Acumulado Julio SPTMF
Acumulado Julio SPTMF
PRESUPUETARIA
DETALLE DE PAC
PROVISIÓN E INSTALACIÓN DE EQUIPOS DE
1 TELECOMUNICACIONES Y RADAR PARA SISTEMA DE 840104
VTS CONTROL DE TRÁFICO MARÍTIMO
Fiscalización IMPLEMENTACIÓN DE VTS CONTROLDE
2 TRÁFICO MARÍTIMO 730604
RENOVACIÓNYADQUISICIÓNDE BANDERASPARA
9 DIFERENTESÁREASINTERNAS YEXTERNASDE 531408
AUTORIDADPORTUARIA DE GUAYAQUIL
PROCESOS CERTIFICADOS
CONTRATOS SUSCRITOS
CONTRATOS PAGADOS EN SU TOTALIDAD
FORMATO 3
REFORMAS
PRESUPUESTO
INICIAL Y/O CODIFICADO (1) CUATRIMESTRE ENERO
TRASPASOS
CI C2 C3 COMPROMETIDO DEVENGADO
833,439.90 833,439.90 C1
41,466.10 41,466.10 C1
62,604.99 62,604.99 C2
510,049.81 510,049.81 C2
3,600.20 3,600.20 C2
9,000.00 9,000.00 C1
30,000.00 30,000.00 C1
18,000.00 18,000.00 C1
36,000.00 36,000.00 C1
21,000.00 21,000.00 C2
12,000.00 12,000.00 C2
25,000.00 25,000.00 C1
17,000.00 17,000.00 C1
9,000.00 9,000.00 C1
7,099.68 7,099.68 C1
15,000.00 15,000.00 C1
7,099.68 7,099.68 C1
17,700.00 17,700.00 C2
7,099.68 7,099.68 C2
53,571.43 53,571.43 C2
3,000.00 3,000.00 C1
45,000.00 45,000.00 C2
38,000.00 38,000.00 C1
31,500.00 31,500.00 C2
16,730.00 16,730.00 C2
48,000.00 48,000.00 C1
10,000.00 10,000.00 C1
6,000.00 6,000.00 C1
18,500.00 18,500.00 C1
110,000.00 110,000.00 C2
55,000.00 55,000.00 C1
45,000.00 45,000.00 C1
25,000.00 25,000.00 C2
192,500.00 192,500.00 C1
10,000.00 10,000.00 C2
10,000.00 10,000.00 C1
18,000.00 18,000.00 C2
20,000.00 20,000.00 C1
32,000.00 32,000.00 C2
17,500.00 17,500.00 C2
42,999.97 - 42,999.97 - C1
20,000.00 - 20,000.00 - C1
1,564,535.90 3,831,425.76
ENERO FEBRERO MARZO ABRIL
PAGADO
F
AUTORIDAD PO
PROCE
TIPO DE
CODIGO DEL PROCESO CONTRATACION DETALLE
ENERO
LAS ÁREAS SE ENCUENTRAN INCORPORANDO LAS OBSERVACIONES REALIZADAS A LA DOCUMENTACIÒN DE LOS PROC
1 EL PROCESO FUE DECLARADO DESIERTO CON RESOLUCIÒN NRO. APG-APG-2020-019-R DEL 09/04/2020
2 SE ENCUENTRA EN PROCESO DE CONTRATACIÒN
3 EL PROCESO FUE DECLARADO DESIERTO CON RESOLUCIÓN NRO. APG-APG-2020-034-R DEL 24/06/2020
4 SE REMITIÓ AL ÁREA JURÍDICA LA DOCUMENTACIÓN PARA LA ELABORACIÓN DEL CONTRATO
5 SE ENCUENTRA EN PROCESO DE CONTRATACIÒN
6 EL PROCESO FUE DECLARADO DESIERTO CON RESOLUCIÓN NRO. APG-APG-2020-033-R DEL 24/06/2020
FORMATO 4
MODALIDA
D DE ESTADO PRESUPUESTO FECHA VALOR DEL TIEMPO
DEL ADJUDICAC
CONTRATA PROCESO REFERENCIAL ION CONTRATO EJECUCION
CION
ESOS DE CONTRATACIÓN.
ESOS DE CONTRATACIÓN.
