1.01.02 CONSUMO DE FLUIDO ELECTRICO PARA LA OBRA glb 1.00 500.00 500.00
1.01.03 CONSUMO DE AGUA PARA LA OBRA glb 1.00 200.00 200.00
1.01.04 CASETA P/GUARDIANIA Y ALMACEN glb 1.00 800.00 800.00
1.01.05 DEPOSITO PROVICIONAL PARA AGUA glb 1.00 120.00 120.00
1.01.07 PLAN DE CONTINGENCIA SEGURIDAD DE OBRA glb 1.00 3000.00 3000.00
2.01.01 MOVIMIENTO DE TIERRAS
2.01.02 TRAZO NIVEL Y REPLANTEO m2 80.00 3.00 240.00
2.01.03 LIMPIEZA DEL TERRENO MANUAL m2 80.00 0.80 64.00
2.01.05 NIVELACION Y COMPACTACION DE TERRENO m2 80.00 1.50 120.00
2.01.06 ESCAVACION DE ZANJAS ,CIMIENTOS ,ZAPATAS m3 53.66 20.00 1073.19
2.01.07 RELLENO CON MATERIAL PROPIO PARA CIMIENTOS m3 21.72 10.00 217.23
2.01.09 ACARREO DE MATERIAL EXEDENTE m3 31.94 20.00 638.73
2.00 ESTRUCTURAS
OBRAS DE CONCRETO SIMPLE
2.01.09 CIMIENTOS CORRIDOS
CONCRETO CIMIENTOS CORRIDOS MEZCLA 1:10 + 30% PIEDRA GRANDE m3 10.76 233.85 2515.06
FALSO PISO
2.01.09 FALSO PISO CONCRETO 1:10 e= 8 cm. INCLUYE PATIOS LIBRES Y/O m2 72.41 31.40 2273.67
ESTACIONAMIENTO
* los precios de los costos unitarios estan en realcion a los materiales locales del departamento de piura febrero-marzo 2020 sin incluir IGV.
marzo 2020 sin incluir IGV.
PLANTILLA DE METRADO
Presupuesto
Cliente
Lugar
Fecha
MEDIDAS (m)
ITEM DESCRIPCION UND Nº VECES
CANTIDAD LARGO ANCHO
VIGAS DE CIMENTACION m3
EJEB ENTRE 1-4 1.00 1.00 3.00 0.30
EJE 2 ENTRE B-C 1.00 1.00 2.75 0.30
EJE 3 ENTRE B-C 1.00 1.00 2.75 0.30
ZAPATAS m3
Z2 12.00 1.00 1.30 1.50
ZAPATAS
Z2 12.00 1.00 1.30 1.50
FALSO PISO
m3
FALSO PISO CONCRETO 1:10 e= 8 cm. INCLUYE PATIOS LIBRES Y/O ESTACIONAMIENTO
AMBIENTES
SALA COMEDOR 28.75 area
COCHERA 25.40 area
COCINA 8.90 area
SS.HH 2.87 area
PISO DEBAJO DE ESCLAERA Y PASE 6.49 area
ENCOFRADO Y DESENCOFRADO
EJE 1 ENTRE A-B 1.00 2.00 2.85 area
EJE 1 ENTRE B-C 1.00 2.00 4.25 area
EJE 2 ENTRE A-B 1.00 2.00 2.85 area
EJE 3 ENTRE A-B 1.00 2.00 2.85 area
EJE 3-4 ENTRE A-B 1.00 2.00 5.15 area
EJE 4 ENTRE A-B 1.00 2.00 1.85 area
EJE 4 ENTRE B-C 1.00 2.00 4.25 area
EJE A ENTRE 1-2 1.00 2.00 3.10 area
EJE A ENTRE 2-3 1.00 2.00 2.44 area
EJE A ENTRE 3-4 1.00 2.00 2.97 area
EJE B ENTRE 3-4 1.00 2.00 1.32 area
EJE C ENTRE 2-3 1.00 2.00 1.44 area
EJE C ENTRE 3-4 1.00 2.00 3.26 area
3.02.01 ZAPATAS
ENCOFRADO Y DESENCOFRADO
Z2 12.00 1.00 1.30 1.50
4.02.00 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg
3.02.01 COLUMNAS
C1
12 1.00 0.25 0.25
VIGAS DE CIMENTACION
ENCOFRADO Y DESENCOFRADO
LOSA ALIGERADA
VIGAS VA-1
ENCOFRADO Y DESENCOFRADO
FRISOS
GENERAL 1.00 1.00 42.50 area
3.02.01 ARQUITECTURA
tarrajeo 7.1
muros 8.51
6.1
10.4 2
2.47 2
4 2
columnas 0.6 12
derrames puertas
ventanas
cielo raso
total
MEDIDAS (m)
PARCIAL
