Excel Trabajo
Excel Trabajo
01 CONSTRUCCION DE PAVIMENTO
07 MUROS DE CONTENCION
07.01 TRABAJOS PRELIMINARES
08.02.01 MITIGACION POR IMPACTO NEGATIVO EN EL AIRE(RUIDO, POLVO, OLORES Y GASES) glb
08.02.02 MITIGACION POR IMPACTO NEGATIVO EN EL SUELO(EROSION, CONTAMINACION DEL SUELO) glb
784,747.07
141,254.47
926,001.54
18,520.03
9,441.60
953,963.17
Metrado Precio S/. Parcial S/. Rendimiento Numero de dias DIAS REALES
430,791.82
10,540.51
3.00 1,200.00 3,600.00 0.00 1.00
1.00 940.51 940.51 1.00 1.00 1.00
1.00 2,000.00 2,000.00
1.00 2,000.00 2,000.00 15.00 0.07 1.00
1.00 2,000.00 2,000.00
34,874.81
2,856.80 7.57 21,625.98 102.00 28.01 29.00
2,856.80 1.21 3,456.73 1,000.00 2.86 3.00
1,170.40 3.24 3,792.10 400.00 2.93 3.00
1.00 6,000.00 6,000.00 300.00 0.00 1.00
120,227.31
1,128.65 9.11 10,282.00 200.00 5.64 6.00
2,856.80 8.67 24,768.46 122.00 23.42 24.00
42.90 72.65 3,116.69 250.00 0.17 1.00
1,429.87 18.47 26,409.70 250.00 5.72 6.00
2,856.80 4.65 13,284.12 1,250.00 2.29 3.00
16,242.31
274.64
32.00 7.57 242.24 102.00 0.31 1.00
30.00 1.08 32.40 1,000.00 0.03 1.00
1,188.68
16.80 21.05 353.64 6.00 2.80 3.00
8.82 67.41 594.56 18.00 0.49 1.00
13.02 18.47 240.48 250.00 0.05 1.00
287.04
3.36 85.43 287.04 120.00 0.03 1.00
14,359.19
14.41 419.48 6,044.71 13.00 1.11 2.00
72.88 21.26 1,549.43 35.00 2.08 3.00
1,326.48 5.10 6,765.05 250.00 5.31 6.00
32.76
9.00 3.64 32.76 50.00 0.18 1.00
100.00
4.00 25.00 100.00
13,297.20
4,300.00
653,955.89
65,395.59
65,395.59
784,747.07
Cuadrilla
0.5operario+1peon
6 peon
3peon+1 topografo
4peon
0.2operario + 3 peon
2 peon
0.2operario +1 oficial+2 peon
1peon
0.2 operario+2 peon
1 operario +1 oficial+2peon
2 operio+1 oficial+6 peon
1 operario + 1 oficial
1 operario +1 oficial
1 oficial +1 peon
1 peon
1operario +2 peon
1 pon
1 operario +2 peon
1 peon
3peon +1 topografo
1 oficial +1 peon
1 peon
3 peon +1 topografo
1operario +2 peon
2operario+1oficial+6peon
1oficial+3peon
1operario +1 peon
1peon
2peon
1peon
2peon
1operario+2peon
3peon
2operario+6peon
1operario+3peon+1topografo
0.2Oficial+2peon
0.5operario+1peon
1peon
1oficial+3peon
2operario+1oficial+5peon
1operario+1oficial+0.5peon
0.5operario+0.2oficial+1peon
1operario+1oficial
2operario+1oficial+6peon
2operario+1oficial+5peon
6peon
3peon+1 topografo
1peon
1oficial+8peon
1peon
2operario+6peon
2operario+1oficial+6peon
1operario-+1peon
1operario+1oficial
1operario
2peon
OBRA: MEJORAMIENTO DE INFRAESTRUCTURA VIAL
UBICACIÓN: HUANUCO - LEONCIO PRADO - RUPA-RUPA
