Activity ID Activity Name BL Project Start BL Project Finish Original Duration Budgeted Labor Units

CONSTRUCCIÓN DEL PAD FASE 3B Y DEPÓSITO DE DESMONTE NORTE 26-Apr-18 30-Nov-18 219 137893.75
FASE DE CONSTRUCCIÓN 2-Jun-18 20-Nov-18 172 135993.75
OBRAS PRELIMINARES 2-Jun-18 19-Nov-18 171 4237.59
4.1.1 Trazo y replanteo topográfico inicial 2-Jun-18 6-Jun-18 5 0
4.1.2 Trazo y replanteo durante construcción 7-Jun-18 19-Nov-18 166 0
4.1.3 Mantenimiento de vías 7-Jun-18 19-Nov-18 166 4237.59
DEPÓSITO DE DESMONTE NORTE 7-Jun-18 4-Nov-18 151 45780.12
MOVIMIENTO DE TIERRAS 7-Jun-18 30-Aug-18 85 30747.93
4.2.1.1 Apertura de accesos 7-Jun-18 14-Jun-18 8 691.43
BOTADERO NORTE - FASE 1 12-Jun-18 25-Jun-18 14 6050.89
4.2.1.2.1 Corte de Material Organico e= 400 mm 12-Jun-18 14-Jun-18 3 735.39
4.2.1.2.2 Carguío y eliminacion de material orgánico (e=400 mm),D=3 km 15-Jun-18 17-Jun-18 3 1203.84
4.2.1.2.3 Corte y eliminación de material inadecuado, D=1 km 15-Jun-18 25-Jun-18 11 4111.66
BOTADERO NORTE - FASE 2 26-Jun-18 30-Aug-18 66 24005.6
4.2.1.3.1 Corte y eliminacion de material orgánico (e=400 mm),D=3 km 26-Jun-18 10-Jul-18 15 6019.22
4.2.1.3.2 Corte y acopio de material inadecuado 11-Jul-18 25-Jul-18 15 3676.95
4.2.1.3.3 Corte y eliminación de material inadecuado, D=1 km 26-Jul-18 24-Aug-18 30 11213.63
4.2.1.3.4 Relleno estructural con material propio (en berma perimetral) 12-Jul-18 30-Aug-18 50 3095.8
ACCESO HACIA POZA DE SUBDRENAJE 25-Jun-18 08-Aug-18 45 1296.86
4.2.2.1 Corte y eliminación de material inadecuado, D=1 km 25-Jun-18 29-Jun-18 5 9.07
4.2.2.2 Relleno estructural con material propio 30-Jun-18 13-Jul-18 14 1031.4
4.2.2.3 Base de rodadura (e=200 mm) 28-Jul-18 01-Aug-18 5 110.7
4.2.2.4 Relleno estructural con material propio (en berma de seguridad) 02-Aug-18 08-Aug-18 7 145.69
SUBDRENAJE 1-Jul-18 30-Aug-18 61 4553.24
BOTADERO NORTE - FASE 1 1-Jul-18 14-Jul-18 14 747.63
4.2.3.1.1 Excavación y eliminación de material para la zanja de subdrenaje, D=1 km 1-Jul-18 7-Jul-18 7 113.08
4.2.3.1.2 Cama de apoyo 2-Jul-18 8-Jul-18 7 6.18
4.2.3.1.3 Tubería de HDPE sólida SDR 21 de 300 mm (llegada hacia poza de subdrenaje) 3-Jul-18 9-Jul-18 7 81.65
4.2.3.1.4 Tubería de HDPE de pared doble perforada de ø300 mm 4-Jul-18 10-Jul-18 7 98.15
4.2.3.1.5 Tubería de HDPE de pared doble perforada de ø100 mm 5-Jul-18 11-Jul-18 7 182.36
4.2.3.1.6 Grava para subdrenaje 6-Jul-18 12-Jul-18 7 159.19
4.2.3.1.7 Geotextil no tejido de 270 gr/m2 7-Jul-18 13-Jul-18 7 37.37
4.2.3.1.8 Relleno estructural en zanja de subdrenaje con material propio 8-Jul-18 14-Jul-18 7 69.65
BOTADERO NORTE - FASE 2 15-Jul-18 30-Aug-18 47 3805.61
4.2.3.2.1 Excavación y eliminación de material para la zanja de subdrenaje, D=1 km 15-Jul-18 23-Aug-18 40 646.18
4.2.3.2.2 Cama de apoyo 16-Jul-18 24-Aug-18 40 35.33
4.2.3.2.3 Tubería de HDPE de pared doble perforada de ø300 mm 17-Jul-18 25-Aug-18 40 560.86
4.2.3.2.4 Tubería de HDPE de pared doble perforada de ø100 mm 18-Jul-18 26-Aug-18 40 1042.03
4.2.3.2.5 Grava para subdrenaje 19-Jul-18 27-Aug-18 40 909.68
4.2.3.2.6 Geotextil no tejido de 270 gr/m2 20-Jul-18 28-Aug-18 40 213.54
4.2.3.2.7 Relleno estructural en zanja de subdrenaje con material propio 22-Jul-18 30-Aug-18 40 397.99
POZA DE SUBDRENAJE 22-Jul-18 22-Aug-18 32 3724.84
4.2.4.1 Relleno estructural con material propio (incluye bermas) 22-Jul-18 06-Aug-18 16 2409.09
4.2.4.2 Excavación y eliminación en zanja de anclaje, D= 1 km 07-Aug-18 08-Aug-18 2 6.39
4.2.4.3 Suelo de baja permeabilidad, e=300 mm, D= 2,5 km 08-Aug-18 08-Aug-18 1 65.4
4.2.4.4 Suelo de baja permeabilidad en zanjas de anclaje, D= 2,5 km 09-Aug-18 09-Aug-18 1 10.07
4.2.4.5 Gavión caja 5.0x1.0x1.0 m (incluye grava de relleno) 09-Aug-18 11-Aug-18 3 173.8
4.2.4.6 Geocompuesto de arcilla GCL 10-Aug-18 14-Aug-18 5 45.04
4.2.4.7 Geomembrana HDPE lisa de 1,5 mm 11-Aug-18 15-Aug-18 5 640.57
4.2.4.8 Suelo de baja permeabilidad (en bermas perimetrales), D= 2,5 km 12-Aug-18 12-Aug-18 1 21.81
4.2.4.9 Geotextil no tejido de 270 g/m2 13-Aug-18 14-Aug-18 2 12.86
4.2.4.91 Geocelda e=100 mm 15-Aug-18 17-Aug-18 3 124.36
4.2.4.92 Concreto f'c=210 kg/cm2 16-Aug-18 19-Aug-18 4 212.07
4.2.4.93 Enrocado de protección D50=300 mm 20-Aug-18 22-Aug-18 3 3.38
MANEJO DE DRENAJE SUPERFICIAL 2-Jul-18 24-Sep-18 85 3833.39
CANAL DE CORONACION ESTE TRAMO 2 L=480 m. 2-Jul-18 04-Sep-18 65 2596.31
ESTRUCTURA DE CAPTACIÓN NORTE 2 (L=2.4mx1.5mx1.4m, e=150mm) 2-Jul-18 15-Jul-18 14 298.84
4.2.5.1.1.1 Corte y eliminación de material inadecuado, D=1 km 2-Jul-18 4-Jul-18 3 4.74
4.2.5.1.1.2 Relleno para estructuras con material propio 5-Jul-18 7-Jul-18 3 18.46
4.2.5.1.1.3 Solado de concreto f'c=100 kg/cm² 8-Jul-18 10-Jul-18 3 128.41
4.2.5.1.1.4 Acero de refuerzo fy=4200 kg/cm2 11-Jul-18 12-Jul-18 2 30.87
4.2.5.1.1.5 Encofrado y desencofrado 13-Jul-18 15-Jul-18 3 30.87
4.2.5.1.1.6 Concreto f'c=210 kg/cm2 13-Jul-18 15-Jul-18 3 81.56
4.2.5.1.1.7 Juntas de dilatación para canales de concreto, incluye material elastomérico y waterstop 13-Jul-18 15-Jul-18 3 3.93
CANAL DE CORONACIÓN ESTE - TRAMO 2 (L=480m, e= 100mm) 5-Jul-18 23-Aug-18 50 2160.9
4.2.5.1.2.1 Corte y eliminación de material inadecuado, D=1 km 5-Jul-18 19-Jul-18 15 573.48
4.2.5.1.2.2 Relleno para estructuras con material propio 17-Jul-18 21-Jul-18 5 99.62
4.2.5.1.2.3 Geotextil no tejido de 270 g/m2 20-Jul-18 29-Jul-18 10 57.18
4.2.5.1.2.4 Geocelda e=100 mm 26-Jul-18 04-Aug-18 10 533.34
4.2.5.1.2.5 Concreto f'c=210 kg/cm2 31-Jul-18 23-Aug-18 24 897.28
ALCANTARILLA (L=1.5mx1.0mx1.5m, e=150mm, Ø=450mm) 24-Aug-18 04-Sep-18 12 136.57
4.2.5.1.3.1 Corte y eliminación de material inadecuado, D=1 km 24-Aug-18 25-Aug-18 2 6.63
4.2.5.1.3.2 Cama de apoyo 26-Aug-18 27-Aug-18 2 0.9
4.2.5.1.3.3 Tubería de HDPE de pared doble no perforada de 450 mm 28-Aug-18 29-Aug-18 2 30.56
4.2.5.1.3.4 Geotextil no tejido de 270 g/m2 30-Aug-18 31-Aug-18 2 1.18
4.2.5.1.3.5 Geocelda e=150 mm 01-Sep-18 02-Sep-18 2 14.35
4.2.5.1.3.6 Concreto f'c=210 kg/cm2 01-Sep-18 02-Sep-18 2 81.54
4.2.5.1.3.7 Enrocado de protección D50=300 mm, D=5,1 km 03-Sep-18 04-Sep-18 2 1.41
CANAL DE CORONACION OESTE TRAMO 3 L= 210 m 30-Aug-18 24-Sep-18 26 1237.08
ESTRUCTURA DE CAPTACIÓN OESTE 1A (L=2.4mx1.5mx1.8m, e=150mm) 30-Aug-18 06-Sep-18 8 306.12
4.2.5.2.1.1 Corte y eliminación de material inadecuado, D=1 km 30-Aug-18 31-Aug-18 2 4.74
4.2.5.2.1.2 Relleno para estructuras con material propio 01-Sep-18 04-Sep-18 4 18.46
4.2.5.2.1.3 Solado de concreto f'c=100 kg/cm² 04-Sep-18 04-Sep-18 1 128.41
4.2.5.2.1.4 Acero de refuerzo fy=4200 kg/cm2 04-Sep-18 05-Sep-18 2 30.87
4.2.5.2.1.5 Encofrado y desencofrado 05-Sep-18 06-Sep-18 2 38.15
4.2.5.2.1.6 Concreto f'c=210 kg/cm2 05-Sep-18 06-Sep-18 2 81.56
4.2.5.2.1.7 Juntas de dilatación para canales de concreto, incluye material elastomérico y waterstop 06-Sep-18 06-Sep-18 1 3.93
CANAL DE CORONACIÓN OESTE - TRAMO 3 (L=210m, e= 100mm) 01-Sep-18 24-Sep-18 24 805.35
4.2.5.2.2.1 Corte y eliminación de material inadecuado, D=1 km 01-Sep-18 05-Sep-18 5 65.4
4.2.5.2.2.2 Relleno para estructuras con material propio 06-Sep-18 08-Sep-18 3 29.51
4.2.5.2.2.3 Geotextil no tejido de 270 g/m2 09-Sep-18 13-Sep-18 5 25.04
4.2.5.2.2.4 Geocelda e=100 mm 14-Sep-18 18-Sep-18 5 236.77
4.2.5.2.2.5 Concreto f'c=210 kg/cm2 14-Sep-18 24-Sep-18 11 448.63
POZA PARA CONTROL DE EROSION Y SEDIMENTOS (L=1.5mx1.0mx1.5m, e=150mm, Ø=450mm) 06-Sep-18 18-Sep-18 13 125.61
4.2.5.2.3.1 Corte y eliminación de material inadecuado, D=1 km 06-Sep-18 08-Sep-18 3 12.33
4.2.5.2.3.2 Cama de apoyo 09-Sep-18 10-Sep-18 2 0.9
4.2.5.2.3.3 Tubería de HDPE de pared doble no perforada de 450 mm 11-Sep-18 12-Sep-18 2 10.19
4.2.5.2.3.4 Relleno para estructuras con material propio 13-Sep-18 14-Sep-18 2 3.69
4.2.5.2.3.5 Geotextil no tejido de 270 g/m2 15-Sep-18 17-Sep-18 3 1.18
4.2.5.2.3.6 Geocelda e=150 mm 15-Sep-18 17-Sep-18 3 14.35
4.2.5.2.3.7 Concreto f'c=210 kg/cm2 15-Sep-18 17-Sep-18 3 81.56
4.2.5.2.3.8 Enrocado de protección D50=300 mm, D=5,1 km 18-Sep-18 18-Sep-18 1 1.41
INSTRUMENTACIÓN GEOTÉCNICA 4-Oct-18 2-Nov-18 30 34.44
4.2.6.1 Inclinómetro Vertical 4-Oct-18 18-Oct-18 15 17.22
4.2.6.2 Piezómetro Hidráulico 19-Oct-18 2-Nov-18 15 17.22
INSTALACIONES MECÁNICAS 4-Oct-18 4-Nov-18 32 1589.42
4.2.7.1 Sistema de Bombeo 4-Oct-18 2-Nov-18 30 576.77
4.2.7.2 Pipeline 6-Oct-18 4-Nov-18 30 1012.65
PAD DE LIXIVIACIÓN FASE 3B 8-Jul-18 20-Nov-18 136 85976.04
APERTURA ACCESOS 8-Jul-18 12-Jul-18 5 691.43
4.3.1 Apertura de accesos 8-Jul-18 12-Jul-18 5 691.43
SECTOR 1 - PAD 3B ZONA ESTE 13-Jul-18 20-Nov-18 131 38158.69
NIVELACIÓN Y ACCESO PERIMETRAL 13-Jul-18 4-Oct-18 84 15380.59
4.3.2.1.1 Corte simple, selección y acopio de material para ser usado como relleno estructural 13-Jul-18 31-Jul-18 19 158.75
4.3.2.1.2 Corte simple y eliminación, D=1 km 13-Jul-18 31-Jul-18 19 2195.74
4.3.2.1.3 Procesamiento, transporte y compactación de relleno estructural, D=2 km (e=300 mm) 10-Sep-18 4-Oct-18 25 12482.91
4.3.2.1.4 Procesamiento, transporte y compactación de relleno estructural con material propio (e=300mm) 10-Sep-18 4-Oct-18 25 543.2
