Está en la página 1de 3

ADICIONAL Nº 02

Al 15/Abr/2021
Obra : ADICIONALES Y DEDUCTIVOS
Ubicacion : JULIACA - SAN ROMAN - PUNO
Costo A : May/2020 Cliente : MUNICIPALIDAD PROVINCIAL DE SAN ROMAN - JULIACA

REFERENCIAL ACUMULADO ANTERIOR VALORIZACION ACTUAL TOTAL ACUMULADO SALDO POR VALORIZAR

Precio
Item Descripcion Unid Metrado Parcial Metrado Parcial % Metrado Parcial % Metrado Parcial % Metrado Parcial %
Unitario

CONSOLIDADO MEJORAMIENTO DEL SERVICIO DE INFRAESTRUCTURA VIAL


01 CONTRUCCION DE CALZADA
01.01 TRABAJOS PROVISIONALES
01.01.01 CARTEL DE OBRA 3.60 M X 4.80 M UND 1.00 1,123.02 1,123.02 - - - - - - - - - 1.00 1,123.02 100.00%
01.01.02 ALQUILER DE OFICINA Y ALMACEN UND 1.00 900.00 900.00 - - - - - - - - - 1.00 900.00 100.00%
01.01.03 MOVILIZACION Y DESMOVILIZACION DE UND 1.00 3,050.85 3,050.85 - - - - - - - - - 1.00 3,050.85 100.00%
02 PAVIMENTO RIGIDO
02.01 OBRAS PRELIMINARES
02.01.01 TRAZO, NIVELACION Y REPLANTEO M2 16,528.20 0.99 16,362.92 - - - 824.02 815.78 4.99% 824.02 815.78 4.99% 15,704.18 15,547.14 95.01%
02.02 MOVIMIENTO DE TIERRAS
02.02.01 CORTE DE TERRENO CON MAQUINARIA ( M3 10,316.57 6.61 68,192.53 - - - 356.67 2,357.59 3.46% 356.67 2,357.59 3.46% 9,959.90 65,834.94 96.54%
02.02.02 ELIMINACION DE MATERIAL EXCEDENTE ( M3 12,895.71 9.31 120,059.06 - - - 445.84 4,150.77 3.46% 445.84 4,150.77 3.46% 12,449.87 115,908.29 96.54%
02.02.03 PERFILADO Y COMPACTADO EN ZONA D M2 16,528.20 1.87 30,907.73 - - - 824.02 1,540.92 4.99% 824.02 1,540.92 4.99% 15,704.18 29,366.82 95.01%
02.02.04 MEJORAMIENTO DE LA SUB RASANTE CO M3 6,133.70 22.09 135,493.43 - - - 247.20 5,460.65 4.03% 247.20 5,460.65 4.03% 5,886.50 130,032.79 95.97%
02.02.05 SUB BASE GRANULAR E=0.20 M M2 16,528.20 13.67 225,940.49 - - - - - - - - - 16,528.20 225,940.49 100.00%
02.02.06 SUB BASE GRANULAR E=0.25 M M2 - 15.76 - - - #DIV/0! 824.02 12,986.56 #DIV/0! 824.02 12,986.56 #DIV/0! -824.02 -12,986.56 #DIV/0!
02.03 OBRAS DE CONCRETO SIMPLE
02.03.01 ENCOFRADO Y DESENCOFRADO. M2 490.56 46.11 22,619.72 - - - 47.40 2,185.61 9.66% 47.40 2,185.61 9.66% 443.16 20,434.11 90.34%
02.03.02 CONCRETO PREMEZCLADO F'C=210 KG/ M2 13,974.86 71.90 1,004,792.43 - - - - - - - - - 13,974.86 1,004,792.43 100.00%
02.03.03 CURADO DE LOSA M2 23,877.66 0.55 13,132.71 - - - 824.02 453.21 3.45% 824.02 453.21 3.45% 23,053.64 12,679.50 96.55%
02.03.04 CONCRETO PREMEZCLADO F'C=210 KG/C M2 - 53.27 - - - #DIV/0! 824.02 43,895.55 #DIV/0! 824.02 43,895.55 #DIV/0! -824.02 -43,895.55 #DIV/0!
02.04 JUNTAS
02.04.01 JUNTA TRANSVERSAL DE CONTRACCION M 4,530.60 10.96 49,655.38 - - - 231.00 2,531.76 5.10% 231.00 2,531.76 5.10% 4,299.60 47,123.62 94.90%
02.04.02 JUNTA LONGITUDINAL DE CONTRACCION M 2,387.98 13.88 33,145.16 - - - 235.42 3,267.63 9.86% 235.42 3,267.63 9.86% 2,152.56 29,877.53 90.14%
02.04.03 JUNTA TRANSVERSAL DE CONSTRUCCIO M 64.80 13.88 899.42 - - - 38.50 534.38 59.41% 38.50 534.38 59.41% 26.30 365.04 40.59%
02.05 SEÑALIZACION
02.05.01 PINTURA EN PAVIMENTO (LINEAS CONTI M2 449.83 15.78 7,098.32 - - - 20.88 329.49 4.64% 20.88 329.49 4.64% 428.95 6,768.83 95.36%
02.05.02 PINTURA EN PAVIMENTO (SIMBOLOS Y L M2 32.65 17.38 567.46 - - - - - - - - - 32.65 567.46 100.00%
02.05.03 SEÑALES INFORMATIVAS UND 46.00 65.60 3,017.60 - - - - - - - - - 46.00 3,017.60 100.00%
03 AREA VERDE
03.01 SARDINELES
03.01.01 ENCOFRADO Y DESENCOFRADO M2 161.86 39.85 6,450.12 - - - - - - - - - 161.86 6,450.12 100.00%
03.01.02 CONCRETO F'C=175 KG/CM2 M3 12.14 301.03 3,654.50 - - - - - - - - - 12.14 3,654.50 100.00%
03.01.03 PINTURA M2 72.90 15.78 1,150.36 - - - - - - - - - 72.90 1,150.36 100.00%
03.01.04 JUNTA ASFALTICA_ M 26.98 6.14 165.66 - - - - - - - - - 26.98 165.66 100.00%
03.02 SEMBRADO DE GRASS
03.02.01 SEMBRADO DE GRASS M2 171.32 12.00 2,055.84 - - - - - - - - - 171.32 2,055.84 100.00%
03.02.02 SEMBRADO DE PLANTAS ORNAMENTALE UND 92.00 22.79 2,096.68 - - - - - - - - - 92.00 2,096.68 100.00%
04 VEREDAS
04.01 TRABAJOS PRELIMINARES

