P. Unit.
Item Descripción Und Metrado Parcial (S/.) MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 MES 11 MES 12
S/.
OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES PARA
01 249,394.76 249,394.76
TODA LA OBRA
02 SISTEMA DE AGUA POTABLE 2,496,128.97 50,813.57 330,367.83 397,440.06 263,720.09 363,420.56 429,991.26 375,967.21 143,375.30 56,190.80 32,803.41 38,254.65 13,784.25
02.01 CAPTACIONES TIPO MANANTIAL DE LADERA 77,492.68 22,783.30 40,450.05 14,259.33
CAPTACION TIPO MANANTIAL DE LADERA QUISHUARA
02.01.01 20,911.13 13,727.63 7,183.50
Nº 01
CAPTACION TIPO MANANTIAL DE LADERA PAPATA 2 Nº
02.01.02 20,061.08 16,066.25 3,994.83
02
CAPTACION TIPO MANANTIAL DE LADERA PAPATA1 Nº
02.01.03 20,160.24 9,055.67 11,104.57
03
CAPTACION TIPO MANANTIAL DE LADERA CEDRO
02.01.04 16,360.23 6,095.73 10,264.50
HUAYCO Nº 04
02.02 LINEA DE CONDUCCION 686,218.69 19,589.86 167,526.93 213,466.12 155,039.92 100,278.52 22,154.95 8,162.39
LINEA DE CONDUCCION DE CAPTACION PAPATA 1 A
02.02.01 2,042.94 564.56 1,478.38
CAMARA REUNION 01 (L=32 ML.)
LINEA DE CONDUCCION DE CAPTACION PAPATA 2 A
02.02.02 22,162.09 10,251.67 4,198.02 7,578.57 133.83
CAMARA REUNION 01 (L=370 ML.)
02.02.03 CAMARA DE REUNION DE CAUDALES Nº 01 4,831.25 133.53 4,697.72
LINEA DE CONDUCCION DE CAMARA DE REUNION 01 A
02.02.04 15,685.93 3,282.92 4,177.39 8,225.62
CAMARA DE REUNION 02 (L=270 ML.)
LINEA DE CONDUCCION DE CAPTACION QUISHUARA A
02.02.05 98,985.86 11,010.65 41,602.11 11,792.68 14,887.28 19,693.14
CAMARA DE REUNION 02 (L=1 084 ML.)
02.02.06 CAMARA DE REUNION DE CAUDALES Nº 02 5,621.95 3,016.25 2,605.70
LINEA DE CONDUCCION DE CAMARA DE REUNION 02 A
02.02.07 253,251.95 3,279.23 49,912.84 115,682.54 40,340.76 37,814.88 6,221.70
RAE-01 V=200 M3 (L=3 130 ML.)
LINEA DE CONDUCCION DE RAE-01 V=200 M3 A RAE-02
02.02.08 283,636.72 4,601.89 56,301.29 77,615.49 84,007.69 39,620.42 13,327.55 8,162.39
V=250 M3 (L=1 543 ML.)
02.03 OBRAS DE ALMACENAMIENTO Y CONTROL 258,943.24 53,994.54 72,424.55 31,950.28 77,057.47 23,516.40
MEJORAMIETO DE RESERVORIO APOYADO EXISTENTE
02.03.01 56,892.11 49,116.72 7,775.39
DE CONCRETO RAE-01, V=200 M3
MEJORAMIETO DE RESERVORIO APOYADO EXISTENTE
02.03.02 145,267.45 52,259.35 15,625.03 53,899.53 23,483.54
DE CONCRETO RAE-02, V=250 M3
MEJORAMIENTO DE RESERVORIO APOYADO EXISTENTE
02.03.03 8,136.77 4,877.82 3,258.95
DE CONCRETO RAE-03, V=10 M3
MEJORAMIETO DE RESERVORIO APOYADO EXISTENTE
02.03.04 48,646.91 9,130.86 16,325.25 23,157.94 32.86
DE CONCRETO RAE-04, V=50 M3
02.04 LINEA DE ADUCCION 81,021.16 10,162.50 11,100.26 42,038.20 16,791.05 929.17
LINEA DE ADUCCION DE RAE-02 V=250 M3 A SECTOR
02.04.01 64,137.28 10,162.50 11,100.26 42,038.20 836.32
PAUSA (L=784 ML.)
LINEA DE ADUCCION DE RAE-03 V=10 M3 A SECTOR
02.04.02 4,909.15 4,909.15
CRUZ PAMPA (L=87 ML.)
LINEA DE ADUCCION DE RAE-04 V=50 M3 A SECTOR
02.04.03 11,974.73 11,045.58 929.17
PAUSA (L=240 ML.)
