PRESUPUESTO DE OBRA
Obra: FECHA:
CONSTRUCCION PRIMER FASE DE LA OBRA NUEVA IPS LOURDES
FEBRERO 24- 2016
SUBTOTAL DEMOLICION
10,183,408.00
EDIFICACION EXISTENTE
2 PRELIMINARES
CAMPAMENTO TABLA 54 M2 INCLUYE OBRAS
APU UND 1.00 7,780,378.00 7,780,378.00
HIDROSANITARIAS Y ELECTRICAS
100106 CERRAMIENTO LAMINA GALVANIZADA M2 228.00 21,350.00 4,867,800.00
100113 LOCALIZACION-REPLANTEO OBRA ARQUITECTONICA M2 355.00 2,800.00 994,000.00
SUBTOTAL
13,642,178.00
PRELIMINARES
3 EXCAVACIONES
10203 EXCAVACION A MAQUINA SIN RETIRO M3 1,519.70 2,640.00 4,012,008.00
10207 RELLENO ROCA MUERTA COMPACTADO-CILINDRO M3 292.45 30,470.00 8,910,951.50
SUBTOTAL
MAMPOSTERIA Y 12,922,959.50
REPELLOS
4 CIMENTACION
130912 CONCRETO 4000 PSI PARA MURO COLADO M3 110.16 529,710.00 58,352,853.60
SUBTOTAL BASES -
27,170,269.54
PLACAS - ANDENES
8 MAMPOSTERIA Y REPELLOS
MURO ESTRUCTURAL EN BLOQUE DE ARCILLA DE
APU M2 65.70 52,004.00 3,416,662.80
12X24X6CM
190109 REPELLO MURO 1:3 M2 131.40 16,550.00 2,174,670.00
190108 REPELLO MURO 1:3 LINEAL ML 24.00 11,070.00 265,680.00
131214 CONCRETO MURO-DOVELAS 3100PSI-420MPA M3 1.50 299,620.00 449,430.00
SUBTOTAL
MAMPOSTERIA Y 6,306,442.80
REPELLOS
APU LAMPARA PANEL LED DE EMPOTRAR 60X60X11 CUADRADA UND 8.00 341,708.00 2,733,664.00
10 REDES SANITARIAS
Suministro, transporte e instalacion de tuberia PVC Sanitaria ( Incluye soldadura y limpiador PVC), en los siguientes diametros :
110303 Tubería PVC Sanitaria, 4" ML 300.00 22,520.00 6,756,000.00
APU UNION SANITARIA PVC CC-4" UND 32.00 9,792.00 313,344.00
150104 Suministro Tubería PVC Sanitaria, 2" ML 32.00 12,580.00 402,560.00
150105 Suministro Tubería PVC Ventilación, 2" ML 16.00 9,490.00 151,840.00
160733 ANCLAJE - SOPORTE TUBERIA UND 16.00 22,210.00 355,360.00
APU ACCESORIOS 2" PVC-S UND 30.00 8,063.06 241,891.93
APU ACCESORIOS 4" PVC-S UND 12.00 15,837.50 190,050.05
APU CAJA 100X100 UND 4.00 316,693.22 1,266,772.87
APU REJILLA SOTANO ML 9.00 125,000.00 1,125,000.00
APU CAMARA TIPO B 1.0 UND 1.00 1,350,000.00 1,350,000.00
APU TUBERIA ALCANTARILLADO 6" ML 15.70 46,825.35 735,158.03
APU TUBERIA ALCANTARILLADO 4" ML 17.00 25,435.97 432,411.44
APU BOMBA SUGERGIBLE 2 HP - ADT 5 M UND 1.00 1,429,819.07 1,429,819.07
Suministro, transporte e instalacion de Puntos sanitarios en tuberia PVC Sanitaria ( Incluye niples de tuberia, codos, soldadura, limpiador ), en los
siguientes diametros :
150506 Punto sanitario , 4" UND 6.00 48,910.00 293,460.00
150502 Punto sanitario , 2" UND 13.00 22,930.00 298,090.00
150323 Punto sanitario sifon de piso , 2" UND 5.00 6,180.00 30,900.00
160733 ANCLAJE - SOPORTE TUBERIA VERTICAL UND 4.00 22,210.00 88,840.00
