OBRA : EDIFICIO COMERCIAL

L.P. No. : 007 - 2005 - ENTIDAD


CONTRATISTA : CONSTRUCTORES ASOCIADOS
SUPERVISOR : ING. CARLOS VERA GOMEZ AREA GEOGRAFICA No. 04

FORMULA POLINOMICA DE ESTRUCTURAS

COD ELEMENTO NOM COEFIC. INCIDEN. I. BASE


JUNIO\97 AGOSTO SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE ENERO

47 MANO OBRA J 0.335 1.0000 258.94 258.94 258.94 258.94 258.94 258.94
0.335 0.335 0.335 0.335 0.335 0.335
21 CEMENTO T. I 0.4058 263.35 268.71 268.71 268.71 271.70 271.92
22 CEMENTO T. II CC 0.138 0.5942 248.15 248.15 248.15 248.15 251.83 252.60
0.138 0.139 0.139 0.139 0.141 0.141
38 HORMIGON 0.3962 257.81 261.84 261.84 261.84 261.84 261.84
05 AGRG.GRUESO AH 0.053 0.6038 283.24 283.24 283.24 283.24 283.24 269.07
0.053 0.053 0.053 0.053 0.053 0.052
02 ACERO LISO 0.1667 208.94 209.78 209.08 210.58 214.81 213.71
03 ACERO CORRUG. AA 0.078 0.8333 207.50 208.34 207.63 209.12 213.33 212.24
0.078 0.078 0.078 0.079 0.080 0.080
30 DOLAR MAS INF. 0.3284 245.27 247.04 246.04 247.81 253.72 255.08
17 BLOQUE LAD. BD 0.067 0.6716 307.44 304.15 302.09 299.95 298.47 301.97
0.067 0.067 0.066 0.066 0.066 0.067
44 MADERA TERC. 0.1605 239.34 240.34 240.51 241.18 244.45 246.11
43 MADERA NAC. MMM 0.162 0.3272 288.66 299.04 294.87 294.95 297.43 296.27
48 M. Y EQUIPO N. 0.5123 246.25 246.33 245.61 247.52 252.06 251.82
0.162 0.164 0.163 0.164 0.166 0.166
39 INDICE GRAL. GU 0.167 1.0000 242.96 245.53 246.25 246.62 246.82 248.39
0.167 0.169 0.169 0.170 0.170 0.171

TOTAL 1.000 1.005 1.004 1.006 1.012 1.012


OBRA : EDIFICIO COMERCIAL
L.P. No. : 007 - 2005 - ENTIDAD
CONTRATISTA : CONSTRUCTORES ASOCIADOS
SUPERVISOR : ING. CARLOS VERA GOMEZ AREA GEOGRAFICA No. 04

FORMULA POLINOMICA DE ARQUITECTURA

COD ELEMENTO NOM COEFIC. INCID. I. BASE


JUNIO\97 AGOSTO SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE ENERO

47 MANO OBRA J 0.389 1.0000 258.94 258.94 258.94 258.94 258.94 258.94
0.389 0.389 0.389 0.389 0.389 0.389
21 CEMENTO T. I 0.4066 263.35 268.71 268.71 268.71 271.70 271.92
22 CEMENTO T. II CC 0.091 0.5934 248.15 248.15 248.15 248.15 251.83 252.60
0.091 0.092 0.092 0.092 0.093 0.093
17 BLOQUE Y LAD 0.1644 307.44 304.15 302.09 299.95 298.47 301.97
04 A.FINO PAB 0.073 0.3151 277.59 281.92 281.92 281.92 281.92 281.92
54 PINTURA LATEX 0.5205 263.69 263.69 264.70 266.88 267.71 267.71
0.073 0.073 0.073 0.074 0.074 0.074
51 PERFIL AC. LIV. P 0.122 1.0000 200.24 200.70 200.00 201.44 205.74 205.02
0.122 0.122 0.122 0.123 0.125 0.125
26 CERRAJERIA N. 0.2295 225.27 225.86 225.29 226.45 227.84 227.69
65 TUB.AC.NEGRO DTC 0.061 0.2951 178.45 185.16 185.50 190.45 196.21 196.00
30 DOLAR MAS INF. 0.4754 245.27 247.04 246.04 247.81 253.72 255.08
0.061 0.062 0.062 0.063 0.064 0.064
48 M. Y EQUIPO N. 0.3814 246.25 246.33 245.61 247.52 252.06 251.82
43 MADERA NAC. MM 0.097 0.6186 288.66 299.04 294.87 294.95 297.43 296.27
0.097 0.099 0.098 0.098 0.100 0.099
39 INDICE GRAL. GU 0.167 1.0000 242.96 245.53 246.25 246.62 246.82 248.39
0.167 0.169 0.169 0.170 0.170 0.171

TOTAL 1.000 1.006 1.005 1.008 1.014 1.015


OBRA : EDIFICIO COMERCIAL
L.P. No. : 007 - 2005 - ENTIDAD
CONTRATISTA : CONSTRUCTORES ASOCIADOS
SUPERVISOR : ING. CARLOS VERA GOMEZ AREA GEOGRAFICA No. 04

