CONSTRUCCIÓN DEL PAD FASE 3B Y DEPÓSITO DE DESMONTE NORTE 26-Apr-18 30-Nov-18 219 137893.75
FASE DE CONSTRUCCIÓN 2-Jun-18 20-Nov-18 172 135993.75
OBRAS PRELIMINARES 2-Jun-18 19-Nov-18 171 4237.59
4.1.1 Trazo y replanteo topográfico inicial 2-Jun-18 6-Jun-18 5 0
4.1.2 Trazo y replanteo durante construcción 7-Jun-18 19-Nov-18 166 0
4.1.3 Mantenimiento de vías 7-Jun-18 19-Nov-18 166 4237.59
DEPÓSITO DE DESMONTE NORTE 7-Jun-18 4-Nov-18 151 45780.12
MOVIMIENTO DE TIERRAS 7-Jun-18 30-Aug-18 85 30747.93
4.2.1.1 Apertura de accesos 7-Jun-18 14-Jun-18 8 691.43
BOTADERO NORTE - FASE 1 12-Jun-18 25-Jun-18 14 6050.89
4.2.1.2.1 Corte de Material Organico e= 400 mm 12-Jun-18 14-Jun-18 3 735.39
4.2.1.2.2 Carguío y eliminacion de material orgánico (e=400 mm),D=3 km 15-Jun-18 17-Jun-18 3 1203.84
4.2.1.2.3 Corte y eliminación de material inadecuado, D=1 km 15-Jun-18 25-Jun-18 11 4111.66
BOTADERO NORTE - FASE 2 26-Jun-18 30-Aug-18 66 24005.6
4.2.1.3.1 Corte y eliminacion de material orgánico (e=400 mm),D=3 km 26-Jun-18 10-Jul-18 15 6019.22
4.2.1.3.2 Corte y acopio de material inadecuado 11-Jul-18 25-Jul-18 15 3676.95
4.2.1.3.3 Corte y eliminación de material inadecuado, D=1 km 26-Jul-18 24-Aug-18 30 11213.63
4.2.1.3.4 Relleno estructural con material propio (en berma perimetral) 12-Jul-18 30-Aug-18 50 3095.8
ACCESO HACIA POZA DE SUBDRENAJE 25-Jun-18 08-Aug-18 45 1296.86
4.2.2.1 Corte y eliminación de material inadecuado, D=1 km 25-Jun-18 29-Jun-18 5 9.07
4.2.2.2 Relleno estructural con material propio 30-Jun-18 13-Jul-18 14 1031.4
4.2.2.3 Base de rodadura (e=200 mm) 28-Jul-18 01-Aug-18 5 110.7
4.2.2.4 Relleno estructural con material propio (en berma de seguridad) 02-Aug-18 08-Aug-18 7 145.69
SUBDRENAJE 1-Jul-18 30-Aug-18 61 4553.24
BOTADERO NORTE - FASE 1 1-Jul-18 14-Jul-18 14 747.63
4.2.3.1.1 Excavación y eliminación de material para la zanja de subdrenaje, D=1 km 1-Jul-18 7-Jul-18 7 113.08
4.2.3.1.2 Cama de apoyo 2-Jul-18 8-Jul-18 7 6.18
4.2.3.1.3 Tubería de HDPE sólida SDR 21 de 300 mm (llegada hacia poza de subdrenaje) 3-Jul-18 9-Jul-18 7 81.65
4.2.3.1.4 Tubería de HDPE de pared doble perforada de ø300 mm 4-Jul-18 10-Jul-18 7 98.15
4.2.3.1.5 Tubería de HDPE de pared doble perforada de ø100 mm 5-Jul-18 11-Jul-18 7 182.36
4.2.3.1.6 Grava para subdrenaje 6-Jul-18 12-Jul-18 7 159.19
4.2.3.1.7 Geotextil no tejido de 270 gr/m2 7-Jul-18 13-Jul-18 7 37.37
4.2.3.1.8 Relleno estructural en zanja de subdrenaje con material propio 8-Jul-18 14-Jul-18 7 69.65
BOTADERO NORTE - FASE 2 15-Jul-18 30-Aug-18 47 3805.61
4.2.3.2.1 Excavación y eliminación de material para la zanja de subdrenaje, D=1 km 15-Jul-18 23-Aug-18 40 646.18
4.2.3.2.2 Cama de apoyo 16-Jul-18 24-Aug-18 40 35.33
4.2.3.2.3 Tubería de HDPE de pared doble perforada de ø300 mm 17-Jul-18 25-Aug-18 40 560.86
4.2.3.2.4 Tubería de HDPE de pared doble perforada de ø100 mm 18-Jul-18 26-Aug-18 40 1042.03
4.2.3.2.5 Grava para subdrenaje 19-Jul-18 27-Aug-18 40 909.68
4.2.3.2.6 Geotextil no tejido de 270 gr/m2 20-Jul-18 28-Aug-18 40 213.54
4.2.3.2.7 Relleno estructural en zanja de subdrenaje con material propio 22-Jul-18 30-Aug-18 40 397.99
POZA DE SUBDRENAJE 22-Jul-18 22-Aug-18 32 3724.84
4.2.4.1 Relleno estructural con material propio (incluye bermas) 22-Jul-18 06-Aug-18 16 2409.09
4.2.4.2 Excavación y eliminación en zanja de anclaje, D= 1 km 07-Aug-18 08-Aug-18 2 6.39
4.2.4.3 Suelo de baja permeabilidad, e=300 mm, D= 2,5 km 08-Aug-18 08-Aug-18 1 65.4
4.2.4.4 Suelo de baja permeabilidad en zanjas de anclaje, D= 2,5 km 09-Aug-18 09-Aug-18 1 10.07
4.2.4.5 Gavión caja 5.0x1.0x1.0 m (incluye grava de relleno) 09-Aug-18 11-Aug-18 3 173.8
4.2.4.6 Geocompuesto de arcilla GCL 10-Aug-18 14-Aug-18 5 45.04
4.2.4.7 Geomembrana HDPE lisa de 1,5 mm 11-Aug-18 15-Aug-18 5 640.57
4.2.4.8 Suelo de baja permeabilidad (en bermas perimetrales), D= 2,5 km 12-Aug-18 12-Aug-18 1 21.81
4.2.4.9 Geotextil no tejido de 270 g/m2 13-Aug-18 14-Aug-18 2 12.86
4.2.4.91 Geocelda e=100 mm 15-Aug-18 17-Aug-18 3 124.36
4.2.4.92 Concreto f'c=210 kg/cm2 16-Aug-18 19-Aug-18 4 212.07
4.2.4.93 Enrocado de protección D50=300 mm 20-Aug-18 22-Aug-18 3 3.38
MANEJO DE DRENAJE SUPERFICIAL 2-Jul-18 24-Sep-18 85 3833.39
CANAL DE CORONACION ESTE TRAMO 2 L=480 m. 2-Jul-18 04-Sep-18 65 2596.31
ESTRUCTURA DE CAPTACIÓN NORTE 2 (L=2.4mx1.5mx1.4m, e=150mm) 2-Jul-18 15-Jul-18 14 298.84
4.2.5.1.1.1 Corte y eliminación de material inadecuado, D=1 km 2-Jul-18 4-Jul-18 3 4.74
4.2.5.1.1.2 Relleno para estructuras con material propio 5-Jul-18 7-Jul-18 3 18.46
4.2.5.1.1.3 Solado de concreto f'c=100 kg/cm² 8-Jul-18 10-Jul-18 3 128.41
4.2.5.1.1.4 Acero de refuerzo fy=4200 kg/cm2 11-Jul-18 12-Jul-18 2 30.87
4.2.5.1.1.5 Encofrado y desencofrado 13-Jul-18 15-Jul-18 3 30.87
4.2.5.1.1.6 Concreto f'c=210 kg/cm2 13-Jul-18 15-Jul-18 3 81.56
4.2.5.1.1.7 Juntas de dilatación para canales de concreto, incluye material elastomérico y waterstop 13-Jul-18 15-Jul-18 3 3.93
CANAL DE CORONACIÓN ESTE - TRAMO 2 (L=480m, e= 100mm) 5-Jul-18 23-Aug-18 50 2160.9
4.2.5.1.2.1 Corte y eliminación de material inadecuado, D=1 km 5-Jul-18 19-Jul-18 15 573.48
4.2.5.1.2.2 Relleno para estructuras con material propio 17-Jul-18 21-Jul-18 5 99.62
4.2.5.1.2.3 Geotextil no tejido de 270 g/m2 20-Jul-18 29-Jul-18 10 57.18
4.2.5.1.2.4 Geocelda e=100 mm 26-Jul-18 04-Aug-18 10 533.34
4.2.5.1.2.5 Concreto f'c=210 kg/cm2 31-Jul-18 23-Aug-18 24 897.28
ALCANTARILLA (L=1.5mx1.0mx1.5m, e=150mm, Ø=450mm) 24-Aug-18 04-Sep-18 12 136.57
4.2.5.1.3.1 Corte y eliminación de material inadecuado, D=1 km 24-Aug-18 25-Aug-18 2 6.63
4.2.5.1.3.2 Cama de apoyo 26-Aug-18 27-Aug-18 2 0.9
4.2.5.1.3.3 Tubería de HDPE de pared doble no perforada de 450 mm 28-Aug-18 29-Aug-18 2 30.56
4.2.5.1.3.4 Geotextil no tejido de 270 g/m2 30-Aug-18 31-Aug-18 2 1.18
4.2.5.1.3.5 Geocelda e=150 mm 01-Sep-18 02-Sep-18 2 14.35
4.2.5.1.3.6 Concreto f'c=210 kg/cm2 01-Sep-18 02-Sep-18 2 81.54
4.2.5.1.3.7 Enrocado de protección D50=300 mm, D=5,1 km 03-Sep-18 04-Sep-18 2 1.41
CANAL DE CORONACION OESTE TRAMO 3 L= 210 m 30-Aug-18 24-Sep-18 26 1237.08
ESTRUCTURA DE CAPTACIÓN OESTE 1A (L=2.4mx1.5mx1.8m, e=150mm) 30-Aug-18 06-Sep-18 8 306.12
4.2.5.2.1.1 Corte y eliminación de material inadecuado, D=1 km 30-Aug-18 31-Aug-18 2 4.74
4.2.5.2.1.2 Relleno para estructuras con material propio 01-Sep-18 04-Sep-18 4 18.46
4.2.5.2.1.3 Solado de concreto f'c=100 kg/cm² 04-Sep-18 04-Sep-18 1 128.41
4.2.5.2.1.4 Acero de refuerzo fy=4200 kg/cm2 04-Sep-18 05-Sep-18 2 30.87
4.2.5.2.1.5 Encofrado y desencofrado 05-Sep-18 06-Sep-18 2 38.15
4.2.5.2.1.6 Concreto f'c=210 kg/cm2 05-Sep-18 06-Sep-18 2 81.56
4.2.5.2.1.7 Juntas de dilatación para canales de concreto, incluye material elastomérico y waterstop 06-Sep-18 06-Sep-18 1 3.93
CANAL DE CORONACIÓN OESTE - TRAMO 3 (L=210m, e= 100mm) 01-Sep-18 24-Sep-18 24 805.35
4.2.5.2.2.1 Corte y eliminación de material inadecuado, D=1 km 01-Sep-18 05-Sep-18 5 65.4
4.2.5.2.2.2 Relleno para estructuras con material propio 06-Sep-18 08-Sep-18 3 29.51
4.2.5.2.2.3 Geotextil no tejido de 270 g/m2 09-Sep-18 13-Sep-18 5 25.04
4.2.5.2.2.4 Geocelda e=100 mm 14-Sep-18 18-Sep-18 5 236.77
4.2.5.2.2.5 Concreto f'c=210 kg/cm2 14-Sep-18 24-Sep-18 11 448.63
POZA PARA CONTROL DE EROSION Y SEDIMENTOS (L=1.5mx1.0mx1.5m, e=150mm, Ø=450mm) 06-Sep-18 18-Sep-18 13 125.61
4.2.5.2.3.1 Corte y eliminación de material inadecuado, D=1 km 06-Sep-18 08-Sep-18 3 12.33
4.2.5.2.3.2 Cama de apoyo 09-Sep-18 10-Sep-18 2 0.9
4.2.5.2.3.3 Tubería de HDPE de pared doble no perforada de 450 mm 11-Sep-18 12-Sep-18 2 10.19
4.2.5.2.3.4 Relleno para estructuras con material propio 13-Sep-18 14-Sep-18 2 3.69
4.2.5.2.3.5 Geotextil no tejido de 270 g/m2 15-Sep-18 17-Sep-18 3 1.18
4.2.5.2.3.6 Geocelda e=150 mm 15-Sep-18 17-Sep-18 3 14.35
4.2.5.2.3.7 Concreto f'c=210 kg/cm2 15-Sep-18 17-Sep-18 3 81.56
4.2.5.2.3.8 Enrocado de protección D50=300 mm, D=5,1 km 18-Sep-18 18-Sep-18 1 1.41
INSTRUMENTACIÓN GEOTÉCNICA 4-Oct-18 2-Nov-18 30 34.44
4.2.6.1 Inclinómetro Vertical 4-Oct-18 18-Oct-18 15 17.22
4.2.6.2 Piezómetro Hidráulico 19-Oct-18 2-Nov-18 15 17.22
INSTALACIONES MECÁNICAS 4-Oct-18 4-Nov-18 32 1589.42
4.2.7.1 Sistema de Bombeo 4-Oct-18 2-Nov-18 30 576.77
4.2.7.2 Pipeline 6-Oct-18 4-Nov-18 30 1012.65
PAD DE LIXIVIACIÓN FASE 3B 8-Jul-18 20-Nov-18 136 85976.04
APERTURA ACCESOS 8-Jul-18 12-Jul-18 5 691.43
4.3.1 Apertura de accesos 8-Jul-18 12-Jul-18 5 691.43
SECTOR 1 - PAD 3B ZONA ESTE 13-Jul-18 20-Nov-18 131 38158.69
NIVELACIÓN Y ACCESO PERIMETRAL 13-Jul-18 4-Oct-18 84 15380.59
4.3.2.1.1 Corte simple, selección y acopio de material para ser usado como relleno estructural 13-Jul-18 31-Jul-18 19 158.75
4.3.2.1.2 Corte simple y eliminación, D=1 km 13-Jul-18 31-Jul-18 19 2195.74
4.3.2.1.3 Procesamiento, transporte y compactación de relleno estructural, D=2 km (e=300 mm) 10-Sep-18 4-Oct-18 25 12482.91
4.3.2.1.4 Procesamiento, transporte y compactación de relleno estructural con material propio (e=300mm) 10-Sep-18 4-Oct-18 25 543.2
CIMENTACIÓN 01-Aug-18 10-Aug-18 10 1688.61
4.3.2.2.1 Corte simple, selección y acopio de material inadecuado para ser usado como relleno estructural 01-Aug-18 10-Aug-18 10 56.25
4.3.2.2.2 Corte simple y eliminación de material inadecuado, D=1 km 01-Aug-18 10-Aug-18 10 1632.36
REVESTIMIENTO 16-Aug-18 8-Oct-18 54 11579.99
4.3.2.3.1 Procesamiento, transporte y compactación de suelo de baja permeabilidad, e=300 mm, D=1 km 16-Aug-18 14-Sep-18 30 3549.71
