Documentos de Académico
Documentos de Profesional
Documentos de Cultura
MEDIDAS EN METROS
N° DESCRIPCIÓN UNIDAD CANT.
ALTO ANCHO
1 INSTALACION DE FAENAS glb
1
2 LETRERO DE OBRA glb
1
MEDIDAS EN METROS
PARCIAL TOTAL
LARGO ÁREA VOLUMEN
1.00
1.00
1.00
1.00
252.96
12.00 126.48 126.48
14.05 126.48 126.48
965.55
26.73 482.74 482.74
15.03 193.14 193.14
24.14 289.67 289.67
2,911.07
2,911.07 2,911.07
1,981.63
1,981.63 1,981.63
333.60
333.60
26,420.80
1,376.08
EXPROPIA
CION DE
TERRREN
m2
O NO
CONSTRUI
DO
4
1 18.06 26.73 482.74
1 12.85 15.03 193.14
1 12.00 24.14 289.67
EXCAVACI
ON SUELO
S/DURO m3
C/MAQUIN
ARIA
5
1
CONFORM
ACION
DEL m3
6 TERRAPLE
N
1
PRODUCCI
ON,
TRANSPOR
TE Y m2
COLOCACI
ON CAPA
BASE
7
1 0.2 1,667.98 333.5960
PRODUCCI
ON,
TRANSPOR
TE Y m2
COLOCACI
ON CAPA
SUB BASE
8
1 0.2 1,667.98 333.5960
SUMINIST
RO
ASFALTO
DILUIDO Lt
PARA
IMPRIMAC
9 ION MC 30
AREA 1 1 1.2 3.3 1,667.98
AREA 2 1 1.2 9.9 1,667.98
PRODUCCI
ON
COLOCACI
ON DE m3
CARPETA
ASFALTIC
10 A
4to carril 1 0.1 3.3 1,667.98
3 carriles 1 0.05 9.9 1,667.98
MURO DE
CONTENCI m3
11 ON
MURO 1 1 3 0.2 30.00
MURO 2 1 4.8 0.2 76.00
VIGA DE
HORMIGO m3
12 N H21
TRAMO 1 1 0.35 4.8 60.00
TRAMO 2 1 0.35 4.8 80.00
LOSA DE
HORMIGO m3
13 N H21
TRAMO 1 1 0.25 4.8 60.00
TRAMO 2 1 0.25 4.8 80.00
ESTRIBOS
Y ALEROS m3
14 H21
TRAMO 1 1 0.02 4.8 60.00
TRAMO 2 1 0.02 4.8 80.00
BARANDA
DO
m
PREFABRI
15 CADO
1 140.00
LIMPIEZA
DE m2
16 CALZADA
1 3.3 1,667.98 5,504.3340
CUNETA
DE
m
MANPOST
17 ERIA
1 1,667.98
PROV. Y
COLOC.
DE
pza
SEÑALIZA
CION
18 VERTICAL
6
PINTADO
DE
SEÑALIZA glb
CION (A
19 MANO)
3
LIMPIEZA
glb
20 GENERAL
1
ROS
PARCIAL TOTAL
VOLUMEN
1.00
1.00
1.00
1.00
252.96
126.48
126.48
965.55
482.74
193.14
289.67
2,911.07
2,911.07 2,911.07
1,981.63
1,981.63 1,981.63
333.60
333.60
333.60
333.60
26,420.80
6,605.20 6,605.20
19,815.60 19,815.60
1,376.08
550.43 550.43
825.65 825.65
90.96
18.00 18.00
72.96 72.96
235.20
100.80 100.80
134.40 134.40
168.00
72.00 72.00
96.00 96.00
13.44
5.76 5.76
7.68 7.68
140.00
140.00
5,504.33
5,504.33
1,667.98
1,667.98
6.00
6.00
3.00
3.00
1.00
1.00
N° DESCRIPCIÓN UNIDAD CANT. MEDIDAS EN METROS
ALTO ANCHO LARGO
INSTALACION DE FAENAS glb
1
1
LETRERO DE OBRA glb
2
1
m2
EXPROPIACION DE TERRRENO CONSTRIUDO
3
1 10.54 12
1 9 14.053
EXPROPIACION DE TERRRENO NO m2
CONSTRUIDO
4 1 18.06 26.73
1 12.85 15.03
1 12 24.139
m3
5 EXCAVACION SUELO S/DURO C/MAQUINARIA
1
CONFORMACION DEL TERRAPLEN m3
6
1
PRODUCCION, TRANSPORTE Y COLOCACION m2
7 CAPA BASE
1 0.2 1667.98
PRODUCCION, TRANSPORTE Y COLOCACION m2
8 CAPA SUB BASE
1 0.2 1667.98
SUMINISTRO ASFALTO DILUIDO PARA Lt
IMPRIMACION MC 30
9
AREA 1 1 1.2 3.3 1667.98
AREA 2 1 1.2 9.9 1667.98
PRODUCCION COLOCACION DE CARPETA m3
ASFALTICA
10
4to carril 1 0.1 3.3 1667.98
3 carriles 1 0.05 9.9 1667.98
MURO DE CONTENCION m3