FORMULA POLINOMICA DE INSTALACION SANITARIA

COD ELEMENTO NOM COEFIC. INCID. I. BASE


JUNIO\97 AGOSTO SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE ENERO

47 MANO DE OBRA J 0.315 1.0000 258.94 258.94 258.94 258.94 258.94 258.94
0.315 0.315 0.315 0.315 0.315 0.315
10 APARATO SAN. A 0.102 1.0000 215.59 215.09 215.01 215.87 216.02 219.03
0.102 0.102 0.102 0.102 0.102 0.104
77 VALVULA BRON. 0.1872 229.52 229.52 229.33 229.74 230.54 230.51
65 TUB.AC.NEGRO TTV 0.187 0.3262 178.45 185.16 185.50 190.45 196.21 196.00
72 TUB.PVC AGUA 0.4866 218.35 218.63 217.91 220.25 222.84 222.82
0.187 0.189 0.189 0.192 0.195 0.195
21 CEMENTO T. I 0.1500 263.35 268.71 268.71 268.71 271.70 271.92
30 DOLAR MAS INF. DC 0.100 0.8500 245.27 247.04 246.04 247.81 253.72 255.08
0.100 0.101 0.101 0.101 0.103 0.104
48 MAQ. EQU.NAC. M 0.129 1.0000 246.25 246.33 245.61 247.52 252.06 251.82
0.129 0.129 0.129 0.130 0.132 0.132
39 INDICE GRAL. GU 0.167 1.0000 242.96 245.53 246.25 246.62 246.82 248.39
0.167 0.169 0.169 0.170 0.170 0.171

TOTAL 1.000 1.005 1.004 1.009 1.017 1.020


OBRA : EDIFICIO COMERCIAL
L.P. No. : 007 - 2005 - ENTIDAD
CONTRATISTA : CONSTRUCTORES ASOCIADOS
SUPERVISOR : ING. CARLOS VERA GOMEZ AREA GEOGRAFICA No. 04

FORMULA POLINOMICA DE INSTALACION ELECTRICA

COD ELEMENTO NOM COEFIC. INCID. I. BASE


JUNIO\97 AGOSTO SETIEMBRE OCTUBRE NOVIEMBREDICIEMBRE ENERO

47 MANO OBRA J 0.194 1.0000 258.94 258.94 258.94 258.94 258.94 258.94
0.194 0.194 0.194 0.194 0.194 0.194
11 ART.ALUM.EXT. 0.2575 214.41 214.49 213.76 215.30 219.90 219.66
12 ART.ALUM.INT. AA 0.369 0.7425 201.04 201.12 199.93 201.88 206.20 205.97
0.369 0.369 0.367 0.371 0.378 0.378
72 T.PVC ELECT. 0.2625 218.35 218.63 217.91 220.25 222.84 222.82
19 CABLE NYY ACT 0.160 0.3500 316.13 316.20 315.14 317.39 319.83 319.48
07 ALAMB.CAB.TW 0.3875 313.63 304.05 303.09 305.37 304.74 304.12
0.160 0.158 0.158 0.159 0.160 0.160
30 DOLAR MAS INF. 0.1909 245.27 247.04 246.04 247.81 253.72 255.08
56 PLANCHA A.LAC PPD 0.110 0.3636 189.49 189.56 188.92 190.28 194.34 194.13
62 POSTE CONCRETO 0.4455 195.64 195.66 195.49 195.84 196.89 196.83
0.110 0.110 0.110 0.110 0.112 0.112
39 INDICE GRAL. GU 0.167 1.0000 242.96 245.53 246.25 246.62 246.82 248.39
0.167 0.169 0.169 0.170 0.170 0.171

TOTAL 1.000 1.000 0.998 1.003 1.014 1.014


OBRA : EDIFICIO COMERCIAL
L.P. No. : Nº 007-2005-ENTIDAD
CONTRATISTA : CONSTRUCTORES ASOCIADOS
SUPERVISOR : ING. CARLOS VERA GOMEZ

DEDUCCIONES POR ADELANTO EN EFECTIVO

ADELANTO EN EFECTI: S/. 72,572.00 (S/IGV)


MONTO DE CONTRATO: S/. 362861,52 (S/IGV)

D = V x A x ( Kr / Ka - 1 ) / C

VALORIZACIONES MONTO ADELANTO MONTO COEFICIENTES DEDUCCION


No. MES VALORIZADO (V) (A) CONTRATO (C) Kr Ka (D)
ESTRUCTURAS
01 SET/2005 54043.60 43136.80 215680.85 1.006 1.004 21.53
02 OCT/2005 84185.87 1.012 1.004 134.16
03 NOV/2005 51290.28 1.012 1.004 81.74
04 DIC/2005 21089.91 1.012 1.004 33.61
05 ENE/2006 5071.13 1.012 1.004 8.08

SUB TOTAL 215680.79 43136.80 215680.85 279.12


ARQUITECTURA
01 SET/2005 805.82 23571.39 117857.98 1.008 1.005 0.48
02 OCT/2005 583.57 1.014 1.005 1.05
03 NOV/2005 22608.42 1.015 1.005 44.99
04 DIC/2005 60015.96 1.015 1.005 119.43
05 ENE/2006 32471.30 1.015 1.005 64.62

SUB TOTAL 116485.07 23571.39 117857.98 230.57


INST.SANITARIA
01 SET/2005 0.00 2569.04 12841.16 1.009 1.004 0.00
02 OCT/2005 353.07 1.017 1.004 0.91
03 NOV/2005 1530.41 1.020 1.004 4.88
04 DIC/2005 5007.01 1.020 1.004 15.96
05 ENE/2006 5950.65 1.020 1.004 18.97

SUB TOTAL 12841.14 2569.04 12841.16 40.72


INST.ELECTRICA
01 SET/2005 0.00 3294.77 16481.53 1.003 1.000 0.00
02 OCT/2005 895.79 1.014 1.000 2.51
03 NOV/2005 1581.26 1.014 1.000 4.43
04 DIC/2005 3237.89 1.014 1.000 9.07
05 ENE/2006 10766.58 1.014 1.000 30.15