CIMENTACIÓN 01-Aug-18 10-Aug-18 10 1688.61
4.3.2.2.1 Corte simple, selección y acopio de material inadecuado para ser usado como relleno estructural 01-Aug-18 10-Aug-18 10 56.25
4.3.2.2.2 Corte simple y eliminación de material inadecuado, D=1 km 01-Aug-18 10-Aug-18 10 1632.36
REVESTIMIENTO 16-Aug-18 8-Oct-18 54 11579.99
4.3.2.3.1 Procesamiento, transporte y compactación de suelo de baja permeabilidad, e=300 mm, D=1 km 16-Aug-18 14-Sep-18 30 3549.71
4.3.2.3.2 Procesamiento, transporte y compactación de suelo de baja permeabilidad en bermas perimetrales, D=1 km 22-Aug-18 26-Sep-18 36 538.16
4.3.2.3.3 Excavación y relleno con suelo de baja permeabilidad en zanja de anclaje, D=1 km 28-Aug-18 4-Oct-18 38 234.25
4.3.2.3.4 Instalación de geomembrana LLDPE SST de 2 mm 03-Sep-18 8-Oct-18 36 7257.86
COLECCIÓN 09-Sep-18 18-Oct-18 40 2106.78
4.3.2.4.1 Instalación de tubería de HDPE de pared doble perforada de 300 mm 09-Sep-18 8-Oct-18 30 497.35
4.3.2.4.2 Instalación de tubería de HDPE de pared doble perforada de 200 mm 14-Sep-18 13-Oct-18 30 122.88
4.3.2.4.3 Instalación de tubería de HDPE de pared doble perforada de 100 mm 19-Sep-18 18-Oct-18 30 1486.57
SOBRERREVESTIMIENTO 17-Oct-18 20-Nov-18 35 7402.7
4.3.2.5.1 Transporte y colocación de material de sobrerevestimiento, e=500mm 17-Oct-18 20-Nov-18 35 7402.7
SECTOR 2 - PAD 3B ZONA OESTE 18-Jul-18 21-Oct-18 96 40326.89
NIVELACIÓN Y ACCESO PERIMETRAL 18-Jul-18 15-Sep-18 60 18807.85
4.3.3.1.1 Corte simple y eliminación, D=1 km 06-Aug-18 10-Aug-18 5 2195.74
4.3.3.1.2 Procesamiento, transporte y compactación de relleno de transición, D=2 km (relleno estructural, e=500 mm) 18-Jul-18 23-Aug-18 37 4129.2
4.3.3.1.3 Procesamiento, transporte y compactación de relleno estructural, D=2 km (e=300 mm) 18-Jul-18 15-Sep-18 60 12482.91
CIMENTACIÓN 11-Aug-18 12-Aug-18 2 429.57
4.3.3.2.1 Corte simple y eliminación de material inadecuado, D=1 km 11-Aug-18 12-Aug-18 2 429.57
REVESTIMIENTO 13-Aug-18 29-Sep-18 48 11579.99
4.3.3.3.1 Procesamiento, transporte y compactación de suelo de baja permeabilidad, e=300 mm, D=1 km 13-Aug-18 16-Sep-18 35 3549.71
4.3.3.3.2 Procesamiento, transporte y compactación de suelo de baja permeabilidad en bermas perimetrales, D=1 km 15-Aug-18 23-Sep-18 40 538.16
4.3.3.3.3 Excavación y relleno con suelo de baja permeabilidad en zanja de anclaje, D=1 km 17-Aug-18 25-Sep-18 40 234.25
4.3.3.3.4 Instalación de geomembrana LLDPE SST de 2 mm 23-Aug-18 29-Sep-18 38 7257.86
COLECCIÓN 07-Sep-18 16-Oct-18 40 2106.78
4.3.3.4.1 Instalación de tubería de HDPE de pared doble perforada de 300 mm 07-Sep-18 16-Oct-18 40 497.35
4.3.3.4.2 Instalación de tubería de HDPE de pared doble perforada de 200 mm 07-Sep-18 16-Oct-18 40 122.88
4.3.3.4.3 Instalación de tubería de HDPE de pared doble perforada de 100 mm 07-Sep-18 16-Oct-18 40 1486.57
SOBRERREVESTIMIENTO 12-Sep-18 21-Oct-18 40 7402.7
4.3.3.5.1 Transporte y colocación de material de sobrerevestimiento, e=500mm 12-Sep-18 21-Oct-18 40 7402.7
ACCESOS 9-Nov-18 18-Nov-18 10 961.92
4.3.4.1 Procesamiento, transporte y compactación de la base de rodadura, e=200 mm, D=2 km 9-Nov-18 15-Nov-18 7 796.98
4.3.4.2 Procesamiento, transporte y compactación de relleno para estructuras en berma de seguridad, D=2 km 16-Nov-18 18-Nov-18 3 164.94
MANEJO DE DRENAJE SUPERFICIAL 19-Sep-18 9-Nov-18 52 4200.32
CANAL DE CORONACION OESTE - TRAMO 2 19-Sep-18 6-Oct-18 18 1331.87
4.3.5.1.1 Excavación localizada y eliminación de material suelto, D=1 km 19-Sep-18 22-Sep-18 4 51.76
4.3.5.1.2 Procesamiento, transporte y compactación de relleno para estructuras, D=2 km 23-Sep-18 23-Sep-18 1 23.59
4.3.5.1.3 Instalación de geotextil no tejido de 270 g/m2 24-Sep-18 29-Sep-18 6 44.65
4.3.5.1.4 Instalación de geocelda e=100 mm 24-Sep-18 29-Sep-18 6 437.19
4.3.5.1.5 Concreto f'c=210 kg/cm2 30-Sep-18 6-Oct-18 7 774.68
ESTRUCTURA DE CAPTACIÓN OESTE 2B 28-Sep-18 12-Oct-18 15 220.04
4.3.5.2.1 Excavación localizada y eliminación de material suelto, D=1 km 28-Sep-18 29-Sep-18 2 3.98
4.3.5.2.2 Procesamiento, transporte y compactación de relleno para estructuras, D=2 km 30-Sep-18 1-Oct-18 2 11.8
4.3.5.2.3 Solado de concreto f'c=100 kg/cm² 2-Oct-18 4-Oct-18 3 94.16
4.3.5.2.4 Acero de refuerzo fy=4200 kg/cm2 5-Oct-18 6-Oct-18 2 27.78
4.3.5.2.5 Encofrado y desencofrado 7-Oct-18 9-Oct-18 3 30.51
4.3.5.2.6 Concreto f'c=210 kg/cm2 7-Oct-18 9-Oct-18 3 48.93
4.3.5.2.7 Juntas de dilatación para canales de concreto, incluye material elastomérico y waterstop 10-Oct-18 12-Oct-18 3 2.88
CANAL DE CORONACION ESTE - TRAMO 1 30-Sep-18 29-Oct-18 30 2208.33
4.3.5.3.1 Excavación localizada y eliminación de material suelto, D=1 km 30-Sep-18 6-Oct-18 7 85.69
4.3.5.3.2 Procesamiento, transporte y compactación de relleno para estructuras, D=2 km 7-Oct-18 9-Oct-18 3 39.12
4.3.5.3.3 Instalación de geotextil no tejido de 270 g/m2 10-Oct-18 19-Oct-18 10 73.76
4.3.5.3.4 Instalación de geocelda e=100 mm 10-Oct-18 19-Oct-18 10 721.32
4.3.5.3.5 Concreto f'c=210 kg/cm2 18-Oct-18 29-Oct-18 12 1288.44
ESTRUCTURA DE CAPTACIÓN ESTE 1B 30-Oct-18 9-Nov-18 11 220.04
4.3.5.4.1 Excavación localizada y eliminación de material suelto, D=1 km 30-Oct-18 31-Oct-18 2 3.98
4.3.5.4.2 Procesamiento, transporte y compactación de relleno para estructuras, D=2 km 1-Nov-18 2-Nov-18 2 11.8
4.3.5.4.3 Solado de concreto f'c=100 kg/cm² 3-Nov-18 3-Nov-18 1 94.16
4.3.5.4.4 Acero de refuerzo fy=4200 kg/cm2 4-Nov-18 5-Nov-18 2 27.78
4.3.5.4.5 Encofrado y desencofrado 6-Nov-18 8-Nov-18 3 30.51
4.3.5.4.6 Concreto f'c=210 kg/cm2 6-Nov-18 8-Nov-18 3 48.93
4.3.5.4.7 Juntas de dilatación para canales de concreto, incluye material elastomérico y waterstop 9-Nov-18 9-Nov-18 1 2.88
ESTRUCTURA DE CAPTACIÓN ESTE 2B 31-Oct-18 9-Nov-18 10 220.04
4.3.5.5.1 Excavación localizada y eliminación de material suelto, D=1 km 31-Oct-18 31-Oct-18 1 3.98
4.3.5.5.2 Procesamiento, transporte y compactación de relleno para estructuras, D=2 km 1-Nov-18 1-Nov-18 1 11.8
4.3.5.5.3 Solado de concreto f'c=100 kg/cm² 2-Nov-18 2-Nov-18 1 94.16
4.3.5.5.4 Acero de refuerzo fy=4200 kg/cm2 3-Nov-18 4-Nov-18 2 27.78
4.3.5.5.5 Encofrado y desencofrado 5-Nov-18 6-Nov-18 2 30.51
4.3.5.5.6 Concreto f'c=210 kg/cm2 7-Nov-18 8-Nov-18 2 48.93
4.3.5.5.7 Juntas de dilatación para canales de concreto, incluye material elastomérico y waterstop 9-Nov-18 9-Nov-18 1 2.88
INSTRUMENTACIÓN GEOTÉCNICA 19-Oct-18 17-Nov-18 30 1636.79
HITO TOPOGRÁFICO 11-Nov-18 17-Nov-18 7 132.01
4.3.6.1.1 Hito topográfico 11-Nov-18 17-Nov-18 7 132.01
INCLINÓMETRO VERTICAL 19-Oct-18 9-Nov-18 22 32.03
4.3.6.2.1 Perforación Diamantina HQ3 DF 19-Oct-18 6-Nov-18 19 0
4.3.6.2.2 Suministro e instalacion de inclinómetro vertical 7-Nov-18 9-Nov-18 3 32.03
PIEZÓMETRO DE CUERDA VIBRANTE 3-Nov-18 17-Nov-18 15 1008.91
4.3.6.3.1 Excavación y eliminación de material suelto para zanja de protección (1,0 m x 0,5 m) 3-Nov-18 17-Nov-18 15 894.09
4.3.6.3.2 Excavación y eliminación de material suelto para caja de instrumentación (2,5 m x 2,5 m x 1,0 m) 3-Nov-18 17-Nov-18 15 31.04
4.3.6.3.3 Transporte y nivelación de arena para protección de cable (1,0 m x 0,5 m) 3-Nov-18 17-Nov-18 15 80.97
4.3.6.3.4 Transporte y nivelación de arena para protección de piezómetro de cuerda vibrante (2,5 m x 2,5 m x 1,0 m) 3-Nov-18 17-Nov-18 15 2.81
4.3.6.3.5 Suministro e instalación de piezómetro de cuerda vibrante 3-Nov-18 17-Nov-18 15 0
SENSOR/CELDA DE ASENTAMIENTO DE CUERDA VIBRANTE NO VENTEADO 19-Oct-18 2-Nov-18 15 463.84
4.3.6.4.1 Excavación y eliminación de material suelto para zanja de protección (1,0 m x 0,5 m) 19-Oct-18 2-Nov-18 15 409.78
4.3.6.4.2 Excavación y eliminación de material suelto para caja de instrumentación (2,5 m x 2,5 m x 1,0 m) 19-Oct-18 2-Nov-18 15 15.54
4.3.6.4.3 Transporte y nivelación de arena para protección de cable (1,0 m x 0,5 m) 19-Oct-18 2-Nov-18 15 37.11
4.3.6.4.4 Transporte y nivelación de arena para protección de piezómetro de cuerda vibrante (2,5 m x 2,5 m x 1,0 m) 19-Oct-18 2-Nov-18 15 1.41
4.3.6.4.5 Suministro e instalación de celda de asentamiento de cuerda vibrante no venteado 19-Oct-18 2-Nov-18 15 0
FASE DE POST-CONSTRUCCIÓN 5-Nov-18 30-Nov-18 26 0
CAMINATA DE CONSTRUCCIÓN (SM) 5-Nov-18 24-Nov-18 20 0
5.1.1 CC - Depósito de Desmonte Norte 5-Nov-18 7-Nov-18 3 0
5.1.2 CC - PAD 3B 21-Nov-18 24-Nov-18 4 0
CAMINATA DE TARJETA NARANJA (SM-SUPERVISIÓN) 8-Nov-18 27-Nov-18 20 0
5.2.1 CTN - Depósito de Desmonte Norte 8-Nov-18 10-Nov-18 3 0
5.2.2 CTN - PAD 3B 25-Nov-18 27-Nov-18 3 0
CAMINATA DE TARJETA VERDE (SUPERVISIÓN-CLIENTE) 11-Nov-18 30-Nov-18 20 0
5.3.1 CTV - Depósito de Desmonte Norte 11-Nov-18 13-Nov-18 3 0
5.3.2 CTV - PAD 3B 28-Nov-18 30-Nov-18 3 0
CIERRE Y TÉRMINO DE OBRA 24-Nov-18 30-Nov-18 7 0
6.1 Elaboración de As Builts y Dossier Finales 24-Nov-18 29-Nov-18 6 0
6.2 Desmovilización de equipos e instalaciones provisionales 25-Nov-18 30-Nov-18 6 0
6.3 Término de obra 30-Nov-18 30-Nov-18 0 0
METRADOS - DDN y PAD3B
:INGENIERIA DE DETALLE PARA LA AMPLIACION FR LAS INFRAESTRUCTURAS DE PAD POZAS Y DEPOSITO DE DESMONTE E INFRAESTRUCTURAS AUXILIARES D
:0
CONTRACTU METRADO
Descripción Und AL SM

