Está en la página 1de 8

01 RED DE DISTRIBUCION

01.01 TUBERIA DE DISTRIBUCION


01.01.01 TRAZO, NIVELES Y REPLANTEO DE ZANJAS m 7,296.00 2.65
01.01.02 EXCAVACION MANUAL DE ZANJAS EN TERRENO COMPACTA 1X0.40 M m 460.80 19.49
01.01.03 REFINE Y NIVELACION DE FONDOS m2 3,562.00 1.19
01.01.04 CAMA DE PROTECCION PARA TUBERIA <=3" m 729.65 2.64
01.01.05 RELLENO Y APIZONADO DE ZANJAS m3 620.00 3.75
01.01.06 TUBERIA PVC SAP C- 7.5 D=3" m 2,800.00 27.15
01.01.07 TUBERIA PVC SAP C- 7.5 D=2" m 7,296.00 20.85
01.01.08 TUBERIA PVC SAP C- 7.5 D=1 1/2" m 1,658.00 0.90
01.01.09 TUBERIA PVC SAP C- 7.5 D=1" m 640.00 0.90
01.01.10 TUBERIA PVC SAP C- 7.5 D=3/4" m 640.00 13.50
01.01.11 PRUEBA HIDRAULICA EN TUBERIA PVC m 640.00 3.82
01.01.12 ACCESORIOS DE RED DISTRIBUCION glb 1.00 2,108.00
01.02 VALVULAS DE CONTROL DE DISTRIBUCION 2" 40X40CM
01.02.01 TRAZO Y REPLANTEO und 10.80 33.04
01.02.02 EXCAVACION EN TERRENO COMPACTA m3 3.07 19.12
01.02.03 ENCOFRADO Y DESENCOFRADO m2 3.07 31.42
01.02.04 CONCRETO f'c=175 kg/cm2 m3 6.50 352.21
01.02.05 CONCRETO f´c = 210 kg/cm2 m3 6.50 394.17
01.02.06 CONCRETO CICLOPEO f'c=140 kg/cm2 + 30% P. M. m3 6.50 198.55
01.02.07 TARRAJEO MUROS EXTERIORES C:A 1:5 e=1.5 cm m2 6.50 21.53
01.02.08 TAPA METALICA DE 0.40 X 0.40 m und 6.50 160.84
01.02.09 VALVULA DE CONTROL D=2" und 6.50 176.66
01.02.10 VALVULA DE CONTROL D=1" und 6.50 254.79
01.03 VALVULAS DE CONTROL DE MATRIZ 3" 60X60CM
01.03.01 TRAZO Y REPLANTEO m2 8.00 3.10
01.03.02 EXCAVACION EN TERRENO COMPACTA m3 9.60 19.12
01.03.03 CONCRETO f'c=175 kg/cm2 m3 3.97 352.21
01.03.04 CONCRETO CICLOPEO f'c=140 kg/cm2 + 30% P. M. m3 8.00 198.55
01.03.05 ENCOFRADO Y DESENCOFRADO m2 38.40 31.42
01.03.06 TARRAJEO MUROS EXTERIORES C:A 1:5 e=1.5 cm m2 19.20 21.53
01.03.07 TAPA METALICA DE 0.60 X 0.60 m und 8.00 158.45
01.03.08 VALVULA DE CONTROL D=3" und 8.00 204.84
01.04 VALVULAS DE PURGA 2"@3/4 DE 40X40CM
01.04.01 TRAZO Y REPLANTEO m2 21.00 3.10
01.04.02 EXCAVACION EN TERRENO COMPACTA m3 21.00 19.12
01.04.03 CONCRETO f'c=175 kg/cm2 m3 21.00 352.21
01.04.04 CONCRETO CICLOPEO f'c=140 kg/cm2 + 30% P. M. m3 21.00 198.55
