Friday, May 14, 2021 1

Saturday, May 15, 2021 2


Sunday, May 16, 2021 3
Monday, May 17, 2021 SEMANA 1 4
Tuesday, May 18, 2021 5
Wednesday, May 19, 2021 6
Thursday, May 20, 2021 7
Friday, May 21, 2021 8
Saturday, May 22, 2021 9
MAYO
Sunday, May 23, 2021 10
Monday, May 24, 2021 SEMANA 2 11
Tuesday, May 25, 2021 12
Wednesday, May 26, 2021 13
Thursday, May 27, 2021 14
Friday, May 28, 2021 15
Saturday, May 29, 2021 16
SEMANA 3
Sunday, May 30, 2021 17
Monday, May 31, 2021 18
Tuesday, June 01, 2021
Wednesday, June 02, 2021
Thursday, June 03, 2021
Friday, June 04, 2021
Saturday, June 05, 2021
Sunday, June 06, 2021
BAJADA
Monday, June 07, 2021
Tuesday, June 08, 2021
Wednesday, June 09, 2021
Thursday, June 10, 2021
Friday, June 11, 2021
Saturday, June 12, 2021
Sunday, June 13, 2021 1
Monday, June 14, 2021 2
Tuesday, June 15, 2021 3
JUNIO
Wednesday, June 16, 2021 SEMANA 1 4
Thursday, June 17, 2021 5
Friday, June 18, 2021 6
Saturday, June 19, 2021 7
Sunday, June 20, 2021 8
Monday, June 21, 2021 9
Tuesday, June 22, 2021 10
Wednesday, June 23, 2021 SEMANA 2 11
SEMANA 2
Thursday, June 24, 2021 12
Friday, June 25, 2021 13
Saturday, June 26, 2021 14
Sunday, June 27, 2021 15
Monday, June 28, 2021 16
Tuesday, June 29, 2021 17
SEMANA 3
Wednesday, June 30, 2021 18
Thursday, July 01, 2021 19
JULIO
Friday, July 02, 2021 20
ÍTEM
1
1.01
1.02
1.03
1.04
2
2.01
2.01.01
2.02
2.02.01
2.02.02
2.03
2.03.01
2.04
2.04.01
2.04.02
2.04.03
2.05
2.05.01
2.05.02
2.05.03
2.06
2.06.01
2.07
2.07.01
2.07.02
2.07.03
2.07.04
2.07.05
2.08
2.08.01
2.08.02
2.08.03
2.09
2.09.01
DESCRIPCION
TRABAJOS PRELIMINARES
INGENIERIA DE DETALLE
MOVILIZACION Y DESMOVILIZACION
INSTALACIONES PROVICIONALES
TOPOGRAFIA Y GEOREFERENCIACION
ESTACIÓN HIDROMÉTRICA-RFerr30 (Carmen Alto)
DEMOLICIÓN DE CONSTRUCCIONES EXISTENTES
Demolición de construcciones existentes
OBRAS DE MOVIMIENTO DE TIERRAS
Excavación localizada
Remoción de enrocados
OBRAS DE CONCRETO SIMPLE
Concreto f'c=100 kg/cm2
OBRAS DE CONCRETO ARMADO
Concreto f'c=280 kg/cm2
Encofrado y desencofrado
Acero de refuerzo fy=42 Mpa
ESTRUCTURAS
Soporte de sensor
Estrutura de cerco (Tubo Ø3", tubo tensor 2")
Malla Galvanizada N° 9 DE 2"
Equipamientos eléctricos
Sensor de Nivel Tipo Radar de acuerdo con caracterisiticas descritas en la tabla 4.1 y item 4.4.2 LF13172B-0100-0440-ESP-000
Puesta a tierra (incluye excavación)
Conductor de cobre desnudo de temple blando de 120 mm2
Conductor de cobre eléctrolítico recocido aislado tipo THHN, color verde, 70 mm2
Tipo compresión Unión tipo T; 120 mm2 -70 mm2
Tipo compresión Unión tipo T; 120 mm2 -120 mm2
Pozos a tierra con cámara de registro, con varilla de cobre 5/8"x2.4m.
Sistema de protección atmosférica
Pararrayos tipo franklin 0.6m de acero, con accesorios para montaje
Mastil metálico de 2", 1.5 m
Pozos a tierra sin caja de registro, con varilla de cobre 5/8"x2.4m, para descarga atmosférica
Integración de instrumentos
Integración de instrumentos con los equipos existentes
14 15 16 17 18 19
UND METRADO AVANCE SALDO V S D L M M

