Está en la página 1de 38

DESCRIPCION

01.00.00 TRABAJOS PRELIMINARES


01.01.01 TRAZO, NIVELES Y REPLANTEO
02.00.00 MOVIMIENTO DE TIERRAS
02.01.00 EXCAVACION DE ZANJA PARA CIMIENTOS
EJE 1-1 ENTRE A Y C
EJE 1'-1' ENTRE A' Y A''
EJE 1''-1'' ENTRE B Y C
EJE 2-2 ENTRE A Y B
EJE 3-3 ENTRE B Y C
EJE 4-4 ENTRE B Y C
EJE A-A ENTRE 1 Y 2
EJE A'-A' ENTRE 1' Y 2
EJE A''-A'' ENTRE 1 Y 1'
EJE B-B ENTRE 1'' Y 4
EJE C-C ENTRE 1 Y 4

03.00.00 OBRAS DE CONCRETO SIMPLE


03.01.00 CIMIENTO CORRIDO - MEZCLA C:H 1:10+30% PG
EJE 1-1 ENTRE A Y C
EJE 1'-1' ENTRE A' Y A''
EJE 1''-1'' ENTRE B Y C
EJE 2-2 ENTRE A Y B
EJE 3-3 ENTRE B Y C
EJE 4-4 ENTRE B Y C
EJE A-A ENTRE 1 Y 2
EJE A'-A' ENTRE 1' Y 2
EJE A''-A'' ENTRE 1 Y 1'
EJE B-B ENTRE 1'' Y 4
EJE C-C ENTRE 1 Y 4

03.02.00 SOBRECIMIENTO - MEZCLA C:H 1:8+25% PM


EJE 1-1 ENTRE A Y C
EJE 1'-1' ENTRE A' Y A''
EJE 1''-1'' ENTRE B Y C
EJE 2-2 ENTRE A Y B
EJE 3-3 ENTRE B Y C
EJE 4-4 ENTRE B Y C
EJE A-A ENTRE 1 Y 2
EJE A'-A' ENTRE 1' Y 2
EJE A''-A'' ENTRE 1 Y 1'
EJE B-B ENTRE 1'' Y 4
EJE C-C ENTRE 1 Y 4
03.03.00 ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO DE 60 CM.
EJE 1-1 ENTRE A Y C
EJE 1'-1' ENTRE A' Y A''
EJE 1''-1'' ENTRE B Y C
EJE 2-2 ENTRE A Y B
EJE 3-3 ENTRE B Y C
EJE 4-4 ENTRE B Y C
EJE A-A ENTRE 1 Y 2
EJE A'-A' ENTRE 1' Y 2
EJE A''-A'' ENTRE 1 Y 1'
EJE B-B ENTRE 1'' Y 4
EJE C-C ENTRE 1 Y 4

03.04.00 FALSO PISO DE 4" CEMENTO - HORMIGON 1:6


AREA IRREGULAR
COCINA
SALA-COMEDOR
DORMITORIO 1
DORMITORIO 2
LAVANDERIA
BAÑO

COCINA
SALA-COMEDOR
DORMITORIO 1
DORMITORIO 2
LAVANDERIA
BAÑO

04.00.00 OBRAS DE CONCRETO ARMADO


04.01ZAPATAS
04.01.01 ZAPATAS- CONCRETO F'c= 210kg/cm2
Z-1
Z-2

04.02.00 COLUMNAS
04.02.01 COLUMNAS - CONCRETO F'c= 210 kg/cm2
C-1

04.02.02 COLUMNAS - ENCOFRADO Y DESENCOFRADO


C-1

04.03.00 LOSA ALIGERADA


04.03.01 LOSA ALIGERADA - CONCRETO f'c=210 kg/cm2
PAÑO 1
PAÑO 2
PAÑO 3
PAÑO 4

Factor de concreto por m2=(1x1x0.05)+(0.10x0.15x1x2.5)

04.03.02 LOSA ALIGERADA - ENCOFRADO Y DESENCOFRADO


PAÑO 1
PAÑO 2
PAÑO 3
PAÑO 4

04.03.04 LADRILLO HUECO DE 15X30X30 cm


DE PARTIDA 04.03.02 (AREA)
Factor de ladrillo por m2 (2.5x3.33)