4.3.2.3.2 Procesamiento, transporte y compactación de suelo de baja permeabilidad en bermas perimetrales, D=1 km 22-Aug-18 26-Sep-18 36 538.16
4.3.2.3.3 Excavación y relleno con suelo de baja permeabilidad en zanja de anclaje, D=1 km 28-Aug-18 4-Oct-18 38 234.25
4.3.2.3.4 Instalación de geomembrana LLDPE SST de 2 mm 03-Sep-18 8-Oct-18 36 7257.86
COLECCIÓN 09-Sep-18 18-Oct-18 40 2106.78
4.3.2.4.1 Instalación de tubería de HDPE de pared doble perforada de 300 mm 09-Sep-18 8-Oct-18 30 497.35
4.3.2.4.2 Instalación de tubería de HDPE de pared doble perforada de 200 mm 14-Sep-18 13-Oct-18 30 122.88
4.3.2.4.3 Instalación de tubería de HDPE de pared doble perforada de 100 mm 19-Sep-18 18-Oct-18 30 1486.57
SOBRERREVESTIMIENTO 17-Oct-18 20-Nov-18 35 7402.7
4.3.2.5.1 Transporte y colocación de material de sobrerevestimiento, e=500mm 17-Oct-18 20-Nov-18 35 7402.7
SECTOR 2 - PAD 3B ZONA OESTE 18-Jul-18 21-Oct-18 96 40326.89
NIVELACIÓN Y ACCESO PERIMETRAL 18-Jul-18 15-Sep-18 60 18807.85
4.3.3.1.1 Corte simple y eliminación, D=1 km 06-Aug-18 10-Aug-18 5 2195.74
4.3.3.1.2 Procesamiento, transporte y compactación de relleno de transición, D=2 km (relleno estructural, e=500 mm) 18-Jul-18 23-Aug-18 37 4129.2
4.3.3.1.3 Procesamiento, transporte y compactación de relleno estructural, D=2 km (e=300 mm) 18-Jul-18 15-Sep-18 60 12482.91
CIMENTACIÓN 11-Aug-18 12-Aug-18 2 429.57
4.3.3.2.1 Corte simple y eliminación de material inadecuado, D=1 km 11-Aug-18 12-Aug-18 2 429.57
REVESTIMIENTO 13-Aug-18 29-Sep-18 48 11579.99
4.3.3.3.1 Procesamiento, transporte y compactación de suelo de baja permeabilidad, e=300 mm, D=1 km 13-Aug-18 16-Sep-18 35 3549.71
4.3.3.3.2 Procesamiento, transporte y compactación de suelo de baja permeabilidad en bermas perimetrales, D=1 km 15-Aug-18 23-Sep-18 40 538.16
4.3.3.3.3 Excavación y relleno con suelo de baja permeabilidad en zanja de anclaje, D=1 km 17-Aug-18 25-Sep-18 40 234.25
4.3.3.3.4 Instalación de geomembrana LLDPE SST de 2 mm 23-Aug-18 29-Sep-18 38 7257.86
COLECCIÓN 07-Sep-18 16-Oct-18 40 2106.78
4.3.3.4.1 Instalación de tubería de HDPE de pared doble perforada de 300 mm 07-Sep-18 16-Oct-18 40 497.35
4.3.3.4.2 Instalación de tubería de HDPE de pared doble perforada de 200 mm 07-Sep-18 16-Oct-18 40 122.88
4.3.3.4.3 Instalación de tubería de HDPE de pared doble perforada de 100 mm 07-Sep-18 16-Oct-18 40 1486.57
SOBRERREVESTIMIENTO 12-Sep-18 21-Oct-18 40 7402.7
4.3.3.5.1 Transporte y colocación de material de sobrerevestimiento, e=500mm 12-Sep-18 21-Oct-18 40 7402.7
ACCESOS 9-Nov-18 18-Nov-18 10 961.92
4.3.4.1 Procesamiento, transporte y compactación de la base de rodadura, e=200 mm, D=2 km 9-Nov-18 15-Nov-18 7 796.98
4.3.4.2 Procesamiento, transporte y compactación de relleno para estructuras en berma de seguridad, D=2 km 16-Nov-18 18-Nov-18 3 164.94
MANEJO DE DRENAJE SUPERFICIAL 19-Sep-18 9-Nov-18 52 4200.32
CANAL DE CORONACION OESTE - TRAMO 2 19-Sep-18 6-Oct-18 18 1331.87
4.3.5.1.1 Excavación localizada y eliminación de material suelto, D=1 km 19-Sep-18 22-Sep-18 4 51.76
4.3.5.1.2 Procesamiento, transporte y compactación de relleno para estructuras, D=2 km 23-Sep-18 23-Sep-18 1 23.59
4.3.5.1.3 Instalación de geotextil no tejido de 270 g/m2 24-Sep-18 29-Sep-18 6 44.65
4.3.5.1.4 Instalación de geocelda e=100 mm 24-Sep-18 29-Sep-18 6 437.19
4.3.5.1.5 Concreto f'c=210 kg/cm2 30-Sep-18 6-Oct-18 7 774.68
ESTRUCTURA DE CAPTACIÓN OESTE 2B 28-Sep-18 12-Oct-18 15 220.04
4.3.5.2.1 Excavación localizada y eliminación de material suelto, D=1 km 28-Sep-18 29-Sep-18 2 3.98
4.3.5.2.2 Procesamiento, transporte y compactación de relleno para estructuras, D=2 km 30-Sep-18 1-Oct-18 2 11.8
4.3.5.2.3 Solado de concreto f'c=100 kg/cm² 2-Oct-18 4-Oct-18 3 94.16
4.3.5.2.4 Acero de refuerzo fy=4200 kg/cm2 5-Oct-18 6-Oct-18 2 27.78
4.3.5.2.5 Encofrado y desencofrado 7-Oct-18 9-Oct-18 3 30.51
4.3.5.2.6 Concreto f'c=210 kg/cm2 7-Oct-18 9-Oct-18 3 48.93
4.3.5.2.7 Juntas de dilatación para canales de concreto, incluye material elastomérico y waterstop 10-Oct-18 12-Oct-18 3 2.88
CANAL DE CORONACION ESTE - TRAMO 1 30-Sep-18 29-Oct-18 30 2208.33
4.3.5.3.1 Excavación localizada y eliminación de material suelto, D=1 km 30-Sep-18 6-Oct-18 7 85.69
4.3.5.3.2 Procesamiento, transporte y compactación de relleno para estructuras, D=2 km 7-Oct-18 9-Oct-18 3 39.12
4.3.5.3.3 Instalación de geotextil no tejido de 270 g/m2 10-Oct-18 19-Oct-18 10 73.76
4.3.5.3.4 Instalación de geocelda e=100 mm 10-Oct-18 19-Oct-18 10 721.32
4.3.5.3.5 Concreto f'c=210 kg/cm2 18-Oct-18 29-Oct-18 12 1288.44
ESTRUCTURA DE CAPTACIÓN ESTE 1B 30-Oct-18 9-Nov-18 11 220.04
4.3.5.4.1 Excavación localizada y eliminación de material suelto, D=1 km 30-Oct-18 31-Oct-18 2 3.98
4.3.5.4.2 Procesamiento, transporte y compactación de relleno para estructuras, D=2 km 1-Nov-18 2-Nov-18 2 11.8
4.3.5.4.3 Solado de concreto f'c=100 kg/cm² 3-Nov-18 3-Nov-18 1 94.16
4.3.5.4.4 Acero de refuerzo fy=4200 kg/cm2 4-Nov-18 5-Nov-18 2 27.78
4.3.5.4.5 Encofrado y desencofrado 6-Nov-18 8-Nov-18 3 30.51
4.3.5.4.6 Concreto f'c=210 kg/cm2 6-Nov-18 8-Nov-18 3 48.93
4.3.5.4.7 Juntas de dilatación para canales de concreto, incluye material elastomérico y waterstop 9-Nov-18 9-Nov-18 1 2.88
ESTRUCTURA DE CAPTACIÓN ESTE 2B 31-Oct-18 9-Nov-18 10 220.04
4.3.5.5.1 Excavación localizada y eliminación de material suelto, D=1 km 31-Oct-18 31-Oct-18 1 3.98
4.3.5.5.2 Procesamiento, transporte y compactación de relleno para estructuras, D=2 km 1-Nov-18 1-Nov-18 1 11.8
4.3.5.5.3 Solado de concreto f'c=100 kg/cm² 2-Nov-18 2-Nov-18 1 94.16
4.3.5.5.4 Acero de refuerzo fy=4200 kg/cm2 3-Nov-18 4-Nov-18 2 27.78
4.3.5.5.5 Encofrado y desencofrado 5-Nov-18 6-Nov-18 2 30.51
4.3.5.5.6 Concreto f'c=210 kg/cm2 7-Nov-18 8-Nov-18 2 48.93
4.3.5.5.7 Juntas de dilatación para canales de concreto, incluye material elastomérico y waterstop 9-Nov-18 9-Nov-18 1 2.88
INSTRUMENTACIÓN GEOTÉCNICA 19-Oct-18 17-Nov-18 30 1636.79
HITO TOPOGRÁFICO 11-Nov-18 17-Nov-18 7 132.01
4.3.6.1.1 Hito topográfico 11-Nov-18 17-Nov-18 7 132.01
INCLINÓMETRO VERTICAL 19-Oct-18 9-Nov-18 22 32.03
4.3.6.2.1 Perforación Diamantina HQ3 DF 19-Oct-18 6-Nov-18 19 0
4.3.6.2.2 Suministro e instalacion de inclinómetro vertical 7-Nov-18 9-Nov-18 3 32.03
PIEZÓMETRO DE CUERDA VIBRANTE 3-Nov-18 17-Nov-18 15 1008.91
4.3.6.3.1 Excavación y eliminación de material suelto para zanja de protección (1,0 m x 0,5 m) 3-Nov-18 17-Nov-18 15 894.09
4.3.6.3.2 Excavación y eliminación de material suelto para caja de instrumentación (2,5 m x 2,5 m x 1,0 m) 3-Nov-18 17-Nov-18 15 31.04
4.3.6.3.3 Transporte y nivelación de arena para protección de cable (1,0 m x 0,5 m) 3-Nov-18 17-Nov-18 15 80.97
4.3.6.3.4 Transporte y nivelación de arena para protección de piezómetro de cuerda vibrante (2,5 m x 2,5 m x 1,0 m) 3-Nov-18 17-Nov-18 15 2.81
4.3.6.3.5 Suministro e instalación de piezómetro de cuerda vibrante 3-Nov-18 17-Nov-18 15 0
SENSOR/CELDA DE ASENTAMIENTO DE CUERDA VIBRANTE NO VENTEADO 19-Oct-18 2-Nov-18 15 463.84
4.3.6.4.1 Excavación y eliminación de material suelto para zanja de protección (1,0 m x 0,5 m) 19-Oct-18 2-Nov-18 15 409.78
4.3.6.4.2 Excavación y eliminación de material suelto para caja de instrumentación (2,5 m x 2,5 m x 1,0 m) 19-Oct-18 2-Nov-18 15 15.54
4.3.6.4.3 Transporte y nivelación de arena para protección de cable (1,0 m x 0,5 m) 19-Oct-18 2-Nov-18 15 37.11
4.3.6.4.4 Transporte y nivelación de arena para protección de piezómetro de cuerda vibrante (2,5 m x 2,5 m x 1,0 m) 19-Oct-18 2-Nov-18 15 1.41
4.3.6.4.5 Suministro e instalación de celda de asentamiento de cuerda vibrante no venteado 19-Oct-18 2-Nov-18 15 0
FASE DE POST-CONSTRUCCIÓN 5-Nov-18 30-Nov-18 26 0
CAMINATA DE CONSTRUCCIÓN (SM) 5-Nov-18 24-Nov-18 20 0
5.1.1 CC - Depósito de Desmonte Norte 5-Nov-18 7-Nov-18 3 0
5.1.2 CC - PAD 3B 21-Nov-18 24-Nov-18 4 0
CAMINATA DE TARJETA NARANJA (SM-SUPERVISIÓN) 8-Nov-18 27-Nov-18 20 0
5.2.1 CTN - Depósito de Desmonte Norte 8-Nov-18 10-Nov-18 3 0
5.2.2 CTN - PAD 3B 25-Nov-18 27-Nov-18 3 0
CAMINATA DE TARJETA VERDE (SUPERVISIÓN-CLIENTE) 11-Nov-18 30-Nov-18 20 0
5.3.1 CTV - Depósito de Desmonte Norte 11-Nov-18 13-Nov-18 3 0
5.3.2 CTV - PAD 3B 28-Nov-18 30-Nov-18 3 0
CIERRE Y TÉRMINO DE OBRA 24-Nov-18 30-Nov-18 7 0
6.1 Elaboración de As Builts y Dossier Finales 24-Nov-18 29-Nov-18 6 0
6.2 Desmovilización de equipos e instalaciones provisionales 25-Nov-18 30-Nov-18 6 0
6.3 Término de obra 30-Nov-18 30-Nov-18 0 0
METRADOS - DDN y PAD3B
:INGENIERIA DE DETALLE PARA LA AMPLIACION FR LAS INFRAESTRUCTURAS DE PAD POZAS Y DEPOSITO DE DESMONTE E INFRAESTRUCTURAS AUXILIARES D
:0
CONTRACTU METRADO
Descripción Und AL SM
DDN DDN
OBSERVACIONES Y COMENTARIOS
IZQUIERDO DERECHO
75.43 32.12
0.11 9.36
5.37 5.08
28.25 28.25
37.91 0.11
593.531 292.595
272.339 129.827
1540.518 3210.437
1 1
1 1
39 7
17 8
3 3
3 3
27 51
2 2
1 4
6 2
0 11
2 0
0 1
1258.600 937.720
0.000 484.440
275.4
10.8
86.4
971.19
863.19
120.36
4.72
37.76
424.446
377.246
long 13.6
1.8
9.4
1.8
1.8
9.4
1.8
18.85
seccion trans 58.45 m
long. 5.31
310.3695
CRONOGRAMA "MEJORAMIENTO CARRETERA IZCAHUACA-CRUCE HUARCAYA - P. INMACULADA" - MINERA SUYAMARCA
20-May
21-May
22-May
23-May
24-May
25-May
26-May
27-May
28-May
29-May
30-May
31-May
10-Aug
11-Aug
12-Aug
13-Aug
14-Aug
15-Aug
16-Aug
17-Aug
18-Aug
19-Aug
20-Aug
21-Aug
22-Aug
23-Aug
24-Aug
25-Aug
26-Aug
27-Aug
28-Aug
29-Aug
30-Aug
31-Aug
10-Jun
11-Jun
12-Jun
13-Jun
14-Jun
15-Jun
16-Jun
17-Jun
18-Jun
19-Jun
20-Jun
21-Jun
22-Jun
23-Jun
24-Jun
25-Jun
26-Jun
27-Jun
28-Jun
29-Jun
30-Jun
10-Jul
11-Jul
12-Jul
13-Jul
14-Jul
15-Jul
16-Jul