TRABAJOS PROVISIONALES Y PRELIMINARES


CONSTRUCCIONES PROVISIONALES
Mantenimiento de vías mes
Facilidades temporales mes
Trabajos provisionales glb 1.00 1.00
MOVILIZACION DE CAMPAMENTO MAQUINARIA Y HERRAMIENTAS
Movilización y desmovilización glb 1.00 1.00
OBRAS CIVILES
MOVIMIENTO DE TIERRAS
Corte y eliminacion de material orgánico (e=400 mm),D=3 km m3 65,120.00 54,460.74
Corte y acopio de material inadecuado m3 53,504.00
Corte y eliminación de material inadecuado, D=1 km m3 185,834.00 212,795.84
Relleno estructural con material propio (en berma perimetral) m 3
4,675.00 4,261.97
ACCESO HACIA POZA DE SUBDRENAJE
Corte y eliminación de material inadecuado, D=1 km m3 110.00 538.26
Relleno estructural con material propio m3 4,950.00 4,379.16
Base de rodadura (e=200 mm) m3 330.00 281.68
Relleno estructural con material propio (en berma de seguridad) m3 220.00 198.41
SUBDRENAJE
Excavación y eliminación de material para la zanja de subdrenaje, D=1 km m3 3,927.00 3,738.19
Cama de apoyo m3 253.00 267.81
Grava para subdrenaje m3 2,607.00 2,370.76
Relleno estructural en zanja de subdrenaje con material propio m3 1,067.00 1,003.71
Geotextil no tejido de 270 gr/m 2
m2 5,575.50 6,139.47
Tubería de HDPE sólida SDR 21 de 300 mm (llegada hacia poza de
m 14.70 13.53
subdrenaje)
Tubería de HDPE de pared doble perforada de ø300 mm m 1,152.90 1,129.86
Tubería de HDPE de pared doble perforada de ø100 mm m 2,142.00 2,103.74
Yee para tubería de HDPE de pared doble de 300X300X300 mm und 4.00 4.00
Yee para tubería de HDPE de pared doble de 300X300X100 mm und 11.00 10.00
Yee para tubería de HDPE de pared doble de 100X100X100 mm und 4.00 4.00
Bota de HDPE, ø300 mm und 1.00 1.00
Reduccion de pared doble de 300X100mm und 2.00
Tapa de Tubería de HDPE de pared doble perforada de ø100 mm und 16.00
Tapa de Tubería de HDPE de pared doble perforada de ø300 mm und 2.00
Codos 30º Para Tuberia de HDPE de pared doble de ø300mm und 3.00
Codos 45º Para Tuberia de HDPE de pared doble de ø300mm und 5.00
Copla Especial de Transicion de SDR ø300mm und 1.00
Copla Partida para tuberia de HDPE de pared doble de ø100mm und 385.00
Copla Partida para tuberia de HDPE de pared doble de ø300mm und 234.00
POZA DE SUBDRENAJE
Relleno estructural con material propio (incluye bermas) m3 11,539.00 10,217.03
Suelo de baja permeabilidad, e=300 mm, D= 2,5 km m3 214.50 175.68
Suelo de baja permeabilidad (en bermas perimetrales), D= 2,5 km m3 71.50 59.27
Enrocado de protección D50=300 mm m3 13.20 8.14
Excavación y eliminación en zanja de anclaje, D= 1 km m3 33.00 35.57
Suelo de baja permeabilidad en zanjas de anclaje, D= 2,5 km m3 33.00 35.57
Gavión caja 5.0x1.0x1.0 m (incluye grava de relleno) und 11.00 9.50
Geocompuesto de arcilla GCL m2 236.25 188.07
Geomembrana HDPE lisa de 1,5 mm m2 1,191.75 1,176.56
Concreto f'c=210 kg/cm 2
m3 27.30 32.22
Geotextil no tejido de 270 g/m2 m2 285.60 373.46
Geocelda e=100 mm m2 273.00 322.16
MANEJO DE DRENAJE SUPERFICIAL
CANAL DE CORONACIÓN OESTE - TRAMO 3 (L=210m, e= 100mm)
Corte y eliminación de material inadecuado, D=1 km m3 379.50 1,379.67
Relleno para estructuras con material propio m3 44.00 48.95
Concreto f'c=210 kg/cm2 m3 57.75 67.14
Geotextil no tejido de 270 g/m2 m2 556.50 749.52
Geocelda e=100 mm m2 519.75 666.24
CANAL DE CORONACIÓN ESTE - TRAMO 2 (L=480m, e= 100mm)
Corte y eliminación de material inadecuado, D=1 km m3 3,327.50 2,068.15
Relleno para estructuras con material propio m3 148.50 19.23
Concreto f'c=210 kg/cm 2
m3 115.50 153.85
Geotextil no tejido de 270 g/m2 m2 1,270.50 1,729.33
Geocelda e=100 mm m2 1,170.75 1,537.02
POZA PARA CONTROL DE EROSION Y SEDIMENTOS (L=1.5mx1.0mx1.5m,
e=150mm, Ø=450mm)
Corte y eliminación de material inadecuado, D=1 km m3 71.50 107.55
Relleno para estructuras con material propio m3 5.50 20.81
Enrocado de protección D50=300 mm, D=5,1 km m3 5.50 2.67
Cama de apoyo m3 5.50 1.03
Concreto f'c=210 kg/cm2 m3 10.50 10.45
Geotextil no tejido de 270 g/m2 m2 26.25 56.50
Geocelda e=150 mm m2 31.50 69.35
Tubería de HDPE de pared doble no perforada de 450 mm m 15.75 10.52
ALCANTARILLA (L=1.5mx1.0mx1.5m, e=150mm, Ø=450mm)
Corte y eliminación de material inadecuado, D=1 km m3 38.50 143.19
Enrocado de protección D50=300 mm, D=5,1 km m 3
5.50 1.94
Cama de apoyo m3 5.50 4.17
Concreto f'c=210 kg/cm2 m3 10.50 4.76
Geotextil no tejido de 270 g/m2 m2 26.25 34.85
Geocelda e=150 mm m2 31.50 4.76
Tubería de HDPE de pared doble no perforada de 450 mm m 47.25 39.30
ESTRUCTURA DE CAPTACIÓN OESTE 1A (L=2.4mx1.5mx1.8m, e=150mm)
Corte y eliminación de material inadecuado, D=1 km m3 27.50 104.68
Relleno para estructuras con material propio m3 27.50 104.68
Solado de concreto f'c=100 kg/cm² m2 15.75 9.10
Acero de refuerzo fy=4200 kg/cm2 kg 367.50 596.00
Encofrado y desencofrado m2 21.00 28.71
Concreto f'c=210 kg/cm2 m3 10.50 3.38
Juntas de dilatación para canales de concreto, incluye material elastomérico
m 15.75 14.23
y waterstop
ESTRUCTURA DE CAPTACIÓN 2 (L=2.4mx1.5mx1.4m, e=150mm)
Corte y eliminación de material inadecuado, D=1 km m3 27.50 19.80
Relleno para estructuras con material propio m3 27.50 19.80
Solado de concreto f'c=100 kg/cm² m2 15.75 11.70
Acero de refuerzo fy=4200 kg/cm2 kg 367.50 542.20
Encofrado y desencofrado m2 21.00 23.67
Concreto f'c=210 kg/cm2 m3 10.50 3.00
Juntas de dilatación para canales de concreto, incluye material elastomérico
m 15.75 14.23
y waterstop
INSTRUMENTACIÓN GEOTÉCNICA
INCLINÓMETRO VERTICAL / PIEZÓMETRO HIDRÁULICO gbl 1.00 1.00
INSTALACIONES MECÁNICAS
SISTEMA DE BOMBEO gbl 1.00 1.00
PIPELINE gbl 1.00 1.00
METRADO
PAD DE LIXIVIACIÓN FASE 3B Und CONTRAC.
SM
TRABAJOS PROVISIONALES Y PRELIMINARES
CONSTRUCCIONES PROVISIONALES
Mantenimiento de vías mes 5.00 5.00
Facilidades temporales mes 5.00 5.00
Trabajos provisionales glb 1.00 1.00
Corte y eliminación de acceso existente m3 16 768.50
MOVILIZACION DE CAMPAMENTO MAQUINARIA Y HERRAMIENTAS
Movilización y desmovilización de equipos glb 1.00 1.00
OBRAS CIVILES
CIMENTACIÓN
MOVIMIENTO DE TIERRAS
Corte simple, selección y acopio de material inadecuado para ser usado
m3 682.00 15 195.10
como relleno estructural
Corte simple y eliminación de material inadecuado, D=1 km m3 25 003.00 35 455.24
NIVELACIÓN Y ACCESO PERIMETRAL
MOVIMIENTO DE TIERRAS
Corte simple, selección y acopio de material para ser usado como relleno
m3 1 925.00 21 115.01
estructural
Corte simple y eliminación, D=1 km m3 53 251.00 49,268.35
Procesamiento, transporte y compactación de relleno de transición, D=2 km
m3 58 850.00 57 036.85
(relleno estructural, e=500 mm)
Procesamiento, transporte y compactación de relleno estructural, D=2 km
m3 101 585.00 47 324.94
(e=300 mm)
Procesamiento, transporte y compactación de relleno estructural con
m3 2 607.00 36 310.11
material propio (e=300mm)
REVESTIMIENTO
MOVIMIENTO DE TIERRAS
Procesamiento, transporte y compactación de suelo de baja permeabilidad,
m3 30 437.00 26 983.70
e=300 mm, D=1 transporte
Procesamiento, km y compactación de suelo de baja permeabilidad
m3 3 729.00 3 377.20
en bermas perimetrales,
Excavación y relleno conD=1 km
suelo de baja permeabilidad en zanja de anclaje,
m3 407.00 358.99
D=1 km
GEOSINTÉTICOS
Instalación de geomembrana LLDPE SST de 2 mm m2 108 024.00 100 112.63
COLECCIÓN
TUBERÍAS DE HDPE
Instalación de tubería de HDPE de pared doble perforada de ϕ300 mm m 932.40 886.13
Instalación de tubería de HDPE de pared doble perforada de ϕ200 mm m 415.80 402.17
Instalación de tubería de HDPE de pared doble perforada de ϕ100 mm m 5 166.00 4 750.96
Instalación de yee para tubería de HDPE de pared doble de 300x300x300
und 2.00 2.00
mm
Instalación de yee para tubería de HDPE de pared doble de 300x300x200
und 2.00 2.00
mm
Instalación de yee para tubería de HDPE de pared doble de 300x300x100
und 49.00 46.00
mm
Instalación de yee para tubería de HDPE de pared doble de 200x200x100
und 20.00 25.00
mm
Instalación de yee para tubería de HDPE de pared doble de 100x100x100
und 6.00 6.00
mm
Preparación e instalación de bota de HDPE de ϕ300 mm und 6.00 6.00
Tapas de Tuberia HDPE de pared doble perforada de ϕ100 mm und 78.00
Tapas de Tuberia HDPE de pared doble perforada de ϕ200 mm und 4.00
Tapas de Tuberia HDPE de pared doble perforada de ϕ300 mm und 5.00
Codo de Tuberia HDPE de pared doble perforada de ϕ300 mm und 8.00
Codo de Tuberia HDPE de pared doble perforada de ϕ100 mm und 11.00
Reduccion tubería de HDPE de pared doble de 300 a 200 mm und 2.00
Reduccion tubería de HDPE de pared doble de 450 a 300 mm und 1.00
SOBREREVESTIMIENTO
MOVIMIENTO DE TIERRAS
Transporte y colocación de material de sobrerevestimiento, e=500mm m3 54 087.00 47 282.39
ACCESOS
MOVIMIENTO DE TIERRAS
Procesamiento, transporte y compactación de la base de rodadura, e=200
m3 2 376.00 2 196.32
mm, D=2 km
Procesamiento, transporte y compactación de relleno para estructuras en
m3 539.00 484.44
berma de seguridad, D=2 km
MANEJO DE DRENAJE SUPERFICIAL
CANAL DE CORONACION ESTE - TRAMO 1
MOVIMIENTO DE TIERRAS
Excavación localizada y eliminación de material suelto, D=1 km m3 497.20 275.40
Procesamiento, transporte y compactación de relleno para estructuras, D=2
m3 58.30 10.80
km
GEOSINTÉTICOS
Concreto f'c=210 kg/cm2 m3 165.90 86.40
Instalación de geotextil no tejido de 270 g/m2 m2 1 639.05 971.19
Instalación de geocelda e=100 mm m2 1 583.40 863.19
CANAL DE CORONACION OESTE - TRAMO 2
MOVIMIENTO DE TIERRAS
Excavación localizada y eliminación de material suelto, D=1 km m3 300.30 120.36
Procesamiento, transporte y compactación de relleno para estructuras, D=2
m3 35.20 4.72
km
GEOSINTÉTICOS
Concreto f'c=210 kg/cm2 m3 99.75 37.76
Instalación de geotextil no tejido de 270 g/m2 m2 992.25 424.45
Instalación de geocelda e=100 mm m2 959.70 377.25
ESTRUCTURA DE CAPTACIÓN ESTE 1B
MOVIMIENTO DE TIERRAS
Excavación localizada y eliminación de material suelto, D=1 km m3 23.10
Procesamiento, transporte y compactación de relleno para estructuras, D=2
m3 17.60
km
CONCRETO ARMADO
Solado de concreto f'c=100 kg/cm² m2 11.55 11.70
Acero de refuerzo fy=4200 kg/cm2 kg 330.75 596.00
Encofrado y desencofrado m2 16.80 28.71
Concreto f'c=210 kg/cm2 m3 6.30 3.38
Juntas de dilatación para canales de concreto, incluye material elastomérico
m 11.55 14.23
y waterstop
ESTRUCTURA DE CAPTACIÓN ESTE 2B
MOVIMIENTO DE TIERRAS
Excavación localizada y eliminación de material suelto, D=1 km m3 23.10
Procesamiento, transporte y compactación de relleno para estructuras, D=2
m3 17.60
km
CONCRETO ARMADO
Solado de concreto f'c=100 kg/cm² m2 11.55 11.70
Acero de refuerzo fy=4200 kg/cm2 kg 330.75 568.34
Encofrado y desencofrado m2 16.80 28.71
Concreto f'c=210 kg/cm2 m3 6.30 3.38
Juntas de dilatación para canales de concreto, incluye material elastomérico
m 11.55 14.23
y waterstop
ESTRUCTURA DE CAPTACIÓN OESTE 2B
MOVIMIENTO DE TIERRAS
Excavación localizada y eliminación de material suelto, D=1 km m3 23.10
Procesamiento, transporte y compactación de relleno para estructuras, D=2
m3 17.60
km
CONCRETO ARMADO
Solado de concreto f'c=100 kg/cm² m2 11.55 10.50
Acero de refuerzo fy=4200 kg/cm2 kg 330.75 432.80
Encofrado y desencofrado m2 16.80 24.51
Concreto f'c=210 kg/cm2 m3 6.30 2.92
Juntas de dilatación para canales de concreto, incluye material elastomérico
m 11.55 13.43
y waterstop
INSTRUMENTACIÓN GEOTÉCNICA
HITO TOPOGRÁFICO
Hito topográfico und 11.00
INCLINÓMETRO VERTICAL
PERFORACIÓN
Perforación Diamantina HQ3 DF m 117.60
Suministro e instalacion de inclinómetro vertical glb 1.00
PIEZÓMETRO DE CUERDA VIBRANTE
MOVIMIENTO DE TIERRAS
Excavación y eliminación de material suelto para zanja de protección (1,0 m
m 792.00
x 0,5 m)
Excavación y eliminación de material suelto para caja de instrumentación
m3 13.75
(2,5 m x 2,5 m x 1,0 m)
Transporte y nivelación de arena para protección de cable (1,0 m x 0,5 m) m 792.00
Transporte y nivelación de arena para protección de piezómetro de cuerda
m3 13.75
vibrante (2,5 m x 2,5 m x 1,0 m)
EQUIPOS
Suministro e instalación de piezómetro de cuerda vibrante glb 1.00
SENSOR/CELDA DE ASENTAMIENTO DE CUERDA VIBRANTE NO
VENTEADO
MOVIMIENTO DE TIERRAS
Excavación y eliminación de material suelto para zanja de protección (1,0 m
m 363.00
x 0,5 m)
Excavación y eliminación de material suelto para caja de instrumentación
m3 6.88
(2,5 m x 2,5 m x 1,0 m)
Transporte y nivelación de arena para protección de cable (1,0 m x 0,5 m) m 363.00
Transporte y nivelación de arena para protección de piezómetro de cuerda
m3 6.88
vibrante (2,5 m x 2,5 m x 1,0 m)
EQUIPOS
Suministro e instalación de celda de asentamiento de cuerda vibrante no
glb 1.00
venteado
N y PAD3B
E E INFRAESTRUCTURAS AUXILIARES DE LA UNIDAD MINERA PUCAMARCA

DDN DDN
OBSERVACIONES Y COMENTARIOS
IZQUIERDO DERECHO

1577.9412 2160.2516 4459.68


113.9030 153.9042 210.09
1003.0537 1367.7043 2684.02
415.3330 588.3743 1565.57
2529.6078 3609.8598 5607.63
13.5300 0.0000
567.6760 562.1850
739.2710 1364.4730
4 0
5 5
1 3
1 0
1 1
6 10
1 1
0 3
5 0
1 0

seccion trans 23.91 m


long. 20.43 m
488.4813 m2
0.320 208.2
3.600 208.2
3.200 208.2
.
2068.150
19.231
153.846
1729.326
1537.018

75.43 32.12

0.11 9.36
5.37 5.08
28.25 28.25

37.91 0.11

SECTOR 1 SECTOR 2 OBSERVACIONES Y COMENTARIOS


57079.13
17131.4 67174.17

11141.475 15842.226 Sin considerar % de esponjamiento


1179.747464 2197.452177
131.4726 227.5218

41204.04584 58908.58012 Sin considerar % de desperdicio

593.531 292.595
272.339 129.827
1540.518 3210.437
1 1
1 1
39 7
17 8
3 3
3 3
27 51
2 2
1 4
6 2
0 11
2 0
0 1

19636.985 27645.402 Sin considerar % de esponjamiento

1258.600 937.720
0.000 484.440

275.4
10.8

86.4
971.19
863.19
120.36
4.72

37.76
424.446
377.246
long 13.6
1.8
9.4
1.8
1.8
9.4
1.8
18.85
seccion trans 58.45 m
long. 5.31
310.3695
CRONOGRAMA "MEJORAMIENTO CARRETERA IZCAHUACA-CRUCE HUARCAYA - P. INMACULADA" - MINERA SUYAMARCA

20-May

21-May

22-May

23-May

24-May

25-May

26-May

27-May

28-May

29-May

30-May

31-May

10-Aug

11-Aug

12-Aug

13-Aug

14-Aug

15-Aug

16-Aug

17-Aug

18-Aug

19-Aug

20-Aug

21-Aug

22-Aug

23-Aug

24-Aug

25-Aug

26-Aug

27-Aug

28-Aug

29-Aug

30-Aug

31-Aug
10-Jun

11-Jun

12-Jun

13-Jun

14-Jun

15-Jun

16-Jun

17-Jun

18-Jun

19-Jun

20-Jun

21-Jun

22-Jun

23-Jun

24-Jun

25-Jun

26-Jun

27-Jun

28-Jun

29-Jun

30-Jun

10-Jul

11-Jul

12-Jul

13-Jul

14-Jul

15-Jul

16-Jul

17-Jul

18-Jul

19-Jul

20-Jul

21-Jul

22-Jul

23-Jul

24-Jul

25-Jul

26-Jul

27-Jul

28-Jul

29-Jul

30-Jul

31-Jul
1-Jun

2-Jun

3-Jun

4-Jun

5-Jun

6-Jun

7-Jun

8-Jun

9-Jun

1-Aug

2-Aug

3-Aug

4-Aug

5-Aug

6-Aug

7-Aug

8-Aug

9-Aug

1-Sep

2-Sep

3-Sep

4-Sep

5-Sep

6-Sep

7-Sep

8-Sep

9-Sep
1-Jul

2-Jul

3-Jul

4-Jul

5-Jul

6-Jul

7-Jul

8-Jul

9-Jul
Item Actividad Metrado Estimado Avance Diario Días Calendario Días Útiles Fecha Inicio Fecha Fin

CONSTRUCCIÓN DEL PAD FASE 3B Y DEPÓSITO DE DESMONTE NORTE

INICIO CONSTRUCCION - 1 1 22/05/18 22/05/18 X Inicio Inicio


Construcción Movilización 06
22 May 18 Ago 12

2.0 DEPÓSITO DE DESMONTE NORTE

2.0 SUBDRENAJE

2.0 BOTADERO NORTE OESTE 26/06/18 20/08/18 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

2.9 Tubería de HDPE sólida SDR 21 de 300 mm (llegada hacia poza de subdrenaje) 13.53 0.24 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Copla especial para transición de tuberia de HDPE de pared doble no perforada a tuberia
sólida SDR 21 de ø300 mm 1.00 0.02 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

