C.I. Nº21 proy.

Aguas Negras
C.T. = 43.95
C.R.e. = 42.92
tuberia desde
instalaciones
1.1 1.7
C.R.s. = 41.58
H. = 1.08 1.8
C.I. Nº22 proy.
Aguas Negras 1.14 11 77 13
13
existentes C.I. Nº20 proy.
Aguas Negras C.T. = 43.93
se intersecta tuberia existente C.T. = 43.65 C.R.e.1 = 43.69
y se desvia C.R.e. = 41.65 C.R.e.2 = 43.75
PVC Ø160mm. A.Negras C.R.s. = 43.43
ETAPA 2 C.R.s. = 41.62
H. = 2.03 i = 2%, L:25.45m
42
H. = 0.50
MURO PROVISORIO MURO PROVISORIO MURO PROVISORIO

ETAPA 1 NPT:-1.28 2 3 4 5 6 8 9 10 11 12
NV: +42.8
NPT: -0.15
PVC Ø110mm. A.Negras
NPT:-1.58
NV: +42.5
RAMPA HORMIGON
SEGUN E.T.A.

PVC Ø160mm. A.Negras 1 2


NV: +43.93
ACCESO 22
i = 1%,L:15.35m C.I. Nº3 proy.
V PVC Ø110mm Aguas Negras
A1 40
i = 13.1 %,L:9.26m ESCALA EN HORMIGON
PVC Ø160mm. A.Negras
CIRCULACION INTERNOS. A1 CASA 2 Sube
22
ACCESO C.T. = 44.93
41 ESCALERA
ESCALA EN HORMIGON ESCALA EN HORMIGON
C.R.e. = 44.40
i = 3%,L:3.40m NPT: -0.30
NV: +44.00
NPT: -0.30
C.R.s. = 44.37
10000

ACCESO PPAL

10 9 NPT: +0.00
NV: +44.30
CASA 3 NPT: +0.00
NV: +44.30
NV: +44.00

H. = 0.56
11 8 RAMPA HORMIGON RAMPA HORMIGON
ACCESO OF COLAB.
PVC Ø110mm. A.Negras SEGUN E.T.A. ACCESO ACCESO SEGUN E.T.A.

A2 AA A
PRINCIPAL PRINCIPAL PRINCIPAL
12 7
OF 45 A
i = 3%,L:11.00m

3690
13 6
110
BAÑO
TABLERO
14 5
COLAB. BODEGA
BAÑO
TABLERO TABLERO
BAÑO
BODEGA
ELECTRICO ELECTRICO ELECTRICO
15 4 DORMITORIO
wc

LIMITE CIERRO PATIO INTERNOS


16 3 110 110 DOBLE

14 15 16
10,05 m2

13 12 11 10

13 12 11 10

13 12 11 10 9
DORMITORIO VIGA 15X145 SEG. CAL. 17 2
A1 VIGA 15X145 SEG. CAL. VIGA 15X145 SEG. CAL. PATIO

15 16

15 16
DOBLE PAVIMENTO RADIER AFINADO
019

SALA INTERVENCION 18 CON JUNTA DILATACION CADA 3.00 MTS


1

700
PATIO GRUPAL 2

h= 1,60mts

3350
PAVIMENTO RADIER
PATIO

TAB HORMIGON 150MM


AFINADO
GUN CIP 2156/2

PAVIMENTO RADIER

TAB. HOR. 150MM


CON JUNTA TAB. HOR. TAB. HOR.

ZONA CONTROL CASA 2


AFINADO
GRH GRH

ZONA CONTROL CASA 3


DILATACION CADA 150MM 150MM

METALICA SEGUN

METALICA SEGUN
9

9
DORMITORIO OFICINA DORMITORIO OFICINA OFICINA
CIRCULACION 1
GRH CON JUNTA

CIERRO MALLA

CIERRO MALLA
3.00 MTS

MURO. HOR. 200 MM


DOBLE DILATACION CADA DOBLE

1000
INTERVENCIÓN INTERVENCIÓN INTERVENCIÓN
CIRCCIRC
1. 1.

DETALLE

DETALLE
8

8
10,05 m2 NPT: 0.00 3.00 MTS 10,05 m2

METALICA SEGUN
CULO.