RÈGIMEN ADJUDICADO
ESPECIAL (4) 849,046.44 5/25/2020 849,046.44 153 DÌAS
PRESUPUESTO
INGRESOS
TASAS GENERALES
TASAS PORTUARIAS Y AEROPORTUARIAS
TASAS DIVERSAS (CONCESIONES PORTUARIAS)
RENTAS DE INVERSIONES Y MULTAS
CUENTAS PENDIENTES POR COBRAR
OTROS INGRESOS
EGRESOS
GRUPO 51 GASTOS EN PERSONAL
GRUPO 53 BIENES Y SERVICIOS DE CONSUMO
GRUPO 57 OTROS GASTOS CORRIENTES
GRUPO 58 TRANSFERENCIAS Y DONACIONES CORRIENTES
GRUPO 73 BIENES Y SERVICIOS PARA INVERSION
GRUPO 75 OBRAS PUBLICAS
GRUPO 84 BIENES DE LARGA DURACION
GRUPO 99 OTROS PASIVOS
DETALLE DE PAI
DETALLE DE PAPP
CODIGO OBJETIVO ESTRATEGICO INSTITUCIONAL
E PAPP
PRESUPUESTO PRESUPUESTO INICIAL ANUAL REFORMAS Y/O TRASPASOS CODIFICADO ANUAL(3)
TRIMESTRE
OPERATIVO 2,885,229.60 - 73,849.07 2,811,380.53
OPERATIVO
PAGADO
TRIMESTRE
INVERSION
INVERSION
PAGADO
TRIMESTRE
OPERATIVO 2,163,922.20 73,849.07 2,237,771.27
OPERATIVO
PAGADO
TRIMESTRE
INVERSION 979,895.00 - 979,895.00
INVERSION
PAGADO
TRIMESTRE
OPERATIVO 2,119,625.00 - 2,119,625.00
OPERATIVO
PAGADO
TRIMESTRE
INVERSION
INVERSION
PAGADO
TRIMESTRE
OPERATIVO
1,803,268.50 100,000.00 1,903,268.50
OPERATIVO
PAGADO
TRIMESTRE
INVERSION
INVERSION
PAGADO
TRIMESTRE
OPERATIVO 360,653.70 - 100,000.00 260,653.70
OPERATIVO
PAGADO
TRIMESTRE
INVERSION
INVERSION
PAGADO
10,312,594.00 - 10,312,594.00
FORMATO 5
ENERO
4,123,636.88 1,169,082.09
7,046.50 6,056.50
187,343.87 127,135.79
3,883,058.41 1,007,727.27
31,046.88 22,950.43
0.00 0.00
15,141.22 5,212.10
230,818.37
2,811,380.53
246,962.85
2,237,771.27
0.00
979,894.72
- - - ###
529,906.25
2,119,625.00
224,261.48
1,903,268.50
28,852.30
260,653.70
10,312,594
FEBRERO MARZO
230,818.37
246,962.85
0.00
- - - ### - - - ###
529,906.25
224,261.48
28,852.30
1,541,879.51
1,211,796.43
195,496.44
- - - ### - -
508,710.00
1,009,830.36
101,966.07
0.00
1,541,879.51
50,524.99
### 48,453.21 54,298.13 66,634.76
1,211,796.43
195,496.44
- ### - - - ###
508,710.00
1,009,830.36
101,966.07
375,079.85
281,309.89
- - - ### - -
445,248.25
- - - ### - -
508,710.00
- - - ### - -
254,424.91
- - - ### - -
46,884.98
- - - ### - -
STO SEPTIEMBRE OCTUBRE
9.85
0.00
### 0.00 0.00 0.00 0.00
9.89
- ### - - - -
8.25
- ### - - - -
0.00
- ### - - - -
4.91
- ### - - - -
.98
- ### - - - -
OCTUBRE NOVIEMBRE
663,602.81
0.00 0.00
### 0.00 0.00 0.00
###
497,702.11
- - ### - - - ###
339,150.03
- - ### - - - ###
572,298.75
- - ### - - - ###
414,751.76
- - ### - - - ###
82,950.35
- - ### - - - ###
DICIEMBRE
- - -
- - -
- - -
- - -
- - -
COMPROMETIDO DEVENGADO RECAUDADO
0.00 13,815,661.37 13,505,263.41
0.00 40,308.67 39,223.67
0.00 953,482.57 827,946.98
0.00 12,441,425.13 12,340,347.50
0.00 196,327.63 133,227.25
0.00 0.00 0.00
0.00 184,117.37 164,518.01
- - -
AUTORIDAD PORTUARIA DE GUAYAQUIL
OBRAS
CIVILES
MANTENIMIENTOS
INFRAESTRUCTURA
ESTUDIOS