04.04.00
VIGAS
04.04.01 VIGAS DE CONCRETO F´c=210Kg/cm2
EJE A-A ENTRE 1 Y 2
EJE B-B ENTRE 1 Y 4
EJE C-C ENTRE 1 Y 4
EJE 1-1 ENTRE A Y C
EJE 2-2 ENTRE A Y C
EJE 3-3 ENTRE BY C
EJE 4-4 ENTRE BY C

04.04.02 VIGAS ENCOFRADO Y DESENCOFRADO


PERIMETRO

05.00.00 MUROS Y TABIQUES


05.01.00 MURO DE SOGA CON LADRILLO KING KONG
EJE 1-1 ENTRE A Y C
EJE 2-2 ENTRE A Y C
EJE 3-3 ENTRE A Y C
EJE A-A ENTRE 1 Y 3
EJE C-C ENTRE 1 Y 3
EJE A'-A' ENTRE 1 Y 2
EJE B-B ENTRE 1 Y 2
EJE B'-B' ENTRE 1 Y 2

06.00.00 REVOQUES Y ENLUCIDOS


06.01.00 TARRAJEO FROTACHADO EN MUROS INTERIORES MEZCLA 1:5 E=1.5CM
BAÑO

SALA -COMEDOR-COCINA
DORMITORIO 1
DORMITORIO 2

06.02.00 TARRAJEO FROTACHADO EN MUROS EXTERIORES MEZCLA 1:5 E=1.5CM (FACHADA)


FACHADA

TARRAJEO DE COLUMNAS

06.03.00 VESTIDURA DE DERRAMES E=1.5 CM MEZCLA 1:5 (PUERTAS Y VENTANAS)


V-2
V-1
V-3
P-1
P-2
P-3

06.05.00 TARRAJEO CIELO RAZO MEZCLA 1:5 (BAÑO )


BAÑO
07.00.00 PISOS Y CONTRAPISOS
07.01.00 CONTRAPISO DE CEMENTO SEMI - PULIDO ESP. 2" DE 1:8 CEMENTO - HORMIGON
DE PARTIDA 03.04.00
07.02.00 PISO DE CERAMICO 30cm X 30cm EN EL BAÑO COMPLETO (INCLUYE SARDINEL)
BAÑO
SARDINEL DE BAÑO
08.00.00 REVESTIMIENTOS
08.01.00 ENCHAPADO EN ZONAS HUMEDAS (LAVADERO DE COCINA Y LAVADERO DE ROPA)
COCINA
LAVANDERIA
08.02.00 PARED DEL BAÑO ENCHAPADA EN MAYOLICA H=1.20 MT

A1
A2

08.03.00 POZA DE DUCHA ENCHAPADA EN MAYOLICA H=1.80MT

A1

09.00.00 CONTRAZOCALO
09.01.00 CONTRAZOCALO EXTERIOR DE CEMENTO ENLUCIDO H = 0.30MT
10.00.00 CARPINTERIA DE MADERA
CANTIDAD UND LONGITUD ANCHO ALTO SUB- TOTAL DESCRIPCION

1 m2 ……….. 35.00

1 m3 3.56 0.60 0.70 1.50


1 m3 1.73 0.60 0.70 0.73
1 m3 2.62 0.60 0.70 1.10
1 m3 1.68 0.60 0.70 0.71
1 m3 2.62 0.60 0.70 1.10
1 m3 1.05 0.60 0.70 0.44
1 m3 2.67 0.60 0.70 1.12
1 m3 1.65 0.60 0.70 0.69
1 m3 0.45 0.60 0.70 0.19
1 m3 3.79 0.60 0.70 1.59
1 m3 6.53 0.60 0.70 2.74
11.91

1 m3 3.56 0.60 0.60 1.28


1 m3 1.73 0.60 0.60 0.62
1 m3 2.62 0.60 0.60 0.94
1 m3 1.68 0.60 0.60 0.60
1 m3 2.62 0.60 0.60 0.94
1 m3 1.05 0.60 0.60 0.38
1 m3 2.67 0.60 0.60 0.96
1 m3 1.65 0.60 0.60 0.59
1 m3 0.45 0.60 0.60 0.16
1 m3 3.79 0.60 0.60 1.36
1 m3 6.53 0.60 0.60 2.35
10.21