CIERRO MALLA
OFICINA NV: +44.08 OFICINA OFICINA

7 6

7 6

7 6
EDUCADORES EDUCADORES EDUCADORES

DETALLE
A3
S

5
A2
NO
H.A. SEGUN CAL

150
4

4
DORMITORIO V PVC Ø110mm DORMITORIO

A4
O PATIO INTER

INDIVIDUAL INDIVIDUAL
41

3 2 1

3 2 1

3 2 1
5,40 m2
SE

Sube
E

SSHH UNIVERSAL 1P
11
S SEGUN DETALL

CIERRO MALLA CIERRO MALLA


PVC Ø110mm. A.Negras 0 CIERRO MALLA CIERRO MALLA CIERRO MALLA CIERRO MALLA
LINEA OFICIAL

METALICA SEGUN METALICA SEGUN METALICA SEGUN METALICA SEGUN METALICA SEGUN METALICA SEGUN
DETALLE DETALLE 44 DETALLE DETALLE DETALLE DETALLE

VIGA 20 X 50 SEG CALCULO

VIGA 20 X 50 SEG CALCULO

VIGA 20 X 50 SEG CALCULO


DORMITORIO
INDIVIDUAL
5,40 m2
i = 3%,L:13.00m
ZONA 110 A3
DORMITORIO DORMITORIO
0
CONTROL INDIVIDUAL
11 INDIVIDUAL
L EXTERIOR EN

LIMITE CIERR

5,40 m2

900
BAÑO

CASA 1 DORMITORIO
ESTAR
COMEDOR
#######
ESTAR
COMEDOR
SALA ASEO
ASEO
A. SUCIA
A. LIMPIA
D.PVC ØA.110mm DORMITORIO
ESTAR
COMEDOR
ESTAR
COMEDOR
PVC Ø110mm. A.Negras
ALTURA 6.00 MT

INDIVIDUAL NPT:-1.28 A. LIMPIA/ SUCIA


LIMPIA/ SUCIA
44 INDIVIDUAL
21

900
5,40 m2 RECUPERACIÓN 5,40 m2
NV: +42.8 SALA
11 Llega NPT: +0.00
i = 2%,L:17.85m
. RECUPERACIÓN
0
A4 NPT: +0.00
NV: +44.30

150

150
BAÑO NV: +44.30
DORMITORIO DORMITORIO
INDIVIDUAL INDIVIDUAL
5,40 m2
MURO PERIMETRA

900
PVC Ø 110mm

1800
DORMITORIO V PVC Ø110mm DORMITORIO
INDIVIDUAL 37 38 39 INDIVIDUAL

900
AREA SALUD CIRCULACION AREA
5,40 m2 Sube ######
SALUD NPT: 0.00
NV: +44.08
5,40 m2

A5

150
DORMITORIO DORMITORIO
INDIVIDUAL INDIVIDUAL

B
5,40 m2

900

900
VIGA 20 X 50 SEG CALCULO 12B B VIGA 20 X 50 SEG CALCULO VIGA 20 X 50 SEG CALCULO
B
CLÍNICA

PVC Ø 110mm
DENTAL
BOX
BAÑO SALA NPT: -0.15
NV: +43.93
75
3%
BAÑO PROCEDIMIENTOS
DORMITORIO
0 V PVC Ø110mm
DORMITORIO
3%
11 110 75
INDIVIDUAL INDIVIDUAL

900

900
5,40 m2
CLÍNICA 45 44 5,40 m2
BAÑO
CIRCULACION 2
GIMNASIO
DENTAL Sube GRUPAL
B1

150
110
VIGA 20 X 50 SEG CALCULO

VIGA 20 X 50 SEG CALCULO

VIGA 20 X 50 SEG CALCULO


DORMITORIO NPT: 0.00 DORMITORIO
NV: +44.08

2880
INDIVIDUAL INDIVIDUAL
110
C CC C
16 16 16 5,40 m2

900

900

900
PVC Ø110mm. A.Negras 1 15
C 15 WC 15 1 C
38 WC
PVC Ø160mm. A.Negras i = 3%,L:4.50m 2 14
BAÑO
1 14
BAÑO 110 14 2
27 DORMITORIO 3
GRUPAL
110 PVC Ø 110mm
GRUPAL
110 3
i = 1%,L:35.00m INDIVIDUAL 13 2 13 13
5,40 m2 4 3 4
12 TAB. HOR. SEG. CALCULO
12 TAB. HOR. SEG. CALCULO TAB. HOR. SEG. CALCULO
12