Suministro, transporte e instalacion de tuberia PVC Sanitaria para recoleccion de aguas lluvias provenientes de las cubiertas. (Incluye soldadura y
limpiador) en los siguientes diametros :
APU Tubería PVC Sanitaria, 4" aguas lluvias- BALL-4 ML 12.00 35,353.85 424,246.19
APU ACCESORIOS SANITARIO PVC -S4" UND 8.00 15,837.50 126,700.03
APU Tubería PVC Sanitaria, 6" -aguas lluvias ML 10.00 67,699.06 676,990.56
APU ACCESORIOS SANITARIO PVC -S6" UND 8.00 78,159.10 625,272.77
APU ANCLAJE - SOPORTE TUBERIA UND 4.00 24,013.00 96,052.00
APU CAJA DE 100X100 UND 1.00 316,693.22 316,693.22
PUNTOS SANITARIOS: Suministro, transporte e instalacion de Punto sanitario para AGUAS LLUVIAS en tuberia PVC Sanitaria ( Incluye niples de tuberia,
codo, soldadura, limpiador y sifon )
150506 Punto sanitario , 4" UND 8.00 48,910.00 391,280.00
APU Punto sanitario , 6" UND 6.00 78,159.10 468,954.58
APU TAPA CAJA MARCO ANGULO 1,00X1,00 UND 5.00 121,700.00 608,500.00
11 INSTALACIONES RED CONTRA INCENDIOS
160410 EXTINTOR ABC-10 LB UND 6.00 78,770.00 472,620.00
160409 EXTINTOR CO2-10 LB UND 2.00 942,370.00 1,884,740.00
SUBTOTAL INST
21,553,546.75
HIDROSANITARIO
12 INSTALACIONES HIDRAULICAS
Suministro, transporte e instalacion de tuberia PVC Presion E.L RDE 21 (Incluye accesorios PVC, soldadura, limpiador), en los siguientes diametros :
APU 2" TUBERIA PVC- UZ RDE-21 ML 16.00 22,895.86 366,333.74
160516 1.1/2" TUBERIA PVC- UZ RDE-21 ML 19.00 11,110.00 211,090.00
APU 1" TUBERIA PVC- UZ RDE-21 ML 14.00 7,492.35 104,892.85
APU 3/4" TUBERIA PVC- UZ RDE-21 ML 21.00 5,417.71 113,771.99
APU 1/2" TUBERIA PVC- UZ RDE-9 ML 120.00 4,740.47 568,856.45
10106 LOCALIZACION-REPLANTEO ML 70.00 1,380.00 96,600.00
60810 EXCAVACION A MANO M3 12.00 9,880.00 118,560.00
100612 RELLENO ARENA FINA TUBERIA ML 8.00 34,830.00 278,640.00
100618 RELLENO MATERIAL SITIO COMPACATADO-SALTARIN ML 2.00 11,330.00 22,660.00
100622 RETIRO DE SALDOS EN SITIO M3 14.00 5,300.00 74,200.00
160413 ANCLAJE - SOPORTE TUBERIA UND 32.00 22,210.00 710,720.00
160801 PUNTO HIDRAULICO 1/2" UND 25.00 29,050.00 726,250.00
160803 PUNTO HIDRAULICO 1" UND 5.00 34,080.00 170,400.00
160802 PUNTO HIDRAULICO 3/4" UND 3.00 31,730.00 95,190.00
APU ANCLAJE - SOPORTE TUBERIA VERICAL UND 8.00 29,508.60 236,068.80
APU VALVULA DE PASO RED - WHITE 1 1/2" UND 2.00 101,863.93 203,727.86
APU VALVULA DE PASO RED - WHITE 1" UND 4.00 68,336.53 273,346.13
APU VALVULA DE PASO RED - WHITE 1/2" UND 13.00 36,516.00 474,708.00
40701 PRUEBA HIDRAULICA A TUBERIA PVC PRESION ML 190.00 1,920.00 364,800.00
60810 EXCAVACION A MANO M3 17.00 9,880.00 167,960.00
APU RELLENO CON MATERIAL DE SITIO TANQUE M3 1.00 12,333.84 12,333.84
