VARILLA
PESO (lb/ft)
LARGO (ft)
PESO qq
Uds/qq
3/8"
3/8"
3/8"
3/8"
3/8"
1/2"
1/2"
1/2"
1/2"
1/2"
3/4"
3/4"
3/4"
3/4"
3/4"
1"
1"
1"
1"
1"
1"
1"
1"
1"
0.376
20
295
22.21
13.30
0.376
25
237
22.23
10.64
0.376
30
196
22.06
8.87
0.376
35
168
22.06
7.60
0.376
40
147
22.06
6.65
0.668
20
166
22.13
7.49
0.668
25
133
22.16
5.99
0.668
30
111
22.20
4.99
0.668
35
95
22.16
4.28
0.668
40
83
22.13
3.74
1.502
20
74
22.18
3.33
1.502
25
60
22.48
2.66
1.502
30
50
22.48
2.22
1.502
35
42
22.03
1.90
1.502
40
37
22.18
1.66
2.670
20
42
22.38
1.87
2.670
25
34
22.65
1.50
2.670
30
28
22.38
1.25
2.670
35
24
22.38
1.07
2.670
40
21
22.38
0.94
2.670
45
19
22.78
0.83
2.670
50
17
22.65
0.75
2.670
55
16
23.45
0.68
2.670
60
14
22.38
0.62
1/4"
0.17
2 Ф1/2”
H=0.45m
Ф3/8 0.20m
0.25m
ACERO SUPERIOR
2 Ф3/8”
A) Para
A 3 Ф 1”
B) Para 2 Ф1/2”
CALCULO DE LA MADERA
0.25m
25cm
4.88m
CALCULO DE LA MADERA DE FONDO . (1” Х 12” Х 16 )
30.5cm
1m=3.28ft*****1pulg=2.54Cm
8.89m
4.88m
Necesito 2ud
0.25m
0.60m
0.25m
DESCRIPCION
CANTIDAD
Hormigón 210
Ligado y Vaciado
Acero
Mo/Acero
Alambre 3Lb/qq
Madera
Coloc. Conf Mad
TOTAL
1.05
1.05
12.33
L=8.89
UNIDAD
P.UNITARIO
COSTO
5,500
500
2,200
300
50
60
135.42
5,775.00
525.00
9,042.00
1,233.00
616.50
2,560.05
1,203.88
ANALISIS DE COSTO DE 1.0 m³ DE ZAPATA DE MUROS DE MURO DE 8” ESPESOR
8”
0.25m
ACERO LONGITUDINAL
15db
0.25m
15db
0.25m
15db
SUMATORIA DE ACERO
DESCRIPCION
CANTIDAD
1.05
1.05
UNIDAD
1.50
P.UNITARIO
COSTO
5,500
500
2,200
300
50
5,775.00
525.00
1,100.00
150.00
75.00
BLOCK DE 4”
BLOCK DE 6”
0.20m
BLOCK DE 8”
0.20m
0.20m
0.40m
0.40m
0.10m
Espesor
0.40m
0.15m
Espesor
0.20m
Espesor
|
AREA DE 1m²
CANTIDAD
Arena gruesa
Agua
Cemento
Mo/mezclado
TOTAL 10%
1.0
69.04
11.52
0.5
DESCRIPCION
CANTIDAD
Suministro (Block)
Mo/Block
Acero
Mo/Acero
Alambre 3Lb/qq
Mortero 1:3
Hormigón en Cámara(160)
TOTAL
13
13
UNIDAD
0.0666
DESCRIPCION
CANTIDAD
Suministro (Block)
Mo/Block
Acero
Mo/Acero
Alambre 3Lb/qq
Mortero 1:3
Hormigón en Cámara(160)
13
13
TOTAL
UNIDAD
0.0666
UNIDAD
P.UNITARIO
COSTO
800.00
1.00
300.00
450.00
800.00
69.04
3,456.00
225.00
P.UNITARIO
COSTO
35.00
10.00
2,200.00
300.00
50.00
3,149.04
455.00
130.00
48.84
6.66
3.33
195.20
96.36
P.UNITARIO
COSTO
28.00
10.00
2,200.00
300.00
50.00
364.00
130.00
48.84
6.66
3.33
140.14
75.58
3,149.04
ANALISIS DE COSTO DE 1.0 m³ DE ZAPATA DE COLUMNA CUADRADA
Rec=5cm/2=0.025cm
Rec=0.025
Rec=0.025
0.30m
Rec
0.07
SUMATORIA DE ACERO
CANTIDAD
1.05
1.05
2.34
UNIDAD
P.UNITARIO
COSTO
5,500
500
2,200
300
50
5,775.00
525.00
1,716.00
234.00
117.00
ANALISIS PARA 1m² DE PAÑETE
DESCRIPCION
CANTIDAD
Arena Fina
Cal hidratada (50Lb)
Mo/mezclado
TOTAL
1.0
3.00
0.5
DESCRIPCION
CANTIDAD
Mezcla de pañete
Cemento
Agua
Mo/mezclado
TOTAL
1.0
9.46
45.25
0.5
DESCRIPCION
CANTIDAD
Mortero 1:4
Mo/Pañete
Andamio Según MOPC
TOTAL
0.040
0.20
2
UNIDAD
UNIDAD
UNIDAD
P.UNITARIO
COSTO
900.00
80.00
450
900.00
240.00
225.00
P.UNITARIO
COSTO
300.00
1.00
450
1,365.00
2,838.00
45.25
225.00
P.UNITARIO
COSTO
200.00
60
178.93
40.00
120.00
DESCRIPCION
CANTIDAD
Agua
Cemento
Arena Lavada (Azul)
Grava 3/4"
Ligado y Vaciado
TOTAL 16%
60.00
7.00
DESCRIPCION
CANTIDAD
Agua
Cemento
Arena Lavada (Azul)
Grava 3/4"
Ligado y Vaciado
TOTAL 16%
60.00
8.23
DESCRIPCION
CANTIDAD
Agua
Cemento
Arena Lavada (Azul)
Grava 3/4"
Ligado y Vaciado
TOTAL 16%
60.00
9.52
UNIDAD
1.00
UNIDAD
1.00
1.00
UNIDAD
P.UNITARIO
COSTO
1.00
300.00
1,100.00
900.00
500.00
60.00
2,100.00
561.00
765.00
500.00
P.UNITARIO
COSTO
1.00
300.00
1,100.00
900.00
500.00
60.00
2,469.00
484.00
792.00
500.00
P.UNITARIO
COSTO
1.00
300.00
1,100.00
900.00
500.00
60.00
2,856.00
550.00
666.00
500.00
DESCRIPCION
Suministro Cerámica (.30*.30)+5% desp.