2.10 Tubería de HDPE de pared doble perforada de ø300 mm 576.45 10.29 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Codos 30° para tubería de HDPE de pared doble de ϕ300 mm 3.00 0.05 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Codos 45° para tubería de HDPE de pared doble de ϕ300 mm 5.00 0.09 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Copla partida para tubería de HDPE de pared doble de ϕ300 mm 128.00 2.29 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

2.11 Tubería de HDPE de pared doble perforada de ø100 mm 1,071.00 19.13 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Copla partida para tubería de HDPE de pared doble de ϕ100 mm 200.00 3.57 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Yee para tubería de HDPE de pared doble de 300X300X300 mm 2.00 0.04 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Yee para tubería de HDPE de pared doble de 300X300X100 mm 6.00 0.11 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Yee para tubería de HDPE de pared doble de 100X100X100 mm 2.00 0.04 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

2.13 Geotextil no tejido de 270 gr/m2 2,787.75 49.78 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

2.0 BOTADERO NORTE - ESTE 03/07/18 17/08/18 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

2.9 Tubería de HDPE de pared doble perforada de ø300 mm 576.45 12.53 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Codos 30° para tubería de HDPE de pared doble de ϕ300 mm 3.00 0.07 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Codos 45° para tubería de HDPE de pared doble de ϕ300 mm 5.00 0.11 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Copla partida para tubería de HDPE de pared doble de ϕ300 mm 128.00 2.78 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

2.10 Tubería de HDPE de pared doble perforada de ø100 mm 1,071.00 23.28 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Copla partida para tubería de HDPE de pared doble de ϕ100 mm 200.00 4.35 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Yee para tubería de HDPE de pared doble de 300X300X300 mm 2.00 0.04 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Yee para tubería de HDPE de pared doble de 300X300X100 mm 5.00 0.11 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Yee para tubería de HDPE de pared doble de 100X100X100 mm 2.00 0.04 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

2.12 Geotextil no tejido de 270 gr/m2 2,787.75 60.60 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

3.0 POZA DE SUBDRENAJE 24/06/18 31/07/18 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

3.5 Gavión caja 5.0x1.0x1.0 m (incluye grava de relleno) 11.00 0.29 38 38 24/06/18 31/07/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

3.6 Geocompuesto de arcilla GCL 236.25 6.22 38 38 24/06/18 31/07/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

3.7 Geomembrana HDPE lisa de 1,5 mm 1,191.75 31.36 38 38 24/06/18 31/07/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

3.9 Geotextil no tejido de 270 g/m2 285.60 7.52 38 38 24/06/18 31/07/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

3.10 Geocelda e=100 mm 273.00 7.18 38 38 24/06/18 31/07/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

3.0 MANEJO DE DRENAJE SUPERFICIAL

3.0 CANAL DE CORONACIÓN ESTE TRAMO 2 03/07/18 14/08/18 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

4.2.5.1. Geotextil no tejido de 270 g/m2 1,270.50 29.55 43 43 03/07/18 14/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X


2.3
4.2.5.1. Geocelda e=100 mm 1,170.75 27.23 43 43 03/07/18 14/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
2.4
3.0 ALCANTARILLA (L=1.5mx1.0mx1.5m, e=150mm, Ø=450mm) 15/08/18 21/08/18 - - - - - - -

3.8 Tubería de HDPE de pared doble no perforada de 450 mm 47.25 6.75 7 7 15/08/18 21/08/18 X X X X X X X

3.9 Geotextil no tejido de 270 g/m2 26.25 3.75 7 7 15/08/18 21/08/18 X X X X X X X

3.10 Geocelda e=150 mm 31.50 4.50 7 7 15/08/18 21/08/18 X X X X X X X

3.0 CANAL DE CORONACION OESTE TRAMO 3 L= 210 m

4.0 ESTRUCTURA DE CAPTACIÓN OESTE 1A (L=2.4mx1.5mx1.8m, e=150mm)

4.0 CANAL DE CORONACIÓN OESTE - TRAMO 3 (L=210m, e= 100mm) 22 24/08/18 14/09/18 - - - - - - - - - - - - - - - - -

4.3 Geotextil no tejido de 270 g/m2 556.50 25.30 22 22 24/08/18 14/09/18 X X X X X X X X X X X X X X X X X

4.4 Geocelda e=100 mm 519.75 23.63 22 22 24/08/18 14/09/18 X X X X X X X X X X X X X X X X X

4.0 POZA PARA CONTROL DE EROSION Y SEDIMENTOS (L=1.5mx1.0mx1.5m, e=150mm, 7 15/09/18 21/09/18
Ø=450mm)
4.3 Tubería de HDPE de pared doble no perforada de 450 mm 15.75 2.25 7 7 15/09/18 21/09/18

4.5 Geotextil no tejido de 270 g/m2 26.25 3.75 7 7 15/09/18 21/09/18

4.3 Geocelda e=150 mm 31.50 4.50 7 7 15/09/18 21/09/18

4.0 INSTALACIONES MECÁNICAS 40 01/08/18 30/08/18 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

4.1 Sistema de Bombeo 1.00 0.03 30 30 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Tubería de acero al carbono, Sch40, BW, ASTM A-53 GR B, sin costura - diámetro 3" 3.00 0.11 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Tubería de acero al carbono, Sch 40, BW, ASTM A-53 GR B, sin costura - diámetro 2" 5.00 0.18 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Cople, THRD 3000LB FS, ASTM A-105, diámetro de 1" 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Brida Slip On, Tipo RF, AC ASTM A-105, ANSI B16.5, CL-300, diámetro de 3" 8.00 0.29 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Codo 90°, SW 3000LB FS, ASTM A-105, diámetro 2" 3.00 0.11 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Codo 45°, SW 3000LB FS, ASTM A-105, diámetro 2" 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Codo 90° ASME B16.9, 5D, BW, Sch 40, ASTM A234 WPB sin costura, diámetro 3" 2.00 0.07 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Tee SW 3000 LB, FS, ASTM A-105, 2"x2" 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Tee THRD 3000 LB, ASTM A-105, 1"x1" 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Unión universal SW 3000LB FS, ASTM A-105, diámetro 2" 2.00 0.07 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Sockolet, 3000 LB FS, ASTM A-105, 3"x2" 2.00 0.07 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Bushing, RED. THRD 3000LB, ASTM A-105, 1"x1/2" 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Empaquetadura plana para bridas RF, material: PTFE con aglutinante sintético, ASME
B16.21, CL-300 ASME B16.5, espesor de 3mm (1/8"), diámetro 3"
7.00 0.25 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

(8) Espárrago ASTM A193 Gr B7, Clase 2A, con dos tuercas hexagonales clase pesada 6.00 0.21 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
ASTM A 194 Gr 2H Cl-2B y arandelas, 3/4" x 108 mm

Niple Acero al carbono ASTM A-53 GR B, sin costura, SCH 40, diámetro 2" (100 mm LG) 6.00 0.21 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Niple Acero al carbono ASTM A-53 GR B, sin costura, SCH 40, diámetro 1" (100 mm LG) 2.00 0.07 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Niple Acero al carbono ASTM A-53 GR B, sin costura, SCH 40, diámetro 1" (50 mm LG) 2.00 0.07 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Plug MNPT, THRD, diámetro 1" 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Válvula de Mariposa, CL-300 STD, LUG 316 TRIM HNDL, diámetro 3" 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Válvula check, CL-300 RF STL, LUG DR THRU 316 TRIM, diámetro 3" 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Válvula de bola, roscada, 800 LB SW, diámetro 1" 2.00 0.07 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Válvula de bola, roscada, 800 LB SW, diámetro 2" 2.00 0.07 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Bomba sumergible multietápica, ADT 234, 28 kW, 460V/3f/60Hz , caudal de 24 m3/h 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

4.2 Pipeline

Tubería de acero al carbono, Sch40, BW, ASTM A-53 GR B, sin costura - diámetro 3" 179.00 6.63 30 27 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X

TRIMMED Codo 45° ASME B16.9, 5D, BW, Sch 40, ASTM A234 WPB sin costura (7.81°), diám 1.00 0.04 30 27 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X

TRIMMED Codo 45° ASME B16.9, 5D, BW, Sch 40, ASTM A234 WPB sin costura (33.10°), diá 1.00 0.04 30 27 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X

TRIMMED Codo 45° ASME B16.9, 5D, BW, Sch 40, ASTM A234 WPB sin costura (36.61°), diá 1.00 0.04 30 27 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X

TRIMMED Codo 45° ASME B16.9, 5D, BW, Sch 40, ASTM A234 WPB sin costura (21.67°), diá 1.00 0.04 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Brida Slip On, Tipo RF, AC ASTM A-105, ANSI B16.5, CL-300, diámetro de 3" 8.00 0.32 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

(8) Espárrago ASTM A193 Gr B7, Clase 2A, con dos tuercas hexagonales clase pesada ASTM 8.00 0.32 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Tubería de ɸ3", HDPE ASTM F714 - PE100, SDR 7.4, diámetro IPS, 322.00 12.88 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Tubería de ɸ3", HDPE ASTM F714 - PE100, SDR 11, diámetro IPS 1,150.00 46.00 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Flange Adapter, HDPE PE100, SDR 7.4 9.00 0.36 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Flange Adapter, HDPE PE100, SDR 9 1.00 0.04 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Flange Adapter, HDPE PE100, SDR 11 3.00 0.12 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Brida lap joint, Tipo RF, AC ASTM A-105, ANSI B16.5, CL-300, diámetro de 3" 9.00 0.36 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Brida lap joint, Tipo RF, AC ASTM A-105, ANSI B16.5, CL-150, diámetro de 3" 4.00 0.16 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Brida Slip On, Tipo RF, AC ASTM A-105, ANSI B16.5, CL-150, diámetro de 3" 2.00 0.08 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

(4) Espárrago ASTM A193 Gr B7, Clase 2A, con dos tuercas hexagonales clase pesada ASTM 3.00 0.12 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Empaquetadura plana para bridas RF, material: PTFE con aglutinante sintético, ASME B16.21 6.00 0.24 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Empaquetadura plana para bridas RF, material: PTFE con aglutinante sintético, ASME B16.21 2.00 0.08 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Niple Acero al carbono ASTM A-53 GR B, sin costura, SCH 40, diámetro 3" (300 mm LG) 4.00 0.16 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Niple Acero al carbono ASTM A-53 GR B, sin costura, SCH 40, diámetro 1" (300 mm LG) 4.00 0.16 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Sockolet, 3000 # FS, ASTM A-105, 3"x1" 4.00 0.16 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Válvula de bola, roscada, 800 LB SW, diámetro 1" 8.00 0.32 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Válvula de venteo 16 bar, diámetro 1" 4.00 0.16 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

4.0 PAD DE LIXIVIACION FASE 3B

SECTOR 1 - PAD 3B ZONA ESTE 40 19/09/18 30/10/18

REVESTIMIENTO 40 19/09/18 28/10/18

4.3.2.3. Instalación de geomembrana LLDPE SST de 2 mm 54,012.00 1,350.30 40 40 19/09/18 28/10/18


4
COLECCIÓN 40 05/10/18 30/10/18

Copla partida para tubería de HDPE de pared doble de ϕ450 mm 3.00 0.12 26 26 05/10/18 30/10/18

Reducción para tuberia de HDPE de pared doble de ϕ450 a 300 mm 3.00 0.12 26 26 05/10/18 30/10/18

4.3.2.4. Instalación de tubería de HDPE de pared doble perforada de 300 mm 466.20 17.93 26 26 05/10/18 30/10/18
1
Tapa para tubería de HDPE de pared doble de ϕ300 mm 4.00 0.15 26 26 05/10/18 30/10/18

Copla partida para tubería de HDPE de pared doble de ϕ300 mm 147.50 5.67 26 26 05/10/18 30/10/18

Codos 30° para tubería de HDPE de pared doble de ϕ300 mm 6.00 0.23 26 26 05/10/18 30/10/18

Reducción para tuberia de HDPE de pared doble de ϕ300 a 200 mm 2.00 0.08 26 26 05/10/18 30/10/18

4.3.2.4. Instalación de tubería de HDPE de pared doble perforada de 200 mm 207.90 8.00 26 26 05/10/18 30/10/18
2
Tapa para tubería de HDPE de pared doble de ϕ200 mm 4.00 0.15 26 26 05/10/18 30/10/18

Copla partida para tubería de HDPE de pared doble de ϕ200 mm 60.00 2.31 26 26 05/10/18 30/10/18

4.3.2.4. Instalación de tubería de HDPE de pared doble perforada de 100 mm 2,583.00 99.35 26 26 05/10/18 30/10/18
3
Tapa para tubería de HDPE de pared doble de ϕ100 mm 50.00 1.92 26 26 05/10/18 30/10/18

Copla partida para tubería de HDPE de pared doble de ϕ100 mm 498.00 19.15 26 26 05/10/18 30/10/18

Instalación de yee para tubería de HDPE de pared doble de 300x300x300 mm 1.00 0.04 26 26 05/10/18 30/10/18

Instalación de yee para tubería de HDPE de pared doble de 300x300x200 mm 1.00 0.04 26 26 05/10/18 30/10/18

Instalación de yee para tubería de HDPE de pared doble de 300x300x100 mm 25.00 0.96 26 26 05/10/18 30/10/18

Instalación de yee para tubería de HDPE de pared doble de 200x200x100 mm 10.00 0.38 26 26 05/10/18 30/10/18

Instalación de yee para tubería de HDPE de pared doble de 100x100x100 mm 3.00 0.12 26 26 05/10/18 30/10/18

Preparación e instalación de bota de HDPE de ϕ300 mm 3.00 0.12 26 26 05/10/18 30/10/18

SECTOR 2 - PAD 3B ZONA OESTE 40 20/08/18 04/10/18 - - - - - - - - - - - - - - - - - - - - -

REVESTIMIENTO 40 20/08/18 26/09/18 - - - - - - - - - - - - - - - - - - - - -

4.3.3.3. Instalación de geomembrana LLDPE SST de 2 mm 54,012.00 1,421.37 38 38 20/08/18 26/09/18 X X X X X X X X X X X X X X X X X X X X X


4
COLECCIÓN 40 26/08/18 04/10/18 - - - - - - - - - - - - - - -

Copla partida para tubería de HDPE de pared doble de ϕ450 mm 3.00 0.08 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X

Reducción para tuberia de HDPE de pared doble de ϕ450 a 300 mm 3.00 0.08 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X

4.3.3.4. Instalación de tubería de HDPE de pared doble perforada de 300 mm 466.20 11.66 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X
1
Tapa para tubería de HDPE de pared doble de ϕ300 mm 4.00 0.10 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X

Copla partida para tubería de HDPE de pared doble de ϕ300 mm 147.50 3.69 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X

Codos 30° para tubería de HDPE de pared doble de ϕ300 mm 6.00 0.15 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X

Reducción para tuberia de HDPE de pared doble de ϕ300 a 200 mm 2.00 0.05 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X

4.3.3.4. Instalación de tubería de HDPE de pared doble perforada de 200 mm 207.90 5.20 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X
2
Tapa para tubería de HDPE de pared doble de ϕ200 mm 4.00 0.10 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X

Copla partida para tubería de HDPE de pared doble de ϕ200 mm 60.00 1.50 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X

4.3.3.4. Instalación de tubería de HDPE de pared doble perforada de 100 mm 2,583.00 64.58 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X
3
Tapa para tubería de HDPE de pared doble de ϕ100 mm 50.00 1.25 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X

Copla partida para tubería de HDPE de pared doble de ϕ100 mm 498.00 12.45 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X

Instalación de yee para tubería de HDPE de pared doble de 300x300x300 mm 1.00 0.03 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X

Instalación de yee para tubería de HDPE de pared doble de 300x300x200 mm 1.00 0.03 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X

Instalación de yee para tubería de HDPE de pared doble de 300x300x100 mm 24.00 0.60 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X

Instalación de yee para tubería de HDPE de pared doble de 200x200x100 mm 10.00 0.25 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X

Instalación de yee para tubería de HDPE de pared doble de 100x100x100 mm 3.00 0.08 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X

Preparación e instalación de bota de HDPE de ϕ300 mm 3.00 0.08 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X

