- TERRAPLEN DELANTERO
TOTAL 2 750.00
HORMIGON M3 7 70 490.00
ARENA GRUESA M3 4 70 280.00
CEMENTO BLS 38 27 1026.00
MANO OBRA ML 45 25 1125.00
TOTAL 4 2921.00
MATERIALES 5466.00
FIERRO 1/2" VARILLAS 14.00 40.00 560.00
FIERRO 3/8" VARILLAS 9.00 28.00 252.00
ALAMBRE # 16 KG 10.00 10.00 100.00
CEMENTO BLS 48.00 27.00 1296.00
HORMIGON M3 6.00 70.00 420.00
TUBO 2" UND 8.00 18.00 144.00
TUBO 1" UND 10.00 25.00 250.00
TUBO 1/2" UND 12.00 14.00 168.00
CODO 1" UND 6.00 6.00 36.00
CODO 1/2" UND 6.00 2.00 12.00
TEE 1/2" UND 6.00 2.00 12.00
TUBO 3/4" LUZ UND 15.00 8.00 120.00
CURVAS 3/4" LUZ UND 12.00 3.00 36.00
CODO 2" DESAGUE UND 5.00 7.00 35.00
LLAVE PASO 1/2" UND 1.00 40.00 40.00
VALVULLA CHECK 1/2" UND 2.00 40.00 80.00
ESCALERA Y TECHO SOBRE TANQUE GLOBAL 1.00 500.00 500.00
TANQUE ROTOPLAST 1100 L UND 1.00 600.00 600.00
BOMBA SUMERGIBLE 1 HP, 15 m ALTURA UND 1.00 400.00 400.00
CONTROL DE NIVEL UND 2.00 100.00 200.00
CABLE # 14 ROLLO 1.00 205.00 205.00
TOTAL 6 7416.00
ACABADOS :
PISO 2: MATERIALES:
PISO EN BANOS M2 12.4 30 372
PARED EN BAÑOS M2 52.2 30 1566
PEGAMENTO x 25 kg BLS 35 12 420
SANITARIOS BAÑO COMPLETO UNIDAD 2 600 1200
ACCESORIOS/MANIJAS,JABONERAS, UNIDAD 2 75 150
LLAVE LAVATORIO UNIDAD 2 50 100
MANGUERAS DE ACOPLE EN LAV, WATER UNIDAD 4 25 100
PISO EN DORMITORIOS M2 25 30 750
PISO EN STAR Y PASADIZOS M2 32 30 960
ZOCALOS ML 34 15 510
CORTINA EN BAÑO UNIDAD 2 75 150
CIELO RASO CON DRAYWALL M2 0
PUERTA ALUMINIO UND 2 0
VENTANA VIDRIO 8 mm M2 0
VENTANA CON MALLA METALICA/MADERA M2 0
PISO 1: MATERIALES:
PISO EN BAÑO M2 2 30 60
PARED EN BAÑO M2 8 30 240
PEGAMENTO x 25 kg BLS 14 12 168
SANITARIOS BAÑO COMPLETO UNIDAD 1 600 600
ACCESORIOS/MANIJAS,JABONERAS, UNIDAD 1 75 75
LLAVE LAVATORIO UNIDAD 1 50 50
MANGUERAS DE ACOPLE EN LAV, WATER UNIDAD 2 25 50
PISO EN SALA M2 41 30 1230
ZOCALO ML 23 15 345
PUERTA ALUMINIO EN BAÑO UNIDAD 1 0
PUERTA MADERA UNIDAD 2 0
0
0
0
PISO 1: MANO DE OBRA:
PISOS Y PAREDES/ZOCALOS M2 54.45 20 1089
INSTALACION SANITARIOS EN BAÑOS UND 2 150 300
CIELO RASO M2 0
VENTANA CON MALLA METALICA M2 0
MANO DE OBRA:
INSTALACION EN BAÑOS UNIDAD 3 200 600 600.00
MATERIALES 4988.00
FIERRO 1/2" VARILLAS 14.00 45.00 630.00
FIERRO 3/8" VARILLAS 9.00 28.00 252.00
ALAMBRE # 16 KG 5.00 10.00 50.00
CEMENTO BLS 22.00 27.00 594.00
HORMIGON M3 4.00 70.00 280.00
TUBO 2" UND 8.00 18.00 144.00
TUBO 1" UND 8.00 25.00 200.00
TUBO 1/2" UND 8.00 14.00 112.00
CODO 1" UND 6.00 6.00 36.00
CODO 1/2" UND 6.00 2.00 12.00
TEE 1/2" UND 6.00 2.00 12.00
TUBO 3/4" LUZ UND 15.00 8.00 120.00
CURVAS 3/4" LUZ UND 12.00 3.00 36.00
CODO 2" DESAGUE UND 5.00 7.00 35.00
LLAVE PASO 1/2" UND 1.00 40.00 40.00
VALVULLA CHECK 1/2" UND 2.00 40.00 80.00
ESCALERA Y TECHO SOBRE TANQUE GLOBAL 1.00 950.00 950.00
TANQUE ROTOPLAST 1100 L UND 1.00 600.00 600.00
BOMBA SUMERGIBLE 1 HP, 15 m ALTURUND 1.00 400.00 400.00
CONTROL DE NIVEL UND 2.00 100.00 200.00
CABLE # 14 ROLLO 1.00 205.00 205.00
CIELORAZO I AREA 64
CIELORAZO EAREA 36
area 1 area 2 area 3 area 4 area total
piso cuato 1 0.27 10.07 10.34
piso cuarto 2 0.285 10.07 10.355
piso baño 1 1.0192 3.264 4.2832
pared baño 1 9.18 6.28 15.46
piso baño 2 1.0192 3.264 4.2832
pared baño 2 9.18 6.28 15.46
piso valcon y sala star 11.685 8.7135 3.135 3.08 26.6135
piso y contra piso escalera 1 28.5 1.21 29.71
piso y contra piso esaclera 2 6.65 0.9025 7.5525
piso sala 1er piso 33.4284 33.4284
piso baño 1er psio 1.776 1.776
pared baño 1er piso 6.6 6.6
pared ducha 1 6.28 6.28
pared ducha 2 6.28 6.28
piso pared
area cuartos 20.695 CISTERNA 13.5
area baños 10.3424 50.08 PISO 2DO 26.6
piso 2do piso 26.6135 PISO 1ER 33.4
piso 1er piso 33.4284 ESCALERA 37.26
55.8749
78
1365.6
134.4
18 243 1215.6
10 266 509
10 334 843
10 372.6 1215.6
1.- TERRAPLEN DELANTERO
TOTAL 2 750.00
HORMIGON M3 7 70 490.00
ARENA GRUESA M3 4 70 280.00
CEMENTO BLS 38 27 1026.00
MANO OBRA ML 45 25 1125.00
TOTAL 4 2921.00