17-Jul
18-Jul
19-Jul
20-Jul
21-Jul
22-Jul
23-Jul
24-Jul
25-Jul
26-Jul
27-Jul
28-Jul
29-Jul
30-Jul
31-Jul
1-Jun
2-Jun
3-Jun
4-Jun
5-Jun
6-Jun
7-Jun
8-Jun
9-Jun
1-Aug
2-Aug
3-Aug
4-Aug
5-Aug
6-Aug
7-Aug
8-Aug
9-Aug
1-Sep
2-Sep
3-Sep
4-Sep
5-Sep
6-Sep
7-Sep
8-Sep
9-Sep
1-Jul
2-Jul
3-Jul
4-Jul
5-Jul
6-Jul
7-Jul
8-Jul
9-Jul
Item Actividad Metrado Estimado Avance Diario Días Calendario Días Útiles Fecha Inicio Fecha Fin
2.0 SUBDRENAJE
2.9 Tubería de HDPE sólida SDR 21 de 300 mm (llegada hacia poza de subdrenaje) 13.53 0.24 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Copla especial para transición de tuberia de HDPE de pared doble no perforada a tuberia
sólida SDR 21 de ø300 mm 1.00 0.02 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
2.10 Tubería de HDPE de pared doble perforada de ø300 mm 576.45 10.29 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Codos 30° para tubería de HDPE de pared doble de ϕ300 mm 3.00 0.05 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Codos 45° para tubería de HDPE de pared doble de ϕ300 mm 5.00 0.09 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Copla partida para tubería de HDPE de pared doble de ϕ300 mm 128.00 2.29 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
2.11 Tubería de HDPE de pared doble perforada de ø100 mm 1,071.00 19.13 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Copla partida para tubería de HDPE de pared doble de ϕ100 mm 200.00 3.57 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Yee para tubería de HDPE de pared doble de 300X300X300 mm 2.00 0.04 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Yee para tubería de HDPE de pared doble de 300X300X100 mm 6.00 0.11 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Yee para tubería de HDPE de pared doble de 100X100X100 mm 2.00 0.04 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
2.9 Tubería de HDPE de pared doble perforada de ø300 mm 576.45 12.53 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Codos 30° para tubería de HDPE de pared doble de ϕ300 mm 3.00 0.07 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Codos 45° para tubería de HDPE de pared doble de ϕ300 mm 5.00 0.11 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Copla partida para tubería de HDPE de pared doble de ϕ300 mm 128.00 2.78 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
2.10 Tubería de HDPE de pared doble perforada de ø100 mm 1,071.00 23.28 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Copla partida para tubería de HDPE de pared doble de ϕ100 mm 200.00 4.35 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Yee para tubería de HDPE de pared doble de 300X300X300 mm 2.00 0.04 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Yee para tubería de HDPE de pared doble de 300X300X100 mm 5.00 0.11 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Yee para tubería de HDPE de pared doble de 100X100X100 mm 2.00 0.04 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
3.5 Gavión caja 5.0x1.0x1.0 m (incluye grava de relleno) 11.00 0.29 38 38 24/06/18 31/07/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
3.8 Tubería de HDPE de pared doble no perforada de 450 mm 47.25 6.75 7 7 15/08/18 21/08/18 X X X X X X X
4.0 POZA PARA CONTROL DE EROSION Y SEDIMENTOS (L=1.5mx1.0mx1.5m, e=150mm, 7 15/09/18 21/09/18
Ø=450mm)
4.3 Tubería de HDPE de pared doble no perforada de 450 mm 15.75 2.25 7 7 15/09/18 21/09/18
Tubería de acero al carbono, Sch40, BW, ASTM A-53 GR B, sin costura - diámetro 3" 3.00 0.11 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Tubería de acero al carbono, Sch 40, BW, ASTM A-53 GR B, sin costura - diámetro 2" 5.00 0.18 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Cople, THRD 3000LB FS, ASTM A-105, diámetro de 1" 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Brida Slip On, Tipo RF, AC ASTM A-105, ANSI B16.5, CL-300, diámetro de 3" 8.00 0.29 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Codo 90°, SW 3000LB FS, ASTM A-105, diámetro 2" 3.00 0.11 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Codo 45°, SW 3000LB FS, ASTM A-105, diámetro 2" 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Codo 90° ASME B16.9, 5D, BW, Sch 40, ASTM A234 WPB sin costura, diámetro 3" 2.00 0.07 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Tee SW 3000 LB, FS, ASTM A-105, 2"x2" 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Tee THRD 3000 LB, ASTM A-105, 1"x1" 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Unión universal SW 3000LB FS, ASTM A-105, diámetro 2" 2.00 0.07 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Sockolet, 3000 LB FS, ASTM A-105, 3"x2" 2.00 0.07 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Bushing, RED. THRD 3000LB, ASTM A-105, 1"x1/2" 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Empaquetadura plana para bridas RF, material: PTFE con aglutinante sintético, ASME
B16.21, CL-300 ASME B16.5, espesor de 3mm (1/8"), diámetro 3"
7.00 0.25 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
(8) Espárrago ASTM A193 Gr B7, Clase 2A, con dos tuercas hexagonales clase pesada 6.00 0.21 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
ASTM A 194 Gr 2H Cl-2B y arandelas, 3/4" x 108 mm
Niple Acero al carbono ASTM A-53 GR B, sin costura, SCH 40, diámetro 2" (100 mm LG) 6.00 0.21 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Niple Acero al carbono ASTM A-53 GR B, sin costura, SCH 40, diámetro 1" (100 mm LG) 2.00 0.07 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Niple Acero al carbono ASTM A-53 GR B, sin costura, SCH 40, diámetro 1" (50 mm LG) 2.00 0.07 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Válvula de Mariposa, CL-300 STD, LUG 316 TRIM HNDL, diámetro 3" 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Válvula check, CL-300 RF STL, LUG DR THRU 316 TRIM, diámetro 3" 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Válvula de bola, roscada, 800 LB SW, diámetro 1" 2.00 0.07 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Válvula de bola, roscada, 800 LB SW, diámetro 2" 2.00 0.07 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Bomba sumergible multietápica, ADT 234, 28 kW, 460V/3f/60Hz , caudal de 24 m3/h 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
4.2 Pipeline
Tubería de acero al carbono, Sch40, BW, ASTM A-53 GR B, sin costura - diámetro 3" 179.00 6.63 30 27 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X
TRIMMED Codo 45° ASME B16.9, 5D, BW, Sch 40, ASTM A234 WPB sin costura (7.81°), diám 1.00 0.04 30 27 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X
TRIMMED Codo 45° ASME B16.9, 5D, BW, Sch 40, ASTM A234 WPB sin costura (33.10°), diá 1.00 0.04 30 27 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X
TRIMMED Codo 45° ASME B16.9, 5D, BW, Sch 40, ASTM A234 WPB sin costura (36.61°), diá 1.00 0.04 30 27 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X
TRIMMED Codo 45° ASME B16.9, 5D, BW, Sch 40, ASTM A234 WPB sin costura (21.67°), diá 1.00 0.04 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
Brida Slip On, Tipo RF, AC ASTM A-105, ANSI B16.5, CL-300, diámetro de 3" 8.00 0.32 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
(8) Espárrago ASTM A193 Gr B7, Clase 2A, con dos tuercas hexagonales clase pesada ASTM 8.00 0.32 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
Tubería de ɸ3", HDPE ASTM F714 - PE100, SDR 7.4, diámetro IPS, 322.00 12.88 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
Tubería de ɸ3", HDPE ASTM F714 - PE100, SDR 11, diámetro IPS 1,150.00 46.00 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
Flange Adapter, HDPE PE100, SDR 7.4 9.00 0.36 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
Brida lap joint, Tipo RF, AC ASTM A-105, ANSI B16.5, CL-300, diámetro de 3" 9.00 0.36 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
Brida lap joint, Tipo RF, AC ASTM A-105, ANSI B16.5, CL-150, diámetro de 3" 4.00 0.16 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
Brida Slip On, Tipo RF, AC ASTM A-105, ANSI B16.5, CL-150, diámetro de 3" 2.00 0.08 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
(4) Espárrago ASTM A193 Gr B7, Clase 2A, con dos tuercas hexagonales clase pesada ASTM 3.00 0.12 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
Empaquetadura plana para bridas RF, material: PTFE con aglutinante sintético, ASME B16.21 6.00 0.24 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
Empaquetadura plana para bridas RF, material: PTFE con aglutinante sintético, ASME B16.21 2.00 0.08 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
Niple Acero al carbono ASTM A-53 GR B, sin costura, SCH 40, diámetro 3" (300 mm LG) 4.00 0.16 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
Niple Acero al carbono ASTM A-53 GR B, sin costura, SCH 40, diámetro 1" (300 mm LG) 4.00 0.16 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
Sockolet, 3000 # FS, ASTM A-105, 3"x1" 4.00 0.16 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
Válvula de bola, roscada, 800 LB SW, diámetro 1" 8.00 0.32 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
Copla partida para tubería de HDPE de pared doble de ϕ450 mm 3.00 0.12 26 26 05/10/18 30/10/18
Reducción para tuberia de HDPE de pared doble de ϕ450 a 300 mm 3.00 0.12 26 26 05/10/18 30/10/18
4.3.2.4. Instalación de tubería de HDPE de pared doble perforada de 300 mm 466.20 17.93 26 26 05/10/18 30/10/18
1
Tapa para tubería de HDPE de pared doble de ϕ300 mm 4.00 0.15 26 26 05/10/18 30/10/18