131304 MURO CONCRETO TANQUE SUBTERRANEO 4000PSI M3 14.40 642,260.00 9,248,544.00
APU LOSA M3 1.80 268,186.00 482,734.80
APU ACERO DE REFUERZO KG 850.00 3,520.00 2,992,000.00
APU TAPAS EN ALFAJOR 80X80 UND 2.00 250,045.00 500,090.00
APU POLLOS EN CONCRETO PARA BOMBAS 1.0X1.0 UND 2.00 45,527.00 91,054.00
APU PASES EN MUROS ACERO INOX EQUIPO DE BOMBEO UND 2.00 92,100.00 184,200.00
APU BOMBAS PRESION 40-60 Q= 40 GPM Y E INSTALACION GLB 2.00 5,500,000.00 11,000,000.00
APU CAJA MEDIDOR + MEDIDOR 1" UND 1.00 1,157,688.12 1,157,688.12
APU ACOMETIDA 1" UND 1.00 562,868.64 562,868.64
APU REJA ESLABONADA M2 12.00 25,950.00 311,400.00
IMPERMEABILIZACION EPOXICO MURO TANQUE AGUA
APU M2 27.00 120,000.00 3,240,000.00
POTABLE
SUBTOTAL
INSTALACIONES 35,161,689.21
HIDRAULICAS
13 DIVISIONES
240419 MURO 1-BOARD 8MM 1-BOARD 8MM M2 229.40 62,580.00 14,355,852.00
240432 MURO 1-BOARD 10MM 1-CARA M2 25.55 36,410.00 930,156.80
240437 ESTRUC.MURO BOARD [CANAL-PARAL] 89MM C20 M2 229.40 37,520.00 8,607,088.00
240402 MURO CARTERA SUPERBOARD 10 MM ML 23.25 20,670.00 480,577.50
240444 ESTRUCT.DINTEL BOARD[OMEGA-ANG]92MM C20 ML 23.25 23,520.00 546,840.00
14 ESTUCOS Y PINTURAS
290109 ESTUCO MUROS PLASTICO M2 875.51 5,330.00 4,666,468.30
290112 ESTUCO MUROS PLASTICO LINEAL ML 65.12 4,350.00 283,278.00
APU PINTURA HIDRORREPELENTE COLOR BLANCO [2M] M2 918.60 4,856.00 4,460,721.60
290210 URETANO SIKA MUROS M2 191.00 24,840.00 4,744,439.52
290213 URETANO SIKA CIELOS M3 61.50 26,660.00 1,639,651.48
290619 PINTURA KORAZA [3M] M2 827.25 7,190.00 5,947,935.00
PINTURA REFLECTIVA COLOR BLANCO SEÑALIZACION
APU ML 65.00 1,658.00 107,770.00
PARQUEADEROS
SUBTOTAL
ESTUCOS Y 21,850,263.90
PINTURAS
15 REVESTIMIENTOS ESPECIALES
SUBTOTAL
REVESTIMIENTOS 49,726,198.70
ESPECIALES
16 PISOS Y ENCHAPES
200421 PISO PAÑOS DE GRANITO PULIDO #2. M2 35.00 66,300.00 2,320,500.00
200440 BALDOSA GRANO # 4-5 40X40 M2 441.00 83,470.00 36,810,270.00
APU DILATACIONES EN ALUMINIO PARA PISO ML 120.00 6,976.00 837,120.00
200819 GUARDAESCOBA GRANITO 1/2 C + DIL. PLAST. ML 191.50 28,140.00 5,388,810.00
200414 CENEFA GRANITO PULIDO #2. A<=60CM ML 18.75 31,130.00 583,687.50
APU SIKAFLEX 1CSL A=8-10MM H=10MM ML 85.33 10,840.00 925,013.33
ENCHAPE PARED TIPO EGEO BLANCO DE 30X60CM H:
APU M2 91.80 55,342.00 5,080,395.60
2,40M
APU MURO PLOMADO 2MM M2 19.98 378,400.00 7,560,432.00
260120 VIDRIO PLOMADO BLINDADO 24 MM (20*30) UND 1.00 643,450.00 643,450.00
SUBTOTAL PISOS Y
60,149,678.43
ENCHAPES
17 CUBIERTAS E IMPERMEABILIZACIONES
JARDIN PARA ODONTOLOGIA INC. SISTEMA DE RIEGO POR
APU M2 12.00 100,116.00 1,201,392.00
ASPERSION EJECUTABLE.