REDES DE DISTRIBUCION DE AGUA POTABLE PARA
02.05 998,323.23 8,440.41 122,390.85 169,714.61 108,680.17 198,985.00 169,261.56 205,711.90 15,138.73
PAUSA Y BARRIOS PERIURBANOS (L=18166 ML.)
CONEXIONES DOMICILIARIAS DE AGUA POTABLE PARA
02.06 394,129.97 155,049.94 88,104.44 34,388.05 31,745.23 32,803.41 38,254.65 13,784.25
PAUSA Y BARRIOS PERIURBANOS (1187 UND.)
03 REDES DE ALCANTARILLADO SANITARIO 2,576,526.02 20,371.63 210,983.80 112,462.67 95,010.74 183,788.62 659,305.70 400,643.71 206,373.23 266,420.27 241,546.98 179,618.66
REDES DE ALCANTARILLADO PARA PAUSA Y BARRIOS
03.01 1,494,746.77 20,371.63 210,983.80 112,462.67 57,093.04 112,570.71 489,138.15 115,490.22 177,394.50 190,024.77 9,217.27
PERIURBANOS (L=12 146 ML.)
EMISOR PARA PAUSA Y BARRIOS PERIURBANOS (L=2 210
03.02 272,525.12 37,917.70 47,360.50 95,636.24 53,212.48 8,278.56 9,359.18 19,354.28 1,406.18
ML.)
CONEXIONES DOMICILIARIAS DE ALCANTARILLADO PARA
03.03 809,254.13 23,857.41 74,531.31 231,941.01 20,700.17 67,036.32 212,975.43 178,212.48
PAUSA Y BARRIOS PERIURBANOS (1 319 UND.)
04 PLANTAS DE TRATAMIENTO DE AGUAS RESIDUALES PTAR 2,308,361.29 36,391.51 270,381.84 389,263.13 213,516.82 390,282.01 574,157.95 205,712.28 156,484.15 34,178.24 37,993.37
AVANCE PORCENTUAL MENSUAL % 4.68% 7.07% 7.14% 8.20% 12.17% 16.89% 15.13% 12.01% 6.90% 5.65% 3.35% 0.81%
AVANCE PORCENTUAL ACUMULADO % 4.68% 11.75% 18.89% 27.10% 39.26% 56.15% 71.28% 83.29% 90.19% 95.85% 99.19% 100.00%
CRONOGRAMA GENERAL DE DESEMBOLSOS DE OBRA
MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO EN LA LOCALIDAD DE PAUSA Y SECTORES PERIURBANOS, DISTRITO
Proyecto:
DE PAUSA, PROVINCIA DE PAUCAR DEL SARA SARA - AYACUCHO
Ubicación: Ayacucho - Paucar del Sara Sara - Pausa
Localidad: Ciudad de Pausas y Periurbano
Costo Total Inc. IGV: S/. 9,613,787.64
Costo Directo: S/. 7,084,589.27
TOTALES S/. 2,401,555.68 S/. 8,147,277.66 S/. 600,388.92 S/. 1,801,166.76 S/. 8,147,277.66 S/. 1,466,509.98
TOTAL DESEMBOLSADO S/. 8,147,277.66 S/. 1,466,509.98
DÍAS CALENDARIO
DESCRIPCION mes 1 mes 2 mes 3 mes 4 PARCIALES
AÑO 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
OK
1 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES PARA TODA LA OBRA
02.02.01 LINEA DE CONDUCCION DE CAPTACION PAPATA 1 A CAMARA REUNION 01 (L=32 ML.) #REF! #REF!
02.02.04 LINEA DE CONDUCCION DE CAMARA DE REUNION 01 A CAMARA DE REUNION 02 (L=270 ML.) #REF! #REF!
02.02.05 LINEA DE CONDUCCION DE CAPTACION QUISHUARA A CAMARA DE REUNION 02 (L=1 084 ML.)
02.02.08 LINEA DE CONDUCCION DE RAE-01 V=200 M3 A RAE-02 V=250 M3 (L=1 543 ML.)
02.03.01 MEJORAMIETO DE RESERVORIO APOYADO EXISTENTE DE CONCRETO RAE-01, V=200 M3 #REF! #REF!
02.03.04 MEJORAMIETO DE RESERVORIO APOYADO EXISTENTE DE CONCRETO RAE-04, V=50 M3 #REF! #REF! #REF!
02.04.02 LINEA DE ADUCCION DE RAE-03 V=10 M3 A SECTOR CRUZ PAMPA (L=87 ML.) #REF! #REF! #REF!
3.02 EMISOR PARA PAUSA Y BARRIOS PERIURBANOS (L=2 210 ML.) #REF! #REF!
CRONOGRAMA VALORIZADO
04.02.07 FILTRO BIOLOGICO 01
8 MONITOREO ARQUEOLOGICO
###
COSTO DIRECTO #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF!
#REF! #REF!
#REF!
#REF! #REF!
#REF!
CRONOGRAMA VALORIZADO