Página 1 de 3
ADICIONAL Nº 02
Al 15/Abr/2021
Obra : ADICIONALES Y DEDUCTIVOS
Ubicacion : JULIACA - SAN ROMAN - PUNO
Costo A : May/2020 Cliente : MUNICIPALIDAD PROVINCIAL DE SAN ROMAN - JULIACA

REFERENCIAL ACUMULADO ANTERIOR VALORIZACION ACTUAL TOTAL ACUMULADO SALDO POR VALORIZAR

04.01.01 TRAZO, NIVELACION Y REPLANTEO M2 7,349.46 0.99 7,275.97 - - - 282.52 279.69 3.84% 282.52 279.69 3.84% 7,066.94 6,996.27 96.16%
04.01.02 DEMOLICION DE VEREDAS EXISTENTES M2 4,483.69 6.68 29,951.05 - - - - - - - - - 4,483.69 29,951.05 100.00%
04.02 MOVIMIENTO DE TIERRAS
04.02.01 RELLENO MANUAL CON MATERIAL DE P M3 734.95 41.01 30,140.30 - - - 28.25 1,158.53 3.84% 28.25 1,158.53 3.84% 706.70 28,981.77 96.16%
04.02.02 PERFILADO Y COMPACTADO DE LA SUB M2 7,349.46 2.30 16,903.76 - - - 282.52 649.80 3.84% 282.52 649.80 3.84% 7,066.94 16,253.96 96.16%
04.03 CONCRETO SIMPLE
04.03.01 ENCOFRADO Y DESENCOFRADO VEREDA M2 2,153.59 36.52 78,649.11 - - - 56.50 2,063.38 2.62% 56.50 2,063.38 2.62% 2,097.09 76,585.73 97.38%
04.03.02 CONCRETO EN VEREDA F'C=175 KG/CM M2 7,349.46 50.46 370,853.75 - - - 282.52 14,255.96 3.84% 282.52 14,255.96 3.84% 7,066.94 356,597.79 96.16%
04.03.03 CONCRETO EN SARDINELES F'C=175 KG M3 205.40 322.04 66,147.02 - - - 10.59 3,410.40 5.16% 10.59 3,410.40 5.16% 194.81 62,736.61 94.84%
04.03.04 CONCRETO EN RAMPA F'C=175 KG/CM2 M2 403.59 63.05 25,446.35 - - - - - - - - - 403.59 25,446.35 100.00%
04.03.05 PINTURA EN SARDINEL M2 1,825.75 15.78 28,810.34 - - - 70.63 1,114.54 3.87% 70.63 1,114.54 3.87% 1,755.12 27,695.79 96.13%
04.04 JUNTAS
04.04.01 JUNTA ASFALTICA M 3,050.42 3.80 11,591.60 - - - 106.65 405.27 3.50% 106.65 405.27 3.50% 2,943.77 11,186.33 96.50%
05 CUNETAS Y BADENES DE CRUCE
05.01 CUNETA TRIANGULAR
05.01.01 ENCOFRADO Y DESENCOFRADO M2 1,001.84 39.85 39,923.32 - - - - - - - - - 1,001.84 39,923.32 100.00%
05.01.02 CONCRETO PREMEZCLADO F'C=210 KG/ M 4,293.59 33.78 145,037.47 - - - - - - - - - 4,293.59 145,037.47 100.00%
05.01.03 JUNTA ASFALTICA CUNETA M 715.60 6.14 4,393.78 - - - - - - - - - 715.60 4,393.78 100.00%
05.02 BADENES
05.02.01 ENCOFRADO Y DESENCOFRADO M2 232.78 39.85 9,276.28 - - - - - - - - - 232.78 9,276.28 100.00%
05.02.02 CONCRETO PREMEZCLADO F'C=210 KG/ M2 406.54 71.90 29,230.23 - - - - - - - - - 406.54 29,230.23 100.00%
05.02.03 JUNTA ASFALTICA CUNETA M 176.49 6.14 1,083.65 - - - - - - - - - 176.49 1,083.65 100.00%
