CONSORCIO EL PROGRESO

CONSTRUCCION SUPERESTRUCTURA PUENTE BARRANCA DE UPIA

ACTIVIDAD : RAMPAS
EJE O ABSCISA : HOJA 1 DE 2

EJE Ø CANTIDAD LONG. FIGURA PESO


CORTE

5/8" 12 6.00 112.32

5/8" 24 10.00 374.40

0
5/8" 12 6.00 112.32
0

0
7/8" 24 6.00 440.64
0

7/8" 12 9.00 330.48

7/8" 30 12.00 1,101.60

7/8" 12 12.00 440.64

7/8" 12 9.00 330.48

7/8" 12 6.80 249.70

3/4" 8 6.00 108.00

3/4" 8 12.00 216.00


CONSORCIO EL PROGRESO
CONSTRUCCION SUPERESTRUCTURA PUENTE BARRANCA DE UPIA

3/4" 8 12.00 216.00

3/4" 4 6.70 60.30

1/2" 552 6.02 3,323.04

3/8" 421 3.14 753.51

3/8" 128 12.00 875.52

0
3/8" 64 3.00 109.44

3/8" 32 6.20 113.09

3/8" 842 0.60 287.96

0
TOTAL 9,555.43

ACTIVIDAD : RAMPAS DE AJUSTE


EJE O ABSCISA : HOJA 1 DE 2
CONSORCIO EL PROGRESO
CONSTRUCCION SUPERESTRUCTURA PUENTE BARRANCA DE UPIA

EJE Ø CANTIDAD LONG. FIGURA PESO


CORTE

3/8" 160 3.10 282.72

3/8" 160 12.00 1,094.40

0
3/8" 132 4.50 338.58
0

0
1/2" 160 3.10 496.00
0

1/2" 256 3.00 768.00

1/2" 320 1.30 416.00

5/8" 256 4.00 1,597.44

TOTAL 1,597.44

TOTAL DE ACERO 11,152.87


CONSORCIO EL PROGRESO
CONSTRUCCION SUPERESTRUCTURA PUENTE BARRANCA DE UPIA
CONSORCIO EL PROGRESO
CONSTRUCCION SUPERESTRUCTURA PUENTE BARRANCA DE UPIA

N 8
D 0.17
PI 3.1416
L 0.534072
4.272576
CONSORCIO EL PROGRESO
CONSTRUCCION SUPERESTRUCTURA PUENTE BARRANCA DE UPIA

9.23076923077