01.04.05 ENCOFRADO Y DESENCOFRADO m2 27.00 31.42
01.04.06 TARRAJEO MUROS EXTERIORES C:A 1:5 e=1.5 cm m2 27.00 21.53
01.04.07 VALVULA DE PURGA DE D=3/4" und 27.00 133.39
01.04.08 TAPA METALICA DE 0.40 X 0.40 m und 27.00 160.84
01.05 HIDRANTES DE RIEGO
01.05.01 TRAZO Y REPLANTEO m2 130.00 3.10
01.05.02 EXCAVACION EN TERRENO COMPACTA m3 25.00 19.12
01.05.03 ENCOFRADO Y DESENCOFRADO m2 75.00 31.42
01.05.04 CONCRETO f'c=175 kg/cm2 m3 6.20 352.21
01.05.05 CONCRETO f´c = 100 kg/cm2 (solado) m3 10.00 165.72
01.05.06 CONCRETO CICLOPEO f'c=140 kg/cm2 + 30% P. M. m3 3.68 198.55
01.05.07 TARRAJEO MUROS EXTERIORES C:A 1:5 e=1.5 cm m2 102.00 21.53
01.05.08 TAPA METALICA DE 0.40 X 0.40 m und 50.00 160.84
01.05.09 HIDRANTE DE 3/4" MONTADO SOBRE MATRIZ DE 1" und 50.00 184.82
01.06 MODULO DE RIEGO MOVIL 25MMX3/4" (50 UND)
01.06.01 EQUIPO MOVIL DE RIEGO (03 ASPERSION) und 20.00 763.83
01.07 PINTURA EN OBRAS DE ARTE
01.07.01 PINTURA ESMALTE EN MUROS EXTERIORES m2 60.00 12.55
01.08 TRANSPORTE O FLETES
01.08.01 FLETE TERRESTRE glb 1.00 3,000.00
01.08.02 FLETE A ZONA RURAL glb 1.00 1,000.00
367,297.35
280,208.05
19,334.40
8,980.99
4,238.78
1,926.28
2,325.00
76,020.00
152,121.60
1,492.20
576.00
8,640.00
2,444.80
2,108.00
10,643.89
356.83
58.70
96.46
2,289.37
2,562.11
1,290.58
139.95
1,045.46
1,148.29
1,656.14
7,721.25
24.80
183.55
1,398.27
1,588.40
1,206.53
413.38
1,267.60
1,638.72
21,406.44
65.10
401.52
7,396.41
4,169.55
848.34
581.31
3,601.53
4,342.68
27,288.12
403.00
478.00
2,356.50
2,183.70
1,657.20
730.66
2,196.06
8,042.00
9,241.00
15,276.60
15,276.60
753.00
753.00
4,000.00
3,000.00
1,000.00
ITEM DESCRIPCION- PARTIDAS UND CANT. N° ELEM.
01 RED DE DISTRIBUCION
01.01 TUBERIA DE DISTRIBUCION
01.01.01 TRAZO, NIVELES Y REPLANTEO DE ZANJAS m
01.01.02 EXCAVACION MANUAL DE ZANJAS EN TERRENO COMPACTA 1X0.40 m
01.01.03 REFINE Y NIVELACION DE FONDOS m2
01.01.04 CAMA DE PROTECCION PARA TUBERIA <=3" m
01.01.05 RELLENO Y APIZONADO DE ZANJAS m3
01.01.06 TUBERIA PVC SAP C- 7.5 D=3" m
01.01.07 TUBERIA PVC SAP C- 7.5 D=2" m
01.01.08 TUBERIA PVC SAP C- 7.5 D=1 1/2" m
01.01.09 TUBERIA PVC SAP C- 7.5 D=1" m
