01
01.01
01.02
01.03
01.05
01.06
02
02.01
02.02
03
03.01
03.02
03.03
04
04.01
04.02
04.03
04.04
04.05
04.06
04.07
05
05.01
05.02
05.03
05.04
05.05
06
06.01
06.02
06.03
06.04
06.05
06.06
06.07
06.08
07
07.01
07.02
07.03
07.04
08
08.01
08.02
08.03
08.04
08.05
08.06
08.07
08.08
09
09.01
09.02
09.03
09.04
09.05
09.06
09.07
09.08
10
10.01
10.02
10.03
10.04
10.05
10.06
10.07
10.08
11
11.01
11.02
11.03
11.04
11.05
11.06
11.07
11.08
12
12.01
12.02
12.03
12.04
12.05
12.06
12.07
12.08
13
13.01
13.02
13.03
13.04
13.05
13.06
14
14.01
14.02
14.03
14.04
15
15.01
15.01.01
15.01.02
15.01.03
15.01.04
15.01.05
15.01.06
15.02
15.02.01
15.02.02
15.02.03
15.02.04
15.02.05
15.02.06
16
16.01
16.02
16.03
16.04
16.05
16.06
17
17.01
18
18.01
18.02
18.03
18.04
18.05
18.06
18.07
Descripción
OBRAS PROVISIONALES
CARTEL DE IDENTIFICACION DE OBRA (4.80X3.60M)
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS DE OBRA
ALQUILER DE LOCAL P/OFICINA Y/O ALMACEN
INSTALACIONES PROVISIONALES DE ENERGIA ELECTRICA
INSTALACIONES PROVISIONALES DE AGUA
OBRAS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO DE OBRA
DEMOLICIONES
DEMOLICION DE VEREDAS DE 0.10 M.
ACARREO, CARGUIO Y ELIMINACIÓN DE MATERIAL EXCEDENTE
ELIMINACION DE MATERIAL EXCEDENTE
MOVIMIENTO DE TIERRAS
TRAZO, NIVELES Y REPLANTEO DURANTE EL PROCESO
CORTE DE MATERIAL SUELTO CON EQUIPO PESADO
RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO
PERFILADO Y COMPACTADO A NIVEL DE SUB-RASANTE
RIEGO DE SUB-RASANTE
ACARREO LATERAL DE MATERIAL EXCEDENTE
ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO PESADO
BASE
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELES Y REPLANTEO DURANTE EL PROCESO
BASE GRANULAR DE CANTERA E=0.40M CONFORMADO Y COMPACTADO
EXTENDIDO Y COMPACTACION DE BASE
RIEGO DE BASE
PAVIMENTOS
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELES Y REPLANTEO DURANTE EL PROCESO
ENCOFRADO Y DESENCOFRADO NORMAL
CONCRETO F'C=210KG/CM2 E=0.20M EN PAVIMENTOS
CURADO DE CONCRETO CON ADITIVO
JUNTA DE DILATACIÓN E=1"
JUNTA DE CONTRACCION E=6MM CADA 2.5m
CUNETA
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELES Y REPLANTEO DURANTE EL PROCESO
COMPACTADO DE SUELO PARA CUNETAS
BADENES DE CONCRETO
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELES Y REPLANTEO DURANTE EL PROCESO
SEÑALIZACION
PINTADO DE PAVIMENTO (SIMBOLOS Y LETRAS)
PINTADO DE PAVIMENTO (LINEAS CONTINUAS)
PINTURA EN SARDINEL
SEÑALES PREVENTIVAS E INFORMATIVAS
VARIOS
NIVELACION DE BUZONES EXISTENTES
NIVELACION DE CAJAS DOMICILIARIAS-AGUA
NIVELACION DE CAJAS DOMICILIARIAS-DESAGUE
REUBICACION DE POSTES DE LUZ
LIMPIEZA FINAL DE OBRA
FLETE TERRESTRE
PLAN DE MONITOREO ARQUEOLÓGICO
Und. Metrado Precio (S/.) Parcial (S/.)