MANEJO DE DRENAJE SUPERFICIAL 30 26/09/18 31/10/18

CANAL DE CORONACION OESTE - TRAMO 2 0 26/09/18 01/10/18

4.3.5.1. Instalación de geotextil no tejido de 270 g/m2 992.25 165.38 6 6 26/09/18 01/10/18
3
4.3.5.1. Instalación de geocelda e=100 mm 959.70 159.95 6 6 26/09/18 01/10/18
4
CANAL DE CORONACION ESTE - TRAMO 1 0 02/10/18 31/10/18

4.3.5.3. Instalación de geotextil no tejido de 270 g/m2 1,639.05 54.64 30 30 02/10/18 31/10/18
3
4.3.5.3. Instalación de geocelda e=100 mm 1,583.40 52.78 30 30 02/10/18 31/10/18
4
10-Nov

11-Nov

12-Nov

13-Nov

14-Nov

15-Nov

16-Nov

17-Nov

18-Nov

19-Nov

20-Nov

21-Nov

22-Nov

23-Nov

24-Nov

25-Nov

26-Nov

27-Nov

28-Nov

29-Nov

30-Nov

10-Dec

11-Dec

12-Dec

13-Dec

14-Dec

15-Dec

16-Dec

17-Dec

18-Dec

19-Dec

20-Dec

21-Dec
10-Sep

11-Sep

12-Sep

13-Sep

14-Sep

15-Sep

16-Sep

17-Sep

18-Sep

19-Sep

20-Sep

21-Sep

22-Sep

23-Sep

24-Sep

25-Sep

26-Sep

27-Sep

28-Sep

29-Sep

30-Sep

10-Oct

11-Oct

12-Oct

13-Oct

14-Oct

15-Oct

16-Oct

17-Oct

18-Oct

19-Oct

20-Oct

21-Oct

22-Oct

23-Oct

24-Oct

25-Oct

26-Oct

27-Oct

28-Oct

29-Oct

30-Oct

31-Oct

1-Nov

2-Nov

3-Nov

4-Nov

5-Nov

6-Nov

7-Nov

8-Nov

9-Nov

1-Dec

2-Dec

3-Dec

4-Dec

5-Dec

6-Dec

7-Dec

8-Dec

9-Dec
1-Oct

2-Oct

3-Oct

4-Oct

5-Oct

6-Oct

7-Oct

8-Oct

9-Oct

- - - - -

X X X X X

X X X X X
Fin de Obra
- - - - - - - 16 Ene 12

X X X X X X X

X X X X X X X Fin de Obra
16 Ene 12
X X X X X X X

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Fin de Obra
16 Ene 12
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Fin de Obra
- - - - - - - - - - - - - - - - - - - - - - - - - - 16 Ene 12

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

- - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - -

X X X X X X X X X X X X X X X X X

- - - - - - - - - - - - - - - - - - - - - - - - -

X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - -

X X X X X X

X X X X X X

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
20-May

21-May

22-May

23-May

24-May

25-May

26-May

27-May

28-May

29-May

30-May

31-May

10-Jun

11-Jun

12-Jun

13-Jun

14-Jun

15-Jun

16-Jun

17-Jun

18-Jun

19-Jun

20-Jun

21-Jun

22-Jun

23-Jun

24-Jun

25-Jun

26-Jun

27-Jun

28-Jun

29-Jun

30-Jun

10-Aug

11-Aug

12-Aug

13-Aug

14-Aug

15-Aug

16-Aug

17-Aug

18-Aug

19-Aug

20-Aug

21-Aug

22-Aug

23-Aug

24-Aug

25-Aug

26-Aug

27-Aug

28-Aug

29-Aug

30-Aug

31-Aug

10-Sep

11-Sep

12-Sep

13-Sep

14-Sep

15-Sep

16-Sep

17-Sep

18-Sep
10-Jul

11-Jul

12-Jul

13-Jul

14-Jul

15-Jul

16-Jul

17-Jul

18-Jul

19-Jul

20-Jul

21-Jul

22-Jul

23-Jul

24-Jul

25-Jul

26-Jul

27-Jul

28-Jul

29-Jul

30-Jul

31-Jul

1-Aug

2-Aug

3-Aug

4-Aug

5-Aug

6-Aug

7-Aug

8-Aug

9-Aug

1-Sep

2-Sep

3-Sep

4-Sep

5-Sep

6-Sep

7-Sep

8-Sep

9-Sep
1-Jun

2-Jun

3-Jun

4-Jun

5-Jun

6-Jun

7-Jun

8-Jun

9-Jun

1-Jul

2-Jul

3-Jul

4-Jul

5-Jul

6-Jul

7-Jul

8-Jul

9-Jul
Item Actividad Metrado Estimado Avance Diario Días Calendario Días Útiles Fecha Inicio Fecha Fin

CONSTRUCCIÓN DEL PAD FASE 3B Y DEPÓSITO DE DESMONTE NORTE

INICIO CONSTRUCCION - 1 1 22/05/18 22/05/18 X Inicio Inicio


Construcción Movilización 06
22 May 18 Ago 12

2.0 DEPÓSITO DE DESMONTE NORTE

2.0 SUBDRENAJE

2.0 BOTADERO NORTE OESTE 26/06/18 20/08/18 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

2.9 Tubería de HDPE sólida SDR 21 de 300 mm (llegada hacia poza de subdrenaje) 14.70 0.26 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Copla especial para transición de tuberia de HDPE de pared doble no perforada a tuberia 1.00 0.02 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
sólida SDR 21 de ø300 mm

2.10 Tubería de HDPE de pared doble perforada de ø300 mm 576.45 10.29 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Codos 30° para tubería de HDPE de pared doble de ϕ300 mm 3.00 0.05 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Codos 45° para tubería de HDPE de pared doble de ϕ300 mm 5.00 0.09 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Copla partida para tubería de HDPE de pared doble de ϕ300 mm 128.00 2.29 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

2.11 Tubería de HDPE de pared doble perforada de ø100 mm 1,071.00 19.13 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Copla partida para tubería de HDPE de pared doble de ϕ100 mm 200.00 3.57 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Yee para tubería de HDPE de pared doble de 300X300X300 mm 2.00 0.04 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Yee para tubería de HDPE de pared doble de 300X300X100 mm 6.00 0.11 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Yee para tubería de HDPE de pared doble de 100X100X100 mm 2.00 0.04 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

2.13 Geotextil no tejido de 270 gr/m2 2,787.75 49.78 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

2.0 BOTADERO NORTE - ESTE 03/07/18 17/08/18 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

2.9 Tubería de HDPE de pared doble perforada de ø300 mm 576.45 12.53 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Codos 30° para tubería de HDPE de pared doble de ϕ300 mm 3.00 0.07 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Codos 45° para tubería de HDPE de pared doble de ϕ300 mm 5.00 0.11 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Copla partida para tubería de HDPE de pared doble de ϕ300 mm 128.00 2.78 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

2.10 Tubería de HDPE de pared doble perforada de ø100 mm 1,071.00 23.28 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Copla partida para tubería de HDPE de pared doble de ϕ100 mm 200.00 4.35 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Yee para tubería de HDPE de pared doble de 300X300X300 mm 2.00 0.04 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Yee para tubería de HDPE de pared doble de 300X300X100 mm 5.00 0.11 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Yee para tubería de HDPE de pared doble de 100X100X100 mm 2.00 0.04 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

2.12 Geotextil no tejido de 270 gr/m2 2,787.75 60.60 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

3.0 POZA DE SUBDRENAJE 24/06/18 31/07/18 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

3.5 Gavión caja 5.0x1.0x1.0 m (incluye grava de relleno) 11.00 0.29 38 38 24/06/18 31/07/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

3.6 Geocompuesto de arcilla GCL 236.25 6.22 38 38 24/06/18 31/07/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

3.7 Geomembrana HDPE lisa de 1,5 mm 1,191.75 31.36 38 38 24/06/18 31/07/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

3.9 Geotextil no tejido de 270 g/m2 285.60 7.52 38 38 24/06/18 31/07/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

3.10 Geocelda e=100 mm 273.00 7.18 38 38 24/06/18 31/07/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

3.0 MANEJO DE DRENAJE SUPERFICIAL

3.0 CANAL DE CORONACIÓN ESTE TRAMO 2 03/07/18 14/08/18 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

4.2.5.1. Geotextil no tejido de 270 g/m2 1,270.50 29.55 43 43 03/07/18 14/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X


2.3
4.2.5.1. Geocelda e=100 mm 1,170.75 27.23 43 43 03/07/18 14/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
2.4
3.0 ALCANTARILLA (L=1.5mx1.0mx1.5m, e=150mm, Ø=450mm) 15/08/18 21/08/18 - - - - - - -

3.8 Tubería de HDPE de pared doble no perforada de 450 mm 47.25 6.75 7 7 15/08/18 21/08/18 X X X X X X X

3.9 Geotextil no tejido de 270 g/m2 26.25 3.75 7 7 15/08/18 21/08/18 X X X X X X X

3.10 Geocelda e=150 mm 31.50 4.50 7 7 15/08/18 21/08/18 X X X X X X X

3.0 CANAL DE CORONACION OESTE TRAMO 3 L= 210 m

4.0 ESTRUCTURA DE CAPTACIÓN OESTE 1A (L=2.4mx1.5mx1.8m, e=150mm)

4.0 CANAL DE CORONACIÓN OESTE - TRAMO 3 (L=210m, e= 100mm) 22 24/08/18 14/09/18 - - - - - - - - - - - - - - - - - - - - - -

4.3 Geotextil no tejido de 270 g/m2 556.50 25.30 22 22 24/08/18 14/09/18 X X X X X X X X X X X X X X X X X X X X X X

4.4 Geocelda e=100 mm 519.75 23.63 22 22 24/08/18 14/09/18 X X X X X X X X X X X X X X X X X X X X X X

4.0 POZA PARA CONTROL DE EROSION Y SEDIMENTOS (L=1.5mx1.0mx1.5m, e=150mm, 7 15/09/18 21/09/18 - - - -
Ø=450mm)
4.3 Tubería de HDPE de pared doble no perforada de 450 mm 15.75 2.25 7 7 15/09/18 21/09/18 X X X X

4.5 Geotextil no tejido de 270 g/m2 26.25 3.75 7 7 15/09/18 21/09/18 X X X X

4.3 Geocelda e=150 mm 31.50 4.50 7 7 15/09/18 21/09/18 X X X X

4.0 INSTALACIONES MECÁNICAS 40 01/08/18 30/08/18 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

4.1 Sistema de Bombeo 1.00 0.03 30 30 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Tubería de acero al carbono, Sch40, BW, ASTM A-53 GR B, sin costura - diámetro 3" 3.00 0.11 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Tubería de acero al carbono, Sch 40, BW, ASTM A-53 GR B, sin costura - diámetro 2" 5.00 0.18 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Cople, THRD 3000LB FS, ASTM A-105, diámetro de 1" 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Brida Slip On, Tipo RF, AC ASTM A-105, ANSI B16.5, CL-300, diámetro de 3" 8.00 0.29 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Codo 90°, SW 3000LB FS, ASTM A-105, diámetro 2" 3.00 0.11 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Codo 45°, SW 3000LB FS, ASTM A-105, diámetro 2" 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Codo 90° ASME B16.9, 5D, BW, Sch 40, ASTM A234 WPB sin costura, diámetro 3" 2.00 0.07 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Tee SW 3000 LB, FS, ASTM A-105, 2"x2" 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Tee THRD 3000 LB, ASTM A-105, 1"x1" 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Unión universal SW 3000LB FS, ASTM A-105, diámetro 2" 2.00 0.07 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Sockolet, 3000 LB FS, ASTM A-105, 3"x2" 2.00 0.07 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Bushing, RED. THRD 3000LB, ASTM A-105, 1"x1/2" 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Empaquetadura plana para bridas RF, material: PTFE con aglutinante sintético, ASME
B16.21, CL-300 ASME B16.5, espesor de 3mm (1/8"), diámetro 3" 7.00 0.25 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

(8) Espárrago ASTM A193 Gr B7, Clase 2A, con dos tuercas hexagonales clase pesada
ASTM A 194 Gr 2H Cl-2B y arandelas, 3/4" x 108 mm 6.00 0.21 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Niple Acero al carbono ASTM A-53 GR B, sin costura, SCH 40, diámetro 2" (100 mm 6.00 0.21 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Niple Acero al carbono ASTM A-53 GR B, sin costura, SCH 40, diámetro 1" (100 mm 2.00 0.07 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Niple Acero al carbono ASTM A-53 GR B, sin costura, SCH 40, diámetro 1" (50 mm L 2.00 0.07 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Plug MNPT, THRD, diámetro 1" 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Válvula de Mariposa, CL-300 STD, LUG 316 TRIM HNDL, diámetro 3" 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Válvula check, CL-300 RF STL, LUG DR THRU 316 TRIM, diámetro 3" 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Válvula de bola, roscada, 800 LB SW, diámetro 1" 2.00 0.07 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Válvula de bola, roscada, 800 LB SW, diámetro 2" 2.00 0.07 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Bomba sumergible multietápica, ADT 234, 28 kW, 460V/3f/60Hz , caudal de 24 m3/h 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

4.2 Pipeline

Tubería de acero al carbono, Sch40, BW, ASTM A-53 GR B, sin costura - diámetro 3" 179.00 6.63 30 27 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X

TRIMMED Codo 45° ASME B16.9, 5D, BW, Sch 40, ASTM A234 WPB sin costura (7.81°) 1.00 0.04 30 27 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X

TRIMMED Codo 45° ASME B16.9, 5D, BW, Sch 40, ASTM A234 WPB sin costura (33.10° 1.00 0.04 30 27 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X

TRIMMED Codo 45° ASME B16.9, 5D, BW, Sch 40, ASTM A234 WPB sin costura (36.61° 1.00 0.04 30 27 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X

TRIMMED Codo 45° ASME B16.9, 5D, BW, Sch 40, ASTM A234 WPB sin costura (21.67° 1.00 0.04 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Brida Slip On, Tipo RF, AC ASTM A-105, ANSI B16.5, CL-300, diámetro de 3" 8.00 0.32 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

(8) Espárrago ASTM A193 Gr B7, Clase 2A, con dos tuercas hexagonales clase pesad 8.00 0.32 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Tubería de ɸ3", HDPE ASTM F714 - PE100, SDR 7.4, diámetro IPS, 322.00 12.88 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Tubería de ɸ3", HDPE ASTM F714 - PE100, SDR 11, diámetro IPS 1,150.00 46.00 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Flange Adapter, HDPE PE100, SDR 7.4 9.00 0.36 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Flange Adapter, HDPE PE100, SDR 9 1.00 0.04 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Flange Adapter, HDPE PE100, SDR 11 3.00 0.12 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Brida lap joint, Tipo RF, AC ASTM A-105, ANSI B16.5, CL-300, diámetro de 3" 9.00 0.36 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Brida lap joint, Tipo RF, AC ASTM A-105, ANSI B16.5, CL-150, diámetro de 3" 4.00 0.16 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Brida Slip On, Tipo RF, AC ASTM A-105, ANSI B16.5, CL-150, diámetro de 3" 2.00 0.08 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

(4) Espárrago ASTM A193 Gr B7, Clase 2A, con dos tuercas hexagonales clase pesad 3.00 0.12 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Empaquetadura plana para bridas RF, material: PTFE con aglutinante sintético, ASME 6.00 0.24 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Empaquetadura plana para bridas RF, material: PTFE con aglutinante sintético, ASME 2.00 0.08 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Niple Acero al carbono ASTM A-53 GR B, sin costura, SCH 40, diámetro 3" (300 mm 4.00 0.16 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Niple Acero al carbono ASTM A-53 GR B, sin costura, SCH 40, diámetro 1" (300 mm 4.00 0.16 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Sockolet, 3000 # FS, ASTM A-105, 3"x1" 4.00 0.16 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Válvula de bola, roscada, 800 LB SW, diámetro 1" 8.00 0.32 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Válvula de venteo 16 bar, diámetro 1" 4.00 0.16 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

4.0 PAD DE LIXIVIACION FASE 3B

SECTOR 1 - PAD 3B ZONA ESTE 40 19/09/18 30/10/18

REVESTIMIENTO 40 19/09/18 28/10/18

4.3.2.3. Instalación de geomembrana LLDPE SST de 2 mm 54,012.00 1,350.30 40 40 19/09/18 28/10/18


4
COLECCIÓN 40 05/10/18 30/10/18

Copla partida para tubería de HDPE de pared doble de ϕ450 mm 3.00 0.12 26 26 05/10/18 30/10/18

