Por m3 de Concreto Por bolsa de Cemento

Volumen m3 m3 En und. de Recipiente


Cem Arena Piedra F.C. Arena Piedra Agua Arena Piedra Agua Arena Piedra
140 1 2.5 3.5 7.01 0.51 0.54 0.184 0.073 0.077 0.026 20.8 22.0
175 1 2.5 2.5 8.43 0.54 0.55 0.485 0.064 0.065 0.058 18.3 18.6
210 1 2 2 9.73 0.52 0.53 0.186 0.053 0.054 0.019 15.3 15.6
245 1 1.5 1.5 11.50 0.5 0.51 0.187 0.043 0.044 0.016 12.4 12.7
280 1 1 1.5 13.34 0.45 0.51 0.189 0.034 0.038 0.014 9.6 10.9
Obra 1 1.48 2.23 10.17 0.43 0.64 0.042 0.063 0.000 12.0 18.0

Resit Metrado Desperdicio Arena Piedra Cem


175 273 3% 151.8 154.7 2370.4

Litros carretillas o lampadas Recip Litros Selec


Cem Arena Piedra Cem Arena Piedra carret 46.0
140 28.32 70.79 99.11 8.1 20.2 28.3 carret 66.0
175 28.32 70.79 70.79 8.1 20.2 20.2 lata 19.0
210 28.32 56.63 56.63 8.1 16.2 16.2 lata C 20.0
245 28.32 42.48 42.48 8.1 12.1 12.1 Lampa 3.5 1
280 28.32 28.32 42.48 8.1 8.1 12.1 Bls Cem Abiet 32.5
Obra 28.32 41.91 63.15 8.1 12.0 18.0 Bls Cem Cerrad 28.3

F'c SUM VOL F.C.


14
140 7 7.01
12 f(x) = 40.1994377494331 x^-0.886758879225462
175 6 8.43 R² = 0.993016946268309
210 5 9.73 10
245 4 11.5 8
280 3.5 13.34
6
4.71 10.17 3 4 5 6 7

16

14
4.75
12
4.73
10
4.71
8
4.69
6
4.67
4
4.65
2 219 219.25 219.5 219.75 220 220.25
0 SUM VOLS F.C.
140 175 210 245 280 315
SUM VOLS F.C.
emento
und. de Recipiente
Agua Arena Piedra Arena Piedra
7.5 17.53 24.54 0.50 0.69
16.4 21.08 21.08 0.60 0.60
5.5 19.46 19.46 0.55 0.55
4.6 17.25 17.25 0.49 0.49
4.0 13.34 20.01 0.38 0.57
0.0 15.05 22.68 0.43 0.64

3.5
0
0
0
0
3.5
0
0

377494331 x^-0.886758879225462
6946268309

5 6 7

219.5 219.75 220 220.25 220.5


SUM VOLS F.C.