1" 27.39m.c.a
A=0.22 ha 4.31 l/s
N-122
N-96 H-10 D1 T1
VYR 60 37.22m.c.a
A=0.12 ha 2.31 l/s P= 42.68 mca 3,194.35 41.57m.c.a
VYR 60 46.10m.c.a
H-43 D2 T1 A=0.11 ha 2.11 l/s
N-110 PROYECTADO
N-77
VYR 60
D2 T1
3,193.67 40.53m.c.a
46.78m.c.a
A=0.15 ha 2.84 l/s
H-45
N-8
P= 38.98 mca
D2 T1
3,193.21 38.97m.c.a H-12 D1 T1 N-119
3,160.12 25.24m.c.a
H-48 D2 T1 VYR 60 47.24m.c.a 3,199.74 20.85m.c.a P= 20.92 mca
N-13
H-59
IBIS 1"
D2 T3
3,202.04 14.28m.c.a
23.13m.c.a
P= 17.52 mca
A=0.07 ha 1.27 l/s
P= 45.76 mca
N-116 dia
VYR 60 54.86m.c.a
A=0.13 ha 2.44 l/s
4.30
A=0.12 ha 2.43 l/s
N-22
H-60 D2 T3
H-111 D4 T1
H-51 D2 T2 IBIS 1" 24.22m.c.a
H-107 D4 T1
3,185.47 44.30m.c.a A=0.14 ha 2.83 l/s
VYR 60 54.98m.c.a
A=0.11 ha 2.08 l/s
IBIS 1"
D2 T3
3,200.13 16.84m.c.a
25.04m.c.a
A=0.11 ha 2.07 l/s
A=0.12 ha 2.30 l/s N-73
A=0.15 ha 2.94 l/s H-52 D2 T2 PROYECTADO P= 17.13 mca
IBIS 1" 26.14m.c.a Lamina bruta a reponer corregida (Lb) mm/dia 0.34
VYR 60 57.22m.c.a
A=0.12 ha 2.32 l/s
N-115
P= 18.29 mca
mm/dia
3,200.54 16.56m.c.a
1.37
3,184.30 44.69m.c.a P= 18.23 mca H-62 D2 T3
IBIS 1" 24.63m.c.a N-81
H-110 D4 T1
VYR 60 56.15m.c.a A=0.09 ha 1.69 l/s 3,198.57 17.86m.c.a
P= 17.96 mca
A=0.09 ha 1.76 l/s IBIS 1" 26.60m.c.a
H-70 D2 T3 A=0.12 ha 2.34 l/s
N=8495400 N=8495400
H-64 D2 T3
3,200.16 17.22m.c.a N-19 3,199.82 18.59m.c.a
IBIS 1" 25.01m.c.a P= 16.61 mca IBIS 1" 25.35m.c.a
3,156.48 26.49m.c.a
A=0.11 ha 2.13 l/s
3,164.25 21.93m.c.a
H-73 D2 T4
3,181.22 29.68m.c.a
N-74 IBIS 1" 43.95m.c.a
PROYECTADO
Lps.
P= 18.96 mca N-43
1.23
P= 17.04 mca
N-89
IBIS 1"
D2 T4
3,201.15 16.96m.c.a
24.02m.c.a
A=0.12 ha 2.28 l/s
IBIS 1" 20.77m.c.a IBIS 1" 21.89m.c.a EMISOR SELECCIONADO (Catalogo) H-76 D2 T4
3,182.74 31.47m.c.a
VYR 60 42.43m.c.a
A=0.08 ha 1.65 l/s
N-44
P= 31.20 mca
H-66 D2 T3
3,202.30 16.53m.c.a
IBIS 1" 22.87m.c.a
N-91
P= 17.91 mca
V. PURGA N°8
H-79 D3 T1 A=0.13 ha 2.59 l/s
Marca/modelo COSTA
N-99 P= 20.62 mca A=0.16 ha 3.11 l/s
IBIS VYR
N-126 PROYECTADO 3,195.45 18.01m.c.a
P= 31.05 mca
P= 27.98 mca IBIS 1" 29.72m.c.a
N-55
A=0.11 ha 2.08 l/s
