Está en la página 1de 1

CÁLCULO HIDRAULICO DE LINEA DE CONDUCCIÓN

PROYECTO:
“INSTALACIÓN DEL SISTEMA DE AGUA POTABLE AA. HH. BELLA VISTA - PICHANAQUI - CHANCHAMAYO – JUNÍN”
CLIENTE: MUNICIPALIDAD DISTRITAL DE PICHANAQUI
UBICACIÓN Localidad: AA. HH. BELLA VISTA Distrito: PICHANAQUI Provincia: CHANCHAMAYO Departamento: JUNÍN
FECHA: 7/25/2021
RESPONSABLE: RUTH KARINA AGUIRRE MENDIETA
TRAMO COTA TERRENO DIAMETRO TUBERIA PERDIDA DE PERDIDA DE COTA PIEZOMETRICA PRESIONES
LONGITUD DESNIV. PEND. VELOC. PERDIDA DE
CAUDAL CARGA CARGA CLASE DE
LRT INICIAL FINAL H S CALCULO COMER. V CARGA UNI hf INICIAL FINAL INICIAL - P FINAL - P
INCIO FINAL Qmd (l/seg) DISPON. hf TRAMO hf TUBERIA
(m) (msnm) (msnm) (m) (m/km) C=150 (Pulgadas) (m/seg) (m/m) (msnm) (msnm) (m) (m)
(m/m) (m/m)
CAP-01 Desarenador 1.56 40.00 670.620 666.873 3.75 93.675 1.33 2 1.251 0.094 0.009 0.343 670.62 670.28 0.00 3.40 C - 10
Desarenador Filtro 1.56 25.00 666.873 664.213 2.66 106.400 1.29 2 1.251 0.106 0.009 0.214 670.28 670.06 3.40 5.85 C - 10
Filtro VA-01 1.56 111.63 664.213 657.865 6.35 56.866 1.47 2 1.251 0.057 0.009 0.956 670.06 669.11 5.85 11.24 C - 10
VA-01 VP-01 1.56 156.10 657.865 636.773 21.09 135.119 1.23 2 1.251 0.135 0.009 1.337 669.11 667.77 11.24 31.00 C - 10
VP-01 VA-02 1.56 245.39 636.773 626.327 10.45 42.569 1.56 2 1.251 0.043 0.009 2.102 667.77 665.67 31.00 39.34 C - 10
VA-02 VP-02 1.56 61.29 626.327 620.940 5.39 87.894 1.34 2 1.251 0.088 0.009 0.525 665.67 665.14 39.34 44.20 C - 10
VP-02 VA-03 1.56 103.26 620.940 623.835 2.89 28.036 1.70 2 1.251 0.028 0.009 0.884 665.14 664.26 44.20 40.42 C - 10
VA-03 VA-04 1.56 445.35 623.835 598.155 25.68 57.663 1.47 2 1.251 0.058 0.009 3.814 664.26 660.45 40.42 62.29 C - 10
VA-04 A-P.AEREO 1.56 28.72 598.155 575.939 22.22 773.538 0.86 2 1.251 0.774 0.009 0.246 660.45 660.20 62.29 84.26 C - 10
A-P.AEREO B-P.AEREO 1.56 22.32 575.939 575.733 0.21 9.229 2.14 2 1.251 0.009 0.009 0.191 660.20 660.01 84.26 84.28 C - 10
B-P.AEREO VP-03 1.56 36.57 575.733 574.213 1.52 41.564 1.57 2 1.251 0.042 0.009 0.313 660.01 659.69 84.28 85.48 C - 10
VP-03 VA-05 1.56 19.94 574.213 580.198 5.99 300.150 1.04 2 1.251 0.300 0.009 0.171 659.69 659.52 85.48 79.33 C - 10
VA-05 VA-06 1.56 538.45 580.198 577.847 2.35 4.366 2.49 2 1.251 0.004 0.009 4.612 659.52 654.91 79.33 77.07 C - 10
VA-06 VP-04 1.56 225.17 577.847 570.328 7.52 33.393 1.64 2 1.251 0.033 0.009 1.928 654.91 652.98 77.07 82.66 C - 10
VP-04 R-25m3 1.56 154.81 570.328 610.491 40.16 259.434 1.08 2 1.251 0.259 0.009 1.326 652.98 651.66 82.66 41.17 C - 11

También podría gustarte