01.01.10 TUBERIA PVC SAP C- 7.5 D=3/4" m
01.01.11 PRUEBA HIDRAULICA EN TUBERIA PVC m
01.01.12 ACCESORIOS DE RED DISTRIBUCION glb
01.02 VALVULAS DE CONTROL DE DISTRIBUCION 2" 40X40CM
01.02.01 TRAZO Y REPLANTEO und
01.02.02 EXCAVACION EN TERRENO COMPACTA m3
01.02.03 ENCOFRADO Y DESENCOFRADO m2
01.02.04 CONCRETO f'c=175 kg/cm2 m3
01.02.05 CONCRETO f´c = 210 kg/cm2 m3
01.02.06 CONCRETO CICLOPEO f'c=140 kg/cm2 + 30% P. M. m3
01.02.07 TARRAJEO MUROS EXTERIORES C:A 1:5 e=1.5 cm m2
01.02.08 TAPA METALICA DE 0.40 X 0.40 m und
01.02.09 VALVULA DE CONTROL D=2" und
01.02.10 VALVULA DE CONTROL D=1" und
01.03 VALVULAS DE CONTROL DE MATRIZ 3" 60X60CM
01.03.01 TRAZO Y REPLANTEO m2
01.03.02 EXCAVACION EN TERRENO COMPACTA m3
01.03.03 CONCRETO f'c=175 kg/cm2 m3
01.03.04 CONCRETO CICLOPEO f'c=140 kg/cm2 + 30% P. M. m3
01.03.05 ENCOFRADO Y DESENCOFRADO m2
01.03.06 TARRAJEO MUROS EXTERIORES C:A 1:5 e=1.5 cm m2
01.03.07 TAPA METALICA DE 0.60 X 0.60 m und
01.03.08 VALVULA DE CONTROL D=3" und
01.04 VALVULAS DE PURGA 2"@3/4 DE 40X40CM
01.04.01 TRAZO Y REPLANTEO m2
01.04.02 EXCAVACION EN TERRENO COMPACTA m3
01.04.03 CONCRETO f'c=175 kg/cm2 m3
01.04.04 CONCRETO CICLOPEO f'c=140 kg/cm2 + 30% P. M. m3
01.04.05 ENCOFRADO Y DESENCOFRADO m2
01.04.06 TARRAJEO MUROS EXTERIORES C:A 1:5 e=1.5 cm m2
01.04.07 VALVULA DE PURGA DE D=3/4" und
01.04.08 TAPA METALICA DE 0.40 X 0.40 m und
01.05 HIDRANTES DE RIEGO
01.05.01 TRAZO Y REPLANTEO m2
01.05.02 EXCAVACION EN TERRENO COMPACTA m3
01.05.03 ENCOFRADO Y DESENCOFRADO m2
01.05.04 CONCRETO f'c=175 kg/cm2 m3
01.05.05 CONCRETO f´c = 100 kg/cm2 (solado) m3
01.05.06 CONCRETO CICLOPEO f'c=140 kg/cm2 + 30% P. M. m3
01.05.07 TARRAJEO MUROS EXTERIORES C:A 1:5 e=1.5 cm m2
01.05.08 TAPA METALICA DE 0.40 X 0.40 m und
01.05.09 HIDRANTE DE 3/4" MONTADO SOBRE MATRIZ DE 1" und
01.06 MODULO DE RIEGO MOVIL 25MMX3/4" (50 UND)
01.06.01 EQUIPO MOVIL DE RIEGO (03 ASPERSION) und
01.07 PINTURA EN OBRAS DE ARTE
01.07.01 PINTURA ESMALTE EN MUROS EXTERIORES m2
01.08 TRANSPORTE O FLETES
01.08.01 FLETE TERRESTRE glb
01.08.02 FLETE A ZONA RURAL glb
MEDIDA
N° VECES SUB TOTAL TOTAL
LARGO ANCHO ALTURA

