Está en la página 1de 39

D.

VARILLA

PESO (lb/ft)

LARGO (ft)

CANTIDAD POR ATADO (UD)

PESO qq

Uds/qq

3/8"
3/8"
3/8"
3/8"
3/8"
1/2"
1/2"
1/2"
1/2"
1/2"
3/4"
3/4"
3/4"
3/4"
3/4"
1"
1"
1"
1"
1"
1"
1"
1"
1"

0.376

20

295

22.21

13.30

0.376

25

237

22.23

10.64

0.376
30

196

22.06

8.87

0.376

35

168

22.06

7.60

0.376

40

147

22.06

6.65

0.668

20

166

22.13

7.49

0.668

25

133

22.16

5.99

0.668

30

111

22.20

4.99

0.668
35

95

22.16

4.28

0.668

40

83

22.13

3.74

1.502

20

74

22.18

3.33

1.502

25

60

22.48

2.66

1.502

30

50

22.48

2.22

1.502

35

42

22.03

1.90
1.502

40

37

22.18

1.66

2.670

20

42

22.38

1.87

2.670

25

34

22.65

1.50

2.670

30

28

22.38

1.25

2.670

35

24

22.38

1.07

2.670

40

21

22.38

0.94
2.670

45

19

22.78

0.83

2.670

50

17

22.65

0.75

2.670

55

16

23.45

0.68

2.670

60

14

22.38

0.62

1/4"

0.17

EJEMPLO =(0.376lb/ft)(20ft)= 7.52lb


1qq = 100lb
Si hago una reglita de tres =0.0752 qq
pero yo quiero que el resultado me de ud/qq solo tengo que dividir 1/0.0752=13.30
Ud/qq

1 ATADO DE VARILLA = 22.26 qq =2,226lb


1.25 Factor fuerza
ANALISIS PARA 1M3 DE UNA VIGAS DE 3 TAPAS
3 Ф 1”

2 Ф1/2”

Asumiendo longitud de la viga (L=4.00 mts)

H=0.45m

ESTRIBOS 3/8” a 0.20m

Ф3/8 0.20m

0.25m

ACERO SUPERIOR

2 Ф3/8”

A) Para
A 3 Ф 1”

B) Para 2 Ф1/2”

ACERO INFERIOR 2 Ф3/8”

CALCULO DE LA MADERA

CALCULO DE LA MADERA DE LOS LADOS. (1” Х 10” Х 16 )


1m=3.28ft*****1pulg=2.54Cm
0.45m
m

0.25m

Necesito 8ud, cuatro de ambos lados.

25cm

4.88m
CALCULO DE LA MADERA DE FONDO . (1” Х 12” Х 16 )
30.5cm
1m=3.28ft*****1pulg=2.54Cm
8.89m

4.88m

Necesito 2ud

0.25m

Espesor, Ancho, Largo


CALCULO DE LOS CAQUETES, Sep=0.60m y h=0.80m (1” Х 4” Х 16 )
8.89m

Observando cuantos chaquetes necesito.

0.60m
0.25m

DESCRIPCION

CANTIDAD

Hormigón 210
Ligado y Vaciado
Acero
Mo/Acero
Alambre 3Lb/qq
Madera
Coloc. Conf Mad
TOTAL

1.05
1.05

12.33
L=8.89

COSTO DE ESTA VIGA

UNIDAD

P.UNITARIO

COSTO

5,500
500
2,200
300
50
60
135.42

5,775.00
525.00
9,042.00
1,233.00
616.50
2,560.05
1,203.88
ANALISIS DE COSTO DE 1.0 m³ DE ZAPATA DE MUROS DE MURO DE 8” ESPESOR
8”

Asumiendo una longitud L=10mts

0.25m

Ancho Zapata Muro 0.60m

CALCULO DEL ACERO

ACERO LONGITUDINAL

LONGITUD DE LOS CANGREJOS

15db

0.25m

15db

0.25m

15db
SUMATORIA DE ACERO

CALCULO DEL VOLUMEN

DESCRIPCION

CANTIDAD

Hormigón 210 “Industrial”


Ligado y Vaciado
Acero
Mo/Acero
Alambre 3Lb/qq
TOTAL

1.05
1.05

UNIDAD

1.50

P.UNITARIO

COSTO

5,500
500
2,200
300
50

5,775.00
525.00
1,100.00
150.00
75.00

DIMENSIONES DEL BLOCK

BLOCK DE 4”

BLOCK DE 6”

0.20m

BLOCK DE 8”

0.20m

0.20m

0.40m

0.40m
0.10m
Espesor

0.40m
0.15m
Espesor

EL ANCHO DE LA ZAPATA DE MURO = 3(ESPESOR DEL BLOCK)