A8 5 11
DD 4 11 11 5
D D
D

6 15 5 6
10 10 10

950
SEGURIDA

7 14 6 7 TERRAZA
9 9 9 CUBIERTA
8 110 PATIO INTERIOR
(PATIO DE LUZ)
13
7 8 8
110

150
ESCALERA TAB. HOR. SEG. CALCULO TAB. HOR. SEG. CALCULO TAB. HOR. SEG. CALCULO
ALTURA 1.80 CMS 12
4 11

4 11

4 11
5 10

3 12
2 13
1 14
15
16

5 10

3 12
2 13
1 14
15
16

16
15
1 14
2 13
3 12

5 10
TERRAZA OF ADMINISTRATIVA SALA MULTIUSO TERRAZA
6 9

6 9

6 9
TAB. HOR. SEG. CALCULO TAB. HOR. SEG. CALCULO TAB. HOR. SEG. CALCULO
8

8
CUBIERTA 11 CUBIERTA
PVC Ø110mm. A.Negras
7

7
TERRAZA
110

TAB. S-S. 15
CUBIERTA
i = 2.30%,L:7.00m
A9 E E E E
150
AR-005

NOS

NPT:-1.28 BANCA DE HORMIGON


2 BANCA DE HORMIGON BANCA DE HORMIGON C.I. Nº6 proy.
B

NV: +42.8
1 PVC Ø110mm. A.Negras 10
NPT:+0.00 Aguas Negras
O PATIO INTER

39 280 1250

9 NPT: +0.00
NV: +44.30
3 i = 3%,L:3.65m C.T. = 44.73
PVC Ø110mm. A.Negras GIMNASIO. NV: +44.30
PVC Ø110mm. A.Negras

2000
TERRAZA EXTERIOR 8 TERRAZA EXTERIOR
C.R.e.1 = 43.96

1200
RAMPA HORMIGON
SEGUN E.T.A. 37
PAVIMENTO BALSOSA MICROVIBRADA
ANTIDESLIZANTE SEGUN E.T.A.
RAMPA HORMIGON
SEGUN E.T.A.
PAVIMENTO BALSOSA MICROVIBRADA
ANTIDESLIZANTE SEGUN E.T.A.
19 RAMPA HORMIGON
SEGUN E.T.A.
i = 3%,L:1.8m 18 17 16 15 14 13 12 11 10 7
i = 2.30%,L:7.00m 2 C.R.e. = 44.01
ANILLO DE

ESPACIO ENCUENTRO 6

2500
100
PVC Ø110mm. A.Negras ACCESO SENDA 1 2 3 4 5 6 7 8 9 C.R.s. = 43.93
A11 ESCALA EN HORMIGON 34
i = 10%,L:16.50m
5
FF ESCALA EN HORMIGON ESCALA EN HORMIGON F F H. = 0.80

1200
INTERNOS-VISITAS.
4

3
LIMITE CIERR

2
280 280 280 280 280 280 280 280

NPT:-1.58
NV: +42.5 NPT: -0.30
NV: +44.00 2 3 4.1 9.1 11 12 1
CIP 2156/2019

NPT: -0.30
NV: +44.00

CALLE SIERRA NEVADA


C.I. Nº13A proy. CIRCULACION ACCESO
Aguas Negras NPT: 0.00
NV: +44.08
SENDA
CIRCULACION

PATIO CASA 1 C.T. = 42.80


C.R.e.1 = 42.69
V PVC Ø110mm
Sube
35 PATIO CASA 2 C.I. Nº7 proy.
PATIO CASA 3
1 13

019
C.R.e.2 = 42.67
INTERNOS. C.R.e.3 = 42.75
TAB. S-S. 15 TAB. S-S. 15 TAB. S-S. 15
INTERNOS. Aguas Negras
INTERNOS.
CION SEGUN

