Proyecto : "PLAN DE LIMPIEZA Y DESCOLMATACIÓN DEL CAUCE DEL RÍO ALIS EN LOS TRAMOS CAÑON DE UCHCO Y TRAMO HUACTA DEL DISTRITO ALIS, PROVINCIA YAUYOS - LIMA"
Ubicación : Dist. ALIS; Prov: YAUYOS; Región; LIMA
Elaborado FECHA: Febrero-2020 : 30 Días Calendario
ORAY
CRONOGRAMA VALORIZADO DE OBRA
Proyecto : "CONSTRUCCION DE ESCALINATAS Y MEJORAMIENTO DE LA INFRAESTRUCTURA TURISTICA EN EL SECTOR CAIDA DEL ANGEL DEL DISTRITO DE ALIS, PROVINCIA DE YAUYOS-L
Ubicación : Dist. ALIS; Prov: YAUYOS; Región; LIMA
Elaborado FECHA: febrero- 2020 : 60 Días Calendario
ORAY
06.03.00 OBRAS DE CONCRETO ARMADO #NAME? #NAME? #NAME? #NAME?
06.04.00 CARPINTERIA DE MADERA #NAME? #NAME? #NAME? #NAME?
06.05.00 CARPINTERIA METALICA #NAME? #NAME? #NAME? #NAME?
06.06.00 CERRAJERIA #NAME? #NAME? #NAME? #NAME?
06.07.00 APARATOS Y ACCESORIOS SANITARIOS #NAME? #NAME? #NAME? #NAME?
06.08.00 VARIOS #NAME? #NAME? #NAME? #NAME?
07.00.00 ESCALINATAS
07.01.00 OBRAS PRELIMINARES #NAME? #NAME? #NAME? #NAME? #NAME?
07.02.00 MOVIMIENTO DE TIERRAS #NAME? #NAME? #NAME? #NAME? #NAME?
07.03.00 OBRAS DE CONCRETO SIMPLE #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
07.04.00 OBRAS DE CONCRETO ARMADO #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
07.05.00 VARIOS #NAME? #NAME? #NAME? #NAME? #NAME?
08.00.00 MIRADOR
08.01.00 OBRAS PRELIMINARES #NAME? #NAME? #NAME? #NAME?
08.02.00 MOVIMIENTO DE TIERRAS #NAME? #NAME? #NAME? #NAME?
08.03.00 OBRAS DE CONCRETO SIMPLE #NAME? #NAME? #NAME? #NAME?
08.04.00 ESTRUCTURA DE MADERA #NAME? #NAME? #NAME? #NAME? #NAME?
08.05.00 PINTURA #NAME? #NAME? #NAME? #NAME?
09.00.00 VARIOS
09.01.00 FLETE TERRESTRE #NAME? #NAME? #NAME? #NAME? #NAME?
09.02.00 PRUEBAS A LA COMPRESION DE CONCRETO #NAME? #NAME? #NAME? #NAME? #NAME?
09.03.00 DISEÑO DE MEZCLA #NAME? #NAME? #NAME? #NAME?
10.00.00 ESTUDIO DE IMPACTO AMBIENTAL
10.01.00 ESTUDIO DE IMPACTO AMBIENTAL 24,795.00 100 24,795.00 24,795.00
COSTO DIRECTO #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Gastos Generales y Dirección Técnica 9.28% #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Utilidades 10 % #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
.
SUB TOTAL #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
IGV 18 % #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
PRESUPUESTO #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Supervision 4.19% #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
PRESUPUESTO TOTAL #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
% DE AVANCE #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
% DE AVANCE ACUMULADO #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
VALORIZACION MENSUAL
COSTO DIRECTO #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Gastos Generales y Dirección Técnica 9.28% #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Utilidades 10 % #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
.
SUB TOTAL #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
IGV 18 % #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
PRESUPUESTO #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Supervision 4.19% #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
PRESUPUESTO TOTAL #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
% DE AVANCE #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
% DE AVANCE ACUMULADO #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
ORAY
CRONOGRAMA BARRAS GANT DE OBRA
Proyecto : "CONSTRUCCION DE ESCALINATAS Y MEJORAMIENTO DE LA INFRAESTRUCTURA TURISTICA EN EL SECTOR CAIDA DEL ANGEL DEL DISTRITO DE A
Ubicación: Dist. ALIS; Prov: YAUYOS; Región; LIMA
Elaborado FECHA: FEBRERO- 2020 : 60 Días Calendario
04.00.00 PLAZOLETA
ORAY
04.01.00 TRABAJOS PRELIMINARES #NAME? #NAME? #NAME? #NAME?
06.00.00 LETRINAS
07.00.00 ESCALINATAS
07.03.00 OBRAS DE CONCRETO SIMPLE #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
07.04.00 OBRAS DE CONCRETO ARMADO #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
08.00.00 MIRADOR
09.00.00 VARIOS
ORAY
09.02.00 PRUEBAS A LA COMPRESION DE CONCRETO #NAME? #NAME? #NAME? #NAME? #NAME?
VALORIZACION MENSUAL
COSTO DIRECTO 209,185.17 100.00 65,281.74 35,477.02 29,943.67 37,837.93 12,915.91 15,227.59 9,048.63 3,452.69 209,185.17
Gastos Generales y Dirección Técnica 9.28% 19,412.17 100.00 6,058.08 3,292.23 2,778.74 3,511.32 1,198.58 1,413.11 839.70 320.41 19,412.17
Utilidades 10 % 20,918.52 100.00 6,528.17 3,547.70 2,994.37 3,783.79 1,291.59 1,522.76 904.86 345.27 20,918.52
.
SUB TOTAL 249,515.86 100.00 77,867.99 42,316.95 35,716.78 45,133.05 15,406.08 18,163.45 10,793.20 4,118.36 249,515.86
IGV 18 % 44,912.85 100.00 14,016.24 7,617.05 6,429.02 8,123.95 2,773.10 3,269.42 1,942.78 741.30 44,912.85
PRESUPUESTO 294,428.71 100.00 91,884.23 49,934.00 42,145.80 53,256.99 18,179.18 21,432.88 12,735.97 4,859.66 294,428.71
Supervision 4.19% 12,355.98 100.00 3,856.01 2,095.53 1,768.69 2,234.98 762.91 899.45 534.48 203.94 12,355.98
PRESUPUESTO TOTAL 306,784.69 100.00 187,624.46 101,963.53 86,060.29 108,748.97 37,121.27 43,765.20 26,006.42 9,923.27 306,784.69
% DE AVANCE 31.21% 16.96% 14.31% 18.09% 6.17% 7.28% 4.33% 1.65% 100.00%
% DE AVANCE ACUMULADO 31.21% 48.17% 62.48% 80.57% 86.74% 94.02% 98.35% 100.00% 100.00%