Copla partida para tubería de HDPE de pared doble de ϕ300 mm 147.50 5.67 26 26 05/10/18 30/10/18
Codos 30° para tubería de HDPE de pared doble de ϕ300 mm 6.00 0.23 26 26 05/10/18 30/10/18
Reducción para tuberia de HDPE de pared doble de ϕ300 a 200 mm 2.00 0.08 26 26 05/10/18 30/10/18
4.3.2.4. Instalación de tubería de HDPE de pared doble perforada de 200 mm 207.90 8.00 26 26 05/10/18 30/10/18
2
Tapa para tubería de HDPE de pared doble de ϕ200 mm 4.00 0.15 26 26 05/10/18 30/10/18
Copla partida para tubería de HDPE de pared doble de ϕ200 mm 60.00 2.31 26 26 05/10/18 30/10/18
4.3.2.4. Instalación de tubería de HDPE de pared doble perforada de 100 mm 2,583.00 99.35 26 26 05/10/18 30/10/18
3
Tapa para tubería de HDPE de pared doble de ϕ100 mm 50.00 1.92 26 26 05/10/18 30/10/18
Copla partida para tubería de HDPE de pared doble de ϕ100 mm 498.00 19.15 26 26 05/10/18 30/10/18
Instalación de yee para tubería de HDPE de pared doble de 300x300x300 mm 1.00 0.04 26 26 05/10/18 30/10/18
Instalación de yee para tubería de HDPE de pared doble de 300x300x200 mm 1.00 0.04 26 26 05/10/18 30/10/18
Instalación de yee para tubería de HDPE de pared doble de 300x300x100 mm 25.00 0.96 26 26 05/10/18 30/10/18
Instalación de yee para tubería de HDPE de pared doble de 200x200x100 mm 10.00 0.38 26 26 05/10/18 30/10/18
Instalación de yee para tubería de HDPE de pared doble de 100x100x100 mm 3.00 0.12 26 26 05/10/18 30/10/18
Copla partida para tubería de HDPE de pared doble de ϕ450 mm 3.00 0.08 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X
Reducción para tuberia de HDPE de pared doble de ϕ450 a 300 mm 3.00 0.08 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X
4.3.3.4. Instalación de tubería de HDPE de pared doble perforada de 300 mm 466.20 11.66 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X
1
Tapa para tubería de HDPE de pared doble de ϕ300 mm 4.00 0.10 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X
Copla partida para tubería de HDPE de pared doble de ϕ300 mm 147.50 3.69 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X
Codos 30° para tubería de HDPE de pared doble de ϕ300 mm 6.00 0.15 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X
Reducción para tuberia de HDPE de pared doble de ϕ300 a 200 mm 2.00 0.05 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X
4.3.3.4. Instalación de tubería de HDPE de pared doble perforada de 200 mm 207.90 5.20 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X
2
Tapa para tubería de HDPE de pared doble de ϕ200 mm 4.00 0.10 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X
Copla partida para tubería de HDPE de pared doble de ϕ200 mm 60.00 1.50 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X
4.3.3.4. Instalación de tubería de HDPE de pared doble perforada de 100 mm 2,583.00 64.58 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X
3
Tapa para tubería de HDPE de pared doble de ϕ100 mm 50.00 1.25 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X
Copla partida para tubería de HDPE de pared doble de ϕ100 mm 498.00 12.45 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X
Instalación de yee para tubería de HDPE de pared doble de 300x300x300 mm 1.00 0.03 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X
Instalación de yee para tubería de HDPE de pared doble de 300x300x200 mm 1.00 0.03 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X
Instalación de yee para tubería de HDPE de pared doble de 300x300x100 mm 24.00 0.60 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X
Instalación de yee para tubería de HDPE de pared doble de 200x200x100 mm 10.00 0.25 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X
Instalación de yee para tubería de HDPE de pared doble de 100x100x100 mm 3.00 0.08 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X
4.3.5.1. Instalación de geotextil no tejido de 270 g/m2 992.25 165.38 6 6 26/09/18 01/10/18
3
4.3.5.1. Instalación de geocelda e=100 mm 959.70 159.95 6 6 26/09/18 01/10/18
4
CANAL DE CORONACION ESTE - TRAMO 1 0 02/10/18 31/10/18
4.3.5.3. Instalación de geotextil no tejido de 270 g/m2 1,639.05 54.64 30 30 02/10/18 31/10/18
3
4.3.5.3. Instalación de geocelda e=100 mm 1,583.40 52.78 30 30 02/10/18 31/10/18
4
10-Nov
11-Nov
12-Nov
13-Nov
14-Nov
15-Nov
16-Nov
17-Nov
18-Nov
19-Nov
20-Nov
21-Nov
22-Nov
23-Nov
24-Nov
25-Nov
26-Nov
27-Nov
28-Nov
29-Nov
30-Nov
10-Dec
11-Dec
12-Dec
13-Dec
14-Dec
15-Dec
16-Dec
17-Dec
18-Dec
19-Dec
20-Dec
21-Dec
10-Sep
11-Sep
12-Sep
13-Sep
14-Sep
15-Sep
16-Sep
17-Sep
18-Sep
19-Sep
20-Sep
21-Sep
22-Sep
23-Sep
24-Sep
25-Sep
26-Sep
27-Sep
28-Sep
29-Sep
30-Sep
10-Oct
11-Oct
12-Oct
13-Oct
14-Oct
15-Oct
16-Oct
17-Oct
18-Oct
19-Oct
20-Oct
21-Oct
22-Oct
23-Oct
24-Oct
25-Oct
26-Oct
27-Oct
28-Oct
29-Oct
30-Oct
31-Oct
1-Nov
2-Nov
3-Nov
4-Nov
5-Nov
6-Nov
7-Nov
8-Nov
9-Nov
1-Dec
2-Dec
3-Dec
4-Dec
5-Dec
6-Dec
7-Dec
8-Dec
9-Dec
1-Oct
2-Oct
3-Oct
4-Oct
5-Oct
6-Oct
7-Oct
8-Oct
9-Oct
- - - - -
X X X X X
X X X X X
Fin de Obra
- - - - - - - 16 Ene 12
X X X X X X X
X X X X X X X Fin de Obra
16 Ene 12
X X X X X X X
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Fin de Obra
16 Ene 12
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Fin de Obra
- - - - - - - - - - - - - - - - - - - - - - - - - - 16 Ene 12
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
X X X X X X X X X X X X X X X X X
- - - - - - - - - - - - - - - - - - - - - - - - -
X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - -
X X X X X X
X X X X X X
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
20-May
21-May
22-May
23-May
24-May
25-May
26-May
27-May
28-May
29-May
30-May
31-May
10-Jun
11-Jun
12-Jun
13-Jun
14-Jun
15-Jun
16-Jun
17-Jun
18-Jun
19-Jun
20-Jun
21-Jun
22-Jun
23-Jun
24-Jun
25-Jun
26-Jun
27-Jun
28-Jun
29-Jun
30-Jun
10-Aug
11-Aug
12-Aug
13-Aug
14-Aug
15-Aug
16-Aug
17-Aug
18-Aug
19-Aug
20-Aug
21-Aug
22-Aug
23-Aug
24-Aug
25-Aug
26-Aug
27-Aug
28-Aug
29-Aug
30-Aug
31-Aug
10-Sep
11-Sep
12-Sep
13-Sep
14-Sep
15-Sep
16-Sep
17-Sep
18-Sep
10-Jul
11-Jul
12-Jul
13-Jul
14-Jul
15-Jul
16-Jul
17-Jul
18-Jul
19-Jul
20-Jul
21-Jul
22-Jul
23-Jul
24-Jul
25-Jul
26-Jul
27-Jul
28-Jul
29-Jul
30-Jul
31-Jul
1-Aug
2-Aug
3-Aug
4-Aug
5-Aug
6-Aug
7-Aug
8-Aug
9-Aug
1-Sep
2-Sep
3-Sep
4-Sep
5-Sep
6-Sep
7-Sep
8-Sep
9-Sep
1-Jun
2-Jun
3-Jun
4-Jun
5-Jun
6-Jun
7-Jun
8-Jun
9-Jun
1-Jul
2-Jul
3-Jul
4-Jul
5-Jul
6-Jul
7-Jul
8-Jul
9-Jul
Item Actividad Metrado Estimado Avance Diario Días Calendario Días Útiles Fecha Inicio Fecha Fin
2.0 SUBDRENAJE
2.9 Tubería de HDPE sólida SDR 21 de 300 mm (llegada hacia poza de subdrenaje) 14.70 0.26 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Copla especial para transición de tuberia de HDPE de pared doble no perforada a tuberia 1.00 0.02 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
sólida SDR 21 de ø300 mm
2.10 Tubería de HDPE de pared doble perforada de ø300 mm 576.45 10.29 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Codos 30° para tubería de HDPE de pared doble de ϕ300 mm 3.00 0.05 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Codos 45° para tubería de HDPE de pared doble de ϕ300 mm 5.00 0.09 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Copla partida para tubería de HDPE de pared doble de ϕ300 mm 128.00 2.29 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
2.11 Tubería de HDPE de pared doble perforada de ø100 mm 1,071.00 19.13 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Copla partida para tubería de HDPE de pared doble de ϕ100 mm 200.00 3.57 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Yee para tubería de HDPE de pared doble de 300X300X300 mm 2.00 0.04 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Yee para tubería de HDPE de pared doble de 300X300X100 mm 6.00 0.11 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Yee para tubería de HDPE de pared doble de 100X100X100 mm 2.00 0.04 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
2.9 Tubería de HDPE de pared doble perforada de ø300 mm 576.45 12.53 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Codos 30° para tubería de HDPE de pared doble de ϕ300 mm 3.00 0.07 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Codos 45° para tubería de HDPE de pared doble de ϕ300 mm 5.00 0.11 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Copla partida para tubería de HDPE de pared doble de ϕ300 mm 128.00 2.78 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
2.10 Tubería de HDPE de pared doble perforada de ø100 mm 1,071.00 23.28 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Copla partida para tubería de HDPE de pared doble de ϕ100 mm 200.00 4.35 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Yee para tubería de HDPE de pared doble de 300X300X300 mm 2.00 0.04 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Yee para tubería de HDPE de pared doble de 300X300X100 mm 5.00 0.11 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Yee para tubería de HDPE de pared doble de 100X100X100 mm 2.00 0.04 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
3.5 Gavión caja 5.0x1.0x1.0 m (incluye grava de relleno) 11.00 0.29 38 38 24/06/18 31/07/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
3.8 Tubería de HDPE de pared doble no perforada de 450 mm 47.25 6.75 7 7 15/08/18 21/08/18 X X X X X X X
4.0 POZA PARA CONTROL DE EROSION Y SEDIMENTOS (L=1.5mx1.0mx1.5m, e=150mm, 7 15/09/18 21/09/18 - - - -
Ø=450mm)
4.3 Tubería de HDPE de pared doble no perforada de 450 mm 15.75 2.25 7 7 15/09/18 21/09/18 X X X X