Reducción para tuberia de HDPE de pared doble de ϕ450 a 300 mm 3.00 0.12 26 26 05/10/18 30/10/18

4.3.2.4. Instalación de tubería de HDPE de pared doble perforada de 300 mm 466.20 17.93 26 26 05/10/18 30/10/18
1
Tapa para tubería de HDPE de pared doble de ϕ300 mm 4.00 0.15 26 26 05/10/18 30/10/18

Copla partida para tubería de HDPE de pared doble de ϕ300 mm 147.50 5.67 26 26 05/10/18 30/10/18

Codos 30° para tubería de HDPE de pared doble de ϕ300 mm 6.00 0.23 26 26 05/10/18 30/10/18

Reducción para tuberia de HDPE de pared doble de ϕ300 a 200 mm 2.00 0.08 26 26 05/10/18 30/10/18

4.3.2.4. Instalación de tubería de HDPE de pared doble perforada de 200 mm 207.90 8.00 26 26 05/10/18 30/10/18
2
Tapa para tubería de HDPE de pared doble de ϕ200 mm 4.00 0.15 26 26 05/10/18 30/10/18

Copla partida para tubería de HDPE de pared doble de ϕ200 mm 60.00 2.31 26 26 05/10/18 30/10/18

4.3.2.4. Instalación de tubería de HDPE de pared doble perforada de 100 mm 2,583.00 99.35 26 26 05/10/18 30/10/18
3
Tapa para tubería de HDPE de pared doble de ϕ100 mm 50.00 1.92 26 26 05/10/18 30/10/18

Copla partida para tubería de HDPE de pared doble de ϕ100 mm 498.00 19.15 26 26 05/10/18 30/10/18

Instalación de yee para tubería de HDPE de pared doble de 300x300x300 mm 1.00 0.04 26 26 05/10/18 30/10/18

Instalación de yee para tubería de HDPE de pared doble de 300x300x200 mm 1.00 0.04 26 26 05/10/18 30/10/18

Instalación de yee para tubería de HDPE de pared doble de 300x300x100 mm 25.00 0.96 26 26 05/10/18 30/10/18

Instalación de yee para tubería de HDPE de pared doble de 200x200x100 mm 10.00 0.38 26 26 05/10/18 30/10/18

Instalación de yee para tubería de HDPE de pared doble de 100x100x100 mm 3.00 0.12 26 26 05/10/18 30/10/18

Preparación e instalación de bota de HDPE de ϕ300 mm 3.00 0.12 26 26 05/10/18 30/10/18

SECTOR 2 - PAD 3B ZONA OESTE 40 20/08/18 04/10/18 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

REVESTIMIENTO 40 20/08/18 26/09/18 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

4.3.3.3. Instalación de geomembrana LLDPE SST de 2 mm 54,012.00 1,421.37 38 38 20/08/18 26/09/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X


4
COLECCIÓN 40 26/08/18 04/10/18 - - - - - - - - - - - - - - - - - - - - - - - -

Copla partida para tubería de HDPE de pared doble de ϕ450 mm 3.00 0.08 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X

Reducción para tuberia de HDPE de pared doble de ϕ450 a 300 mm 3.00 0.08 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X

4.3.3.4. Instalación de tubería de HDPE de pared doble perforada de 300 mm 466.20 11.66 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X
1
Tapa para tubería de HDPE de pared doble de ϕ300 mm 4.00 0.10 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X

Copla partida para tubería de HDPE de pared doble de ϕ300 mm 147.50 3.69 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X

Codos 30° para tubería de HDPE de pared doble de ϕ300 mm 6.00 0.15 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X

Reducción para tuberia de HDPE de pared doble de ϕ300 a 200 mm 2.00 0.05 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X

4.3.3.4. Instalación de tubería de HDPE de pared doble perforada de 200 mm 207.90 5.20 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X
2
Tapa para tubería de HDPE de pared doble de ϕ200 mm 4.00 0.10 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X

Copla partida para tubería de HDPE de pared doble de ϕ200 mm 60.00 1.50 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X

4.3.3.4. Instalación de tubería de HDPE de pared doble perforada de 100 mm 2,583.00 64.58 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X
3
Tapa para tubería de HDPE de pared doble de ϕ100 mm 50.00 1.25 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X

Copla partida para tubería de HDPE de pared doble de ϕ100 mm 498.00 12.45 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X

Instalación de yee para tubería de HDPE de pared doble de 300x300x300 mm 1.00 0.03 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X

Instalación de yee para tubería de HDPE de pared doble de 300x300x200 mm 1.00 0.03 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X

Instalación de yee para tubería de HDPE de pared doble de 300x300x100 mm 24.00 0.60 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X

Instalación de yee para tubería de HDPE de pared doble de 200x200x100 mm 10.00 0.25 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X

Instalación de yee para tubería de HDPE de pared doble de 100x100x100 mm 3.00 0.08 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X

Preparación e instalación de bota de HDPE de ϕ300 mm 3.00 0.08 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X

MANEJO DE DRENAJE SUPERFICIAL 30 26/09/18 31/10/18

CANAL DE CORONACION OESTE - TRAMO 2 0 26/09/18 01/10/18

4.3.5.1. Instalación de geotextil no tejido de 270 g/m2 992.25 165.38 6 6 26/09/18 01/10/18
3
4.3.5.1. Instalación de geocelda e=100 mm 959.70 159.95 6 6 26/09/18 01/10/18
4
CANAL DE CORONACION ESTE - TRAMO 1 0 02/10/18 31/10/18

4.3.5.3. Instalación de geotextil no tejido de 270 g/m2 1,639.05 54.64 30 30 02/10/18 31/10/18
3
4.3.5.3. Instalación de geocelda e=100 mm 1,583.40 52.78 30 30 02/10/18 31/10/18
4
19-Sep

20-Sep

21-Sep

22-Sep

23-Sep

24-Sep

25-Sep

26-Sep

27-Sep

28-Sep

29-Sep

30-Sep

10-Nov

11-Nov

12-Nov

13-Nov

14-Nov

15-Nov

16-Nov

17-Nov

18-Nov

19-Nov

20-Nov

21-Nov

22-Nov

23-Nov

24-Nov

25-Nov

26-Nov

27-Nov

28-Nov

29-Nov

30-Nov

10-Dec

11-Dec

12-Dec

13-Dec

14-Dec

15-Dec

16-Dec

17-Dec

18-Dec

19-Dec

20-Dec

21-Dec
10-Oct

11-Oct

12-Oct

13-Oct

14-Oct

15-Oct

16-Oct

17-Oct

18-Oct

19-Oct

20-Oct

21-Oct

22-Oct

23-Oct

24-Oct

25-Oct

26-Oct

27-Oct

28-Oct

29-Oct

30-Oct

31-Oct

1-Nov

2-Nov

3-Nov

4-Nov

5-Nov

6-Nov

7-Nov

8-Nov

9-Nov

1-Dec

2-Dec

3-Dec

4-Dec

5-Dec

6-Dec

7-Dec

8-Dec

9-Dec
1-Oct

2-Oct

3-Oct

4-Oct

5-Oct

6-Oct

7-Oct

8-Oct

9-Oct

Fin de Obra
- - - 16 Ene 12

X X X

X X X Fin de Obra
16 Ene 12
X X X

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Fin de Obra
16 Ene 12
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Fin de Obra
- - - - - - - - - - - - - - - - - - - - - - - - - - 16 Ene 12

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

- - - - - - - - - - - - - - - -

- - - - - - - -

X X X X X X X X

- - - - - - - - - - - - - - - -

X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - -

X X X X X X

X X X X X X

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
20-May

21-May

22-May

23-May

24-May

25-May

26-May

27-May

28-May

29-May

30-May

31-May

10-Jun

11-Jun

12-Jun

13-Jun

14-Jun

15-Jun

16-Jun

17-Jun

18-Jun

19-Jun

20-Jun

21-Jun

22-Jun

23-Jun

24-Jun

25-Jun

26-Jun

27-Jun

28-Jun

29-Jun

30-Jun

10-Aug

11-Aug

12-Aug

13-Aug

14-Aug

15-Aug

16-Aug

17-Aug

18-Aug

19-Aug

20-Aug

21-Aug

22-Aug

23-Aug

24-Aug

25-Aug

26-Aug

27-Aug

28-Aug

29-Aug

30-Aug

31-Aug

10-Sep

11-Sep

12-Sep

13-Sep

14-Sep

15-Sep

16-Sep

17-Sep

18-Sep
10-Jul

11-Jul

12-Jul

13-Jul

14-Jul

15-Jul

16-Jul

17-Jul

18-Jul

19-Jul

20-Jul

21-Jul

22-Jul

23-Jul

24-Jul

25-Jul

26-Jul

27-Jul

28-Jul

29-Jul

30-Jul

31-Jul

1-Aug

2-Aug

3-Aug

4-Aug

5-Aug

6-Aug

7-Aug

8-Aug

9-Aug

1-Sep

2-Sep

3-Sep

4-Sep

5-Sep

6-Sep

7-Sep

8-Sep

9-Sep
1-Jun

2-Jun

3-Jun

4-Jun

5-Jun

6-Jun

7-Jun

8-Jun

9-Jun

1-Jul

2-Jul

3-Jul

4-Jul

5-Jul

6-Jul

7-Jul

8-Jul

9-Jul
Item Actividad Metrado Estimado Avance Diario Días Calendario Días Útiles Fecha Inicio Fecha Fin

CONSTRUCCIÓN DEL PAD FASE 3B Y DEPÓSITO DE DESMONTE NORTE

INICIO CONSTRUCCION - 1 1 22/05/18 22/05/18 X Inicio Inicio


Construcción Movilización 06
22 May 18 Ago 12

2.0 DEPÓSITO DE DESMONTE NORTE

2.0 SUBDRENAJE

2.0 BOTADERO NORTE OESTE 26/06/18 20/08/18 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

2.9 Tubería de HDPE sólida SDR 21 de 300 mm (llegada hacia poza de subdrenaje) 14.70 0.26 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Copla especial para transición de tuberia de HDPE de pared doble no perforada a tuberia 1.00 0.02 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
sólida SDR 21 de ø300 mm

2.10 Tubería de HDPE de pared doble perforada de ø300 mm 576.45 10.29 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Codos 30° para tubería de HDPE de pared doble de ϕ300 mm 3.00 0.05 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Codos 45° para tubería de HDPE de pared doble de ϕ300 mm 5.00 0.09 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Copla partida para tubería de HDPE de pared doble de ϕ300 mm 128.00 2.29 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

2.11 Tubería de HDPE de pared doble perforada de ø100 mm 1,071.00 19.13 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Copla partida para tubería de HDPE de pared doble de ϕ100 mm 200.00 3.57 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Yee para tubería de HDPE de pared doble de 300X300X300 mm 2.00 0.04 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Yee para tubería de HDPE de pared doble de 300X300X100 mm 6.00 0.11 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Yee para tubería de HDPE de pared doble de 100X100X100 mm 2.00 0.04 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

2.13 Geotextil no tejido de 270 gr/m2 2,787.75 49.78 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

2.0 BOTADERO NORTE - ESTE 03/07/18 17/08/18 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

2.9 Tubería de HDPE de pared doble perforada de ø300 mm 576.45 12.53 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Codos 30° para tubería de HDPE de pared doble de ϕ300 mm 3.00 0.07 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Codos 45° para tubería de HDPE de pared doble de ϕ300 mm 5.00 0.11 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Copla partida para tubería de HDPE de pared doble de ϕ300 mm 128.00 2.78 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

2.10 Tubería de HDPE de pared doble perforada de ø100 mm 1,071.00 23.28 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Copla partida para tubería de HDPE de pared doble de ϕ100 mm 200.00 4.35 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Yee para tubería de HDPE de pared doble de 300X300X300 mm 2.00 0.04 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Yee para tubería de HDPE de pared doble de 300X300X100 mm 5.00 0.11 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Yee para tubería de HDPE de pared doble de 100X100X100 mm 2.00 0.04 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

2.12 Geotextil no tejido de 270 gr/m2 2,787.75 60.60 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

3.0 POZA DE SUBDRENAJE 24/06/18 31/07/18 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

3.5 Gavión caja 5.0x1.0x1.0 m (incluye grava de relleno) 11.00 0.29 38 38 24/06/18 31/07/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

3.6 Geocompuesto de arcilla GCL 236.25 6.22 38 38 24/06/18 31/07/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

3.7 Geomembrana HDPE lisa de 1,5 mm 1,191.75 31.36 38 38 24/06/18 31/07/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

3.9 Geotextil no tejido de 270 g/m2 285.60 7.52 38 38 24/06/18 31/07/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

3.10 Geocelda e=100 mm 273.00 7.18 38 38 24/06/18 31/07/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

3.0 MANEJO DE DRENAJE SUPERFICIAL

3.0 CANAL DE CORONACIÓN ESTE TRAMO 2 03/07/18 14/08/18 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

4.2.5.1. Geotextil no tejido de 270 g/m2 1,270.50 29.55 43 43 03/07/18 14/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X


2.3
4.2.5.1. Geocelda e=100 mm 1,170.75 27.23 43 43 03/07/18 14/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
2.4
3.0 ALCANTARILLA (L=1.5mx1.0mx1.5m, e=150mm, Ø=450mm) 15/08/18 21/08/18 - - - - - - -

3.8 Tubería de HDPE de pared doble no perforada de 450 mm 47.25 6.75 7 7 15/08/18 21/08/18 X X X X X X X

3.9 Geotextil no tejido de 270 g/m2 26.25 3.75 7 7 15/08/18 21/08/18 X X X X X X X

3.10 Geocelda e=150 mm 31.50 4.50 7 7 15/08/18 21/08/18 X X X X X X X

3.0 CANAL DE CORONACION OESTE TRAMO 3 L= 210 m

4.0 ESTRUCTURA DE CAPTACIÓN OESTE 1A (L=2.4mx1.5mx1.8m, e=150mm)

4.0 CANAL DE CORONACIÓN OESTE - TRAMO 3 (L=210m, e= 100mm) 22 24/08/18 14/09/18 - - - - - - - - - - - - - - - - - - - - - -

4.3 Geotextil no tejido de 270 g/m2 556.50 25.30 22 22 24/08/18 14/09/18 X X X X X X X X X X X X X X X X X X X X X X

4.4 Geocelda e=100 mm 519.75 23.63 22 22 24/08/18 14/09/18 X X X X X X X X X X X X X X X X X X X X X X

4.0 POZA PARA CONTROL DE EROSION Y SEDIMENTOS (L=1.5mx1.0mx1.5m, e=150mm, 7 15/09/18 21/09/18 - - - -
Ø=450mm)
4.3 Tubería de HDPE de pared doble no perforada de 450 mm 15.75 2.25 7 7 15/09/18 21/09/18 X X X X

4.5 Geotextil no tejido de 270 g/m2 26.25 3.75 7 7 15/09/18 21/09/18 X X X X

4.3 Geocelda e=150 mm 31.50 4.50 7 7 15/09/18 21/09/18 X X X X

4.0 INSTALACIONES MECÁNICAS 40 01/08/18 30/08/18 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

4.1 Sistema de Bombeo 1.00 0.03 30 30 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Tubería de acero al carbono, Sch40, BW, ASTM A-53 GR B, sin costura - diámetro 3" 3.00 0.11 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Tubería de acero al carbono, Sch 40, BW, ASTM A-53 GR B, sin costura - diámetro 2" 5.00 0.18 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Cople, THRD 3000LB FS, ASTM A-105, diámetro de 1" 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Brida Slip On, Tipo RF, AC ASTM A-105, ANSI B16.5, CL-300, diámetro de 3" 8.00 0.29 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Codo 90°, SW 3000LB FS, ASTM A-105, diámetro 2" 3.00 0.11 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Codo 45°, SW 3000LB FS, ASTM A-105, diámetro 2" 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Codo 90° ASME B16.9, 5D, BW, Sch 40, ASTM A234 WPB sin costura, diámetro 3" 2.00 0.07 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Tee SW 3000 LB, FS, ASTM A-105, 2"x2" 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Tee THRD 3000 LB, ASTM A-105, 1"x1" 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Unión universal SW 3000LB FS, ASTM A-105, diámetro 2" 2.00 0.07 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Sockolet, 3000 LB FS, ASTM A-105, 3"x2" 2.00 0.07 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Bushing, RED. THRD 3000LB, ASTM A-105, 1"x1/2" 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Empaquetadura plana para bridas RF, material: PTFE con aglutinante sintético, ASME
B16.21, CL-300 ASME B16.5, espesor de 3mm (1/8"), diámetro 3" 7.00 0.25 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