PROYECTADO
N-72 P= 32.57 mca
V. AIRE N°6
N-102
H-81 D3 T1 P= 32.44 mca
3,178.73 33.54m.c.a PROYECTADO
VYR 60 46.44m.c.a N-15 H-80 D3 T1
3,181.26 32.26m.c.a N-92
P= 20.23 mca
H-82 D3 T1 A=0.06 ha 1.13 l/s
P= 32.77 mca 3,180.11 32.08m.c.a H-77 D2 T4 P= 21.48 mca IBIS 1" 29.31m.c.a PROYECTADO
VYR 60 45.06m.c.a 3,186.78 27.95m.c.a A=0.08 ha 1.57 l/s
H-90 D3 T2 H-92 D3 T3 V. AIRE N°7
A=0.09 ha 1.66 l/s IBIS 1" 38.39m.c.a N-17 3,193.95 22.33m.c.a 3,201.50 17.23m.c.a N-28
A=0.09 ha 1.86 l/s P= 27.56 mca PROYECTADO
IBIS 1" 31.22m.c.a IBIS 1" 23.67m.c.a P= 17.62 mca
A=0.15 ha 2.90 l/s N-51 A=0.09 ha 1.69 l/s
BOQUILLA
P= 21.46 mca
N-133 N-82
H-95 D3 T3
3,196.65 19.67m.c.a
bar
3,198.88 17.99m.c.a
PROYECTADO
H-78 D2 T4 P= 22.08 mca H-89 D3 T2
3,188.61 25.09m.c.a 3,194.15 21.33m.c.a
IBIS 1" 36.56m.c.a IBIS 1" 31.02m.c.a
Diametro de cobertura m
IBIS 1" 24.17m.c.a P= 16.13 mca 3,191.22 22.28m.c.a
30.00 28.00
IBIS 1" 32.29m.c.a IBIS 1" 33.95m.c.a
A=0.09 ha 1.83 l/s A=0.09 ha 1.75 l/s
A=0.20 ha 3.98 l/s
H-112 D4 T2
N-75
m.
PROYECTADO
21.00 18.00
VYR 60 49.78m.c.a
21.00 18.00
N-46
lph
P= 2.66 mca P= 23.42 mca
H-104 D4 T1
3,191.80 23.71m.c.a
m3/h 3.17
3,178.60 30.51m.c.a
VYR 60 46.57m.c.a
A=0.27 ha 5.30 l/s
N-32
P= 23.92 mca
Lps. 0.88
IBIS 1" 35.79m.c.a
A=0.10 ha 1.92 l/s
H-99 D3 T4
3,177.36 14.40m.c.a
IBIS 1" 18.51m.c.a
N-124
P= 17.64 mca
PROYECTADO
3,175.45 14.66m.c.a
IBIS 1" 41.33m.c.a
H-132 D4 T4
IBIS 1" 20.42m.c.a
A=0.16 ha 3.12 l/s
A=0.12 ha 2.38 l/s
TERRENO NORMAL 3,158.72 22.17m.c.a A=0.07 ha 1.45 l/s Turnos 62.86 N-122
P= 16.19 mca
N-110
P= 15.29 mca
N
P= 14.14 mca
3,169.73 17.99m.c.a
3,163.37 17.78m.c.a
IBIS 1" 41.24m.c.a IBIS 1" 26.14m.c.a
N-24
A=0.23 ha 4.58 l/s
3,175.10 14.37m.c.a 3,173.98 14.38m.c.a
IBIS 1" 36.23m.c.a A=0.10 ha 1.88 l/s P= 19.47 mca Numero de aspersores en la parcela und 350.00 N-133
P= 28.88 mca
V. CONTROL D:4" N°10
P= 20.23 mca
H-115 D4 T2
N-66 N-107
H-112 D4 T2
und
3,157.34 26.47m.c.a
22.00
3,163.41 23.02m.c.a
W E
IBIS 1" 38.53m.c.a N-134
und
P= 26.76 mca N-84 N-124 N-39
V. AIRE N°10
m.