GLB 1.00 0.50 0.50 0.50


GLB 1.00 0.50 0.50 0.50
GLB 1.00 0.50 0.50 0.50
GLB 1.00 0.50 0.50 0.25 0.25

m3 16.95 16.96 0.00 8.48 2.12

m3 4.86 4.86 0.00 1.22 1.24 1.20


m3 13.68 13.68 0.00

m3 0.60 0.60 0.00

m3 12.60 12.60 0.00


m2 19.62 19.62 0.00 2.76
kg 568.13 568.13 0.00 189.38 18.07 85.65 85.65

kg 58.29 0.00 58.29


kg 609.00 0.00 609.00
m2 32.50 0.00 32.50

und. 1.00 0.00 1.00

m 35.00 35.00 0.00


m 16.67 0.00 16.67
und 5.00 0.00 5.00
und 4.17 4.17 0.00
und 2.75 2.75 0.00

und 1.00 0.00 1.00


und 1.00 0.00 1.00
und 2.33 2.33 0.00

glb 1.00 0.00 1.00


20 21.00 22.00 23.00 24.00 25.00 26.00 27.00 28.00 29.00
J V S D L M M J V S

3.10 3.26

0.48 0.72
0.65 0.34 2.45 4.67 2.10

0.30 0.30

6.30 6.30
7.05 4.14 2.48 2.53 0.66
18.43 170.95

3.42 31.58

4.17
0.43 0.12 1.30 0.90

0.27 0.15 1.05 0.86


30.00 31.00
D L

1.70 1.77
ÍTEM
1
1.01
1.02
1.03
1.04
3
3.01
3.01.01
3.02
3.02.01
3.02.02
3.02.03
3.03
3.03.01
3.04
3.04.01
3.04.02
3.04.03
3.05
3.05.01
3.05.02
3.05.03
3.06
3.06.01
3.07
3.07.01
3.08
3.08.01
3.08.02
3.08.03
3.08.04
3.08.05
3.09
3.09.01
3.09.02
3.09.03
3.10
3.10.01
ÍTEM
1
1.01
1.02
1.03
1.04
3
3.01
3.01.01
3.02
3.02.01
3.02.02
3.02.03
3.03
3.03.01
3.04
3.04.01
3.04.02
3.04.03
3.05
3.05.01
3.05.02
3.05.03
3.06
3.06.01
3.07
3.07.01
3.08
3.08.01
3.08.02
3.08.03
3.08.04
3.08.05
3.09
3.09.01
3.09.02
3.09.03
3.10
3.10.01
DESCRIPCION
TRABAJOS PRELIMINARES
INGENIERIA DE DETALLE
MOVILIZACION Y DESMOVILIZACION
INSTALACIONES PROVICIONALES
TOPOGRAFIA Y GEOREFERENCIACION
ESTACIÓN HIDROMÉTRICA-RPamp30 (Pamputa)
DEMOLICIÓN DE CONSTRUCCIONES EXISTENTES
Demolición de construcciones existentes
OBRAS DE MOVIMIENTO DE TIERRAS
Exacavación con maquinaria
Excavación localizada
Remoción de enrocados
OBRAS DE CONCRETO SIMPLE
Concreto f'c=100 kg/cm2
OBRAS DE CONCRETO ARMADO
Concreto f'c=280 kg/cm2
Encofrado y desencofrado
Acero de refuerzo fy=42 Mpa
ESTRUCTURAS
Soporte de sensor
Estrutura de cerco (Tubo Ø3", tubo tensor 2")
Malla Galvanizada N° 9 DE 2"
Equipamientos eléctricos
Suminitro de tablero de alimentación y control de estaciones hidrométricas co panel solar 12 VDC, 10 kA, norma de fabricació
Intrumentos
Sensor de Nivel Tipo Radar de acuerdo con caracterisiticas descritas en la tabla 4.1 y item 4.4.2 LF13172B-0100-0440-ESP-000
Puesta a tierra (incluye excavación)
Conductor de cobre desnudo de temple blando de 120 mm2
Conductor de cobre eléctrolítico recocido aislado tipo THHN, color verde, 70 mm2
Tipo compresión Unión tipo T; 120 mm2 -70 mm2
Tipo compresión Unión tipo T; 120 mm2 -120 mm2
Pozos a tierra con cámara de registro, con varilla de cobre 5/8"x2.4m.
Sistema de protección atmosférica
Pararrayos tipo franklin 0.6m de acero, con accesorios para montaje
Mastil metálico de 2", 1.5 m
Pozos a tierra sin caja de registro, con varilla de cobre 5/8"x2.4m, para descarga atmosférica
Integración de instrumentos
Integración de instrumentos con los equipos existentes
DESCRIPCION
TRABAJOS PRELIMINARES
INGENIERIA DE DETALLE
MOVILIZACION Y DESMOVILIZACION
INSTALACIONES PROVICIONALES
TOPOGRAFIA Y GEOREFERENCIACION
ESTACIÓN HIDROMÉTRICA-RPamp30 (Pamputa)
DEMOLICIÓN DE CONSTRUCCIONES EXISTENTES
Demolición de construcciones existentes
OBRAS DE MOVIMIENTO DE TIERRAS
Exacavación con maquinaria
Excavación localizada
Remoción de enrocados
OBRAS DE CONCRETO SIMPLE
Concreto f'c=100 kg/cm2
OBRAS DE CONCRETO ARMADO
Concreto f'c=280 kg/cm2
Encofrado y desencofrado
Acero de refuerzo fy=42 Mpa
ESTRUCTURAS
Soporte de sensor
Estrutura de cerco (Tubo Ø3", tubo tensor 2")
Malla Galvanizada N° 9 DE 2"
Equipamientos eléctricos
Suminitro de tablero de alimentación y control de estaciones hidrométricas co panel solar 12 VDC, 10 kA, norma de fabricació
Intrumentos
Sensor de Nivel Tipo Radar de acuerdo con caracterisiticas descritas en la tabla 4.1 y item 4.4.2 LF13172B-0100-0440-ESP-000
Puesta a tierra (incluye excavación)
Conductor de cobre desnudo de temple blando de 120 mm2
Conductor de cobre eléctrolítico recocido aislado tipo THHN, color verde, 70 mm2
Tipo compresión Unión tipo T; 120 mm2 -70 mm2
Tipo compresión Unión tipo T; 120 mm2 -120 mm2
Pozos a tierra con cámara de registro, con varilla de cobre 5/8"x2.4m.
Sistema de protección atmosférica
Pararrayos tipo franklin 0.6m de acero, con accesorios para montaje
Mastil metálico de 2", 1.5 m
Pozos a tierra sin caja de registro, con varilla de cobre 5/8"x2.4m, para descarga atmosférica
Integración de instrumentos
Integración de instrumentos con los equipos existentes
14 15 16 17
UND METRADO AVANCE SALDO L M M J