1 m3 3.50 0.15 0.35 0.18


1 m3 1.35 0.15 0.35 0.07
1 m3 2.25 0.15 0.35 0.12
1 m3 1.60 0.15 0.35 0.08
2 m3 1.90 0.15 0.35 0.20

1 m3 4.10 0.15 0.35 0.22


1 m3 1.40 0.15 0.35 0.07
1 m3 0.80 0.15 0.35 0.04
1 m3 3.59 0.15 0.35 0.19
1 m3 8.32 0.15 0.35 0.44
1.61
1 m2 3.50 0.70 2.45
1 m2 1.35 0.70 0.95
1 m2 2.25 0.70 1.58
1 m2 1.60 0.70 1.12
2 m2 1.90 0.70 2.66
0.00
1 m2 4.10 0.70 2.87
1 m2 1.40 0.70 0.98
1 m2 0.80 0.70 0.56
1 m2 3.59 0.70 2.51
1 m2 8.32 0.70 5.82
21.50

1 m2 2.05 1.55 ……….. 3.18


1 m2 3.15 2.80 8.82
1 m2 3.38 2.10 ……….. 7.10
1 m2 2.54 2.10 ……….. 5.33
1 m2 0.90 0.90 ……….. 0.81
1 m2 1.20 2.10 ……….. 2.52
27.76

1 m3 2.05 1.55 0.10 0.32


1 m3 3.15 2.80 0.10 0.88
1 m3 3.38 2.10 0.10 0.71
1 m3 2.54 2.10 0.10 0.53
1 m3 0.90 0.90 0.10 0.08
1 m3 1.20 2.10 0.10 0.25
2.46

3 m3 0.80 0.80 0.60 1.15


3 m3 0.80 0.80 0.60 1.15
2.30

10 m3 0.25 0.25 2.7 1.69

10 m2 1.00 ….. 2.7 27.00


1 m2 2.5 4.10 ……….. 10.25
1 m2 1.90 4.10 ……….. 7.79
1 m2 1.90 1.89 ……….. 3.59
1 m2 1.90 2.34 ……….. 4.45
26.08
m3 0.0875
2.28

1 m2 2.5 4.10 ……….. 10.25


1 m2 1.90 4.10 ……….. 7.79
1 m2 1.90 1.89 ……….. 3.59
1 m2 1.90 2.34 ……….. 4.45
26.08

1 und ……….. ……….. ……….. 26.08


8.325
217
227.94557625

1 m3 4.60 0.25 0.20 0.23


2 m3 9.32 0.25 0.20 0.93

2 m3 5.15 0.25 0.20 0.52

2 m3 2.4 0.25 0.20 0.24

1.92

1 m2 28.94 0.20 5.79


2 m2 4.65 0.25 2.33
1 m2 4.10 0.25 1.03
2 m2 8.82 0.25 4.41
2 m2 1.90 0.25 0.95
14.50

3 m2 5.35 ……… 2.25 36.11 V-1


V-2
V-3
2 m2 4.25 ……… 2.25 19.13

1 m2 1.55 2.25 3.49


1 m2 1.40 2.25 3.15
1 m2 1.50 2.25 3.38
65.25
59.79

1 m2 2.16 0.64 2.64 5.44


A1 A2 A3

1 m2 13 ……… 2.4 31.2 V-2


1 m2 8.6 ……… 2.4 20.64 V-2
1 m2 9.1 ……… 2.4 21.84 V-2
79.12
3.78
75.34

1 m2 4 ……… 2.2 8.8 V-1


V-3
P-1
8.8
4.78
4.02

3 m2 0.2 2.4 1.44


1 m2 0.2 0.6 0.12
4 m2 0.3 2.4 2.88
4.44

2 m2 4.6 0.15 ……… 1.38


1 m2 4.8 0.15 ……… 0.72
1 m2 1.8 0.15 ……… 0.27
1 m2 5.7 0.15 ……… 0.86
2 m2 5.6 0.15 ……… 1.68
1 m2 5.5 0.15 ……… 0.83
5.73