06 ESTUDIO DE IMPACTO AMBIENTAL
06.01 RIEGO CON CISTERNA M2 10,800.00 0.49 5,292.00 - - - - - - - - - 10,800.00 5,292.00 100.00%
06.02 ACONDICIONAMIENTO DE MATERIAL EXCEDENTE M3 3,223.93 4.26 13,733.94 - - - - - - - - - 3,223.93 13,733.94 100.00%
06.03 CONTENEDORES DE RESIDUOS COMUNES Y PEL UND 10.00 48.67 486.70 - - - - - - - - - 10.00 486.70 100.00%
07 SEGURIDAD Y SALUD EN OBRA
07.01 ELABORACION, IMPLEMENTACION Y ADMINISTRA UND 1.00 5,000.00 5,000.00 - - - - - - - - - 1.00 5,000.00 100.00%
07.02 EQUIPOS DE PROTECCION INDIVIDUAL COVID19 UND 1.00 39,914.95 39,914.95 - - - - - - - - - 1.00 39,914.95 100.00%
07.03 EQUIPOS DE PROTECCION COLECTIVA UND 1.00 8,276.72 8,276.72 - - - - - - - - - 1.00 8,276.72 100.00%
07.04 CAPACITACION DE SEGURIDAD Y SALUD UND 1.00 4,000.00 4,000.00 - - - - - - - - - 1.00 4,000.00 100.00%
07.05 RECURSOS PARA RESPUESTAS ANTE EMERGENC UND 1.00 1,990.12 1,990.12 - - - - - - - - - 1.00 1,990.12 100.00%
07.06 SEÑALIZACION TEMPORAL DE SEGURIDAD UND 12.00 142.44 1,709.28 - - - - - - - - - 12.00 1,709.28 100.00%
08 VARIOS, LIMPIEZA Y OTROS
08.01 NIVELACION DE TAPA DE BUZONES UND 33.00 157.97 5,213.01 - - - - - - - - - 33.00 5,213.01 100.00%
08.02 NIVELACION DE CAJAS DE REGISTRO DE AGUA UND 374.00 21.06 7,876.44 - - - - - - - - - 374.00 7,876.44 100.00%
08.03 NIVELACION DE CAJAS DE REGISTRO DE DESAG UND 374.00 22.18 8,295.32 - - - - - - - - - 374.00 8,295.32 100.00%
08.04 PLAN DE MONITOREO ARQUELOGICO UND 1.00 7,500.00 7,500.00 - - - - - - - - - 1.00 7,500.00 100.00%
08.05 LIMPIEZA FINAL DE OBRA M2 23,877.66 0.08 1,910.21 - - - - - - - - - 23,877.66 1,910.21 100.00%

COSTO DIRECTO 2,758,444.06 - 103,847.47 103,847.47 2,654,596.58


GASTOS GENERALES 8.69911422644676 % 239,960.20 - 9,033.81 9,033.81 230,926.39
UTILIDAD 0.5 % 13,792.22 - 519.24 519.24 13,272.98

Página 2 de 3
ADICIONAL Nº 02
Al 15/Abr/2021
Obra : ADICIONALES Y DEDUCTIVOS
Ubicacion : JULIACA - SAN ROMAN - PUNO
Costo A : May/2020 Cliente : MUNICIPALIDAD PROVINCIAL DE SAN ROMAN - JULIACA

REFERENCIAL ACUMULADO ANTERIOR VALORIZACION ACTUAL TOTAL ACUMULADO SALDO POR VALORIZAR

SUB TOTAL 3,012,196.48 - 113,400.52 113,400.52 2,898,795.95


IGV. 18 % 542,195.37 - 20,412.09 20,412.09 521,783.27
PRESUPUESTO TOTAL 3,554,391.85 - 133,812.61 133,812.61 3,420,579.22
PORCENTAJE VALORIZADO 0.00% 3.76% 3.76% 96.24%

Página 3 de 3