C.T. = 44.73

LINEA EDIFICACION SEGUN CIP 2156/2


SALA SALA
C.R.s. = 42.15 ATENCIÓN ATENCIÓN
PVC Ø160mm. A.Negras
H. = 0.65 BODEGA
INDIVIDUAL INDIVIDUAL
C.R.e. = 43.98 18

LINEA OFICIAL SEGUN CIP 2156/2019


PATIO
DE ARTÍCULOS
DEPORTIVOS PAVIMENTO RADIER AFINADO C.R.s. = 43.95 i = 2.30%,L:17.70m PVC Ø160mm. A.Negras
D.PVC Ø 110mm SALA TRABAJO
GRUPAL
CON JUNTA DILATACION CADA 3.00 MTS
C D H. = 0.78 14
i = 3%,L:12.40m
34 TERAPEUTICO PATIO
llega

TAB. S-S. 15

TAB. S-S. 15
PAVIMENTO RADIER AFINADO
CON JUNTA DILATACION CADA 3.00 MTS
LINEA EDIFICA

9999.9

30

LIMITE CIERRO PATIO INTERNOS


Puerta 900 150
50

EG 1200

11 10 9

INTERIOR CABINA= 1400


1750
BAÑO BAÑO
VISITAS 110 VISITAS INTERIOR CABINA= 1100

VARONES DAMAS
PVC Ø160mm. A.Negras
1700

27 110 110
i = 3.5%,L:14.40m 12
8 INTERIOR CABINA= 1100
1700

13
PVC Ø110mm. A.Negras 7
34 110
14
5
i = 25%,L:5.80m

INTERIOR CABINA= 1400


C.I. Nº9.A proy.

1750
BAÑOS BAÑOS 15
4
16
3 Puerta 900
EG 1200

150
Aguas Negras
NPT: -1.28
50

17
BAÑO
2
NV: +43.95
C.T. = 44.50

30
NPT:-1.58
18
NV: +42.5 1 C.R.e. = 43.62 PVC Ø160mm. A.Negras
C.I. Nº13 proy. 19
C.R.s. = 43.59 14
Aguas Negras NPT: -0.15
NV: +43.93 H. = 0.91 i = 2.37 %,L:13.55m
PVC Ø160mm. A.Negras C.T. = 42.70 ACCESO
DESDE
i = 3%,L:14.80m C.R.e.1 = 41.96
CIRCULACION
CIRCULACION
TÚNEL
SUBTERRÁNEO

C.I. Nº16 proy.


NPT: 0.00 C.R.e.2 = 42.43 ACCESO
VISITAS
NV: +44.08
PVC Ø110mm. A.Negras Aguas Negras C.R.e.3 = 42.63
13
i = 6%,L:3.00m
LIMITE CIERRO PATIO INTERNOS C.I. Nº17 proy.
C.T. = 42.70
C.R.s. = 41.93
H. = 0.77 3 2
A14 LIMITE CIERRO PATIO INTERNOS LIMITE CIERRO PATIO INTERNOS X
Aguas Negras PVC Ø160mm. A.Negras C.R.e. = 41.48
C.R.e.1 NPT: -0.73 C.I. Nº9 proy.
PVC Ø110mm. A.Negras
1
NPT: -1.68

27
PVC Ø160mm. A.Negras
i = 2%,L:15.30m
NV: +42.4
C.T. = 43.55 i = 3%,L:7.25m C.R.e. = 41.69
C.R.e.2
C.R.s. = 41.45
NPT: -2.53
NV: +42.7
1 i = 3%,L:6.00m
35 ANILLO DE SEGURIDAD 15 16
NV: +44.5 Aguas Negras
C.R.e.1 = 41.24 H. = 1.25 C.T. = 44.50
C.R.e.2 = 41.64 2 NPT: -1.28 C.R.e.1 = 43.56
C.R.e.3 = 41.69 1 NV: +43.95 1 C.R.e.2 = 43.37
1
2 2 C.R.e.4 = 41.74
C.R.s. = 41.21
3 1 6 1.8 7 8 1.14 9 10 16
D PVC Ø110mm 12 14
2
C.R.e.3 = 44.39
C.R.s. = 42.88
llega PVC Ø160mm. A.Negras
1 2 3 H. = 2.34 4 6 C.I. Nº16A proy. 7 8 9 9´ 10 12 13 PVC Ø110mm. A.Negras H. = 1.62
D.PVC Ø 110mm 2 i = 40%,L:2.00m 13
13
D.PVC Ø 110mm
3 4 3 baja 1.7 110
1%
Aguas Negras
C.T. = 42.70
7.4 7.6
C.I. Nº12 proy.
i = 6%,L:3.00m 3
Llega de garita
A 110 1% T.R EC-120
C.R.e. = 41.81
C.R.e.1
C.R.e. = 42.65
C.R.e.2
Aguas Negras T.R A A
EC-120