SUB TOTAL 16481.52 3294.77 16481.53 46.16

TOTAL S/. 361488.52 72572.00 362861.52 596.57


OBRA : EDIFICIO COMERCIAL
L.P. No. : Nº 007-2005-ENTIDAD
CONTRATISTA : CONSTRUCTORES ASOCIADOS
SUPERVISOR : ING. CARLOS VERA GOMEZ

DEDUCCION DE REAJUSTE QUE NO CORRESPONDE

MATERIAL VALORIZACION MONTO ADEL.OTORGADOSCOEF.INC. INDICES ADELANTO


MONTO MAX.
ADELANTO AMORTIZAC
SALDO DELDEDUCCION
INDICE VALORIZ. MONTO FECHA FORM. Io Ia Ir UTILIZADOUTILIZABLEDEDUCIBLEPTE.VALORI
ADELANTO
No. MES (1) (2) (3) (4) (5) (6) (7)=3*1 (8)=2*(4/5) (9)=8-7 7*5/4 7*(6-5)/4

ESTRUCTURAS
CEMEN.I 01 SET/05 ### ### SET/05 0.0560 263.35 268.71 268.71 3026.44 ### 7721.02 3088.04 7878.16 0.00
(21) 02 OCT/05 ### 0.0560 263.35 268.71 268.71 4714.41 ### 6033.05 4810.36 3067.80 0.00
03 NOV/05 ### 0.0560 263.35 268.71 271.70 2872.26 ### 7875.20 2930.72 137.08 32.61
04 DIC/05 ### 0.0560 263.35 268.71 271.92 1181.03 ### 9566.43 137.08 0.00 14.40
05 ENE/06 ### 0.0560 263.35 268.71 271.92 283.98 ### ### 0.00 0.00 0.00
CEMEN.I 01 SET/05 ### ### SET/05 0.0820 248.15 248.15 248.15 4431.58 ### 7747.37 4431.58 7747.37 0.00
(22) 02 OCT/05 ### 0.0820 248.15 248.15 248.15 6903.24 ### 5275.71 6903.24 844.13 0.00
03 NOV/05 ### 0.0820 248.15 248.15 251.83 4205.80 ### 7973.15 844.13 0.00 62.37
04 DIC/05 ### 0.0820 248.15 248.15 252.60 1729.37 ### ### 0.00 0.00 31.01
05 ENE/06 ### 0.0820 248.15 248.15 252.60 415.83 ### ### 0.00 0.00 0.00
ACERO C 01 SET/05 ### ### SET/05 0.0650 207.50 208.34 208.34 3512.83 ### ### 3527.05 ### 0.00
(03) 02 OCT/05 ### 0.0650 207.50 207.63 209.12 5472.08 ### 8506.16 5475.51 4984.44 39.29
03 NOV/05 ### 0.0650 207.50 207.63 213.33 3333.87 ### ### 3335.96 1648.48 91.58
04 DIC/05 ### 0.0650 207.50 207.63 212.24 1370.84 ### ### 1648.48 0.00 30.46
05 ENE/06 ### 0.0650 207.50 207.63 212.24 329.62 ### ### 0.00 0.00 0.00
LADRILL 01 SET/05 ### ### SET/05 0.0450 307.44 304.15 304.15 2431.96 3790.56 1358.60 2405.93 1344.07 0.00
(17) 02 OCT/05 ### 0.0450 307.44 304.15 299.95 3788.36 3790.56 2.20 1344.07 0.00 0.00
03 NOV/05 ### 0.0450 307.44 304.15 298.47 2308.06 3790.56 1482.50 0.00 0.00 0.00
04 DIC/05 ### 0.0450 307.44 304.15 301.97 949.05 3790.56 2841.51 0.00 0.00 0.00
05 ENE/06 ### 0.0450 307.44 304.15 301.97 228.20 3790.56 3562.36 0.00 0.00 0.00
AGRE.GR 01 SET/05 ### ### SET/05 0.0320 283.24 283.24 283.24 1729.40 1870.00 140.60 1729.40 140.60 0.00
(05) 02 OCT/05 ### 0.0320 283.24 283.24 283.24 2693.95 1870.00 -823.95 140.60 0.00 0.00
03 NOV/05 ### 0.0320 283.24 283.24 283.24 1641.29 1870.00 228.71 0.00 0.00 0.00
04 DIC/05 ### 0.0320 283.24 283.24 269.07 674.88 1870.00 1195.12 0.00 0.00 0.00
05 ENE/06 ### 0.0320 283.24 283.24 269.07 162.28 1870.00 1707.72 0.00 0.00 0.00
HORMIG 01 SET/05 ### ### SET/05 0.0210 257.81 261.84 261.84 1134.92 1919.99 785.07 1152.66 797.34 0.00
(38) 02 OCT/05 ### 0.0210 257.81 261.84 261.84 1767.90 1919.99 152.09 797.34 0.00 0.00
03 NOV/05 ### 0.0210 257.81 261.84 261.84 1077.10 1919.99 842.89 0.00 0.00 0.00
04 DIC/05 ### 0.0210 257.81 261.84 261.84 442.89 1919.99 1477.10 0.00 0.00 0.00
05 ENE/06 ### 0.0210 257.81 261.84 261.84 106.49 1919.99 1813.50 0.00 0.00 0.00
MAD.NAC 01 SET/05 ### ### SET/05 0.0530 288.66 299.04 299.04 2864.31 6770.30 3905.99 2967.31 4046.44 0.00
(43) 02 OCT/05 ### 0.0530 288.66 294.87 294.95 4461.85 6866.04 2404.19 4046.44 0.00 1.24
03 NOV/05 ### 0.0530 288.66 294.87 297.43 2718.38 6866.04 4147.66 0.00 0.00 24.11
04 DIC/05 ### 0.0530 288.66 294.87 296.27 1117.77 6866.04 5748.27 0.00 0.00 5.42
05 ENE/06 ### 0.0530 288.66 294.87 296.27 268.77 6866.04 6597.27 0.00 0.00 0.00

