PARA FIRMA DE CONTRATO

CRONOGRAMA DE AVANCE DE OBRA: CAO


PLAZO DE EJECUCION
ACTIVIDADES DURACION PARCIAL
1° SEMANA 2° SEMANA
CERCO PERIMETRICO 2 2000.00
TRAZO Y NIVELACION 1 850.00
EXCAVACION 7 3640.00
CIMIENTO CORRIDO 4 8724.00
ACERO DE ZAPATAS 2 437.00
CONCRETO ZAPATAS 4 2178.00

CRONOGRAMA DE AVANCE VALORIZADO DE OBRA: CAVO


AVANCES
ACTIVIDADES DURACION PARCIAL
1° SEMANA 2° SEMANA
CERCO PERIMETRICO 2 2,000.00 2,000.00
TRAZO Y NIVELACION 1 850.00 850.00
EXCAVACION 7 3,640.00 2,600.00 1,040.00
CIMIENTO CORRIDO 4 8,724.00 2,181.00 6,543.00
ACERO DE ZAPATAS 2 437.00 0.00 437.00
CONCRETO ZAPATAS 4 2178.00 0.00 1,633.50

CD 17,829.00 7,631.00 9,653.50


GG 1,782.90 763.10 965.35
UTIL 1,782.90 763.10 965.35
SUBTOTAL 21,394.80 180,000.00 11,584.20
IGV 3,851.06 32,400.00 2,085.16
TOTAL 25,245.86 212,400.00 13,669.36
AVANCE PARCIAL 841.33% 54.14%
AVANCE ACUMULADO 841.33% 895.47%
PLAZO DE EJECUCION
2° SEMANA 3° SEMANA 4° SEMANA

AVANCES
2° SEMANA 3° SEMANA TOTALES
2,000.00
850.00
1,040.00 3,640.00
6,543.00 8,724.00
437.00 437.00
1,633.50 544.50 2,178.00

9,653.50 544.50
965.35 54.45
965.35 54.45
11,584.20 653.40
2,085.16 117.61
13,669.36 771.01
54.14% 3.05%
895.47% 898.52% 898.52%