7,296.00
460.80
3,562.00
729.65
620.00
2,800.00
7,296.00
1,658.00
640.00
640.00
640.00
1.00

10.80
3.07
3.07
6.50
6.50
6.50
6.50
6.50
6.50
6.50

8.00
9.60
3.97
8.00
38.40
19.20
8.00
8.00

21.00
21.00
21.00
21.00
27.00
27.00
27.00
27.00

130.00
25.00
75.00
6.20
10.00
3.68
102.00
50.00
50.00

20.00
60.00

1.00
1.00

También podría gustarte

  • Trabajo Dips
    Trabajo Dips
    Documento14 páginas
    Trabajo Dips
    Geyberson Duaner Davila Alvarez
    Aún no hay calificaciones
  • Libro1 (Autoguardado)
    Libro1 (Autoguardado)
    Documento3 páginas
    Libro1 (Autoguardado)
    Geyberson Duaner Davila Alvarez
    Aún no hay calificaciones
  • IDS AREAS - Enero 2014
    IDS AREAS - Enero 2014
    Documento26 páginas
    IDS AREAS - Enero 2014
    Yeferson DA
    Aún no hay calificaciones
  • Resultados Del Estudio de Prerfactibilidad
    Resultados Del Estudio de Prerfactibilidad
    Documento6 páginas
    Resultados Del Estudio de Prerfactibilidad
    Yeferson DA
    Aún no hay calificaciones
  • Ficha #04 de Segundo Grado.
    Ficha #04 de Segundo Grado.
    Documento3 páginas
    Ficha #04 de Segundo Grado.
    Geyberson Duaner Davila Alvarez
    Aún no hay calificaciones
  • Minesight
    Minesight
    Documento31 páginas
    Minesight
    Geyberson Duaner Davila Alvarez
    Aún no hay calificaciones
  • NEGDA
    NEGDA
    Documento2 páginas
    NEGDA
    Geyberson Duaner Davila Alvarez
    Aún no hay calificaciones
  • Champions
    Champions
    Documento6 páginas
    Champions
    Yeferson DA
    Aún no hay calificaciones
  • Horario 2015-2
    Horario 2015-2
    Documento3 páginas
    Horario 2015-2
    Geyberson Duaner Davila Alvarez
    Aún no hay calificaciones
  • Elementos de Quimica
    Elementos de Quimica
    Documento19 páginas
    Elementos de Quimica
    Yeferson DA
    Aún no hay calificaciones
  • Geolo Estruccc
    Geolo Estruccc
    Documento19 páginas
    Geolo Estruccc
    Geyberson Duaner Davila Alvarez
    Aún no hay calificaciones
  • Mar 1
    Mar 1
    Documento20 páginas
    Mar 1
    Yeferson DA
    Aún no hay calificaciones
  • YACIMIENTOS
    YACIMIENTOS
    Documento46 páginas
    YACIMIENTOS
    freddy
    Aún no hay calificaciones
  • Imprimir Diario
    Imprimir Diario
    Documento3 páginas
    Imprimir Diario
    Geyberson Duaner Davila Alvarez
    Aún no hay calificaciones
  • Trabajo Plomo
    Trabajo Plomo
    Documento11 páginas
    Trabajo Plomo
    Geyberson Duaner Davila Alvarez
    Aún no hay calificaciones
  • Manifiesto Total de Gastos
    Manifiesto Total de Gastos
    Documento9 páginas
    Manifiesto Total de Gastos
    Geyberson Duaner Davila Alvarez
    Aún no hay calificaciones
  • Lista de Proyectos de Antabamba
    Lista de Proyectos de Antabamba
    Documento2 páginas
    Lista de Proyectos de Antabamba
    Geyberson Duaner Davila Alvarez
    Aún no hay calificaciones
  • Resultados Del Estudio de Prerfactibilidad
    Resultados Del Estudio de Prerfactibilidad
    Documento6 páginas
    Resultados Del Estudio de Prerfactibilidad
    Yeferson DA
    Aún no hay calificaciones
  • TITO
    TITO
    Documento10 páginas
    TITO
    Geyberson Duaner Davila Alvarez
    Aún no hay calificaciones
  • Exposicion Topo Nenis
    Exposicion Topo Nenis
    Documento53 páginas
    Exposicion Topo Nenis
    Geyberson Duaner Davila Alvarez
    Aún no hay calificaciones
  • Capitulo 10
    Capitulo 10
    Documento16 páginas
    Capitulo 10
    Anonymous 95iZTBXQv
    Aún no hay calificaciones
  • IDS AREAS - Enero 2014
    IDS AREAS - Enero 2014
    Documento26 páginas
    IDS AREAS - Enero 2014
    Yeferson DA
    Aún no hay calificaciones
  • Metas 2014 Red Cotabambas 15dic
    Metas 2014 Red Cotabambas 15dic
    Documento625 páginas
    Metas 2014 Red Cotabambas 15dic
    Geyberson Duaner Davila Alvarez
    Aún no hay calificaciones
  • Metas Fisicas Red Cotabambas 2015 PPR
    Metas Fisicas Red Cotabambas 2015 PPR
    Documento273 páginas
    Metas Fisicas Red Cotabambas 2015 PPR
    Geyberson Duaner Davila Alvarez
    Aún no hay calificaciones
  • Plan de Negocio - Rosmeri - Miel
    Plan de Negocio - Rosmeri - Miel
    Documento5 páginas
    Plan de Negocio - Rosmeri - Miel
    Geyberson Duaner Davila Alvarez
    Aún no hay calificaciones
  • GEOLOGÍA
    GEOLOGÍA
    Documento31 páginas
    GEOLOGÍA
    Yeferson DA
    Aún no hay calificaciones
  • Elementos de Quimica
    Elementos de Quimica
    Documento19 páginas
    Elementos de Quimica
    Yeferson DA
    Aún no hay calificaciones
  • Metas Fisicas 2016 PP Red Cotabambas
    Metas Fisicas 2016 PP Red Cotabambas
    Documento136 páginas
    Metas Fisicas 2016 PP Red Cotabambas
    Geyberson Duaner Davila Alvarez
    Aún no hay calificaciones