T.R C.R.s. = 41.78 NPT (ADMINISTRACION): +-0.00 C.T. = 42.70 NPT (ADMINISTRACION): +-0.00
110 1%
C.I. Nº19 proy. EC-120
NV: 45.23 NV: 45.23

Aguas Negras 110 1% 110 H. = 0.95 C.R.e. = 42.13 110


EC-120

110 1% 110
C.R.s. = 42.10 D.PVC Ø 110mm OBRA :
C.T. = 43.55
C.R.e.1 = 40.90
110
1%
PVC Ø160mm. A.Negras
i = 3%,L:4.75m
33 H. = 0.60 1% 1% 13
Llega de garita REPOSICION CENTRO CERRADO
EC-120

110 75
MTS-90

C.R.e.2 = 41.27 110 1% 1%


DE ANTOFAGASTA
EC-120

1% TALLER DE
C.R.e.3 = 43.37 V PVC Ø110mm
MTS-90

DORMITORIO OFICINA 29 110


EC-120

C.R.s. = 40.87 Sube MANTENIMIENTO


EC-120

FEMENINO EDUCADOR
L-2BT

15b FECHA : 26/06/2021 ESCALA : 1:100


EC-90

H. = 2.68 EC-120 SECRETARIAS


Y ESPERA 110 110
CONTIENE : SOLUCION AGUAS NEGRAS
REJA SEGUN E.T.A.

1%
EC-120

MTS-120 MTS-120 MTS-120 MTS-120


A6
V PVC Ø110mm
A6
A6
PRIMER PISO
PASILLO 16 NPT (ADMINISTRACION): +-0.00 6.00

D.PVC Ø 110mm Sube T.R NV: 45.23


EC-120

DORMITORIOS 29
NPT (ADMINISTRACION): +-0.00 baja V PVC Ø110mm NPT (ADMINISTRACION): +-0.00
DESTINO : CARCEL ARCHIVO :
NV: 45.23 SECTOR CSC 16A NV: 45.23
DORMITORIO V PVC Ø110mm
X
UN CIP 2156/2019

V PVC Ø110mm
MD-90

9 Sube
MASCULINO Sube Sube COMEDOR BODEGAJE
MD-90
110
MTS-90
L-2BT
MTS-120

FUNCIONARIOS Y ENTREGA
1%
MTS-90

NPT (ADMINISTRACION): +-0.00


NV: 45.23

110 1% CALDERAS
110 1%
MTS-120

T.R
NPT (ADMINISTRACION): -0.73
MTS-120
MTS-90

DEPENDENCIAS NPT (ADMINISTRACION): -0.07 NV: 44.50


OFICINA NV: 45.16
PERSONAL
LINEA OFICIAL SEG

CIRCULACION DIRECTOR PVC Ø160mm. A.Negras


MTS-120

DORMITORIO DORMITORIO DORMITORIO DORMITORIO SENAME


VISITAS 4 SENAME i = 3%,L:19.15m
MASCULINO MASCULINO MASCULINO MASCULINO
MTS-120

REPOSTERO
NPT (ADMINISTRACION): +-0.00
MTS-90
L-2BT
MTS-90 MTS-90
NV: 45.23 ACCESO
LINEA EDIFICACION SEGUN CIP 2156/2019 PERSONAL LINEA EDIFICACION SEGUN CIP 2156/2019
MTS-90

1
JARDINERA
C C
NPT: -0.33
NPT: -0.33
NV: 44.90
NV: 44.90
REJA

ACCESO VISITAS
NPT (ADMINISTRACION): +-0.00
NPT: -0.33 NV: 45.23
SEGU

NV: 44.90 NPT (ADMINISTRACION): -1.23


NV: 44.00
PVC Ø160mm. A.Negras
N

30
E.T.A

i = 3.5 %,L:20.47m 13 13
12 12
.