0.20m
Espesor
|

ANALISIS DE COSTO DE 1.0 m² DE BLOCK 8” ESPESOR CON

AREA DEL BLOCK

AREA DE 1m²

CANTIDAD DE BLOCK QUE CABEN EN 1m²


DESCRIPCION

CANTIDAD

Arena gruesa
Agua
Cemento
Mo/mezclado
TOTAL 10%

1.0
69.04
11.52
0.5

DESCRIPCION

CANTIDAD

Suministro (Block)
Mo/Block
Acero
Mo/Acero
Alambre 3Lb/qq
Mortero 1:3
Hormigón en Cámara(160)
TOTAL

13
13

UNIDAD

0.0666

DESCRIPCION

CANTIDAD

Suministro (Block)
Mo/Block
Acero
Mo/Acero
Alambre 3Lb/qq
Mortero 1:3
Hormigón en Cámara(160)

13
13

TOTAL

UNIDAD

0.0666

UNIDAD

P.UNITARIO
COSTO

800.00
1.00
300.00
450.00

800.00
69.04
3,456.00
225.00

P.UNITARIO

COSTO

35.00
10.00
2,200.00
300.00
50.00
3,149.04

455.00
130.00
48.84
6.66
3.33
195.20
96.36

P.UNITARIO

COSTO

28.00
10.00
2,200.00
300.00
50.00

364.00
130.00
48.84
6.66
3.33
140.14
75.58

3,149.04
ANALISIS DE COSTO DE 1.0 m³ DE ZAPATA DE COLUMNA CUADRADA

Rec=5cm/2=0.025cm

Rec=0.025

Rec=0.025

0.30m

Rec
0.07

SUMATORIA DE ACERO

CALCULO DEL VOLUMEN

EL HORMIGON DE ZAPATA DE COLUMNA NUNCA USAR


DESCRIPCION

CANTIDAD

Hormigón 210 “Industrial”


Ligado y Vaciado
Acero
Mo/Acero
Alambre 3Lb/qq
TOTAL

1.05
1.05

2.34

UNIDAD

P.UNITARIO

COSTO

5,500
500
2,200
300
50

5,775.00
525.00
1,716.00
234.00
117.00
ANALISIS PARA 1m² DE PAÑETE

DESCRIPCION

CANTIDAD

Arena Fina
Cal hidratada (50Lb)
Mo/mezclado
TOTAL

1.0
3.00
0.5

DESCRIPCION

CANTIDAD

Mezcla de pañete
Cemento
Agua
Mo/mezclado
TOTAL

1.0
9.46
45.25
0.5

DESCRIPCION

CANTIDAD

Mortero 1:4
Mo/Pañete
Andamio Según MOPC
TOTAL

0.040
0.20
2

UNIDAD

UNIDAD

UNIDAD

P.UNITARIO

COSTO

900.00
80.00
450

900.00
240.00
225.00

P.UNITARIO

COSTO

300.00
1.00
450

1,365.00
2,838.00
45.25
225.00

P.UNITARIO

COSTO

200.00
60

178.93
40.00
120.00
DESCRIPCION

CANTIDAD

Agua
Cemento
Arena Lavada (Azul)
Grava 3/4"
Ligado y Vaciado
TOTAL 16%

60.00
7.00

DESCRIPCION

CANTIDAD

Agua
Cemento
Arena Lavada (Azul)
Grava 3/4"
Ligado y Vaciado
TOTAL 16%

60.00
8.23

DESCRIPCION

CANTIDAD

Agua
Cemento
Arena Lavada (Azul)
Grava 3/4"
Ligado y Vaciado
TOTAL 16%

60.00
9.52

UNIDAD

1.00

UNIDAD

1.00

1.00

UNIDAD

P.UNITARIO

COSTO

1.00
300.00
1,100.00
900.00
500.00

60.00
2,100.00
561.00
765.00
500.00

P.UNITARIO

COSTO

1.00
300.00
1,100.00
900.00
500.00

60.00
2,469.00
484.00
792.00
500.00

P.UNITARIO

COSTO

1.00
300.00
1,100.00
900.00
500.00

60.00
2,856.00
550.00
666.00
500.00
DESCRIPCION
Suministro Cerámica (.30*.30)+5% desp.
Mo/Cerámica
Corte de Chazo
Derretido blanco 10%
Mortero 1:3 (esp=0.03)5%desp
Hormigón (160 kg/cm2)de torta e=0.07,
5% desp.
Estopa

CANTIDAD

UNIDAD

P.UNITARIO

COSTO

11.67
1
1

53.02
264.59
10
417.81

618.74
264.59
10
18.38
160.16
342.16

0.25

55.58

13.90

TOTAL

DESCRIPCION
Suministro Cerámica (.20*.25)5% desp.
Mo/Cerámica
Corte de Chazo
Derretido blanco 10%
Mortero 1:3 (esp=0.03)5%desp
Estopa
TOTAL