Tubería de acero al carbono, Sch40, BW, ASTM A-53 GR B, sin costura - diámetro 3" 3.00 0.11 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Tubería de acero al carbono, Sch 40, BW, ASTM A-53 GR B, sin costura - diámetro 2" 5.00 0.18 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Cople, THRD 3000LB FS, ASTM A-105, diámetro de 1" 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Brida Slip On, Tipo RF, AC ASTM A-105, ANSI B16.5, CL-300, diámetro de 3" 8.00 0.29 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Codo 90°, SW 3000LB FS, ASTM A-105, diámetro 2" 3.00 0.11 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Codo 45°, SW 3000LB FS, ASTM A-105, diámetro 2" 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Codo 90° ASME B16.9, 5D, BW, Sch 40, ASTM A234 WPB sin costura, diámetro 3" 2.00 0.07 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Tee SW 3000 LB, FS, ASTM A-105, 2"x2" 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Tee THRD 3000 LB, ASTM A-105, 1"x1" 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Unión universal SW 3000LB FS, ASTM A-105, diámetro 2" 2.00 0.07 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Sockolet, 3000 LB FS, ASTM A-105, 3"x2" 2.00 0.07 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Bushing, RED. THRD 3000LB, ASTM A-105, 1"x1/2" 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Empaquetadura plana para bridas RF, material: PTFE con aglutinante sintético, ASME
B16.21, CL-300 ASME B16.5, espesor de 3mm (1/8"), diámetro 3" 7.00 0.25 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
(8) Espárrago ASTM A193 Gr B7, Clase 2A, con dos tuercas hexagonales clase pesada
ASTM A 194 Gr 2H Cl-2B y arandelas, 3/4" x 108 mm 6.00 0.21 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Niple Acero al carbono ASTM A-53 GR B, sin costura, SCH 40, diámetro 2" (100 mm 6.00 0.21 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Niple Acero al carbono ASTM A-53 GR B, sin costura, SCH 40, diámetro 1" (100 mm 2.00 0.07 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Niple Acero al carbono ASTM A-53 GR B, sin costura, SCH 40, diámetro 1" (50 mm L 2.00 0.07 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Válvula de Mariposa, CL-300 STD, LUG 316 TRIM HNDL, diámetro 3" 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Válvula check, CL-300 RF STL, LUG DR THRU 316 TRIM, diámetro 3" 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Válvula de bola, roscada, 800 LB SW, diámetro 1" 2.00 0.07 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Válvula de bola, roscada, 800 LB SW, diámetro 2" 2.00 0.07 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Bomba sumergible multietápica, ADT 234, 28 kW, 460V/3f/60Hz , caudal de 24 m3/h 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
4.2 Pipeline
Tubería de acero al carbono, Sch40, BW, ASTM A-53 GR B, sin costura - diámetro 3" 179.00 6.63 30 27 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X
TRIMMED Codo 45° ASME B16.9, 5D, BW, Sch 40, ASTM A234 WPB sin costura (7.81°) 1.00 0.04 30 27 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X
TRIMMED Codo 45° ASME B16.9, 5D, BW, Sch 40, ASTM A234 WPB sin costura (33.10° 1.00 0.04 30 27 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X
TRIMMED Codo 45° ASME B16.9, 5D, BW, Sch 40, ASTM A234 WPB sin costura (36.61° 1.00 0.04 30 27 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X
TRIMMED Codo 45° ASME B16.9, 5D, BW, Sch 40, ASTM A234 WPB sin costura (21.67° 1.00 0.04 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
Brida Slip On, Tipo RF, AC ASTM A-105, ANSI B16.5, CL-300, diámetro de 3" 8.00 0.32 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
(8) Espárrago ASTM A193 Gr B7, Clase 2A, con dos tuercas hexagonales clase pesad 8.00 0.32 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
Tubería de ɸ3", HDPE ASTM F714 - PE100, SDR 7.4, diámetro IPS, 322.00 12.88 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
Tubería de ɸ3", HDPE ASTM F714 - PE100, SDR 11, diámetro IPS 1,150.00 46.00 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
Flange Adapter, HDPE PE100, SDR 7.4 9.00 0.36 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
Brida lap joint, Tipo RF, AC ASTM A-105, ANSI B16.5, CL-300, diámetro de 3" 9.00 0.36 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
Brida lap joint, Tipo RF, AC ASTM A-105, ANSI B16.5, CL-150, diámetro de 3" 4.00 0.16 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
Brida Slip On, Tipo RF, AC ASTM A-105, ANSI B16.5, CL-150, diámetro de 3" 2.00 0.08 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
(4) Espárrago ASTM A193 Gr B7, Clase 2A, con dos tuercas hexagonales clase pesad 3.00 0.12 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
Empaquetadura plana para bridas RF, material: PTFE con aglutinante sintético, ASME 6.00 0.24 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
Empaquetadura plana para bridas RF, material: PTFE con aglutinante sintético, ASME 2.00 0.08 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
Niple Acero al carbono ASTM A-53 GR B, sin costura, SCH 40, diámetro 3" (300 mm 4.00 0.16 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
Niple Acero al carbono ASTM A-53 GR B, sin costura, SCH 40, diámetro 1" (300 mm 4.00 0.16 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
Sockolet, 3000 # FS, ASTM A-105, 3"x1" 4.00 0.16 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
Válvula de bola, roscada, 800 LB SW, diámetro 1" 8.00 0.32 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
Copla partida para tubería de HDPE de pared doble de ϕ450 mm 3.00 0.12 26 26 05/10/18 30/10/18
Reducción para tuberia de HDPE de pared doble de ϕ450 a 300 mm 3.00 0.12 26 26 05/10/18 30/10/18
4.3.2.4. Instalación de tubería de HDPE de pared doble perforada de 300 mm 466.20 17.93 26 26 05/10/18 30/10/18
1
Tapa para tubería de HDPE de pared doble de ϕ300 mm 4.00 0.15 26 26 05/10/18 30/10/18
Copla partida para tubería de HDPE de pared doble de ϕ300 mm 147.50 5.67 26 26 05/10/18 30/10/18
Codos 30° para tubería de HDPE de pared doble de ϕ300 mm 6.00 0.23 26 26 05/10/18 30/10/18
Reducción para tuberia de HDPE de pared doble de ϕ300 a 200 mm 2.00 0.08 26 26 05/10/18 30/10/18
4.3.2.4. Instalación de tubería de HDPE de pared doble perforada de 200 mm 207.90 8.00 26 26 05/10/18 30/10/18
2
Tapa para tubería de HDPE de pared doble de ϕ200 mm 4.00 0.15 26 26 05/10/18 30/10/18
Copla partida para tubería de HDPE de pared doble de ϕ200 mm 60.00 2.31 26 26 05/10/18 30/10/18
4.3.2.4. Instalación de tubería de HDPE de pared doble perforada de 100 mm 2,583.00 99.35 26 26 05/10/18 30/10/18
3
Tapa para tubería de HDPE de pared doble de ϕ100 mm 50.00 1.92 26 26 05/10/18 30/10/18
Copla partida para tubería de HDPE de pared doble de ϕ100 mm 498.00 19.15 26 26 05/10/18 30/10/18
Instalación de yee para tubería de HDPE de pared doble de 300x300x300 mm 1.00 0.04 26 26 05/10/18 30/10/18
Instalación de yee para tubería de HDPE de pared doble de 300x300x200 mm 1.00 0.04 26 26 05/10/18 30/10/18
Instalación de yee para tubería de HDPE de pared doble de 300x300x100 mm 25.00 0.96 26 26 05/10/18 30/10/18
Instalación de yee para tubería de HDPE de pared doble de 200x200x100 mm 10.00 0.38 26 26 05/10/18 30/10/18
Instalación de yee para tubería de HDPE de pared doble de 100x100x100 mm 3.00 0.12 26 26 05/10/18 30/10/18
Copla partida para tubería de HDPE de pared doble de ϕ450 mm 3.00 0.08 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X
Reducción para tuberia de HDPE de pared doble de ϕ450 a 300 mm 3.00 0.08 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X
4.3.3.4. Instalación de tubería de HDPE de pared doble perforada de 300 mm 466.20 11.66 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X
1
Tapa para tubería de HDPE de pared doble de ϕ300 mm 4.00 0.10 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X
Copla partida para tubería de HDPE de pared doble de ϕ300 mm 147.50 3.69 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X
Codos 30° para tubería de HDPE de pared doble de ϕ300 mm 6.00 0.15 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X
Reducción para tuberia de HDPE de pared doble de ϕ300 a 200 mm 2.00 0.05 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X
4.3.3.4. Instalación de tubería de HDPE de pared doble perforada de 200 mm 207.90 5.20 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X
2
Tapa para tubería de HDPE de pared doble de ϕ200 mm 4.00 0.10 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X
Copla partida para tubería de HDPE de pared doble de ϕ200 mm 60.00 1.50 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X
4.3.3.4. Instalación de tubería de HDPE de pared doble perforada de 100 mm 2,583.00 64.58 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X
3
Tapa para tubería de HDPE de pared doble de ϕ100 mm 50.00 1.25 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X
Copla partida para tubería de HDPE de pared doble de ϕ100 mm 498.00 12.45 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X
Instalación de yee para tubería de HDPE de pared doble de 300x300x300 mm 1.00 0.03 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X
Instalación de yee para tubería de HDPE de pared doble de 300x300x200 mm 1.00 0.03 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X
Instalación de yee para tubería de HDPE de pared doble de 300x300x100 mm 24.00 0.60 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X