ALTURA
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
80.00
80.00
80.00
80.00
53.66
1.20 0.97
1.20 1.98
1.20 0.97
1.20 0.97
1.20 3.38
1.20 0.97
1.20 1.98
1.20 0.75
1.20 0.82
1.20 0.83
1.20 0.75
1.20 0.82
1.20 0.83
1.45 1.31
1.45 1.20
1.45 1.20
1.45 33.93
21.72
0.30 8.63
0.30 7.62
0.30 2.67
0.30 0.86
0.30 1.95
31.94
10.76
0.90 0.73
0.90 1.49
0.90 0.73
0.90 0.73
0.90 1.27
0.90 0.73
0.90 1.49
0.90 0.56
0.90 0.62
0.90 0.62
0.90 0.56
0.90 0.62
0.90 0.62
11.95
area 0.81
area 1.65
area 0.81
area 0.81
area 1.41
area 0.81
area 1.65
area 0.63
area 0.69
area 0.69
area 0.63
area 0.69
area 0.69
2.55
area 0.90
area 0.83
area 0.83
23.40
23.40
23.40
23.40
72.41
72.41
2.60
0.45 0.19
0.45 0.29
0.45 0.19
0.45 0.19
0.45 0.35
0.45 0.12
0.45 0.29
0.45 0.21
0.45 0.16
0.45 0.20
0.45 0.09
0.45 0.10
0.45 0.22
34.72
0.45 2.57
0.45 3.83
0.45 2.57
0.45 2.57
0.45 4.64
0.45 1.67
0.45 3.83
0.45 2.79
0.45 2.20
0.45 2.67
0.45 1.19
0.45 1.30
0.45 2.93
18.72
0.80 18.72
67.20
67.20
2.25
25.92
3.00 2.25
25.92
3.00 25.92
1.15
7.65
1.15
0.45 0.41
0.45 0.37
0.45 0.37
7.65
0.45 2.70
0.45 2.48
0.45 2.48
4.04
0.20 0.17
0.20 0.26
0.20 0.05
0.20 0.17
0.20 0.26
0.20 0.05
0.20 0.17
0.20 0.26
0.20 0.05
0.20 0.19
0.20 0.15
0.20 0.20
0.20 0.17
0.20 0.26
0.20 0.05
0.20 0.19
0.20 0.15
0.20 0.19
0.20 0.15
0.20 0.20
0.20 0.19
0.20 0.20
0.20 0.15
0.20 0.10
0.20 0.14
8.50
0.20 8.50
0.09 5.44
60.47
8.33 503.72
94.94
3.00 8.55
3.00 12.75
1.00 2.85
1.00 2.85
3.00 15.45
3.00 5.55
3.00 12.75
3.00 9.30
3.00 7.32
3.00 8.91
3.00 3.96
1.00 1.44
1.00 3.26
3.00 21.30
3.00 25.53
3.00 18.30
1.00 20.8
3.00 14.82
2.10 16.8
3.00 21.60
9
12
81.23
241.38
ACERO
Proyecto
Metrados ESTRUCTURAS
Prop.
SBC-1
EJE 1 ENTRE A-C 6 0.25 8.00 8.25 49.5
EJE 2 ENTRE A-B 6 0.25 2.30 2.55 15.3
EJE 3 ENTRE A-B 6 0.25 2.30 2.55 15.3
EJE 3-4 ENTRE A-B 6 0.25 4.60 4.85 29.1
EJE 4 ENTRE A-C 6 0.25 8.00 8.25 49.5
EJE A ENTRE 1-4 6 0.25 10.00 10.25 61.5
EJE B ENTRE 3-4 6 0.25 3.70 3.95 23.7
EJE C ENTRE 1-4 6 0.25 10.00 10.25 61.5
ESTRIBOS
EJE 1 ENTRE A-B 23 2.85
EJE 1 ENTRE B-C 30 4.25
EJE 2 ENTRE A-B 23 2.85
EJE 3 ENTRE A-B 23 2.85
EJE 3-4 ENTRE A-B 34 5.15
EJE 4 ENTRE A-B 18 1.85
EJE 4 ENTRE B-C 30 4.25
EJE A ENTRE 1-2 24 3.10
SOBRECIMIENTO EJE A ENTRE 2-3 21 2.44
S EJE A ENTRE 3-4 23 2.97
EJE B ENTRE 3-4 15 1.32
EJE C ENTRE 2-3 16 1.44
EJE C ENTRE 3-4 25 3.26
estribos
LONGITUD DE ESTRIBO
principal 303 1.00 0.17 1.30 1.47 446.00
5/8" 3/4"
4,403.06
0.00 0.00
1.56 2.24
0.00 0.00
282.52
SUSTENTO DE MATERIALES Y MANO DE OBRA
Presupuesto VIVIENDA VILLA HERMOSA
CEMENTO
ESTRUCTURAS (bolsas)
2.00
3.02.00 OBRAS DE CONCRETO ARMADO
3.02.01 COLUMNAS
4.02.00 CONCRETO f'c=210 kg/cm2 CEMENTO PACASMAYO MS m3 2.25 21.9