TOTAL ESTRUCTURAS ### ### 332.49


ARQUITECTURA
CEMEN.I 01 SET/05 805.82 ### SET/05 0.0370 263.35 268.71 268.71 29.82 3509.37 3479.55 30.43 3550.37 0.00
(21) 02 OCT/05 583.57 0.0370 263.35 268.71 268.71 21.59 3509.37 3487.78 22.03 3528.34 0.00
03 NOV/05 ### 0.0370 263.35 268.71 271.70 836.51 3509.37 2672.86 853.54 2674.81 9.50
04 DIC/05 ### 0.0370 263.35 268.71 271.92 2220.59 3509.37 1288.78 2674.81 0.00 27.07
05 ENE/06 ### 0.0370 263.35 268.71 271.92 1201.44 3509.37 2307.93 0.00 0.00 0.00
CEMEN.I 01 SET/05 805.82 ### SET/05 0.0540 248.15 248.15 248.15 43.51 4391.05 4347.54 43.51 4347.54 0.00
(22) 02 OCT/05 583.57 0.0540 248.15 248.15 248.15 31.51 4391.05 4359.54 31.51 4316.03 0.00
03 NOV/05 ### 0.0540 248.15 248.15 251.83 1220.85 4391.05 3170.20 1220.85 3095.18 18.10
04 DIC/05 ### 0.0540 248.15 248.15 252.60 3240.86 4391.05 1150.19 3095.18 0.00 58.12
05 ENE/06 ### 0.0540 248.15 248.15 252.60 1753.45 4391.05 2637.60 0.00 0.00 0.00
AGREG.F 01 SET/05 805.82 ### SET/05 0.0230 277.59 281.92 281.92 18.53 2358.22 2339.69 18.82 2376.18 0.00
(04) 02 OCT/05 583.57 0.0230 277.59 281.92 281.92 13.42 2358.22 2344.80 13.63 2362.55 0.00
03 NOV/05 ### 0.0230 277.59 281.92 281.92 519.99 2358.22 1838.23 528.10 1834.45 0.00
04 DIC/05 ### 0.0230 277.59 281.92 281.92 1380.37 2358.22 977.85 1834.45 0.00 0.00
05 ENE/06 ### 0.0230 277.59 281.92 281.92 746.84 2358.22 1611.38 0.00 0.00 0.00
MADERA 01 SET/05 805.82 ### SET/05 0.0600 288.66 299.04 299.04 48.35 4436.71 4388.36 50.09 4546.16 0.00
(43) 02 OCT/05 583.57 0.0600 288.66 294.87 294.95 35.01 4499.45 4464.44 35.76 4510.40 0.01
03 NOV/05 ### 0.0600 288.66 294.87 297.43 1356.51 4499.45 3142.94 1385.69 3124.71 12.03
04 DIC/05 ### 0.0600 288.66 294.87 296.27 3600.96 4499.45 898.49 3124.71 0.00 17.46
05 ENE/06 ### 0.0600 288.66 294.87 296.27 1948.28 4499.45 2551.17 0.00 0.00 0.00
PER.AC.L 01 SET/05 805.82 ### SET/05 0.1220 200.24 200.70 200.70 98.31 4480.46 4382.15 98.54 4392.21 0.00
(51) 02 OCT/05 583.57 0.1220 200.24 200.00 201.44 71.20 4496.14 4424.94 71.11 4321.10 0.51
03 NOV/05 ### 0.1220 200.24 200.00 205.74 2758.23 4496.14 1737.91 2754.92 1566.18 79.07
04 DIC/05 ### 0.1220 200.24 200.00 205.02 7321.95 4496.14 ### 1566.18 0.00 183.56
05 ENE/06 ### 0.1220 200.24 200.00 205.02 3961.50 4496.14 534.64 0.00 0.00 0.00
TOTAL ARQUITECTURA ### ### 405.43

TOTAL ESTRUCTURAS + ARQU ### ### 737.92

EN LA VALORIZACION ANTERIOR ### 772.15

EN LA PRESENTE VALORIZACION 0.00 -34.23


OBRA : EDIFICIO COMERCIAL
L.P. No. : Nº 007-2005-ENTIDAD
CONTRATISTA : CONSTRUCTORES ASOCIADOS
SUPERVISOR : ING. CARLOS VERA GOMEZ

CALCULO DEL REINTEGRO MAXIMO

VALORIZACIONES PROGRAMADO EJECUTADO REINTEGRO DEDUCCIONES REINTEGRO


V K R R V K R R BRUTO ADELANTOADELANTO AUTORI-
No. MES V*(K-1) ACUMULADO V*(K-1) ACUMULADOAUTORIZADOEFECTIVOMATERIALES ZADO
ESTRUCTURAS
01 SET/05 33213.17 1.006 199.28 199.28 54043.60 1.006 324.26 324.26 324.26 21.53 0.00 302.73
02 OCT/05 60369.01 1.012 724.43 923.71 84185.87 1.012 1010.23 1334.49 1010.23 134.16 40.53 835.54
03 NOV/05 77026.32 1.012 924.32 1848.02 51290.28 1.012 615.48 1949.98 615.48 81.74 210.67 323.07
04 DIC/05 41191.17 1.012 494.29 2342.32 21089.91 1.012 253.08 2203.05 253.08 33.61 81.29 138.18
05 ENE/06 3881.18 1.012 46.57 2388.89 5071.13 1.012 60.85 2263.91 46.57 8.08 0.00 38.49