Instalación de yee para tubería de HDPE de pared doble de 200x200x100 mm 10.00 0.25 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X
Instalación de yee para tubería de HDPE de pared doble de 100x100x100 mm 3.00 0.08 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X
4.3.5.1. Instalación de geotextil no tejido de 270 g/m2 992.25 165.38 6 6 26/09/18 01/10/18
3
4.3.5.1. Instalación de geocelda e=100 mm 959.70 159.95 6 6 26/09/18 01/10/18
4
CANAL DE CORONACION ESTE - TRAMO 1 0 02/10/18 31/10/18
4.3.5.3. Instalación de geotextil no tejido de 270 g/m2 1,639.05 54.64 30 30 02/10/18 31/10/18
3
4.3.5.3. Instalación de geocelda e=100 mm 1,583.40 52.78 30 30 02/10/18 31/10/18
4
19-Sep
20-Sep
21-Sep
22-Sep
23-Sep
24-Sep
25-Sep
26-Sep
27-Sep
28-Sep
29-Sep
30-Sep
10-Nov
11-Nov
12-Nov
13-Nov
14-Nov
15-Nov
16-Nov
17-Nov
18-Nov
19-Nov
20-Nov
21-Nov
22-Nov
23-Nov
24-Nov
25-Nov
26-Nov
27-Nov
28-Nov
29-Nov
30-Nov
10-Dec
11-Dec
12-Dec
13-Dec
14-Dec
15-Dec
16-Dec
17-Dec
18-Dec
19-Dec
20-Dec
21-Dec
10-Oct
11-Oct
12-Oct
13-Oct
14-Oct
15-Oct
16-Oct
17-Oct
18-Oct
19-Oct
20-Oct
21-Oct
22-Oct
23-Oct
24-Oct
25-Oct
26-Oct
27-Oct
28-Oct
29-Oct
30-Oct
31-Oct
1-Nov
2-Nov
3-Nov
4-Nov
5-Nov
6-Nov
7-Nov
8-Nov
9-Nov
1-Dec
2-Dec
3-Dec
4-Dec
5-Dec
6-Dec
7-Dec
8-Dec
9-Dec
1-Oct
2-Oct
3-Oct
4-Oct
5-Oct
6-Oct
7-Oct
8-Oct
9-Oct
Fin de Obra
- - - 16 Ene 12
X X X
X X X Fin de Obra
16 Ene 12
X X X
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Fin de Obra
16 Ene 12
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Fin de Obra
- - - - - - - - - - - - - - - - - - - - - - - - - - 16 Ene 12
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
- - - - - - - - - - - - - - - -
- - - - - - - -
X X X X X X X X
- - - - - - - - - - - - - - - -
X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - -
X X X X X X
X X X X X X
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
20-May
21-May
22-May
23-May
24-May
25-May
26-May
27-May
28-May
29-May
30-May
31-May
10-Jun
11-Jun
12-Jun
13-Jun
14-Jun
15-Jun
16-Jun
17-Jun
18-Jun
19-Jun
20-Jun
21-Jun
22-Jun
23-Jun
24-Jun
25-Jun
26-Jun
27-Jun
28-Jun
29-Jun
30-Jun
10-Aug
11-Aug
12-Aug
13-Aug
14-Aug
15-Aug
16-Aug
17-Aug
18-Aug
19-Aug
20-Aug
21-Aug
22-Aug
23-Aug
24-Aug
25-Aug
26-Aug
27-Aug
28-Aug
29-Aug
30-Aug
31-Aug
10-Sep
11-Sep
12-Sep
13-Sep
14-Sep
15-Sep
16-Sep
17-Sep
18-Sep
10-Jul
11-Jul
12-Jul
13-Jul
14-Jul
15-Jul
16-Jul
17-Jul
18-Jul
19-Jul
20-Jul
21-Jul
22-Jul
23-Jul
24-Jul
25-Jul
26-Jul
27-Jul
28-Jul
29-Jul
30-Jul
31-Jul
1-Aug
2-Aug
3-Aug
4-Aug
5-Aug
6-Aug
7-Aug
8-Aug
9-Aug
1-Sep
2-Sep
3-Sep
4-Sep
5-Sep
6-Sep
7-Sep
8-Sep
9-Sep
1-Jun
2-Jun
3-Jun
4-Jun
5-Jun
6-Jun
7-Jun
8-Jun
9-Jun
1-Jul
2-Jul
3-Jul
4-Jul
5-Jul
6-Jul
7-Jul
8-Jul
9-Jul
Item Actividad Metrado Estimado Avance Diario Días Calendario Días Útiles Fecha Inicio Fecha Fin
2.0 SUBDRENAJE
2.9 Tubería de HDPE sólida SDR 21 de 300 mm (llegada hacia poza de subdrenaje) 14.70 0.26 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Copla especial para transición de tuberia de HDPE de pared doble no perforada a tuberia 1.00 0.02 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
sólida SDR 21 de ø300 mm
2.10 Tubería de HDPE de pared doble perforada de ø300 mm 576.45 10.29 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Codos 30° para tubería de HDPE de pared doble de ϕ300 mm 3.00 0.05 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Codos 45° para tubería de HDPE de pared doble de ϕ300 mm 5.00 0.09 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Copla partida para tubería de HDPE de pared doble de ϕ300 mm 128.00 2.29 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
2.11 Tubería de HDPE de pared doble perforada de ø100 mm 1,071.00 19.13 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Copla partida para tubería de HDPE de pared doble de ϕ100 mm 200.00 3.57 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Yee para tubería de HDPE de pared doble de 300X300X300 mm 2.00 0.04 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Yee para tubería de HDPE de pared doble de 300X300X100 mm 6.00 0.11 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Yee para tubería de HDPE de pared doble de 100X100X100 mm 2.00 0.04 56 56 26/06/18 20/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
2.9 Tubería de HDPE de pared doble perforada de ø300 mm 576.45 12.53 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Codos 30° para tubería de HDPE de pared doble de ϕ300 mm 3.00 0.07 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Codos 45° para tubería de HDPE de pared doble de ϕ300 mm 5.00 0.11 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Copla partida para tubería de HDPE de pared doble de ϕ300 mm 128.00 2.78 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
2.10 Tubería de HDPE de pared doble perforada de ø100 mm 1,071.00 23.28 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Copla partida para tubería de HDPE de pared doble de ϕ100 mm 200.00 4.35 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Yee para tubería de HDPE de pared doble de 300X300X300 mm 2.00 0.04 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Yee para tubería de HDPE de pared doble de 300X300X100 mm 5.00 0.11 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Yee para tubería de HDPE de pared doble de 100X100X100 mm 2.00 0.04 46 46 03/07/18 17/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
3.5 Gavión caja 5.0x1.0x1.0 m (incluye grava de relleno) 11.00 0.29 38 38 24/06/18 31/07/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
3.8 Tubería de HDPE de pared doble no perforada de 450 mm 47.25 6.75 7 7 15/08/18 21/08/18 X X X X X X X
4.0 POZA PARA CONTROL DE EROSION Y SEDIMENTOS (L=1.5mx1.0mx1.5m, e=150mm, 7 15/09/18 21/09/18 - - - -
Ø=450mm)
4.3 Tubería de HDPE de pared doble no perforada de 450 mm 15.75 2.25 7 7 15/09/18 21/09/18 X X X X
Tubería de acero al carbono, Sch40, BW, ASTM A-53 GR B, sin costura - diámetro 3" 3.00 0.11 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Tubería de acero al carbono, Sch 40, BW, ASTM A-53 GR B, sin costura - diámetro 2" 5.00 0.18 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Cople, THRD 3000LB FS, ASTM A-105, diámetro de 1" 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Brida Slip On, Tipo RF, AC ASTM A-105, ANSI B16.5, CL-300, diámetro de 3" 8.00 0.29 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Codo 90°, SW 3000LB FS, ASTM A-105, diámetro 2" 3.00 0.11 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Codo 45°, SW 3000LB FS, ASTM A-105, diámetro 2" 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Codo 90° ASME B16.9, 5D, BW, Sch 40, ASTM A234 WPB sin costura, diámetro 3" 2.00 0.07 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Tee SW 3000 LB, FS, ASTM A-105, 2"x2" 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Tee THRD 3000 LB, ASTM A-105, 1"x1" 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Unión universal SW 3000LB FS, ASTM A-105, diámetro 2" 2.00 0.07 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Sockolet, 3000 LB FS, ASTM A-105, 3"x2" 2.00 0.07 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Bushing, RED. THRD 3000LB, ASTM A-105, 1"x1/2" 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Empaquetadura plana para bridas RF, material: PTFE con aglutinante sintético, ASME
B16.21, CL-300 ASME B16.5, espesor de 3mm (1/8"), diámetro 3" 7.00 0.25 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
(8) Espárrago ASTM A193 Gr B7, Clase 2A, con dos tuercas hexagonales clase pesada
ASTM A 194 Gr 2H Cl-2B y arandelas, 3/4" x 108 mm 6.00 0.21 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Niple Acero al carbono ASTM A-53 GR B, sin costura, SCH 40, diámetro 2" (100 mm 6.00 0.21 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Niple Acero al carbono ASTM A-53 GR B, sin costura, SCH 40, diámetro 1" (100 mm 2.00 0.07 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Niple Acero al carbono ASTM A-53 GR B, sin costura, SCH 40, diámetro 1" (50 mm L 2.00 0.07 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Válvula de Mariposa, CL-300 STD, LUG 316 TRIM HNDL, diámetro 3" 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Válvula check, CL-300 RF STL, LUG DR THRU 316 TRIM, diámetro 3" 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Válvula de bola, roscada, 800 LB SW, diámetro 1" 2.00 0.07 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Válvula de bola, roscada, 800 LB SW, diámetro 2" 2.00 0.07 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Bomba sumergible multietápica, ADT 234, 28 kW, 460V/3f/60Hz , caudal de 24 m3/h 1.00 0.04 30 28 01/08/18 30/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X X
4.2 Pipeline
Tubería de acero al carbono, Sch40, BW, ASTM A-53 GR B, sin costura - diámetro 3" 179.00 6.63 30 27 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X
TRIMMED Codo 45° ASME B16.9, 5D, BW, Sch 40, ASTM A234 WPB sin costura (7.81°) 1.00 0.04 30 27 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X
TRIMMED Codo 45° ASME B16.9, 5D, BW, Sch 40, ASTM A234 WPB sin costura (33.10° 1.00 0.04 30 27 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X
TRIMMED Codo 45° ASME B16.9, 5D, BW, Sch 40, ASTM A234 WPB sin costura (36.61° 1.00 0.04 30 27 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X X X
TRIMMED Codo 45° ASME B16.9, 5D, BW, Sch 40, ASTM A234 WPB sin costura (21.67° 1.00 0.04 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