17,535.46
und 1.00 937.74 937.74
GLB 1.00 7,447.72 7,447.72
mes 8.00 950.00 7,600.00
und 1.00 1,200.00 1,200.00
und 1.00 350.00 350.00
23,018.70
m2 10,415.70 0.55 5,728.64
m2 10,415.70 1.66 17,290.06
52,997.18
m2 1,590.03 8.70 13,833.26
m3 330.33 95.59 31,576.24
m3 330.33 22.97 7,587.68
909,884.54
m2 10,415.70 1.10 11,457.27
m3 5,342.95 6.79 36,278.63
m2 559.64 26.05 14,578.62
m2 10,415.70 4.14 43,121.00
m2 10,415.70 46.02 479,330.51
m3 5,342.95 53.57 286,221.83
m3 5,342.95 7.28 38,896.68
1,469,352.85
m2 6,972.68 4.08 28,448.53
m2 6,972.68 1.10 7,669.95
m2 6,972.68 35.98 250,877.03
m2 6,972.68 123.55 861,474.61
m2 6,972.68 46.02 320,882.73
1,063,676.17
m2 6,972.68 4.08 28,448.53
m2 6,972.68 1.10 7,669.95
m 1,484.37 19.82 29,420.21
m2 6,999.68 112.89 790,193.88
m2 6,972.68 2.40 16,734.43
m 7,421.84 20.40 151,405.54
m 2,897.28 7.94 23,004.40
m2 6,999.68 2.40 16,799.23
106,184.43
kg 2,468.56 9.84 24,290.63
kg 2,885.22 8.36 24,120.44
kg 5,785.00 8.36 48,362.60
kg 991.65 9.49 9,410.76
470,012.32
m2 2,623.00 4.08 10,701.84
m2 2,623.00 1.10 2,885.30
m2 2,623.00 25.76 67,568.48
m2 1,275.44 45.66 58,236.59
m3 524.60 488.81 256,429.73
m2 2,655.00 24.29 64,489.95
m 998.60 3.41 3,405.23
m2 2,623.00 2.40 6,295.20
13,947.89
m2 71.52 4.08 291.80
m2 71.52 1.10 78.67
m2 71.52 25.76 1,842.36
m2 47.99 45.66 2,191.22
m3 15.36 488.81 7,508.12
m2 71.52 24.29 1,737.22
m 37.20 3.41 126.85
m2 71.52 2.40 171.65
6,268.37
m2 28.20 4.08 115.06
m2 28.20 1.10 31.02
m2 28.20 25.76 726.43
m2 30.08 45.66 1,373.45
m3 5.64 488.81 2,756.89
m2 28.20 24.29 684.98
m2 28.20 2.40 67.68
m 150.40 3.41 512.86
139,563.63
m2 231.00 4.08 942.48
m2 231.00 1.10 254.10
m2 231.00 3.51 810.81
m2 1,884.96 45.66 86,067.27
m3 92.40 488.81 45,166.04
m2 231.00 24.29 5,610.99
m2 231.00 2.40 554.40
m 46.20 3.41 157.54
109,544.32
m2 577.50 4.08 2,356.20
m2 577.50 1.10 635.25
m2 577.50 3.51 2,027.03
m 788.29 19.82 15,623.91
m3 93.84 488.81 45,869.93
m2 646.73 24.29 15,709.07
m2 646.73 2.40 1,552.15
m 4,746.00 5.43 25,770.78
6,796.37
m2 43.57 4.08 177.77
m2 43.57 1.10 47.93
m 105.78 19.82 2,096.56
m3 6.54 555.39 3,632.25
m2 43.57 2.40 104.57
m 105.78 6.97 737.29
59,558.81
m2 395.66 10.69 4,229.61
m 1,225.00 2.86 3,503.50
m 2,450.00 21.13 51,768.50
m 20.00 2.86 57.20
182,533.90
94,850.00
GLB 1.00 2,500.00 2,500.00
GLB 1.00 33,600.00 33,600.00
GLB 1.00 7,500.00 7,500.00
GLB 1.00 7,500.00 7,500.00
GLB 1.00 25,150.00 25,150.00
GLB 1.00 18,600.00 18,600.00
87,683.90
GLB 1.00 6,300.00 6,300.00
GLB 1.00 56,901.89 56,901.89
GLB 1.00 7,055.59 7,055.59
GLB 1.00 7,490.59 7,490.59
GLB 1.00 7,254.00 7,254.00
GLB 1.00 2,681.83 2,681.83
33,881.50
GLB 1.00 2,500.00 2,500.00
GLB 1.00 7,500.00 7,500.00
GLB 1.00 1,125.00 1,125.00
GLB 1.00 9,450.00 9,450.00
GLB 1.00 5,806.50 5,806.50
GLB 1.00 7,500.00 7,500.00
2,038.55
und 5.00 407.71 2,038.55
189,267.14
und 20.00 449.82 8,996.40
und 110.00 220.01 24,201.10
und 110.00 220.01 24,201.10
und 110.00 287.31 31,604.10
m2 10,415.70 0.58 6,041.11
GLB 1.00 87,223.33 87,223.33
GLB 1.00 7,000.00 7,000.00