(8) Espárrago ASTM A193 Gr B7, Clase 2A, con dos tuercas hexagonales clase pesada
ASTM A 194 Gr 2H Cl-2B y arandelas, 3/4" x 108 mm 6.00 0.21 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Niple Acero al carbono ASTM A-53 GR B, sin costura, SCH 40, diámetro 2" (100 mm 6.00 0.21 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Niple Acero al carbono ASTM A-53 GR B, sin costura, SCH 40, diámetro 1" (100 mm 2.00 0.07 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Niple Acero al carbono ASTM A-53 GR B, sin costura, SCH 40, diámetro 1" (50 mm L 2.00 0.07 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Plug MNPT, THRD, diámetro 1" 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Válvula de Mariposa, CL-300 STD, LUG 316 TRIM HNDL, diámetro 3" 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Válvula check, CL-300 RF STL, LUG DR THRU 316 TRIM, diámetro 3" 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Válvula de bola, roscada, 800 LB SW, diámetro 1" 2.00 0.07 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Válvula de bola, roscada, 800 LB SW, diámetro 2" 2.00 0.07 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Bomba sumergible multietápica, ADT 234, 28 kW, 460V/3f/60Hz , caudal de 24 m3/h 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X

4.2 Pipeline

Tubería de acero al carbono, Sch40, BW, ASTM A-53 GR B, sin costura - diámetro 3" 179.00 6.63 30 27 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X

TRIMMED Codo 45° ASME B16.9, 5D, BW, Sch 40, ASTM A234 WPB sin costura (7.81°) 1.00 0.04 30 27 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X

TRIMMED Codo 45° ASME B16.9, 5D, BW, Sch 40, ASTM A234 WPB sin costura (33.10° 1.00 0.04 30 27 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X

TRIMMED Codo 45° ASME B16.9, 5D, BW, Sch 40, ASTM A234 WPB sin costura (36.61° 1.00 0.04 30 27 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X

TRIMMED Codo 45° ASME B16.9, 5D, BW, Sch 40, ASTM A234 WPB sin costura (21.67° 1.00 0.04 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Brida Slip On, Tipo RF, AC ASTM A-105, ANSI B16.5, CL-300, diámetro de 3" 8.00 0.32 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

(8) Espárrago ASTM A193 Gr B7, Clase 2A, con dos tuercas hexagonales clase pesad 8.00 0.32 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Tubería de ɸ3", HDPE ASTM F714 - PE100, SDR 7.4, diámetro IPS, 322.00 12.88 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Tubería de ɸ3", HDPE ASTM F714 - PE100, SDR 11, diámetro IPS 1,150.00 46.00 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Flange Adapter, HDPE PE100, SDR 7.4 9.00 0.36 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Flange Adapter, HDPE PE100, SDR 9 1.00 0.04 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Flange Adapter, HDPE PE100, SDR 11 3.00 0.12 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Brida lap joint, Tipo RF, AC ASTM A-105, ANSI B16.5, CL-300, diámetro de 3" 9.00 0.36 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Brida lap joint, Tipo RF, AC ASTM A-105, ANSI B16.5, CL-150, diámetro de 3" 4.00 0.16 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Brida Slip On, Tipo RF, AC ASTM A-105, ANSI B16.5, CL-150, diámetro de 3" 2.00 0.08 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

(4) Espárrago ASTM A193 Gr B7, Clase 2A, con dos tuercas hexagonales clase pesad 3.00 0.12 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Empaquetadura plana para bridas RF, material: PTFE con aglutinante sintético, ASME 6.00 0.24 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Empaquetadura plana para bridas RF, material: PTFE con aglutinante sintético, ASME 2.00 0.08 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Niple Acero al carbono ASTM A-53 GR B, sin costura, SCH 40, diámetro 3" (300 mm 4.00 0.16 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Niple Acero al carbono ASTM A-53 GR B, sin costura, SCH 40, diámetro 1" (300 mm 4.00 0.16 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Sockolet, 3000 # FS, ASTM A-105, 3"x1" 4.00 0.16 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Válvula de bola, roscada, 800 LB SW, diámetro 1" 8.00 0.32 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

Válvula de venteo 16 bar, diámetro 1" 4.00 0.16 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X

4.0 PAD DE LIXIVIACION FASE 3B

SECTOR 1 - PAD 3B ZONA ESTE 40 19/09/18 30/10/18

REVESTIMIENTO 40 19/09/18 28/10/18

4.3.2.3. Instalación de geomembrana LLDPE SST de 2 mm 54,012.00 1,350.30 40 40 19/09/18 28/10/18


4
COLECCIÓN 40 05/10/18 30/10/18

Copla partida para tubería de HDPE de pared doble de ϕ450 mm 3.00 0.12 26 26 05/10/18 30/10/18

Reducción para tuberia de HDPE de pared doble de ϕ450 a 300 mm 3.00 0.12 26 26 05/10/18 30/10/18

4.3.2.4. Instalación de tubería de HDPE de pared doble perforada de 300 mm 466.20 17.93 26 26 05/10/18 30/10/18
1
Tapa para tubería de HDPE de pared doble de ϕ300 mm 4.00 0.15 26 26 05/10/18 30/10/18

Copla partida para tubería de HDPE de pared doble de ϕ300 mm 147.50 5.67 26 26 05/10/18 30/10/18

Codos 30° para tubería de HDPE de pared doble de ϕ300 mm 6.00 0.23 26 26 05/10/18 30/10/18

Reducción para tuberia de HDPE de pared doble de ϕ300 a 200 mm 2.00 0.08 26 26 05/10/18 30/10/18

4.3.2.4. Instalación de tubería de HDPE de pared doble perforada de 200 mm 207.90 8.00 26 26 05/10/18 30/10/18
2
Tapa para tubería de HDPE de pared doble de ϕ200 mm 4.00 0.15 26 26 05/10/18 30/10/18

Copla partida para tubería de HDPE de pared doble de ϕ200 mm 60.00 2.31 26 26 05/10/18 30/10/18

4.3.2.4. Instalación de tubería de HDPE de pared doble perforada de 100 mm 2,583.00 99.35 26 26 05/10/18 30/10/18
3
Tapa para tubería de HDPE de pared doble de ϕ100 mm 50.00 1.92 26 26 05/10/18 30/10/18

Copla partida para tubería de HDPE de pared doble de ϕ100 mm 498.00 19.15 26 26 05/10/18 30/10/18

Instalación de yee para tubería de HDPE de pared doble de 300x300x300 mm 1.00 0.04 26 26 05/10/18 30/10/18

Instalación de yee para tubería de HDPE de pared doble de 300x300x200 mm 1.00 0.04 26 26 05/10/18 30/10/18

Instalación de yee para tubería de HDPE de pared doble de 300x300x100 mm 25.00 0.96 26 26 05/10/18 30/10/18

Instalación de yee para tubería de HDPE de pared doble de 200x200x100 mm 10.00 0.38 26 26 05/10/18 30/10/18

Instalación de yee para tubería de HDPE de pared doble de 100x100x100 mm 3.00 0.12 26 26 05/10/18 30/10/18

Preparación e instalación de bota de HDPE de ϕ300 mm 3.00 0.12 26 26 05/10/18 30/10/18

SECTOR 2 - PAD 3B ZONA OESTE 40 20/08/18 04/10/18 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

REVESTIMIENTO 40 20/08/18 26/09/18 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

4.3.3.3. Instalación de geomembrana LLDPE SST de 2 mm 54,012.00 1,421.37 38 38 20/08/18 26/09/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X


4
COLECCIÓN 40 26/08/18 04/10/18 - - - - - - - - - - - - - - - - - - - - - - - -

Copla partida para tubería de HDPE de pared doble de ϕ450 mm 3.00 0.08 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X

Reducción para tuberia de HDPE de pared doble de ϕ450 a 300 mm 3.00 0.08 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X

4.3.3.4. Instalación de tubería de HDPE de pared doble perforada de 300 mm 466.20 11.66 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X
1
Tapa para tubería de HDPE de pared doble de ϕ300 mm 4.00 0.10 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X

Copla partida para tubería de HDPE de pared doble de ϕ300 mm 147.50 3.69 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X

Codos 30° para tubería de HDPE de pared doble de ϕ300 mm 6.00 0.15 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X

Reducción para tuberia de HDPE de pared doble de ϕ300 a 200 mm 2.00 0.05 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X

4.3.3.4. Instalación de tubería de HDPE de pared doble perforada de 200 mm 207.90 5.20 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X
2
Tapa para tubería de HDPE de pared doble de ϕ200 mm 4.00 0.10 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X

Copla partida para tubería de HDPE de pared doble de ϕ200 mm 60.00 1.50 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X

4.3.3.4. Instalación de tubería de HDPE de pared doble perforada de 100 mm 2,583.00 64.58 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X
3
Tapa para tubería de HDPE de pared doble de ϕ100 mm 50.00 1.25 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X

Copla partida para tubería de HDPE de pared doble de ϕ100 mm 498.00 12.45 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X

Instalación de yee para tubería de HDPE de pared doble de 300x300x300 mm 1.00 0.03 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X

Instalación de yee para tubería de HDPE de pared doble de 300x300x200 mm 1.00 0.03 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X

Instalación de yee para tubería de HDPE de pared doble de 300x300x100 mm 24.00 0.60 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X

Instalación de yee para tubería de HDPE de pared doble de 200x200x100 mm 10.00 0.25 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X

Instalación de yee para tubería de HDPE de pared doble de 100x100x100 mm 3.00 0.08 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X

Preparación e instalación de bota de HDPE de ϕ300 mm 3.00 0.08 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X

MANEJO DE DRENAJE SUPERFICIAL 30 26/09/18 31/10/18

CANAL DE CORONACION OESTE - TRAMO 2 0 26/09/18 01/10/18

4.3.5.1. Instalación de geotextil no tejido de 270 g/m2 992.25 165.38 6 6 26/09/18 01/10/18
3
4.3.5.1. Instalación de geocelda e=100 mm 959.70 159.95 6 6 26/09/18 01/10/18
4
CANAL DE CORONACION ESTE - TRAMO 1 0 02/10/18 31/10/18

4.3.5.3. Instalación de geotextil no tejido de 270 g/m2 1,639.05 54.64 30 30 02/10/18 31/10/18
3
4.3.5.3. Instalación de geocelda e=100 mm 1,583.40 52.78 30 30 02/10/18 31/10/18
4
19-Sep

20-Sep

21-Sep

22-Sep

23-Sep

24-Sep

25-Sep

26-Sep

27-Sep

28-Sep

29-Sep

30-Sep

10-Nov

11-Nov

12-Nov

13-Nov

14-Nov

15-Nov

16-Nov

17-Nov

18-Nov

19-Nov

20-Nov

21-Nov

22-Nov

23-Nov

24-Nov

25-Nov

26-Nov

27-Nov

28-Nov

29-Nov

30-Nov

10-Dec

11-Dec

12-Dec

13-Dec

14-Dec

15-Dec

16-Dec

17-Dec

18-Dec

19-Dec

20-Dec

21-Dec
10-Oct

11-Oct

12-Oct

13-Oct

14-Oct

15-Oct

16-Oct

17-Oct

18-Oct

19-Oct

20-Oct

21-Oct

22-Oct

23-Oct

24-Oct

25-Oct

26-Oct

27-Oct

28-Oct

29-Oct

30-Oct

31-Oct

1-Nov

2-Nov

3-Nov

4-Nov

5-Nov

6-Nov

7-Nov

8-Nov

9-Nov

1-Dec

2-Dec

3-Dec

4-Dec

5-Dec

6-Dec

7-Dec

8-Dec

9-Dec
1-Oct

2-Oct

3-Oct

4-Oct

5-Oct

6-Oct

7-Oct

8-Oct

9-Oct

Fin de Obra
- - - 16 Ene 12

X X X

X X X Fin de Obra
16 Ene 12
X X X

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Fin de Obra
16 Ene 12
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Fin de Obra
- - - - - - - - - - - - - - - - - - - - - - - - - - 16 Ene 12

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

- - - - - - - - - - - - - - - -

- - - - - - - -

X X X X X X X X

- - - - - - - - - - - - - - - -

X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - -

X X X X X X

X X X X X X

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
20-May

21-May

22-May

23-May

24-May

25-May

26-May

27-May

28-May

29-May

30-May

31-May

10-Jun

11-Jun

12-Jun

13-Jun

14-Jun

15-Jun

16-Jun

17-Jun

18-Jun

19-Jun

20-Jun
1-Jun

2-Jun

3-Jun

4-Jun

5-Jun

6-Jun

7-Jun

8-Jun

9-Jun
Item Actividad Metrado Estimado Avance Diario Días Calendario Días Útiles Fecha Inicio Fecha Fin

CONSTRUCCIÓN DEL PAD FASE 3B Y DEPÓSITO DE DESMONTE NORTE

INICIO CONSTRUCCION - 1 1 22/05/18 22/05/18 X Inicio


Construcción
22 May 18
2.0 DEPÓSITO DE DESMONTE NORTE

2.0 SUBDRENAJE

2.0 BOTADERO NORTE OESTE 26/06/18 20/08/18

2.9 Tubería de HDPE sólida SDR 21 de 300 mm (llegada hacia poza de subdrenaje) 14.70 0.26 56 56 26/06/18 20/08/18

Copla especial para transición de tuberia de HDPE de pared doble no perforada a tuberia
sólida SDR 21 de ø300 mm
1.00 0.02 56 56 26/06/18 20/08/18

2.10 Tubería de HDPE de pared doble perforada de ø300 mm 576.45 10.29 56 56 26/06/18 20/08/18

Codos 30° para tubería de HDPE de pared doble de ϕ300 mm 3.00 0.05 56 56 26/06/18 20/08/18

Codos 45° para tubería de HDPE de pared doble de ϕ300 mm 5.00 0.09 56 56 26/06/18 20/08/18

Copla partida para tubería de HDPE de pared doble de ϕ300 mm 128.00 2.29 56 56 26/06/18 20/08/18

2.11 Tubería de HDPE de pared doble perforada de ø100 mm 1,071.00 19.13 56 56 26/06/18 20/08/18

Copla partida para tubería de HDPE de pared doble de ϕ100 mm 200.00 3.57 56 56 26/06/18 20/08/18

Yee para tubería de HDPE de pared doble de 300X300X300 mm 2.00 0.04 56 56 26/06/18 20/08/18

Yee para tubería de HDPE de pared doble de 300X300X100 mm 6.00 0.11 56 56 26/06/18 20/08/18

Yee para tubería de HDPE de pared doble de 100X100X100 mm 2.00 0.04 56 56 26/06/18 20/08/18

2.13 Geotextil no tejido de 270 gr/m2 2,787.75 49.78 56 56 26/06/18 20/08/18

2.0 BOTADERO NORTE - ESTE 03/07/18 17/08/18

2.9 Tubería de HDPE de pared doble perforada de ø300 mm 576.45 12.53 46 46 03/07/18 17/08/18

Codos 30° para tubería de HDPE de pared doble de ϕ300 mm 3.00 0.07 46 46 03/07/18 17/08/18

Codos 45° para tubería de HDPE de pared doble de ϕ300 mm 5.00 0.11 46 46 03/07/18 17/08/18

Copla partida para tubería de HDPE de pared doble de ϕ300 mm 128.00 2.78 46 46 03/07/18 17/08/18

2.10 Tubería de HDPE de pared doble perforada de ø100 mm 1,071.00 23.28 46 46 03/07/18 17/08/18

Copla partida para tubería de HDPE de pared doble de ϕ100 mm 200.00 4.35 46 46 03/07/18 17/08/18

Yee para tubería de HDPE de pared doble de 300X300X300 mm 2.00 0.04 46 46 03/07/18 17/08/18

Yee para tubería de HDPE de pared doble de 300X300X100 mm 5.00 0.11 46 46 03/07/18 17/08/18

Yee para tubería de HDPE de pared doble de 100X100X100 mm 2.00 0.04 46 46 03/07/18 17/08/18