SUB-TOTAL ### 2388.89 ### 2263.91 2249.63 279.12 332.49 1638.02


EN VAL. ANTERIOR 1615.71
REINTEGRO A PAGAR 22.31
ARQUITECTURA
01 SET/05 11238.08 1.008 89.90 89.90 805.82 1.008 6.45 6.45 6.45 0.48 0.00 5.97
02 OCT/05 19366.93 1.014 271.14 361.04 583.57 1.014 8.17 14.62 8.17 1.05 0.52 6.60
03 NOV/05 33183.22 1.015 497.75 858.79 22608.42 1.015 339.13 353.74 339.13 44.99 118.70 175.44
04 DIC/05 37307.96 1.015 559.62 1418.41 60015.96 1.015 900.24 1253.98 559.62 119.43 286.21 153.98
05 ENE/06 16761.79 1.015 251.43 1669.84 32471.30 1.015 487.07 1741.05 251.43 64.62 0.00 186.81

SUB-TOTAL ### 1669.84 ### 1741.05 1164.79 230.57 405.43 528.79


EN VAL. ANTERIOR 270.00
REINTEGRO A PAGAR 258.79
INST. SANITARIA
01 SET/05 715.29 1.009 6.44 6.44 0.00 1.009 0.00 0.00 0.00 0.00 0.00
02 OCT/05 2366.75 1.017 40.23 46.67 353.07 1.017 6.00 6.00 6.00 0.91 5.09
03 NOV/05 4305.92 1.020 86.12 132.79 1530.41 1.020 30.61 36.61 30.61 4.88 25.73
04 DIC/05 4273.57 1.020 85.47 218.26 5007.01 1.020 100.14 136.75 85.47 15.96 69.51
05 ENE/06 1179.63 1.020 23.59 241.85 5950.65 1.020 119.01 255.76 23.59 18.97 4.62

SUB-TOTAL 12841.16 241.85 12841.14 255.76 145.67 40.72 0.00 104.95


EN VAL. ANTERIOR 86.83
REINTEGRO A PAGAR 18.12
INST. ELECTRICA
01 SET/05 250.58 1.003 0.75 0.75 0.00 1.003 0.00 0.00 0.00 0.00 0.00
02 OCT/05 1912.33 1.014 26.77 27.52 895.79 1.014 12.54 12.54 12.54 2.51 10.03
03 NOV/05 4579.72 1.014 64.12 91.64 1581.26 1.014 22.14 34.68 22.14 4.43 17.71
04 DIC/05 7891.10 1.014 110.48 202.12 3237.89 1.014 45.33 80.01 45.33 9.07 36.26
05 ENE/06 1847.80 1.014 25.87 227.99 10766.58 1.014 150.73 230.74 25.87 30.15 -4.28

SUB-TOTAL 16481.53 227.99 16481.52 230.74 105.88 46.16 0.00 59.72


EN VAL. ANTERIOR 64.00
REINTEGRO A PAGAR -4.28

TOTAL S/. ### 4528.57 ### ### 3665.97 596.57 737.92 2331.48
AMORTIZACION DEL ADELANTO EN EFECTIVO

OBRA : EDIFICIO COMERCIAL


L.P. No. : Nº 007-2005-ENTIDAD
CONTRATISTA : CONSTRUCTORES ASOCIADOS
SUPERVISOR : ING. CARLOS VERA GOMEZ
ADEL.EFECTIVO : S/. 72,572.00
FECHA DE PAGO : 05.09.2005

MONTO CONTRATADO : 362,861.52 A/C= 0.200000


VALORIZACION MONTO AMORTIZACION SALDO POR
No. MES VALORIZADO DEL ADELANTO AMORTIZAR

01 SET/2005 54,849.42 10,969.88 61,602.12

02 OCT/2005 86,018.31 17,203.66 44,398.45

03 NOV/2005 77,010.36 15,402.07 28,996.38

04 DIC/2005 89,350.77 17,870.15 11,126.23

05 ENE/2006 54,259.66 11,126.23 0.00

TOTAL 361,488.52 72,572.00


OBRA : EDIFICIO COMERCIAL
L.P. No. : Nº 007-2005-ENTIDAD
CONTRATISTA : CONSTRUCTORES ASOCIADOS
SUPERVISOR : ING. CARLOS VERA GOMEZ

DEDUCCION DE REAJUSTE QUE NO CORRESPONDE

MATERIAL VALORIZACION MONTO ADEL.OTORGADOS COEF.INC. INDICES ADELANTOMONTO MAX.ADELANTO AMORTIZACISALDO DELDEDUCCION
INDICE VALORIZADO MONTO FECHA FORM. Io Ia Ir UTILIZADO UTILIZABLE DEDUCIBLE PTE.VALORIZADELANTO
No. MES (1) (2) (3) (4) (5) (6) (7)=3*1 (8)=2*(4/5) (9)=8-7 7*5/4 7*(6-5)/4

