Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Obra PROYECTO SNIP Nº 352431: "CONSTRUCCION DEL LABORATORIO DEL CENTRO INVESTIGACION EN CLIMATOLOGIA Y ENERGIAS ALTERNATIVAS DE LA UNTRM"
0.09482171792
0.04999999840
0.12 223,966.27
-
658.61
552,546.48
Obra PROYECTO SNIP Nº 352431: "CONSTRUCCION DEL LABORATORIO DEL CENTRO INVESTIGACION EN CLIMATOLOGIA Y ENERGIAS ALTERNATIVAS DE LA UNTRM"
0.09482171792
0.04999999840
0.12 223,966.27
-
658.61
552,546.48
COSTO REAL
GASTOS GENERALES ( GG )
UTILIDAD ( UTI )
IGV
PLAN COVID-19
MONTO TOTAL
369,991.13 521,333.07
37,722.07 50,107.47
19,891.05 26,421.94
455,434.12 604,968.21
81,978.14 108,894.28
47,409.73 62,975.92
584,821.99 776,838.41
21.17% 28.12%
382,781 495,297 -
MES COSTO C. ACUMULADO
1 345,883.27 345,883.27
2 373,016.52 718,899.79 500000
3 234,169.47 953,069.26
4 397,821.00 1,350,890.26
5 528,438.80 1,879,329.06
CPTP 1,879,329.06
250000
0 2 4 6 8 10 12
INDICADORES CONCLUSIONES
VARIACIÓN DE COSTO -50,039.25 El gasto es mayor a lo presupuestado
VARIACIÓN DE CRONOGRAMA -118,249.69 El proyecto está atrasado
INDICE DE RENDIMIENTO DE COSTO 0.97 Se gasta más de lo prespuestado
INDICE DE RENDIMIENTO DE CRONOGRAMA 0.94 Hay atraso
INDICE DE COSTO-CRONOGRAMA 0.91 Mayor a 0.9 = Ok