TRAMO: JR. MARTIRES, JR. 7 DE SETIEMBRE Y JR. CAJAMARCA- AA.HH. JESUS ALBERTO PAEZ
Item Descripción Und. Metrado Precio S/. Parcial S/. Mes Agosto
01 CONSTRUCCION DE PAVIMENTO 430,791.82
01.01 TRABAJOS PROVISIONALES 10,540.51
01.01.01 ALQUILER DE ALMACEN mes 3.00 1,200.00 3,600.00 1200
01.01.02 CARTEL DE OBRA DE 3.60Mx2.20M und 1.00 940.51 940.51 940.51
MOVILIZACION Y DESMOVILIZACION DE
01.01.03
EQUIPOS Y MAQUINARIAS glb 1.00 2,000.00 2,000.00 1,000.00
01.01.04 AGUA PARA LA CONSTRUCCION glb 1.00 2,000.00 2,000.00 666.6666667
01.01.05 FLETE TERRESTRE glb 1.00 2,000.00 2,000.00 666.6666667
01.02 TRABAJOS PRELIMINARES 34,874.81
LIMPIEZA MANUAL DE TERRENO
01.02.01
NORMAL m2 2,856.80 7.57 21,625.98 21,625.98
TRAZO Y REPLANTEO EN TERRENO
01.02.02
NORMAL m2 2,856.80 1.21 3,456.73 3,456.73
SEÑALIZACION DE OBRA DURANTE
01.02.03
EJECUCION m 1,170.40 3.24 3,792.10 1,264.03
01.02.04 REPOSICION DE TUBERIAS EXISTENTES glb 1.00 6,000.00 6,000.00 2000
01.03 MOVIMIENTO DE TIERRAS 120,227.31
01.03.01 CORTE EN TERRENO NORMAL m3 1,128.65 9.11 10,282.00 10,282.00
PERFILADO DE CALZADA DE VIAS
01.03.02
TERRENO NORMAL m2 2,856.80 8.67 24,768.46
CONFORMACION Y COMPACTACION DE
01.03.05 SUB-RASANTE CON MOTONIVELADORA m2 2,856.80 4.65 13,284.12
125HP
PRUEBA DE RESISTENCIA A LA
01.06.03.01
COMPRESION DEL CONCRETO und 15.00 29.91 448.65
PRUEBA DE DISEÑO DE MEZCLA DEL
01.06.03.02
CONCRETO und 1.00 250.00 250.00
02 CONSTRUCCION DE CUNETAS 162,428.76
02.01 TRABAJOS PRELIMINARES 795.14
TRAZO Y REPLANTEO EN TERRENO
02.01.01
NORMAL m2 657.14 1.21 795.14
02.02 MOVIMIENTO DE TIERRAS 12,801.09
CONFORMACION Y COMPACTACION DE
02.02.01 SUB-RASANTE CON MOTONIVELADORA m2 657.14 4.65 3,055.70
125HP
PRUEBA DE RESISTENCIA A LA
02.05.01.01
COMPRESION DEL CONCRETO und 12.00 29.91 358.92
PRUEBA DE DISEÑO DE MEZCLA DEL
02.05.01.02
CONCRETO und 1.00 250.00 250.00
03 SARDINELES DE CONCRETO 9,111.66
03.01 TRABAJOS PRELIMINARES 79.40
TRAZO Y REPLANTEO EN TERRENO
03.01.01
NORMAL CON EQUIPO m2 73.52 1.08 79.40
03.02 MOVIMIENTO DE TIERRAS 520.03
EXCAVACION DE ZANJAS PARA
03.02.01
SARDINELES EN TERRENO NORMAL m3 3.96 107.30 424.91
ENCOFRADO Y DESENCOFRADO(MUROS
06.04.02
Y ALETAS) m2 25.50 39.25 1,000.88
EMBOQUILLADO DE MAMPOSTERIA DE
06.04.05 PIEDRA ASENTADO DE CONCRETO m3 1.26 383.24 482.88
F'C=175 KG/CM2
%PROGRAMADO MENSUAL X
%PROGRAMADO ACUMULADO X
LBERTO PAEZ
21,625.98
3,456.73
1264.03333333 1264.033333 3,792.10
6,000.00 6,000.00
Y Z 100%
X+Y X+Y+Z