ESTRUCTURAS
CEMEN.I 01 SET\97 54043.60 10966.20 SET/97 0.0560 263.35 268.71 268.71 3026.44 10747.46 7721.02 3088.04 7878.16 0.00
(21) 02 OCT\97 84185.87 0.0560 263.35 268.71 268.71 4714.41 10747.46 6033.05 4810.36 3067.80 0.00
03 NOV\97 51290.28 0.0560 263.35 268.71 271.70 2872.26 10747.46 7875.20 2930.72 137.08 32.61
04 DIC\97 21089.91 0.0560 263.35 268.71 271.92 1181.03 10747.46 9566.43 137.08 0.00 14.40
05 ENE\98 5071.13 0.0560 263.35 268.71 271.92 283.98 10747.46 10463.48 0.00 0.00 0.00
CEMEN.II 01 SET\97 54043.60 12178.95 SET/97 0.0820 248.15 248.15 248.15 4431.58 12178.95 7747.37 4431.58 7747.37 0.00
(22) 02 OCT\97 84185.87 0.0820 248.15 248.15 248.15 6903.24 12178.95 5275.71 6903.24 844.13 0.00
03 NOV\97 51290.28 0.0820 248.15 248.15 251.83 4205.80 12178.95 7973.15 844.13 0.00 62.37
04 DIC\97 21089.91 0.0820 248.15 248.15 252.60 1729.37 12178.95 10449.58 0.00 0.00 31.01
05 ENE\98 5071.13 0.0820 248.15 248.15 252.60 415.83 12178.95 11763.12 0.00 0.00 0.00
ACERO CO01 SET\97 54043.60 13987.00 SET/97 0.0650 207.50 208.34 208.34 3512.83 13930.61 10417.78 3527.05 10459.95 0.00
(03) 02 OCT\97 84185.87 0.0650 207.50 207.63 209.12 5472.08 13978.24 8506.16 5475.51 4984.44 39.29
03 NOV\97 51290.28 0.0650 207.50 207.63 213.33 3333.87 13978.24 10644.37 3335.96 1648.48 91.58
04 DIC\97 21089.91 0.0650 207.50 207.63 212.24 1370.84 13978.24 12607.40 1648.48 0.00 30.46
05 ENE\98 5071.13 0.0650 207.50 207.63 212.24 329.62 13978.24 13648.62 0.00 0.00 0.00
LADRILLO 01 SET\97 54043.60 3750.00 SET/97 0.0450 307.44 304.15 304.15 2431.96 3790.56 1358.60 2405.93 1344.07 0.00
(17) 02 OCT\97 84185.87 0.0450 307.44 304.15 299.95 3788.36 3790.56 2.20 1344.07 0.00 0.00
03 NOV\97 51290.28 0.0450 307.44 304.15 298.47 2308.06 3790.56 1482.50 0.00 0.00 0.00
04 DIC\97 21089.91 0.0450 307.44 304.15 301.97 949.05 3790.56 2841.51 0.00 0.00 0.00
05 ENE\98 5071.13 0.0450 307.44 304.15 301.97 228.20 3790.56 3562.36 0.00 0.00 0.00
AGRE.GR. 01 SET\97 54043.60 1870.00 SET/97 0.0320 283.24 283.24 283.24 1729.40 1870.00 140.60 1729.40 140.60 0.00
(05) 02 OCT\97 84185.87 0.0320 283.24 283.24 283.24 2693.95 1870.00 -823.95 140.60 0.00 0.00
03 NOV\97 51290.28 0.0320 283.24 283.24 283.24 1641.29 1870.00 228.71 0.00 0.00 0.00
04 DIC\97 21089.91 0.0320 283.24 283.24 269.07 674.88 1870.00 1195.12 0.00 0.00 0.00
05 ENE\98 5071.13 0.0320 283.24 283.24 269.07 162.28 1870.00 1707.72 0.00 0.00 0.00
HORMIGO 01 SET\97 54043.60 1950.00 SET/97 0.0210 257.81 261.84 261.84 1134.92 1919.99 785.07 1152.66 797.34 0.00
(38) 02 OCT\97 84185.87 0.0210 257.81 261.84 261.84 1767.90 1919.99 152.09 797.34 0.00 0.00
03 NOV\97 51290.28 0.0210 257.81 261.84 261.84 1077.10 1919.99 842.89 0.00 0.00 0.00
04 DIC\97 21089.91 0.0210 257.81 261.84 261.84 442.89 1919.99 1477.10 0.00 0.00 0.00
05 ENE\98 5071.13 0.0210 257.81 261.84 261.84 106.49 1919.99 1813.50 0.00 0.00 0.00
MAD.NAC. 01 SET\97 54043.60 7013.75 SET/97 0.0530 288.66 299.04 299.04 2864.31 6770.30 3905.99 2967.31 4046.44 0.00
(43) 02 OCT\97 84185.87 0.0530 288.66 294.87 294.95 4461.85 6866.04 2404.19 4046.44 0.00 1.24
03 NOV\97 51290.28 0.0530 288.66 294.87 297.43 2718.38 6866.04 4147.66 0.00 0.00 24.11
04 DIC\97 21089.91 0.0530 288.66 294.87 296.27 1117.77 6866.04 5748.27 0.00 0.00 5.42
05 ENE\98 5071.13 0.0530 288.66 294.87 296.27 268.77 6866.04 6597.27 0.00 0.00 0.00