11 MURO 1 1 3 0.2 30
MURO 2 1 4.8 0.2 76
VIGA DE HORMIGON H21 m3
12 PUENTE 1 1 0.35 4.8 60
PUENTE 2 1 0.35 4.8 80
LOSA DE HORMIGON H21 m3
13 PUENTE 1 1 0.25 4.8 60
PUENTE 2 1 0.25 4.8 80
ESTRIBOS Y ALEROS H21 m3
14 PUENTE 1 1 0.02 4.8 60
14
PUENTE 2 1 0.02 4.8 80
BARANDADO PREFABRICADO m
15
1 140
LIMPIEZA DE CALZADA m2
16
1 3.3 1667.98
CUNETA DE MANPOSTERIA m
17
1 1667.98
pza
18 PROV. Y COLOC. DE SEÑALIZACION VERTICAL
6
PINTADO DE SEÑALIZACION (A MANO) glb
19
3
LIMPIEZA GENERAL glb
20
1
AS EN METROS
PARCIAL TOTAL
ÁREA VOLUMEN
1
1
1
1
252.96
126.48 126.48
126.477 126.477
965.55
482.7438 482.7438
193.1355 193.1355
289.668 289.668
2911.07
2911.07 2911.07
1981.63
1981.63 1981.63
333.6
333.596 333.596
333.6
333.596 333.596
26420.8
6605.2008 6605.2008
19815.6024 19815.6024
1376.08
550.4334 550.4334
825.6501 825.6501
90.96
18 18
72.96 72.96
235.2
100.8 100.8
134.4 134.4
168
72 72
96 96
13.44
5.76 5.76
7.68 7.68
140
140
5504.33
5504.334 5504.334
1667.98
1667.98
6
3
3
1
1
DESCRIPCIÓ MEDIDAS EN METROS
N° N
UNIDAD CANT.
ALTO ANCHO LARGO ÁREA
INSTALAC
ION DE glb
1 FAENAS
1
LETRERO
glb
2 DE OBRA
1
EXPROPIA
CION DE
TERRREN
m2
O
CONSTRIU
3 DO
1 10.54 12.00 126.48
1 9.00 14.05 126.48
EXPROPIA
CION DE
TERRREN
m2
O NO
CONSTRUI
DO
4
1 18.06 26.73 482.74
1 12.85 15.03 193.14
1 12.00 24.14 289.67
EXCAVACI
ON SUELO
S/DURO m3
C/MAQUIN
ARIA
5
1
CONFORM
ACION
DEL m3
6 TERRAPLE
N
1
PRODUCCI
ON,
TRANSPOR
TE Y m2
COLOCACI
ON CAPA
BASE
7
1 0.2 1,667.98 333.5960
PRODUCCI
ON,
TRANSPOR
TE Y m2
COLOCACI
ON CAPA
SUB BASE
8
1 0.2 1,667.98 333.5960
SUMINIST
RO
ASFALTO
DILUIDO Lt
PARA
IMPRIMAC
9 ION MC 30
AREA 1 1 1.2 3.3 1,667.98
AREA 2 1 1.2 9.9 1,667.98
PRODUCCI
ON
COLOCACI
ON DE m3
CARPETA
ASFALTIC
10 A
4to carril 1 0.1 3.3 1,667.98
3 carriles 1 0.05 9.9 1,667.98
MURO DE
CONTENCI m3
11 ON
MURO 1 1 3 0.2 30.00
MURO 2 1 4.8 0.2 76.00
VIGA DE
HORMIGO m3
12 N H21
TRAMO 1 1 0.35 4.8 60.00
TRAMO 2 1 0.35 4.8 80.00
LOSA DE
HORMIGO m3
13 N H21
TRAMO 1 1 0.25 4.8 60.00
TRAMO 2 1 0.25 4.8 80.00
ESTRIBOS
Y ALEROS m3
14 H21
TRAMO 1 1 0.02 4.8 60.00
TRAMO 2 1 0.02 4.8 80.00
BARANDA
DO
m
PREFABRI
15 CADO
1 140.00
LIMPIEZA
DE m2
16 CALZADA
1 3.3 1,667.98 5,504.3340
CUNETA
DE
m
MANPOST
17 ERIA
1 1,667.98
PROV. Y
COLOC.
DE
pza
SEÑALIZA
CION
18 VERTICAL
6
PINTADO
DE
SEÑALIZA glb
CION (A
19 MANO)
3
LIMPIEZA
glb
20 GENERAL
1
ROS
PARCIAL TOTAL
VOLUMEN
1.00
1.00
1.00
1.00
252.96
126.48
126.48
965.55
482.74
193.14
289.67
2,911.07
2,911.07 2,911.07
1,981.63
1,981.63 1,981.63
333.60
333.60
333.60
333.60
26,420.80
6,605.20 6,605.20
19,815.60 19,815.60
1,376.08
550.43 550.43
825.65 825.65
90.96
18.00 18.00
72.96 72.96
235.20
100.80 100.80
134.40 134.40
168.00
72.00 72.00
96.00 96.00
13.44
5.76 5.76
7.68 7.68
140.00
140.00
5,504.33
5,504.33
1,667.98
1,667.98
6.00
6.00
3.00
3.00
1.00
1.00