1 m2 2.2 1.20 ……… 2.64

1 m2 27.76

1 m2 2.2 1.20 ……… 2.64


1 m2 1.2 0.50 ……… 0.60
3.24

1 m2 1.3 0.50 ……… 0.65


1 m2 0.9 0.50 ……… 0.45
1.10

1 m2 1.4 1.20 ……… 1.68


1 m2 1.8 1.20 ……… 2.16

3.84

1 m2 2.9 1.80 ……… 5.22

5.22

1 ml 5.85 ….. ……. 5.85


DESCUENTO
UND . CANTIDAD LONGITUD ANCHO ALTO SUB- TOTAL
TOTAL

35.00

11.91

10.21

1.61
21.50

27.76

2.46

2.30

1.69

27.00
2.28

26.08

228

1.92

14.50

m2 2.00 1.00 1.40 2.80


m2 2.00 0.90 1.40 2.52
mm2 1.00 0.70 0.20 0.14
5.46
59.79

m2 1.00 0.90 1.4 1.26


m2 1.00 0.90 1.4 1.26
m2 1.00 0.90 1.4 1.26
3.78

75.34

m2 1.00 1.00 1.4 1.40


m2 1.00 1.00 1.4 1.40
m2 1.00 0.90 2.2 1.98
4.78

4.02

4.44

5.73

2.64

27.76
3.24

1.10

3.84

5.22

5.85
UND

m2

m3

m3

m3
m2

m2

m3

m3

m3

m3
m3

m2

und

m3

m2
m2

m2

m2

m2

m2

m2

m2
m2

m2

m2

m2

m2
ITEM DESCCRIPCION DISEÑO DEL ACERO

PAÑO A1
ACERO
LONGITUDINAL Rec: 0.025
5.15
ACERO
LONGITUDINAL Rec: 0.025
2.40

TEMPERATURA 1 Rec:
4.35
TEMPERATURA 2

4.72

DESCCRIPCION DISEÑO DEL ACERO

VIGAS
VA
EJE A÷ 1 Y 2 Rec: 0.025
ACERO
LONGITUDINAL 0.15 4.60

ESTRIBOS Rec: 0.025


0.25

0.20

VA
EJE 1 ÷ AY C
EJE 2÷ A Y C Rec: 0.025
ACERO
LONGITUDINAL 0.15 5.15

ESTRIBOS
0.25

0.20
VS TRASLAPE 0.6
EJE B÷ 1 Y 4
EJE C÷ 1 Y 4 Rec: 0.025
ACERO
LONGITUDINAL 0.15 9.32

ESTRIBOS Rec: 0.025


0.25

0.20

VA
EJE 3 ÷ B Y C
EJE 3 ÷ B Y C Rec: 0.025
ACERO
LONGITUDINAL 0.15 2.40

ESTRIBOS Rec: 0.025


0.25

0.20

DESCCRIPCION DISEÑO DEL ACERO

COLUMNAS
ACERO COLUMNAS
fy=2400 kg/cm2
C-1

ACERO
LONGITUDINAL t= 0.4 3.45

ESTRIBOS Rec: 0.025


0.25

0.25
DISEÑO DEL
03.02.00
DESCRIPCION ACERO
03.02.02
ZAPATAS
ACERO ZAPATAS
fy=2400 kg/cm2

Z-1

ACERO
LONGITUDINAL r= 0.025 0.8

ITEM
Ø CANT. N° DE ELEM LONG.

0.15 1/2 1 10 5.25

0.10 3/8 1 9 2.45

0.25 1/4 1 21 4.35

0.25 1/4 1 10 4.72


LONG.
PESO
VARILLAS

Ø CANT. N° . DE ELEM LONG.

1/2
0.15 1 6 4.85

1/4 1 26 0.90

1/2
0.15 2 4 5.40

1/4 2 29 0.90
1/2
0.15 2 6 10.17

1/4 2 59 0.90

1/2
0.15 2 4 2.65

1/4 2 15 0.90

LONG.
PESO
VARILLAS

Ø CANT. N° . DE ELEM LONG.

0.2 0.20
1/2 8 4 4.05

1/4 8 23 1.00

LONG.
PESO
VARILLAS
N° ELEM.
Ø CANT LONG.