TOTAL ESTRUCTURAS 51715.90 51715.90 332.49


ARQUITECTURA
CEMEN.I 01 SET\97 805.82 3580.80 SET/97 0.0370 263.35 268.71 268.71 29.82 3509.37 3479.55 30.43 3550.37 0.00
(21) 02 OCT\97 583.57 0.0370 263.35 268.71 268.71 21.59 3509.37 3487.78 22.03 3528.34 0.00
03 NOV\97 22608.42 0.0370 263.35 268.71 271.70 836.51 3509.37 2672.86 853.54 2674.81 9.50
04 DIC\97 60015.96 0.0370 263.35 268.71 271.92 2220.59 3509.37 1288.78 2674.81 0.00 27.07
05 ENE\98 32471.30 0.0370 263.35 268.71 271.92 1201.44 3509.37 2307.93 0.00 0.00 0.00
CEMEN.II 01 SET\97 805.82 4391.05 SET/97 0.0540 248.15 248.15 248.15 43.51 4391.05 4347.54 43.51 4347.54 0.00
(22) 02 OCT\97 583.57 0.0540 248.15 248.15 248.15 31.51 4391.05 4359.54 31.51 4316.03 0.00
03 NOV\97 22608.42 0.0540 248.15 248.15 251.83 1220.85 4391.05 3170.20 1220.85 3095.18 18.10
04 DIC\97 60015.96 0.0540 248.15 248.15 252.60 3240.86 4391.05 1150.19 3095.18 0.00 58.12
05 ENE\98 32471.30 0.0540 248.15 248.15 252.60 1753.45 4391.05 2637.60 0.00 0.00 0.00
AGREG.FI. 01 SET\97 805.82 2395.00 SET/97 0.0230 277.59 281.92 281.92 18.53 2358.22 2339.69 18.82 2376.18 0.00
(04) 02 OCT\97 583.57 0.0230 277.59 281.92 281.92 13.42 2358.22 2344.80 13.63 2362.55 0.00
03 NOV\97 22608.42 0.0230 277.59 281.92 281.92 519.99 2358.22 1838.23 528.10 1834.45 0.00
04 DIC\97 60015.96 0.0230 277.59 281.92 281.92 1380.37 2358.22 977.85 1834.45 0.00 0.00
05 ENE\98 32471.30 0.0230 277.59 281.92 281.92 746.84 2358.22 1611.38 0.00 0.00 0.00
MADERA 01 SET\97 805.82 4596.25 SET/97 0.0600 288.66 299.04 299.04 48.35 4436.71 4388.36 50.09 4546.16 0.00
(43) 02 OCT\97 583.57 0.0600 288.66 294.87 294.95 35.01 4499.45 4464.44 35.76 4510.40 0.01
03 NOV\97 22608.42 0.0600 288.66 294.87 297.43 1356.51 4499.45 3142.94 1385.69 3124.71 12.03
04 DIC\97 60015.96 0.0600 288.66 294.87 296.27 3600.96 4499.45 898.49 3124.71 0.00 17.46
05 ENE\98 32471.30 0.0600 288.66 294.87 296.27 1948.28 4499.45 2551.17 0.00 0.00 0.00
PER.AC.LI. 01 SET\97 805.82 4490.75 SET/97 0.1220 200.24 200.70 200.70 98.31 4480.46 4382.15 98.54 4392.21 0.00
(51) 02 OCT\97 583.57 0.1220 200.24 200.00 201.44 71.20 4496.14 4424.94 71.11 4321.10 0.51
03 NOV\97 22608.42 0.1220 200.24 200.00 205.74 2758.23 4496.14 1737.91 2754.92 1566.18 79.07
04 DIC\97 60015.96 0.1220 200.24 200.00 205.02 7321.95 4496.14 -2825.81 1566.18 0.00 183.56
05 ENE\98 32471.30 0.1220 200.24 200.00 205.02 3961.50 4496.14 534.64 0.00 0.00 0.00
TOTAL ARQUITECTURA 19453.85 19453.86 405.43

TOTAL ESTRUCTURAS + ARQUITEC 71169.75 71169.76 737.92

EN LA VALORIZACION ANTERIOR 71169.76 772.15

EN LA PRESENTE VALORIZACION 0.00 -34.23


CALCULO DE LA MULTA

OBRA : EDIFICIO COMERCIAL


L.P. Nº : Nº 007-2005-ENTIDAD
CONTRATISTA : CONSTRUCTORES ASOCIADOS
Monto Contrato, con IGV: 428,176.59

MULTA POR RETRASO EN LA ENTREGA DE LA OBRA

A Determinación del retraso en la terminación de la obra :

1 Fecha de inicio del plazo 06 - set - 2005


2 Plazo contractual, en días calendario 135 días calendarios
3 Fecha de término de plazo contractual original 18 - ene - 2006
4 Ampliaciones de plazo 0
5 Plazo vigente (plazo original + ampliaciones) : PV 135 días calendarios
6 Fecha de vencimiento del plazo vigente 18 - ene - 2006
7 Fecha de término de la obra, según Supervisor 27 - ene - 2006
(Asiento Nº 287 Folio Nº 038 del C. de Obra 03)
8 Dias de retraso : A7 - A 6 = 9 días calendarios

B Determinación del retraso en la subsanación de observaciones :

1 Fecha del Acta de Constatación Física


2 1/12 del plazo vigente : A5 / 12 11 días calendarios
3 Fecha Máxima para subsanar observaciones : B1 + B2
4 Fecha de término de subsanación de observaciones
(Asiento Nº , folio Nº , del C. De Obra 03)
5 Días de atraso en subsanar observaciones ( B4 - B3 )

C Atraso Total : A8 + B5 = 9 días calendarios

D Multa por retraso en la entrega de la obra :