3.00.00 ARQUITECTURA
4.02.00 MUROS DE LADRILLO kk DE 18 HUECOS m2 94.94 20.7
ACERO DE AMARRE REFUERZO EN MUROS DE LADRILLO kg 95.47
JUNTA ENTRE COLUMNAS CON TECNOPRTK 1" (plancha) ml 12.00
TARRAJEO m2 241.38 28.2
desperdicio % 5 1.05
115.65
RESUMEN
LISTA DE MATERIALES CANTIDAD PRECIO PARCIAL
CEMENTO (bolsas) 116 S/27.00 S/3,122.66
ARENA GRUESA (m3) 7 S/35.00 S/228.38
ARENA FINA (m3) 4 S/35.00 S/141.93
HORMIGON (m3) 0 S/45.00 S/0.00
PIEDRA CHANCADA DE 1/2" (m3) 4 S/80.00 S/280.06
PIEDRA PILCA GRANDE (m3) 0 S/70.00 S/0.00
VARILLA DE 5/8" (und) 86 S/65.00 S/5,596.50
VARILLA DE 1/2" (und) 28 S/28.00 S/787.92
LARILLO KK 24X12X9 (und) 3888 S/1.40 S/5,442.91
VARILLA DE 3/8" (und) 42 S/22.00 S/924.00
VARILLA DE 1/4" (und) 0 S/17.00 S/0.00
ALAMBRE N #16 (kg) 25 S/7.00 S/175.00
ALAMBRE N #8 (kg) 7 S/9.50 S/66.50
JUNTA ENTRE COLUMNAS CON TECNOPRTK 1" (plancha) 2 S/7.00 S/14.00
LADRILLO TECHO .30X.30X.15 (und) 529 S/2.00 S/1,057.80
S/17,837.67
MANO DE OBRA
PARTIDAS UND METRADO
CIMIENTOS Ancho.0.60 ,H=0.90 ML 13.25
CIMIENTOS Ancho.0.50 ,H=0.90 ML 8.00
ZAPATAS (1.35x1.50x0.80) UND 12
VIGA DE CIMENTACION 30x30 cm ML 19.10
SOLADOS e=4" M2 #REF!
COMPACTACION DE HORMIGON e=4"(vigas,
M2 #REF!
zapatas,cimientos)
FALSO PISO H=8cm M2 #REF!
SOBRECIMIENTOS Ancho.0.15 ,H=45 ML 38.58
COLUMNAS UND 12
MUROS DE LADRILLO M2 94.94
LOSA ALIGERADA M2 81.23
TARRAJEO MUROS M2 117.55
TARRAJEO COLUMNAS M2 21.60
TARRAJEO DERRAME PUERTAS Y VENTANAS M2 21.00
TARRAJEO CIELO RASO M2 81.23
materiales
PIEDRA
ARENA HORMI PIEDRA LARILLO KK
ARENA PILCA VARILLA DE VARILLA DE VARILLA DE
GRUESA GON CHANCADA 24X12X9
FINA (m3) GRANDE 5/8" (und) 1/2" (und) 3/8" (und)
(m3) (m3) DE 1/2" (m3) (und)
(m3)
1.170 1.193
2.101 2.142
2.9 3702.66
10.40
3.862
1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05
6.53 4.06 0.00 3.50 0.00 86.10 28.14 3887.79 42.00
VARILLA DE ALAMBRE
1/4" (und) N #16 (kg)
1.05
0.00
RESUMEN
LISTA DE MATERIALES CANTIDAD PRECIO PARCIAL
CEMENTO (bolsas) 116 S/27.00 S/3,122.66
ARENA GRUESA (m3) 7 S/35.00 S/228.38
MANO DE OBRA
PARTIDAS UND METRADO
DEMOLICION
MUROS M2 29.15
LOSA(ALEROS) M2 12.60
DESMONTAJE DE PUERTAS UND
(1.00X2.70) 1.00
DESMONTAJE DE VENTANAS UND
(1.70X.35) 1.00
(1.90X1.44) 1.00
(1.50X1.70) 1.00
DESMONTAJE DE PORTON UND
(2.47X2.70) 1.00
DINTELES EN VANOS ML 2.63
ACARREO DE MATERIAL EXEDENTE M3 6.89
CONSTRUCCION
CIMIENTOS Ancho.0.60 ,H=0.90 ML 13.25
CIMIENTOS Ancho.0.50 ,H=0.90 ML 8.00
ZAPATAS (1.35x1.50x0.80) UND 12.00
VIGA DE CIMENTACION 30x30 cm ML 19.10
SOLADOS e=4" M2 #REF!
* los precios de los costos unitarios estan en realcion a los materiales locales del departamento de piura ENERO -2020 sin incluir IGV.