180310 IMPERM.MANTO 500XT-FOIL ALUMINIO M2 25,330.00 -
SUBTOTAL CUBIERTAS E
3,893,552.00
IMPERMEABILIZACIONES
18 CIELO FALSO
180410 C.F.PANEL YESO 12.7MM S.JUNTA+VINILO M2 274.00 39,200.00 10,740,800.00
APU ESTRUCTURA CIELO M2 274.00 21,000.00 5,754,000.00
180405 CARTERA PANEL YESO 12.7MM S.JUNTA+VINILO ML 64.27 33,430.00 2,148,546.10
APU MOLDURAS MEDIA CAÑA EN YESO PARA CIELOS ML 95.75 40,852.00 3,911,579.00
SUBTOTAL CIELO FALSO 22,554,925.10
SUBTOTAL CARPINTERIA
46,407,597.68
DE ALUMINIO
20 CARPINTERIA MADERA
PUERTA PLEGABLE PVC HOGGAN COLOR MILANO NOGAL
18,1 M2 4.50 242,575.00 1,091,587.50
ANCHO: 0.60-1.00M Y ALTURA:2.0M.
21 BARANDAS
PASAMANOS EN ACERO INOXIDABLE DE 3" ANCLAJE A
APU ML 11.00 377,178.00 4,148,958.00
MURO
22 DOTACIONES
SANITARIO LINEA INSTITUCIONAL COLOR BLANCO REF.
APU JGO 4.00 760,748.00 3,042,992.00
ERIE DE CORONA O SIMILAR + VALVULA ANTIVANDALICA.
250530 GRIFO LAVAMANOS PUSH PARED - DOCOL UND 10.00 146,120.00 1,461,200.00
250419 ORINAL COLBY PLUS MEDIANO - ALFA UND 0.00 162,350.00 -
APU GRIFO PUSH ORINAL COMPLETA UND 0.00 184,630.00 -
SECADORES MANOS LIBRES SENSOR ABS CROMADO TIPO
APU UND 10.00 510,740.00 5,107,400.00
AC-CS400X LOSDI O SIMILAR
SUBTOTAL PAVIMENTO
21,565,200.00
CONCRETO RIGIDO
24 OBRAS COMPLEMENTARIAS
TOPELLANTAS DE CONCRETO PREFABRICADOS 0,70 0,20,
APU UND 12.00 37,102.00 445,224.00
h= 15 cm
SUBTOTAL OBRAS
3,601,315.56
COMPLEMENTARIAS
25 ZONAS VERDES
APU VEGETACION TIPO BAMBUSA UND 60.00 28,329.00 1,699,740.00
100617 RELLENO GRAVA TRITURADA-POLVILLO [S.COM] M3 14.00 47,440.00 664,160.00
APU ARBOL TIPO ALMENDRO PORTE MEDIO UND 3.00 49,029.00 147,087.00
SUMINISTRO E INSTALACION TIERRA AGRICOLA PARA
300220 M3 28.00 51,320.00 1,436,960.00
JARDIN SECO
SUBTOTAL ZONAS
3,947,947.00
VERDES
26 MUEBLES PREFABRICADOS
COSTOS INDIRECTOS
IMPREVISTOS -
UTILIDAD 9.00% 90,697,673
TOTAL AIU 29.00% 292,248,056
IVA SOBRE LA
UTILIDAD
VALOR TOTAL
PRESUPUESTO 1,299,999,974
ANEXO N° 1- A
PRESUPUESTO DE OBRA
FECHA:
Obra: CONSTRUCCION PRIMER FASE DE LA OBRA NUEVA IPS LOURDES
1-Apr-2016
27 ESTRUCTURA METALICA
29 AIRES ACONDICIONADO
32 REDES SANITARIAS
33 ESTUCOS Y PINTURAS
COSTOS INDIRECTOS
IMPREVISTOS
VALOR TOTAL
PRESUPUESTO $400,750,000°°
GRAN TOTAL PRESUPUESTO: $ 1.700.749.974°°