1/2 6 8 0.75

3/8" 1/4" 1/2"


22.05 531.35 433.64
2.45 59.04 48.18
LONGITUD DE ø EN (m)
1/4 12mm 3/8 1/2

- - - 52.50

22.05

91.35 - - -

47.20
138.55 22.05 52.50
34.49895 12.348 52.185
15.39 1.372 5.83

LONGITUD DE ø EN (m)
1/4 12mm 3/8 1/2

- - - 29.10

23.40 - -

- - - 43.20

52.20 - -
- - - 122.04

106.20 - -

- - - 21.20

27.00 - -

208.80 215.54
51.9912 214.25
23.2 23.95

LONGITUD DE ø EN (m)
1/4 12mm 3/8 1/2

- - - 129.60

184.00 - -

184.00 129.60
45.816 128.8224
20.44 14.4
LONGITUD POR Ø
(en m.)
1/4" 12mm 3/8" 1/2"

- - - 36.00

LONG 36.00
PESO 35.78
VARILLAS 4.0
PESO de 1/2 PESO de 1/4 PESO de 3/8
5/8 3/4 (Kg/m) (Kg/m) (Kg/m)
0.994 0.249 0.560

- -

- -

TOTAL

5/8 3/4

- -

- -
86.68 Kg

- -

- -
- -

- -

- -

- -

TOTAL

5/8 3/4

- -

- - 266.24 Kg

PESO de 1/2 PESO de 1/4 PESO de 3/8


TOTAL (Kg/m) (Kg/m) (Kg/m)
0.994 0.249 0.560
5/8" 3/4"

- -

KG TOTAL

174.64 Kg

35.78 Kg
RESUMEN DE MATERIALE
OBRA :

UBICACIÓN :
PROPIETARIO : JESUS ELIZABETH BENITES GUEVARA
ELABORADO : ISAAC PASCUAL CHALAN
ESPECIALISTA:

PARTIDA DESCRIPCION CEMENTO CEMENTO PIEDRA HORMIGON


TIPO I TIPO MS GRANDE 8"
BLS M3 M3 M3

VIVIENDA 01

TOTAL 132.05 0.00 22.38 10.35

* % DESPERDICIO 141.30 0.00 23.94 11.07

FACTOR DE LADRILLO
METRADO TOTAL
CANT. DE LADRILLOS (m2)
0.015 jh
0.015 jv 38.87
59.79 2391.60
0.09 h 40
0.23 L

CEMENTO TIPO HORMIGON


I PIEDRA GRANDEGRAVILLA
CANTIDAD EN M3 BLS M3 M3 M3
CIMIENTOS CORRIDO 10.21
01:10+30%P.G 7.15 3.10 1.2 3.06
SOBRECIMIENTO 1.61
01:8+25%P.G 1.21 5.74 1.2 0.40
FALSO PISO 4"
1:06 2.46 0.51 0.13
ZAPATAS
210 Kg/cm2 2.30 9.73 0.85
COLUMNAS
210 Kg/cm2 1.69 9.73 0.85
LOSA ALIGERDA
210 Kg/cm2 2.28 9.73 0.85
VIGAS
210 Kg/cm2 1.92 9.73 0.85
MORTERO
C.A 1:5 1.46 7.00
EN DE MATERIALES

GRAVILLA ARENA ARENA FINA AGUA LADRILLO


1/2" GRUESA LADRILLO KK TECHO
M3 M3 M3 M3 UND UND

6.96 8.49 0.76 5.00 2,391.60 243.00

7.45 9.08 0.81 5.35 2559.01 260.01

CALCULO DE VOLUMEN DE MORTERO


UND VOL. AREA DE
VOL.DE CANT. VOL.
MORTERO / MURO
LADRILLO LADRILLOS/m2 MURO /m2
m2 TOTAL
0.0025875 38.87 0.125 0.02441691 59.79
UND

ARENA GRUESAARENA FINA AGUA CEMENTO TIPO I HORMIGONPIEDRA GRANDEGRAVILLA


M3 M3 M3 BLS M3 M3 M3

0.19 31.65 8.58 21.89

0.19 9.24 1.45 0.49

0.61 1.25 0.32

0.64 0.185 22.38 1.955

0.84 0.189 16.44 1.4365

0.96 0.189 22.18 1.938


0.96 0.189 18.68 1.632

1.07 0.52 0.255 10.22 0

TOTAL 132.05 10.35 22.38 6.96


O
VOL.
MORTERO
TOTAL
1.46

ARENA GRUESAARENA FINA AGUA


M3 M3 M3

1.36

0.23

1.50

1.472 0.43

1.4196 0.32

2.1888 0.43
1.8432 0.36

1.56207912 0.75914125 0.37

8.49 0.76 5.00