Mo/Cerámica
Corte de Chazo
Derretido blanco 10%
Mortero 1:3 (esp=0.03)5%desp
Hormigón (160 kg/cm2)de torta e=0.07,
5% desp.
Estopa
CANTIDAD
UNIDAD
P.UNITARIO
COSTO
11.67
1
1
53.02
264.59
10
417.81
618.74
264.59
10
18.38
160.16
342.16
0.25
55.58
13.90
TOTAL
DESCRIPCION
Suministro Cerámica (.20*.25)5% desp.
Mo/Cerámica
Corte de Chazo
Derretido blanco 10%
Mortero 1:3 (esp=0.03)5%desp
Estopa
TOTAL
CANTIDAD
UNIDAD
P.UNITARIO
COSTO
10.5
1
1
44.43
264.59
10
417.81
466.52
264.59
10
18.38
160.16
0.25
55.58
DESCRIPCION
CANTIDAD
Mortero 1:4
Madera
Confección
Canteado de regla
TOTAL
0.03
0.109
1.00
1.09
DESCRIPCION
CANTIDAD
Mortero 1:4
Madera
Confección
Canteado de regla
TOTAL
UNIDAD
UNIDAD
0.109
1.00
1.09
P.UNITARIO
COSTO
60
26.83
9
134.20
6.54
26.83
9.81
P.UNITARIO
COSTO
60
26.83
9
15.66
6.54
26.83
9.81
CANTEADO DE REGLA
CANTIDAD DE USO
DESCRIPCION
CANTIDAD
Mortero 1:3
Confección
TOTAL
0.0075
1.00
UNIDAD
P.UNITARIO
COSTO
30.00
37.54
30.00
DESCRIPCION
Suministro
Primera mano
Segunda mano
Retoque
TOTAL
CANTIDAD
1.00
1.00
1.00
UNIDAD
P.UNITARIO
COSTO
19.52
18.30
35
26.5
19.52
18.30
35
ANALISIS DE ZAPATA DE COLUMNA CUADRADA (DISEÑO A CORTANTE
DIMENSIONES DE COLUMNA
COLUMNA
Columna
DATOS
L=3.75m
Columna
B=3.75m
L=3.75m
Columna
CASO #1
B=3.75m
CASO #2
0.40m
1.00m
Rec = 7cm
L=3.75m
3.75m x 3.75m
Columna
B=3.75m
REGLAMENTO PARA DISEÑO Y CONSTRUCCION DE EDIFICIOS EN MAMPOSTERIA ESTRUCTURAL
(R027)
AREA MINIMA
COLUMNA. AMARRE
6.2.1 Las columnas de amarres deberán ser continuas desde la cimentación hasta la
parte superior del muro y
deben ser vaciadas directamente contra este. Para fines de diseño se podrá
considerar como columna de
amarre, todo refuerzo concentrado en las intersecciones extremas de los muros
(nudos) siempre y cuando
tengan más de tres barras en igual número de cámaras.
6.2.2 Las dimensiones mínimas para las columnas de amarre no serán menor que el
espesor bruto del muro.
6.2.3 El área minina de la columna de amarre no deberá ser menor de 400 cm2.
6.3.1 Las vigas de amarre deben ser vaciadas directamente sobre el muro en toda su
longitud, y deberán
anclarse en las columnas de amarre colocadas en los extremos de muro.
6.3.2 Las dimensiones mínimas para las vigas de amarre nunca serán menor que el
espesor bruto del muro.
6.3.3 El área mínima de las vigas de amarre no podrá ser menor de 300 cm2
Si esto cumple
“Continuar
con el diseño”
de lo
contrario,
rediseñar de
nuevo.
a
2.50m
2.0m
5.80m
14.234 ton
ton
12.06 ton
+
2.791m
2.0m
7.5 ton
15.346 ton