Brida Slip On, Tipo RF, AC ASTM A-105, ANSI B16.5, CL-300, diámetro de 3" 8.00 0.32 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
(8) Espárrago ASTM A193 Gr B7, Clase 2A, con dos tuercas hexagonales clase pesad 8.00 0.32 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
Tubería de ɸ3", HDPE ASTM F714 - PE100, SDR 7.4, diámetro IPS, 322.00 12.88 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
Tubería de ɸ3", HDPE ASTM F714 - PE100, SDR 11, diámetro IPS 1,150.00 46.00 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
Flange Adapter, HDPE PE100, SDR 7.4 9.00 0.36 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
Brida lap joint, Tipo RF, AC ASTM A-105, ANSI B16.5, CL-300, diámetro de 3" 9.00 0.36 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
Brida lap joint, Tipo RF, AC ASTM A-105, ANSI B16.5, CL-150, diámetro de 3" 4.00 0.16 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
Brida Slip On, Tipo RF, AC ASTM A-105, ANSI B16.5, CL-150, diámetro de 3" 2.00 0.08 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
(4) Espárrago ASTM A193 Gr B7, Clase 2A, con dos tuercas hexagonales clase pesad 3.00 0.12 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
Empaquetadura plana para bridas RF, material: PTFE con aglutinante sintético, ASME 6.00 0.24 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
Empaquetadura plana para bridas RF, material: PTFE con aglutinante sintético, ASME 2.00 0.08 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
Niple Acero al carbono ASTM A-53 GR B, sin costura, SCH 40, diámetro 3" (300 mm 4.00 0.16 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
Niple Acero al carbono ASTM A-53 GR B, sin costura, SCH 40, diámetro 1" (300 mm 4.00 0.16 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
Sockolet, 3000 # FS, ASTM A-105, 3"x1" 4.00 0.16 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
Válvula de bola, roscada, 800 LB SW, diámetro 1" 8.00 0.32 30 25 02/08/18 31/08/18 X X X X X X X X X X X X X X X X X X X X X X X X X
Copla partida para tubería de HDPE de pared doble de ϕ450 mm 3.00 0.12 26 26 05/10/18 30/10/18
Reducción para tuberia de HDPE de pared doble de ϕ450 a 300 mm 3.00 0.12 26 26 05/10/18 30/10/18
4.3.2.4. Instalación de tubería de HDPE de pared doble perforada de 300 mm 466.20 17.93 26 26 05/10/18 30/10/18
1
Tapa para tubería de HDPE de pared doble de ϕ300 mm 4.00 0.15 26 26 05/10/18 30/10/18
Copla partida para tubería de HDPE de pared doble de ϕ300 mm 147.50 5.67 26 26 05/10/18 30/10/18
Codos 30° para tubería de HDPE de pared doble de ϕ300 mm 6.00 0.23 26 26 05/10/18 30/10/18
Reducción para tuberia de HDPE de pared doble de ϕ300 a 200 mm 2.00 0.08 26 26 05/10/18 30/10/18
4.3.2.4. Instalación de tubería de HDPE de pared doble perforada de 200 mm 207.90 8.00 26 26 05/10/18 30/10/18
2
Tapa para tubería de HDPE de pared doble de ϕ200 mm 4.00 0.15 26 26 05/10/18 30/10/18
Copla partida para tubería de HDPE de pared doble de ϕ200 mm 60.00 2.31 26 26 05/10/18 30/10/18
4.3.2.4. Instalación de tubería de HDPE de pared doble perforada de 100 mm 2,583.00 99.35 26 26 05/10/18 30/10/18
3
Tapa para tubería de HDPE de pared doble de ϕ100 mm 50.00 1.92 26 26 05/10/18 30/10/18
Copla partida para tubería de HDPE de pared doble de ϕ100 mm 498.00 19.15 26 26 05/10/18 30/10/18
Instalación de yee para tubería de HDPE de pared doble de 300x300x300 mm 1.00 0.04 26 26 05/10/18 30/10/18
Instalación de yee para tubería de HDPE de pared doble de 300x300x200 mm 1.00 0.04 26 26 05/10/18 30/10/18
Instalación de yee para tubería de HDPE de pared doble de 300x300x100 mm 25.00 0.96 26 26 05/10/18 30/10/18
Instalación de yee para tubería de HDPE de pared doble de 200x200x100 mm 10.00 0.38 26 26 05/10/18 30/10/18
Instalación de yee para tubería de HDPE de pared doble de 100x100x100 mm 3.00 0.12 26 26 05/10/18 30/10/18
Copla partida para tubería de HDPE de pared doble de ϕ450 mm 3.00 0.08 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X
Reducción para tuberia de HDPE de pared doble de ϕ450 a 300 mm 3.00 0.08 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X
4.3.3.4. Instalación de tubería de HDPE de pared doble perforada de 300 mm 466.20 11.66 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X
1
Tapa para tubería de HDPE de pared doble de ϕ300 mm 4.00 0.10 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X
Copla partida para tubería de HDPE de pared doble de ϕ300 mm 147.50 3.69 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X
Codos 30° para tubería de HDPE de pared doble de ϕ300 mm 6.00 0.15 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X
Reducción para tuberia de HDPE de pared doble de ϕ300 a 200 mm 2.00 0.05 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X
4.3.3.4. Instalación de tubería de HDPE de pared doble perforada de 200 mm 207.90 5.20 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X
2
Tapa para tubería de HDPE de pared doble de ϕ200 mm 4.00 0.10 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X
Copla partida para tubería de HDPE de pared doble de ϕ200 mm 60.00 1.50 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X
4.3.3.4. Instalación de tubería de HDPE de pared doble perforada de 100 mm 2,583.00 64.58 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X
3
Tapa para tubería de HDPE de pared doble de ϕ100 mm 50.00 1.25 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X
Copla partida para tubería de HDPE de pared doble de ϕ100 mm 498.00 12.45 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X
Instalación de yee para tubería de HDPE de pared doble de 300x300x300 mm 1.00 0.03 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X
Instalación de yee para tubería de HDPE de pared doble de 300x300x200 mm 1.00 0.03 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X
Instalación de yee para tubería de HDPE de pared doble de 300x300x100 mm 24.00 0.60 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X
Instalación de yee para tubería de HDPE de pared doble de 200x200x100 mm 10.00 0.25 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X
Instalación de yee para tubería de HDPE de pared doble de 100x100x100 mm 3.00 0.08 40 40 26/08/18 04/10/18 X X X X X X X X X X X X X X X X X X X X X X X X
4.3.5.1. Instalación de geotextil no tejido de 270 g/m2 992.25 165.38 6 6 26/09/18 01/10/18
3
4.3.5.1. Instalación de geocelda e=100 mm 959.70 159.95 6 6 26/09/18 01/10/18
4
CANAL DE CORONACION ESTE - TRAMO 1 0 02/10/18 31/10/18
4.3.5.3. Instalación de geotextil no tejido de 270 g/m2 1,639.05 54.64 30 30 02/10/18 31/10/18
3
4.3.5.3. Instalación de geocelda e=100 mm 1,583.40 52.78 30 30 02/10/18 31/10/18
4
19-Sep
20-Sep
21-Sep
22-Sep
23-Sep
24-Sep
25-Sep
26-Sep
27-Sep
28-Sep
29-Sep
30-Sep
10-Nov
11-Nov
12-Nov
13-Nov
14-Nov
15-Nov
16-Nov
17-Nov
18-Nov
19-Nov
20-Nov
21-Nov
22-Nov
23-Nov
24-Nov
25-Nov
26-Nov
27-Nov
28-Nov
29-Nov
30-Nov
10-Dec
11-Dec
12-Dec
13-Dec
14-Dec
15-Dec
16-Dec
17-Dec
18-Dec
19-Dec
20-Dec
21-Dec
10-Oct
11-Oct
12-Oct
13-Oct
14-Oct
15-Oct
16-Oct
17-Oct
18-Oct
19-Oct
20-Oct
21-Oct
22-Oct
23-Oct
24-Oct
25-Oct
26-Oct
27-Oct
28-Oct
29-Oct
30-Oct
31-Oct
1-Nov
2-Nov
3-Nov
4-Nov
5-Nov
6-Nov
7-Nov
8-Nov
9-Nov
1-Dec
2-Dec
3-Dec
4-Dec
5-Dec
6-Dec
7-Dec
8-Dec
9-Dec
1-Oct
2-Oct
3-Oct
4-Oct
5-Oct
6-Oct
7-Oct
8-Oct
9-Oct
Fin de Obra
- - - 16 Ene 12
X X X
X X X Fin de Obra
16 Ene 12
X X X
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Fin de Obra
16 Ene 12
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Fin de Obra
- - - - - - - - - - - - - - - - - - - - - - - - - - 16 Ene 12
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
- - - - - - - - - - - - - - - -
- - - - - - - -
X X X X X X X X
- - - - - - - - - - - - - - - -
X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - -
X X X X X X
X X X X X X
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
20-May
21-May
22-May
23-May
24-May
25-May
26-May
27-May
28-May
29-May
30-May
31-May
10-Jun
11-Jun
12-Jun
13-Jun
14-Jun
15-Jun
16-Jun
17-Jun
18-Jun
19-Jun
20-Jun
1-Jun
2-Jun
3-Jun
4-Jun
5-Jun
6-Jun
7-Jun
8-Jun
9-Jun
Item Actividad Metrado Estimado Avance Diario Días Calendario Días Útiles Fecha Inicio Fecha Fin
2.0 SUBDRENAJE
2.9 Tubería de HDPE sólida SDR 21 de 300 mm (llegada hacia poza de subdrenaje) 14.70 0.26 56 56 26/06/18 20/08/18
Copla especial para transición de tuberia de HDPE de pared doble no perforada a tuberia
sólida SDR 21 de ø300 mm
1.00 0.02 56 56 26/06/18 20/08/18
2.10 Tubería de HDPE de pared doble perforada de ø300 mm 576.45 10.29 56 56 26/06/18 20/08/18
Codos 30° para tubería de HDPE de pared doble de ϕ300 mm 3.00 0.05 56 56 26/06/18 20/08/18
Codos 45° para tubería de HDPE de pared doble de ϕ300 mm 5.00 0.09 56 56 26/06/18 20/08/18
Copla partida para tubería de HDPE de pared doble de ϕ300 mm 128.00 2.29 56 56 26/06/18 20/08/18
2.11 Tubería de HDPE de pared doble perforada de ø100 mm 1,071.00 19.13 56 56 26/06/18 20/08/18
Copla partida para tubería de HDPE de pared doble de ϕ100 mm 200.00 3.57 56 56 26/06/18 20/08/18
Yee para tubería de HDPE de pared doble de 300X300X300 mm 2.00 0.04 56 56 26/06/18 20/08/18
Yee para tubería de HDPE de pared doble de 300X300X100 mm 6.00 0.11 56 56 26/06/18 20/08/18
Yee para tubería de HDPE de pared doble de 100X100X100 mm 2.00 0.04 56 56 26/06/18 20/08/18
2.9 Tubería de HDPE de pared doble perforada de ø300 mm 576.45 12.53 46 46 03/07/18 17/08/18
Codos 30° para tubería de HDPE de pared doble de ϕ300 mm 3.00 0.07 46 46 03/07/18 17/08/18
Codos 45° para tubería de HDPE de pared doble de ϕ300 mm 5.00 0.11 46 46 03/07/18 17/08/18