CANTIDAD

UNIDAD

P.UNITARIO

COSTO
10.5
1
1

44.43
264.59
10
417.81

466.52
264.59
10
18.38
160.16

0.25

55.58
DESCRIPCION

CANTIDAD

Mortero 1:4
Madera
Confección
Canteado de regla
TOTAL

0.03
0.109
1.00
1.09

DESCRIPCION

CANTIDAD

Mortero 1:4
Madera
Confección
Canteado de regla
TOTAL

UNIDAD

UNIDAD

0.109
1.00
1.09

P.UNITARIO

COSTO

60
26.83
9

134.20
6.54
26.83
9.81

P.UNITARIO

COSTO

60
26.83
9

15.66
6.54
26.83
9.81
CANTEADO DE REGLA

CANTIDAD DE USO

DESCRIPCION

CANTIDAD

Mortero 1:3
Confección
TOTAL

0.0075
1.00

UNIDAD

P.UNITARIO

COSTO

30.00

37.54
30.00
DESCRIPCION
Suministro
Primera mano
Segunda mano
Retoque
TOTAL

CANTIDAD

1.00
1.00
1.00

UNIDAD

P.UNITARIO

COSTO

19.52
18.30
35

26.5
19.52
18.30
35
ANALISIS DE ZAPATA DE COLUMNA CUADRADA (DISEÑO A CORTANTE

DIMENSIONES DE COLUMNA

COLUMNA

Columna

DATOS
L=3.75m

Columna

B=3.75m
L=3.75m

Columna

CASO #1

B=3.75m
CASO #2
0.40m

1.00m

Rec = 7cm

L=3.75m

3.75m x 3.75m

Columna

B=3.75m
REGLAMENTO PARA DISEÑO Y CONSTRUCCION DE EDIFICIOS EN MAMPOSTERIA ESTRUCTURAL
(R027)

AREA MINIMA
COLUMNA. AMARRE

ARE MINIMA VIGA.


AMARRE
6.1.1 Se clasifican como muros con elementos de amarre aquellos que se construyan
rodeados de vigas y
columnas con el objetivo de aumentar su resistencia a carga axial, flexión y
cortante cuando las solicitaciones
externas lo ameriten. La resistencia de muros con elementos de amarre debe ser
evaluada con acción
integra y monolítica entre los elementos de columnas, vigas y mampostería.
6.1.2 los muros con elementos de amarre no deberán tener un espesor menor de 15 cm
(6”)
6.1.3 La resistencia a la compresión del hormigón a los 28 días en los elementos de
amarre no será menor
de 180kg /cm2

6.2.1 Las columnas de amarres deberán ser continuas desde la cimentación hasta la
parte superior del muro y
deben ser vaciadas directamente contra este. Para fines de diseño se podrá
considerar como columna de
amarre, todo refuerzo concentrado en las intersecciones extremas de los muros
(nudos) siempre y cuando
tengan más de tres barras en igual número de cámaras.
6.2.2 Las dimensiones mínimas para las columnas de amarre no serán menor que el
espesor bruto del muro.
6.2.3 El área minina de la columna de amarre no deberá ser menor de 400 cm2.

6.2.4.1 Refuerzo Longitudinal


El refuerzo mínimo en toda la longitud del eje de la columna será el valor mayor de
las condiciones siguientes:
A) 0.01Ac. Ejemplo 0.01 (20 cm x 20 cm)=4 barras.
B) El área asociada a 3 barras de diámetros mayores o iguales a 1/2" (cuando no
usamos columna de amarre)
6.2.4.2 Refuerzo Transversal
Para este tipo de refuerzo se utilizaran estribos cerrados con las siguientes
especificaciones:
A) El diámetro del estribo será mayor o igual a 1/4".
B) El espaciamiento del estribo no será mayor que 20cm.

6.3.1 Las vigas de amarre deben ser vaciadas directamente sobre el muro en toda su
longitud, y deberán
anclarse en las columnas de amarre colocadas en los extremos de muro.
6.3.2 Las dimensiones mínimas para las vigas de amarre nunca serán menor que el
espesor bruto del muro.
6.3.3 El área mínima de las vigas de amarre no podrá ser menor de 300 cm2

6.3.4.1 Refuerzo Longitudinal


A) El área asociada serán 4 barras de diámetros mayores o iguales a 3/8”.
6.3.4.2 Refuerzo Transversal
Para este tipo de refuerzo se utilizaran estribos cerrados con las siguientes
especificaciones:
A) El diámetro del estribo será mayor o igual a 1/4".
B) El espaciamiento no será mayor a 20cm
Si esto cumple
con la norma
usar la sep.
Menor entre
.

Si esto cumple
“Continuar
con el diseño”
de lo
contrario,
rediseñar de
nuevo.
a
2.50m

2.0m

5.80m

14.234 ton
ton

12.06 ton

+
2.791m

2.0m

7.5 ton
15.346 ton