PRELIMINARES
DEFINITIVOS
FISCALIZACION
PRELIMINARES
FISCALIZACIÓN INTEGRAL DEL DRAGADO DE
MANTENIMIENTO DEL CANAL DE ACCESO AL
PUERTO MARÍTIMO DE GUAYAQUIL INCLUYE
MONITOREO Y AUDITORÍA AMBIENTAL (Contrato
No. 22-2014) (3)
DEFINITIVOS
NUEVOS PROYECTOS
DENOMINACIÓN
DEFINITIVOS
18 de
15 de Agosto de 04 de Marzo del
2013 $ 50,927,731.23 Septiembre del 2019
2013
05 de 05 de
septiembre de $ 2,944,496.93 septiembre de 30 de noviembre
de 2019
2014 2014
17 de diciembre $ 377,986.30
17 Diciembre 17 de octubre
de 2014 de 2014 de 2015
reajustes definitivos de las planillas 29; 30; 31; 32; 33; 36; y 40, por un valor de $212.408,60 incl. IVA; Las plan
licitud de asignación de recursos.
os, se encontro errores en el sistema que no pudieron ser resueltos por nuestro ente rector por encontrarse en c
formes o productos del componente ambiental en los formatos que indique AUTORIDAD PORTUARIA DE GUAYAQ
del contrato.
FORMATO 6
25,935,365.64 232,856.42
47,218,037.11 5,761,222.78
$ 2,883,264.89 $ 347,520.77
340,022.89 40,802.75
IMPLEMENTACIÓN DE VTS
(CONTROL DE TRÁFICO MARÍTIMO)
TOTAL
n valor de $212.408,60 incl. IVA; Las planillas fueron devueltas por que el valor de factura fue mayor al proyecta
nuestro ente rector por encontrarse en cierre del ejercicio fiscal. Por otro lado DIGEIM-SERDRA de forma verbal
que AUTORIDAD PORTUARIA DE GUAYAQUIL en función de lo requerido por el Ministerio de Ambiente, utilizand
FORMATO 6
INFORMACIÓN REQUERIDA
CODIFICADO AÑO ACTUAL VALOR PROGRAMADO AÑO 2021 VALOR PROGRAMADO AÑO 2022
$ -
$ -
$ -
$ - -
$ 979,895.00
$ 979,895.00
ctura fue mayor al proyectado acorde al cronograma de cierre, se deshabilitó los traspasos presupuestarios para
M-SERDRA de forma verbal a través de sus técnico insiste que los reajustes de las planillas 53-54-55 se deben r
erio de Ambiente, utilizando la información de campo recopilada durante el dragado del canal de acceso al puer
VALOR COMPROMETIDO AÑO ACTUAL VALOR VALOR
DEVENGADO AÑO ACTUAL PAGADO AÑO ACTUAL
- - -
- - -
$ - $ - $ -
- - -
- - -
ó los traspasos presupuestarios para asignar recursos, se encontro errores en el sistema que no pudieron ser re
de las planillas 53-54-55 se deben revisar y aplicar los índices en los meses de pago de las planillas, sin consid
dragado del canal de acceso al puerto según el contrato No. 22-2014. Se está actualizando información admini
PORCENTAJE VALOR REAJUSTE IVA EN LAS PLANILLAS DE
AVANCE TOTAL DE LA PRECIOS ACTUAL REAJUSTES VALOR ACTUAL DE LA OBRA
OBRA
97.90% $ - $ - $ 418,789.05
ue no pudieron ser resueltos por nuestro ente rector por encontrarse en cierre del ejercicio
s planillas, sin considerar que han existido atrasos imputables a la fiscalización. Se esta
o información administrativa y cronogramas requeridos para la presentación ante el