PROYECCION CUBIERTA ACCESO VISITAS 11 11


JARDINERA 10 JARDINERA 10

iner

Carpa
Conta

Malla
NPT: -0.33 9 9

Malla
o
s

nader
NPT: -0.33

Malla
PVC Ø160mm. A.Negras NV: 44.90 8 8

Malla
Inver
NV: 44.90

Malla
2 NPT: -2.53

Malla
Carpa
s
Malla
7 7
i = 4%,L:13.85m

Carpa

Malla
ESCALA

.
RAMPA ESCALA

do aprox
NV: 42.70

Carpa

.
6 6

Traza
do aprox
ACCESO 5 TERÉS
C.I. Nº19.A proy. ACCESO ACCESO DE IN

Traza
Carpa
5 SITIO

Malla

Mallas
Aguas Negras NE .T.A. VISITAS VISITAS 4 PERSONAL4
Conexión Col. Existente SEGU C.I. Nº8 proy.

Malla
REJA

.
C.T. = 41.76

do aprox
Aguas Negras 3 3
Aguas Negras

Traza

s
Malla
C.R.e.1 = 40.05 2 2
PVC Ø160mm. A.Negras

s
Malla
C.R.e.2 = 40.15 C.R.e. = 40.01 C.T. = 44.00

Mallas
1 1
C.R.e.3 = 40.01 NPT: -1.03 i = 2%,L:46.00m C.R.e. = 42.31
C.R.s. = 39.98 2 C.R.s. = 42.28
REJ NV: 44.20 2
AS H. = 1.78 4 3 H. = 1.72
EGU 3

imado
2 2

do aprox
NE 1 1

Traza
.T.A
. NPT: -2.23

N
N E.T.A. 1 NPT: -1.63 RAMPA 1 NV: 43.00
SEGU NV: 43.60
REJA ACCESO
LINEA OFICIAL SEGUN CIP 2156/2019 VISITAS LINEA OFICIAL SEGUN CIP 2156/2019

C.I. Nº8.C proy. REJA SEGUN E.T.A. REJA SEGUN E.T.A. REJA SEGUN E.T.A.
Aguas Negras PORTON ACCESO VEHICULAR
se intersecta tuberia existente C.I. Nº8.B proy. C.I. Nº8.A proy.
PVC Ø160mm. A.Negras SEGUN DISEÑO

C
C.T. = 42.50 NPT: -2.23 Aguas Negras Aguas Negras
NPT: -2.00
9
i = 1%,L:10.52m
9
NV: 480.00
C.R.e.1 = 40.63 NV: 43.00 C.T. = 42.70
C.T. = 42.70
C.R.e.2 = 41.28 C.R.e.1 = 41.38
C.R.e.3 = 41.29 C.R.e.1 = 40.74
PVC Ø160mm. A.Negras C.R.e.2 = 41.54 C.R.e.2 = 40.89
BANCA SEGUN E.T.A. BANCA SEGUN E.T.A. BANCA SEGUN E.T.A.
C.R.s. = 40.63 i = 1%,L:8.30m C.R.e.3 = 40.88
H. = 1.90 C.R.s. = 40.71
H. = 1.99 C.R.e.4 = 40.88
C.R.s. = 40.85
H. = 2.09
UD.PVC Ø160mm. A.Negras
1
i = 3%,L:8.00m existente NPT: -2.40
se reutiliza ud existente en terreno NV: 481.10
siempre que sea de 160 mm se debera
revisar en terreno si no fuera se remplaza el
tramo desde 1ra camara a colector en 160 mm

SOLERA EXISTENTE CALLE FELIX GARCIA SOLERA EXISTENTE CALLE FELIX GARCIA
REBAJE SOLERA CALLE FELIX GARCIA Nº
COLECTOR EXISTENTE CALLE FELIX GARCIA

CALLE FELIX GARCIA

SOLUCION DE PRIMER PISO


ESCALA 1 :100

1 EMITIDO PARA CONSTRUCCIÓN 12/07/2021 C.L.D G.Y.G D.I.Z


0 EMITIDO PARA CONSTRUCCIÓN 15/03/2020 C.L.D G.Y.G D.I.Z