Tope Multa = 5% del ContratoVigente


= 21,408.83
Multa = Contrato Vigente, con IGV x Atraso Total en d.c. x 9/10000
= 3,468.23

Multa a considerar = 3,468.23


OBRA : EDIFICIO COMERCIAL
L.P. No. : Nº 007-2005-ENTIDAD
CONTRATISTA : CONSTRUCTORES ASOCIADOS
SUPERVISOR : ING. CARLOS VERA GOMEZ

RESUMEN DE VALORIZACION MENSUAL No. 05


MES : ENERO 2006

MONTO VAL. ACUMULADA VALORIZACION VAL. ACUMULADA % SALDO POR


DESCRIPCION CONTRACTUAL ANTERIOR ACTUAL ACTUAL AVANCE VALORIZAR

VALORIZACION CONTRACTUAL (V)


FORMULA No. 01 ESTRUCTURAS 215,680.85 210,609.66 5,071.13 215,680.79 100.00% 0.06
FORMULA No. 02 ARQUITECTURA 117,857.98 84,013.77 32,471.30 116,485.07 98.84% 1,372.91
FORMULA No. 03 INST. SANITARIA 12,841.16 6,890.49 5,950.65 12,841.14 100.00% 0.02
FORMULA No. 01 INST. ELECTRICA 16,481.53 5,714.94 10,766.58 16,481.52 100.00% 0.01
----------------- ----------------- ----------------- ----------------- -----------------
TOTAL CONTRACTUAL 362,861.52 307,228.86 54,259.66 361,488.52 1,373.00

% DE AVANCE DE OBRA A LA FECHA 84.67% 14.95% 99.62% 0.38%

REAJUSTES (R)
FORMULA No. 01 ESTRUCTURAS 1,615.71 22.31 1,638.02
FORMULA No. 02 ARQUITECTURA 270.10 258.79 528.89
FORMULA No. 03 INST. SANITARIA 86.83 18.12 104.95
FORMULA No. 01 INST. ELECTRICA 64.00 (4.28) 59.72
----------------- ----------------- -----------------
TOTAL REAJUSTES 2,036.64 294.94 2,331.58

VALORIZACION BRUTA ( VB = V + R ) 309,265.50 54,554.60 363,820.10

AMORTIZACIONES (A)
AMORTIZACION DE ADEL. EFECTIVO 72,572.00 61,445.76 11,126.23 72,571.99 0.01
AMORTIZACION DE MATERIALES 71,170.00 71,169.75 0.00 71,169.75 0.25
----------------- ----------------- ----------------- ----------------- -----------------
TOTAL DE AMORTIZACIONES 143,742.00 132,615.51 11,126.23 143,741.74 0.26

VALORIZACION NETA ( VN = VB - A ) 176,649.99 43,428.37 220,078.36

GASTOS DE LICITACION (L) 0.00 0.00 0.00

MULTA POR ATRAZO DE OBRA (M) 0.00 3,468.23 3,468.23

MONTOS A PAGAR AL CONTRATISTA :

EN EFECTIVO ( VN - FG - L - M ) 176,649.99 39,960.14 216,610.13


EN I.G.V. ( VN * 0.19 ) 33,563.50 8,251.39 41,814.89
----------------- ----------------- -----------------
MONTO TOTAL CON IGV 210,213.49 48,211.53 258,425.02

TOTAL COMPROMISO ( INCLUYE IGV ) 210,213.49 48,211.53 258,425.02


INFORME No. 057-2006-GO

A : XXX
Gerente de Administración

DE : YYY
Gerente de Obras

ASUNTO : Valorizacion de ObraNº 05


CONTRATISTA: CONSTRUCTORES ASOCIADOS

REF. : L.P. No. 007-2005-ENTIDAD


Obra: EDIFICIO COMERCIAL

FECHA : Arequipa,

Me dirijo a ustedes, para remitirle adjunto al presente, el expediente de la Nº 05 de la obra de la


referencia, correspondiente a los trabajos efectuados en el mes de ENERO de 2006 por el Contratista
CONSTRUCTORES ASOCIADOS y cuyos cálculos elaborados por el Supervisor externo y
en nuestra Gerencia son los siguientes:

A. VALORIZACION CONTRACTUAL (V)


Estructuras 5,071.13
Arquitectura 32,471.30
Inst.Sanitarias 5,950.65
Inst.Electricas 10,766.58
SUB-TOTAL 54,259.66

AVANCE DE OBRA A LA FECHA 100.00%


AVANCE PROGRAMADO ACUM. 100.00%

B. REAJUSTE ( R )
Estructuras 22.31
Arquitectura 258.79
Inst.Sanitarias 18.12
Inst.Electricas (4.28)
SUB-TOTAL 294.94

MONTO DE LA VALORIZACION BRUTA (VB) 54,554.60

C. DEDUCCION
Am. Ad. Efectivo 11,126.23
Am. Ad. Materiales 0.00
Total Deducciones 11,126.23

MONTO DE LA VALORIZACION NETA (VN) 43,428.37

F. MULTA POR ATRASO DE OBRA 3,468.23

G. MONTO A PAGAR AL CONTRATISTA

En Efectivo 39,960.14
En IGV 8,251.39

MONTO TOTAL DE LA VALORIZACION CON IGV 48,211.53

H. COMPROMISO A SOLICITAR 51,679.76

Se hace de conocimiento, que el contratista antes de efectuar el cobro de la factura correspondiente a la


presente Valorización, deberá entregar los Comprobantes de Pago de las aportaciones a ESSALUD, AFP,
CONAFOVICER, SENCICO y otros, conforme a los dispositivos legales vigentes.