GLB 0.50 0.50 0.00 0.50


GLB 0.50 0.50 0.00 0.50
GLB 0.50 0.50 0.00 0.50
GLB 0.50 0.50 0.00 0.50

m3 16.95 16.95 0.00 8.48 4.24

m3 42.55 42.55 0.00


m3 4.86 4.86 0.00
m3 13.68 13.68 0.00

m3 1.55 1.55 0.00

m3 23.58 23.58 0.00


m2 77.81 77.81 0.00 5.46
kg 894.20 894.20 0.00 158.58 211.35

kg 58.29 0.00 58.29


kg 609.00 0.00 609.00
m2 37.50 0.00 37.50

und. 1.00 0.00 1.00

und. 1.00 0.00 1.00

m 35.00 35.00 0.00


m 16.67 0.00 16.67
und 5.00 0.00 5.00
und 4.17 4.17 0.00
und 2.75 2.75 0.00 0.55 0.20 0.10

und 1.00 0.00 1.00


und 1.00 0.00 1.00
und 2.33 2.33 0.00 0.47 0.26 0.10

glb 1.00 0.00 1.00


UND METRADO PU PARCIAL

GLB 0.50 $ 1,750.00 $ 875.00 $ 875.00


GLB 0.50 $ 4,000.00 $ 2,000.00 $ 2,000.00
GLB 0.50 $ 2,350.00 $ 1,175.00 $ 1,175.00
GLB 0.50 $ 1,650.00 $ 825.00 $ 825.00

m3 16.95 $ 57.09 $ 967.68 $ 322.56 $ 322.56 $ 322.56

m3 42.55 $ 70.39 $ 2,995.09


m3 4.86 $ 63.22 $ 307.25
m3 13.68 $ 125.82 $ 1,721.22

m3 1.55 $ 150.00 $ 232.50

m3 23.58 $ 260.00 $ 6,130.80


m2 77.81 $ 30.62 $ 2,382.54
kg 894.20 $ 2.25 $ 2,011.95

kg 58.29 $ 5.38 $ 313.60


kg 609.00 $ 5.38 $ 3,276.42
m2 37.50 $ 56.50 $ 2,118.75

und. 1.00 $ 4,605.36 $ 4,605.36

und. 1.00 $ 4,396.16 $ 4,396.16

m 35.00 $ 23.86 $ 835.10


m 16.67 $ 34.74 $ 579.12
und 5.00 $ 94.49 $ 472.45
und 4.17 $ 110.31 $ 459.99
und 2.75 $ 753.76 $ 2,072.84

und 1.00 $ 497.44 $ 497.44


und 1.00 $ 384.94 $ 384.94
und 2.33 $ 723.76 $ 1,686.36
glb 1.00 $ 1,044.24 $ 1,044.24
18 19 20 21 22 23 24
V S D L M M J

1.51 0.77 2.58


1.50 6.84 0.27

11.79
14.22 8.67 1.37
184.97

31.40

3.13
0.15 0.10 1.00

0.10 0.10
25 26 27 28 29 30 1
V S D L M M J

4.23

42.55

5.07

1.55

2.26 9.53
8.19 5.92 30.45 1.77 1.76
192.20 147.10

3.60

1.04
0.65

1.30
V S D