Copla partida para tubería de HDPE de pared doble de ϕ300 mm 128.00 2.78 46 46 03/07/18 17/08/18
2.10 Tubería de HDPE de pared doble perforada de ø100 mm 1,071.00 23.28 46 46 03/07/18 17/08/18
Copla partida para tubería de HDPE de pared doble de ϕ100 mm 200.00 4.35 46 46 03/07/18 17/08/18
Yee para tubería de HDPE de pared doble de 300X300X300 mm 2.00 0.04 46 46 03/07/18 17/08/18
Yee para tubería de HDPE de pared doble de 300X300X100 mm 5.00 0.11 46 46 03/07/18 17/08/18
Yee para tubería de HDPE de pared doble de 100X100X100 mm 2.00 0.04 46 46 03/07/18 17/08/18
3.5 Gavión caja 5.0x1.0x1.0 m (incluye grava de relleno) 11.00 0.29 38 38 24/06/18 31/07/18
3.8 Tubería de HDPE de pared doble no perforada de 450 mm 47.25 6.75 7 7 15/08/18 21/08/18
4.0 POZA PARA CONTROL DE EROSION Y SEDIMENTOS (L=1.5mx1.0mx1.5m, e=150mm, 7 15/09/18 21/09/18
Ø=450mm)
4.3 Tubería de HDPE de pared doble no perforada de 450 mm 15.75 2.25 7 7 15/09/18 21/09/18
Tubería de acero al carbono, Sch40, BW, ASTM A-53 GR B, sin costura - diámetro 3" 3.00 0.11 30 28 01/08/18 30/08/18
Tubería de acero al carbono, Sch 40, BW, ASTM A-53 GR B, sin costura - diámetro 2" 5.00 0.18 30 28 01/08/18 30/08/18
Cople, THRD 3000LB FS, ASTM A-105, diámetro de 1" 1.00 0.04 30 28 01/08/18 30/08/18
Brida Slip On, Tipo RF, AC ASTM A-105, ANSI B16.5, CL-300, diámetro de 3" 8.00 0.29 30 28 01/08/18 30/08/18
Codo 90°, SW 3000LB FS, ASTM A-105, diámetro 2" 3.00 0.11 30 28 01/08/18 30/08/18
Codo 45°, SW 3000LB FS, ASTM A-105, diámetro 2" 1.00 0.04 30 28 01/08/18 30/08/18
Codo 90° ASME B16.9, 5D, BW, Sch 40, ASTM A234 WPB sin costura, diámetro 3" 2.00 0.07 30 28 01/08/18 30/08/18
Tee SW 3000 LB, FS, ASTM A-105, 2"x2" 1.00 0.04 30 28 01/08/18 30/08/18
Tee THRD 3000 LB, ASTM A-105, 1"x1" 1.00 0.04 30 28 01/08/18 30/08/18
Unión universal SW 3000LB FS, ASTM A-105, diámetro 2" 2.00 0.07 30 28 01/08/18 30/08/18
Sockolet, 3000 LB FS, ASTM A-105, 3"x2" 2.00 0.07 30 28 01/08/18 30/08/18
Bushing, RED. THRD 3000LB, ASTM A-105, 1"x1/2" 1.00 0.04 30 28 01/08/18 30/08/18
Empaquetadura plana para bridas RF, material: PTFE con aglutinante sintético, ASME
B16.21, CL-300 ASME B16.5, espesor de 3mm (1/8"), diámetro 3" 7.00 0.25 30 28 01/08/18 30/08/18
(8) Espárrago ASTM A193 Gr B7, Clase 2A, con dos tuercas hexagonales clase pesada 6.00 0.21 30 28 01/08/18 30/08/18
ASTM A 194 Gr 2H Cl-2B y arandelas, 3/4" x 108 mm
Niple Acero al carbono ASTM A-53 GR B, sin costura, SCH 40, diámetro 2" (100 mm LG) 6.00 0.21 30 28 01/08/18 30/08/18
Niple Acero al carbono ASTM A-53 GR B, sin costura, SCH 40, diámetro 1" (100 mm LG) 2.00 0.07 30 28 01/08/18 30/08/18
Niple Acero al carbono ASTM A-53 GR B, sin costura, SCH 40, diámetro 1" (50 mm LG) 2.00 0.07 30 28 01/08/18 30/08/18
Válvula de Mariposa, CL-300 STD, LUG 316 TRIM HNDL, diámetro 3" 1.00 0.04 30 28 01/08/18 30/08/18
Válvula check, CL-300 RF STL, LUG DR THRU 316 TRIM, diámetro 3" 1.00 0.04 30 28 01/08/18 30/08/18
Válvula de bola, roscada, 800 LB SW, diámetro 1" 2.00 0.07 30 28 01/08/18 30/08/18
Válvula de bola, roscada, 800 LB SW, diámetro 2" 2.00 0.07 30 28 01/08/18 30/08/18
Bomba sumergible multietápica, ADT 234, 28 kW, 460V/3f/60Hz , caudal de 24 m3/h 1.00 0.04 30 28 01/08/18 30/08/18
4.2 Pipeline
Tubería de acero al carbono, Sch40, BW, ASTM A-53 GR B, sin costura - diámetro 3" 179.00 6.63 30 27 02/08/18 31/08/18
TRIMMED Codo 45° ASME B16.9, 5D, BW, Sch 40, ASTM A234 WPB sin costura (7.81°), diám 1.00 0.04 30 27 02/08/18 31/08/18
TRIMMED Codo 45° ASME B16.9, 5D, BW, Sch 40, ASTM A234 WPB sin costura (33.10°), diá 1.00 0.04 30 27 02/08/18 31/08/18
TRIMMED Codo 45° ASME B16.9, 5D, BW, Sch 40, ASTM A234 WPB sin costura (36.61°), diá 1.00 0.04 30 27 02/08/18 31/08/18
TRIMMED Codo 45° ASME B16.9, 5D, BW, Sch 40, ASTM A234 WPB sin costura (21.67°), diá 1.00 0.04 30 25 02/08/18 31/08/18
Brida Slip On, Tipo RF, AC ASTM A-105, ANSI B16.5, CL-300, diámetro de 3" 8.00 0.32 30 25 02/08/18 31/08/18
(8) Espárrago ASTM A193 Gr B7, Clase 2A, con dos tuercas hexagonales clase pesada ASTM 8.00 0.32 30 25 02/08/18 31/08/18
Tubería de ɸ3", HDPE ASTM F714 - PE100, SDR 7.4, diámetro IPS, 322.00 12.88 30 25 02/08/18 31/08/18
Tubería de ɸ3", HDPE ASTM F714 - PE100, SDR 11, diámetro IPS 1,150.00 46.00 30 25 02/08/18 31/08/18
Flange Adapter, HDPE PE100, SDR 7.4 9.00 0.36 30 25 02/08/18 31/08/18
Brida lap joint, Tipo RF, AC ASTM A-105, ANSI B16.5, CL-300, diámetro de 3" 9.00 0.36 30 25 02/08/18 31/08/18
Brida lap joint, Tipo RF, AC ASTM A-105, ANSI B16.5, CL-150, diámetro de 3" 4.00 0.16 30 25 02/08/18 31/08/18
Brida Slip On, Tipo RF, AC ASTM A-105, ANSI B16.5, CL-150, diámetro de 3" 2.00 0.08 30 25 02/08/18 31/08/18
(4) Espárrago ASTM A193 Gr B7, Clase 2A, con dos tuercas hexagonales clase pesada ASTM 3.00 0.12 30 25 02/08/18 31/08/18
Empaquetadura plana para bridas RF, material: PTFE con aglutinante sintético, ASME B16.21 6.00 0.24 30 25 02/08/18 31/08/18
Empaquetadura plana para bridas RF, material: PTFE con aglutinante sintético, ASME B16.21 2.00 0.08 30 25 02/08/18 31/08/18
Niple Acero al carbono ASTM A-53 GR B, sin costura, SCH 40, diámetro 3" (300 mm LG) 4.00 0.16 30 25 02/08/18 31/08/18
Niple Acero al carbono ASTM A-53 GR B, sin costura, SCH 40, diámetro 1" (300 mm LG) 4.00 0.16 30 25 02/08/18 31/08/18
Sockolet, 3000 # FS, ASTM A-105, 3"x1" 4.00 0.16 30 25 02/08/18 31/08/18
Válvula de bola, roscada, 800 LB SW, diámetro 1" 8.00 0.32 30 25 02/08/18 31/08/18
Copla partida para tubería de HDPE de pared doble de ϕ450 mm 3.00 0.12 26 26 05/10/18 30/10/18
Reducción para tuberia de HDPE de pared doble de ϕ450 a 300 mm 3.00 0.12 26 26 05/10/18 30/10/18
4.3.2.4. Instalación de tubería de HDPE de pared doble perforada de 300 mm 466.20 17.93 26 26 05/10/18 30/10/18
1
Tapa para tubería de HDPE de pared doble de ϕ300 mm 4.00 0.15 26 26 05/10/18 30/10/18
Copla partida para tubería de HDPE de pared doble de ϕ300 mm 147.50 5.67 26 26 05/10/18 30/10/18
Codos 30° para tubería de HDPE de pared doble de ϕ300 mm 6.00 0.23 26 26 05/10/18 30/10/18
Reducción para tuberia de HDPE de pared doble de ϕ300 a 200 mm 2.00 0.08 26 26 05/10/18 30/10/18
4.3.2.4. Instalación de tubería de HDPE de pared doble perforada de 200 mm 207.90 8.00 26 26 05/10/18 30/10/18
2
Tapa para tubería de HDPE de pared doble de ϕ200 mm 4.00 0.15 26 26 05/10/18 30/10/18
Copla partida para tubería de HDPE de pared doble de ϕ200 mm 60.00 2.31 26 26 05/10/18 30/10/18
4.3.2.4. Instalación de tubería de HDPE de pared doble perforada de 100 mm 2,583.00 99.35 26 26 05/10/18 30/10/18
3
Tapa para tubería de HDPE de pared doble de ϕ100 mm 50.00 1.92 26 26 05/10/18 30/10/18
Copla partida para tubería de HDPE de pared doble de ϕ100 mm 498.00 19.15 26 26 05/10/18 30/10/18
Instalación de yee para tubería de HDPE de pared doble de 300x300x300 mm 1.00 0.04 26 26 05/10/18 30/10/18
Instalación de yee para tubería de HDPE de pared doble de 300x300x200 mm 1.00 0.04 26 26 05/10/18 30/10/18
Instalación de yee para tubería de HDPE de pared doble de 300x300x100 mm 25.00 0.96 26 26 05/10/18 30/10/18
Instalación de yee para tubería de HDPE de pared doble de 200x200x100 mm 10.00 0.38 26 26 05/10/18 30/10/18
Instalación de yee para tubería de HDPE de pared doble de 100x100x100 mm 3.00 0.12 26 26 05/10/18 30/10/18
Copla partida para tubería de HDPE de pared doble de ϕ450 mm 3.00 0.08 40 40 26/08/18 04/10/18
Reducción para tuberia de HDPE de pared doble de ϕ450 a 300 mm 3.00 0.08 40 40 26/08/18 04/10/18
4.3.3.4. Instalación de tubería de HDPE de pared doble perforada de 300 mm 466.20 11.66 40 40 26/08/18 04/10/18
1
Tapa para tubería de HDPE de pared doble de ϕ300 mm 4.00 0.10 40 40 26/08/18 04/10/18
Copla partida para tubería de HDPE de pared doble de ϕ300 mm 147.50 3.69 40 40 26/08/18 04/10/18
Codos 30° para tubería de HDPE de pared doble de ϕ300 mm 6.00 0.15 40 40 26/08/18 04/10/18
Reducción para tuberia de HDPE de pared doble de ϕ300 a 200 mm 2.00 0.05 40 40 26/08/18 04/10/18
4.3.3.4. Instalación de tubería de HDPE de pared doble perforada de 200 mm 207.90 5.20 40 40 26/08/18 04/10/18
2
Tapa para tubería de HDPE de pared doble de ϕ200 mm 4.00 0.10 40 40 26/08/18 04/10/18
Copla partida para tubería de HDPE de pared doble de ϕ200 mm 60.00 1.50 40 40 26/08/18 04/10/18
4.3.3.4. Instalación de tubería de HDPE de pared doble perforada de 100 mm 2,583.00 64.58 40 40 26/08/18 04/10/18
3
Tapa para tubería de HDPE de pared doble de ϕ100 mm 50.00 1.25 40 40 26/08/18 04/10/18
Copla partida para tubería de HDPE de pared doble de ϕ100 mm 498.00 12.45 40 40 26/08/18 04/10/18
Instalación de yee para tubería de HDPE de pared doble de 300x300x300 mm 1.00 0.03 40 40 26/08/18 04/10/18
Instalación de yee para tubería de HDPE de pared doble de 300x300x200 mm 1.00 0.03 40 40 26/08/18 04/10/18
Instalación de yee para tubería de HDPE de pared doble de 300x300x100 mm 24.00 0.60 40 40 26/08/18 04/10/18
Instalación de yee para tubería de HDPE de pared doble de 200x200x100 mm 10.00 0.25 40 40 26/08/18 04/10/18
Instalación de yee para tubería de HDPE de pared doble de 100x100x100 mm 3.00 0.08 40 40 26/08/18 04/10/18
4.3.5.1. Instalación de geotextil no tejido de 270 g/m2 992.25 165.38 6 6 26/09/18 01/10/18
3
4.3.5.1. Instalación de geocelda e=100 mm 959.70 159.95 6 6 26/09/18 01/10/18
4
CANAL DE CORONACION ESTE - TRAMO 1 0 02/10/18 31/10/18
4.3.5.3. Instalación de geotextil no tejido de 270 g/m2 1,639.05 54.64 30 30 02/10/18 31/10/18
3
4.3.5.3. Instalación de geocelda e=100 mm 1,583.40 52.78 30 30 02/10/18 31/10/18
4