2.12 Geotextil no tejido de 270 gr/m2 2,787.75 60.60 46 46 03/07/18 17/08/18

3.0 POZA DE SUBDRENAJE 24/06/18 31/07/18

3.5 Gavión caja 5.0x1.0x1.0 m (incluye grava de relleno) 11.00 0.29 38 38 24/06/18 31/07/18

3.6 Geocompuesto de arcilla GCL 236.25 6.22 38 38 24/06/18 31/07/18

3.7 Geomembrana HDPE lisa de 1,5 mm 1,191.75 31.36 38 38 24/06/18 31/07/18

3.9 Geotextil no tejido de 270 g/m2 285.60 7.52 38 38 24/06/18 31/07/18

3.10 Geocelda e=100 mm 273.00 7.18 38 38 24/06/18 31/07/18

3.0 MANEJO DE DRENAJE SUPERFICIAL

3.0 CANAL DE CORONACIÓN ESTE TRAMO 2 03/07/18 14/08/18

4.2.5.1. Geotextil no tejido de 270 g/m2 1,270.50 29.55 43 43 03/07/18 14/08/18


2.3
4.2.5.1. Geocelda e=100 mm 1,170.75 27.23 43 43 03/07/18 14/08/18
2.4
3.0 ALCANTARILLA (L=1.5mx1.0mx1.5m, e=150mm, Ø=450mm) 15/08/18 21/08/18

3.8 Tubería de HDPE de pared doble no perforada de 450 mm 47.25 6.75 7 7 15/08/18 21/08/18

3.9 Geotextil no tejido de 270 g/m2 26.25 3.75 7 7 15/08/18 21/08/18

3.10 Geocelda e=150 mm 31.50 4.50 7 7 15/08/18 21/08/18

3.0 CANAL DE CORONACION OESTE TRAMO 3 L= 210 m

4.0 ESTRUCTURA DE CAPTACIÓN OESTE 1A (L=2.4mx1.5mx1.8m, e=150mm)

4.0 CANAL DE CORONACIÓN OESTE - TRAMO 3 (L=210m, e= 100mm) 22 24/08/18 14/09/18

4.3 Geotextil no tejido de 270 g/m2 556.50 25.30 22 22 24/08/18 14/09/18

4.4 Geocelda e=100 mm 519.75 23.63 22 22 24/08/18 14/09/18

4.0 POZA PARA CONTROL DE EROSION Y SEDIMENTOS (L=1.5mx1.0mx1.5m, e=150mm, 7 15/09/18 21/09/18
Ø=450mm)
4.3 Tubería de HDPE de pared doble no perforada de 450 mm 15.75 2.25 7 7 15/09/18 21/09/18

4.5 Geotextil no tejido de 270 g/m2 26.25 3.75 7 7 15/09/18 21/09/18

4.3 Geocelda e=150 mm 31.50 4.50 7 7 15/09/18 21/09/18

4.0 INSTALACIONES MECÁNICAS 40 01/08/18 30/08/18

4.1 Sistema de Bombeo 1.00 0.03 30 30 01/08/18 30/08/18

Tubería de acero al carbono, Sch40, BW, ASTM A-53 GR B, sin costura - diámetro 3" 3.00 0.11 30 28 01/08/18 30/08/18

Tubería de acero al carbono, Sch 40, BW, ASTM A-53 GR B, sin costura - diámetro 2" 5.00 0.18 30 28 01/08/18 30/08/18

Cople, THRD 3000LB FS, ASTM A-105, diámetro de 1" 1.00 0.04 30 28 01/08/18 30/08/18

Brida Slip On, Tipo RF, AC ASTM A-105, ANSI B16.5, CL-300, diámetro de 3" 8.00 0.29 30 28 01/08/18 30/08/18

Codo 90°, SW 3000LB FS, ASTM A-105, diámetro 2" 3.00 0.11 30 28 01/08/18 30/08/18

Codo 45°, SW 3000LB FS, ASTM A-105, diámetro 2" 1.00 0.04 30 28 01/08/18 30/08/18

Codo 90° ASME B16.9, 5D, BW, Sch 40, ASTM A234 WPB sin costura, diámetro 3" 2.00 0.07 30 28 01/08/18 30/08/18

Tee SW 3000 LB, FS, ASTM A-105, 2"x2" 1.00 0.04 30 28 01/08/18 30/08/18

Tee THRD 3000 LB, ASTM A-105, 1"x1" 1.00 0.04 30 28 01/08/18 30/08/18

Unión universal SW 3000LB FS, ASTM A-105, diámetro 2" 2.00 0.07 30 28 01/08/18 30/08/18

Sockolet, 3000 LB FS, ASTM A-105, 3"x2" 2.00 0.07 30 28 01/08/18 30/08/18

Bushing, RED. THRD 3000LB, ASTM A-105, 1"x1/2" 1.00 0.04 30 28 01/08/18 30/08/18

Empaquetadura plana para bridas RF, material: PTFE con aglutinante sintético, ASME
B16.21, CL-300 ASME B16.5, espesor de 3mm (1/8"), diámetro 3" 7.00 0.25 30 28 01/08/18 30/08/18

(8) Espárrago ASTM A193 Gr B7, Clase 2A, con dos tuercas hexagonales clase pesada 6.00 0.21 30 28 01/08/18 30/08/18
ASTM A 194 Gr 2H Cl-2B y arandelas, 3/4" x 108 mm

Niple Acero al carbono ASTM A-53 GR B, sin costura, SCH 40, diámetro 2" (100 mm LG) 6.00 0.21 30 28 01/08/18 30/08/18

Niple Acero al carbono ASTM A-53 GR B, sin costura, SCH 40, diámetro 1" (100 mm LG) 2.00 0.07 30 28 01/08/18 30/08/18

Niple Acero al carbono ASTM A-53 GR B, sin costura, SCH 40, diámetro 1" (50 mm LG) 2.00 0.07 30 28 01/08/18 30/08/18

Plug MNPT, THRD, diámetro 1" 1.00 0.04 30 28 01/08/18 30/08/18

Válvula de Mariposa, CL-300 STD, LUG 316 TRIM HNDL, diámetro 3" 1.00 0.04 30 28 01/08/18 30/08/18

Válvula check, CL-300 RF STL, LUG DR THRU 316 TRIM, diámetro 3" 1.00 0.04 30 28 01/08/18 30/08/18

Válvula de bola, roscada, 800 LB SW, diámetro 1" 2.00 0.07 30 28 01/08/18 30/08/18

Válvula de bola, roscada, 800 LB SW, diámetro 2" 2.00 0.07 30 28 01/08/18 30/08/18

Bomba sumergible multietápica, ADT 234, 28 kW, 460V/3f/60Hz , caudal de 24 m3/h 1.00 0.04 30 28 01/08/18 30/08/18

4.2 Pipeline

Tubería de acero al carbono, Sch40, BW, ASTM A-53 GR B, sin costura - diámetro 3" 179.00 6.63 30 27 02/08/18 31/08/18

TRIMMED Codo 45° ASME B16.9, 5D, BW, Sch 40, ASTM A234 WPB sin costura (7.81°), diám 1.00 0.04 30 27 02/08/18 31/08/18

TRIMMED Codo 45° ASME B16.9, 5D, BW, Sch 40, ASTM A234 WPB sin costura (33.10°), diá 1.00 0.04 30 27 02/08/18 31/08/18

TRIMMED Codo 45° ASME B16.9, 5D, BW, Sch 40, ASTM A234 WPB sin costura (36.61°), diá 1.00 0.04 30 27 02/08/18 31/08/18

TRIMMED Codo 45° ASME B16.9, 5D, BW, Sch 40, ASTM A234 WPB sin costura (21.67°), diá 1.00 0.04 30 25 02/08/18 31/08/18

Brida Slip On, Tipo RF, AC ASTM A-105, ANSI B16.5, CL-300, diámetro de 3" 8.00 0.32 30 25 02/08/18 31/08/18

(8) Espárrago ASTM A193 Gr B7, Clase 2A, con dos tuercas hexagonales clase pesada ASTM 8.00 0.32 30 25 02/08/18 31/08/18

Tubería de ɸ3", HDPE ASTM F714 - PE100, SDR 7.4, diámetro IPS, 322.00 12.88 30 25 02/08/18 31/08/18

Tubería de ɸ3", HDPE ASTM F714 - PE100, SDR 11, diámetro IPS 1,150.00 46.00 30 25 02/08/18 31/08/18

Flange Adapter, HDPE PE100, SDR 7.4 9.00 0.36 30 25 02/08/18 31/08/18

Flange Adapter, HDPE PE100, SDR 9 1.00 0.04 30 25 02/08/18 31/08/18

Flange Adapter, HDPE PE100, SDR 11 3.00 0.12 30 25 02/08/18 31/08/18

Brida lap joint, Tipo RF, AC ASTM A-105, ANSI B16.5, CL-300, diámetro de 3" 9.00 0.36 30 25 02/08/18 31/08/18

Brida lap joint, Tipo RF, AC ASTM A-105, ANSI B16.5, CL-150, diámetro de 3" 4.00 0.16 30 25 02/08/18 31/08/18

Brida Slip On, Tipo RF, AC ASTM A-105, ANSI B16.5, CL-150, diámetro de 3" 2.00 0.08 30 25 02/08/18 31/08/18

(4) Espárrago ASTM A193 Gr B7, Clase 2A, con dos tuercas hexagonales clase pesada ASTM 3.00 0.12 30 25 02/08/18 31/08/18

Empaquetadura plana para bridas RF, material: PTFE con aglutinante sintético, ASME B16.21 6.00 0.24 30 25 02/08/18 31/08/18

Empaquetadura plana para bridas RF, material: PTFE con aglutinante sintético, ASME B16.21 2.00 0.08 30 25 02/08/18 31/08/18

Niple Acero al carbono ASTM A-53 GR B, sin costura, SCH 40, diámetro 3" (300 mm LG) 4.00 0.16 30 25 02/08/18 31/08/18

Niple Acero al carbono ASTM A-53 GR B, sin costura, SCH 40, diámetro 1" (300 mm LG) 4.00 0.16 30 25 02/08/18 31/08/18

Sockolet, 3000 # FS, ASTM A-105, 3"x1" 4.00 0.16 30 25 02/08/18 31/08/18

Válvula de bola, roscada, 800 LB SW, diámetro 1" 8.00 0.32 30 25 02/08/18 31/08/18

Válvula de venteo 16 bar, diámetro 1" 4.00 0.16 30 25 02/08/18 31/08/18

4.0 PAD DE LIXIVIACION FASE 3B

SECTOR 1 - PAD 3B ZONA ESTE 40 19/09/18 30/10/18

REVESTIMIENTO 40 19/09/18 28/10/18

4.3.2.3. Instalación de geomembrana LLDPE SST de 2 mm 54,012.00 1,350.30 40 40 19/09/18 28/10/18


4
COLECCIÓN 40 05/10/18 30/10/18

Copla partida para tubería de HDPE de pared doble de ϕ450 mm 3.00 0.12 26 26 05/10/18 30/10/18

Reducción para tuberia de HDPE de pared doble de ϕ450 a 300 mm 3.00 0.12 26 26 05/10/18 30/10/18

4.3.2.4. Instalación de tubería de HDPE de pared doble perforada de 300 mm 466.20 17.93 26 26 05/10/18 30/10/18
1
Tapa para tubería de HDPE de pared doble de ϕ300 mm 4.00 0.15 26 26 05/10/18 30/10/18

Copla partida para tubería de HDPE de pared doble de ϕ300 mm 147.50 5.67 26 26 05/10/18 30/10/18

Codos 30° para tubería de HDPE de pared doble de ϕ300 mm 6.00 0.23 26 26 05/10/18 30/10/18

Reducción para tuberia de HDPE de pared doble de ϕ300 a 200 mm 2.00 0.08 26 26 05/10/18 30/10/18

4.3.2.4. Instalación de tubería de HDPE de pared doble perforada de 200 mm 207.90 8.00 26 26 05/10/18 30/10/18
2
Tapa para tubería de HDPE de pared doble de ϕ200 mm 4.00 0.15 26 26 05/10/18 30/10/18

Copla partida para tubería de HDPE de pared doble de ϕ200 mm 60.00 2.31 26 26 05/10/18 30/10/18

4.3.2.4. Instalación de tubería de HDPE de pared doble perforada de 100 mm 2,583.00 99.35 26 26 05/10/18 30/10/18
3
Tapa para tubería de HDPE de pared doble de ϕ100 mm 50.00 1.92 26 26 05/10/18 30/10/18

Copla partida para tubería de HDPE de pared doble de ϕ100 mm 498.00 19.15 26 26 05/10/18 30/10/18

Instalación de yee para tubería de HDPE de pared doble de 300x300x300 mm 1.00 0.04 26 26 05/10/18 30/10/18

Instalación de yee para tubería de HDPE de pared doble de 300x300x200 mm 1.00 0.04 26 26 05/10/18 30/10/18

Instalación de yee para tubería de HDPE de pared doble de 300x300x100 mm 25.00 0.96 26 26 05/10/18 30/10/18

Instalación de yee para tubería de HDPE de pared doble de 200x200x100 mm 10.00 0.38 26 26 05/10/18 30/10/18

Instalación de yee para tubería de HDPE de pared doble de 100x100x100 mm 3.00 0.12 26 26 05/10/18 30/10/18

Preparación e instalación de bota de HDPE de ϕ300 mm 3.00 0.12 26 26 05/10/18 30/10/18

SECTOR 2 - PAD 3B ZONA OESTE 40 20/08/18 04/10/18

REVESTIMIENTO 40 20/08/18 26/09/18

4.3.3.3. Instalación de geomembrana LLDPE SST de 2 mm 54,012.00 1,421.37 38 38 20/08/18 26/09/18


4
COLECCIÓN 40 26/08/18 04/10/18

Copla partida para tubería de HDPE de pared doble de ϕ450 mm 3.00 0.08 40 40 26/08/18 04/10/18

Reducción para tuberia de HDPE de pared doble de ϕ450 a 300 mm 3.00 0.08 40 40 26/08/18 04/10/18

4.3.3.4. Instalación de tubería de HDPE de pared doble perforada de 300 mm 466.20 11.66 40 40 26/08/18 04/10/18
1
Tapa para tubería de HDPE de pared doble de ϕ300 mm 4.00 0.10 40 40 26/08/18 04/10/18

Copla partida para tubería de HDPE de pared doble de ϕ300 mm 147.50 3.69 40 40 26/08/18 04/10/18

Codos 30° para tubería de HDPE de pared doble de ϕ300 mm 6.00 0.15 40 40 26/08/18 04/10/18

Reducción para tuberia de HDPE de pared doble de ϕ300 a 200 mm 2.00 0.05 40 40 26/08/18 04/10/18

4.3.3.4. Instalación de tubería de HDPE de pared doble perforada de 200 mm 207.90 5.20 40 40 26/08/18 04/10/18
2
Tapa para tubería de HDPE de pared doble de ϕ200 mm 4.00 0.10 40 40 26/08/18 04/10/18

Copla partida para tubería de HDPE de pared doble de ϕ200 mm 60.00 1.50 40 40 26/08/18 04/10/18

4.3.3.4. Instalación de tubería de HDPE de pared doble perforada de 100 mm 2,583.00 64.58 40 40 26/08/18 04/10/18
3
Tapa para tubería de HDPE de pared doble de ϕ100 mm 50.00 1.25 40 40 26/08/18 04/10/18

Copla partida para tubería de HDPE de pared doble de ϕ100 mm 498.00 12.45 40 40 26/08/18 04/10/18

Instalación de yee para tubería de HDPE de pared doble de 300x300x300 mm 1.00 0.03 40 40 26/08/18 04/10/18

Instalación de yee para tubería de HDPE de pared doble de 300x300x200 mm 1.00 0.03 40 40 26/08/18 04/10/18

Instalación de yee para tubería de HDPE de pared doble de 300x300x100 mm 24.00 0.60 40 40 26/08/18 04/10/18

Instalación de yee para tubería de HDPE de pared doble de 200x200x100 mm 10.00 0.25 40 40 26/08/18 04/10/18

Instalación de yee para tubería de HDPE de pared doble de 100x100x100 mm 3.00 0.08 40 40 26/08/18 04/10/18

Preparación e instalación de bota de HDPE de ϕ300 mm 3.00 0.08 40 40 26/08/18 04/10/18

MANEJO DE DRENAJE SUPERFICIAL 30 26/09/18 31/10/18

CANAL DE CORONACION OESTE - TRAMO 2 0 26/09/18 01/10/18

4.3.5.1. Instalación de geotextil no tejido de 270 g/m2 992.25 165.38 6 6 26/09/18 01/10/18
3
4.3.5.1. Instalación de geocelda e=100 mm 959.70 159.95 6 6 26/09/18 01/10/18
4
CANAL DE CORONACION ESTE - TRAMO 1 0 02/10/18 31/10/18

4.3.5.3. Instalación de geotextil no tejido de 270 g/m2 1,639.05 54.64 30 30 02/10/18 31/10/18
3
4.3.5.3. Instalación de geocelda e=100 mm 1,583.40 52.78 30 30 02/10/18 31/10/18
4