3,159.64 21.89m.c.a IBIS 1" 32.20m.c.a N-24
54.00 IBIS 1" 36.23m.c.a 3,159.83 24.90m.c.a A=0.10 ha 1.88 l/s P= 19.47 mca A=0.13 ha 2.53 l/s
A=0.15 ha 3.00 l/s IBIS 1" 36.04m.c.a
N-66 N-107
A=0.09 ha 1.69 l/s
P= 21.84 mca P= 21.92 mca
PROYECTADO unidad
P= 21.44 mca
2.57 H-129 D4 T4
3,162.46 22.15m.c.a
V. AIRE N°9
P= 21.44 mca
IBIS 1" 33.41m.c.a PROYECTADO
A=0.16 ha 3.08 l/s H-126 D4 T3
S
3,161.88 21.85m.c.a N-68
IBIS 1" 33.99m.c.a P= 20.20 mca
N-21
H-129 D4 T4
A=0.07 ha 1.39 l/s IBIS 1" 33.66m.c.a
V. AIRE N°9
N-58 A=0.07 ha 1.39 l/s
P= 21.23 mca
IBIS 1"
D4 T4
3,159.55 21.35m.c.a
36.32m.c.a
PROYECTADO
A=0.16 ha 3.16 l/s
0.97
3,158.52 23.72m.c.a
N-113 IBIS 1" 37.35m.c.a
P= 23.45 mca A=0.17 ha 3.32 l/s
unidad
IBIS 1" 37.53m.c.a
N-68
A=0.11 ha 2.14 l/s
3,161.88 21.85m.c.a
IBIS 1" 33.99m.c.a P= 20.20 mca Numero de lineas por dia unidad
N-21
A=0.07 ha 1.34 l/s
36.00 METROS
P= 21.95 mca H-123 D4 T3
3,163.76 19.39m.c.a H-122 D4 T3 150 0 150 N-20
300 H-120
3,151.77
IBIS 1"
D4 T3
27.71m.c.a
44.10m.c.a
A=0.09 ha 1.76 l/s
V. PURGA N°9
N-53
E=581750
E=582000
E=582250
N=8495300 N=8495300
N-130
P= 21.23 mca
H-127 D4 T4
COLOR SECTOR 1:5000
3,159.55 21.35m.c.a
IBIS 1" 36.32m.c.a 1 TURNO DE 6am. @ 9am.
A=0.16 ha 3.16 l/s
2 TURNO DE 9am. @ 12pm. LEYENDA DEL DIAMETRO DE TUBERIA
N-36
P= 23.45 mca
N-113
H-121 D4 T3
3,158.52 23.72m.c.a 3 TURNO DE 12pm. @ 15pm.
IBIS 1" 37.35m.c.a
P= 23.45 mca
A=0.17 ha 3.32 l/s 4 TURNO DE 15pm. @ 18pm. COLOR TUBERIA
H-128 D4 T4
N-93
P= 23.96 mca LEYENDA 1 TUBERIA PVC ISO NTP 399.002 DN=1 1/2" C:7.5
H-130 D4 T4
DETALLE DE ZANJA EN TERRRENO NORMAL 3,158.64 21.02m.c.a 3,158.34 22.98m.c.a
IBIS 1" 37.53m.c.a
2 TUBERIA PVC ISO NTP 1452 DN=2" C:7.5
ESC:1/20 IBIS 1" 37.23m.c.a
A=0.12 ha 2.30 l/s SIMBOLO DESCRIPCION
A=0.11 ha 2.14 l/s 3 TUBERIA PVC ISO NTP 1452 DN=2 1/2" C:7.5
VALVULA DE CONTROL
5 TUBERIA PVC ISO NTP 1452 DN=4" C:7.5
6 TUBERIA PVC ISO NTP 1452 DN=6" C:7.5
CAMARA ROMPE PRESION TIPO 6
CON VALVULA DETALLE DE LOS CUADROS
VALVULA DE PURGA
H-120 D4 T3
3,151.77 27.71m.c.a
N VALVULA DE AIRE PROYECTADO H-24 D1 T3
E=582300
IBIS 1" 44.10m.c.a
A=0.09 ha 1.76 l/s 1,993.33 21.24m.c.a
SENN 40 21.67m.c.a
N-20
# PARCELAS A=0.18ha 2.71 l/s
V. PURGA N°9
W E P= 28.19 mca
PROYECTADO
N-53
P= 29.88 mca N-130 MUNICIPALIDAD DISTRITAL DE
S P= 34.86 mca
ESCALA: 1/1000
PROV. :
DIST. :
CANGALLO
E=582000
E=582100
E=582200
LUGAR : ACCO 02
SECTOR ACCO 02
DETALLE DE ZANJA EN TERRRENO ROCOSO Y SEMIROCOSO FECHA : DISEÑOY CAD: ING. SUPERVISOR ING. RESIDENTE : ESCALA :
NOVIEMBRE - 2021 Ing. Eygler Huamani Ccorahua INDICADA
ESC:1/20 hitter833@hotmail.com